| NOBLE CORPORATION ANDSUBSIDIARIES FLEET STATUS REPORT - January 11, 2008 | | | | . | | | Estimated unpaid down time days |
| RIG | | RIG DESIGN | | YEAR BUILT / REBUILT | | WATER DEPTH | | LOCATION | | OPERATOR | | ESTIMATED CONTRACT START DATE | | ESTIMATED CONTRACT EXPIRATION DATE | | DAYRATE ($000) | | COMMENTS | 4Q-07 | | 1Q-08 | 1Q-08 | 2Q-08 | 3Q-08 | 4Q-08 |
| | | | | | | | | | | | | | | | | | | | A* | | A* | E** | E** | E** | E** |
This fleet status report contains “forward-looking statements” within the meaning of the U.S. federal securities laws about our business, financial performance and prospects. Statements about our plans, intentions, expectations, beliefs, estimates, predictions or similar expressions for the future are forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct. Various factors could cause actual results to differ materially. We discuss these factors, including risks and uncertainties, from time to time in our filings with the U.S.Securities and Exchange Commission. |
| International (53) (d) | | | | | | | | | | | | | | | | | | | |
| Mexico Jackups (10) (e) | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | A* | | A* | E** | E** | E** | E** |
| Noble Bill Jennings | | MLT Class 84-E.R.C. | | 1975/1997 | | 390’-IC | | Bay of Campeche | | Pemex | | 6/19/2007 | | 6/17/2008 | | 185-187 | | Anticipate +/- 14 days of downtime in 2Q 2008 for rig modifications and regulatory inspection. | 2 | | | | 14 | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Eddie Paul | | MLT Class 84-E.R.C. | | 1976/1995 | | 390’-IC | | Bay of Campeche | | Pemex | | 6/05/2007 | | 12/03/2009 | | 177-179 | | Anticipate +/- 10 days of downtime in 3Q 2008 for rig modifications and regulatory inspection. | 2 | | | | | 10 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Leonard Jones | | MLT Class 53-E.R.C. | | 1972/1998 | | 390’-IC | | Bay of Campeche | | Pemex | | 6/24/2007 | | 12/22/2009 | | 185-187 | | Anticipate +/- 10 days of downtime in 3Q 2008 for rig modifications and regulatory inspection. | | | | | | 10 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Johnnie Hoffman | | Baker Marine BMC 300 | | 1976/1993 | | 300’-IC | | Bay of Campeche | | Shipyard | | 7/07/2007 | | 10/30/2007 | | - | | Incurred 30 days of downtime in 4Q 2007 for rig modifications and regulatory inspection. | 33 | | | | | | |
| | | | | | | | | Bay of Campeche | | Pemex | | 10/31/2007 | | 4/14/2010 | | 170-172 | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Gene Rosser | | Levingston Class 111-C | | 1977/1996 | | 300’-IC | | Bay of Campeche | | Pemex | | 11/01/2006 | | 12/20/2007 | | 166-168 | | | | | | | | | |
| | | | | | | | | | | Pemex | | 12/21/2007 | | 6/20/2010 | | 170-172 | | Anticipate +/- 10 days of downtime in 4Q 2008 for rig modifications and regulatory inspection. | 2 | | | | | | 10 |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble John Sandifer | | Levingston Class 111-C | | 1975/1995 | | 300’-IC | | Bay of Campeche | | Pemex | | 9/24/2007 | | 3/20/2010 | | 170-172 | | | 1 | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Lewis Dugger | | Levingston Class 111-C | | 1977/1997 | | 300’-IC | | Bay of Campeche | | Pemex | | 6/20/2007 | | 6/17/2008 | | 170-172 | | Anticipate +/- 25 days of downtime in 2Q 2008/3Q 2008 for rig modifications and regulatory inspection. | 1 | | | | 10 | 15 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Sam Noble | | Levingston Class 111-C | | 1982 | | 300’-IC | | Bay of Campeche | | Pemex | | 9/22/2007 | | 3/21/2010 | | 170-172 | | Anticipate +/- 10 days of downtime in 3Q 2008 for rig modification and regulatory inspection. | | | | | | 10 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Earl Frederickson | | MLT Class 82-SD-C | | 1979/1999 | | 250’-IC | | Bay of Campeche | | Pemex | | 5/02/2007 | | 4/30/2008 | | 149-151 | | Anticipate +/- 14 days of downtime in 2Q 2008 for rig modificaitons and regulatory inspection. | 1 | | | | 14 | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Tom Jobe | | MLT Class 82-SD-C | | 1982 | | 250’-IC | | Bay of Campeche | | Pemex | | 8/08/2007 | | 8/06/2008 | | 149-151 | | | 1 | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Brazil Semisubmersibles (2) | | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Paul Wolff | | Noble EVA 4000™ | | 1981/1999/2006 | | 10,000'-DP | | Brazil | | Petrobras | | 1/01/2006 | | 11/04/2009 | | 163-165 | | Eligible for a maximum 20% performance bonus. | 21 | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Therald Martin (c) | | Pentagone 85 | | 1977/2004 | | 4,000' | | Brazil | | Petrobras | | 4/11/2007 | | 10/26/2008 | | 113-115 | | Resume 22 month contract with Petrobras. Eligible for a maximum 15% performance bonus. | | | | | | | |
| | | | | | | | | Brazil | | Petrobras | | 10/27/2008 | | 11/26/2009 | | 113-115 | | 13-month priced option. Customer will pay lump sum reimbursement amount and demob if option is not exercised. Eligible for a maximum 15% performance bonus. | | | | | | | |
| | | | | | | | | Brazil | | Petrobras | | 11/27/2009 | | 12/27/2010 | | 113-115 | | 13-month priced option. Customer will pay lump sum reimbursement amount and demob if option is not exercised. Eligible for a maximum 15% performance bonus. | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Brazil Drillships (3) | | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Roger Eason (c) | | NAMNedlloyd-C | | 1977/2005 | | 7,200'-DP | | Brazil | | Petrobras | | 3/16/2007 | | 11/28/2007 | | 136-138 | | Eligible for a maximum 15% performance bonus. | | | | | | | |
| | | | | | | | | Brazil | | Downtime/Shipyard | | 11/29/2007 | | 5/15/2008 | | - | | Incurred 44 days of downtime during 4Q 2007 including downtime related to the fire reported on November 29, 2007. A damage assessment is ongoing and the initial preliminary estimate for a return to service date is middle 2Q 2008. A charge for a $10 million insurance deductible was taken in the 4Q 2007 which increased "Contract Drilling Services Expense" during the quarter. | | | | | 45 | | |
| | | | | | | | | Brazil | | Petrobras | | 5/16/2008 | | 3/15/2010 | | 136-138 | | | | | | | | | |
| | | | | | | | | Brazil | | Petrobras - Downtime Extension | | 3/16/2010 | | 9/24/2010 | | 136-138 | | Petrobras can extend contract for contractor responsible downtime (to date - 193 days through November 29, 2007). Anticipated contract/dayrate expiration assuming Petrobras extension for 193 days of contractor responsible downtime. Eligible for a maximum 15% performance bonus. | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Leo Segerius (c) | | Gusto Engineering Pelican Class | | 1981/2002 | | 5,600’-DP | | Brazil | | Petrobras | | 7/01/2006 | | 6/13/2008 | | 123-125 | | Incurred 41 days of downtime during the 4Q 2007 for regulatory inspection and refurbishments. Eligible for a maximum 10% performance bonus. | 48 | | | | | | |
| | | | | | | | | Brazil | | Chevron | | 6/14/2008 | | 1/13/2009 | | 524-526 | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Noble Muravlenko | | Gusto Engineering Pelican Class | | 1982/1997 | | 4,900’-DP | | Brazil | | Petrobras | | 3/18/2007 | | 3/17/2009 | | 119-121 | | Eligible for a maximum 15% performance bonus. | | | | | | | |
| | | | | | | | | Brazil | | Petrobras - Downtime Extension | | 3/18/2009 | | 5/18/2009 | | 119-121 | | Petrobras can extend contract for contractor responsible downtime (to date - 51 days). Anticipated contract/dayrate expiration assuming Petrobras extension for contractor responsible downtime. Eligible for a maximum 15% performance bonus. Note: The entity that owns the rig is fully consolidated; however, there is a minority interest holder for 18%. | 7 | | 2 | | | | |
| Changes from last Fleet Status Report denoted by Red, Bold, Underlined type. |