| | | | | | | | | | | | | | | | | | |
| | | | YEAR | | | | | | | | ANTICIPATED | | | | |
| | | | BUILT/ | | WATER | | | | | | CONTRACT | | DAYRATE | | |
RIG | | RIG DESIGN | | REBUILT | | DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
|
This fleet status report contains “forward-looking statements” within the meaning of the U.S. federal securities laws about our business, financial performance and prospects. Statements about our plans, intentions, expectations, beliefs, estimates, predictions or similar expressions for the future are forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially. We discuss these factors, including risks and uncertainties, from time to time in our filings with the U.S. Securities and Exchange Commission. |
U.S. Gulf of Mexico (12) |
|
Jackups (2) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
# Noble Eddie Paul | | MLT Class 84-E.R.C. | | | 1976/1995 | | | 390’-IC | | Ship Shoal 296 | | Apache | | 4/2006 | | (a) | | Following current contract, rig scheduled to be down for +/- 30 days for inspection and refurbishments, then to Mexico for one-year modified bareboat contract with Pemex @ $140-142, which is expected to commence on +/- 5/29/2006. |
| | | | | | | | | | | | | | | | | | |
# Noble Tom Jobe | | MLT Class 82-SD-C | | | 1982 | | | 250’-IC | | TX — Signal shipyard | | Shipyard | | | | | | Contract with Chevron completed on 3/6/2006. Rig will be in shipyard for +/- 14 days for inspection and refurbishments, then to Mexico for a 488-day modified bareboat contract with Pemex @ $119-121 commencing +/- 4/7/2006. |
| | | | | | | | | | | | | | | | | | |
Semisubmersibles (7) | | | | | | | | | | | | | | | | | | |
|
Noble Paul Romano (b) | | Noble EVA 4000TM | | | 1981/1998 | | | 6,000’ | | Green Canyon 518 | | Anadarko | | 6/2007 | | 324-326 | | 18-month contract extension with Anadarko from 1/1/2006 @ $324-326. Anticipate +/- seven days of downtime in 4Q 2006 for inspection. |
| | | | | | | | | | | | | | | | | | |
# Noble Jim Thompson (b) | | Noble EVA 4000TM | | | 1984/1999 | | | 6,000’ | | Mississippi Canyon 935 | | Shell | | 12/2006 | | 314-316 | | One-year contract extension with Shell from 1/1/2006 @ $314-316. Presently negotiating extension. |
| | | | | | | | | | | | | | | | | | |
Noble Amos Runner (b) | | Noble EVA 4000TM | | | 1982/1999 | | | 6,600’ | | Green Canyon 683 | | Kerr-McGee | | 1/2007 | | 196-198 | | One-year contract with Kerr-McGee commenced on 1/9/2006 @ $196-198, then one year @ $329-331. |
|
# Noble Max Smith (b) | | Noble EVA 4000TM | | | 1980/1999 | | | 6,000’ | | Garden Banks 114 | | Amerada Hess | | 3/2006 | | 154-155 | | Two-year contract with Amerada Hess @ $304-306 expected to commence on +/- 3/23/2006 following current contract with same customer. |
| | | | | | | | | | | | | | | | | | |
# Noble Lorris Bouzigard | | IPF Pentagone | | | 1975/2003 | | | 4,000’ (c) | | Green Canyon 82 | | W&T | | 4/2006 | | 139-141 | | Completed well for Forest Oil @ $134-136 on 2/4/2006. Rig assigned to W&T by Mariner for two wells @ $139-141. To commence 15-month extension with Mariner on +/- 5/1/2006 @ $172-173 for two wells, then to shipyard for +/- 75 days for upgrades utilizing aluminum alloy riser. Following upgrades, will commence one well with Walter O&G @ $129-131 for +/- 45 days then complete 15-month term with Mariner. |
| | | | | | | | | | | | | | | | | | |
# Noble Therald Martin | | IPF Pentagone | | | 1977/2003 | | | 4,000’ | | East Breaks 602 | | Kerr-McGee | | 4/2006 | | 119-121 | | Following two-well contract with Kerr-McGee @ $104-106, began first of two option wells on 2/14/2006 that were exercised @ $119-121. Received four-year commitment from Petrobras @ $113-115 plus a 15% performance bonus. The Petrobras contract will commence following completion of the rig’s work for Kerr-McGee and one month of shipyard mooring system upgrades. Cost of mobilization to Brazil paid for by Petrobras, with the rig on a moving rate of $108-109 during mobilization (limited to 60 days). Petrobras has the right of early termination in year three and four upon payment by Petrobras of a lump sum cancellation penalty amount depending on the date of termination. |
| | | | | | | | | | | | | | | | | | |
Noble Clyde Boudreaux (b) | | F&G 9500 Enhanced Pacesetter | | | 1987/1999 | | | 10,000’ | | MS — Signal shipyard | | Shipyard | | | | | | Two-year contract for Shell to commence after upgrade in 1Q 2007 @ $209-211. |
| | | | | | | | | | | | | | | | | | |
Submersibles (3) | | | | | | | | | | | | | | | | | | |
|
# Noble Joe Alford | | Pace 85 | | | 1982/1997 | | | 85’-C | | TX — Signal shipyard | | Shipyard | | | | | | Next to Arena/ADTI on +/- 4/1/2006 for +/- 75 days @ $46-48, plus one option well @ $69-71. Then to Mariner for six months @ $84-86. Rig scheduled for +/- 30 days of downtime in 3Q 2006 for additional upgrades. |
| | | | | | | | | | | | | | | | | | |
# Noble Lester Pettus | | Pace 85 | | | 1982/1997 | | | 85’-C | | Main Pass 19 | | Petsec | | 3/2006 | | 54-56 | | One-year contract with Century Exploration commencing +/- 3/17/2006, with initial six months @ $58-59 and following six months @ $74-76. Rig scheduled for +/- 60 days of downtime in 3Q 2006 for upgrades in drilling capacity and quarters. |
| | | | | | | | | | | | | | | | | | |
# Noble Fri Rodli | | Transworld | | | 1979/1998 | | | 70’-C | | High Island 198 | | Virgin Offshore | | 3/2006 | | 74-76 | | Completed well for Mariner @ $55-56 on 2/13/2006, then to Virgin Offshore @ $74-76. Next to Helis @ $74-76 for +/- 30 days. Negotiating with Mariner for return after Helis work. Anticipate +/- three days of downtime in 4Q 2006. |