All wells are expected to be onstream at the beginning of the second quarter. The PCU#9 provides strong consistent production additions to the Company, helping to maintain production and provide solid cash flow.
The non-operated Pembina Cardium Unit 11 (“PCU#11”) (45 percent working interest) provided strong production additions in 2023. Following up on this success in 2024, Obsidian Energy is participating in a 12 (5.4 net) well program in the area, which includes 3 (1.3 net) injection wells.
Willesden Green (Cardium)
Completing the second half 2023 program, most of the wells came onstream in late December with the remaining wells in the program now on production. Originally designed as a two (2.0 net) well pad, mechanical issues when placing the liner on the 12-30 Pad necessitated re-drilling one of the locations. The two wells are now completed as planned, producing at an average IP 30-day rate of 154 boe/d (60 percent oil). In addition, the one (1.0 net) well at the 1-06 Pad that came onstream at the end of December 2023 had an IP 30-day rate of 136 boe/d (86 percent oil). The IP rates from these wells are lagging our typical Willesden Green results but provides important information for future development.
We have now also rig released the third well at the three-well 4-18 Pad in January with all three (3.0 net) wells now onstream. We also drilled two (2.0 net) wells of the three (3.0 net) wells planned at the Crimson 2-13 Pad in the first half program.
Viking
Following up on our previous success at Viking, we accelerated drilling of an eight (8.0 net) well program on the 2-22 Pad into the fourth quarter of 2023. All eight (8.0 net) wells are on production and currently contributing over 1,300 boe/d of production from the pad in February post optimization.
HEAVY OIL ASSETS (PEACE RIVER)
Our 2024 capital program in Peace River represents a significant milestone in the development and exploration/appraisal of this asset. The first half 2024 program includes 11 (11.0) net development wells targeting the Bluesky and Clearwater formations, and two (2.0 net) Clearwater exploration/appraisal wells.
Continuing our testing of the multizone heavy oil potential across our Peace River acreage, Obsidian Energy completed drilling and coring all five (5.0 net) oilsands exploration (“OSE”) wells planned for our first half 2024 program. The detailed technical results from these wells help us further characterize our significant land base as we look to accelerate future development areas. Early results are highly encouraging.
Clearwater
Obsidian Energy began to unlock our Clearwater formation potential across our acreage from both a development and exploration/appraisal perspective in 2023, establishing the Dawson field as our first Clearwater development area. Based on these results, the team planned a 13 (13.0 net) well Peace River Clearwater development program in 2024 to further delineate existing prospects and add production.
Our first quarter 2024 program includes the drilling, coring and testing of two (2.0 net) exploration/appraisal wells in our Nampa area. We are extremely pleased with the early results of the Nampa 6-28 Pad (1.0 net) well, which is showing the best quality Clearwater oil to date in our Peace River area. Currently producing at an IP 15-day rate of 210 boe/d (100 percent oil and a peak rate of 282 boe/d), oil quality is 16.0o API which is expected to sell at an incremental $6.00 – $8.00/bbl pricing premium to existing Bluesky production. The second well in our first half 2024 Clearwater exploration/appraisal program at Nampa is in the process of being drilled and is expected to be online in early March.
2