| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT / | | | | | | | | CONTRACT | | | | |
RIG | | RIG DESIGN | | REBUILT | | WATER DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | DAYRATE ($000) | | COMMENTS |
Arabian Gulf Jackups (14) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Kenneth Delaney | | F&G L-780 MOD II-IC (T) | | | 1983/1998 | | | 300’-IC | | UAE (Abu Dhabi) | | NDC | | 7/2006 | | 50-51 | | Rig scheduled to be in the shipyard for +/- 15 days in 4Q 2005 and +/- 45 days in 1Q 2006 for refurbishments and inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble George McLeod | | F&G L-780 MOD II-IC (T) | | | 1981/1995 | | | 300’-IC | | UAE (Abu Dhabi) | | NDC | | 8/2006 | | 50-51 | | Anticipate +/- 14 days of downtime for survey in 3Q 2006. |
| | | | | | | | | | | | | | | | | | |
Noble Jimmy Puckett | | F&G L-780 MOD II-IC (T) | | | 1982/2002 | | | 300’-IC | | Qatar | | Ras Gas | | 5/2007 | | 55-57 | | |
| | | | | | | | | | | | | | | | | | |
# Noble Harvey Duhaney | | Levingston Class 111-C (T) | | | 1976/2001 | | | 300’-IC | | Qatar | | Total | | 2/2006 | | 50-52 | | Received two-year contract extension from Total @ $84-86 commencing 2/1/2006. Anticipate +/- 20 days of downtime in 1Q 2006 for upgrades and survey. |
| | | | | | | | | | | | | | | | | | |
Noble Gus Androes | | Levingston Class 111-C (T) | | | 1982/1996 | | | 300’-IC | | UAE (Abu Dhabi) | | Total ABK | | 12/2005 | | 53-55 | | LOI from Total ABK for a six-month extension from 12/31/2005 @ $67-69. Anticipate +/- 14 days of downtime in 3Q 2006 for inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Chuck Syring | | MLT Class 82-C (T) | | | 1976/1996 | | | 250’-IC | | Qatar | | QatarGas III | | 3/2006 | | 50-52 | | Anticipate +/- 60 days of downtime in 3Q 2006 for upgrades and survey. |
| | | | | | | | | | | | | | | | | | |
# Noble Charles Copeland | | MLT Class 82-SD-C (T) | | | 1979/2001 | | | 250’-IC | | Qatar | | Anadarko | | 12/2005 | | 59-60 | | Completed Ras Gas well @ $56-58 on 10/7/2005, then entered shipyard. Completed shipyard work and commenced 10-day workover well for Anadarko on 12/1/2005 @ $59-61. Next to Ras Gas for a minimum 192-day contract @$70-72. |
| | | | | | | | | | | | | | | | | | |
Noble Roy Rhodes | | MLT 116-C (T) | | | 1979 | | | 300’-IC**** | | UAE (Dubai) | | DPC | | 1/2006 | | 51-53 | | Received a one-year contract extension through 1/2007 @ $67-69. |
| | | | | | | | | | | | | | | | | | |
Noble Dhabi II | | Baker Marine-150 (T) | | | 1982 | | | 150’-IC | | UAE (Abu Dhabi) | | ADOC | | 7/2006 | | 39-40 | | Anticipate 80 days of downtime in 2Q/3Q 2006 for upgrades and survey. |
| | | | | | | | | | | | | | | | | | |
# Noble Gene House | | Modec 300-C (T) | | | 1981/2004 | | | 300’-IC | | Qatar | | Dolphin Energy | | 2/2007 | | 59-60 | | Anticipate +/- seven days of downtime in 2Q 2006 for survey. |
| | | | | | | | | | | | | | | | | | |
# Noble Dick Favor | | BakMar BMC 150 IC (T) | | | 1982/2005 | | | 150’-IC | | UAE (Abu Dhabi) | | Bunduq | | 3/2006 | | 51-52 | | Received a two-well (+/- 90 days) contract from Anadarko and Wintershall in Qatar @ $59-61 following Bunduq contract. |
| | | | | | | | | | | | | | | | | | |
Noble Cees van Diemen | | Modec 300-C (T) | | | 1981/2004 | | | 300’-IC | | Qatar | | Ras Gas | | 11/2007 | | 54-56 | | |
| | | | | | | | | | | | | | | | | | |
Noble David Tinsley | | Modec 300-C (T) | | | 1981/2004 | | | 300’-IC | | Qatar | | Ras Gas | | 10/2006 | | 54-56 | | Anticipate +/- 14 days of downtime in 4Q 2006 for survey. |
| | | | | | | | | | | | | | | | | | |
Noble Mark Burns | | Levingston Class 111-C (T) | | | 1980/2005 | | | 300’-IC | | Qatar | | Ras Gas | | 1/2007 | | 60-61 | | |
| | | | | | | | | | | | | | | | | | |
Mediterranean Jackup (1) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Carl Norberg | | MLT Class 82-C (T) | | | 1976/1996 | | | 250’-IC | | Croatia | | CROSCO / INAgip | | 3/2006 | | 48-50 | | Bareboat chartered for contract to operator. Three month extension from 3/2006 @ $56-57. |
| | | | | | | | | | | | | | | | | | |
India Jackups (2) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Ed Holt | | Levingston Class 111-C (T) | | | 1981/1994 | | | 300’-IC | | India | | ONGC | | 3/2006 | | 48-49 | | Anticipate +/- 90 days of downtime in 1Q 2006 for survey and upgrades. |
| | | | | | | | | | | | | | | | | | |
# Noble Charlie Yester | | MLT 116-C (T) | | | 1979 | | | 300’-IC | | India | | ONGC | | 12/2006 | | 50-51 | | Anticipate +/- 14 days of downtime in 1Q 2006 for survey. |
| | | | | | | | | | | | | | | | | | |
Far East Semisubmersibles (3) | | | | | | | | | | | | | | | | | | |
Noble Dave Beard | | F&G 9500 Enhanced Pacesetter | | | 1986 | | | 10,000’ | | Dalian, China | | Shipyard | | | | | | Received a five-year contract with Petrobras @ $219-220, plus 15% bonus. Commencement of operations in Brazil is scheduled for 30 months after contract signing, estimated to be +/- 2Q 2008. Mobilization cost paid for by Petrobras, with the unit on a moving rate of $208-210 during mobilization (limited to 75 days). Total capital expenditures are estimated to be +/- $375 million. |
| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Danny Adkins (former Bingo 9000 — Rig 3) | | Trosvik Bingo 9000 | | | 1999 | | | 12,000’ | | Dalian, China | | Shipyard | | | | | | LOI from Shell for four-year contract @ $404-406 following upgrade of baredeck hull to 12,000’ water depth capability. Upgrade expected to be 32 to 36 months from execution of shipyard construction contract. Total capital expenditures are estimated to be +/- $500 million, including the purchase price of the hull. |
| | | | | | | | | | | | | | | | | | |
Bingo 9000 — Rig 4 | | Trosvik Bingo 9000 | | | 1999 | | | 10,000’ ***** | | Dalian, China | | Shipyard | | | | | | Baredeck hull. |
| | | | | | | | | | | | | | | | | | |
Far East Jackups (2) | | | | | | | | | | | | | | | | | | |
# Noble Roger Lewis — Newbuild | | F&G JU-2000E | | | 2007 | | | 400’-IC | | Dalian, China | | Shipyard | | | | | | Two-year contract with Shell @ $104-106 with five one-year options at mutually agreed rates. Contract to commence following construction of rig, which is expected to be completed in 3Q 2007. |
| | | | | | | | | | | | | | | | | | |
# Noble Hans Deul — Newbuild | | F&G JU-2000E | | | 2008 | | | 400’-IC | | Dalian, China | | Shipyard | | | | | | Two-year contract with Shell @ $104-106 with five one-year options at mutually agreed rates. Contract to commence following construction of rig, which is expected to be completed in 1Q 2008. |