| | | | | | | | | | | | | | ANTICIPATED | | | | |
| | | | | | | | | | | | | | CONTRACT/DAY- | | | | |
| | | | YEAR BUILT | | | | | | | | RATE | | DAYRATE | | |
RIG | | RIG DESIGN | | / REBUILT | | WATER DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
|
This fleet status report contains “forward-looking statements” within the meaning of the U.S. federal securities laws about our business, financial performance and prospects. Statements about our plans, intentions, expectations, beliefs, estimates, predictions or similar expressions for the future are forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially. We discuss these factors, including risks and uncertainties, from time to time in our filings with the U.S. Securities and Exchange Commission. |
| | | | | | | | | | | | | | | | | | |
International (54) (c) | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Mexico Jackups (10) (d) | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Bill Jennings | | MLT Class 84-E.R.C. | | | 1975/1997 | | | 390'-IC | | Bay of Campeche | | Pemex | | 5/2007 | | 74-76 | | Anticipate +/– 10 days of downtime in 3Q 2007 for regulatory inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Eddie Paul | | MLT Class 84-E.R.C. | | | 1976/1995 | | | 390'-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 140-142 | | |
| | | | | | | | | | Bay of Campeche | | Pemex | | 12/2009 | | 177-179 | | Contract extension for 913 days beginning 6/5/2007. |
| | | | | | | | | | | | | | | | | | |
Noble Leonard Jones | | MLT Class 53-E.R.C. | | | 1972/1998 | | | 390'-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 70-71 | | Experienced seven days of downtime in 3Q 2006 for regulatory inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Johnnie Hoffman | | Baker Marine BMC 300 IC | | | 1976/1993 | | | 300'-IC | | Bay of Campeche | | Pemex | | 7/2007 | | 64-65 | | Experienced 14days of downtime in 4Q 2006.Anticipate +/– 90 days of downtime in 3Q 2007 for rig modifications and regulatory inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Gene Rosser | | Levingston Class 111-C | | | 1977/1996 | | | 300'-IC | | Bay of Campeche | | Pemex | | 10/2006 | | 66-68 | | |
| | | | | | | | | | Bay of Campeche | | Pemex | | 12/2007 | | 166-168 | | Pemex contract commenced 11/1/2006 for 415 days.Experienced 16days of downtime in 4Q 2006 for regulatory inspection between contracts. |
| | | | | | | | | | | | | | | | | | |
Noble John Sandifer | | Levingston Class 111-C | | | 1975/1995 | | | 300'-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 64-65 | | Anticipate +/– 90 days of downtime in 2Q 2007 for rig modifications and regulatory inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Lewis Dugger | | Levingston Class 111-C | | | 1977/1997 | | | 300'-IC | | Bay of Campeche | | Pemex | | 5/2007 | | 64-65 | | Anticipate +/– 30 days of downtime in 2Q 2007 for regulatory inspection and modifications. |
| | | | | | | | | | | | | | | | | | |
Noble Sam Noble | | Levingston Class 111-C | | | 1982 | | | 300'-IC | | Bay of Campeche | | Pemex | | 9/2007 | | 64-65 | | Anticipate +/– 10 days of downtime in 2Q 2007 for regulatory inspection. |
| | | | | | | �� | | | | | | | | | | | |
Noble Earl Frederickson | | MLT Class 82-SD-C | | | 1979/1999 | | | 250'-IC | | Bay of Campeche | | Pemex | | 4/2007 | | 149-151 | | Extension of Pemex contract for 255 days commenced 8/20/2006.Anticipate +/– 10 days of downtime in 2Q 2007 for regulatory inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Tom Jobe | | MLT Class 82-SD-C | | | 1982 | | | 250'-IC | | Bay of Campeche | | Pemex | | 8/2007 | | 119-121 | | |
| | | | | | | | | | | | | | | | | | |
Brazil Semisubmersible (2) | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Paul Wolff | | Noble EVA 4000TM | | | 1981/1998 | | | 8,900'-DP | | Brazil | | Petrobras | | 12/2007 | | 163-165 | | Eligible for a maximum 20% performance bonus.Eliminated +/– seven days of previously disclosed anticipated downtime in 4Q 2006. |
| | | | | | | | | | | | Petrobras | | 12/2009 | | 213-215 | | Rate contingent upon upgrade of unit to 10,000' water depth capability utilizing aluminum alloy riser. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | Petrobras - Downtime Extension | | 7/2010 | | 213-215 | | Petrobras can extend contract for contractor responsible downtime (to date - 183 days including shipyard downtime days). Anticipated contract/dayrate expiration assuming Petrobras extension for contractor responsible downtime. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | | | | | | | |
Noble Therald Martin | | IPF Pentagone | | | 1977/2003 | | | 4,000' | | Brazil | | Petrobras | | 10/2006 | | — | | Experienced 30days of downtime during 4Q 2006. |
| | | | | | | | | | Brazil | | Petrobras | | 8/2008 | | 113-115 | | 22 month contract with Petrobras. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | Brazil | | Petrobras | | 9/2009 | | 113-115 | | 13 month priced option. Customer will pay lump sum reimbursement amount and demob if option is not exercised. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | Brazil | | Petrobras | | 10/2010 | | 113-115 | | 13 month priced option. Customer will pay lump sum reimbursement amount and demob if option is not exercised. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | | | | | | | |
Brazil Drillships (3) | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Roger Eason | | Neddrill | | | 1977/2005 | | | 7,200'-DP | | Brazil | | Petrobras | | 4/2007 | | 96-97 | | |
| | | | | | | | | | Brazil | | Petrobras | | 4/2010 | | 136-138 | | Rate effective +/– 4/30/2007. Anticipate +/–14 days of downtime in 3Q 2007 for regulatory inspection. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | Brazil | | Petrobras - Downtime Extension | | 7/2010 | | 136-138 | | Petrobras can extend contract for contractor responsible downtime (to date -88days including shipyard and expected 3Q 2007 downtime days). Anticipated contract/dayrate expiration assuming Petrobras extension for contractor responsible downtime. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | | | | | | | |
Noble Leo Segerius | | Gusto Engineering Pelican Class | | | 1981/2002 | | | 5,600'-DP | | Brazil | | Petrobras | | 7/2008 | | 123-125 | | Anticipate +/– 28 days of downtime commencing +/– 3Q 2007 for regulatory inspection and refurbishments. Eligible for a maximum 10% performance bonus. |
| | | | | | | | | | | | | | | | | | |
Noble Muravlenko | | Gusto Engineering Pelican Class | | | 1982/1997 | | | 4,600'-DP | | Brazil | | Petrobras | | 3/2007 | | 81-82 | | Eligible for a maximum 10% performance bonus. Anticipate +/– 10 days of downtime in 1Q 2007. |
| | | | | | | | | | Brazil | | Petrobras | | 3/2009 | | 119-121 | | Rate effective 3/17/2007. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | Brazil | | Petrobras - Downtime Extension | | 4/2009 | | 119-121 | | Petrobras can extend contract for contractor responsible downtime (to date - 17 days). Anticipated contract/dayrate expiration assuming Petrobras extension for contractor responsible downtime. Eligible for a maximum 15% performance bonus.
Note: The entity that owns this rig is fully consolidated; however, there is a minority interest holder for 18%. |