| NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - January 8, 2009 | | | | . | | | Approximate actual and estimated unpaid down time days * |
| RIG | RIG DESIGN | YEAR BUILT / REBUILT | WATER DEPTH | LOCATION | | OPERATOR | ESTIMATED CONTRACT START DATE | | ESTIMATED CONTRACT EXPIRATION DATE | | FULL CONTRACT DAYRATE ($000) | COMMENTS | | 4Q-08 | 1Q-09 | 1Q-09 | 2Q-09 | 3Q-09 | 4Q-09 |
| | | | | | | | | | | | | | | A | A | E | E | E | E |
| | | | | | | | | | | | | | | | | | | | |
| India Jackups (3) (c, d) | | | | | | | | | | | | | | | | | | | |
| Noble Ed Holt | Levingston Class 111-C | 1981/2003 | 300’-IC | India | | Jindal/ONGC | 1/15/2007 | | 9/30/2009 | | 82-83 | Rig bareboat chartered to Jindal which is contracted with ONGC. | | | | | | | 31 |
| | | | | | | | | | | | | | | | | | | | |
| Noble George McLeod | F&G L-780 MOD II | 1981/1995 | 300’-IC | UAE (Sharjah) | | Shipyard | 9/15/2008 | | 12/17/2008 | | - | Contract preparation. | | | | | | | |
| | | | | In-transit | | Jindal/ONGC | 12/18/2008 | | 1/04/2009 | | - | Anticipate lump sum fee will offset mobilization costs. | | 91 | 4 | | | | |
| | | | | India | | Jindal/ONGC | 1/05/2009 | | 1/04/2012 | | 132-134 | Rig bareboat chartered to Jindal which is contracted with ONGC. | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
| Noble Charlie Yester | MLT Class 116-C | 1980 | 300’-IC | India | | Jindal/ONGC | 1/30/2007 | | 1/29/2010 | | 130-131 | Rig bareboat chartered to Jindal which is contracted with ONGC. | | | | 14 | | | |
| | | | | | | | | | | | | | | | | | | | |
| Far East Semisubmersibles (3) | | | | | | | | | | | | | | | | | | |
| Noble Dave Beard - Newbuild | F&G 9500 Enhanced Pacesetter | 1986/2008 | 10,000'-DP | Dalian, China - DSIC | | Shipyard | | | 1/31/2009 | | - | | | | | | | | |
| | | | | In-transit | | Petrobras | 2/01/2009 | | 3/31/2009 | | - | Mobilization fee of $208k-$210k per day during the in-transit period will be amortized over the term of the contract. | | | | | | | |
| | | | | Customs/testing | | Shipyard | 4/01/2009 | | 10/06/2009 | | - | Install thrusters, commission dynamic positioning and drilling systems. | | | | | | | |
| | | | | Brazil | | Petrobras | 10/07/2009 | | 10/06/2014 | | 219-221 | Eligible for a maximum 15% bonus. | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
| Noble Danny Adkins - Newbuild | Bingo 9000 | 1999/2009 | 12,000'-DP | Singapore - Jurong | | Shipyard | | | 4/30/2009 | | - | | | | | | | | |
| | | | | In-transit & acceptance testing | | Shell | 5/01/2009 | | 8/31/2009 | | 424-426 | | | | | | | | |
| | | | | US GOM | | Shell | 9/01/2009 | | 4/30/2013 | | 446-448 | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
| Noble Jim Day - Newbuild | Bingo 9000 | 1999/2009 | 12,000'-DP | Singapore - Jurong | | Shipyard | | | 12/15/2009 | | - | | | | | | | | |
| | | | | In-transit & acceptance testing | | Marathon | 12/16/2009 | | 3/31/2010 | | - | Lump sum fee will offset mobilization costs. | | | | | | | |
| | | | | US GOM | | Marathon | 4/01/2010 | | 3/31/2014 | | 514-516 | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
| Far East Drillship (1) | | | | | | | | | | | | | | | | | | | |
| Globetrotter - Newbuild | Globetrotter Class | 2011 | 10,000'-DP | Dalian, China - STX / Netherlands - Huisman | | Shipyard | | | 9/30/2011 | | - | NE has secured priced options for three additional drillships. | | | | | | | |
| | | | | In-transit & acceptance testing | | TBA | 10/01/2011 | | 12/31/2011 | | | | | | | | | | |
| | | | | TBA | | TBA | 1/01/2012 | | TBA | | TBA | Available. | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
| Far East Jackups (1) | | | | | | | | | | | | | | | | | | | |
| Noble Scott Marks - Newbuild | F&G JU-2000E | 2009 | 400'-IC | Dalian, China - DSIC | | Shipyard | | | 6/30/2009 | | - | | | | | | | | |
| | | | | In-transit | | Venture | 7/01/2009 | | 8/31/2009 | | 44-46 | | | | | | | | |
| | | | | North Sea | | Venture | 9/01/2009 | | 8/31/2011 | | 209-211 | | | | | | | | |
| | | | | | | | | | | | | | | 704 | 36 | 437 | 207 | 106 | 81 |
(a) | Unit has been upgraded to the NC-5SM mooring standard. | | | | | | | | |
(b) | Rig utilizes the Aluminum Alloy Riser technology. | | 2008 Total (includes: shipyard, stacked, and downtime days) | 2290 | | 2009 Total (includes: shipyard, stacked, and downtime days. Does not include cold-stacked Noble Fri Rodli.) | 867 |
(c) | In various market segments, the Company contracts with certain parties for the provision of certain local services and advice. Compensation paid to such parties by the Company typically is based on a percentage of the drilling contract’s daywork operating rate, and the Company accounts for such payments in its financial statements in the contract drilling services operating costs and expenses line item. | | | | | | | | |
(d) | Listed rigs are modified bareboat charter; cost structure varies by region. | | 1Q 08 Downtime (includes: shipyard, stacked, and downtime days): 375 days | | | | |
(e) | Leg extensions fabricated to enable the rig to operate in up to 390' of water in a non-harsh environment. | | 2Q 08 Downtime (includes: shipyard, stacked, and downtime days): 540 days | | | | |
(f) | Rig is currently equipped to operate in 250' of water. Leg extensions fabricated to enable the rig to operate in up to 300' of water. | | 3Q 08 Downtime (includes: shipyard, stacked, and downtime days): 671 days | | | | |
(g) | Rig is currently equipped to operate in 250' of water. | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
(h) | Noble's submersible rig, Noble Fri Rodli, is currently cold-stacked. | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
* | A = Actual approximate downtime incurred during the quarter indicated as of the report date; E = Estimated additional downtime days expected to occur as of the report date. | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
# = | Rate withheld at request of operator. | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | |
| Changes from last Fleet Status Report denoted by Red, Bold, Underlined type. | | | | | | | | |