| NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - March 03, 2009 | | | | | | | Approximate actual and estimated unpaid down time days * |
| RIG | RIG DESIGN | YEAR BUILT / REBUILT | WATER DEPTH | LOCATION | OPERATOR | ESTIMATED CONTRACT START DATE | | ESTIMATED CONTRACT EXPIRATION DATE | | FULL CONTRACT DAYRATE ($000) | COMMENTS | | 1Q-09 | 1Q-09 | 2Q-09 | 3Q-09 | 4Q-09 |
| | | | | | | | | | | | | | A | E | E | E | E |
| | | | | | | | | | | | | | | | | | |
| Brazil Semisubmersibles(3)(c ) | | | | | | | | | | | | | | | |
| Noble Dave Beard - Newbuild | F&G 9500 Enhanced Pacesetter | 1986/2008 | 10,000'-DP | Dalian, China - DSIC | Shipyard | | | 1/31/2009 | | - | The drilling contract for the Noble Dave Beard gives the customer the right to terminate the contract if the rig did not commence operations by December 2008 and also gives the customer the right to apply a penalty for delay beyond the date upon which it had the right to cancel. We continue to discuss an extension for the commencement and a reduction in penalty for this rig and believe we will come to an accommodation with the client that is acceptable to us. | | | | | | |
| | | | | In-transit | Petrobras | 2/01/2009 | | 3/24/2009 | | - | Mobilization fee of $208k-$210k per day during the in-transit period will be amortized over the term of the contract. | | | | | | |
| | | | | Customs/testing | Shipyard | 3/25/2009 | | 10/06/2009 | | - | Install thrusters, commission dynamic positioning and drilling systems. | | | | | | |
| | | | | Brazil | Petrobras | 10/07/2009 | | 10/06/2014 | | 219-221 | Eligible for a maximum 15% bonus. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Paul Wolff | Noble EVA 4000™ | 1981/1999/2006 | 9,200'-DP | Brazil | Petrobras | 1/01/2006 | | 11/03/2009 | | 163-165 | Eligible for a maximum 20% performance bonus. | | 10 | 15 | 15 | | |
| | | | | Brazil | Petrobras | 11/04/2009 | | 11/03/2014 | | 427-429 | Received Memorandum of Understanding. Eligible for a maximum 15% performance bonus. Petrobras has an option to convert this to a 6-year term at $416k/day plus a maximum 18% performance bonus; option must be exercised by 11/01/2009. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Therald Martin (b) | Pentagone 85 | 1977/2004 | 4,000' | Brazil | Petrobras | 4/11/2007 | | 10/17/2010 | | 113-115 | Eligible for a maximum 15% performance bonus. | | 3 | | 21 | | |
| | | | | Brazil | Petrobras | 10/18/2010 | | 10/17/2015 | | 269-271 | Received Memorandum of Understanding. Eligible for a maximum 10% performance bonus. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Brazil Drillships (3) (c ) | | | | | | | | | | | | | | | |
| Noble Roger Eason (b) | NAM Nedlloyd-C | 1977/2005 | 7,200'-DP | Brazil | Downtime/Shipyard | 11/29/2007 | | 3/14/2009 | | - | Commissioning systems to prepare for return to work following the repairs related to the fire reported on November 29, 2007. Anticipate +/- 74 days of downtime in the 1Q 2009 for repairs. | 62 | 11 | | | |
| | | | | Brazil | Petrobras | 3/15/2009 | | 3/14/2010 | | 136-138 | Eligible for a maximum 15% performance bonus. | | | | | | |
| | | | | Brazil | Petrobras | 3/15/2010 | | 4/30/2011 | | 346-348 | Received Memorandum of Understanding. Eligible for a maximum of 15% performance bonus. | | | | | | |
| | | | | Brazil | Petrobras | 5/01/2011 | | 9/28/2011 | | 89-91 | Anticipate to enter the shipyard for +/- 150 days for rig modifications and regulatory inspection. | | | | | | |
| | | | | Brazil | Petrobras | 9/29/2011 | | 8/12/2016 | | 346-348 | Received Memorandum of Understanding. Eligible for a maximum of 15% performance bonus. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Leo Segerius (b) | Gusto Engineering Pelican Class | 1981/2002 | 5,600’-DP | Brazil | Chevron | 8/14/2008 | | 6/24/2009 | | 524-526 | | | | | | | |
| | | | | Brazil | Shell | 6/25/2009 | | 9/05/2009 | | 524-526 | Received letter of intent. | | 3 | | 6 | 19 | |
| | | | | Brazil | Petrobras | 9/06/2009 | | 3/31/2010 | | 299-301 | Received Memorandum of Understanding. Eligible for a maximum of 15% performance bonus. | | | | | | |
| | | | | Brazil | Petrobras | 4/01/2010 | | 8/29/2010 | | 89-91 | Anticipate to enter the shipyard for +/- 150 days for rig modifications and regulatory inspection. | | | | | | |
| | | | | Brazil | Petrobras | 8/30/2010 | | 1/23/2016 | | 299-301 | Received Memorandum of Understanding. Eligible for a maximum of 15% performance bonus. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Muravlenko | Gusto Engineering Pelican Class | 1982/1997 | 4,900’-DP | Brazil | Petrobras | 3/18/2007 | | 2/03/2009 | | 119-121 | Eligible for a maximum 15% performance bonus. | | | | | | |
| | | | | Brazil | Shipyard | 2/04/2009 | | 3/26/2009 | | - | | | 27 | 47 | | | |
| | | | | Brazil | Petrobras | 3/27/2009 | | 10/31/2010 | | 289-291 | Received Memorandum of Understanding. Eligible for a maximum of 15% performance bonus. | | | | | | |
| | | | | Brazil | Petrobras | 11/01/2010 | | 3/31/2011 | | 89-91 | Anticipate to enter the shipyard for +/- 150 days for rig modifications and regulatory inspection. | | | | | | |
| | | | | Brazil | Petrobras | 4/01/2011 | | 8/14/2015 | | 289-291 | Received Memorandum of Understanding. Eligible for a maximum of 15% performance bonus. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| North Sea Semisubmersible (1) | | | | | | | | | | | | | | | |
| Noble Ton van Langeveld | Offshore Co. SCP III Mark 2 | 1979/2000 | 1,500' | United Kingdom | Venture | 6/30/2008 | | 6/29/2009 | | 359-361 | | | | | | | |
| | | | | United Kingdom | Venture | 6/30/2009 | | 6/30/2010 | | 379-381 | Plus a six month priced option at a dayrate of $380k to be declared before 12/31/2009. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| North Sea Jackups (8) | | | | | | | | | | | | | | | |
| Noble Hans Deul | F&G JU-2000E | 2008 | 400'-IC | Dalian, China - DSIC | Shipyard | | | 11/07/2008 | | - | | | | | | | |
| | | | | In-transit | Shell | 11/08/2008 | | 1/02/2009 | | 34-36 | | | | | | | |
| | | | | Commissioning | Shipyard | 1/03/2009 | | 2/05/2009 | | - | Contract preparation. | | | | | | |
| | | | | United Kingdom | Shell | 2/06/2009 | | 2/05/2011 | | 127-129 | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Julie Robertson | Baker Marine Europe Class | 1981/2001 | 390'-IC (e) | United Kingdom | Venture | 9/15/2008 | | 9/14/2009 | | 197-199 | | | | | | 4 | |
| | | | | United Kingdom | Venture | 9/15/2009 | | 9/14/2010 | | 211-213 | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Al White | CFEM T-2005-C | 1982/2005 | 360’-IC | Netherlands | Total | 10/08/2008 | | 10/07/2009 | | 207-209 | | | 2 | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Byron Welliver | CFEM T-2005-C | 1982 | 300’-IC | Denmark | Maersk | 9/04/2008 | | 9/03/2009 | | 209-211 | | | | | | 16 | |
| | | | | Denmark | Maersk - Option | 9/04/2009 | | 9/03/2010 | | 219-221 | Priced option. | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Lynda Bossler | MSC/CJ-46 | 1982 | 250’-IC | Netherlands | Cirrus Energy | 9/02/2008 | | 3/01/2009 | | 219-221 | | | | | | | |
| | | | | Netherlands | Wintershall | 3/02/2009 | | 8/01/2009 | | 219-221 | | | | | | | |
| | | | | Netherlands | Cirrus Energy | 8/02/2009 | | 10/01/2009 | | 219-221 | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Piet van Ede | MSC/CJ-46 | 1982 | 250’-IC | Netherlands | Gaz de France | 1/01/2009 | | 12/31/2009 | | 211-213 | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble Ronald Hoope | MSC/CJ-46 | 1982 | 250’-IC | United Kingdom | Gaz de France | 1/01/2009 | | 12/31/2009 | | 211-213 | | | | | | | |
| | | | | | | | | | | | | | | | | | |
| Noble George Sauvageau | NAM Nedlloyd-C | 1981 | 250’-IC | Netherlands | Wintershall | 1/01/2009 | | 12/31/2009 | | 219-221 | | | | | | | |
| Changes from last Fleet Status Report denoted by Red, Bold, Underlined type. | | | | | | | | | | | | | | |