| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | ANTICIPATED | | | | |
| | | | | | | | | | | | | | CONTRACT/DAY- | | | | |
| | | | YEAR BUILT | | | | | | | | RATE | | DAYRATE | | |
RIG | | RIG DESIGN | | / REBUILT | | WATER DEPTH | | LOCATION | | OPERATOR | | EXPIRATION | | ($000) | | COMMENTS |
|
International (54) (c) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Mexico Jackups (10)(d) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Bill Jennings | | MLT Class 84-E.R.C. | | | 1975/1997 | | | 390'-IC | | Bay of Campeche | | Pemex | | 5/2007 | | 74-76 | | |
| | | | | | | | | | | | | | | | | | |
Noble Eddie Paul | | MLT Class 84-E.R.C. | | | 1976/1995 | | | 390'-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 140-142 | | |
| | | | | | | | | | | | | | | | | | |
Noble Leonard Jones | | MLT Class 53-E.R.C. | | | 1972/1998 | | | 390'-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 70-71 | | Anticipate +/– eight days of downtime in 3Q 2006 for regulatory inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Johnnie Hoffman | | Baker Marine BMC 300 IC | | | 1976/1993 | | | 300'-IC | | Bay of Campeche | | Pemex | | 7/2007 | | 64-65 | | Anticipate +/– 10 days of downtime in 4Q 2006 for regulatory inspection. |
| | | | | | | | | | | | | | | | | | |
Noble Gene Rosser | | Levingston Class 111-C | | | 1977/1996 | | | 300'-IC | | Bay of Campeche | | Pemex | | 10/2006 | | 66-68 | | Experienced ten days of downtime in July for regulatory inspections. |
| | | | | | | | | | | | Pemex | | 12/2007 | | 166-168 | | Pemex contract scheduled to commence 11/1/2006 @ $166k-168k for 415 days. Anticipate +/– 15 days of downtime in 4Q 2006 for regulatory inspection between contracts. |
| | | | | | | | | | | | | | | | | | |
Noble John Sandifer | | Levingston Class 111-C | | | 1975/1995 | | | 300'-IC | | Bay of Campeche | | Pemex | | 6/2007 | | 64-65 | | |
| | | | | | | | | | | | | | | | | | |
Noble Lewis Dugger | | Levingston Class 111-C | | | 1977/1997 | | | 300'-IC | | Bay of Campeche | | Pemex | | 5/2007 | | 64-65 | | |
| | | | | | | | | | | | | | | | | | |
Noble Sam Noble | | Levingston Class 111-C | | | 1982 | | | 300'-IC | | Bay of Campeche | | Pemex | | 9/2007 | | 64-65 | | |
| | | | | | | | | | | | | | | | | | |
Noble Earl Frederickson | | MLT Class 82-SD-C | | | 1979/1999 | | | 250'-IC | | Bay of Campeche | | Pemex | | 8/2006 | | 39-40 | | |
| | | | | | | | | | | | Pemex | | 4/2007 | | 149-151 | | Anticipate +/– 10 days of downtime in 3Q 2006 for regulatory inspection.Extension of Pemex contract for 255 days. |
| | | | | | | | | | | | | | | | | | |
Noble Tom Jobe | | MLT Class 82-SD-C | | | 1982 | | | 250'-IC | | Bay of Campeche | | Pemex | | 8/2007 | | 119-121 | | |
| | | | | | | | | | | | | | | | | | |
Brazil Semisubmersible (2) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Paul Wolff | | Noble EVA 4000TM | | | 1981/1998 | | | 8,900'-DP | | Brazil | | Petrobras | | 12/2006 | | 163-165 | | Eligible for a maximum 20% performance bonus.Expect +/– 20 days downtime in 3Q 2006 for modifications. |
| | | | | | | | | | | | Petrobras | | 12/2009 | | 213-215 | | Rate contingent upon upgrade of unit to 10,000’ water depth capability utilizing aluminum alloy riser. Eligible for a maximum 15% performance bonus. Petrobras can extend contract for contractor responsible downtime (to date —190days including shipyard andexpected 3Q 2006 downtime days). |
| | | | | | | | | | | | Petrobras - Downtime Extension | | 7/2010 | | 213-215 | | Anticipated contract/dayrate expiration assuming Petrobras extension for contractor responsible downtime. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | | | | | | | |
Noble Therald Martin | | IPF Pentagone | | | 1977/2003 | | | 4,000' | | In-transit | | Petrobras | | 9/2006 | | 108-109 | | |
| | | | | | | | | | Brazil | | Petrobras | | 9/2010 | | 113-115 | | Four-year contract with Petrobras. Eligible for a maximum 15% performance bonus. |
Brazil Drillships (3) | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
Noble Roger Eason | | Neddrill | | | 1977/2005 | | | 7,200'-DP | | Brazil | | Petrobras | | 4/2007 | | 96-97 | | Expect +/– 20 days downtime in 3Q 2006 for modifications. |
| | | | | | | | | | | | Petrobras | | 4/2010 | | 136-138 | | Rate effective+/– 4/30/2007. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | Petrobras - Downtime Extension | | 7/2010 | | 136-138 | | Petrobras can extend contract for contractor responsible downtime (to date —75 daysincluding shipyard andexpected 3Q 2006 downtime days). Anticipated contract/dayrate expiration assuming Petrobras extension for contractor responsible downtime. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | | | | | | | |
Noble Leo Segerius | | Gusto Engineering Pelican Class | | | 1981/2002 | | | 5,600'-DP | | Brazil | | Petrobras Petrobras - Downtime Extension | | 7/2008 9/2008 | | 123-125 123-125 | | Anticipate +/– 28 days of downtime commencing +/– 7/2007 for regulatory inspection and refurbishments. Petrobras can extend contract for contract-defined downtime (to date — 72 days). Anticipated contract/dayrate expiration assuming Petrobras extension for downtime. Eligible for a maximum 10% performance bonus. |
| | | | | | | | | | | | | | | | | | |
Noble Muravlenko | | Gusto Engineering Pelican Class | | | 1982/1997 | | | 4,600'-DP | | Brazil | | Petrobras | | 3/2007 | | 81-82 | | Eligible for a maximum 10% performance bonus. |
| | | | | | | | | | | | Petrobras | | 3/2009 | | 119-121 | | Rate effective 3/17/2007. Eligible for a maximum 15% performance bonus. |
| | | | | | | | | | | | Petrobras - Downtime Extension | | 4/2009 | | 119-121 | | Petrobras can extend contract for contractor responsible downtime (to date — 17 days). Anticipated contract/dayrate expiration assuming Petrobras extension for contractor responsible downtime. Eligible for a maximum 15% performance bonus. |
|
| | | | | | | | | | | | | | | | | | Note: The entity that owns this rig is fully consolidated; however, there is a minority interest holder for 18%. |