| | | | | | | | | | | | | | ANTICIPATED | | | | |
| | | | | | | | | | | | | | CONTRACT | | | | |
RIG | | RIG DESIGN | | YEAR BUILT / REBUILT | | WATER DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | DAYRATE ($000) | | COMMENTS |
|
This fleet status report contains “forward-looking statements” within the meaning of the U.S. federal securities laws about our business, financial performance and prospects. Statements about our plans, intentions, expectations, beliefs, estimates, predictions or similar expressions for the future are forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially. We discuss these factors, including risks and uncertainties, from time to time in our filings with the U.S. Securities and Exchange Commission. |
| | | | | | | | | | | | | | | | | | |
U.S. Gulf of Mexico (12) | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Jackups (2) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Eddie Paul | | MLT Class 84-E.R.C. | | | 1976/1995 | | | 390’-IC | | Ship Shoal 207 | | Apache | | 3/2006 | | * | | Contract extended 90 days from 12/12/2005. Following current contract, rig scheduled to be down for +/- 40 days for inspection and refurbishments, then to Mexico for one-year modified bareboat contract with Pemex @ $140-142, which is expected to commence on +/- 5/29/2006. |
| | | | | | | | | | | | | | | | | | |
# Noble Tom Jobe | | MLT Class 82-SD-C | | | 1982 | | | 250’-IC | | South Timbalier 134 | | Chevron | | 2/2006 | | 65-66 | | Following current contract, rig will be down for +/- 30 days for inspection and refurbishments, then to Mexico for a 488-day modified bareboat contract with Pemex @ $119-121. |
| | | | | | | | | | | | | | | | | | |
Semisubmersibles (7) | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Paul Romano****** | | Noble EVA 4000TM | | | 1981/1998 | | | 6,000’ | | Green Canyon 518 | | Anadarko | | 6/2007 | | 324-326 | | 18-month contract extension with Anadarko from 1/1/2006 @ $324-326. Rig experienced damage to mooring equipment due to Hurricane Rita and was out of service until 11/30/2005. Loss of hire insurance in effect from date of incident @ $169-171 per day. Anticipate +/- seven days of downtime in 4Q 2006 for inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Jim Thompson****** | | Noble EVA 4000TM | | | 1984/1999 | | | 6,000’ | | Mississippi Canyon 935 | | Shell | | 12/2006 | | 314-316 | | One-year contract extension with Shell from 1/1/2006 @ $314-316. Rig experienced damage to mooring system due to Hurricane Katrina and was out of service until 11/7/2005. Loss of hire insurance in effect from date of incident @ $174-176 per day. |
| | | | | | | | | | | | | | | | | | |
# Noble Amos Runner****** | | Noble EVA 4000TM | | | 1982/1999 | | | 6,600’ | | Green Canyon 765 | | Kerr-McGee | | 1/2007 | | 196-198 | | Following expiration of previous contract with Kerr-McGee at $152-153, commenced another contract with Kerr-McGee on 1/9/2006 for one-year @ $196-198, then one year @ $329-331. Rig experienced damage to the mooring system due to Hurricane Rita and was out of service until 11/22/2005. Loss of hire insurance in effect from date of incident @ $152-153 per day. |
| | | | | | | | | | | | | | | | | | |
# Noble Max Smith****** | | Noble EVA 4000TM | | | 1980/1999 | | | 6,000’ | | Green Canyon 238 | | BHP | | 2/2006 | | 154-155 | | Rig experienced damage to the mooring system, the starboard outboard column, crossover deck and main deck outboard of an anchor winch due to Hurricane Rita. Loss of hire insurance in effect from date of incident @ $154-155 per day. Hurricane damage repairs completed on 1/9/2006, then back to BHP to complete well for +/- 30 days @ $154-155. Then to Amerada Hess for +/- 90 days @ $154-155. Rig to then commence two-year contract with Amerada Hess @ $304-306, expected to commence on +/- 5/15/2006. |
| | | | | | | | | | | | | | | | | | |
# Noble Lorris Bouzigard | | IPF Pentagone | | | 1975/2003 | | | 4,000’ ** | | St. Mablien 288 | | Forest | | 2/2006 | | 134-136 | | Completed well for Mariner on 10/28/2005 @ $74-76, then completed first two wells of a four well contract with Mariner. The first well was @ $104-106 and the second @ $135-136. Then to Forest Oil for one well @ $134-136 (current well). Then back to Mariner for 2 wells @ $139-141. Rig then scheduled to enter shipyard for +/- 75 days on +/- 5/6/2006 for upgrade to 4,000’ water depth using aluminum alloy riser. Rig then to drill well for Walter O&G @ $129-131, followed by 15-month contract with Mariner @ $172-173. Rig experienced seven days of hurricane-related downtime in 10/2005 (no loss of hire insurance). |
| | | | | | | | | | | | | | | | | | |
# Noble Therald Martin | | IPF Pentagone | | | 1977/2003 | | | 4,000’ | | Ewing Banks 602 | | Kerr-McGee | | 4/2006 | | 104-106 | | Rig experienced damage to mooring system due to Hurricane Rita and was out of service from date of incident until 10/27/2005 (no loss of hire insurance). Then commenced two-well contract with Kerr-McGee @ $104-106, plus two option wells @ $119-121 that have been exercised. Received four-year commitment from Petrobras @ $113-115 plus a 15% performance bonus. The Petrobras contract will commence following completion of the rig’s work for Kerr-McGee and one month of shipyard mooring system upgrades. Cost of mobilization paid for by Petrobras, with the rig on a moving rate of $108-109 during mobilization (limited to 60 days). Petrobras has the right of early termination in year three and four upon payment by Petrobras of a lump sum cancellation penalty amount depending on the date of termination. |
| | | | | | | | | | | | | | | | | | |
Noble Clyde Boudreaux****** | | F&G 9500 Enhanced Pacesetter | | | 1987/1999 | | | 10,000’ | | MS — Signal shipyard | | Shipyard | | | | | | Two-year contract for Shell to commence after upgrade in 1Q 2007 @ $209-211. |
| | | | | | | | | | | | | | | | | | |
Submersibles (3) | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Joe Alford | | Pace 85 | | | 1982/1997 | | | 85’-C | | TX — Signal shipyard | | | | | | | | Rig experienced damage to the support members below the hull due to Hurricane Rita (no loss of hire insurance), expected to be out of service until +/- 3/7/2006, with upgrades in drilling capacity and quarters to be performed while the rig is in the shipyard. Next to Arena/ADTI for +/- 75 days @ $46-48, plus one option well @ $69-71. Rig scheduled for +/- 30 days of downtime in 3Q 2006 for additional upgrades. |