AT A GLANCE
3/24/2014
18
Strategic
Location
Serves top producing counties in North Dakota - Mountrail and McKenzie counties
At terminus of Canadian Pacific line, which offers enhanced rail access and reduced
congestion
Unique road access to highway infrastructure, providing the only Missouri River bridge
crossing for approximately 70 miles
Unique
Infrastructure
Capabilities
Pioneer Terminal double loop tracks capable of transloading a 120 car unit train per day
180,000 bbls of existing onsite storage, with expansion to 270,000 bbls permitted & designed
Capacity for five gathering pipelines (one online and one has been announced)
Four ladder tracks expanding to eight for inbound commodity products
70 acre industrial yard site secured inside loop track
World Class
Joint Ventures
Transloading joint venture oversight provided by DAKP (DAKP consolidates the transloading JV
financials as of EOY 2013)
Strobel Starostka Transfer provides terminal logistics service
Crude oil marketing joint venture; joint venture has 1,000+ leased rail cars
Trucking joint venture provides vertical integration and greater control of crude delivery to Pioneer
Experienced
Management
& Board
Management has extensive expertise in the midstream and upstream segments, project construction,
finance, legal, and entrepreneurial growth
Board expertise in the fields of rail, logistics, finance, and the Williston Basin
Growth
Inventory
Pioneer expansion built on time and under budget for $50 million to increase throughput capacity
from 30,000 bpd to 80,000 bpd; Pioneer enables further growth in 2014 and 2015
Frac sand terminal project underway with UNIMIN (largest supplier to Bakken); other expected
projects include diesel inbound, NGL outbound, drill pipe yard, and industrial yard