EXHIBIT 99.1
This fleet status report contains “forward-looking statements” within the meaning of the U.S. federal securities laws about our business, financial performance and prospects. Statements about our plans, intentions, expectations, beliefs, estimates, predictions or similar expressions for the future are forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially. We discuss these factors, including risks and uncertainties, from time to time in our filings with the U.S. Securities and Exchange Commission.
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT — October 6, 2005
| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT / | | WATER | | | | | | CONTRACT | | DAYRATE | | |
RIG | | RIG DESIGN | | REBUILT | | DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
U.S. Gulf of Mexico (12) | | | | | | | | | | | | | | | | | | |
Jackups (2) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Eddie Paul | | MLT Class 84-E.R.C. (T) | | | 1976/1995 | | | 390’-IC | | High Island A-572 | | Apache | | 12/2005 | | * | | Anticipate +/- 15 days of downtime in 4Q 2005 and +/- seven days in 3Q 2006 for inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Tom Jobe | | MLT Class 82-SD-C (T) (Z) | | | 1982 | | | 250’-IC | | South Timbalier 134 | | Chevron | | 1/2006 | | 65-66 | | Chevron has 180-day option. Anticipate +/- seven days of downtime in 10/2005. Rig scheduled for +/- 30 days of downtime in 3Q 2006 and +/- 10 days in 4Q 2006 for upgrades and inspection. |
| | | | | | | | | | | | | | | | | | |
Semisubmersibles (7) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Paul Romano | | Noble EVA 4000TM (T) | | | 1981/1998 | | | 6,000’ | | Green Canyon 518 | | Anadarko | | 12/2005 | | 169-171 | | 18-month contract extension with Anadarko from 1/1/2006 @ $324-326. Rig experienced damage to mooring equipment due to Hurricane Rita, expected to out of service +/- 30 days. Loss of hire insurance in effect from date of incident @ $169-171 per day (for this contract loss of hire anticipated to start effective 10/08/2005). Anticipate +/- seven days of downtime in 2Q 2006 and +/- seven days in 4Q 2006 for inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Jim Thompson | | Noble EVA 4000TM (T) | | | 1984/1999 | | | 6,000’ | | TX — Signal shipyard | | Shell | | 12/2005 | | 174-176 | | One-year contract extension with Shell from 1/1/2006 @ $314-316. Rig experienced damage to mooring system due to Hurricane Katrina, expected to be out of service +/- 60 days. Loss of hire insurance in effect from date of incident @ $174-176 per day. |
| | | | | | | | | | | | | | | | | | |
# Noble Amos Runner | | Noble EVA 4000TM (T) | | | 1982/1999 | | | 6,600’ | | Green Canyon 767 | | Kerr-McGee | | 1/2006 | | 152-153 | | Contract commenced on 7/09/2005 for six months. Contract with Kerr-McGee commencing in 1/2006 for one year @ $196-198. Then one year @ $329-331. Rig experienced damage to the mooring system due to Hurricane Rita, expected to be out of service +/- 30 days. Loss of hire insurance in effect from date of incident @ $152-153 per day. |
| | | | | | | | | | | | | | | | | | |
# Noble Max Smith | | Noble EVA 4000TM (T) | | | 1980/1999 | | | 6,000’ | | Under tow to shipyard | | BHP | | 11/2005 | | 154-155 | | Contract commenced 5/30/2005. Next to Amerada Hess @ $154-155. Contract with Amerada Hess for two years @ $304-306, commencing +/- 1/15/2006. Rig experienced damage to the mooring system, the starboard outboard column, crossover deck and main deck outboard of an anchor winch due to Hurricane Rita, expected to be out of service +/- 120 days. Loss of hire insurance in effect from date of incident initially @ $154-155 per day (for this contract loss of hire anticipated to start effective 10/07/2005). |
| | | | | | | | | | | | | | | | | | |
# Noble Lorris Bouzigard | | IPF Pentagone (T) | | | 1975/2003 | | | 4,000’ ** | | Eugene Island 367 | | Mariner Energy | | 10/2005 | | 74-76 | | Contract commenced on 10/02/2005 for one well. Mariner then has five additional wells with the first @ $104-106, the second @ $129-131 and the third and fourth @ $139-141. Rig then scheduled to enter shipyard for +/- 75 days on +/- 3/01/2006 for upgrade to 4,000’ water depth using aluminum alloy riser. Then fifth Mariner well at $129-131 to be followed by 15-month contract @ $172-173. Anticipate +/- seven days of downtime in 10/2005. |
| | | | | | | | | | | | | | | | | | |
# Noble Therald Martin | | IPF Pentagone (T) | | | 1977/2003 | | | 4,000’ | | Ewing Banks 602 | | | | | | | | Chevron contract @ $72-73 completed on 9/23/2005. Rig experienced damage to mooring system due to Hurricane Rita, expected to be out service +/- 30 days from date of incident. Then to Kerr-McGee for two wells @ $104-106, plus two option wells @ $119-121. Received four-year term commitment from Petrobras @ $113-115 plus a 15% performance bonus. The Petrobras contract will commence following completion of the unit’s work for Kerr-McGee. Cost of mobilization paid for by Petrobras, with the unit on a moving rate of $108-109 during mobilization (limited to 60 days). Petrobras has the right of early termination in year three and four upon payment by Petrobras of a lump sum cancellation penalty amount depending on the date of termination. |
| | | | | | | | | | | | | | | | | | |
# Noble Clyde Boudreaux | | F&G 9500 Enhanced Pacesetter | | | 1987/1999 | | | 10,000’ | | MS — Signal shipyard | | Shipyard | | | | | | Two-year contract for Shell to commence after upgrade in 1Q 2007 @ $209-211. |
| | | | | | | | | | | | | | | | | | |
Submersibles (3) | | | | | | | | | | | | | | | | | | |
1
| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT / | | WATER | | | | | | CONTRACT | | DAYRATE | | |
RIG | | RIG DESIGN | | REBUILT | | DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
# Noble Joe Alford | | Pace 85 | | | 1982/1997 | | | 85’-C | | East Cameron 79 | | Mariner Energy | | 10/2005 | | 45-46 | | Rig experienced damage to the support members below the hull due to Hurricane Rita, expected to be out of service +/- 90 days. Next to Arena/ADTI for +/- 60 days @ $46-48. Rig scheduled for +/- 60 days of downtime in 2Q 2006 and +/- 60 days in 3Q 2006 for upgrades. |
| | | | | | | | | | | | | | | | | | |
# Noble Lester Pettus | | Pace 85 | | | 1982/1997 | | | 85’-C | | MS — Signal shipyard | | | | | | | | In shipyard until +/- 11/07/2005, then four wells for Petsec for +/- 130 days @ $54-55. Rig scheduled for +/- 60 days of downtime in 2Q 2006 for upgrades. |
| | | | | | | | | | | | | | | | | | |
# Noble Fri Rodli | | Transworld | | | 1979/1998 | | | 70’-C | | West Delta 49 | | LLOG | | 10/2005 | | 44-46 | | Next to Mariner for one well on +/- 10/07/2005 @ $44-46, then +/- 80 days @ $55-56. Anticipate +/- seven days of downtime in 1Q 2006 and +/- three days in 4Q 2006. |
| | |
| | (# ) Denotes change from previous report. |
2
| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT / | | WATER | | | | | | CONTRACT | | DAYRATE | | |
RIG | | RIG DESIGN | | REBUILT | | DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
International (48) | | | | | | | | | | | | | | | | | | |
Mexico Jackups (8) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Lewis Dugger | | Levingston Class 111-C (T) | | | 1977/1997 | | | 300’-IC | | Bay of Campeche | | Pemex | | 5/2007 | | 64-65 | | |
| | | | | | | | | | | | | | | | | | |
Noble Gene Rosser | | Levingston Class 111-C (T) | | | 1977/1996 | | | 300’-IC | | Bay of Campeche | | Pemex | | 11/2006 | | 66-68 | | Contract commenced 8/10/2005. Rig experienced 10 days of downtime in 3Q 2005 for spud can inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Sam Noble | | Levingston Class 111-C (T) | | | 1982 | | | 300’-IC | | Bay of Campeche | | Pemex | | 9/2007 | | 64-65 | | Contract commenced on 9/21/2005. |
| | | | | | | | | | | | | | | | | | |
# Noble John Sandifer | | Levingston Class 111-C (T) | | | 1975/1995 | | | 300’-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 64-65 | | Anticipate +/- 10 days of downtime in 1Q 2006 for spud can inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Johnnie Hoffman | | BakMar BMC 300 IC (T) (Z) | | | 1976/1993 | | | 300’-IC | | Bay of Campeche | | Pemex | | 7/2007 | | 64-65 | | Contract commenced 7/15/2005. Anticipate +/- 10 days of downtime in 4Q 2005 for spud can inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Leonard Jones | | MLT Class 53-E.R.C. (T) | | | 1972/1998 | | | 390’-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 70-71 | | Anticipate +/- eight days of downtime in 1Q 2006 for spud can inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Earl Frederickson | | MLT Class 82-SD-C (T) (Z) | | | 1979/1999 | | | 250’-IC | | Bay of Campeche | | Pemex | | 8/2006 | | 39-40 | | Contract from Amerada Hess for +/- 20-month program in Equatorial Guinea to commence upon completion of the Pemex contract. Contract commencement in Equatorial Guinea anticipated to be +/- 11/15/2006. Dayrate is $73-75 with mobilization paid by operator. |
| | | | | | | | | | | | | | | | | | |
# Noble Bill Jennings | | MLT Class 84-E.R.C. (T) | | | 1975/1997 | | | 390’-IC | | Bay of Campeche | | Pemex | | 7/2007 | | 74-76 | | Contract commenced on 7/17/2005. Anticipate +/- eight days of downtime in 1Q 2006 for spud can inspection. |
| | | | | | | | | | | | | | | | | | |
Brazil Semisubmersible (1) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Paul Wolff | | Noble EVA 4000TM (T) | | | 1981/1998 | | | 8,900’-DP | | Brazil | | Petrobras | | 12/2007 | | 154-156 | | Rig experienced five days of downtime in 3Q 2005. Rig scheduled to be in shipyard for +/- 150 days commencing +/- 10/15/2005 for periodic special survey. We will receive 28 days of dayrate while in the shipyard. Dayrate increases $5,000 per day effective 1/01/2006 through 12/31/2006. Received a two-year contract extension with Petrobras through 12/31/2009 with a new dayrate of $209-211, plus a 15% performance bonus commencing upon upgrade of the unit to 10,000 foot water depth capability (estimated to be January 2007). |
| | | | | | | | | | | | | | | | | | |
Brazil Drillships (3) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Leo Segerius | | Gusto Engineering Pelican Class (T) | | | 1981/2002 | | | 5,900’-DP | | Brazil | | Petrobras | | 6/2006 | | 93-95 | | Rig experienced 45 days of downtime in 3Q 2005 for thruster repairs. Received a two-year contract extension with Petrobras through 7/01/2008 with the dayrate increasing on 1/01/2006 to $124-126, plus a 10% performance bonus. Anticipate +/- 60 days of downtime in 4Q 2006 for refurbishments and survey. |
| | | | | | | | | | | | | | | | | | |
Noble Muravlenko | | Gusto Engineering Pelican Class (T) | | | 1982/1997 | | | 4,500’-DP | | Brazil | | Petrobras | | 2/2007 | | 81-82 | | Received a two-year contract extension with Petrobras commencing 2/01/2007 through 2/01/2009 @ $119-121, plus a 15% performance bonus. |
| | | | | | | | | | | | | | | | | | |
# Noble Roger Eason | | Neddrill (T) | | | 1977/2004 | | | 7,200’-DP | | Brazil | | Petrobras | | 4/2007 | | 96-97 | | Rig experienced 19 days of downtime in 3Q 2005. Received a two-year contract extension with Petrobras from 4/13/2007 through 4/13/2009 @ $136-138, plus a 15% performance bonus. |
| | |
| | (#) Denotes change from previous report. |
3
| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT / | | WATER | | | | | | CONTRACT | | DAYRATE | | |
RIG | | RIG DESIGN | | REBUILT | | DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
North Sea Jackups (8) | | | | | | | | | | | | | | | | | | |
# Noble Al White | | CFEM T-2005 C (T) | | | 1982/1997 | | | 360’-IC | | Netherlands | | Wintershall | | 4/2006 | | 89-91 | | Rig in shipyard from 7/18/2005 through 9/23/2005 for upgrade to 7,500 PSI mud system, then commenced Wintershall work for +/- 200 days @ $89-91. Then to RWE for additional two wells for +/- 100 days each @ $124-126, plus option @ same rate for +/- 400 days. |
| | | | | | | | | | | | | | | | | | |
# Noble Byron Welliver | | CFEM T-2005 C (T) | | | 1982 | | | 300’-IC | | Denmark | | Maersk | | 9/2006 | | 73-75 | | One-year extension from 9/03/2005 @ $73-75, plus one-year option @ $83-85. |
| | | | | | | | | | | | | | | | | | |
Noble Kolskaya | | Gusto Engineering (T) | | | 1985/1997 | | | 330’-IC | | Germany | | Wintershall | | 10/2005 | | 62-64 | | Contract commenced 7/01/2005, plus 60-day option well @ $64-66. LOI from Wintershall for 2006 @ $103-104. |
| | | | | | | | | | | | | | | | | | |
# Noble George Sauvageau | | NAM (T) | | | 1981 | | | 250’-IC | | Netherlands | | Gaz de Franz | | 11/2005 | | 58-59 | | Next 80-day well for Gaz de Franz to commence on +/- 11/01/2005 @ $97-98. Then to Shell in +/- 1/2006 for one year @ $105-107, plus six one-year options at mutually agreed rates. |
| | | | | | | | | | | | | | | | | | |
# Noble Ronald Hoope | | MSC/CJ46 (T) | | | 1982 | | | 250’-IC | | United Kingdom | | Venture | | 12/2005 | | 62-64 | | Venture has exercised the first of its two three-month options at $102-103. Contract with Gaz de Franz for 180 days @ $102-103 in direct continuation of the Venture contract, expected to commence +/- 6/01/2006. |
| | | | | | | | | | | | | | | | | | |
# Noble Piet van Ede | | MSC/CJ46 (T) | | | 1982 | | | 250’-IC | | Netherlands | | Gaz de Franz | | 11/2005 | | 53-55 | | 14-month extension from 11/2005 @ $97-98. |
| | | | | | | | | | | | | | | | | | |
# Noble Lynda Bossler | | MSC/CJ46 (T) (Z) | | | 1982 | | | 250’-IC | | Netherlands | | Burlington | | 10/2005 | | 74-76 | | Rig being demobilized from Burlington location. Rig to then commence 115-day well for Wintershall on +/- 11/07/2005 @ $79-80, then an 80-day well @ $98-100, with options through 12/31/2006 @ $99-100. |
| | | | | | | | | | | | | | | | | | |
# Noble Julie Robertson | | Baker Marine Europe Class (T) | | | 1981/2000 | | | 390’-IC*** | | United Kingdom | | Caledonia EU | | 11/2005 | | 65-67 | | Next to Gaz de Franz UK for 90 days @ $67-69 then back to Caledonia for 45 days at $67-69. Then to Venture for one well @ $65-67, then nine-month contract @ $109-110. |
| | | | | | | | | | | | | | | | | | |
North Sea Semisubmersible (1) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Ton van Langeveld | | Offshore SCP III Mark 2 (T) | | | 1979/2000 | | | 1,500’ | | United Kingdom | | Kerr-McGee | | 10/2005 | | 84-86 | | Six-month extension @ $114-116. In negotiations regarding an additional extension of one year. Anticipate +/- 20 days of downtime in 3Q 2006 for upgrades and inspection. |
| | | | | | | | | | | | | | | | | | |
West Africa Jackups (6) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Tommy Craighead | | F&G L-780 MOD II-IC (T) | | | 1982/1990 | | | 300’-IC | | Nigeria | | Addax | | 1/2006 | | 47-49 | | Anticipate +/- five days of downtime in 1Q 2006 for spud can inpection and +/- seven days in 3Q 2006 for upgrades. |
| | | | | | | | | | | | | | | | | | |
# Noble Percy Johns | | F&G L-780 MOD II-IC (T) | | | 1981/1995 | | | 300’-IC | | Nigeria | | ExxonMobil | | 3/2006 | | 50-52 | | Rig experienced five days of downtime in 3Q 2005. Anticipate +/- five days of downtime in 1Q 2006 for spud can inspection and +/- 10 days in 1Q 2006 for upgrades. |
| | | | | | | | | | | | | | | | | | |
Noble Roy Butler | | F&G L-780 MOD II-IC (T) | | | 1982/1996 | | | 300’-IC**** | | Nigeria | | Chevron | | 5/2006 | | 51-53 | | |
| | | | | | | | | | | | | | | | | | |
# Noble Ed Noble | | MLT Class 82-SD-C (T) | | | 1984/1990 | | | 250’-IC | | Nigeria | | ExxonMobil | | 9/2006 | | 46-48 | | Anticipate +/- five days of downtime in 2Q 2006 for spud can inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Lloyd Noble | | MLT Class 82-SD-C (T) | | | 1983/1990 | | | 250’-IC | | Nigeria | | Chevron | | 5/2006 | | 49-51 | | Anticipate +/- seven days of downtime in 4Q 2005 for spud can inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Don Walker | | BakMar BMC 150 IC (T) | | | 1982/1992 | | | 150’-IC | | Nigeria | | Addax | | 10/2005 | | 64-66 | | Next to Peak Well Management for one-well in Benin @ $73-75 to commence +/- 11/01/2005 for +/- 40 days. Received LOI from Chevron for +/- 21 days @ $67-69 in direct continuation of Peak. Then one well with MoniPulo @ $60-62. Received LOI from Shell for one year @ $82-84 expected to commence 2/2006. Anticipate +/- five days of downtime in 1Q 2006 for spud can inspection and +/- three days in 2Q 2006 for upgrades to BOP control system. |
| | | | | | | | | | | | | | | | | | |
West Africa Semisubmersible (1) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Homer Ferrington | | F&G 9500 Enhanced Pacesetter (T) | | | 1985/2000 | | | 6,000’ | | Nigeria | | ExxonMobil | | 6/2006 | | 128-131 | | |
| | |
| | (# ) Denotes change from previous report. |
4
| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT / | | WATER | | | | | | CONTRACT | | DAYRATE | | |
RIG | | RIG DESIGN | | REBUILT | | DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
Arabian Gulf Jackups (14) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Kenneth Delaney | | F&G L-780 MOD II-IC (T) | | | 1983/1998 | | | 300’-IC | | UAE (Abu Dhabi) | | NDC | | 7/2006 | | 50-51 | | Rig scheduled to be in the shipyard for +/- 30 days in 4Q 2005 and +/- 30 days in 1Q 2006 for refurbishments and inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble George McLeod | | F&G L-780 MOD II-IC (T) | | | 1981/1995 | | | 300’-IC | | UAE (Abu Dhabi) | | NDC | | 8/2006 | | 50-51 | | Anticipate +/- 14 days of downtime for survey in 2Q 2006. |
| | | | | | | | | | | | | | | | | | |
Noble Jimmy Puckett | | F&G L-780 MOD II-IC (T) | | | 1982/2002 | | | 300’-IC | | Qatar | | Ras Gas | | 5/2007 | | 55-57 | | |
| | | | | | | | | | | | | | | | | | |
# Noble Harvey Duhaney (formerly Noble Crosco Panon) | | Levingston Class 111-C (T) | | | 1976/2001 | | | 300’-IC | | Qatar | | Total | | 2/2006 | | 50-52 | | On 8/10/2005, exercised option in joint venture agreement and acquired the remaining 50% equity interest in entity that owns the rig for $32.1 million. Anticipate +/- 60 days in 1Q/2Q 2006 for upgrades and survey. |
| | | | | | | | | | | | | | | | | | |
# Noble Gus Androes | | Levingston Class 111-C (T) | | | 1982/1996 | | | 300’-IC | | UAE (Abu Dhabi) | | Total ABK | | 12/2005 | | 53-55 | | LOI from Total ABK for a six-month extension from 12/31/2005 @ $67-69. Anticipate +/- 14 days of downtime in 3Q 2006 for inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Chuck Syring | | MLT Class 82-C (T) | | | 1976/1996 | | | 250’-IC | | Qatar | | QatarGas III | | 3/2006 | | 50-52 | | Anticipate +/- 60 days of downtime in 3Q 2006 for upgrades and survey. |
| | | | | | | | | | | | | | | | | | |
# Noble Charles Copeland | | MLT Class 82-SD-C (T) | | | 1979/2001 | | | 250’-IC | | Qatar | | Shipyard | | | | | | Completed Ras Gas well @ $56-58 on 10/07/2005, then entered shipyard for +/- 45 days. Then a +/- 190-day contract with Ras Gas @ $70-72. |
| | | | | | | | | | | | | | | | | | |
Noble Roy Rhodes | | MLT 116-C (T) | | | 1979 | | | 300’-IC**** | | UAE (Dubai) | | DPC | | 1/2006 | | 51-53 | | Received a one-year contract extension through 1/2007 @ $67-69. |
| | | | | | | | | | | | | | | | | | |
# Noble Dhabi II | | Baker Marine-150 (T) | | | 1982 | | | 150’-IC | | UAE (Abu Dhabi) | | ADOC | | 7/2006 | | 39-40 | | Anticipate 80 days of downtime in 2Q/3Q 2006 for upgrades and survey. |
| | | | | | | | | | | | | | | | | | |
# Noble Gene House | | Modec 300-C (T) | | | 1981/2004 | | | 300’-IC | | Qatar | | Dolphin Energy | | 2/2007 | | 59-60 | | |
| | | | | | | | | | | | | | | | | | |
# Noble Dick Favor | | BakMar BMC 150 IC (T) | | | 1982/2005 | | | 150’-IC | | UAE (Abu Dhabi) | | Bunduq | | 3/2006 | | 51-52 | | |
| | | | | | | | | | | | | | | | | | |
# Noble Cees van Diemen | | Modec 300-C (T) | | | 1981/2004 | | | 300’-IC | | Qatar | | Ras Gas | | 11/2007 | | 54-56 | | |
| | | | | | | | | | | | | | | | | | |
# Noble David Tinsley | | Modec 300-C (T) | | | 1981/2004 | | | 300’-IC | | Qatar | | Ras Gas | | 10/2006 | | 54-56 | | Anticipate +/- 14 days of downtime in 4Q 2006 for survey. |
| | | | | | | | | | | | | | | | | | |
# Noble Mark Burns | | Levingston Class 111-C (T) | | | 1980/2005 | | | 300’-IC | | Qatar | | Ras Gas | | 1/2007 | | 60-61 | | Following completion of rig’s upgrade/refurbishment project, commenced 475-day contract for Ras Gas on 8/23/2005 @ $60-61. |
| | | | | | | | | | | | | | | | | | |
Mediterranean Jackup (1) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Carl Norberg | | MLT Class 82-C (T) | | | 1976/1996 | | | 250’-IC | | Croatia | | CROSCO / INAgip | | 3/2006 | | 48-50 | | Bareboat chartered for contract to operator. Six-month extension of the bareboat charter from 9/16/2005 @ $48-50, then three-months @ $56-57. |
| | | | | | | | | | | | | | | | | | |
India Jackups (2) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Ed Holt | | Levingston Class 111-C (T) | | | 1981/1994 | | | 300’-IC | | India | | ONGC | | 3/2006 | | 48-49 | | Anticipate +/- 60 days of downtime in 1Q 2006 for survey and upgrades. |
| | | | | | | | | | | | | | | | | | |
# Noble Charlie Yester | | MLT 116-C (T) | | | 1979 | | | 300’-IC | | India | | ONGC | | 12/2006 | | 50-51 | | Operations recommenced on 8/10/2005 after evacuation of the rig as a result of a fire on ONGC’s BHN platform offshore India. Additional operating costs associated with the incident are anticipated to be +/- $2.5 million. Anticipate +/- 14 days of downtime in 4Q 2005 for survey. |
| | | | | | | | | | | | | | | | | | |
Far East Semisubmersibles (3) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Dave Beard | | F&G 9500 Enhanced Pacesetter | | | 1986 | | | 10,000’ | | Dalian, China | | Shipyard | | | | | | Received a five-year contract with Petrobras @ $219-220, plus 15% bonus. Commencement of operations in Brazil is scheduled for 30 months after contract signing, estimated to be +/- 2Q 2008. Mobilization cost paid for by Petrobras, with the unit on a moving rate of $208-210 during mobilization (limited to 75 days). Total capital expenditures are estimated to be +/- $375 million. |
| | | | | | | | | | | | | | | | | | |
Bingo 9000 — Rig 3 | | Trosvik Bingo 9000 | | | 1999 | | | 10,000’ ***** | | Dalian, China | | Shipyard | | | | | | Baredeck hull. |
| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT / | | WATER | | | | | | CONTRACT | | DAYRATE | | |
RIG | | RIG DESIGN | | REBUILT | | DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
Bingo 9000 — Rig 4 | | Trosvik Bingo 9000 | | | 1999 | | | 10,000’ ***** | | Dalian, China | | Shipyard | | | | | | Baredeck hull. |
| | |
(#) | | Denotes change from previous report. |
|
(T) | | Denotes Top Drive. |
|
(Z) | | Denotes Zero Discharge. |
|
(*) | | Terms of contract confidential per agreement with operator. |
|
(**) | | Rig to be upgraded to 4,000’ utilizing aluminum alloy riser. |
|
(***) | | Leg extensions fabricated to enable the rig to operate in up to 390’ of water in a non-harsh environment. |
|
(****) | | The rig is currently equipped to operate in 250’ of water. Leg extensions fabricated to enable the Noble Roy Butler to operate in up to 300’ of water. |
|
(*****) | | Baredeck hull constructed as capable to operate in 10,000’ of water. |