Commitments and Contingencies | Commitments and Contingencies Legal Matters Talen Energy is involved in the following legal proceedings, claims and litigation. Talen Energy believes that it has meritorious defenses in connection with its current legal proceedings, claims and litigation, and it intends to vigorously contest each of them. However, Talen Energy cannot provide assurance that it will be successful in its efforts. No estimate of the possible loss or range of loss in excess of amounts accrued, if any, can be made at this time regarding any of the matters specifically described below because the inherently unpredictable nature of legal proceedings may be exacerbated by various factors such as ongoing discovery, significant facts that are in dispute, the stage of the proceeding and the wide range of potential outcomes for any such matter. As a result, any losses actually incurred could be substantial. Sierra Club Litigation In March 2013, the Sierra Club and MEIC filed a complaint in the U.S. District Court, District of Montana, Billings Division against Talen Montana and the other Colstrip Steam Electric Station (Colstrip) owners: Avista Corporation, Puget Sound Energy, Portland General Electric Company, NorthWestern Corporation and PacifiCorp. Talen Montana operates Colstrip on behalf of the owners. The complaint alleged certain violations of the Clean Air Act, including New Source Review, Title V and opacity requirements and listed 39 separate claims for relief. The complaint requested injunctive relief and civil penalties on average of $36,000 per day per violation, including a request that the owners remediate environmental damage and that $100,000 of the civil penalties be used for beneficial mitigation projects. In July 2013, the Sierra Club and MEIC filed an additional Notice of Intent to Sue, identifying additional plant projects that are alleged not to be in compliance with the Clean Air Act and, in September 2013, filed an amended complaint. The amended complaint dropped all claims regarding pre-2001 plant projects, as well as the plaintiffs' Title V and opacity claims. It did, however, add claims with respect to a number of post-2000 plant projects, which effectively increased the number of projects subject to the litigation by about 40 . Talen Montana and the other Colstrip owners filed a motion to dismiss the amended complaint in October 2013. In May 2014, the court dismissed the plaintiffs' independent Best Available Control Technology claims and their Prevention of Significant Deterioration (PSD) claims for three projects, but denied the owners' motion to dismiss the plaintiffs' other PSD claims on statute of limitation grounds. In August 2014, the Sierra Club and MEIC filed a second amended complaint. This complaint includes the same causes of action articulated in the first amended complaint, but in regard to only eight projects done between 2001 and 2013. In September 2014, the Colstrip owners filed an answer to the second amended complaint. Discovery closed in the first quarter of 2015, and in April, the plaintiffs indicated they intend to pursue claims related to only four of the remaining projects. The magistrate judge entered an order on the parties' motions for summary judgment on December 31, 2015. The judgment dismissed two of the plaintiffs' four remaining claims and provided more preferable legal standards for the remaining two claims. The case has been bifurcated as to liability and remedy. The liability trial initially was set for May 2016 and the remedy trial, in the case of any finding of liability, was to be set at a later date. However, based on a joint motion filed by the parties, the liability trial date was stayed to allow settlement discussions to proceed. In July 2016, a proposed settlement agreement was reached that includes a commitment by the defendants to cease operations of Colstrip Units 1 and 2 on or before July 1, 2022 and liability releases for the owners of all Colstrip units, without requiring monetary payments to the plaintiffs. Apart from outright dismissal of all claims against Colstrip Units 3 and 4, those units are not affected by the proposed settlement. The settlement agreement has been filed with the U.S. District Court, District of Montana, Billings Division, for approval; however Talen Energy cannot provide assurance that the settlement agreement will be approved or, if it is not, that these proceedings will not have a material adverse effect on Talen Energy's financial condition or results of operations. Management will continue to monitor the status of the proposed settlement and timing of the proposed shutdown of Units 1 and 2 and evaluate the plant's recoverability, which could result in an impairment charge in future periods. At June 30, 2016, the carrying value of Talen Montana's interest in the Colstrip coal-fired generation plant was approximately $94 million . Notice of Intent to File Suit In October 2014, Talen Energy received a notice letter from the Chesapeake Bay Foundation (CBF) alleging violations of the Clean Water Act and Pennsylvania Clean Streams Law at the Brunner Island generation plant. The letter was sent to Brunner Island, LLC and the PADEP and was intended to provide notice of the alleged violations and CBF's intent to file suit in Federal court after expiration of the 60 day statutory notice period. Among other things, the letter alleged that Brunner Island, LLC failed to comply with the terms of its National Pollutant Discharge Elimination System permit and associated regulations related to the application of nutrient credits to the facility's discharges of nitrogen into the Susquehanna River. The letter also alleged that PADEP failed to ensure that credits generated from nonpoint source pollution reduction activities that Brunner Island, LLC applies to its discharges meet the eligibility and certification requirements under PADEP's nutrient trading program regulations. In July 2016, the CBF withdrew its notice of alleged violations and intent to file suit. Montana Regional Haze In September 2012, the EPA Region 8 developed a regional haze Federal Implementation Plan (FIP) for Montana. The final FIP assumed no additional controls for Corette or Colstrip Units 3 and 4 but proposed stricter limits for Corette and Colstrip Units 1 and 2. Talen Montana was meeting these stricter permit limits at Corette without any significant changes to operations, although other requirements led to the suspension of operations and retirement of Corette in March 2015. The stricter limits at Colstrip Units 1 and 2 would require additional controls to meet more stringent nitrogen oxides and sulfur dioxide limits, the cost of which could be significant. Both Talen Montana and environmental groups appealed the final FIP to the U.S. Court of Appeals for the Ninth Circuit where oral argument was heard in May 2014. On June 9, 2015, the Ninth Circuit issued a decision that vacated as arbitrary and capricious the portions of the FIP setting stricter emissions limits for Colstrip Units 1 and 2 and Corette. The Ninth Circuit upheld the EPA's decision not to require further emissions reductions at Colstrip Units 3 and 4. The Ninth Circuit opinion requires the EPA to now reissue a FIP that is consistent with the opinion. Colstrip Wastewater Facility Administrative Order on Consent Talen Montana is party to an Administrative Order on Consent (AOC) with the MDEQ related to operation of the wastewater facilities at the Colstrip power plant. In September 2012, Earthjustice, on behalf of Sierra Club, MEIC, and the National Wildlife Federation, filed an affidavit under Montana's Major Facility Siting Act (MFSA) that sought review of the AOC by Montana's Board of Environmental Review. Talen Montana elected to have this proceeding conducted in Montana state district court, and in October 2012, Earthjustice filed a petition for review in Montana state district court in Rosebud County. This matter was stayed in December 2012 pending the outcome of separate litigation where the same environmental groups challenged the AOC in a writ of mandamus. That litigation was resolved in May 2013 when defendants Talen Montana and MDEQ won their motions to dismiss the matter, and the environmental groups did not appeal. In April 2014, Earthjustice filed successful motions for leave to amend the petition for review and to lift the stay. Talen Montana and the MDEQ responded to the amended petition and filed partial motions to dismiss in July 2014, which were denied in October 2014. Trial was set for April 2016. However, based on a motion filed by the parties, the trial date was vacated to allow settlement discussions to proceed. In July 2016, Talen Montana and the other Colstrip owners entered into a settlement agreement that was filed with the court. Under the terms of the settlement, the Colstrip owners will convert to a "non-liquid" disposal system for CCR generated by the Unit 3 and 4 scrubbers no later than July 1, 2022. In exchange, the environmental groups agree to release the Colstrip owners from certain claims related to operation of the CCR Units and alleged groundwater contamination. This settlement is not expected to have a material adverse effect on Talen Energy's financial condition or results of operations. Montana Hydroelectric Litigation In February 2012, the U.S. Supreme Court issued a unanimous decision overturning judgments by the Montana First Judicial District Court and the Montana Supreme Court in pending litigation, which had held that the streambeds underlying the Talen Montana hydroelectric generating facilities were owned by the State of Montana and that Talen Montana owed the State of Montana compensation for its prior use of those streambeds. The case was remanded by the U.S. Supreme Court to the Montana Supreme Court for further proceedings in accordance with the decision and, in April 2012, was similarly remanded by the Montana Supreme Court to the Montana First Judicial District Court. In the interim, nothing further was done by the State of Montana to formally prosecute the action until April 2016, when the State filed a Complaint on Remand against Talen Montana and NorthWestern Corporation, the latter of which had purchased the facilities from Talen Montana in November 2014. The allegations of the complaint are very similar to the claims made by the State in the prior state court litigation. NorthWestern Corporation and Talen Montana have since removed the case to the Federal District Court in Montana and have filed motions to dismiss certain of the claims. The State opposed removal and filed a motion to remand the case to the First Judicial District Court. Further proceedings have not been scheduled by the federal court and, as a result, Talen Energy cannot estimate a range of reasonably possible losses, if any, related to this matter. Topaz Power Holdings, LLC (Topaz) Gas Supply Litigation In November 2014, Southwest Energy, L.P. (SWE) filed a petition alleging breach of contract against Topaz, a wholly owned indirect subsidiary of Talen Energy, in the 269 th Judicial District Court, Harris County, Texas. SWE and Topaz were parties to a natural gas supply contract that was terminated in October 2014. SWE seeks damages in the approximate amount of $7 million for Topaz's alleged failure to terminate the contract in accordance with its terms. SWE subsequently amended the petition to join additional parties, including other Talen Energy affiliates, and assert additional claims relating to the contract termination and the circumstances under which Topaz obtained an alternative natural gas supply for 2015. In April 2016, the court granted SWE's motion for partial summary judgment on the breach of contract claim, holding that the contract had not been properly terminated and as a result, Talen Energy recorded an insignificant charge to "Operation and maintenance" on the Statement of Income for the six months ended June 30, 2016. Further proceedings are required to determine SWE's damages on the breach of contract claim and Talen Energy's liability and damages, if any, on SWE's other claims in the litigation. Talen Energy continues to believe that all of SWE's claims are without merit and unsupported by the facts and law, and it intends to vigorously contest each of them. Other In addition to the above matters, from time-to-time in the ordinary course of its business Talen Energy may be subject to other legal proceedings, claims and litigation. While the outcome of these legal proceedings, claims and litigation is uncertain, the likely results are not expected, either individually or in the aggregate, to have a material adverse effect on Talen Energy's financial condition or results of operations, although the effect could be material to Talen Energy's results of operations in any interim reporting period. Regulatory Matters Talen Energy is subject to regulation by federal and state agencies in the various regions where it conducts business, including with respect to the following matters. New Jersey Capacity Legislation In January 2011, New Jersey enacted a law (the Act) that Talen Energy believes would intervene in the wholesale capacity market to create incentives for the development of new, in-state electricity generation facilities even when, under the FERC- approved PJM economic model, such new generation would not be economic. The Act could have the effect of depressing capacity prices in PJM in the short term, which could impact Talen Energy's revenues, and also could harm the long-term ability of the PJM capacity market to encourage necessary generation investment throughout PJM. In February 2011, certain Talen Energy subsidiaries and several other companies filed a complaint in U.S. District Court in New Jersey challenging the Act on the grounds that it violates the Supremacy and Commerce clauses of the U.S. Constitution and requesting relief barring implementation. In October 2013, the U.S. District Court in New Jersey issued a decision finding the Act unconstitutional under the Supremacy Clause on the grounds that it infringes upon the FERC's exclusive authority to regulate the wholesale sale of electricity in interstate commerce. The decision was appealed to the U.S. Court of Appeals for the Third Circuit (Third Circuit) by CPV Power Development, Inc., Hess Newark, LLC and the State of New Jersey (the Appellants). In September 2014, the Third Circuit affirmed the District Court's decision. In December 2014, the Appellants filed a petition for certiorari before the U.S. Supreme Court. In March 2015, the U.S. Supreme Court requested the U.S. Solicitor General to submit briefs expressing its views as to the issues raised in this case. In September 2015, the U.S. Solicitor General filed a brief expressing the view of the United States that the case was rightly decided and that the petition for certiorari should be denied. In April 2016, in light of the decision in the Maryland case described below, the U.S. Supreme Court denied all petitions for certiorari, allowing the Third Circuit's decision to become final. Maryland Capacity Order In April 2012, the Maryland Public Service Commission (MD PSC) ordered (the Order) three electric utilities in Maryland to enter into long-term contracts to support the construction of new electricity generating facilities in Maryland, the intent of which, Talen Energy believed, was to encourage the construction of new generation even when, under the FERC-approved PJM economic model, such new generation would not be economic. The MD PSC action could have the effect of depressing capacity prices in PJM in the short term, which could impact Talen Energy's revenues, and also could harm the long-term ability of the PJM capacity market to encourage necessary generation investment throughout PJM. In April 2012, Talen Energy subsidiaries and several other companies filed a complaint in U.S. District Court (District Court) in Maryland challenging the Order on the grounds that it violates the Supremacy and Commerce clauses of the U.S. Constitution, and requested declaratory and injunctive relief barring implementation of the Order by the MD PSC Commissioners. In September 2013, the District Court issued a decision finding the order unconstitutional under the Supremacy Clause on the grounds that it infringes upon the FERC's exclusive authority to regulate the wholesale sale of electricity in interstate commerce. The decision was appealed to the U.S. Court of Appeals for the Fourth Circuit (Fourth Circuit) by CPV Power Development, Inc. and the State of Maryland (Appellants). In June 2014, the Fourth Circuit affirmed the District Court's opinion and subsequently denied the Appellants' motion for rehearing. In December 2014, the Appellants filed a petition for certiorari before the U.S. Supreme Court. In March 2015, the U.S. Supreme Court requested the U.S. Solicitor General to submit briefs expressing its views as to the issues raised in this case. In September 2015, the U.S. Solicitor General filed a brief expressing the view of the United States that the case was rightly decided and that the petition for certiorari should be denied. In October 2015, the U.S. Supreme Court granted certiorari of the case. In April 2016, the U.S. Supreme Court issued a unanimous decision affirming the Fourth Circuit's decision and finding that Maryland's program is preempted by the Federal Power Act because it sets an interstate wholesale rate, contravening the Federal Power Act's division of authority between state and federal regulators. Pacific Northwest Markets Talen Energy Marketing and Talen Montana made spot market bilateral sales of power in the Pacific Northwest during the period from December 2000 through June 2001. Several parties subsequently claimed refunds at the FERC as a result of these sales. In June 2003, the FERC terminated proceedings to consider whether to order refunds for spot market bilateral sales made in the Pacific Northwest, including sales made by Talen Montana, during the period December 2000 through June 2001. In August 2007, the U.S. Court of Appeals for the Ninth Circuit reversed the FERC's decision and ordered the FERC to consider additional evidence. In October 2011, the FERC initiated proceedings to consider additional evidence. In December 2015, the United States Court of Appeals for the Ninth Circuit affirmed the FERC's October 2011 order setting out the remand process that the FERC has followed from 2011 to the present. In July 2012, Talen Montana and the City of Tacoma, one of the two parties claiming refunds at the FERC, reached a settlement whereby Talen Montana paid $75 thousand to resolve the City of Tacoma's $23 million claim. The settlement does not resolve the remaining claim outstanding by the City of Seattle for approximately $50 million . Hearings before a FERC Administrative Law Judge (ALJ) regarding the City of Seattle's refund claims were completed in October 2013 and briefing was completed in January 2014. In March 2014, the ALJ issued an initial decision denying the City of Seattle's complaint against Talen Montana. In May 2015, the FERC issued an order affirming the ALJ's March 2014 decision, and in January 2016 the FERC denied requests for a rehearing of its order affirming the ALJ's decision. In February 2016, the City of Seattle appealed the FERC's decision to the United States Court of Appeals for the Ninth Circuit. Although Talen Energy and its subsidiaries believe they have not engaged in any improper trading or marketing practices affecting the Pacific Northwest markets, Talen Energy cannot predict the outcome of the above-described proceedings or whether any subsidiaries will be the subject of any additional governmental investigations or named in other lawsuits or refund proceedings. Consequently, Talen Energy cannot estimate a range of reasonably possible losses, if any, related to this matter. Electricity - Reliability Standards The NERC is responsible for establishing and enforcing reliability standards (Reliability Standards) regarding the bulk power system. The FERC oversees this process and independently enforces the Reliability Standards. The Reliability Standards have the force and effect of law and apply to certain users of the bulk power electricity system, including electric utility companies, generators and marketers. Under the Federal Power Act, the FERC may assess civil penalties of up to $1 million per day, per violation, for certain violations. Talen Energy monitors its subsidiaries' compliance with the Reliability Standards and self-reports potential violations of certain applicable reliability requirements and submits accompanying mitigation plans, as required. The resolution of a number of potential violations is pending. In the course of implementing their programs to ensure compliance with the Reliability Standards by those Talen Energy subsidiaries subject to the standards, certain other instances of potential non-compliance may be identified from time to time. Talen Energy cannot predict the outcome of these matters and cannot estimate a range of reasonably possible losses, if any. Other In addition to the regulatory matters discussed above, Talen Energy and its subsidiaries are party to other regulatory proceedings arising in the ordinary course of business or have other regulatory exposure. While the outcome of these other regulatory matters and proceedings is uncertain, the likely results are not expected, either individually or in the aggregate, to have a material adverse effect on Talen Energy's financial condition or results of operations, although the effect could be material to Talen Energy's results of operations in any interim reporting period. Environmental Matters Environmental Laws and Regulations Extensive federal, state and local environmental laws and regulations are applicable to Talen Energy's air emissions, water discharges and the management of hazardous and solid waste, as well as other aspects of its business. In addition, many of these environmental considerations are also applicable to the operations of key suppliers, or customers, such as coal producers and industrial power users, and may impact the cost for their products or their demand for Talen Energy's services. It may be necessary for Talen Energy to modify, curtail, replace or cease operation of certain facilities or performance of certain operations to comply with statutes, regulations and other requirements imposed by regulatory bodies, courts or environmental groups. Talen Energy may incur costs to comply with environmental laws and regulations, including increased capital expenditures or operating and maintenance expenses, monetary fines, penalties or other restrictions, which could be material. Legal challenges to environmental permits or rules add to the uncertainty of estimating the future cost of complying with these permits and rules. In addition, costs may increase significantly if the requirements or scope of environmental laws or regulations, or similar rules, are expanded or changed. Other From time-to-time, in the ordinary course of its business, Talen Energy may become involved in other environmental matters or become subject to other environmental statutes, regulations or requirements. In the opinion of management, based upon information currently available to Talen Energy, while the outcome of these other environmental matters and proceedings is uncertain, the likely results are not expected, either individually or in the aggregate, to have a material adverse effect on Talen Energy's financial condition or results of operations, although the effect could be material to Talen Energy's results of operations in any interim reporting period. Other Commitments and Contingencies Nuclear Insurance The Price-Anderson Act is a United States Federal law which governs liability-related issues and ensures the availability of funds for public liability claims arising from an incident at any of the U.S. licensed nuclear facilities. It also seeks to limit the liability of nuclear reactor owners for such claims from any single incident. At June 30, 2016 , the liability limit per incident is $13.4 billion for such claims, which is funded by insurance coverage from American Nuclear Insurers and an industry retroactive assessment program. Under the industry retroactive assessment program, in the event of a nuclear incident at any of the reactors covered by The Price-Anderson Act, as amended, Susquehanna Nuclear could be assessed deferred premiums of up to $255 million per incident, payable at a maximum of $38 million per year. Additionally, Susquehanna Nuclear purchases property insurance programs from NEIL, an industry mutual insurance company of which Susquehanna Nuclear is a member. At June 30, 2016 , facilities at the Susquehanna plant are insured against property damage losses up to $2.0 billion . Susquehanna Nuclear also purchases an insurance program that provides coverage for the cost of replacement power during prolonged outages of nuclear units caused by certain specified conditions. Under the NEIL property and replacement power insurance programs, Susquehanna Nuclear could be assessed retrospective premiums in the event of the insurers' adverse loss experience. This maximum assessment is $61 million at June 30, 2016 . Talen Energy has additional coverage that, under certain conditions, may reduce this exposure. Guarantees and Other Assurances In the normal course of business, Talen Energy enters into agreements that provide financial performance assurance to third parties on behalf of certain subsidiaries. Such agreements include, for example, guarantees, stand-by letters of credit issued by financial institutions and surety bonds issued by insurance companies. These agreements are entered into primarily to support or enhance the creditworthiness attributed to a subsidiary on a stand-alone basis or to facilitate the commercial activities in which these subsidiaries engage. The table below details guarantees provided as of June 30, 2016 . "Exposure" represents the estimated maximum potential amount of future payments that could be required to be made under the guarantee. The probability of expected payment/performance for the guarantees described below is remote. There was no recorded liability at June 30, 2016 or December 31, 2015 . Talen Energy Supply has indemnifications related to sales of assets that are governed by the specific sales agreement and include breach of the representations, warranties and covenants, and liabilities for certain other matters. Talen Energy's maximum exposure with respect to certain indemnifications and the expiration of the indemnifications cannot be estimated because the maximum potential liability is not always capped by the transaction documents and the expiration date is based on the applicable statute of limitations. The exposure and expiration date noted is based on those cases in which the agreements provide for specific limits. Talen Energy's exposure and related expiration dates are: Exposure at Expiration Date Indemnifications for sales of assets $ 2,796 2025 - 2036 In connection with the acquisition of RJS Power and the spinoff from PPL, Talen Energy Supply agreed to indemnify PPL and its affiliates following the spinoff for liabilities primarily relating to the Talen Energy Supply business prior to the spinoff, as well as for losses arising out of breaches of Talen Energy's failure to perform covenants and agreements in the transaction agreements following the spinoff or arising out of breaches by the Riverstone Holders of certain representations and warranties in the transaction agreements. Talen Energy Supply also agreed to indemnify PPL for liabilities relating to the employment or termination of service of PPL employees who primarily supported the Talen Energy Supply business prior to the spinoff (excluding however defined benefit pension obligations of PPL employees who terminated service prior to July 1, 2000 or who were not employed by Talen Energy Supply or its subsidiaries at the time of termination). Talen Energy Supply also agreed to indemnify PPL from tax liabilities resulting from actions by Talen Energy following the closing resulting in the transaction failing to qualify for its intended tax-free treatment. Talen Energy and/or its subsidiaries provide other miscellaneous guarantees through contracts entered into in the normal course of business. These guarantees are primarily in the form of indemnification or warranties related to services or equipment and vary in duration. The amounts of these guarantees often are not explicitly stated, and the overall maximum amount of the obligation under such guarantees cannot be reasonably estimated. Historically, no significant payments have been made with respect to these types of guarantees and the probability of payment/performance under these guarantees is remote. Talen Energy, on behalf of itself and certain of its subsidiaries, maintains insurance that may cover liability assumed under contract for bodily injury and property damage. The coverage provides maximum aggregate coverage of $100 million . This insurance may be applicable to obligations under certain of these contractual arrangements. |