MANAGEMENT'S DISCUSSION AND ANALYSIS
THREE MONTHS ENDED MARCH 31, 2011
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
T A B L E O F C O N T E N T S
Page 2
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.1 Date
This Management’s Discussion and Analysis ("MD&A") should be read in conjunction with the unaudited condensed consolidated interim financial statements (“Interim Financial Statements”) for the three months ended March 31, 2011 and the audited consolidated financial statements of Northern Dynasty Minerals Ltd. ("Northern Dynasty" or the "Company") for the year ended December 31, 2010 as publicly filed on the Company’s profile atwww.sedar.com.
The Company reports in accordance with International Financial Reporting Standards ("IFRS") and the following disclosure, and associated Interim Financial Statements, are presented in accordance with IFRS. This MD&A is prepared as of May 13, 2011. All dollar figures stated herein are expressed in Canadian dollars, unless otherwise specified.
This discussion includes certain statements that may be deemed "forward-looking statements". These forward- looking statements constitute "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. |
|
All information contained in this management discussion relating to the contents of the Preliminary Assessment, including but not limited to statements of the Pebble Project's potential and information under the headings "Preliminary Assessment Key Findings,” “Production Profiles,” “Financial Valuation” and “Capital and Operating Costs” are "forward looking statements" within the definition of the United States Private Securities Litigation Reform Act of 1995. The information relating to the possible construction of a port, road, power generating facilities and power transmission facilities also constitutes such "forward looking statements." The Preliminary Assessment was prepared to broadly quantify the Pebble project's capital and operating cost parameters and to provide guidance on the type and scale of future project engineering and development work that will be needed to ultimately define the project's likelihood of feasibility and optimal production rate. It was not prepared to be used as a valuation of the Pebble project nor should it be considered to be a pre-feasibility study. Although based on a comprehensive technical review of recent engineering and technical studies undertaken by the Pebble Partnership and Northern Dynasty, the studies of capital and operating costs are incomplete and have not been optimized, so the ultimate costs may vary significantly from the amounts set out in the Preliminary Assessment. This could materially and adversely impact the projected economics of the Pebble Project. The Preliminary Assessment is based on Wardrop’s comprehensive review of recent engineering and technical studies undertaken principally by the Pebble Limited Partnership (the “Pebble Partnership”) and by Northern Dynasty. The economic assessments and other opinions expressed in the Preliminary Assessment are strictly those of Northern Dynasty and Wardrop, and do not reflect the views of any other stakeholder in the project. As such, any project which is ultimately put forward by the Pebble Partnership for permitting under the National Environmental Policy Act may differ from those mine models presented in the Preliminary Assessment. |
|
The Preliminary Assessment, in part, uses inferred mineral resources which are considered too speculative geologically to be categorized as mineral reserves and to have economic considerations applied to them. There can be no assurance that the operating and financial projections contained in the Preliminary Assessment will be realized. |
Page 3
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
The following are the principal risk factors and uncertainties which, in management's opinion, are likely to most directly affect the conclusions of the Preliminary Assessment and the ultimate feasibility of the Pebble project. A portion of the mineralized material at the Pebble Project is currently classified as an inferred resource and it is not a reserve. The mineralized material in the Preliminary Assessment is based on the measured, indicated and inferred resources estimated by Hunter Dickinson Inc. and audited by Wardrop, a Tetra Tech Company. Additional process tests and other engineering and geologic work will be required to determine if the mineralized material is an economically exploitable reserve. There can be no assurance that this mineralized material can become a reserve or the amount that may be converted to a reserve or the grade thereof. Final feasibility work has not been done to confirm the pit design, mining methods, and processing methods assumed in the Preliminary Assessment. Final feasibility could determine that the assumed pit design, mining methods, and processing methods are not correct. Construction and operation of the mine and processing facilities depends on securing environmental and other permits on a timely basis. No permits have been applied for and there can be no assurance that required permits can be secured or secured on a timely basis. Data is incomplete and cost estimates have been developed in part based on the expertise of the individuals participating in the preparation of the Preliminary Assessment and on costs at projects believed to be comparable, and not based on firm price quotes. Costs, including design, procurement, construction, and on-going operating costs and metal recoveries could be materially different from those contained in the Preliminary Assessment. There can be no assurance that mining can be conducted at the rates and grades assumed in the Preliminary Assessment. The project requires the development of port facilities, roads and electrical generating and transmission facilities. Although Northern Dynasty believes that the State of Alaska favours the development of these facilities, there can be no assurance that these infrastructure facilities can be developed on a timely and cost-effective basis. Energy risks include the potential for significant increases in the cost of fuel and electricity. The Preliminary Assessment assumes specified, long-term prices levels for gold, copper, silver and molybdenum. Prices for these commodities are historically volatile, and Northern Dynasty has no control of or influence on those prices, all of which are determined in international markets. There can be no assurance that the prices of these commodities will continue at current levels or that they will not decline below the prices assumed in the Preliminary Assessment. Prices for gold, copper, silver, and molybdenum have been below the price ranges assumed in Preliminary Assessment during the past ten years, and for extended periods of time. The project will require major financing, probably a combination of debt and equity financing. Interest rates are at historically low levels. There can be no assurance that debt and/or equity financing will be available on acceptable terms. A significant increase in costs of capital could materially and adversely affect the value and feasibility of constructing the project. Other general risks include those ordinary to very large construction projects including the general uncertainties inherent in engineering and construction cost, the need to comply with generally increasing environmental obligations, and accommodation of local and community concerns. The Company is also subject to the specific risks inherent in the mining business, as well as general economic and business conditions. For more information on the Company, Investors should review the Company’s annual Form 40-F filing with the United States Securities and Exchange Commission and its home jurisdiction filings that are available at www.sedar.com. |
|
The Company reviews its forward looking statements on an ongoing basis and updates this information when circumstances require it. |
Unless otherwise noted, Northern Dynasty is solely responsible for the content of the disclosure set out herein.
Page 4
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources |
The following section uses the terms "measured resources" and "indicated resources". The Company advises investors that although those terms are recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission (the "SEC") does not recognize them.Investors are cautioned not to assume that anypart or all of mineral deposits in these categories will ever be converted into reserves. |
Cautionary Note to Investors Concerning Estimates of Inferred Resources |
The following section uses the term "inferred resources". The Company advises investors that although this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that any part or all of a mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of economic studies, except in rare cases.Investors arecautioned not to assume that any part or all of an inferred resource exists, or is economically or legallymineable. |
1.2 Overview
1.2.1 Summary
Northern Dynasty is a mineral exploration company which holds indirect interests in 627 square miles of mineral claims in southwest Alaska, USA. These claims are part of or in the vicinity of the Pebble Copper-Gold-Molybdenum Project (the "Pebble Project").
1.2.1.1 Pebble Project
The Pebble property ("Pebble") is located in southwest Alaska, 19 miles (30 kilometers) from the villages of Iliamna and Newhalen, and approximately 200 miles (320 kilometers) southwest of the city of Anchorage. Situated approximately 1,000 feet above sea-level and 65 miles from tidewater on Cook Inlet, the site conditions are favorable for successful mine site and infrastructure development.
Mineralization was discovered in 1987, and by 1997 an initial mineral resource of copper, gold and molybdenum had been outlined in the Pebble deposit by a previous operator.
Northern Dynasty acquired the right to earn an interest in the Pebble property in late 2001. Over the next 5½ years, the Company explored the Pebble deposit and surrounding property, leading to the discovery of higher grade mineralization to the east and an overall expansion of the deposit, as well as the discovery of two other porphyry copper-gold-molybdenum deposits, a porphyry copper zone and a gold-copper skarn occurrence along the extensive mineralized trend. Comprehensive environmental, social and engineering studies began in 2004.
In mid-2007, a wholly-owned affiliate of Northern Dynasty and a wholly-owned subsidiary of Anglo American plc, Anglo American US (Pebble) LLC ("Anglo American") established the Pebble Limited Partnership (the “Pebble Partnership”) to engineer, permit, construct and operate a modern, long-life mine at the Pebble Project. The 50/50 Pebble Partnership owns the Pebble Project, which consists of the Pebble Deposit and 329.8 square miles of associated resource lands, and also has access to a stream of financing provided by Anglo American for comprehensive exploration, engineering, environmental and socioeconomic programs and, if warranted, development of the Pebble Project. Work programs at Pebble since mid-2007 have been carried out by the Pebble Partnership.
Page 5
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
2011 Preliminary Assessment demonstrates a financially and technically robust project
Positive results of an independent Preliminary Assessment on the Pebble Project were announced by Northern Dynasty on February 23, 2011. The study, completed by Wardrop, a Tetra Tech Company ("Wardrop"), was based on concept, pre-feasibility and feasibility-level study programs undertaken by the Pebble Partnership and Northern Dynasty. The Preliminary Assessment updates and substantially revises project economic analysis last done by Northern Dynasty in 2004.
The economic assessments and other opinions expressed in the Preliminary Assessment are strictly those of Northern Dynasty and Wardrop, and do not reflect the views of any other stakeholder in the project. The Pebble Partnership continues to separately undertake detailed engineering studies toward the completion of a prefeasibility report for the Pebble Project, including ongoing programs to engage project stakeholders in the planning process. As such, any project which is ultimately put forward by the Pebble Partnership for permitting under the National Environmental Policy Act ("NEPA") and the Alaska State Large Mine Permitting Process may differ from those mine models presented in the Preliminary Assessment.
The Preliminary Assessment describes and assigns potential economic value to three mine development cases comprising 25, 45 and 78 years of open pit mining and a nominal processing rate of 200,000 tons per day. Key results include:
- For the Pebble Project, the 45-year Reference Case yields a 14.2% pre-tax internal rate of return ("IRR"), a 6.2-year payback on initial capital investment of US$4.7 billion and a US$6.1 billion pre- tax net present value ("NPV") at a 7% discount rate and long-term metal prices defined in the Preliminary Assessment as $2.50 per pound of copper, $1,050 per ounce of gold, $13.50 per pound of molybdenum and $15.00 per ounce of silver. At current prevailing metal prices, defined in the Preliminary Assessment as $4.00 per pound of copper, $1,350 per ounce of gold, $15.00 per pound of molybdenum and $28.00 per ounce of silver, the 45-year Reference Case yields a 23.2% pre-tax IRR, a 3.2-year payback on initial capital investment1 and a US$15.7 billion pre-tax NPV at a 7% discount rate.
- For Northern Dynasty’s 50% share of the project, the 45-year Reference Case yields an 18% pre-tax and 15.4% post-tax IRR, a 4.7-year pre-tax and 5.3-year post-tax payback on initial capital investment and a US$3.6 billion pre-tax and US$2.4 billion post-tax NPV at a 7% discount rate and long-term metal prices.
At current prevailing metal prices, the 45-year Reference Case yields a 30.2% pre-tax and 25.1% post-tax IRR, a 2.6-year pre-tax and 3.1-year post-tax payback on initial capital investment and a US$8.3 billion pre-tax and $5.6 billion post-tax NPV at a 7% discount rate for Northern Dynasty’s 50% interest.
- The 45-year Reference Case produces 31 billion ("B") lb copper, 30 million ("M") oz gold, 1.4 B lb molybdenum, 140 M oz silver, 1.2 M kg rhenium and 907,000 oz palladium while mining only 32% of the mineral resource.
- For the 45-year Reference Case, cash costs per payable lb of copper after by-product credits total (US$0.11).
__________________________________________________
1 Initial capital expenditures for all three development cases are estimated at $4.7 billion, excluding capital costs associated with outsourced power, road and port infrastructure.
Page 6
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Northern Dynasty management believes that this expert, independent study confirms the economic potential of this superior asset. As described in the Preliminary Assessment, the Pebble Project is both a financially and technically robust project characterized by low costs and globally significant production of copper, gold and molybdenum over an unparalleled operating life.
Pebble is a large, polymetallic project located in a low risk political jurisdiction, and has the potential to generate substantial annual revenues, with increasingly better returns over decades of production. Although projects of the scale of Pebble are commonly developed by consortiums of major mining and metal companies, it also has the potential to be a company maker. Given current industry and commodity market conditions, Northern Dynasty believes that Pebble will generate significant competitive interest in the Company from a broad range of potential acquirers.
Pebble Partnership continues to advance Prefeasibility Study and prepare for permitting
The Pebble Partnership continues to advance engineering and project design initiatives for the Pebble Project. This effort will be informed by input received from project stakeholders through public consultation forums undertaken in Alaska prior to the completion of a Prefeasibility Study and the submission of permit applications. At this time, it is expected that the Pebble Partnership will complete a Prefeasibility Study for the Pebble Project in 2012, prior to initiating permitting under NEPA.
Permitting will be initiated when the Pebble Partnership submits its Project Description and Environmental Baseline Document. These documents will provide the basis for an Environmental Impact Statement ("EIS") to be prepared. The EIS will be prepared by a third-party contractor under the direction of a lead federal agency. The Pebble EIS will be the focal point for project permitting. It will determine whether sufficient evaluation of the project’s potential environmental/socioeconomic effects and development alternatives has been undertaken, and will provide the basis for federal, state and local government agencies to make individual permitting decisions.
The Pebble Partnership has budgeted US$91 million for a comprehensive work program in 2011 to advance the Prefeasibility Study for the Pebble Project, finalize the Environmental Baseline Document, continue its community engagement and workforce development programs and prepare for permitting under NEPA.
Corporate
Northern Dynasty has cash and cash equivalents on hand of $41.8 million for its operating requirements. With the project funding that has been approved by Anglo American for 2011, and given its holdings of cash and cash equivalents, management believes that the Company has sufficient capital resources to cover its short to medium term cash requirements.
1.2.1.2 Limited Partnership Established to Advance the Pebble Project
On July 26, 2007, the Company converted a wholly-owned general partnership that held its Pebble property interests into a limited partnership, the Pebble Partnership. Anglo American subscribed for 50% of the Pebble Partnership's equity effective July 31, 2007. The Company (through a wholly-owned affiliate) and Anglo American effectively have equal rights in the Pebble Partnership. To maintain its 50% interest in the Pebble Partnership, Anglo American is required to commit staged cash investments into the Pebble Partnership aggregating to US$1.5 billion.
Page 7
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Anglo American’s staged investment requirements include an initial minimum expenditure of US$125 million (completed in 2008) towards a prefeasibility report. The prefeasibility report is to be approved by the Board of the general partner (Pebble Mines Corp.), and is to summarize all previous prefeasibility studies. After receipt of the approved prefeasibility report, Anglo American is required, in order to retain its 50% interest in the Pebble Partnership, to commit within 90 days to further expenditures which would bring its total investment to at least US$450 million, which amount is to be expended towards producing a final feasibility study and related activities, the completion of which is expected to take the Pebble Partnership to a production decision. Upon an affirmative decision by the Pebble Partnership to develop a mine, Anglo American is required to commit to the remaining portion of the total investment of US$1.5 billion in order to retain its interest in the Pebble Partnership. Following completion of the US$1.5 billion expenditure, any further expenditure will be funded by Anglo American and the Company (through its affiliate) on a 50:50 basis (subject to dilution for non-contribution). The Pebble Partnership agreement provides for equal project control rights with no operator’s fees payable to either party.
The Company determined that its investment in the Pebble Partnership qualifies as an interest in a jointly controlled entity in accordance with IAS 31,Interests in Joint Ventures. The Company applies the equity method to account for its interest in the Pebble Partnership.
Anglo American’s cash contribution since the formation of the Pebble Partnership on July 31, 2007 to March 31, 2011 amounts to $347.9 million (US$327.7 million).
The corporate office of the Pebble Partnership is located in Anchorage, Alaska. The Alaska-based operations are guided by the Board of the general partner with equal representation from Anglo American and Northern Dynasty.
1.2.1.3 Technical Programs
Exploration of the Pebble Project has revealed that the property is underlain by an extensive, northeast-trending mineralized system.
Following successful exploration of the Pebble deposit and surrounding mineral property by Northern Dynasty between 2001 and 2003, comprehensive technical programs, including drilling, engineering, environmental and socioeconomic studies focused on advancing the Pebble deposit have been underway since 2004. Since mid-2007, these programs have been carried out by the Pebble Partnership.
1.2.1.3.1 2011 Preliminary Assessment for Northern Dynasty
On February 17, 2011, Wardrop issued an independent 43-101-compliant Preliminary Assessment Technical Report on the Pebble Project. The Preliminary Assessment is based on concept, pre-feasibility and feasibility-level technical and engineering studies completed by the Pebble Partnership and Northern Dynasty. The economic assessments and other opinions expressed in the Preliminary Assessment are strictly those of Northern Dynasty and Wardrop, and do not reflect the views of any pro Pebble interests in the project. The Pebble Partnership continues to separately undertake detailed engineering studies toward the completion of a prefeasibility report for the Pebble Project, including ongoing programs to engage project stakeholders in the planning process. As such, any project which is ultimately put forward by the Pebble Partnership for permitting under the NEPA may differ from those mine models presented in the Preliminary Assessment.
Page 8
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
The Preliminary Assessment Technical Report describes and assigns potential economic value for three successive development cases:
1. | An Investment Decision Case (“IDC Case”), which describes an initial 25-year open pit mine life upon which a decision to initiate mine permitting, construction and operations may be based; |
| |
2. | A Reference Case, which is based on 45 years of open pit mine production; and |
| |
3. | A Resource Case, which is based on 78 years of open pit mine production and seeks to assess the longer-term value of the project in current dollars. |
The 25-year IDC Case is the only scenario for which a tailings storage facility has been comprehensively engineered, although preliminary engineering studies have identified a number of suitable sites nearby to receive tailings after 25 years. Ongoing investigations would be undertaken during the first 25 years of mining, including construction of an early access shaft and assessing the possibility of underground mining to determine the optimal mining method and plan for subsequent phases of development.
For the purposes of its Preliminary Assessment, Wardrop has selected the 45-year Reference Case as its base case. All currency values are in US dollars. Production rates are stated in imperial tons. Mineral Resources are stated in metric tonnes.
The Preliminary Assessment, in part, uses inferred mineral resources which are considered too speculative geologically to be categorized as mineral reserves and to have economic considerations applied to them. There can be no assurance that the operating and financial projections contained in the Preliminary Assessment will be realized.
Page 9
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Key Parameters and Findings
• | The Preliminary Assessment is based on a mineral resource estimate announced in February 2010. At a 0.30% CuEQ2cutoff, there are: |
| |
| 5.94 billion tonnes of measured and indicated resources grading 0.42% copper, 0.35 g/t goldand 250 ppm molybdenum (0.78% CuEQ), and containing 55 billion pounds of copper, 67 million ounces of gold, and 3.3 billion pounds of molybdenum, including |
| |
| - 527 million tonnes of measured resources grading 0.33% Cu, 0.35 g/t Au and 178 ppm Mo and |
| - 5,414 million tonnes of indicated resources grading 0.43% Cu, 0.35 g/t Au and 257 ppm Mo; |
| |
| and 4.84 billion tonnes of inferred resources grading 0.24% copper, 0.26 g/t gold and 215 ppmmolybdenum (0.53% CuEQ), and containing 25.6 billion pounds of copper, 40.4 million ounces of gold, and 2.3 billion pounds of molybdenum. |
| |
• | The Pebble deposit would support open pit mining utilizing conventional drill, blast and truck-haul methods, with an initial mine life of 25 years and potential for mine extensions to 78 years and beyond. |
| |
• | The potential exists for underground block cave development at a mining rate of 150,000 tons per day to emerge as the preferred mining method for phases of development beyond 25 years. |
| |
• | The process plant would employ conventional crush-grind-float technology and equipment with a nominal throughput of 200,000 tons per day, as well as secondary gold recovery. Average mill throughput for the first 25 years would be 219,000 tons per day, rising to 229,000 tons per day for the 45-year and 78-year cases. |
| |
• | Other project facilities and infrastructure would include: a 378 megawatt natural gas-fired turbine plant at the mine site; an 86-mile transportation corridor to Cook Inlet for road and pipeline rights-of- way; and a new deep-water port on Cook Inlet. |
| |
• | Construction of the Pebble Project would take four years, and employ a peak labour force of 2,080. The operations workforce averages 1,120 over the first 25 years of mining. |
| |
• | The 45-year Reference Case processes 3.8 billion tons of material with a strip ratio of 2.1:1 and average grades of 0.46% copper, 0.011 oz gold per ton and 214 ppm molybdenum. |
| |
• | The 45-year Reference Case produces 31 billion lb copper, 30 million oz gold, 1.4 billion lb molybdenum, 140 million oz silver, 1.2 million kg rhenium and 907,000 oz palladium, while developing 32% of the total Pebble mineral resource. |
| |
• | Economic valuations are expressed in US dollars in real terms utilizing long-term metal prices of $2.50/lb copper, $1,050/oz gold, $13.50/lb molybdenum, $15/oz silver, $3,000/kg rhenium and $490/oz palladium. |
__________________________________________________
2Mineral resources are within a volume or shell defined by long-term metal price estimates of $2.50/lb copper, $900/oz gold and $25/lb molybdenum. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Copper equivalent calculations for the resource estimate used metal prices of $1.85/lb for copper, $902/oz for gold and $12.50/lb for molybdenum, and metallurgical recoveries of 85% for copper 69.6% for gold, and 77.8% for molybdenum in the Pebble West area and 89.3% for copper, 76.8% for gold, 83.7% for molybdenum in the Pebble East area. Recovery values reflect average results of metallurgical testwork completed to the date of the estimate and are subject to revision pending ongoing metallurgical studies. Revenue is calculated for each metal based on grades, recoveries and selected metal prices; accumulated revenues are then divided by the revenue at 1% copper. Recoveries for gold and molybdenum are normalized to the copper recovery as shown below:
CuEq (Pebble West) = Cu % + (Au g/t x 69.6%/85% x 29.00/40.79) + (Mo % x 77.8%/85% x 75.58/40.79)
CuEq (Pebble East) = Cu% + (Au g/t x 76.8%/89.3% x 29.00/40.79)+ (Mo % x 83.7%/89.3% x 5.58/40.79)
Page 10
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
• | Annual cash flows are calculated and subsequently discounted at a rate of 7%. Market convention generally uses a discount rate of 8% for copper and other base metal projects and 5% for gold and other precious metal projects. Given the large contribution of gold to total revenues at Pebble, a 7% blended discount rate has been selected. |
| |
• | For the Pebble Project, the 45-year Reference Case yields a 14.2% pre-tax IRR, a 6.2-year payback on initial capital investment and a $6.1 billion pre-tax NPV at long-term metal prices. At current prevailing metal prices, the 45-year Reference Case yields a 23.2% pre-tax IRR, a 3.2-year payback on initial capital investment and a $15.7 billion pre-tax NPV at a 7% discount rate. |
| |
• | For Northern Dynasty’s 50% interest in the Pebble Project, the 45-year Reference Case yields an 18% pre-tax and 15.4% post-tax IRR, a 4.7-year pre-tax and 5.3-year post-tax payback on initial capital investment, and a $3.6 billion pre-tax and $2.4 billion post-tax NPV at a 7% discount rate at long-term metal prices. At current prevailing metal prices, Northern Dynasty’s 50% interest in the Pebble Project yields an 30.2% pre-tax and 25.1% post-tax IRR, a 2.6-year pre-tax and 3.1-year post-tax payback on initial capital investment and an $8.3 billion pre-tax and $5.6 billion post-tax NPV at a 7% discount rate. |
| |
• | Initial capital expenditures for all three development cases are estimated at $4.7 billion, excluding capital costs associated with outsourced power, road and port infrastructure. Sustaining capital requirements for the 45-year Reference Case are estimated to be $6.14 billion. |
| |
• | Operating costs for the 45-year Reference Case average $966 million per year and total $43.5 billion over the life of the mine. Operating costs per ton milled average $11.55 for the 45-year Reference Case, while cash costs per payable pound of copper, after by-product credits, are minus $0.11. |
| |
• | At long term metal prices, Net Smelter Return ("NSR") for the 45-year Reference Case averages $2.67 billion per year and totals $120.2 billion over the life of mine. NSR per ton milled for the 45-year Reference Case averages $31.91. |
| |
• | For the 45-year Reference Case, at long term metal prices 56% of NSR would be derived from copper, 24% from gold, 16% from molybdenum and 4% from other metals (silver, rhenium and palladium). |
Qualified Persons for the Preliminary Assessment Technical Report include Hassan Ghaffari, P.Eng, Robert Morrison, P.Geo, Andre de Ruijter, P.Eng, Tysen Hantelmann, P.Eng, Aleksandar Zivkovic, P.Eng, and Scott Cowie, MAusIMM; Doug Ramsey, P.R. Bio is author of sustainability section. All of these qualified persons are independent of Northern Dynasty.
Additional details on the Preliminary Assessment are described in Northern Dynasty’s 2010 Annual Information Form and the February 2011 Preliminary Assessment Technical Report, both of which are posted on the Company’s profile at www.sedar.com.
Page 11
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.2.1.3.2 Pebble Partnership Studies toward Prefeasibility Study
The Pebble Partnership has assembled an experienced engineering and permitting team for the Pebble Project, consisting of more than 20 senior engineers and technical specialists (many of whom are from the Anglo American group or Northern Dynasty), as well as engineering firms and specialized consultancies from around the world.
Exploration and Drilling
Site work in 2011 will be focused on drilling for engineering studies, and support for environmental field work. The drilling programs are designed to collect information around planned infrastructure, to complete condemnation studies and metallurgical testwork, and to further test groundwater conditions and overburden characteristics in the pit area. Further assessment of the resource model is planned between the East and West zones.
Engineering
The current phase of the engineering program consists of completion of the prefeasibility study for the Pebble Project, with delivery of the study expected in 2012. This work commenced during the current quarter, and began with updating of the schedule and estimate of cost for 2011 work. In addition, a number of key consultants were engaged for the study and the selection process of the primary engineering contractor was well advanced during the quarter, with final selection expected in Q2.
Mining
A mining engineering consultant was engaged during the current quarter and commenced with the open pit optimization study. Additional analysis was conducted to support this effort, particularly with respect to definition of optimization parameters and geotechnical considerations. The optimization planning will extend through Q2, with prefeasibility design work commencing thereafter.
Previous work had identified that autonomous haulage presented a significant opportunity for Pebble. Further analysis of this opportunity continued during the quarter.
Metallurgy
Metallurgical testwork continued during the quarter, and focused on secondary gold and molybdenum recovery. The goal of this work is to provide criteria for the prefeasibility design of these components of the project, and is expected to be completed during Q2, in time to support the prefeasibility study, following the selection of the primary engineering contractor.
Further analyses of geo-metallurgical domains were ongoing during the quarter. As they became available, the results from these studies were used to update the mine optimization parameters and process.
Waste and Water Management
The consultant responsible for the prefeasibility assessment of waste and water management commenced their work during the quarter. Key milestones achieved during the quarter included development of preliminary alternatives for the waste rock site configurations and development of the 2011 site investigation program to support the prefeasibility study design. Efforts to review and update the design and operating criteria for the tailings storage facility also commenced during the quarter.
Page 12
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Infrastructure
The process to engage consultants for the major infrastructure components, including the access road, port and power supply commenced and was well advanced by the end of the quarter.
Instruments to measure metocean data (waves, current) at the proposed port site had been placed during late 2010; and these instruments were retrieved in January 2011. Once the data was downloaded, the instruments were redeployed. A second data collection exercise will occur during the second quarter. The information derived from these data collection programs will be important for designing the port facilities and the section of the access road that lie near the port site.
Environmental and Socioeconomic Studies
Comprehensive environmental and socioeconomic baseline study programs are ongoing at the Pebble Project, with the objectives of collecting data in the Pebble Project area and comparing annual variability. This data provides a foundation for the sound environmental design of the project and preparation of state and federal permit applications in future years. The 2010 field programs primarily focused on hydrology, water quality and fish resources.
The Environmental Baseline Document ("EBD") is being finalized by the Pebble Partnership for expected public release during 2011. This document will be submitted with permit applications once mine engineering and a proposed development plan are completed. The EBD will present information and analysis on baseline physical, chemical, biological and social conditions based upon ongoing data collection by the Pebble Project environmental study team since 2004. Its purpose is to provide the public, regulatory agencies and the Pebble Partnership with a detailed compendium of pre-development environmental and socioeconomic conditions in the project area.
Cultural Resource Studies
Cultural resource studies have been carried out by the Pebble Partnership on all areas that might be affected by the project, with the exception of possible road and port locations. Examination of the road and port sites will be undertaken once a decision is made regarding the exact location of these project features.
Community Engagement
An active program of stakeholder outreach continued throughout 2010, and included community meetings, stakeholder visits, presentations and event appearances, as well as stakeholder tours to the Pebble Project site and to operating mines in the United States. The focus of these outreach activities is to update stakeholders on the Pebble Project, to receive feedback on stakeholder priorities and concerns, and to advise participants about modern mining practices. The 2010 site tours ran for five months in 2010 and hosted 53 tour groups, which included 197 stakeholders.
The Pebble Partnership has a number of other initiatives underway to enhance stakeholder relationships, including:
1. | ThePebble Fund for Sustainable Bristol Bay Fisheries & Communities– Established in 2008 with a five-year, US$5 million commitment, the goal of the Pebble Fund is to enhance the health and sustainability of regional fisheries and the communities they support. Grants are determined based on criteria and selections made by an advisory board comprised of citizens from communities throughout the Bristol Bay region. The fourth round of grants was announced in April 2011, when $778,250 was awarded to 18 worthy community development projects in southwest Alaska. The Pebble Fund has supported 83 community-based projects throughout southwest Alaska via grants totaling more than US$3.25 million, while leveraging nearly US$12 million in matching funds from other organizations. |
Page 13
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
2. | An independent stakeholder dialogue process concerning the Pebble Project was initiated in late 2010 by the Keystone Center – a non-profit organization specializing in facilitating stakeholder- driven consultation processes concerning contentious, science-based issues. From December 3, 2010, the Keystone Process will convene Independent Science Panels of respected experts in a range of technical, scientific and sociological fields to review environmental and socioeconomic data compiled by the Pebble Partnership for the purpose of project engineering and permitting, while providing expert insight to Pebble Project stakeholders. |
The Pebble Partnership stakeholder relations plans for 2011 include a continuation of local community and state-wide stakeholder engagement, public education programming, as well as the stakeholder tour program. The Pebble Fund program will continue with the possible introduction of a ‘micro-loan’ program to support the development of sustainable local businesses. A total of four Independent Science Panel events are planned for the fall of 2011 as part of the Keystone process, to review the Pebble Partnership’s environmental baseline studies. As the Pebble Project advances toward the completion of a prefeasibility study and preparation for project permitting under NEPA, it is expected that the Pebble Partnership will initiate a broad-based public consultation program to involve stakeholders in the process by which the project is being designed.
Employment and Workforce Development
The Pebble Partnership is one of the most important private sector employers in southwest Alaska. To the end of December 2010, a total of 372 Alaskans have been employed at the Pebble Project.
Employee training and further workforce development initiatives continue to expand. Workforce development initiatives at the Pebble Project include the provision of training in the areas of equipment operations, health, safety and environment. Working with the U.S. and Alaska Departments of Labour, the Pebble Partnership has established the first-ever registered apprenticeship training program to help local drill helpers become certified drillers. The Company is also investing in programs to train local workers to become environmental technicians, emergency medical technicians and bear guards. In addition, scholarships are available to high school students from the Bristol Bay region that are interested in pursuing studies at college and vocational/technical schools in the fields of project management, operations, geology, science, engineering and other areas of responsible resource development.
The Pebble Partnership expects to complete and publicly release a Workforce Development strategy for the Pebble Project in 2011, to identify long-term education, training and recruitment programs and partnerships to ensure appropriately qualified and skilled workers are available to construct and operate the Pebble Project, and to fulfill its local hire commitments.
1.2.1.4 Legal Matters
A lawsuit filed on July 29, 2009, in Anchorage Superior Court by Trustees for Alaska (an environmental law firm) on behalf of certain activists asserts that the Alaska Department of Natural Resources violated Alaska’s Constitution by granting exploration and temporary water use permits to the Pebble Partnership. Neither the Company nor the Pebble Partnership is named as a party; however, the Pebble Partnership has been granted intervener status in the case. While plaintiffs had requested a preliminary injunction to halt exploration activity at Pebble until the case is resolved, the court denied this request on November 27, 2009, and drilling has continued. The Superior Court heard the Trustees’ constitutional challenge in December 2010. Pending final submissions from the plaintiffs, it is expected to issue a final ruling within six months. The lawsuit is considered unlikely to succeed as it seeks to overturn the State’s regulatory regime for resource management in Alaska.
Page 14
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
On February 23, 2011, the Company issued a news release announcing that it was in receipt of a new independent Preliminary Assessment of the Pebble Project, which is based on the information generated and provided by the Pebble Partnership and Northern Dynasty. The information provided by the Pebble Partnership and the Preliminary Assessment constitute a material change in the affairs of the Company because it changed the technical parameters and estimated net present value of the property by billions of dollars from the last such assessment done in 2004. Anglo American, the other 50% partner in the Pebble Partnership, has asserted that the news release contained confidential information which is the property of the Pebble Partnership and was not authorized to be released, and Anglo American reserves all rights to claim that the release has damaged Anglo American and/or the Pebble Partnership. The Company has received legal advice that the news release was a permitted disclosure under the various agreements with Anglo American, and its issuance was a mandatory requirement under Canadian and US regulatory requirements. The Company does not believe that Anglo American’s allegations have any merit; however, it cannot give assurances about future events or actions by Anglo American.
1.2.2 Other Properties
1.2.2.1 South Pebble, SP and KAK Claims
Agreement between Full Metal Minerals and the Pebble Partnership
The Pebble Partnership entered into a letter agreement (the "FMM Agreement") with Full Metal Minerals Corp. and its subsidiary Full Metal Minerals (USA) Inc. (together, "FMM") in September 2010, which is subject to due diligence by the Pebble Partnership. In the event that any issues uncovered by the Pebble Partnership during its due diligence review are satisfactorily resolved and the FMM Agreement becomes binding, the Pebble Partnership can earn a 60% interest in FMM’s South Pebble Claims (the "FMM Properties"), by incurring exploration expenditures of at least US$3 million and making annual payments of US$50,000 to FMM over a period ending on December 31, 2013. The venture between FMM and the Pebble Partnership will be in the form of a limited liability company ("LLC") operated by the Pebble Partnership.
For the duration of the earn-in period and the term of the LLC, the Pebble Partnership will have an option to select and purchase claims that form part of the FMM Properties (the "Purchased Claims") at a price of US$25 per acre, provided that the Purchased Claims are declared or agreed to be outside of the current scope of the LLC, constitute no more than 20,000 acres, constitute a continuous block of claims and are located outside an "Exclusion Area" specified in the FMM Agreement.
The FMM Properties total 542 claims covering approximately 135 square miles and located west and northwest of the ground held 100% by the Pebble Partnership; 99 of these claims, covering an area of 24.3 square miles, form the "Exclusion Area".
Under the FMM Agreement, the Pebble Partnership was required to complete a Z-Axis Tipper Electromagnetic Technique ("ZTEM") airborne survey over the FMM Properties (completed) and make annual payments of US$50,000 to FMM (first payment made).
Page 15
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.2.2.2 Big Chunk North and South and Bonanza Hills Claims
Northern Dynasty’s Purchase and Option Agreement with Liberty Star
On June 29, 2010, Northern Dynasty entered into an agreement with Liberty Star Uranium and Metals Corp. and its subsidiary, Big Chunk Corp. (together, "Liberty Star"), pursuant to which Liberty Star sold 23.8 square miles of claims, the "Purchased Claims", to a US subsidiary of Northern Dynasty in consideration for both a US$1 million cash payment and a secured convertible loan from Northern Dynasty in the amount of US$3 million which accrues interest at 10% per annum compounded monthly (the "Loan"). The Loan is repayable, in cash or convertible into Liberty Star shares, after Northern Dynasty has spent at least US$1 million earning into the joint venture. As of the date of this MD&A, Northern Dynasty has not spent US$1 million.
In addition, subject to negotiating and signing a definitive earn-in option and joint venture agreement, Northern Dynasty can earn a 60% interest in Liberty Star’s remaining Big Chunk and Bonanza Hills projects in Alaska by spending US$10 million on those properties over six years. The Loan may be applied as part of the earn-in requirements, at Northern Dynasty’s discretion. As of the date of this MD&A, Northern Dynasty and Liberty Star have not entered into a joint venture agreement. The Pebble Partnership had the right but declined to acquire the Purchased Claims.
The total area of the properties is 186.7 square miles, and includes 95 Purchased Claims; 428 Big Chunk South claims (102.9 square miles); 184 Big Chunk North claims (46 square miles); and 56 Bonanza Hills claims (14 square miles). All are located in the vicinity of Pebble.
In 2010, Northern Dynasty funded helicopter borne ZTEM and aeromagnetic geophysical surveys over the Big Chunk North and Bonanza Hills properties and a two-hole air rotary drill program on the Big Chunk South property.
Page 16
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.2.3 Market Trends
Copper prices showed a significant increase between late 2003 and mid-2008, and after a steep decline in late 2008 and early 2009, have been steadily increasing since that time.
Although the gold price has dropped from time to time, over the past five years, the average annual price has steadily increased. This upward trend accelerated in 2009 in response to the global economic uncertainty that began in mid-2008.
Molybdenum prices have been more volatile than gold or copper, beginning an upward trend in 2003 that reached a peak of US$34/lb in October 2005, decreasing through 2006, then rising in 2007 until the latter part of 2008, when they dropped significantly. This decrease continued until May 2009. Since that time, prices have been variable, but on an overall upward trend.
Average annual prices as well as the average price so far in 2011 for copper, gold and molybdenum are shown in the table below:
Year | Average metal price (US$) |
Copper | Gold | Molybdenum |
2008 | 3.16/lb | 871/oz | 29.70/lb |
2009 | 2.34/lb | 974/oz | 11.29/lb |
2010 | 3.42/lb | 1,228/oz | 15.87/lb |
2011 (to the date of this MD&A) | 4.33/lb | 1,422/oz | 17.19/lb |
Source: LME Official Cash Price as provided at www.metalprices.com
Page 17
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.3 Selected Annual Information
The following consolidated financial statements have been prepared in accordance with IFRS as issued by the International Accounting Standards Board ("IASB") and interpretations of the IFRS Interpretations Committee ("IFRIC"). The Company adopted and transitioned to IFRS as of January 1, 2008. All figures are expressed in thousands of Canadian dollars, except per share amounts.
| | As at | | | As at | | | As at | |
| | December 31 | | | December 31 | | | December 31 | |
Statements of Financial Position | | 2010 | | | 2009 | | | 2008 | |
Property, plant and equipment | $ | – | | $ | – | | $ | 11 | |
Investment in the Pebble Partnership | | 99,306 | | | 104,937 | | | 121,611 | |
Mineral property interests | | 1,055 | | | – | | | – | |
Current assets | | 43,886 | | | 45,133 | | | 46,282 | |
Total assets | | 144,247 | | | 150,070 | | | 167,904 | |
Shareholders’ equity | | 140,060 | | | 146,070 | | | 163,315 | |
Other liabilities | | 3,633 | | | 3,807 | | | 4,441 | |
Current liabilities | | 554 | | | 193 | | | 148 | |
Total shareholders’ equity and liabilities | | 144,247 | | | 150,070 | | | 167,904 | |
Working capital | $ | 43,332 | | $ | 44,940 | | $ | 46,134 | |
| | Year ended | | | Year ended | | | Year ended | |
Expenses (income) | | December 31 2010 | | | December 31 2009 | | | December 31 2008 | |
Conference and travel | $ | 288 | | $ | 349 | | $ | 273 | |
Depreciation | | – | | | – | | | 4 | |
Donations | | 12 | | | 445 | | | – | |
Exploration | | 1,800 | | | 321 | | | 408 | |
Insurance | | 248 | | | 263 | | | 407 | |
Legal, accounting and audit | | 274 | | | 354 | | | 370 | |
Office costs | | 653 | | | 331 | | | 226 | |
Salaries | | 2,188 | | | 1,453 | | | 1,381 | |
Shareholder communication | | 431 | | | 750 | | | 384 | |
Trust and filing | | 224 | | | 199 | | | 235 | |
Foreign exchange loss (gain) | | 138 | | | 130 | | | (9,130 | ) |
Deferred income tax expense (recovery) | | 30 | | | (25 | ) | | – | |
Impairment of marketable securities | | – | | | 15 | | | – | |
Impairment of property, plant and equipment (“PPE”) | | – | | | 11 | | | – | |
Interest income | | (544 | ) | | (335 | ) | | (1.115 | ) |
Share-based compensation | | 8,373 | | | 8,479 | | | 7,707 | |
Loss for the year | $ | 14,115 | | $ | 12,740 | | $ | 1,150 | |
| | | | | | | | | |
Basic and diluted loss per common share | $ | 0.15 | | $ | 0.14 | | $ | 0.01 | |
Weighted average number of common shares outstanding | | 93,779 | | | 92,828 | | | 92,544 | |
Page 18
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.4 Summary of Quarterly Results
Figures are expressed in thousands of Canadian dollars, except per share amounts. Small differences are due to rounding.
| | Mar 31 | | | Dec 31 | | | Sep 30 | | | Jun 30 | | | Mar 31 | | | Dec 31 | | | Sep 30 | | | Jun 30 | |
| | 2011 | | | 2010 | | | 2010 | | | 2010 | | | 2010 | | | 2009 | | | 2009 | | | 2009 | |
Other assets | $ | 1,055 | | $ | 1,055 | | $ | 1,055 | | $ | 1,055 | | $ | – | | $ | – | | $ | – | | $ | 1 | |
Equity investment in PLP | | 96,810 | | | 99,306 | | | 102,741 | | | 106,295 | | | 101,423 | | | 104,937 | | | 106,904 | | | 116,120 | |
Current assets | | 45,302 | | | 43,886 | | | 43,421 | | | 44,955 | | | 46,632 | | | 45,133 | | | 45,236 | | | 45,641 | |
Total assets | | 143,167 | | | 144,247 | | | 147,217 | | | 152,305 | | | 148,055 | | | 150,070 | | | 152,140 | | | 161,762 | |
| | | | | | | | | | | | | | | | | | | | | | | | |
Equity | | 139,261 | | | 140,060 | | | 143,287 | | | 148,305 | | | 144,322 | | | 146,070 | | | 151,797 | | | 161,693 | |
Other liabilities | | 3,542 | | | 3,633 | | | 3,737 | | | 3,825 | | | 3,645 | | | 3,807 | | | – | | | – | |
Current liabilities | | 364 | | | 554 | | | 193 | | | 175 | | | 88 | | | 193 | | | 343 | | | 69 | |
Total shareholders’ equity andliabilities | | 143,167 | | | 144,247 | | | 147,217 | | | 152,305 | | | 148,055 | | | 150,070 | | | 152,140 | | | 161,762 | |
| | | | | | | | | | | | | | | | | | | | | | | | |
Working capital | | 44,938 | | | 43,332 | | | 43,228 | | | 44,780 | | | 46,544 | | | 44,940 | | | 44,893 | | | 45,572 | |
| | | | | | | | | | | | | | | | | | | | | | | | |
Comprehensive Loss | | | | | | | | | | | | | | | | | | | | | | | | |
Expenses | | | | | | | | | | | | | | | | | | | | | | | | |
Conference and travel | | 103 | | | 61 | | | 44 | | | 55 | | | 128 | | | 59 | | | 101 | | | 79 | |
Depreciation | | – | | | – | | | – | | | – | | | – | | | (12 | ) | | 2 | | | 1 | |
Donations | | – | | | 4 | | | 5 | | | – | | | 3 | | | – | | | – | | | – | |
Exploration | | 316 | | | 850 | | | 653 | | | 150 | | | 147 | | | 241 | | | 11 | | | 17 | |
Foreign exchange loss (gain) | | 79 | | | 112 | | | 110 | | | (105 | ) | | 21 | | | 12 | | | 74 | | | 86 | |
Insurance | | 67 | | | 61 | | | 61 | | | 62 | | | 64 | | | 66 | | | 65 | | | 65 | |
Impairment on marketable securities | | – | | | – | | | – | | | – | | | – | | | 15 | | | – | | | – | |
Legal, accounting and audit | | 53 | | | 122 | | | 86 | | | 36 | | | 30 | | | 128 | | | 130 | | | 55 | |
Office costs | | 197 | | | 137 | | | 183 | | | 226 | | | 107 | | | 33 | | | 53 | | | 168 | |
Salaries | | 622 | | | 436 | | | 580 | | | 747 | | | 425 | | | 249 | | | 361 | | | 393 | |
Shareholder communication | | 176 | | | 77 | | | 98 | | | 158 | | | 98 | | | 113 | | | 230 | | | 213 | |
Share-based compensation | | 6,501 | | | 1,588 | | | 1,543 | | | 4,340 | | | 902 | | | 1,346 | | | 1,313 | | | 1,352 | |
Trust and filing | | 181 | | | 7 | | | 10 | | | 42 | | | 165 | | | 7 | | | 18 | | | 28 | |
Total before undernoted | | 8,295 | | | 3,455 | | | 3,373 | | | 5,711 | | | 2,090 | | | 2,257 | | | 2,358 | | | 2,457 | |
| | | | | | | | | | | | | | | | | | | | | | | | |
Interest income | | (197 | ) | | (198 | ) | | (175 | ) | | (90 | ) | | (81 | ) | | (89 | ) | | (111 | ) | | (47 | ) |
Impairment loss on PPE | | – | | | – | | | – | | | – | | | – | | | 11 | | | – | | | – | |
Deferred income tax | | – | | | 21 | | | 41 | | | 3 | | | (35 | ) | | (25 | ) | | – | | | – | |
Loss for the period | | 8,098 | | | 3,278 | | | 3,239 | | | 5,624 | | | 1,974 | | | 2,154 | | | 2,247 | | | 2,410 | |
Loss (gain) on marketable securities | | – | | | 1 | | | (1 | ) | | 1 | | | – | | | – | | | 2 | | | (1 | ) |
Exchange difference on translation of the Pebble Partnership | | 2,496 | | | 3,435 | | | 3,554 | | | (4,872 | ) | | 3,514 | | | 1,967 | | | 9,216 | | | 9,815 | |
Deferred income tax | | (91 | ) | | (124 | ) | | (129 | ) | | 176 | | | (127 | ) | | (609 | ) | | – | | | – | |
Comprehensive loss | $ | 10,503 | | $ | 6,590 | | $ | 6,663 | | $ | 929 | | $ | 5,361 | | $ | 3,512 | | $ | 11,465 | | $ | 12,224 | |
| | | | | | | | | | | | | | | | | | | | | | | | |
Basic and diluted loss per common share | $ | 0.09 | | $ | 0.03 | | $ | 0.03 | | $ | 0.06 | | $ | 0.02 | | $ | 0.02 | | $ | 0.02 | | $ | 0.03 | |
| | | | | | | | | | | | | | | | | | | | | | | | |
Weighted average number of common shares outstanding YTD (thousands) | | 94,567 | | | 93,973 | | | 93,857 | | | 93,815 | | | 93,254 | | | 93,063 | | | 92,958 | | | 92,728 | |
Page 19
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.5 Results of Operations
The following financial data has been prepared in accordance with IFRS as issued by the IASB and interpretations of the IFRS Interpretations Committee ("IFRIC") and are expressed in Canadian dollars unless otherwise stated.
The Company’s operations and business are not driven by seasonal trends, but rather the achievement of project milestones such as the achievement of various technical, environmental, socio-economic and legal objectives, including obtaining the necessary permits, completion of pre-feasibility and final feasibility studies, preparation of engineering designs, as well as receipt of financings to fund these objectives along with mine construction.
1.5.1 Results of Comprehensive Loss for the Quarter Ended March 31, 2011 vs. 2010
Loss was $8.1 million for the current quarter as compared to $2.0 million in the comparative period of 2010. The increase was mainly attributable to higher share-based compensation recognized in the current quarter.
Share-based compensation is measured by determining the fair value of the share purchase options at the grant date for each tranche and is recognized over the period during which the share purchase option vests. Share-based compensation increased to $6.5 million from $0.9 million in 2010 as a result of the Company granting options in the current quarter as compared to 2010 when share purchase options were only granted in Q2 of 2010. The weighted average grant date fair value per share purchase option was $6.56 determined using the Black Scholes model with the following weighted average assumptions: risk free rate of 2.29%; expected volatility of 64% and expected life of 4.15 years.
The Company recorded exploration costs of $0.3 million (2010 – $0.1 million) and salaries of $0.6 million (2010 – $0.4 million) during the quarter as it completed and issued an independent Preliminary Assessment Technical Report in February 2010 and incurred costs relating to the analysis thereof.
As a result of the appreciation of the Canadian dollar against the US dollar from approximately 1USD=0.99CAD at January 1, 2011 to 1USD=0.97CAD at March 31, 2011, the Company recorded an exchange loss of $2.5 million in other comprehensive loss related to the exchange difference on the equity investment in the Pebble Partnership, which has a US dollar functional currency. This compared to the loss recognized in 2010 of $3.5 million when the Canadian dollar strengthened from 1USD=1.05CAD at January 1, 2010 to 1USD=1.02CAD at March 31, 2010.
1.5.2 Financial position as at March 31, 2011 vs. December 31, 2010
The Company’s total assets decreased to $143.2 million from $144.2 million. The decrease was mainly attributable to the decrease in the carrying value of the Group’s investment in the Pebble Partnership as a result of the exchange loss of $2.5 million recognized on translation (refer 1.5.1) . Cash and cash equivalents increased by $1.4 million as the Company received proceeds of $3.2 million from the issue of shares on exercise of share purchase options and utilized $2.0 million in its operations.
1.5.3 Investment in the Pebble Partnership
As indicated in section 1.2.1.2, the Company has determined that, in accordance with IFRS, it has joint control of the Pebble Partnership and applies the equity method to account for its investment in the Pebble Partnership.
Page 20
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Expenditures incurred on the Pebble Project through the Pebble Partnership are being funded 100% by Anglo American. Anglo American’s total contributions from inception to March 31, 2011, total $347.9 million (US$327.7 million). For the period ended March 31, 2011, the Pebble Partnership incurred losses of $9.8 million (2010 – $10.5 million). Exploration costs in the same period decreased marginally to $8.6 million from $9.1 million in the comparative period of 2010. The Pebble Partnership continues to focus on the preparation of a prefeasibility study for the Pebble Project which is expected to be delivered in 2012. The main exploration expenditures during the period were for:
- engineering (2011 – $2.3 million; 2010 – $2.7 million);
- environmental planning and testing (2011 – $2.5 million; 2010 – $3.0 million);
- site activities (2011 – $2.1 million; 2010 – $1.8 million); and
- public affairs (2011 – $1.6 million; 2010 – $1.6 million).
For further discussion on exploration activities and the technical programs underway on the Pebble Project, please refer to section 1.2.1.3.
1.5.4 Discussion of Quarterly Trends
The Company’s investment in the Pebble Partnership is carried in US dollars. Exchange differences arising from the translation of the Group’s investment in the Pebble Partnership are taken directly to the foreign currency translation reserve in other comprehensive loss. Except for Q2 of 2010, the Company has recorded an exchange loss in other comprehensive loss in seven of the past eight quarters as a result of the depreciation of the US dollar. This has resulted in a decrease in the carrying value of the Company’s investment in the Pebble Partnership on the statements of financial position over the same corresponding period. The following table summarizes the movement in the US dollar to the Canadian dollar and the resulting exchange differences recognized in each quarter:
| | 1CAD for 1USD | |
Period | USD movement to CAD | Start | End | Recognized (gain) loss |
Q2 2009 | Depreciation | $1.26 | $1.16 | $9.8 million |
Q3 2009 | Depreciation | $1.16 | $1.07 | $9.2 million |
Q4 2009 | Depreciation | $1.07 | $1.05 | $2.0 million |
Q1 2010 | Depreciation | $1.05 | $1.02 | $3.5 million |
Q2 2010 | Appreciation | $1.02 | $1.06 | $(4.9) million |
Q3 2010 | Depreciation | $1.06 | $1.03 | $3.6 million |
Q4 2010 | Depreciation | $1.03 | $0.99 | $3.4 million |
Q1 2011 | Depreciation | $0.99 | $0.97 | $2.5 million |
| | | | |
FY 2009 | Depreciation | $1.22 | $1.05 | $16.7 million |
FY 2010 | Depreciation | $1.05 | $0.99 | $5.6 million |
Share-based compensation expense also typically fluctuates based on the timing of share purchase option grants and the vesting periods associated with these grants. The fair value of share purchase options is recognized at the grant date and the compensation expense for each tranche is recognized over the period during which the share purchase option vest. As a result of the vesting of certain tranches of prior share purchase options granted, share-based compensation decreased until Q2 of 2010. In Q2 of 2010, the Company granted new share purchase options which resulted in the increase in share-based compensation recognized. In Q3 and Q4 of 2010, share-based compensation decreased as a result of the vesting of certain tranches of these options and the inclusion of forfeiture rates. In Q1 of 2011, share-based compensation increased as a result of share purchase options granted in the quarter.
Page 21
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.6 Liquidity
Historically, the Company's sole source of funding has been the issuance of equity securities for cash, primarily through private placements to sophisticated investors and institutions. Except for 2008, when the Company issued common shares pursuant to a private placement financing, the Company has in each past year issued common shares pursuant to the exercise of share purchase options. The Company's access to financing is always uncertain. There can be no assurance of continued access to significant equity funding.
The funding of expenditures on the Pebble Project held through the Pebble Partnership is currently being provided by Anglo American (described below). Excluding cash and cash equivalents in the Pebble Partnership, Northern Dynasty has approximately $42 million in cash and cash equivalents for its own operating requirements. With the Pebble Project being funded by Anglo American in the amount of US$91 million for 2011, and given the Company’s holdings of cash and cash equivalents, the Company believes it has sufficient sources to cover its short to medium term cash requirements.
As discussed in section 1.2.2, the Company is in a 50:50 limited partnership with Anglo American. Each of the Company and Anglo American effectively has equal rights in the Pebble Partnership through wholly-owned affiliates. To maintain its 50% interest in the Pebble Partnership, Anglo American is required to make staged cash investments into the Pebble Partnership aggregating to US$1.5 billion. Anglo American completed the initial US$125 million commitment to fund prefeasibility study expenditures in 2008. After approval of the prefeasibility report, in order to retain its 50% interest, Anglo American is required to commit to further expenditures which will bring its total investment to at least US$450 million, which amount is to be expended producing a final feasibility study and in related activities, the completion of which is expected to take the Pebble Partnership to a production decision. Upon an affirmative decision to develop a mine, Anglo American is required to commit to the remaining portion of the total investment of US$1.5 billion in order to retain its 50% interest in the Pebble Partnership.
At March 31, 2011, the Company had working capital of approximately $45 million as compared to $43.3 million at December 31, 2010.
The Company has no long term debt, capital lease obligations, operating leases or any other long term obligations. The Company has no "Purchase Obligations", defined as any agreement to purchase goods or services that is enforceable and legally binding on the Company that specifies all significant terms, including: fixed or minimum quantities to be purchased; fixed, minimum or variable price provisions; and the approximate timing of the transaction.
The Pebble Partnership has purchase orders for goods and services relating to its activities on the Pebble Project. It also is responsible for all maintenance payments on the property and routine office leases. All costs are funded through existing cash resources in the Pebble Partnership which are being funded by Anglo American and are in the normal course of operations.
The Company is responsible for all maintenance payments on the Purchased Claims (refer 1.2.2.2) . Subject to entering into a definitive joint venture agreement with Liberty Star, the Company would be required to spend US$10 million in exploration and claims maintenance over 6 years.
Page 22
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.7 Capital Resources
The Company has no long-term debt and had 94,750,149 common shares issued and outstanding at March 31, 2011.
The Company had no commitments for material capital expenditures as of March 31, 2011.
The Pebble Partnership, which is being funded by Anglo American, has an approximate US$1.8 million commitment to the Pebble Fund for Sustainable Bristol Bay Fisheries & Communities over the next two years (refer to Community Engagementin 1.2.1.3.2)
The Company has no lines of credit or other sources of financing.
1.8 Off-Balance Sheet Arrangements
None.
1.9 Transactions with Related Parties
The Company and its subsidiaries transact with Hunter Dickinson Services Inc. ("HDSI"), a wholly-owned subsidiary of Hunter Dickinson Inc., a private company which has certain directors and officers in common with the Company. HDSI provides geological, corporate development, administrative and management services to, and incurs third party costs on behalf of the Company pursuant to annually set rates.
Costs for services rendered by HDSI to the Company for the period ended March 31, 2011 were $0.9 million as compared to $0.5 million for the period ended March 31, 2010. The increase over 2010 is due to the Company using resources provided by HDSI to assist with ongoing administration and management of the Company including assisting with the independent preliminary assessment, continuous disclosure obligations, shareholder communications and investor relations, as well as assisting with the Company’s role as partner in the Pebble Partnership. Costs for expenses paid by HDSI and reimbursed by the Company for the period ended March 31 2011 amounted to $0.3 million as compared to $0.2 million for the period ended March 31, 2010.
Compensation paid to key management personnel (directors and senior management comprising the senior Vice President ("VP"), Corporate Development; VP, Engineering and VP, Public Affairs) for the period comprised salaries of $0.4 million (2010 – $0.3 million) and share-based compensation of $3.4 million (2010 – $0.5 million).
1.10 Fourth Quarter
Not applicable.
1.11 Proposed Transactions
There are no proposed asset or business acquisitions or dispositions, other than those in the ordinary course, before the Board of Directors for consideration.
Page 23
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.12 Critical Accounting Estimates
The Company's significant accounting policies are presented in Note 2 in the notes to the consolidated financial statements for the year ended December 31, 2010 and the Interim Financial Statements for the three months ended March 31, 2011. The preparation of these Interim Financial Statements requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities at the end of the reporting period presented and reported amounts of expenses during said reporting period. Actual outcomes could differ from these estimates. The Interim Financial Statements include estimates which, by their nature, are uncertain. The impacts of such estimates are pervasive throughout the Interim Financial Statements, and may require accounting adjustments based on future occurrences. Revisions to accounting estimates are recognized in the period in which the estimate is revised and future periods if the revision affects both current and future periods. These estimates are based on historical experience, current and future economic conditions and other factors, including expectations of future events that are believed to be reasonable under the circumstances.
Significant assumptions about the future and other sources of estimation uncertainty at the end of the reporting period, that could result in a material adjustment to the carrying amounts of assets and liabilities in the event that actual results differ from assumptions made, include, but are not limited to, the following:
i. | the inputs used in accounting for share-based compensation expense in loss; and |
| |
ii. | the provision for the income tax recovery which is included in profit or loss and the composition of deferred income tax liabilities included in the interim statements of financial position. |
1) Mineral resources and the carrying value of the Company’s investment in the Pebble Partnership
Mineral resources are estimated by professional geologists and engineers in accordance with recognized industry, professional and regulatory standards. These estimates require inputs such as future metals prices, future operating costs, and various technical geological, engineering, and construction parameters. Changes in any of these inputs could cause a significant change in the resources estimates which in turn could have a material effect on the carrying value of the Company’s investment in the Pebble Partnership.
2) Impairment analysis of assets
At the end of each reporting period the carrying amounts of the Company’s assets are reviewed to determine whether there is any indication that those assets are impaired. If any such indication exists, the recoverable amount of the asset is estimated in order to determine the extent of the impairment, if any. The recoverable amount is the higher of fair value less costs to sell and value in use. In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset. If the recoverable amount of an asset is estimated to be less than its carrying amount, the carrying amount of the asset is reduced to its recoverable amount and the impairment loss is recognized in the profit or loss for the period. For the purposes of impairment testing, exploration and evaluation assets are allocated to cash-generating units to which the exploration activity relates. For an asset that does not generate largely independent cash inflows, the recoverable amount is determined for the cash generating unit to which the asset belongs.
Recoverability of the carrying amount of the exploration and evaluation assets is dependent on successful development and commercial exploitation, or alternatively, sale of the respective assets.
Page 24
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Changes in any of the assumptions used to determine impairment testing could materially affect the results of the analysis.
At March 31, 2011, the Company reviewed the carrying value of its assets and determined that there were no indicators of impairment.
3) Restoration, rehabilitation, and environmental obligations
An obligation to incur restoration, rehabilitation and environmental costs arises when environmental disturbance is caused by the exploration or development of a mineral property interest. Such costs arising from the decommissioning of plant and other site preparation work, discounted to their net present value, are provided for and capitalized at the start of each project to the carrying amount of the asset, along with a corresponding liability as soon as the obligation to incur such costs arises. The timing of the actual rehabilitation expenditure is dependent on a number of factors such as the life and nature of the asset, the operating license conditions, and when applicable the environment in which the mine operates.
Discount rates using pre-tax rates that reflect the time value of money are used to calculate the net present value. These costs are charged against profit or loss over the economic life of the related asset, through amortization using either the unit-of-production or the straight line method. The corresponding liability is progressively increased as the effect of discounting unwinds creating an expense recognized in profit or loss.
Decommissioning costs are also adjusted for changes in estimates. Those adjustments are accounted for as a change in the corresponding capitalized cost, except where a reduction in costs is greater than the unamortized capitalized cost of the related assets, in which case the capitalized cost is reduced to nil and the remaining adjustment is recognized in profit or loss.
The operations of the Company may in the future be affected from time to time in varying degree by changes in environmental regulations or changes in estimates used in determining restoration and rehabilitation obligations. Both the likelihood of new regulations or degree of changes in estimates and their overall effect upon the Company are not predictable.
At March 31, 2011, the Company has no material restoration, rehabilitation and environmental obligations as the disturbance to date is minimal.
4) Share-based compensation expense
From time to time, the Company through its Board of Directors, grants share purchase options to directors, employees and service providers. The Company uses the Black-Scholes option pricing model to estimate a value for these options. This model, and other models which are used to value options, require inputs such as expected volatility, expected life to exercise, and interest rates. Changes in any of these inputs could cause a significant change in the share-based compensation expense charged in a period.
During the period, the Company granted share purchase options and the share-based compensation expense recognized relates to the vesting of tranches from this grant and grants of share purchase options in prior year grants. The following are the weighted average assumptions and inputs used to estimate the fair value of share purchase options granted during the period:
Page 25
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Risk-free interest rate | 2.29% |
Expected life | 4.15 years |
Expected volatility | 64% |
Grant date share price | $13.78 |
Expected dividend yield | Nil |
5) Income Taxes
The Company uses the asset and liability method of accounting for income taxes. Under this method, deferred income tax assets and liabilities are computed based on differences between the carrying amounts of assets and liabilities on the statements of financial position and their corresponding tax values, generally using the substantively enacted or enacted income tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. Deferred income tax assets also result from unused loss carry forwards, resource-related pools and other deductions. A deferred tax asset is only recognized to the extent that it is probable that future taxable profits will be available against which the asset can be utilized.
A deferred tax liability would arise on the carrying value of the investment in the Pebble Partnership as a result of historical transactions. The Company recognizes net deferred tax liabilities as it believes it does not control the timing of the reversal of these temporary differences even though management has made the judgment that the reversal is not expected to occur in the foreseeable future.
1.13 Changes in Accounting Policies including Initial Adoption
Accounting Standards, Interpretations and Amendments to Existing Standards
Effective January 1, 2011, the Group adopted new and revised IFRS that were issued by the IASB. The application of these new and revised IFRS has not had any material impact on the amounts reported for the current and prior years but may affect the accounting for future transactions or arrangements.
1) | Amendment to IAS 32 Financial Instruments: Presentation |
| |
| Rights, options or warrants to acquire a fixed number of the Group’s equity instruments for a fixed amount of any currency will be allowed to be classified as equity instruments so long as the Group offers the rights, options or warrants pro rata to all of the Group’s existing owners of the same class of the Group’s non-derivative equity instruments. |
| |
2) | Amendments to IFRS 3 Business Combinations |
| |
| Clarification that the contingent consideration arising in a business combination previously accounted for in accordance with IFRS 3 that is outstanding at the adoption date continues to be accounted for in accordance with IFRS 3. |
| |
| Limiting the accounting policy choice to measure non-controlling interests upon initial recognition at fair value or at the non-controlling interest’s proportionate share of the acquiree’s identifiable net assets to instruments that give rise to a present ownership interest and that currently entitle the holder to a share of net assets in the event of liquidation. |
| |
| Expansion of the guidance with regards to the attribution of the market-based measure of an acquirer’s share-based payment awards issued in exchange for acquiree awards. |
Page 26
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
3) | Amendments to IAS 27 Consolidated and Separate Financial Statements |
| |
| Clarification that the amendments to IAS 21 The Effects of Changes in Foreign Exchange Rates, IAS 28 Investments in Associates, and IAS 31 Interests in Joint Ventures resulting from IAS 27 should be applied prospectively, except for amendments resulting from renumbering. |
| |
4) | Amendments to IFRS 7 Financial Instruments: Disclosures |
| |
| Amendment to disclosure requirements, specifically, ensuring qualitative disclosures are made in close proximity to quantitative disclosures in order to better enable financial statement users to evaluate an entity’s exposure to risks arising from financial instruments. |
| |
5) | Amendments to IAS 1 Presentation of Financial Statements |
| |
| Clarification that the breakdown of changes in equity resulting from transactions recognized in other comprehensive income is required to be presented in the statement of changes in equity or in the notes to the financial statements. |
| |
6) | Amendments to IAS 24 Related Party Disclosures |
| |
| Amendment of the definition for related parties. |
| |
7) | Amendments to IAS 34 Interim Financial Reporting |
| |
| Addition of further examples of events or transactions that require disclosure and removal of references to materiality when discussing other minimum disclosures. |
Page 27
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Accounting standards not yet effective
1) | Effective for annual periods beginning on or after July 1, 2011 |
| | |
| • | Amendments to IFRS 7 Financial Instruments: Disclosures |
| | |
| | Increase in disclosure with regards to the transfer of financial assets, especially if there is a disproportionate amount of transfer transactions that take place around the end of a reporting period. |
| | |
2) | Effective for annual periods beginning on or after January 1, 2013 |
| | |
| • | New standard IFRS 9 Financial Instruments |
| | |
| • | Partial replacement of IAS 39 Financial Instruments: Recognition and Measurement |
The Group has not early adopted these revised standards and is currently assessing the impact that these standards will have on the condensed consolidated interim financial statements.
1.14 Financial Instruments and Other Instruments
The loan advanced by the Group as part of it consideration for claims purchased has an equity conversion option. This equity conversion feature has been determined to be an embedded derivative which requires separation from the loan receivable. For embedded derivatives identified for separation, the fair value of the derivative must be calculated as of the inception date and at each reporting date subsequent to the inception date. The Group has determined that the fair value of the equity conversion option at the date of inception and at March 31, 2011, is of nominal value as the earn-in and joint venture agreement has not been entered into and the first US$1 million has still to be incurred by the Group in respect to the JV Agreement claims.
1) Non-derivative financial assets:
The Company has the following non-derivative financial assets: financial assets at fair value through profit or loss, available-for-sale financial assets, and loans and receivables.
Financial assets at fair value through profit or loss("FVTPL")
A financial asset is classified at fair value through profit or loss if it is classified as held for trading or is designated as such upon initial recognition. Financial assets are designated as at FVTPL if the Company manages such investments and makes purchase and sale decisions based on their fair value in accordance with the Company’s documented risk management or investment strategy. Attributable transaction costs are recognized in profit or loss when incurred. Financial assets at fair value through profit or loss are measured at fair value, and changes therein are recognized in profit or loss.
Available-for-sale financial assets
Available-for-sale ("AFS") financial assets are non-derivatives that are either designated as AFS or are not classified as (i) loans and receivables, (ii) held-to-maturity investments or (iii) financial assets as at FVTPL. The Group’s investments in marketable securities are classified as AFS financial assets. Subsequent to initial recognition, they are measured at fair value and changes therein, other than impairment losses and foreign currency differences on AFS monetary items, are recognized in other comprehensive income or loss. When an investment is derecognized, the cumulative gain or loss in the investment revaluation reserve is transferred to profit or loss.
Page 28
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
The fair value of AFS monetary assets denominated in a foreign currency is determined in that foreign currency and translated at the spot rate at the end of the reporting period. The change in fair value attributable to translation differences that result from the amortized cost of the monetary asset is recognized in profit or loss. The change in fair value of AFS equity investments are recognized directly in equity.
Loans and receivables
Loans and receivables are financial assets with fixed or determinable payments that are not quoted in an active market. Such assets are initially recognized at fair value plus any directly attributable transaction costs. Subsequent to initial recognition loans and receivables are measured at amortized cost using the effective interest method, less any impairment losses.
Loans and receivables comprise amounts receivable including the Liberty Star loan receivable and balances receivable from a related party.
2) Non-derivative financial liabilities:
The Company has the following non-derivative financial liabilities: amounts payable and other liabilities.
Such financial liabilities are recognized initially at fair value net of any directly attributable transaction costs. Subsequent to initial recognition these financial liabilities are measured at amortized cost using the effective interest method.
3) Financial Risk Management
The Company is exposed in varying degrees to a variety of financial instrument related risks. The Board approves and monitors the risk management processes, inclusive of documented investment policies, counterparty limits, and controlling and reporting structures. The type of risk exposure and the way in which such exposure is managed is provided as follows:
Credit Risk
Credit risk is the risk of potential loss to the Company if a counterparty to a financial instrument fails to meet its contractual obligations. The Company’s credit risk is primarily attributable to its liquid financial assets, including cash and cash equivalents, amounts receivable and balances receivable from related parties. The Company limits the exposure to credit risk in its cash and cash equivalents by only investing its cash and cash equivalents with high-credit quality financial institutions in business and saving accounts, guaranteed investment certificates, and in government treasury bills which are available on demand by the Company for its programs.
The Company’s loan receivable from Liberty Star is secured by other claims and assets owned by Liberty Star in Alaska, USA. Management has assessed the recoverability of the loan as at the end of the reporting period and based on financial information available on Liberty Star, management has concluded that there is no objective evidence of impairment to the loan and considers the full amount to be recoverable.
Page 29
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Liquidity Risk
Liquidity risk is the risk that the Company will not be able to meet its financial obligations when they become due. The Company ensures, as far as reasonably possible, it will have sufficient capital in order to meet short term business requirements, after taking into account cash flows from operations and the Company’s holdings of cash and cash equivalents. The Company believes that these sources will be sufficient to cover its short to medium term cash requirements. In the longer term on completion of the US$1.5 billion expenditure by Anglo American, any further expenditure will need to be funded by the Group and Anglo American on a 50:50 basis. The Group currently does not have the required funding to meet these long term obligations should they arise.
The Company’s cash and cash equivalents are currently invested in business accounts and guaranteed investment certificates which are available on demand.
The Company has no contractual obligations other than current trade and related party payables.
Further discussion can be found in Section 1.6Liquidity.
Foreign Exchange Risk
The Company is exposed to foreign exchange risk as some of its cash and cash equivalents are held in US dollars. Also certain of the Company’s corporate expenses are incurred in US dollars. As a consequence, the Company’s operations are subject to currency transaction risk and currency translation risk. The operating results and financial position of the Company are reported in Canadian dollars in the Company’s condensed consolidated interim financial statements. The fluctuation of the US dollar in relation to the Canadian dollar will consequently have an impact upon the losses incurred by the Company and may also affect the value of the Company’s assets and the amount of shareholders’ equity. The Company has not entered into any agreements or purchased any instruments to hedge possible currency risks at this time.
The exposure of the Company’s cash and cash equivalents, amounts receivable and amounts receivable from related parties to foreign exchange risk (in thousands of dollars) is as follows:
Currency | | As at March 31, 2011 | | | As at December 31, 2010 | |
| | Foreign | | | Amount in | | | Foreign | | | Amount in | |
| | currency amount | | | Canadian dollars | | | currency amount | | | Canadian dollars | |
US dollars | | | | | | | | | | | | |
Amounts receivable | $ | 3,220 | | $ | 3,122 | | $ | 3,153 | | $ | 3,136 | |
Cash and cash equivalents | | 18 | | | 17 | | | 49 | | | 48 | |
Total financial assets | $ | 3,238 | | $ | 3,139 | | $ | 3,202 | | $ | 3,458 | |
The exposure of the Company’s amounts payable and other liabilities and amounts due to related parties to foreign exchange risk (in thousands of dollars) is as follows:
Currency | | As at March 31, 2011 | | | As at December 31, 2010 | |
| | | | | | | | | | | Amount | |
| | | | | | | | | | | in | |
| | Foreign currency | | | Amount in Canadian | | | Foreign currency | | | Canadian | |
| | amount | | | dollars | | | amount | | | dollars | |
US dollars | | | | | | | | | | | | |
Amounts payable and other liabilities | $ | – | | $ | – | | $ | 1 | | $ | 1 | |
Total financial liabilities | $ | – | | $ | – | | $ | 1 | | $ | 1 | |
Page 30
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Based on the above net exposures and assuming that all other variables remain constant, a 10% depreciation of the Canadian dollar against the US dollar would result in a decrease in the loss of approximately $314,000 in the period (2010 – $62,000). This sensitivity analysis includes only outstanding foreign currency denominated monetary items and excludes the effect of any translation adjustments for the investment in the Pebble Partnership.
Interest rate risk
The Company is subject to interest rate risk with respect to its investments in cash and cash equivalents. The Company’s policy is to invest cash at fixed rates of interest and cash reserves are to be maintained in cash and cash equivalents in order to maintain liquidity, while achieving a satisfactory return for shareholders. Fluctuations in interest rates when the cash and cash equivalents mature impact interest income earned.
Assuming that all other variables remain constant, a 100 basis points change representing a 1% increase or decrease in interest rates would have resulted in a decrease or an increase in the loss of approximately $101,000 in the period (2010 – $113,000).
Commodity price risk
While the value of the Company’s core mineral resource property, held through its 50% interest in the Pebble Partnership, is related to the price of gold, copper and molybdenum and the outlook for these minerals, the Company currently does not have any operating mines and hence does not have any hedging or other commodity based risks in respect of its operational activities.
Gold, copper, and molybdenum prices have fluctuated widely historically and are affected by numerous factors outside of the Company's control, including, but not limited to, industrial and retail demand, central bank lending, forward sales by producers and speculators, levels of worldwide production, short-term changes in supply and demand because of speculative hedging activities, and certain other factors related specifically to gold.
Capital Management
The Company's policy is to maintain a strong capital base so as to maintain investor and creditor confidence and to sustain future development of the business. The capital structure of the Company consists of equity, comprising share capital, net of accumulated deficit.
There were no changes in the Company's approach to capital management during the period. The Company is not subject to any externally imposed capital requirements.
Page 31
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.15 Other MD&A Requirements
Additional information relating to the Company, including the Company's Annual Information Form, is available on the Company’s profile atwww.sedar.com.
1.15.1 Disclosure of Outstanding Share Data
The capital structure of the Company as of the date of this MD&A is as per the following table:
| Exercise price | | |
Expiry date | per share | Number | Number |
Common shares | | | 94,888,524 |
| | | |
Share purchase options | | | |
October 27, 2011 | $3.00 | 61,978 | |
February 2, 2012 | $5.00 | 365,668 | |
February 4, 2012 | $5.00 | 944,676 | |
February 20, 2012 | $10.95 | 150,000 | |
March 26, 2012 | $8.25 | 25,000 | |
April 11, 2013 | $9.74 | 75,000 | |
May 27, 2013 | $7.59 | 1,497,330 | |
August 22, 2013 | $5.35 | 40,000 | |
October 27, 2013 | $3.00 | 107,000 | |
February 2, 2014 | $5.00 | 1,823,000 | |
March 15, 2014 | $15.44 | 928,400 | |
May 27, 2015 | $7.59 | 951,000 | |
March 15, 2016 | $15.44 | 1,266,000 | 8,235,052 |
| | | |
1.15.2 Internal Controls over Financial Reporting
The Company's management is responsible for establishing and maintaining adequate internal controls over financial reporting. Any system of internal controls over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation.
There have been no significant changes in internal controls over financial reporting that occurred during the period ended March 31, 2011 that could have materially affected or are reasonably likely to materially affect the Company’s internal control over financial reporting.
1.15.3 Disclosure Controls and Procedures
The Company has disclosure controls and procedures in place to provide reasonable assurance that any information required to be disclosed by the Company under securities legislation is recorded, processed, summarized and reported within the applicable time periods and to ensure that required information is gathered and communicated to the Company's management so that decisions can be made about timely disclosure of that information.
Page 32
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
1.15.4 Risk Factors
The following are the principal risk factors and uncertainties which, in management's opinion, are likely to most directly affect the ultimate feasibility of the Pebble project.
The Pebble Project’s mineral property interests do not contain any ore reserves or any known body of economic mineralization
Although there are known bodies of mineralization on the Pebble Project, and the Pebble Partnership has completed core drilling programs within, and adjacent to, the deposits to determine measured and indicated resources, there are currently no known reserves or body of commercially viable ore and the Pebble Project must be considered an exploration prospect only. Extensive additional work is required before the Company or the Pebble Partnership can ascertain if any mineralization may be economic and hence constitute "ore". Engineering, socioeconomic and environmental studies are ongoing. Exploration for minerals is a speculative venture necessarily involving substantial risk. If the expenditures the Company and/or the Pebble Partnership incur and have incurred in the past on the Pebble Project do not result in discovery and development of commercial quantities of ore, the value of exploration and acquisition expenditures incurred will be totally lost.
Feasibility work to determine the viability of the Pebble Project has not been completed and permits have not been applied forFinal feasibility work has not been done to confirm the pit or underground mine design, mining methods, and processing methods. Final feasibility could determine that the currently assumed pit or other mine design, mining methods, and processing methods are incorrect. Construction and operation of the mine and processing facilities depends on securing environmental and other permits on a timely basis. No permits have been applied for and there can be no assurance that required permits can be secured or secured on a timely basis. Cost estimates used are based on costs at projects believed to be comparable, and not based on firm price quotes. Costs, including design, procurement, construction, and on-going operating costs and metal recoveries could be materially different from those currently assumed. There can be no assurance that mining can be conducted at assumed rates and grades. The project requires the development of port facilities, roads and electrical generating and transmission facilities. Although the Company believes that the State of Alaska favours the development of these facilities, there can be no assurance that these infrastructure facilities can be developed on a timely and cost-effective basis. Energy risks include the potential for significant increases in the cost of fuel and electricity.
Volatility in Metal Prices
The project has been evaluated using projected long-term price levels for copper, gold and molybdenum. Prices for these commodities are historically volatile, and the Company has no control of or influence on those prices, all of which are determined in international markets. The level of interest rates, the rate of inflation, the world supplies of and demands for copper, gold and molybdenum and the stability of exchange rates can all cause fluctuations in these prices. Such external economic factors are influenced by changes in international investment patterns and monetary systems and political developments. There can be no assurance that the prices of these commodities will continue at current levels or that they will not decline below the projected prices. The prices of copper, gold and molybdenum have fluctuated in recent years and they have shown an upward trend of late, future significant price declines could cause unfavorable changes in the economics of the project and may result in investors being unwilling to finance mineral projects, with the result that the Company may not be able to obtain sufficient financing to fund its exploration and, if warranted, development activities.
Page 33
NORTHERN DYNASTY MINERALS LTD. |
MANAGEMENT'S DISCUSSION AND ANALYSIS |
THREE MONTHS ENDED MARCH 31, 2011 |
Compliance with environmental requirements will command large resources and changes to these requirements could significantly increase the costs developing the Pebble Project and could delay these activities.
The Pebble Partnership and the Company must comply with stringent environmental legislation in carrying out work on the Pebble Project. Environmental legislation is evolving in a manner that will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. Changes in environmental legislation could increase the cost to the Pebble Partnership of carrying out its exploration and, if warranted, development of the Pebble Project. Further, compliance with new or additional environmental legislation may result in delays to the exploration and, if warranted, development activities.
Changes in government regulations and the presence of unknown environmental hazards may result in significant unanticipated compliance and reclamation costs
Government regulations relating to mineral rights tenure, permission to disturb areas and the right to operate can adversely affect the Company. Northern Dynasty and the Pebble Partnership may not be able to obtain all necessary licenses and permits that may be required to carry out exploration at their project. Obtaining the necessary governmental permits is a complex, time-consuming and costly process. The duration and success of efforts to obtain permits are contingent upon many variables not within the Company’s or the Pebble Partnership’s control. Obtaining environmental permits may increase costs and cause delays depending on the nature of the activity to be permitted and the interpretation of applicable requirements implemented by the permitting authority. There can be no assurance that all necessary approvals and permits will be obtained and, if obtained, that the costs involved will not exceed those that we previously estimated. It is possible that the costs and delays associated with the compliance with such standards and regulations could become such that we would not proceed with the development or operation.
General Mining Risks
Mining is an inherently risky business with large capital expenditures and cyclical metals markets. Although the Company and the Pebble Partnership maintain high environmental standards for their project, like most major mining projects, there are almost always public concerns about new mining projects. The opponents of the Pebble Project are well organized and are trying to bring public and political pressure against the Pebble Project. If successful, the opponents could delay or prevent the commercialization of the Pebble Project even if it is found to be economically viable and technically and legally permittable.
The Company and Pebble Partnership also compete with many companies possessing far greater financial resources and technical facilities for the acquisition of mineral concessions, claims, leases and other mineral interests, as well as for the recruitment and retention of qualified employees.
The Pebble Project will require major financing, probably a combination of debt and equity financing. There can be no assurance that debt and/or equity financing will be available on acceptable terms. A significant increase in costs of capital could materially and adversely affect the value and feasibility of constructing the project.
Page 34