GEOLOGICAL REPORT
ON THE
BELL 1-4 MINERAL CLAIMS
OMINECA MINING DIVISION
BRITISH COLUMBIA, CANADA
FOR
STERLING GROUP VENTURES, INC.
UNIT 35, 12880 RAILWAY AVE.
RICHMOND, BRITISH COLUMBIA
V7E 6G4
BY
R.T. HEARD, P. ENG.
10881 SUNSHINE COAST HIGHWAY
HALFMOON BAY, BRITISH COLUMBIA
V0N 1Y2
MAY 31, 2002
1
SUMMARY
The Bell Property, discovered in 1914, has been sporadically prospected and sampled since that time.
Recent sampling has verified significant concentrations of precious and base metals outcropping over an aerial extent of 400 meters on strike and 200 meters vertically. This mineralization suggests the possibility that the property could produce economic grades over sizeable widths.
A three-phase exploration program to evaluate and test this thesis is recommended at a cost of $266,000.
TABLE OF CONTENTS
Page | |||
SUMMARY | 2 | ||
TABLE OF CONTENTS | 2 | ||
INTRODUCTION | |||
Location and Access | 3 | ||
Mineral Property | 3 | ||
History | 3 | ||
GEOLOGY | |||
General Geology | 4 | ||
Local Geology | 4 | ||
Mineralization | 4 | ||
Sample Results | |||
R. T. Heard & Associates Ltd. – 1997 | 4 | ||
CONCLUSIONS | 6 | ||
RECOMMENDATIONS | 6 | ||
SELECTED REFERENCES | 7 | ||
AUTHOR’S QUALIFICATIONS | 8 |
2
INTRODUCTION
Location and Access
The property is located approximately 25 miles south west of Telkwa, B.C., at 54º 37' north latitude and 127º 40' west longitude, one-half mile north of Milk Creek, at an approximate median elevation of six thousand feet.
Access can be obtained by four-wheel drive vehicle from Telkwa along the B.C. Hydro power line access road that extends through Telkwa Pass. The centre of the property lies approximately one mile west of the 25-mile point from Telkwa. Access can also be gained by helicopter from Smithers, B.C., approximately 30 miles.
Mineral Property
The BELL property consists of four – two post mineral claims. They were staked and recorded April 24, 1998. The registered owner is Angel Jade Mines (Free Miner’s Certificate 13115). Claim details are as shown below.
CLAIM NAME | TENURE NUMBER | DATE OF EXPIRY |
Bell 1 | 362113 | April 24, 2004 |
Bell 2 | 362114 | April 24, 2004 |
Bell 3 | 362115 | April 24, 2004 |
Bell 4 | 362116 | April 24, 2004 |
All recorded on NTS map sheet 093L, 12E
History
The property was first staked in 1914. The property was restaked in the thirties by Jack Hemelspech, a local prospector, who kept the ground in good standing up to the time of his death in 1974. In 1981 the ground was staked by David Price and examined in detail by Lacana Mining Corporation in September of that year. Lacana does not appear to have optioned the property and Mr. Price allowed it to lapse in 1989.
In 1989, the property was staked as the Mel claims and in 1998 restaked as the Bell claims by Angel Jade Mines.
This author performed limited sampling over parts of the property in 1993 and 1997. He visited the property in September 2001 to confirm staking of the Bell claims and verify claim post locations.
3
GEOLOGY
General Geology
“The Smithers map – area is underlain by the Lower and Middle Jurassic essentially volcanic Hazelton Group; by the Middle and Upper Jurassic mainly sedimentary Bowser Lake Group; by the Volcanic and sedentary Lower Cretaceous Skeena Group; and, by the Tertiary volcanic Endako and Ootsa Lake Groups. The Early Jurassic Topley Intrusions cut the lower part of the Hazelton Group and a variety of intermediate to acidic plutons of Late Cretaceous to Eocene age intrude most older units throughout the area.
Structurally the area is dominated by a multitude of steep normal faults. Few contacts between map-units are unfaulted and these are mainly intrusive or contacts between younger map-units. Folding is common only in the few sedimentary units and is spatially and genetically related to the Eocene thrust faults.” (Tipper, 1976)
Local Geology
The oldest rocks in the area of the project are Hazelton Group volcanics of Middle Jurassic age. The oldest, Telkwa Formation of variegated red, maroon, grey-green breccia, tuff and flows of basaltic to rhyolitic composition are found in fault contact with a red tuff member of the Nilkitwa Formation, a red to brick red, fine-grained tuff and fine breccia.
Nakina Intrusions of Eocene age are found in outcrop as a small plug in the center of the claim group. These intrusions are composed of quartz monzonite and felsite, in part porphyritic. The normal fault has been traced north – south for 50 miles. This fault, in combinations with the intrusions, was probably the heat source for the mineralizing fluids.
Mineralization
The mineralization is hosted in quartz veins and altered members of a metasedimentary – volcanoclastic package. Detailed mapping has yet to be carried out on the property. The gold and silver values often occur in association with a sulphide mix of galena, sphalerite, chalcopyrite, pyrite and pyrrhotite.
Sample Results
R. T. Heard & Associates Ltd. – 1997 Assay Results
During a re-examination of the property in 1997, two trenches were dug along strike from the pit area, chip sampled and analyzed using a 30 element induced coupled plasma (ICP) procedure.
The ICP analysis is located in the Appendix of this report. A description of sample locations follows:
4
Sample No. | Description-Location | Sample Length | Assay – Ag grams |
119003 | Trench 1 | 0-5 feet | 2.3 |
119004 | " | 5-10 feet | 2.1 |
119005 | " | 10-15 feet | 7.5 |
119006 | " | 15-20 feet | 2.6 |
119007 | " | 20-25 feet | 7.5 |
119008 | " | 25-30 feet | 17.4 |
119009 | " | 30-35 feet | 6.0 |
119010 | Trench 2 | 0-15 feet | 20.3 |
These results show an elevation of silver and iron values along strike. An electromagnetic survey should be able to map any structures through this area and is therefore recommended.
5
CONCLUSIONS
The Bell property contains significant concentrations of precious metals hosted by and adjacent of flat lying quartz veins. These veins outcrop over a vertical distance in excess of 200 meters with strike lengths over 400 meters.
A three-phase exploration program is proposed, using geological mapping, prospecting, geochemical sampling, electromagnetic survey and diamond drilling to further evaluate this prospect. The estimated cost of the recommended program is $266,000.
RECOMMENDATIONS
A three-phase exploration program is proposed.
Phase 1. | Establish a base line with 25-meter stations and cross lines run every 50 metersfor 100 meters each side of the baseline.Geologically map the grid. Conduct anelectromagnetic survey over the grid with readings taken every 25 meters alongthe lines.Rock and geochemical sample those areas determined by thegeological and EM surveys. | |||
These surveys will require two to three weeks.The estimated cost is as follows: | ||||
Grid materials (pickets, paint, flagging etc.) | 500 | |||
Geological and Geochemical supplies | 300 | |||
EM Survey (5.2 km x 200/km) | 2000 | |||
Wages and fees | 10,000 | |||
Camp equipment, operation | 2000 | |||
Helicopter costs | 10,000 | |||
Diamond drilling, (600 ft x $17/ft) | 10,200 | |||
Assaying | 1000 | |||
Sub Total | 36,000 | |||
Contingencies | 5,000 | |||
Cost for Phase 1 | $41,000 |
6
Phase 2. | Contingent uponfavourable results from Phase 1, a second phase of explorationwill be directed towards the continuation of the diamond drilling.It isanticipated that some additional geological mapping, prospecting and somegeochemical sampling will take place as the drilling progresses but separatefunding for that is not identified here. | |||
Cost to complete Phase 2 is estimated to be: | ||||
Transportation | 3,000 | |||
Wages and fees | 13,000 | |||
Camp equipment and operation | 16,500 | |||
Helicopter costs | 15,000 | |||
Diamond drilling (1500 ft x $17/ft) | 25,500 | |||
Assaying | 4,500 | |||
Camp cook, Industrial First Aid | 5,000 | |||
Field costs, including drill fuel ($5.00/ft.) | 7,500 | |||
Subtotal | 90,000 | |||
Contingencies | 10,000 | |||
Total Costs for Phase 2 | 100,000 | |||
Phase 3. | The third phase of exploration will continue the diamond drill program if resultsfrom the phase 2 program remain positive. Cost of the third phase of explorationis estimated to be as follows: | |||
Wages and fees | 15,000 | |||
Camp equipment, operation | 20,000 | |||
Helicopter costs | 15,000 | |||
Diamond drilling (2000 ft x $17/ft) | 34,000 | |||
Assaying and ICP Analyses | 11,000 | |||
Camp cook, Industrial First Aid | 5,000 | |||
Field costs ($5.00/ft) | 10,000 | |||
Subtotal | 110,000 | |||
Contingencies | 15,000 | |||
Total Costs for Phase 3 | 125,000 |
7
SELECTED REFERENCES
Armstrong, J. E. (1944): Smithers, British Columbia; Geological Survey of Canada, Preliminary Map, Paper 44-23.
Carter, N.C. (1973): Geology of the Northern Babine Lake Area, B.C.; Department of Mines and Petroleum Resources, Preliminary Map No.12.
Carter, N.C. (1974): Geology and Geochronology of Porphyry Copper and Molybdenum Deposits in West – Central British Columbia; University of British Columbia, Phd Thesis.
Gower, S.C. (1982): A Report on the Trenching, Sampling and Related Geological Mapping on the Dome #1 Group Mineral Claims; Assessment Report 10,152.
Jones, R.H.B. (1926): Geology and Ore Deposits of Hudson Bay Mountain, Coast District, British Columbia; Geological Survey of Canada, Summary Report, 1925, Part A.
Kirkham, R.V. (1969): A Mineralogical and Geochemical Study of the Zonal Distribution of Ores in the Hudson Bay Range, British Columbia; University of Wisconsin Doctoral Thesis.
Leach, W.W. (1907A): The Telkwa Mining District, British Columbia; Geological Survey of Canada, Summary Report, 1906.
Leach, W.W. (1907B): Telkwa River and Vicinity; Geological Survey of Canada, Separate Report, 988.
Leach, W.W. (1908): The Bulkley Valley, British Columbia; Geological Survey of Canada, Summary Report,1907.
Leach, W.W. (1909): The Bulkley Valley and Vicinity; Geological Survey of Canada, Summary Report, 1908.
Richards, T.A. (1976): Takla Project; McConnell Creek East – Half Map Area; Geological Survey of Canada, in Report of Activities, Paper 76-1, Part A.
Tipper, H.W. (1971): Smithers Map Area, British Columbia; Geological Survey of Canada, Report of Activities, Paper 71-1, Part A; pages 34-37.
Tipper,H.W. (1976): Smithers Map 93L. Geological Compilation by H.W. Tipper, 1976, Field Work T.A. Richards (1970-71) and H.W. Tipper, Geological Survey of Canada, Open File 351.
Tipper, H.W. and T.A. Richards (in press): Jurassic Stratigraphy and History of North-Central British Columbia; Geological Survey of Canada, Bulletin.
8
AUTHOR’S QUALIFICATIONS
I, RICHARD T. HEARD, of 10881 Sunshine Coast Highway, Halfmoon Bay, British Columbia, do hereby certify that:
1 | . | I am a registered Professional Engineer in good standing in the Association ofProfessional Engineers and Geoscientists of British Columbia. |
2 | . | I am a graduate of Haileybury School of Mines, 1958 and of the Montana College ofMineral Science and Technology, Butte, Montana with BSc in Geological Engineering,1971. |
3 | . | I have been practising my profession as an Exploration Geologist for more than 40 yearsand as a Professional Engineer for the past 28 years. |
4 | . | This report is based on a search of published literature as well as a personal knowledge ofthe area. I have visited the property on those times listed herein. |
5 | . | I do not beneficially own, directly or indirectly, any securities of Sterling GroupVentures, Inc. or any affiliate, nor do I expect to receive any interest, direct or indirect inSterling Group Ventures, Inc. or any of its affiliates. |
6 | . | I hereby grant my permission for Sterling Group Ventures, Inc. to use this report for anylegal purposes normal to the business of Sterling Group Ventures, Inc. |
Dated at Vancouver, British Columbia this 31st day of May, 2002.
/s/ R.T. Heard
R.T. Heard, P. Eng.
9