(4) COMMITMENTS AND CONTINGENCIES |
REGULATORY AND OTHER MATTERS |
Relationship with Mirant Corporation |
In 2000, Pepco sold substantially all of its electricity generation assets to Mirant Corporation, formerly Southern Energy, Inc. As part of the Asset Purchase and Sale Agreement, Pepco entered into several ongoing contractual arrangements with Mirant and certain of its subsidiaries (collectively, Mirant). On July 14, 2003, Mirant Corporation and most of its subsidiaries filed a voluntary petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code in the U.S. Bankruptcy Court for the Northern District of Texas (the Bankruptcy Court). |
Depending on the outcome of the matters discussed below, the Mirant bankruptcy could have a material adverse effect on the results of operations of Pepco Holdings and Pepco. However, management believes that Pepco Holdings and Pepco currently have sufficient cash, cash flow and borrowing capacity under their credit facilities and in the capital markets to be able to satisfy any additional cash requirements that may arise due to the Mirant bankruptcy. Accordingly, management does not anticipate that the Mirant bankruptcy will impair the ability of Pepco Holdings or Pepco to fulfill their contractual obligations or to fund projected capital expenditures. On this basis, management currently does not believe that the Mirant bankruptcy will have a material adverse effect on the financial condition of either company. |
Transition Power Agreements |
As part of the Asset Purchase and Sale Agreement, Pepco and Mirant entered into Transition Power Agreements for Maryland and the District of Columbia, respectively (collectively, the TPAs). Under these agreements, Mirant was obligated to supply Pepco with all of the capacity and energy needed to fulfill its SOS obligations in Maryland through June 2004 and its SOS obligations in the District of Columbia through January 22, 2005. 15 _____________________________________________________________________________ |
To avoid the potential rejection of the TPAs, Pepco and Mirant entered into an Amended Settlement Agreement and Release dated as of October 24, 2003 (the Settlement Agreement) pursuant to which Mirant assumed both of the TPAs and the terms of the TPAs were modified. The Settlement Agreement also provided that Pepco has an allowed, pre-petition general unsecured claim against Mirant Corporation in the amount of $105 million (the Pepco TPA Claim). |
Pepco has also asserted the Pepco TPA Claim against other Mirant entities, which Pepco believes are liable to Pepco under the terms of the Asset Purchase and Sale Agreement's Assignment and Assumption Agreement (the Assignment Agreement). Under the Assignment Agreement, Pepco believes that each of the Mirant entities assumed and agreed to discharge certain liabilities and obligations of Pepco as defined in the Asset Purchase and Sale Agreement. Mirant has filed objections to these claims. Under the original plan of reorganization filed by the Mirant entities with the Bankruptcy Court, certain Mirant entities other than Mirant Corporation would pay significantly higher percentages of the claims of their creditors than would Mirant Corporation. The amount that Pepco will be able to recover from the Mirant bankruptcy estate with respect to the Pepco TPA Claim will depend on the amount of assets available for distribution to creditors of the Mirant entities that are found to be liable for the Pepco TPA Claim. |
Power Purchase Agreements |
Under agreements with FirstEnergy Corp., formerly Ohio Edison (FirstEnergy), and Allegheny Energy, Inc., both entered into in 1987, Pepco is obligated to purchase from FirstEnergy 450 megawatts of capacity and energy annually through December 2005 (the FirstEnergy PPA). Under the Panda PPA, entered into in 1991, Pepco is obligated to purchase from Panda 230 megawatts of capacity and energy annually through 2021. In each case, the purchase price is substantially in excess of current market price. As a part of the Asset Purchase and Sale Agreement, Pepco entered into a "back-to-back" arrangement with Mirant. Under this arrangement, Mirant is obligated, among other things, to purchase from Pepco the capacity and energy that Pepco is obligated to purchase under the FirstEnergy PPA and the Panda PPA at a price equal to the price Pepco is obligated to pay under the FirstEnergy PPA and the Panda PPA (the PPA-Related Obligations). |
Pepco Pre-Petition Claims |
When Mirant filed its bankruptcy petition on July 14, 2003, Mirant had unpaid obligations to Pepco of approximately $29 million, consisting primarily of payments due to Pepco in respect of the PPA-Related Obligations (the Mirant Pre-Petition Obligations). The Mirant Pre-Petition Obligations constitute part of the indebtedness for which Mirant is seeking relief in its bankruptcy proceeding. Pepco has filed Proofs of Claim in the Mirant bankruptcy proceeding in the amount of approximately $26 million to recover this indebtedness; however, the amount of Pepco's recovery, if any, is uncertain. The $3 million difference between Mirant's unpaid obligation to Pepco and the $26 million Proofs of Claim primarily represents a TPA settlement adjustment which is included in the $105 million Proofs of Claim filed by Pepco against the Mirant debtors in respect of the Pepco TPA Claim. In view of the uncertainty as to recoverability, Pepco, in the third quarter of 2003, expensed $14.5 mi llion to establish a reserve against the $29 million receivable from Mirant. In January 2004, Pepco paid approximately $2.5 million to Panda in settlement of certain billing disputes under the Panda PPA that related to periods after the sale of Pepco's generation assets to Mirant. Pepco believes that under the terms 16 _____________________________________________________________________________ of the Asset Purchase and Sale Agreement, Mirant is obligated to reimburse Pepco for the settlement payment. Accordingly, in the first quarter of 2004, Pepco increased the amount of the receivable due from Mirant by approximately $2.5 million and amended its Proofs of Claim to include this amount. Pepco currently estimates that the $14.5 million expensed in the third quarter of 2003 represents the portion of the entire $31.5 million receivable unlikely to be recovered in bankruptcy, and no additional reserve has been established for the $2.5 million increase in the receivable. The amount expensed represents Pepco's estimate of the possible outcome in bankruptcy, although the amount ultimately recovered could be higher or lower. |
Mirant's Attempt to Reject the PPA-Related Obligations |
On August 28, 2003, Mirant filed with the Bankruptcy Court a motion seeking authorization to reject its PPA-Related Obligations. Upon motions filed with the U.S. District Court for the Northern District of Texas (the District Court) by Pepco and FERC, in October 2003, the District Court withdrew jurisdiction over the rejection proceedings from the Bankruptcy Court. In December 2003, the District Court denied Mirant's motion to reject the PPA-Related Obligations on jurisdictional grounds. The District Court's decision was appealed by Mirant and The Official Committee of Unsecured Creditors of Mirant Corporation (the Creditors' Committee) to the U.S. Court of Appeals for the Fifth Circuit (the Court of Appeals). On August 4, 2004, the Court of Appeals remanded the case to the District Court saying that the District Court has jurisdiction to rule on the merits of Mirant's rejection motion, suggesting that in doing so the court apply a "more rigorous standard" than the busine ss judgment rule usually applied by bankruptcy courts in ruling on rejection motions. |
On December 9, 2004, the District Court issued an order again denying Mirant's motion to reject the PPA-Related Obligations. The District Court found that the PPA-Related Obligations are not severable from the Asset Purchase and Sale Agreement and that the Asset Purchase and Sale Agreement cannot be rejected in part, as Mirant was seeking to do. On December 16, the Creditors' Committee appealed the District Court's order to the Court of Appeals, and on December 20, 2004, Mirant also appealed the District Court's order. Mirant and the Creditors' Committee each filed its brief on April 4, 2005. Pepco's and FERC's briefs are due May 19, 2005. Oral arguments have not yet been scheduled. |
As more fully discussed below, Mirant had been making regular periodic payments in respect of the PPA-Related Obligations. On December 9, 2004, Mirant filed a notice with the Bankruptcy Court that it was suspending payments to Pepco in respect of the PPA-Related Obligations. On December 13, 2004, Mirant failed to make a payment of approximately $17.9 million due to Pepco for the period November 1, 2004 to November 30, 2004. On December 23, 2004, Pepco received a payment of approximately $6.8 million from Mirant, which according to Mirant represented the market value of the power for which payment was due on December 13. At that time, Mirant informed Pepco that it intended to continue to pay the market value, but not the above-market portion, of the power purchased under the PPA-Related Obligations. Pepco disagreed with Mirant's assertion that it need only pay the market value and believed that the amount representing the market value calculated by Mirant was insuffi cient. |
On January 21, 2005, Mirant made a payment of approximately $21.1 million. Pepco disputed Mirant's contention that the amount paid reflected the full amount due Pepco under these agreements for the applicable periods. 17 _____________________________________________________________________________ |
On January 21, 2005, Mirant filed in the Bankruptcy Court a motion seeking to reject certain of its ongoing obligations under the Asset Purchase and Sale Agreement, including the PPA-Related Obligations (the Second Motion to Reject). On March 1, 2005 (as amended by order dated March 7, 2005), the District Court granted Pepco's motion to withdraw jurisdiction over the Asset Purchase and Sale Agreement rejection proceedings from the Bankruptcy Court. In addition, the District Court ordered Mirant to pay on March 18, 2005, all past-due unpaid amounts under the PPA-Related Obligations. On March 4, 2004, Mirant filed an emergency motion for reconsideration and a stay of the March 1, 2005 order. On March 14, 2005, Pepco filed a response to Mirant's motion. |
On March 16, 2005, the District Court denied Mirant's emergency motion for reconsideration and stay of the District Court's March 1 and March 7 Orders. On the same day, Mirant filed a petition for writ of mandamus, and a motion for stay pending appeal and mandamus review in the Court of Appeals. |
On March 17, 2005, the Court of Appeals issued an Order staying the District Court's Orders of March 1 and March 7, 2005. Accordingly, Mirant was not required to make the payment that was due to Pepco on March 18, 2005 pursuant to the District Court's Orders. On March 28, 2005, in accordance with the Court of Appeals March 17Order, Pepco, FERC, the Maryland Public Service Commission (MPSC) and Office of the People's Counsel (OPC) of Maryland filed oppositions to Mirant's petition for writ of mandamus in the Court of Appeals. Mirant and the Creditor's Committee filed briefs with the Court of Appeals on April 1, 2005. |
On March 28, 2005, Pepco, FERC, the District of Columbia OPC, the MPSC and the Maryland OPC filed oppositions to the Second Motion to Reject in the District Court. |
On April 11, 2005 the Court of Appeals entered an Order vacating the stay it had ordered on March 17, 2005 and denying Mirant's motions for writ of mandamus and stay pending appeal. On April 13, 2005, Pepco received a payment from Mirant in the amount of approximately $57.5 million, representing the full amount then due in respect of the PPA-Related Obligations. |
Pepco is exercising all available legal remedies and vigorously opposing Mirant's attempt to reject the PPA-Related Obligations and other obligations under the Asset Purchase and Sale Agreement in order to protect the interests of its customers and shareholders. While Pepco believes that it has substantial legal bases to oppose the attempt to reject the agreements, the outcome of Mirant's efforts to reject the PPA-Related Obligations is uncertain. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations, Pepco could be required to repay to Mirant, for the period beginning on the effective date of the rejection (which date could be prior to the date of the court's order granting the rejection and possibly as early as September 18, 2003) and ending on the date Mirant is entitled to cease its purchases of energy and capacity from Pepco, all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and capacity. Pepco estimates that the amount it could be required to repay to Mirant in the unlikely event that September 18, 2003, is determined to be the effective date of rejection, is approximately $185.6 million as of May 1, 2005. |
Mirant has also indicated to the Bankruptcy Court that it will move to require Pepco to disgorge all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and capacity, for the 18 _____________________________________________________________________________ period July 14, 2003 (the date on which Mirant filed its bankruptcy petition) through rejection, if approved, on the theory that Mirant did not receive value for those payments. Pepco estimates that the amount it would be required to repay to Mirant on the disgorgement theory, in addition to the amounts described above, is approximately $22.5 million. |
Any repayment by Pepco of amounts paid by Mirant would entitle Pepco to file a claim against the bankruptcy estate in an amount equal to the amount repaid. Pepco believes that, to the extent such amounts were not recovered from the Mirant bankruptcy estate, they would be recoverable as stranded costs from customers through distribution rates as described below. |
The following are estimates prepared by Pepco of its potential future exposure if Mirant's attempt to reject the PPA-Related Obligations ultimately is successful. These estimates are based in part on current market prices and forward price estimates for energy and capacity, and do not include financing costs, all of which could be subject to significant fluctuation. The estimates assume no recovery from the Mirant bankruptcy estate and no regulatory recovery, either of which would mitigate the effect of the estimated loss. Pepco does not consider it realistic to assume that there will be no such recoveries. Based on these assumptions, Pepco estimates that its pre-tax exposure as of May 1, 2005, representing the loss of the future benefit of the PPA-Related Obligations to Pepco, is as follows: |
The ability of Pepco to recover from the Mirant bankruptcy estate in respect to the Mirant Pre-Petition Obligations and damages if the PPA-Related Obligations are successfully rejected will depend on whether Pepco's claims are allowed, the amount of assets available for distribution to the creditors of the Mirant companies determined to be liable for those claims, and Pepco's priority relative to other creditors. At the current stage of the bankruptcy proceeding, there is insufficient information to determine the amount, if any, that Pepco might be able to recover from the Mirant bankruptcy estate, whether the recovery would be in cash or another form of payment, or the timing of any recovery. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations and Pepco's full claim is not recovered from the Mirant bankruptcy estate, Pepco may seek authority from the MPSC and the District of Columbia Public Service Commission (DCPSC) to recover its additional costs. Pepco is committed to working with its regulatory authorities to achieve a result that is appropriate for its shareholders and customers. Under the provisions of the 19 _____________________________________________________________________________ settlement agreements approved by the MPSC and the DCPSC in the deregulation proceedings in which Pepco agreed to divest its generation assets under certain conditions, the PPAs were to become assets of Pepco's distribution business if they could not be sold. Pepco believes that, if Mirant ultimately is successful in rejecting the PPA-Related Obligations, these provisions would allow the stranded costs of the PPAs that are not recovered from the Mirant bankruptcy estate to be recovered from Pepco's customers through its distribution rates. If Pepco's interpretation of the settlement agreements is confirmed, Pepco expects to be able to establish the amount of its anticipated recovery as a regulatory asset. However, there is no assurance that Pepco's interpretation of the settlement agreements would be confirmed by the respective public service commissions. |
If the PPA-Related Obligations are successfully rejected, and there is no regulatory recovery, Pepco will incur a loss. However, the accounting treatment of such a loss depends on a number of legal and regulatory factors, and is not determinable at this time. |
The SMECO Agreement |
As a term of the Asset Purchase and Sale Agreement, Pepco assigned to Mirant a facility and capacity agreement with Southern Maryland Electric Cooperative, Inc. (SMECO) under which Pepco was obligated to purchase the capacity of an 84-megawatt combustion turbine installed and owned by SMECO at a former Pepco generating facility (the SMECO Agreement). The SMECO Agreement expires in 2015 and contemplates a monthly payment to SMECO of approximately $.5 million. Pepco is responsible to SMECO for the performance of the SMECO Agreement if Mirant fails to perform its obligations thereunder. At this time, Mirant continues to make post-petition payments due to SMECO. |
On March 15, 2004, Mirant filed a complaint with the Bankruptcy Court seeking a declaratory judgment that the SMECO Agreement is an unexpired lease of non-residential real property rather than an executory contract and that if Mirant were to successfully reject the agreement, any claim against the bankruptcy estate for damages made by SMECO (or by Pepco as subrogee) would be subject to the provisions of the Bankruptcy Code that limit the recovery of rejection damages by lessors. Pepco believes that there is no reasonable factual or legal basis to support Mirant's contention that the SMECO Agreement is a lease of real property. Litigation continues and the outcome of this proceeding cannot be predicted. |
Mirant Plan of Reorganization |
On January 19, 2005, Mirant filed its Plan of Reorganization and Disclosure Statement with the Bankruptcy Court. In that plan, Mirant proposed to transfer all assets to "New Mirant" (an entity it proposed to create in the reorganization), with the exception of the PPA-Related Obligations. Mirant proposed that the PPA-Related Obligations would remain in "Old Mirant," which would be a shell entity as a result of the reorganization. Pepco believes this plan cannot be confirmed by the Bankruptcy Court under the law and has submitted objections to the plan. The plan also did not have the support of any of the creditor's committees in the Mirant bankruptcy. |
On March 11, 2005, Mirant filed an application with FERC seeking approval for the internal transfers and corporate restructuring that will result from its proposed Plan of Reorganization. Mirant must obtain FERC approval for these transactions under Section 203 of the Federal 20 _____________________________________________________________________________ Power Act. On April 1, 2005, Pepco filed a motion to intervene and protest at FERC in connection with Mirant's March 11 FERC filing. On the same date, the District of Columbia OPC also filed a motion to intervene and protest. |
On March 25, 2005, Mirant filed its First Amended Plan of Reorganization and First Amended Disclosure Statement. Pepco is currently analyzing this amended plan. |
Rate Proceedings |
New Jersey |
In February 2003, ACE filed a petition with the NJBPU to increase its electric distribution rates and its Regulatory Asset Recovery Charge (RARC) in New Jersey. In December 2003, the NJBPU issued an order also consolidating into this base rate proceeding outstanding issues from several other proceedings. Later in December 2003, ACE filed a Motion for Reconsideration in which it suggested that these additional issues be dealt with in a Phase II to the base rate case to address the outstanding issues identified in the NJBPU's December 2003 order. The parties to the base rate proceeding agreed that a Phase II to the base rate case would be initiated in April 2004. Accordingly, in April 2004, ACE filed testimony with the NJBPU initiating a Phase II to the base rate proceeding, which addressed these additional issues and sought recovery of the $25.4 million of deferred restructuring costs previously transferred into the base rate case (which is also referred to as Phase 1 ). |
On April 19, 2005, a settlement was reached among ACE, the staff of the NJBPU, the New Jersey Ratepayer Advocate and active intervenor parties. The settlement, if approved by the NJBPU, will resolve issues in both the Phase I proceeding and the other issues referred by the NJBPU to the base rate proceeding and addressed in the Phase II proceeding. No party to either of these proceedings opposes the settlement. |
The proposed settlement will allow for an increase in ACE's base rates of approximately $18.8 million, $2.8 million of which would come from an increase in RARC revenue collections. $16 million of the base rate increase, not related to RARC collections, will be collected annually until such time as base rates change pursuant to another base rate proceeding. The $2.8 million in RARC collections will be collected each year for four years. The $18.8 million increase in base rate revenue will be offset by a base rate revenue decrease in a similar amount in total resulting from a change in depreciation rate, which is further discussed below, similar to what has been adopted by the NJBPU for other New Jersey electric utility companies. Overall, the settlement provides for a net decrease in revenues of approximately $.3 million, consisting of a $3.1 million reduction of distribution revenues offset by the $2.8 million increase in RARC revenue collections mentioned above. The proposed settlement specifies an overall rate of return of 8.14%. The proposed settlement provides for a change in depreciation rates driven by a change in average service lives. In addition, the settlement provides for a change in depreciation technique from remaining life to whole life, including amortization of any calculated excess or deficiencies in the depreciation reserve. As a result of these changes there is a net excess depreciation reserve. Accordingly PHI and ACE recorded a regulatory liability in March 2005 by reducing its depreciation reserve by approximately $131 million. The regulatory liability will be amortized over 8.25 years and will result in a reduction of depreciation and amortization expense on PHI's and ACE's consolidated statements of earnings. While the impact of the settlement will be 21 _____________________________________________________________________________ essentially revenue and cash neutral to PHI and ACE, there will be a positive annual pre-tax earnings impact to PHI and ACE of approximately $20 million. |
With respect to Phase II issues, which included supply-related deferred costs, the settlement provides for a disallowance of $13.0 million previously recorded to such deferred accounts and specifies the recovery over four years of an adjusted deferred balance of approximately $116.8 million, including a portion of the $25.4 million of costs transferred first into the Phase I proceeding from other proceedings and then ultimately into the Phase II proceeding, offset by the return over one year of over-collected balances in certain other deferred accounts, with the net result being that there will be no rate impact from the deferral account recoveries and credits for at least one year. |
The settlement does not become effective unless approved by the NJBPU. It is likely that the NJBPU will consider the settlement in the second quarter of 2005. While ACE believes it is probable that the NJBPU will approve the settlement, ACE cannot predict with certainty the timing of any NJBPU approval. The settlement does not affect the existing appeal filed by ACE with the Appellate Division of the Superior Court of New Jersey (the NJ Superior Court) related to the July 2004 Final Decision and Order issued by the NJBPU in ACE's restructuring deferral proceeding before the NJBPU under the New Jersey Electric Discount and Energy Competition Act (EDECA), discussed below under "Restructuring Deferral." |
Delaware |
In October 2004, DPL submitted its annual Gas Cost Rate (GCR) filing to the Delaware Public Service Commission (DPSC). In its filing, DPL sought to increase its GCR by approximately 16.8% in anticipation of increasing natural gas commodity costs. The GCR, which permits DPL to recover its procurement gas costs through customer rates, became effective November 1, 2004 and is subject to refund pending evidentiary hearings. In addition, in November 2004, DPL filed a supplemental filing seeking approval to further increase GCR rates by an additional 6.5% effective December 29, 2004. The additional GCR increase became effective December 29, 2004 and, similarly, is subject to refund pending evidentiary hearings. The DPSC Staff and the Division of Public Advocate filed their testimony on March 7, 2005 recommending full approval of the GCR changes being sought by DPL, including the revisions to the tariff in the original and supplemental filings. An evidentiary hearing was held on May 5, 2005, at which both DPSC staff and the Division of Public Advocate testified that the rates sought by DPL should be approved as filed. A final order addressing both the November 1 and December 29 increases is expected in the second quarter of 2005. |
Pursuant to the April 16, 2002 merger settlement agreement in Delaware, on May 4, 2005, DPL made a filing with the DPSC whereby DPL seeks approval of a proposed increase of approximately $6.177 million in electric transmission service revenues, or about 1.1% of total Delaware retail electric revenues. This proposed revenue increase is the Delaware retail portion of the increase in the "Delmarva zonal" transmission rates on file with FERC under the Open Access Transmission Tariff (OATT) of the PJM Interconnection, LLC (PJM). This level of revenue increase will decrease to the extent that competitive retail suppliers provide a supply and transmission service to retail customers. In that circumstance, PJM would charge the competitive retail supplier the PJM OATT rate for transmission service into the Delmarva zone and DPL's charges to the retail customer would exclude as a "shopping credit" an amount equal to the standard offer service supply charge and th e transmission and ancillary charges that would 22 _____________________________________________________________________________ otherwise be charged by DPL to the retail customer. DPL has proposed to begin collecting this rate change for service rendered on and after June 3, 2005, subject to refund. |
District of Columbia |
Pepco's delivery rates in the District of Columbia generally are capped through July 2007, except with respect to residential low-income customers, for whom rates generally are capped through July 2009. In July 2004, Pepco filed a distribution rate review case with the DCPSC as required by the terms of the Pepco-Conectiv merger settlement approved by the DCPSC to determine whether Pepco's distribution rates would be decreased during the period the rates are capped. In accordance with the terms of the merger settlement, Pepco's distribution rates cannot be increased as a result of this proceeding. On April 7, 2005, the DCPSC approved a settlement of this proceeding which provides that Pepco's current distribution rates will remain unchanged through the end of the rate cap periods set forth above, except as otherwise provided in the merger settlement, or as may otherwise be required by the Commission or by law. |
Restructuring Deferral |
Pursuant to a July 1999 summary order issued by the NJBPU under EDECA (which was subsequently affirmed by a final decision and order issued in March 2001), ACE was obligated to provide BGS from August 1, 1999 to at least July 31, 2002 to retail electricity customers in ACE's service territory who did not choose a competitive energy supplier. The order allowed ACE to recover through customer rates certain costs incurred in providing BGS. ACE's obligation to provide BGS was subsequently extended to July 31, 2003. At the allowed rates, for the period August 1, 1999 through July 31, 2003, ACE's aggregate allowed costs exceeded its aggregate revenues from supplying BGS. These under-recovered costs were partially offset by a $59.3 million deferred energy cost liability existing as of July 31, 1999 (LEAC Liability) that was related to ACE's Levelized Energy Adjustment Clause and ACE's Demand Side Management Programs. ACE established a regulatory asset in an amount equal to the balance. |
In August 2002, ACE filed a petition with the NJBPU for the recovery of approximately $176.4 million in actual and projected deferred costs relating to the provision of BGS and other restructuring related costs incurred by ACE over the four-year period August 1, 1999 through July 31, 2003. The deferred balance was net of the $59.3 million offset for the LEAC Liability. The petition also requested that ACE's rates be reset as of August 1, 2003 so that there would be no under-recovery of costs embedded in the rates on or after that date. The increase sought represented an overall 8.4% annual increase in electric rates and was in addition to the base rate increase discussed above. ACE's recovery of the deferred costs is subject to review and approval by the NJBPU in accordance with EDECA. |
In July 2003, the NJBPU issued a summary order, which (i) permitted ACE to begin collecting a portion of the deferred costs and reset rates to recover on-going costs incurred as a result of EDECA, (ii) approved the recovery of $125 million of the deferred balance over a ten-year amortization period beginning August 1, 2003, (iii) transferred to ACE's pending base rate case for further consideration approximately $25.4 million of the deferred balance, and (iv) estimated the overall deferral balance as of July 31, 2003 at $195 million, of which $44.6 million was disallowed recovery by ACE. In July 2004, the NJBPU issued its final order in the restructuring deferral proceeding. The final order did not modify the amount of the 23 _____________________________________________________________________________ disallowances set forth in the July 2003 summary order, but did provide a much more detailed analysis of evidence and other information relied on by the NJBPU as justification for the disallowances. ACE believes the record does not justify the level of disallowance imposed by the NJBPU. In August 2004, ACE filed with the NJ Superior Court, which hears appeals of New Jersey administrative agencies, including the NJBPU, a Notice of Appeal related to the July 2004 final order. ACE cannot predict the outcome of this appeal. |
Divestiture Cases |
District of Columbia |
Final briefs on Pepco's District of Columbia divestiture proceeds sharing application were filed in July 2002 following an evidentiary hearing in June 2002. That application was filed to implement a provision of Pepco's DCPSC-approved divestiture settlement that provided for a sharing of any net proceeds from the sale of Pepco's generation-related assets. One of the principal issues in the case is whether Pepco should be required to share with customers the excess deferred income taxes (EDIT) and accumulated deferred investment tax credits (ADITC) associated with the sold assets and, if so, whether such sharing would violate the normalization provisions of the Internal Revenue Code and its implementing regulations. As of May 1, 2005, the District of Columbia allocated portions of EDIT and ADITC associated with the divested generation assets were approximately $6.5 million and $5.8 million, respectively. In March 2003, the Internal Revenue Service (IRS) issued a notice of proposed rulemaking (NOPR) that is relevant to that principal issue. Comments on the NOPR were filed by several parties in June 2003, and the IRS held a public hearing later in June 2003. As a result of the NOPR, three of the parties in the divestiture case filed comments with the DCPSC urging the DCPSC to decide the tax issues now on the basis of the proposed rule. Pepco filed comments with the DCPSC in reply to those comments, in which Pepco stated that the courts have held and the IRS has stated that proposed rules are not authoritative and that no decision should be issued on the basis of proposed rules. Instead, Pepco argued that the only prudent course of action is for the DCPSC to await the issuance of final regulations relating to the tax issues and then allow the parties to file supplemental briefs on the tax issues. Pepco cannot predict whether the IRS will adopt the regulations as proposed, make changes before issuing final regulations or decide not to adopt regulations. Other issu es in the proceeding deal with the treatment of internal costs and cost allocations as deductions from the gross proceeds of the divestiture. |
Pepco believes that a sharing of EDIT and ADITC would violate the normalization rules. If Pepco were required to share EDIT and ADITC and, as a result, the normalization rules were violated, Pepco would be unable to use accelerated depreciation on District of Columbia allocated or assigned property. Pepco, in addition to sharing with customers the generation-related ADITC balance, would have to pay to the IRS an amount equal to Pepco's $5.8 million District of Columbia jurisdictional generation-related ADITC balance as well as its District of Columbia jurisdictional transmission and distribution-related ADITC balance as of the later of the date a DCPSC order is issued and all rights to appeal have been exhausted or lapsed, or the date the DCPSC order becomes operative. As of May 1, 2005, the District of Columbia jurisdictional transmission and distribution-related ADITC balance was approximately $5.8 million. |
Pepco believes that its calculation of the District of Columbia customers' share of divestiture proceeds is correct. However, depending on the ultimate outcome of this proceeding, Pepco 24 _____________________________________________________________________________ could be required to make additional gain-sharing payments to District of Columbia customers, including the payments described above related to EDIT and ADITC. Such additional payments (which, other than the EDIT and ADITC related payments, cannot be estimated) would be charged to expense in the quarter and year in which a final decision is rendered and could have a material adverse effect on Pepco's and PHI's results of operations for those periods. However, neither PHI nor Pepco believes that additional gain-sharing payments, if any, or the ADITC-related payments to the IRS, if required, would have a material adverse impact on its financial condition. It is uncertain when the DCPSC will issue a decision. |
Maryland |
Pepco filed its divestiture proceeds plan application in Maryland in April 2001. Reply briefs were filed in May 2002. The principal issue in the Maryland case is the same EDIT and ADITC sharing issue that was raised in the D.C. case. As of May 1, 2005, the Maryland allocated portions of EDIT and ADITC associated with the divested generation assets were approximately $9.1 million and $10.4 million, respectively. Other issues deal with the treatment of certain costs as deductions from the gross proceeds of the divestiture. In November 2003, the Hearing Examiner in the Maryland proceeding issued a proposed order that concluded that Pepco's Maryland divestiture settlement agreement provided for a sharing between Pepco and customers of the EDIT and ADITC associated with the sold assets. Pepco believes that such a sharing would violate the normalization rules and would result in Pepco's inability to use accelerated depreciation on Maryland allocated or assigned property. If th e proposed order is affirmed, Pepco would have to share with its Maryland customers, on an approximately 50/50 basis, the Maryland allocated portion of the generation-related EDIT,i.e., $9.1 million as of May 1, 2005, and the generation-related ADITC. If such sharing were to violate the normalization rules, Pepco, in addition to sharing with customers an amount equal to approximately 50 percent of the generation-related ADITC balance, would be unable to use accelerated depreciation on Maryland allocated or assigned property. Furthermore, Pepco would have to pay to the IRS an amount equal to Pepco's $10.4 million Maryland jurisdictional generation-related ADITC balance as of May 1, 2005, as well as its Maryland retail jurisdictional ADITC transmission and distribution-related balance as of the later of the date a MPSC order is issued and all rights to appeal have been exhausted or lapsed, or the date the MPSC order becomes operative. As of May 1, 2005, the Maryland retail jurisdictional t ransmission and distribution-related ADITC balance was approximately $10.4 million. The Hearing Examiner decided all other issues in favor of Pepco, except that only one-half of the severance payments that Pepco included in its calculation of corporate reorganization costs should be deducted from the sales proceeds before sharing of the net gain between Pepco and customers. See also the disclosure above under "Divestiture Cases - District of Columbia" regarding the March 2003 IRS NOPR. |
Under Maryland law, if the proposed order is appealed to the MPSC, the proposed order is not a final, binding order of the MPSC and further action by the MPSC is required with respect to this matter. Pepco has appealed the Hearing Examiner's decision on the treatment of EDIT and ADITC and corporate reorganization costs to the MPSC. Pepco cannot predict what the outcome of the appeal will be or when the appeal might be decided. Pepco believes that its calculation of the Maryland customers' share of divestiture proceeds is correct. However, depending on the ultimate outcome of this proceeding, Pepco could be required to share with its customers approximately 50 percent of the EDIT and ADITC balances described above and make additional gain-sharing payments related to the disallowed severance payments. Such additional payments would be charged to expense in the quarter and year in which a final 25 _____________________________________________________________________________ decision is rendered and could have a material adverse effect on results of operations for those periods. However, neither PHI nor Pepco believes that additional gain-sharing payments, if any, or the ADITC-related payments to the IRS, if required, would have a material adverse impact on its financial condition. |
SOS and Default Service Proceedings |
District of Columbia |
As more fully described in Note (12), Commitments and Contingencies, to the financial statements of the Pepco Holdings 2004 10-K, in a proceeding initiated by the DCPSC to consider issues relating to (a) the establishment of terms and conditions for providing SOS in the District of Columbia after Pepco's obligation to provide SOS terminated on February 7, 2005, and (b) the selection of a new SOS provider, the DCPSC issued an order in March 2004 adopting the wholesale SOS model. Under this model, Pepco would continue to be the SOS provider in the District of Columbia after February 7, 2005. This March 2004 order, as amended by a DCPSC order issued in July 2004, also extended Pepco's obligation to provide SOS at market rates for up to an additional 76 months for small commercial and residential customers, and for an additional 28 months for large commercial customers. |
In August 2004, the DCPSC issued an order approving administrative charges including an average margin for Pepco of approximately $0.00248 per kilowatt hour, calculated based on total sales to residential, small and large commercial District of Columbia SOS customers over the twelve months ended December 31, 2003. Because margins vary by customer class, the actual average margin over any given time period will depend on the amount of electricity used by the respective classes of customers over the time period. The administrative charges went into effect for Pepco's District of Columbia SOS sales on February 8, 2005. Pepco completed the first competitive procurement process for District of Columbia SOS at the end of October and filed the proposed new SOS rates with the DCPSC on November 3, 2004. |
The TPA with Mirant under which Pepco obtained the fixed-rate DC SOS supply ended on January 22, 2005, while the new SOS supply contracts with the winning bidders in the competitive procurement process began on February 1, 2005. Pepco procured power separately on the market for next-day deliveries to cover the period from January 23 through January 31, 2005, before the new District of Columbia SOS contracts began. Consequently, Pepco had to pay the difference between the procurement cost of power on the market for next-day deliveries and the current District of Columbia SOS rates charged to customers during the period from January 23 through January 31, 2005. In addition, because the new District of Columbia SOS rates did not go into effect until February 8, 2005, Pepco had to pay the difference between the procurement cost of power under the new District of Columbia SOS contracts and the District of Columbia SOS rates charged to customers for the period from February 1 to February 7, 2005. The total amount of the difference is estimated to be approximately $8.7 million. This difference, however, will be included in the calculation of the Generation Procurement Credit (GPC) for the District of Columbia for the period February 8, 2004 through February 7, 2005. The GPC provides for a sharing between Pepco's customers and shareholders, on an annual basis, of any margins, but not losses, that Pepco earned providing SOS in the District of Columbia during the four-year period from February 8, 2001 through February 7, 2005. Currently, based on the rates paid by Pepco to Mirant under the TPA Settlement, there is no customer sharing. However, in the event that Pepco were to ultimately realize a significant 26 _____________________________________________________________________________ recovery from the Mirant bankruptcy estate associated with the TPA Settlement, the GPC would be recalculated, and the amount of customer sharing with respect to such recovery would be reduced because of the $8.7 million loss being included in the GPC calculation. |
Maryland |
Under a settlement approved by the MPSC in April 2003, Pepco is required to provide SOS at market rates to residential and small commercial customers through May 2008, to medium-sized commercial customers through May 2006, and to large commercial customers through May 2005. In accordance with the settlement, Pepco purchases the power supply required to satisfy its market rate SOS obligations from wholesale suppliers under contracts entered into pursuant to a competitive bid procedure approved by the MPSC. Pepco is entitled to recover from its SOS customers the cost of the SOS supply plus an average margin of $0.002 per kilowatt hour, calculated based on total sales to residential, small and large commercial Maryland SOS customers over the twelve months ended December 31, 2003. Because margins vary by customer class, the actual average margin over any given time period will depend on the amount of electricity used by the respective classes of customers over the time period. |
Under a settlement approved by the MPSC in April 2003, DPL is required to provide SOS supply at market rates to residential and small commercial customers through May 2008, to medium-sized commercial customers through May 2006, and to large commercial customers through May 2005. In accordance with the settlement, DPL purchases the power supply required to satisfy its market rate SOS obligations from wholesale suppliers under contracts entered into pursuant to a competitive bid procedure approved and supervised by the MPSC. DPL is entitled to recover from its SOS customers the costs of the SOS supply plus an average margin of $0.002 per kilowatt hour, calculated based on total sales to residential, small, and large commercial Maryland SOS customers over the twelve months ended December 31, 2003. Because margins vary by customer class, the actual average margin over any given time period will depend on the amount of electricity used by the respective classes of cus tomers over the time period. |
Virginia |
Under amendments to the Virginia Electric Utility Restructuring Act implemented in March 2004, DPL is obligated to offer default service to customers in Virginia for an indefinite period until relieved of that obligation by the VSCC. DPL currently obtains all of the energy and capacity needed to fulfill its default service obligations in Virginia under a supply agreement with Conectiv Energy that commenced on January 1, 2005 and expires in May 2006. A prior agreement, also with Conectiv Energy, terminated effective December 31, 2004. DPL entered into this supply agreement after conducting a competitive bid procedure in which Conectiv Energy was the lowest bidder. |
In October 2004, DPL filed an application with the VSCC for approval to increase the rates that DPL charges its Virginia default service customers to allow it to recover its costs for power under the new supply agreement plus an administrative charge and a margin. A VSCC order issued in November 2004 allowed DPL to put interim rates into effect on January 1, 2005, subject to refund if the VSCC subsequently determined the rate is excessive. The interim rates reflected an increase of 1.0247 cents per kwh to the fuel rate, which provide for recovery of the entire amount being paid by DPL to Conectiv Energy, but did not include an administrative charge or margin, pending further consideration of this issue. Therefore, the November 2004 27 _____________________________________________________________________________ order also directed the parties to file memoranda concerning whether administrative costs and a margin are properly recovered through a fuel clause mechanism. Memoranda were filed by DPL, the VSCC Staff and Virginia's Office of Attorney General. The VSCC ruled in January 2005 that the administrative charge and margin are base rate items not recoverable through a fuel clause. No appeal is planned regarding this filing. A settlement resolving all other issues and making the interim rates final was filed on March 4, 2005, the amount of the final rates being contingent only on possible future adjustment depending on the result of a related proceeding at FERC. The VSCC approved the settlement on March 25, 2005. |
In October 2004, Conectiv Energy made a filing with FERC requesting authorization to enter into a contract to supply power to an affiliate, DPL, under the supply agreement described above. In December 2004, FERC granted the requested authorization effective January 1, 2005, subject to refund and hearings on the narrow question whether, in the absence of direct VSCC oversight over the DPL competitive bid process, DPL unduly preferred its own affiliate, Conectiv Energy, in the design and implementation of the DPL competitive bid process, or unduly favored Conectiv Energy in the credit criteria and analysis applied. DPL cannot predict the outcome of this proceeding. |
Delaware |
Under a settlement approved by the DPSC, DPL is required to provide POLR service to retail customers in Delaware until May 1, 2006. In October 2004, the DPSC initiated a proceeding to investigate and determine which entity should act as the SOS supplier in DPL's Delaware service territory after May 1, 2006, and what prices should be charged for SOS after May 1, 2006. The process used in Delaware consists of three separate stages. The stage 1 process was constructed to allow the DPSC to determine by February 28, 2005 the fundamental issues related to the selection of an SOS supplier. Stage 2 would resolve issues relating to the process under which supply would be acquired by the SOS provider and the way in which SOS prices would be set and monitored. In Stage 3, these selection and pricing mechanisms would be implemented to determine the post-May 2006 SOS supplier and the post-May 2006 SOS price. On January 26, 2005, the DPSC Staff issued a report recommending to the DPSC that DPL be selected as the SOS supplier, subject to further discussions as to how to establish SOS prices. On March 22, 2005, the DPSC issued an order approving DPL as the SOS provider at market rates after May 1, 2006, when DPL's current fixed rate POLR obligation ends. The DPSC will determine in the future the duration of DPL's market rate SOS obligation and the margin, if any, that it will be permitted to earn in conjunction with providing the SOS. The DPSC also approved a structure whereby DPL will purchase the power supply required to satisfy its market rate SOS obligations from wholesale suppliers under contracts entered into pursuant to a competitive bid procedure. |
Proposed Shut Down of B.L. England Generating Facility; Construction of Transmission Facilities |
Pursuant to a September 2003 NJBPU order, ACE filed a report in April 2004 with the NJBPU recommending that the B.L. England generating facility be shut down. The report stated that the operation of the B.L. England facility is necessary at the time of the report to satisfy reliability standards, but that those reliability standards could also be satisfied in other ways. The report concludes that, based on B.L. England's current and projected operating costs resulting from compliance with more restrictive environmental requirements, the most cost- 28 _____________________________________________________________________________ effective way in which to meet reliability standards is to shut down the B.L. England facility and construct additional transmission enhancements in southern New Jersey. |
The terms of an April 26, 2004 preliminary settlement among PHI, Conectiv, ACE, the New Jersey Department of Environmental Protection (NJDEP) and the Attorney General of New Jersey, which are further discussed under "Preliminary Settlement Agreement with NJDEP," below, established emission limits for B.L. England's operations (which would become applicable on October 1, 2008 for Unit 1 and on May 1, 2009 for Unit 2 if B.L. England is not shut down) and required ACE to seek necessary approvals from agencies that may have jurisdiction to shut down and permanently cease operations at B.L. England by December 15, 2007, and to obtain approval to construct necessary substation and transmission facilities. |
In letters dated May and September 2004 to PJM, ACE informed PJM of its intent, as owner of the B.L. England generating plant, to retire the entire plant (447 MW) on December 15, 2007. PJM completed its independent analysis to determine the upgrades required to eliminate any identified reliability problems resulting from the retirement of B.L. England and recommended that certain transmission upgrades be installed prior to the summer of 2008. ACE's independent assessment confirmed that the transmission upgrades identified by PJM are the transmission upgrades necessary to maintain reliability in the Atlantic zone after the retirement of B.L. England. The amount of the costs incurred by ACE to construct the recommended transmission upgrades that ACE would be permitted to recover from load serving entities that use ACE's transmission system would be subject to approval by FERC. The amount of construction costs that ACE would be permitted to recover from retail ratepayers wou ld be determined in accordance with the treatment of transmission-related revenue requirements in retail rates under the jurisdiction of the appropriate state regulatory commission. ACE cannot predict how the recovery of such costs will ultimately be treated by FERC and the state regulatory commissions and, therefore, cannot predict the financial impact to ACE of installing the recommended transmission upgrades. However, in the event that the NJBPU makes satisfactory findings and grants other requested approvals concerning the retirement of B.L. England and the construction of the transmission upgrades required to maintain reliability in the Atlantic zone after such retirement, ACE expects to begin construction of the appropriate transmission upgrades while final decisions by FERC and state regulatory commissions concerning the methodology for recovery of the costs of such construction are still pending. |
In November 2004, ACE made a filing with the NJBPU requesting the necessary approvals for construction of the transmission upgrades required to maintain reliability in the Atlantic zone after the retirement of B.L. England. The NJBPU issued an order on April 21, 2005, which unanimously approved the petition for the construction of the transmission upgrades, including the 230 kilovolt (kV) Cumberland to Dennis line, the138 kV Dennis to Corson line, and the 138 kV Cardiff to Lewis line. The approval states that these lines are necessary even if B.L. England does not shut down. On May 6, 2005, ACE announced that it would again auction its electric generation assets, including B.L. England. ACE intends to construct the transmission upgrades referred to above whether or not B.L. England is sold. |
In December 2004, ACE filed a petition with the NJBPU requesting that the NJBPU establish a proceeding that will consist of a Phase I and Phase II and that the procedural process for the Phase I proceeding require intervention and participation by all persons interested in the prudence of the decision to shut down B.L. England generating facility and the categories of stranded costs associated with shutting down and dismantling the facility and remediation of the 29 _____________________________________________________________________________ site. ACE contemplates that Phase II of this proceeding, which would be initiated by an ACE filing in 2008 or 2009, would establish the actual level of prudently incurred stranded costs to be recovered from customers in rates. Evidentiary hearings for the necessary approvals for construction of the transmission upgrades were held on March 28, 2005. It is expected that the NJBPU will rule on the petition in the second quarter of 2005. ACE cannot predict the outcome of these two proceedings. |
General Litigation |
During 1993, Pepco was served with Amended Complaints filed in the state Circuit Courts of Prince George's County, Baltimore City and Baltimore County, Maryland in separate ongoing, consolidated proceedings known as "In re: Personal Injury Asbestos Case." Pepco and other corporate entities were brought into these cases on a theory of premises liability. Under this theory, plaintiffs argue that Pepco was negligent in not providing a safe work environment for employees or its contractors, who allegedly were exposed to asbestos while working on Pepco's property. Initially, a total of approximately 448 individual plaintiffs added Pepco to their complaints. While the pleadings are not entirely clear, it appears that each plaintiff sought $2 million in compensatory damages and $4 million in punitive damages from each defendant. |
Since the initial filings in 1993, additional individual suits have been filed against Pepco, and significant numbers of cases have been dismissed. As a result of two motions to dismiss, numerous hearings and meetings and one motion for summary judgment, Pepco has had approximately 400 of these cases successfully dismissed with prejudice, either voluntarily by the plaintiff or by the court. Of the approximately 250 remaining asbestos cases pending against Pepco, approximately 85 cases were filed after December 19, 2000, and have been tendered to Mirant for defense and indemnification pursuant to the terms of the Asset Purchase and Sale Agreement. |
While the aggregate amount of monetary damages sought in the remaining suits (excluding those tendered to Mirant) exceeds $400 million, Pepco believes the amounts claimed by current plaintiffs are greatly exaggerated. The amount of total liability, if any, and any related insurance recovery cannot be determined at this time; however, based on information and relevant circumstances known at this time, Pepco does not believe these suits will have a material adverse effect on its financial condition. However, if an unfavorable decision were rendered against Pepco, it could have a material adverse effect on Pepco's and PHI's results of operations. |
Environmental Litigation |
PHI, through its subsidiaries, is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. In addition, federal and state statutes authorize governmental agencies to compel responsible parties to clean up certain abandoned or unremediated hazardous waste sites. PHI's subsidiaries may incur costs to clean up currently or formerly owned facilities or sites found to be contaminated, as well as other facilities or sites that may have been contaminated due to past disposal practices. |
In May 2004, the U.S. Department of Justice (DOJ) invited DPL to enter into pre-filing negotiations in connection with DPL's alleged liability under Comprehensive Environmental 30 _____________________________________________________________________________ Response, Compensation, and Liability Act of 1980 at the Diamond State Salvage site in Wilmington, Delaware. In the context of the negotiations, DOJ informed DPL that DPL is a de minimis party at the site. In February 2005, DPL entered into a de minimis consent decree with the United States which, if approved by the U.S. District Court, would require DPL to pay $144,000 as reimbursement of the government's response costs, resolve DPL's alleged liability, and provide DPL a covenant not to sue from the United States and protection from third-party claims for contribution. |
In July 2004, DPL entered into an Administrative Consent Order with the Maryland Department of the Environment (MDE) to perform a Remedial Investigation/Feasibility Study (RI/FS) to further identify the extent of soil, sediment and ground and surface water contamination related to former manufactured gas plant (MGP) operations at the Cambridge, Maryland site on DPL-owned property and to investigate the extent of MGP contamination on adjacent property. The costs for completing the RI/FS for this site are approximately $300,000, approximately $50,000 of which will be expended in 2005. The costs of cleanup resulting from the RI/FS will not be determinable until the RI/FS is completed and an agreement with respect to cleanup is reached with the MDE. Due to project delays, DPL now expects that the completion date for the RI/FS will be in the fourth quarter of 2005. |
In October 1995, Pepco and DPL each received notice from the Environmental Protection Agency (EPA) that it, along with several hundred other companies, might be a potentially responsible party (PRP) in connection with the Spectron Superfund Site in Elkton, Maryland. The site was operated as a hazardous waste disposal, recycling and processing facility from 1961 to 1988. |
In August 2001, Pepco entered into a consent decree for de minimis parties with EPA to resolve its liability at this site. Under the terms of the consent decree, which was approved by the U.S. District Court for the District of Maryland in March 2003, Pepco made de minimis payments to the United States and a group of PRPs. In return, those parties agreed not to sue Pepco for past and future costs of remediation at the site and the United States will also provide protection against third-party claims for contributions related to response actions at the site. The consent decree does not cover any damages to natural resources. However, Pepco believes that any liability that it might incur due to natural resource damage at this site would not have a material adverse effect on its financial condition or results of operations. In April 1996 DPL, with numerous other PRPs, entered into an administrative order on consent with EPA to perform an RI/FS at the site. In February 2003 , the EPA informed DPL that it will have no future liability for contribution to the remediation of the site. |
In the early 1970s, both Pepco and DPL sold scrap transformers, some of which may have contained some level of PCBs, to a metal reclaimer operating at the Metal Bank/Cottman Avenue site in Philadelphia, Pennsylvania, owned by a nonaffiliated company. In December 1987, Pepco and DPL were notified by EPA that they, along with a number of other utilities and non-utilities, were PRPs in connection with the PCB contamination at the site. |
In October 1994, an RI/FS including a number of possible remedies was submitted to the EPA. In December 1997, the EPA issued a Record of Decision that set forth a selected remedial action plan with estimated implementation costs of approximately $17 million. In June 1998, the EPA issued a unilateral administrative order to Pepco and 12 other PRPs to conduct the design and actions called for in its decision. In May 2003, two of the potentially liable owner/operator entities filed for reorganization under Chapter 11 of the U.S. Bankruptcy Code. 31 _____________________________________________________________________________ In October 2003, the Bankruptcy Court confirmed a Reorganization Plan that incorporates the terms of a settlement among the debtors, the United States and a group of utility PRPs including Pepco. Under the settlement, the reorganized entity/site owner will pay a total of $13.25 million to remediate the site. |
As of May 1, 2005, Pepco had accrued $1.7 million to meet its liability for a site remedy. At the present time, it is not possible to estimate the total extent of EPA's administrative and oversight costs or the expense associated with a site remedy ultimately implemented. However, Pepco believes that its liability at this site will not have a material adverse effect on its financial condition or results of operations. |
In 1999, DPL entered into a de minimis settlement with EPA and paid approximately $107,000 to resolve its liability for cleanup costs at the site. The de minimis settlement did not resolve DPL's responsibility for natural resource damages, if any, at the site. DPL believes that any liability for natural resource damages at this site will not have a material adverse effect on its financial condition or results of operations. |
In June 1992, EPA identified ACE as a PRP at the Bridgeport Rental and Oil Services Superfund Site in Logan Township, New Jersey. In September 1996, ACE along with other PRPs signed a consent decree with EPA and NJDEP to address remediation of the site. ACE's liability is limited to 0.232 percent of the aggregate remediation liability and thus far ACE has made contributions of approximately $105,000. Based on information currently available, ACE may be required to contribute approximately an additional $100,000. ACE believes that its liability at this site will not have a material adverse effect on its financial condition or results of operations. |
In November 1991, NJDEP identified ACE as a PRP at the Delilah Road Landfill site in Egg Harbor Township, New Jersey. In 1993, ACE, along with other PRPs, signed an administrative consent order with NJDEP to remediate the site. The soil cap remedy for the site has been completed and the NJDEP conditionally approved the report submitted by the parties on the implementation of the remedy in January 2003. In March 2004, NJDEP approved a Ground Water Sampling and Analysis Plan. The results of groundwater monitoring over the first year of this ground water sampling plan will help to determine the extent of post-remedy operation and maintenance costs. In March 2003, EPA demanded from the PRP group reimbursement for EPA's past costs at the site, totaling $168,789. The PRP group objected to the demand for certain costs, but agreed to reimburse EPA approximately $19,000. Based on information currently available, ACE may be required to contribute approximately an additional $626 ,000. ACE believes that its liability for post-remedy operation and maintenance costs will not have a material adverse effect on its financial condition or results of operations. |
Preliminary Settlement Agreement with the NJDEP |
In an effort to address NJDEP's concerns regarding ACE's compliance with New Source Review (NSR) requirements at B.L. England, on April 26, 2004, PHI, Conectiv and ACE entered into a preliminary settlement agreement with NJDEP and the Attorney General of New Jersey. The preliminary settlement agreement outlines the basic parameters for a definitive agreement to resolve ACE's NSR liability at B.L. England and various other environmental issues at ACE and Conectiv Energy facilities in New Jersey. Among other things, the preliminary settlement agreement provides that: 32 _____________________________________________________________________________ |
New Accounting Standards |
FIN 47 |
In March 2005, the Financial Accounting Standards Board (FASB) published FASB Interpretation No. 47,Accounting for Conditional Asset Retirement Obligations(FIN 47). FIN 47 clarifies that FASB Statement No. 143,Accounting for Asset Retirement Obligations applies to conditional asset retirement obligations as defined and requires that the fair value of a reasonably estimable conditional asset retirement obligation be recognized as part of the carrying amounts of the asset. FIN 47 is effective no later than the end of fiscal years ending after December 15, 2005 (December 31, 2005 for Pepco). Pepco is in the process of evaluating the anticipated impact that the implementation of FIN 47 will have on its overall financial position or net results of operations. |
(3) SEGMENT INFORMATION |
In accordance with SFAS No. 131 "Disclosures about Segments of an Enterprise and Related Information," Pepco has one segment, its regulated utility business. |
(4) COMMITMENTS AND CONTINGENCIES |
REGULATORY AND OTHER MATTERS |
Relationship with Mirant Corporation |
In 2000, Pepco sold substantially all of its electricity generation assets to Mirant Corporation, formerly Southern Energy, Inc. As part of the Asset Purchase and Sale Agreement, Pepco entered into several ongoing contractual arrangements with Mirant and certain of its subsidiaries (collectively, Mirant). On July 14, 2003, Mirant Corporation and most of its subsidiaries filed a voluntary petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code in the U.S. Bankruptcy Court for the Northern District of Texas (the Bankruptcy Court). |
Depending on the outcome of the matters discussed below, the Mirant bankruptcy could have a material adverse effect on the results of operations of Pepco Holdings and Pepco. However, management believes that Pepco Holdings and Pepco currently have sufficient cash, cash flow and borrowing capacity under their credit facilities and in the capital markets to be able to satisfy any additional cash requirements that may arise due to the Mirant bankruptcy. Accordingly, management does not anticipate that the Mirant bankruptcy will impair the ability of Pepco 48 _____________________________________________________________________________ Holdings or Pepco to fulfill their contractual obligations or to fund projected capital expenditures. On this basis, management currently does not believe that the Mirant bankruptcy will have a material adverse effect on the financial condition of either company. |
Transition Power Agreements |
As part of the Asset Purchase and Sale Agreement, Pepco and Mirant entered into Transition Power Agreements for Maryland and the District of Columbia, respectively (collectively, the TPAs). Under these agreements, Mirant was obligated to supply Pepco with all of the capacity and energy needed to fulfill its SOS obligations in Maryland through June 2004 and its SOS obligations in the District of Columbia through January 22, 2005. |
To avoid the potential rejection of the TPAs, Pepco and Mirant entered into an Amended Settlement Agreement and Release dated as of October 24, 2003 (the Settlement Agreement) pursuant to which Mirant assumed both of the TPAs and the terms of the TPAs were modified. The Settlement Agreement also provided that Pepco has an allowed, pre-petition general unsecured claim against Mirant Corporation in the amount of $105 million (the Pepco TPA Claim). |
Pepco has also asserted the Pepco TPA Claim against other Mirant entities, which Pepco believes are liable to Pepco under the terms of the Asset Purchase and Sale Agreement's Assignment and Assumption Agreement (the Assignment Agreement). Under the Assignment Agreement, Pepco believes that each of the Mirant entities assumed and agreed to discharge certain liabilities and obligations of Pepco as defined in the Asset Purchase and Sale Agreement. Mirant has filed objections to these claims. Under the original plan of reorganization filed by the Mirant entities with the Bankruptcy Court, certain Mirant entities other than Mirant Corporation would pay significantly higher percentages of the claims of their creditors than would Mirant Corporation. The amount that Pepco will be able to recover from the Mirant bankruptcy estate with respect to the Pepco TPA Claim will depend on the amount of assets available for distribution to creditors of the Mirant entities that are found to be liable for the Pepco TPA Claim. |
Power Purchase Agreements |
Under agreements with FirstEnergy Corp., formerly Ohio Edison (FirstEnergy), and Allegheny Energy, Inc., both entered into in 1987, Pepco is obligated to purchase from FirstEnergy 450 megawatts of capacity and energy annually through December 2005 (the FirstEnergy PPA). Under the Panda PPA, entered into in 1991, Pepco is obligated to purchase from Panda 230 megawatts of capacity and energy annually through 2021. In each case, the purchase price is substantially in excess of current market price. As a part of the Asset Purchase and Sale Agreement, Pepco entered into a "back-to-back" arrangement with Mirant. Under this arrangement, Mirant is obligated, among other things, to purchase from Pepco the capacity and energy that Pepco is obligated to purchase under the FirstEnergy PPA and the Panda PPA at a price equal to the price Pepco is obligated to pay under the FirstEnergy PPA and the Panda PPA (the PPA-Related Obligations). |
Pepco Pre-Petition Claims |
When Mirant filed its bankruptcy petition on July 14, 2003, Mirant had unpaid obligations to Pepco of approximately $29 million, consisting primarily of payments due to Pepco in respect of the PPA-Related Obligations (the Mirant Pre-Petition Obligations). The Mirant Pre-Petition 49 _____________________________________________________________________________ Obligations constitute part of the indebtedness for which Mirant is seeking relief in its bankruptcy proceeding. Pepco has filed Proofs of Claim in the Mirant bankruptcy proceeding in the amount of approximately $26 million to recover this indebtedness; however, the amount of Pepco's recovery, if any, is uncertain. The $3 million difference between Mirant's unpaid obligation to Pepco and the $26 million Proofs of Claim primarily represents a TPA settlement adjustment which is included in the $105 million Proofs of Claim filed by Pepco against the Mirant debtors in respect of the Pepco TPA Claim. In view of the uncertainty as to recoverability, Pepco, in the third quarter of 2003, expensed $14.5 million to establish a reserve against the $29 million receivable from Mirant. In January 2004, Pepco paid approximately $2.5 million to Panda in settlement of certain billing disputes under the Panda PPA that related to periods after the sale of Pepco's generation assets to Mirant. Pepco believes that under the terms of the Asset Purchase and Sale Agreement, Mirant is obligated to reimburse Pepco for the settlement payment. Accordingly, in the first quarter of 2004, Pepco increased the amount of the receivable due from Mirant by approximately $2.5 million and amended its Proofs of Claim to include this amount. Pepco currently estimates that the $14.5 million expensed in the third quarter of 2003 represents the portion of the entire $31.5 million receivable unlikely to be recovered in bankruptcy, and no additional reserve has been established for the $2.5 million increase in the receivable. The amount expensed represents Pepco's estimate of the possible outcome in bankruptcy, although the amount ultimately recovered could be higher or lower. |
Mirant's Attempt to Reject the PPA-Related Obligations |
On August 28, 2003, Mirant filed with the Bankruptcy Court a motion seeking authorization to reject its PPA-Related Obligations. Upon motions filed with the U.S. District Court for the Northern District of Texas (the District Court) by Pepco and the Federal Energy Regulatory Commission (FERC), in October 2003, the District Court withdrew jurisdiction over the rejection proceedings from the Bankruptcy Court. In December 2003, the District Court denied Mirant's motion to reject the PPA-Related Obligations on jurisdictional grounds. The District Court's decision was appealed by Mirant and The Official Committee of Unsecured Creditors of Mirant Corporation (the Creditors' Committee) to the U.S. Court of Appeals for the Fifth Circuit (the Court of Appeals). On August 4, 2004, the Court of Appeals remanded the case to the District Court saying that the District Court has jurisdiction to rule on the merits of Mirant's rejection motion, suggesting that in doing so the court apply a "more rigorous standard" than the business judgment rule usually applied by bankruptcy courts in ruling on rejection motions. |
On December 9, 2004, the District Court issued an order again denying Mirant's motion to reject the PPA-Related Obligations. The District Court found that the PPA-Related Obligations are not severable from the Asset Purchase and Sale Agreement and that the Asset Purchase and Sale Agreement cannot be rejected in part, as Mirant was seeking to do. On December 16, the Creditors' Committee appealed the District Court's order to the Court of Appeals, and on December 20, 2004, Mirant also appealed the District Court's order. Mirant and the Creditors' Committee each filed its brief on April 4, 2005. Pepco's and FERC's briefs are due May 19, 2005. Oral arguments have not yet been scheduled. |
As more fully discussed below, Mirant had been making regular periodic payments in respect of the PPA-Related Obligations. On December 9,` 2004, Mirant filed a notice with the Bankruptcy Court that it was suspending payments to Pepco in respect of the PPA-Related Obligations. On December 13, 2004, Mirant failed to make a payment of approximately $17.9 million due to Pepco for the period November 1, 2004 to November 30, 2004. On December 23, 50 _____________________________________________________________________________ 2004, Pepco received a payment of approximately $6.8 million from Mirant, which according to Mirant represented the market value of the power for which payment was due on December 13. At that time, Mirant informed Pepco that it intended to continue to pay the market value, but not the above-market portion, of the power purchased under the PPA-Related Obligations. Pepco disagreed with Mirant's assertion that it need only pay the market value and believed that the amount representing the market value calculated by Mirant was insufficient. |
On January 21, 2005, Mirant made a payment of approximately $21.1 million. Pepco disputed Mirant's contention that the amount paid reflected the full amount due Pepco under these agreements for the applicable periods. |
On January 21, 2005, Mirant filed in the Bankruptcy Court a motion seeking to reject certain of its ongoing obligations under the Asset Purchase and Sale Agreement, including the PPA-Related Obligations (the Second Motion to Reject). On March 1, 2005 (as amended by order dated March 7, 2005), the District Court granted Pepco's motion to withdraw jurisdiction over the Asset Purchase and Sale Agreement rejection proceedings from the Bankruptcy Court. In addition, the District Court ordered Mirant to pay on March 18, 2005, all past-due unpaid amounts under the PPA-Related Obligations. On March 4, 2004, Mirant filed an emergency motion for reconsideration and a stay of the March 1, 2005 order. On March 14, 2005, Pepco filed a response to Mirant's motion. |
On March 16, 2005, the District Court denied Mirant's emergency motion for reconsideration and stay of the District Court's March 1 and March 7 Orders. On the same day, Mirant filed a petition for writ of mandamus, and a motion for stay pending appeal and mandamus review in the Court of Appeals. |
On March 17, 2005, the Court of Appeals issued an Order staying the District Court's Orders of March 1 and March 7, 2005. Accordingly, Mirant was not required to make the payment that was due to Pepco on March 18, 2005 pursuant to the District Court's Orders. On March 28, 2005, in accordance with the Court of Appeals March 17Order, Pepco, FERC, the Maryland Public Service Commission (MPSC) and Office of the People's Counsel (OPC) of Maryland filed oppositions to Mirant's petition for writ of mandamus in the Court of Appeals. Mirant and the Creditor's Committee filed briefs with the Court of Appeals on April 1, 2005. |
On March 28, 2005, Pepco, FERC, the District of Columbia OPC, the MPSC and the Maryland OPC filed oppositions to the Second Motion to Reject in the District Court. |
On April 11, 2005 the Court of Appeals entered an Order vacating the stay it had ordered on March 17, 2005 and denying Mirant's motions for writ of mandamus and stay pending appeal. On April 13, 2005, Pepco received a payment from Mirant in the amount of approximately $57.5 million, representing the full amount then due in respect of the PPA-Related Obligations. |
Pepco is exercising all available legal remedies and vigorously opposing Mirant's attempt to reject the PPA-Related Obligations and other obligations under the Asset Purchase and Sale Agreement in order to protect the interests of its customers and shareholders. While Pepco believes that it has substantial legal bases to oppose the attempt to reject the agreements, the outcome of Mirant's efforts to reject the PPA-Related Obligations is uncertain. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations, Pepco could be required to repay to Mirant, for the period beginning on the effective date of the rejection (which 51 _____________________________________________________________________________ date could be prior to the date of the court's order granting the rejection and possibly as early as September 18, 2003) and ending on the date Mirant is entitled to cease its purchases of energy and capacity from Pepco, all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and capacity. Pepco estimates that the amount it could be required to repay to Mirant in the unlikely event that September 18, 2003, is determined to be the effective date of rejection, is approximately $185.6 million as of May 1, 2005. |
Mirant has also indicated to the Bankruptcy Court that it will move to require Pepco to disgorge all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and capacity, for the period July 14, 2003 (the date on which Mirant filed its bankruptcy petition) through rejection, if approved, on the theory that Mirant did not receive value for those payments. Pepco estimates that the amount it would be required to repay to Mirant on the disgorgement theory, in addition to the amounts described above, is approximately $22.5 million. |
Any repayment by Pepco of amounts paid by Mirant would entitle Pepco to file a claim against the bankruptcy estate in an amount equal to the amount repaid. Pepco believes that, to the extent such amounts were not recovered from the Mirant bankruptcy estate, they would be recoverable as stranded costs from customers through distribution rates as described below. |
The following are estimates prepared by Pepco of its potential future exposure if Mirant's attempt to reject the PPA-Related Obligations ultimately is successful. These estimates are based in part on current market prices and forward price estimates for energy and capacity, and do not include financing costs, all of which could be subject to significant fluctuation. The estimates assume no recovery from the Mirant bankruptcy estate and no regulatory recovery, either of which would mitigate the effect of the estimated loss. Pepco does not consider it realistic to assume that there will be no such recoveries. Based on these assumptions, Pepco estimates that its pre-tax exposure as of May 1, 2005, representing the loss of the future benefit of the PPA-Related Obligations to Pepco, is as follows: |
The ability of Pepco to recover from the Mirant bankruptcy estate in respect to the Mirant Pre-Petition Obligations and damages if the PPA-Related Obligations are successfully rejected will depend on whether Pepco's claims are allowed, the amount of assets available for 52 _____________________________________________________________________________ distribution to the creditors of the Mirant companies determined to be liable for those claims, and Pepco's priority relative to other creditors. At the current stage of the bankruptcy proceeding, there is insufficient information to determine the amount, if any, that Pepco might be able to recover from the Mirant bankruptcy estate, whether the recovery would be in cash or another form of payment, or the timing of any recovery. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations and Pepco's full claim is not recovered from the Mirant bankruptcy estate, Pepco may seek authority from the MPSC and the District of Columbia Public Service Commission (DCPSC) to recover its additional costs. Pepco is committed to working with its regulatory authorities to achieve a result that is appropriate for its shareholders and customers. Under the provisions of the settlement agreements approved by the MPSC and the DCPSC in the deregulation proceedings in which Pepco agreed to divest its generation assets under certain conditions, the PPAs were to become assets of Pepco's distribution business if they could not be sold. Pepco believes that, if Mirant ultimately is successful in rejecting the PPA-Related Obligations, these provisions would allow the stranded costs of the PPAs that are not recovered from the Mirant bankruptcy estate to be recovered from Pepco's customers through its distribut ion rates. If Pepco's interpretation of the settlement agreements is confirmed, Pepco expects to be able to establish the amount of its anticipated recovery as a regulatory asset. However, there is no assurance that Pepco's interpretation of the settlement agreements would be confirmed by the respective public service commissions. |
If the PPA-Related Obligations are successfully rejected, and there is no regulatory recovery, Pepco will incur a loss. However, the accounting treatment of such a loss depends on a number of legal and regulatory factors, and is not determinable at this time. |
The SMECO Agreement |
As a term of the Asset Purchase and Sale Agreement, Pepco assigned to Mirant a facility and capacity agreement with Southern Maryland Electric Cooperative, Inc. (SMECO) under which Pepco was obligated to purchase the capacity of an 84-megawatt combustion turbine installed and owned by SMECO at a former Pepco generating facility (the SMECO Agreement). The SMECO Agreement expires in 2015 and contemplates a monthly payment to SMECO of approximately $.5 million. Pepco is responsible to SMECO for the performance of the SMECO Agreement if Mirant fails to perform its obligations thereunder. At this time, Mirant continues to make post-petition payments due to SMECO. |
On March 15, 2004, Mirant filed a complaint with the Bankruptcy Court seeking a declaratory judgment that the SMECO Agreement is an unexpired lease of non-residential real property rather than an executory contract and that if Mirant were to successfully reject the agreement, any claim against the bankruptcy estate for damages made by SMECO (or by Pepco as subrogee) would be subject to the provisions of the Bankruptcy Code that limit the recovery of rejection damages by lessors. Pepco believes that there is no reasonable factual or legal basis to support Mirant's contention that the SMECO Agreement is a lease of real property. Litigation continues and the outcome of this proceeding cannot be predicted. 53 _____________________________________________________________________________ |
Mirant Plan of Reorganization |
On January 19, 2005, Mirant filed its Plan of Reorganization and Disclosure Statement with the Bankruptcy Court. In that plan, Mirant proposed to transfer all assets to "New Mirant" (an entity it proposed to create in the reorganization), with the exception of the PPA-Related Obligations. Mirant proposed that the PPA-Related Obligations would remain in "Old Mirant," which would be a shell entity as a result of the reorganization. Pepco believes this plan cannot be confirmed by the Bankruptcy Court under the law and has submitted objections to the plan. The plan also did not have the support of any of the creditor's committees in the Mirant bankruptcy. |
On March 11, 2005, Mirant filed an application with FERC seeking approval for the internal transfers and corporate restructuring that will result from its proposed Plan of Reorganization. Mirant must obtain FERC approval for these transactions under Section 203 of the Federal Power Act. On April 1, 2005, Pepco filed a motion to intervene and protest at FERC in connection with Mirant's March 11 FERC filing. On the same date, the District of Columbia OPC also filed a motion to intervene and protest. |
On March 25, 2005, Mirant filed its First Amended Plan of Reorganization and First Amended Disclosure Statement. Pepco is currently analyzing this amended plan. |
Rate Proceedings |
Pepco's delivery rates in the District of Columbia generally are capped through July 2007, except with respect to residential low-income customers, for whom rates generally are capped through July 2009. In July 2004, Pepco filed a distribution rate review case with the DCPSC as required by the terms of the Pepco-Conectiv merger settlement approved by the DCPSC to determine whether Pepco's distribution rates would be decreased during the period the rates are capped. In accordance with the terms of the merger settlement, Pepco's distribution rates cannot be increased as a result of this proceeding. On April 7, 2005, the DCPSC approved a settlement of this proceeding, which provides that Pepco's current distribution rates will remain unchanged through the end of the rate cap periods set forth above, except as otherwise provided in the merger settlement, or as may otherwise be required by the Commission or by law. |
Divestiture Cases |
District of Columbia |
Final briefs on Pepco's District of Columbia divestiture proceeds sharing application were filed in July 2002 following an evidentiary hearing in June 2002. That application was filed to implement a provision of Pepco's DCPSC-approved divestiture settlement that provided for a sharing of any net proceeds from the sale of Pepco's generation-related assets. One of the principal issues in the case is whether Pepco should be required to share with customers the excess deferred income taxes (EDIT) and accumulated deferred investment tax credits (ADITC) associated with the sold assets and, if so, whether such sharing would violate the normalization provisions of the Internal Revenue Code and its implementing regulations. As of May 1, 2005, the District of Columbia allocated portions of EDIT and ADITC associated with the divested generation assets were approximately $6.5 million and $5.8 million, respectively. In March 2003, the Internal Revenue Service (IRS) issued a notice of proposed rulemaking (NOPR) that is 54 _____________________________________________________________________________ relevant to that principal issue. Comments on the NOPR were filed by several parties in June 2003, and the IRS held a public hearing later in June 2003. As a result of the NOPR, three of the parties in the divestiture case filed comments with the DCPSC urging the DCPSC to decide the tax issues now on the basis of the proposed rule. Pepco filed comments with the DCPSC in reply to those comments, in which Pepco stated that the courts have held and the IRS has stated that proposed rules are not authoritative and that no decision should be issued on the basis of proposed rules. Instead, Pepco argued that the only prudent course of action is for the DCPSC to await the issuance of final regulations relating to the tax issues and then allow the parties to file supplemental briefs on the tax issues. Pepco cannot predict whether the IRS will adopt the regulations as proposed, make changes before issuing final regulations or decide not to adopt regulations. Other issues in the proceeding deal with the treatment of internal costs and cost allocations as deductions from the gross proceeds of the divestiture. |
Pepco believes that a sharing of EDIT and ADITC would violate the normalization rules. If Pepco were required to share EDIT and ADITC and, as a result, the normalization rules were violated, Pepco would be unable to use accelerated depreciation on District of Columbia allocated or assigned property. Pepco, in addition to sharing with customers the generation-related ADITC balance, would have to pay to the IRS an amount equal to Pepco's $5.8 million District of Columbia jurisdictional generation-related ADITC balance as well as its District of Columbia jurisdictional transmission and distribution-related ADITC balance as of the later of the date a DCPSC order is issued and all rights to appeal have been exhausted or lapsed, or the date the DCPSC order becomes operative. As of May 1, 2005, the District of Columbia jurisdictional transmission and distribution-related ADITC balance was approximately $5.8 million. |
Pepco believes that its calculation of the District of Columbia customers' share of divestiture proceeds is correct. However, depending on the ultimate outcome of this proceeding, Pepco could be required to make additional gain-sharing payments to District of Columbia customers, including the payments described above related to EDIT and ADITC. Such additional payments (which, other than the EDIT and ADITC related payments, cannot be estimated) would be charged to expense in the quarter and year in which a final decision is rendered and could have a material adverse effect on Pepco's and PHI's results of operations for those periods. However, neither PHI nor Pepco believes that additional gain-sharing payments, if any, or the ADITC-related payments to the IRS, if required, would have a material adverse impact on its financial condition. It is uncertain when the DCPSC will issue a decision. |
Maryland |
Pepco filed its divestiture proceeds plan application in Maryland in April 2001. Reply briefs were filed in May 2002. The principal issue in the Maryland case is the same EDIT and ADITC sharing issue that was raised in the D.C. case. As of May 1, 2005, the Maryland allocated portions of EDIT and ADITC associated with the divested generation assets were approximately $9.1 million and $10.4 million, respectively. Other issues deal with the treatment of certain costs as deductions from the gross proceeds of the divestiture. In November 2003, the Hearing Examiner in the Maryland proceeding issued a proposed order that concluded that Pepco's Maryland divestiture settlement agreement provided for a sharing between Pepco and customers of the EDIT and ADITC associated with the sold assets. Pepco believes that such a sharing would violate the normalization rules and would result in Pepco's inability to use accelerated depreciation on Maryland allocated or assigned property. If th e proposed order is affirmed, 55 _____________________________________________________________________________ Pepco would have to share with its Maryland customers, on an approximately 50/50 basis, the Maryland allocated portion of the generation-related EDIT,i.e., $9.1 million as of May 1, 2005, and the generation-related ADITC. If such sharing were to violate the normalization rules, Pepco, in addition to sharing with customers an amount equal to approximately 50 percent of the generation-related ADITC balance, would be unable to use accelerated depreciation on Maryland allocated or assigned property. Furthermore, Pepco would have to pay to the IRS an amount equal to Pepco's $10.4 million Maryland jurisdictional generation-related ADITC balance as of May 1, 2005, as well as its Maryland retail jurisdictional ADITC transmission and distribution-related balance as of the later of the date a MPSC order is issued and all rights to appeal have been exhausted or lapsed, or the date the MPSC order becomes operative. As of May 1, 2005, the Maryland retail jurisdictional transmission and dist ribution-related ADITC balance was approximately $10.4 million. The Hearing Examiner decided all other issues in favor of Pepco, except that only one-half of the severance payments that Pepco included in its calculation of corporate reorganization costs should be deducted from the sales proceeds before sharing of the net gain between Pepco and customers. See also the disclosure above under "Divestiture Cases - District of Columbia" regarding the March 2003 IRS NOPR. |
Under Maryland law, if the proposed order is appealed to the MPSC, the proposed order is not a final, binding order of the MPSC and further action by the MPSC is required with respect to this matter. Pepco has appealed the Hearing Examiner's decision on the treatment of EDIT and ADITC and corporate reorganization costs to the MPSC. Pepco cannot predict what the outcome of the appeal will be or when the appeal might be decided. Pepco believes that its calculation of the Maryland customers' share of divestiture proceeds is correct. However, depending on the ultimate outcome of this proceeding, Pepco could be required to share with its customers approximately 50 percent of the EDIT and ADITC balances described above and make additional gain-sharing payments related to the disallowed severance payments. Such additional payments would be charged to expense in the quarter and year in which a final decision is rendered and could have a material adverse effect on results of oper ations for those periods. However, neither PHI nor Pepco believes that additional gain-sharing payments, if any, or the ADITC-related payments to the IRS, if required, would have a material adverse impact on its financial condition. |
SOS and Default Service Proceedings |
District of Columbia |
As more fully described in Note (12), Commitments and Contingencies, to the financial statements of the Pepco Holdings 2004 10-K, in a proceeding initiated by the DCPSC to consider issues relating to (a) the establishment of terms and conditions for providing SOS in the District of Columbia after Pepco's obligation to provide SOS terminated on February 7, 2005, and (b) the selection of a new SOS provider, the DCPSC issued an order in March 2004 adopting the wholesale SOS model. Under this model, Pepco would continue to be the SOS provider in the District of Columbia after February 7, 2005. This March 2004 order, as amended by a DCPSC order issued in July 2004, also extended Pepco's obligation to provide SOS at market rates for up to an additional 76 months for small commercial and residential customers, and for an additional 28 months for large commercial customers. |
In August 2004, the DCPSC issued an order approving administrative charges including an average margin for Pepco of approximately $0.00248 per kilowatt hour, calculated based on total sales to residential, small and large commercial District of Columbia SOS customers over the 56 _____________________________________________________________________________ twelve months ended December 31, 2003. Because margins vary by customer class, the actual average margin over any given time period will depend on the amount of electricity used by the respective classes of customers over the time period. The administrative charges went into effect for Pepco's District of Columbia SOS sales on February 8, 2005. Pepco completed the first competitive procurement process for District of Columbia SOS at the end of October and filed the proposed new SOS rates with the DCPSC on November 3, 2004. |
The TPA with Mirant under which Pepco obtained the fixed-rate DC SOS supply ended on January 22, 2005, while the new SOS supply contracts with the winning bidders in the competitive procurement process began on February 1, 2005. Pepco procured power separately on the market for next-day deliveries to cover the period from January 23 through January 31, 2005, before the new District of Columbia SOS contracts began. Consequently, Pepco had to pay the difference between the procurement cost of power on the market for next-day deliveries and the current District of Columbia SOS rates charged to customers during the period from January 23 through January 31, 2005. In addition, because the new District of Columbia SOS rates did not go into effect until February 8, 2005, Pepco had to pay the difference between the procurement cost of power under the new District of Columbia SOS contracts and the District of Columbia SOS rates charged to customers for the period from February 1 to February 7, 2005. The total amount of the difference is estimated to be approximately $8.7 million. This difference, however, will be included in the calculation of the Generation Procurement Credit (GPC) for the District of Columbia for the period February 8, 2004 through February 7, 2005. The GPC provides for a sharing between Pepco's customers and shareholders, on an annual basis, of any margins, but not losses, that Pepco earned providing SOS in the District of Columbia during the four-year period from February 8, 2001 through February 7, 2005. Currently, based on the rates paid by Pepco to Mirant under the TPA Settlement, there is no customer sharing. However, in the event that Pepco were to ultimately realize a significant recovery from the Mirant bankruptcy estate associated with the TPA Settlement, the GPC would be recalculated, and the amount of customer sharing with respect to such recovery would be reduced because of the $8.7 million loss being included in the GPC calculation. |
Maryland |
Under a settlement approved by the MPSC in April 2003, Pepco is required to provide SOS at market rates to residential and small commercial customers through May 2008, to medium-sized commercial customers through May 2006, and to large commercial customers through May 2005. In accordance with the settlement, Pepco purchases the power supply required to satisfy its market rate SOS obligations from wholesale suppliers under contracts entered into pursuant to a competitive bid procedure approved by the MPSC. Pepco is entitled to recover from its SOS customers the cost of the SOS supply plus an average margin of $0.002 per kilowatt hour, calculated based on total sales to residential, small and large commercial Maryland SOS customers over the twelve months ended December 31, 2003. Because margins vary by customer class, the actual average margin over any given time period will depend on the amount of electricity used by the respective classes of customers over the time period. |
General Litigation |
During 1993, Pepco was served with Amended Complaints filed in the state Circuit Courts of Prince George's County, Baltimore City and Baltimore County, Maryland in separate ongoing, consolidated proceedings known as "In re: Personal Injury Asbestos Case." Pepco and other 57 _____________________________________________________________________________ corporate entities were brought into these cases on a theory of premises liability. Under this theory, plaintiffs argue that Pepco was negligent in not providing a safe work environment for employees or its contractors, who allegedly were exposed to asbestos while working on Pepco's property. Initially, a total of approximately 448 individual plaintiffs added Pepco to their complaints. While the pleadings are not entirely clear, it appears that each plaintiff sought $2 million in compensatory damages and $4 million in punitive damages from each defendant. |
Since the initial filings in 1993, additional individual suits have been filed against Pepco, and significant numbers of cases have been dismissed. As a result of two motions to dismiss, numerous hearings and meetings and one motion for summary judgment, Pepco has had approximately 400 of these cases successfully dismissed with prejudice, either voluntarily by the plaintiff or by the court. Of the approximately 250 remaining asbestos cases pending against Pepco, approximately 85 cases were filed after December 19, 2000, and have been tendered to Mirant for defense and indemnification pursuant to the terms of the Asset Purchase and Sale Agreement. |
While the aggregate amount of monetary damages sought in the remaining suits (excluding those tendered to Mirant) exceeds $400 million, Pepco believes the amounts claimed by current plaintiffs are greatly exaggerated. The amount of total liability, if any, and any related insurance recovery cannot be determined at this time; however, based on information and relevant circumstances known at this time, Pepco does not believe these suits will have a material adverse effect on its financial condition. However, if an unfavorable decision were rendered against Pepco, it could have a material adverse effect on Pepco's and PHI's results of operations. |
Environmental Litigation |
Pepco is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. In addition, federal and state statutes authorize governmental agencies to compel responsible parties to clean up certain abandoned or unremediated hazardous waste sites. Pepco may incur costs to clean up currently or formerly owned facilities or sites found to be contaminated, as well as other facilities or sites that may have been contaminated due to past disposal practices. |
In October 1995, Pepco received notice from the Environmental Protection Agency (EPA) that it, along with several hundred other companies, might be a potentially responsible party (PRP) in connection with the Spectron Superfund Site in Elkton, Maryland. The site was operated as a hazardous waste disposal, recycling and processing facility from 1961 to 1988. |
In August 2001, Pepco entered into a consent decree for de minimis parties with EPA to resolve its liability at this site. Under the terms of the consent decree, which was approved by the U.S. District Court for the District of Maryland in March 2003, Pepco made de minimis payments to the United States and a group of PRPs. In return, those parties agreed not to sue Pepco for past and future costs of remediation at the site and the United States will also provide protection against third-party claims for contributions related to response actions at the site. The consent decree does not cover any damages to natural resources. However, Pepco believes that any liability that it might incur due to natural resource damage at this site would not have a material adverse effect on its financial condition or results of operations. 58 _____________________________________________________________________________ |
In the early 1970s, Pepco sold scrap transformers, some of which may have contained some level of PCBs, to a metal reclaimer operating at the Metal Bank/Cottman Avenue site in Philadelphia, Pennsylvania, owned by a nonaffiliated company. In December 1987, Pepco was notified by EPA that it, along with a number of other utilities and non-utilities, was a PRP in connection with the PCB contamination at the site. |
In October 1994, a Remedial Investigation/Feasibility Study including a number of possible remedies was submitted to the EPA. In December 1997, the EPA issued a Record of Decision that set forth a selected remedial action plan with estimated implementation costs of approximately $17 million. In June 1998, the EPA issued a unilateral administrative order to Pepco and 12 other PRPs to conduct the design and actions called for in its decision. In May 2003, two of the potentially liable owner/operator entities filed for reorganization under Chapter 11 of the U.S. Bankruptcy Code. In October 2003, the Bankruptcy Court confirmed a Reorganization Plan that incorporates the terms of a settlement among the debtors, the United States and a group of utility PRPs including Pepco. Under the settlement, the reorganized entity/site owner will pay a total of $13.25 million to remediate the site. |
As of May 1, 2005, Pepco had accrued $1.7 million to meet its liability for a site remedy. At the present time, it is not possible to estimate the total extent of EPA's administrative and oversight costs or the expense associated with a site remedy ultimately implemented. However, Pepco believes that its liability at this site will not have a material adverse effect on its financial condition or results of operations. |
(5) SUBSEQUENT EVENT (DEBT) |
On May 5, 2005, Pepco Holdings, Pepco, DPL and ACE entered into a five-year credit agreement with an aggregate borrowing limit of $1.2 billion. This agreement replaces a $650 million five-year credit agreement that was entered into in July 2004 and a $550 million three-year credit agreement entered into in July 2003. Pepco Holdings' credit limit under this agreement is $700 million. The credit limit of each of Pepco, DPL and ACE is the lower of $300 million and the maximum amount of debt the company is permitted to have outstanding by its regulatory authorities, except that the aggregate amount of credit used by Pepco, DPL and ACE at any given time under the agreement may not exceed $500 million in the aggregate. Under the terms of the credit agreement, the companies are entitled to request increases in the principal amount of available credit up to an aggregate increase of $300 million, with any such increase proportionately increasing the credit limit of each of the respective borrowers and the $300 million sublimits for each of Pepco, DPL and ACE. The interest rate payable by the respective companies on utilized funds will be based on a pricing schedule determined by the credit rating of the borrower. The indebtedness incurred under the Credit Agreement is unsecured. |
The credit agreement is intended to serve primarily as a source of liquidity to support the commercial paper programs of the respective companies. The companies also are permitted to use the facility to borrow funds for general corporate purposes and issue letters of credit. In order for a borrower to use the facility, certain representations and warranties made by the borrower at the time the credit agreement was entered into also must be true at the time the facility is utilized, and the borrower must be in compliance with specified covenants, including the financial covenant described below. However, amaterial adverse change in the borrower's business, property, or financial condition subsequent to the entry into the credit agreement is not 59 _____________________________________________________________________________ a condition to the availability of credit under the facility.Among the covenants contained in the credit agreement are (i) the requirement that each borrowing company maintain a ratio of total indebtedness to total capitalization of 65% or less, computed in accordance with the terms of the credit agreement, (ii) a restriction on sales or other dispositions of assets, other than sales and dispositions permitted by the credit agreement and (iii) a restriction on the incurrence of liens on the assets of a borrower or any of its significant subsidiaries other than liens permitted by the credit agreement. The failure to satisfy any of the covenants or the occurrence of specified events that constitute events of default that could result in the acceleration of repayment obligations of the borrower. The events of default include (i) the failure of any borrowing company or any of its significant subsidiaries to pay when due, or the acceleration of, cer tain indebtedness under other borrowing arrangements, (ii) certain bankruptcy events, judgments or decrees against any borrowing company or its significant subsidiaries, and (iii) a change in control (as defined in the credit agreement) of Pepco Holdings or the failure of Pepco Holdings to own all of the voting stock of Pepco, DPL and ACE. The agreement does not include any ratings triggers. |
60 _____________________________________________________________________________ |
New Accounting Standards |
FIN 47 |
In March 2005, The Financial Accounting Standards Board (FASB) published FASB Interpretation No. 47,Accounting for Conditional Asset Retirement Obligations(FIN 47). FIN 47 clarifies that FASB Statement No. 143,Accounting for Asset Retirement Obligations applies to conditional asset retirement obligations as defined and requires that the fair value of a reasonably estimable conditional asset retirement obligation be recognized as part of the carrying amounts of the asset. FIN 47 is effective no later than the end of fiscal years ending after December 15, 2005 (December 31, 2005 for DPL). DPL is in the process of evaluating the anticipated impact that the implementation of FIN 47 will have on its overall financial position or net results of operations. |
(3) SEGMENT INFORMATION |
In accordance with SFAS No. 131, "Disclosures about Segments of an Enterprise and Related Information," DPL has one segment, its regulated utility business. |
(4) COMMITMENTS AND CONTINGENCIES |
REGULATORY AND OTHER MATTERS |
Rate Proceedings |
In October 2004, DPL submitted its annual Gas Cost Rate (GCR) filing to the Delaware Public Service Commission (DPSC). In its filing, DPL sought to increase its GCR by approximately 16.8% in anticipation of increasing natural gas commodity costs. The GCR, which permits DPL to recover its procurement gas costs through customer rates, became effective November 1, 2004 and is subject to refund pending evidentiary hearings. In addition, in November 2004, DPL filed a supplemental filing seeking approval to further increase GCR 69 _____________________________________________________________________________ rates by an additional 6.5% effective December 29, 2004. The additional GCR increase became effective December 29, 2004 and, similarly, is subject to refund pending evidentiary hearings. The DPSC Staff and the Division of Public Advocate filed their testimony on March 7, 2005 recommending full approval of the GCR changes being sought by DPL, including the revisions to the tariff in the original and supplemental filings. An evidentiary hearing was held on May 5, 2005, at which both DPSC staff and the Division of Public Advocate testified that the rates sought by DPL should be approved as filed. A final order addressing both the November 1 and December 29 increases is expected in the second quarter of 2005. |
Pursuant to the April 16, 2002 merger settlement agreement in Delaware, on May 4, 2005, DPL made a filing with the DPSC whereby DPL seeks approval of a proposed increase of approximately $6.177 million in electric transmission service revenues, or about 1.1% of total Delaware retail electric revenues. This proposed revenue increase is the Delaware retail portion of the increase in the "Delmarva zonal" transmission rates on file with FERC under the Open Access Transmission Tariff (OATT) of the PJM Interconnection, LLC (PJM). This level of revenue increase will decrease to the extent that competitive retail suppliers provide a supply and transmission service to retail customers. In that circumstance, PJM would charge the competitive retail supplier the PJM OATT rate for transmission service into the Delmarva zone and DPL's charges to the retail customer would exclude as a "shopping credit" an amount equal to the standard offer service supply charge and th e transmission and ancillary charges that would otherwise be charged by DPL to the retail customer. DPL has proposed to begin collecting this rate change for service rendered on and after June 3, 2005, subject to refund. |
SOS and Default Service Proceedings |
Maryland |
Under a settlement approved by the Maryland Public Service Commission (MPSC) in April 2003, DPL is required to provide SOS supply at market rates to residential and small commercial customers through May 2008, to medium-sized commercial customers through May 2006, and to large commercial customers through May 2005. In accordance with the settlement, DPL purchases the power supply required to satisfy its market rate SOS obligations from wholesale suppliers under contracts entered into pursuant to a competitive bid procedure approved and supervised by the MPSC. DPL is entitled to recover from its SOS customers the costs of the SOS supply plus an average margin of $0.002 per kilowatt hour, calculated based on total sales to residential, small, and large commercial Maryland SOS customers over the twelve months ended December 31, 2003. Because margins vary by customer class, the actual average margin over any given time period will depend on the amount of electricity used by the respective classes of customers over the time period. |
Virginia |
Under amendments to the Virginia Electric Utility Restructuring Act implemented in March 2004, DPL is obligated to offer default service to customers in Virginia for an indefinite period until relieved of that obligation by the Virginia State Corporation Commission (VSCC). DPL currently obtains all of the energy and capacity needed to fulfill its default service obligations in Virginia under a supply agreement with a subsidiary of Conectiv Energy Holding Company (Conectiv Energy) that commenced on January 1, 2005 and expires in May 2006. A prior agreement, also with Conectiv Energy, terminated effective December 31, 2004. DPL entered
70 _____________________________________________________________________________ into this supply agreement after conducting a competitive bid procedure in which Conectiv Energy was the lowest bidder.
|
In October 2004, DPL filed an application with the VSCC for approval to increase the rates that DPL charges its Virginia default service customers to allow it to recover its costs for power under the new supply agreement plus an administrative charge and a margin. A VSCC order issued in November 2004 allowed DPL to put interim rates into effect on January 1, 2005, subject to refund if the VSCC subsequently determined the rate is excessive. The interim rates reflected an increase of 1.0247 cents per kwh to the fuel rate, which provide for recovery of the entire amount being paid by DPL to Conectiv Energy, but did not include an administrative charge or margin, pending further consideration of this issue. Therefore, the November 2004 order also directed the parties to file memoranda concerning whether administrative costs and a margin are properly recovered through a fuel clause mechanism. Memoranda were filed by DPL, the VSCC Staff and Virginia's Office of Attorney Ge neral. The VSCC ruled in January 2005 that the administrative charge and margin are base rate items not recoverable through a fuel clause. No appeal is planned regarding this filing. A settlement resolving all other issues and making the interim rates final was filed on March 4, 2005, the amount of the final rates being contingent only on possible future adjustment depending on the result of a related proceeding at FERC. The VSCC approved the settlement on March 25, 2005. |
Delaware |
Under a settlement approved by the DPSC, DPL is required to provide POLR service to retail customers in Delaware until May 1, 2006. In October 2004, the DPSC initiated a proceeding to investigate and determine which entity should act as the SOS supplier in DPL's Delaware service territory after May 1, 2006, and what prices should be charged for SOS after May 1, 2006. The process used in Delaware consists of three separate stages. The stage 1 process was constructed to allow the DPSC to determine by February 28, 2005 the fundamental issues related to the selection of an SOS supplier. Stage 2 would resolve issues relating to the process under which supply would be acquired by the SOS provider and the way in which SOS prices would be set and monitored. In Stage 3, these selection and pricing mechanisms would be implemented to determine the post-May 2006 SOS supplier and the post-May 2006 SOS price. On January 26, 2005, the DPSC Staff issued a report recommending to the DPSC that DPL be selected as the SOS supplier, subject to further discussions as to how to establish SOS prices. On March 22, 2005, the DPSC issued an order approving DPL as the SOS provider at market rates after May 1, 2006, when DPL's current fixed rate POLR obligation ends. The DPSC will determine in the future the duration of DPL's market rate SOS obligation and the margin, if any, that it will be permitted to earn in conjunction with providing the SOS. The DPSC also approved a structure whereby DPL will purchase the power supply required to satisfy its market rate SOS obligations from wholesale suppliers under contracts entered into pursuant to a competitive bid procedure. |
Environmental Litigation |
DPL is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. In addition, federal and state statutes authorize governmental agencies to compel responsible parties to clean up certain abandoned or unremediated hazardous waste sites. DPL may incur costs to clean up currently or
71 _____________________________________________________________________________
formerly owned facilities or sites found to be contaminated, as well as other facilities or sites that may have been contaminated due to past disposal practices.
|
In May 2004, the U.S. Department of Justice (DOJ) invited DPL to enter into pre-filing negotiations in connection with DPL's alleged liability under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 at the Diamond State Salvage site in Wilmington, Delaware. In the context of the negotiations, DOJ informed DPL that DPL is a de minimis party at the site. In February 2005, DPL entered into a de minimis consent decree with the United States which, if approved by the U.S. District Court, would require DPL to pay $144,000 as reimbursement of the government's response costs, resolve DPL's alleged liability, and provide DPL a covenant not to sue from the United States and protection from third-party claims for contribution. |
In July 2004, DPL entered into an Administrative Consent Order with the Maryland Department of the Environment (MDE) to perform a Remedial Investigation/Feasibility Study (RI/FS) to further identify the extent of soil, sediment and ground and surface water contamination related to former manufactured gas plant (MGP) operations at the Cambridge, Maryland site on DPL-owned property and to investigate the extent of MGP contamination on adjacent property. The costs for completing the RI/FS for this site are approximately $300,000, approximately $50,000 of which will be expended in 2005. The costs of cleanup resulting from the RI/FS will not be determinable until the RI/FS is completed and an agreement with respect to cleanup is reached with the MDE. Due to project delays, DPL now expects that the completion date for the RI/FS will be in the fourth quarter of 2005. |
In October 1995, DPL received notice from the Environmental Protection Agency (EPA) that it, along with several hundred other companies, might be a potentially responsible party (PRP) in connection with the Spectron Superfund Site in Elkton, Maryland. The site was operated as a hazardous waste disposal, recycling and processing facility from 1961 to 1988. In April 1996 DPL, with numerous other PRPs, entered into an administrative order on consent with EPA to perform an RI/FS at the site. In February 2003, the EPA informed DPL that it will have no future liability for contribution to the remediation of the site. |
In the early 1970s, DPL sold scrap transformers, some of which may have contained some level of PCBs, to a metal reclaimer operating at the Metal Bank/Cottman Avenue site in Philadelphia, Pennsylvania, owned by a nonaffiliated company. In December 1987, DPL was notified by EPA that it, along with a number of other utilities and non-utilities, was a PRP in connection with the PCB contamination at the site. In 1999, DPL entered into a de minimis settlement with EPA and paid approximately $107,000 to resolve its liability for cleanup costs at the site. The de minimis settlement did not resolve DPL's responsibility for natural resource damages, if any, at the site. DPL believes that any liability for natural resource damages at this site will not have a material adverse effect on its financial condition or results of operations. |
(5) SUBSEQUENT EVENT (DEBT) |
On May 5, 2005, Pepco Holdings, Pepco, DPL and ACE entered into a five-year credit agreement with an aggregate borrowing limit of $1.2 billion. This agreement replaces a $650 million five-year credit agreement that was entered into in July 2004 and a $550 million three-year credit agreement entered into in July 2003. Pepco Holdings' credit limit under this agreement is $700 million. The credit limit of each of Pepco, DPL and ACE is the lower of $300 million and the maximum amount of debt the company is permitted to have outstanding by 72 _____________________________________________________________________________ its regulatory authorities, except that the aggregate amount of credit used by Pepco, DPL and ACE at any given time under the agreement may not exceed $500 million in the aggregate. Under the terms of the credit agreement, the companies are entitled to request increases in the principal amount of available credit up to an aggregate increase of $300 million, with any such increase proportionately increasing the credit limit of each of the respective borrowers and the $300 million sublimits for each of Pepco, DPL and ACE. The interest rate payable by the respective companies on utilized funds will be based on a pricing schedule determined by the credit rating of the borrower. The indebtedness incurred under the Credit Agreement is unsecured. |
The credit agreement is intended to serve primarily as a source of liquidity to support the commercial paper programs of the respective companies. The companies also are permitted to use the facility to borrow funds for general corporate purposes and issue letters of credit. In order for a borrower to use the facility, certain representations and warranties made by the borrower at the time the credit agreement was entered into also must be true at the time the facility is utilized, and the borrower must be in compliance with specified covenants, including the financial covenant described below. However, amaterial adverse change in the borrower's business, property, or financial condition subsequent to the entry into the credit agreement is not a condition to the availability of credit under the facility.Among the covenants contained in the credit agreement are (i) the requirement that each borrowing company maintain a ratio of total indebtedness to total capitalization of 65% or less, computed in accordance with the terms of the credit agreement, (ii) a restriction on sales or other dispositions of assets, other than sales and dispositions permitted by the credit agreement and (iii) a restriction on the incurrence of liens on the assets of a borrower or any of its significant subsidiaries other than liens permitted by the credit agreement. The failure to satisfy any of the covenants or the occurrence of specified events that constitute events of default that could result in the acceleration of repayment obligations of the borrower. The events of default include (i) the failure of any borrowing company or any of its significant subsidiaries to pay when due, or the acceleration of, certain indebtedness under other borrowing arrangements, (ii) certain bankruptcy events, judgments or decrees against any borrowing company or its significant subsidiaries, and (iii) a change in control (as defined in the credit agreement) of Pep co Holdings or the failure of Pepco Holdings to own all of the voting stock of Pepco, DPL and ACE. The agreement does not include any ratings triggers. |
73 _____________________________________________________________________________ |
New Accounting Standards |
FIN 47 |
In March 2005, the Financial Accounting Standards Board (FASB) published FASB Interpretation No. 47,Accounting for Conditional Asset Retirement Obligations(FIN 47). FIN 47 clarifies that FASB Statement No. 143,Accounting for Asset Retirement Obligations applies to conditional asset retirement obligations as defined and requires that the fair value of a reasonably estimable conditional asset retirement obligation be recognized as part of the carrying amounts of the asset. FIN 47 is effective no later than the end of fiscal years ending after December 15, 2005 (December 31, 2005 for ACE). ACE is in the process of evaluating the anticipated impact that the implementation of FIN 47 will have on its overall financial position or net results of operations. |
(3) SEGMENT INFORMATION |
In accordance with SFAS No. 131, "Disclosures about Segments of an Enterprise and Related Information," ACE has one segment, its regulated utility business. 82 _____________________________________________________________________________ |
(4) COMMITMENTS AND CONTINGENCIES |
REGULATORY AND OTHER MATTERS |
Rate Proceedings |
In February 2003, ACE filed a petition with the NJBPU to increase its electric distribution rates and its Regulatory Asset Recovery Charge (RARC) in New Jersey. In December 2003, the NJBPU issued an order also consolidating into this base rate proceeding outstanding issues from several other proceedings. Later in December 2003, ACE filed a Motion for Reconsideration in which it suggested that these additional issues be dealt with in a Phase II to the base rate case to address the outstanding issues identified in the NJBPU's December 2003 order. The parties to the base rate proceeding agreed that a Phase II to the base rate case would be initiated in April 2004. Accordingly, in April 2004, ACE filed testimony with the NJBPU initiating a Phase II to the base rate proceeding, which addressed these additional issues and sought recovery of the $25.4 million of deferred restructuring costs previously transferred into the base rate case (which is also referred to as Phase 1 ). |
On April 19, 2005, a settlement was reached among ACE, the staff of the NJBPU, the New Jersey Ratepayer Advocate and active intervenor parties. The settlement, if approved by the NJBPU, will resolve issues in both the Phase I proceeding and the other issues referred by the NJBPU to the base rate proceeding and addressed in the Phase II proceeding. No party to either of these proceedings opposes the settlement. |
The proposed settlement will allow for an increase in ACE's base rates of approximately $18.8 million, $2.8 million of which would come from an increase in RARC revenue collections. $16 million of the base rate increase, not related to RARC collections, will be collected annually until such time as base rates change pursuant to another base rate proceeding. The $2.8 million in RARC collections will be collected each year for four years. The $18.8 million increase in base rate revenue will be offset by a base rate revenue decrease in a similar amount in total resulting from a change in depreciation rate, which is further discussed below, similar to what has been adopted by the NJBPU for other New Jersey electric utility companies. Overall, the settlement provides for a net decrease in revenues of approximately $.3 million, consisting of a $3.1 million reduction of distribution revenues offset by the $2.8 million increase in RARC revenue collections mentioned above. The proposed settlement specifies an overall rate of return of 8.14%. The proposed settlement provides for a change in depreciation rates driven by a change in average service lives. In addition, the settlement provides for a change in depreciation technique from remaining life to whole life, including amortization of any calculated excess or deficiencies in the depreciation reserve. As a result of these changes there is a net excess depreciation reserve. Accordingly ACE recorded a regulatory liability in March 2005 by reducing its depreciation reserve by approximately $131 million. The regulatory liability will be amortized over 8.25 years and will result in a reduction of depreciation and amortization expense on ACE's consolidated statements of earnings. While the impact of the settlement will be essentially revenue and cash neutral to ACE, there will be a positive annual pre-tax earnings impact to ACE of approximately $20 million. |
With respect to Phase II issues, which included supply-related deferred costs, the settlement provides for a disallowance of $13.0 million previously recorded to such deferred accounts and specifies the recovery over four years of an adjusted deferred balance of approximately 83 _____________________________________________________________________________ $116.8 million, including a portion of the $25.4 million of costs transferred first into the Phase I proceeding from other proceedings and then ultimately into the Phase II proceeding, offset by the return over one year of over-collected balances in certain other deferred accounts, with the net result being that there will be no rate impact from the deferral account recoveries and credits for at least one year. |
The settlement does not become effective unless approved by the NJBPU. It is likely that the NJBPU will consider the settlement in the second quarter of 2005. While ACE believes it is probable that the NJBPU will approve the settlement, ACE cannot predict with certainty the timing of any NJBPU approval. The settlement does not affect the existing appeal filed by ACE with the Appellate Division of the Superior Court of New Jersey (the NJ Superior Court) related to the July 2004 Final Decision and Order issued by the NJBPU in ACE's restructuring deferral proceeding before the NJBPU under the New Jersey Electric Discount and Energy Competition Act (EDECA), discussed below under "Restructuring Deferral." |
Restructuring Deferral |
Pursuant to a July 1999 summary order issued by the NJBPU under EDECA (which was subsequently affirmed by a final decision and order issued in March 2001), ACE was obligated to provide Basic Generation Service (BGS) from August 1, 1999 to at least July 31, 2002 to retail electricity customers in ACE's service territory who did not choose a competitive energy supplier. The order allowed ACE to recover through customer rates certain costs incurred in providing BGS. ACE's obligation to provide BGS was subsequently extended to July 31, 2003. At the allowed rates, for the period August 1, 1999 through July 31, 2003, ACE's aggregate allowed costs exceeded its aggregate revenues from supplying BGS. These under-recovered costs were partially offset by a $59.3 million deferred energy cost liability existing as of July 31, 1999 (LEAC Liability) that was related to ACE's Levelized Energy Adjustment Clause and ACE's Demand Side Management Programs. ACE established a regulatory asset in an amount equal to the balance. |
In August 2002, ACE filed a petition with the NJBPU for the recovery of approximately $176.4 million in actual and projected deferred costs relating to the provision of BGS and other restructuring related costs incurred by ACE over the four-year period August 1, 1999 through July 31, 2003. The deferred balance was net of the $59.3 million offset for the LEAC Liability. The petition also requested that ACE's rates be reset as of August 1, 2003 so that there would be no under-recovery of costs embedded in the rates on or after that date. The increase sought represented an overall 8.4% annual increase in electric rates and was in addition to the base rate increase discussed above. ACE's recovery of the deferred costs is subject to review and approval by the NJBPU in accordance with EDECA. |
In July 2003, the NJBPU issued a summary order, which (i) permitted ACE to begin collecting a portion of the deferred costs and reset rates to recover on-going costs incurred as a result of EDECA, (ii) approved the recovery of $125 million of the deferred balance over a ten-year amortization period beginning August 1, 2003, (iii) transferred to ACE's pending base rate case for further consideration approximately $25.4 million of the deferred balance, and (iv) estimated the overall deferral balance as of July 31, 2003 at $195 million, of which $44.6 million was disallowed recovery by ACE. In July 2004, the NJBPU issued its final order in the restructuring deferral proceeding. The final order did not modify the amount of the disallowances set forth in the July 2003 summary order, but did provide a much more detailed 84 _____________________________________________________________________________ analysis of evidence and other information relied on by the NJBPU as justification for the disallowances. ACE believes the record does not justify the level of disallowance imposed by the NJBPU. In August 2004, ACE filed with the NJ Superior Court, which hears appeals of New Jersey administrative agencies, including the NJBPU, a Notice of Appeal related to the July 2004 final order. ACE cannot predict the outcome of this appeal. |
Proposed Shut Down of B.L. England Generating Facility; Construction of Transmission Facilities |
Pursuant to a September 2003 NJBPU order, ACE filed a report in April 2004 with the NJBPU recommending that the B.L. England generating facility be shut down. The report stated that the operation of the B.L. England facility is necessary at the time of the report to satisfy reliability standards, but that those reliability standards could also be satisfied in other ways. The report concludes that, based on B.L. England's current and projected operating costs resulting from compliance with more restrictive environmental requirements, the most cost-effective way in which to meet reliability standards is to shut down the B.L. England facility and construct additional transmission enhancements in southern New Jersey. |
The terms of an April 26, 2004 preliminary settlement among PHI, Conectiv, ACE, the New Jersey Department of Environmental Protection (NJDEP) and the Attorney General of New Jersey, which are further discussed under "Preliminary Settlement Agreement with NJDEP," below, established emission limits for B.L. England's operations (which would become applicable on October 1, 2008 for Unit 1 and on May 1, 2009 for Unit 2 if B.L. England is not shut down) and required ACE to seek necessary approvals from agencies that may have jurisdiction to shut down and permanently cease operations at B.L. England by December 15, 2007, and to obtain approval to construct necessary substation and transmission facilities. |
In letters dated May and September 2004 to the PJM Interconnection, LLC (PJM), ACE informed PJM of its intent, as owner of the B.L. England generating plant, to retire the entire plant (447 MW) on December 15, 2007. PJM completed its independent analysis to determine the upgrades required to eliminate any identified reliability problems resulting from the retirement of B.L. England and recommended that certain transmission upgrades be installed prior to the summer of 2008. ACE's independent assessment confirmed that the transmission upgrades identified by PJM are the transmission upgrades necessary to maintain reliability in the Atlantic zone after the retirement of B.L. England. The amount of the costs incurred by ACE to construct the recommended transmission upgrades that ACE would be permitted to recover from load serving entities that use ACE's transmission system would be subject to approval by FERC. The amount of construction costs that ACE would be permitted to rec over from retail ratepayers would be determined in accordance with the treatment of transmission-related revenue requirements in retail rates under the jurisdiction of the appropriate state regulatory commission. ACE cannot predict how the recovery of such costs will ultimately be treated by FERC and the state regulatory commissions and, therefore, cannot predict the financial impact to ACE of installing the recommended transmission upgrades. However, in the event that the NJBPU makes satisfactory findings and grants other requested approvals concerning the retirement of B.L. England and the construction of the transmission upgrades required to maintain reliability in the Atlantic zone after such retirement, ACE expects to begin construction of the appropriate transmission upgrades while final decisions by FERC and state regulatory commissions concerning the methodology for recovery of the costs of such construction are still pending. 85 _____________________________________________________________________________ |
In November 2004, ACE made a filing with the NJBPU requesting the necessary approvals for construction of the transmission upgrades required to maintain reliability in the Atlantic zone after the retirement of B.L. England. The NJBPU issued an order on April 21, 2005, which unanimously approved the petition for the construction of the transmission upgrades, including the 230 kilovolt (kV) Cumberland to Dennis line, the138 kV Dennis to Corson line, and the 138 kV Cardiff to Lewis line. The approval states that these lines are necessary even if B.L. England does not shut down. On May 6, 2005, ACE announced that it would again auction its electric generation assets, including B.L. England. ACE intends to construct the transmission upgrades referred to above whether or not B.L. England is sold. |
In December 2004, ACE filed a petition with the NJBPU requesting that the NJBPU establish a proceeding that will consist of a Phase I and Phase II and that the procedural process for the Phase I proceeding require intervention and participation by all persons interested in the prudence of the decision to shut down B.L. England generating facility and the categories of stranded costs associated with shutting down and dismantling the facility and remediation of the site. ACE contemplates that Phase II of this proceeding, which would be initiated by an ACE filing in 2008 or 2009, would establish the actual level of prudently incurred stranded costs to be recovered from customers in rates. Evidentiary hearings for the necessary approvals for construction of the transmission upgrades were held on March 28, 2005. It is expected that the NJBPU will rule on the petition in the second quarter of 2005. ACE cannot predict the outcome of these two proceedings. |
Environmental Litigation |
ACE is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. In addition, federal and state statutes authorize governmental agencies to compel responsible parties to clean up certain abandoned or unremediated hazardous waste sites. ACE may incur costs to clean up currently or formerly owned facilities or sites found to be contaminated, as well as other facilities or sites that may have been contaminated due to past disposal practices. |
In June 1992, Environmental Protection Agency (EPA) identified ACE as a potentially responsible party (PRP) at the Bridgeport Rental and Oil Services Superfund Site in Logan Township, New Jersey. In September 1996, ACE along with other PRPs signed a consent decree with EPA and NJDEP to address remediation of the site. ACE's liability is limited to 0.232 percent of the aggregate remediation liability and thus far ACE has made contributions of approximately $105,000. Based on information currently available, ACE may be required to contribute approximately an additional $100,000. ACE believes that its liability at this site will not have a material adverse effect on its financial condition or results of operations. 86 _____________________________________________________________________________ |
In November 1991, NJDEP identified ACE as a PRP at the Delilah Road Landfill site in Egg Harbor Township, New Jersey. In 1993, ACE, along with other PRPs, signed an administrative consent order with NJDEP to remediate the site. The soil cap remedy for the site has been completed and the NJDEP conditionally approved the report submitted by the parties on the implementation of the remedy in January 2003. In March 2004, NJDEP approved a Ground Water Sampling and Analysis Plan. The results of groundwater monitoring over the first year of this ground water sampling plan will help to determine the extent of post-remedy operation and maintenance costs. In March 2003, EPA demanded from the PRP group reimbursement for EPA's past costs at the site, totaling $168,789. The PRP group objected to the demand for certain costs, but agreed to reimburse EPA approximately $19,000. Based on information currently available, ACE may be required to contribute approximately an additional $626 ,000. ACE believes that its liability for post-remedy operation and maintenance costs will not have a material adverse effect on its financial condition or results of operations. |
Preliminary Settlement Agreement with the NJDEP |
In an effort to address NJDEP's concerns regarding ACE's compliance with New Source Review (NSR) requirements at B.L. England, on April 26, 2004, PHI, Conectiv and ACE entered into a preliminary settlement agreement with NJDEP and the Attorney General of New Jersey. The preliminary settlement agreement outlines the basic parameters for a definitive agreement to resolve ACE's alleged NSR liability at B.L. England and various other environmental issues at ACE and Conectiv Energy facilities in New Jersey. Among other things, the preliminary settlement agreement provides that: |
Contractual Arrangements with Credit Rating Triggers or Margining Rights |
Under certain contractual arrangements entered into by PHI's subsidiaries in connection with competitive energy and other transactions, the affected company may be required to provide cash collateral or letters of credit as security for its contractual obligations if the credit rating for long-term unsecured debt of the applicable company is downgraded one or more levels. In the event of a downgrade, the amount required to be posted would depend on the amount of the underlying contractual obligation existing at the time of the downgrade. As of March 31, 2005, a one-level downgrade in the credit rating of long-term unsecured debt of PHI and all of its affected subsidiaries would have required PHI and such subsidiaries to provide aggregate cash collateral or letters of credit of approximately up to $152 million. An additional amount of approximately $225 million of aggregate cash collateral or letters of credit would have been required in the event of subsequent downgrades to below investment grade. |
Many of the contractual arrangements entered into by PHI's subsidiaries in connection with competitive energy activities include margining rights pursuant to which the PHI subsidiary or a counterparty may request collateral if the market value of the contractual obligations reaches levels that are in excess of the credit thresholds established in the applicable arrangements. Pursuant to these margining rights, the affected PHI subsidiary may receive, or be required to post, collateral due to energy price movements. As of March 31, 2005, Pepco Holdings' subsidiaries that engaged in competitive energy activities were in receipt of (a net holder of) cash collateral in the amount of $18.0 million as recorded in connection with their competitive energy activities. |
REGULATORY AND OTHER MATTERS |
Relationship with Mirant Corporation |
In 2000, Pepco sold substantially all of its electricity generation assets to Mirant Corporation, formerly Southern Energy, Inc. As part of the Asset Purchase and Sale Agreement, Pepco entered into several ongoing contractual arrangements with Mirant and certain of its subsidiaries (collectively, Mirant). On July 14, 2003, Mirant Corporation and most of its subsidiaries filed a voluntary petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code in the U.S. Bankruptcy Court for the Northern District of Texas (the Bankruptcy Court). |
Depending on the outcome of the matters discussed below, the Mirant bankruptcy could have a material adverse effect on the results of operations of Pepco Holdings and Pepco. However, management believes that Pepco Holdings and Pepco currently have sufficient cash, cash flow and borrowing capacity under their credit facilities and in the capital markets to be able to satisfy any additional cash requirements that may arise due to the Mirant bankruptcy. Accordingly, management does not anticipate that the Mirant bankruptcy will impair the ability of Pepco Holdings or Pepco to fulfill their contractual obligations or to fund projected capital expenditures. On this basis, management currently does not believe that the Mirant bankruptcy will have a material adverse effect on the financial condition of either company. |
Transition Power Agreements |
As part of the Asset Purchase and Sale Agreement, Pepco and Mirant entered into Transition Power Agreements for Maryland and the District of Columbia, respectively (collectively, the 112 _____________________________________________________________________________ TPAs). Under these agreements, Mirant was obligated to supply Pepco with all of the capacity and energy needed to fulfill its SOS obligations in Maryland through June 2004 and its SOS obligations in the District of Columbia through January 22, 2005. |
To avoid the potential rejection of the TPAs, Pepco and Mirant entered into an Amended Settlement Agreement and Release dated as of October 24, 2003 (the Settlement Agreement) pursuant to which Mirant assumed both of the TPAs and the terms of the TPAs were modified. The Settlement Agreement also provided that Pepco has an allowed, pre-petition general unsecured claim against Mirant Corporation in the amount of $105 million (the Pepco TPA Claim). |
Pepco has also asserted the Pepco TPA Claim against other Mirant entities, which Pepco believes are liable to Pepco under the terms of the Asset Purchase and Sale Agreement's Assignment and Assumption Agreement (the Assignment Agreement). Under the Assignment Agreement, Pepco believes that each of the Mirant entities assumed and agreed to discharge certain liabilities and obligations of Pepco as defined in the Asset Purchase and Sale Agreement. Mirant has filed objections to these claims. Under the original plan of reorganization filed by the Mirant entities with the Bankruptcy Court, certain Mirant entities other than Mirant Corporation would pay significantly higher percentages of the claims of their creditors than would Mirant Corporation. The amount that Pepco will be able to recover from the Mirant bankruptcy estate with respect to the Pepco TPA Claim will depend on the amount of assets available for distribution to creditors of the Mirant entities that are found to be liable for the Pepco TPA Claim. |
Power Purchase Agreements |
Under agreements with FirstEnergy Corp., formerly Ohio Edison (FirstEnergy), and Allegheny Energy, Inc., both entered into in 1987, Pepco is obligated to purchase from FirstEnergy 450 megawatts of capacity and energy annually through December 2005 (the FirstEnergy PPA). Under an agreement with Panda, entered into in 1991, Pepco is obligated to purchase from Panda 230 megawatts of capacity and energy annually through 2021 (the Panda PPA). In each case, the purchase price is substantially in excess of current market price. As a part of the Asset Purchase and Sale Agreement, Pepco entered into a "back-to-back" arrangement with Mirant. Under this arrangement, Mirant is obligated, among other things, to purchase from Pepco the capacity and energy that Pepco is obligated to purchase under the FirstEnergy PPA and the Panda PPA at a price equal to the price Pepco is obligated to pay under the FirstEnergy PPA and the Panda PPA (the PPA-Related Obligations). |
Pepco Pre-Petition Claims |
When Mirant filed its bankruptcy petition on July 14, 2003, Mirant had unpaid obligations to Pepco of approximately $29 million, consisting primarily of payments due to Pepco in respect of the PPA-Related Obligations (the Mirant Pre-Petition Obligations). The Mirant Pre-Petition Obligations constitute part of the indebtedness for which Mirant is seeking relief in its bankruptcy proceeding. Pepco has filed Proofs of Claim in the Mirant bankruptcy proceeding in the amount of approximately $26 million to recover this indebtedness; however, the amount of Pepco's recovery, if any, is uncertain. The $3 million difference between Mirant's unpaid obligation to Pepco and the $26 million Proofs of Claim primarily represents a TPA settlement adjustment which is included in the $105 million Proofs of Claim filed by Pepco against the 113 _____________________________________________________________________________ Mirant debtors in respect of the Pepco TPA Claim. In view of the uncertainty as to recoverability, Pepco, in the third quarter of 2003, expensed $14.5 million to establish a reserve against the $29 million receivable from Mirant. In January 2004, Pepco paid approximately $2.5 million to Panda in settlement of certain billing disputes under the Panda PPA that related to periods after the sale of Pepco's generation assets to Mirant. Pepco believes that under the terms of the Asset Purchase and Sale Agreement, Mirant is obligated to reimburse Pepco for the settlement payment. Accordingly, in the first quarter of 2004, Pepco increased the amount of the receivable due from Mirant by approximately $2.5 million and amended its Proofs of Claim to include this amount. Pepco currently estimates that the $14.5 million expensed in the third quarter of 2003 represents the portion of the entire $31.5 million receivable unlikely to be recovered in bankruptcy, and no additional reserve has been established fo r the $2.5 million increase in the receivable. The amount expensed represents Pepco's estimate of the possible outcome in bankruptcy, although the amount ultimately recovered could be higher or lower. |
Mirant's Attempt to Reject the PPA-Related Obligations |
On August 28, 2003, Mirant filed with the Bankruptcy Court a motion seeking authorization to reject its PPA-Related Obligations. Upon motions filed with the U.S. District Court for the Northern District of Texas (the District Court) by Pepco and FERC, in October 2003, the District Court withdrew jurisdiction over the rejection proceedings from the Bankruptcy Court. In December 2003, the District Court denied Mirant's motion to reject the PPA-Related Obligations on jurisdictional grounds. The District Court's decision was appealed by Mirant and The Official Committee of Unsecured Creditors of Mirant Corporation (the Creditors' Committee) to the U.S. Court of Appeals for the Fifth Circuit (the Court of Appeals). On August 4, 2004, the Court of Appeals remanded the case to the District Court saying that the District Court has jurisdiction to rule on the merits of Mirant's rejection motion, suggesting that in doing so the court apply a "more rigorous standard" than the busine ss judgment rule usually applied by bankruptcy courts in ruling on rejection motions. |
On December 9, 2004, the District Court issued an order again denying Mirant's motion to reject the PPA-Related Obligations. The District Court found that the PPA-Related Obligations are not severable from the Asset Purchase and Sale Agreement and that the Asset Purchase and Sale Agreement cannot be rejected in part, as Mirant was seeking to do. On December 16, the Creditors' Committee appealed the District Court's order to the Court of Appeals, and on December 20, 2004, Mirant also appealed the District Court's order. Mirant and the Creditors' Committee each filed its brief on April 4, 2005. Pepco's and FERC's briefs are due May 19, 2005. Oral arguments have not yet been scheduled. |
As more fully discussed below, Mirant had been making regular periodic payments in respect of the PPA-Related Obligations. On December 9, 2004, Mirant filed a notice with the Bankruptcy Court that it was suspending payments to Pepco in respect of the PPA-Related Obligations. On December 13, 2004, Mirant failed to make a payment of approximately $17.9 million due to Pepco for the period November 1, 2004 to November 30, 2004. On December 23, 2004, Pepco received a payment of approximately $6.8 million from Mirant, which according to Mirant represented the market value of the power for which payment was due on December 13. At that time, Mirant informed Pepco that it intended to continue to pay the market value, but not the above-market portion, of the power purchased under the PPA-Related Obligations. Pepco
114 _____________________________________________________________________________
disagreed with Mirant's assertion that it need only pay the market value and believed that the amount representing the market value calculated by Mirant was insufficient.
|
On January 21, 2005, Mirant made a payment of approximately $21.1 million. Pepco disputed Mirant's contention that the amount paid reflected the full amount due Pepco under these agreements for the applicable periods. |
On January 21, 2005, Mirant filed in the Bankruptcy Court a motion seeking to reject certain of its ongoing obligations under the Asset Purchase and Sale Agreement, including the PPA-Related Obligations (the Second Motion to Reject). On March 1, 2005 (as amended by order dated March 7, 2005), the District Court granted Pepco's motion to withdraw jurisdiction over the Asset Purchase and Sale Agreement rejection proceedings from the Bankruptcy Court. In addition, the District Court ordered Mirant to pay on March 18, 2005, all past-due unpaid amounts under the PPA-Related Obligations. On March 4, 2004, Mirant filed an emergency motion for reconsideration and a stay of the March 1, 2005 order. On March 14, 2005, Pepco filed a response to Mirant's motion. |
On March 16, 2005, the District Court denied Mirant's emergency motion for reconsideration and stay of the District Court's March 1 and March 7 Orders. On the same day, Mirant filed a petition for writ of mandamus, and a motion for stay pending appeal and mandamus review in the Court of Appeals. |
On March 17, 2005, the Court of Appeals issued an Order staying the District Court's Orders of March 1 and March 7, 2005. Accordingly, Mirant was not required to make the payment that was due to Pepco on March 18, 2005 pursuant to the District Court's Orders. On March 28, 2005, in accordance with the Court of Appeals March 17Order, Pepco, FERC, the Maryland Public Service Commission (MPSC) and Office of the People's Counsel (OPC) of Maryland filed oppositions to Mirant's petition for writ of mandamus in the Court of Appeals. Mirant and the Creditor's Committee filed briefs with the Court of Appeals on April 1, 2005. |
On March 28, 2005, Pepco, FERC, the District of Columbia OPC, the MPSC and the Maryland OPC filed oppositions to the Second Motion to Reject in the District Court. |
On April 11, 2005 the Court of Appeals entered an Order vacating the stay it had ordered on March 17, 2005 and denying Mirant's motions for writ of mandamus and stay pending appeal. On April 13, 2005, Pepco received a payment from Mirant in the amount of approximately $57.5 million, representing the full amount then due in respect of the PPA-Related Obligations. |
Pepco is exercising all available legal remedies and vigorously opposing Mirant's attempt to reject the PPA-Related Obligations and other obligations under the Asset Purchase and Sale Agreement in order to protect the interests of its customers and shareholders. While Pepco believes that it has substantial legal bases to oppose the attempt to reject the agreements, the outcome of Mirant's efforts to reject the PPA-Related Obligations is uncertain. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations, Pepco could be required to repay to Mirant, for the period beginning on the effective date of the rejection (which date could be prior to the date of the court's order granting the rejection and possibly as early as September 18, 2003) and ending on the date Mirant is entitled to cease its purchases of energy and capacity from Pepco, all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and 115 _____________________________________________________________________________ capacity. Pepco estimates that the amount it could be required to repay to Mirant in the unlikely event that September 18, 2003, is determined to be the effective date of rejection, is approximately $185.6 million as of May 1, 2005. |
Mirant has also indicated to the Bankruptcy Court that it will move to require Pepco to disgorge all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and capacity, for the period July 14, 2003 (the date on which Mirant filed its bankruptcy petition) through rejection, if approved, on the theory that Mirant did not receive value for those payments. Pepco estimates that the amount it would be required to repay to Mirant on the disgorgement theory, in addition to the amounts described above, is approximately $22.5 million. |
Any repayment by Pepco of amounts paid by Mirant would entitle Pepco to file a claim against the bankruptcy estate in an amount equal to the amount repaid. Pepco believes that, to the extent such amounts were not recovered from the Mirant bankruptcy estate, they would be recoverable as stranded costs from customers through distribution rates as described below. |
The following are estimates prepared by Pepco of its potential future exposure if Mirant's attempt to reject the PPA-Related Obligations ultimately is successful. These estimates are based in part on current market prices and forward price estimates for energy and capacity, and do not include financing costs, all of which could be subject to significant fluctuation. The estimates assume no recovery from the Mirant bankruptcy estate and no regulatory recovery, either of which would mitigate the effect of the estimated loss. Pepco does not consider it realistic to assume that there will be no such recoveries. Based on these assumptions, Pepco estimates that its pre-tax exposure as of May 1, 2005, representing the loss of the future benefit of the PPA-Related Obligations to Pepco, is as follows: |
The ability of Pepco to recover from the Mirant bankruptcy estate in respect to the Mirant Pre-Petition Obligations and damages if the PPA-Related Obligations are successfully rejected will depend on whether Pepco's claims are allowed, the amount of assets available for distribution to the creditors of the Mirant companies determined to be liable for those claims, and Pepco's priority relative to other creditors. At the current stage of the bankruptcy proceeding, there is insufficient information to determine the amount, if any, that Pepco might be able to 116 _____________________________________________________________________________ recover from the Mirant bankruptcy estate, whether the recovery would be in cash or another form of payment, or the timing of any recovery. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations and Pepco's full claim is not recovered from the Mirant bankruptcy estate, Pepco may seek authority from the MPSC and the District of Columbia Public Service Commission (DCPSC) to recover its additional costs. Pepco is committed to working with its regulatory authorities to achieve a result that is appropriate for its shareholders and customers. Under the provisions of the settlement agreements approved by the MPSC and the DCPSC in the deregulation proceedings in which Pepco agreed to divest its generation assets under certain conditions, the PPAs were to become assets of Pepco's distribution business if they could not be sold. Pepco believes that, if Mirant ultimately is successful in rejecting the PPA-Related Obligations, these provisions would allow the stranded costs of the PPAs that are not recovered from the Mirant bankruptcy estate to be recovered from Pepco's customers through its distribut ion rates. If Pepco's interpretation of the settlement agreements is confirmed, Pepco expects to be able to establish the amount of its anticipated recovery as a regulatory asset. However, there is no assurance that Pepco's interpretation of the settlement agreements would be confirmed by the respective public service commissions. |
If the PPA-Related Obligations are successfully rejected, and there is no regulatory recovery, Pepco will incur a loss. However, the accounting treatment of such a loss depends on a number of legal and regulatory factors, and is not determinable at this time. |
The SMECO Agreement |
As a term of the Asset Purchase and Sale Agreement, Pepco assigned to Mirant a facility and capacity agreement with Southern Maryland Electric Cooperative, Inc. (SMECO) under which Pepco was obligated to purchase the capacity of an 84-megawatt combustion turbine installed and owned by SMECO at a former Pepco generating facility (the SMECO Agreement). The SMECO Agreement expires in 2015 and contemplates a monthly payment to SMECO of approximately $.5 million. Pepco is responsible to SMECO for the performance of the SMECO Agreement if Mirant fails to perform its obligations thereunder. At this time, Mirant continues to make post-petition payments due to SMECO. |
On March 15, 2004, Mirant filed a complaint with the Bankruptcy Court seeking a declaratory judgment that the SMECO Agreement is an unexpired lease of non-residential real property rather than an executory contract and that if Mirant were to successfully reject the agreement, any claim against the bankruptcy estate for damages made by SMECO (or by Pepco as subrogee) would be subject to the provisions of the Bankruptcy Code that limit the recovery of rejection damages by lessors. Pepco believes that there is no reasonable factual or legal basis to support Mirant's contention that the SMECO Agreement is a lease of real property. Litigation continues and the outcome of this proceeding cannot be predicted. |
Mirant Plan of Reorganization |
On January 19, 2005, Mirant filed its Plan of Reorganization and Disclosure Statement with the Bankruptcy Court. In that plan, Mirant proposed to transfer all assets to "New Mirant" (an entity it proposed to create in the reorganization), with the exception of the PPA-Related Obligations. Mirant proposed that the PPA-Related Obligations would remain in "Old Mirant," 117 _____________________________________________________________________________ which would be a shell entity as a result of the reorganization. Pepco believes this plan cannot be confirmed by the Bankruptcy Court under the law and has submitted objections to the plan. The plan also did not have the support of any of the creditor's committees in the Mirant bankruptcy. |
On March 11, 2005, Mirant filed an application with FERC seeking approval for the internal transfers and corporate restructuring that will result from its proposed Plan of Reorganization. Mirant must obtain FERC approval for these transactions under Section 203 of the Federal Power Act. On April 1, 2005, Pepco filed a motion to intervene and protest at FERC in connection with Mirant's March 11 FERC filing. On the same date, the District of Columbia OPC also filed a motion to intervene and protest. |
On March 25, 2005, Mirant filed its First Amended Plan of Reorganization and First Amended Disclosure Statement. Pepco is currently analyzing this amended plan. |
Rate Proceedings |
New Jersey |
For a discussion of the history of ACE's proceeding filed with the New Jersey Board of Public Utilities (NJBPU) to increase its electric distribution rates and Regulatory Asset Recovery Charge (RARC) in New Jersey (also referred to as Phase I) and a related Phase II proceeding, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Rate Proceedings" of PHI's Annual Report on Form 10-K for the year ended December 31, 2004 (the Pepco Holdings 2004 10-K). On April 19, 2005, a settlement was reached among ACE, the staff of the NJBPU, the New Jersey Ratepayer Advocate and active intervenor parties. The settlement, if approved by the NJBPU, will resolve issues in both the Phase I proceeding and the other issues referred by the NJBPU to the base rate proceeding and addressed in the Phase II proceeding. No party to either of these proceedings opposes the settlement. |
The proposed settlement will allow for an increase in ACE's base rates of approximately $18.8 million, $2.8 million of which would come from an increase in RARC revenue collections. $16 million of the base rate increase, not related to RARC collections, will be collected annually until such time as base rates change pursuant to another base rate proceeding. The $2.8 million in RARC collections will be collected each year for four years. The $18.8 million increase in base rate revenue will be offset by a base rate revenue decrease in a similar amount in total resulting from a change in depreciation rate, which is further discussed below, similar to what has been adopted by the NJBPU for other New Jersey electric utility companies. Overall, the settlement provides for a net decrease in revenues of approximately $.3 million, consisting of a $3.1 million reduction of distribution revenues offset by the $2.8 million increase in RARC revenue collections mentioned above. The proposed settlement specifies an overall rate of return of 8.14%. The proposed settlement provides for a change in depreciation rates driven by a change in average service lives. In addition, the settlement provides for a change in depreciation technique from remaining life to whole life, including amortization of any calculated excess or deficiencies in the depreciation reserve. As a result of these changes there is a net excess depreciation reserve. Accordingly PHI and ACE recorded a regulatory liability in March 2005 by reducing its depreciation reserve by approximately $131 million. The regulatory liability will be amortized over 8.25 years and will result in a reduction of depreciation and amortization expense on PHI's and 118 _____________________________________________________________________________ ACE's consolidated statements of earnings. While the impact of the settlement will be essentially revenue and cash neutral to PHI and ACE, there will be a positive annual pre-tax earnings impact to PHI and ACE of approximately $20 million. |
With respect to Phase II issues, which included supply-related deferred costs, the settlement provides for a disallowance of $13.0 million previously recorded to such deferred accounts and specifies the recovery over four years of an adjusted deferred balance of approximately $116.8 million, including a portion of the $25.4 million of costs transferred first into the Phase I proceeding from other proceedings and then ultimately into the Phase II proceeding, offset by the return over one year of over-collected balances in certain other deferred accounts, with the net result being that there will be no rate impact from the deferral account recoveries and credits for at least one year. |
The settlement does not become effective unless approved by the NJBPU. It is likely that the NJBPU will consider the settlement in the second quarter of 2005. While ACE believes it is probable that the NJBPU will approve the settlement, ACE cannot predict with certainty the timing of any NJBPU approval. The settlement does not affect the existing appeal filed by ACE with the Appellate Division of the Superior Court of New Jersey related to the July 2004 Final Decision and Order issued by the NJBPU in ACE's restructuring deferral proceeding before the NJBPU under the New Jersey Electric Discount and Energy Competition Act. For additional information about this appeal and the New Jersey regulatory proceeding leading up to this appeal, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Restructuring Deferral" of the Pepco Holdings 2004 10-K. |
Delaware |
For a discussion of the history DPL's annual Gas Cost Rate (GCR) filing, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Rate Proceedings" of the Pepco Holdings 2004 10-K. An evidentiary hearing was held on May 5, 2005, at which both Delaware Public Service Commission (DPSC) staff and the Division of Public Advocate testified that the rates sought by DPL should be approved as filed. A final order addressing both the November 1 and December 29 increases is expected in the second quarter of 2005. |
Pursuant to the April 16, 2002 merger settlement agreement in Delaware, on May 4, 2005, DPL made a filing with the DPSC whereby DPL seeks approval of a proposed increase of approximately $6.177 million in electric transmission service revenues, or about 1.1% of total Delaware retail electric revenues. This proposed revenue increase is the Delaware retail portion of the increase in the "Delmarva zonal" transmission rates on file with FERC under the PJM Open Access Transmission Tariff (OATT). This level of revenue increase will decrease to the extent that competitive retail suppliers provide a supply and transmission service to retail customers. In that circumstance, PJM would charge the competitive retail supplier the PJM OATT rate for transmission service into the Delmarva zone and DPL's charges to the retail customer would exclude as a "shopping credit" an amount equal to the standard offer service supply charge and the transmission and ancillary charg es that would otherwise be charged by DPL to the retail customer. DPL has proposed to begin collecting this rate change for service rendered on and after June 3, 2005, subject to refund. 119 _____________________________________________________________________________ |
District of Columbia |
For a discussion of the history of Pepco's distribution rate review case filed with the DCPSC, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Rate Proceedings" of the Pepco Holdings 2004 10-K. On April 7, 2005, the DCPSC approved a settlement of this proceeding, which provides that Pepco's current distribution rates will remain unchanged through the end of the rate cap periods set forth above, except as otherwise provided in the merger settlement, or as may otherwise be required by the Commission or by law. |
SOS and Default Service Proceedings |
Virginia |
For a discussion of the history of DPL's default service proceedings in Virginia, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- SOS and Default Service Proceedings" of the Pepco Holdings 2004 10-K. As discussed in the Pepco Holdings 2004 10-K, the parties to this proceeding entered into and filed, on March 4, 2005, a settlement resolving the issues in this proceeding. The settlement proposed to make the interim rates DPL had put into effect final, without any administrative charge or margin, but with the amount of the final rates being contingent only on possible future adjustment depending on the result of a related proceeding at FERC. The VSCC approved the settlement on March 25, 2005. |
Delaware |
For a discussion of the history of DPL's default service proceedings Delaware, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- SOS and Default Service Proceedings" of the Pepco Holdings 2004 10-K. On March 22, 2005, the DPSC issued an order approving DPL as the SOS provider at market rates after May 1, 2006, when DPL's current fixed rate POLR obligation ends. The DPSC will determine in the future the duration of DPL's market rate SOS obligation and the margin, if any, that it will be permitted to earn in conjunction with providing the SOS. The DPSC also approved a structure whereby DPL will purchase the power supply required to satisfy its market rate SOS obligations from wholesale suppliers under contracts entered into pursuant to a competitive bid procedure. |
Proposed Shut Down of B.L. England Generating Facility; Construction of Transmission Facilities |
For a discussion of the history of the proposed shut-down of the B.L. England generating facility, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Proposed Shut Down of B.L. England Generating Facility; Construction of Transmission Facilities " of the Pepco Holdings 2004 10-K. As discussed in the Pepco Holdings 2004 10-K, in November 2004, ACE made a filing with the NJBPU requesting the necessary approvals for construction of the transmission upgrades required to maintain reliability in the Atlantic zone after the retirement of B.L. England. The NJBPU issued an order on April 21, 2005, which unanimously approved the petition for the construction of the transmission upgrades, including the 230 kilovolt (kV) Cumberland to Dennis line, the138 kV Dennis to Corson line, and the 138 kV Cardiff to Lewis 120 _____________________________________________________________________________ line. The approval states that these lines are necessary even if B.L. England does not shut down. On May 6, 2005, ACE announced that it would again auction its electric generation assets, including B.L. England. ACE intends to construct the transmission upgrades referred to above whether or not B.L. England is sold. |
Environmental Litigation |
For a discussion of the history of DPL's Administrative Consent Order, entered into with the Maryland Department of the Environment, to perform a Remedial Investigation/Feasibility Study (RI/FS) with respect to former manufactured gas plant operations at the Cambridge, Maryland site, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Environmental Litigation" of the Pepco Holdings 2004 10-K. Due to project delays, DPL now expects that the completion date for the RI/FS will be in the fourth quarter of 2005. |
Preliminary Settlement Agreement with the NJDEP |
For a discussion of the history and details of the April 26, 2004 preliminary settlement agreement entered into by PHI, Conectiv, ACE, the New Jersey Department of Environmental Protection (NJDEP) and the Attorney General of New Jersey, please refer to "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Preliminary Settlement Agreement with the NJDEP" of the Pepco Holdings 2004 10-K.. As discussed in the Pepco Holdings 2004 10-K, under the preliminary settlement agreement, in order to address ACE's appeal of NJDEP actions relating to NJDEP's July 2001 denial of ACE's request to renew a permit variance from sulfur-in-fuel requirements under New Jersey regulations, effective through July 30, 2001, that authorized Unit 1 at B.L. England generating facility to burn bituminous coal containing greater than 1% sulfur, ACE will be permitted to combust coal with a sulfur content of greater than 1% at the B.L. England facility in accordance with the terms of B.L. England's current permit until December 15, 2007 and NJDEP will not impose new, more stringent short-term SO2 emissions limits on the B.L. England facility during this period. However, in the absence of a final settlement agreement with NJDEP, ACE will need to seek, in July 2005, a renewal of its current fuel authorization, which is scheduled to expire on July 30, 2006. The preliminary settlement agreement provides that the parties will work toward a consent order or other final settlement document that reflects the terms of the preliminary settlement agreement. ACE, Conectiv and PHI continue to negotiate with the NJDEP the terms of a consent order or other final settlement document. |
Federal Tax Treatment of cross-border Leases |
PCI maintains a portfolio of cross-border energy sale-leaseback transactions, which as of March 31, 2005 had a book value of approximately $1.2 billion and from which PHI currently derives approximately $55 million per year in tax benefits in the form of interest and depreciation deductions. The American Jobs Creation Act of 2004 imposed new passive loss limitation rules that apply prospectively to leases (including cross-border leases) entered into after March 12, 2004 with tax indifferent parties (i.e., municipalities and tax exempt or governmental entities). All of PCI's cross-border energy leases are with tax indifferent parties and were entered into prior to 2004. Although this legislation is prospective in nature and does not affect PCI's existing cross-border energy leases, it does not prohibit the IRS from challenging prior leasing transactions. In this regard, on February 11, 2005, the Treasury 121 _____________________________________________________________________________ Department and IRS issued Notice 2005-13 informing taxpayers that the IRS intends to challenge on various grounds the purported tax benefits claimed by taxpayers entering into certain sale-leaseback transactions with tax-indifferent parties, including those entered into on or prior to March 12, 2004 (the Notice). PCI's cross-border energy leases are similar to those sale-leaseback transactions described in the Notice. |
PCI's leases have been under examination by the IRS as part of the normal PHI tax audit. On May 4, 2005, the IRS issued a Notice of Proposed Adjustment to PHI that challenges the tax benefits realized from interest and depreciation deductions claimed by PHI with respect to these leases for the tax years 2001 and 2002. The tax benefits claimed by PHI with respect to these leases from 2001 through the first quarter of 2005 were approximately $189 million. The ultimate outcome of this issue is uncertain; however, if the IRS prevails, PHI would be subject to additional taxes, along with interest and possibly penalties on the additional taxes, which could have a material adverse effect on PHI's results of operations and cash flow. |
PHI believes that its tax position related to these transactions was proper based on applicable statutes, regulations and case law, and intends to contest any adjustments proposed by the IRS; however, there is no assurance that PHI's position will prevail. |
Under SFAS No. 13, as currently interpreted, a settlement with the IRS that results in a deferral of tax benefits that does not change the total estimated net income from a lease does not require an adjustment to the book value of the lease. However, if the IRS were to disallow, rather than require the deferral of, certain tax deductions related to PHI's leases, PHI would be required to adjust the book value of the leases and record a charge to earnings equal to the repricing impact of the disallowed deductions. Such a charge to earnings, if required, is likely to have a material adverse effect on PHI's results of operations for the period in which the charge is recorded. |
In recent deliberations, the Financial Accounting Standards Board (FASB) has determined that a change in the timing of tax benefits also should require a repricing of the lease and an adjustment to the book value of a lease. Under this interpretation, a material change in the timing of cash flows under PHI's cross-border leases as the result of a settlement with the IRS also would require an adjustment to the book value. PHI understands that the FASB intends to publish this guidance for comment in the near future to become effective at the end of 2005. If adopted, the application of this guidance could result in a material adverse effect on PHI's results of operations even if the resolution is limited to a deferral of the tax benefits realized by PCI from its leases. |
CRITICAL ACCOUNTING POLICIES |
No material changes to Pepco Holdings' critical accounting policies occurred during the first quarter of 2005. Accordingly, for a discussion of these policies, please refer to Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations of Pepco Holdings' Annual Report on Form 10-K for the year ended December 31, 2004. 122 _____________________________________________________________________________ |
NEW ACCOUNTING STANDARDS |
SAB 107 and SFAS 123R |
In March 2005, the Securities and Exchange Commission (SEC) issuedStaff Accounting Bulletin No. 107 (SAB 107) which providesimplementation guidance onthe interaction betweenFASB Statement No. 123 (revised 2004),Share-Based Payment (SFAS 123R)and certain SEC rules and regulations as well as guidance on the valuation of share-based payment arrangements for public companies. |
In April 2005, the SEC approved a new rule delaying the effective date of SFAS 123R for public companies. Under the SEC's rule, SFAS 123R is now effective for public companies for annual, rather than interim, periods that begin after June 15, 2005 (year ended December 31, 2006 for Pepco Holdings). Pepco Holdings is in the process of completing its evaluation of the impact of SFAS 123R and does not anticipate that its implementation or SAB 107 will have a material effect on PHI's overall financial position or net results of operations. |
FIN 47 |
In March 2005, The Financial Accounting Standards Board (FASB) published FASB Interpretation No. 47,Accounting for Conditional Asset Retirement Obligations(FIN 47). FIN 47 clarifies that FASB Statement No. 143,Accounting for Asset Retirement Obligations applies to conditional asset retirement obligations as defined and requires that the fair value of a reasonably estimable conditional asset retirement obligation be recognized as part of the carrying amounts of the asset. FIN 47 is effective no later than the end of fiscal years ending after December 15, 2005 (December 31, 2005 for Pepco Holdings). Pepco Holdings is in the process of evaluating the anticipated impact that the implementation of FIN 47 will have on its overall financial position or net results of operations. |
RISK FACTORS |
The IRS challenge to cross-border energy sale and lease-back transactions entered into by a PHI subsidiary could result in loss of prior and future tax benefits. |
PCI maintains a portfolio of cross-border energy sale-leaseback transactions, which as of March 31, 2005 had a book value of approximately $1.2 billion and from which PHI currently derives approximately $55 million per year in tax benefits in the form of interest and depreciation deductions. All of PCI's cross-border energy leases are with tax indifferent parties and were entered into prior to 2004. On February 11, 2005, the Treasury Department and IRS issued a notice informing taxpayers that the IRS intends to challenge the tax benefits claimed by taxpayers with respect to certain of these transactions. |
PCI's leases have been under examination by the IRS as part of the normal PHI tax audit. On May 4, 2005, the IRS issued a Notice of Proposed Adjustment to PHI that challenges the tax benefits realized from interest and depreciation deductions claimed by PHI with respect to these leases for the tax years 2001 and 2002. The tax benefits claimed by PHI with respect to these leases from 2001 through the first quarter of 2005 were approximately $189 million. The ultimate outcome of this issue is uncertain; however, if the IRS prevails, PHI would be subject to
123 _____________________________________________________________________________
additional taxes, along with interest and possibly penalties on the additional taxes, which could have a material adverse effect on PHI's results of operations and cash flow.
|
In addition, a disallowance, rather than a deferral, of tax benefits to be realized by PHI from these leases will require PHI to adjust the book value of its leases and record a charge to earnings equal to the repricing impact of the disallowed deductions. Such a change would likely have a material adverse effect on PHI's results of operations for the period in which the charge is recorded. See "Management's Discussion and Analysis of Financial Condition and Results of Operations - Regulatory and Other Matters." |
For information concerning additional risk factors, please refer to Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations in Pepco Holdings' Annual Report on Form 10-K for the year ended December 31, 2004. |
FORWARD LOOKING STATEMENTS |
Some of the statements contained in this Quarterly Report on Form 10-Q are forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended, and are subject to the safe harbor created by the Private Securities Litigation Reform Act of 1995. These statements include declarations regarding Pepco Holdings' intents, beliefs and current expectations. In some cases, you can identify forward-looking statements by terminology such as "may," "will," "should," "expects," "plans," "anticipates," "believes," "estimates," "predicts," "potential" or "continue" or the negative of such terms or other comparable terminology. Any forward-looking statements are not guarantees of future performance, and actual results could differ materially from those indicated by the forward-looking statements. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause our or our industry's ac tual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by such forward-looking statements. |
The forward-looking statements contained herein are qualified in their entirety by reference to the following important factors, which are difficult to predict, contain uncertainties, are beyond Pepco Holdings' control and may cause actual results to differ materially from those contained in forward-looking statements: |
Default Supply Revenue increased by $45.4 million, despite a decline in sales driven by customer migration, primarily due to higher retail energy rates, the result of the successful implementation of the SOS competitive bid procedure in Maryland beginning in July 2004 and in the District of Columbia beginning in February 2005 (offset in Fuel and Purchased Energy). |
For the three months ended March 31, 2005, Pepco's Maryland customers served by an alternate supplier represented 34% of Pepco's total Maryland load, and Pepco's District of Columbia customers served by an alternate supplier represented 49% of Pepco's total District of Columbia load. For the three months ended March 31, 2004, Pepco's Maryland customers served by an alternate supplier represented 24% of Pepco's total Maryland load, and Pepco's District of Columbia customers served by an alternate supplier represented 37% of Pepco's total District of Columbia load. |
Default Electricity Supply Sales were approximately 4,065,000 MwH for the three months ended March 31, 2005, compared to approximately 4,715,000 MwH for the comparable period in 2004. |
Operating Expenses |
Fuel and Purchased Energy |
Fuel and Purchased Energy increased by $42.7 million to $216.4 million for the three months ended March 31, 2005, from $173.7 million for the comparable period in 2004. The increase was primarily due to the following: (i) $40.6 million increase in energy costs, which are reflected in the new SOS rates for Maryland beginning in July 2004 and the District of Columbia beginning in February 2005 (offset in Default Supply Revenue), (ii) $4.4 million increase in costs due to the end of the generation procurement credit (GPC) as a result of the new SOS agreements, partially offset by (iii) $2.3 million lower PJM Interconnection, LLC (PJM) network transmission costs. 129 _____________________________________________________________________________ |
Other Operation and Maintenance |
Other Operation and Maintenance decreased by $.6 million to $66.5 million for the three months ended March 31, 2005, from $67.1 million for the comparable period in 2004. The decrease was primarily due to (i) $2.5 million lower Default Supply costs, (ii) $2.1 million lower severance costs, (iii) $1.8 million lower information technology costs, and (iv) $.8 million lower employee benefit expense, partially offset by (v) $2.0 million higher incentive costs, (vi) $2.2 million higher building lease costs, (vii) $1.5 million sick pay reserve, and (viii) $1.3 million increased bad debt expense. |
Depreciation and Amortization |
Depreciation and Amortization expenses decreased by $4.1 million to $39.8 million for the three months ended March 31, 2005 from $43.9 million for the comparable period in 2004. The decrease is primarily due to a $2.7 million decrease related to non-regulated assets and $1.8 million decrease due to software retirements. |
Other Taxes |
Other Taxes increased by $9.2 million to $65.7 million for the three months ended March 31, 2005, from $56.5 million for the comparable period in 2004. The increase was primarily due to pass-throughs of (i) $6.9 million higher county surcharge and $1.3 million higher delivery taxes (offset in Regulated T&D Electric Revenue) and (ii) $1.0 million delivery tax prior period adjustment. |
Gain on Sale of Assets |
The gain on sale of assets in the first quarter of 2004 of $6.6 million represents the sale of land. |
Other Income (Expenses) |
Other Expenses decreased by $2.8 million to a net expense of $16.5 million for the three months ended March 31, 2005 from a net expense of $19.3 million for the comparable period in 2004. This was primarily due to (i) $1.2 million lower interest expense and (ii) $1.1 million higher other income. |
Income Tax Expense |
Pepco's effective tax rate for the three months ended March 31, 2005 was 44% as compared to the federal statutory rate of 35%. The major reasons for this difference are state income taxes (net of federal benefit) and the flow-through of certain book tax depreciation differences partially offset by the flow-through of deferred investment tax credits and certain removal costs. |
Pepco's effective tax rate for the three months ended March 31, 2004 was 38% as compared to the federal statutory rate of 35%. The major reasons for this difference are state income taxes (net of federal benefit, including the benefit associated with the retroactive adjustment for the issuance of final consolidated return regulations by a local taxing authority, which is the primary reason for the lower effective rate as compared to 2005) and the flow-through of certain book tax depreciation differences partially offset by the flow-through of deferred investment tax credits and certain removal costs. 130 _____________________________________________________________________________ |
CAPITAL RESOURCES AND LIQUIDITY |
Financing Activity Subsequent to March 31, 2005 |
On May 5, 2005, Pepco Holdings, Pepco, DPL and ACE entered into a five-year credit agreement with an aggregate borrowing limit of $1.2 billion. This agreement replaces a $650 million five-year credit agreement that was entered into in July 2004 and a $550 million three-year credit agreement entered into in July 2003. Pepco Holdings' credit limit under this agreement is $700 million. The credit limit of each of Pepco, DPL and ACE is the lower of $300 million and the maximum amount of debt the company is permitted to have outstanding by its regulatory authorities, except that the aggregate amount of credit used by Pepco, DPL and ACE at any given time under the agreement may not exceed $500 million in the aggregate. Under the terms of the credit agreement, the companies are entitled to request increases in the principal amount of available credit up to an aggregate increase of $300 million, with any such increase proportionately increasing the credit limit of each of the respective borrowers and the $300 million sublimits for each of Pepco, DPL and ACE. The interest rate payable by the respective companies on utilized funds will be based on a pricing schedule determined by the credit rating of the borrower. The indebtedness incurred under the Credit Agreement is unsecured. |
The credit agreement is intended to serve primarily as a source of liquidity to support the commercial paper programs of the respective companies. The companies also are permitted to use the facility to borrow funds for general corporate purposes and issue letters of credit. In order for a borrower to use the facility, certain representations and warranties made by the borrower at the time the credit agreement was entered into also must be true at the time the facility is utilized, and the borrower must be in compliance with specified covenants, including the financial covenant described below. However, amaterial adverse change in the borrower's business, property, or financial condition subsequent to the entry into the credit agreement is not a condition to the availability of credit under the facility.Among the covenants contained in the credit agreement are (i) the requirement that each borrowing company maintain a ratio of total indebtedness to total capitalization of 65% or less, computed in accordance with the terms of the credit agreement, (ii) a restriction on sales or other dispositions of assets, other than sales and dispositions permitted by the credit agreement and (iii) a restriction on the incurrence of liens on the assets of a borrower or any of its significant subsidiaries other than liens permitted by the credit agreement. The failure to satisfy any of the covenants or the occurrence of specified events that constitute events of default that could result in the acceleration of repayment obligations of the borrower. The events of default include (i) the failure of any borrowing company or any of its significant subsidiaries to pay when due, or the acceleration of, certain indebtedness under other borrowing arrangements, (ii) certain bankruptcy events, judgments or decrees against any borrowing company or its significant subsidiaries, and (iii) a change in control (as defined in the credit agreement) of Pep co Holdings or the failure of Pepco Holdings to own all of the voting stock of Pepco, DPL and ACE. The agreement does not include any ratings triggers. 131 _____________________________________________________________________________ |
Working Capital |
At March 31, 2005, Pepco's current assets totaled $432.6 million and its current liabilities totaled $504.4 million. At December 31, 2004, Pepco's current assets totaled $364.0 million and its current liabilities totaled $434.6 million. |
Pepco's working capital deficit results in large part from the fact that, in the normal course of business, it acquires and pays for energy supplies for its customers before the supplies are metered and then billed to customers. Short-term financings are used to meet liquidity needs. Short-term financings are also used, at times, to temporarily fund redemptions of long-term debt, until long-term replacement issues are completed. |
Cash Flow Activities |
Pepco's cash flows for the three months ended March 31, 2005 and 2004 are summarized below. |
In the first quarter of 2004 Pepco issued $275 million of secured senior notes with maturities of 10 and 30 years; the proceeds of which were used to redeem higher interest rate securities and to repay short-term debt. |
Capital Requirements |
Construction Expenditures |
Pepco's construction expenditures for the three months ended March 31, 2005 totaled $35.4 million. These expenditures were related to capital costs associated with new customer services, distribution reliability, and transmission. |
REGULATORY AND OTHER MATTERS |
Relationship with Mirant Corporation |
In 2000, Pepco sold substantially all of its electricity generation assets to Mirant Corporation, formerly Southern Energy, Inc. As part of the Asset Purchase and Sale Agreement, Pepco entered into several ongoing contractual arrangements with Mirant and certain of its subsidiaries 133 _____________________________________________________________________________ (collectively, Mirant). On July 14, 2003, Mirant Corporation and most of its subsidiaries filed a voluntary petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code in the U.S. Bankruptcy Court for the Northern District of Texas (the Bankruptcy Court). |
Depending on the outcome of the matters discussed below, the Mirant bankruptcy could have a material adverse effect on the results of operations of Pepco Holdings and Pepco. However, management believes that Pepco Holdings and Pepco currently have sufficient cash, cash flow and borrowing capacity under their credit facilities and in the capital markets to be able to satisfy any additional cash requirements that may arise due to the Mirant bankruptcy. Accordingly, management does not anticipate that the Mirant bankruptcy will impair the ability of Pepco Holdings or Pepco to fulfill their contractual obligations or to fund projected capital expenditures. On this basis, management currently does not believe that the Mirant bankruptcy will have a material adverse effect on the financial condition of either company. |
Transition Power Agreements |
As part of the Asset Purchase and Sale Agreement, Pepco and Mirant entered into Transition Power Agreements for Maryland and the District of Columbia, respectively (collectively, the TPAs). Under these agreements, Mirant was obligated to supply Pepco with all of the capacity and energy needed to fulfill its SOS obligations in Maryland through June 2004 and its SOS obligations in the District of Columbia through January 22, 2005. |
To avoid the potential rejection of the TPAs, Pepco and Mirant entered into an Amended Settlement Agreement and Release dated as of October 24, 2003 (the Settlement Agreement) pursuant to which Mirant assumed both of the TPAs and the terms of the TPAs were modified. The Settlement Agreement also provided that Pepco has an allowed, pre-petition general unsecured claim against Mirant Corporation in the amount of $105 million (the Pepco TPA Claim). |
Pepco has also asserted the Pepco TPA Claim against other Mirant entities, which Pepco believes are liable to Pepco under the terms of the Asset Purchase and Sale Agreement's Assignment and Assumption Agreement (the Assignment Agreement). Under the Assignment Agreement, Pepco believes that each of the Mirant entities assumed and agreed to discharge certain liabilities and obligations of Pepco as defined in the Asset Purchase and Sale Agreement. Mirant has filed objections to these claims. Under the original plan of reorganization filed by the Mirant entities with the Bankruptcy Court, certain Mirant entities other than Mirant Corporation would pay significantly higher percentages of the claims of their creditors than would Mirant Corporation. The amount that Pepco will be able to recover from the Mirant bankruptcy estate with respect to the Pepco TPA Claim will depend on the amount of assets available for distribution to creditors of the Mirant entities that are found to be liable for the Pepco TPA Claim. |
Power Purchase Agreements |
Under agreements with FirstEnergy Corp., formerly Ohio Edison (FirstEnergy), and Allegheny Energy, Inc., both entered into in 1987, Pepco is obligated to purchase from FirstEnergy 450 megawatts of capacity and energy annually through December 2005 (the FirstEnergy PPA). Under an agreement with Panda, entered into in 1991, Pepco is obligated to purchase from Panda 230 megawatts of capacity and energy annually through 2021 (the Panda PPA). In each case, the purchase price is substantially in excess of current market price. As a part of the Asset Purchase and Sale Agreement, Pepco entered into a "back-to- 134 _____________________________________________________________________________ back" arrangement with Mirant. Under this arrangement, Mirant is obligated, among other things, to purchase from Pepco the capacity and energy that Pepco is obligated to purchase under the FirstEnergy PPA and the Panda PPA at a price equal to the price Pepco is obligated to pay under the FirstEnergy PPA and the Panda PPA (the PPA-Related Obligations). |
Pepco Pre-Petition Claims |
When Mirant filed its bankruptcy petition on July 14, 2003, Mirant had unpaid obligations to Pepco of approximately $29 million, consisting primarily of payments due to Pepco in respect of the PPA-Related Obligations (the Mirant Pre-Petition Obligations). The Mirant Pre-Petition Obligations constitute part of the indebtedness for which Mirant is seeking relief in its bankruptcy proceeding. Pepco has filed Proofs of Claim in the Mirant bankruptcy proceeding in the amount of approximately $26 million to recover this indebtedness; however, the amount of Pepco's recovery, if any, is uncertain. The $3 million difference between Mirant's unpaid obligation to Pepco and the $26 million Proofs of Claim primarily represents a TPA settlement adjustment which is included in the $105 million Proofs of Claim filed by Pepco against the Mirant debtors in respect of the Pepco TPA Claim. In view of the uncertainty as to recoverability, Pepco, in the third quarter of 2003, expensed $14.5 mi llion to establish a reserve against the $29 million receivable from Mirant. In January 2004, Pepco paid approximately $2.5 million to Panda in settlement of certain billing disputes under the Panda PPA that related to periods after the sale of Pepco's generation assets to Mirant. Pepco believes that under the terms of the Asset Purchase and Sale Agreement, Mirant is obligated to reimburse Pepco for the settlement payment. Accordingly, in the first quarter of 2004, Pepco increased the amount of the receivable due from Mirant by approximately $2.5 million and amended its Proofs of Claim to include this amount. Pepco currently estimates that the $14.5 million expensed in the third quarter of 2003 represents the portion of the entire $31.5 million receivable unlikely to be recovered in bankruptcy, and no additional reserve has been established for the $2.5 million increase in the receivable. The amount expensed represents Pepco's estimate of the possible outcome in bankruptcy, although the amount ultimatel y recovered could be higher or lower. |
Mirant's Attempt to Reject the PPA-Related Obligations |
On August 28, 2003, Mirant filed with the Bankruptcy Court a motion seeking authorization to reject its PPA-Related Obligations. Upon motions filed with the U.S. District Court for the Northern District of Texas (the District Court) by Pepco and FERC, in October 2003, the District Court withdrew jurisdiction over the rejection proceedings from the Bankruptcy Court. In December 2003, the District Court denied Mirant's motion to reject the PPA-Related Obligations on jurisdictional grounds. The District Court's decision was appealed by Mirant and The Official Committee of Unsecured Creditors of Mirant Corporation (the Creditors' Committee) to the U.S. Court of Appeals for the Fifth Circuit (the Court of Appeals). On August 4, 2004, the Court of Appeals remanded the case to the District Court saying that the District Court has jurisdiction to rule on the merits of Mirant's rejection motion, suggesting that in doing so the court apply a "more rigorous standard" than the busine ss judgment rule usually applied by bankruptcy courts in ruling on rejection motions. 135 _____________________________________________________________________________ |
On December 9, 2004, the District Court issued an order again denying Mirant's motion to reject the PPA-Related Obligations. The District Court found that the PPA-Related Obligations are not severable from the Asset Purchase and Sale Agreement and that the Asset Purchase and Sale Agreement cannot be rejected in part, as Mirant was seeking to do. On December 16, the Creditors' Committee appealed the District Court's order to the Court of Appeals, and on December 20, 2004, Mirant also appealed the District Court's order. Mirant and the Creditors' Committee each filed its brief on April 4, 2005. Pepco's and FERC's briefs are due May 19, 2005. Oral arguments have not yet been scheduled. |
As more fully discussed below, Mirant had been making regular periodic payments in respect of the PPA-Related Obligations. On December 9, 2004, Mirant filed a notice with the Bankruptcy Court that it was suspending payments to Pepco in respect of the PPA-Related Obligations. On December 13, 2004, Mirant failed to make a payment of approximately $17.9 million due to Pepco for the period November 1, 2004 to November 30, 2004. On December 23, 2004, Pepco received a payment of approximately $6.8 million from Mirant, which according to Mirant represented the market value of the power for which payment was due on December 13. At that time, Mirant informed Pepco that it intended to continue to pay the market value, but not the above-market portion, of the power purchased under the PPA-Related Obligations. Pepco disagreed with Mirant's assertion that it need only pay the market value and believed that the amount representing the market value calculated by Mirant was insuffi cient. |
On January 21, 2005, Mirant made a payment of approximately $21.1 million. Pepco disputed Mirant's contention that the amount paid reflected the full amount due Pepco under these agreements for the applicable periods. |
On January 21, 2005, Mirant filed in the Bankruptcy Court a motion seeking to reject certain of its ongoing obligations under the Asset Purchase and Sale Agreement, including the PPA-Related Obligations (the Second Motion to Reject). On March 1, 2005 (as amended by order dated March 7, 2005), the District Court granted Pepco's motion to withdraw jurisdiction over the Asset Purchase and Sale Agreement rejection proceedings from the Bankruptcy Court. In addition, the District Court ordered Mirant to pay on March 18, 2005, all past-due unpaid amounts under the PPA-Related Obligations. On March 4, 2004, Mirant filed an emergency motion for reconsideration and a stay of the March 1, 2005 order. On March 14, 2005, Pepco filed a response to Mirant's motion. |
On March 16, 2005, the District Court denied Mirant's emergency motion for reconsideration and stay of the District Court's March 1 and March 7 Orders. On the same day, Mirant filed a petition for writ of mandamus, and a motion for stay pending appeal and mandamus review in the Court of Appeals. |
On March 17, 2005, the Court of Appeals issued an Order staying the District Court's Orders of March 1 and March 7, 2005. Accordingly, Mirant was not required to make the payment that was due to Pepco on March 18, 2005 pursuant to the District Court's Orders. On March 28, 2005, in accordance with the Court of Appeals March 17Order, Pepco, FERC, the Maryland Public Service Commission (MPSC) and Office of the People's Counsel (OPC) of Maryland filed oppositions to Mirant's petition for writ of mandamus in the Court of Appeals. Mirant and the Creditor's Committee filed briefs with the Court of Appeals on April 1, 2005. 136 _____________________________________________________________________________ |
On March 28, 2005, Pepco, FERC, the District of Columbia OPC, the MPSC and the Maryland OPC filed oppositions to the Second Motion to Reject in the District Court. |
On April 11, 2005 the Court of Appeals entered an Order vacating the stay it had ordered on March 17, 2005 and denying Mirant's motions for writ of mandamus and stay pending appeal. On April 13, 2005, Pepco received a payment from Mirant in the amount of approximately $57.5 million, representing the full amount then due in respect of the PPA-Related Obligations. |
Pepco is exercising all available legal remedies and vigorously opposing Mirant's attempt to reject the PPA-Related Obligations and other obligations under the Asset Purchase and Sale Agreement in order to protect the interests of its customers and shareholders. While Pepco believes that it has substantial legal bases to oppose the attempt to reject the agreements, the outcome of Mirant's efforts to reject the PPA-Related Obligations is uncertain. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations, Pepco could be required to repay to Mirant, for the period beginning on the effective date of the rejection (which date could be prior to the date of the court's order granting the rejection and possibly as early as September 18, 2003) and ending on the date Mirant is entitled to cease its purchases of energy and capacity from Pepco, all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and capacity. Pepco estimates that the amount it could be required to repay to Mirant in the unlikely event that September 18, 2003, is determined to be the effective date of rejection, is approximately $185.6 million as of May 1, 2005. |
Mirant has also indicated to the Bankruptcy Court that it will move to require Pepco to disgorge all amounts paid by Mirant to Pepco in respect of the PPA-Related Obligations, less an amount equal to the price at which Mirant resold the purchased energy and capacity, for the period July 14, 2003 (the date on which Mirant filed its bankruptcy petition) through rejection, if approved, on the theory that Mirant did not receive value for those payments. Pepco estimates that the amount it would be required to repay to Mirant on the disgorgement theory, in addition to the amounts described above, is approximately $22.5 million. |
Any repayment by Pepco of amounts paid by Mirant would entitle Pepco to file a claim against the bankruptcy estate in an amount equal to the amount repaid. Pepco believes that, to the extent such amounts were not recovered from the Mirant bankruptcy estate, they would be recoverable as stranded costs from customers through distribution rates as described below. |
The following are estimates prepared by Pepco of its potential future exposure if Mirant's attempt to reject the PPA-Related Obligations ultimately is successful. These estimates are based in part on current market prices and forward price estimates for energy and capacity, and do not include financing costs, all of which could be subject to significant fluctuation. The estimates assume no recovery from the Mirant bankruptcy estate and no regulatory recovery, either of which would mitigate the effect of the estimated loss. Pepco does not consider it realistic to assume that there will be no such recoveries. Based on these assumptions, Pepco estimates that its pre-tax exposure as of May 1, 2005, representing the loss of the future benefit of the PPA-Related Obligations to Pepco, is as follows: 137 _____________________________________________________________________________ |
The ability of Pepco to recover from the Mirant bankruptcy estate in respect to the Mirant Pre-Petition Obligations and damages if the PPA-Related Obligations are successfully rejected will depend on whether Pepco's claims are allowed, the amount of assets available for distribution to the creditors of the Mirant companies determined to be liable for those claims, and Pepco's priority relative to other creditors. At the current stage of the bankruptcy proceeding, there is insufficient information to determine the amount, if any, that Pepco might be able to recover from the Mirant bankruptcy estate, whether the recovery would be in cash or another form of payment, or the timing of any recovery. |
If Mirant ultimately is successful in rejecting the PPA-Related Obligations and Pepco's full claim is not recovered from the Mirant bankruptcy estate, Pepco may seek authority from the MPSC and the District of Columbia Public Service Commission (DCPSC) to recover its additional costs. Pepco is committed to working with its regulatory authorities to achieve a result that is appropriate for its shareholders and customers. Under the provisions of the settlement agreements approved by the MPSC and the DCPSC in the deregulation proceedings in which Pepco agreed to divest its generation assets under certain conditions, the PPAs were to become assets of Pepco's distribution business if they could not be sold. Pepco believes that, if Mirant ultimately is successful in rejecting the PPA-Related Obligations, these provisions would allow the stranded costs of the PPAs that are not recovered from the Mirant bankruptcy estate to be recovered from Pepco's customers through its distribut ion rates. If Pepco's interpretation of the settlement agreements is confirmed, Pepco expects to be able to establish the amount of its anticipated recovery as a regulatory asset. However, there is no assurance that Pepco's interpretation of the settlement agreements would be confirmed by the respective public service commissions. |
If the PPA-Related Obligations are successfully rejected, and there is no regulatory recovery, Pepco will incur a loss. However, the accounting treatment of such a loss depends on a number of legal and regulatory factors, and is not determinable at this time. |
The SMECO Agreement |
As a term of the Asset Purchase and Sale Agreement, Pepco assigned to Mirant a facility and capacity agreement with Southern Maryland Electric Cooperative, Inc. (SMECO) under which Pepco was obligated to purchase the capacity of an 84-megawatt combustion turbine installed 138 _____________________________________________________________________________ and owned by SMECO at a former Pepco generating facility (the SMECO Agreement). The SMECO Agreement expires in 2015 and contemplates a monthly payment to SMECO of approximately $.5 million. Pepco is responsible to SMECO for the performance of the SMECO Agreement if Mirant fails to perform its obligations thereunder. At this time, Mirant continues to make post-petition payments due to SMECO. |
On March 15, 2004, Mirant filed a complaint with the Bankruptcy Court seeking a declaratory judgment that the SMECO Agreement is an unexpired lease of non-residential real property rather than an executory contract and that if Mirant were to successfully reject the agreement, any claim against the bankruptcy estate for damages made by SMECO (or by Pepco as subrogee) would be subject to the provisions of the Bankruptcy Code that limit the recovery of rejection damages by lessors. Pepco believes that there is no reasonable factual or legal basis to support Mirant's contention that the SMECO Agreement is a lease of real property. Litigation continues and the outcome of this proceeding cannot be predicted. |
Mirant Plan of Reorganization |
On January 19, 2005, Mirant filed its Plan of Reorganization and Disclosure Statement with the Bankruptcy Court. In that plan, Mirant proposed to transfer all assets to "New Mirant" (an entity it proposed to create in the reorganization), with the exception of the PPA-Related Obligations. Mirant proposed that the PPA-Related Obligations would remain in "Old Mirant," which would be a shell entity as a result of the reorganization. Pepco believes this plan cannot be confirmed by the Bankruptcy Court under the law and has submitted objections to the plan. The plan also did not have the support of any of the creditor's committees in the Mirant bankruptcy. |
On March 11, 2005, Mirant filed an application with FERC seeking approval for the internal transfers and corporate restructuring that will result from its proposed Plan of Reorganization. Mirant must obtain FERC approval for these transactions under Section 203 of the Federal Power Act. On April 1, 2005, Pepco filed a motion to intervene and protest at FERC in connection with Mirant's March 11 FERC filing. On the same date, the District of Columbia OPC also filed a motion to intervene and protest. |
On March 25, 2005, Mirant filed its First Amended Plan of Reorganization and First Amended Disclosure Statement. Pepco is currently analyzing this amended plan. |
Rate Proceedings |
For a discussion of the history Pepco's distribution rate review case filed with the DCPSC, please refer to Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations -- Regulatory and Other Matters -- Rate Proceedings" of Pepco's Annual Report on Form 10-K for the year ended December 31, 2004. On April 7, 2005, the DCPSC approved a settlement of this proceeding, which provides that Pepco's current distribution rates will remain unchanged through the end of the rate cap periods set forth above, except as otherwise provided in the merger settlement, or as may otherwise be required by the Commission or by law. 139 _____________________________________________________________________________ |
CRITICAL ACCOUNTING POLICIES |
No material changes to Pepco's critical accounting policies occurred during the first quarter of 2005. Accordingly, for a discussion of these policies, please refer to Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations of Pepco's Annual Report on Form 10-K for the year ended December 31, 2004. |
NEW ACCOUNTING STANDARDS |
FIN 47 |
In March 2005, The Financial Accounting Standards Board (FASB) published FASB Interpretation No. 47,Accounting for Conditional Asset Retirement Obligations(FIN 47). FIN 47 clarifies that FASB Statement No. 143,Accounting for Asset Retirement Obligations,applies to conditional asset retirement obligations as defined and requires that the fair value of a reasonably estimable conditional asset retirement obligation be recognized as part of the carrying amounts of the asset. FIN 47 is effective no later than the end of fiscal years ending after December 15, 2005 (December 31, 2005 for Pepco). Pepco is in the process of evaluating the anticipated impact that the implementation of FIN 47 will have on its overall financial position or net results of operations. |
RISK FACTORS |
For information concerning risk factors, please refer to Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations in Pepco's Annual Report on Form 10-K for the year ended December 31, 2004. |
FORWARD LOOKING STATEMENTS |
Some of the statements contained in this Quarterly Report on Form 10-Q are forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended, and are subject to the safe harbor created by the Private Securities Litigation Reform Act of 1995. These statements include declarations regarding Pepco's intents, beliefs and current expectations. In some cases, you can identify forward-looking statements by terminology such as "may," "will," "should," "expects," "plans," "anticipates," "believes," "estimates," "predicts," "potential" or "continue" or the negative of such terms or other comparable terminology. Any forward-looking statements are not guarantees of future performance, and actual results could differ materially from those indicated by the forward-looking statements. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause our or our industry's actual res ults, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by such forward-looking statements. |
The forward-looking statements contained herein are qualified in their entirety by reference to the following important factors, which are difficult to predict, contain uncertainties, are beyond Pepco's control and may cause actual results to differ materially from those contained in forward-looking statements: |
140 _____________________________________________________________________________ |
For additional information concerning market risk, please refer to Item 7A, Quantitative and Qualitative Disclosure About Market Risk in Pepco Holdings' Annual Report on Form 10-K for the year ended December 31, 2004. |
Pepco |
For information concerning market risk, please refer to Item 7A, Quantitative and Qualitative Disclosure About Market Risk in Pepco's Annual Report on Form 10-K for the year ended December 31, 2004. |
INFORMATION FOR THIS ITEM IS NOT REQUIRED FOR DPL AND ACE AS THEY MEET THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION H(1)(a) AND (b) OF FORM 10-Q AND THEREFORE ARE FILING THIS FORM WITH A REDUCED FILING FORMAT. 157 _____________________________________________________________________________ |
Item 4. CONTROLS AND PROCEDURES |
Pepco Holdings, Inc. |
Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures |
Under the supervision, and with the participation of management, including the chief executive officer and the chief financial officer, Pepco Holdings has evaluated the effectiveness of the design and operation of its disclosure controls and procedures as of March 31, 2005, and, based upon this evaluation, the chief executive officer and the chief financial officer of Pepco Holdings have concluded that these controls and procedures are effective to provide reasonable assurance that material information relating to Pepco Holdings and its subsidiaries that is required to be disclosed in reports filed with, or submitted to, the SEC under the Securities Exchange Act of 1934 (i) is recorded, processed, summarized and reported within the time periods specified by the SEC rules and forms and (ii) is accumulated and communicated to management, including its chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure. |
Changes in Internal Control Over Financial Reporting |
During the three months ended March 31, 2005, there was no change in Pepco Holdings' internal control over financial reporting that has materially affected, or is reasonably likely to materially affect, Pepco Holdings' internal controls over financial reporting. |
Potomac Electric Power Company |
Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures |
Under the supervision, and with the participation of management, including the chief executive officer and the chief financial officer, Pepco has evaluated the effectiveness of the design and operation of its disclosure controls and procedures as of March 31, 2005, and, based upon this evaluation, the chief executive officer and the chief financial officer of Pepco have concluded that these controls and procedures are effective to provide reasonable assurance that material information relating to Pepco and its subsidiaries that is required to be disclosed in reports filed with, or submitted to, the SEC under the Securities Exchange Act of 1934 (i) is recorded, processed, summarized and reported within the time periods specified by the SEC rules and forms and (ii) is accumulated and communicated to management, including its chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure. |
Changes in Internal Control Over Financial Reporting |
During the three months ended March 31, 2005, there was no change in Pepco's internal control over financial reporting that has materially affected, or is reasonably likely to materially affect, Pepco's internal controls over financial reporting. 158 _____________________________________________________________________________ |
Delmarva Power & Light Company |
Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures |
Under the supervision, and with the participation of management, including the chief executive officer and the chief financial officer, DPL has evaluated the effectiveness of the design and operation of its disclosure controls and procedures as of March 31, 2005, and, based upon this evaluation, the chief executive officer and the chief financial officer of DPL have concluded that these controls and procedures are effective to provide reasonable assurance that material information relating to DPL that is required to be disclosed in reports filed with, or submitted to, the SEC under the Securities Exchange Act of 1934 (i) is recorded, processed, summarized and reported within the time periods specified by the SEC rules and forms and (ii) is accumulated and communicated to management, including its chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure. |
Changes in Internal Control Over Financial Reporting |
During the three months ended March 31, 2005, there was no change in DPL's internal control over financial reporting that has materially affected, or is reasonably likely to materially affect, DPL's internal controls over financial reporting. |
Atlantic City Electric Company |
Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures |
Under the supervision, and with the participation of management, including the chief executive officer and the chief financial officer, ACE has evaluated the effectiveness of the design and operation of its disclosure controls and procedures as of March 31, 2005, and, based upon this evaluation, the chief executive officer and the chief financial officer of ACE have concluded that these controls and procedures are effective to provide reasonable assurance that material information relating to ACE and its subsidiaries that is required to be disclosed in reports filed with, or submitted to, the SEC under the Securities Exchange Act of 1934 (i) is recorded, processed, summarized and reported within the time periods specified by the SEC rules and forms and (ii) is accumulated and communicated to management, including its chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure. |
Changes in Internal Control Over Financial Reporting |
During the three months ended March 31, 2005, there was no change in ACE's internal control over financial reporting that has materially affected, or is reasonably likely to materially affect, ACE's internal controls over financial reporting. 159 _____________________________________________________________________________ |
Part II OTHER INFORMATION |
Item 1. LEGAL PROCEEDINGS |
Pepco Holdings |
Mirant Bankruptcy |
On July 14, 2003, Mirant and most of its subsidiaries filed a voluntary petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code. For additional information, please refer to Note (4), "Commitments and Contingencies," to the financial statements of PHI included herein. |
ACE Appeal of New Jersey Deferral Proceeding |
In August 2004, ACE filed with the Appellate Division of the Superior Court of New Jersey, which hears appeals of New Jersey administrative agencies, including the New Jersey Board of Public Utilities (NJBPU), a Notice of Appeal and a Case Information Statement related to the July 2004 Final Decision and Order issued by the NJBPU in ACE's restructuring deferral proceeding before the NJBPU under the New Jersey Electric Discount and Energy Competition Act. ACE cannot predict the outcome of this appeal. For additional information concerning the New Jersey regulatory proceeding leading up to this appeal, please refer to Note (4), "Commitments and Contingencies" to the financial statements of PHI included herein. |
For further information concerning litigation matters, please refer to Item 3, "Legal Proceedings," included in Pepco Holdings' Annual Report on Form 10-K for the year ended December 31, 2004 and Note (4), "Commitments and Contingencies," to the financial statements of PHI included herein. |
Pepco |
Mirant Bankruptcy |
On July 14, 2003, Mirant and most of its subsidiaries filed a voluntary petition for reorganization under Chapter 11 of the U.S. Bankruptcy Code. For additional information, please refer to Note (4), "Commitments and Contingencies," to the financial statements of Pepco included herein. |
For further information concerning litigation matters, please refer to Note (4), "Commitments and Contingencies," to the financial statements of Pepco included herein. |
DPL |
For information concerning litigation matters, please refer to Note (4), "Commitments and Contingencies," to the financial statements of DPL included herein. 160 _____________________________________________________________________________ |
ACE |
In August 2004, ACE filed with the Appellate Division of the Superior Court of New Jersey, which hears appeals of New Jersey administrative agencies, including the New Jersey Board of Public Utilities (NJBPU), a Notice of Appeal and a Case Information Statement related to the July 2004 Final Decision and Order issued by the NJBPU in ACE's restructuring deferral proceeding before the NJBPU under the New Jersey Electric Discount and Energy Competition Act. ACE cannot predict the outcome of this appeal. For additional information concerning the New Jersey regulatory proceeding leading up to this appeal, please refer to Note (4), "Commitments and Contingencies" to the financial statements of ACE included herein. |
For additional information concerning litigation matters, please refer to Item 3, "Legal Proceedings," included in ACE's Annual Report on Form 10-K for the year ended December 31, 2004 and Note (4), "Commitments and Contingencies," to the financial statements of ACE included herein. |
Item 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS |
(c) Purchases of Equity Securities by the Issuer and Affiliated Purchasers. |
Pepco Holdings |
None. |
Pepco |
None. |
INFORMATION FOR THIS ITEM IS NOT REQUIRED FOR DPL AND ACE AS THEY MEET THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION H(1)(a) AND (b) OF FORM 10-Q AND THEREFORE ARE FILING THIS FORM WITH A REDUCED FILING FORMAT. |
Item 3. DEFAULTS UPON SENIOR SECURITIES |
Pepco Holdings |
None. |
Pepco |
None. |
INFORMATION FOR THIS ITEM IS NOT REQUIRED FOR DPL AND ACE AS THEY MEET THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION H(1)(a) AND (b) OF FORM 10-Q AND THEREFORE ARE FILING THIS FORM WITH A REDUCED FILING FORMAT. 161 _____________________________________________________________________________ |
Item 4. SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS |
Pepco Holdings |
None. |
Pepco |
None. |
INFORMATION FOR THIS ITEM IS NOT REQUIRED FOR DPL AND ACE AS THEY MEET THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION H(1)(a) AND (b) OF FORM 10-Q AND THEREFORE ARE FILING THIS FORM WITH A REDUCED FILING FORMAT. |
Item 5. OTHER INFORMATION |
Pepco Holdings |
On May 5, 2005, Pepco Holdings, Pepco, DPL and ACE entered into a five-year credit agreement with an aggregate borrowing limit of $1.2 billion. This agreement replaces a $650 million five-year credit agreement that was entered into in July 2004 and a $550 million three-year credit agreement entered into in July 2003. Pepco Holdings' credit limit under this agreement is $700 million. The credit limit of each of Pepco, DPL and ACE is the lower of $300 million and the maximum amount of debt the company is permitted to have outstanding by its regulatory authorities, except that the aggregate amount of credit used by Pepco, DPL and ACE at any given time under the agreement may not exceed $500 million in the aggregate. Under the terms of the credit agreement, the companies are entitled to request increases in the principal amount of available credit up to an aggregate increase of $300 million, with any such increase proportionately increasing the credit limit of each of the respective borrowers and the $300 million sublimits for each of Pepco, DPL and ACE. The interest rate payable by the respective companies on utilized funds will be based on a pricing schedule determined by the credit rating of the borrower. The indebtedness incurred under the Credit Agreement is unsecured. |
The credit agreement is intended to serve primarily as a source of liquidity to support the commercial paper programs of the respective companies. The companies also are permitted to use the facility to borrow funds for general corporate purposes and issue letters of credit. In order for a borrower to use the facility, certain representations and warranties made by the borrower at the time the credit agreement was entered into also must be true at the time the facility is utilized, and the borrower must be in compliance with specified covenants, including the financial covenant described below. However, amaterial adverse change in the borrower's business, property, or financial condition subsequent to the entry into the credit agreement is not a condition to the availability of credit under the facility.Among the covenants contained in the credit agreement are (i) the requirement that each borrowing company maintain a ratio of total indebtedness to total capitalization of 65% or less, computed in accordance with the terms of the credit agreement, (ii) a restriction on sales or other dispositions of assets, other than sales and dispositions permitted by the credit agreement and (iii) a restriction on the incurrence of liens on the assets of a borrower or any of its significant subsidiaries other than liens permitted by the credit agreement. The failure to satisfy any of the covenants or the occurrence of specified events that constitute events of default that could result in the acceleration of repayment 162 _____________________________________________________________________________ obligations of the borrower. The events of default include (i) the failure of any borrowing company or any of its significant subsidiaries to pay when due, or the acceleration of, certain indebtedness under other borrowing arrangements, (ii) certain bankruptcy events, judgments or decrees against any borrowing company or its significant subsidiaries, and (iii) a change in control (as defined in the credit agreement) of Pepco Holdings or the failure of Pepco Holdings to own all of the voting stock of Pepco, DPL and ACE. The agreement does not include any ratings triggers. |
PHI has had, currently has, or expects to have in the future various banking, underwriting, investment and other relationships with lenders that are parties to the credit agreement and their respective affiliates, including Wachovia Bank, N.A. which serves as a transfer agent and registrar for the PHI common stock, The Bank of New York which serves as trustee under various bond indentures, The Northern Trust Company, which serves as trustee for the Pepco Holdings Retirement Plan Master Trust and VEBA Trust and, Mizuho Corporate Bank (USA), which is the lender in a $50 million term loan to PHI due December 13, 2005. |
Pepco |
On May 5, 2005, Pepco Holdings, Pepco, DPL and ACE entered into a five-year credit agreement with an aggregate borrowing limit of $1.2 billion. This agreement replaces a $650 million five-year credit agreement that was entered into in July 2004 and a $550 million three-year credit agreement entered into in July 2003. Pepco Holdings' credit limit under this agreement is $700 million. The credit limit of each of Pepco, DPL and ACE is the lower of $300 million and the maximum amount of debt the company is permitted to have outstanding by its regulatory authorities, except that the aggregate amount of credit used by Pepco, DPL and ACE at any given time under the agreement may not exceed $500 million in the aggregate. Under the terms of the credit agreement, the companies are entitled to request increases in the principal amount of available credit up to an aggregate increase of $300 million, with any such increase proportionately increasing the credit limit of each of the respective borrowers and the $300 million sublimits for each of Pepco, DPL and ACE. The interest rate payable by the respective companies on utilized funds will be based on a pricing schedule determined by the credit rating of the borrower. The indebtedness incurred under the Credit Agreement is unsecured. |
The credit agreement is intended to serve primarily as a source of liquidity to support the commercial paper programs of the respective companies. The companies also are permitted to use the facility to borrow funds for general corporate purposes and issue letters of credit. In order for a borrower to use the facility, certain representations and warranties made by the borrower at the time the credit agreement was entered into also must be true at the time the facility is utilized, and the borrower must be in compliance with specified covenants, including the financial covenant described below. However, amaterial adverse change in the borrower's business, property, or financial condition subsequent to the entry into the credit agreement is not a condition to the availability of credit under the facility.Among the covenants contained in the credit agreement are (i) the requirement that each borrowing company maintain a ratio of total indebtedness to total capitalization of 65% or less, computed in accordance with the terms of the credit agreement, (ii) a restriction on sales or other dispositions of assets, other than sales and dispositions permitted by the credit agreement and (iii) a restriction on the incurrence of liens on the assets of a borrower or any of its significant subsidiaries other than liens permitted by the credit agreement. The failure to satisfy any of the covenants or the occurrence of specified events that constitute events of default that could result in the acceleration of repayment 163 _____________________________________________________________________________ obligations of the borrower. The events of default include (i) the failure of any borrowing company or any of its significant subsidiaries to pay when due, or the acceleration of, certain indebtedness under other borrowing arrangements, (ii) certain bankruptcy events, judgments or decrees against any borrowing company or its significant subsidiaries, and (iii) a change in control (as defined in the credit agreement) of Pepco Holdings or the failure of Pepco Holdings to own all of the voting stock of Pepco, DPL and ACE. The agreement does not include any ratings triggers. |
Pepco has had, currently has, or expects to have in the future various banking, underwriting, investment and other relationships with lenders that are parties to the credit agreement and their respective affiliates, including The Bank of New York, which serves as trustee under various Pepco bond indentures, The Northern Trust Company, which serves as trustee for the Pepco Holdings Retirement Plan Master Trust and VEBA Trust, and The Royal Bank of Scotland Finance (Ireland), which is the lender in a $100 million term loan to Pepco due December 1, 2006. |
DPL |
On May 5, 2005, Pepco Holdings, Pepco, DPL and ACE entered into a five-year credit agreement with an aggregate borrowing limit of $1.2 billion. This agreement replaces a $650 million five-year credit agreement that was entered into in July 2004 and a $550 million three-year credit agreement entered into in July 2003. Pepco Holdings' credit limit under this agreement is $700 million. The credit limit of each of Pepco, DPL and ACE is the lower of $300 million and the maximum amount of debt the company is permitted to have outstanding by its regulatory authorities, except that the aggregate amount of credit used by Pepco, DPL and ACE at any given time under the agreement may not exceed $500 million in the aggregate. Under the terms of the credit agreement, the companies are entitled to request increases in the principal amount of available credit up to an aggregate increase of $300 million, with any such increase proportionately increasing the credit limit of each of the respective borrowers and the $300 million sublimits for each of Pepco, DPL and ACE. The interest rate payable by the respective companies on utilized funds will be based on a pricing schedule determined by the credit rating of the borrower. The indebtedness incurred under the Credit Agreement is unsecured. |
The credit agreement is intended to serve primarily as a source of liquidity to support the commercial paper programs of the respective companies. The companies also are permitted to use the facility to borrow funds for general corporate purposes and issue letters of credit. In order for a borrower to use the facility, certain representations and warranties made by the borrower at the time the credit agreement was entered into also must be true at the time the facility is utilized, and the borrower must be in compliance with specified covenants, including the financial covenant described below. However, amaterial adverse change in the borrower's business, property, or financial condition subsequent to the entry into the credit agreement is not a condition to the availability of credit under the facility.Among the covenants contained in the credit agreement are (i) the requirement that each borrowing company maintain a ratio of total indebtedness to total capitalization of 65% or less, computed in accordance with the terms of the credit agreement, (ii) a restriction on sales or other dispositions of assets, other than sales and dispositions permitted by the credit agreement and (iii) a restriction on the incurrence of liens on the assets of a borrower or any of its significant subsidiaries other than liens permitted by the credit agreement. The failure to satisfy any of the covenants or the occurrence of specified events that constitute events of default that could result in the acceleration of repayment 164 _____________________________________________________________________________ obligations of the borrower. The events of default include (i) the failure of any borrowing company or any of its significant subsidiaries to pay when due, or the acceleration of, certain indebtedness under other borrowing arrangements, (ii) certain bankruptcy events, judgments or decrees against any borrowing company or its significant subsidiaries, and (iii) a change in control (as defined in the credit agreement) of Pepco Holdings or the failure of Pepco Holdings to own all of the voting stock of Pepco, DPL and ACE. The agreement does not include any ratings triggers. |
DPL also has had, currently has, or expects to have in the future various banking, underwriting, investment and other relationships with lenders that are parties to the credit agreement and their respective affiliates, including JPMorgan Chase Bank N.A. and The Bank of New York who serve as a trustee under various DPL bond indentures, and The Northern Trust Company, which serves trustee for the Pepco Holdings Retirement Plan Master Trust and VEBA Trust. |
ACE |
On May 5, 2005, Pepco Holdings, Pepco, DPL and ACE entered into a five-year credit agreement with an aggregate borrowing limit of $1.2 billion. This agreement replaces a $650 million five-year credit agreement that was entered into in July 2004 and a $550 million three-year credit agreement entered into in July 2003. Pepco Holdings' credit limit under this agreement is $700 million. The credit limit of each of Pepco, DPL and ACE is the lower of $300 million and the maximum amount of debt the company is permitted to have outstanding by its regulatory authorities, except that the aggregate amount of credit used by Pepco, DPL and ACE at any given time under the agreement may not exceed $500 million in the aggregate. Under the terms of the credit agreement, the companies are entitled to request increases in the principal amount of available credit up to an aggregate increase of $300 million, with any such increase proportionately increasing the credit limit of each of the respective borrowers and the $300 million sublimits for each of Pepco, DPL and ACE. The interest rate payable by the respective companies on utilized funds will be based on a pricing schedule determined by the credit rating of the borrower. The indebtedness incurred under the Credit Agreement is unsecured. |
The credit agreement is intended to serve primarily as a source of liquidity to support the commercial paper programs of the respective companies. The companies also are permitted to use the facility to borrow funds for general corporate purposes and issue letters of credit. In order for a borrower to use the facility, certain representations and warranties made by the borrower at the time the credit agreement was entered into also must be true at the time the facility is utilized, and the borrower must be in compliance with specified covenants, including the financial covenant described below. However, amaterial adverse change in the borrower's business, property, or financial condition subsequent to the entry into the credit agreement is not a condition to the availability of credit under the facility.Among the covenants contained in the credit agreement are (i) the requirement that each borrowing company maintain a ratio of total indebtedness to total capitalization of 65% or less, computed in accordance with the terms of the credit agreement, (ii) a restriction on sales or other dispositions of assets, other than sales and dispositions permitted by the credit agreement and (iii) a restriction on the incurrence of liens on the assets of a borrower or any of its significant subsidiaries other than liens permitted by the credit agreement. The failure to satisfy any of the covenants or the occurrence of specified events that constitute events of default that could result in the acceleration of repayment obligations of the borrower. The events of default include (i) the failure of any borrowing 165 _____________________________________________________________________________ company or any of its significant subsidiaries to pay when due, or the acceleration of, certain indebtedness under other borrowing arrangements, (ii) certain bankruptcy events, judgments or decrees against any borrowing company or its significant subsidiaries, and (iii) a change in control (as defined in the credit agreement) of Pepco Holdings or the failure of Pepco Holdings to own all of the voting stock of Pepco, DPL and ACE. The agreement does not include any ratings triggers. |
ACE has had, currently has, or expects to have in the future various banking, underwriting, investment and other relationships with lenders that are parties to the credit agreement and their respective affiliates, including The Bank of New York, which serves as trustee under various ACE bond indentures, and The Northern Trust Company, which serves as trustee for the Pepco Holdings Retirement Plan Master Trust and VEBA Trust. |
Item 6. EXHIBITS |
The documents listed below are being filed or furnished on behalf of Pepco Holdings, Inc. (PHI), Potomac Electric Power Company (Pepco), Delmarva Power & Light Company (DPL), and Atlantic City Electric Company (ACE). |