Regulatory Matters, Commitments, Contingencies And Environmental Liabilities | REGULATORY MATTERS, COMMITMENTS, CONTINGENCIES AND ENVIRONMENTAL LIABILITIES Winter Storm Impacts Winter Storm Uri, which occurred in February 2021, resulted in one-time impacts to the Partnership’s consolidated net income and also affected the results of operations in certain segments. The recognition of the impacts of Winter Storm Uri during 2021 required management to make certain estimates and assumptions, including estimates of expected credit losses and assumptions related to the resolution of disputes with counterparties with respect to certain purchases and sales of natural gas. The ultimate realization of credit losses and the resolution of disputed purchases and sales of natural gas could materially impact the Partnership’s financial condition and results of operations in future periods. FERC Proceedings Rover – FERC - Stoneman House In late 2016, FERC Enforcement Staff began a non-public investigation related to Rover’s purchase and removal of a potentially historic home (known as the Stoneman House) while Rover’s application for permission to construct the new 711-mile interstate natural gas pipeline and related facilities was pending. On March 18, 2021, FERC issued an Order to Show Cause and Notice of Proposed Penalty (Docket No. IN19-4-000), ordering Rover to explain why it should not pay a $20 million civil penalty for alleged violations of FERC regulations requiring certificate holders to be forthright in their submissions of information to the FERC. Rover filed its answer and denial to the order on June 21, 2021 and a surreply on September 15, 2021. FERC issued an order on January 20, 2022 setting the matter for hearing before an administrative law judge. The hearing is set to commence on March 6, 2023. On February 1, 2022, Energy Transfer and Rover filed a Complaint for Declaratory Relief in the United States District Court for the Northern District of Texas seeking an order declaring that FERC must bring its enforcement action in federal district court (instead of before an administrative law judge). Also on February 1, 2022, Energy Transfer and Rover filed an expedited request to stay the proceedings before the FERC administrative law judge pending the outcome of the federal district court case. On March 16, 2022, the United States District Court requested briefing from the parties on whether it could stay the FERC ALJ proceedings, while also staying the federal court litigation, until the Supreme Court decides a case that could affect the outcome of the federal lawsuit. The parties filed those briefs on April 5, 2022. The parties have agreed to request a status conference before the federal district court. Energy Transfer and Rover intend to vigorously defend this claim. Rover – FERC - Tuscarawas In mid-2017, FERC Enforcement Staff began a non-public investigation regarding allegations that diesel fuel may have been included in the drilling mud at the Tuscarawas River horizontal directional drilling (“HDD”) operations. Rover and the Partnership are cooperating with the investigation. Enforcement Staff has provided Rover with a notice pursuant to Section 1b.19 of the FERC regulations that Enforcement Staff intends to recommend that the FERC pursue an enforcement action against Rover and the Partnership. The company disagrees with Enforcement Staff’s findings and intends to vigorously defend against any potential penalty. On December 16, 2021, FERC issued an Order to Show Cause and Notice of Proposed Penalty (Docket No. IN17-4-000), ordering Rover to show cause why it should not be found to have violated Section 7(e) of the Natural Gas Act, Section 157.20 of FERC’s regulations, and the Rover Pipeline Certificate Order, and assessed civil penalties of $40 million. Rover filed its answer to this order on March 21, 2022, and Enforcement Staff filed a reply on April 20, 2022. The primary contractor (and one of the subcontractors) responsible for the HDD operations of the Tuscarawas River site have agreed to indemnify Rover and the Partnership for any and all losses, including any fines and penalties from government agencies, resulting from their actions in conducting such HDD operations. Given the stage of the proceedings, the Partnership is unable at this time to provide an assessment of the potential outcome or range of potential liability, if any; however, the Partnership believes the indemnity described above will be applicable to the penalty proposed by Enforcement Staff. Other FERC Proceedings By an order issued January 16, 2019, the FERC initiated a review of Panhandle’s existing rates pursuant to Section 5 of the NGA to determine whether the rates currently charged by Panhandle are just and reasonable and set the matter for hearing. On August 30, 2019, Panhandle filed a general rate proceeding under Section 4 of the NGA. The Natural Gas Act Section 5 and Section 4 proceedings were consolidated by order of the Chief Judge on October 1, 2019. A hearing in the combined proceedings commenced on August 25, 2020 and adjourned on September 15, 2020. The initial decision by the administrative law judge was issued on March 26, 2021. On April 26, 2021, Panhandle filed its brief on exceptions to the initial decision. On May 17, 2021, Panhandle filed its brief opposing exceptions in this proceeding. This matter remains pending before the FERC. In May 2021, the FERC commenced an audit of SPLP for the period from January 1, 2018 to present to evaluate SPLP’s compliance with its FERC oil tariffs, the accounting requirements of the Uniform System of Accounts as prescribed by the FERC, and the FERC’s Form No. 6 reporting requirements. The audit is ongoing. Commitments In the normal course of business, Energy Transfer purchases, processes and sells natural gas pursuant to long-term contracts and enter into long-term transportation and storage agreements. Such contracts contain terms that are customary in the industry. Energy Transfer believes that the terms of these agreements are commercially reasonable and will not have a material adverse effect on the Partnership’s financial position or results of operations. Our joint venture agreements require that we fund our proportionate share of capital contributions to our unconsolidated affiliates. Such contributions will depend upon the unconsolidated affiliates’ capital requirements, such as for funding capital projects or repayment of long-term obligations. We have certain non-cancelable rights-of-way (“ROW”) commitments, which require fixed payments and either expire upon our chosen abandonment or at various dates in the future. The table below reflects ROW expense included in operating expenses in the accompanying consolidated statements of operations: Three Months Ended 2022 2021 ROW expense $ 14 $ 6 Litigation and Contingencies We may, from time to time, be involved in litigation and claims arising out of our operations in the normal course of business. Natural gas and crude oil are flammable and combustible. Serious personal injury and significant property damage can arise in connection with their transportation, storage or use. In the ordinary course of business, we are sometimes threatened with or named as a defendant in various lawsuits seeking actual and punitive damages for product liability, personal injury and property damage. We maintain liability insurance with insurers in amounts and with coverage and deductibles management believes are reasonable and prudent, and which are generally accepted in the industry. However, there can be no assurance that the levels of insurance protection currently in effect will continue to be available at reasonable prices or that such levels will remain adequate to protect us from material expenses related to product liability, personal injury or property damage in the future. We or our subsidiaries are parties to various legal proceedings and/or regulatory proceedings incidental to our businesses. For each of these matters, we evaluate the merits of the case, our exposure to the matter, possible legal or settlement strategies, the likelihood of an unfavorable outcome and the availability of insurance coverage. If we determine that an unfavorable outcome of a particular matter is probable and can be estimated, we accrue the contingent obligation, as well as any expected insurance recoverable amounts related to the contingency. As new information becomes available, our estimates may change. The impact of these changes may have a significant effect on our results of operations in a single period. As of March 31, 2022 and December 31, 2021, accruals of approximately $163 million and $144 million, respectively, were reflected on our consolidated balance sheets related to contingencies that met both the probable and reasonably estimable criteria. In addition, we may recognize additional contingent losses in the future related to (i) contingent matters for which a loss is currently considered reasonably possible but not probable and/or (ii) losses in excess of amounts that have already been accrued for such contingent matters. In some of these cases, we are not able to estimate possible losses or a range of possible losses in excess of amounts accrued. For such matters where additional contingent losses can be reasonably estimated, the range of additional losses is estimated to be up to approximately $600 million. The outcome of these matters cannot be predicted with certainty and there can be no assurance that the outcome of a particular matter will not result in the payment of amounts that have not been accrued for the matter. Furthermore, we may revise accrual amounts or our estimates of reasonably possible losses prior to resolution of a particular contingency based on changes in facts and circumstances or changes in the expected outcome. Dakota Access Pipeline On July 27, 2016, the Standing Rock Sioux Tribe (“SRST”) filed a lawsuit in the United States District Court for the District of Columbia (“District Court”) challenging permits issued by the United States Army Corps of Engineers (“USACE”) that allowed Dakota Access to cross the Missouri River at Lake Oahe in North Dakota. The case was subsequently amended to challenge an easement issued by the USACE that allowed the pipeline to cross land owned by the USACE adjacent to the Missouri River. Dakota Access and the Cheyenne River Sioux Tribe (“CRST”) intervened. Separate lawsuits filed by the Oglala Sioux Tribe (“OST”) and the Yankton Sioux Tribe (“YST”) were consolidated with this action and several individual tribal members intervened (collectively, with SRST and CRST, the “Tribes”). On March 25, 2020, the District Court remanded the case back to the USACE for preparation of an Environment Impact Statement (“EIS”). On July 6, 2020, the District Court vacated the easement and ordered Dakota Access to be shut down and emptied of oil by August 5, 2020. Dakota Access and the USACE appealed to the United States Court of Appeals for the District of Columbia (“Court of Appeals”) which granted an administrative stay of the District Court’s July 6 order and ordered further briefing on whether to fully stay the July 6 order. On August 5, 2020, the Court of Appeals 1) granted a stay of the portion of the District Court order that required Dakota Access to shut the pipeline down and empty it of oil, 2) denied a motion to stay the March 25 order pending a decision on the merits by the Court of Appeals as to whether the USACE would be required to prepare an EIS, and 3) denied a motion to stay the District Court’s order to vacate the easement during this appeal process. The August 5 order also states that the Court of Appeals expected the USACE to clarify its position with respect to whether USACE intended to allow the continued operation of the pipeline notwithstanding the vacatur of the easement and that the District Court may consider additional relief, if necessary. On August 10, 2020, the District Court ordered the USACE to submit a status report by August 31, 2020, clarifying its position with regard to its decision-making process with respect to the continued operation of the pipeline. On August 31, 2020, the USACE submitted a status report that indicated that it considered the presence of the pipeline at the Lake Oahe crossing without an easement to constitute an encroachment on federal land, and that it was still considering whether to exercise its enforcement discretion regarding this encroachment. The Tribes subsequently filed a motion seeking an injunction to stop the operation of the pipeline and both USACE and Dakota Access filed briefs in opposition of the motion for injunction. The motion for injunction was fully briefed as of January 8, 2021. On January 26, 2021, the Court of Appeals affirmed the District Court’s March 25, 2020 order requiring an EIS and its July 6, 2020 order vacating the easement. In this same January 26 order, the Court of Appeals also overturned the District Court’s July 6, 2020 order that the pipeline shut down and be emptied of oil. Dakota Access filed for rehearing en banc on April 12, 2021, which the Court of Appeals denied. On September 20, 2021, Dakota Access filed a petition with the U.S. Supreme Court to hear the case. Oppositions were filed by the Solicitor General (December 17, 2021) and the Tribes (December 16, 2021). Dakota Access filed their reply on January 4, 2022. The District Court scheduled a status conference for February 10, 2021 to discuss the effects of the Court of Appeals’ January 26, 2021 order on the pending motion for injunctive relief, as well as USACE’s expectations as to how it will proceed regarding its enforcement discretion regarding the easement. On May 3, 2021, USACE advised the District Court that it had not changed its position with respect to its opposition to the Tribes’ motion for injunction. It is anticipated that the completion and publication of a draft EIS will not occur until the end of April 2022 at the earliest. On May 21, 2021, the District Court denied the plaintiffs’ request for an injunction. On June 22, 2021, the District Court terminated the consolidated lawsuits and dismissed all remaining outstanding counts without prejudice. The pipeline continues to operate pending completion of the EIS. The USACE now estimates that the EIS will be complete by the end of 2022 or early 2023. Energy Transfer cannot determine when or how future lawsuits will be resolved or the impact they may have on the Dakota Access pipelines; however, Energy Transfer expects after the law and complete record are fully considered, any such proceeding will be resolved in a manner that will allow the pipeline to continue to operate. In addition, lawsuits and/or regulatory proceedings or actions of this or a similar nature could result in interruptions to construction or operations of current or future projects, delays in completing those projects and/or increased project costs, all of which could have an adverse effect on our business and results of operations. Mont Belvieu Incident On June 26, 2016, a hydrocarbon storage well located on another operator’s facility adjacent to Lone Star NGL LLC’s (“Lone Star”), now known as Energy Transfer GC NGLs LLC, facilities in Mont Belvieu, Texas experienced an over-pressurization resulting in a subsurface release. The subsurface release caused a fire at Lone Star’s South Terminal and damage to Lone Star’s storage well operations at its South and North Terminals. Normal operations resumed at the facilities in the fall of 2016, with the exception of one of Lone Star’s storage wells at the North Terminal that has not been returned to service. Lone Star has obtained payment for most of the losses it has submitted to the adjacent operator. Lone Star continues to quantify and seek reimbursement for outstanding losses. MTBE Litigation ETC Sunoco and Energy Transfer R&M (collectively, “Sunoco Defendants”) are defendants in lawsuits alleging MTBE contamination of groundwater. The plaintiffs, state-level governmental entities, assert product liability, nuisance, trespass, negligence, violation of environmental laws, and/or deceptive business practices claims. The plaintiffs seek to recover compensatory damages, and in some cases also seek natural resource damages, injunctive relief, punitive damages, and attorneys’ fees. As of March 31, 2022, Sunoco Defendants are defendants in four cases, including one case initiated by the State of Maryland, one by the Commonwealth of Pennsylvania and two by the Commonwealth of Puerto Rico. The more recent Puerto Rico action is a companion case alleging damages for additional sites beyond those at issue in the initial Puerto Rico action. The actions brought by the State of Maryland and Commonwealth of Pennsylvania have also named as defendants ETO, ETP Holdco, and Sunoco Partners Marketing & Terminals L.P., now known as Energy Transfer Marketing & Terminals L.P. (“ETMT”). It is reasonably possible that a loss may be realized in the remaining cases; however, we are unable to estimate the possible loss or range of loss in excess of amounts accrued. An adverse determination with respect to one or more of the MTBE cases could have a significant impact on results of operations during the period in which any such adverse determination occurs, but such an adverse determination likely would not have a material adverse effect on the Partnership’s consolidated financial position. Litigation Filed By or Against Williams In April and May 2016, The William Companies, Inc. (“Williams”) filed two lawsuits (the “Williams Litigation”) against Energy Transfer, LE GP, LLC, and, in one of the lawsuits, Energy Transfer Corp LP, ETE Corp GP, LLC, and Energy Transfer Equity GP, LLC (collectively, “Energy Transfer Defendants”), alleging that Energy Transfer Defendants breached their obligations under the Energy Transfer-Williams merger agreement (the “Merger Agreement”). In general, Williams alleges that Energy Transfer Defendants breached the Merger Agreement by (a) failing to use commercially reasonable efforts to obtain from Latham & Watkins LLP (“Latham”) the delivery of a tax opinion concerning Section 721 of the Internal Revenue Code (“721 Opinion”), (b) issuing the Partnership’s Series A convertible preferred units (the “Issuance”), and (c) making allegedly untrue representations and warranties in the Merger Agreement. After a two-day trial on June 20 and 21, 2016, the Court ruled in favor of Energy Transfer Defendants and issued a declaratory judgment that Energy Transfer could terminate the merger after June 28, 2016 because of Latham’s inability to provide the required 721 Opinion. The Court did not reach a decision regarding Williams’ claims related to the Issuance nor the alleged untrue representations and warranties. On March 23, 2017, the Delaware Supreme Court affirmed the Court’s ruling on the June 2016 trial. In September 2016, the parties filed amended pleadings. Williams filed an amended complaint seeking a $410 million termination fee (the “Termination Fee”) based on the alleged breaches of the Merger Agreement listed above. Energy Transfer Defendants filed amended counterclaims and affirmative defenses, asserting that Williams materially breached the Merger Agreement by, among other things, (a) failing to use its reasonable best efforts to consummate the merger, (b) failing to provide material information to Energy Transfer for inclusion in the Form S-4 related to the merger, (c) failing to facilitate the financing of the merger, and (d) breaching the Merger Agreement’s forum-selection clause. Trial was held regarding the parties’ amended claims on May 10-17, 2021, and on December 29, 2021, the Court ruled in favor of Williams and awarded it the Termination Fee plus certain fees and expenses, holding that the Issuance breached the Merger Agreement and that Williams had not materially breached the Merger Agreement, though the Court awarded sanctions against Williams due to its CEO’s intentional spoliation of evidence. The Court did not reach a decision on Williams’ tax-related claims. A final judgment has not yet been entered. Energy Transfer Defendants’ deadline to file an appeal to the Delaware Supreme Court has not yet been set. Energy Transfer Defendants cannot predict the ultimate outcome of the Williams Litigation nor can the Energy Transfer Defendants predict the amount of time and expense that will be required to resolve the Williams Litigation. Rover - State of Ohio On November 3, 2017, the State of Ohio and the Ohio Environmental Protection Agency (“Ohio EPA”) filed suit against Rover and other defendants seeking to recover civil penalties allegedly owed and certain injunctive relief related to permit compliance. The defendants filed several motions to dismiss, which were granted on all counts. The Ohio EPA appealed, and on December 9, 2019, the Fifth District Court of Appeals entered a unanimous judgment affirming the trial court. The Ohio EPA sought review from the Ohio Supreme Court, which the defendants opposed in briefs filed in February 2020. On April 22, 2020, the Ohio Supreme Court granted the Ohio EPA’s request for review. On March 17, 2022, the Ohio Supreme Court reversed in part and remanded to the Ohio trial court. The Ohio Supreme Court agreed with Rover that the State of Ohio had waived its rights under Section 401 of the Clean Water Act but remanded to the trial court to determine whether any of the allegations fell outside the scope of the waiver. Revolution On September 10, 2018, a pipeline release and fire (the “Incident”) occurred on the Revolution pipeline, a natural gas gathering line located in Center Township, Beaver County, Pennsylvania. There were no injuries. The Pennsylvania Office of Attorney General (“AG”) has commenced an investigation regarding the Incident, and the United States Attorney for the Western District of Pennsylvania has issued a federal grand jury subpoena for documents relevant to the Incident. The scope of these investigations is not further known at this time. On February 2, 2022, the AG issued a press release related to the Revolution pipeline, and released a Grand Jury Presentment and filed a criminal complaint against ETC Northeast Pipeline, LLC in Magisterial District Court No. 12-2-02 in Dauphin County, Pennsylvania, with respect to nine misdemeanor charges related to various alleged violations of the Clean Streams Law associated with the construction of the Revolution pipeline. The Partnership will defend itself vigorously against these charges. Chester County, Pennsylvania Investigation In December 2018, the former Chester County District Attorney (the “Chester County DA”) sent a letter to the Partnership stating that his office was investigating the Partnership and related entities for “potential crimes” related to the Mariner East pipelines. Subsequently, the matter was submitted to an Investigating Grand Jury in Chester County, Pennsylvania, which has issued subpoenas seeking documents and testimony. On September 24, 2019, the Chester County DA sent a Notice of Intent to the Partnership of its intent to pursue an abatement action if certain conditions were not remediated. The Partnership responded to the Notice of Intent within the prescribed time period. In December 2019, the Chester County DA announced charges against a current employee related to the provision of security services. On June 25, 2020, a preliminary hearing was held on the charges against the employee, and the judge dismissed all charges. On April 22, 2021, the Chester County DA filed a Complaint and Consent Decree in the Court of Common Pleas of Chester County, Pennsylvania constituting a settlement agreement between the Chester County DA and the Partnership. A status conference was held on May 10, 2021, and an Amended Consent Decree was filed on June 16, 2021, which was approved and entered by the Court on December 20, 2021. Delaware County, Pennsylvania Investigation On March 11, 2019, the Delaware County District Attorney’s Office (the “Delaware County DA”) announced that the Delaware County DA and the Pennsylvania Attorney General’s Office (the “AG”), at the request of the Delaware County DA, are conducting an investigation of alleged criminal misconduct involving the construction and related activities of the Mariner East pipelines in Delaware County. On March 16, 2020, the AG served a Statewide Investigating Grand Jury subpoena for documents relating to inadvertent returns and water supplies related to the Mariner East pipelines. The Partnership has complied with the subpoena. On October 5, 2021, the AG held a press conference related to the Mariner East pipelines, released a Grand Jury Presentment and subsequently filed a criminal complaint against Energy Transfer in the Magisterial District Court No. 12-2-02 in Dauphin County, Pennsylvania with respect to 47 misdemeanor charges related to the discharge of industrial waste and pollution and one felony charge related to the failure to report information related to the discharges. The Partnership will defend itself vigorously against these charges. On October 13, 2021, the AG announced that he is running for Governor of Pennsylvania. Shareholder Litigation Regarding Pennsylvania Pipeline Construction Four purported unitholders of Energy Transfer filed derivative actions against various past and current members of Energy Transfer’s Board of Directors, LE GP, LLC, and Energy Transfer, as a nominal defendant that assert claims for breach of fiduciary duties, unjust enrichment, waste of corporate assets, breach of Energy Transfer’s limited partnership agreement, tortious interference, abuse of control, and gross mismanagement related primarily to matters involving the construction of pipelines in Pennsylvania. They also seek damages and changes to Energy Transfer’s corporate governance structure. See Bettiol v. LE GP, Case No. 3:19-cv-02890-X (N.D. Tex.); Davidson v. Kelcy L. Warren, Cause No. DC-20-02322 (44th Judicial District of Dallas County, Texas); Harris v. Kelcy L. Warren, Case No. 2:20-cv-00364-GAM (E.D. Pa.); and King v. LE GP, Case No. 3:20-cv-00719-X (N.D. Tex.). Another purported unitholder of Energy Transfer, Allegheny County Employees’ Retirement System (“ACERS”), individually and on behalf of all others similarly situated, filed a suit under the federal securities laws purportedly on behalf of a class, against Energy Transfer and three of Energy Transfer’s directors, Kelcy L. Warren, John W. McReynolds, and Thomas E. Long. See Allegheny County Emps.’ Ret. Sys. v. Energy Transfer LP, Case No. 2:20-00200-GAM (E.D. Pa.). On June 15, 2020, ACERS filed an amended complaint and added as additional defendants Energy Transfer directors Marshall McCrea and Matthew Ramsey, as well as Michael J. Hennigan and Joseph McGinn. The amended complaint asserts claims for violations of Sections 10(b) and 20(a) of the Exchange Act and Rule 10b-5 promulgated thereunder related primarily to matters involving the construction of pipelines in Pennsylvania. On August 14, 2020, the defendants filed a motion to dismiss ACERS’ amended complaint. On April 6, 2021, the court granted in part and denied in part the defendants’ motion to dismiss. The court held that ACERS could proceed with its claims regarding certain statements put at issue by the amended complaint while also dismissing claims based on other statements. The court also dismissed without prejudice the claims against defendants McReynolds, McGinn, and Hennigan. Fact discovery is ongoing. The defendants cannot predict the outcome of these lawsuits or any lawsuits that might be filed subsequent to the date of this filing; nor can the defendants predict the amount of time and expense that will be required to resolve these lawsuits. However, the defendants believe that the claims are without merit and intend to vigorously contest them. Cline Class Action On July 7, 2017, Perry Cline filed a class action complaint in the Eastern District of Oklahoma against Sunoco (R&M), LLC (now known as Energy Transfer R&M) and ETMT that alleged ETMT failed to make timely payments of oil and gas proceeds from Oklahoma wells and to pay statutory interest for those untimely payments. On October 3, 2019, the Court certified a class to include all persons who received untimely payments from Oklahoma wells on or after July 7, 2012 and who have not already been paid statutory interest on the untimely payments (the “Class”). Excluded from the Class are those entitled to payments of proceeds that qualify as “minimum pay,” prior period adjustments, and pass through payments, as well as governmental agencies and publicly traded oil and gas companies. After a bench trial, on August 17, 2020, Judge John Gibney (sitting from the Eastern District of Virginia) issued an opinion that awarded the Class actual damages of $74.8 million for late payment interest for identified and unidentified royalty owners and interest-on-interest. This amount was later amended to $80.7 million to account for interest accrued from trial (the “Order”). Judge Gibney also awarded punitive damages in the amount of $75 million. The Class is also seeking attorneys’ fees. On August 27, 2020, ETMT filed its Notice of Appeal with the 10th Circuit and appealed the entirety of the Order. The matter was fully briefed, and oral argument was set for November 15, 2021. However, on November 1, 2021, the 10th Circuit dismissed the appeal due to jurisdictional concerns with finality of the Order. En banc rehearing of this decision was denied on November 29, 2021. On December 1, 2021, ETMT filed a Petition for Writ of Mandamus to the 10th Circuit to correct the jurisdictional problems and secure final judgment. On February 2, 2022, the 10th Circuit denied the Petition for Writ of Mandamus, citing that there are other avenues for ETMT to obtain adequate relief. On February 10, 2022, ETMT filed a Motion to Modify the Plan of Allocation Order and Issue a Rule 58 Judgment with the trial court, requesting the district court to enter a final judgment in compliance with the Rules. Sunoco also filed an injunction with the trial court to enjoin all efforts by plaintiffs to execute on any non-final judgment. On March 31, 2022, Judge Gibney denied the Motion to Modify the Plan of Allocation, reiterating his thoughts that the order constitutes a final judgment. Judge Gibney granted the injunction in part (placing a hold on enforcement efforts for 60 days) and denied the injunction in part. ETMT cannot predict the outcome of the case, nor can ETMT predict the amount of time and expense that will be required to resolve the appeal. However, ETMT intends to vigorously appeal the entirety of the Order, including an appeal of the partial denial of the injunction and denial of the Motion to Modify to the 10th Circuit. Additionally, a Petition for Writ of Certiorari was filed with the United States Supreme Court on April 28, 2022 seeking review of the 10th Circuit’s dismissal of ETMT’s appeal. Energy Transfer LP and ETC Texas Pipeline, Ltd. v. Culberson Midstream LLC, et al. On April 8, 2022, Energy Transfer LP (“Energy Transfer”) and ETC Texas Pipeline, Ltd. (“ETC,” and together with Energy Transfer, “Plaintiffs") filed suit against Culberson Midstream LLC (“Culberson”), Culberson Midstream Equity, LLC (“Culberson Equity”), and Moontower Resources Gathering, LLC (“Moontower,” and together with Culberson and Culberson Equity, “Defendants”). On October 1, 2018, ETC and Culberson entered into a Gas Gathering and Processing Agreement (the “Bypass GGPA”) under which Culberson was to gather gas from its dedicated acreage and deliver all committed gas exclusively to ETC. In connection with the Bypass GGPA, on October 18, 2018, Energy Transfer and Culberson Equity also entered into an Option Agreement. Under the Option Agreement, Culberson Equity and Moontower had the right (but not the obligation) to require Energy Transfer to purchase their respective interests in Culberson by way of a put option. Notably, the Option Agreement is only enforceable so long as the parties comply with the Bypass GGPA. In late March 2022, Culberson Equity and Moontower submitted a put notice to Energy Transfer seeking to require Energy Transfer to purchase their respective interests in Culberson for approximately $93 million. On April 8, 2022, Plaintiffs filed suit against Defendants asserting claims for declaratory judgment and breach of contract. Plaintiffs contend that Defendants materially breached the Bypass GGPA by sending some committed gas to third parties and also by failing to send any gas to Plaintiffs since March 2020, and thus that Defendants' put no |