Schedule III Real Estate and Accumulated Depreciation - Real Estate and Accumulated Depreciation, by Property (Details) - USD ($) | Dec. 31, 2016 | Dec. 31, 2015 | Dec. 31, 2014 | Dec. 31, 2013 |
Initial Costs to Company | | | | |
Encumbrances | $ 30,310,000 | | | |
Land | 153,258,000 | | | |
Buildings and Improvements | 1,788,637,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 84,091,000 | | | |
Buildings and Improvements | 7,829,825,000 | | | |
Total Costs | | | | |
Land | 237,349,000 | | | |
Buildings and Improvements | 9,618,462,000 | | | |
Accumulated Depreciation | (3,175,972,000) | $ (2,595,648,000) | $ (2,242,345,000) | $ (1,904,311,000) |
Taxable basis in aggregate initial cost | 11,890,862,000 | | | |
Operating Lease [Member] | | | | |
Total Costs | | | | |
Initial cost | 0 | | | |
Americas | AT1 Atlanta [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 120,368,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 120,368,000 | | | |
Accumulated Depreciation | (33,293,000) | | | |
Americas | AT2 Atlanta [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 41,845,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 41,845,000 | | | |
Accumulated Depreciation | (16,871,000) | | | |
Americas | AT3 Atlanta [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,935,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,935,000 | | | |
Accumulated Depreciation | (1,257,000) | | | |
Americas | BO1 BOSTON (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,332,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,332,000 | | | |
Accumulated Depreciation | (5,999,000) | | | |
Americas | CH1 CHICAGO (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 155,387,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 155,387,000 | | | |
Accumulated Depreciation | (99,289,000) | | | |
Americas | CH2 CHICAGO (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 104,108,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 104,108,000 | | | |
Accumulated Depreciation | (48,677,000) | | | |
Americas | CH3 CHICAGO (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 9,759,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 351,000 | | | |
Buildings and Improvements | 229,398,000 | | | |
Total Costs | | | | |
Land | 10,110,000 | | | |
Buildings and Improvements | 229,398,000 | | | |
Accumulated Depreciation | (88,929,000) | | | |
Americas | CH4 CHICAGO (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,566,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,566,000 | | | |
Accumulated Depreciation | (8,181,000) | | | |
Americas | DA1 Dallas [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,407,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,407,000 | | | |
Accumulated Depreciation | (46,642,000) | | | |
Americas | DA2 Dallas [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 78,681,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 78,681,000 | | | |
Accumulated Depreciation | (17,561,000) | | | |
Americas | DA3 Dallas [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 85,099,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 85,099,000 | | | |
Accumulated Depreciation | (25,993,000) | | | |
Americas | DA4 Dallas [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,421,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,421,000 | | | |
Accumulated Depreciation | (7,702,000) | | | |
Americas | DA6 Dallas [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 20,522,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 83,115,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 103,637,000 | | | |
Accumulated Depreciation | (11,130,000) | | | |
Americas | DA7 Dallas [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,431,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,431,000 | | | |
Accumulated Depreciation | (2,351,000) | | | |
Americas | DC1 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,120,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,120,000 | | | |
Accumulated Depreciation | (363,000) | | | |
Americas | DC2 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 5,047,000 | | | |
Buildings and Improvements | 153,115,000 | | | |
Total Costs | | | | |
Land | 5,047,000 | | | |
Buildings and Improvements | 153,115,000 | | | |
Accumulated Depreciation | (126,299,000) | | | |
Americas | DC3 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 37,451,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 52,846,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 90,297,000 | | | |
Accumulated Depreciation | (46,073,000) | | | |
Americas | DC4 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,906,000 | | | |
Buildings and Improvements | 7,272,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 71,942,000 | | | |
Total Costs | | | | |
Land | 1,906,000 | | | |
Buildings and Improvements | 79,214,000 | | | |
Accumulated Depreciation | (46,128,000) | | | |
Americas | DC5 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 4,983,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 88,407,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 93,390,000 | | | |
Accumulated Depreciation | (52,407,000) | | | |
Americas | DC6 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 5,082,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 86,711,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 91,793,000 | | | |
Accumulated Depreciation | (35,116,000) | | | |
Americas | DC7 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,605,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,605,000 | | | |
Accumulated Depreciation | (10,099,000) | | | |
Americas | DC8 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,186,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,186,000 | | | |
Accumulated Depreciation | (4,614,000) | | | |
Americas | DC10 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 44,601,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 70,790,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 115,391,000 | | | |
Accumulated Depreciation | (30,595,000) | | | |
Americas | DC11 WASHINGTON, DC (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 5,082,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 165,021,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 170,103,000 | | | |
Accumulated Depreciation | (20,495,000) | | | |
Americas | DE1 DENVER (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,978,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,978,000 | | | |
Accumulated Depreciation | (5,968,000) | | | |
Americas | LA1 LOS ANGELES [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 110,624,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 110,624,000 | | | |
Accumulated Depreciation | (60,332,000) | | | |
Americas | LA2 LOS ANGELES [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,861,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,861,000 | | | |
Accumulated Depreciation | (9,870,000) | | | |
Americas | LA3 EL SEGUNDO [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 34,727,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,959,000 | | | |
Buildings and Improvements | 21,931,000 | | | |
Total Costs | | | | |
Land | 3,959,000 | | | |
Buildings and Improvements | 56,658,000 | | | |
Accumulated Depreciation | (42,651,000) | | | |
Americas | LA4 EL SEGUNDO [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 19,333,000 | | | |
Buildings and Improvements | 137,630,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 28,247,000 | | | |
Total Costs | | | | |
Land | 19,333,000 | | | |
Buildings and Improvements | 165,877,000 | | | |
Accumulated Depreciation | (60,398,000) | | | |
Americas | MI2 MIAMI (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,239,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,239,000 | | | |
Accumulated Depreciation | (10,570,000) | | | |
Americas | MI3 MIAMI (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 29,573,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 29,573,000 | | | |
Accumulated Depreciation | (7,983,000) | | | |
Americas | NY1 NEWARK [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 79,857,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 79,857,000 | | | |
Accumulated Depreciation | (42,647,000) | | | |
Americas | NY2 NEW YORK CITY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 17,859,000 | | | |
Buildings and Improvements | 194,181,000 | | | |
Total Costs | | | | |
Land | 17,859,000 | | | |
Buildings and Improvements | 194,181,000 | | | |
Accumulated Depreciation | (120,724,000) | | | |
Americas | NY4 NEW YORK CITY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 330,754,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 330,754,000 | | | |
Accumulated Depreciation | (153,480,000) | | | |
Americas | NY5 NEW YORK CITY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 243,296,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 243,296,000 | | | |
Accumulated Depreciation | (38,838,000) | | | |
Americas | NY6 NEW YORK CITY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,266,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,266,000 | | | |
Accumulated Depreciation | (5,587,000) | | | |
Americas | NY7 NEW YORK CITY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 24,660,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 138,865,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 163,525,000 | | | |
Accumulated Depreciation | (88,677,000) | | | |
Americas | NY8 NEW YORK CITY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,159,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,159,000 | | | |
Accumulated Depreciation | (6,118,000) | | | |
Americas | NY9 NEW YORK CITY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 53,840,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 53,840,000 | | | |
Accumulated Depreciation | (28,065,000) | | | |
Americas | PH1 PHILADELPHIA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 43,979,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 43,979,000 | | | |
Accumulated Depreciation | (10,365,000) | | | |
Americas | SE2 SEATTLE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 29,242,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 29,242,000 | | | |
Accumulated Depreciation | (19,757,000) | | | |
Americas | SE3 SEATTLE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,760,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 94,947,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 96,707,000 | | | |
Accumulated Depreciation | (22,692,000) | | | |
Americas | SV1 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 15,545,000 | | | |
Buildings and Improvements | 159,286,000 | | | |
Total Costs | | | | |
Land | 15,545,000 | | | |
Buildings and Improvements | 159,286,000 | | | |
Accumulated Depreciation | (104,600,000) | | | |
Americas | SV2 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 147,154,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 147,154,000 | | | |
Accumulated Depreciation | (68,545,000) | | | |
Americas | SV3 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 43,738,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 43,738,000 | | | |
Accumulated Depreciation | (38,220,000) | | | |
Americas | SV4 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,941,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,941,000 | | | |
Accumulated Depreciation | (19,003,000) | | | |
Americas | SV5 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,238,000 | | | |
Buildings and Improvements | 98,991,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 88,737,000 | | | |
Total Costs | | | | |
Land | 6,238,000 | | | |
Buildings and Improvements | 187,728,000 | | | |
Accumulated Depreciation | (43,544,000) | | | |
Americas | SV6 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 15,585,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,811,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,396,000 | | | |
Accumulated Depreciation | (22,079,000) | | | |
Americas | SV8 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 48,939,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 48,939,000 | | | |
Accumulated Depreciation | (21,363,000) | | | |
Americas | SV12 SILICON VALLEY (METRO) [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 20,535,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | (222,000) | | | |
Buildings and Improvements | 2,277,000 | | | |
Total Costs | | | | |
Land | 20,313,000 | | | |
Buildings and Improvements | 2,277,000 | | | |
Accumulated Depreciation | 0 | | | |
Americas | TR1 TORONTO, CANADA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 90,158,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 90,158,000 | | | |
Accumulated Depreciation | (19,895,000) | | | |
Americas | TR2 TORONTO, CANADA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 21,113,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 76,387,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 97,500,000 | | | |
Accumulated Depreciation | (7,133,000) | | | |
Americas | RJ1 RIO DE JANEIRO, BRAZIL [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,361,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,361,000 | | | |
Accumulated Depreciation | (17,933,000) | | | |
Americas | RJ2 RIO DE JANEIRO, BRAZIL [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 2,012,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 34,237,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 36,249,000 | | | |
Accumulated Depreciation | (10,145,000) | | | |
Americas | SP1 SÃO PAULO, BRAZIL [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 10,188,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,181,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 33,369,000 | | | |
Accumulated Depreciation | (19,816,000) | | | |
Americas | SP2 SÃO PAULO, BRAZIL [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,615,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,615,000 | | | |
Accumulated Depreciation | (33,839,000) | | | |
Americas | OTHERS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 52,630,000 | | | |
Buildings and Improvements | 18,709,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 934,000 | | | |
Buildings and Improvements | 185,212,000 | | | |
Total Costs | | | | |
Land | 53,564,000 | | | |
Buildings and Improvements | 203,921,000 | | | |
Accumulated Depreciation | (2,202,000) | | | |
EMEA | OTHERS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,019,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,019,000 | | | |
Accumulated Depreciation | (1,502,000) | | | |
EMEA | AM1 AMSTERDAM, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 71,764,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 71,764,000 | | | |
Accumulated Depreciation | (23,787,000) | | | |
EMEA | AM2 AMSTERDAM, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 53,661,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 53,661,000 | | | |
Accumulated Depreciation | (17,868,000) | | | |
EMEA | AM3 AMSTERDAM, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 27,099,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 92,654,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 119,753,000 | | | |
Accumulated Depreciation | (22,758,000) | | | |
EMEA | AM5 AMSTERDAM, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 92,199,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,029,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 93,228,000 | | | |
Accumulated Depreciation | (5,838,000) | | | |
EMEA | AM6 AMSTERDAM, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,616,000 | | | |
Buildings and Improvements | 50,876,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,872,000 | | | |
Total Costs | | | | |
Land | 6,616,000 | | | |
Buildings and Improvements | 54,748,000 | | | |
Accumulated Depreciation | (2,691,000) | | | |
EMEA | AM7 AMSTERDAM, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,397,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 363,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,760,000 | | | |
Accumulated Depreciation | (973,000) | | | |
EMEA | AM8 AMSTERDAM, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,291,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,291,000 | | | |
Accumulated Depreciation | (1,677,000) | | | |
EMEA | DB1 DUBLIN, IRELAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,852,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,852,000 | | | |
Accumulated Depreciation | (164,000) | | | |
EMEA | DB2 DUBLIN, IRELAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 12,460,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 671,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,131,000 | | | |
Accumulated Depreciation | (1,706,000) | | | |
EMEA | DB3 DUBLIN, IRELAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,334,000 | | | |
Buildings and Improvements | 54,387,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,507,000 | | | |
Total Costs | | | | |
Land | 3,334,000 | | | |
Buildings and Improvements | 57,894,000 | | | |
Accumulated Depreciation | (3,208,000) | | | |
EMEA | DB4 DUBLIN, IRELAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 26,875,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,899,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 36,774,000 | | | |
Accumulated Depreciation | (1,163,000) | | | |
EMEA | DU1 DÜSSELDORF, GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,330,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,330,000 | | | |
Accumulated Depreciation | (17,813,000) | | | |
EMEA | DX1 DUBAI, UNITED ARAB EMIRATES [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 45,710,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 45,710,000 | | | |
Accumulated Depreciation | (5,501,000) | | | |
EMEA | EN1 ENSCHEDE, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,408,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,408,000 | | | |
Accumulated Depreciation | (13,720,000) | | | |
EMEA | FR1 FRANKFURT (METRO), GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,173,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,173,000 | | | |
Accumulated Depreciation | (6,792,000) | | | |
EMEA | FR2 FRANKFURT (METRO), GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 11,212,000 | | | |
Buildings and Improvements | 198,157,000 | | | |
Total Costs | | | | |
Land | 11,212,000 | | | |
Buildings and Improvements | 198,157,000 | | | |
Accumulated Depreciation | (73,449,000) | | | |
EMEA | FR3 FRANKFURT (METRO), GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,967,000 | | | |
Buildings and Improvements | 4,679,000 | | | |
Total Costs | | | | |
Land | 1,967,000 | | | |
Buildings and Improvements | 4,679,000 | | | |
Accumulated Depreciation | (1,178,000) | | | |
EMEA | FR4 FRANKFURT (METRO), GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 11,578,000 | | | |
Buildings and Improvements | 9,307,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 51,650,000 | | | |
Total Costs | | | | |
Land | 11,578,000 | | | |
Buildings and Improvements | 60,957,000 | | | |
Accumulated Depreciation | (14,570,000) | | | |
EMEA | FR5 FRANKFURT (METRO), GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 30,310,000 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,716,000 | | | |
Buildings and Improvements | 109,540,000 | | | |
Total Costs | | | | |
Land | 3,716,000 | | | |
Buildings and Improvements | 109,540,000 | | | |
Accumulated Depreciation | (20,552,000) | | | |
EMEA | FR7 FRANKFURT (METRO), GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 43,634,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,035,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 44,669,000 | | | |
Accumulated Depreciation | (4,492,000) | | | |
EMEA | GV1 GENEVA (METRO), SWITZERLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,846,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,846,000 | | | |
Accumulated Depreciation | (4,232,000) | | | |
EMEA | GV2 GENEVA (METRO), SWITZERLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,282,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,282,000 | | | |
Accumulated Depreciation | (13,709,000) | | | |
EMEA | HE1 HELSINKI (METRO), FINLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,732,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,732,000 | | | |
Accumulated Depreciation | (632,000) | | | |
EMEA | HE2 HELSINKI (METRO), FINLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,445,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,445,000 | | | |
Accumulated Depreciation | (524,000) | | | |
EMEA | HE3 HELSINKI (METRO), FINLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,765,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,765,000 | | | |
Accumulated Depreciation | (2,118,000) | | | |
EMEA | HE4 HELSINKI (METRO), FINLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 29,092,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,785,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,877,000 | | | |
Accumulated Depreciation | (2,824,000) | | | |
EMEA | HE5 HELSINKI (METRO), FINLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,564,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 64,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,628,000 | | | |
Accumulated Depreciation | (1,019,000) | | | |
EMEA | HE6 HELSINKI (METRO), FINLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 17,204,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,067,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 27,271,000 | | | |
Accumulated Depreciation | (540,000) | | | |
EMEA | IS1 ISTANBUL (METRO), TURKEY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,046,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,046,000 | | | |
Accumulated Depreciation | (2,126,000) | | | |
EMEA | LD1 LONDON (METRO), UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,352,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,352,000 | | | |
Accumulated Depreciation | (2,154,000) | | | |
EMEA | LD3 LONDON (METRO), UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,864,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,864,000 | | | |
Accumulated Depreciation | (9,975,000) | | | |
EMEA | LD4 LONDON (METRO), UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 23,044,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,232,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 79,276,000 | | | |
Accumulated Depreciation | (30,704,000) | | | |
EMEA | LD5 LONDON (METRO), UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,412,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 162,639,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 179,051,000 | | | |
Accumulated Depreciation | (51,491,000) | | | |
EMEA | LD6 LONDON (METRO), UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 103,276,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 103,276,000 | | | |
Accumulated Depreciation | (6,038,000) | | | |
EMEA | LD8 LONDON (METRO), UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 107,544,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,834,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 112,378,000 | | | |
Accumulated Depreciation | (7,598,000) | | | |
EMEA | LD9 LONDON (METRO), UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 181,431,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,667,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 183,098,000 | | | |
Accumulated Depreciation | (11,741,000) | | | |
EMEA | MA1 MANCHESTER, UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,254,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,254,000 | | | |
Accumulated Depreciation | (797,000) | | | |
EMEA | MA2 MANCHESTER, UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,619,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,619,000 | | | |
Accumulated Depreciation | (952,000) | | | |
EMEA | MA3 MANCHESTER, UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 44,931,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 316,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 45,247,000 | | | |
Accumulated Depreciation | (4,305,000) | | | |
EMEA | MA4 MANCHESTER, UNITED KINGDOM [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 6,697,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 65,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,762,000 | | | |
Accumulated Depreciation | (748,000) | | | |
EMEA | ML1 MILAN (METRO), ITALY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 806,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 806,000 | | | |
Accumulated Depreciation | (742,000) | | | |
EMEA | ML2 MILAN (METRO), ITALY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,650,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,650,000 | | | |
Accumulated Depreciation | (2,676,000) | | | |
EMEA | ML3 MILAN (METRO), ITALY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,937,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,937,000 | | | |
Accumulated Depreciation | (5,373,000) | | | |
EMEA | ML4 MILAN (METRO), ITALY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,870,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,870,000 | | | |
Accumulated Depreciation | (1,346,000) | | | |
EMEA | MU1 MUNICH, GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,818,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,818,000 | | | |
Accumulated Depreciation | (11,501,000) | | | |
EMEA | MU3 MUNICH, GERMANY [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 726,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 726,000 | | | |
Accumulated Depreciation | (38,000) | | | |
EMEA | PA1 PARIS (METRO), FRANCE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,527,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,527,000 | | | |
Accumulated Depreciation | (17,093,000) | | | |
EMEA | PA2 & PA3 PARIS (METRO), FRANCE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 29,615,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 23,723,000 | | | |
Buildings and Improvements | 240,675,000 | | | |
Total Costs | | | | |
Land | 23,723,000 | | | |
Buildings and Improvements | 270,290,000 | | | |
Accumulated Depreciation | (75,980,000) | | | |
EMEA | PA4 PARIS (METRO), FRANCE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,701,000 | | | |
Buildings and Improvements | 9,503,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 127,215,000 | | | |
Total Costs | | | | |
Land | 1,701,000 | | | |
Buildings and Improvements | 136,718,000 | | | |
Accumulated Depreciation | (26,823,000) | | | |
EMEA | PA5 PARIS (METRO), FRANCE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,554,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 843,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,397,000 | | | |
Accumulated Depreciation | (1,575,000) | | | |
EMEA | PA6 PARIS (METRO), FRANCE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,322,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,322,000 | | | |
Accumulated Depreciation | (5,006,000) | | | |
EMEA | PA7 PARIS (METRO), FRANCE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,300,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,300,000 | | | |
Accumulated Depreciation | (1,951,000) | | | |
EMEA | SK1 STOCKHOLD, (METRO), SWEDEN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 15,495,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 574,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,069,000 | | | |
Accumulated Depreciation | (2,216,000) | | | |
EMEA | SK2 STOCKHOLD, (METRO), SWEDEN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 80,148,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 251,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 80,399,000 | | | |
Accumulated Depreciation | (4,678,000) | | | |
EMEA | SK3 STOCKHOLD, (METRO), SWEDEN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,167,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,167,000 | | | |
Accumulated Depreciation | (858,000) | | | |
EMEA | SO1 SOFIA, BULGARIA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,236,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 312,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,548,000 | | | |
Accumulated Depreciation | (353,000) | | | |
EMEA | WA1 WARSZAWA,POLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,950,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 592,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,542,000 | | | |
Accumulated Depreciation | (920,000) | | | |
EMEA | WA2 WARSZAWA,POLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 4,709,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,615,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,324,000 | | | |
Accumulated Depreciation | (770,000) | | | |
EMEA | ZH1 ZURICH (METRO), SWITZERLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,457,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,457,000 | | | |
Accumulated Depreciation | (4,619,000) | | | |
EMEA | ZH2 ZURICH (METRO), SWITZERLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,460,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,460,000 | | | |
Accumulated Depreciation | (3,563,000) | | | |
EMEA | ZH4 ZURICH (METRO), SWITZERLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 11,284,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,868,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 36,152,000 | | | |
Accumulated Depreciation | (16,116,000) | | | |
EMEA | ZH5 ZURICH (METRO), SWITZERLAND [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,232,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,232,000 | | | |
Accumulated Depreciation | (10,456,000) | | | |
EMEA | ZW1 ZWOLLE, THE NETHERLANDS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,331,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,331,000 | | | |
Accumulated Depreciation | (4,097,000) | | | |
Asia-Pacific | OTHERS [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,401,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,401,000 | | | |
Accumulated Depreciation | (4,661,000) | | | |
Asia-Pacific | HK1 HONG KONG, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 131,250,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 131,250,000 | | | |
Accumulated Depreciation | (65,402,000) | | | |
Asia-Pacific | HK2 HONG KONG, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 237,118,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 237,118,000 | | | |
Accumulated Depreciation | (51,447,000) | | | |
Asia-Pacific | HK3 HONG KONG, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 134,342,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 134,342,000 | | | |
Accumulated Depreciation | (44,062,000) | | | |
Asia-Pacific | HK4 HONG KONG, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,003,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,003,000 | | | |
Accumulated Depreciation | (3,963,000) | | | |
Asia-Pacific | ME1 MELBOURNE, AUSTRALIA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 15,341,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 66,103,000 | | | |
Total Costs | | | | |
Land | 15,341,000 | | | |
Buildings and Improvements | 66,103,000 | | | |
Accumulated Depreciation | (5,854,000) | | | |
Asia-Pacific | OS1 OSAKA, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 14,876,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,851,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 52,727,000 | | | |
Accumulated Depreciation | (8,036,000) | | | |
Asia-Pacific | OS2 OSAKA, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 103,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 103,000 | | | |
Accumulated Depreciation | (26,000) | | | |
Asia-Pacific | SG1 SINGAPORE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 160,917,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 160,917,000 | | | |
Accumulated Depreciation | (104,697,000) | | | |
Asia-Pacific | SG2 SINGAPORE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 261,025,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 261,025,000 | | | |
Accumulated Depreciation | (99,403,000) | | | |
Asia-Pacific | SG3 SINGAPORE [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 34,844,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 96,449,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 131,293,000 | | | |
Accumulated Depreciation | (10,360,000) | | | |
Asia-Pacific | SH2 SHANGHAI, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,482,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,482,000 | | | |
Accumulated Depreciation | (971,000) | | | |
Asia-Pacific | SH3 SHANGHAI, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,066,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,024,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,090,000 | | | |
Accumulated Depreciation | (3,512,000) | | | |
Asia-Pacific | SH4 SHANGHAI, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,657,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,657,000 | | | |
Accumulated Depreciation | (1,422,000) | | | |
Asia-Pacific | SH5 SHANGHAI, CHINA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 11,284,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,003,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 30,287,000 | | | |
Accumulated Depreciation | (6,010,000) | | | |
Asia-Pacific | SY1 SYDNEY, AUSTRALIA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,261,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,261,000 | | | |
Accumulated Depreciation | (14,036,000) | | | |
Asia-Pacific | SY2 SYDNEY, AUSTRALIA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 3,080,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,510,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,590,000 | | | |
Accumulated Depreciation | (18,795,000) | | | |
Asia-Pacific | SY3 SYDNEY, AUSTRALIA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 8,712,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 134,257,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 142,969,000 | | | |
Accumulated Depreciation | (42,948,000) | | | |
Asia-Pacific | SY4 SYDNEY, AUSTRALIA [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 84,679,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 84,679,000 | | | |
Accumulated Depreciation | (2,300,000) | | | |
Asia-Pacific | TY1 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,547,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,547,000 | | | |
Accumulated Depreciation | (10,787,000) | | | |
Asia-Pacific | TY2 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 75,386,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 75,386,000 | | | |
Accumulated Depreciation | (57,738,000) | | | |
Asia-Pacific | TY3 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 69,367,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 69,367,000 | | | |
Accumulated Depreciation | (23,762,000) | | | |
Asia-Pacific | TY4 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 49,287,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 49,287,000 | | | |
Accumulated Depreciation | (10,658,000) | | | |
Asia-Pacific | TY5 TOKYO, JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 102,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 49,598,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 49,700,000 | | | |
Accumulated Depreciation | (2,045,000) | | | |
Asia-Pacific | TY6 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 37,941,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,412,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 50,353,000 | | | |
Accumulated Depreciation | (8,663,000) | | | |
Asia-Pacific | TY7 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 13,175,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 869,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,044,000 | | | |
Accumulated Depreciation | (2,759,000) | | | |
Asia-Pacific | TY8 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 53,848,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,044,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 58,892,000 | | | |
Accumulated Depreciation | (7,016,000) | | | |
Asia-Pacific | TY9 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 106,710,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,197,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 114,907,000 | | | |
Accumulated Depreciation | (15,450,000) | | | |
Asia-Pacific | TY10 TOKYO, JAPAN [Member] | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 69,881,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,115,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 76,996,000 | | | |
Accumulated Depreciation | $ (5,707,000) | | | |