Schedule III - Real Estate and Accumulated Depreciation - Real Estate and Accumulated Depreciation, by Property (Detail) - USD ($) | Dec. 31, 2021 | Dec. 31, 2020 | Dec. 31, 2019 | Dec. 31, 2018 |
Initial Costs to Company | | | | |
Encumbrances | $ 30,310,000 | | | |
Land | 598,614,000 | | | |
Buildings and Improvements | 4,687,056,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 387,949,000 | | | |
Buildings and Improvements | 16,232,443,000 | | | |
Total Costs | | | | |
Land | 986,560,000 | | | |
Buildings and Improvements | 20,919,495,000 | | | |
Accumulated Depreciation | (7,274,860,000) | $ (6,399,477,000) | $ (5,329,182,000) | $ (4,517,016,000) |
Taxable basis in aggregate initial cost | 29,100,000,000 | | | |
Operating lease | | | | |
Total Costs | | | | |
Initial cost | 0 | | | |
Americas | AT1 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 151,612,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 151,612,000 | | | |
Accumulated Depreciation | (82,544,000) | | | |
Americas | AT2 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 38,799,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 38,799,000 | | | |
Accumulated Depreciation | (28,723,000) | | | |
Americas | AT3 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,453,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,453,000 | | | |
Accumulated Depreciation | (3,348,000) | | | |
Americas | AT4 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 5,400,000 | | | |
Buildings and Improvements | 20,209,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,446,000 | | | |
Total Costs | | | | |
Land | 5,400,000 | | | |
Buildings and Improvements | 40,655,000 | | | |
Accumulated Depreciation | (13,506,000) | | | |
Americas | AT5 ATLANTA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,011,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,207,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,218,000 | | | |
Accumulated Depreciation | (5,101,000) | | | |
Americas | BG1 BOGOTÁ (METRO), COLOMBIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 8,779,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 749,000 | | | |
Buildings and Improvements | 5,408,000 | | | |
Total Costs | | | | |
Land | 749,000 | | | |
Buildings and Improvements | 14,187,000 | | | |
Accumulated Depreciation | (5,040,000) | | | |
Americas | BG2 BOGOTÁ (METRO), COLOMBIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 4,815,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,730,000 | | | |
Total Costs | | | | |
Land | 4,815,000 | | | |
Buildings and Improvements | 10,730,000 | | | |
Accumulated Depreciation | 0 | | | |
Americas | BO1 BOSTON (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,128,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,128,000 | | | |
Accumulated Depreciation | (6,128,000) | | | |
Americas | BO2 BOSTON (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,500,000 | | | |
Buildings and Improvements | 30,383,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 36,598,000 | | | |
Total Costs | | | | |
Land | 2,500,000 | | | |
Buildings and Improvements | 66,981,000 | | | |
Accumulated Depreciation | (16,486,000) | | | |
Americas | CH1 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 162,703,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 162,703,000 | | | |
Accumulated Depreciation | (108,670,000) | | | |
Americas | CH2 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 118,498,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 118,498,000 | | | |
Accumulated Depreciation | (63,074,000) | | | |
Americas | CH3 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 9,759,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 351,000 | | | |
Buildings and Improvements | 354,558,000 | | | |
Total Costs | | | | |
Land | 10,110,000 | | | |
Buildings and Improvements | 354,558,000 | | | |
Accumulated Depreciation | (155,151,000) | | | |
Americas | CH4 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,911,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,911,000 | | | |
Accumulated Depreciation | (14,761,000) | | | |
Americas | CH7 CHICAGO (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 670,000 | | | |
Buildings and Improvements | 10,564,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,164,000 | | | |
Total Costs | | | | |
Land | 670,000 | | | |
Buildings and Improvements | 18,728,000 | | | |
Accumulated Depreciation | (6,185,000) | | | |
Americas | CL1 CALGARY (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 11,572,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,719,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,291,000 | | | |
Accumulated Depreciation | (3,419,000) | | | |
Americas | CL2 CALGARY (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 14,145,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,223,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,368,000 | | | |
Accumulated Depreciation | (4,293,000) | | | |
Americas | CL3 CALGARY (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,910,000 | | | |
Buildings and Improvements | 69,334,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 395,000 | | | |
Buildings and Improvements | 15,473,000 | | | |
Total Costs | | | | |
Land | 8,304,000 | | | |
Buildings and Improvements | 84,807,000 | | | |
Accumulated Depreciation | (9,371,000) | | | |
Americas | CU1 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,019,000 | | | |
Buildings and Improvements | 37,581,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,734,000 | | | |
Total Costs | | | | |
Land | 1,019,000 | | | |
Buildings and Improvements | 43,315,000 | | | |
Accumulated Depreciation | (17,847,000) | | | |
Americas | CU2 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,244,000 | | | |
Buildings and Improvements | 48,000,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,546,000 | | | |
Total Costs | | | | |
Land | 1,244,000 | | | |
Buildings and Improvements | 60,546,000 | | | |
Accumulated Depreciation | (19,028,000) | | | |
Americas | CU3 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,088,000 | | | |
Buildings and Improvements | 37,387,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,104,000 | | | |
Total Costs | | | | |
Land | 1,088,000 | | | |
Buildings and Improvements | 40,491,000 | | | |
Accumulated Depreciation | (14,112,000) | | | |
Americas | CU4 CULPEPER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,372,000 | | | |
Buildings and Improvements | 27,832,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 34,983,000 | | | |
Total Costs | | | | |
Land | 1,372,000 | | | |
Buildings and Improvements | 62,815,000 | | | |
Accumulated Depreciation | (12,897,000) | | | |
Americas | DA1 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 69,250,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 69,250,000 | | | |
Accumulated Depreciation | (42,245,000) | | | |
Americas | DA2 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 81,911,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 81,911,000 | | | |
Accumulated Depreciation | (34,463,000) | | | |
Americas | DA3 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 97,996,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 97,996,000 | | | |
Accumulated Depreciation | (45,222,000) | | | |
Americas | DA4 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,789,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,789,000 | | | |
Accumulated Depreciation | (9,588,000) | | | |
Americas | DA6 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 20,522,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 174,231,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 194,753,000 | | | |
Accumulated Depreciation | (48,576,000) | | | |
Americas | DA7 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 30,709,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 30,709,000 | | | |
Accumulated Depreciation | (16,356,000) | | | |
Americas | DA9 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 610,000 | | | |
Buildings and Improvements | 15,398,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,868,000 | | | |
Total Costs | | | | |
Land | 610,000 | | | |
Buildings and Improvements | 22,265,000 | | | |
Accumulated Depreciation | (7,481,000) | | | |
Americas | DA11 DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 175,787,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 175,787,000 | | | |
Accumulated Depreciation | (13,565,000) | | | |
Americas | INFOMART BUILDING DALLAS (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 24,380,000 | | | |
Buildings and Improvements | 337,643,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,293,000 | | | |
Buildings and Improvements | 26,974,000 | | | |
Total Costs | | | | |
Land | 27,673,000 | | | |
Buildings and Improvements | 364,617,000 | | | |
Accumulated Depreciation | (42,321,000) | | | |
Americas | DC1 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,477,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,477,000 | | | |
Accumulated Depreciation | (2,251,000) | | | |
Americas | DC2 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 5,047,000 | | | |
Buildings and Improvements | 126,667,000 | | | |
Total Costs | | | | |
Land | 5,047,000 | | | |
Buildings and Improvements | 126,667,000 | | | |
Accumulated Depreciation | (98,822,000) | | | |
Americas | DC3 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 37,451,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 50,459,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 87,910,000 | | | |
Accumulated Depreciation | (55,075,000) | | | |
Americas | DC4 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,906,000 | | | |
Buildings and Improvements | 7,272,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 74,265,000 | | | |
Total Costs | | | | |
Land | 1,906,000 | | | |
Buildings and Improvements | 81,537,000 | | | |
Accumulated Depreciation | (59,399,000) | | | |
Americas | DC5 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 4,983,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 93,177,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 98,160,000 | | | |
Accumulated Depreciation | (70,435,000) | | | |
Americas | DC6 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 5,082,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 92,783,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 97,865,000 | | | |
Accumulated Depreciation | (55,372,000) | | | |
Americas | DC7 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,080,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,080,000 | | | |
Accumulated Depreciation | (14,401,000) | | | |
Americas | DC10 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 44,601,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 88,492,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 133,093,000 | | | |
Accumulated Depreciation | (99,617,000) | | | |
Americas | DC11 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 5,082,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 187,604,000 | | | |
Total Costs | | | | |
Land | 1,429,000 | | | |
Buildings and Improvements | 192,686,000 | | | |
Accumulated Depreciation | (72,664,000) | | | |
Americas | DC12 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 101,783,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 81,604,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 183,387,000 | | | |
Accumulated Depreciation | (37,732,000) | | | |
Americas | DC13 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 5,500,000 | | | |
Buildings and Improvements | 25,423,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,656,000 | | | |
Total Costs | | | | |
Land | 5,500,000 | | | |
Buildings and Improvements | 47,079,000 | | | |
Accumulated Depreciation | (16,183,000) | | | |
Americas | DC14 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,560,000 | | | |
Buildings and Improvements | 33,511,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,726,000 | | | |
Total Costs | | | | |
Land | 2,560,000 | | | |
Buildings and Improvements | 49,237,000 | | | |
Accumulated Depreciation | (14,491,000) | | | |
Americas | DC15 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,965,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,965,000 | | | |
Buildings and Improvements | 170,776,000 | | | |
Total Costs | | | | |
Land | 3,929,000 | | | |
Buildings and Improvements | 170,776,000 | | | |
Accumulated Depreciation | (12,708,000) | | | |
Americas | DC21 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,507,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 100,804,000 | | | |
Total Costs | | | | |
Land | 1,507,000 | | | |
Buildings and Improvements | 100,804,000 | | | |
Accumulated Depreciation | (6,622,000) | | | |
Americas | DC97 WASHINGTON, DC (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 2,021,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 847,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,867,000 | | | |
Accumulated Depreciation | (1,564,000) | | | |
Americas | DE1 DENVER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,849,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,849,000 | | | |
Accumulated Depreciation | (8,845,000) | | | |
Americas | DE2 DENVER (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 5,240,000 | | | |
Buildings and Improvements | 23,053,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,064,000 | | | |
Total Costs | | | | |
Land | 5,240,000 | | | |
Buildings and Improvements | 54,116,000 | | | |
Accumulated Depreciation | (17,837,000) | | | |
Americas | HO1 HOUSTON (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,440,000 | | | |
Buildings and Improvements | 23,780,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 33,281,000 | | | |
Total Costs | | | | |
Land | 1,440,000 | | | |
Buildings and Improvements | 57,060,000 | | | |
Accumulated Depreciation | (18,065,000) | | | |
Americas | KA1 KAMLOOPS (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,991,000 | | | |
Buildings and Improvements | 46,983,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 149,000 | | | |
Buildings and Improvements | 6,768,000 | | | |
Total Costs | | | | |
Land | 3,140,000 | | | |
Buildings and Improvements | 53,751,000 | | | |
Accumulated Depreciation | (5,537,000) | | | |
Americas | LA1 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 110,808,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 110,808,000 | | | |
Accumulated Depreciation | (75,153,000) | | | |
Americas | LA2 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,582,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,582,000 | | | |
Accumulated Depreciation | (9,250,000) | | | |
Americas | LA3 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 34,727,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,959,000 | | | |
Buildings and Improvements | 17,368,000 | | | |
Total Costs | | | | |
Land | 3,959,000 | | | |
Buildings and Improvements | 52,095,000 | | | |
Accumulated Depreciation | (43,042,000) | | | |
Americas | LA4 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 19,333,000 | | | |
Buildings and Improvements | 137,630,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 58,351,000 | | | |
Total Costs | | | | |
Land | 19,333,000 | | | |
Buildings and Improvements | 195,981,000 | | | |
Accumulated Depreciation | (102,469,000) | | | |
Americas | LA7 LOS ANGELES (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,800,000 | | | |
Buildings and Improvements | 33,621,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,409,000 | | | |
Total Costs | | | | |
Land | 7,800,000 | | | |
Buildings and Improvements | 90,030,000 | | | |
Accumulated Depreciation | (17,280,000) | | | |
Americas | MI1 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 18,920,000 | | | |
Buildings and Improvements | 127,194,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 112,732,000 | | | |
Total Costs | | | | |
Land | 18,920,000 | | | |
Buildings and Improvements | 239,925,000 | | | |
Accumulated Depreciation | (74,698,000) | | | |
Americas | MI2 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,677,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 22,677,000 | | | |
Accumulated Depreciation | (15,028,000) | | | |
Americas | MI3 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 33,886,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 33,886,000 | | | |
Accumulated Depreciation | (20,458,000) | | | |
Americas | MI6 MIAMI (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 4,750,000 | | | |
Buildings and Improvements | 23,017,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,848,000 | | | |
Total Costs | | | | |
Land | 4,750,000 | | | |
Buildings and Improvements | 32,865,000 | | | |
Accumulated Depreciation | (13,768,000) | | | |
Americas | MO1 MONTERREY (METRO), MEXICO | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 2,572,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,557,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,129,000 | | | |
Accumulated Depreciation | (909,000) | | | |
Americas | MT1 MONTREAL (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 76,932,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,745,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 89,678,000 | | | |
Accumulated Depreciation | (13,974,000) | | | |
Americas | MX1 MEXICO CITY (METRO), MEXICO | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,090,000 | | | |
Buildings and Improvements | 53,980,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,428,000 | | | |
Total Costs | | | | |
Land | 1,090,000 | | | |
Buildings and Improvements | 89,409,000 | | | |
Accumulated Depreciation | (8,341,000) | | | |
Americas | MX2 MEXICO CITY (METRO), MEXICO | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,090,000 | | | |
Buildings and Improvements | 16,061,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 52,318,000 | | | |
Total Costs | | | | |
Land | 1,090,000 | | | |
Buildings and Improvements | 68,379,000 | | | |
Accumulated Depreciation | (1,979,000) | | | |
Americas | NY1 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 71,716,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 71,716,000 | | | |
Accumulated Depreciation | (47,232,000) | | | |
Americas | NY2 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 17,859,000 | | | |
Buildings and Improvements | 207,035,000 | | | |
Total Costs | | | | |
Land | 17,859,000 | | | |
Buildings and Improvements | 207,035,000 | | | |
Accumulated Depreciation | (135,182,000) | | | |
Americas | NY4 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 364,176,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 364,176,000 | | | |
Accumulated Depreciation | (211,873,000) | | | |
Americas | NY5 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 296,054,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 296,054,000 | | | |
Accumulated Depreciation | (99,005,000) | | | |
Americas | NY6 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 95,441,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 95,441,000 | | | |
Accumulated Depreciation | (18,988,000) | | | |
Americas | NY7 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 24,660,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 172,048,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 196,708,000 | | | |
Accumulated Depreciation | (142,718,000) | | | |
Americas | NY9 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 50,109,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 50,109,000 | | | |
Accumulated Depreciation | (38,190,000) | | | |
Americas | NY11 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,050,000 | | | |
Buildings and Improvements | 58,717,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,588,000 | | | |
Total Costs | | | | |
Land | 2,050,000 | | | |
Buildings and Improvements | 83,305,000 | | | |
Accumulated Depreciation | (26,847,000) | | | |
Americas | NY13 NEW YORK (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 31,603,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 8,300,000 | | | |
Buildings and Improvements | 6,583,000 | | | |
Total Costs | | | | |
Land | 8,300,000 | | | |
Buildings and Improvements | 38,187,000 | | | |
Accumulated Depreciation | (18,342,000) | | | |
Americas | OT1 OTTAWA (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,586,000 | | | |
Buildings and Improvements | 39,128,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 75,000 | | | |
Buildings and Improvements | 4,490,000 | | | |
Total Costs | | | | |
Land | 1,661,000 | | | |
Buildings and Improvements | 43,618,000 | | | |
Accumulated Depreciation | (5,397,000) | | | |
Americas | PH1 PHILADELPHIA (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 44,638,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 44,638,000 | | | |
Accumulated Depreciation | (21,454,000) | | | |
Americas | RJ1 RIO DE JANEIRO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,064,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,064,000 | | | |
Accumulated Depreciation | (13,455,000) | | | |
Americas | RJ2 RIO DE JANEIRO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 2,012,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,181,000 | | | |
Buildings and Improvements | 55,254,000 | | | |
Total Costs | | | | |
Land | 1,181,000 | | | |
Buildings and Improvements | 57,266,000 | | | |
Accumulated Depreciation | (19,885,000) | | | |
Americas | SE2 SEATTLE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,109,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,109,000 | | | |
Accumulated Depreciation | (24,939,000) | | | |
Americas | SE3 SEATTLE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,760,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 101,258,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 103,018,000 | | | |
Accumulated Depreciation | (63,601,000) | | | |
Americas | SE4 SEATTLE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 4,000,000 | | | |
Buildings and Improvements | 12,903,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,022,000 | | | |
Total Costs | | | | |
Land | 4,000,000 | | | |
Buildings and Improvements | 49,925,000 | | | |
Accumulated Depreciation | (11,090,000) | | | |
Americas | SJ1 SAINT JOHN (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 162,000 | | | |
Buildings and Improvements | 14,276,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 8,000 | | | |
Buildings and Improvements | 1,428,000 | | | |
Total Costs | | | | |
Land | 170,000 | | | |
Buildings and Improvements | 15,703,000 | | | |
Accumulated Depreciation | (1,861,000) | | | |
Americas | SP1 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 10,188,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,870,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,058,000 | | | |
Accumulated Depreciation | (18,478,000) | | | |
Americas | SP2 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 2,874,000 | | | |
Buildings and Improvements | 48,068,000 | | | |
Total Costs | | | | |
Land | 2,874,000 | | | |
Buildings and Improvements | 48,068,000 | | | |
Accumulated Depreciation | (35,184,000) | | | |
Americas | SP3 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,222,000 | | | |
Buildings and Improvements | 72,997,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 42,690,000 | | | |
Total Costs | | | | |
Land | 7,223,000 | | | |
Buildings and Improvements | 115,688,000 | | | |
Accumulated Depreciation | (37,026,000) | | | |
Americas | SP4 SÃO PAULO (METRO), BRAZIL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 22,027,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 57,782,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 79,809,000 | | | |
Accumulated Depreciation | (15,875,000) | | | |
Americas | SV1 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 15,545,000 | | | |
Buildings and Improvements | 144,829,000 | | | |
Total Costs | | | | |
Land | 15,545,000 | | | |
Buildings and Improvements | 144,829,000 | | | |
Accumulated Depreciation | (100,483,000) | | | |
Americas | SV2 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 157,926,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 157,926,000 | | | |
Accumulated Depreciation | (100,979,000) | | | |
Americas | SV3 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 77,334,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 77,334,000 | | | |
Accumulated Depreciation | (41,552,000) | | | |
Americas | SV4 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 102,684,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 102,684,000 | | | |
Accumulated Depreciation | (26,207,000) | | | |
Americas | SV5 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,238,000 | | | |
Buildings and Improvements | 98,991,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 101,852,000 | | | |
Total Costs | | | | |
Land | 6,238,000 | | | |
Buildings and Improvements | 200,843,000 | | | |
Accumulated Depreciation | (91,142,000) | | | |
Americas | SV6 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 15,585,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 30,329,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 45,914,000 | | | |
Accumulated Depreciation | (42,339,000) | | | |
Americas | SV8 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 157,147,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 157,147,000 | | | |
Accumulated Depreciation | (42,067,000) | | | |
Americas | SV10 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 12,646,000 | | | |
Buildings and Improvements | 123,594,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 93,742,000 | | | |
Total Costs | | | | |
Land | 12,646,000 | | | |
Buildings and Improvements | 217,336,000 | | | |
Accumulated Depreciation | (42,743,000) | | | |
Americas | SV11 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 147,118,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 147,118,000 | | | |
Accumulated Depreciation | (3,081,000) | | | |
Americas | SV12 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 20,313,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,586,000 | | | |
Total Costs | | | | |
Land | 20,313,000 | | | |
Buildings and Improvements | 8,586,000 | | | |
Accumulated Depreciation | 0 | | | |
Americas | SV13 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 3,758,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,758,000 | | | |
Accumulated Depreciation | (3,225,000) | | | |
Americas | SV14 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,638,000 | | | |
Buildings and Improvements | 5,503,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,782,000 | | | |
Total Costs | | | | |
Land | 3,638,000 | | | |
Buildings and Improvements | 9,285,000 | | | |
Accumulated Depreciation | (3,044,000) | | | |
Americas | SV15 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,651,000 | | | |
Buildings and Improvements | 23,060,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,875,000 | | | |
Total Costs | | | | |
Land | 7,651,000 | | | |
Buildings and Improvements | 32,934,000 | | | |
Accumulated Depreciation | (11,023,000) | | | |
Americas | SV16 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 4,271,000 | | | |
Buildings and Improvements | 15,018,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,056,000 | | | |
Total Costs | | | | |
Land | 4,271,000 | | | |
Buildings and Improvements | 20,074,000 | | | |
Accumulated Depreciation | (6,506,000) | | | |
Americas | SV17 SILICON VALLEY (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 17,493,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,368,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,862,000 | | | |
Accumulated Depreciation | (14,966,000) | | | |
Americas | TR1 TORONTO (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 92,608,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 92,608,000 | | | |
Accumulated Depreciation | (38,106,000) | | | |
Americas | TR2 TORONTO (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 21,113,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 107,044,000 | | | |
Buildings and Improvements | 142,753,000 | | | |
Total Costs | | | | |
Land | 107,044,000 | | | |
Buildings and Improvements | 163,865,000 | | | |
Accumulated Depreciation | (32,874,000) | | | |
Americas | TR4 TORONTO (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 13,985,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,014,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,999,000 | | | |
Accumulated Depreciation | (5,308,000) | | | |
Americas | TR5 MARKHAM (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 24,913,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,594,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 27,507,000 | | | |
Accumulated Depreciation | (5,928,000) | | | |
Americas | TR6 BRAMPTON (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 9,386,000 | | | |
Buildings and Improvements | 58,704,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,316,000 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 12,702,000 | | | |
Buildings and Improvements | 58,704,000 | | | |
Accumulated Depreciation | (6,151,000) | | | |
Americas | TR7 BRAMPTON (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 9,855,000 | | | |
Buildings and Improvements | 71,966,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 18,170,000 | | | |
Total Costs | | | | |
Land | 9,854,000 | | | |
Buildings and Improvements | 90,136,000 | | | |
Accumulated Depreciation | (13,019,000) | | | |
Americas | VA1 BURNABY (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 4,668,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,233,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,901,000 | | | |
Accumulated Depreciation | (1,048,000) | | | |
Americas | WI1 WINNIPEG (METRO), CANADA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 57,234,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,976,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 62,210,000 | | | |
Accumulated Depreciation | (2,379,000) | | | |
Americas | OTHERS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 76,482,000 | | | |
Buildings and Improvements | 52,099,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 122,301,000 | | | |
Total Costs | | | | |
Land | 76,482,000 | | | |
Buildings and Improvements | 174,400,000 | | | |
Accumulated Depreciation | (21,468,000) | | | |
EMEA | OTHERS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 59,811,000 | | | |
Buildings and Improvements | 18,309,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 17,398,000 | | | |
Buildings and Improvements | 32,642,000 | | | |
Total Costs | | | | |
Land | 77,209,000 | | | |
Buildings and Improvements | 50,951,000 | | | |
Accumulated Depreciation | (9,560,000) | | | |
EMEA | AD1 ABU DHABI (METRO), UNITED ARAB EMIRATES | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 75,587,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 75,587,000 | | | |
Accumulated Depreciation | (11,797,000) | | | |
EMEA | AM1 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 98,785,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 98,785,000 | | | |
Accumulated Depreciation | (52,871,000) | | | |
EMEA | AM2 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 83,244,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 83,244,000 | | | |
Accumulated Depreciation | (34,928,000) | | | |
EMEA | AM3 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 27,099,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 134,758,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 161,857,000 | | | |
Accumulated Depreciation | (70,989,000) | | | |
EMEA | AM4 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 223,115,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 223,115,000 | | | |
Accumulated Depreciation | (36,326,000) | | | |
EMEA | AM5 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 92,199,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,153,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 108,352,000 | | | |
Accumulated Depreciation | (37,422,000) | | | |
EMEA | AM6 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,616,000 | | | |
Buildings and Improvements | 50,876,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 539,000 | | | |
Buildings and Improvements | 92,063,000 | | | |
Total Costs | | | | |
Land | 7,155,000 | | | |
Buildings and Improvements | 142,938,000 | | | |
Accumulated Depreciation | (32,929,000) | | | |
EMEA | AM7 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,397,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 139,860,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 147,257,000 | | | |
Accumulated Depreciation | (25,536,000) | | | |
EMEA | AM8 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,692,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,692,000 | | | |
Accumulated Depreciation | (6,119,000) | | | |
EMEA | AM11 AMSTERDAM (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 6,405,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 416,000 | | | |
Buildings and Improvements | 13,007,000 | | | |
Total Costs | | | | |
Land | 416,000 | | | |
Buildings and Improvements | 19,412,000 | | | |
Accumulated Depreciation | (2,761,000) | | | |
EMEA | BA1 BARCELONA (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 9,443,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 16,468,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,911,000 | | | |
Accumulated Depreciation | (9,654,000) | | | |
EMEA | BX1 BORDEAUX (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,916,000 | | | |
Buildings and Improvements | 3,507,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 118,000 | | | |
Buildings and Improvements | 31,230,000 | | | |
Total Costs | | | | |
Land | 2,034,000 | | | |
Buildings and Improvements | 34,737,000 | | | |
Accumulated Depreciation | (778,000) | | | |
EMEA | DB1 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,393,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,393,000 | | | |
Accumulated Depreciation | (4,455,000) | | | |
EMEA | DB2 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 12,460,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,493,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,953,000 | | | |
Accumulated Depreciation | (10,735,000) | | | |
EMEA | DB3 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,334,000 | | | |
Buildings and Improvements | 54,387,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 271,000 | | | |
Buildings and Improvements | 20,819,000 | | | |
Total Costs | | | | |
Land | 3,605,000 | | | |
Buildings and Improvements | 75,206,000 | | | |
Accumulated Depreciation | (24,039,000) | | | |
EMEA | DB4 DUBLIN (METRO), IRELAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 26,875,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,088,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 45,963,000 | | | |
Accumulated Depreciation | (10,977,000) | | | |
EMEA | DU1 DÜSSELDORF (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 8,235,000 | | | |
Buildings and Improvements | 33,389,000 | | | |
Total Costs | | | | |
Land | 8,235,000 | | | |
Buildings and Improvements | 33,389,000 | | | |
Accumulated Depreciation | (19,657,000) | | | |
EMEA | DX1 DUBAI (METRO), UNITED ARAB EMIRATES | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 93,205,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 93,205,000 | | | |
Accumulated Depreciation | (41,746,000) | | | |
EMEA | DX2 DUBAI (METRO), UNITED ARAB EMIRATES | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 667,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 667,000 | | | |
Accumulated Depreciation | (339,000) | | | |
EMEA | DX3 DUBAI (METRO), UNITED ARAB EMIRATES | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,737,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,460,000 | | | |
Total Costs | | | | |
Land | 6,737,000 | | | |
Buildings and Improvements | 5,460,000 | | | |
Accumulated Depreciation | (376,000) | | | |
EMEA | EN1 ENSCHEDE (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,914,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 32,914,000 | | | |
Accumulated Depreciation | (24,331,000) | | | |
EMEA | FR2 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 20,843,000 | | | |
Buildings and Improvements | 545,921,000 | | | |
Total Costs | | | | |
Land | 20,843,000 | | | |
Buildings and Improvements | 545,921,000 | | | |
Accumulated Depreciation | (171,728,000) | | | |
EMEA | FR4 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 11,578,000 | | | |
Buildings and Improvements | 9,307,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 943,000 | | | |
Buildings and Improvements | 103,983,000 | | | |
Total Costs | | | | |
Land | 12,521,000 | | | |
Buildings and Improvements | 113,290,000 | | | |
Accumulated Depreciation | (39,794,000) | | | |
EMEA | FR5 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 30,310,000 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 14,210,000 | | | |
Buildings and Improvements | 224,488,000 | | | |
Total Costs | | | | |
Land | 14,210,000 | | | |
Buildings and Improvements | 224,488,000 | | | |
Accumulated Depreciation | (59,488,000) | | | |
EMEA | FR6 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 140,753,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 140,753,000 | | | |
Accumulated Depreciation | (33,382,000) | | | |
EMEA | FR7 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 43,634,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,353,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 80,987,000 | | | |
Accumulated Depreciation | (31,181,000) | | | |
EMEA | FR8 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 20,430,000 | | | |
Buildings and Improvements | 58,199,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 48,445,000 | | | |
Total Costs | | | | |
Land | 20,430,000 | | | |
Buildings and Improvements | 106,644,000 | | | |
Accumulated Depreciation | (1,119,000) | | | |
EMEA | FR11x FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,566,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,566,000 | | | |
Accumulated Depreciation | (154,000) | | | |
EMEA | FR13 FRANKFURT (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,218,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,218,000 | | | |
Accumulated Depreciation | 0 | | | |
EMEA | GN1 GENOA (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,988,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 2,772,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,760,000 | | | |
Accumulated Depreciation | (51,000) | | | |
EMEA | GV1 GENEVA (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,319,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,319,000 | | | |
Accumulated Depreciation | (9,864,000) | | | |
EMEA | GV2 GENEVA (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 44,778,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 44,778,000 | | | |
Accumulated Depreciation | (22,820,000) | | | |
EMEA | HE1 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,008,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,008,000 | | | |
Accumulated Depreciation | (3,554,000) | | | |
EMEA | HE3 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,371,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,371,000 | | | |
Accumulated Depreciation | (10,364,000) | | | |
EMEA | HE4 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 29,092,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,063,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 36,155,000 | | | |
Accumulated Depreciation | (20,133,000) | | | |
EMEA | HE5 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,564,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,633,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 27,197,000 | | | |
Accumulated Depreciation | (7,027,000) | | | |
EMEA | HE6 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 17,204,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,594,000 | | | |
Buildings and Improvements | 30,980,000 | | | |
Total Costs | | | | |
Land | 1,594,000 | | | |
Buildings and Improvements | 48,185,000 | | | |
Accumulated Depreciation | (15,811,000) | | | |
EMEA | HE7 HELSINKI (METRO), FINLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 7,348,000 | | | |
Buildings and Improvements | 6,946,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 1,141,000 | | | |
Buildings and Improvements | 51,331,000 | | | |
Total Costs | | | | |
Land | 8,488,000 | | | |
Buildings and Improvements | 58,277,000 | | | |
Accumulated Depreciation | (5,421,000) | | | |
EMEA | HH1 HAMBURG (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,612,000 | | | |
Buildings and Improvements | 5,360,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 610,000 | | | |
Buildings and Improvements | 47,875,000 | | | |
Total Costs | | | | |
Land | 4,222,000 | | | |
Buildings and Improvements | 53,235,000 | | | |
Accumulated Depreciation | (4,466,000) | | | |
EMEA | IL2 ISTANBUL (METRO), TURKEY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 14,460,000 | | | |
Buildings and Improvements | 39,289,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 41,641,000 | | | |
Total Costs | | | | |
Land | 14,460,000 | | | |
Buildings and Improvements | 80,930,000 | | | |
Accumulated Depreciation | (10,234,000) | | | |
EMEA | LD3 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,380,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,380,000 | | | |
Accumulated Depreciation | (14,747,000) | | | |
EMEA | LD4 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 23,044,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 137,786,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 160,831,000 | | | |
Accumulated Depreciation | (59,443,000) | | | |
EMEA | LD5 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,412,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 189,336,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 205,748,000 | | | |
Accumulated Depreciation | (107,560,000) | | | |
EMEA | LD6 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 151,375,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 151,375,000 | | | |
Accumulated Depreciation | (45,283,000) | | | |
EMEA | LD7 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 2,271,000 | | | |
Buildings and Improvements | 271,256,000 | | | |
Total Costs | | | | |
Land | 2,271,000 | | | |
Buildings and Improvements | 271,256,000 | | | |
Accumulated Depreciation | (16,921,000) | | | |
EMEA | LD8 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 107,544,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 88,016,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 195,560,000 | | | |
Accumulated Depreciation | (59,180,000) | | | |
EMEA | LD9 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 181,431,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 176,718,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 358,149,000 | | | |
Accumulated Depreciation | (100,677,000) | | | |
EMEA | LD10 LONDON (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 40,251,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 108,488,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 148,739,000 | | | |
Accumulated Depreciation | (22,593,000) | | | |
EMEA | LS1 LISBON (METRO), PORTUGAL | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,374,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,517,000 | | | |
Buildings and Improvements | 11,379,000 | | | |
Total Costs | | | | |
Land | 3,517,000 | | | |
Buildings and Improvements | 18,753,000 | | | |
Accumulated Depreciation | (4,690,000) | | | |
EMEA | MA1 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,457,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,457,000 | | | |
Accumulated Depreciation | (9,016,000) | | | |
EMEA | MA2 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,606,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,606,000 | | | |
Accumulated Depreciation | (9,336,000) | | | |
EMEA | MA3 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 44,931,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,721,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 54,652,000 | | | |
Accumulated Depreciation | (31,547,000) | | | |
EMEA | MA4 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 6,697,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,576,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 13,272,000 | | | |
Accumulated Depreciation | (9,222,000) | | | |
EMEA | MA5 MANCHESTER (METRO), UNITED KINGDOM | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,706,000 | | | |
Buildings and Improvements | 6,874,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 407,000 | | | |
Buildings and Improvements | 73,093,000 | | | |
Total Costs | | | | |
Land | 4,113,000 | | | |
Buildings and Improvements | 79,967,000 | | | |
Accumulated Depreciation | (328,000) | | | |
EMEA | MD1 MADRID (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,917,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 7,825,000 | | | |
Buildings and Improvements | 7,236,000 | | | |
Total Costs | | | | |
Land | 7,825,000 | | | |
Buildings and Improvements | 15,153,000 | | | |
Accumulated Depreciation | (5,701,000) | | | |
EMEA | MD2 MADRID (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 40,952,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 70,588,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 111,540,000 | | | |
Accumulated Depreciation | (35,723,000) | | | |
EMEA | ML2 MILAN (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,112,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,112,000 | | | |
Accumulated Depreciation | (15,321,000) | | | |
EMEA | ML3 MILAN (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,616,000 | | | |
Buildings and Improvements | 44,350,000 | | | |
Total Costs | | | | |
Land | 3,616,000 | | | |
Buildings and Improvements | 44,350,000 | | | |
Accumulated Depreciation | (15,565,000) | | | |
EMEA | ML4 MILAN (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,293,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,293,000 | | | |
Accumulated Depreciation | (7,720,000) | | | |
EMEA | ML5 MILAN (METRO), ITALY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,894,000 | | | |
Buildings and Improvements | 20,952,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 74,033,000 | | | |
Total Costs | | | | |
Land | 6,894,000 | | | |
Buildings and Improvements | 94,985,000 | | | |
Accumulated Depreciation | (1,903,000) | | | |
EMEA | MU1 MUNICH (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 39,084,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 39,084,000 | | | |
Accumulated Depreciation | (19,432,000) | | | |
EMEA | MU3 MUNICH (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,909,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 5,909,000 | | | |
Accumulated Depreciation | (2,714,000) | | | |
EMEA | MU4 MUNICH (METRO), GERMANY | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 12,127,000 | | | |
Buildings and Improvements | 35,120,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 51,418,000 | | | |
Total Costs | | | | |
Land | 12,127,000 | | | |
Buildings and Improvements | 86,538,000 | | | |
Accumulated Depreciation | (15,000) | | | |
EMEA | PA1 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,946,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 20,946,000 | | | |
Accumulated Depreciation | (16,853,000) | | | |
EMEA | PA2 & PA3 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 29,615,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 23,608,000 | | | |
Buildings and Improvements | 326,618,000 | | | |
Total Costs | | | | |
Land | 23,608,000 | | | |
Buildings and Improvements | 356,233,000 | | | |
Accumulated Depreciation | (144,908,000) | | | |
EMEA | PA4 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,598,000 | | | |
Buildings and Improvements | 9,503,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 5,516,000 | | | |
Buildings and Improvements | 246,653,000 | | | |
Total Costs | | | | |
Land | 7,114,000 | | | |
Buildings and Improvements | 256,156,000 | | | |
Accumulated Depreciation | (88,191,000) | | | |
EMEA | PA5 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,554,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 11,829,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 28,383,000 | | | |
Accumulated Depreciation | (8,143,000) | | | |
EMEA | PA6 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,366,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 73,366,000 | | | |
Accumulated Depreciation | (38,093,000) | | | |
EMEA | PA7 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,419,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,419,000 | | | |
Accumulated Depreciation | (11,932,000) | | | |
EMEA | PA10 PARIS (METRO), FRANCE | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 100,933,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 100,933,000 | | | |
Accumulated Depreciation | 0 | | | |
EMEA | SA1 SEVILLE (METRO), SPAIN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,567,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,572,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,139,000 | | | |
Accumulated Depreciation | (2,162,000) | | | |
EMEA | SK1 STOCKHOLM, (METRO), SWEDEN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 15,495,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 41,282,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,777,000 | | | |
Accumulated Depreciation | (11,370,000) | | | |
EMEA | SK2 STOCKHOLM, (METRO), SWEDEN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 80,148,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 3,914,000 | | | |
Buildings and Improvements | 81,981,000 | | | |
Total Costs | | | | |
Land | 3,914,000 | | | |
Buildings and Improvements | 162,129,000 | | | |
Accumulated Depreciation | (39,960,000) | | | |
EMEA | SK3 STOCKHOLM, (METRO), SWEDEN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,857,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,857,000 | | | |
Accumulated Depreciation | (6,546,000) | | | |
EMEA | SO1 SOFIA (METRO), BULGARIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,236,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 4,470,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,706,000 | | | |
Accumulated Depreciation | (3,191,000) | | | |
EMEA | SO2 SOFIA (METRO), BULGARIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,719,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 39,000 | | | |
Buildings and Improvements | 18,118,000 | | | |
Total Costs | | | | |
Land | 2,758,000 | | | |
Buildings and Improvements | 18,118,000 | | | |
Accumulated Depreciation | (2,099,000) | | | |
EMEA | WA1 WARSAW (METRO), POLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 5,950,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 25,321,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,271,000 | | | |
Accumulated Depreciation | (9,228,000) | | | |
EMEA | WA2 WARSAW (METRO), POLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 4,709,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 9,337,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,046,000 | | | |
Accumulated Depreciation | (5,436,000) | | | |
EMEA | WA3 WARSAW (METRO), POLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,647,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 64,414,000 | | | |
Total Costs | | | | |
Land | 2,648,000 | | | |
Buildings and Improvements | 64,414,000 | | | |
Accumulated Depreciation | (2,873,000) | | | |
EMEA | ZH2 ZURICH (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,915,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 3,915,000 | | | |
Accumulated Depreciation | (2,748,000) | | | |
EMEA | ZH4 ZURICH (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 11,284,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 39,677,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 50,961,000 | | | |
Accumulated Depreciation | (28,110,000) | | | |
EMEA | ZH5 ZURICH (METRO), SWITZERLAND | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 8,075,000 | | | |
Buildings and Improvements | 225,653,000 | | | |
Total Costs | | | | |
Land | 8,075,000 | | | |
Buildings and Improvements | 225,653,000 | | | |
Accumulated Depreciation | (35,657,000) | | | |
EMEA | ZW1 ZWOLLE (METRO), THE NETHERLANDS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,518,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 10,518,000 | | | |
Accumulated Depreciation | (8,976,000) | | | |
Asia-Pacific | OTHERS | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,733,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,921,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,654,000 | | | |
Accumulated Depreciation | (9,964,000) | | | |
Asia-Pacific | AE1 ADELAIDE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,654,000 | | | |
Buildings and Improvements | 1,015,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 96,000 | | | |
Buildings and Improvements | 2,149,000 | | | |
Total Costs | | | | |
Land | 2,749,000 | | | |
Buildings and Improvements | 3,164,000 | | | |
Accumulated Depreciation | (994,000) | | | |
Asia-Pacific | BR1 BRISBANE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,159,000 | | | |
Buildings and Improvements | 1,053,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 114,000 | | | |
Buildings and Improvements | 2,968,000 | | | |
Total Costs | | | | |
Land | 3,273,000 | | | |
Buildings and Improvements | 4,021,000 | | | |
Accumulated Depreciation | (845,000) | | | |
Asia-Pacific | CA1 CANBERRA (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 18,410,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 8,454,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 26,864,000 | | | |
Accumulated Depreciation | (3,369,000) | | | |
Asia-Pacific | HK1 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 301,395,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 301,395,000 | | | |
Accumulated Depreciation | (122,088,000) | | | |
Asia-Pacific | HK2 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 243,358,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 243,358,000 | | | |
Accumulated Depreciation | (177,462,000) | | | |
Asia-Pacific | HK3 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 182,078,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 182,078,000 | | | |
Accumulated Depreciation | (90,545,000) | | | |
Asia-Pacific | HK4 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 95,305,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 95,305,000 | | | |
Accumulated Depreciation | (20,654,000) | | | |
Asia-Pacific | HK5 HONG KONG (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 70,002,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 40,919,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 110,921,000 | | | |
Accumulated Depreciation | (26,895,000) | | | |
Asia-Pacific | MB1 MUMBAI (METRO), INDIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 573,000 | | | |
Buildings and Improvements | 28,457,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 484,000 | | | |
Total Costs | | | | |
Land | 573,000 | | | |
Buildings and Improvements | 28,941,000 | | | |
Accumulated Depreciation | (658,000) | | | |
Asia-Pacific | MB2 MUMBAI (METRO), INDIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 56,725,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,315,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 58,040,000 | | | |
Accumulated Depreciation | (1,331,000) | | | |
Asia-Pacific | ME1 MELBOURNE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 14,926,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 538,000 | | | |
Buildings and Improvements | 93,006,000 | | | |
Total Costs | | | | |
Land | 15,464,000 | | | |
Buildings and Improvements | 93,006,000 | | | |
Accumulated Depreciation | (29,361,000) | | | |
Asia-Pacific | ME2 MELBOURNE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 102,610,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 102,610,000 | | | |
Accumulated Depreciation | (7,310,000) | | | |
Asia-Pacific | ME4 MELBOURNE (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 3,425,000 | | | |
Buildings and Improvements | 84,175,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 124,000 | | | |
Buildings and Improvements | 15,526,000 | | | |
Total Costs | | | | |
Land | 3,549,000 | | | |
Buildings and Improvements | 99,701,000 | | | |
Accumulated Depreciation | (23,979,000) | | | |
Asia-Pacific | OS1 OSAKA (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 6,655,000 | | | |
Buildings and Improvements | 4,094,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 240,000 | | | |
Buildings and Improvements | 4,754,000 | | | |
Total Costs | | | | |
Land | 6,895,000 | | | |
Buildings and Improvements | 8,847,000 | | | |
Accumulated Depreciation | (2,882,000) | | | |
Asia-Pacific | OS1 OSAKA (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 14,876,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 104,213,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 119,089,000 | | | |
Accumulated Depreciation | (42,667,000) | | | |
Asia-Pacific | OS3 OSAKA (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 199,271,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 199,271,000 | | | |
Accumulated Depreciation | (7,274,000) | | | |
Asia-Pacific | PE1 PERTH (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 1,347,000 | | | |
Buildings and Improvements | 1,337,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 49,000 | | | |
Buildings and Improvements | 2,100,000 | | | |
Total Costs | | | | |
Land | 1,396,000 | | | |
Buildings and Improvements | 3,437,000 | | | |
Accumulated Depreciation | (596,000) | | | |
Asia-Pacific | PE2 PERTH (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,327,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,390,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 33,717,000 | | | |
Accumulated Depreciation | (8,124,000) | | | |
Asia-Pacific | PE3 PERTH (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,004,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 56,004,000 | | | |
Accumulated Depreciation | (4,000) | | | |
Asia-Pacific | SG1 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 291,489,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 291,489,000 | | | |
Accumulated Depreciation | (133,905,000) | | | |
Asia-Pacific | SG2 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 339,887,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 339,887,000 | | | |
Accumulated Depreciation | (232,450,000) | | | |
Asia-Pacific | SG3 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 34,844,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 239,648,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 274,492,000 | | | |
Accumulated Depreciation | (71,579,000) | | | |
Asia-Pacific | SG4 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 54,602,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 146,113,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 200,715,000 | | | |
Accumulated Depreciation | (17,748,000) | | | |
Asia-Pacific | SG5 SINGAPORE (METRO) | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 197,620,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 197,620,000 | | | |
Accumulated Depreciation | (4,016,000) | | | |
Asia-Pacific | SH2 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,290,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 7,290,000 | | | |
Accumulated Depreciation | (3,562,000) | | | |
Asia-Pacific | SH3 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 7,066,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 14,596,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 21,662,000 | | | |
Accumulated Depreciation | (8,140,000) | | | |
Asia-Pacific | SH5 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 11,284,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 24,662,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,946,000 | | | |
Accumulated Depreciation | (17,322,000) | | | |
Asia-Pacific | SH6 SHANGHAI (METRO), CHINA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 16,545,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,873,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 54,418,000 | | | |
Accumulated Depreciation | (6,124,000) | | | |
Asia-Pacific | SL1 SEOUL (METRO), SOUTH KOREA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 29,236,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 37,580,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 66,816,000 | | | |
Accumulated Depreciation | (12,612,000) | | | |
Asia-Pacific | SY1 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 86,206,000 | | | |
Buildings and Improvements | 38,251,000 | | | |
Total Costs | | | | |
Land | 86,206,000 | | | |
Buildings and Improvements | 38,251,000 | | | |
Accumulated Depreciation | (24,756,000) | | | |
Asia-Pacific | SY2 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 3,080,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 28,268,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 31,348,000 | | | |
Accumulated Depreciation | (24,941,000) | | | |
Asia-Pacific | SY3 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 8,712,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 150,497,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 159,209,000 | | | |
Accumulated Depreciation | (91,013,000) | | | |
Asia-Pacific | SY4 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 184,417,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 184,417,000 | | | |
Accumulated Depreciation | (55,173,000) | | | |
Asia-Pacific | SY5 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 82,091,000 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 2,948,000 | | | |
Buildings and Improvements | 246,519,000 | | | |
Total Costs | | | | |
Land | 85,039,000 | | | |
Buildings and Improvements | 246,519,000 | | | |
Accumulated Depreciation | (15,090,000) | | | |
Asia-Pacific | SY6 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 8,860,000 | | | |
Buildings and Improvements | 64,197,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 319,000 | | | |
Buildings and Improvements | 15,492,000 | | | |
Total Costs | | | | |
Land | 9,179,000 | | | |
Buildings and Improvements | 79,689,000 | | | |
Accumulated Depreciation | (13,191,000) | | | |
Asia-Pacific | SY7 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 2,745,000 | | | |
Buildings and Improvements | 47,350,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 99,000 | | | |
Buildings and Improvements | 6,844,000 | | | |
Total Costs | | | | |
Land | 2,844,000 | | | |
Buildings and Improvements | 54,194,000 | | | |
Accumulated Depreciation | (9,078,000) | | | |
Asia-Pacific | SY8 SYDNEY (METRO), AUSTRALIA | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 1,073,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 500,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 1,573,000 | | | |
Accumulated Depreciation | (1,149,000) | | | |
Asia-Pacific | TY1 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,993,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 35,993,000 | | | |
Accumulated Depreciation | (22,284,000) | | | |
Asia-Pacific | TY2 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 93,532,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 93,532,000 | | | |
Accumulated Depreciation | (66,919,000) | | | |
Asia-Pacific | TY3 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 77,305,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 77,305,000 | | | |
Accumulated Depreciation | (44,811,000) | | | |
Asia-Pacific | TY4 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 78,446,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 78,446,000 | | | |
Accumulated Depreciation | (36,604,000) | | | |
Asia-Pacific | TY5 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 102,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 61,821,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 61,923,000 | | | |
Accumulated Depreciation | (20,456,000) | | | |
Asia-Pacific | TY6 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 37,941,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 17,821,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 55,762,000 | | | |
Accumulated Depreciation | (37,344,000) | | | |
Asia-Pacific | TY7 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 13,175,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 6,280,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 19,455,000 | | | |
Accumulated Depreciation | (14,370,000) | | | |
Asia-Pacific | TY8 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 53,848,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 12,625,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 66,472,000 | | | |
Accumulated Depreciation | (30,152,000) | | | |
Asia-Pacific | TY9 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 106,710,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 23,644,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 130,354,000 | | | |
Accumulated Depreciation | (83,055,000) | | | |
Asia-Pacific | TY10 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 69,881,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 15,220,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 85,102,000 | | | |
Accumulated Depreciation | (28,348,000) | | | |
Asia-Pacific | TY11 TOKYO (METRO), JAPAN | | | | |
Initial Costs to Company | | | | |
Encumbrances | 0 | | | |
Land | 0 | | | |
Buildings and Improvements | 22,099,000 | | | |
Costs Capitalized Subsequent to Acquisition or Lease | | | | |
Land | 0 | | | |
Buildings and Improvements | 221,004,000 | | | |
Total Costs | | | | |
Land | 0 | | | |
Buildings and Improvements | 243,103,000 | | | |
Accumulated Depreciation | $ (19,907,000) | | | |