Schedule III Real Estate and Accumulated Depreciation - Real Estate and Accumulated Depreciation, by Property (Detail) - USD ($) | Dec. 31, 2018 | Dec. 31, 2017 | Dec. 31, 2016 | Dec. 31, 2015 |
Initial Costs to Company | | | | |
Encumbrances | $ 30,310,000 | | | |
Land | 492,431,000 | | | |
Buildings and Improvements | 3,675,228,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 138,101,000 | | | |
Buildings and Improvements | 10,714,438,000 | | | |
Total Costs | | | | |
Land | 630,532,000 | | | |
Buildings and Improvements | 14,389,666,000 | | | |
Accumulated Depreciation | (4,517,016,000) | $ (3,980,198,000) | $ (3,175,972,000) | $ (2,595,648,000) |
Taxable basis in aggregate initial cost | 21,371,300,000 | | | |
Operating Lease [Member] | | | | |
Total Costs | | | | |
Initial cost | 0 | | | |
Americas | AT1 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 125,872,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 125,872,000 | | | |
Accumulated Depreciation | (50,601,000) | | | |
Americas | AT2 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 41,058,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 41,058,000 | | | |
Accumulated Depreciation | (21,054,000) | | | |
Americas | AT3 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,469,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,469,000 | | | |
Accumulated Depreciation | (2,128,000) | | | |
Americas | AT4 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 5,400,000 | | | |
Buildings and Improvements | 20,209,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,588,000 | | | |
Total Costs | | | | |
Land | 5,400,000 | | | |
Buildings and Improvements | 27,797,000 | | | |
Accumulated Depreciation | (6,133,000) | | | |
Americas | AT5 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,011,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,170,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,181,000 | | | |
Accumulated Depreciation | (2,248,000) | | | |
Americas | BG1 BOGOTÁ (METRO), COLOMBIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 8,779,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 929,000 | | | |
Buildings and Improvements | 2,527,000 | | | |
Total Costs | | | | |
Land | 929,000 | | | |
Buildings and Improvements | 11,306,000 | | | |
Accumulated Depreciation | (1,866,000) | | | |
Americas | BO1 BOSTON (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,026,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,026,000 | | | |
Accumulated Depreciation | (6,920,000) | | | |
Americas | BO2 BOSTON (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,500,000 | | | |
Buildings and Improvements | 30,383,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,800,000 | | | |
Total Costs | | | | |
Land | 2,500,000 | | | |
Buildings and Improvements | 33,183,000 | | | |
Accumulated Depreciation | (6,602,000) | | | |
Americas | CH1 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 146,693,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 146,693,000 | | | |
Accumulated Depreciation | (89,280,000) | | | |
Americas | CH2 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 108,106,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 108,106,000 | | | |
Accumulated Depreciation | (55,969,000) | | | |
Americas | CH3 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 9,759,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 351,000 | | | |
Buildings and Improvements | 295,893,000 | | | |
Total Costs | | | | |
Land | 10,110,000 | | | |
Buildings and Improvements | 295,893,000 | | | |
Accumulated Depreciation | (106,445,000) | | | |
Americas | CH4 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,148,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,148,000 | | | |
Accumulated Depreciation | (11,315,000) | | | |
Americas | CH7 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 670,000 | | | |
Buildings and Improvements | 10,564,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,029,000 | | | |
Total Costs | | | | |
Land | 670,000 | | | |
Buildings and Improvements | 12,593,000 | | | |
Accumulated Depreciation | (2,357,000) | | | |
Americas | CU1 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,019,000 | | | |
Buildings and Improvements | 37,581,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,315,000 | | | |
Total Costs | | | | |
Land | 1,019,000 | | | |
Buildings and Improvements | 38,896,000 | | | |
Accumulated Depreciation | (6,618,000) | | | |
Americas | CU2 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,244,000 | | | |
Buildings and Improvements | 48,000,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,357,000 | | | |
Total Costs | | | | |
Land | 1,244,000 | | | |
Buildings and Improvements | 49,357,000 | | | |
Accumulated Depreciation | (7,200,000) | | | |
Americas | CU3 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,088,000 | | | |
Buildings and Improvements | 37,387,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 555,000 | | | |
Total Costs | | | | |
Land | 1,088,000 | | | |
Buildings and Improvements | 37,942,000 | | | |
Accumulated Depreciation | (5,605,000) | | | |
Americas | CU4 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,372,000 | | | |
Buildings and Improvements | 27,832,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,364,000 | | | |
Total Costs | | | | |
Land | 1,372,000 | | | |
Buildings and Improvements | 59,196,000 | | | |
Accumulated Depreciation | (3,398,000) | | | |
Americas | DA1 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 66,119,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 66,119,000 | | | |
Accumulated Depreciation | (37,704,000) | | | |
Americas | DA2 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 79,384,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 79,384,000 | | | |
Accumulated Depreciation | (25,148,000) | | | |
Americas | DA3 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 95,891,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 95,891,000 | | | |
Accumulated Depreciation | (33,723,000) | | | |
Americas | DA4 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,205,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,205,000 | | | |
Accumulated Depreciation | (8,470,000) | | | |
Americas | DA6 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 20,522,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 139,630,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 160,152,000 | | | |
Accumulated Depreciation | (22,692,000) | | | |
Americas | DA7 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 28,006,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 28,006,000 | | | |
Accumulated Depreciation | (7,670,000) | | | |
Americas | DA9 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 610,000 | | | |
Buildings and Improvements | 15,398,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 699,000 | | | |
Total Costs | | | | |
Land | 610,000 | | | |
Buildings and Improvements | 16,097,000 | | | |
Accumulated Depreciation | (2,963,000) | | | |
Americas | DA10 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 117,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,633,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,750,000 | | | |
Accumulated Depreciation | (1,704,000) | | | |
Americas | INFOMART BUILDING DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 24,380,000 | | | |
Buildings and Improvements | 337,643,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,619,000 | | | |
Total Costs | | | | |
Land | 24,380,000 | | | |
Buildings and Improvements | 343,262,000 | | | |
Accumulated Depreciation | (8,353,000) | | | |
Americas | DC1 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,247,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,247,000 | | | |
Accumulated Depreciation | (825,000) | | | |
Americas | DC2 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 5,047,000 | | | |
Buildings and Improvements | 121,519,000 | | | |
Total Costs | | | | |
Land | 5,047,000 | | | |
Buildings and Improvements | 121,519,000 | | | |
Accumulated Depreciation | (93,855,000) | | | |
Americas | DC3 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 37,451,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 49,266,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 86,717,000 | | | |
Accumulated Depreciation | (48,753,000) | | | |
Americas | DC4 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,906,000 | | | |
Buildings and Improvements | 7,272,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 71,813,000 | | | |
Total Costs | | | | |
Land | 1,906,000 | | | |
Buildings and Improvements | 79,085,000 | | | |
Accumulated Depreciation | (50,787,000) | | | |
Americas | DC5 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 4,983,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 88,456,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 93,439,000 | | | |
Accumulated Depreciation | (60,307,000) | | | |
Americas | DC6 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 5,082,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 89,795,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 94,877,000 | | | |
Accumulated Depreciation | (44,365,000) | | | |
Americas | DC7 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,765,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,765,000 | | | |
Accumulated Depreciation | (11,629,000) | | | |
Americas | DC8 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,901,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,901,000 | | | |
Accumulated Depreciation | (4,589,000) | | | |
Americas | DC10 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 44,601,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,924,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 118,525,000 | | | |
Accumulated Depreciation | (52,029,000) | | | |
Americas | DC11 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 5,082,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 179,753,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 184,835,000 | | | |
Accumulated Depreciation | (40,450,000) | | | |
Americas | DC12 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 101,783,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 59,152,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 160,935,000 | | | |
Accumulated Depreciation | (8,220,000) | | | |
Americas | DC13 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 5,500,000 | | | |
Buildings and Improvements | 25,423,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,477,000 | | | |
Total Costs | | | | |
Land | 5,500,000 | | | |
Buildings and Improvements | 28,900,000 | | | |
Accumulated Depreciation | (6,928,000) | | | |
Americas | DC14 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,560,000 | | | |
Buildings and Improvements | 33,511,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 614,000 | | | |
Total Costs | | | | |
Land | 2,560,000 | | | |
Buildings and Improvements | 34,125,000 | | | |
Accumulated Depreciation | (5,509,000) | | | |
Americas | DC97 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 2,021,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 631,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,652,000 | | | |
Accumulated Depreciation | (692,000) | | | |
Americas | DE1 DENVER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,985,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,985,000 | | | |
Accumulated Depreciation | (7,988,000) | | | |
Americas | DE2 DENVER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 5,240,000 | | | |
Buildings and Improvements | 23,053,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 27,744,000 | | | |
Total Costs | | | | |
Land | 5,240,000 | | | |
Buildings and Improvements | 50,797,000 | | | |
Accumulated Depreciation | (8,099,000) | | | |
Americas | HO1 HOUSTON (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,440,000 | | | |
Buildings and Improvements | 23,780,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,078,000 | | | |
Total Costs | | | | |
Land | 1,440,000 | | | |
Buildings and Improvements | 54,858,000 | | | |
Accumulated Depreciation | (6,880,000) | | | |
Americas | LA1 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 106,877,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 106,877,000 | | | |
Accumulated Depreciation | (63,323,000) | | | |
Americas | LA2 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,785,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,785,000 | | | |
Accumulated Depreciation | (8,654,000) | | | |
Americas | LA3 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 34,727,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,959,000 | | | |
Buildings and Improvements | 21,461,000 | | | |
Total Costs | | | | |
Land | 3,959,000 | | | |
Buildings and Improvements | 56,188,000 | | | |
Accumulated Depreciation | (44,967,000) | | | |
Americas | LA4 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 19,333,000 | | | |
Buildings and Improvements | 137,630,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 33,753,000 | | | |
Total Costs | | | | |
Land | 19,333,000 | | | |
Buildings and Improvements | 171,383,000 | | | |
Accumulated Depreciation | (78,571,000) | | | |
Americas | LA7 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,800,000 | | | |
Buildings and Improvements | 33,621,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,204,000 | | | |
Total Costs | | | | |
Land | 7,800,000 | | | |
Buildings and Improvements | 38,825,000 | | | |
Accumulated Depreciation | (6,166,000) | | | |
Americas | MI1 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 18,920,000 | | | |
Buildings and Improvements | 127,194,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 88,736,000 | | | |
Total Costs | | | | |
Land | 18,920,000 | | | |
Buildings and Improvements | 215,930,000 | | | |
Accumulated Depreciation | (25,966,000) | | | |
Americas | MI2 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,391,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,391,000 | | | |
Accumulated Depreciation | (12,178,000) | | | |
Americas | MI3 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,056,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,056,000 | | | |
Accumulated Depreciation | (12,752,000) | | | |
Americas | MI6 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 4,750,000 | | | |
Buildings and Improvements | 23,017,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,916,000 | | | |
Total Costs | | | | |
Land | 4,750,000 | | | |
Buildings and Improvements | 28,933,000 | | | |
Accumulated Depreciation | (5,859,000) | | | |
Americas | NY1 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 70,595,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 70,595,000 | | | |
Accumulated Depreciation | (38,536,000) | | | |
Americas | NY2 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 17,859,000 | | | |
Buildings and Improvements | 198,809,000 | | | |
Total Costs | | | | |
Land | 17,859,000 | | | |
Buildings and Improvements | 198,809,000 | | | |
Accumulated Depreciation | (125,571,000) | | | |
Americas | NY4 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 346,128,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 346,128,000 | | | |
Accumulated Depreciation | (176,708,000) | | | |
Americas | NY5 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 259,184,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 259,184,000 | | | |
Accumulated Depreciation | (63,058,000) | | | |
Americas | NY6 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,464,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,464,000 | | | |
Accumulated Depreciation | (11,734,000) | | | |
Americas | NY7 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 24,660,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 169,698,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 194,358,000 | | | |
Accumulated Depreciation | (115,229,000) | | | |
Americas | NY8 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,650,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,650,000 | | | |
Accumulated Depreciation | (7,426,000) | | | |
Americas | NY9 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 51,918,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 51,918,000 | | | |
Accumulated Depreciation | (31,834,000) | | | |
Americas | NY11 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,050,000 | | | |
Buildings and Improvements | 58,717,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,378,000 | | | |
Total Costs | | | | |
Land | 2,050,000 | | | |
Buildings and Improvements | 70,095,000 | | | |
Accumulated Depreciation | (11,926,000) | | | |
Americas | NY12 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,460,000 | | | |
Buildings and Improvements | 10,380,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,631,000 | | | |
Total Costs | | | | |
Land | 3,460,000 | | | |
Buildings and Improvements | 12,011,000 | | | |
Accumulated Depreciation | (2,413,000) | | | |
Americas | NY13 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 31,603,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,170,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,773,000 | | | |
Accumulated Depreciation | (6,982,000) | | | |
Americas | PH1 PHILADELPHIA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 43,380,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 43,380,000 | | | |
Accumulated Depreciation | (14,553,000) | | | |
Americas | RJ1 RIO DE JANEIRO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,167,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,167,000 | | | |
Accumulated Depreciation | (16,059,000) | | | |
Americas | RJ2 RIO DE JANEIRO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 2,012,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,695,000 | | | |
Buildings and Improvements | 51,849,000 | | | |
Total Costs | | | | |
Land | 1,695,000 | | | |
Buildings and Improvements | 53,861,000 | | | |
Accumulated Depreciation | (14,380,000) | | | |
Americas | SE2 SEATTLE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 27,856,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 27,856,000 | | | |
Accumulated Depreciation | (23,013,000) | | | |
Americas | SE3 SEATTLE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,760,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 97,454,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 99,214,000 | | | |
Accumulated Depreciation | (34,694,000) | | | |
Americas | SE4 SEATTLE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 4,000,000 | | | |
Buildings and Improvements | 12,903,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,032,000 | | | |
Total Costs | | | | |
Land | 4,000,000 | | | |
Buildings and Improvements | 25,935,000 | | | |
Accumulated Depreciation | (3,001,000) | | | |
Americas | SP1 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 10,188,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,319,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,507,000 | | | |
Accumulated Depreciation | (23,450,000) | | | |
Americas | SP2 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 68,952,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 68,952,000 | | | |
Accumulated Depreciation | (50,007,000) | | | |
Americas | SP3 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 10,368,000 | | | |
Buildings and Improvements | 72,997,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,900,000 | | | |
Total Costs | | | | |
Land | 10,368,000 | | | |
Buildings and Improvements | 96,897,000 | | | |
Accumulated Depreciation | (10,451,000) | | | |
Americas | SP4 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 22,027,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,027,000 | | | |
Accumulated Depreciation | (4,936,000) | | | |
Americas | SV1 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 15,545,000 | | | |
Buildings and Improvements | 142,285,000 | | | |
Total Costs | | | | |
Land | 15,545,000 | | | |
Buildings and Improvements | 142,285,000 | | | |
Accumulated Depreciation | (89,903,000) | | | |
Americas | SV2 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 151,278,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 151,278,000 | | | |
Accumulated Depreciation | (81,688,000) | | | |
Americas | SV3 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 40,448,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 40,448,000 | | | |
Accumulated Depreciation | (35,541,000) | | | |
Americas | SV4 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,946,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,946,000 | | | |
Accumulated Depreciation | (20,473,000) | | | |
Americas | SV5 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,238,000 | | | |
Buildings and Improvements | 98,991,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 94,163,000 | | | |
Total Costs | | | | |
Land | 6,238,000 | | | |
Buildings and Improvements | 193,154,000 | | | |
Accumulated Depreciation | (63,716,000) | | | |
Americas | SV6 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 15,585,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 29,146,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 44,731,000 | | | |
Accumulated Depreciation | (28,862,000) | | | |
Americas | SV8 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 51,200,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 51,200,000 | | | |
Accumulated Depreciation | (29,120,000) | | | |
Americas | SV10 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 12,646,000 | | | |
Buildings and Improvements | 123,594,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 81,555,000 | | | |
Total Costs | | | | |
Land | 12,646,000 | | | |
Buildings and Improvements | 205,149,000 | | | |
Accumulated Depreciation | (9,252,000) | | | |
Americas | SV12 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 20,313,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,623,000 | | | |
Total Costs | | | | |
Land | 20,313,000 | | | |
Buildings and Improvements | 4,623,000 | | | |
Accumulated Depreciation | 0 | | | |
Americas | SV13 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 3,828,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 85,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,913,000 | | | |
Accumulated Depreciation | (1,617,000) | | | |
Americas | SV14 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,638,000 | | | |
Buildings and Improvements | 5,503,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,375,000 | | | |
Total Costs | | | | |
Land | 3,638,000 | | | |
Buildings and Improvements | 8,878,000 | | | |
Accumulated Depreciation | (1,006,000) | | | |
Americas | SV15 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,651,000 | | | |
Buildings and Improvements | 23,060,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 838,000 | | | |
Total Costs | | | | |
Land | 7,651,000 | | | |
Buildings and Improvements | 23,898,000 | | | |
Accumulated Depreciation | (3,730,000) | | | |
Americas | SV16 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 4,271,000 | | | |
Buildings and Improvements | 15,018,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 646,000 | | | |
Total Costs | | | | |
Land | 4,271,000 | | | |
Buildings and Improvements | 15,664,000 | | | |
Accumulated Depreciation | (2,813,000) | | | |
Americas | SV17 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 17,493,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,034,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,527,000 | | | |
Accumulated Depreciation | (6,977,000) | | | |
Americas | TR1 TORONTO (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 87,819,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 87,819,000 | | | |
Accumulated Depreciation | (25,974,000) | | | |
Americas | TR2 TORONTO (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 21,113,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 94,362,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 115,475,000 | | | |
Accumulated Depreciation | (17,923,000) | | | |
Americas | OTHERS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 78,242,000 | | | |
Buildings and Improvements | 21,304,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 39,800,000 | | | |
Total Costs | | | | |
Land | 78,242,000 | | | |
Buildings and Improvements | 61,104,000 | | | |
Accumulated Depreciation | (5,002,000) | | | |
EMEA | OTHERS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 16,933,000 | | | |
Buildings and Improvements | 7,018,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 16,149,000 | | | |
Buildings and Improvements | 24,847,000 | | | |
Total Costs | | | | |
Land | 33,082,000 | | | |
Buildings and Improvements | 31,865,000 | | | |
Accumulated Depreciation | (4,005,000) | | | |
EMEA | AD1 ABU DHABI (METRO), UNITED ARAB EMIRATES | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 319,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 319,000 | | | |
Accumulated Depreciation | (56,000) | | | |
EMEA | AM1 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 87,687,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 87,687,000 | | | |
Accumulated Depreciation | (37,861,000) | | | |
EMEA | AM2 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 80,258,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 80,258,000 | | | |
Accumulated Depreciation | (27,008,000) | | | |
EMEA | AM3 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 27,099,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 126,102,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 153,201,000 | | | |
Accumulated Depreciation | (43,860,000) | | | |
EMEA | AM4 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 152,650,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 152,650,000 | | | |
Accumulated Depreciation | (6,626,000) | | | |
EMEA | AM5 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 92,199,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,059,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 106,258,000 | | | |
Accumulated Depreciation | (19,576,000) | | | |
EMEA | AM6 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,616,000 | | | |
Buildings and Improvements | 50,876,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 584,000 | | | |
Buildings and Improvements | 65,278,000 | | | |
Total Costs | | | | |
Land | 7,200,000 | | | |
Buildings and Improvements | 116,154,000 | | | |
Accumulated Depreciation | (12,138,000) | | | |
EMEA | AM7 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,397,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 51,535,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 58,932,000 | | | |
Accumulated Depreciation | (2,378,000) | | | |
EMEA | AM8 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,125,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,125,000 | | | |
Accumulated Depreciation | (3,364,000) | | | |
EMEA | BA1 BARCELONA (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 9,443,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,843,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,286,000 | | | |
Accumulated Depreciation | (1,495,000) | | | |
EMEA | DB1 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,389,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,389,000 | | | |
Accumulated Depreciation | (1,495,000) | | | |
EMEA | DB2 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 12,460,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,384,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,844,000 | | | |
Accumulated Depreciation | (4,963,000) | | | |
EMEA | DB3 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,334,000 | | | |
Buildings and Improvements | 54,387,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 294,000 | | | |
Buildings and Improvements | 14,917,000 | | | |
Total Costs | | | | |
Land | 3,628,000 | | | |
Buildings and Improvements | 69,304,000 | | | |
Accumulated Depreciation | (11,434,000) | | | |
EMEA | DB4 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 26,875,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,608,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 42,483,000 | | | |
Accumulated Depreciation | (5,134,000) | | | |
EMEA | DU1 DÜSSELDORF (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 8,287,000 | | | |
Buildings and Improvements | 29,641,000 | | | |
Total Costs | | | | |
Land | 8,287,000 | | | |
Buildings and Improvements | 29,641,000 | | | |
Accumulated Depreciation | (18,951,000) | | | |
EMEA | DX1 DUBAI (METRO), UNITED ARAB EMIRATES | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 87,891,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 87,891,000 | | | |
Accumulated Depreciation | (16,550,000) | | | |
EMEA | DX2 DUBAI (METRO), UNITED ARAB EMIRATES | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 569,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 569,000 | | | |
Accumulated Depreciation | (100,000) | | | |
EMEA | EN1 ENSCHEDE (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 30,140,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 30,140,000 | | | |
Accumulated Depreciation | (18,843,000) | | | |
EMEA | FR1 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,189,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,189,000 | | | |
Accumulated Depreciation | (3,679,000) | | | |
EMEA | FR2 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 12,547,000 | | | |
Buildings and Improvements | 425,473,000 | | | |
Total Costs | | | | |
Land | 12,547,000 | | | |
Buildings and Improvements | 425,473,000 | | | |
Accumulated Depreciation | (110,194,000) | | | |
EMEA | FR4 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 11,578,000 | | | |
Buildings and Improvements | 9,307,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,023,000 | | | |
Buildings and Improvements | 76,784,000 | | | |
Total Costs | | | | |
Land | 12,601,000 | | | |
Buildings and Improvements | 86,091,000 | | | |
Accumulated Depreciation | (25,959,000) | | | |
EMEA | FR5 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 30,310,000 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 4,044,000 | | | |
Buildings and Improvements | 164,611,000 | | | |
Total Costs | | | | |
Land | 4,044,000 | | | |
Buildings and Improvements | 164,611,000 | | | |
Accumulated Depreciation | (34,108,000) | | | |
EMEA | FR6 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 135,960,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 135,960,000 | | | |
Accumulated Depreciation | (8,885,000) | | | |
EMEA | FR7 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 43,634,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,621,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 64,255,000 | | | |
Accumulated Depreciation | (13,072,000) | | | |
EMEA | GV1 GENEVA (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,798,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,798,000 | | | |
Accumulated Depreciation | (3,634,000) | | | |
EMEA | GV2 GENEVA (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,328,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,328,000 | | | |
Accumulated Depreciation | (19,817,000) | | | |
EMEA | HE1 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,486,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,486,000 | | | |
Accumulated Depreciation | (1,887,000) | | | |
EMEA | HE2 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,554,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,554,000 | | | |
Accumulated Depreciation | (1,297,000) | | | |
EMEA | HE3 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,019,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,019,000 | | | |
Accumulated Depreciation | (7,227,000) | | | |
EMEA | HE4 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 29,092,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,383,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,475,000 | | | |
Accumulated Depreciation | (9,726,000) | | | |
EMEA | HE5 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,564,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,089,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,653,000 | | | |
Accumulated Depreciation | (2,991,000) | | | |
EMEA | HE6 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 17,204,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,604,000 | | | |
Buildings and Improvements | 25,004,000 | | | |
Total Costs | | | | |
Land | 1,604,000 | | | |
Buildings and Improvements | 42,208,000 | | | |
Accumulated Depreciation | (5,811,000) | | | |
EMEA | HE7 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,348,000 | | | |
Buildings and Improvements | 6,946,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,573,000 | | | |
Total Costs | | | | |
Land | 7,348,000 | | | |
Buildings and Improvements | 10,519,000 | | | |
Accumulated Depreciation | (537,000) | | | |
EMEA | HH1 HAMBURG (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,612,000 | | | |
Buildings and Improvements | 5,360,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 3,612,000 | | | |
Buildings and Improvements | 5,360,000 | | | |
Accumulated Depreciation | 0 | | | |
EMEA | IS1 ISTANBUL (METRO), TURKEY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,412,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,412,000 | | | |
Accumulated Depreciation | (4,416,000) | | | |
EMEA | IL2 ISTANBUL (METRO), TURKEY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 14,460,000 | | | |
Buildings and Improvements | 39,289,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,778,000 | | | |
Total Costs | | | | |
Land | 14,460,000 | | | |
Buildings and Improvements | 49,067,000 | | | |
Accumulated Depreciation | (1,646,000) | | | |
EMEA | LD3 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,666,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,666,000 | | | |
Accumulated Depreciation | (13,366,000) | | | |
EMEA | LD4 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 23,044,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 111,645,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 134,689,000 | | | |
Accumulated Depreciation | (38,277,000) | | | |
EMEA | LD5 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,412,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 173,477,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 189,889,000 | | | |
Accumulated Depreciation | (76,880,000) | | | |
EMEA | LD6 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 131,113,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 131,113,000 | | | |
Accumulated Depreciation | (18,714,000) | | | |
EMEA | LD7 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 80,257,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 80,257,000 | | | |
Accumulated Depreciation | (4,000) | | | |
EMEA | LD8 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 107,544,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,273,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 133,817,000 | | | |
Accumulated Depreciation | (22,468,000) | | | |
EMEA | LD9 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 181,431,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 77,537,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 258,968,000 | | | |
Accumulated Depreciation | (36,890,000) | | | |
EMEA | LD10 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 40,251,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 103,274,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 143,525,000 | | | |
Accumulated Depreciation | (6,805,000) | | | |
EMEA | LS1 LISBON (METRO), PORTUGAL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,374,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,540,000 | | | |
Buildings and Improvements | 2,036,000 | | | |
Total Costs | | | | |
Land | 3,540,000 | | | |
Buildings and Improvements | 9,410,000 | | | |
Accumulated Depreciation | (1,234,000) | | | |
EMEA | MA1 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,136,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,136,000 | | | |
Accumulated Depreciation | (2,674,000) | | | |
EMEA | MA2 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,038,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,038,000 | | | |
Accumulated Depreciation | (3,983,000) | | | |
EMEA | MA3 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 44,931,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,147,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 50,078,000 | | | |
Accumulated Depreciation | (14,266,000) | | | |
EMEA | MA4 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 6,697,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,639,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,336,000 | | | |
Accumulated Depreciation | (4,778,000) | | | |
EMEA | MD1 MADRID (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,917,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,917,000 | | | |
Accumulated Depreciation | (1,766,000) | | | |
EMEA | MD2 MADRID (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 40,952,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,829,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 54,781,000 | | | |
Accumulated Depreciation | (10,453,000) | | | |
EMEA | ML2 MILAN (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,270,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,270,000 | | | |
Accumulated Depreciation | (5,538,000) | | | |
EMEA | ML3 MILAN (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,639,000 | | | |
Buildings and Improvements | 39,064,000 | | | |
Total Costs | | | | |
Land | 3,639,000 | | | |
Buildings and Improvements | 39,064,000 | | | |
Accumulated Depreciation | (9,830,000) | | | |
EMEA | ML4 MLAN (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,218,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,218,000 | | | |
Accumulated Depreciation | (3,628,000) | | | |
EMEA | MU1 MUNICH (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,757,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,757,000 | | | |
Accumulated Depreciation | (14,145,000) | | | |
EMEA | MU3 MUNICH (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,525,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,525,000 | | | |
Accumulated Depreciation | (1,210,000) | | | |
EMEA | PA1 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,246,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,246,000 | | | |
Accumulated Depreciation | (21,338,000) | | | |
EMEA | PA2 & PA3 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 29,615,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 25,820,000 | | | |
Buildings and Improvements | 283,451,000 | | | |
Total Costs | | | | |
Land | 25,820,000 | | | |
Buildings and Improvements | 313,066,000 | | | |
Accumulated Depreciation | (112,946,000) | | | |
EMEA | PA4 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,701,000 | | | |
Buildings and Improvements | 9,503,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 150,000 | | | |
Buildings and Improvements | 226,529,000 | | | |
Total Costs | | | | |
Land | 1,851,000 | | | |
Buildings and Improvements | 236,032,000 | | | |
Accumulated Depreciation | (51,667,000) | | | |
EMEA | PA5 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,554,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,299,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,853,000 | | | |
Accumulated Depreciation | (4,455,000) | | | |
EMEA | PA6 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 64,821,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 64,821,000 | | | |
Accumulated Depreciation | (19,377,000) | | | |
EMEA | PA7 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,399,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,399,000 | | | |
Accumulated Depreciation | (5,632,000) | | | |
EMEA | PA8 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 47,649,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 47,649,000 | | | |
Accumulated Depreciation | 0 | | | |
EMEA | SA1 SEVILLE (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,567,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,567,000 | | | |
Accumulated Depreciation | (905,000) | | | |
EMEA | SK1 STOCKHOLM, (METRO), SWEDEN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 15,495,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,283,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,778,000 | | | |
Accumulated Depreciation | (5,665,000) | | | |
EMEA | SK2 STOCKHOLM, (METRO), SWEDEN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 80,148,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 7,117,000 | | | |
Buildings and Improvements | 46,719,000 | | | |
Total Costs | | | | |
Land | 7,117,000 | | | |
Buildings and Improvements | 126,867,000 | | | |
Accumulated Depreciation | (14,764,000) | | | |
EMEA | SK3 STOCKHOLM, (METRO), SWEDEN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,556,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,556,000 | | | |
Accumulated Depreciation | (2,878,000) | | | |
EMEA | SO1 SOFIA (METRO), BULGARIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,236,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,547,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,783,000 | | | |
Accumulated Depreciation | (1,270,000) | | | |
EMEA | SO2 SOFIA (METRO), BULGARIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,775,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,814,000 | | | |
Total Costs | | | | |
Land | 2,775,000 | | | |
Buildings and Improvements | 8,814,000 | | | |
Accumulated Depreciation | 0 | | | |
EMEA | WA1 WARSAW (METRO), POLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,950,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,138,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,088,000 | | | |
Accumulated Depreciation | (4,007,000) | | | |
EMEA | WA2 WARSAW (METRO), POLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 4,709,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,833,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,542,000 | | | |
Accumulated Depreciation | (2,546,000) | | | |
EMEA | WA3 WARSAW (METRO), POLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,819,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,705,000 | | | |
Total Costs | | | | |
Land | 2,819,000 | | | |
Buildings and Improvements | 6,705,000 | | | |
Accumulated Depreciation | (1,000) | | | |
EMEA | ZH1 ZURICH (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,000 | | | |
Accumulated Depreciation | 0 | | | |
EMEA | ZH2 ZURICH (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,323,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,323,000 | | | |
Accumulated Depreciation | (2,543,000) | | | |
EMEA | ZH4 ZURICH (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 11,284,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,778,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 43,062,000 | | | |
Accumulated Depreciation | (26,376,000) | | | |
EMEA | ZH5 ZURICH (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 7,918,000 | | | |
Buildings and Improvements | 88,981,000 | | | |
Total Costs | | | | |
Land | 7,918,000 | | | |
Buildings and Improvements | 88,981,000 | | | |
Accumulated Depreciation | (18,350,000) | | | |
EMEA | ZW1 ZWOLLE (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,860,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,860,000 | | | |
Accumulated Depreciation | (5,925,000) | | | |
Asia-Pacific | OTHERS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 12,022,000 | | | |
Buildings and Improvements | 875,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,500,000 | | | |
Total Costs | | | | |
Land | 12,022,000 | | | |
Buildings and Improvements | 13,375,000 | | | |
Accumulated Depreciation | (7,600,000) | | | |
Asia-Pacific | AE1 ADELAIDE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,663,000 | | | |
Buildings and Improvements | 1,015,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 745,000 | | | |
Total Costs | | | | |
Land | 2,663,000 | | | |
Buildings and Improvements | 1,760,000 | | | |
Accumulated Depreciation | (148,000) | | | |
Asia-Pacific | BR1 BRISBANE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,170,000 | | | |
Buildings and Improvements | 1,053,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 827,000 | | | |
Total Costs | | | | |
Land | 3,170,000 | | | |
Buildings and Improvements | 1,880,000 | | | |
Accumulated Depreciation | (68,000) | | | |
Asia-Pacific | CA1 CANBERRA (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 18,410,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 321,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,731,000 | | | |
Accumulated Depreciation | (573,000) | | | |
Asia-Pacific | HK1 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 147,895,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 147,895,000 | | | |
Accumulated Depreciation | (87,393,000) | | | |
Asia-Pacific | HK2 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 285,083,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 285,083,000 | | | |
Accumulated Depreciation | (99,612,000) | | | |
Asia-Pacific | HK3 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 134,081,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 134,081,000 | | | |
Accumulated Depreciation | (60,527,000) | | | |
Asia-Pacific | HK4 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,593,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,593,000 | | | |
Accumulated Depreciation | (5,818,000) | | | |
Asia-Pacific | HK5 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 70,002,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 38,903,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 108,905,000 | | | |
Accumulated Depreciation | (4,225,000) | | | |
Asia-Pacific | ME1 MELBOURNE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 14,977,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 81,609,000 | | | |
Total Costs | | | | |
Land | 14,977,000 | | | |
Buildings and Improvements | 81,609,000 | | | |
Accumulated Depreciation | (13,909,000) | | | |
Asia-Pacific | ME2 MELBOURNE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,141,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,141,000 | | | |
Accumulated Depreciation | 0 | | | |
Asia-Pacific | ME4 MELBOURNE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,437,000 | | | |
Buildings and Improvements | 84,175,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,499,000 | | | |
Total Costs | | | | |
Land | 3,437,000 | | | |
Buildings and Improvements | 86,674,000 | | | |
Accumulated Depreciation | (4,407,000) | | | |
Asia-Pacific | ME5 MELBOURNE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,678,000 | | | |
Buildings and Improvements | 4,094,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,586,000 | | | |
Total Costs | | | | |
Land | 6,678,000 | | | |
Buildings and Improvements | 5,680,000 | | | |
Accumulated Depreciation | (445,000) | | | |
Asia-Pacific | OS1 OSAKA (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 14,876,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 66,296,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 81,172,000 | | | |
Accumulated Depreciation | (18,931,000) | | | |
Asia-Pacific | PE1 PERTH (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,352,000 | | | |
Buildings and Improvements | 1,337,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 363,000 | | | |
Total Costs | | | | |
Land | 1,352,000 | | | |
Buildings and Improvements | 1,700,000 | | | |
Accumulated Depreciation | (64,000) | | | |
Asia-Pacific | PE2 PERTH (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,327,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,685,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,012,000 | | | |
Accumulated Depreciation | (1,129,000) | | | |
Asia-Pacific | SG1 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 177,270,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 177,270,000 | | | |
Accumulated Depreciation | (111,655,000) | | | |
Asia-Pacific | SG2 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 333,964,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 333,964,000 | | | |
Accumulated Depreciation | (164,156,000) | | | |
Asia-Pacific | SG3 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 34,844,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 196,081,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 230,925,000 | | | |
Accumulated Depreciation | (29,083,000) | | | |
Asia-Pacific | SH2 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,529,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,529,000 | | | |
Accumulated Depreciation | (1,643,000) | | | |
Asia-Pacific | SH3 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,066,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,137,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,203,000 | | | |
Accumulated Depreciation | (5,075,000) | | | |
Asia-Pacific | SH5 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 11,284,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,792,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,076,000 | | | |
Accumulated Depreciation | (9,650,000) | | | |
Asia-Pacific | SH6 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,545,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,353,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 41,898,000 | | | |
Accumulated Depreciation | (2,000) | | | |
Asia-Pacific | SY1 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,435,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,435,000 | | | |
Accumulated Depreciation | (14,709,000) | | | |
Asia-Pacific | SY2 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 3,080,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,721,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,801,000 | | | |
Accumulated Depreciation | (21,601,000) | | | |
Asia-Pacific | SY3 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 8,712,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 140,590,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 149,302,000 | | | |
Accumulated Depreciation | (60,057,000) | | | |
Asia-Pacific | SY4 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 142,633,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 142,633,000 | | | |
Accumulated Depreciation | (18,167,000) | | | |
Asia-Pacific | SY5 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 82,372,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,969,000 | | | |
Total Costs | | | | |
Land | 82,372,000 | | | |
Buildings and Improvements | 56,969,000 | | | |
Accumulated Depreciation | 0 | | | |
Asia-Pacific | SY6 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 8,890,000 | | | |
Buildings and Improvements | 64,197,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,889,000 | | | |
Total Costs | | | | |
Land | 8,890,000 | | | |
Buildings and Improvements | 66,086,000 | | | |
Accumulated Depreciation | (2,283,000) | | | |
Asia-Pacific | SY7 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,754,000 | | | |
Buildings and Improvements | 47,350,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,335,000 | | | |
Total Costs | | | | |
Land | 2,754,000 | | | |
Buildings and Improvements | 48,685,000 | | | |
Accumulated Depreciation | (1,612,000) | | | |
Asia-Pacific | SY8 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,073,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 161,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,234,000 | | | |
Accumulated Depreciation | (190,000) | | | |
Asia-Pacific | TY1 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,793,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,793,000 | | | |
Accumulated Depreciation | (13,513,000) | | | |
Asia-Pacific | TY2 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 85,585,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 85,585,000 | | | |
Accumulated Depreciation | (61,682,000) | | | |
Asia-Pacific | TY3 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 75,837,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 75,837,000 | | | |
Accumulated Depreciation | (35,231,000) | | | |
Asia-Pacific | TY4 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,585,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,585,000 | | | |
Accumulated Depreciation | (20,562,000) | | | |
Asia-Pacific | TY5 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 102,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,973,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 57,075,000 | | | |
Accumulated Depreciation | (8,431,000) | | | |
Asia-Pacific | TY6 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 37,941,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,779,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,720,000 | | | |
Accumulated Depreciation | (19,544,000) | | | |
Asia-Pacific | TY7 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 13,175,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,253,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,428,000 | | | |
Accumulated Depreciation | (8,356,000) | | | |
Asia-Pacific | TY8 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 53,848,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,256,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 67,104,000 | | | |
Accumulated Depreciation | (16,874,000) | | | |
Asia-Pacific | TY9 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 106,710,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,877,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 131,587,000 | | | |
Accumulated Depreciation | (40,361,000) | | | |
Asia-Pacific | TY10 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 69,881,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,842,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 85,723,000 | | | |
Accumulated Depreciation | (15,387,000) | | | |
Asia-Pacific | TY11 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 22,099,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,931,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 55,030,000 | | | |
Accumulated Depreciation | (1,000) | | | |
Asia-Pacific | TY12 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 10,285,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,001,000 | | | |
Total Costs | | | | |
Land | 10,285,000 | | | |
Buildings and Improvements | 1,001,000 | | | |
Accumulated Depreciation | $ 0 | | | |