Exhibit 10.45
EXECUTION
VERSION
MASTER INFORMATION TECHNOLOGY SERVICES AGREEMENT
DATED JULY 16, 2003
BETWEEN
VANGUARD CAR RENTAL USA INC., A DELAWARE CORPORATION
AND
PEROT SYSTEMS CORPORATION, A DELAWARE CORPORATION
MASTER INFORMATION TECHNOLOGY SERVICES AGREEMENT
TABLE OF CONTENTS
ARTICLE 1 DEFINITIONS | | 2 |
1.1 | | Certain Definitions | | 2 |
| | | | |
ARTICLE 2 GENERAL PROVISIONS AND OBLIGATIONS | | 11 |
2.1 | | Overview of Agreement | | 11 |
2.2 | | Conditions to Obligations of Newco | | 12 |
2.3 | | Conditions to Obligations of Perot Systems | | 13 |
2.4 | | Exclusivity | | 14 |
2.5 | | Account Manager | | 15 |
2.6 | | Conduct of Personnel | | 16 |
| | | | |
ARTICLE 3 DESCRIPTION OF SERVICES AND SERVICE LEVELS | | 16 |
3.1 | | Provision of Services | | 16 |
3.2 | | Variable Services | | 17 |
3.3 | | Post-Effective Date Adjustments | | 18 |
3.4 | | Service Locations | | 18 |
3.5 | | Overview of Services | | 18 |
3.6 | | Annual Technology Plan | | 19 |
3.7 | | Training | | 21 |
3.8 | | Perot Systems Licenses and Permits; Export | | 21 |
3.9 | | No Adverse Changes to the Services | | 22 |
3.10 | | Subcontractors | | 22 |
3.11 | | Changes to Services Due to Changes in Newco’s Business | | 22 |
3.12 | | Service Levels | | 22 |
3.13 | | European and Asian Affiliates | | 24 |
| | | | |
ARTICLE 4 CERTAIN NEWCO OBLIGATIONS | | 25 |
4.1 | | Newco’s Cooperation | | 25 |
4.2 | | Access to Newco’s Facilities | | 25 |
4.3 | | Support | | 26 |
4.4 | | Third Party Bids | | 26 |
4.5 | | Certain Obligations | | 27 |
| | | | |
ARTICLE 5 PEROT SYSTEMS OBLIGATIONS | | 27 |
5.1 | | Perot Systems’ Cooperation | | 27 |
5.2 | | Access to Perot Systems’ Facilities | | 27 |
5.3 | | Employee Transfers | | 28 |
5.4 | | Key Employees | | 28 |
5.5 | | Required Consents | | 28 |
| | | | |
ARTICLE 6 RESPONSIBILITY FOR ASSETS | | 29 |
6.1 | | General | | 29 |
i
6.2 | | Existing Hardware | | 30 |
6.3 | | Replacement and Additional Hardware | | 31 |
6.4 | | Existing Software | | 32 |
6.5 | | Replacement and Additional Software | | 34 |
6.6 | | Third Party Service Contracts | | 35 |
6.7 | | Certain Hardware and Software Provided by Perot Systems | | 35 |
6.8 | | Managed Contracts. | | 36 |
| | | | |
ARTICLE 7 CHARGES AND PAYMENT | | 36 |
7.1 | | Charges for Services | | 36 |
7.2 | | Charges for Additional Services | | 37 |
7.3 | | Service Level Credits | | 37 |
7.4 | | Reimbursable Expenses | | 38 |
7.5 | | Retained and Pass-Through Expenses | | 38 |
7.6 | | Taxes and Tax Planning | | 39 |
7.7 | | Pricing Adjustments | | 41 |
7.8 | | Invoices and Payment | | 42 |
7.9 | | Audits by Newco | | 44 |
7.10 | | Internal Benchmarking | | 45 |
7.11 | | Newco Satisfaction Surveys | | 45 |
7.12 | | Extraordinary Events | | 46 |
7.13 | | Change of Location | | 47 |
| | | | |
ARTICLE 8 INTELLECTUAL PROPERTY AND CONFIDENTIALITY | | 47 |
8.1 | | Confidential Information | | 47 |
8.2 | | Residual Knowledge | | 50 |
8.3 | | PSC Software, Tools and Methodologies | | 50 |
8.4 | | Other Proprietary Rights | | 51 |
8.5 | | Trademark Protection | | 51 |
8.6 | | Functionally Similar Software | | 52 |
8.7 | | Rights in GreenWay 1.0, Odyssey and VRS | | 52 |
8.8 | | Ownership of Newco Data | | 54 |
8.9 | | Return of Data | | 54 |
8.10 | | Data Privacy | | 55 |
8.11 | | Developed Software Rights | | 55 |
8.12 | | Websites | | 56 |
8.13 | | Further Assurances | | 56 |
| | | | |
ARTICLE 9 DISASTER RECOVERY AND BUSINESS CONTINUITY | | 57 |
9.1 | | Disaster Recovery | | 57 |
9.2 | | Business Continuity | | 57 |
| | | | |
ARTICLE 10 TERM AND TERMINATION | | 58 |
10.1 | | Term | | 58 |
10.2 | | Renewals | | 58 |
10.3 | | Termination for Cause | | 58 |
10.4 | | Termination for Service Level Performance | | 59 |
10.5 | | Termination for Non-Payment | | 59 |
10.6 | | Termination for Insolvency; Bankruptcy | | 59 |
10.7 | | Termination for Convenience | | 60 |
10.8 | | Termination for Critical Service Failures | | 60 |
10.9 | | Termination for Change in Control of Perot Systems | | 61 |
10.10 | | Termination Assistance | | 61 |
10.11 | | Return of Perot Systems Tools | | 62 |
10.12 | | Partial Discontinuance | | 62 |
| | | | |
ARTICLE 11 WARRANTIES AND CERTAIN COVENANTS | | 63 |
11.1 | | By Newco | | 63 |
11.2 | | By Perot Systems | | 64 |
11.3 | | Certain Covenants | | 66 |
11.4 | | Viruses | | 67 |
| | | | |
ARTICLE 12 INDEMNITIES | | 68 |
12.1 | | Cross Indemnity | | 68 |
12.2 | | Perot Systems Employment Indemnification | | 68 |
12.3 | | Newco Employment Indemnification | | 68 |
12.4 | | Indemnification Procedures | | 68 |
12.5 | | Subrogation | | 69 |
12.6 | | Intellectual Property Indemnity by Perot Systems | | 69 |
12.7 | | Intellectual Property Indemnity By Newco | | 70 |
12.8 | | Certain Third Party Claims | | 70 |
12.9 | | Infringement Indemnification Procedures | | 70 |
| | | | |
ARTICLE 13 DAMAGES AND LIMITATIONS OF LIABILITY | | 71 |
13.1 | | Limitation on Liability | | 71 |
13.2 | | Consequential Damages | | 71 |
13.3 | | Exclusions | | 71 |
13.4 | | Mitigation | | 71 |
13.5 | | Force Majeure | | 72 |
| | | | |
ARTICLE 14 INSURANCE | | 73 |
14.1 | | Insurance | | 73 |
14.2 | | Insurance Documentation | | 73 |
14.3 | | Risk of Loss | | 74 |
14.4 | | No Limitation | | 74 |
| | | | |
ARTICLE 15 INITIAL DISPUTE RESOLUTION | | 74 |
15.1 | | General | | 74 |
15.2 | | Management Meetings | | 74 |
| | | | |
ARTICLE 16 GENERAL | | 75 |
16.1 | | No Hire Commitments | | 75 |
16.2 | | Notices | | 76 |
16.3 | | Assignment | | 76 |
16.4 | | Severability | | 77 |
16.5 | | Relationship of Parties | | 77 |
16.6 | | Approvals and Similar Actions | | 77 |
16.7 | | Covenant of Good Faith | | 77 |
16.8 | | Non-disparagement | | 77 |
16.9 | | Press Releases | | 77 |
16.10 | | Modification; Waiver | | 77 |
16.11 | | Governing Law and Consent to Jurisdiction | | 78 |
16.12 | | Entire Agreement | | 78 |
16.13 | | Survival | | 78 |
16.14 | | Section, Exhibit, and Schedule References | | 78 |
List of Exhibits and Schedules
Exhibits | | |
| | |
A | | Services |
| | Attachment A-1 – Intentionally Omitted |
| | Attachment A-2 – Transition Services |
| | Attachment A-3 – VRS Project Services |
| | Attachment A-4 – Supported Desktop Hardware and Supported Desktop Software |
B | | Service Levels and Service Level Credits |
C | | Charges |
| | Attachment C-1 – Resource Units |
| | Attachment C-2 – Annual Services Charge, Resource Baselines and ARC/RRC Rates |
| | Attachment C-3 – T&M Rates |
| | Attachment C-4 – Newco Retained Expenses |
D | | Form of Partial Termination and Assignment Agreement |
E | | Form of Customer Satisfaction Survey |
F | | Change Control Process |
| | |
Schedules | | |
| | |
2.4(b) | | Newco Retained Functions |
2.4(c) | | Exclusive Services and Software |
3.1(c) | | Supported Affiliates and Franchisees/Licensees |
3.4 | | Service Locations |
5.4 | | Key Employees |
6.1 | | Responsibility Allocation Matrices |
6.2(a) | | Supported Hardware Owned by Newco |
6.2(b) | | Supported Hardware Leased by Newco |
6.4(a) | | Third Party Systems Software |
6.4(b) | | Third Party Applications Software |
6.6 | | Third Party Service Contracts |
8.3 | | PSC Software and PSC Tools |
8.7(b) | | Newco Proprietary Information |
8.11(b) | | Embedded Software |
10.8 | | Critical Services |
10.9 | | Restricted Acquirers |
10.10 | | Termination Assistance Services |
MASTER INFORMATION TECHNOLOGY SERVICES AGREEMENT
This Master Information Technology Services Agreement (this “MSA”), dated July 16, 2003 (the “Agreement Date”), is between: (i) Perot Systems Corporation, a Delaware corporation (“Perot Systems”) having its principal place of business at 2300 West Plano Parkway, Plano, Texas 75075; and (ii) Vanguard Car Rental USA Inc., a Delaware corporation, having its principal place of business at 200 South Andrews Avenue, Ft. Lauderdale, Florida 33301 (“Newco”). This MSA is not effective until the occurrence of the Effective Date (defined below).
RECITALS
WHEREAS, CAR Acquisition Company LLC has entered into an Asset Purchase Agreement, dated as of June 12, 2003, as amended by the First Amendment to Asset Purchase Agreement dated as of June 30, 2003, (as so amended, the “APA”), with ANC Rental Corporation, a Delaware corporation and Debtor-in-Possession in case number 01-11200 (and others, jointly administered), pending in the United States Bankruptcy Court for the District of Delaware (“ANC Rental”) and certain subsidiaries of ANC Rental, including but not limited to National Car Rental System, Inc., a Delaware corporation (“National”), Alamo Rent-A-Car, LLC, a Delaware limited liability company (“Alamo”), and ANC Information Technology, L.P., a Delaware limited partnership (“ANC”; ANC Rental, National, Alamo, ANC and such other subsidiaries are collectively referred to as “Debtors”), pursuant to which CAR Acquisition Company LLC intends, directly or through wholly-owned Affiliates, including Newco, to acquire (the “Acquisition”) certain Acquired Assets (defined below) and assume certain liabilities of Debtors relating to their ownership and operation of car rental businesses and licensing of the right to operate car rental businesses mainly throughout the United States, Canada and Europe (the “Business”);
WHEREAS, Perot Systems has been providing to Debtors certain information technology services in connection with the Business pursuant to that certain Master Services Agreement between Perot Systems and ANC entered into effective as of September 30, 2000, including Work Orders #1 through #3 thereto entered into effective as of September 30, 2000 (collectively, the “ANC Agreement”);
WHEREAS, in that certain Services Agreement, dated as of September 30, 1997, between National and Perot Systems (the “National Agreement”), National was granted (i) a perpetual, non-exclusive, non-transferable, fully-paid sublicense to copy, use, perform, distribute and make Derivative Works (defined below) from the automobile rental information system known as “GreenWay 1.0” which was developed and operated by Perot Systems Europe Limited, a wholly-owned subsidiary of Perot Systems, for Europcar International, S.A. (“Europcar”), and (ii) a perpetual, non-exclusive, non-transferable, fully-paid license to copy, use, perform, distribute and make Derivative Works from all Derivative Works, additions or enhancements to GreenWay 1.0 made by Perot Systems under the National Agreement (the “GreenWay Modifications”; GreenWay 1.0, as modified by the GreenWay Modifications, is referred to as the “GreenWay System”), in each case for the internal use of National, its subsidiaries and its franchisees (such sublicense and license are collectively referred to as the “GreenWay License”);
WHEREAS, the GreenWay License (i) survived the termination of the National Agreement in accordance with the terms of the Termination Agreement, dated September 30, 2000, between Perot Systems and National (the “National Termination Agreement”), and (ii) was extended in the ANC Agreement to apply to Derivative Works, additions or enhancements to the GreenWay System under the terms of Work Order #1 to the ANC Agreement (the “Odyssey Modifications”; the GreenWay System, as modified by the Odyssey Modifications, is the “Odyssey System,” and the GreenWay License, as extended by Work Order #1 to the ANC Agreement is the “Odyssey License”);
WHEREAS, Newco desires Perot Systems, and Perot Systems is willing, to provide to Newco the information technology services necessary to support the Business of Newco and its Affiliates and, incidentally, their Franchisees/Licensees upon consummation of the Acquisition;
WHEREAS, in connection with the Acquisition, on the Effective Date, ANC, ANC Rental National, Alamo, Newco and Perot Systems will enter into the ANC Partial Termination and Assignment Agreement under which, inter alia, all of National’s and its Affiliates’ rights under the GreenWay License and the Odyssey License will be assigned to Newco;
WHEREAS, under the ANC Partial Termination and Assignment Agreement, Perot Systems and Newco intend that the ANC Agreement terminate immediately prior to the Effective Date except that, despite the termination of the ANC Agreement, the Odyssey License shall survive, shall be assigned to Newco and shall be expanded hereunder, and that Newco shall have no liability to Perot Systems or any of its Affiliates with respect to the ANC Agreement or the GreenWay License or the Odyssey License with respect to any period prior to the Effective Date; and
WHEREAS, Newco desires (i) to consolidate its information technology operations and systems and those of its Affiliates engaged in the Business, (ii) to modify the GreenWay License and the Odyssey License to expand them to cover Newco and all of Newco’s Affiliates and Franchisees/Licensees that are engaged in the Business from time to time, (iii) to enhance the Odyssey System to include certain functions and capabilities of the legacy automobile rental information system used by Alamo as of the Agreement Date (the “Legacy System”), (iv) to decommission the Legacy System, and (v) to outsource Newco’s and its Affiliates’ information technology services requirements to Perot Systems, and Perot Systems desires to provide such services and modifications hereunder;
NOW, THEREFORE, in consideration of the mutual promises, covenants and conditions contained herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereto, intending to be legally bound, agree as follows:
ARTICLE 1
DEFINITIONS
1.1 Certain Definitions Capitalized terms used in this MSA have the meanings ascribed to such terms in the following sections of this Article 1 or in the sections of this MSA where such terms are defined. Terms, acronyms, and phrases utilized in the information
2
technology services industry or other pertinent business context that are not otherwise defined in this MSA shall be interpreted in accordance with their generally understood meaning in such industry or business context.
1.2 | | “Account Manager” is defined in Section 2.5. |
| | |
1.3 | | “Acquisition” is defined in the recitals. |
| | |
1.4 | | “Acquired Assets” is defined in the APA. |
| | |
1.5 | | “Additional Services” means services that are in addition to the Base Services. |
| | |
1.6 | | “Additional Services Rates” means the hourly, daily and monthly rates for Additional Services that are set forth in Attachment C-3 to Exhibit C. |
| | |
1.7 | | “Affiliate” means, with respect to a legal entity (the principal entity), another legal entity (the affiliate) that controls, is controlled by, or is under common control with, the principal entity, determined in accordance with the rules and regulations of the United States Securities and Exchange Commission. |
| | |
1.8 | | “Agreement Date” is defined in the preamble. |
| | |
1.9 | | “Alamo” is defined in the recitals. |
| | |
1.10 | | “Alamo Domain Name” is defined in Section 8.12(a). |
| | |
1.11 | | “Alamo Website” is defined in Section 8.12(b). |
| | |
1.12 | | “ANC” is defined in the recitals. |
| | |
1.13 | | “ANC Agreement” is defined in the recitals. |
| | |
1.14 | | “ANC Rental” is defined in the recitals. |
| | |
1.15 | | “ANC Partial Termination and Assignment Agreement” is defined in Section 2.2(c). |
| | |
1.16 | | “Annual Services Charge” is defined in Exhibit C. |
| | |
1.17 | | “APA” is defined in the recitals. |
| | |
1.18 | | “Applications Software” means Third Party Applications Software and Newco Applications Software. |
| | |
1.19 | | “Assigned Hardware” means Assigned Hardware (Leased) and Assigned Hardware (Owned). |
| | |
1.20 | | “Assigned Hardware (Leased)” is defined in Section 6.2(b)(i). |
| | |
1.21 | | “Assigned Hardware (Owned)” is defined in Section 6.2(a)(i). |
3
| | |
1.22 | | “Assigned Hardware Leases” is defined in Section 6.2(b)(i). |
| | |
1.23 | | “Assigned Systems Software Licenses” is defined in Section 6.4(a)(i). |
| | |
1.24 | | “Assigned Third Party Applications Software” means Third Party Applications Software that is assigned to Perot Systems as provided in Section 6.4(b)(ii). |
| | |
1.25 | | “Assigned Third Party Applications Software Licenses” is defined in Section 6.4(b)(ii). |
| | |
1.26 | | “Assigned Third Party Service Contracts” is defined in Section 6.6(a). |
| | |
1.27 | | “Base Services” means the Transition Services, Data Center Services, VRS Project Services (which include, without limitation, the development, testing and implementation of the Legacy Customizations), Core Applications Services (which include, without limitation, the development, testing and implementation of the Maintenance Modifications and Non-Legacy Customizations), Desktop Services, Disaster Recovery Services, General Services (which include, without limitation, Website Services, Procurement Services, Vendor Management and Hardware and Software Maintenance), Help Desk Services, LAN/WAN and Remote Network Monitoring Services, Security Services, Training, and Voice Communications Management Services. |
| | |
1.28 | | “BLS” is defined in Section 7.7. |
| | |
1.29 | | “Business” is defined in the recitals. |
| | |
1.30 | | “Business Day” means every day Monday through Friday other than those holidays when Newco’s corporate headquarters is not open for business. |
| | |
1.31 | | “Change” means a material alteration in or addition to the Base Services or any Additional Services hereunder made after commencement of such Base Services or Additional Services. |
| | |
1.32 | | “Change Control Process” is defined in Exhibit F. |
| | |
1.33 | | “Change Order” means a direction from Newco to Perot Systems to effect a Change as described in Exhibit F. |
| | |
1.34 | | “Confidential Information” is defined in Section 8.1(a). |
| | |
1.35 | | “Content” is defined in Section 8.12(c). |
| | |
1.36 | | “Contract Year” means a 12-month period ending on an anniversary of the Effective Date. |
| | |
1.37 | | “Control” means with regard to any entity (i) the legal, beneficial, or equitable ownership, directly or indirectly, of more than fifty percent (50%) of a class of the capital stock (or other ownership interest, if such entity is not a corporation) of such entity ordinarily having voting rights to elect or appoint the Board of Directors (or similar |
4
| | governing body if such entity is not a corporation) of such entity, or (ii) the power, directly or indirectly, to elect or appoint more than fifty percent (50%) of the Board of Directors (or similar governing body if such entity is not a corporation) of such entity, whether through ownership of voting securities, by contract, or otherwise, provided that with respect to an entity that is not the ultimate parent of a controlled group, Control of the entity shall be deemed to refer to Control of the ultimate parent. |
| | |
1.38 | | “Core Applications Services” means the services described in Article 5 of Exhibit A. |
| | |
1.39 | | “CPI” is defined in Section 7.7. |
| | |
1.40 | | “Critical Services” is defined in Section 10.8(a). |
| | |
1.41 | | “Damages” is defined in Section 12.1. |
| | |
1.42 | | “Data Center Services” means the services described in Article 4 of Exhibit A. |
| | |
1.43 | | “Days” or “days” means calendar days unless otherwise stated. |
| | |
1.44 | | “Debtors” is defined in the recitals. |
| | |
1.45 | | “Derivative Work” means a derivative work as that term is defined and used within the U.S. Copyright Act. |
| | |
1.46 | | “Desktop Services” means the services described in Article 6 of Exhibit A. |
| | |
1.47 | | “Developed Software” is defined in Section 8.11(a). |
| | |
1.48 | | “Disabling Code” is defined in Section 11.2(e). |
| | |
1.49 | | “Disaster Recovery Services” means the services described in Section 9.1 and in Article 8 of Exhibit A. |
| | |
1.50 | | “ECI” is defined in Section 7.7. |
| | |
1.51 | | “Effective Date” means (i) the date on which all of the conditions to each Party’s obligations under this MSA set forth in Sections 2.2 and 2.3 are satisfied, or (ii) such other date as the Parties mutually agree. |
| | |
1.52 | | “Embedded Software” is defined in Section 8.11(b). |
| | |
1.53 | | “End-User” is defined in Article 1 of Exhibit A. |
| | |
1.54 | | “Europcar” is defined in the recitals. |
| | |
1.55 | | “European and Asian Affiliates” is defined in Section 3.13(a). |
| | |
1.56 | | “Extension Period” is defined in Section 10.2. |
5
1.57 | | “Extraordinary Event” is defined in Section 7.12. |
| | |
1.58 | | “Force Majeure” is defined in Section 13.5. |
| | |
1.59 | | “Franchisees/Licensees” is defined in Section 3.1(c). |
| | |
1.60 | | “General Services” means the services described in Article 2 of Exhibit A. |
| | |
1.61 | | “GreenWay 1.0” means the automobile rental management information system originally developed and operated by Perot Systems Europe Ltd. for Europcar, including the related documentation for and interfaces to such system. |
| | |
1.62 | | “GreenWay License” is defined in the recitals. |
| | |
1.63 | | “GreenWay Modifications” is defined in the recitals. |
| | |
1.64 | | “GreenWay System” is defined in the recitals. |
| | |
1.65 | | “Hardware” means computers, machines, peripherals and other equipment. |
| | |
1.66 | | “Hardware and Software Maintenance” means the hardware and software maintenance services described in Section 2.7 of Exhibit A. |
| | |
1.67 | | “Help Desk Services” means the services described in Article 3 of Exhibit A. |
| | |
1.68 | | “Initial Term” is defined in Section 10.1. |
| | |
1.69 | | “Intellectual Property Rights” is defined in Section 8.4(a). |
| | |
1.70 | | “Key Employees” is defined in Section 5.4. |
| | |
1.71 | | “LAN/WAN and Remote Network Monitoring Services” means the services described in Article 7 of Exhibit A. |
| | |
1.72 | | “Legacy Customizations” means Derivative Works, additions and enhancements to the Odyssey System made in connection with the VRS Project under this MSA to add functionality to the Odyssey System taken from, or similar to, functionality of the Legacy System, as such additions and enhancements are further described in Attachment A-3 of Exhibit A. |
| | |
1.73 | | “Legacy System” is defined in the recitals. |
| | |
1.74 | | “Maintenance Modifications” means generic error correction, performance enhancement and other modifications made to the Odyssey System generally for the customers of Perot Systems (including Newco) in connection with regular maintenance of the Odyssey System (expressly excluding modifications and enhancements made as part of the VRS Project Services and specific features and functions described in a Change Order). |
| | |
1.75 | | “Major Project” is defined in Section 2.4(b)(v). |
6
1.76 | | “Managed Asset” is defined in Section 6.1. |
| | |
1.77 | | “Managed Contracts” is defined in Section 6.1. |
| | |
1.78 | | “MSA” means (i) this Master Information Technology Services Agreement and the attached Attachments, Exhibits and Schedules, and (ii) any Change Orders and the Attachments, Exhibits and Schedules attached to the Change Orders. |
| | |
1.79 | | “National” is defined in the recitals. |
| | |
1.80 | | “National Agreement” is defined in the recitals. |
| | |
1.81 | | “National Domain Name” is defined in Section 8.12(d). |
| | |
1.82 | | “National Termination Agreement” is defined in the recitals. |
| | |
1.83 | | “National Website” is defined in Section 8.12(e). |
| | |
1.84 | | “New Representative” is defined in Section 15.2(b). |
| | |
1.85 | | “Newco” is defined in the preamble. |
| | |
1.86 | | “Newco Applications Software” is defined in Section 6.4(b)(iii). |
| | |
1.87 | | “Newco Data” is defined in Section 8.8. |
| | |
1.88 | | “Newco Personnel” means employees and subcontractors of any tier of Newco or any Affiliate or subcontractor of Newco (other than PSC Personnel). |
| | |
1.89 | | “Newco Retained Functions” means the information technology services and functions described in Schedule 2.4(b). |
| | |
1.90 | | “Newco Service Location” means a Service Location owned or leased by Newco. |
| | |
1.91 | | “Non-Legacy Customizations” means Derivative Works, additions and enhancements to the Odyssey System made under this MSA pursuant to a Change Order. |
| | |
1.92 | | “Notice of Election” is defined in Section 12.4(a). |
| | |
1.93 | | “Notice Period” has the meanings set forth in Section 10.4. |
| | |
1.94 | | “Odyssey License” is defined in the recitals. |
| | |
1.95 | | “Odyssey Modifications” is defined in the recitals. |
| | |
1.96 | | “Odyssey System” is defined in the recitals. |
| | |
1.97 | | “Operations Procedures Manual” is defined in Section 2.2 of Exhibit A. |
7
1.98 | | “Parties” means Perot Systems and Newco. |
| | |
1.99 | | “Pass-Through Expenses” means out-of-pocket expenses (i) described in Attachment C-4 to Exhibit C, or (ii) paid to third parties by Perot Systems on behalf of Newco or the Supported Affiliates as an administrative convenience at Newco’s request (e.g., any Retained Expenses that are paid by Perot Systems at Newco’s request) that are to be reimbursed by Newco, without a mark-up, as provided in Section 7.5(a). |
| | |
1.100 | | “Perot Systems” is defined in the preamble. |
| | |
1.101 | | “Perot Systems Data Center” means a data center owned or leased and operated by Perot Systems where the Services are being primarily performed, including the data centers located at 1780 Jay Ell Drive, Richardson, Texas 75081 and 2300 West Plano Parkway, Plano, Texas 75075. |
| | |
1.102 | | “Perot Systems Service Location” means a Service Location owned or leased and operated by Perot Systems. |
| | |
1.103 | | “Personal Information” is defined in Section 8.10. |
| | |
1.104 | | “Procurement Services” means the procurement services described in Section 2.7 of Exhibit A. |
| | |
1.105 | | “PSC Personnel” means employees and Subcontractors of any tier of Perot Systems or any Affiliate or Subcontractor of Perot Systems. |
| | |
1.106 | | “PSC Software” is defined in Section 8.3. |
| | |
1.107 | | “PSC Tools” is defined in Section 8.3. |
| | |
1.108 | | “Remote Support Site” means the locations listed in Schedule 3.4 where Supported Hardware is located or Services are to be provided, which are supported by PSC Personnel who are not based at such locations. |
| | |
1.109 | | “Required Consents is defined in Section 5.5. |
| | |
1.110 | | “Retained Expenses” means the costs and expenses identified in Attachment C-4 to Exhibit C. |
| | |
1.111 | | “Retained Hardware” means the Retained Hardware (Leased) and the Retained Hardware (Owned). |
| | |
1.112 | | “Retained Hardware (Leased)” is defined in Section 6.2(b)(ii). |
| | |
1.113 | | “Retained Hardware (Owned)” is defined in Section 6.2(a)(ii). |
| | |
1.114 | | “Retained Hardware Leases” is defined in Section 6.2(b)(ii). |
| | |
1.115 | | “Retained Systems Software Licenses” is defined in Section 6.4(a)(ii). |
8
1.116 | | “Retained Third Party Applications Software” means Third Party Applications Software retained by Newco as provided in Section 6.4(b)(i). |
| | |
1.117 | | “Retained Third Party Applications Software Licenses” is defined in Section 6.4(b)(i). |
| | |
1.118 | | “Retained Third Party Service Contracts” is defined in Section 6.6(b). |
| | |
1.119 | | “Security Services” means the services described in Article 9 of Exhibit A. |
| | |
1.120 | | “Services” means the Base Services and the Additional Services. |
| | |
1.121 | | “Service Levels” means the levels of performance for Perot Systems to provide the Services, which are set forth in Exhibit B. |
| | |
1.122 | | “Service Level Credits” means credits issued by Perot Systems for failing to meet the Service Levels as described in Section 7.3 and Exhibit B. |
| | |
1.123 | | “Service Locations” is defined in Section 3.4. |
| | |
1.124 | | “Side Letter” is defined in Section 5.3. |
| | |
1.125 | | “Software” means one or more computer programs, in source or object code versions, together with any and all documentation related thereto. |
| | |
1.126 | | “Subcontractor” is defined in Section 3.10. |
| | |
1.127 | | “Supported Affiliates” is defined in Section 3.1(c). |
| | |
1.128 | | “Supported Managed Asset” means any item of Supported Hardware or Supported Software or a Managed Contract. |
| | |
1.129 | | “Supported Hardware” is defined in Section 6.1 and comprises Assigned Hardware and Retained Hardware, and includes, without limitation, the Supported Desktop Hardware (as defined in Exhibit A). |
| | |
1.130 | | “Supported Hardware (Leased)” is defined in Section 6.2 and comprises Assigned Hardware (Leased) and Retained Hardware (Leased). |
| | |
1.131 | | “Supported Hardware (Owned)” is defined in Section 6.2 and comprises Assigned Hardware (Owned) and Retained Hardware (Owned). |
| | |
1.132 | | “Supported Software” is defined in Section 6.1, and includes, without limitation, the Supported Desktop Software (as defined in Exhibit A). |
| | |
1.133 | | “Supported Sites” means the locations listed in Schedule 3.4 where Supported Hardware is located or Services are to be provided, which are supported by PSC Personnel who are based at such locations. |
9
1.134 | | “Supported System “ means Supported Hardware and the Supported Software operated thereon. |
| | |
1.135 | | “Systems Software” means those programs and programming (including the supporting documentation, media, on-line help facilities, and tutorials) that perform (i) tasks basic to the functioning of the Hardware and which are required to operate the Applications Software; or (ii) tasks, other than as performed by Applications Software, otherwise supporting the provision of the Services by Perot Systems. Systems Software includes mainframe and mid-range operating systems, server operating systems, network operating systems, systems utilities (including measuring and monitoring tools), data security software, middleware, database management systems, database management software, and development tools (other than development tools specific to a particular item of Applications Software which is provided by the licensor of such Applications Software). |
| | |
1.136 | | “Technology Plan” is defined in Section 3.6. |
| | |
1.137 | | “Term” has the meaning given in Section 10.1. |
| | |
1.138 | | “Termination Assistance Period” is defined in Section 10.10(a). |
| | |
1.139 | | “Termination Assistance Services” is defined in Section 10.10(a). |
| | |
1.140 | | “Third Party Applications Software” means Assigned Third Party Applications Software and Retained Third Party Applications Software. |
| | |
1.141 | | “Third Party Applications Software Licenses” means Assigned Third Party Applications Software Licenses and Retained Third Party Applications Software Licenses. |
| | |
1.142 | | “Third Party Service Contracts” means Assigned Third Party Service Contracts and Retained Third Party Service Contracts. |
| | |
1.143 | | “Third Party Systems Software” means System Software licensed to Newco and its Affiliates by a third party other than Perot Systems and PSC Personnel. |
| | |
1.144 | | “Third Party Vendors” means information technology vendors and suppliers, other than Perot Systems and PSC Personnel, who provide goods or services to Newco, any of its Affiliates or any of the Franchisees/Licensees. |
| | |
1.145 | | “Tools License” is defined in Section 10.11. |
| | |
1.146 | | “Trademarks” shall have the meaning set forth in Section 8.5. |
| | |
1.147 | | “Training” means the services described in Section 3.7 and Exhibit A. |
| | |
1.148 | | “Transition Period” means the 90-day period commencing on the Effective Date. |
| | |
1.149 | | “Transition Services” means the services described in Attachment A-2 of Exhibit A. |
10
1.150 | | “Transitioned Applications” means the software applications listed in Annex A-2-1 to Attachment A-2 to Exhibit A. |
| | |
1.151 | | “Transitioned Employees” is defined in Section 5.3. |
| | |
1.152 | | “Vehicle Rental System” or “VRS” means the Odyssey System, as modified by the VRS Modifications. |
| | |
1.153 | | “Vendor Management” means the services described in Section 2.6 of Exhibit A. |
| | |
1.154 | | “Virus” is defined in Section 11.4. |
| | |
1.155 | | “Voice Communications Management Services” means the services described in Article 10 of Exhibit A. |
| | |
1.156 | | “VRS Modifications” means the Derivative Works, additions and enhancements to the Odyssey System made in accordance with this MSA, and including without limitation the Legacy Customizations, the Non-Legacy Customizations and Maintenance Modifications. |
| | |
1.157 | | “VRS Project Services” means (i) the Services described in Attachment A-3 of Exhibit A relating to the development, testing, and delivery of the Legacy Customizations, including all interfaces necessary to ensure an integrated applications environment that supports the automobile rental and maintenance operations of the parts of Newco’s Business known prior to the Effective Date as “Alamo” and “National”; (ii) the Services necessary for the conversion of associated data from the Legacy System to the VRS; (iii) the Services necessary for the implementation and rollout of the VRS to the Supported Sites, including the Legacy Customizations; and (iv) the Services necessary for the decommissioning of the Legacy System. |
| | |
1.158 | | “Website Services” means the web site services described in Section 2.7 of Exhibit A. |
ARTICLE 2
GENERAL PROVISIONS AND OBLIGATIONS
2.1 Overview of Agreement This MSA sets forth the terms under which Perot Systems will provide to Newco and its Affiliates and Franchisees/Licensees the information technology and related services identified in this MSA as Base Services and, if requested by Newco, will provide additional information technology or other services identified in this MSA as Additional Services. Among the reasons that the Parties are entering into this MSA are a desire (i) to control and, where reasonably practical, reduce Newco’s information technology costs, (ii) to modify the Odyssey License to expand it to cover Newco and all of Newco’s Affiliates and Franchisees/Licensees that are engaged in the Business from time to time, (iii) to enhance the Odyssey System to support all the automobile rental and maintenance operations of the Business, including, without limitation, the portion of the Business operated under the “Alamo” trademark, and to migrate, as soon as reasonably practicable, such part of Newco’s Business’ information technology operations from the Legacy System to VRS, and (iv) to assure that the
11
information technology systems of Newco and its Supported Affiliates are managed in a manner that is responsive to the current and future needs of Newco, its Supported Affiliates and, to the extent of their interaction with the Supported Systems, its Franchisees/Licensees.
2.2 Conditions to Obligations of Newco The obligations of Newco under this MSA shall be subject to the fulfillment, to the reasonable satisfaction of Newco, unless waived by Newco on or before the Effective Date, of each of the following conditions precedent:
(a) Closing of the Acquisition.
(i) The closing of the purchase by Newco and its Affiliates of the Acquired Assets as contemplated by the APA; and
(ii) National’s assignment of the Odyssey License to Newco and the consent of Perot Systems thereto in connection with the closing of the Acquisition under the APA pursuant to a partial termination and assignment agreement effective as of the Effective Date in the form of Exhibit D (the “ANC Partial Termination and Assignment Agreement”).
(b) Waiver. Perot Systems and its Affiliates shall have waived, and as of the Effective Date, hereby do waive, any and all claims and rights any of them may have against Newco and any of its Affiliates and ANC or any of its Affiliates with respect to the ANC Agreement in connection with periods on or before the Effective Date, including the cost of curing any defaults or breaches under any agreement or understanding between Perot Systems or any of its Affiliates, on the one hand, and ANC Rental or any of its Affiliates, on the other hand, including without limitation, the ANC Agreement, provided that such waiver shall not be construed as, or deemed to be, a waiver of any such claims or rights Perot Systems or its Affiliates may have against ANC or any of its Affiliates (except with respect to any cure costs, which, to the extent payable by Newco, are hereby waived), including but not limited to (i) Perot Systems’ claims of $8,858,762.05, each filed on January 13, 2003, in the estates of ANC Rental, Alamo, National and ANC under 11 U.S.C. Section 502(a) and (b), (ii) any claims deemed to be arising from the Debtors’ rejection of the ANC Agreement, 11 U.S.C. Section 502(g)), and (iii) any claim Perot Systems currently has, or will have, under 11 U.S.C. Section 503(a) and (b) for services performed for any of the Debtors under the ANC Agreement, provided further, however, that Perot Systems hereby agrees that it will only assert the claims described in clauses (i) and (ii) as general unsecured claims and not as administrative expense priority claims or any other type of priority claims in Debtor’s bankruptcy cases.
(c) Termination of the ANC Agreement.
(i) The execution and delivery by Perot Systems of the ANC Partial Termination and Assignment Agreement providing for the partial termination of the ANC Agreement, including but not limited to all Work
12
Orders and Change Orders (as such terms are defined in the ANC Agreement) thereunder, without cause or further obligations on the part of either Party, and the survival and assignment of the Odyssey License and the GreenWay License as provided therein; and
(ii) The entry of a Final Order (as defined in the APA); provided, however, that in the event that the Purchaser (as defined in the APA) waives, with Perot Systems’ prior consent, the closing condition under Section 6.2(c) of the APA, then the order shall be deemed to be a “Final Order” for the purposes of this MSA, such Final Order approving the partial termination of the ANC Agreement and execution and performance of the ANC Partial Termination and Assignment Agreement.
2.3 Conditions to Obligations of Perot Systems The obligations of Perot Systems under this MSA shall be subject to the fulfillment, to the reasonable satisfaction of Perot Systems, unless waived by Perot Systems on or before the Effective Date, of each of the following conditions precedent:
(a) Closing of the Acquisition.
(i) The closing of the purchase by Newco and its Affiliates of the Acquired Assets as contemplated by the APA; and
(ii) National’s assignment of the Odyssey License to Newco under the ANC Partial Termination and Assignment Agreement.
(b) Termination of the ANC Agreement.
(i) The execution and delivery by ANC Rental, ANC, National, Alamo, and Newco of the ANC Partial Termination and Assignment Agreement providing for the partial termination of the ANC Agreement, including but not limited to all Work Orders and Change Orders (as such terms are defined in the ANC Agreement) thereunder, without cause or further obligation on the part of either Party effective as of the Effective Date, and the survival and assignment of the Odyssey License; and
(ii) The entry of a Final Order by the United States Bankruptcy Court:
(A) Approving the partial termination of the ANC Agreement and ANC Rental’s, ANC’s, National’s and Alamo’s execution and performance of the ANC Partial Termination and Assignment Agreement;
(B) Providing that all payments made to Perot Systems under the ANC Agreement through the Effective Date shall have administrative expense priority under 11 U.S.C. Section 503(b);
13
(C) Releasing Perot Systems from any and all causes of action Debtors may have under 11 U.S.C. Section 550; and
(D) Setting a deadline to file amended claims, if any, occasioned by the execution of the ANC Partial Termination and Assignment Agreement.
2.4 Exclusivity
(a) Applicable to Newco. Except as provided in Section 2.4(b), (i) Perot Systems shall be the exclusive provider of the Base Services to Newco and its Affiliates, including the migration to and subsequent operation of the VRS and the decommissioning of the Legacy System, and (ii) upon completion of such migration and decommissioning in accordance with the VRS Project Plan, the VRS shall be the primary technology platform used by Newco and its Supported Affiliates for vehicle rental and maintenance operations processing.
(b) Exceptions. Notwithstanding Section 2.4(a), Newco may engage third parties or use internal resources to obtain the following information technology services:
(i) Newco Retained Functions;
(ii) services necessary to measure Perot Systems’ performance of the Services;
(iii) services that are necessary to support any Newco Affiliate, Franchisee/Licensee or customer thereof that is not supported for any reason under this MSA;
(iv) services necessary to create reports from Newco’s business intelligence report writer software and to perform database inquiries requested by Newco, a Supported Affiliate, or a Franchisee/Licensee that, on and after Effective Date are being performed by business analysts employed or engaged by ANC Rental or its Affiliates, provided that after the Effective Date the applicable Newco Personnel (A) create such reports and perform such inquiries in accordance with the Operations Procedures Manual, and (B) remain responsible for running, supporting and maintaining such reports and inquiries in accordance with the Operations Procedures Manual;
(v) Additional Services for Major Projects required by Newco or its Supported Affiliates, provided that Perot Systems has submitted a bid on such Major Project and Newco or the applicable Affiliate has rejected Perot Systems’ bid after considering the bid in good faith. In the event that Newco or any Supported Affiliate awards such bid to a third party other than Perot Systems, Newco will notify Perot Systems as to whether its bid was unsuccessful due to price, schedule or competency. For purposes of this MSA, a “Major Project” is any single information technology project, or series of related information technology projects, for which
14
Newco or the applicable Affiliate will pay more than $250,000 in service fees, in the aggregate, to complete; provided however, that, for the avoidance of doubt, the classification of one or more services or projects as a Major Project shall not be relevant to the classification of any services as Additional Services as opposed to Base Services hereunder;
(vi) any services Perot Systems has declined to provide for any reason;
(vii) any services with respect to which Newco exercises a right under this MSA to terminate in connection with Perot Systems’ breach or default of a related performance obligation; and
(viii) any services provided by a Third Party Vendor under any Retained Systems Software License, Retained Third Party Applications Software License or Retained Third Party Service Contracts.
(c) Applicable to Perot Systems. To the extent that Perot Systems shall provide any services or software to any competitor in the Business of Newco:
(i) Perot Systems will maintain separation between its employees and Subcontractors that provide Services hereunder and those that provide services or software to such competitor (except to the extent that such employees and Subcontractors provide Services generally to all or most of Perot Systems’ outsourcing customers in a shared services environment such as in a help desk or data center environment);
(ii) Perot Systems shall not provide or allow access to any Confidential Information regarding Newco or its Affiliates, Franchisees/Licensees or customers to any such competitor; and
(iii) Perot Systems shall not provide to any such competitor any aspect of the Base Services, Additional Services or software that (A) the Parties identify in Schedule 2.4(c) as being provided or intended to be provided to Newco hereunder on an exclusive basis, or (B) are owned by Newco (e.g., Retained Hardware (Owned)) or licensed on an exclusive basis to Newco, including without limitation the Legacy System, the Legacy Customizations and the Non-Legacy Customizations; in each case without the prior written consent of Newco.
2.5 Account Manager Each Party will designate an individual to serve as its “Account Manager” under this MSA. Each Party’s Account Manager will (i) serve as the principal point of accountability for coordinating and managing that Party’s obligations under this MSA, and (ii) be authorized to act for and on behalf of that Party with respect to all matters relating to this MSA, subject to the limitations set forth in this MSA and any other limitations of which the other Party is notified and to which it agrees in writing, which agreement will not be unreasonably withheld.
15
2.6 Conduct of Personnel While at the other Party’s facility, Newco Personnel or PSC Personnel, as applicable, will conduct themselves in a businesslike manner and will comply with the other Party’s reasonable requests and generally applicable rules and regulations, including all safety and security rules and regulations of which that Party has been notified. Newco may cause Perot Systems to reassign, replace or remove any individual performing services under this MSA where the performance of such individual is such that it may, in Newco’s reasonable opinion, subject Newco to liability or violate any such Newco policy. In addition, Newco may, on giving notice to Perot Systems’ Account Manager, require the immediate removal of any PSC Personnel, who in Newco’s reasonable opinion, have violated any safety or security rules or regulations of Newco, violated any laws or regulations, or breached any of the confidentiality provisions of this MSA. However, Newco may not request the reassignment, replacement, or removal of any individual for reasons that would be improper under applicable law if Newco were the individual’s employer. Perot Systems will promptly replace any individual reassigned, replaced, or removed at Newco’s request.
ARTICLE 3
DESCRIPTION OF SERVICES AND SERVICE LEVELS
3.1 Provision of Services
(a) General. Commencing on the Effective Date and continuing throughout the Term, Perot Systems shall provide the following services and functions and assume the following responsibilities, as they may evolve during the Term and as they may be supplemented, enhanced, modified, or replaced in accordance with the terms of this MSA:
(i) the services, functions, and responsibilities specifically described in Exhibit A;
(ii) any services, functions, or responsibilities that are not specifically described in this MSA or Exhibit A, but which are required for the proper performance and delivery of the services, functions, and responsibilities that are specifically described in this MSA or Exhibit A, including without limitation any services, functions or responsibilities that are reasonably: (A) required for the proper operation of the Supported Systems and services for which Perot Systems assumes operational or management responsibility; or (B) required sub-tasks for the proper performance and provision of the services, functions and responsibilities described in this MSA, which services shall be deemed to be implied by and included within the scope of the Base Services to be provided by Perot Systems to the same extent and in the same manner as if specifically described in the definition thereof; provided, however, that, notwithstanding the foregoing, services, functions or responsibilities that are specifically excluded from the scope of Base Services under this MSA shall not be deemed to be within the scope of the Base Services; and
16
(iii) any services, functions, or responsibilities that are Additional Services.
(b) Services Evolution. Except as expressly provided herein, Perot Systems shall cause the Services to evolve and to be modified, enhanced, supplemented, and replaced as necessary for the Services to keep pace with technological advances and advances in the methods of delivering services, where such advances are at the time pertinent and in general use within the information technology industry or among Newco’s competitors and do not materially increase Perot Systems’ cost of providing the Services above the costs reasonably anticipated to be incurred by Perot Systems under this MSA. As an example, such evolution shall include addition of functionality by Perot Systems (using the PSC Personnel assigned to the Applications Development Pool) as this is made possible with new Supported Hardware and Supported Software acquired by Perot Systems during the Term. Adjustments in Services in accordance with this Section 3.1(b) shall be deemed to be included within the scope of the Base Services to the same extent and in the same manner as if expressly described in the definition thereof.
(c) Supported Affiliates and Franchisees/Licensees. Perot Systems shall provide the Services to Newco to support the operations of Newco, those Affiliates of Newco identified in Schedule 3.1(c), Part A (“Supported Affiliates”), and those franchisees or licensees of Newco or the Supported Affiliates identified in Schedule 3.1(c), Part B (“Franchisees/Licensees”). Newco may add additional Supported Affiliates and Franchisees/Licensees to Schedule 3.1(c) from time to time during the Term through the Change Control Process. Newco shall cause each of the Supported Affiliates, and shall enter into an agreement with each Franchisee/Licensee that binds each Franchisee/Licensee, to comply with the terms and conditions of this MSA applicable to such entity. In the event that Newco is unable to cause any Supported Affiliate or Franchisee/Licensee to comply with any applicable term or condition of this MSA applicable to such entity, then Perot Systems shall be relieved of its applicable obligations under this MSA or the applicable Change Order, but only to the extent that it is unable to perform Services as a result of the failure of the Supported Affiliate or the Franchisees/Licensees to comply with such term or condition. Notwithstanding the fact that the Supported Affiliates and the Franchisees/Licensees may benefit from the Services and Perot Systems’ other obligations under this MSA, all Services shall be deemed to be provided to Newco or its designated Affiliate hereunder and neither any Affiliate, any Franchisee/License, nor any other person or entity shall be deemed to be a third-party beneficiary with the right to enforce any part of this MSA or to seek damages of any kind from Perot Systems.
3.2 Variable Services The Base Services, in whole or in part, may be variable in volume throughout the course of this MSA. Perot Systems shall, subject to Exhibit C, increase or decrease the amount of the Base Services provided pursuant to this MSA according to Newco’s demand or requests for the Base Services over or under the applicable baseline(s) for such Base Services established in Exhibit C. Variations as contemplated under this Section shall be provided for in the pricing mechanisms set forth in this MSA.
17
Perot Systems shall not be entitled to receive an adjustment to the rates and charges based on such variations except as set forth in this MSA.
3.3 Post-Effective Date Adjustments The Parties acknowledge that certain items that would constitute Supported Hardware, Supported Software or a Managed Contract, existing as of the Effective Date, may have been inadvertently omitted from, included or mischaracterized under this MSA. Accordingly, the Parties agree that to the extent any such omitted, included or mischaracterized Supported Hardware, Supported Software or Managed Contract is discovered, the Parties shall negotiate in good faith to amend the relevant Attachment, Schedule or Exhibit as appropriate promptly after such discovery. With respect to any such omitted Supported Hardware, Supported Software or Managed Contract, if the charges payable to any applicable third party in connection therewith or any other associated costs were not included in the financial assumptions underlying the calculation of the Annual Services Charge then Newco shall be financially responsible for such charges and costs. If, however, such charges and costs were included in the financial assumptions underlying the calculation of the Annual Services Charges hereunder, then Perot Systems shall have financial responsibility for such charges and costs without any corresponding increase in the Annual Services Charges.
3.4 Service Locations The Services shall be provided from the Supported Sites and the Remote Support Sites identified in Schedule 3.4 and in any applicable Change Order (the “Service Locations”). Perot Systems shall not provide services to a third party from a Service Location owned or leased by Newco without Newco’s prior written consent. Newco shall be permitted access, with at least ten (10) days notice in writing or less as mutually agreed by the parties, to any Perot Systems Service Location subject to any reasonable security provisions in effect at the time of such access. As applicable, Newco shall use its reasonable efforts to notify Perot Systems in a timely manner of any plans or determination to relocate a Newco Service Location so that Perot Systems shall have a reasonable amount of time to prepare for and implement such change or relocation to the extent it impacts Perot Systems. Perot Systems shall use the Newco Service Locations in an efficient manner that is coordinated and does not interfere unreasonably with Newco’s operations. Perot Systems shall be responsible for any damage to the Newco Service Locations and to any systems located therein as a result of Perot Systems’ negligence or misconduct and for any injuries suffered by any person as a result.
3.5 Overview of Services
(a) Transition Services. As part of the Base Services, Perot Systems shall perform such tasks and deliver such deliverables described in Attachment A-2 to Exhibit A as the Transition Services that are not completed prior to the Effective Date.
(b) General Services. As part of the Base Services, Perot Systems shall provide the services described as General Services in Article 1 to Exhibit A.
(c) Data Center Services. As part of the Base Services, Perot Systems shall provide the services described as Data Center Services in Article 4 to Exhibit A, in accordance with the Operations Procedures Manual and this MSA.
18
(d) LAN/WAN Network and Remote Network Monitoring Services. As part of the Base Services, Perot Systems shall provide the services described as LAN/WAN Network and Remote Monitoring Services in Article 7 to Exhibit A, in accordance with the Operations Procedures Manual and this MSA.
(e) Desktop Services. As part of the Base Services, Perot Systems shall provide the services described as Desktop Services in Article 6 to Exhibit A, in accordance with the Operations Procedures Manual and this MSA.
(f) Help Desk Services. As part of the Base Services, Perot Systems shall provide the services described as Help Desk Services in Article 3 to Exhibit A. The Help Desk Services will be performed courteously and in accordance with the Operations Procedures Manual and this MSA to assist End-Users in determining, tracking, and resolving problems and questions.
(g) Core Application Services. As part of the Base Services, Perot Systems shall provide the services described as Core Applications Services in Article 5 of Exhibit A in accordance with the Operations Procedures Manual and this MSA. The Core Applications Services include application development, application maintenance and application testing services.
(h) Security Services. As part of the Base Services, Perot Systems shall provide the services described as Security Services in Article 9 to Exhibit A, in accordance with the Operations Procedures Manual and this MSA.
(i) Disaster Recovery Services. As part of the Base Services, Perot Systems shall provide the services described as Disaster Recovery Services in Section 9.1(b) of this MSA and Article 8 to Exhibit A, in accordance with the Operations Procedures Manual and this MSA.
(j) Voice Communications Management Services. As part of the Base Services, Perot Systems shall provide the services described as Voice Communications Management Services in Article 10 to Exhibit A, in accordance with the Operations Procedures Manual and this MSA.
(k) VRS Project Services. As part of the Base Services, Perot Systems shall provide the VRS Project Services described in Attachment A-3 of Exhibit A. Until the completion of the VRS Project Services and as a part of the Base Services, Perot Systems will provide all of the other Base Services for the Legacy System.
3.6 Annual Technology Plan Perot Systems and Newco shall jointly prepare Newco’s annual technology plan in accordance with the provisions of this Section 3.6 (the “Technology Plan”). The Parties shall mutually agree on an appropriate allocation of responsibility for drafting the various sections of the Technology Plan. The Technology Plan shall address the information technology requirements of Newco and it will be among the principal means for Newco to assess its investment in information technology services and to address changing technology needs as its business needs change. Each Technology Plan after the first shall review and assess the immediately preceding
19
Technology Plan. The Technology Plan shall include a three-year plan and annual implementation plans, consisting of: specific guidance as to the information services requirements described in this Section 3.6, projects and plans for the upcoming year, including details on operations, maintenance backlog and development activities, estimated cost of implementation of the projects and plans, the impact implementation would have on Newco’s ongoing information technology services costs including, charges under this MSA, and cost/benefit analyses of the projects and plans. A Technology Plan shall be prepared for each year of this MSA within thirty (30) calendar days prior to the end of each calendar year, beginning with a Technology Plan for the year 2004. In addition, Perot Systems agrees to meet with Newco at least once during every three (3) month period during the Term to inform Newco of new information processing technology Perot Systems is developing or information processing trends and directions Perot Systems is otherwise aware of that may relate to Newco’s Business.
(a) Three-Year Plan. The Technology Plan shall include a comprehensive assessment and strategic analysis of Newco’s then-current information technology systems and services for the next three (3) years, including an assessment of the appropriate direction for such systems and services, in light of Newco’s business priorities and strategies and competitive market forces (to the extent necessary information about the Business is provided by Newco to Perot Systems). The plan shall include a specific identification of proposed strategies for taking advantage of advancements in technology (including software and hardware strategies), a cost projection, a cost/benefit analysis of any proposed changes, a description of any changes or any upgrades to Newco’s then-current information systems environment that would be required to implement proposed changes, a description of the types of personnel skills and abilities needed to respond to any recommended changes or upgrades in technology, a general plan and a projected time schedule for developing and achieving the recommended elements, an estimate of the financial impact implementing such proposed strategies would have on Newco’s ongoing information technology services costs, and a discussion of opportunities to exploit industry trends and potential performance improvement opportunities, and to reduce costs and expenses under this MSA.
(b) Drafting and Review. Perot Systems shall submit to Newco a draft of the sections of each Technology Plan, for Newco’s review and written approval, which draft shall have been developed with input from key users of the Services from Newco. Newco recognizes that Perot Systems may require a significant amount of business input from Newco throughout the technology planning process and will provide Perot Systems with such input and other support as Perot Systems may reasonably require to meet its obligations for the Technology Plan.
(c) Modifications. Newco and Perot Systems shall work to revise the Technology Plan from time to time as reasonably requested by Newco.
(d) Implementation of Technology Updates. At the request of Newco, Perot Systems shall implement any or all of the suggested changes, additions and upgrades described in each of the Technology Plans through the Change Control Process.
20
3.7 Training
(a) Perot Systems shall develop appropriate training materials for, and provide appropriate training with respect to the use of the Services (and any modifications and additions thereto as they are introduced) to, Newco’s training staff (or lead users) in connection with (i) administering or ordering the Services; (ii) training End-Users of the Services; or (iii) reporting and managing interruptions, delays or other troubles. Newco’s training staff shall train the remainder of the Newco Personnel, and the curriculum and training materials distributed to such Personnel shall be subject to Newco’s prior approval, which approval shall not be unreasonably withheld. Perot Systems shall cooperate with Newco in the training of PSC Personnel on Newco’s systems and practices so that Perot Systems can properly and efficiently provide the Services in accordance with the terms of this MSA.
(b) Training for all Newco Personnel described in Subsection 3.7(a) shall be provided at Supported Sites agreed to by the Parties, which Newco shall make available for this purpose. Newco shall make the Newco Personnel reasonably available to receive such training. Perot Systems shall conduct and complete such training for Newco Personnel assigned to any site between five (5) and twenty (20) Business Days prior to the first availability of a significant component of the applicable Services at that Supported Site unless the Parties agree otherwise. Perot Systems shall provide retraining upon Newco’s reasonable request, and as needed to accommodate turnover among Newco’s Personnel. Perot Systems shall update training materials as the Services change.
(c) Perot Systems shall develop, distribute, and update templates for handouts and desktop aids for Services End-Users as reasonably necessary for such users to efficiently use the Services.
3.8 Perot Systems Licenses and Permits; Export Perot Systems shall obtain, and has responsibility for complying with, all licenses, consents, approvals, permits, and authorizations required by laws and regulations applicable to it as an information technology services provider, which are legally required to be obtained in order to perform the Services, including any permissions necessary or appropriate under U.S. export control laws, and with respect to any Services that will be performed offshore from locations outside the U.S. and any movement or transmission of data, information or any other materials subject to export control laws. As part of the Services, Perot Systems shall be responsible for, and shall coordinate and oversee, compliance with any and all such licenses, consents, approvals, permits, and authorizations and Newco shall reasonably cooperate with and assist Perot Systems in obtaining same. However, Perot Systems shall have no obligation to identify or interpret for Newco any laws or regulations affecting the Services that do not generally apply to Perot Systems’ internal business operations. If Perot Systems determines that any change in the Services or the way in which Perot Systems performs the Services is necessary to comply with any law or regulation affecting Perot Systems’ internal operations, Perot Systems shall notify
21
Newco of such change, and such change may be made subject to the Change Control Process.
3.9 No Adverse Changes to the Services Except as may be necessary on an emergency basis to maintain the continuity of the Services, Perot Systems shall not, without Newco’s prior written consent, modify: (a) the composition of the Services; or (b) the manner in which the Services are to be provided or delivered pursuant to this MSA if such modification would have a material adverse effect on the business of Newco.
3.10 Subcontractors Perot Systems shall have the right to subcontract all or any part of the Services to any of its Affiliates and to any other person or entity (each, a “Subcontractor”), including Affiliates and other persons or entities whose principal place of business is outside the United States, without Newco’s consent, except that Perot Systems shall not subcontract any part of the Services to any Affiliate, person or entity who is a competitor of Newco in the Business without Newco’s prior consent, which may be withheld by Newco in its sole discretion. Perot Systems’ Account Manager will give Newco’s Account Manager reasonable advance notice of each proposed subcontract to a Subcontractor other than an Affiliate of Perot Systems whose principal place of business is located in the United States. Perot Systems shall be fully responsible, financially and otherwise, for the Services provided by each Subcontractor to the same extent as if it had performed the Services itself. Notwithstanding the foregoing, Newco acknowledges and agrees that Perot Systems may subcontract all or any part of the Core Application Services to HCL Perot Systems Ltd., whose principal place of business is outside the United States, provided that Newco’s consent shall be required to subcontract any new obligations after Perot Systems ceases to own, directly or indirectly, at least twenty-five percent (25%) of HCL Perot Systems Ltd.
3.11 Changes to Services Due to Changes in Newco’s Business Newco and Perot Systems understand that Newco’s predicted resource requirements, while based on the best knowledge available, may be subject to significant variation as a result of unexpected growth or reduction in its business, including due to mergers, acquisitions or divestitures, or due to other changes resulting from the then-current business environment. Upon request by Newco in connection with the occurrence of an event that results in a sustained increase or decrease in the resource requirements under this MSA, Perot Systems shall prepare a good faith proposal to address the new resource requirements, which may include, without limitation, appropriate adjustments to the Service Levels, Base Services and the fees set forth in this MSA, so that Newco may be responsive to its evolving business needs and remain competitive in the marketplace. Upon request by Newco, the Parties agree to negotiate in good faith to adjust this MSA appropriately to reflect such changes for the applicable remaining years of the Term.
3.12 Service Levels
(a) Perot Systems will meet or exceed the Service Levels
22
(i) set forth in Parts C and E of Exhibit B for the applicable Base Services commencing on the Effective Date, except with respect to the Transitioned Applications and the VRS;
(ii) set forth in Part F of Exhibit B for the applicable Base Services commencing after the Transition Period with respect to the Transitioned Applications; and
(iii) set forth in Part D of Exhibit B for the applicable Base Services commencing on the Effective Date and continuing until the addition of the VRS Modifications with respect to the Odyssey System and commencing on the Warranty Period defined in Attachment A-3 to Exhibit A with respect to the VRS.
(b) As contemplated by the Change Control Process, (i) any Change Order implementing Service or resource changes requested by Newco and any other Change Order changing the manner in which the Services are provided by Perot Systems may include an equitable adjustment to the Annual Services Charge and the applicable Service Levels and the Service Level Credits, and (ii) Perot Systems will review with Newco as part of the Change Control Process the anticipated effect of such reduction, addition, or change on Perot Systems’ ability to meet the applicable Service Levels.
(c) If Perot Systems fails to meet any Service Level, Perot Systems will (i) promptly investigate and perform a root-cause analysis to identify the cause of the failure; (ii) provide to Newco a report on the causes of the problem; (iii) correct the problem, to the extent such problem is within its control, or take appropriate steps in escalation to the appropriate Third Party Vendor to cause the problem to be corrected to the extent such problem is not within its control; (iv) take appropriate preventive measures to reduce the probability of a recurrence of the problem; (v) take appropriate actions to mitigate the adverse effects of the problem prior to its correction; and (vi) periodically advise Newco of the status of remedial efforts being undertaken with respect to such problems in accordance with the Operations Procedures Manual.
(d) On an annual basis, Newco and Perot Systems will review the Service Levels and, if mutually agreed (which agreement shall not be withheld unreasonably), the Parties will adjust the Service Levels to reflect appropriate changes in circumstances, such as technological advances, changes in methods used generally to perform similar services, changes in business metrics, operating costs and budgetary constraints, and any service or resource changes requested or approved by Newco.
(e) Perot Systems will procure and implement appropriate monitoring tools (to the extent such tools are not already used by Perot Systems to monitor applications, systems, and networks that are being managed by Perot Systems, the tools will be approved by Newco and will be acquired at Perot Systems’ expense for use by
23
Perot Systems) and related procedures necessary to measure and report Perot Systems’ compliance with the Service Levels. An initial list of such monitoring tools is set forth in Part G of Exhibit B. Perot Systems will provide Newco with (i) the performance monitoring reports described in Part G of Exhibit B, and (ii) such other documentation and information as Newco reasonably requests, to verify that the Services are being performed in compliance with the Service Levels. Upon Newco’s reasonable request, but not more frequently than once per Contract Year, Perot Systems will provide Newco and its designees with information and access to such tools and procedures for purposes of performing an audit of Perot Systems’ compliance with the Service Levels and these reporting requirements.
3.13 European and Asian Affiliates
(a) Notwithstanding anything to the contrary in this MSA, the Parties acknowledge and agree that the Affiliates of Newco whose principle business operations are located outside the United States and Canada (“European and Asian Affiliates”), will not receive any of the Base Services with respect to Hardware and Software that is located outside the United States, except with respect to the “bridges” described in subsection (b) below. All other components of the Base Services will initially be performed for the European and Asian Affiliates on the same basis and to the same extent as Base Services are performed for Franchisees/Licensees. For the avoidance of doubt, the European and Asian Affiliates will initially have administrative, financial, legal, and operational responsibility for all Hardware and Software located outside the United States and Canada. Upon request by Newco, Perot Systems will prepare for Newco’s review and approval a proposal to provide the full range of Base Services, or any component of the Base Services, to all or any of the European and Asian Affiliates.
(b) The Parties further acknowledge and agree that the European and Asian Affiliates do not use either the Legacy System, the Odyssey System or VRS to conduct their automobile rental and maintenance operations from the Effective Date until the VRS Project is completed. However, the information technology systems used by the European and Asian Affiliates exchange certain data relating to reservations via “bridges” with the Legacy System and such exchanges will continue until the Legacy System is decommissioned. In connection with the VRS Project Services, Perot Systems will modify such bridges so that the information technology systems used by the European and Asian Affiliates may exchange data with VRS on a basis similar to or more efficiently than the data is exchanged with the Legacy System. Unless otherwise agreed in a Change Order, the European and Asian Affiliates will have administrative, financial, legal, and operational responsibility for procuring, acquiring, installing and testing all hardware and software necessary to install and operate VRS.
(c) If, for any reason, any European and Asian Affiliate ceases to be an Affiliate of Newco, Perot Systems agrees that such European and Asian Affiliate shall, unless
24
otherwise requested by Newco, become a Franchisee/Licensee of Newco and continue to have access to and use of VRS on the same basis as other Franchisees/Licensees.
ARTICLE 4
CERTAIN NEWCO OBLIGATIONS
4.1 Newco’s Cooperation Newco shall reasonably cooperate with Perot Systems by, among other things, making available, as reasonably requested by Perot Systems, management decisions, information, approvals or disapprovals, and acceptances or rejections in a timely manner so that Perot Systems may fulfill its obligations and responsibilities under this MSA. Newco shall cause the Supported Affiliates to, and enter into agreements with each of the Franchisee/Licensees providing that they will, reasonably cooperate with Perot Systems by, among other things, making available, as reasonably requested by Perot Systems, management decisions, information, approvals or disapprovals, and acceptances or rejections in a timely manner so that Perot Systems may fulfill its obligations and responsibilities under this MSA. In addition, Newco will use its commercially reasonable efforts, including the provision of necessary letters of agency, to cause its Third Party Vendors to cooperate with Perot Systems in the performance of the Services.
4.2 Access to Newco’s Facilities Newco (i) shall grant to or obtain reasonable access for Perot Systems during Newco’s normal business hours (and at any other hour as reasonably requested by Perot Systems) to the equipment, facilities, and systems in Newco’s or any Supported Affiliate’s possession or control to which Perot Systems reasonably requires access to perform its obligations under this MSA, and (ii) shall use commercially reasonable efforts to grant to or obtain reasonable access for Perot Systems during normal business hours (and at any other hour as reasonably requested by Perot Systems) to the equipment, facilities, and systems in the Franchisee/Licensees’ possession or control to which Perot Systems reasonably requires access to perform its Services under this MSA, subject to the following conditions:
(a) Rules. PSC Personnel and each business invitee of such PSC Personnel shall obey all generally applicable rules and procedures at any Newco, Supported Affiliate’s or Franchisee/Licensees’ facility of which Newco, the Supported Affiliates or the Franchisee/Licensee has notified Perot Systems. When PSC Personnel are located at Newco’s, a Supported Affiliate’s or Franchisee/Licensees’ facility, Perot Systems shall use, and shall cause all PSC Personnel to use, such facility only to provide the Services, provided that such PSC Personnel may perform limited back office work at Newco Service Locations that is incidental to the provision of the Services.
(b) Alteration. Perot Systems shall not make any structural, mechanical or electrical alterations to Newco’s, any Supported Affiliate’s or Franchisee/Licensees’ facilities without, as applicable, Newco’s, the applicable Supported Affiliate’s or the applicable Franchisee/Licensee’s prior written approval.
25
(c) Structure. Subject to Newco’s obligations under Section 4.3, when a portion of Newco’s, any Supported Affiliate’s or Franchisee/Licensee’s facilities occupied by PSC Personnel is no longer required to perform the Services, Perot Systems shall return such portion to Newco, the Supported Affiliate or the Franchisee/Licensee, as applicable, in the same condition as when Perot Systems began use of such portion, except for (i) authorized alterations and modifications, and (ii) reasonable wear and tear.
(d) Limited Access. Newco, any Supported Affiliate and any Franchisee/Licensee, as applicable, may impose reasonable security procedures to limit access to those portions of Newco’s, such Supported Affiliate’s or such Franchisee/Licensee’s facilities being used by Perot Systems to perform the Services.
(e) Changes by Newco, the Supported Affiliates or Franchisee/Licensees. Newco shall not, and shall cause the Supported Affiliates to not, make any changes to a facility owned, leased or controlled by Newco or a Supported Affiliate where the Services are being performed if Newco reasonably expects such change (i) to have a material adverse effect on Perot Systems’ ability to perform its obligations (including its obligation to meet any Service Levels) hereunder; or (ii) materially to increase the cost to Perot Systems to perform its obligations hereunder, without prior written notice to and approval by Perot Systems (such approval not to be unreasonably withheld or delayed).
4.3 Support As to any portion of Newco’s or any Supported Affiliates’ facilities to be occupied by PSC Personnel under Section 4.2 to provide the Services, Newco shall provide to the assigned PSC Personnel at no charge, for use primarily in connection with performance of the Services (i) a reasonable work environment, including office space, basic furniture, a telephone, utilities and common office supplies; (ii) reasonable access to photocopy, printer, facsimile, and similar office equipment; (iii) reasonable facility maintenance and janitorial services; (iv) desktop computers, workstations, terminals, printers and other equipment reasonably required by PSC Personnel in connection with the performance of the Services; and (v) reasonable access to the networks located at facilities within their responsibility and required for the provisions of the Services.
4.4 Third Party Bids
(a) As provided in Section 2.4(b), Newco has the right to obtain certain Additional Services from Third Party Vendors. With respect to Services sought by Newco as provided in Section 2.4(b)(v), Newco shall notify Perot Systems of, and Perot Systems shall have the right to respond to, all requests for information, requests for proposal and similar bidding procedures on the same basis as other Third Party Vendors.
(b) If Newco obtains information technology services from any Third Party Vendor, Perot Systems will have the right to approve, which approval will not be unreasonably withheld or delayed, the implementation and installation of any resulting Third Party Vendor software, equipment or services that Perot Systems
26
will be required to manage or operate as part of the Services, prior to becoming responsible for such Third Party Vendor software, equipment or services as part of the Services pursuant to the Change Control Process.
4.5 Certain Obligations Commencing on the Effective Date and continuing throughout the Term, as between Perot Systems and Newco, Newco will be responsible for providing and performing the Newco Retained Functions and the services, functions and responsibilities described in Schedule 2.4(b).
ARTICLE 5
PEROT SYSTEMS OBLIGATIONS
5.1 Perot Systems’ Cooperation During the Term, Perot Systems shall provide commercially reasonable cooperation to Newco by responding to Newco’s reasonable requests for information related to the functionality or operation of the GreenWay System, the Odyssey System, the VRS and the Services to the extent that (i) Perot Systems has such information, (ii) Perot Systems is not prohibited from disclosing such information under the terms of any other agreement, (iii) Newco does not provide such information to a competitor of Perot Systems unless Perot Systems and such competitor enter into a commercially reasonable confidentiality agreement under which such competitor agrees to protect the confidentiality of Perot Systems Confidential Information, and (iv) Newco treats such information as Perot Systems’ Confidential Information to the extent such information is owned by Perot Systems.
5.2 Access to Perot Systems’ Facilities Perot Systems (i) shall grant to or obtain reasonable access for Newco or the Supported Affiliates (excluding direct competitors of Perot Systems) during normal business hours, and at such other time as reasonably necessary, to the equipment, facilities, and systems in Perot Systems’ facilities, including Perot Systems’ Data Center where the Services are being performed. Newco will provide Perot Systems with at least two-Business Days written notice prior to providing any business invitees of Newco or the Supported Affiliates with access to the Perot Systems facilities, including any Perot Systems Data Center, where Services are being performed. Perot Systems may control such access so as to provide reasonable protection of Confidential Information of Perot Systems, its Subsidiaries, or its customers or vendors. In connection with such access, the following obligations shall apply:
(a) Rules. Newco Personnel and each business invitee of such Newco Personnel shall obey all generally applicable rules and procedures of Perot Systems facilities, including Perot Systems Data Center, of which such persons have been notified.
(b) Alteration. Newco shall not make any structural, mechanical or electrical alterations to any Perot Systems facilities including Perot Systems Data Center without Perot Systems’ prior written approval.
(c) Limited Access. Except as otherwise agreed, Perot Systems may impose reasonable security procedures to limit access to those portions of the Perot
27
Systems facilities, including Perot Systems Data Center, not being used to perform Services.
(d) Structure. When a portion of Perot Systems’ facilities occupied by Newco Personnel is no longer required to perform the Services, Newco shall return such portion to Perot Systems, in substantially the same condition as when Newco began use of such portion, except for (i) authorized alterations and modifications, and (ii) reasonable wear and tear.
(e) Limitations. The access provided in this Section shall be limited as required by Perot Systems under Perot Systems’ agreements with other customers or other third parties.
5.3 Employee Transfers On or before the Effective Date, Perot Systems will offer employment to the individuals currently employed by ANC Rental or its Affiliates who have been identified in a side letter from Perot Systems to Newco dated as of the Agreement Date (the “Side Letter”), subject to Perot Systems’ standard employment policies and practices, including pre-employment background investigations and drug tests. Those individuals who accept Perot Systems’ offer of employment are collectively referred to herein as the “Transitioned Employees”. Perot Systems agrees that such offers of employment will (i) include compensation and benefit terms that are at least comparable to those offered to other Perot Systems’ employees with similar skills and experience, and (ii) provide that each Transitioned Employee will be given credit for their years of service as an employee of ANC Rental (or any predecessor entity or Affiliate) in connection with Perot Systems’ benefit plans and programs, including vacation and short-term disability. Transitioned Employees will become employees of Perot Systems as of the Effective Date or such later date as they report to work at Perot Systems. Employees identified in the Side Letter shall not be deemed to be terminated from employment by ANC Rental or its Affiliates and shall not be entitled to severance.
5.4 Key Employees Schedule 5.4 contains a list of certain Perot Systems employees who are key personnel to the activities contemplated by this MSA, including the Perot Systems Account Manager (collectively, “Key Employees”). The Parties may agree to modify or amend such list from time to time in writing. Perot Systems shall not reassign to another account any Key Employee without receiving Newco’s written approval after: (i) providing at least thirty (30) days prior notice to Newco in writing or by e-mail; and (ii) nominating replacement personnel of at least equal competence and experience reasonably acceptable to Newco. Perot Systems shall promptly replace any Key Employee to whom Newco reasonably objects. Schedule 5.4 shall be amended to reflect such replacement personnel.
5.5 Required Consents Perot Systems will use commercially reasonable efforts on Newco’s behalf to obtain any third-party consents necessary for Perot Systems to have access to and use any Supported Software or Supported Hardware in connection with the Services (“Required Consents”). Newco shall cooperate with Perot Systems to obtain such Required Consents. Newco shall pay any reasonable and applicable license, transfer or access fees for any Supported Software. If a Required Consent is not obtained, then,
28
unless and until such Required Consent is obtained, Perot Systems will determine and adopt, subject to Newco’s prior written approval, such alternative commercially reasonable approaches as are necessary and sufficient, so as not to increase Service charges, to provide the Services in accordance with the applicable Service Levels without such Required Consents, to the extent reasonably possible.
ARTICLE 6
RESPONSIBILITY FOR ASSETS
6.1 General The Debtors, with Perot Systems’ assistance, have developed lists of all software (the “Supported Software”), all equipment (the “Supported Hardware”), and all licenses, equipment leases, maintenance agreements, service agreements and support agreements (the “Managed Contracts”) existing as of the Agreement Date (to be updated as of the Effective Date and as new agreements and equipment come into existence after the Effective Date in accordance with this MSA), that will be supported or managed by Perot Systems as part of the Base Services. The Parties’ respective administrative, financial, legal and operational responsibilities with respect to the Supported Hardware, Supported Software, and Managed Contracts are described in this Article 6 and, for the convenience of the Parties, in the Responsibility Allocation Matrices attached as Schedule 6.1. In the event of any conflict between this Article 6 and Schedule 6.1, the text of this Article 6 shall control. Any grant by Newco to Perot Systems of rights of use pursuant to this Article 6 shall be deemed to include, subject to the other provisions of this MSA, a grant of such rights to Perot Systems’ Subcontractors to the extent necessary to perform the Services hereunder.
(a) The responsibilities of a Party having administrative, financial, legal or operational responsibility for a Managed Asset are as follows:
(i) If a Party has administrative responsibility for a Managed Asset, such Party shall be responsible for managing such Managed Asset, including (A) the tracking of renewal dates and license compliance provisions, (B) providing notice to the Party with legal responsibility when actions need to be taken with respect to such Managed Asset (e.g., notification of renewal of the license for such Managed Asset), and (C) receiving invoices from third party vendors, promptly reviewing such invoices, and providing to the Party with financial responsibility the original invoice together with a statement identifying which charges are proper and valid and should be paid.
(ii) If a Party has financial responsibility for a Managed Asset, such Party shall be responsible for all current (applicable immediately after the agreed effective date of such financial responsibility) and future financial costs and expenses related to such Managed Asset, including (A) acquisition, lease, license, or other ownership costs; (B) cost of modifications, upgrades, enhancements, new releases, replacements, and expanded license rights; and (C) growth and technology refreshments (including third party software and equipment maintenance agreements).
29
(iii) If a Party has legal responsibility for a Managed Asset, such Party shall be responsible for (A) if applicable, assuming leases and licenses for any such Managed Asset being assigned pursuant to this MSA; and (B) entering into contracts, leases, and licenses for any such Managed Asset in its name, including (1) contracts addressing the modifications, upgrades, enhancements, and replacements of such Managed Asset, and (2) third party software or equipment maintenance agreements with respect to such Managed Asset.
(iv) If a Party has operational responsibility for a Managed Asset, such Party shall be responsible for operational support of such Managed Asset, including (A) the unpacking, configuration, staging, setup, and installation of such Managed Asset; (B) the support of such Managed Asset; (C) the maintenance of such Managed Asset; (D) moves, additions and changes with respect to such Managed Asset; and (E) disaster recovery with respect to such Managed Asset.
6.2 Existing Hardware The Parties’ respective rights and responsibilities with respect to (i) Supported Hardware directly or indirectly owned (immediately after consummation of the Acquisition) by Newco (collectively, the “Supported Hardware (Owned)”), and (ii) Supported Hardware directly or indirectly leased (immediately after consummation of the Acquisition) by Newco (collectively, the “Supported Hardware (Leased)”), shall be as follows:
(a) Owned by Newco. The Parties’ respective rights and responsibilities with respect to Supported Hardware (Owned) shall be as follows:
(i) On the Effective Date, Newco shall assign and convey to Perot Systems the Supported Hardware (Owned) identified in Schedule 6.2(a), Part A (the “Assigned Hardware (Owned)”). After such assignment and conveyance, Perot Systems shall be administratively, financially, legally, and operationally responsible for such Assigned Hardware.
(ii) Newco shall retain ownership of, and administrative, financial and legal responsibility for, all Supported Hardware (Owned) identified in Schedule 6.2(a), Part B (the “Retained Hardware (Owned)”). On the Effective Date, Newco shall, and hereby does, grant to Perot Systems the right to access, configure, maintain and use the Retained Hardware (Owned) and all other rights with respect to the Retained Hardware (Owned) necessary to perform the Services. Beginning on the Effective Date and continuing until the end of the Term, Perot Systems shall be operationally responsible for the Retained Hardware (Owned).
(b) Leased by Newco. The Parties’ respective rights and responsibilities with respect to Supported Hardware (Leased) shall be as follows:
30
(i) On the Effective Date, Newco shall assign to Perot Systems the equipment leases identified in Schedule 6.2(b), Part A (“Assigned Hardware Leases”) relating to the Supported Hardware (Leased) identified in Schedule 6.2(b), Part A (“Assigned Hardware (Leased)”). After such assignment and assumption, Perot Systems shall be administratively, financially, legally, and operationally responsible for the Assigned Hardware Leases and the applicable Supported Hardware (Leased) subject to such leases with respect to all periods after the effective date of the Assignment and Assumption Agreement.
(ii) Newco shall retain financial and legal responsibility for the equipment leases identified in Schedule 6.2(b), Part B (“Retained Hardware Leases”) relating to the Supported Hardware (Leased) identified in Schedule 6.2(b), Part B (the “Retained Hardware (Leased)”). On the Effective Date, Newco shall, and hereby does, grant to Perot Systems the right to access, configure, maintain and use the Retained Hardware (Leased) and all other rights with respect to the Retained Hardware (Leased) necessary to perform the Services. Beginning on the Effective Date and continuing until the end of the Term, Perot Systems shall be administratively and operationally responsible for the Retained Hardware (Leased) and the Retained Hardware Leases.
6.3 Replacement and Additional Hardware
(a) Perot Systems Responsibility. Except as provided in Section 6.3(b), Perot Systems shall be administratively, financially, legally and operationally responsible to procure and acquire any additions, enhancements and upgrades to, repairs to, and replacements of, Supported Hardware that are necessary to provide the Services in accordance with the applicable Service Levels. Such additional Hardware may be purchased or leased by Perot Systems in its sole discretion, provided that Perot Systems shall give at least thirty (30) days’ notice to Newco before purchasing or leasing any equipment having a purchase price or capital cost, as applicable, greater than $100,000 (with reasonably related expenditures to be aggregated) or entering into any equipment lease the term of which will extend beyond the scheduled expiration of the Term. Newco shall have the right, in its sole discretion, to cause Perot Systems to defer any such purchase or lease, provided that the Parties enter into a Change Order that addresses (i) sharing the costs that will be avoided and may be incurred by the Parties as a result of such deferral, (ii) adjustments to the Annual Services Charge and any Service Levels and Service Level Credits that may be affected by such deferral, and (iii) such other matters as the Parties determine appropriate.
(b) Newco Responsibility. Newco shall be financially and legally responsible to procure and acquire (i) any additions, enhancements and upgrades to, repairs to, and replacements of, Retained Hardware (Owned) and Retained Hardware (Leased), and (ii) unless otherwise agreed by the Parties in a Change Order, any additions, enhancements and upgrades to and replacements of Supported
31
Hardware that are necessary, as a result of changes in Newco’s volume of, or method of doing, business, for Perot Systems to provide the Services in accordance with the applicable Service Levels; and, upon acquisition of such Supported Hardware, Newco shall grant Perot Systems the rights described in 6.2(a)(ii) or 6.2(b)(ii), as the case may be. Notwithstanding the foregoing, Newco shall have the option in its sole discretion not to procure or acquire any such additions, enhancements, upgrades or replacements having a purchase price or capital cost, as applicable, greater than $100,000 (with reasonably related expenditures to be aggregated) provided that the Parties agree that if Newco elects not to procure or acquire such items, the Annual Services Charge and the affected Service Levels and Service Level Credits may require appropriate adjustment.
6.4 Existing Software The Parties’ respective rights and responsibilities with respect to (i) existing Third Party Systems Software for Assigned Hardware, (ii) existing Third Party Systems Software for Retained Hardware, and (iii) existing Applications Software, shall be as follows:
(a) Third Party Systems Software.
(i) For Assigned Hardware. Subject to obtaining the consents described in Section 5.5, (A) Newco shall assign, and hereby does assign, as of the Effective Date, the licenses identified in Schedule 6.4(a), Part A to the Third Party Systems Software for the Assigned Hardware (the “Assigned Systems Software Licenses”), and (B) Perot Systems shall assume, and hereby does assume, as of the Effective Date, the Assigned Systems Software Licenses. With respect to all periods after the Effective Date during the Term, Perot Systems shall be administratively, financially, legally, and operationally responsible for the Assigned Systems Software Licenses and, subject to such licenses, the related Third Party Systems Software, including, as necessary or appropriate to provide the Services, additions, enhancements, modifications, replacements and upgrades of such Third Party Systems Software and introduction of new Third Party Systems Software for the Assigned Hardware.
(ii) For Retained Hardware. Newco shall retain financial and legal responsibility for the licenses identified in Schedule 6.4(a), Part B to the Third Party Systems Software for the Retained Hardware (the “Retained Systems Software Licenses”), including, as necessary or appropriate to obtain the Services, additions, enhancements, modifications, replacements and upgrades of such Third Party Systems Software and the acquisition of new Third Party Systems Software for the Retained Hardware. Subject to obtaining the consents described in Section 5.5, (A) as of the Effective Date, Newco shall, and hereby does, grant to Perot Systems the rights that Newco has or later obtains with respect to such Third Party Systems Software for the Retained Hardware, and (B) with respect to all periods after the Effective Date during the Term, Perot Systems shall (1) be administratively and operationally responsible for the Retained Systems
32
Software Licenses and the related Third Party Systems Software, including, as necessary or appropriate to provide the Services, additions, enhancements, modifications, replacements and upgrades of such Third Party Systems Software and introduction of new Third Party Systems Software for the Retained Hardware, and (2) comply with the duties, including use restrictions, imposed by the Retained Systems Software Licenses.
(b) Applications Software.
(i) Retained Third Party Applications Software. Newco shall retain financial and legal responsibility for the licenses identified in Schedule 6.4(b), Part A to the Third Party Applications Software (the “Retained Third Party Applications Software Licenses”), including, as necessary or appropriate to obtain the Services, additions, enhancements, modifications, replacements and upgrades of such Third Party Applications Software. Subject to obtaining the consents described in Section 5.5, (A) as of the Effective Date, Newco shall, and hereby does, grant to Perot Systems the rights that Newco has or later obtains with respect to the Third Party Applications Software, and (B) with respect to all periods after the Effective Date during the Term, Perot Systems shall (1) be administratively and operationally responsible for the Retained Third Party Applications Software Licenses and the related Third Party Applications Software, including, as necessary or appropriate to provide the Services, additions, enhancements, modifications, replacements and upgrades of such Third Party Applications Software, and (2) comply with the duties, including use restrictions, imposed by the Retained Third Party Applications Software Licenses.
(ii) Assigned Third Party Applications Software. Subject to obtaining the consents described in Section 5.5, (A) Newco shall assign, and hereby does assign as of the Effective Date, the licenses identified in Schedule 6.4(b), Part B to the Third Party Applications Software (the “Assigned Third Party Applications Software Licenses”), and (B) Perot Systems shall assume, and hereby does assume, as of the Effective Date, the Assigned Third Party Applications Software Licenses. With respect to all periods after the Effective Date during the Term, Perot Systems shall (1) be administratively, financially, legally, and operationally responsible for the Assigned Third Party Applications Software Licenses and the related Third Party Applications Software, including, as necessary or appropriate to provide the Services, enhancements, modifications, and upgrades of such Third Party Applications Software, and (2) comply with the duties, including use restrictions, imposed by the Assigned Third Party Applications Software Licenses.
(iii) Applications Software Owned by Newco. Newco shall retain ownership of, and financial and legal responsibility for, the Applications Software
33
identified in Schedule 6.4(b), Part C (the “Newco Applications Software”), including, as necessary or appropriate to provide the Services, enhancements, modifications, and upgrades of such Newco Applications Software. As of the Effective Date, (B) Newco shall, and hereby does, grant to Perot Systems the rights set forth in Section 6.4(b)(i) with respect to the Newco Applications Software, and (B) with respect to all periods after the Effective Date during the Term, Perot Systems shall be administratively and operationally responsible for the Newco Applications Software, including, as necessary or appropriate to provide the Services, enhancements, modifications, and upgrades of the Newco Applications Software.
6.5 Replacement and Additional Software
(a) Third Party Systems Software.
(i) For Assigned Hardware. Perot Systems shall be administratively, financially, legally and operationally responsible for Third Party Systems Software acquired for, and installed on, Assigned Hardware after the Effective Date (including enhancements, replacements and upgrades to Systems Software for Assigned Hardware) to the same extent as Perot Systems is administratively, financially, legally and operationally responsible for the Assigned Hardware.
(ii) For Retained Hardware. Newco shall be financially and legally responsible for Third Party Systems Software acquired after the Effective Date for installation on Retained Hardware (including enhancements, replacements and upgrades to Systems Software for Retained Hardware). Effective upon acquisition of such Third Party Systems Software, (A) such Third Party Systems Software licenses shall be deemed to be Retained Systems Software Licenses, (B) Newco shall, and hereby does, grant to Perot Systems the rights described in Section 6.4(a)(ii)(A) with respect to such Third Party Systems Software, and (C) from such effective date until the end of the Term, Perot Systems shall have the responsibilities and obligations described in Section 6.4(a)(ii)(B) with respect to such Third Party Systems Software and the applicable software licenses.
(b) Third Party Applications Software. Perot Systems shall be administratively and operationally responsible for Third Party Applications Software included in the Base Services as of the Effective Date. Perot Systems shall install, operate, and support new Third Party Applications Software approved by Newco in a mutually agreed Change Order. Unless otherwise agreed by the Parties in the applicable Change Order, (A) Newco shall have financial and legal responsibility for all licenses for new Third Party Applications Software as Additional Services, (B) Newco shall, and hereby does, grant to Perot Systems the rights that Newco obtains with respect to such new Third Party Applications Software, and (C) with respect to all periods after the effective date of such grant during the Term, Perot
34
Systems shall (1) be administratively and operationally responsible for such licenses and, subject to such licenses, the related Third Party Applications Software, including, as necessary or appropriate to provide the Services, enhancements, modifications, and upgrades of such Third Party Applications Software, and (2) comply with the duties, including use restrictions, imposed by such licenses. Perot Systems shall not install or operate in connection with the Services any new Third Party Applications Software without Newco’s prior written approval in a Change Order, which Change Order will provide for appropriate adjustments to the Annual Services Charge.
6.6 Third Party Service Contracts
(a) Subject to Sections 6.6(b) and 5.5, Newco assigns to Perot Systems, and Perot Systems accepts and assumes such assignment for, the Third Party Service Contracts identified in Schedule 6.6, Part A (the “Assigned Third Party Service Contracts”), effective as of the Effective Date. Perot Systems shall have administrative, financial, legal and operational responsibility for the Assigned Third Party Service Contracts with respect to periods on and after the Effective Date.
(b) Newco shall retain financial and legal responsibility for the Third Party Service Contracts identified in Schedule 6.6, Part B (the “Retained Third Party Service Contracts”), and, subject to Section 5.5, Newco grants to Perot Systems, solely to the extent necessary for performing the Services, the rights Newco has with respect to the Retained Third Party Service Contracts that are reasonably necessary for Perot Systems to provide the Services. Perot Systems shall have administrative and operational responsibility for, and shall comply with the duties imposed on Newco by, the Retained Third Party Service Contracts.
(c) The Parties acknowledge that certain Third Party Service Contracts for Supported Hardware and Supported Software, such as hardware maintenance contracts and software support agreements, may be listed in Schedule 6.6. Notwithstanding Sections 6.6(a) and (b), these Third Party Service Contracts shall be treated in the same manner provided in Sections 6.1 through 6.4 as the Supported Hardware or Supported Software to which such Third Party Service Contracts relate, including whether such Third Party Service Contract is retained by Newco or assigned to Perot Systems, and the allocation of administrative, financial, legal and operational responsibility as between the Parties.
6.7 Certain Hardware and Software Provided by Perot Systems . Notwithstanding the provisions of Sections 6.1 through 6.6 above, Perot Systems will have administrative, financial, legal and operational responsibility for the following Hardware and Software as part of the Annual Services Charge:
(a) Hardware and Software used by PSC Personnel to provide concurrent support to more than one Perot Systems’ customer. For example, with respect to the Help Desk Services, Perot Systems will provide the help desk Software, the Hardware
35
on which such Software is operated, telephone switches and handsets, desktop computers and related Hardware and Software used to provide the Help Desk Services;
(b) Hardware and Software necessary to retain up to seven years of data from the Legacy System for up to seven years after the Legacy System is decommissioned;
(c) Hardware and Software used generally in the business of Perot Systems. For example, Hardware and Software used by Perot Systems’ accounting, human resources, and other back-office functions; and
(d) Hardware and Software not used by Perot Systems for the direct benefit of Newco and its Supported Affiliates and Franchisees/Licensees.
6.8 Managed Contracts.
(a) Upon request by Newco after the date on which Newco attains an investment grade credit rating for its unsecured corporate debt (i.e., a rating of Baa3 or better by Moody’s and of BBB- by Standard & Poors), and provided that Newco has not failed to pay when due (subject to Section 7.8(c)(ii) and any other provisions of this MSA governing payment disputes) all undisputed invoices properly submitted under Section 7.8 during the prior six (6) months, Perot Systems shall prepare and submit to Newco for review and approval a proposal pursuant to which Perot Systems would acquire (whether through purchase, assumption of the applicable license or lease, or otherwise) and become fully responsible for the Supported Hardware, the Supported Software and the Managed Contracts from Newco or the applicable Third Party Vendor, including responsibility for the payment, support, maintenance and management thereof. Such proposal will include (i) the reasonable changes (if any) in Service Levels and Service Level Credits that would result from such acquisition, and (ii) reasonable changes, if any, to charges under this MSA to reflect amounts to be paid by Perot Systems and passed through (without markup) to Newco during the remainder of the Term.
(b) Following receipt of a proposal, Newco shall have the opportunity to review the proposal, and, at Newco’s election, to accept, reject, or enter into good faith negotiations with Perot Systems of the terms of the proposal in accordance with the Change Control Process. Upon negotiation of mutually acceptable terms for such acquisition and assumption of responsibility by Perot Systems, the Parties shall prepare and, at Newco’s option, execute a Change Order reflecting such mutually agreed upon terms and the terms of this MSA shall be deemed amended accordingly.
ARTICLE 7
CHARGES AND PAYMENT
7.1 Charges for Services Subject to the terms of this MSA, Newco will pay Perot Systems the amounts set forth in Exhibit C for the Services, at the times and according to the terms set forth in that Exhibit and in this Article 7. Perot Systems’ charges for the Base
36
Services identified in Attachment C-2 of Exhibit C (“Annual Services Charge”) will be adjusted for incremental charges or credits based on the Resource Baselines established in Attachment C-2 of Exhibit C of this MSA and as otherwise provided in this MSA.
7.2 Charges for Additional Services Unless otherwise agreed by the Parties, Newco will pay Perot Systems for Additional Services at the rates set forth in Attachment C-3 to Exhibit C (“Additional Services Rates”), as such rates are adjusted annually pursuant to Section 7.7 of this MSA. Unless otherwise specifically provided in a Change Order, Perot Systems will deliver invoices to Newco in accordance with Section 7.8, for all amounts due and payable, and each such invoice will be due in accordance with Section 7.8 and the other requirements of this MSA. Newco may from time to time reduce the scope or level of Services provided by Perot Systems in accordance with a Change Order, and the fees charged to Newco shall be reduced accordingly to reflect the reduced scope or level of Services.
7.3 Service Level Credits
(a) General. If Perot Systems fails to meet the applicable Service Level for a particular Service during steady state operations (i.e., not during a Transition Period with respect to a particular Service), Perot Systems shall incur and provide to Newco performance credits against fees payable hereunder by Newco to Perot Systems as described in Exhibit B and this Section 7.3 (“Service Level Credits”).
(b) Limitation on Credits.
(i) Basis for Credits. Perot Systems will only be obligated to issue Service Level Credits under this Section 7.3 and Exhibit B to the extent the events giving rise to such credits are within its control or otherwise are its responsibility hereunder, provided that to the extent the circumstances giving rise to one or more credits are due to the failure of one or more Third Party Vendors to perform its or their obligations under one or more Managed Contracts, (A) no Service Level Credits will be issued if Perot Systems has pursued the escalation procedures, if any, described in the applicable Managed Contracts and has otherwise used commercially reasonable efforts to cause the applicable Third Party Vendor to perform its obligations and remedy any nonperformance, and (B) upon request by Newco, Perot Systems will assign to Newco any claim for breach it may have against such Third Party Vendor with respect to such circumstances.
(ii) No Default. Except as provided in Section 10.4, the failure to meet individual Service Levels shall not constitute a default by Perot Systems of its obligations under this MSA, shall not create any liability beyond the Service Level Credits due under this Section 7.3 (including but not limited to any liability for damages) and shall not provide Newco the right to terminate this MSA.
37
(iii) Maximum Credits. Perot Systems shall issue Service Level Credits, if applicable, to Newco based on Perot Systems’ failure to meet the Service Levels in the performance of the Services, provided, however, that such Service Level Credits under this MSA shall not exceed in the aggregate more than 10% of the portion of the Annual Services Charge for the applicable calendar month.
(iv) Earn-Back. If Perot Systems credits Newco with a Service Level Credit and, in each of the next three (3) consecutive months, Perot Systems exceeds the Service Level for the applicable Service, the Service Level Credit will be earned-back.
7.4 Reimbursable Expenses Except as provided in a Change Order or this MSA, Newco shall not reimburse Perot Systems for out-of-pocket expenses incurred by PSC Personnel in connection with Services provided under this MSA. If a Change Order provides for reimbursement of out-of-pocket expenses, such reimbursement shall be restricted to the following actual, reasonable and documented out-of-pocket expenses of Perot Systems, without markup, incurred under this MSA or a Change Order: (i) in connection with Perot Systems’ transportation, lodging and related costs and expenses incurred in compliance with Perot Systems’ then-current standard travel policy, and (ii) such other reimbursable expenses as are specified in this MSA or the applicable Change Order. Whenever a vehicle is rented by Perot Systems under this MSA, such vehicle must be rented from a Newco or one of its Affiliates or Franchisees/Licensees, to the extent that a vehicle of the type (e.g., mid-size, etc.) reasonably requested is available from one of them at the time and at the location reserved by Perot Systems, and the charges for such rental will be comparable to the charges paid by Newco’s largest customers for an equivalent vehicle. Perot Systems shall give Newco at least thirty (30) days prior notice in writing or by e-mail (with confirmation copy by facsimile or mail in accordance with Section 16.2) of any material change in Perot Systems’ standard travel policy after the Effective Date.
7.5 Retained and Pass-Through Expenses
(a) Responsibility for Retained Expenses. Except as otherwise agreed by the Parties in writing, Newco shall pay all Retained Expenses directly to the applicable Third Party Vendor. Perot Systems shall have no obligation to become financially or legally responsible for Retained Expenses.
(b) Responsibility for Pass-Through Expenses. Except as otherwise agreed by the Parties in writing, Perot Systems shall pay all Pass-Through Expenses directly to the applicable Third Party Vendor promptly after Perot Systems has reviewed and approved the applicable invoice, provided that with respect to any Retained Expenses that are paid by Perot Systems (with Newco’s prior approval) as an administrative convenience, Newco shall review and approve the applicable invoice before such payment is made.
38
(c) Review of Invoices. Perot Systems will review all invoices for Retained Expenses and Pass-Through Expenses to determine whether the charges reflected in such invoices comply in all material respects with the applicable purchase documentation or contract. Perot Systems will use its diligent, commercially reasonable efforts to resolve any discrepancies with the applicable documentation or contract prior to submitting any invoice for Retained Expenses or request for reimbursement of Pass-Through Expenses to Newco. After completing its review, Perot Systems will submit such invoices, together with Perot Systems’ recommendation for payment, nonpayment, or partial payment, to Newco on the twentieth (20th) day of the month after receipt, for Newco’s review and approval; however, Perot Systems will submit invoices that require payment by Newco earlier than the twentieth (20th) day of such month at most three (3) Business Days after such invoice is received by Perot Systems, but in any event, as quickly as reasonably practicable. Newco will promptly review and approve, and if approved, pay the invoices submitted to it (or advise Perot Systems’ Account Manager that an invoice is not approved, with an explanation of the reasons for not approving the invoice). Perot Systems shall provide a list of expected monthly invoice payables (e.g., invoices outstanding, but not received), of which Perot Systems has knowledge.
7.6 Taxes and Tax Planning
(a) Responsibility. Except as set forth in this Section 7.6, Newco will pay, or reimburse Perot Systems for, all taxes and duties levied in connection with the Services or this MSA.
(i) Sales Taxes and the Like. Perot Systems will pay all sales, use, value-added, consumption and other taxes and duties levied on any goods or services used or consumed by it or the PSC Personnel or any party acting on its or their behalf in providing the Services, except for such taxes relating to Retained Expenses, Pass-Through Expenses or goods or services provided by Third Party Vendors directly to or for the benefit of Newco.
(ii) Property, Income and Payroll Taxes. Perot Systems will pay all (A) real and personal property, ad valorem and similar taxes on real, personal and tangible or intangible property it owns, leases or licenses, (B) franchise and privilege taxes on its business operations, (C) taxes based on its net income or gross receipts, and (D) payroll withholding and similar taxes related to the PSC Personnel (including all Affiliates, or any party acting on its or their behalf).
(b) Cooperation.
(i) Obligation. Each Party will cooperate with the other Party in all reasonable respects to more accurately determine and minimize applicable tax liabilities to the extent legally permissible, including without
39
limitation, through working with the other Party to allocate, where appropriate, payments made under this MSA for (i) taxable goods, services and transactions, (ii) non-taxable goods, services, and transactions, and (iii) transactions in which Perot Systems acts solely as a payment agent for Newco in receiving goods or services (including leasing and licensing arrangements) that otherwise are non-taxable or have previously been subjected to tax. Perot Systems’ invoices shall separately state the amounts of any sales and similar taxes it is collecting from Newco on behalf of any governmental agency.
(ii) Certificates. Each party will provide the other Party with resale certificates, information regarding any out-of-state, out-of-province or out-of-country sales or use of equipment, materials, services or sales, or other exemption certificates or information reasonably requested by the other Party. If any new taxes are passed into law that materially adversely affect Newco’s tax liability under this MSA, the Parties will work together to minimize the amount of these taxes.
(iii) Response Notification. Each Party will promptly notify the other Party of, and coordinate with the other Party the response to and settlement of, any claim for taxes, including penalties and interest, asserted by applicable taxing authorities for which liability by the other Party is asserted.
(iv) Settlement of Claims. Without limiting the foregoing, Perot Systems shall promptly notify Newco of, and coordinate with Newco the response to and settlement of, any claim for taxes, including penalties and interest, asserted by applicable taxing authorities for which Newco is responsible hereunder. With respect to any claim arising out of a form or return signed by Newco or Perot Systems, the Party signing the form shall have the right to elect to control the response to and settlement of the claim, but the other Party shall have all rights to participate in the responses and settlements that are appropriate to its potential responsibilities or liabilities. If either Party believes in good faith that there are sufficient and reasonable grounds upon which to challenge the imposition of any tax for which such Party would be liable under this Section 7.6, and any such challenge may only be made by the other Party, then upon that Party’s request, the other Party will assert such a challenge, provided, however, that the other Party will not be required to challenge any assessment unless requested and authorized by the requesting Party to do so. The requesting party will promptly reimburse the other party for the reasonable accounting and legal fees and other expenses (including penalties and interest) the other party incurs in asserting such a challenge. The requesting party shall be entitled to any tax refunds or rebates granted to the extent such refunds or rebates are for taxes or similar amounts that were paid by the requesting party.
40
(v) Tax Protection. Each party agrees to indemnify the other party and hold it harmless from any deficiency for taxes (including penalties and interest) for which the indemnifying party is responsible under this Section 7.6.
7.7 Pricing Adjustments The Service Charges under this MSA, including the Annual Services Charge, ARC Rates, RRC Rates and the Additional Services Rates will be reviewed by the Parties annually on the anniversary of the Effective Date, beginning on the second anniversary of the Effective Date. Such charges and rates will be increased by the lesser variance of: (a) the percentage that the Employment Cost Index for total compensation, private industry workers, not seasonally adjusted, services, business services (“ECI”) for the United States as published by the Bureau of Labor Statistics of the Department of Labor (“BLS”), for the month in which the Effective Date falls for such Contract Year exceeds the ECI for the month in which the Effective Date falls for the previous Contract Year; or (b) [REDACTED] multiplied by the percentage that the Consumer Price Index for All Urban Consumers as published by the BLS (“CPI”) for the month of in which the Effective Date falls for such Contract Year exceeds the CPI for the month in which the Effective Date falls for the previous Contract Year. An example of such computation is provided below. In the event the ECI and CPI decline by [REDACTED] percent ([REDACTED]%) or more during any three-year period, the Parties shall negotiate in good faith an appropriate adjustment to the Service Charges under this MSA that reflects the reduction, if any, in Perot Systems’ costs to provide the Services resulting from such decline. If the BLS stops publishing the ECI or the CPI or substantially changes the content or format thereof, the parties will substitute other mutually acceptable price indices.
Example:
Assumptions: 2007 is Base Period
Hypothetical August 2007 ECI = 156.3
Hypothetical August 2008 ECI = 161.4
Hypothetical August 2009 ECI = 171.1
Hypothetical August 2007 CPI = 172.6
Hypothetical August 2008 CPI = 177.8
Hypothetical August 2009 CPI = 185.8
| | CPI Levels | | Annual % Change | | CPI Cap ([REDACTED] x annual % change) | |
August 2007 CPI | | 172.6 | | | | | |
August 2008 CPI | | 177.8 | | [REDACTED] | % | [REDACTED] | % |
August 2009 CPI | | 185.8 | | [REDACTED] | % | [REDACTED] | % |
August 2007 ECI | | 156.3 | | | | | |
August 2008 ECI | | 161.4 | | [REDACTED] | % | | |
August 2009 ECI | | 171.1 | | [REDACTED] | % | | |
41
Therefore the maximum allowable change for 2008 would be [REDACTED]% while the maximum allowable change for 2009 would be [REDACTED]%.
7.8 Invoices and Payment
(a) Timing of Invoices. Perot Systems will invoice Newco monthly on or about the first day of each calendar month for (i) the Services to be performed during the following calendar month, including, to the extent applicable, Perot Systems’ good faith estimate of its fees and expenses for any Services to be provided on a time and materials or similar basis, (ii) any Additional Services in accordance with the terms of the applicable Change Order unless otherwise provided in the Change Order, (iii) all Reimbursable Expenses incurred and all Pass-Through Expenses for which invoices were received during the previous month, and (iv) an adjustment for any underpayments or overpayments made in connection with any previous month’s estimated fees or expenses or other applicable correction. Notwithstanding the foregoing, subject to the provisions of Section 2.2, Perot Systems will invoice Newco for the first month of the Term on or before the Effective Date.
(b) Supporting Information. Perot Systems will substantiate its invoices in reasonable detail (including, on Newco’s request, copies of any third-party invoices) and Perot Systems will provide such details as are reasonably necessary to establish that, for example, periodic payments or payments conditioned on the occurrence of specified events, are due and payable. Notwithstanding the foregoing, Perot Systems shall have no obligation to provide any information regarding its cost to provide any Services for which Newco has agreed to pay a fixed price, provided that Perot Systems shall provide information necessary to establish that Newco was properly charged. Perot Systems will use commercially reasonable efforts to invoice Newco for all internally driven expenses (e.g., authorized PSC Personnel travel and expense reimbursement, task orders) within forty-five (45) days of incurring an expense. Perot Systems will use commercially reasonable efforts with Third Party Vendors (e.g., software and infrastructure purchases, telecommunications billings) to obtain timely invoicing.
(c) Payment.
(i) Timing of Payment. Except as permitted by Section 7.8(c)(ii) below, Newco will pay Perot Systems the full amount of each invoice, by wire transfer to Perot Systems, within twenty (20) days after receipt of the applicable invoice. (For example, the monthly invoice for February’s Services will be delivered by Perot Systems to Newco on January 1st and payment is due from Newco on January 20th.) Subject to the provisions of Section 2.2, payment for the first month of the Term is due on the Effective Date.
42
(ii) Disputed Invoices. If Newco reasonably and in good faith disputes the amounts due under any invoice Newco shall give prompt notice of such dispute to Perot Systems’ account manager in writing within thirty (30) days after receiving the applicable invoice, together with a reasonably detailed written explanation signed by the Newco Account Manager of the disputed amount and grounds for the dispute.
If the aggregate amounts payable under all invoices disputed by Newco is less than or equal to $[REDACTED] Newco may withhold payment of such amounts. Newco’s failure to pay amounts disputed in accordance with this Section 7.8(c)(ii) will not (prior to the resolution of the applicable dispute) be grounds for a claim of breach or suspension of work by Perot Systems unless Newco fails to pursue a prompt resolution of such dispute within thirty (30) days after the applicable invoice date in good faith.
If the total of all amounts disputed by Newco is greater than $[REDACTED] and less than or equal to the sum of (x) $[REDACTED], plus (y) the amount of any reasonably disputed Service Level Credits, Newco may withhold payment of such disputed amounts provided that Newco pays all such disputed amounts into an escrow account at a major United States commercial bank with which neither Party maintains a primary, direct relationship independent of this MSA. Newco’s failure to pay amounts disputed in accordance with this paragraph will not (prior to the resolution of the applicable dispute) be grounds for a claim of breach or suspension of work by Perot Systems unless Newco fails to place the disputed amounts into escrow or to pursue a prompt resolution of such dispute within thirty (30) days after the applicable invoice date in good faith.
If the total of all amounts disputed by Newco is greater than the sum of (x) $[REDACTED], plus (y) the amount of any reasonably disputed Service Level Credits, Newco (A) may withhold payment of such disputed amounts to the extent permitted by the preceding paragraph, (B) shall pay Perot Systems all disputed amounts in excess of the amounts permitted to be withheld and placed in escrow by the preceding paragraph, and (C) after following the procedures set forth in Article 15, may seek all available remedies under this MSA or otherwise available at law or in equity. Newco’s failure to pay amounts disputed in accordance with this paragraph will not (prior to the resolution of the applicable dispute) be grounds for a claim of breach or suspension of work by Perot Systems unless Newco fails to place the disputed amounts permitted to be withheld into escrow, to pay Perot Systems the remaining disputed amounts within ten (10) days after written notice, or to pursue a prompt resolution of such dispute within thirty (30) days after the applicable invoice date in good faith.
For purposes of clarity, if the total amount disputed by Newco under all invoices is $[REDACTED], Newco may withhold payment of such amount
43
without an escrow until the parties resolve the dispute. If the total amount disputed by Newco is $[REDACTED], Newco may withhold payment of such amount, provided that the full $[REDACTED] is placed into escrow until the parties resolve the dispute. If the total amount disputed by Newco is $[REDACTED], Newco may withhold payment of $[REDACTED], provided that such amount is placed into escrow until the parties resolve the dispute and must pay Perot Systems $[REDACTED]. However, if added to the total disputed amount of $[REDACTED] is a disputed Service Level Credit, then the amount of the disputed Service Level Credit shall be placed into escrow together with the $[REDACTED], pending resolution of the respective disputes.
(d) Interest. Late payments of amounts properly due and not subject to a dispute or an unsatisfied milestone, and any amounts due to Newco (e.g., through a credit, refund, or reimbursement) that are not paid within thirty (30) days of the applicable date such amounts become due to Newco, shall accrue interest at the lesser of (i) 1.0% per month on outstanding amounts, or (ii) the maximum rate permitted by applicable law, from the due date, pro-rated for partial months.
(e) Offset. Perot Systems will offset all credits due to Newco under this MSA against amounts then owing by Newco starting with the oldest undisputed amounts owed. Any such credits owed to Newco at the termination or expiration of this MSA will be paid to Newco in cash by Perot Systems within twenty (20) days after termination or expiration of this MSA (or the applicable portion of the services associated with the credits) except as provided otherwise in this MSA, provided that Newco has paid all outstanding invoices due and owing to Perot Systems.
(f) Overpayments. Perot Systems will credit any overpayments made by Newco against the first invoice issued to Newco after discovery of the overpayment, or, upon request by Newco, promptly returned to Newco. Any such credits owed to Newco at the termination or expiration of this MSA will be paid to Newco in cash by Perot Systems within twenty (20) days after termination or expiration of this MSA (or the applicable portion of the services associated with the credits) except as provided otherwise in this MSA.
7.9 Audits by Newco
(a) Audit Trail and Audit Rights. Perot Systems shall maintain complete business records related to or resulting from this MSA or any Services hereunder to the extent, and on the same basis as, such records are maintained for other customers of Perot Systems. At Newco’s request, which request shall not be made more often than once per Contract Year (although the time period to be audited shall not be limited to a single Contract Year), Perot Systems will allow Newco or its designated representatives to audit its accounting and other books and records to the extent reasonably necessary to verify:
(i) The accuracy of Perot Systems’ invoices to Newco; or
44
(ii) Perot Systems’ performance of the Services in accordance with this MSA including, to the extent applicable to the Services and the accuracy of the charges therefor, including books and records relating to (1) Perot Systems’ practices and procedures under this MSA, (2) of operating systems and practices under this MSA, (3) of general controls and security practices and procedures under this MSA, (4) of disaster recovery and back-up procedures under this MSA, (5) of the efficiency of Perot Systems in performing the Services, (6) compliance with applicable Service Levels and other terms of this MSA, (7) any audit necessary to enable Newco to meet applicable regulatory, bankruptcy, or legal requirements, and (8) any other audits reasonably required by Newco.
Perot Systems will cooperate with, and comply with all reasonable requests from, Newco or its designated representatives in connection with such audit. Prior to conducting an audit, Newco’s designated representatives will execute and deliver to the Party to be audited a confidential information agreement containing terms reasonably acceptable to such Party.
(b) Audit Results. Upon completion of any such audit, Newco and Perot Systems will review the audit report together and work in good faith to agree upon (i) any adjustment of charges to Newco (including any credit or reimbursement of any overpayment by Newco), (ii) any appropriate adjustments to Perot Systems’ billing practices, and (iii) other appropriate changes based upon the results of the audit. If any such audit discloses overpayments that in the aggregate equal 5% or more of the cumulative amounts that were actually due during the audited period, as shown by the audit, then Perot Systems will reimburse Newco for the costs of the audit. Any overpayment by Newco shall promptly be paid-back to Newco.
7.10 Internal Benchmarking Upon request by Newco, Perot Systems will enter into good faith negotiations regarding Perot Systems’ charges for, and the scope of, the Services, provided that any such request will not occur before the third anniversary of the Effective Date or more often than once every two years thereafter. After such request, the Parties shall determine whether the cost to provide the Services projected to be incurred by Perot Systems in the aggregate, as adjusted to accommodate, as appropriate, differences in volume of services, scope of services, service levels, financing or payment streams (including costs spread over the life of an agreement), and other pertinent factors, after the date of such request is significantly (i.e., greater than 15%) less or greater than the cost to provide the Services projected to be incurred by Perot Systems on the Effective Date, then the Parties will enter into a mutually satisfactory amendment to this MSA that addresses the sharing of the costs that will be incurred or avoided by Perot Systems.
7.11 Newco Satisfaction Surveys
(a) Baseline Customer Satisfaction Survey. During the six (6) month period after the Effective Date, as part of the Services, Perot Systems will conduct a survey to measure End-User satisfaction with the Services, the Systems and Perot Systems’
45
performances under this MSA generally, at mutually agreed upon Newco sites. The survey will contain questions to be agreed upon by Newco and Perot Systems will promptly share the results of the survey with Newco, including, without limitation, copies of the user questionnaires completed by any Newco Personnel.
(b) Regular Customer Satisfaction Surveys. At least once every twelve (12) months during the Term during a mutually agreed time period, and as part of the Services, Perot Systems will conduct a survey to measure End-User satisfaction with the Services, the Systems and Perot Systems’ responsiveness to requests for Services at each Newco site. The survey will at a minimum cover at least the following classes of users: (i) end users of the Services, (ii) senior management of end users, and (iii) senior managers of Newco’s information technology function. The survey will contain questions to be agreed upon by Newco and Perot Systems no later than thirty (30) days before the date on which the survey is scheduled to begin. Perot Systems will promptly share the results of the survey with Newco, including, without limitation, copies of the user questionnaires completed by any Newco Personnel. The content, scope, and method of each such survey will be consistent with the baseline customer survey conducted under Section 7.11(a), and the timing of the surveys will be subject to mutual agreement. Without limiting any other provision of this Section, Newco shall also have the right to conduct its own periodic user satisfaction surveys and to share the results thereof with Perot Systems for response under subsection (c), below.
(c) Review of Results. Perot Systems will review the results with Newco and undertake commercially reasonable actions to respond to and resolve deficiencies identified in the Customer Satisfaction Surveys to the extent caused by Perot Systems or PSC Personnel. If Newco, in its reasonable discretion, determines that Perot Systems is not maintaining user satisfaction at a reasonably acceptable level, or if, based on feedback, Newco determines that its needs are not being satisfactorily met by Perot Systems (to the extent within Perot Systems’ or its Subcontractors’ control) in the performance of this MSA or by the requirements of this MSA, Newco shall provide Perot Systems with notice thereof and the Parties shall work in good faith to develop and implement a plan to cure the deficiency promptly and that will minimize Newco’s costs.
7.12 Extraordinary Events If an Extraordinary Event occurs or is reasonably expected to occur, Newco and Perot Systems will negotiate in good faith appropriate changes to the charges assessed, claims settlement (if, and only if, Newco terminates this MSA), or the scope, nature or volume of Services provided under this MSA. For purposes of this MSA, “Extraordinary Event” means an event or transaction or series of events or transactions relating to Newco’s business that results or is reasonably expected to result in a material increase or decrease of Perot Systems’ aggregate cost of providing the Services or in the resources required to provide the Services. The term “Extraordinary Events” includes (i) changes to the principal locations where Newco operates that materially adversely affect Perot Systems’ ability to provide the Services in the manner or at the cost provided at the previous address (except for changes in location expressly contemplated by this MSA); (ii) material changes in products or services of, or in the number of users
46
served by, Newco, beyond changes contemplated by this MSA; (iii) mergers, annexations, or divestitures of a material nature involving Newco; (iv) changes in methods of customer service delivery by Newco not contemplated by this MSA; (v) material changes in service priorities that require material changes to Service deliveries or timeframes, without adequate notice thereof; and (vi) quarterly increases or decreases of greater than 20% (compared to the corresponding quarter of the previous year) of Newco’s aggregate rentals resulting from a general economic downturn or upturn in the baseline volumes set forth in Exhibit C, provided however that the term Extraordinary Event shall not include any such events, transactions, or series of events or transactions within Newco’s control that occur within 180 days after the Effective Date.
7.13 Change of Location If Newco requests Perot Systems to provide some portion of the Services from a site other than the Supported Site initially specified by Newco (or as contemplated by the Parties) and Perot Systems agrees to make such change, then (i) Newco shall continue to pay the monthly charges for the Services as described in this MSA, (ii) Newco shall compensate Perot Systems for such migration services as Additional Services, and for any reasonably associated costs actually incurred by Perot Systems to the extent resulting from the migration, and (iii) the Parties shall mutually agree in good faith upon an appropriate increase or decrease in the Service charges to Newco as a result of the increased or decreased costs resulting from the migration to be incurred in connection with the ongoing performance of the migrated Services as well as reasonable shutdown related expenses actually incurred. If Perot Systems would terminate any dedicated employees or consultants, solely as a result of any such migration, Newco shall pay or reimburse Perot Systems for the actual severance and termination benefits or, in lieu thereof, relocation benefits, of such PSC Personnel actually paid by Perot Systems with no markup on such benefits or other amounts.
ARTICLE 8
INTELLECTUAL PROPERTY AND CONFIDENTIALITY
8.1 Confidential Information
(a) Defined. Each Party agrees that all information of the other Party, including but not limited to:
(i) information regarding the other Party’s trade secrets, business activities and plans;
(ii) information regarding the other Party’s customers, vendors suppliers, and other business partners,
(iii) information regarding the other Party’s marketing, engineering, and financial strategy and information, business methods, data contained in the systems and market segmentation related thereto;
(iv) information regarding the other Party’s technologies, systems, and processes, as well as other financial, business, and technical information, research, designs, plans, compilations, methods, techniques, procedures
47
and know-how communicated, accessed by, or revealed, transmitted, processed, stored, archived, or maintained in connection with this MSA or its performance;
(v) information provided by or on behalf of the other Party’s Affiliates and, in the case of Newco, its Franchisees/Licensees in connection with the Services;
(vi) information of a third party, including customers and suppliers of the other Party, obtained or created in connection with the Services; and
(vii) the terms of this MSA;
regardless of whether any of the foregoing is in tangible or intangible form, and whether or not stored, compiled, or memorialized physically, electronically, graphically, photographically or in writing (collectively, “Confidential Information”).
All Confidential Information of the disclosing Party shall be treated as strictly confidential. Each Party’s Confidential Information shall be and remain the property of such Party. None of the other Party’s Confidential Information, or any part thereof, shall be sold, assigned, leased, or otherwise disposed of to any third-party by the other party, or commercially exploited by or on behalf of the other party, its employees or agents. Each Party shall cause its Affiliates and shall use commercially reasonable efforts to cause its Subcontractors and Personnel to comply with this Section 8.1 to the extent that they have access to the Confidential Information of the other Party. In addition, Newco shall use commercially reasonable efforts to cause its Franchisees/Licensees to comply with this Section 8.1 to the extent that they have access to Perot Systems’ Confidential Information.
(b) Exceptions. Confidential Information shall not include information that (i) is known by the receiving Party without an obligation of confidentiality on the date of its disclosure to the receiving Party; (ii) is independently developed by the receiving Party without any use of or reliance on the disclosing Party’s Confidential Information; (iii) is or becomes publicly available without a breach of this MSA by the receiving Party; (iv) is disclosed to the receiving Party by a third person who is not required to maintain its confidentiality; or (v) is required to be disclosed by reason of legal or accounting requirements beyond the reasonable control of the receiving Party (including without limitation, requirements of the Securities and Exchange Commission or applicable securities regulations), provided, however, in such event, the Party subject to such legal or accounting requirement shall notify the other Party in writing promptly and shall cooperate reasonably with the other party at the other Party’s expense in seeking a protective order or other appropriate remedy. The receiving Party shall have the burden of proving the applicability of any of the foregoing exceptions.
48
(c) Duty of Care. Each Party shall use at least the same degree of care as it employs with respect to its own Confidential Information of like importance but, in any event, no less than a reasonable degree of care, to avoid unauthorized disclosure or use of the other Party’s Confidential Information.
(d) Permitted Disclosure. Each Party may disclose Confidential Information only to its own officers, directors and employees and to its Subcontractors, consultants or advisors, and those of its Affiliates, Franchisees/Licensees, who reasonably need to know it for the purpose of performing their obligations under this MSA and who are under a duty of confidentiality with respect to such Confidential Information. Each Party shall be responsible to the other Party for any violation of this MSA by its officers, directors, employees, Subcontractors, consultants, advisors and its Affiliates.
(e) Impermissible Uses. Neither Party may use the other party’s Confidential Information to compete with, or to allow others to compete with, the other Party or for any purpose not in furtherance of this MSA. In addition, each Party shall: (1) notify the other Party promptly of any material unauthorized possession, use, or attempted access to the other Party’s Confidential Information by any person or entity which may become known to such Party, (2) promptly furnish to the other Party full details of such unauthorized possession, use, or attempted access, (3) use reasonable efforts to cooperate with the other Party, at the other Party’s cost, in any litigation and investigation against third parties reasonably deemed necessary by the other Party to protect its proprietary rights in and to the Confidential Information, and (4) use its commercially reasonable efforts to prevent a recurrence of any such unauthorized possession, use, or attempted access of the other Party’s Confidential Information.
(f) Return of Confidential Information. Promptly after the expiration or termination of this MSA, each Party shall return promptly or, with the written consent of the other Party, destroy all of the other Party’s Confidential Information, except for (i) archival and backup copies that are not readily available for use (other than archival and backup copies of data and information specifically created as part of the Services and transferred to the Party for which the copy was created), (ii) records that are required by law or this MSA to be retained, and (iii) any item with respect to which a Party shall have been given ownership or a perpetual license, including without limitation, Newco’s and its Affiliates’ and Franchisees/Licensees’ rights to VRS, the GreenWay System and the Odyssey System, and any Derivative Works thereof and modifications, updates and enhancements thereto. Perot Systems shall cause its Affiliates and shall use commercially reasonable efforts to cause the PSC Personnel to comply with the provisions of this Section 8.1(f). Newco shall cause its Affiliates and shall use commercially reasonable efforts to cause its Franchisees/Licensees, Subcontractors and the Newco Personnel to comply with the provisions of this Section 8.1(f).
49
(g) Injunctive Relief. Each Party agrees that in the event of a breach or threatened breach by the other Party, including its officers, directors, employees, consultants or advisors, of the provisions of this Section 8.1, the non-breaching Party shall have no adequate remedy in money damages and, accordingly, shall be entitled to seek an injunction against such breach, in addition to any other legal or equitable remedies available to it.
(h) Survival. The Parties’ duties under this Section 8.1 shall expire five years after disclosure of the relevant Confidential Information, notwithstanding any earlier termination of this MSA, provided that such Confidential Information is not a trade secret (as determined by applicable law). The Parties’ duties under this Section 8.1 with respect to Confidential Information that is a trade secret shall continue for so long as such Confidential Information remains a trade secret.
8.2 Residual Knowledge
(a) Rights of Perot Systems. Newco acknowledges that Perot Systems is in the business of providing information technology services. Without limiting Perot Systems’ obligations with regard to Confidential Information under Section 8.1, Newco acknowledges that Perot Systems shall: (i) have the right to provide services or resources to Perot Systems’ other customers or other third parties that are similar to the activities performed or resources provided by Perot Systems hereunder, and (ii) be free to use the residual knowledge of a general nature retained by PSC Personnel in a non-tangible form; provided that the use of the residual knowledge does not violate a patent owned by Newco or any of its Affiliates, or any other intellectual property or proprietary right of Newco, any of its Affiliates or the Franchisees/Licensees.
(b) Rights of Newco. Without limiting Newco’s obligations with regard to Confidential Information under Section 8.1, Perot Systems acknowledges that Newco shall: (i) have the right to provide services or resources to Newco’s other customers or other third parties that are similar to the activities performed or resources provided by Perot Systems hereunder, and (ii) be free to use the residual knowledge of a general nature retained by Newco Personnel in a nontangible form; provided that the use of the residual knowledge does not violate a patent owned by Perot Systems or any of its Affiliates, or any other intellectual property or proprietary right of Perot Systems, its Affiliates or any PSC Personnel (including but not limited to the architecture, interfaces or implementation of Odyssey that is entitled to protection under United States copyright, patent or trade secret law).
8.3 PSC Software, Tools and Methodologies Subject to the terms and conditions of this Section 8, any software that is proprietary to Perot Systems that exists prior to the Effective Date, and that Perot Systems uses or to which Perot Systems provides Newco access (“PSC Software”) and any pre-existing or independently developed tools or methodologies which are proprietary to Perot Systems and used in connection with the activities contemplated by this MSA (“PSC Tools”), including any modifications to any
50
PSC Software and the PSC Tools, shall be and remain the property of Perot Systems, and Newco shall have no rights or interests therein except as provided herein or in a Change Order; provided, however, that Newco shall have an irrevocable, perpetual license to use all PSC Software and PSC Tools as are reasonably necessary or appropriate for Newco and its Affiliates and Franchisees/Licensees to benefit from the rights and Services provided hereunder. Perot Systems shall not install any PSC Software or PSC Tools on any hardware owned by Newco or its Affiliates without Newco’s prior written approval, which approval will not be unreasonably withheld. Newco hereby consents to the installation of all PSC Software and PSC Tools that is already installed on hardware owned by Newco or its Affiliates on the Effective Date. A complete list of PSC Software and PSC Tools as of the Effective Date is attached to this MSA as Schedule 8.3. This list shall be updated only upon mutual agreement of the Parties.
8.4 Other Proprietary Rights
(a) As used in this MSA, the term “Intellectual Property Rights” means, collectively, all rights under patent, trademark, copyright and trade secret laws, and all other intellectual property, industrial property, and proprietary rights recognized in any jurisdiction worldwide, including moral rights and similar rights. Except as expressly stated otherwise in this MSA, each Party’s Intellectual Property Rights shall remain the sole and exclusive property of such Party and nothing in this MSA shall be construed to grant the other Party any ownership right in such Intellectual Property Rights.
(b) Except as otherwise set forth in Sections 8.3 and 8.7 of this MSA, Perot Systems agrees that all computer software, documentation, and other materials, works or work product of any kind developed for Newco or its Affiliates as a result of any Services provided under this MSA shall be works made for hire and the exclusive property of Newco, including without limitation all Intellectual Property Rights in and to any such computer software, documentation and other materials, works or work product. Accordingly, Perot Systems assigns, and agrees to assign (and shall cause the PSC Personnel, including Perot Systems’ Affiliates and Subcontractors, to assign and agree to assign), without any requirement of further action on consideration, all right, title and interest, including all Intellectual Property Rights, in or to any such computer software, documentation and materials to Newco.
(c) Newco hereby grants Perot Systems a non-exclusive, worldwide, fully paid-up license for the Term to edit, modify, adapt, translate, exhibit, publish, transmit, participate in the transfer of, reproduce, create derivative works from, perform, display, and otherwise use Newco’s and its Affiliate’s Intellectual Property Rights solely as necessary to provide the Services to Newco, Newco’s Affiliates and the Franchisees/Licensees.
8.5 Trademark Protection Each Party agrees that: (i) it shall not use the other Party’s Trademarks (or the Trademarks of any of such Party’s Affiliates) without the prior written consent of the appropriate entity, except to the extent necessary for such party to fulfill its
51
obligations under this MSA, or use any such Trademarks in a manner likely to diminish the other Party’s Trademark’s commercial value; (ii) it shall not knowingly use or permit the use of any mark, name, or image likely to cause confusion with the other Party’s Trademarks; (iii) it shall not knowingly use or permit any third party to use the other Party’s Trademarks without such other Party’s consent; (iv) all goodwill and other benefits associated with use of the other Party’s Trademarks shall inure to the other Party; and (v) all use of the other Party’s Trademarks shall be in accordance with the applicable Trademark usage policies of the other Party, and either Party shall have the right to audit the other Party’s use of any Trademarks and the quality of any services provided in connection therewith. Any Party shall obtain the prior written approval of the other Party hereto prior to the dissemination or distribution of any materials incorporating or bearing any of the other Party’s Trademarks. Any materials that are substantially similar to materials previously approved do not have to be resubmitted for approval. As used in this MSA, the term “Trademarks” means, collectively, the trademarks, service marks, trade names, logos or other commercial or product designation(s) of a Party, authorized in writing by the Party for use under and in the course of performing this MSA. Each Party hereby gives the other Party written consent to use its principal Trademarks in connection with presentations and related materials where the other Party needs to identify the Trademark holder as a vendor or customer, subject to clause (v) of this Section 8.5.
8.6 Functionally Similar Software Notwithstanding the foregoing provision, nothing in this MSA is intended to prohibit either Party or any of its agents from developing or acquiring software that may be functionally similar to the existing Software systems provided that, in so doing, such Party does not violate the terms of this MSA, including without limitation the confidentiality provisions above.
8.7 Rights in GreenWay 1.0, Odyssey and VRS
(a) GreenWay 1.0. As between Perot Systems and Newco and its Affiliates, Europcar shall continue to own all right, title and interest, including all Intellectual Property Rights, in GreenWay 1.0, subject to the GreenWay License, as amended in the Odyssey License and in Section 8.7(c)(ii). Certain provisions of the National Agreement, including, without limitations, Section 6.1(a), (b), (c) and (e) thereof and the Odyssey License survived (i) the termination of the National Agreement as provided in the National Termination Agreement, and (ii) the termination of the ANC Agreement as provided in the Termination Agreement, and set forth certain license rights granted by Perot Systems to National and certain rights granted by National to Perot Systems. In the event of any conflict between the terms of the GreenWay License or the Odyssey License and this MSA, the provisions of this MSA shall control.
(b) Derivative Works, Additions and Enhancements.
(i) As between Perot Systems and Newco and its Affiliates, Perot Systems shall own all right, title and interest, including all Intellectual Property
52
Rights, in and to the GreenWay Modifications and the Odyssey Modifications, except:
(A) the GreenWay License, as modified by the Odyssey License and Section 8.7(c);
(B) that portion of the GreenWay Modifications and the Odyssey Modifications constituting Newco Proprietary Information described in Schedule 8.7(b), and
(C) the Legacy Customizations and the Non-Legacy Customizations.
(ii) As between Perot Systems and Newco, Newco shall own the VRS Modifications (except the Maintenance Modifications).
(c) Assignment and Extension of Rights.
(i) Assignment. Perot Systems hereby consents to the assignment of the GreenWay License and the Odyssey License from National to Newco.
(ii) Amendment. On the Effective Date, the GreenWay License and the Odyssey License shall be, and hereby are, amended to grant to Newco, Newco’s Affiliates and Franchisees/Licensees a perpetual, non-exclusive, non-transferable, fully-paid sublicense to copy, use, perform, distribute and make Derivative Works from the GreenWay System and the Odyssey System, both in object code and in source code forms, for the internal use of Newco and its Affiliates, which internal use includes the operational support of the Franchisees/Licensees and any future franchisees and licensees of Newco or its then-current Affiliates.
(iii) VRS. On the Effective Date, Perot Systems shall grant, and hereby does grant, to Newco a perpetual, non-exclusive, non-transferable, fully-paid license to copy, use, perform, distribute and make Derivative Works from the VRS, both in object code and in source code forms, for the internal use of Newco and its Affiliates, which internal use includes the operational support of the Franchisees/Licensees and any future franchisees and licensees of Newco or its Affiliates.
(d) Consequences and Effectuation of Agreement Termination. The GreenWay License, the Odyssey License and the licenses granted in clause (c) above shall survive the expiration and any termination of this MSA. Such licenses shall terminate immediately upon Perot Systems providing Newco with at least one hundred eighty (180) Days prior notice if an arbitrator, arbitration panel or court of competent jurisdiction, as the case may be, has finally determined, without any further right of Newco to appeal, that there has been a material and uncured breach by Newco or any of its Affiliates under Section 8.1 involving the design, source code, object code, or documentation of the GreenWay System or the Odyssey System.
53
8.8 Ownership of Newco Data All data of Newco and its Affiliates and Franchisees/Licensees (and all derivatives thereof) (collectively, the “Newco Data”) is, or will be, and shall remain the property and Confidential Information of Newco. Newco Data shall not, without Newco’s approval (in its sole discretion) be, (1) used by Perot Systems or PSC Personnel other than in connection with providing the Services and applicable laws, (2) disclosed in contravention of this MSA or applicable laws, sold, assigned, leased or otherwise provided to third parties by Perot Systems or PSC Personnel or (3) commercially exploited by or on behalf of Perot Systems or PSC Personnel. Perot Systems hereby irrevocably assigns, transfers and conveys, and shall cause PSC Personnel to irrevocably assign, transfer and convey, to Newco without further consideration all of its and their present and future right, title and interest in and to Newco Data. Upon request by Newco, Perot Systems shall execute and deliver, and shall cause PSC Personnel to execute and deliver, any documents that may be necessary or desirable under any Federal, state, local, foreign or international law, rule or regulation to preserve, or enable Newco to enforce, its rights hereunder with respect to Newco Data. Without limiting any other obligation under this MSA:
(a) Perot Systems shall establish and maintain commercially reasonable safeguards against the destruction, loss, or alteration of Newco Data in the possession of PSC Personnel which are no less rigorous than those maintained by ANC immediately prior to the Effective Date, and, except as otherwise provided in the Operations Procedures Manual, shall be no less rigorous than those generally maintained by Perot Systems for its own information of a similar nature or importance; and
(b) Perot Systems shall institute commercially reasonable systems security measures to guard against the unauthorized access, alteration or destruction of Newco Data, subject to Newco’s agreement to pay for any Hardware or Software necessary to meet the requirements set forth in the Information Services Security Document to be agreed by the Parties. Unless otherwise agreed by the Parties in the Information Services Security Document, such measures shall include the installation of Software which: (1) requires all users to enter a user identification number and password prior to gaining access to Newco’s information systems; (2) controls and tracks the addition and deletion of users; and (3) controls user access to areas and features of the systems housing Newco Data.
8.9 Return of Data Upon request by Newco after the expiration or termination of this MSA, Perot Systems shall (1) at Newco’s expense, promptly return to Newco, in the format and on the media requested by Newco, all or any part of Newco Data and (2) erase or destroy all or any part of Newco Data in Perot Systems’ possession, in each case to the extent so requested by Newco provided that such request does not contravene any applicable law or regulation. To the extent that such return, erasure or destruction prevents Perot Systems from performing any portion of the Services, Newco shall relieve Perot Systems from its obligation to perform such portion of the Services, for so long as such return, erasure or destruction prevents Perot Systems from so performing such portion of the Services.
54
8.10 Data Privacy If for any reason Perot Systems obtains any personal nonpublic information or data with respect to any customer or client of Newco, including information with regard to any individual, any domain names, user names, addresses, passwords or other personally identifying information (collectively “Personal Information”), Perot Systems agrees not to use such information for any purpose for itself or any third party except to the extent, and only for so long as, required to perform a specific obligation of Perot Systems hereunder. Perot Systems agrees not to disclose Personal Information to any third person and to limit internal disclosure to those of Perot Systems’ employees that are required to possess such information in order to perform a specific obligation of Perot Systems hereunder. Perot Systems shall comply with all applicable laws respecting the use and distribution of Personal Information, including without limitation, any opt-out, or declination to opt-in, to any disclosure of Personal Information under any applicable law, regulation or rule. Notwithstanding the foregoing, Perot Systems shall have no obligation to identify or interpret any laws or regulations involving the disclosure or use of Personal Information in connection with Newco’s Business.
8.11 Developed Software Rights
(a) Ownership. Except as provided in Section 8.7 and this subsection, Newco shall own the Intellectual Property Rights to all Software developed as part of the Services by Perot Systems and delivered to Newco after the Effective Date, including (i) all Derivative Works of, and all additions or enhancements to, Newco Software or, as between Newco and Perot Systems, Third Party Software, (ii) the Legacy Customizations and the Non-Legacy Customizations and (iii) the source code to and content of all web sites of Newco and its Affiliates, but excluding any Derivative Works of, and any additions or enhancements to, PSC Software (including any related Embedded Software) (“Developed Software”). Perot Systems hereby assigns and shall cause the PSC Personnel to assign to Newco the Intellectual Property Rights to the Developed Software, which shall be deemed “works for hire.” Perot Systems may from time to time request that Newco grant to Perot Systems a license to the Developed Software for itself and for its customers (excluding any direct competitors of Newco or its Affiliates in the Business) on such terms as the parties agree are commercially reasonable. Perot Systems hereby grants to Newco and its Affiliates and Franchisees/Licensees a perpetual, transferable, non-exclusive, paid-up license to use and practice any patent rights or trade secrets, whether now or in the future existing, that are embedded in the Developed Software that are owned by Perot Systems as part of the Developed Software. Perot Systems agrees that it will provide to Newco a copy of the source code and documentation for the Developed Software at the time Perot Systems installs the Developed Software for use.
(b) Embedded Software. The term “Embedded Software” is defined to mean pre-existing software identified in Schedule 8.11(b) that is owned by Perot Systems and software licensed by Newco or Perot Systems from a third party that is embedded in the Developed Software. Perot Systems shall retain its rights to any Embedded Software that is owned by Perot Systems, provided, however, that
55
Perot Systems grants to Newco and its Affiliates and Franchisees/Licensees a perpetual, transferable, non-exclusive, paid-up license to use, modify, and enhance the Embedded Software that is owned by Perot Systems as part of the Developed Software. If any Embedded Software is owned by a third party, then the terms of the applicable license shall define each Party’s rights to such Embedded Software. Perot Systems agrees that it will not install on any Supported Hardware, use as part of the Developed Software, or use in connection with any Change Order any Embedded Software that is not generally made available to the public without obtaining Newco’s prior written consent and agreement to the terms of the applicable license.
8.12 Websites The Parties agree and acknowledge that, as between Newco and Perot Systems, all Newco Websites, including without limitation, the Alamo Website and the National Website, are the exclusive property of Newco, including, without limitation, all Intellectual Property Rights embodied in or represented by each Newco Website. To the extent Perot Systems may have any Intellectual Property Rights in or to any Newco Website, Perot Systems shall and hereby does assign irrevocably, without the need of any further action or consideration, to Newco all right, title and interest in and to each Newco Website and related Intellectual Property Rights from the moment of creation and fixation in tangible form, including any copyright rights in or to the Newco Websites. For purposes of this Section, the following shall apply:
(a) “Alamo Domain Name” means the “alamo.com” domain name, and any other domain names used or maintained by or for Alamo from time to time.
(b) “Alamo Website” means the user interface, functionality and Content made available from time to time under the Alamo Domain Name, including, without limitation, all HTML files, Java files, graphics files, animation files, data files, technology, scripts and programs, both in executable code and source code form, and any documentation related to the Alamo Website.
(c) “Content” means all text, pictures, sound, graphics, video and other data and materials.
(d) “National Domain Name” means the “nationalcar.com” domain name, and any other domain names used or maintained by or for National from time to time.
(e) “National Website” means the user interface, functionality and Content made available form time to time under the National Domain Name, including, without limitation, all HTML files, Java files, graphics files, animation files, data files technology, scripts and programs, both in executable code and source code form and documentation related to the National Website, except for the Odyssey Interface to the Website.
8.13 Further Assurances Without limiting any other obligation under this MSA, each party further agrees to give testimony and execute documents and to take such further acts (at the other party’s expense) reasonably requested by the other party to evidence, secure,
56
acquire, transfer, maintain, perfect, and enforce its respective ownership and Intellectual Property Rights described in this MSA.
ARTICLE 9
DISASTER RECOVERY AND BUSINESS CONTINUITY
9.1 Disaster Recovery
(a) Perot Systems Disaster Recovery Plan. Perot Systems shall maintain disaster recovery and backup processes and procedures through which Perot Systems will be able to perform its obligations hereunder and continue its business with minimal disruptions or delays. Perot Systems shall provide Newco with a copy of its written plan or plans for disaster recovery, backup arrangements and business continuity, and shall promptly provide Newco with any updates or changes made thereto during the Term. In the event of a disaster, Perot Systems shall implement all necessary disaster recovery plans such that the Services are reinstated in accordance with the Service Levels.
(b) Newco Disaster Recovery Plan. Perot Systems shall develop, for Newco’s approval, and begin and diligently pursue implementing Newco’s disaster recovery plan for the recovery of application maintenance and development processes within six (6) months following the Effective Date. Perot Systems shall periodically update and test the operability of all disaster recovery plans every six (6) months of the Term and shall certify to Newco following such update and testing that the disaster recovery plans are fully operational. Perot Systems shall perform the Disaster Recovery Services set forth in Article 8 of Exhibit A. In the event of a disaster affecting a Service Location, Perot Systems shall not increase any fees charged under this MSA, except that (i) Newco shall reimburse Perot Systems for all out-of-pocket and incremental costs and expenses (A) incurred by PSC Personnel in connection with activating the disaster recovery plan in the event of an actual disaster (e.g., including travel, lodging and meals for PSC Personnel who travel to a Recovery Center (as such term is defined in Exhibit A)), and (B) paid by PSC to Third Party Vendors in connection with activating the disaster recovery plan in the event of an actual disaster, and (ii) to the extent services are required from PSC Personnel who are not ordinarily assigned to provide the Services to respond to an actual disaster, Newco shall pay for such PSC Personnel on a time and materials basis at the Additional Services rates.
9.2 Business Continuity Perot Systems shall develop, for Newco’s approval, and begin and diligently pursue implementing within six (6) months following the Effective Date a business continuity plan for the continued delivery of the Services upon the occurrence of a disruptive event which does not require execution of the disaster recovery plan. As part of such plan, Perot Systems will implement a combination of equipment, software and network connectivity at an alternate location, such that, within the time mutually agreed upon by the parties, but no more than sixty (60) hours, following a loss of a Service, Perot Systems will recover and fully furnish such Service. Newco shall have financial responsibility for all such equipment, software and network connectivity, and all related
57
facilities, costs and expenses, as a Retained Expense. Perot Systems shall periodically update and test the operability of all business continuity plans every six (6) months during the Term and shall certify to Newco following such update and testing that the business continuity plans are fully operational. In the event of an applicable disruptive event, Perot Systems shall perform all appropriate business continuity plans. In the event that it performs the business continuity plan, Perot Systems shall not increase any fees charged under this MSA, except that (i) Newco shall reimburse Perot Systems for all out-of-pocket and incremental costs and expenses (A) incurred by PSC Personnel in connection with activating the business continuity plan in the event of an actual business disruption (e.g., including travel, lodging and meals for PSC Personnel who travel to a Recovery Center (as such term is defined in Exhibit A)), and (B) paid by PSC to Third Party Vendors in connection with activating the business continuity plan in the event of an actual business disruption, and (ii) to the extent services are required from PSC Personnel who are not ordinarily assigned to provide the Services to respond to an actual business disruption, Newco shall pay for such PSC Personnel on a time and materials basis at the Additional Services rates.
ARTICLE 10
TERM AND TERMINATION
10.1 Term The term of this MSA shall commence as of the Effective Date and shall expire on the eve of the tenth (10th) anniversary of the Effective Date at 11:59 P.M., unless terminated earlier in accordance with this Article 10 (the “Initial Term”; the Initial Term, as extended by the Extension Period(s) (defined below), is referred to in this MSA as the “Term”).
10.2 Renewals Unless this MSA is terminated earlier in accordance with its terms, Newco shall notify Perot Systems in writing pursuant to this Section at least one hundred eighty (180) days prior to the termination of the Initial Term as to whether Newco desires to extend the Initial Term. If Newco provides Perot Systems with notice that it desires to extend the Initial Term and the Parties have not agreed on the applicable terms and conditions with respect to the renewal of this MSA sixty (60) days prior to the termination of the Initial Term, then the term of this MSA shall extend for a period (the “Extension Period”) of twelve (12) months after the end of the Initial Term, on the terms and conditions in effect as of the expiration of the Initial Term. If during the Extension Period, the Parties are unable to reach agreement on the terms and conditions with respect to the renewal of this MSA, this MSA shall expire at the end of the Extension Period.
10.3 Termination for Cause Except as otherwise provided and without limiting any other termination rights under this MSA, if either Party materially breaches any of its duties or obligations under this MSA (other than a failure by Newco to pay covered by Section 10.5), and fails to cure such material breach within sixty (60) days (or within a reasonable period for any breach that the breaching Party demonstrates to the reasonable satisfaction of the other Party cannot reasonably be cured within sixty (60) days after receipt of written notice from the other Party specifying such breach), then the non-breaching Party may, by giving prior notice to the breaching Party, terminate this MSA as of the date specified in the notice of termination.
58
10.4 Termination for Service Level Performance
(a) Critical Service Levels. If Perot Systems fails to meet the minimum Service Level for any Critical Service for three consecutive months, Newco shall have the right, exercisable within thirty-five (35) days after the end of the third consecutive month, to terminate this MSA by giving Perot Systems at least thirty (30) Days (but not greater than one hundred eighty (180) Days) prior written notice of its intention to terminate this MSA (“Notice Period”), unless the failure to meet the minimum Service Level during any of such three consecutive months was caused primarily as a result of Force Majeure or the acts or failures to act of Newco, any Supported Affiliate, any Franchisee/Licensee or any third party other than PSC Personnel or a Subcontractor of Perot Systems. During such Notice Period, Perot Systems may seek to cure the problems that caused the applicable Service Level to be missed and, if Newco is reasonably satisfied that the problems have been cured, then Newco shall rescind its notice in writing, provided that Newco shall have the right, by giving written notice to Perot Systems, to reinstate such notice, without extending the aggregate duration of the Notice Period, if the same problems recur during the first ninety (90) days of the Notice Period.
(b) Three Months Performance. If Perot Systems becomes obligated to issue Service Level Credits in the maximum amount provided in Section 7.3 for three consecutive months, Newco shall have the right, exercisable within thirty-five (35) days after the end of the third consecutive month, to terminate this MSA by giving Perot Systems at least thirty (30) Days (but not greater than one hundred eighty (180) Days) prior written notice of its intention to terminate this MSA (“Notice Period”). During such Notice Period, Perot Systems may seek to cure the problems that caused the applicable Service Level Credits to be issued and, if Newco is reasonably satisfied that the problems have been cured, then Newco shall rescind its notice in writing, provided that Newco shall have the right, by giving written notice to Perot Systems, to reinstate such notice, without extending the aggregate duration of the Notice Period, if the same problems recur during the first ninety (90) days of the Notice Period.
10.5 Termination for Non-Payment If Newco or Perot Systems fails to pay when due any undisputed amount under this MSA and fails to cure such nonpayment or fails to comply with Section 7.8(b) within thirty (30) days after receipt of written notice from the other party specifying such breach, then the non-breaching party may, by giving prior written notice to the breaching party, terminate this MSA as of a date specified in such notice. In the event either party terminates this MSA, Perot Systems shall provide termination assistance in accordance with this MSA including Section 10.10.
10.6 Termination for Insolvency; Bankruptcy Either Party may terminate this MSA if the other Party (i) files for bankruptcy; (ii) becomes or is declared insolvent or is the subject of any proceedings related to its liquidation, insolvency or the appointment of a receiver or similar officer for it; (iii) makes an assignment for the benefit of all or substantially all of its creditors; (iv) is unable to pay its debts generally as they come due; or (v) enters into an agreement for the composition, extension, or readjustment of substantially all of
59
its obligations, by giving written notice to the other party of its intention to terminate this MSA as of a date specified in the notice, which shall not be less than ninety (90) days after the date of the notice. This MSA shall terminate on the date set forth in the notice.
10.7 Termination for Convenience At any time after the first four (4) years of the Initial Term, Newco shall have the right to terminate this MSA for its convenience by (i) giving Perot Systems at least one hundred eighty (180) days prior written notice of termination, and (ii) paying to Perot Systems, within ten (10) Days after receiving an invoice for such amounts, a Termination Fee in the amount set forth in Section 3.1 of Exhibit C. Newco’s payment of such Termination Fee will not be deemed to limit in any way Newco’s obligation to pay Perot Systems any other amounts owed by Newco to Perot Systems under this MSA in connection with Services provided on or before the termination date of this MSA or thereafter during the Transition Assistance Period.
10.8 Termination for Critical Service Failures
(a) Termination for Critical Services Failure - Force Majeure. Notwithstanding Section 13.5 of this MSA, if (i) an event of Force Majeure, a third party service failure (other than actions or failures to act by Newco, any Newco Affiliate, or any Franchisee/Licensee), or a defect or error in the Transitioned Applications that was reported prior to the completion of the Transition Period prevents Perot Systems from performing the Services designated in Schedule 10.8 as “mission critical” (the “Critical Services”) and (ii) Newco or any of its Affiliates or Franchisees/Licensees is unable to operate its business for more than sixty (60) hours (excluding scheduled downtime) during any thirty (30) day period during the Term due to the unavailability of a Critical Service, then Newco shall have the right, during the following thirty (30) day period, to terminate this MSA, in whole or in part, with respect to such Critical Service, without termination fees or further liability to Perot Systems, provided that, to the extent such Critical Services are performed from Newco facilities or utilizing Newco equipment or software, Newco’s disaster recovery and business continuity plans reasonably permit Perot Systems to restore such Critical Service.
(b) Termination for Critical Services Failure – Mission Critical. If Perot Systems fails to provide any one of the Critical Services (except, during the Transition Period, any Transitioned Applications that may constitute a Critical Service) to Newco or the Supported Affiliates primarily as a result of the acts or failures to act of PSC Personnel for more than sixty (60) hours (excluding scheduled downtime) during any thirty (30) day period during the Term, then Newco shall have the right, during the following thirty (30) day period, to terminate this MSA, in whole or in part, with respect to such Critical Service, without termination fees or further liability to Perot Systems.
(c) Termination for Other Services Failure. If (i) Perot Systems fails to make available for regular use any Supported System other than a Supported System designated as a Critical Service (except for, during the Transition Period, any Transitioned Applications that may constitute Critical Services) primarily as a
60
result of the acts or failures to act of PSC Personnel, and (ii) Perot Systems does not cure such failure within five (5) days after the earlier of the time Perot Systems becomes aware of the failure or the time Newco delivers a notice to Perot Systems or, if such failure cannot reasonably be cured within such five (5) day period, provide Newco with a work-around that ends such failure within such five (5) day period, then Newco shall have the right, during the thirty (30) day period after such failure began, to terminate this MSA, without termination fees or further liability to Perot Systems.
10.9 Termination for Change in Control of Perot Systems . Newco shall have the right to terminate this MSA within ninety (90) days following a change in Control of Perot Systems by (i) giving Perot Systems at least ninety (90) days prior written notice of termination, and (ii) paying to Perot Systems, within ten (10) Days after receiving an invoice for such amounts, a Termination Fee in the amount set forth in Section 3.1 of Exhibit C, provided that such Termination Fee shall not be payable in the event Control of Perot Systems becomes vested in any one or a group of entities listed on Schedule 10.9. Newco’s payment of such Termination Fee (if required) will not be deemed to limit in any way Newco’s obligation to pay Perot Systems any other amounts owed by Newco to Perot Systems under this MSA in connection with Services provided on or before the termination date of this MSA or thereafter during the Transition Assistance Period.
10.10 Termination Assistance
(a) Obligation. Upon expiration or termination of this MSA (or any part thereof), Perot Systems will, at Newco’s request, provide the Termination Assistance Services described in Schedule 10.10 (in connection with the terminated Services) (the “Termination Assistance Services”) for a period of up to six months following the effective date of such expiration or termination (the “Termination Assistance Period”).
(b) Compensation. Newco will pay Perot Systems in advance for the Termination Assistance Services and out-of-pocket expenses described in Sections 10.9(c) and (d) on either (i) a time and materials basis at the rates set forth in Attachment C-3 to Exhibit C, or (ii) another mutually acceptable basis. After the expiration or termination of this MSA, Newco will pay Perot Systems in advance for that portion of any PSC Data Center facilities occupied by Newco at Perot Systems’ standard commercial rates for such facilities. Newco will pay Perot Systems, on the first day of each month and as a condition to its obligation to provide such assistance, an amount equal to Perot Systems’ reasonable estimate of the total amount payable to Perot Systems for such assistance for that month. Perot Systems will invoice Newco on or about the fifth day of the following month for the actual costs incurred by Perot Systems in providing such assistance. Such invoice will reflect any adjustments necessary (including a credit or refund of any overpayment by Newco) to reconcile the amounts paid by Newco (as estimated by Perot Systems) and the charges actually incurred. Upon completion of such assistance, Perot Systems shall refund promptly to Newco any paid, but unearned, fees paid to Perot Systems.
61
(c) Hardware, Software and Third Party Service Contracts. On the termination or expiration date, (i) Perot Systems shall assign, and Newco shall assume, each Supported Software license, each Supported Hardware lease and each Managed Contract under this MSA by executing and delivering to Newco an Assignment and Assumption Agreement in an agreed form, and (ii) Perot Systems shall assign and convey any Supported Hardware owned or possessed by Perot Systems to Newco and, if such Hardware shall be owned by Perot Systems, by executing and delivering to Newco a Bill of Sale in an agreed form. In connection with the assignment and conveyance of such Managed Assets, Newco shall pay to Perot Systems on the date of termination of this MSA an amount equal to Perot Systems’ aggregate net book value for any such Managed Assets that are then owned by Perot Systems and the cost for which Perot Systems shall not have been reimbursed by Newco or any of its Affiliates. If, on the termination or expiration date, any of the Supported Hardware is located at a PSC Data Center, Newco shall, at its sole cost and expense, cause such Hardware to be relocated to another facility selected by Newco in its sole discretion by the end of the Termination Assistance Period.
(d) Description of Termination Assistance Services. During the Termination Assistance Period, Perot Systems will cooperate with Newco and its designees and provide the assistance reasonably requested by Newco or its designee(s) to allow Newco’s business operations to continue without material interruption or adverse effect and to facilitate the orderly transfer of responsibility for the Services then being provided by Perot Systems to Newco or its designees.
10.11 Return of Perot Systems Tools Upon termination or expiration of this MSA, at the request of Newco, Perot Systems shall grant to Newco, on such commercially reasonable terms as the Parties agree a license to any of the PSC Software and the PSC Tools being used to provide the Services on, or with six months before, such termination or expiration, for the internal use of Newco and the Supported Affiliates in the operation, maintenance and support of the Supported Systems (the “Tools License”). If (i) the PSC Software or the PSC Tools licensed to Newco under Section 8.3 were improved primarily by PSC Personnel while providing the Services, or (ii) Newco separately paid for such PSC Software or PSC Tools, then the Tools License will be granted by Perot Systems without payment of a separate license fee or royalty. If (i) the PSC Software or the PSC Tools licensed to Newco under Section 8.3 were improved in part by PSC Personnel while providing the Services, or (ii) Newco otherwise paid for part of such improvements, then the Tools License will be granted by Perot Systems for a separate license fee that takes into account the financial contribution made by Newco to such improvements.
10.12 Partial Discontinuance
(a) �� Independent of Newco’s rights to terminate this MSA under Article 10, Newco may discontinue components of the Base Services pursuant to Subsection 10.12(b) below, provided that such Subsection shall not be construed to allow Newco to discontinue components that are subject to a termination right under
62
Section 10.4 or 10.8 sooner than such sections would allow Newco to terminate this MSA.
(b) If (i) Perot Systems fails to provide a material component of the Base Services or an Additional Service (except for, during the Transition Period, a Transitioned Application) primarily as a result of the acts or failures to act of PSC Personnel, and (ii) Perot Systems does not cure such failure within sixty (60) days after the earlier of the time Perot Systems becomes aware of the failure or the time Newco delivers a notice to Perot Systems regarding such failure or, if such failure cannot reasonably be cured within such sixty (60) day period, provide Newco with a work-around that ends such failure during such sixty (60) day period, then Newco shall have the right, during the sixty (60) day period after such failure began, to terminate this MSA solely with respect to such material component, without termination fees or further liability to Perot Systems. In such event, the Annual Services Charge, ARC rates, RRC rates and other applicable charges will be equitably adjusted to reflect the termination of the discontinued Services.
ARTICLE 11
WARRANTIES AND CERTAIN COVENANTS
11.1 By Newco Newco hereby warrants to Perot Systems that:
(a) Good Standing. Newco (i) is duly organized, validly existing and in good standing under the laws of the jurisdiction of its organization, (ii) is in good standing and authorized to do business in every jurisdiction where the failure so to do has a material adverse effect on Newco’s ability to perform its material obligations under this MSA, and (iii) has full corporate or other organizational power to own, lease, and operate its properties and assets, to conduct its business as that business is now being conducted, and to perform its obligations under this MSA.
(b) Authorization. This MSA has been duly authorized, executed and delivered by Newco and constitutes a valid and binding agreement of it, enforceable against it in accordance with its terms, subject to the provisions of the United States Bankruptcy Code and other laws generally affecting debtors’ rights.
(c) No Conflicts. Neither the execution nor delivery by Newco of this MSA, nor the performance by Newco of any of its respective obligations under this MSA, shall, in and of itself, result in the material breach of any term or provision of, or constitute a material default under, any charter or bylaw, or material agreement, order, law, rule or regulation applicable to it which adversely affects its ability to perform its material obligations hereunder. The foregoing does not extend to any breach or default to the extent directly caused by Perot Systems.
(d) Supported Affiliates. When, if and as Newco requests Perot Systems to provide any Services to Newco or a Supported Affiliate, the foregoing representations in this Section 11.1 shall be deemed to have been made by, and shall be binding
63
upon, both Newco and such Supported Affiliate with respect to such Supported Affiliate.
(e) DISCLAIMER OF WARRANTIES. EXCEPT AS SPECIFIED IN THIS MSA, NEWCO DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
11.2 By Perot Systems Perot Systems hereby warrants to Newco as follows:
(a) Good Standing. Perot Systems (i) is a corporation duly incorporated, validly existing and in good standing under the laws of the State of Delaware, (ii) is in good standing and is authorized to do business in each jurisdiction where the failure so to do has a material adverse effect on Perot Systems’ ability to perform its material obligations under this MSA and (iii) has full corporate power to own, lease, and operate its properties and assets, to conduct its business as that business is now being conducted, and to perform its obligations under this MSA.
(b) Authorization. This MSA has been duly authorized, executed and delivered by Perot Systems and constitutes a valid and binding agreement of it, enforceable against it in accordance with its terms, subject to the provisions of the United States Bankruptcy Code and other laws generally affecting debtors’ rights.
(c) No Conflicts. Neither the execution nor delivery by Perot Systems of this MSA, nor the performance by it of any of its obligations under this MSA, shall result in the material breach of any term or provision of, or constitute a material default under, any charter provision or bylaw, or material agreement, order, law, rule or regulation applicable to it, which has a material adverse effect on Perot Systems ability to perform its material obligations hereunder. The foregoing does not extend to any breach or default to the extent directly caused by Newco.
(d) Quality of Services. The Services under this MSA shall be performed in a competent and diligent manner in accordance with the highest then-current industry practices implemented by PSC Personnel of suitable training, skill and experience to perform such Services.
(e) Disabling Code. Perot Systems shall not insert into the Software any Disabling Code, and Perot Systems shall not knowingly invoke any Disabling Code at any time, including upon expiration or termination of this MSA, for purposes of self-help or any other surreptitious or wrongful reason. “Disabling Code” shall include any Viruses and any other computer code (i) designed to disrupt, disable, harm, or otherwise impede, in any manner, including aesthetic disruptions or distortions, the operation of the Supported Software or the Services, or any other associated software, firmware, hardware, computer system or network (sometimes referred to as “Trojan Horses”, “viruses”, “worms” or “Easter eggs”), (ii) that would disable the Supported Software or Services or impair in any way their operation based on the elapsing of a period of time, exceeding an authorized
64
number of copies, advancement to a particular date or other numeral (sometimes referred to as “time bombs”, “time locks”, or “drop dead” devices) or (iii) that would permit any unauthorized person to access the Supported Software or Services to cause such disablement or impairment (sometimes referred to as “traps”, “access codes” or “trap door” devices), or any other similar harmful, malicious or hidden procedures, routines or mechanisms which would permit unauthorized access to such programs or cause such programs to cease functioning or to damage or corrupt data, storage media, programs, equipment or communications, or otherwise interfere with operations of Newco.
(f) Deliverable Quality. Each deliverable produced by Perot Systems hereunder, or for which Perot Systems otherwise has responsibility for the successful completion as a part of the Services, (i) shall conform to the reasonable acceptance test (which acceptance test shall be based on the applicable specifications and other mutually agreed criteria) or, in the case of deliverables other than software, the specifications, documentation and other criteria for such deliverable set forth or referred to in the applicable project plan, and (ii) if, after acceptance of any such deliverable, Newco identifies a material deviation from such criteria for that deliverable, Perot Systems shall promptly correct such deviation without additional charge.
(g) Hardware and Software. Perot Systems shall use reasonable commercial efforts to manage the Third Party Vendors who maintain the Supported Hardware and Supported Software under Managed Contracts for which Perot Systems has administrative responsibility so that they operate substantially in accordance with their specifications, including:
(i) maintaining Hardware in good operating condition, subject to normal wear and tear;
(ii) undertaking repairs and preventive maintenance on Hardware in accordance with the applicable Hardware manufacturer’s recommendations; and
(iii) performing Software maintenance in accordance with the applicable Software vendor’s documentation and recommendations.
(h) Efficiency and Cost Effectiveness. To the extent Perot Systems’ performance affects Perot Systems’ charges under this MSA, Perot Systems shall use commercially reasonable efforts to use efficiently the resources or services necessary to provide the Services and that with respect to chargeable resources it shall use commercially reasonable efforts to perform the Services in the most cost-effective manner consistent with the required level of quality and performance.
(i) Technology. Perot Systems shall provide the Services using, consistent with the Change Control Process, proven, current technology, which is generally available
65
whenever possible, that shall enable Newco to take advantage of technological advancements in its industry and support Newco’s efforts to maintain competitiveness in the markets in which it competes. This warranty is not intended to conflict with or enlarge specific provisions of this MSA (e.g., technology refresh) or conflict with Newco’s technology environment.
(j) Intellectual Property Rights. Perot Systems has or will obtain all consents, licenses, permissions and releases necessary to grant Newco the rights granted hereunder, including but not limited to, those rights granted with respect to GreenWay 1.0, Odyssey and VRS.
(k) DISCLAIMER OF WARRANTIES. EXCEPT AS SPECIFIED IN THIS MSA, PEROT SYSTEMS DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A SPECIFIC PURPOSE.
11.3 Certain Covenants
(a) Compliance with Law. Newco shall comply, and shall cause the Supported Affiliates to comply, in all material respects with all Federal, state and local laws and regulations generally applicable to entities in the car rental business that relate to this MSA and shall obtain all applicable permits and licenses generally applicable to entities in the car rental business as required in connection with its obligations under this MSA. Perot Systems and all parties acting on its behalf hereunder shall comply in all material respects with all Federal, state and local laws and regulations generally applicable to entities in the information technology services business that relate to this MSA and shall obtain all applicable permits and licenses generally applicable to entities in the information technology services business as required in connection with its obligations under this MSA. Each Party shall render reasonable cooperation to the other party to achieve such legal compliance. If and to the extent that any U.S. or other international export licenses may be required for the export of any software or equipment hereunder, the exporting Party shall be responsible for obtaining any such licenses. Each Party shall be solely responsible for determining whether such Party is in compliance with all laws or regulations affecting its internal operations.
(b) Third Party Equipment or Software Warranties. To the extent that Perot Systems has the necessary rights, Perot Systems shall pass through to Newco or its designee any third party warranties, indemnifications (including reimbursement of expenses and attorneys’ fees), and other benefits designed to protect the user or purchaser for equipment or software which Perot Systems receives as procurement agent for Newco and will provide to Newco or its designee copies of the purchase agreements and service agreements for such equipment and the license and maintenance agreements for any such third party software.
(c) Prompt Payment of Subcontractors. Upon payment by Newco (provided the appropriate invoice has been submitted by Perot Systems), Perot Systems shall
66
pay its Subcontractors and Perot Systems used in connection with the Services all sums due and owing to such persons in accordance with the terms of its agreements with such Subcontractors and Perot Systems.
(d) No Liens or Encumbrances. Perot Systems shall not take any actions that would reasonably result in any liens or encumbrances of any kind or amount being placed upon any facilities, equipment or software used to render the Services to Newco under this MSA.
11.4 Viruses For purposes of this MSA the term “Virus” shall mean: (i) program code programming instructions or set of instructions intentionally constructed with the intent to wrongfully damage, interfere with, allow unauthorized access to or otherwise adversely affect computer programs, data files, or operations; or (ii) or other code typically designated to be a Virus. With respect to the technologies for which Perot Systems has assumed operational control under this MSA, Perot Systems will be responsible for: (i) employing the commercially reasonable prevention procedures, detection mechanisms, and Virus response procedures approved by Newco in the Operations Procedures Manual to contain the infection and protect against vertical propagation; (ii) maintaining a Virus intervention program and documenting procedures; (iii) using the latest versions/releases of Virus protection software programs approved by Newco; and (iv) providing Newco with an incident report, in a mutually agreed upon format, in the event that a Virus causes loss of operational efficiency or loss of any data. Perot Systems shall diligently test any PSC Software, PSC Tools, Developed Software and Embedded Software prior to loading them onto the Supported Hardware using commercially reasonable Virus detection and removal products purchased by Newco. Perot Systems will perform such testing in accordance with a testing process that is reasonably acceptable to Perot Systems and Newco under the Operations Procedures Manual.
If a Party believes or has reason to believe that a Virus has been introduced into the Supported Systems, Developed Software, PSC Software, PSC Tools, Embedded Software or Supported Hardware, each Party shall use commercially reasonable efforts to identify and neutralize such Virus and to mitigate any adverse effect thereof. Perot Systems shall assist Newco in repairing or restoring as soon as, and to the extent, reasonably practicable any data or information damaged by such Virus.
Each Party shall use commercially reasonable efforts to ensure that no Viruses are introduced by any PSC Personnel or Newco Personnel, as the case may be, into the systems used under this MSA. Except for services that may be provided by PSC Personnel regularly assigned to provide the Services, Perot Systems’ efforts (i) to identify and neutralize such Virus and to mitigate any adverse effect thereof, and (ii) to assist Newco in repairing or restoring any data or information damaged by such Virus shall be an Additional Service (except in the case where PSC Personnel willfully introduced such Virus, in which case such assistance shall be at Perot Systems’ expense).
Perot Systems agrees that, notwithstanding anything to the contrary herein, if a Virus is found to have been introduced into the systems used to provide the Services, Perot
67
Systems shall use commercially reasonable efforts at no additional charge to eliminate the Virus, to reduce the effects of the Virus and, if the Virus causes a loss of operational efficiency or loss of data, to mitigate and restore such losses, without additional PSC Personnel. The priority and intensity of the efforts undertaken by the Parties to identify and neutralize the Virus, and to repair or restore any affected data or information, shall be determined by the Parties based on their evaluation of the situation, based on such factors as the Parties deem appropriate, including but not limited to, the number of sites affected, the severity of the damage being caused, and the relative importance of the data and information affected.
ARTICLE 12
INDEMNITIES
12.1 Cross Indemnity Each Party shall, and does hereby, indemnify, defend and hold harmless the other Party, their Affiliates, and their officers, directors, employees, agents, successors and assigns and, in the case of Newco, its Franchisees/Licensees (the “Indemnified Parties”) from and against any costs, claims, liabilities, damages and obligations, penalties, losses and expenses incurred by the Indemnified Parties (including, without limitation, reasonable attorneys’ fees and disbursements, costs of investigation, interest, fines, penalties, judgments and amounts paid in settlement) (collectively, “Damages”) or threatened damages directly or indirectly arising out of or resulting from any third party claim regarding (a) the death or bodily injury of any person caused by the negligence or willful misconduct of the indemnitor or any person acting on its behalf hereunder, or (b) the damage, loss or destruction of any real or tangible personal property caused by the negligence or willful misconduct of the indemnitor or any person acting on its behalf hereunder.
12.2 Perot Systems Employment Indemnification Perot Systems shall, and does hereby, indemnify, defend and hold harmless Newco and its Indemnified Parties from and against any damages or threatened damages arising out of or resulting from an act or omission of Perot Systems in Perot Systems’ capacity as an employer (provided that such damages or threatened damages do not arise as a result of any contractual obligation of Newco or its Affiliates to its respective employee or employees).
12.3 Newco Employment Indemnification Newco shall, and does hereby, indemnify, defend and hold harmless Perot Systems and its Indemnified Parties from and against any damages or threatened damages arising out of or resulting from an act or omission of Newco or its Affiliates in Newco’s or its Affiliates’ capacity as an employer (provided that such damages or threatened damages do not arise as a result of any contractual obligation of Perot Systems to its employee or employees).
12.4 Indemnification Procedures
(a) Notice of Indemnification Claim; Notice of Election. Promptly after receipt by any Indemnified Party under this Article 12 of notice of the commencement or threatened commencement of any civil, criminal, administrative, or investigative action or proceeding involving indemnified Damages or threatened Damages, the
68
Indemnified Party shall notify the indemnitor thereof in writing. A failure or delay in giving timely written notice to the indemnitor shall not relieve its obligations under this Article 12 except to the extent that it can demonstrate prejudice attributable to such failure or delay. Within fifteen (15) days following receipt of written notice from the Indemnified Party relating to any claim, but no later than ten (10) days before the date on which any response to a complaint or summons is due, the indemnitor shall notify the Indemnified Party in writing if the indemnitor elects to assume control of the defense and settlement of that action or proceeding (a “Notice of Election”).
(b) Procedure Following Notice of Election. If the indemnitor delivers a Notice of Election within the required notice period, the indemnitor shall have sole control over the defense and settlement of such action or proceeding, provided, however, that:
(i) the Indemnified Party shall be entitled to participate in the defense of such action or proceeding and to employ counsel at its own expense;
(ii) the indemnitor shall not be liable to the Indemnified Party for any legal expenses incurred by the Indemnified Party in such action or proceeding;
(iii) the indemnitor shall obtain the prior approval of the Indemnified Party in respect of any non-cash aspects of a proposed settlement of such action or proceeding which could reasonably adversely affect the Indemnified Party before entering into such settlement or ceasing to defend such action or proceeding; and
(iv) any proposed settlement of such action or proceeding shall be subject to the indemnitor’s and Indemnified Party’s prior approval, which approval shall not be unreasonably withheld.
(c) Procedure Where No Notice Of Election Is Delivered. If the indemnitor does not deliver a Notice of Election within the required notice period, the Indemnified Party may defend such action or proceeding in such manner as it may deem appropriate, at the cost and expense of the indemnitor. The indemnitor shall promptly reimburse the Indemnified Party for all such costs and expenses, including reasonable attorneys’ fees, demand for which may be made periodically.
12.5 Subrogation Upon payment of any indemnity in full under this Article 12, the indemnitor shall be subrogated to all rights of the Indemnified Party with respect to the claims to which such indemnification relates.
12.6 Intellectual Property Indemnity by Perot Systems Perot Systems shall defend, indemnify and hold harmless Newco and its Indemnified Parties from and against any and all Damages directly or indirectly arising out of any third-party (i.e., a party other than Newco, any of its Affiliates or the Franchisees/Licensees) claims brought against any of Newco or its Indemnified Parties alleging that the Developed Software, the PSC Software, PSC Tools, or the Embedded Software that is owned by Perot Systems
69
infringes a third person’s Intellectual Property Rights anywhere in the world, except to the extent that such a claim is based on the requirements or specifications for Developed Software provided by Newco Personnel.
12.7 Intellectual Property Indemnity By Newco Newco shall defend, indemnify and hold harmless Perot Systems and its Indemnified Parties from any Damages directly or indirectly arising out of any third-party (i.e., a party other than Perot Systems or any of its Affiliates) claims brought against any of Perot Systems or its Indemnified Parties alleging that (i) to the extent based on the requirements or specifications of Developed Software provided by Newco Personnel, the Developed Software (ii) the Newco Software. or (ii) Perot Systems’ use of the Supported Systems owned by Newco, infringes a third person’s Intellectual Property Rights anywhere in the world, except to the extent that such a claim is based on the Developed Software (other than with respect to Newco’s requirements or specifications), the PSC Tools or the Embedded Software that is owned by Perot Systems.
12.8 Certain Third Party Claims Except as specifically set forth in Section 12.6 and 12.7, neither Party shall seek indemnification from the other Party from and against any damages arising out of or resulting from any third-party claims brought against such Party’s use of the Supported Software and Embedded Systems and alleging that such use infringes such third party’s trademark, copyright, trade secret or patent. Instead, the affected Party shall seek indemnification from the owner or licensor of such Supported System or Embedded Software. Perot Systems agrees to pass through to Newco any indemnification rights that it may have against the owner or licensor of the Supported Software and Embedded Software, and shall procure the necessary rights to do so
12.9 Infringement Indemnification Procedures
(a) Mitigation. Upon receiving notice of an infringement claim, the indemnitor may, in its sole discretion, (i) modify the allegedly infringing item to be non-infringing provided that the modification is of substantially equivalent functionality, (ii) replace the allegedly infringing item with a non-infringing item of substantially equivalent functionality, or (iii) if, in the indemnitor’s reasonable discretion, modification or replacement is not commercially practicable, obtain for the Indemnified Party the right to continue to use the item in accordance with the terms of this MSA. If the indemnitor elects to modify the allegedly infringing item, (A) the Indemnified Party shall, without charge, give the indemnitor all assistance and information necessary to allow the indemnitor to make such modifications as promptly as practicable at the indemnitor’s expense, and (B) all relevant inspection, test and acceptance criteria and schedules shall be revised as appropriate to reflect such modifications.
(b) Exclusions. Notwithstanding any other provisions of this Section 12.9, the indemnitor shall have no liability to the Indemnified Party for any claim of infringement to the extent such claim is based on the use or licensing of any portion of Developed Software or Supported Software that was:
70
(i) modified by the Indemnified Party without the indemnitor’s involvement or approval if the claim reasonably relates only to such modification by the Indemnified Party;
(ii) not provided or recommended by the indemnitor to the Indemnified Party; or
(iii) due to a combination of non-infringing portions of Supported Software or Developed Software provided by the indemnitor and infringing portions provided by the Indemnified Party or some third party and such infringement is the result of such combination.
ARTICLE 13
DAMAGES AND LIMITATIONS OF LIABILITY
13.1 Limitation on Liability
(a) PEROT SYSTEMS. THE LIABILITY OF PEROT SYSTEMS HEREUNDER, WHETHER BASED ON CONTRACT, EQUITY, NEGLIGENCE, TORT, INTENTIONAL CONDUCT OR OTHERWISE, FOR ANY AND ALL EVENTS, ACTS OR OMISSIONS RELATING IN ANY WAY TO THIS MSA, SHALL NOT EXCEED, IN THE AGGREGATE, $25,000,000 (LESS THE AMOUNT OF ANY SERVICE LEVEL CREDITS PAID UNDER THIS MSA).
(b) NEWCO. THE LIABILITY OF NEWCO HEREUNDER, WHETHER BASED ON CONTRACT, EQUITY, NEGLIGENCE, TORT, INTENTIONAL CONDUCT OR OTHERWISE, FOR ANY AND ALL EVENTS, ACTS OR OMISSIONS RELATING IN ANY WAY TO THIS MSA, SHALL NOT EXCEED, IN THE AGGREGATE, $[REDACTED] (LESS THE AMOUNT OF ANY SERVICE LEVEL CREDITS PAID UNDER THIS MSA).
13.2 Consequential Damages NEITHER PEROT SYSTEMS NOR NEWCO SHALL BE LIABLE FOR, NOR SHALL THE MEASURE OF DAMAGES INCLUDE, ANY INDIRECT DAMAGES, INCIDENTAL DAMAGES, CONSEQUENTIAL DAMAGES OR AMOUNTS FOR LOSS OF INCOME, DATA, PROFITS OR SAVINGS ARISING OUT OF ITS PERFORMANCE OR NONPERFORMANCE UNDER THIS MSA. THE FOREGOING EXCLUSION IN THIS SECTION SHALL NOT BE DEEMED TO LIMIT PEROT SYSTEMS’ RIGHT TO RECOVER ANY PAYMENTS FOR SERVICES THAT ARE OR MAY BECOME DUE AND PAYABLE BY NEWCO UNDER THIS MSA.
13.3 Exclusions The limitations of liability set forth in Section 13.1 shall not apply to either Party’s obligation to indemnify pursuant to Article 12.
13.4 Mitigation Each Party shall act reasonably to mitigate its damages, including Direct Damages or threatened Direct Damages for which such Party may be indemnified, for which the other Party is responsible.
71
13.5 Force Majeure
(a) If either Party is prevented, hindered, or delayed in the performance or observance of any of its obligations hereunder, except for a Party’s payment obligations, by reason of any circumstance beyond its reasonable control, including but not limited to circumstances such as fire, flood, earthquake, elements of nature or acts of God; riots, civil disorders, terrorism, rebellions or revolutions in any country, or a court order which substantially interferes with Newco’s ability to enjoy the benefits of this MSA (“Force Majeure”), that Party shall be excused from any further performance or observance of the obligation(s) so affected for as long as the Force Majeure continues and that Party continues to use all commercially reasonable efforts to recommence performance whenever and to whatever extent possible without delay.
(b) Any Party so delayed in its performance will immediately notify the Party to whom performance is due by telephone (to be confirmed in writing within two days of the inception of such delay) and describe at a reasonable level of detail the circumstances causing such delay. In the event that a Force Majeure occurrence affects Perot Systems, as soon as reasonably practical, the Parties shall meet to discuss the how long the Force Majeure occurrence is reasonably likely to prevent Perot Systems from providing the Services or any component(s) thereof in accordance with the Service Levels and whether Perot Systems will be able to provide a suitable temporary alternative to the Services or component(s) thereof promptly. The Parties shall use all reasonable efforts to conduct and conclude all of the meeting activities promptly after the occurrence of such Force Majeure.
(c) If, in light of the expected duration of a Force Majeure occurrence and Perot Systems’ inability to provide a suitable temporary alternative promptly or if any a Force Majeure occurrence substantially prevents, hinders, or delays performance of the Services or any component(s) thereof necessary for the performance of critical Newco functions (which Newco shall determine, in its reasonable discretion) for more than sixty (60) consecutive hours, then Newco may, at its option and without liability to Perot Systems, procure such Services or component(s) from an alternate source for the duration of the contract entered into with such alternative source, and the charges payable hereunder shall be equitably adjusted to reflect the Services or component(s) that cannot be performed. Perot Systems will not have the right to any additional payments from Newco beyond those that would otherwise be due to Perot Systems as a result of any Force Majeure occurrence that solely affects Perot Systems. If Newco procures such Services or components from an alternate source, Perot Systems shall not charge Newco for such Services or component(s) during the period of suspension, nor shall Perot Systems charge Newco to connect or disconnect suspended or restored Services or component(s). Notwithstanding the foregoing terms, however, neither Party may rely on any Force Majeure occurrence or the rights, remedies, or provisions set forth in this Section as a pretext to intentionally evade or cause the termination of all or a portion of this MSA simply for purposes of avoiding its obligations hereunder without right or cause.
72
(d) Upon the occurrence of a Force Majeure, Perot Systems shall perform the Disaster Recovery Services as provided in this MSA. The occurrence of a Force Majeure shall not relieve Perot Systems of its obligation to implement its disaster recovery plan and provide such Disaster Recovery Services.
ARTICLE 14
INSURANCE
14.1 Insurance During the Term, Perot Systems shall maintain in force, at Perot Systems’ sole expense, the following insurance of the type and in the amounts (which may be satisfied by “Umbrella” or Excess Liability Insurance) set forth below with insurers having an A.M. Best rating of at least A-VII:
(a) Workers’ Compensation: statutory workers’ compensation insurance in accordance with the legal requirements of each country, state, territory and locality exercising jurisdiction over personnel performing Services in such country, state, territory or locality;
(b) Employer’s Liability: employer’s liability insurance with a minimum limit in an amount not less than $500,000 per occurrence, covering bodily injury by accident or disease, including death, as well as employee dishonesty coverage in an amount of $10,000,000;
(c) Commercial General Liability: commercial general liability insurance (including contractual liability insurance) in an amount not less than $5,000,000 per occurrence and general aggregate;
(d) Automobile: comprehensive automotive liability insurance covering use of all owned, non-owned and hired automobiles, with a minimum combined single limit in an amount not less than $5,000,000 per occurrence for bodily injury and property damage liability;
(e) Electronic Data Processing All Risk Property Insurance: on equipment, data, media and valuable papers on the premises of a Perot Systems Data Center, which shall name Newco and its Affiliates as loss payees; and
(f) Computer Services Errors and Omissions Liability Insurance: errors and omissions liability insurance covering the liability for financial loss due to error, omission, negligence of employees and machine malfunction, in an amount of at least $5,000,000 per claim and a policy aggregate limit in an amount not less than $25,000,000.
14.2 Insurance Documentation Upon Newco’s reasonable request, Perot Systems shall furnish to Newco certificates of insurance (including evidence of renewal of insurance) evidencing all coverages referenced in Section 14.1. Such certificates shall include a provision whereby the applicable insurer shall give at least thirty (30) days notice to Newco in writing prior to any cancellation or non-renewal, except ten (10) days’ notice for non-payment of premium. To the extent reasonably practical and appropriate, Perot
73
Systems shall cause the applicable insurer to name Newco as an additional insured and shall furnish Newco with documentation thereof. All deductibles, self-insured retentions, or retrospective premium features shall be assumed by Perot Systems, for the account of Perot Systems, and at Perot Systems’ sole expense and risk. The Workers’ Compensation, Employer’s Liability, Commercial General Liability, and Automobile insurance policies required under this Section shall be endorsed to provide that the applicable underwriters or insurers waive any and all rights of subrogation against Newco, its Affiliates and their respective officers, directors, agents, employees and other representatives.
14.3 Risk of Loss Each party shall be responsible for risk of loss of, and damage to, any equipment, software, or other materials based on the relative degree of fault of such party (its Affiliates, users, customers and Subcontractors) in causing such loss or damage. In the absence of fault of a party (or its Affiliates, users, customers or Subcontractors), (i) Newco shall be responsible for risk of loss, and damage to, any equipment, software, or other materials at the facilities of Newco, its Affiliates and its Franchisees/Licensees, and (ii) Perot Systems shall be responsible for risk of loss, and damage to, any equipment, software, or other materials at the facilities of Perot Systems and its Affiliates. The risk of loss of, or damage to, property in transit will remain with the party arranging the shipment.
14.4 No Limitation Perot Systems’ obligation to maintain insurance coverage in specified amounts shall not act as a limitation on any other liability or obligation which Perot Systems would otherwise have under this MSA.
ARTICLE 15
INITIAL DISPUTE RESOLUTION
15.1 General Any material dispute between the Parties, arising out of or resulting from the interpretation of any provision of this MSA or the performance or non-performance by a Party, shall be resolved as provided in this Article 15.
15.2 Management Meetings Prior to initiating litigation in connection with this MSA, the Parties shall first attempt to resolve their disputes as follows:
(a) Account Managers. Upon a request of a Party, the Account Managers shall promptly meet to resolve and negotiate in good faith to resolve the dispute informally.
(b) Designation of New Representatives. If the Account Managers cannot resolve the dispute within fifteen (15) days of the initial notice of dispute, upon the request of a Party, each Party shall promptly designate a new representative (collectively, the “New Representatives”) who is an executive at the vice president level or higher and not directly involved in the dispute to resolve the dispute. The New Representatives shall promptly meet and negotiate in good faith to resolve the dispute informally.
(c) Disclosure of Non-privileged Information. During the course of negotiations between the Account Managers or the New Representatives, as the case may be,
74
all reasonable requests made by one Party to the other for non-privileged information reasonably related to this MSA (as determined by the disclosing Party in its sole discretion) shall be honored in order that each of the Parties may be fully advised of the other Party’s position.
(d) Discussion Format; Exchange of Written Statements. The specific format for the discussions shall be left to the discretion of the Account Managers or New Representatives, as the case may be, including the preparation of agreed-upon statements of fact or written statements of position. At the option of either Party, legal counsel for such Party may be present at any such discussions.
(e) Review by Senior Executive Officers. If neither the Account Managers nor the New Representatives can resolve the dispute within thirty (30) days of the initial notice of dispute, upon the request of a Party, the president or chief operating officers of Perot Systems and Newco shall promptly meet and negotiate in good faith to resolve the dispute.
ARTICLE 16
GENERAL
16.1 No Hire Commitments
(a) General. Except as otherwise specifically provided in this MSA, and except with respect to any person whose employment is involuntarily terminated by Perot Systems or any Affiliate of Perot Systems, or by Newco or any Affiliate of Newco, as the case may be, during the Term and for six months thereafter, neither Party shall recruit or hire, and each Party shall cause its Affiliates not to recruit or hire, any person then employed by the other Party who materially performed work during the past year in connection with this MSA without the prior consent of the other Party, and such consent may be withheld in the other Party’s sole discretion. Except as otherwise specifically provided in this MSA, during the Term and for six months thereafter, if Newco becomes aware of any of the Franchisee/Licensees recruiting or hiring any person then employed by Perot Systems or any of its Affiliates who materially performed work in connection with this MSA then Newco shall promptly notify Perot Systems in writing or by e-mail. After receipt of such notice, or if Perot Systems otherwise becomes aware that any of the Franchisee/Licensees are recruiting or hiring any person then employed by Perot Systems or any of its Affiliates who materially performed work in connection with this MSA then Perot Systems may request that Newco discuss such activity with the Franchisee/Licensee. In such event, Newco will have such discussion with the Franchisee/Licensee and will use commercially efforts to encourage the Franchisee/Licensee not to recruit or hire any such person during the Term and for six months thereafter. Notwithstanding any provision in this MSA to the contrary, in the event an employee of a Party or any of its Affiliates responds to personal recruiting advertising or other recruiting of a general nature (e.g., through a headhunter not targeted by the Party to recruit the employee) and is employed by the other Party after completing such Party’s new
75
hire interview and employment process, such hire shall not be deemed to violate this Section.
(b) Transferred Employees. Notwithstanding the provisions of Section 16.1(a), upon termination or expiration of this MSA, Newco may re-hire any employees of Newco or its predecessors in interest that were transferred to Perot Systems hereunder or under the ANC Agreement.
16.2 Notices All consents, notices, requests, demands, objections, and other communications to be given or delivered under or by reason of the provisions of this MSA shall be in writing or, where expressly allowed by this MSA, by e-mail and shall be deemed given when delivered personally against receipt, on the next business day when sent by overnight courier, and on the fifth business day after being mailed by certified mail, return receipt requested, to a Party at the following address (or to such other address as that Party may have specified by notice given to the other pursuant to this provision):
If to Perot Systems: | | With a copy to: |
| | |
Perot Systems Corporation Attention: President 2300 West Plano Parkway Plano, Texas 75075 | | Perot Systems Corporation Attention: General Counsel 2300 West Plano Parkway Plano, Texas 75075 |
| | |
If to Newco: | | With a copy to: |
| | |
Vanguard Car Rental USA Inc. Attention: Chief Information Officer 200 South Andrews Avenue Ft. Lauderdale, Florida 33301 | | Schulte Roth & Zabel LLP Attention: Robert R. Kiesel 919 Third Avenue New York, New York 10022 |
16.3 Assignment This MSA shall be binding upon and inure to the benefit of each Party, and their respective successors and permitted assigns, but neither this MSA nor any of the rights, interests or obligations hereunder may be delegated by either Party except as expressly authorized under this MSA, nor may they be assigned by either Party without the prior consent of the other Party, provided, however, that such prior consent of the other Party shall not be unreasonably withheld or delayed in the event that (i) all or substantially all of the business of a Party is acquired by merger, acquisition or otherwise, or such assignment is to an Affiliate, (ii) this MSA is to be included in such transaction, (iii) the acquiring or surviving entity agrees in writing to be bound by all conditions of this MSA and provides a copy of such writing to the other Party, and (iv) the acquiring or surviving entity is not a direct competitor of the other Party and does not own or control, is not owned or controlled by, and is not under common ownership or control of a direct competitor of the other Party. Notwithstanding the foregoing, either Party may assign this MSA to one or more of its Affiliates; provided, however, that the assigning Party
76
shall guaranty the obligations of such Affiliate hereunder pursuant to a guaranty agreement in form and substance reasonably acceptable to the other Party. Except as provided in this Section, any assignment without such consent is void, invalid and unenforceable.
16.4 Severability Whenever possible, each provision of this MSA shall be interpreted so as to be valid under applicable law, but if any provision of this MSA is held to be invalid, such provision shall be deemed restated to reflect the original intentions of the Parties as nearly as possible in accordance with applicable law, and, if capable of substantial performance, the remaining provisions of this MSA shall be enforced as if this MSA was entered into without the invalid provision.
16.5 Relationship of Parties In furnishing Services to Newco, Perot Systems is acting only as an independent contractor and not as a partner, employee, agent or joint venturer of Newco. Except as otherwise expressly provided in this MSA, Perot Systems does not undertake to perform any obligation of Newco, whether regulatory or contractual, or to assume any responsibility for Newco’s business or operations, and Perot Systems has the sole right and obligation to supervise, manage, contract, direct, procure, perform or cause to be performed, all Services to be performed by Perot Systems under this MSA. Except as otherwise expressly provided in this MSA, Perot Systems shall make no contract or commitment binding upon Newco and shall not represent to any other person that Perot Systems has such authority.
16.6 Approvals and Similar Actions Where agreement, approval, acceptance, consent or similar action by either Party is required by any provision of this MSA, such action shall not be unreasonably delayed or withheld unless otherwise expressly provided.
16.7 Covenant of Good Faith Each Party agrees that, in its respective dealings with the other Party under or in connection with this MSA, it shall act in good faith.
16.8 Non-disparagement The Parties agree that successful performance by both Parties hereunder shall require cooperation and good-faith efforts. Accordingly, each Party shall encourage such cooperation and good-faith efforts and hereby agrees that it shall not make any statement, written or oral, that inappropriately or inaccurately refers to, describes or disparages the other Party, its performance hereunder, its products or its services or make any statement, written or oral, that is deceptive, misleading, or unethical regarding the other Party, its performance hereunder, its products or its services.
16.9 Press Releases Neither Party shall issue or release any media release (including, without limitation, any announcement made via e-mail or any posting on the Internet or World Wide Web) relating in any manner to: (a) any aspect of this MSA; or (b) the Services without first providing the other party two days advance notice of the intended media release.
16.10 Modification; Waiver This MSA may be modified only in a writing signed by each party. No delay or omission by either Party to exercise any right or power under this MSA may impair such right or power or be construed to be a waiver thereof. A waiver
77
by either Party of any of the obligations to be performed by the other Party or any breach thereof may not be construed to be a waiver of any succeeding breach thereof or of any other obligation.
16.11 Governing Law and Consent to Jurisdiction The laws of the State of New York, other than its rules on conflicts of laws, shall govern this MSA. Each of the Parties consents to the jurisdiction of any state or federal court located within New York County, New York, and irrevocably agrees that all legal actions or proceedings arising out of or related to this MSA shall be exclusively maintained in either the federal or state courts located in New York, New York.
16.12 Entire Agreement This MSA, including its referenced Schedules, Exhibits, and Change Orders, FRDs, and the ANC Partial Termination and Assignment Agreement, constitutes the final, entire and exclusive agreement among the parties with respect to its subject matter, and there are no prior representations, understandings, or agreements relative hereto which are not expressed herein.
16.13 Survival The provisions of this MSA which by their nature contemplate performance or observance subsequent to any termination or expiration of this MSA shall survive and continue in full force and effect following any termination or expiration of this MSA, including but not limited to Sections 7.6, 7.8, and 10.8 of this MSA, Articles 8, 12, 13, 15, and 16 of this MSA shall survive any expiration or other termination of this MSA.
16.14 Section, Exhibit, and Schedule References Except as otherwise specifically provided in this MSA, Section, Attachment, Exhibit and Schedule references are references to Sections, Exhibits and Schedules in or to this MSA.
{SIGNATURE PAGE FOLLOWS}
78
{SIGNATURE PAGE TO INFORMATION TECHNOLOGY SERVICES AGREEMENT}
WHEREUPON, the parties have caused this MSA to be executed on the Agreement Date through their respective duly appointed and authorized representatives.
VANGUARD CAR RENTAL USA INC. | PEROT SYSTEMS CORPORATION |
| |
| |
By: | /s/ William E. Lobeck | | By: | /s/ Scott A. Lang | |
Name: William E. Lobeck | Name: Scott A. Lang |
Title: Chief Executive Officer | Title: Vice President |
| | | | | |
Exhibit A
Services
Table of Contents
1. | | DEFINITIONS | 4 |
| 1.1 | | Certain Definitions | 4 |
2. | | GENERAL SERVICES | 8 |
| 2.1 | | Introduction | 8 |
2.2 | | Operations Procedures Manual | 8 |
| 2.3 | | Systems Management Controls (“SMC”) | 10 |
| 2.4 | | Service Hours | 12 |
| 2.5 | | Consolidation and Relocation of Supported Hardware | 12 |
| 2.6 | | Management of Managed Contracts | 12 |
| 2.7 | | Other General Services | 15 |
3. | | HELP DESK SERVICES | 17 |
| 3.1 | | Introduction to Help Desk Services | 17 |
| 3.2 | | Perot Systems Responsibilities for the Help Desk Services | 17 |
| 3.3 | | Newco Responsibilities for the Help Desk Services | 18 |
| 3.4 | | Help Desk Services in Support of the Data Center Services | 19 |
| 3.5 | | Help Desk Services in Support of Desktop Services | 20 |
| 3.6 | | Help Desk Services in Support of Core Application Services | 21 |
4. | | DATA CENTER SERVICES | 22 |
| 4.1 | | Introduction to Data Center Services | 22 |
| 4.2 | | Management and Control of the Data Center Services (including applicable Systems Management Controls) | 22 |
| 4.3 | | Description of Data Center Services | 35 |
5 | | CORE APPLICATION SERVICES | 43 |
| 5.1 | | Core Application Services Overview | 43 |
| 5.2 | | Perot Systems Responsibilities for the Core Application Services | 43 |
| 5.3 | | Application Support Pool and Application Enhancement Pool | 46 |
| 5.4 | | General Pool Management and Reporting | 46 |
| 5.5 | | Supported Software Support | 47 |
| 5.6 | | Newco Responsibilities for Supported Software | 49 |
| 5.7 | | Workflow for the Core Application Services | 50 |
| 5.8 | | Break/Fix | 51 |
| 5.9 | | Maintenance | 52 |
| 5.10 | | Ad-Hoc Requests | 53 |
| 5.11 | | Enhancement/New Development | 53 |
| 5.12 | | Newco Responsibilities for the Core Application Services | 53 |
6. | | DESKTOP SERVICES | 56 |
| | | | | |
1
| 6.1 | | Introduction | 56 |
| 6.2 | | Management of the Desktop Services | 56 |
| 6.3 | | Deskside Services | 57 |
| 6.4 | | Supported Desktop Hardware Maintenance Services | 59 |
| 6.5 | | Install, Move, Add, Change Services (“IMAC”) | 60 |
| 6.6 | | Asset Tracking Services | 63 |
| 6.7 | | Electronic Software Distribution for Supported Desktop Software | 65 |
7. | | LAN/WAN AND REMOTE NETWORK MONITORING SERVICES | 68 |
| 7.1 | | Introduction | 68 |
| 7.2 | | Operations of the Data Network | 68 |
| 7.3 | | Data Network Operations Management and Control | 69 |
| 7.4 | | Remote Network Monitoring Services | 69 |
| 7.5 | | Capacity Management for the Data Network | 69 |
| 7.6 | | Data Network Connectivity Service | 70 |
| 7.7 | | Data Network Maintenance | 70 |
| 7.8 | | Data Network Provisioning | 71 |
| 7.9 | | Data Network Administration | 71 |
| 7.10 | | Supported Software Support | 71 |
| 7.11 | | Regulatory Changes Affecting the Data Network | 71 |
| 7.12 | | Data Network Engineering | 71 |
| 7.13 | | Data Network Optimization | 72 |
| 7.14 | | Newco Responsibilities for the Data Network | 73 |
8. | | DISASTER RECOVERY SERVICES | 75 |
| 8.1 | | Introduction | 75 |
| 8.2 | | Disaster Recovery Services | 75 |
| 8.3 | | Data Network Recovery | 76 |
| 8.4 | | Desktop Disaster Recovery Services | 76 |
9. | | Security Services | 78 |
| 9.1 | | Introduction | 78 |
| 9.2 | | Security Management | 78 |
| 9.3 | | Physical Security | 80 |
| 9.4 | | Logical Access Control | 81 |
| 9.5 | | Data Network Infrastructure Security | 83 |
10. | | VOICE COMMUNICATIONS MANAGEMENT SERVICES | 84 |
| 10.1 | | Introduction | 84 |
| 10.2 | | Perot Systems Responsibilities. | 84 |
| 10.3 | | Newco Responsibilities | 84 |
| | | | | |
Attachments
Attachment A-1 Intentionally Omitted
Attachment A-2 Transition Services
2
Attachment A-3 VRS Project Services
Attachment A-4 Supported Desktop Hardware and Supported Desktop Software
3
1. DEFINITIONS
1.1 Certain Definitions
All capitalized terms used, but not defined, in this Exhibit A have the same meanings given them in the MSA or other Exhibits. As used in this Exhibit A:
(a) “Ad-Hoc Services” are the Core Application Services other than Break/Fix, Enhancement/New Development and Maintenance that are specifically described in a Change Order.
(b) “Application Enhancement Pool” is defined in Section 5.3.
(c) “Application Support Pool” is defined in Section 5.3.
(d) “Assets” means Supported Managed Assets.
(e) “Availability Management” is defined in Section 2.3.
(f) “Batch Management” is defined in Section 2.3.
(g) “Break/Fix Services” are the Core Application Services for the diagnosis and repair of application and database related failures for Supported Software and Developed Software.
(h) “Call” is a telephone call to the Help Desk from an End User reporting a problem, asking a question in regards to the Services, or requesting a Service. The procedures for Calls are defined in the Operations Procedures Manual.
(i) “Capacity Management” is defined in Section 2.3.
(j) “Change Initiation Request” is defined in Exhibit F.
(k) “Change Management” is defined in Section 2.3.
(l) “Configuration Management” is defined in Section 2.3.
4
(m) “Data Centers” is defined in Section 4.3.
(n) “Data Network” is defined as Newco’s wide area networks (“WAN”) and local area networks (“LAN”).
(o) “Deskside Services” are Desktop Services that are performed at the End User’s work area.
(p) “Disaster Recovery Contract” is defined in Section 8.1.
(q) “Disaster Recovery Plan” is Newco’s plan for recovering the Critical Services in the event of a Disaster.
(r) “Electronic Software Distribution” or “ESD” is the distribution of Supported Software by electronic means.
(s) “End User” is a person authorized by Newco to receive any Services.
(t) “Enhancement/New Development” are the Core Application Services for the enhancement of Supported Software and development of Developed Software.
(u) “Help Desk” is defined in Section 3.1.
(v) “IMAC” is defined in Section 6.5 of Article 6.
(w) “Information Security Controls Document” is defined in Section 9.1.
(x) “Inventory Management” is defined in Section 6.5.
(y) “Labor Hours” is defined in Exhibit F.
(z) “Level 1 Support” with respect to Help Desk Services, is defined as: 1) answering the incoming Call, 2) recording all Calls; 3) gathering the information provided by the End User regarding the problem or requested Service; 4) obtaining resource status; 5) accessing on-line information; 6) responding to End User requests for information; 7) handling routine product usage and Services problems; 8) transferring Calls to the appropriate support group; 9) dispatching on-site assistance; 10) opening the Call record; 11) informing the End User of the status of
5
a Call; 12) calling the End User for further information; and 13) closing the Call record.
(aa) “Level 2 Support” with respect to Help Desk Services, is defined as: 1) closing problem Calls not closed by Level 1 Support, exclusive of product defects; 2) documenting all actions in the Call record; 3) calling the End User for further information; 4) performing root cause analysis, as required; 5) working with vendors (as appropriate) to resolve problems; 6) making recommendations for process and tool improvements; 7) contacting other support groups and organizations, as required; 8) dispatching on-site assistance, if needed; 9) interfacing with other systems, networks and operating system environments personnel; and 10) routing Calls to other levels of support, as required.
(bb) “Level 3 Support” with respect to Help Desk Services, is defined as: 1) working with vendors that perform the on-site diagnosis and repair by Third Party Vendors as required to close the problem; 2) documenting all actions in the Call record; 3) performing root cause analysis, as required; 4) making recommendations for process and tool improvements; and 5) contacting other support groups or organizations, as required.
(cc) “Maintenance” are the Core Application Services to monitor, adapt or modify Supported Software as necessary to maintain the operability and functionality or to implement technology changes.
(dd) “Performance Management” is defined in Section 2.3.
(ee) “Problem Management” is defined in Section 2.3.
(ff) “Recovery Center” is the data center utilized by Newco’s Third Party Vendor for disaster recovery to recover the Critical Services.
(gg) “Recovery Management” is defined in Section 2.3.
(hh) “Service Hours” the times of the day or night that Perot Systems provides the Services. Service Hours are set forth in the Operations Procedures Manual.
(ii) “Severity Codes” is defined as the severity designation assigned by the Help Desk to a Call. Severity Codes are described in Exhibit B.
6
(jj) “Supported Desktop Hardware” is the Supported Hardware listed in Attachment A-4 to this Exhibit A.
(kk) “Supported Desktop Software” is the Supported Software listed in Attachment A-4 to this Exhibit A.
(ll) “Supported Servers” are the servers listed on Schedules 6.2(a) and 6.2(b).
(mm) “Systems Management Controls” is defined in Section 2.3.
(nn) “SYS/M” is defined in Section 4.2(k).
7
2. GENERAL SERVICES
2.1 Introduction
This Exhibit A describes the duties and responsibilities of Perot Systems and Newco related to Perot Systems’ provision of the Base Services. Perot Systems will provide the Base Services in accordance with the descriptions contained in the MSA, this Exhibit A, the Attachments to this Exhibit A, and the Operations Procedures Manual. Newco will support Perot Systems’ provision of the Base Services in accordance with the descriptions contained in this Exhibit A and the Operations Procedures Manual. During the Term, Newco and Perot Systems may agree on different or additional Base Services and will, as applicable, amend this Exhibit A in accordance with the Change Control Process. This Article 2 of Exhibit A contains descriptions of processes, procedures, and methods that will be utilized by Perot Systems to manage and deliver the Base Services (the “General Services”). The Base Services consist of the following:
(a) General Services described in this Article 2.
(b) Help Desk Services described in Article 3.
(c) Data Center Services described in Article 4.
(d) Core Application Services described in Article 5. The Core Application Services are performed in accordance with the Change Control Process described in Exhibit F.
(e) Desktop Services described in Article 6 with respect to the Supported Desktop Hardware and Supported Desktop Software described in Attachment A-4.
(f) LAN/WAN and Remote Monitoring Services described in Article 7.
(g) Disaster Recovery Services described in Article 8.
(h) Security Services described in Article 9.
(i) Voice Communication Management Services described in Article 10.
(j) Transition Services described in Attachment A-2.
(k) VRS Project Services described in Attachment A-3.
8
2.2 Operations Procedures Manual
(a) Within 90 days of the Effective Date and as part of the Services, Perot Systems shall prepare, in consultation with Newco, and deliver to Newco, for Newco’s approval, an operating procedures manual (the “Operations Procedures Manual”) to supplement the Services, generally summarizing the following:
(i) the computer hardware and software environments in which the Services will be performed;
(ii) the documentation for the Services and all software incorporated therein or used in connection therewith;
(iii) the procedures Perot Systems intends to use and the activities Perot Systems proposes to undertake in order to manage the Services in addition to those specified in this Exhibit A, including, when appropriate, those direction, supervision, monitoring, staffing, reporting, planning, testing, training, support, quality assurance, problem management, and oversight activities normally undertaken at the Supported Sites or Remote Support Sites where critical business, engineering, manufacturing, distribution, commercial, and financial data of Newco are processed;
(iv) the procedures of a management reporting system that Perot Systems will use to manage the Services;
(v) the procedures describing the Virus prevention procedures and detection mechanisms to be employed by Perot Systems, along with the procedures to be utilized by Perot Systems in the event of a Virus introduced into the Supported Systems; and
(vi) the Systems Management Controls.
(b) Upon approval of the Operations Procedures Manual by Newco, Newco and Perot Systems will implement the Operations Procedures Manual in the provision of the Services. The initial version of the Operations Procedures Manual shall take into account Newco’s current operating procedures manual, and ANC’s practices in effect prior to the Effective Date. Perot Systems shall use any existing operating procedures in effect as of the Effective Date until final approval of the Operations Procedures Manual.
(c) Newco and Perot Systems each agree to perform their responsibilities in accordance with the Operations Procedures Manual and this Exhibit A. Perot Systems is responsible for the following in regards to the Operations Procedures Manual:
(i) creating, updating and maintaining the Operations Procedures Manual in consultation with Newco. Perot Systems will obtain Newco’s prior approval of
9
material changes to the Operations Procedures Manual or any changes to Newco’s obligations;
(ii) reviewing operations documentation for adherence to operational procedures and standards;
(iii) periodically distributing to appropriate Newco Personnel, information bulletins regarding new or changed operations and procedures;
(iv) updating and maintaining Help Desk documentation and procedures and distributing to appropriate Newco Personnel; and
(v) developing operations documentation for the Supported Software and updating and distributing documentation for the Services and software.
(d) Perot Systems and Newco will provide documentation for operations procedures and processes relating to the Supported Software and Supported Hardware. Perot Systems will include such documentation in the Operations Procedures Manual.
2.3 Systems Management Controls (“SMC”)
Perot Systems will develop with Newco’s assistance, and Newco will review and approve, the standard set of procedures and disciplines for providing and managing Newco’s information systems as part of the Services (the “System Management Controls” or “SMC”). Perot Systems will utilize and comply with the SMC’s applicable to each Supported System. The Operations Procedures Manual will contain the SMC’s. Perot Systems’ responsibilities for the SMC’s will consist of the following processes:
(a) “Availability Management” is the process for coordinating the appropriate skills, information, tools and procedures required to manage the availability of the Data Networks and the Supported Systems.
(b) “Batch Management” is the process for controlling all batch work including the scheduling of resources, the processing of data and transactions and the distribution of data output/information between End Users. Newco’s instructions on what, when and how to schedule and recover batch work will be provided to Perot Systems and included in the Operations Procedures Manual. Unless otherwise agreed, Perot Systems will perform and control setup and scheduling of batch work in accordance with the Operations Procedures Manual.
(c) “Capacity Management” is the process for the development and maintenance of tactical and strategic plans to verify that the operating environments accommodate Newco’s growing or changing business requirements.
10
(d) “Change Management” is the process for the planning, testing, coordinating, implementing and monitoring of changes affecting delivery of the Base Services and Newco’s operating environments without adversely impacting delivery of the Base Services.
(e) “Configuration Management” is the process for processing configuration changes to the Supported Hardware and Supported Software and maintaining lists and diagrams of Supported System configurations. Upon any revision of the then-current configuration for any Supported Systems, Perot Systems will provide Newco with revised configurations and, on an annual basis, Perot Systems will provide Newco with a complete set of the then-current configurations for the Supported Systems.
(f) “Inventory Management” is the process for maintaining a record of the Supported Hardware (including new purchases and retirements). This activity includes tracking by Supported Hardware location, maintaining available configuration data and providing necessary information to allow Perot Systems’ to perform its obligations in regards to Managed Contracts.
(g) “Performance Management” is the process for monitoring, measuring, analyzing and reporting the performance of each Supported System. The process includes system tuning and other efforts undertaken to improve the efficiency and reliability of systems and reduce ongoing maintenance, monitoring and analyzing trends to identify potential problems, and providing tools to help identify areas where preventive maintenance could be performed to improve system efficiency including system performance. In accordance with the Change Control Process, Perot Systems or Newco may request changes to a Supported System in order to enhance or improve that Supported System’s performance.
(h) “Problem Management” is the process Perot Systems and Newco, as applicable, will utilize for identifying, recording, tracking, updating status (to the End User that reported the problem and Newco management), performing cause analysis and resolving (or providing temporary work-arounds) to reported problems and incidents impacting delivery of the Services, as described in and subject to the timeframes set forth in the Operations Procedures Manual. This process includes recognizing recurring problems, performing root cause analysis on Severity 1 problems or other problems as requested by Newco, addressing procedural issues and containing or minimizing the impact of problems that occur, and updating system and operations documentation as necessary. Finally, this process shall include, at Perot Systems’ election and upon Newco’s approval, performing permanent fixes that involve system changes or enhancements so problems do not reoccur.
(i) “Recovery Management” is the process Perot Systems and Newco will utilize for planning, establishing and testing the recovery procedures required to re-establish
11
the functionality of Supported Systems in the event of a failure. The intent of this process is to anticipate and minimize the impact of Supported Systems failure through the development of predefined, documented procedures and Supported Software and Supported Hardware recovery capabilities. Upon mutual agreement, Perot Systems will include such procedures for recovery in the Operations Procedures Manual.
(j) “Change Control Process” is the process described in Exhibit F that Perot Systems and Newco will follow for initiating, coordinating, scheduling, planning, and implementing Changes and Supported Systems-related Maintenance, Enhancements/New Development and Ad-hoc Projects and other infrastructure projects as agreed to by the parties. Change Orders will be prioritized by Newco. Unless otherwise agreed, the Applications Maintenance Pool and the Application Support Pool described in Article 5 of this Exhibit A will be used to fulfill Change Orders.
2.4 Service Hours
Except as otherwise noted in the Operations Procedures Manual, the Service Hours for each element of the Base Services will be provided by Perot Systems on a 7 X 24 basis.
2.5 Consolidation and Relocation of Supported Hardware
Perot Systems may install, rearrange and relocate Supported Hardware as Perot Systems deems necessary to provide the Base Services, provided that (i) Perot Systems receives Newco’s prior approval of a material relocation (i.e., from one Data Center to another) and (ii) if Perot Systems initiates the installation, rearrangement or relocation, such actions will be at Perot Systems’ expense.
2.6 Management of Managed Contracts
(a) Perot Systems will manage the Managed Contracts in accordance with the MSA and this Exhibit A, provided that Newco will assist Perot Systems in obtaining the necessary consents from the applicable third party vendors in order for Perot Systems to manage such contracts. Perot Systems shall provide Newco with reasonable notice of any renewal, termination, expiration or cancellation dates and changes in fees with respect to Managed Contracts. Perot Systems shall not renew, modify, terminate or cancel, or allow to lapse (where a renewal is available and Perot Systems has knowledge of such renewal) without notice to Newco, or request or grant any consents or waivers under, any such Managed Contracts without the consent of Newco. If any Managed Contract expires before Newco consents to the renewal of such Managed Contract and Perot Systems has provided timely notice of the pending expiration of the Managed Contract, Perot Systems shall have no liability for failing to meet any Service Level that is not met
12
because such Managed Contract has expired, provided that Perot Systems does not itself provide the services that were being provided under such Managed Contract and has provided Newco with a reasonable list of substitute providers of such services. If Perot Systems modifies, terminates, breaches, cancels or allows to lapse (where Newco, after receiving notice of the pending renewal, has instructed Perot Systems to renew) any of the Managed Contracts without obtaining Newco’s prior written consent, any modification, termination or cancellation or reinstatement fees or charges (including, but not limited to, increased charges incurred as a result of reinstating the applicable contract or entering into a new or replacement contract) imposed upon Newco in connection therewith, and all damages (subject to the provisions of Section 13.1 of the MSA) arising therefrom shall be paid by Perot Systems. The management of Managed Contracts by Perot Systems will include the following:
(i) vendor performance, vendor relationships, vendor negotiations and vendor service delivery improvement plans, where applicable;
(ii) on an annual or more frequent basis, analyzing and recommending to Newco the renegotiations, replacement, or substitution of Managed Contracts so as to improve the delivery of Services to Newco or, in the case of Managed Contracts retained by Newco, lowering Newco’s costs for such contracts; and
(iii) managing transitions (e.g., buy-out/purchase options, implementing new leases, etc.) resulting from expiration or termination of hardware and equipment leases and software licenses, and support agreements, and other similar contracts.
Any changes in suppliers for Managed Contracts must be approved by Newco. Newco shall have the right (but not the obligation) to communicate and interact directly with Third Party Vendors under any Managed Contract; provided that such communication or interaction does not interfere with Perot Systems’ performance of the Managed Contract or this MSA.
(b) In addition to the foregoing, and a part of Perot Systems’ obligation to manage Managed Contracts, Perot Systems shall manage licenses for Supported Software, as follows:
(i) Perot Systems’ responsibilities for managing licenses to Supported Software residing on Supported Servers will include, without limitation:
(1) perform an inventory of the licenses to Supported Software residing on Supported Servers as of the Effective Date;
13
(2) maintain Supported Software license records (but not in the asset database) including the licenses existing as of the Effective Date and for Supported Software:
(A) ordered through Perot Systems, or
(B) procured through Newco with notification to Perot Systems;
(3) maintain the license data necessary to enable Newco to receive upgrades, enhancements, refreshes, replacements, and maintenance for Supported Software as provided or made available by the applicable Third Party Vendor; and
(4) implement the mechanism to limit access to Supported Servers, in accordance with applicable Supported Software license requirements, to authorized End Users only, when such mechanisms are made available to Perot Systems by Newco.
(ii) Newco will:
(1) provide Perot Systems with the information necessary to update the inventory for Supported Software Newco procures directly;
(2) register all Supported Software that is licensed to Newco in accordance with the software vendor’s license terms and conditions;
(3) authorize access for End Users and provide such authorization to Perot Systems (for example, user name, user identification number, user class);
(4) communicate applicable Supported Software license terms and conditions to End Users;
(5) be responsible for End User compliance with all Supported Software license terms;
(6) be responsible for all Supported Software license costs for all Retained Systems Software Licenses and Retained Third Party Application Software Licenses; and
(7) inform Perot Systems of any discontinued or transferred Supported Software licenses and maintenance, if applicable.
14
2.7 Other General Services
(a) Supplies Specifications. Perot Systems will provide Newco with the technical and quality specifications for the supplies, if any, required by Perot Systems to perform the Base Services. Newco will provide, as a Retained Expense, all standard printed forms, printer paper, toner cartridges, print ribbons, tape cartridges and all End User supplies and consumables at the Supported Sites.
(b) Technology. Perot Systems will assist Newco in the review of third party vendor proposals affecting Perot Systems’ provision of the Base Services to facilitate existing and future systems compatibility with changing industry standards. Perot Systems will consult with Newco regarding new telecommunications and data processing systems, as appropriate. Upon request, Perot Systems will provide additional assistance for the implementation of such third party vendor proposals as a Change Order utilizing the Applications Support Pool or as an Additional Service.
(c) Third Party Vendor Liaison and Product Assessment. At least annually and as part of the development of the Annual Technology Plan, Perot Systems will consult with Third Party Vendors providing data processing, telecommunications and other services or products related to Perot Systems’ provision of the Base Services in order to keep abreast and apprise Newco of the latest technological product developments.
(d) Service Review Meetings. Upon Newco’s reasonable request, Perot Systems will coordinate meetings with Newco and any of Perot Systems’ Subcontractors providing Base Services to review service measurements. Perot Systems will participate in service review meetings with vendors and service providers under contract with Newco and who interact with Perot Systems relative to the Base Services, as Newco reasonably requests.
(f) Procurement. At Newco’s written request, Perot Systems shall, as part of the Base Services, use its reasonable commercial efforts to procure third party equipment, software and other products or services on behalf of Newco. Perot Systems shall procure such items as a Pass Through Expense without markup (unless Perot Systems has responsibility for the equipment or software, in which case such items will be purchased by Perot Systems as part of its charges for the Base Services). Nothing in this section obligates Newco to procure any third party equipment, software or other products or services through Perot Systems.
(e) Web Site Services. As part of the Base Services, Perot Systems shall provide Services relating to the hosting and operation of Newco’s web sites listed in Schedule 6.4 (as amended from time to time), which Services include, but are not
15
limited to, procuring, providing, installing and managing the hardware, software, and other materials and devices necessary to implement, operate and maintain the Newco web sites on behalf of Newco consistent with the requirements set forth in Exhibit B. As part of the Base Services, Perot Systems shall provide such assistance as Newco may request, install and configure hardware and software, including, without limitation, server and network hardware, install and integrate security monitoring tools, install and integrate logging and reporting systems, integrate and test all systems relating to the operation of the Newco web sites, and monitor the availability and performance of the Newco web sites and related Supported Software, all in accordance with this Exhibit A.
(g) Hardware and Software Maintenance. As part of the Base Services, Perot Systems shall support and maintain the Supported Hardware and Supported Software, in accordance with this Exhibit A, which support and maintenance shall include, but not be limited to, correcting (or causing a third party to correct) errors, malfunctions and failures of the Supported Hardware and Supported Software that adversely affect the capacity, capability or functionality of the Supported Hardware and Supported Software or Newco’s other systems, hardware, software or networks, and providing (or causing a third party to provide) bug fixes, refinements, improvements, enhancements, or other updates of or to the then-existing features of the Supported Hardware and Supported Software. Perot Systems agrees to license to Newco and the Supported Affiliates, for themselves and Franchisees/Licensees, all Maintenance Modifications and documentation and to provide all such Maintenance Modifications to Newco in source code and object code version via an agreed upon medium.
16
3. HELP DESK SERVICES
3.1 Introduction to Help Desk Services
Perot Systems will provide and manage the help desk (“Help Desk”) described in this Article 3 of Exhibit A and the Operations Procedures Manual to perform the following (collectively, “Help Desk Services”): (i) address End User reported problems and respond to questions concerning the Services (ii) request Services (e.g. IMACs and Break/Fix) and (iii) assist in the resolution of reported problems (or temporary work-arounds) in accordance with the Problem Management Process. In providing the Help Desk Services, to the Help Desk will act as the contact point, via a toll free telephone number provided by Perot Systems, for End Users who require assistance in the resolution of problems, concerns, and questions and to request applicable Services. Calls into the Help Desk will be answered in English. If a problem cannot be resolved by telephone, the Help Desk will handle the problem via the escalation procedures set forth in the Operations Procedures Manual.
3.2 Perot Systems Responsibilities for the Help Desk Services
Perot Systems’ responsibilities for Help Desk Services includes, without limitation:
(a) provide, program and maintain the automatic call distribution equipment Perot Systems utilizes to provide the Help Desk Services;
(b) receive, log and dispatch or transfer Calls, as appropriate;
(c) open a Call record (problem ticket) to document Calls. A Call record may include information such as End User information, Call record number, date and time opened, service requested, problem description or symptoms, Call assignment (for example, Level 2 Support, Level 3 Support), Call status, and Call resolution and closure information;
(d) prioritize Calls in accordance with the Severity Codes;
(e) perform problem analysis, when appropriate, including identification of the source of the problem;
(f) provide Call status as the End User requests;
(g) dispatch or arrange for on-site support, if required, for problem determination and/or resolution;
17
(h) notify the designated Newco contact at affected Supported Sites of Supported Hardware or Supported Software failures in accordance with the process set forth in the Operations Procedures Manual;
(i) provide a status recording for Supported Systems with status information such as known major incidents and estimated recovery times;
(j) interface with and coordinate problem determination and resolution with the designated Newco contact at the affected Supported Site and all applicable Third Party Vendors;
(k) monitor problem status and facilitate problem closure within defined Severity Codes or escalate in accordance with the escalation procedures defined in the Operations Procedures Manual;
(l) provide input to appropriate Newco Personnel on End User training requirements based on problem Call tracking and analysis;
(m) with Newco’s assistance, establish and maintain Call prioritization guidelines and escalation procedures;
(n) develop Help Desk operational processes and procedures and provide to Newco for distribution;
(o) maintain a contact list of Perot Systems’ points of contact, including names and telephone, pager and fax numbers, and provide to Newco for distribution;
(p) communicate to the designated Newco contact at Supported Sites on available Base Services and the procedures for accessing such Base Service;
(q) provide a standard monthly report to Newco summarizing the Calls (by status code) received and handled by the Help Desk for the prior month;
(r) using the information contained in the standard monthly reports, Perot Systems will provide information to Newco on Call trends and make recommendations (for example, additional End User training requirements), where appropriate; and
(s) perform an analysis of Newco’s requirements and propose a solution for a web-based interface (Help Now) to allow submission of problem tickets, checking of problem status, password reset and checking of systems status.
3.3 Newco Responsibilities for the Help Desk Services
Newco will provide or perform the following in order for Perot Systems to perform the Help Desk Services:
18
(a) provide and publish a single toll free telephone number for End Users to contact the Help Desk;
(b) perform all End User training on hardware and software (Perot Systems to train Newco’s training personnel);
(c) maintain and distribute an Newco contact list for Supported Sites and Remote Support Sites, including names and telephone, pager and fax numbers, for use by Help Desk staff to contact appropriate Newco personnel for problem determination assistance and escalation and ensure such personnel are available as required;
(d) assist Perot Systems in establishing Call prioritization guidelines and escalation procedures;
(e) communicate the Help Desk processes for reporting problems and requesting Services to Newco’s End Users;
(f) communicate support responsibilities and procedures to the designated Newco contact at the Supported Sites or the Remote Support Site and applicable Third Party Vendors (for example, providing Call status and resolution to the Help Desk and ensure adherence to such procedures); and
(g) assist Perot Systems, as requested and in a time frame commensurate with the assigned problem Severity Code and associated Service Level commitment, in the resolution of recurring problems which are the result of End User error.
3.4 Help Desk Services in Support of the Data Center Services
(a) Perot Systems’ responsibilities for providing the Help Desk Services in support of the Data Center Services includes, without limitation, the following:
(iv) provide Level 1 Support and coordinate Level 2 and Level 3 Support for the Supported Hardware and Supported Software;
(v) report on the status of batch jobs, upon Newco’s request;
(vi) instruct appropriate PSC Personnel to reset passwords and perform logon ID administration in accordance with Newco-provided security guidelines; and
(vii) at the direction of Newco or as required to meet applicable Service Levels, instruct appropriate PSC Personnel to recycle, start and stop Supported Hardware.
19
(b) Newco’s responsibilities for the Help Desk Services in support of the Data Center Services includes the following:
(i) Newco will provide Perot Systems with the security guidelines, including the Supported System access authorization profiles; and
(ii) Newco will, in its sole discretion, authorize exceptions to the security guidelines.
3.5 Help Desk Services in Support of Desktop Services
(a) Perot Systems’ responsibilities for providing the Help Desk Services in support of the Desktop Services includes, without limitation, the following:
(i) provide Level 1 Support, coordinate Level 2 and Level 3 Support for Supported Desktop Hardware (including handheld rental devices) identified in Attachment A-4 to this Exhibit A;
(ii) instruct appropriate PSC Personnel to perform LAN administration and related security functions (for example, password resets); and
(iii) with respect to desktop hardware other than Supported Desktop Hardware:
(1) provide Level 1 Support, to the extent possible with available Help Desk personnel with knowledge of such hardware;
(2) as appropriate, refer problems or questions to the designated Newco contact at the affected Supported Site or Remote Support Site for resolution; and
(3) dispatch applicable Third Party Vendors to perform on-site services (for example, deskside support, hardware maintenance, IMACs) at Newco’s request and instruction or at Perot Systems’ recommendation (subject to Newco’s consent).
(b) Newco’s responsibilities for the Help Desk Services in support of the Desktop Services includes the following:
(i) communicate the Desktop Standards for Supported Desktop Hardware, Supported Desktop Software and maintenance or repair services to End Users;
(ii) ensure that End Users are authorized to request the maintenance and repair services including the dispatch of Third Party Vendors to provide on-site services; and
20
(iii) with respect to desktop hardware other than Supported Desktop Hardware:
(1) provide all Level 2 and Level 3 Support, and
(2) be responsible for the resolution/closure of any problems or questions referred to Newco by Help Desk staff.
3.6 Help Desk Services in Support of Core Application Services
(a) Perot Systems’ responsibilities for providing Help Desk Services in support of the Core Application Services includes, without limitation, the following:
(i) develop, with Newco assistance, Level 1 Support scripts for use in providing Level 1 Support for End Users’ problems and questions relating to the Supported Software;
(ii) provide scripted Level 1 Support for software other than Supported Software for which Newco provides scripts and training (Perot Systems is not responsible for providing Level 2 or Level 3 Support for such software);
(iii) redirect Calls requiring Level 2 and Level 3 Support to the appropriate Perot Systems application support group for problems and questions relating to the Supported Software; and
(iv) redirect Calls requiring Level 2 and Level 3 Support to the appropriate Newco application support group for problems and questions relating to software other than Supported Software.
(b) Newco’s responsibilities for the Help Desk Services in support of the Core Application Services includes the following:
(i) Newco will provide assistance to Perot Systems in the development of Level 1 Support scripts for Supported Software.
21
4. DATA CENTER SERVICES
4.1 Introduction to Data Center Services
Perot Systems will perform the activities described in this Article 4 of Exhibit A and the Operations Procedures Manual in support of the Supported Hardware, Supported Software and related environments located at the Data Centers (the “Data Center Services”). Responsibilities for the Data Center Services include the following:
(a) establishing and maintaining a properly trained and adequate staff at the Data Centers, including necessary management and support staff; and
(b) management of the Supported Servers (including the mainframe until decommissioning), which consists of End User registration, creating and maintaining End User profiles, granting End User access and authorization, providing ongoing End User password support, announcing and providing new networking services for End Users and providing administrative support for certain Supported Servers (for example, print, file, directory, e-mail).
4.2 Management and Control of the Data Center Services (including applicable Systems Management Controls)
Each party’s responsibilities for the management and control of the Data Center Services and Systems Management Controls applicable to the Data Center Services are described below.
(a) End User administration activities.
(i) Perot Systems’ responsibilities for performing End User administration activities will include, without limitation, the following:
(1) maintain access controls and provide individual and group access to LAN and Supported Servers to End Users and PSC Personnel;
(2) register new End Users and delete existing IDs and accounts as Newco requests;
(3) assign and change End User passwords;
(4) adhere to Newco’s standard naming convention when adding or deleting resources; and
(5) with respect to Supported Servers:
22
(A) create and maintain user groups;
(B) create and maintain user profiles;
(C) create and maintain configuration files located on Supported Servers for client machines;
(D) assign and delete home directories;
(E) manage queues for shared printers;
(F) manage directory service;
(G) enable and disable shared resources;
(H) create and maintain user login and logon scripts;
(I) manage and maintain Data Network connectivity between Perot Systems and Newco;
(J) have root authority and password authority;
(K) monitor the amount of utilized Supported Server disk space; and
(L) provide access to End Users to print, file, directory and e-mail services.
(ii) Newco will provide or perform the following:
(1) provide designated PSC Personnel with supervisor-equivalent IDs and passwords where required to provide the Services;
(2) provide Perot Systems with user and group access authorizations;
(3) define and provide to Perot Systems Newco’s standard naming conventions;
(4) with respect to Supported Servers, Newco will:
(A) provide directory structure requirements;
(B) designate the amount of Supported Server disk space to be allotted to End Users;
(C) provide Perot Systems with applicable Supported Software vendor license agreements for Supported Software residing on Supported Servers, as required;
23
(D) maintain financial responsibility for the Data Network connectivity between Perot Systems and Newco; and
(5) for Supported Servers located at Remote Support Sites, Newco will:
(A) designate an Newco contact at each Remote Support Site to provide on-site assistance with Supported Server administrative functions (for example, recycle, power on and off for equipment, and inspect cable connections);
(B) provide a phone number, e-mail address or fax number to enable Perot Systems’ Supported Server administration specialist to communicate with Newco’s support personnel located at Remote Support Sites;
(C) for dial-up services, provide and maintain the required hardware and acceptable data transmission phone lines for remote access and paging; and
(D) pay all telecommunication charges associated with dial-back equipment and pager phone calls.
(b) Configuration Management
(i) Perot Systems will maintain documentation for the following:
(1) Supported Systems configuration;
(2) Data Network operating systems configuration;
(3) backup and restore processes;
(4) Supported Hardware configuration reports; and
(5) With respect to Supported Servers:
(A) protocol details;
(B) user group definitions;
(C) user definitions;
(D) addressing schema;
(E) disk space mappings; and
24
(F) access rights reports.
(ii) Newco will provide Perot Systems with existing documentation and future requirements, as available, for the following:
(1) Supported Systems configuration;
(2) Data Network operating systems configuration;
(3) backup and restore processes;
(4) Supported Hardware configuration reports; and
(5) With respect to Supported Servers:
(A) protocol details;
(B) user group definitions;
(C) user definitions;
(D) addressing schema;
(E) disk space mappings;
(F) Supported Hardware configuration reports; and
(G) access rights reports.
(c) General logical and physical management for Supported Servers
(i) Perot Systems’ responsibilities will include, without limitation, the following for Supported Servers:
(1) perform initial Supported Server configuration for the installed operating system;
(2) setup addresses; and
(3) monitor Supported Servers and log logical access to Supported Server resources.
(ii) Newco will:
(1) provide the required physical environment for Supported Servers located at the Newco Supported Sites and provide Perot Systems with access to such resources;
25
(2) provide Perot Systems with the Supported Server configuration (hardware components, software and communication devices) for each Newco Supported Site; and
(3) provide Perot Systems (as appropriate) with drawings of each Newco Supported Site. Such drawings should include detail, for example, on partitions, doors, equipment racks, electrical power receptacle locations, phone jack locations, telecommunications port locations, Supported Server port locations, and room designations.
(d) Change Management
(i) Perot Systems’ responsibilities for Change Management will include, without limitation, the following:
(1) with Newco, develop procedures for handling planned and emergency changes affecting the Supported Systems, including review, approval, communication and proper documentation;
(2) communicate changes made by Perot Systems affecting the Supported Systems in accordance with the Change Management procedures contained in the Operations Procedures Manual and in Exhibit F;
(3) record and track approved change requests;
(4) schedule or manage testing and implementation of approved changes, including communication to and coordination with affected Newco business units;
(5) evaluate planned changes to the Supported Systems and advise Newco of any requirements to support such changes;
(6) provide automation scripts, where possible, for tasks associated with a change;
(7) receive and handle notification of related change activity;
(8) provide a test environment and evaluate applications and Tools configuration before integrating the same into the production environment;
(9) track change history of managed resources; and
26
(10) provide standard Change Management reports as set forth in the Operations Procedures Manual.
(ii) Newco will:
(1) assist Perot Systems in developing procedures for handling all planned and emergency changes affecting the Supported Systems including review, approval, communication and proper documentation; and
(2) notify Perot Systems of any planned or emergency changes to Newco’s environment affecting Perot Systems’ provision of the Services.
(e) Performance Management
(i) Perot Systems’ responsibilities for Performance Management will include, without limitation, the following:
(1) With Newco’s assistance, define performance indicators and monitor Supported Systems performance against such indicators;
(2) install management agents provided by Newco;
(3) take appropriate action (for example, tuning, and notifying the Newco Project Executive) when Supported Systems’ performance is negatively impacted;
(4) with Newco’s assistance, establish a schedule for performing Supported Systems’ maintenance (for example, virus detection, backup, DASD cleanup, and testing) and modifications and enhancements;
(5) advise Newco of any required Supported System configurations and/or modifications necessary to enable Perot Systems to meet the Service Levels;
(6) provide standard performance reports;
(7) With respect to Supported Servers:
(A) review configuration data and usage patterns;
(B) establish performance thresholds and exception reporting procedures;
(C) with Newco’s approval, establish a schedule for performing Supported Server maintenance (for example, virus
27
detection, backup, disk space cleanup, and testing such as defragmentation) and modifications and enhancements so as to minimally impact End Users;
(D) perform required operating system configurations and modifications as necessary: and
(E) provide proper power protection equipment at Perot Systems’ Data Centers (for example, battery and power surge protection).
(ii) Newco will
(1) assist Perot Systems in establishing a schedule for performing Supported Systems maintenance (for example, virus detection, backup, DASD cleanup, testing and testing such as defragmentation) and modifications and enhancements so as to minimally impact End Users;
(2) provide proper power protection equipment at Newco Data Centers (for example, battery and power surge protection); and
(3) be responsible for all costs associated with providing Supported Server hardware, software and Data Network connectivity required by Perot Systems to provide the Base Services.
(f) Problem Management
(i) Perot Systems’ responsibilities for Problem Management will include, without limitation, the following:
(1) perform Problem Management tasks including real-time mainframe and Supported Server monitoring, problem identification, reporting, logging, tracking, resolution, communication and escalation for problems; and
(2) with Newco’s assistance:
(A) review and update from time to time problem priority levels and associated escalation procedures for inclusion in the Operating Procedures Manual;
(B) review and update from time to time backup and recovery processes and procedures for Critical Services for inclusion in the Operating Procedures Manual;
28
(C) define indicators to monitor;
(D) define alert and paging processes and procedures, including escalation procedures;
(E) develop and maintain a plan that enables the recovery of Newco Data due to unplanned operational types of failures such as equipment malfunction, temporary power disturbances and abnormal termination; and
(3) assign ownership and priority for each reported problem, in accordance with the Problem Management procedures set forth in the Operations Procedures Manual.
(ii) Newco will assist Perot Systems with the following:
(1) defining problem priority levels and associated escalation procedures for inclusion in the Operations Procedures Manual;
(2) establishing backup and recovery processes and procedures for the Critical Services (including Supported Servers that Newco identifies as Critical Services) for inclusion in the Operations Procedures Manual;
(3) defining indicators to monitor;
(4) defining alert and paging processes and procedures; including escalation procedures; and
(5) developing and maintaining a plan that enables the recovery of data due to unplanned operational types of failures such as equipment malfunction, temporary power disturbances and abnormal termination.
(iii) Newco will provide or perform the following:
(1) provide to Perot Systems a list of the designated Newco contact(s) at each Remote Support Site for purposes of assisting with problem resolution and escalation, if required, including any updates as they occur;
(2) ensure the appropriate Newco Personnel are available to interface with Perot Systems to resolve complex Data Network problems affecting Perot Systems’ provision of the Services; and
29
(3) with respect to Supported Servers:
(A) identify the Supported Servers (i.e., Critical Services) requiring backup and recovery and provide all required hardware and software necessary to implement the backup and recovery of such Supported Servers;
(B) provide for an environment to protect the backup tapes for recovery purposes;
(C) for those problems that are transferred to Newco for resolution, notify Perot Systems of the resolution; and
(D) provide Supported Server backup systems and tapes.
(g) Capacity Planning
(i) Perot Systems’ responsibilities for Capacity Planning will include, without limitation, the following:
(1) notify Newco when any Supported Server reaches the mutually agreed critical usage levels and that additional capacity is required to perform the Base Services in accordance with the Service Levels; and
(2) monitor and document Newco’s current Supported Server workloads and provide the information to Newco for use in determining future capacity requirements.
(ii) Newco will:
(1) pay for any additional capacity for any Supported Server that has reached critical usage levels and is impacting Perot Systems’ ability to provide the Base Services;
(2) project Supported Server performance, and capacity and throughput for new Supported Software before promotion into the production environment; and
(3) project future Supported Server-based trends and capacity requirements for new projects and provide such information to Perot Systems as it pertains to the Base Services.
(h) Installation Services for the Supported Servers
30
(i) Perot Systems’ responsibilities for installing Supported Services will include, without limitation, the following:
(1) plan for, install, and configure Supported Software on Supported Servers in the Data Centers, provided however that installation of new Supported Servers will be provided utilizing the Application Support Pool or as a Additional Service;
(2) communicate to the designated Newco contact at Supported Sites, via the Change Management process, any installation prerequisites (for example, additional disk space and memory) and any post install procedures that need to be followed after the installation is completed; and
(3) Provide coordination for installations of Supported Hardware and Supported Software (e.g., wiring, facilities, floorspace, and power).
(ii) Newco will:
(1) provide Perot Systems with operating system Supported Software installation and customization business requirements;
(2) provide the required network connectivity and bandwidth; and
(3) ensure compliance by End Users and Newco ‘s business units, via the Change Management process, with any communicated installation prerequisites and post install procedures.
(i) Availability Management for the Data Network
(i) Perot Systems’ responsibilities for the availability of the Data Network will include, without limitation, the following:
(1) assist Newco in defining Newco’s Data Network availability requirements;
(2) develop an availability plan;
(3) track, analyze and report on availability;
(3) contact the appropriate Third Party Vendor to provide Data Network Supported Hardware and Supported Software maintenance in accordance with the equipment manufacturer’s specifications;
31
(4) provide required support procedures regarding the Data Network to Newco; and
(5) recommend Data Network availability improvements.
(ii) Newco will:
(1) with Perot Systems’ assistance, define Newco’s availability requirements for the Data Network;
(2) ensure the appropriate Newco Personnel are available to interface with Perot Systems Personnel, as required, to isolate or resolve complex Data Network, operational or software problems affecting the Data Network; and
(3) provide proper power protection equipment (for example, battery and power surge protection) for the Data Networks.
(j) Data Management for the Supported Servers
(i) Perot Systems’ responsibilities for Newco Data management will include, without limitation, the following:
(1) with Newco, establish and document in the Operations Procedures Manual, the frequency and types of required data backup as well as the retention periods for Newco Data; and
(2) perform backup and recovery for Newco Data residing on Supported Servers, including interfacing with Newco -specified tape storage facilities, if any.
(ii) Newco will:
(1) define the frequency and types of required Newco Data backup as well as the retention periods for such data; and
(2) provide the required tape storage facilities.
(k) SYS/M Administration and Management
(i) Perot Systems’ responsibilities for Newco’s SYS/M mail application (“SYS/M”) will include, without limitation, the following:
(1) Install hot fixes, patches and service packs for the currently installed version of SYS/M, as required;
(2) Install major version upgrades to SYS/M as a Change Order utilizing the Application Support Pool or as an Additional Service;
32
(3) Respond to and resolve SYS/M problems including, connectivity, mail flow and performance problems;
(4) Monitor the utilization of SYS/M in terms of the number of End Users, the amount of free space per Supported Server, and the size of the database. Notify Newco if additional hardware resources are required;
(5) Monitor and maintain the SYS/M databases. Compress the databases as required;
(6) Monitor SYS/M mail system application availability and initiate corrective action, as required;
(7) Respond to requests from Newco related to security breaches;
(8) Backup and restore the SYS/M application and data;
(9) Add/delete mailboxes;
(10) Add/delete End User’s IDs;
(11) Perform name changes;
(12) Monitor event logs for unusual errors or indications;
(13) Comply with and enforce SYS/M standards provided by Newco; and
(14) Support the SYS/M to Exchange bridge application.
(ii) Newco will:
(1) Provide software releases and licensing necessary for Newco SYS/M; and
(2) Establish standards for the SYS/M environment and communicate changes to Perot Systems.
(l) Microsoft Exchange Management and Administration
(i) Perot Systems’ responsibilities for Newco’s Microsoft Exchange Supported Software application will include, without limitation, the following:
(1) install hot fixes, patches and service packs for the currently installed version of the Microsoft Exchange Server application, as required;
33
(2) upon Newco’s request, install major version upgrades to the Microsoft Exchange Server Application as a Change Order utilizing the Application Support Pool or as an Additional Service;
(3) respond to and resolve Microsoft Exchange problems including, connectivity, mail flow, replication and performance problems for the Supported Sites and escalate Microsoft Exchange problems to the appropriate Third Party Vendors for resolution when necessary;
(4) using standard monitoring tools, monitor the utilization of Microsoft Exchange in terms of the number of users per Supported Server, the amount of free space per Supported Server, and the size of the database per Supported Server, and notify Newco if additional Supported Servers are required;
(5) monitor and maintain the Newco Microsoft Exchange databases. Compress the databases as required;
(6) monitor mail system application availability on all Supported Servers that host Microsoft Exchange and initiate corrective action, as required;
(7) monitor mail system queues on all Supported Servers that host Microsoft Exchange and initiate corrective action, as required;
(8) monitor public folder replication and take corrective action, as required;
(9) respond to requests from Newco related to security breaches;
(10) backup and restore the Microsoft Exchange application and data;
(11) add/delete mailboxes;
(12) add/delete End User’s IDs;
(13) maintain Group IDs (Newco Manages Group content);
(14) perform name changes;
(15) perform mail directory updates, and maintain their associated lists (i.e. for Exchange, the global address list);
(16) monitor event logs for unusual errors or indications; and
(17) Install and maintain the Microsoft Exchange client software.
34
(ii) Newco will:
(1) be financially responsible for providing and maintaining the Microsoft Exchange client software licenses;
(2) provide software releases and licensing necessary for Newco Microsoft Exchange server application; and
(3) define standards for the Microsoft Exchange environment and communicate changes to Perot Systems.
4.3 Description of Data Center Services
Perot Systems will perform the following Data Center Services for the Supported Systems located at the following Supported Sites (the “Data Centers”): Perot Systems’ Plano Technology Center (PTC), Perot Systems’ Richardson Information Management Facility (RIMF), Ft. Lauderdale (Plaza), Ft. Lauderdale (Data Center), Boca Raton, FL (formerly T-Rex now located on Blue Lake Drive), Salt Lake City Reservation Center, Minneapolis Reservation Center, Goose Creek Reservation Center, Etobicoke, Toronto, Canada and/or such other locations that are added as Supported Sites during the Term in accordance with the MSA.
(a) Processing Operations at the Data Centers.
(i) Perot Systems’ responsibilities for processing operations at the Data Centers will include, without limitation, the following:
(1) support the test, production, quality assurance, training and development Supported Systems environments;
(2) provide computer operations support and perform console monitoring activities;
(3) operate and provide Supported Software application availability to present and future Supported Software to support the operating schedules of Newco in accordance with the Service Levels;
(4) with the approval of the Newco Project Executive, schedule Supported Systems maintenance so as to minimize interference with Newco ‘s business operations;
(5) regularly monitor End User submitted job submissions and scheduled job submissions to verify that these jobs are successfully completed as time permits in view of competing production resources; and
35
(6) make available, monitor and process on-line and batch Supported Software applications, including scheduled, unscheduled and on-request as well as End User initiated processing.
(ii) Newco will be responsible for selecting, or defining requirements for, all Supported Software. Upon agreement of the Parties through the Change Order Process, Perot Systems will operate new Supported Software selected by Newco, provided such Supported Software is compatible with the operating environment.
(b) Production Control Services at the Data Centers.
(i) Perot Systems’ responsibilities will include, without limitation:
(1) schedule, control and monitor the running of production jobs in the Data Center using scheduling and quality control procedures as specified in the Operations Procedures Manual;
(2) prioritize and schedule batch jobs and report distribution systems subject to Newco’s schedule parameters including automated scheduling features in the Applications Software and Newco’s specific directions, so on-line Supported Software applications dependent on batch processing and batch process outputs will be available as scheduled;
(3) obtain Newco approval for and distribute major production control schedules before implementation, as specified in the Operations Procedures Manual;
(4) update the scheduler database, as required, to reflect changes to the production environment;
(5) monitor scheduler related incidents, and develop and recommend refinements and revisions to the scheduler database;
(6) provide requirements for job ABEND restart instructions;
(7) coordinate and modify schedules for special requests, follow Newco priorities and notify Newco if special requirements will affect the timely completion of other tasks (so that Newco may adjust its priorities);
(8) to the extent reasonably possible, process special request activities within the requested time frames and in the sequence Newco defines; and
36
(9) maintain production schedules and cooperate with Newco in responding to special processing requests and new processing requirements.
(ii) Newco will:
(1) review and approve the process for batch job submission, including scheduling (when can jobs run) and exceptions; and
(2) provide change requirements to the batch schedule in accordance with the Change Management process.
(c) Systems and Technical Support for the Data Centers.
(i) Perot Systems’ responsibilities for technical support for the Supported Systems will include, without limitation, the following:
(1) for new Supported Hardware products ordered by Perot Systems through Newco’s procurement function, designate a Perot Systems focal point to:
(A) receive the order(s) at the Perot Systems’ work location;
(B) reconcile the shipping documentation to the products actually received;
(C) verify that the ordered product was received in operating condition;
(D) execute an Order/Confirmation (as provided by Newco) and notify Newco procurement of any inaccuracies or items damaged during shipment; and
(E) sign and forward all correct Order/Confirmations within five business days of receipt;
(2) perform technical Supported System support operations, including DASD management, Supported System programming (mainframe only), Supported Server administration, capacity planning and performance tuning for the Supported Software;
(3) upon request, provide support for the refresh of the Supported Systems environments (test, QA, training, development, etc.) (applicable data and code);
(4) provide support for the Supported Hardware and the Supported Software;
37
(5) evaluate, recommend, install and maintain the Supported Software and Supported Hardware;
(6) apply preventive maintenance and program temporary fixes provided to Perot Systems for no additional charge to correct defects in the Supported Software;
(7) provide or obtain new versions and releases, upgrades or replacements of mainframe and Supported Software;
(8) support the operating systems and subsystems, compilers, programming languages, middleware and operational tools; and
(9) perform major version upgrades of the Supported Software as a Change Order utilizing the Application Support Pool or as an Additional Service.
(d) File Services at the Data Centers
(i) Perot Systems’ responsibilities for Newco’s files located at the Data Centers will include, without limitation, the following:
(1) keep files under Perot Systems’ control, maintain currency of such files and make available during scheduled access times;
(2) initiate and complete required data processing activities concerning data integrity (for example, handling line transmission errors) of the processed files, according to the procedures specified in the Operations Procedures Manual;
(3) verify, using tools and procedures specified in the Operations Procedures Manual, the receipt of incoming files and the processing and transmission of outgoing files;
(4) document, maintain and, as appropriate, update and execute mutually approved file backup and recovery procedures;
(5) provide a recovery procedure for restoring the data image to a previous level within a mutually agreed time frame;
(6) conduct regularly scheduled backup and recovery procedures as specified in the Operations Procedures Manual and as prioritized by Newco (for example, data set restore), so as to avoid impacting scheduled operations, and provide recommendations to Newco regarding backup and recovery considerations such as improved levels of protection, efficiencies and cost reductions;
38
(7) conduct routine monitoring and corrective action according to procedures Perot Systems prepares and Newco approves for intermediate files used for on-line and batch processing;
(8) verify availability of adequate file space for processing; and
(9) report to Newco on Newco’s disk space utilization and requirements for Newco’s planning purposes.
(ii) Newco will:
(1) define requirements for job recovery management; and
(2) define requirements for file backup and recovery procedures.
(e) Tape Management Services
(i) Perot Systems’ responsibilities for managing Newco’s tapes at the Data Centers will include, without limitation, the following:
(1) retain tapes for a mutually agreed retention period for auditing purposes;
(2) rotate tapes, as required, for off-site storage;
(3) log and track physical tapes that are checked in and out of the Data Center by Newco or a Third Party in accordance with the procedures specified in the Operations Procedures Manual;
(4) store tapes and paper documentation, as appropriate, at the off-site storage facility specified by Newco;
(5) notify Third Party tape storage provider when it is time to scratch or return a tape in accordance with the procedures specified in the Operations Procedures Manual;
(6) complete tape mounts in sufficient time to meet production processing requirements in accordance with the Service Levels;
(7) provide tape specifications to Newco;
(8) maintain adequate supplies for the tape environment and provide a sufficient scratch tape pool to service required processing needs, and notify Newco when additional tapes and other supplies are required;
39
(9) retrieve archived tapes and restore required files and data sets within mutually agreed time frames;
(10) upon Newco’s reasonable request, allow Newco to review tape management operations, including mailing and receipt control; and
(11) report tape utilization to Newco.
(ii) Newco will:
(1) define requirements for off-site tape storage and archiving;
(2) provide the required off-site tape storage facilities and services;
(3) provide tapes as Perot Systems requests that meet the Perot Systems-provided tape specifications; and
(4) be responsible for the costs associated with the transportation of tapes between the Data Center and an off-site storage facility.
(f) Database Management Services
(i) Perot Systems’ responsibilities for managing Newco’s database environments will include, without limitation, the following:
(1) participate in planning for changes in the size of databases due to business growth or reduction and applications development projects, and review Newco’s plans on a regular basis;
(2) provide physical and operating systems database support for Newco’s database environments and those databases Perot Systems establishes at Newco’s direction;
(3) in cooperation with Newco, monitor and report database performance and database space utilization and identify and recommend practical modifications for improved performance, and, implement reasonable modifications as approved by Newco;
(4) maintain and implement mutually agreed database archive processes and procedures;
(5) maintain mutually agreed database backup procedures, based upon requirements provided by Newco, to recover from a database outage or corrupted database within time frames specified in the Operations Procedures Manual;
40
(6) maintain physical database definitions and make such definitions available to Newco upon request;
(7) promote Newco-approved database changes into the production environment;
(8) be responsible for logical and physical database design and data modeling and cooperate with Newco during physical database design and review;
(9) in cooperation with Newco, maintain the standard database access routines application development and maintenance, and document any changes to such routines; and
(10) assist in problem determination and resolution of database management system issues including escalation to the applicable Third Party Vendor for the affected Supported Software.
(ii) Newco will:
(1) define database backup and recovery requirements;
(2) provide requirements for changes and upgrades to the databases; and
(3) define and approve database security requirements.
(g) Output Services
(i) Perot Systems’ responsibilities for output device processing will include, without limitation, the following:
(1) produce and deliver output (for example, files, tapes, microfiche files, printed matter) in accordance with the Service Levels;
(2) track, manage, communicate and resolve problems related to output production and delivery;
(3) separate, package, label, scan and track tape output and distribute to the mutually agreed distribution drop point in accordance with the Service Levels;
(4) verify that the files are on the queue and available for transmission to the applicable Newco output and production control locations within the mutually agreed time frames and monitor file transmissions and network messages regarding network connectivity;
41
(5) deliver hard copy output to the designated drop location(s) within the designated Data Center;
(6) work with appropriate Newco Personnel to trace and attempt to find missing output items; and
(7) execute reruns of output Newco requests and notify Newco if rerunning any output will impact scheduled on-line or batch production processing.
(ii) Newco will:
(1) provide output distribution from the designated drop location(s) within the designated Data Center;
(2) with Perot Systems’ assistance, trace and attempt to locate missing output items;
(3) notify Perot Systems of any required reruns of output;
(4) be responsible for all distribution services (for example, mail, messenger, postage, courier); and
(5) be responsible for microfiche and microfilm supplies, and retrieval and storage of output.
42
5 CORE APPLICATION SERVICES
5.1 Core Application Services Overview
The Core Application Services performed by Perot Systems comprise the following categories of Services, all as described herein, in Support of the Supported Software and Developed Software (the “Core Application Services”):
(a) Break/Fix
(b) Ad-Hoc
(c) Maintenance
(d) Enhancement/New Development
Requests for Ad-Hoc, Maintenance and Enhancement/Development will be initiated by either Party in accordance with Change Control Process described in Exhibit F. Except as otherwise agreed, requests for Break/Fix will be initiated by either Party in accordance with the Problem Management process as set forth in the Operations Procedures Manual. Perot Systems shall perform all Core Application Services as authorized and prioritized by Newco. Newco shall manage the business priorities for Change Orders, including realigning priorities within the entire portfolio of the above categories of Core Application Services. In the event that such actions are disadvantageous or impractical, then Perot Systems shall recommend to Newco project management actions, which may include reprioritization of Change Orders and revision of requirements, provided that Newco shall direct Perot Systems regarding implementing any such recommendations.
5.2 Perot Systems Responsibilities for the Core Application Services
Perot Systems’ overall responsibilities for the Core Application Services will include the following:
(a) determine requirements/specifications prior to producing a Rough Order of Magnitude Estimate (as defined in Exhibit F) or Change Order, and continue to update such requirements/specifications throughout the Change Order life cycle;
(b) track updates to create an audit trail of the changes to Change Orders;
(c) develop, integrate, and maintain Supported Software in accordance with Newco’s strategies, principles, and standards set forth in the Operations Procedures Manual relating to technical, data and Supported Software architectures;
43
(d) use technologically current (e.g., design, development, integration, maintenance, test) tools and programming languages as appropriate to produce overall (i.e., in the aggregate) improvement in programmer productivity, code stability and reusability;
(e) determine if modifications or alternatives to Change Orders will be more cost effective to Newco and propose such cost effective modifications or alternatives to Newco, and implement such changes or alternatives as approved by Newco;
(f) based on the contents of each release for Supported Software, schedule releases (i.e., implementing changes into production) on a periodic basis as agreed to by the Parties. Newco and Perot Systems shall lock down final release content two (2) weeks prior to the implementation dates. Exceptions to this schedule must be approved by Newco, and may include emergency changes for Supported Software in accordance with the Change Management process;
(g) provide soft-copy versions of all documents arising from or related to a Change Order to Newco;
(h) within 90 days of the Effective Date, evaluate Newco’s testing environment and provide Newco a written evaluation of suggested improvements;
(i) maintain a copy of the Supported Software library as of the Effective Date (the “Initial Applications Software Library”);
(j) comply with Newco’s backup procedures set forth in the Operations Procedures Manual;
(k) maintain, store, catalog and archive Supported Software code (both source and executable) that comes into the possession of Perot Systems, taking into consideration the media on which such source code exists;
(l) develop and document deliverables under a Change Order in accordance with architectures and standards as set forth in the Operations Procedures Manual;
(m) perform Core Application Services so as to minimize disruption to production Supported Software, Supported Hardware and End Users;
(n) assist Newco in determining the requirements for, and participating in, the development and execution of End User training for the business system(s) resulting from Change Orders, including train the trainer, self-study guides and computer-based training consistent with the requirements of the Change Orders;
44
(o) monitor trends within Newco’s industry and related industries and work with Perot Systems in developing strategic plans for information technology;
(p) from time to time during the Term, identify opportunities for improvement within the then-current suite of Supported Software applications, including documenting and prioritizing activities which may result better performance or efficiency;
(q) provide training to Newco’s trainers who will in turn implement End User training;
(r) perform training as requested and prioritized by Newco, if such training is part of a Change Order;
(s) with respect to any missing source code to Supported Software, Perot Systems will perform the following:
(i) if the missing source code is for VRS, Perot Systems will recover the missing source code and will be responsible for all costs incurred in such recovery;
(ii) if the missing source code is for the Legacy Systems, Perot Systems will assist Newco in the recovery of such source code; or
(iii) if the missing source code is for Supported Third Party Systems Software or Supported Third Party Applications Software, Perot Systems will contact the applicable vendor to recover the missing source code, if available.
Perot Systems will conduct a source code inventory of the Ancillary Applications within 90 days of the Effective Date and will work with the applicable Third Party Vendor to recover any missing source code, if such source code is available; and
(t) perform source code audits as requested and prioritized by Newco and Perot Systems;
(u) develop, and thereafter maintain, a knowledge base of documentation gathered throughout the project’s life and allow for re-use of such documentation for future projects;
(v) perform the Core Application Services for Enhancement/New Development Change Order in accordance with the Development Methodology described in the Operating Procedures Manual; and
(w) utilize the applicable source code, version and release control processes and tools that are in use by Newco as of the Effective Date to perform Core Application
45
Services or, subject to Newco’s approval, utilize Perot Systems processes and tools that are no less rigorous than such Newco processes and tools.
5.3 Application Support Pool and Application Enhancement Pool
As part of the Core Application Services, Perot Systems will provide the following pools (“Pools”) of PSC Personnel to perform work activities described in this Exhibit A. The Pools will work primarily on Core Application Services activities, but may work on other activities in support of Supported Hardware, subject to the Change Control Process set forth in Exhibit F.
(a) Application Support Pool. Perot Systems will provide a pool of PSC Personnel (the “Application Support Pool”) to perform Break/Fix, Maintenance and Ad-Hoc or other Changes as directed and prioritized by Newco. During each month of the Term, Perot Systems will provide the number of PSC Personnel for the Application Support Pool in accordance with the baseline set forth in Attachment C-2 to Exhibit C.
(b) Application Enhancement Pool. Perot Systems will provide a pool of PSC Personnel (the “Application Enhancement Pool”) to perform Enhancement/New Development or other Changes as directed and prioritized by Newco. During each month of the Term, Perot Systems will provide the number of PSC Personnel for the Application Enhancement Pool in accordance with the baseline set forth in Attachment C-2 to Exhibit C.
5.4 General Pool Management and Reporting
Perot Systems will perform the following responsibilities to assist Newco in properly allocating resources:
(a) Each month or as otherwise agreed, Perot Systems will perform the following:
(i) Track and report to Newco the Labor Hours expended from the each of the Pools categorized by Break/Fix, Ad Hoc, Enhancement/New Development, and Maintenance. Labor Hours from the Application Support Pool should reflect total hours by team (e.g., reservations, rent, fleet, RMS, etc) and by category and number of Change Orders within each category (i.e., Break/Fix, Ad Hoc, Enhancement/New Development and Maintenance). For Change Orders (except for Fixed Price Changes), reporting will further be detailed by Labor Hours expended on each milestone described in the applicable Change Order. Detail by specific Change Order tasks will be available upon request (except for Fixed Price Changes), but will not be included in regularly scheduled reporting. Such
46
time reporting shall be standardized, uniform and detailed to reasonably describe the work performed as documented in the Operations Procedures Manual. Reporting processes and the types and definition of the relevant reports will be defined in the Operations Procedures Manual.
(ii) Review with Newco all Change Orders and Change Initiation Requests to assist Newco in assessing if the then-current Pool staffing / allocations are sufficient to meet Newco’s business needs.
(b) Each month or more frequently, as mutually agreed by the Parties, Perot Systems will provide Newco a forecast of the next month’s time reporting for Break/Fix, Ad Hoc, Enhancement/New Development, and Maintenance. After each month, provide Newco with a written time report and a comparison of forecasts versus actual hours worked (in the above categories).
(c) At least once each calendar quarter or otherwise upon the reasonable request of Newco, review with Newco, by Supported Software application, all outstanding Change Orders to determine if the then-current Pool allocation is appropriate to meet Newco’s then-current priorities and requirements. As part of this review, update and confirm with Newco the current Pool staffing plan with a projection of the anticipated Pool staffing for the next quarter required to perform Core Application Services for Newco’s review for potentially reallocating hours based on current priorities.
(d) Assess the impact of Change Orders on existing and planned Pool resource levels. This will occur during the planning periods and as Newco identifies changes to the Change Orders. At the conclusion of this assessment, Perot Systems will provide Newco with solution options that include:
(i) redirecting investment levels within the applicable Pool baseline;
(ii) increasing support above the applicable Pool baseline; and
(iii) developing a mutually agreed plan to implement such options.
5.5 Supported Software Support
Perot Systems will provide Newco with technical support and advice on Supported Software as described below:
(a) Supported Third Party Systems Software:
(i) Perot Systems will make available the Third Party Systems Software applications listed in Schedule 6.4(a) to support the development of
47
Developed Software. Perot Systems will not discontinue use of a particular Supported Third Party Systems Software application without Newco’s approval; provided, that Newco will assume support expenses for Supported Third Party Systems Software applications that Newco requires Perot Systems to retain after the manufacturer withdraws its support.
(ii) In the event that Perot Systems desires to discontinue use of a particular Supported Third Party Systems Software application, Perot Systems may offer to migrate Newco to another software application having similar functions at Perot Systems’ expense, and Newco will not unreasonably withhold its approval of such migration.
(iii) If Newco requests additional application development support products, such request will be considered as an Additional Service.
(b) Presentations to Newco:
(i) At least annually as part of the Technology Plan or more frequently as the Parties agree as part of a Change Order or as an Additional Service, Perot Systems will gather information on the use and functions of new hardware and software products. Perot Systems will present Newco with any information Perot Systems regards as relevant to Newco’s business regarding the use and functions of such new products and services to a mutually agreed number of End Users.
(ii) At Newco’s request, Perot Systems will send representatives to scheduled End User meetings.
(iii) Perot Systems will identify the Perot Systems technical team responsible for coordinating aspects of the technical operations and support related to the Base Services. The technical team will coordinate the systems support for Newco and will be Newco’s interface to the Perot Systems support structure. The Operations Procedures Manual will contain the contact list and organizational structure for the technical team.
(c) Supported Software Verification:
Perot Systems’ responsibilities for verifying Supported Software will include, without limitation, the following:
(i) provide Supported Software program problem determination and resolution, including providing support for Supported Software ABENDs and job recovery;
48
(ii) minimize outages caused by Supported Software failures; and
(iii) upon request of Newco and subject to the Change Control Process, Perot Systems will operate new software applications selected by Newco, provided such software is compatible with Newco’s operating environment.
5.6 Newco Responsibilities for Supported Software
(a) Newco’s responsibilities for Supported Software will include the following:
(i) during the Term, select, or define the requirements for the Supported Software. Newco will designate and document application information requirements, including report design and content, frequency of reports, and accessibility to information;
(ii) retain responsibility for license and related charges, including maintenance fees, and for prioritizing the workload of the Application Support Pool necessary to maintain and support Supported Software;
(iii) provide Perot Systems with access to the source code for the application load modules executed in the Supported Software production environment, as required by Perot Systems to provide the Base Services, to the extent that Newco can provide such source code or access;
(iv) enhance Retained Supported Software applications as indicated by performance evaluations at the request of Perot Systems and approved by Newco; and
(v) have the right to audit, control and approve new Supported Software before its promotion into production.
(b) Newco responsibilities for verifying Supported Software will include the following:
(i) verify and evaluate any operating Supported Third Party Systems Software and hardware changes recommended by Perot Systems;
(ii) follow the Change Control Process for all Supported Software changes, before submission or installation into the Supported Systems environment;
(iii) follow the Problem Management process, according to published problem resolution criteria contained in the Operations Procedures Manual and document problem resolution and closure;
49
(iv) certify, in cooperation with Perot Systems, that existing Supported Software applications function correctly when Perot Systems installs new Supported Third Party Systems Software or upgrades to new releases of current Systems Software; and
(v) review, in conjunction with Perot Systems, that new applications or functions are compatible with the operating environment.
5.7 Workflow for the Core Application Services
(a) The parties will utilize the following workflow process for Break/Fix, Ad-Hoc, Enhancement/New Development, and Maintenance.
(i) Break/Fix. Newco may from time to time request that Perot Systems provide Break/Fix support or Perot Systems may identify a problem and open a Break/Fix request through the Help Desk. As soon as reasonably practicable after receipt of a problem ticket from the Help Desk, and in accordance with the time frames set forth in the Operations Procedures Manual, Perot Systems shall acknowledge the problem ticket for Break/Fix and, unless otherwise requested, perform such Break/Fix or a reasonable work around to remedy the problem.
(ii) Maintenance. Newco may from time to time request that Perot Systems provide Maintenance support in accordance with the Change Control Process described in Exhibit F. Following Newco’s approval of the Change Order, Perot Systems shall perform such Maintenance support in accordance with the Change Order.
(iii) Ad-Hoc. Newco may from time to time request that Perot Systems perform Ad-Hoc Requests in accordance with the Change Control Process described in Exhibit F. Following Newco’s approval of the Change Order, Perot Systems shall perform such Ad-Hoc Request in accordance with the Change Order.
(iv) Enhancement/New Development. Newco may from time to time request that Perot Systems provide Enhancement/New Development in accordance with the Change Control Process described in Exhibit F. Upon Newco’s approval of the Change Order, Perot Systems shall perform such Enhancement/New Development in accordance with the Change Order.
(b) Perot Systems acknowledges that Newco may request Perot Systems and other third parties to bid on certain Enhancement/New Development, subject to Section 2.4 of the MSA. In the event that Newco engages a third party to perform
50
Enhancement/New Development, such third party shall conform to the applicable confidentiality and software license provisions and Newco’s application development standards and processes and the standards and procedures within the MSA (or as mutually agreed between Newco and Perot Systems). Perot Systems shall provide such third parties with cooperation, and access to software libraries, code, documentation, test facilities, and any other aspects of the Core Application Services that may be necessary for such third party to successfully complete its work for Newco. Upon completion of the third party work, Perot Systems will have the opportunity to review third party developed code, including applicable acceptance test results, prior to Perot Systems’ acceptance of such third party developed code for ongoing Core Application Services support (e.g., break/fix, adhoc requests, maintenance and enhancements/new development of such third party developed code).
5.8 Break/Fix
Upon receipt of a problem ticket requesting Break/Fix, Perot Systems will, to the extent possible, diagnose and repair application and database related failures for Supported Software, including any Developed Software with assistance from Newco, in accordance with the Service Levels set forth in Exhibit B.
(a) Perot Systems’ general Break/Fix responsibilities include the following:
(i) report problems in accordance with the Problem Management process;
(ii) track, manage, resolve and escalate, as required, reported problems for the Supported Systems;
(iii) perform root cause analysis with appropriate assistance from Newco for Severity 1 problems or other problems as requested by Newco;
(iv) update user, system, and operations documentation as necessary; and
(v) resolve incidents including rescuing Supported Systems, performing such functions as are necessary to reinstate service to the business (e.g., re-running jobs) and resolving issues caused by End User errors. This may include: (i) restarting or amending production schedules due to late arrivals of critical interfaces or due to Supported Hardware or Data Network communications problems; and (ii) at Perot Systems’ election and upon Newco’s approval, performing permanent fixes so that problems do not re-occur. Perot Systems shall work closely with Newco to provide proper production problem resolution.
(b) Specifically for Supported Software licensed from Third Party Vendors, Perot Systems will perform the following:
51
(i) work with the applicable Third Party Vendor to resolve all applications maintenance problems that require application code;
(ii) modify application data, and/or operational modifications to handle regulatory changes as directed by Newco;
(iii) provide Level 2 Support for problems and questions as contracted with Third Party Vendors or Perot Systems; and
(iv) provide Level 3 Support for problems and questions as contracted with Third Party Vendors or Perot Systems.
(c) Specifically for Developed Software, Perot Systems will perform the following:
(i) upon Newco’s prioritization of the Change Order, resolve all applications maintenance problems;
(ii) upon Newco’s prioritization of the Change Order, resolve all applications maintenance that require data and/or operational modifications; and
(iii) provide Level 2 and Level 3 Support for reported problems and questions relating to Developed Software.
5.9 Maintenance
Upon receipt of an approved Maintenance Change Order, Perot Systems will perform the adaptations to Supported Software as necessary to maintain the operability and full functionality of the Supported Software or implement technology changes (e.g., System Software upgrades or new scheduling software), all as fully described in the Change Order (“Maintenance”).
(a) Perot Systems responsibilities for Supported Software maintenance include the following:
(i) application tuning and code restructuring and other efforts undertaken to improve the efficiency and reliability of Supported Software;
(ii) minimize on-going maintenance requirements;
(iii) monitoring and analyzing trends to identify potential problems;
(iv) providing tools to help identify areas where preventive maintenance could be performed to improve Supported Software efficiency including application performance;
(v) recommending any preventive maintenance for Newco’s approval;
52
(vi) applying Newco-approved standards during the installation of Supported Software;
(vii) perform operational maintenance monitoring and tuning on Supported Software on a periodic basis. Perot Systems shall also install, as appropriate, tools/products as provided by Newco to enable the Supported Software to perform efficiently and in accordance with applicable specifications;
(viii) modify application code to handle regulatory changes as directed by Newco; and
(ix) modify application data, and/or operational modifications to handle regulatory changes as directed by Newco.
(b) Specifically for Supported Software licensed from Third Party Vendors, Perot Systems’ responsibilities will include, without limitation, the following:
(i) manage, facilitate, and coordinate Third Party Vendor support for Supported Software; and
(ii) notify Newco and implement, at Newco’s direction, Supported Software fixes/patches & updates and upgrades made available by Third Party Vendors or Perot Systems.
5.10 Ad-Hoc Requests
Upon receipt of an approved Ad-Hoc Change Order, Perot Systems will perform the Core Applications Services described in the Ad-Hoc Change Order. Newco will prioritize Ad-Hoc Change Orders. Perot Systems will track the types of Ad-Hoc Change Orders and will recommend actions to improve efficiency (e.g. creating common queries, implementing training programs for users and upgrading documentation). Such improvements would be sized, prioritized and scheduled via the Change Control Process.
5.11 Enhancement/New Development
Upon receipt of an approved Enhancement/New Development Change Order, Perot Systems will perform the Enhancement/New Development to the existing Supported Software described in the Change Order or develop the Developed Software described in the Change Order. Newco will prioritize Enhancement/New Development Change Orders.
5.12 Newco Responsibilities for the Core Application Services
(a) Newco’s responsibilities for Core Application Services will include:
53
(i) work with Perot Systems in developing the Technology Plan;
(ii) from time to time during the Term, identify opportunities for improvement within the then-current suite of Supported Software, including documenting and prioritizing activities which may result in better performance or efficiency;
(iii) prioritize Change Orders, and work with Perot Systems to align the Change Orders with the tactical and strategic goals of Newco;
(iv) periodically participate in working sessions with Perot Systems to establish task plans for work items Newco will perform, include those tasks in a master plan for the project or release, and report progress against the plan in a timely and accurate manner;
(v) participate in the development of detailed requirements and design for Developed Software or enhancements to Supported Software with Perot Systems’ assistance;
(vi) provide timely notification of all governmental and regulatory changes to Perot Systems in the form of Change Initiation Requests and include Perot Systems in planning activities for Newco sponsored Change Orders that may be undertaken in support of Newco or its customers in other plans;
(vii) in conjunction with Perot Systems, develop test criteria for all projects and changes (described in business terms) before the project is undertaken so that user acceptance tests can be conducted to verify the completeness and correctness of the business function provided by the new or changed application;
(viii) plan for the education and training of Newco employees for current and anticipated projects and releases;
(ix) carry out end user training for all new or changed application functions and include the training plans for those activities in the master plan for the project or release. (Perot Systems will train Newco’s trainers who will in turn implement end user training);
(x) approve all application changes, including governmental and regulatory changes, by creating test cases, conducting user acceptance tests and verifying that the application changes meet requirements before the changes are introduced into the production environment;
54
(xi) ensure Newco employees participate with Perot Systems in reviews of completed projects and releases and in periodic reviews of installed application and assess the completeness and accuracy of the business function provided, the adherence to established business controls, and the auditability of the application (i.e., so that applications are written in a manner that is not overly difficult to audit, understand, and maintain);
(xii) perform Newco tasks as defined by Perot Systems’ project plan as Newco determines to be appropriate;
(xiii) reallocate Pool hours based on business priorities; and
(xiv) conduct weekly review meetings to monitor and evaluate progress against Change Orders.
55
6. DESKTOP SERVICES
6.1 Introduction
Perot Systems will perform the activities described in this Article 6 of Exhibit A and in the Operations Procedures Manual in support of Newco’s desktop and handheld environments described in Attachment A-4, Supported Desktop Hardware and Supported Desktop Software (“Desktop Services”).
6.2 Management of the Desktop Services
Perot Systems will manage the delivery of the Desktop Services, which includes performing the following associated tasks:
(a) Joint definition of strategies
(i) On an annual basis, Perot Systems and Newco will meet and jointly define strategies for managing and providing the following components of the Desktop Services:
(1) Deskside Support;
(2) Procurement;
(3) Supported Hardware Break/Fix;
(4) IMAC;
(5) Asset tracking; and
(6) Electronic software distribution.
During this review, Perot Systems and Newco will jointly evaluate any key emerging strategies for Desktop Services and develop an integrated strategy that supports Newco’s business plan.
(b) Perot Systems will implement the applicable SMC procedures, as appropriate, to the Desktop Services.
(c) Upon reasonable request of Newco, Perot Systems will evaluate new hardware and software, and major version upgrades to Supported Desktop Software for inclusion in the standard base image, hardware standards and/or security standards as a Change Order utilizing the Application Support Pool or as an Additional Service. Perot Systems will provide an assessment document for the new
56
hardware and software, including any one-time or ongoing costs, if any, for the implementation of such hardware and software into the standards. Upon Newco approval of the assessment, Perot Systems will implement such hardware and software into the standards and modify the MSA and Schedules in accordance with the Change Control Process to reflect such updated standards. Perot Systems will evaluate and implement non-major version upgrades, releases and patches to the Supported Desktop Software as part of the Base Services (without utilization of the Application Support Pool).
6.3 Deskside Services
Perot Systems will coordinate with applicable Third Party Vendors for End User assistance with problem determination and problem resolution at the End User’s work location at a Supported Site or Remote Support Site (“Deskside Services”). Deskside Services are a combination of Level 3 Support invoked by the Help Desk (when Level 1 and Level 2 Support cannot adequately address the End User’s problem) and Supported Desktop Hardware related support such as Break/Fix (i.e., hardware maintenance).
(a) Perot Systems will work with the applicable Third Party Vendor to identify the source and impact of reported problems, eradicate any viruses to the extent possible, and apply any emergency software fixes or temporary work arounds in support of the End Users.
(b) The following table defines the On-site Desktop Services Perot Systems, Newco or the Third Party Vendor will perform.
Desktop Services - Management Responsibilities
Newco Locations | | HW Break/Fix | | Problem Management & Dispatch | | IMAC Coordination | | IMAC Perform | | Deskside Services |
Ft. Lauderdale (Plaza), Boca Raton (formerly T-Rex now located on Blue Lake Dr.), Ft. Lauderdale (Data Center), Salt Lake City Reservation Center, Goose Creek Reservation Center, Minneapolis Supported Site and Toronto Supported Sites | | Perot Systems Coordinates
Through Third Party Vendor | | Perot Systems | | Perot Systems | | Perot Systems Coordinates
Through Third Party Vendor | | Perot Systems |
| | | | | | | | | | |
All Remote Support Sites | | Perot Systems Coordinates
Through Third Party Vendor | | Perot Systems | | Perot Systems | | Perot Systems Coordinates
Through Third Party Vendor | | Perot Systems Coordinates
Through Third Party Vendor |
57
(c) Perot Systems’ responsibilities for performing Deskside Services include, without limitation, the following:
(i) provide Deskside Services for Supported Desktop Hardware and Supported Desktop Software located at the Data Centers;
(ii) provide onsite Level 1 Support and problem management for the Accra imaging system, a Supported Software application, at the Minneapolis Supported Site (or any successor thereto, provided that such successor site is a Supported Site and Newco retains the Managed Contract for Accra) in accordance with the Operations Procedures Manual;
(iii) dispatch applicable Third Party Vendors to provide Deskside Services for all other Supported Sites or Remote Support Sites;
(iv) manage Third Party Vendors until problem resolution, work around or closure, as applicable, for all Supported Sites and Remote Support Sites including:
(1) applying emergency software fixes in support of problem resolution;
(2) perform virus eradication on the desktop device;
(3) update the status of the Deskside Services problem or request ticket to the Help Desk through to resolution or work around, as applicable;
(4) on completion of the Deskside Services;
(5) close the problem or request ticket; and
(6) update the asset database to the extent possible with the data provided by the Third Party Vendor.
(d) Newco’s responsibilities for the Deskside Services includes the following:
(i) assist Perot Systems in implementing the Deskside Services operational procedures including the criteria for deployment of PSC Personnel or Third Party Vendors, as applicable; and
(ii) be responsible for all End User data migration, backup and restore, conversion, and erasure, as required, before and following the provision of the Deskside Services.
58
6.4 Supported Desktop Hardware Maintenance Services
(a) Perot Systems’ responsibilities for coordinating maintenance for Supported Desktop Hardware will include, without limitation, the following:
(i) with Newco’s assistance, validate the maintenance operational procedures related to Supported Desktop Hardware including the criteria for deployment of hardware maintenance services personnel;
(ii) dispatch the appropriate Third Party Vendor service personnel in accordance with the established procedures;
(iii) update the status of the hardware maintenance services problem ticket to the Help Desk through to completion;
(iv) on completion of hardware maintenance services:
(1) update the Help Desk so that the problem ticket can be closed;
(2) update the asset database to the extent possible with the data provided by the Third Party Vendor; and
(3) provide a monthly standard report to Newco, using available problem management data that summarizes the hardware maintenance services provided during the prior month.
(b) Newco’s responsibilities for maintenance services for Supported Desktop Hardware include the following:
(i) assist Perot Systems in implementing the hardware maintenance services operational procedures including the criteria for deployment of hardware maintenance services personnel;
(ii) provide a suitable environment for the equipment to be maintained, as the equipment’s manufacturer specifies;
(iii) provide Help Desk representatives with the information required for hardware maintenance services (for example, machine type, serial number), and such other information, as requested, including location address, building and office number and contact name and phone number;
(iv) coordinate and schedule maintenance activities with Newco’s internal support functions, as required;
59
(v) perform any required pre- and post maintenance activities before permitting and following hardware maintenance services on Supported Desktop Hardware (for example, backup, remove, protect, and restore programs, data and removable storage media, remove and reload funds);
(vi) provide Perot Systems with manufacturers’ warranty documentation (for example, warranty certificate, type of warranty, duration, applicable terms and conditions) or applicable maintenance agreement for Supported Desktop Hardware installed as of the Effective Date and for Supported Desktop Hardware that Perot Systems will maintain that Newco procures directly after such date; and
(vii) provide and maintain the inventory of all End User consumable supplies, such as paper, toner, printer cartridges, diskettes, compact disks, tapes, batteries, and other such items that comply with original equipment manufacturer’s specifications, and distribute or install such supplies as End Users require.
6.5 Install, Move, Add, Change Services (“IMAC”)
(a) Perot Systems’ responsibilities for coordinating IMACs for Supported Desktop Hardware will include, without limitation, the following:
(i) with Newco’s assistance, develop the IMAC operational procedures including the development of an IMAC checklist that defines the completion criteria for each IMAC;
(ii) receive requests for IMACs via the established procedures and create the required documentation (for example, Change Order, Help Desk service request);
(iii) schedule the IMAC perform date with the designated Newco contact at the requesting Supported Site or Remote Support Site and the requesting End User;
(iv) before the scheduled IMAC date, communicate to the designated Newco contact any IMAC prerequisites and any procedures that need to be followed after the IMAC is completed;
(v) notify the designated Newco contact of the required IMAC components that need to be available and site preparations (facilities and telecommunications modifications) that need to be completed before the scheduled IMAC date;
60
(vi) before the scheduled IMAC date, verify with the designated Newco contact that the End User has complied with the IMAC prerequisites, Supported Site/Remote Support Site modifications are complete, and that the necessary IMAC components have been received and will be available at the End User’s work location on the scheduled IMAC date;
(vii) coordinate the activities related to and the completion of all required facilities and telecommunications modifications before the scheduled IMAC date;
(viii) dispatch the applicable Third Party Vendor responsible for performing IMAC for Supported Desktop Hardware according to the criteria specified in the IMAC checklist;
(ix) obtain concurrence from the End User or the designated Newco contact that the IMAC was completed in accordance with the IMAC checklist;
(x) assist Newco in resolving on a timely basis any issues impacting IMAC activity;
(xi) update the status of the IMAC Help Desk service request to the Help Desk through to completion; and
(xii) on completion of an IMAC:
(1) close the Help Desk service request, and
(2) update the asset database to the extent possible with the data supplied by the Third Party Vendor;
(xiii) coordinate and perform IMACs for Supported Servers, at Newco’s request, as a Change Order utilizing the Application Support Pool or as an Additional Service;
(xiv) provide a monthly standard report to Newco summarizing the IMACs Perot Systems performed during the prior month, including the current status of any IMACs that are in progress or pending;
(xv) for installations of Supported Software licensed under a Managed Contract, count the number of copies installed on Supported Desktop Hardware through the IMAC provided by the Third Party Vendor or by Deskside Services and, to the extent that Newco provides the initial inventory of the number of copies installed throughout Newco as of the Effective Date, Perot Systems will update the inventory records to reflect the additional copies installed via IMAC or Deskside Services, and provide a monthly report to Newco on installed copies per the inventory
61
report versus the quantity licensed under the terms of the Managed Contract; and
(xvi) For IMAC activity not directly requested by the End User, notify the End User of the IMAC prior to the IMAC date.
(b) Newco’s responsibilities for IMAC include the following:
(i) assist Perot Systems in implementing the IMAC operational procedures including the development of an IMAC checklist that defines the completion criteria for each IMAC;
(ii) provide to Perot Systems, via the established procedures, an authorized IMAC request that clearly defines all IMAC requirements and includes all information Perot Systems requests;
(iii) provide all required IMAC components (for example, hardware, software and any associated components) necessary to perform an IMAC;
(iv) provide the Managed Contracts with applicable Third Party Vendors that perform IMACs;
(v) provide all required Data Network capacity;
(vi) define and provide Perot Systems the escalation procedures for situations where End Users have not completed the communicated IMAC prerequisites or where site preparations have not been completed within the defined time frames or in accordance with specifications;
(vii) be responsible for End User compliance with all software vendor license terms and conditions;
(viii) be responsible for all End User data migration, backup and restore, conversion, or erasure, as required, before and after the IMAC;
(ix) provide necessary End User orientation and education;
(x) provide all transportation of IMAC components to, between, and within Supported Sites/Remote Support Sites and all transportation associated with the disposal or relocation of displaced hardware and software;
(xi) be responsible for all costs and compliance with regulatory requirements for the disposal or relocation of packing materials and displaced or discontinued hardware and software and related materials (for example, batteries, manuals, supplies, cathode ray tubes);
62
(xii) provide the packing materials and prepare all displaced hardware and software for shipping;
(xiii) provide a secure staging or storage area within the Supported Site/Remote Support Site to store IMAC components to be used for a scheduled IMAC and the hardware and software (and associated documentation) displaced by an IMAC;
(xiv) resolve on a timely basis any issues impacting an IMAC; and
(xv) provide authorization and be responsible for all charges for IMACs provided by Perot Systems for hardware other than Supported Desktop Hardware.
6.6 Asset Tracking Services
(a) Perot Systems’ responsibilities for tracking Assets include, without limitation, the following:
(i) define and implement a process for tracking new Assets procured by Newco or Perot Systems after the Effective Date, throughout the life cycle of an Asset, from acquisition through disposal, including any changes performed during the life of the Asset;
(ii) track and maintain Asset records for Supported Desktop Hardware (e.g. PC’s, Cherry keyboards, handhelds) and routers;
(iii) maintain the Asset database, starting with Newco’s initial inventory records as of the Effective Date, and capture changes Perot Systems made or that Newco made and notified Perot Systems caused by:
(1) receipt of new Assets,
(2) data scrubbing and validation (i.e., checking for nomenclature and data entry discrepancies such as validating that the asset type is numeric or alphanumeric),
(3) IMAC, hardware maintenance, and Desktop Services activity. If the activity is performed by Newco or Third Party Vendors, the Asset database will be updated to the extent possible using the data supplied. Perot Systems will coordinate the activity with these Third Party Vendors to collect the Asset information, and
(4) Asset storage, retirement, and disposal;
63
(iv) with Newco’s assistance, implement a process to track and capture any changes to existing Assets made by Newco;
(v) perform electronic inventory scans on hardware and update the Asset database to the extent allowed by the data returned by such scan;
(vi) add Assets for which no asset record is found to the asset database as such assets are found during an asset inventory or are otherwise discovered, for example, during a Help Desk support call, and notify the designated Newco contact at the Supported Site of such additions;
(vii) coordinate and perform these electronic Asset audits as set forth in the Operations Procedures Manual and, following such audits, report the results to Newco;
(viii) forward information on all Asset discrepancies or issues relating to Newco owned, leased or licensed Assets identified by Perot Systems to the designated Newco contact for resolution;
(ix) provide reasonable assistance to Newco in resolving Asset database discrepancies or issues relating to Newco owned, leased or licensed Assets;
(x) resolve Asset database discrepancies or issues relating to Perot Systems owned, leased or licensed Assets;
(xi) provide Newco, in a standard electronic format, the results of each Asset inventory Perot Systems conducts for use by Newco;
(xii) provide a monthly standard report to Newco that reflects Asset change activity performed by Perot Systems or by Newco and for which Newco notified Perot Systems during the prior month; and
(xiii) perform tracking of Supported Software licensed under a Managed Contract to the extent that Newco provides the initial inventory of the number of copies installed throughout Newco as of the Effective Date.
(b) Newco’s responsibilities for Asset tracking services include the following:
(i) provide Newco’s Asset inventory (for all assets including desktops, laptops, terminals, handhelds and attached handheld peripherals, servers and network equipment) existing as of the Effective Date;
(ii) notify Perot Systems on a timely basis of any assets Newco procured directly and of any changes Newco made to existing Assets;
64
(iii) be responsible for Newco Personnel awareness of their responsibilities during an Asset inventory;
(iv) be responsible for Third Party Vendor compliance with Asset tracking reporting;
(v) resolve all asset database discrepancies and issues relating to Newco owned, leased or licensed Assets and notify Perot Systems of the resolution;
(vi) provide reasonable assistance to Perot Systems in resolving Asset database discrepancies relating to Perot Systems’ owned, leased or licensed Assets;
(vii) be responsible for all Asset disposal including any related expenses and adherence to all regulatory guidelines; and
(viii) provide requirements for maintenance of the Asset records that Newco deems necessary to meet Newco’s audit requirements and financial obligations (e.g., records retention requirements).
6.7 Electronic Software Distribution for Supported Desktop Software
(a) Perot Systems’ responsibilities for the electronic distribution of Supported Desktop Software (“ESD”) will include, without limitation, the following:
(i) for ESD of Supported Desktop Software licensed under a Managed Contract, count the number of copies installed on Supported Desktop Hardware through the ESD and, to the extent that Newco provides the initial inventory of the number of copies installed throughout Newco as of the Effective Date, Perot Systems will update the inventory records to reflect the additional copies installed via ESD, and provide a monthly report to Newco on installed copies per the inventory report versus the quantity licensed under the terms of the Managed Contract;
(ii) with Newco, review, validate and update, the Newco ESD processes and procedures;
(iii) provide the ESD processes and procedures including any Newco support requirements to the designed Newco contact at each Supported Site/Remote Support Site for distribution to Newco-designated personnel (for example, operators, systems engineers, problem support personnel);
(iv) with Newco, establish a distribution plan before each ESD including:
65
(1) the mutually agreed Supported Desktop Software (consistent with the Supported Desktop Software standards) to be distributed,
(2) the schedule for the ESD,
(3) any ESD prerequisites and post install procedures that need to be completed by End Users and Newco’s business units, and
(4) any End User training requirements related to the changes that will result from an ESD;
(v) communicate to the Newco designated contact any ESD prerequisites and post install procedures that need to be completed by End Users and Newco’s business units;
(vi) schedule and coordinate ESD activities with the designated contact;
(vii) develop the how-to procedures End Users will follow to download the Supported Desktop Software from a Supported Server to the Supported Desktop Hardware and provide an electronic change notice to all End Users regarding upcoming distributions prior to the distribution itself;
(viii) before an ESD, configure and test the Supported Software (new or upgrades) included in the ESD to verify compatibility with existing Supported Desktop Hardware and software configurations, directory structures and compliance with Newco policy as set forth in the Operations Procedures Manual;
(ix) manage and administer the ESD, including:
(x) monitoring the ESD to verify the successful completion of the process,
(xi) taking corrective action, as appropriate, for problems resulting from the ESD to correct error conditions and facilitate application stability;
(xii) communicate to the Newco designated contact any problems that occurred during the distribution and a list of unsuccessful distributions;
(xiii) provide verification of each completed ESD to the Newco designated contact; and
(xiv) install Supported Desktop Software that cannot be electronically distributed as a Change Order utilizing the Application Support Pool or as an Additional Service.
(b) Newco’s responsibilities for ESD include the following:
66
(i) provide all Supported Desktop Software (new and upgrades) included in an ESD or distributed via a Change Order;
(ii) document and provide to Perot Systems Newco’s standard configuration and policy requirements;
(iii) assist Perot Systems in establishing a distribution plan before each ESD;
(iv) ensure compliance by End Users and Newco’s business units with the communicated ESD prerequisites and post install procedures;
(v) provide to Perot Systems any software vendor license terms and conditions and maintenance requirements for newly distributed Supported Desktop Software that could affect the ESD;
(vi) notify Perot Systems of any distribution time frames specified by any regulatory agency that need to be met to accomplish compliance with any Newco regulatory requirements; and
(vii) notify Perot Systems of any Supported Desktop Software to be de-installed by Perot Systems (through the IMAC process or via a Change Order) in conjunction with an ESD.
67
7. LAN/WAN AND REMOTE NETWORK MONITORING SERVICES
7.1 Introduction
Perot Systems will monitor and manage the LAN and WAN and provide the remote network monitoring services for each Data Network location specified in Schedule 7.13 as described in this Article 7 of this Exhibit A and in the Operations Procedures Manual (the “LAN/WAN and Remote Network Monitoring Services”). Perot Systems will monitor and manage equipment, software, and circuits; implement Data Network management platforms; and design activities required to deliver the LAN/WAN and Remote Network Monitoring Services. Specific to Newco’s systems network architecture (“SNA”) environment, Perot Systems will support the NCP software provided by Newco and support for the 3745 front end processors (“FEP”), host VTAM and TCP/IP support, and monitoring and management of the SNA environment.
7.2 Operations of the Data Network
(a) Perot Systems responsibilities for the operations of the Data Network includes, without limitation, the following:
(i) support the operational functions for the monitoring and management of the routers and remote hardware identified in Schedules 6.2(a) and 6.2(b). These functions will be performed at a Perot Systems-provided network monitoring facility. The personnel, equipment and software to support this environment at the Perot Systems facility are included;
(ii) provide Level 1 Support and coordinate Level 2, and Level 3 Support for the Data Network;
(iii) manage Third Party Vendors who perform Data Network management and maintenance, including performing related IMACs and Supported Hardware maintenance services for the Data Network Supported Hardware specified in Schedule 6.2;
(iv) perform router and ATM switch programming, including feature and function software upgrades (provided by the vendor at no additional charge) and changes to support End User requirements;
(v) provide logical access security for LAN devices, including maintenance passwords and associated administrative support; and
(vi) provide Host VTAM and TCP/IP programming and FEP NCP programming for the SNA environment.
68
7.3 Data Network Operations Management and Control
(a) Perot Systems’ responsibilities management and control of the Data Network will include, without limitation, the following:
(i) provide monitoring of the Data Network. Upon detection of an alarm condition or the receipt of a problem ticket from the Help Desk that indicates an out-of-service or degraded condition with the Data Network, commence coordinating the resolution;
(ii) provide proactive monitoring and surveillance of real-time Data Network elements and connecting transmission media;
(iii) respond to alarms from management systems or problem tickets by facilitating service restoration of the Data Network, coordinating remote diagnostics and trouble resolution, and initiating problem tracking and notification procedures with the Third Party Vendors;
(iv) coordinate dispatch services or Third Party Vendor maintenance activity on Data Network equipment when Data Network problems cannot be cleared remotely;
(v) provide status updates of ongoing problem resolution activities to the Help Desk and End Users; and
(vi) verify that reported faults and End User problems are resolved.
7.4 Remote Network Monitoring Services
Perot Systems’ responsibility for the Data Network will include monitoring the availability and the performance of Data Network resources. The monitoring will be accomplished by periodic polling of Data Network resources and by processing system events that are generated and will attempt to detect problems before End Users are affected. Performance monitoring will also provide information regarding utilization, availability, and performance of the Data Network. Data collected may vary based on the device type, but examples of the information collected will be incorporated into Data Network availability, end-to-end PVC availability, backbone response time and frame delivery reports. Data will be collected using mutually determined polling intervals and analyzed to determine a pattern of usage that consists of the average network usage and peak usage time.
69
7.5 Capacity Management for the Data Network
Perot Systems will be responsible for recommendations and plans for maintaining capacity that will meet or exceed the Service Levels. This includes monitoring and advising Newco providers to tune Supported Hardware and Supported Software capabilities across the Data Network technology environments for efficiency, management of configuration requirements, and efficient coordination with service and supply vendors. Perot Systems will implement processes to provide regular performance and capacity monitoring/reporting, using tools appropriate to the Data Network environment. Perot Systems will monitor the Data Network to establish a reference for projecting bandwidth and equipment needs and will recommend to Newco the adjustment of circuit capacity and appropriate equipment in light of these projections. Perot Systems will provide the Data Network capacity planning information developed by Perot Systems to Newco to assist with Newco’s budgeting, response time analysis, and availability maintenance.
7.6 Data Network Connectivity Service
(a) Newco will be financially responsible for the provision of all WAN connectivity in support of the Data Network locations, including, but not limited to, circuits, CSU/DSUs, and routers. In support of Perot Systems’ access to the Data Network so that Perot Systems technical and Help Desk personnel may perform their monitoring and management responsibilities, Newco will provide connectivity from their ATM network to the Data Centers, including the provision of a terminating IGX ATM switch at RTP. In support of the closing of the Richardson, TX data center, Newco will also provide connectivity as necessary for the purpose of network backup and /or disaster recovery.
(b) Perot Systems will provide the necessary equipment on the RTP side of the IGX switch in support of Perot Systems monitoring and management services, including the standard Perot Systems firewall service to ensure separation of the Newco network from the Perot Systems network.
(c) Perot Systems will provide the monitoring and management of the connectivity in place as of the Effective Date that supports the Data Network routers and remote controllers communication listed in Schedules 6.2(a) and 6.2(b) and the connectivity to be implemented for Perot Systems’ access from RTP.
7.7 Data Network Maintenance
Perot Systems will be responsible for the coordination of maintenance of the Supported Hardware and Supported Software for the Data Network specified in Schedule 6.2 and Schedule 6.4, respectively, by Third Party Vendors. This includes items such as circuits, access devices, multiplexers, CSU/DSUs, routers, and switches.
70
7.8 Data Network Provisioning
Perot Systems will be responsible for the coordination of procurement and installation activities in support of the Data Network equipment and circuits that are needed at each Data Network location. Perot Systems will coordinate, as appropriate, with the Newco facilities department, changes to Data Network equipment and recommend appropriate power and environmental conditions for such equipment and circuits.
7.9 Data Network Administration
Perot Systems will administer the Data Network requirements and activities including the processing of Change Orders. Perot Systems will also be responsible to administer and maintain network address assignments for the Data Network and will protect Newco’s interest in maintaining its current network address registration.
7.10 Supported Software Support
(a) Perot Systems will provide Host VTAM and TCP/IP configurations and support for the LPARs on the Supported Systems located in the Data Centers. Perot Systems will provide installation, programming, and support of NCP software for the Newco 3745 FEPs.
(b) Perot Systems will provide management and coordination via Third Party Vendors for maintenance and support of Supported Software embedded in Supported Hardware within the Data Network.
7.11 Regulatory Changes Affecting the Data Network
Perot Systems will coordinate Data Network modifications as required to maintain compliance with federal regulatory requirements that are applicable to the Data Network and provided to Perot Systems by Newco.
7.12 Data Network Engineering
Perot Systems’ responsibilities for Data Network engineering will include, without limitation, the following:
(a) perform Data Network design activities, including establishing Data Network design criteria and standards with Newco;
(b) manage the capacity and configuration of the Data Network;
71
(c) maintain and provide to Newco inventories, circuit diagrams, location lists, and other Data Network documentation and information as reasonably requested by Newco;
(d) perform engineering functions related to ordering, upgrading, and installing network circuits, systems and equipment;
(e) evaluate and test Data Network, terminal, and interface equipment prior to installation;
(f) configure and install Data Network equipment (or manage Third Party Vendors to configure and install, as applicable, at Supported Sites/Remote Support Sites that will be attached to, and will communicate over, the Data Network, and coordinate such installs with Third Party Vendors who provide, install and maintain required cabling, wiring, physical security and utilities at such Supported Sites/Remote Support Sites;
(g) develop acceptance procedures for installation and changes to the Data Network; and
(h) verify restoration of availability following problems with Data Network circuits or equipment.
7.13 Data Network Optimization
(a) Performance Monitoring of the Data Network:
Perot Systems will implement performance management and monitoring tools to be used in conjunction with the problem management system and the inventory database to monitor the performance of the Data Network. This monitoring will encompass those activities required to continuously evaluate the principal performance indicators of Data Network operations, verify Service Levels, identify actual and potential bottlenecks, and establish and report on trends for decision making and planning. These measurements may take the form of overall throughput, percent utilization, error rates, or specific performance measurements such as packets per second. Measurements will include both peak and average levels. Perot Systems will provide access to a web interface to the performance management and monitoring tools to authorized Newco personnel, as identified by Newco.
(b) Performance Planning:
Perot Systems will work with Newco to identify future loads on the Data Network that could impact performance. Perot Systems will propose to Newco, for its
72
approval, changes to improve performance in anticipation of such future loads. Perot Systems’ proposals will include performance improvement expectations and the corresponding cost for the changes.
(c) Circuit Utilization:
On an ongoing basis, Perot Systems will monitor the utilization of Data Network circuits, report on such utilization on a periodic basis, and make recommendations to Newco as to the appropriate size and port speed of new or existing circuits based on the topology of the Data Network, Newco’s traffic and usage patterns, and Newco’s existing and anticipated business requirements. To the extent appropriate, Perot Systems will recommend upgrading, down sizing, or eliminating existing circuits. Any such changes agreed to by Newco will be implemented by Perot Systems through Newco’s circuit vendor.
(d) Data Network Tuning:
On an ongoing basis, Perot Systems will coordinate the tuning and manage the Data Network to meet Newco business requirements and Service Levels.
(e) Data Network Optimization:
On an ongoing basis, Perot Systems will perform Data Network optimization reviews on a mutually agreed schedule. Such reviews will be performed following any major Data Network migrations or changes. Perot Systems will focus on achieving Newco’s optimization objectives, with Newco’s and Newco’s Third Party Vendors approval and participation. As part of a Change Order, Perot Systems will optimize the Data Network in terms of cost effectiveness and efficiency, but without sacrificing Data Network performance or Perot Systems’ ability to meet the applicable Service Levels for the Data Network.
7.14 Newco Responsibilities for the Data Network
Newco’s responsibilities for the Data Network include the following:
(a) appoint a designated contact at each Supported Site to work with Perot Systems to resolve Data Network operational problems, order Data Network services and products, and authorize others to do so;
(b) provide Perot Systems or Perot Systems’ designee with the necessary assistance to enable PSC Personnel access to the Supported Sites to perform inspections, installations, prepare returns, or perform maintenance (including engineering changes) as appropriate;
73
(c) obtain and pay all costs associated with supplying any required unique registered IP addresses provided by an American Registry of Internet Numbers (ARIN)-accredited registrar or other recognized standards body;
(d) be financially responsible for providing, installing and maintaining the required cabling, wiring, physical security and utilities for the Data Network locations specified in Schedule 7.13;
(e) assign and/or make Perot Systems the agent of all applicable Managed Contracts applicable to the Data Contract, but retain financially responsible for those Managed Contracts; and
(f) Manage applicable vendors for the components Data Network retained by Newco.
74
8. DISASTER RECOVERY SERVICES
8.1 Introduction
Perot Systems will provide the services described in this Article 8 of Exhibit A, the Operations Procedure Manual and in the Disaster Recovery Plan in support of the Critical Services (the “Disaster Recovery Services”) During the Term, Newco will also receive certain disaster recovery services from a Third Party Vendor under a contract (the “Disaster Recovery Contract”) between Newco and such Third Party Vendor (Sungard as of the Effective Date). As part of the Disaster Recovery Services, Perot Systems will manage the Disaster Recovery Contract as part of Perot Systems’ obligations for Managed Contracts and will coordinate the services provided to Newco by its disaster recovery vendor.
8.2 Disaster Recovery Services
(a) Perot Systems’ responsibilities for Disaster Recovery Services will include, without limitation, the following:
(i) make available to Newco a member of Perot Systems’ disaster recovery team that is certified in business continuity planning to serve as a point of contact for coordinating Disaster Recovery Services and related communications and activities;
(ii) maintain and update the Disaster Recovery Plan as required and as directed by Newco;
(iii) notify Newco of any situation which Perot Systems believes constitutes a disaster;
(iv) in the event of a disaster, execute Perot Systems’ responsibilities in the Disaster Recovery Plan, including delivery of the most recent backup copies of the Supported Software and Data described in the Disaster Recovery Plan necessary to restore the Critical Services at the Recovery Center, subject to the terms of the Disaster Recovery Contract;
(v) notify Newco of any operating environment changes made by Perot Systems that may affect the Disaster Recovery Plan;
(vi) coordinate and execute the testing of the Disaster Recovery Plan in accordance with the terms of the Disaster Recovery Contract; and
75
(vii) provide Newco with a copy of the Disaster Recovery test results.
(b) Newco Responsibilities for Disaster Recovery Services include the following:
(i) perform its disaster recovery responsibilities as set forth in the Disaster Recovery Contract and the Disaster Recovery Plan;
(ii) provide a representative who is knowledgeable in the Disaster Recovery Plan to act as the primary interface to Perot Systems’ disaster recovery representative;
(iii) be responsible for declaring a disaster with the disaster recovery Third Party Vendor and notifying Perot Systems prior to such disaster declaration;
(iv) review and approve the disaster recovery plan and disaster recovery test results as required;
(v) provide Perot Systems with a copy of the then-current Disaster Recovery Plan as of the Effective Date;
(vi) resolve any disaster recovery-related concerns or problems, if any, with the disaster recovery Third Party Vendor;
(vii) provide all required Data Network connectivity to the Recovery Center;
(viii) pay any disaster declaration and/or Recovery Center usage fees (for example, fees payable under the disaster recovery Contract);
(ix) pay all travel and living expenses Perot Systems incurs in the support of Perot Systems’ Disaster Recovery responsibilities; and
(x) pay all costs associated with the storage of Newco Data and Supported Software at locations other than the Data Centers, including all storage facility charges and charges for transporting such data and software to, from and between the storage facility, the Data Centers and/or the Recovery Center.
8.3 Data Network Recovery
Newco will be financially responsible for all Disaster Recovery Services for the Data Network, including any connectivity and support costs not covered by the Disaster Recovery Contract.
76
8.4 Desktop Disaster Recovery Services
Newco will be responsible for the provision of disaster recovery services for its desktop operating environment, including any costs associated with backup, connectivity and support of Supported Desktop Hardware and the affected Data Networks.
77
9. Security Services
9.1 Introduction
Perot Systems will perform the security services described in this Article 9 of Exhibit A and the Operations Procedures Manual (the “Security Services”). As part of the Security Services, Perot Systems will provide security controls that are consistent with the security controls in place at Newco as of the Effective Date. Perot Systems will document the controls in place at Newco as of the Effective Date in the “Information Security Controls Document”, which will be provided to Newco in an initial draft within 180 days of the Effective Date. The Information Security Controls Document will also contain security recommendations for Newco’s review. Newco will provide Perot Systems with copies of its then-current security policies to be included as part of the Information Security Controls Document.
9.2 Security Management
(a) Perot Systems’ responsibilities for security management will include, without limitation, the following:
(i) appoint a member of the PSC Personnel to serve as the focal point with responsibility for day-to-day security management related to the Base Services;
(ii) in conjunction with Newco, review security policies and procedures for effectiveness and recommend improvements;
(iii) review changes made or requested by Newco to its security policies and standards and advise Newco whether or not such changes:
(1) can be implemented; and
(2) if implemented, will be considered an Additional Service;
(iv) maintain and update the Information Security Controls Document as Perot Systems deems necessary;
(v) upon request, assist with Newco security investigations and adhere to the confidentiality requirements specified in the MSA in regards to the request or results of such investigations; and
(vi) with respect to the Supported Systems:
(1) assist Newco in defining Newco ‘s security requirements including:
78
(A) evaluate risks,
(B) define Supported Server backup and recovery requirements; and
(C) define access controls;
(2) establish procedures for logging, alarming and reporting of security violations;
(3) provide the appropriate protection for any Newco data residing on a shared Supported System (i.e., not dedicated to Newco);
(4) perform security audits per Newco’s reasonable request (for example, validating access authorization per Newco’s instruction, the correct use of logical control features); and
(5) apply commercially reasonable efforts to detect and eradicate viruses on the Supported Servers, in accordance with the Operations Procedures Manual.
(b) Newco’s responsibilities for security management includes the following:
(i) provide a Newco designated security coordinator for each Supported Site/Remote Support Site with responsibility for day-to-day security management;
(ii) provide Perot Systems with Newco’s security audit history (both internal and external) and security policies, standards and practices in effect as of the Effective Date and any updates as they occur;
(iii) with Perot Systems’ assistance, communicate the security procedures to End Users (for example, login procedures, password requirements, use of anti virus programs, data and equipment security procedures);
(iv) in conjunction with Perot Systems, review Newco’s security policies and procedures for effectiveness and recommend improvements;
(v) notify Perot Systems of changes Newco plans to make to its security policies and standards before implementation;
(vi) with Perot Systems’ assistance, define Newco’s security requirements, including:
(1) providing Perot Systems with Newco’s existing security policies and practices,
79
(2) evaluating risks, and
(3) defining Supported Server backup and recovery requirements; and
(vii) provide any additional or unique resources (for example, hardware, software, personnel or other components) and perform any site modifications required to enable Perot Systems to implement Newco’s security requirements.
9.3 Physical Security
(a) Perot Systems’ responsibilities for physical security will include, without limitation, the following:
(i) provide physical security controls at Perot Systems’ facilities in accordance with the Operations Procedures Manual;
(ii) restrict access to data processing areas at Perot Systems’ facilities to authorized personnel only;
(iii) conduct periodic reviews of the data processing facilities for which Perot Systems has security responsibility including reviews of access logs for unusual occurrences and perform follow-up activities in accordance with the procedures specified in the Information Security Controls Document;
(iv) protect Supported Hardware located at Perot Systems’ facilities from unauthorized access;
(v) implement controls that protect printed output from unauthorized access while under Perot Systems’ control;
(vi) perform an annual audit and reconciliation of the tapes and promptly notify the appropriate Newco and PSC Personnel if discrepancies are discovered;
(vii) work with Newco to resolve discrepancies discovered during the annual tape audit and inform Newco of the resolution; and
(viii) implement controls for and provide effective elimination of residual information on removable storage media before disposal or reuse outside of Newco.
(b) Newco’s responsibilities for the physical security includes the following:
(i) provide physical security controls at the Supported Sites; and
(ii) protect Supported Hardware located at Supported Sites/Remote Support Sites from unauthorized physical access.
80
9.4 Logical Access Control
(a) Perot Systems’ responsibilities for logical access control will include, without limitation, the following:
(i) provide a list of existing Supported System logon Ids to Newco for review and verification on a quarterly basis or longer interval as agreed;
(ii) review and verify quarterly the system logon IDs for PSC Personnel (i.e., re-verification) and delete the IDs of those individuals who no longer have a business need and/or are no longer authorized by Newco or Perot Systems’ management to access the Supported Systems;
(iii) on a regular basis and based on information provided by Newco or as deemed appropriated by Perot Systems for PSC Personnel, delete the system logon IDs of those individuals (including Third Party Vendors) who no longer have a business need and/or are no longer authorized by Newco or Perot Systems’ management to access the Supported Systems;
(iv) install, maintain and upgrade new or existing data access control software in accordance with Perot Systems’ obligations for Supported Software, as deemed necessary by Perot Systems to provide the Base Services and as mutually agreed by the Parties;
(v) implement the functions and features of any access control software, in accordance with Perot Systems’ obligations for Supported Software, that will satisfy Newco ‘s security practices as defined in the Information Security Controls Document;
(vi) implement the security system values and features of the Supported Systems that satisfy Newco’s security practices as defined in the Information Security Controls Document;
(vii) identify the protection requirements for the Supported Systems’ resources;
(viii) administer the protection requirements for the Supported Systems’ resources through the access control software;
(ix) implement the protection requirements for the Supported Systems’ resources via the access control software with all changes being scheduled and performed in accordance with the Change Management process;
(x) capture and maintain audit records for a mutually agreed retention period, and provide record retention reports to the Newco Project Executive upon reasonable request;
81
(xi) promptly inform Newco of any security issues as Perot Systems becomes aware and recommend possible remedial action;
(xii) schedule and notify Newco through the Change Management process of security or integrity software fixes that must be applied to the Supported Systems for which Perot Systems has security responsibility;
(xiii) establish, change, deactivate, and remove logon IDs and associated access authorities for Newco and PSC Personnel;
(xiv) reset logon ID passwords for Newco and PSC Personnel and disclose such passwords to authorized personnel;
(xv) review, approve, and grant requests for standard and privileged user authorities;
(xvi) quarterly review privileged user authorities and remove those for which management authorization no longer exists;
(xvii) control the security officer/security administrator user profiles on those systems for which Perot Systems has security responsibility; and
(xviii) on an annual basis or upon the reasonable request of Newco, perform security health check to validate the following:
(1) access control settings,
(2) authorized privileged users,
(3) operating system resource protection, and
(4) installation and operation of virus control programs on the appropriate platforms.
(b) Newco’s responsibilities for logical access control includes the following:
(i) review and verify quarterly the system logon IDs for Newco personnel and Third Party Vendors (i.e., re-verification) and notify Perot Systems to delete the IDs or modify access of those individuals who no longer have a business need and/or are no longer authorized by management to access the system;
(ii) define and provide the following to Perot Systems:
(1) Newco’s data classification and control criteria, and
82
(2) Newco’s data protection and handling requirements;
(iii) promptly acknowledge receipt of security exposures notified to Newco by Perot Systems and inform Perot Systems of Newco’s acceptance or rejection of Perot Systems’ recommended remedial action or other remedial action Newco implements;
(iv) take appropriate corrective action to remedy security violations notified to Newco by Perot Systems;
(v) define the protection requirements for application resources via the access control software;
(vi) define the protection requirements for End User data via any access control software; and
(vii) establish the process criteria for resetting passwords and disclosing such passwords to authorized personnel.
9.5 Data Network Infrastructure Security
(a) Perot Systems’ responsibilities for infrastructure security for the Data Networks will include, without limitation, the following:
(i) control the network operating system security and administrative user IDs;
(ii) provide and maintain virus avoidance, detection, and elimination software for Supported Servers;
(iii) manage the processes and automated systems for maintaining and updating virus avoidance virus signature files for Supported Hardware; and
(iv) assist in performing virus eradication activities in connection with virus attacks on Supported Systems when reported via the Problem Management process.
(b) Newco responsibilities for Data Network infrastructure security includes the following:
(i) with Perot Systems assistance, define the protection requirements for Supported Hardware and Software; and
(ii) notify Perot Systems of virus attacks as detected and ensure that End Users adhere to procedures for corrective action as specified in the Operations Procedures Manual.
83
10. VOICE COMMUNICATIONS MANAGEMENT SERVICES
10.1 Introduction
Perot Systems will manage voice communications for Supported and Remote Support Sites and will provide invoice payment services for Newco’s voice and data communications infrastructure (the “Voice Communication Management Services”).
10.2 Perot Systems Responsibilities.
(a) Perot Systems’ responsibilities for the Voice Communication Management Services includes the following:
(i) Coordination and execution of field “Move” / “Add” / “Change” activities using remote tools and local vendor, including:
(1) site relocations;
(2) site closures;
(3) new site installations; and
(4) changes at existing locations.
(ii) Coordination and execution of IMAC activities at Supported Sites with on-site PSC Personnel, to include the following:
(1) desktop voice equipment IMAC’s;
(2) voice mail support;
(3) maintain 800 reservation center call routing; and
(4) recommend and engineer new voice solutions and technologies.
10.3 Newco Responsibilities
(a) Newco’s responsibilities for the Voice Communication Management Services includes the following:
(i) End-User completion of a Help Desk service request for all voice IMAC’s;
(ii) retain all voice related leases and owned hardware; and
84
(iii) retain all voice related software and hardware contracts.
85
ATTACHMENT A-2
TO
EXHIBIT A
TRANSITION SERVICES
1. INTRODUCTION
Perot Systems agrees to perform the activities summarized in this Attachment A-2 to transition certain tasks and responsibilities previously performed by ANC to Perot Systems, which are further described in and subject to a change order executed between ANC and Perot Systems under the ANC Agreement (the “ANC Tasks”). The Parties acknowledge that the ANC Tasks are intended to be transitioned to Perot Systems on the Effective Date. During the Transition Period, Perot Systems will perform the activities described in Section 4. In addition, Perot Systems will complete any activities described in Section 3 that were not completed prior to the Effective Date in order to complete transition of the ANC Tasks to Perot Systems (the “Transition Services”).
2. DEFINITIONS
“ANC Tasks” are defined in Section 1 of this Attachment.
“Transition Services” is defined in Section 1 of this Attachment.
“Transitioned Applications” are the software applications listed in Annex A-2-1 to this Attachment.
3. SUMMARY OF ACTIVITIES PRIOR TO THE EFFECTIVE DATE
3.1 Responsibility for Transitioned Applications
(a) On or before the Effective Date, Perot Systems will provide the following Services described in Exhibit A for the Transitioned Applications:
(i) Services described in Exhibit A for Supported Software;
(ii) Services described in Exhibit A for Supported Hardware for the hardware that the Transitioned Applications reside upon; and
(iii) Services in support of the Data Network with respect to any network connectivity between the Transitioned Applications and the End Users.
(b) In addition to those responsibilities set forth above, Perot Systems will perform the following for the Transitioned Applications on or before the Effective Date:
(i) review all system processes applicable to the Transitioned Applications;
1
(ii) review any related third party license and maintenance agreements for the Transitioned Applications;
(iii) review ANC’s service level experience with the Transitioned Applications; and
(iv) produce a system assessment report, which is a current state assessment of the Transitioned Applications, including any recommendations for such applications.
3.2 Human Resource Activities
On or before the Effective Date, Perot Systems will complete the activities described in Section 5.3 of the MSA in regards to the Transitioned Employees.
3.3 Security Administration
Prior to the Effective Date, Perot Systems will perform the following activities in order to transition responsibility for data security to Perot Systems:
(i) review ANC’s then-current security policies and security procedures relating to data security;
(ii) develop a baseline inventory of access IDs to Supported Systems.
3.4 Disaster Recovery – Supported Systems
Prior to the Effective Date, Perot Systems will perform the following activities in order to transition responsibility for developing and maintaining the disaster recovery plan to Perot Systems:
(i) review and evaluate ANC’s then-current disaster recovery plan; and
(ii) review the feasibility and costs associated with adding certain Transitioned Applications to the disaster recovery plan in order to make recommendations to Newco at an appropriate time after the Effective Date.
3.5 Voice Communications
Prior to the Effective Date, Perot Systems will review ANC’s then-current agreements with third party vendors for communications services and equipment in order to transition responsibility for support of the voice communications equipment and connectivity to Perot Systems.
3.6 Quality Assurance
Prior to the Effective Date, Perot Systems will review ANC’s then-current quality assurance programs, policies and procedures in order to transition the quality assurance responsibilities for Supported Software to Perot Systems.
2
4. TRANSITION SERVICES
4.1 Status Report and Transition Services Plan
On the Effective Date of this Agreement, Perot Systems will provide the following to Newco:
(a) a status report of the services provided to ANC up to the Effective Date in order to effect the transition of the ANC Tasks to Perot Systems; and
(b) a plan for completing the Transition Services during the Transition Period, which includes a list of activities remaining to be completed along with any outstanding issues.
4.2 Service Level Review for the Transitioned Applications
As described in Part F of Schedule B, during the Transition Period, Perot Systems will perform the following in regards to Service Levels for the Transitioned Applications:
(a) measure Transitioned Application availability levels and create baselines for mutually agreed Service Levels for the Transitioned Applications, including updating Exhibit B as appropriate; and
(b) work with Newco to identify any Transitioned Applications to be classified as Critical Services.
3
ANNEX A-2-1 TO
ATTACHMENT A-2
TRANSITIONED APPLICATIONS
Area | | Transitioned Application |
Financial Systems | | PeopleSoft HRMS 8.01 (Human Resources, Payroll, Base Benefits) |
| PAF Web Applications (Personnel Action Form) |
| Kronos Timekeeper 2A.03 SP3 |
| Krisp (Reporting with Kronos) |
| TCS 5.0.8.2 (Scheduling for Res Centers) |
| PeopleSoft Financials 7.02 (Accounts Receivable, General Ledger, Asset Management, Accounts Payable) |
| ReportMart – Webscribe 1.1 (Report distribution tool) |
| T-Recs 3.0 (Cash Reconciliation) |
| Sunguard Treasury 1.0 (Cash Reconciliation) |
| PTMS 2.71 (Property Tax Management System) |
| UPCS 4.0 (Unclaimed Property Compliance Software) |
| Pro-Business (Feed for ANC taxes) |
| Fleet Database (Fleet extract from Odyssey) |
| Community Affairs |
Web Systems | | Alamo.com |
| ANC Online |
| ANC Intranet |
| Res2000 |
| Ops Website |
| TA.Alamo.com |
| TOOR.Alamo.com |
| PATS |
| SSRT |
| Nationalcar.com |
| Team Builder |
Revenue Management Systems | | IRMS 2.5.1 (Integrated Revenue Management System) |
| CIS (Competition Intelligence System) |
| Performance Monitor |
| Rubicon Feed for Licensee RMS |
| Yield Management |
| Mainframe IRMS/PM/Fleet Availability |
| Project X |
| ARES |
Fleet OPS | | TuneUp 2.3.1 |
| ATS (Auto Titling System) |
| Mitchell (E-Claim 2.0 and Ultramate 4.7) – Damage Assessment System |
| CIB (Central Insurance Bureau) |
| Harvest (Change Control Tool) |
| Warranty |
| Pyramid 1.2C |
4
Reporting and Data Warehouse | | National Data Warehouse |
| TOPS Database |
| Cognos Cubes |
| Tuxedo |
| JRC |
| CUSTRPT |
| Sales Cubes |
| Advanced Res |
5
Attachment A-3
VRS Project Services
1.0 Background.
1.1 General. The Parties acknowledge and agree that Newco’s information technology operating costs will be reduced if Newco consolidates the separate information technology systems that it uses to support its respective automobile reservation, rental and maintenance operations. After an examination of features and functions of the Odyssey System and the Legacy System, and subject to further review, Newco has requested Perot Systems (i) to modify and enhance the Odyssey System to include the features and functions of the Legacy System that are necessary to support its automobile reservation, rental and maintenance operations, (ii) to convert data associated with the Legacy System to be accessible by the Odyssey System, (iii) to modify and enhance, to the extent necessary, the Transitioned Applications and other necessary Software to interface to and exchange data with the Odyssey System, (iv) to place the modified and enhanced Odyssey System (which modified and enhanced system is referred to in this MSA as the “VRS”) into production at the Supported Locations, and (v) after successful completion of such activities, to decommission the Legacy System and any Transitioned Applications that are no longer necessary to support the Business. The information technology services necessary to complete the tasks described above are referred to in this Attachment and the MSA as the “VRS Project Services”.
1.2 Estimate. Prior to the Agreement Date, Perot Systems developed, with the assistance of ANC, a preliminary list of the features and functions of the Legacy System that Perot Systems anticipates will be necessary to support Alamo’s automobile reservations, rental and maintenance operations which is attached hereto as Appendix A (“Preliminary Function List”). The Parties acknowledge that Newco may materially change the Preliminary Function List. Based on the Preliminary Function List and the major assumptions and dependencies set forth in Appendix B, Perot Systems prepared a high-level estimate of (a) the level of effort required by Perot Systems to define the requirements for the Legacy Customizations, develop analysis and design documents for the Legacy Customizations, develop the program code necessary to implement the Legacy Customizations, and perform unit testing of the VRS System (“VRS Project Estimated LOE”), (b) certain other costs and expenses associated with the VRS Project (e.g., production environment implementation and roll-out costs and expenses, including training Newco’s training staff and targeted End Users), and (c) a preliminary project plan for the VRS Project (“Preliminary Project Plan”), which is attached to this Attachment as Appendix C. The Parties acknowledge and agree that the Annual Services Charge includes Perot Systems’ charges for (i) a level of effort equal to the VRS Project Estimated LOE with respect to the
1
services described in clause (a) above, and (ii) the level of effort associated with the VRS Project Services that are not described in clause (a).
1.3 Mutual Objective.
(a) The Parties mutually desire that the VRS Project Services be completed within the VRS Project Estimated LOE of 143 FTEs and within nine months after the Effective Date, as contemplated by the Preliminary Project Plan. However, the Parties acknowledge and agree that the level of effort and the elapsed time required for Perot Systems to complete the VRS Project Services may exceed or be less than the VRS Project Estimated LOE and the schedule described in the Preliminary Project Plan due to one or more of the following:
(i) Newco’s addition or inclusion of features, functions or capabilities that were not included in the Preliminary Function List or otherwise anticipated by Perot Systems to be required when the VRS Project Estimated LOE and Preliminary Project Plan were developed;
(ii) The identification of detailed elements of the features, functions or capabilities described in the Preliminary Function List that were not anticipated by Perot Systems to be required when the VRS Project Estimated LOE and Preliminary Project Plan were developed; or
(iii) The level of effort necessary for Perot Systems to design, develop, and test features, functions or capabilities described in the Preliminary Function List is reasonably determined by Perot Systems after development of the Detailed FRDs (defined below) and AD&Ds (defined below) to be greater than the VRS Project Estimated LOE. In determining such level of effort, Perot Systems will, to the extent practicable, use assumptions and an estimating methodology consistent with the assumptions and the estimating methodology used to develop the VRS Project Estimated LOE.
(b) If, at any time prior to completion of the VRS Project Services, either Party determines that the level of effort required for Perot Systems to complete the VRS Project Services will exceed the VRS Project Estimated LOE or the completion of the VRS Project Services will be delayed, Perot Systems shall, to the extent reasonably practicable, suggest alternative approaches and options to complete the VRS Project Services within the VRS Project Estimated LOE and the Preliminary Project Plan. Such alternative approaches and options may include (i) elimination of features, functions or capabilities, (ii) simplification of features, functions or capabilities, and (iii) alternative processes, means or methods to meet the
2
VRS requirements. Each Party shall use commercially reasonable efforts to adjust their activities and requirements to achieve the VRS Project Estimated LOE and the Preliminary Project Plan. To this end, Perot Systems will update the VRS Project Level of Effort and the Preliminary Project Plan after each Detailed FRD and AD&D is completed and, if the updated level of effort and schedule is not acceptable to the Parties, the Parties will take the alternative approaches and options described in this Section 1.3(b).
2.0 Requirements Definition. During the first 120 days after the Effective Date (the “Design Period”), the Parties will complete the activities described in this Section 2.
(a) Detailed FRDs. During the first 50 days of the Design Period (the “FRD Approval Period”), Perot Systems will, with Newco’s cooperation, refine the Preliminary Function List and, to the extent reasonably practicable, complete mutually satisfactory, detailed functional requirements documents for the VRS Project (“Detailed FRDs”) for Newco’s review and approval, which review and approval will not be unreasonably withheld. Perot Systems shall submit the Detailed FRDs to Newco as and when they are completed. As soon as reasonably possible (but not later than ten (10) days) after the delivery date, Newco shall complete its review of the submitted Detailed FRD and give written notice to Perot Systems either (i) approving the Detailed FRD or (ii) withholding such approval, which notice shall specify in reasonable detail Newco’s reasons for withholding such approval. While developing the Detailed FRDs, Perot Systems will provide periodic progress reports, not less frequently than every thirty (30) days, which reports will include Perot Systems’ then-current estimate of the level of effort required and schedule for completing the VRS Project. In the event Newco withholds its approval of a Detailed FRD, the Parties shall engage in good faith discussions to resolve their differences as quickly as possible.
(b) AD&Ds. During the 50 days after the end of the FRD Approval Period (or, if earlier, the date on which Newco approves the last Detailed FRD) (the “AD&D Approval Period”), Perot Systems shall develop, for Newco’s review and approval, which review and approval shall not be unreasonably withheld, an analysis and design documents (“AD&D”) for each Detailed FRD that describes the specific design requirements for the Legacy Customizations and any other activities required by such Detailed FRD. Perot Systems shall submit the AD&Ds to Newco as and when they are completed. As soon as reasonably possible (but not later than ten (10) days) after the delivery date, Newco shall complete its review of the submitted AD&D and give written notice to Perot Systems either (i) approving the AD&D or (ii) withholding such approval, which notice shall specify in all reasonable detail Newco’s reasons for withholding such approval. The description of any capabilities, features and functionality of
3
the Legacy Customizations as well as any associated business rules, inputs and outputs for and from the Legacy Customizations contained in each AD&D approved by the Parties will reflect the Parties’ mutual interpretation of the scope of the VRS Project with respect to the applicable Detailed FRD. An AD&D may not expand or contract the unambiguous scope of the VRS Project set forth in the applicable Detailed FRD. For example, if a particular function is referred to in the Detailed FRD, but omitted from the applicable AD&D, the function shall remain in the scope of the VRS Project unless a Change Order removes the function from the Detailed FRD. However, the description of any capabilities, features and functionality of the Legacy Customizations as well as any associated business rules, inputs and outputs for and from the Legacy Customizations contained in an AD&D will control the interpretation of the Detailed FRD with respect to the implementation of such capability, feature or function unless the details in the AD&D clearly and unambiguously contradict the Detailed FRD. Perot Systems shall not be required to provide the VRS Project Proposal (defined in Section 3.1) or begin coding for any Legacy Customization before receiving Newco’s approval of the AD&Ds. While developing the AD&Ds, Perot Systems will provide periodic progress reports, not less frequently than every thirty (30) days, which reports will include Perot Systems’ then-current estimate of the level of effort required and schedule for completing the VRS Project. In the event Newco withholds its approval of an AD&D, the Parties shall engage in good faith discussions to resolve their differences as quickly as possible.
(c) Disputes Regarding Interpretation. In the event of a dispute regarding the interpretation of the mutually agreed Detailed FRDs or the related AD&Ds, (i) Newco shall be responsible for any costs and delays that are determined to arise from any Change in the scope of the VRS Project pursuant to Section 4.4(a) and in accordance with the Change Control Process, (ii) Perot Systems shall be responsible for any costs or delays that are determined to arise from its incorrect interpretation of the scope of the VRS Project consistent with Section 4.4(b) below, and (iii) the Parties shall work together in good faith to resolve any issue agreed not to have been adequately addressed by the applicable Detailed FRD or the related AD&Ds.
3.0 VRS Project Proposal and Late Delivery of the VRS Project.
3.1 Preparation, Assumptions and Pricing Adjustment.
(a) Preparation. Within 130 days after the Effective Date (the “VRS Project Proposal Due Date”), Perot Systems will prepare, for Newco’s review and approval, which approval shall not be unreasonably withheld, a fixed-price proposal to complete the VRS Project Services in accordance with
4
the AD&Ds and a mutually-agreed schedule (“VRS Project Proposal”). The VRS Project Proposal will include the final project plan for the VRS Project (“VRS Project Plan”) and an updated estimate of the staffing mix and level of effort required to complete the VRS Project (“Proposed VRS Project LOE”). Newco acknowledges that any VRS Project Proposal may contain a provision that states that the pricing therein is time-sensitive and therefore that, if the VRS Project Proposal is not accepted by Newco on or before a certain date, the pricing may require adjustment in accordance with this Attachment A-3.
(b) Assumptions. As of the Agreement Date, the Parties anticipate, based upon information known to the Parties on such date, that the VRS Project Proposal will provide for (i) completion of the VRS Project within the schedule described in the Preliminary Project Plan, (ii) a level of effort required by Perot Systems to complete all of the activities described in Section 1.2 as being part of the VRS Project Estimated LOE that is not significantly greater than the VRS Project Estimated LOE, and (iii) the functionality described in the Preliminary Function List all based upon major assumptions and dependencies. However, the Parties acknowledge and agree that trade-offs between schedule, price and functionality may be required to meet the Parties’ expectations regarding schedule, price and functionality after the Detailed FRDs and AD&Ds are completed and the major assumptions and dependencies are affirmed or modified. For example, if the Detailed FRDs require functions, capabilities or interfaces that are materially more complex or extensive than the functions, capabilities and interfaces anticipated to be required by the Preliminary Function List, or Perot Systems’ major assumptions or dependencies are incorrect in any material respect, the Parties acknowledge that an additional level of effort and, perhaps, additional time will be required to complete the VRS Project Services. The Parties agree to work together in good faith to resolve any issues that arise in connection with the VRS Project Proposal.
(c) Pricing Adjustment.
(i) If the Proposed VRS Project LOE is less than the VRS Project Estimated LOE, Newco shall be entitled to a credit equal to: (A) the difference between the number of man-months between the Proposed VRS Project LOE and the VRS Project Estimated LOE, multiplied by (B) eighty percent (80%) of the applicable Additional Service Rate set forth in Exhibit C to the MSA (assuming a six (6) month commitment), for the applicable resource(s) providing VRS Project Services during the Estimated Remaining Project Duration. Any such credit shall be applied, in equal amounts, against the monthly invoices delivered by Perot Systems over the Estimated Remaining Project Duration,
5
commencing with the first invoice delivered by Perot Systems after approval of the VRS Project Proposal.
(ii) If the Proposed VRS Project LOE is more than the VRS Project Estimated LOE, Newco shall pay Perot Systems an additional amount equal to (A) the difference between the number of man-months between the Proposed VRS Project LOE and the VRS Project Estimated LOE, multiplied by (B) eighty percent (80%) of the applicable Additional Service Rate set forth in Exhibit C to the MSA (assuming a six (6) month commitment) for the applicable resource(s) providing VRS Project Services during the Estimated Remaining Project Duration. Any such charge shall be spread, in equal amounts, over the monthly invoices delivered by Perot Systems over the Estimated Remaining Project Duration, commencing with the first invoice delivered by Perot Systems after approval of the VRS Project Proposal.
(iii) For purposes of this Section 3, “Estimated Remaining Project Duration” means the period between the date Perot Systems delivers the VRS Project Proposal and the date by which the VRS Project Proposal estimates the VRS Project will be complete.
3.2 Approval of the VRS Project Proposal.
(a) General. As soon as reasonably possible (but not later than 20 days) after Perot Systems delivers the VRS Project Proposal to Newco, Newco shall complete its review of the same and give written notice to Perot Systems either (i) approving the VRS Project Proposal or (ii) withholding such approval, which notice shall specify in reasonable detail Newco’s reasons for withholding such approval.
(b) Change Order. On the date Newco approves the VRS Project Proposal, the Parties shall execute a Change Order that will include (i) the Detailed FRDs, (ii) the AD&Ds, (iii) the final project plan for the VRS Project, (iv) the change in price, if any, agreed by the Parties for the VRS Project Services (it being acknowledged by the Parties that the Annual Services Charge includes Perot Systems’ price for the VRS Project Estimated LOE), and (v) the critical external dependencies. After the Change Order is executed, Perot Systems will provide the services described in Article 4.0 of this Attachment and such Change Order. Unless otherwise agreed by the Parties, Changes to the Detailed FRDs, the AD&Ds or to other factors affecting the VRS Project (and, to the extent such Changes affect the Base Services, the Base Services) after the VRS Project Proposal is approved will be managed through the Change Control Process.
6
(c) Failure to Approve VRS Project Proposal. If the VRS Project Proposal is not approved by the Parties on or before the earlier to occur of: (1) the date that is twenty (20) days after Perot Systems’ delivery of the VRS Project Proposal to Newco; and (2) the date that is twenty (20) days after the VRS Project Proposal Due Date, Newco shall have the following options:
(i) Newco may direct Perot Systems to proceed with the VRS Project on a time and materials basis for a price equal to (A) the product of eighty percent (80%) of the Additional Services Rates (for a six month commitment) multiplied by the number of FTEs in excess of the VRS Project Estimated LOE expended by Perot Systems in connection with the VRS Project;
(ii) Newco may direct Perot Systems to Change the Detailed FRDs or AD&Ds to reduce or eliminate functions, capabilities or interfaces from the scope of the VRS Project to reduce the cost and shorten the schedule to acceptable levels;
(iii) Newco may direct Perot Systems to cease all activities on the VRS Project and increase the Annual Services Charges, Base Services, Service Levels and other obligations of the Parties under the MSA to reflect the termination of the VRS Project; or
(iv) Newco may terminate the MSA without cause or further liability or obligation to Perot Systems after giving one hundred eighty (180) days prior notice, provided that (A) the amendment to the GreenWay License and the Odyssey License granted in Section 8.7(c)(ii) of the MSA and (B) the VRS license granted in Section 8.7(c)(iii) of the MSA, shall terminate concurrently with the termination of the MSA unless Newco pays Perot Systems a license fee in the amount of $[REDACTED], which fee shall be payable in three (3) equal installments the first of which shall be payable on the date of such termination, and the second and third of which installments shall be payable on the first and second anniversaries of such date, respectively. Notwithstanding the foregoing, Newco may not terminate the MSA pursuant to this Section to the extent that the passage of the time period giving rise to the right to terminate the MSA hereunder is based on an unreasonable refusal by Newco to approve the VRS Project Proposal.
(d) Newco Delay Fee. If the Parties shall not have adopted the VRS Project Proposal and Newco shall not have elected one of the options set forth in Section 3.2(c) above within one hundred fifty (150) days of the earlier to occur of the date set forth in clause 3.2(c)(1) and (2) above, Newco shall
7
pay to Perot Systems an additional monthly fee hereunder of $300,000; provided, however, that the obligation to pay such fee shall terminate upon the agreement by the Parties on the adoption of the VRS Project Proposal or Newco’s election of one of options 3.2(c)(ii), (iii) or (iv) above (it being understood that if Newco elects option 3.2(c)(i) above, after the initial incurrence of the delay fee set forth in this Subsection 3.2(d), the obligation to pay such fee shall continue until the completion of the VRS Project (excluding time attributable to delays caused primarily by PSC Personnel)).
3.3 Late Delivery. If VRS is placed into production more than 150 days after the date set forth in the VRS Project Plan approved by Newco for placing VRS into production, either Party may terminate the VRS Project component of the MSA without cause or further liability or obligation by either Party to the other Party in connection therewith by giving the other Party five (5) Business Days’ written notice, in which case:
(a) Perot Systems shall refund to Newco $[REDACTED] adjusted either upward for any additional charge incurred under Section 3.1(c)(ii); or downward for any credit provided under Section 3.1(c)(i); or downward for any invoices which are then more than 20 days outstanding.;
(b) Perot Systems shall release to Newco $[REDACTED] of the Security Deposit (defined in Section 4.5 below) or, if less, the remaining uncontested balance; and
(c) Perot Systems shall deliver to Newco for its review and approval a proposal for reducing, effective as of the termination date, the Annual Services Charge by $[REDACTED] per month. If Newco does not approve the proposal for reducing the Annual Services Charge within thirty (30) days after it is delivered to Newco, Newco may terminate the MSA pursuant to Section 3.2(c)(iv).
4.0 VRS Project Services.
4.1 Project Governance.
(a) Each Party will designate an individual to serve as its “VRS Project Manager.” Each Party’s VRS Project Manager will: (i) serve as the principal point of accountability for coordinating and managing that Party’s obligations in connection with the VRS Project, and (ii) be authorized to act for and on behalf of that Party with respect to all matters relating to the VRS Project, subject to the limitations set forth in the MSA and any other limitations of which the other Parties are notified.
8
(b) As part of his or her responsibilities in connection with the VRS Project, Perot Systems’ VRS Project Manager shall:
(i) attend weekly VRS Project status meetings, infrastructure meetings, and other meetings reasonably requested by Newco;
(ii) provide reasonably detailed weekly and other periodic status reports, in mutually agreed formats, on the progress of the VRS Project and the resolution of VRS Project issues;
(iii) keep Newco informed regarding changes in Perot Systems Personnel assigned to the VRS Project;
(iv) manage Perot Systems’ participation in the analysis and resolution of significant VRS Project issues; and
(v) maintain the VRS Project Plan and manage the VRS Project against such VRS Project Plan.
(c) As part of his or her responsibilities in connection with the VRS Project, Newco’s VRS Project Manager shall:
(i) attend weekly VRS Project status meetings, infrastructure meetings, and other meetings attended by Perot Systems’ VRS Project Manager;
(ii) provide reasonably detailed weekly and other periodic status reports, in mutually agreed formats, on the progress of Newco’s obligations, including end-user training activities, with respect to the VRS Project and the resolution of VRS Project issues;
(iii) keep Perot Systems informed regarding changes in Newco Personnel assigned to the VRS Project; and
(iv) manage Newco’s participation in the analysis and resolution of significant VRS Project issues.
(d) All Changes to the VRS Project, including any Change to a Detailed FRD or any AD&D shall be made only in accordance with the Change Control Process described in Attachment A-1 to Exhibit A.
4.2 Development and Testing.
(a) Perot Systems shall develop, test, and deliver the deliverables required to implement the capabilities, features and functions described under each Detailed FRD, which includes the Legacy Customizations by performing the tasks and other activities described in the applicable AD&Ds, except to
9
the extent such tasks and activities are assigned to Newco in such AD&Ds. Newco shall perform the tasks and other activities assigned to Newco in the AD&Ds.
(b) Each Party shall perform the unit, system, performance, quality assurance and other testing assigned to such Party for each capability, feature and function of the Legacy Customizations in accordance with the Detailed FRD relating to testing and the AD&D applicable to such capability, feature and function and the VRS Project Plan. Unless otherwise stated in the applicable Detailed FRD or the applicable AD&D, Newco shall be responsible for performing user acceptance tests in accordance with the mutually agreed test criteria and timeframes described in the applicable AD&D (which shall reflect the testing criteria and timeframes included in the Detailed FRD relating to testing). No element of the VRS Project will be placed into production until Newco has accepted such element.
(c) If Newco is unable to perform any task, including but not limited to develop or testing any deliverable or system, in accordance with the VRS Project Plan because a Perot Systems deliverable or task is delayed (whether due to tardiness or defects), the completion date for such task shall be extended by the number of days by which Perot Systems’ deliverable is delayed. Similarly, if Perot Systems is unable to perform any task in accordance with the VRS Project Plan because a Newco deliverable or task is delayed (whether due to tardiness or defects), the completion date for such task shall be extended by the number of days by which Newco’s deliverable is delayed. Notwithstanding the foregoing, each Party shall use reasonable commercial efforts to mitigate the impact of any such delays on the VRS Project Plan by (i) performing all tasks that do not require the delayed deliverable, and (ii) taking such other actions as are reasonably practicable.
(d) Upon completion of testing in accordance with the applicable AD&D and the Detailed FRD relating to testing, Perot Systems shall notify Newco, in writing, that the deliverables required under the VRS Project are complete and ready for testing. Following such notice, Newco’s VRS Project Manager shall review such deliverables and recommend the acceptance or rejection of such deliverables to Newco, noting the reason for rejection, if any, in detail. Following receipt of such recommendation, Newco’s Chief Information Officer or his designee, shall accept or reject, in writing, such deliverables in accordance with the objective test criteria in the applicable test plan. In the event of rejection, the Parties agree to work together in good faith to resolve any issues that contributed to such rejection.
4.3 Warranty. If Newco notifies Perot Systems within ninety (90) days after a VRS Project deliverable is available to be placed into a production environment (which date is identified in the VRS Project Plan) (“Warranty Period”) that there exist
10
any Severity 1 or Severity 2 errors, omissions or non-conformities that cause such deliverable not to conform to the mutually agreed testing criteria described in the applicable AD&D (collectively, “Defects”), then Perot Systems shall promptly correct such Defects in accordance with the testing criteria described in the applicable AD&D without additional charge to Newco. The Parties acknowledge and agree that the testing criteria shall be designed to confirm in an objective way that such software conforms in all material respects to the requirements described in the applicable Detailed FRDs and the related AD&Ds.
4.4 Delays.
(a) Caused by Newco. If the initiation, delivery or implementation of the VRS Project is delayed primarily due to delays, errors, omissions, actions or failures to act by Newco, any Newco Affiliate, any Licensees/Franchisees, any global distributed systems (GDS) vendor or any of their respective Subcontractors, including but not limited to any delay by Newco, any Supported Affiliate or any Licensee/Franchisee in training, rollout, business process reengineering or any external critical dependency, Newco or user testing (excluding delays arising from Perot Systems’ obligations under the MSA or the Detailed FRDs or AD&Ds)(collectively, “Delays”), then (i) if the Delay occurs at any time before Perot Systems delivers the VRS Project Proposal, any subsequent schedule and dates set forth in Appendix C (as well as, if applicable, the FRD Approval Period, the AD&D Approval Period and the VRS Project Proposal Due Date) will be extended on a day-for-day basis, (ii) if the Delay occurs at any time after Perot Systems delivers the VRS Project Proposal, the delivery dates under the VRS Project Plan will be extended on a day-for-day basis, and (iii) in all cases, Perot Systems may increase its charges to Newco for the VRS Project and, to the extent impacted by such delays, the Annual Service Charges, in accordance with the Change Control Process.
(b) Caused by Perot Systems. If the initiation, delivery or implementation of the VRS Project is delayed primarily due to delays, errors, omissions, actions or failures to act by Perot Systems or any PSC Personnel, then Perot Systems will be responsible for any increased costs under the MSA for which Perot Systems is financially responsible, and Perot Systems’ charges under this MSA shall not be increased, except as otherwise provided in this Attachment A-3.
(c) Adjustment to Annual Services Charge. If, after adoption of the VRS Project Proposal, Newco shall cause more than one hundred fifty (150) days of Delay (as defined in Section 4.4(a) above), then commencing on the one hundred fifty first (151st) day of such Delay, and continuing for the remainder of the VRS Project, Newco shall pay to Perot Systems
11
$300,000 per month in addition to the then-current Annual Services Charge.
4.5 Security Deposit. On the Effective Date, Newco shall deliver to Perot Systems (i) a cash sum in an initial amount of $[REDACTED] (the “Security Deposit”), and (ii) a security agreement in form and substance reasonably satisfactory to Perot Systems sufficient to establish that the Security Deposit can be held to secure Newco’s payments to Perot Systems under the MSA and shall not be subject to any lien, attachment, trustee process or any other judicial process of any creditor of Newco. Perot Systems shall have the right to offset or recoup any amounts properly due and payable by Newco to Perot Systems under the MSA against such Security Deposit. Should Newco breach any of the terms and conditions of the MSA, Perot Systems shall have the right, at any time and from time to time, to apply the Security Deposit or any part thereof, for the purpose of curing any such default or for the purpose of reimbursing for any damage or costs occasioned by such default, but the right of Perot Systems to apply the Security Deposit shall not affect any other remedies available to Perot Systems under the MSA or under applicable law. All interest and other return amounts earned on the Security Deposit shall be for the account of Newco and shall be paid over to Newco to the extent the amount of the Security Deposit exceeds the applicable amount set forth on Appendix D hereto. Provided that Newco is then current on its payment obligations under the MSA, the amount of the Security Deposit shall be reduced over time in accordance with the amounts set forth on Appendix D hereto. Any amount by which the Security Deposit exceeds the applicable amount set forth on Appendix D hereto shall be paid to Newco. Nothing herein contained shall require Perot Systems to hold the Security Deposit as a trust fund, nor establish any relationship other than that of debtor and creditor with respect to the Security Deposit.
12
Appendix A
Preliminary Function List
The Preliminary Function List on which the VRS Project Estimated LOE is based is attached as Annex A-1. The following Detailed FRDs will be developed as described in Section 3.0 of Attachment A-3, to which this Appendix is attached.
FRD Description | | Requirements Complete | | AD&D Complete | |
Odyssey GAP 3000 Days Level of Effort | | | | | |
One-Time and International Conversion Reporting FRD | | | | | |
Financial (Receivables, T&S) Conversion FRD | | | | | |
Odyssey Non-Fleet Data Conversion FRD | | | | | |
Odyssey Fleet Data Conversion FRD | | | | | |
GDS Links and Rate Updates Conversion FRD | | | | | |
Rollout Bridges Conversion FRD | | | | | |
*Rollout / Solution Center FRD | | | | | |
*Manual Conversion FRD | | | | | |
Data Security FRD | | | | | |
*Business Process Change FRD | | | | | |
Testing (QA & UAT) FRD | | | | | |
*Training FRD | | | | | |
Ancillary Applications Transition - Admin Systems FRD | | | | | |
Ancillary Applications Transition - Fleet (Tune-up, Pyramid, ATS, Warranty) FRD | | | | | |
Ancillary Applications Transition - Revenue Management System FRD | | | | | |
E-Commerce FRD (National Web, Alamo Web and R2K) | | | | | |
Decommissioning Odyssey - Data Archival and Retrieval FRD | | | | | |
Reporting FRD | | | | | |
Data WarehouseFRD | | | | | |
Infrastructure FRD | | | | | |
* Newco Personnel will be primarily responsible for the activities under this FRD.
13
Annex A-1
Preliminary Function Lists
Area | | Gap Candidate | | Comments | | Days | | Category |
Web | | Initial rate engine call to return all rates regardless of vehicle category and then they do the upsell. LDART - location, Dates arrival, return, type-car | | VRS requires that the vehicle category be entered first. VRS could call upsell rate engine format first thing and it would return all cars and individual T&M. An upsell call could be made that would return the base rate for all cars. The rate call that gives back all car classes that voice reservations uses has the same product for all vehicles. Not sure that this will work for what the Web wants to do
Create front end to display this information - back end Tux service is in place to make this happen and the order of rate engine calls in the tux service may have to be re-ordered. Assumes no architecture changes
Assuming changes made to the Res Commit process to support Voice Res and GDS would support WEB. | | 80 | | Extra large |
| | | | | | | | |
Web | | City Items - how to display the additional optional costs | | VRS to repackage equipment/insurance - multiples of same piece, young drivers, FSO | | 10 | | Small |
| | | | | | | | |
Web | | Quick Rent | | Agentless check out for Alamo. Determine whether this is applicable moving forward. | | 10 | | Small |
| | | | | | | | |
Voice | | Max days before rental when a credit card is not due with a pre-paid | | Alamo allows pre-pays without a credit card and then allows the credit card/prepayment to be taken later, and allow for incremental increases/decreases in that amount along the way. VRS only allows for one prepayment to be taken and it cannot be incremented/decremented, and additionally does not support for not providing that payment on a prepay. This looks significant when looking at doing partial refunds and additional authorizations on a RES, deferring payments, and making sure that all gets to the rental, or refunded. Also display of auth history/details popup for a res. | | 45 | | Large |
| | | | | | | | |
Voice | | Real time Res Statistics: Real time booking by agent on Mainframe listing dollars for potential commission | | VRS has something similar now with a tux service. Agent incentives is already a separate table. We would have to make functionality more robust and provide a screen to review - add the db access to a res commit tux service to do aggregations on a per agent basis. | | 25 | | Medium |
| | | | | | | | |
Voice | | Speedlink and Prepaid vouchers • Alamo sends reservations to Speedlink - • Prepaid vouchers | | PeopleSoft would collect payment and feed would enter into Res from PeopleSoft to create a new payment type and a commission module call to net the payment - Res information has to be made available to discuss with TA and driver. New batch program for Cancellations to feed back into PeopleSoft. Cross team - commission module and PeopleSoft feed is billing.
Speedlink feed could be handled via book it bill it interface | | 25 | | Medium |
14
Voice | | Retrieve reservations that have been booked for a customer within the last 7 days regardless of status. Do not display if projected rental date has already passed. Display this on res form. | | This requirement indicated the entry of the phone number, not the pre-population from a CTI type interface. In that case, RES would pull that info and need to prompt the user that existing RES details exist and determine if the user wants to proceed with that info (could be a modify of a res, a booking, a wrap-up, cancel). Need to work through business rules on what to do in each case. May be able to use existing CTI pre-population logic to handle the retrieve of a wrap-up to start a new booking. Depends on what they want to do with the wrap-up info and the associated rate | | 25 | | Medium |
| | | | | | | | |
Voice | | ANI pop up, call History • where the call came from last seven digits of telephone #) • They store the quote (wrap up) with the exchange number so they can match up that you called before when they call again. | | VRS writes out the wrap up reservation with all the data - CTI telephony captures phone number automatically for storage. We would need to pull up the most recent rate that had been quoted. VRS stores basic res data - wrap status. Store the ANI info linked to res for indexing purposes Add option for agent to get ANI from CTI to do query against wrap up reservations to pull up prior calls. ANI its own column/table. Build in some dialog steps or text into CTI to guide the user Only keep these around for a limited period. Would have to update the purge job. Business rules need to be established regarding getting new rate or honoring old. CTI is not being utilized but the code exists as a baseline. The functionality would need to be broadened and thoroughly tested as it has not been utilized in production.
CTI estimates are not included in this estimate. Instead, it is assumed that phone numbers could be keyed in manually and no automated CTI feature would be required | | 20 | | Medium |
| | | | | | | | |
Voice | | Alternate Res number lookup and display for DBI | | VRS would need to account for a non unique res number from an external source for look up and billing.
As far as the Alt Res #, if we are using ncr_nbr from the RES table, it is 18char alpha so it would not need to be changed, already has an index on it and would only need minor changes to have the reservation form allow for entry of alpha numerics for that value and for the search to auto look for it when a res# is entered. An older design and prototype was done this back in the early VRS development stages. | | 20 | | Medium |
| | | | | | | | |
Voice | | Virtual Inventory levels and capacity matrix | | VRS functionality may be sufficient | | 0 | | Small |
| | | | | | | | |
Voice | | Work Flow | | Need additional details to finalize scope | | 10 | | Small |
15
GDS | | Direct Booking Interfaces (DBI) | | The DBI consists of real-time and batch links that enable Tour Operators to book reservations directly into Alamo’s reservation system. Interfaces will be created for VRS.
Batch links consist of regularly delivered files containing multiple transactions (adds, revisions, or cancels). The files are delivered through AT&T’s Global Network through a file transfer. Currently there are approximately 18 batch links.
The six existing real-time links process individual transactions as they are delivered through one of three different mechanisms. Three links send reservations across leased lines, two use AT&T’s Global Network and one sends reservations via Alamo’s backbone network to the UK.
ANC hosts web sites TA.Alamo.com and TOOR.Alamo.com to facilitate the real-time channel. An assessment is required to determine if there are any front-end requirements associated with switching these interfaces to VRS. | | 60 | | Large |
| | | | | | | | |
GDS | | AVR message/ Capacity AVCs | | VRS does not support AVRs. • seamless takes the vendor our of the rate availability • Recommend finishing the process of getting Galileo, Amadeus, Worldspan etc.. to seamless as opposed to adding in AVR | | 60 | | Extra large |
| | | | | | | | |
GDS | | Amadeus Vouchers | | VRS does not support - • Amadeus has a voucher print function - send details to them and they use them on bookings. Internal vouchers in VRS | | 20 | | Medium |
| | | | | | | | |
GDS | | Southwest, Startoma • direct links • southwest may be coming through a vendor now | | VRS - bring up an actual physical link with the vendor and make sure they have the same message structure and front ends match up • E-Travel, Viatel, (XML OTA format)
Need to add links for Southwest and Startoma | | 20 | | Medium |
| | | | | | | | |
GDS | | GDS Sell from Screens | | Need additional details to finalize scope | | 10 | | Small |
| | | | | | | | |
CPM | | Yield Management capacity controls • stopping your weekend (stop sell) on a rate • reopen | | Need additional details to finalize scope | | 130 | | Extra large |
| | | | | | | | |
CPM | | Deeper Reporting • Historical data - 5 years available for adhoc reporting • AIM, product etc.... Availability of data that is replicated - Market History tapes | | VRS - to build out the data warehouse functionality to satisfy this year over year reporting. | | 130 | | Extra large |
16
CPM | | Market Segmentation • set on customer set up and drives sequence of offered rates linked to segments - OSP going to best rate • customer affinity that groups like contracts together to share like attributes | | VRS - data conversion/ongoing IM we could set much of this affinity functionality in VRS. Market Segmentation - would need to link to the data warehouse and build out for customer analysis. | | 80 | | Extra large |
| | | | | | | | |
CPM | | Channel specific pricing - Different rates for GDS/Voice/Web or by inbound country / IATA etc.. | | VRS input parameters into rate engine - rates would have to be set up by channel or a differential based on channel - set up and call process changes. | | 60 | | Extra large |
| | | | | | | | |
CPM | | Table rates (length of stay, shadow rates, honor rates)
Variable rates set 30 to 60 days out per day and the rentals then lay over this and take the average of rates based on the duration of the res/rental. • David Rosenbaum said they were moving away from the table rates | | Need to verify whether these are needed in the future.
Define a the number of rate detail - different competitive rate per calendar rate per day and take the average of those 5 rental days for the booking. Re-rating requirements are an issue. • Product and vehicle as a header and you fill in a calendar - screen/DB tables - need rate engine changes to do average on length of rental | | 45 | | Large |
| | | | | | | | |
CPM | | DBI • booking channel - download files for confirmation • Type A and B type access | | XML standard - edifact translations for DBI • wrapper to standard interface to VRS | | 10 | | Small |
| | | | | | | | |
CPM | | Coupon processing • looks like a gap more on the Alamo side verses VRS | | Need additional details to finalize scope | | 0 | | TBD |
| | | | | | | | |
CPM | | Rate Structure • GDS will take a weekend or week day rate and shop them differently | | Not an issue for VRS (Pkg, T&M, Weekend, Variable rates) • GDS shopping issue in VRS | | 0 | | TBD |
| | | | | | | | |
CPM | | Sales Rep Incentives • selling commercial contracts • District territory and division fields. | | Manage this outside of VRS. • district/territory and region is tracked on the ORG table now in VRS that could support reporting to see if the contracts being sold are producing • could feed a data warehouse to do this type of reporting of volume | | 0 | | TBD |
| | | | | | | | |
CPM | | Benefit packages - Tours packages | | VRS CIR 130 functionality potentially satisfies need | | 0 | | Small |
| | | | | | | | |
CPM | | Delivery and collection - Europe | | Need additional details to finalize scope (along with understanding the disposition of Europe) | | 0 | | TBD |
17
Billing | | Tour Operator Billing - file feeds of invoices 14 Tour Operators | | The direct tour links are just another form of direct link that Alamo has and that VRS does not (similar to Southwest Airlines, etc.) They probably represent a small-medium effort to convert over, but to confirm the effort, the message protocol or connection method must be determined. Construct the infrastructure which will support multiple DBI links and will minimize the effort needed to add a new link. Link specific message formats and special edits/processing will be user-configurable rather than hard-coded. New communication protocols will be added via incremental development effort. The majority of the business logic will be constructed such that it is common across all links to minimize maintenance requirements. To provide a given DBI link, it will be necessary to complete the appropriate communication module and to complete the link specific development in addition to this infrastructure development piece. | | 600 | | Extra large |
| | | | | | | | |
Billing | | Prepaid vouchers where TOs do not have a business account. In these instances, Alamo gets paid in advance before the rental occurs or driver will pay for the rental via credit card. Basically the Tour pays in advance less commission payment and the res system has to know / calc the commission to validate the payment and the full voucher amount must print on rental/invoice. | | Set up an IATA/contract also / plus no business account. Call 1090 to calc commission and put in a new screen to apply cash to the reservation. Must have a feed into Res to populate the payments table with a new payment type for the prepaid voucher. Also have to set up a batch job to post refunds for cancellations. | | 100 | | Extra large |
| | | | | | | | |
Billing | | Central bill once a month on business and 3 times per month for Tours - pay on the out for tours as well • accruals for next month • adjustments at the close of the rental • Schedule Billing an open rental • Month end closes • utilize long-term rental logic | | Make changes to Schedule bill programs to pick up invoices on open rentals. Make changes to counter invoice program to be called from check out screens in ROPS and still keep the RA open. Make changes to invoice adjustment (CCRI) processes to allow invoice adjustments while the rental is open. Note, we recommend a solution to not allow credit replacements until after the rental is closed. (estimates reflect this). | | 80 | | Extra large |
| | | | | | | | |
Billing | | Frequent Flyer Bonus points program - online user driven more like commission plans for marketing staff | | Option A - 80 Option C - 26 Option D - 11
Estimate is only for Option A. | | 80 | | Extra large |
| | | | | | | | |
Billing | | Consolidated billing for Alamo - bill in a central currency no matter what the rental currency is. Conversion to take place and posting in to financials | | Need to store a preferred currency on the business account and then convert the rental invoices in to this currency when generating the schedule bills and postings into PeopleSoft. Assumes that there is a PeopleSoft instance set up in the foreign currency or some feature is set up to post alternate currency into A/R and G/L in a single corporate instance of PeopleSoft. | | 50 | | Extra large |
18
Billing | | Trecs Cash batch process | | Alamo has identified issues with current ancillary system Trecs and they have created workarounds. Need to verify whether the batch feeds are still needed going forward. | | 45 | | Large |
| | | | | | | | |
Billing | | Frequent Feeds for Alamo | | Modify the Frequent Flyer Feed (BILB0130) program to create Alamo files | | 45 | | Large |
| | | | | | | | |
Billing | | Invoice Format for Alamo - more text • Different Format program • Charge type screens that have print text - brand • Batch invoice (central) • Hand Held invoice | | New format for invoices (HH, Counter and Central). Basically the existing programs are pulling all the relevant data, need to format a new document. | | 40 | | Large |
| | | | | | | | |
Billing | | Southwest airlines | | New Interface | | 40 | | Large |
| | | | | | | | |
Billing | | A/R Balances stored in OPS - • want to see outstanding balances for business accounts/IATAs | | Feed back into VRS to make the BA a do not rent based on outstanding receivables. • balance threshold or aging • business accounts manually set based on a report • cross team for RES/ RENT and Counter Billing • business rules on when to make the edit of do not rent stick in RES/ RENT | | 35 | | Large |
| | | | | | | | |
Billing | | Channel Chart reporting and tracking all referrals of where business is originating and reporting on this. | | Need to capture additional data via forms. Assumes 2 reports | | 30 | | Medium |
| | | | | | | | |
Billing | | Settle on the Out versus the In (Credit Card) | | Need additional details to finalize scope | | 25 | | Medium |
| | | | | | | | |
Billing | | Force charge refunds - AP Accounts done via approval screens where VRS does negative receivables | | Change the force charge batch process to create an A/P posting as well as automatically create an A/P business account instead of an A/R business account.
Create approval screens to release the A/P refund to post into PeopleSoft. | | 25 | | Medium |
| | | | | | | | |
Billing | | Commission file feeds to NPC | | Program modifications to create an Alamo NPC file | | 15 | | Small |
| | | | | | | | |
Billing | | Alternate Res number lookup and display for DBI | | Schedule bill invoices for Tour operators using the DBI interface will need to display this alternate reservation number. | | 15 | | Small |
| | | | | | | | |
Billing | | Electronic Notes and comments | | Add text fields to BA screens | | 15 | | Small |
| | | | | | | | |
Billing | | Memo and note pad - sales staff selling the account | | Add off the org or contract in VRS | | 10 | | Small |
| | | | | | | | |
Billing | | Credit card settlement file generation changes for Alamo - Verifone places a National identifier or code on the settlement file | | Create a Unix script to update the file to Alamo after the Verifone EOD settlement process runs. | | 5 | | Small |
| | | | | | | | |
Billing | | Refund MCO vouchers - unused portions | | Modify the Default Allocation process to not shrink fixed value vouchers so that a refund situation would exist in ROPS and a refund could be given at the counter | | 5 | | Small |
| | | | | | | | |
Billing | | FRND system versus the QSP and the AP postings | | VRS does not post to A/P today but rather G/L for these credits applied as negative rental charges. If a post to A/P a new feed would is required | | 0 | | TBD |
19
Billing | | MSA interface - Old Accounting system - feed to MSA the A/R transactions and then feed output to their Legacy A/R system | | Utilized PeopleSoft A/R - Need to examine conversion and license costs | | 0 | | TBD |
| | | | | | | | |
Billing | | Voucher Images - scan in and view | | Need additional details to finalize scope | | 0 | | TBD |
| | | | | | | | |
Billing | | 1 European country | | May not be an issue - Speedlink in UK and use current Reservation bridge | | 1 | | Small |
| | | | | | | | |
Billing | | NOMAD or report generators - | | Could use Cognos or B.O. reports with Data warehouse | | 0 | | TBD |
| | | | | | | | |
Billing | | Commission calculations and postings | | Assuming that the commission plans/rules and calculation grids would be sufficient to handle Alamo commissions.
Estimate assumes that Alamo creates an A/P account and associated A/P postings each month for each IATA payment. | | 5 | | Small |
| | | | | | | | |
Billing | | No automated Bank/Credit information look up when setting up new accounts • No Feed back from A/R for outstanding balances and aging • Open Item verses balance forward statements | | Would have to create interfaces to MoVRS’s/D&B or another Bank service to automatically get credit information.
Need additional information to finalize scope | | 0 | | TBD |
| | | | | | | | |
Rops | | Rental agent upsell program and incentives - Commission approaches are different between Alamo and National. Alamo rolls all increment revenue together while National itemizes and pays out based 4 distinct categories. | | Two paths: 1) Make commission program consistent between brands; 2) Maintain separate commission programs and enhance VRS to support Alamo incentive processes. | | 50 | | Extra large |
| | | | | | | | |
Rops | | Rental Upsell • more flexible upsell pricing capabilities | | Upsell pricing abilities since gap first was identified have been added to VRS. Ability to perform upsell pricing for leisure and non-contractual rates supported in VRS.
Hooks are in place in VRS. Need to create data model and several new forms and displays to the customer | | 40 | | Large |
| | | | | | | | |
Rops | | Alamo rental agreement print design | | Write new program to print Alamo format with text and labels. | | 40 | | Large |
| | | | | | | | |
Rops | | Quick Silver - Legacy loyalty program.
Emerald Club re-launch could be tied into Quick Silver possibly. | | Quick Silver and Emerald Club sufficiently different requiring VRS enhancements to support Quick Silver. Emerald Club could be customized to support. Recommend combining with Emerald Club re-launch initiative. | | 30 | | Medium |
| | | | | | | | |
Rops | | Overlapping movements - Alamo allows it but National does not. | | VRS has tighter restrictions and car control and does not allow overlapping movements. These edits would have to be relaxed and it would have an effect on inventory and fleet processes | | 30 | | Medium |
20
Rops | | Rental Operations Work Flow - screen flow relating to collecting customer information. Differences between how rates are provided relating to what type of information is required before a rate can be provided. | | Generic - VRS would need to make a public or shopper call to get rates before customer details are entered. VRS can do walk up rate calls prior to entry of driver information | | 30 | | Medium |
| | | | | | | | |
Rops | | Tickets (traffic violations) • match parking tickets from local authorities by time and date to the renter at that time who had the vehicle. | | Integrate with VRS (fleet subsystem) and provide screens to search and find the rental and driver | | 15 | | Small |
| | | | | | | | |
Rops | | National performs TML processing for specific states as does Alamo. These states differ. Enhance TML calling process to handle Alamo’s DMV checks. | | Use TML to do requests for drivers in the Alamo states not already handled by VRS. Assume 3 extra states at 5 days per state | | 15 | | Small |
| | | | | | | | |
Rops | | Interface with 3rd party claims system (Pyramid) | | Orphan system interface - modify Pyramid interface to feed Risk parameters. | | 15 | | Small |
| | | | | | | | |
Rops | | Prepaid vouchers for TO/TAs with no business account. The prepayment from the TA must flood into ROPS at the start of the rental and count for payment against the rental (IATA prepay) and if the payment is not there the charges default to the driver. | | Changes to ROPS forms to handle the new voucher prepayment for prepaid vouchers. | | 15 | | Small |
| | | | | | | | |
Rops | | Perform credit card settlements on the Out instead of at Return time. | | Support cc settlements on both the Out and the Return. Establish business rule by brand. | | 15 | | Small |
| | | | | | | | |
Rops | | Multiple business accounts on a single rental | | Change ROPS forms to allow more than one business account on a rental. | | 10 | | Small |
| | | | | | | | |
Rops | | Voucherless - prevent modification of voucher days and provide ROPS with edits and display messages | | Have edits in ROPS to not allow modifications to vouchers if a flag is set on the business account etc. | | 5 | | Small |
| | | | | | | | |
Rops | | Multiple hold reason codes | | Need additional details to finalize scope | | 5 | | Small |
| | | | | | | | |
Rops | | FRND system versus the Quality Service Processing (QSP). - AP voucher queuing and approval. | | QSP can credit the rental if it is still open. Once the invoice is cut, QSP is non monetary and must be handled via AP. See billing for estimate | | 5 | | Small |
| | | | | | | | |
Rops | | Incentives feed PeopleSoft for Alamo | | VRS feed most likely will be sufficient | | 0 | | Small |
| | | | | | | | |
Rops | | Kiosk’s - Bankruptcy was to discontinue. Method of delivery to interact with a machine to get keys | | Need to verify whether the Kiosk program is still required | | 0 | | TBD |
| | | | | | | | |
Rops | | Road Service • Stand alone system lacking integration today. | | Need additional details to finalize scope | | 0 | | TBD |
| | | | | | | | |
Rops | | Inventory philosophy | | Specific changes to implement the Alamo inventory philosophy not defined yet. . | | 0 | | TBD |
21
Rops | | Business versus Leisure questions asked by ROPS agent | | Add flag to database and screen and pass to rate and billing engine to dictate applicable charges.
National does not ask the customer whether the rental is for leisure or business, but Alamo does and rates are affected. Issue requires further clarification. | | 0 | | TBD |
| | | | | | | | |
Fleet Mgt | | Titling System | | Build a titling system for identifying where titles are located since it is external to VRS. | | 150 | | Extra large |
| | | | | | | | |
Fleet | | Reporting | | VRS to enhance reports to give similar reports to what they have in the mainframe. Some reports would be generated from the Data Warehouse. Others would have to be real time. Allocated a number of days for reports | | 100 | | Extra large |
| | | | | | | | |
Fleet Mgt | | Disposal Centralization | | Disposal in VRS is meant for local or regional use - changes would have to be made to make it more centralized. | | 90 | | Extra large |
| | | | | | | | |
Fleet Mgt | | Real Time Hold evaluation | | VRS holds are a batch process and once they go on a car they stay until some takes them off (user online, bridge or Tune up). Legacy holds are more real time. Specific events trigger hold logic for a vehicle. For example, if it supposed to go on disposal, it places hold on the car. PMs are a hard hold in IVS.
VRS car goes on disposal and gets moved to another location - it stays on disposal. In legacy if the new controlling location re-evaluates the disposal hold and it could come off hold automatically.
Real time evaluations for specific holds | | 30 | | Medium |
| | | | | | | | |
Fleet | | FIN - Depreciation calculation methods and allocations at station level. | | VRS does it at a pool level and not station. All data is there for VRS to calculate at station level.
• Assuming that Alamo would do depreciation based on length of ownership and allocate to business unit/org that owns the car and not Utilization like they do today in IVS. (PeopleSoft allocates the depreciation for VRS). | | 30 | | Medium |
| | | | | | | | |
Fleet | | Risk | | RISK has an interface with Tune up and Pyramid does not and thus we would need to build interface from Pyramid to Tune up. | | 30 | | Medium |
| | | | | | | | |
Fleet | | FIN - Mitsubishi | | Need to add. Make it XML for standards. • need ANC sponsor to interface with manufacturer. • Assuming different file formats than GM | | 20 | | Medium |
| | | | | | | | |
Fleet | | Loss Damage | | VRS would have to build interface to NCIC - police database to see if the car has been recovered or reported stolen. Before they will recover a car and remove a theft hold, they check NCIC. Also make it centralized | | 20 | | Medium |
22
Fleet | | IVS supports Off Lot sales | | In VRS you have to move it to auction to sell. We would need to develop business rules to allow us to sell vehicles that are still on our lot.
• Change sales invoice process | | 10 | | Small |
| | | | | | | | |
Fleet Mgt | | Disposal User Interface | | Disposal - VRS user interface for rule set definition requires the user to understand and/or logic. The users have had trouble with this concept. The form for defining rules could be redesigned with a template feel to hide logical operators from the user. This would ease training requirements for the user. | | 10 | | Small |
| | | | | | | | |
Fleet | | Registration centralization | | VRS is built with a localized model for most operational functions. Changes would be made to centralized (security based mainly). | | 10 | | Small |
| | | | | | | | |
Fleet Mgt | | ATS Interface | | Build interface with ATS, the title request system. | | 10 | | Small |
| | | | | | | | |
Fleet | | Help Text | | We calculate similar numbers with different algorithms so our help text needs to be revamped to make it clear. For example, controlled fleet counts are calculated separately in RES, ROPS and Fleet and the number can represent a valid difference | | 10 | | Small |
| | | | | | | | |
Fleet | | Planning | | ANC is not using VRS’s planning tool since they are using a spreadsheet now. Current legacy system does not have a planning tool. Solution will be to continue the use spreadsheets. | | 5 | | Small |
| | | | | | | | |
Fleet | | Multiple Hold reason codes | | VRS has many more holds than IVS. VRS holds are a batch process and once they go on a car they stay until some takes them off (user online, bridge or Tune up). Legacy holds are more real time. Specific events trigger hold logic for a vehicle. For example, if it suppose to go on disposal, it places hold on the car. PMs are a hard hold in IVS.
VRS car goes on disposal and gets moved to another location - it stays on disposal. In legacy if the new controlling location re-evaluates the disposal hold and it could come off hold automatically.
Disposal - VRS user interface would have to be re-written but the table structures would stay the same. Real time evaluations for specific holds | | 5 | | Small |
| | | | | | | | |
| | | | Total Days | | 3011 | | |
| | | | | | | | |
| | | | Days per Man month | | 21 | | |
| | | | | | | | |
| | | | Man months | | 143 | | |
Note: Some preliminary estimates have not been estimated and are listed as “To Be Determined” (TBD). These gaps generally require investigation to determine the order of magnitude of the effort. Small estimates with 0 days are requirements that will most likely be satisfied with process changes or existing functionality
| | | Range (days) |
| | | 0 | to 15 | Small |
| | | | | |
| | | 16 | to 30 | Medium |
| | | | | |
| | | 31 | to 45 | Large |
| | | | | |
| | | 46 | + | Extra large |
23
Appendix B
Major Assumptions and Dependencies
The VRS Project Estimated LOE and Preliminary VRS Project Plan are based upon the following major assumptions and dependencies:
(a) During the VRS Project, no material changes will be made to any Supported Systems other than those made (i) in connection with the VRS Project, (ii) to comply with tax or other regulatory requirements, or (iii) pursuant to a Change Order.
(b) Perot Systems will work in good faith to introduce additional Changes where required by Newco, through the Change Control Process, as long as the scheduled delivery date for the VRS Project is not changed, except as mutually agreed by the Parties through a Change Order.
(c) Newco’s Global Distributed Systems (GDS) partners will participate on a timely basis in the testing required under the VRS Project and Newco is responsible for such participation.
(d) The VRS Project is being conducted on an accelerated timeline, based on Newco’s business and financial constraints. During the course of the VRS Project, the Parties will not unreasonably withhold any decision, consent or acceptance necessary to complete the VRS Project in accordance with the Preliminary VRS Project Plan.
(e) The Preliminary VRS Project Plan is dependent upon the full, prompt and complete cooperation of Newco business personnel to define their detailed requirements in the context of the business and financial constraints imposed on the VRS Project.
24
Appendix C
Preliminary VRS Project Plan
VRS Project Phase | | Deliverable | | Duration following effective date | | Responsible Party | | Contract Event |
Requirements | | Detailed GAP Requirements | | Day 0 to 50 | | Newco/Perot Systems | | |
| | Delivery of all FRD’s | | Day 50 | | Perot Systems | | FRD Deliverables completed for Newco review |
| | Newco approval of FRD’s | | Day 60 | | Newco | | Detailed FRD’s, Signed off and agreed to by Newco and Perot Systems |
Analysis/Design | | Data collection and compilation of ADD’s | | Day 61 to 114 | | Perot Systems | | |
| | Delivery of all ADD’s | | Day 115 | | Perot Systems | | ADD Deliverables completed for Newco review |
| | Newco approval of ADD’s | | Day 120 | | Newco | | ADD’s signed off and agreed to by Newco and Perot Systems |
| | Delivery of OSP Proposal | | Day 130 | | Perot Systems | | Scope, Timeline, Budget for OSP project |
| | Newco approval of OSP Proposal | | Day 150 | | Newco | | Approval to complete OSP project |
25
Appendix D
Security Deposit Amounts
Month | | Newco Security Deposit Balance | |
| | | |
1 | | $ | [REDACTED] | |
2 | | $ | [REDACTED] | |
3 | | $ | [REDACTED] | |
4 | | $ | [REDACTED] | |
5 | | $ | [REDACTED] | |
6 | | $ | [REDACTED] | |
7 | | $ | [REDACTED] | |
8 | | $ | [REDACTED] | |
9 | | $ | [REDACTED] | |
10 | | $ | [REDACTED] | |
11 | | $ | [REDACTED] | |
12 | | $ | [REDACTED] | |
13 | | $ | [REDACTED] | |
14 | | $ | [REDACTED] | |
15 | | $ | [REDACTED] | |
16 | | $ | [REDACTED] | |
17 | | $ | [REDACTED] | |
18 | | $ | [REDACTED] | |
19 | | $ | [REDACTED] | |
20 | | $ | [REDACTED] | |
21 | | $ | [REDACTED] | |
22 | | $ | [REDACTED] | |
23 | | $ | [REDACTED] | |
24 | | $ | [REDACTED] | |
25 to end of Term | | $ | [REDACTED] | |
26
Attachment A-4
Supported Desktop Hardware and Supported Desktop Software
Part A - Supported Desktop Hardware (as of the Effective Date)
Supported Desktop Hardware
Location or Business Unit | | Platform | | Category | | Machine Manufacturer | | Machine Type/Model | | Machine Serial Number | | Description |
National | | | | Counter | | HP | | VL5 | | | | |
National | | | | Back Office | | HP | | VL5 | | | | |
Alamo | | | | Counter | | Compaq | | 6400 | | | | |
Alamo | | | | Back Office | | Compaq | | 6400 | | | | |
National | | | | Res | | HP | | VL5 | | | | |
Alamo | | | | Res | | Compaq | | 6400 | | | | |
Alamo | | Handheld | | Rental location | | Norand | | 3210 | | | | W/3270 emulation |
Alamo | | Handheld | | Rental location | | Norand | | 1750 | | | | W/3270 emulation |
National | | Handheld | | Rental location | | Intermec | | 6400 | | | | VT220/3270 emulation |
Alamo/Nat’l | | Handheld | | Rental location | | Symbol | | 81C6 | | | | 802.11b/VT220/3270 emulation |
Alamo | | Printer | | Rental location | | O’Neil | | 6805/6805a | | | | |
National | | Printer | | Rental location | | Comtec | | RP3 | | | | |
National | | Printer | | Rental location | | O’Neil | | MP3 | | | | |
Alamo/Nat’l | | Printer | | Rental location | | Zebra | | AL320 | | | | |
Alamo/Nat’l- MSP (ACCRA)* | | Imaging | | Imaging | | | | | | | | |
* Vendor will support the ACCRA imaging system hardware and software existing as of the Effective Date. Such hardware and software will be inventoried and this schedule or the Operations Procedures Manual updated during Transition.
1
Part B - Supported Desktop Software (as of the Effective Date)
(Listed by Standard Image)
Compaq Back Office
Software Package | | Image 9/99 | | New CPC Image | | Field Server Image 8/2001 |
Windows NT 4.0 SP4 | | NT 4.0 SP 5 | | NT 4.0 SP 5 | | NT 4.0 SP 5 |
Microsoft Internet Explorer | | Ver 4.01 SP2 | | Ver 4.01 SP2 | | Ver 5.5 SP1 |
Microsoft Data Access Components (MDAC) | | Ver 2.1 | | Ver 2.1 | | Ver 2.1 |
Microsoft Office 97 Professional | | SR-2 | | SR-2 | | SR-2B |
Microsoft Office 97 Viewers | | Not Installed | | Not Installed | | Not Installed |
Microsoft Outlook 98 | | 8.5.5603.0 | | 8.5.5603.0 | | 8.5.5603.0 |
Microsoft Media Player | | 6.00.02.0902 | | 6.00.02.0902 | | Ver 6.4 |
Microsoft’s FM2Paste.exe (Forms Security Patch) | | X | | X | | X |
Microsoft’s WD97SP (MS Word Template fix) | | X | | X | | X |
Microsoft Res Kit - Perl | | Ver 5.003 | | Ver 5.003 | | Ver 5.003 |
Microsoft Res Kit - Windows Scripting Host | | X | | X | | X |
Hummingbird Host Explorer | | Ver 6.02 | | Ver 6.02 | | Ver 6.02 |
Host Explorer Patch 17 | | Yes | | Yes | | Yes |
McAfee Virus Shield | | Ver 4.0.25 | | Ver 4.0.25 | | McAfee 4.5 SP 1 |
Winzip 32 | | Ver 6.3 (902a) | | Ver 6.3 (902a) | | Ver 8 |
Adobe Acrobat Reader | | Ver 3.02 | | Ver 3.02 | | Ver 5 |
Kronos Timekeeper | | Ver 2A.03 | | Ver 2A.03 | | Removed |
Timbuktu Pro 32 | | Ver 2.0 Build 622 | | Ver 2.0 Build 622 | | Ver 2.0 Build 759 |
Net G (Skill Vantage Manager) | | 2.2 | | 2.2 | | Removed |
RES 2000 | | X | | X | | X |
Citrix Client | | 1.7 | | Ver 3.00.329 | | Ver 3.00.329 |
Ares | | Ver 1.x | | 1.01 | | 1.01 |
RI TuneUP | | Ver 1.04 | | Ver 1.04 | | Ver 2.3.1 |
C:\winnt\Distribution Media Folder | | | | | | |
Mobius / Document Direct | | Yes | | Yes | | Yes |
Keyboards | | 3180 / 8109 | | 3180 / 8109 | | Removed |
Team Builder | | Ver 4.6.18 | | Ver 4.6.18 | | Removed |
PDI | | Ver 2.2 | | Ver 3.00.095 | | Ver 3.00.095 |
MS Access 97 | | Ver xxx | | Ver 5.0 | | Ver 5.0 |
SMS Pkg/SMSMAN | | All Images | | Not Installed | | Installed |
McAfee 4.5 & SP1 SDAT 4155 | | All Images | | Not Installed | | Installed |
COGNOS | | BO Only? | | Not Installed | | Not Installed |
OutLook98 | | All Images | | Not Installed | | Installed |
Timbuktu Pro 32 Build 759 | | All Images | | Not Installed | | Installed |
RI TuneUP Ver 2.3.1 | | Not Installed | | Not Installed | | Not Installed |
Network Associates Directory | | Not Installed | | Not Installed | | Installed |
SQR Viewer | | Not Installed | | Not Installed | | Not Installed |
Winframe Client | | Installed | | Installed | | Installed |
2
VL5 Counter
Software Package | | Image 9/99 | | New CPC Image | | Field Server Image 8/2001 |
Windows NT 4.0 SP4 | | NT 4.0 SP 5 | | NT 4.0 SP 5 | | NT 4.0 SP 5 |
Microsoft Internet Explorer | | Ver 4.01 SP2 | | Ver 4.01 SP 2 | | Ver 5.5 SP 1 |
Microsoft Data Access Components (MDAC) | | Ver 2.1 | | Ver 2.1 | | Ver 2.1 |
Microsoft Office 97 Professional | | Not Installed | | Not Installed | | N/A |
Microsoft Office 97 Viewers | | X | | 8 | | 8 |
Microsoft Outlook 98 | | 8.5.5603.0 | | 8.5 | | 8.5 |
Microsoft Media Player | | 6.00.02.0902 | | 6 | | 6.4 |
Microsoft’s FM2Paste.exe (Forms Security Patch) | | X | | X | | N/A |
Microsoft’s WD97SP (MS Word Template fix) | | Not Installed | | Not Installed | | N/A |
Microsoft Res Kit - Perl | | Ver 5.003 | | Ver 5.003 | | 5.003 |
Microsoft Res Kit - Windows Scripting Host | | X | | X | | N/A |
Hummingbird Host Explorer | | Ver 6.02 | | Ver 6.0.2 | | Ver 6.0.2 |
Host Explorer Patch 17 | | Yes | | Yes | | Yes |
McAfee Virus Shield | | Ver 4.0.25 | | Ver 4.0.25 | | McAfee 4.5 SP 1 |
Winzip 32 | | Ver 6.3 (902a) | | Ver 3.0 | | Ver 8 |
Adobe Acrobat Reader | | Ver 3.02 | | Ver 3.0 | | Ver 5 |
Kronos Timekeeper | | Ver 2A.03 | | Ver 2A.03 | | Removed |
Timbuktu Pro 32 | | Ver 2.0 Build 622 | | Ver 2.0 Build 350 | | Build 758 |
Net G (Skill Vantage Manager) | | 2.2 | | Ver 2.2.1 | | Removed |
RES 2000 | | X | | X | | N/A |
Citrix Client | | N/A | | 3.00.329 | | N/A |
Ares | | N/A | | N/A | | N/A |
RI TuneUP | | N/A | | N/A | | N/A |
C:\WINNT\Distribution Media Folder | | | | | | |
Mobius/Document Direct | | N/A | | N/A | | N/A |
Cherry Keyboards | | 3180/8109 | | 3180/8109 | | Not Installed |
Team Builder | | N/A | | N/A | | N/A |
PDI | | N/A | | N/A | | N/A |
MS Access 97 | | N/A | | N/A | | N/A |
SMS Pkg/SMSMAN | | All Images | | Not Installed | | Installed |
McAfee 4.5 & SP1 SDAT 4155 | | All Images | | Not Installed | | Installed |
COGNOS | | N/A | | N/A | | N/A |
Outlook 98 | | All Images | | Not Installed | | Not Installed |
Tim Buk Tu Pro 32 Build 758 | | All Images | | Not Installed | | Installed |
WINNT SP5 | | Installed | | Installed | | |
Winframe | | Installed | | Not Installed | | |
Internet Eplorer 5.5 SP1 | | Not installed | | Not Installed | | Not Installed |
Network Associates Directory | | Not installed | | Not Installed | | Installed |
3
VL5 Back Office
Software Package | | Image 9/99 | | New CPC Image | | Field Server Image 8/2001 |
Windows NT 4.0 SP4 | | NT 4.0 SP 5 | | NT 4.0 SP 5 | | NT 4.0 SP 5 |
Microsoft Internet Explorer | | Ver 4.01 SP2 | | Ver 4.01 SP2 | | Ver 5.5 SP1 |
Microsoft Data Access Components (MDAC) | | Ver 2.1 | | Ver 2.1 | | Ver 2.1 |
Microsoft Office 97 Professional | | SR-2 | | SR-2 | | SR-2B |
Microsoft Office 97 Viewers | | Not Installed | | Not Installed | | Not Installed |
Microsoft Outlook 98 | | 8.5.5603.0 | | 8.5.5603.0 | | 8.5.5603.0 |
Microsoft Media Player | | 6.00.02.0902 | | 6.00.02.0902 | | Ver 6.4 |
Microsoft’s FM2Paste.exe (Forms Security Patch) | | X | | X | | X |
Microsoft’s WD97SP (MS Word Template fix) | | X | | X | | X |
Microsoft Res Kit - Perl | | Ver 5.003 | | Ver 5.003 | | Ver 5.003 |
Microsoft Res Kit - Windows Scripting Host | | X | | X | | X |
Hummingbird Host Explorer | | Ver 6.02 | | Ver 6.02 | | Ver 6.02 |
Host Explorer Patch 17 | | Yes | | Yes | | Yes |
McAfee Virus Shield | | Ver 4.0.25 | | Ver 4.0.25 | | McAfee 4.5 SP 1 |
Winzip 32 | | Ver 6.3 (902a) | | Ver 6.3 (902a) | | Ver 8 |
Adobe Acrobat Reader | | Ver 3.02 | | Ver 3.02 | | Ver 5 |
Kronos Timekeeper | | Ver 2A.03 | | Ver 2A.03 | | Removed |
Timbuktu Pro 32 | | Ver 2.0 Build 622 | | Ver 2.0 Build 622 | | Ver 2.0 Build 759 |
Net G (Skill Vantage Manager) | | 2.2 | | 2.2 | | Removed |
RES 2000 | | X | | X | | X |
Citrix Client | | 1.7 | | Ver 3.00.329 | | Ver 3.00.329 |
Ares | | Ver 1.x | | 1.01 | | 1.01 |
RI TuneUP | | Ver 1.04 | | Ver 1.04 | | Ver 2.3.1 |
C:\winnt\Distribution Media Folder | | | | | | |
Mobius / Document Direct | | Yes | | Yes | | Yes |
Keyboards | | 3180 / 8109 | | 3180 / 8109 | | Removed |
Team Builder | | Ver 4.6.18 | | Ver 4.6.18 | | Removed |
PDI | | Ver 2.2 | | Ver 3.00.095 | | Ver 3.00.095 |
MS Access 97 | | Ver xxx | | Ver 5.0 | | Ver 5.0 |
SMS Pkg/SMSMAN | | All Images | | Not Installed | | Installed |
McAfee 4.5 & SP1 SDAT 4155 | | All Images | | Not Installed | | Installed |
COGNOS | | BO Only? | | Not Installed | | Not Installed |
OutLook98 | | All Images | | Not Installed | | Installed |
Timbuktu Pro 32 Build 759 | | All Images | | Not Installed | | Installed |
RI TuneUP Ver 2.3.1 | | Not Installed | | Not Installed | | Installed |
Network Associates Directory | | Not Installed | | Not Installed | | Installed |
SQR Viewer | | Not Installed | | Not Installed | | Installed |
Winframe Client | | Installed | | Installed | | Installed |
Note: Maint Managers also have Mitchell Ultramate & E-Claim | | N/A | | N/A | | N/A |
4
Compaq Counter
Software Package | | Image 9/99 | | New CPC Image | | Field Server Image 8/2001 |
Windows NT 4.0 SP4 | | NT 4.0 SP 5 | | NT 4.0 SP 5 | | NT 4.0 SP 5 |
Microsoft Internet Explorer | | Ver 4.01 SP2 | | Ver 4.01 SP2 | | Ver 5.5 SP 1 |
Microsoft Data Access Components (MDAC) | | Ver 2.1 | | Ver 2.1 | | SR 2B |
Microsoft Office 97 Professional | | Not Installed | | Not Installed | | N/A |
Microsoft Office 97 Viewers | | X | | Ver 8 | | 8 |
Microsoft Outlook 98 | | 8.5.5603.0 | | Ver 8.5 | | 8.5 |
Microsoft Media Player | | 6.00.02.0902 | | Ver 6.0 | | 6 |
Microsoft’s FM2Paste.exe (Forms Security Patch) | | X | | X | | N/A |
Microsoft’s WD97SP (MS Word Template fix) | | Not Installed | | Not Installed | | N/A |
Microsoft Res Kit - Perl | | Ver 5.003 | | Ver 5.003 | | 5.003 |
Microsoft Res Kit - Windows Scripting Host | | X | | X | | N/A |
Hummingbird Host Explorer | | Ver 6.02 | | Ver 6.02 | | Ver 6.0.2 |
Host Explorer Patch 17 | | Yes | | Yes | | Yes |
McAfee Virus Shield | | Ver 4.0.25 | | Ver 4.0.25 | | McAfee 4.5 SP 1 |
Winzip 32 | | Ver 6.3 (902a) | | Ver 6.3 | | Ver 8 |
Adobe Acrobat Reader | | Ver 3.02 | | Ver 3.02 | | Ver 5 |
Kronos Timekeeper | | Ver 2A.03 | | Ver 2A.03 | | Removed |
Timbuktu Pro 32 | | Ver 2.0 Build 622 | | Ver 2.0 Build 650 | | Build 758 |
Net G (Skill Vantage Manager) | | 2.2 | | Ver 2.2 | | Removed |
RES 2000 | | X | | N/A | | N/A |
Citrix Client | | | | Ver 3.00.329 | | N/A |
Ares | | | | N/A | | N/A |
RI TuneUP | | | | N/A | | N/A |
C:\WINNT\Distribution Media Folder | | | | | | |
Mobius/Document Direct | | Installed | | N/A | | |
Cherry Keyboards | | 3180 / 8109 | | 3180 / 8109 | | Removed |
Team Builder | | | | | | N/A |
PDI | | | | | | N/A |
MS Access 97 | | | | N/A | | N/A |
SMS Pkg/SMSMAN | | All Images | | Not Installed | | Installed |
McAfee 4.5 & SP1 SDAT 4155 | | Not Installed | | Not Installed | | Installed |
COGNOS | | | | N/A | | N/A |
Outlook 98 | | All Images | | Not Installed | | Installed |
Tim Buk Tu Pro 32 Build 758 | | All Images | | Not Installed | | Installed |
WINNT SP5 | | Not Installed | | Installed | | Installed |
Winframe | | Not Installed | | Installed | | N/A |
Internet Eplorer 5.5 SP1 | | Not Installed | | Not Installed | | Installed |
Network Associates Directory | | Not Installed | | Not Installed | | Installed |
5
RES 1
Windows NT 4 Service Pack 3
Outlook 98
IE 4.01 + SP1
Office 97 Viewers
Adobe Acrobat Reader 3.02
WinZip 32 Bit 6.3 (902a)
McAfee Virus Scan (3.14a Engine)
Timbuktu Pro 32-bit (Build 622)
Perl & KiXtart for scripting
Microsoft Windows Sripting Host
C:\1386
HostExplorer 6.02
EasyView
Mosaix
Helpdesk.bat
Res2000 TCP/IP
Compaq Support Software for Windows NT:
Compaq 10/100 TX Network Drivers (SP7111)
Compaq Universal Video Drivers (SP6395)
ATI Rage Video Drivers (SP6890)
Compaq Bus Master IDE (SP6329)
Compaq Insight Manager Desktop Agents V4.20
(DMI) (SP7724)
Compaq Power Management Extentions (SP6538)
Compaq Remote Management Setup (SP5209)
Compaq Remote ROM Flash & Security (SP3537)
6
RES 2
Windows NT 4 Service Pack 3
Outlook 98
Office Pro 97 SR-2
IE 4.01 + SP1
McAfee Virus Scan (3.14a Engine)
Timbuktu Pro 32-bit (Build 622)
WinZip 6.3 (Build 902a) 32bit
Adobe Acrobat Reader 3.02
Perl & KiXtart for scripting
Microsoft Windows Scripting Host
C:\1386
HostExplorer 6.02
EasyView
Mosaix
Helpdesk.bat
Res2000 TCP/IP
Compaq Support Software for Windows NT
Compaq 10/100 TX Network Drivers (SP7111)
Compaq Universal Video Drivers (SP6395)
ATI Rage Video Drivers (SP6890)
Compaq Bus Master IDE (SP6329)
Compaq Insight Manager Desktop Agents V4.2
(DMI) (SP7724)
Compaq Power Management Extentions (SP6538)
Compaq Remote Management Setup (SP5209)
Compaq Remote ROM Flash & Security (SP3537)
7
EXHIBIT B
SERVICE LEVELS AND SERVICE LEVEL CREDITS
TABLE OF CONTENTS
PART A | | DEFINITIONS |
PART B | | CRITICAL SERVICE LEVELS AND KEY MEASUREMENTS CALCULATION |
PART C | | CRITICAL SERVICE LEVELS AND KEY MEASUREMENTS – LEGACY SYSTEM |
PART D | | CRITICAL SERVICE LEVELS AND KEY MEASUREMENTS – VRS |
PART E | | CRITICAL SERVICE LEVELS AND KEY MEASUREMENTS – SHARED SYSTEMS |
PART F | | SERVICE LEVELS AND KEY MEASUREMENTS – TRANSITIONED APPLICATIONS |
PART G | | SERVICE LEVEL MONITORING TOOLS AND SERVICE LEVEL REPORTING |
1
PART A –DEFINITIONS
1. Certain Definitions
1.1 All capitalized terms used, but not defined, in this Exhibit B are defined and have the same meanings given them in the MSA or other Exhibits. As used in this Exhibit B:
(a) “Critical Service Levels” means the Service Levels for the Critical Services listed in Schedule 10.8.
(b) “Customer Impact Report” means a report delivered by the Help Desk each Business Day, which reports Help Desk call statistics and Severity 1 and Severity 2 activity over the prior 24-hour period.
(c) “Initial Response Time” means the elapsed time between (i) the moment a Problem ticket is recorded in the problem management and reporting system as being opened by PSC Personnel, and (ii) the earlier of (A) the moment such problem is recorded in the problem management and reporting system as being closed by PSC Personnel, or (B) the moment recorded in the problem management and reporting system that PSC Personnel notified the appropriate support personnel.
(d) “Key Measurements” means the Service measurements listed herein for any Services other than Critical Services.
(e) “Prime Hours” with respect to the Critical Services, are set forth in each applicable Critical Service Level table in Parts C, D, E and F hereof.
(f) “Problem” means any disruption in the availability or capability of a Supported System or a Base Service.
(g) “Problem Ticket” means the document in electronic or written form that is created by the Help Desk in the Problem tracking system to record a Problem Call to the Help Desk and track the resolution of the Problem.
(h) “Reference Period” means seven consecutive calendar days beginning 00:00 Sunday and ending on Saturday 23:59 for the Eastern time zone of the United States, unless otherwise specified in this Exhibit.
(i) “Reliability” means, with respect to a Supported System, the (i) the total number of minutes that such Supported System is available to perform its regular functions during a Reference Period, divided by (ii) the total number of minutes that such Supported System is expected (after excluding Scheduled Maintenance Windows and, if approved by Newco, any Unscheduled Maintenance Windows) to be available to perform its regular functions during such Reference Period, expressed as a percentage. For example, if a Supported System is available to perform its regular functions for 9450 minutes during a Reference Period, and is expected to be available to perform its regular functions for 9660 minutes (e.g., 1440 minutes per day, less a daily 60 minute Scheduled Maintenance Window) during such Reference Period, the Reliability for the Reference Period is computed as (9450 / 9660) x 100% = 97.83%.
(j) “Reliability Target” means, with respect to a Supported System, the targeted Reliability.
(k) “Reporting Period” means four consecutive Reference Periods.
2
(l) “Resolved” means, with respect to a Problem, that such Problem has been corrected and has been implemented so that work can be resumed. A Problem may be Resolved prior to the time the related Problem Ticket has been closed.
(m) “Scheduled Maintenance Day” means each day on which the Parties agree that Perot Systems will perform scheduled maintenance on a Supported System during the Scheduled Maintenance Window. Unless otherwise agreed by the Parties, there will be one Scheduled Maintenance Day per calendar month for the Legacy System, two Scheduled Maintenance Days per calendar month for the VRS System, one Scheduled Maintenance Day per calendar month for the Transitioned Applications and one Scheduled Maintenance Day per calendar month for the Data Network.
(n) “Scheduled Maintenance Window” means the four consecutive hour period, starting at 02:00, Eastern Time zone, on each Scheduled Maintenance Day.
(o) “Service Level Credit” means the sum of money Perot Systems agrees to credit Newco’s monthly invoice when a Critical Service Level is not met during the previous Reporting Period, as described in Part B hereof. Service Level Credits are divided into two categories:
(i) “Tier 1” are Service Level Credits issued by Perot Systems for a failure to meet a Critical Service Level for the Critical Services listed in Schedule 10.8; and
(ii) “Tier 2” are Service Level Credits issued by Perot Systems for a failure to meet the Critical Service Levels for the Data Network described in Part F of this Exhibit B.
(p) “Status Update” means a notation in the problem management and reporting system and a communication with an end user or other interested caller regarding the current status of the Problem Resolution Process with respect to a particular Problem.
(q) “System Availability” means, with respect to a Supported System, that all material functions of and resources (other than Network and telecommunications resources) relating to such Supported System, including but not limited to all production databases and all application servers (e.g., VRS application servers and support servers (e.g., servers running GDS, Rates Engine or on-line batch reporting), are available to perform their regular functions.
(r) “Time To Repair” means, with respect to a Problem, the elapsed time between (i) the end of the Initial Response, and (ii) the moment the Problem is Resolved.
(s) “Transaction Response Time” means, with respect to mutually agreed Applications Software, the elapsed time required by such Applications Software to complete a mutually agreed transaction, as measured by tools used by Newco on the Effective Date.
(t) “Unscheduled Maintenance Window” means a period other than a Scheduled Maintenance Window during which the Parties agree that Perot Systems will perform maintenance (e.g., minor upgrades) or other activities (e.g., major upgrades) relating to a Supported System or a Supported Network.
3
PART B –SERVICE LEVEL – KEY MEASUREMENT CREDIT CALCULATION
1. Conditions.
Perot Systems will credit Newco in its monthly invoice for each failure to meet a Critical Service Level or Key Measurement as described herein. Except as set forth below, Perot Systems will not calculate or provide Service Level Credits for the Key Measurements, but Perot Systems will measure its performance against the Key Measurements. If Perot Systems fails to meet such Key Measurements during any three consecutive Reporting Periods (except with respect to Key Measurements for the Transitioned Applications set forth Parts F.2 and F.3 during the Transition Period and the Enhancement and Quality Key Measurements set forth in Parts E.3 and E.4, respectively), (i) Perot Systems shall issue a Service Level Credit to Newco of [REDACTED] percent ([REDACTED]%) of the monthly portion of the Annual Services Charge for the Reporting Period in which the failure occurred; and (ii) Perot Systems will propose a performance improvement plan for Newco’s review within 15 days after the end of such period. If Newco approves such performance improvement plan, Perot Systems will implement such performance improvement plan within 30 days after such approval.
2. Calculations.
At the beginning of each Reporting Period, if Perot Systems failed to meet the Critical Service Levels during the previous Reporting Period, Perot Systems will provide Service Level Credits to Newco in accordance with the calculation described in Sections 3 and 4 below.
Service Level Credits for failures to meet the applicable Service Levels during non-Prime Hours as listed in the Service Level tables in Parts C, D, E and F hereof will be calculated at [REDACTED] percent ([REDACTED]%) of the final calculation for Service Level Credits for Prime Hours.
3. Tier 1 Service Level Credits:
(a) The first instance of failure to meet any Tier 1 Critical Service Level during a Reporting Period shall cause Perot Systems to issue a Service Level Credit to Newco of [REDACTED] percent ([REDACTED]%) of the monthly portion of the Annual Services Charge for the month in which the failure occurred. For example, Perot Systems misses a Tier 1 Critical Service Level and the monthly portion of the Annual Services Charge is $[REDACTED]; the Service Level Credit would be $[REDACTED] ($[REDACTED] X [REDACTED]).
(b) Failure to meet the same Tier 1 Critical Service Level in a second consecutive Reporting Period shall cause Perot Systems to issue a Service Level Credit to Newco of [REDACTED] percent ([REDACTED]%) of the monthly portion of the Annual Services Charge for the month in which the failure occurred.
(c) Failure to meet the same Tier 1 Critical Service Level in a third consecutive Reporting Period shall cause Perot Systems to issue a Service Level Credit to Newco of [REDACTED] percent ([REDACTED]%) of the monthly portion of the Annual Services Charge for the month in which the failure occurred.
4. Tier 2 Service Level Credits:
(a) The first instance of failure to meet any Tier 2 Critical Service Level in a Reporting Period shall cause Perot Systems to issue a Service Level Credit to Newco of [REDACTED] percent ([REDACTED]%) of the monthly portion of the Annual Services Charge for the month in which the failure occurred.
(b) Failure to meet the same Tier 2 Critical Service Level in a second consecutive Reporting Period shall cause Perot Systems to issue a Service Level Credit to Newco of [REDACTED] percent ([REDACTED]%) of the monthly portion of the Annual Services Charge for the month in which the failure occurred.
4
(c) Failure to meet the same Tier 2 Critical Service Level in a third consecutive Reporting Period shall cause Perot Systems to issue a Service Level Credit to Newco of [REDACTED] percent ([REDACTED]%) of the monthly portion of the Annual Services Charge for the month in which the failure occurred.
5. Notes on Critical Service Level Credits
(a) The opportunity to earn back a Service Level Credit as described in Section 7.3(b) of the MSA is forfeited if Newco elects to terminate the Agreement in accordance with Section 10.4(b) of the MSA.
(b) In accordance with Section 10.4(a) of the MSA, Newco may terminate the MSA if Perot Systems fails to meet the minimum Service Level for any Critical Service for three consecutive months.
5
PART C – CRITICAL SERVICE LEVELS AND KEY MEASUREMENTS– LEGACY SYSTEM
1. Legacy System
Perot Systems will measure its performance in accordance with the Critical Service Levels and Key Measurements for the Legacy System set forth in this Part C and report such performance to Newco.
2. Legacy System – Critical Services
The Legacy System – Critical Services are listed in Schedule 10.8. Perot Systems will meet or exceed the Service Level for Reliability set forth in table below:
Period | | Prime / non-Prime Hours Eastern Time | | Service Level for Reliability | |
Sunday-Saturday | | Prime- 0600 – 2000 | | 99.5 | % |
| | non-Prime 2000-0600 | | 99 | % |
| | | | | |
Scheduled Maintenance Day | | Prime- 0600 – 2000 | | 99.5 | % |
| | non-Prime 2000-0200 | | 99 | % |
| | Maintenance 0200-0600 | | | |
Reliability for the Legacy System shall be determined for applicable Supported Software and Supported Hardware (excluding Data Network/telecommunications services and equipment) at the server-side boundaries. A server-side boundary shall be considered internal to the Legacy System application, database and system environment excluding wide area network and desktop environments.
3. Legacy Systems – Key Measurements
(a) The following Legacy Systems applications are subject to Key Measurements:
Area | | Covered Application |
Brand-Legacy | | Customer Service Support – FRND |
Financial-Legacy | | Financial System – FIN |
| | Accounts Receivables |
| | Billing |
Fleet-Legacy | | Fleet Ordering - FPOS |
| | Repair Order System - ROMP |
| | Liability and Claims - RISK |
6
(b) Perot Systems will measure its performance against the Key Measurement – Reliability Target described in the table below for the above listed Legacy Systems applications:
Period | | Prime / non-Prime Hours Eastern Time | | Reliability Target | |
Sunday-Saturday | | Prime- 0600 – 2000 | | 99.5 | % |
| | non-Prime 2000-0600 | | 99 | % |
| | | | | |
Scheduled Maintenance Day | | Prime- 0600 – 2000 | | 99.5 | % |
| | non-Prime 2000-0200 | | 99 | % |
| | Maintenance 0200-0600 | | | |
(c) For purposes of the above Key Measurements table, Legacy System Reliability shall be determined for applicable Supported Software and Supported Hardware (excluding Data Network/telecommunications services and equipment) at the server-side boundaries. A server-side boundary shall be considered internal to the Legacy System application, database and system environment excluding wide area network and desktop environments.
7
PART D – CRITICAL SERVICE LEVELS AND KEY MEASUREMENTS – VEHICLE RENTAL SYSTEM (VRS)(1)
1. VRS System
Perot Systems will measure its performance in accordance with the Critical Service Levels and Key Measurements for the VRS System set forth in this Part D and report such performance to Newco.
2. VRS System – Critical Services
(a) The VRS System Critical Services are listed in Schedule 10.8. Perot Systems will meet or exceed the Service Level for Reliability set forth in table below:
Period | | Prime/ non-Prime Hours Central Time | | Service Level for Reliability | |
M-SA | | Prime- [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | Extended Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | non-Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | | | | |
SU (2nd and 4th Sunday of each month) | | Prime- [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | Extended Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | non-Prime [REDACTED] – [REDACTED] [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | Maintenance [REDACTED] – [REDACTED] | | [REDACTED] | |
| | | | | |
SU (1st and 3rd Sunday of each month) | | Prime- [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | Extended Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | non-Prime [REDACTED] – [REDACTED] [REDACTED] – [REDACTED] | | [REDACTED] | % |
(1) With respect to the Odyssey System prior to the commencement date of the Warranty Period, as defined in Section 4.3 of Attachment A-3 of Exhibit A, Perot Systems will measure its performance with the Odyssey System in regards to the Reliability Service Levels set forth in the table in Section 2(a) below and will be subject to the Service Level Credits set forth in Section B of this Exhibit B.
With respect to the VRS during the Warranty Period, Perot Systems will measure its performance with VRS against the Reliability Service Levels set forth in the table in Section 2(a) below and Perot Systems will calculate Service Level Credits for Perot Systems’ failure to meet the Reliability Service Levels for VRS as follows:
(i) For the initial 60 days of the Warranty Period, Perot Systems will be subject to 50% of the Tier 1 Service Level Credits set forth in Part B of this Exhibit B for a failure to meet the Reliability Service Level; and
(ii) For the final 30 days of the Warranty Period, Perot Systems will be subject to 75% of the Tier 1 Service Level Credits set forth in Section B for a failure to meet the Reliability Service Level.
8
Period | | Prime/ non-Prime Hours Central Time | | Service Level for Reliability | |
| | Maintenance [REDACTED] – [REDACTED] | | | |
| | | | | |
(b) For purposes of the above table, System Reliability shall be determined at the server-side boundaries. A server-side boundary shall be considered internal to the application, database and system environment excluding wide area network and desktop environments.
3. Key Measurement – VRS System - Anticipated Internal System Response Times
Perot Systems will measure its performance against the Anticipated Average Response Time Key Measurement set forth in the table below for the VRS System. For the purposes of this Key Measurement, “Anticipated Response Time” is defined as the time it takes between the completion of one screen or field movement and the display of a subsequent screen or field movement. Measurement will be done manually at the applicable workstation.
Transaction | | Anticipated Average Response Time (1) | | Average Desired Response Time Per Transaction |
Voice Reservation Commit (end to end) | | </= [REDACTED] Seconds | | <[REDACTED] Seconds |
Driver Profile Inquiry (end to end) - (3) | | </= [REDACTED] Seconds | | <[REDACTED] Seconds |
Rental Agreement Inquiry (end to end) - (3) | | </= [REDACTED] Seconds | | <[REDACTED] Seconds |
Rental Handheld Check-in (end to end) - | | </= [REDACTED] Seconds | | <[REDACTED] Seconds |
Rate Engine (internal) | | </= [REDACTED] Second | | <[REDACTED] Seconds |
Commit /Print of RA (end to end) | | </= [REDACTED] Seconds | | <[REDACTED] Seconds |
Global Distribution System – 98% of type A | | </= [REDACTED] Seconds | | <[REDACTED] Seconds |
Credit Card Authorization (end to end) | | </= [REDACTED] Seconds | | <[REDACTED] Seconds |
(1) Inquiry is a simple, single record type retrieval by driver ID or reservation number or RA number. Complex multiple-record and ad hoc inquiries are excluded.
9
PART E – KEY MEASUREMENTS AND CRITICAL SERVICE LEVELS – SHARED SYSTEMS
1. Help Desk Services – Key Measurements
(a) Problem Resolution Matrix
Perot Systems will measure its performance of the Help Desk Services in accordance with the Key Measurements set forth in the Problem Resolution Matrix table below.
Problem Severity | | Description | | Performance Standard | | Measurement Technique | | Resolution Target |
Severity 1 | | Any Problem that (A) affects (i) the majority of End Users of the applicable Supported System, (ii) a Critical Service, (B) materially disrupts Newco’s ability to perform its business operations, and (C) has no reasonable workaround. Severity 1 Problems include:
1. Critical operational reports 2. Performance of critical transactions | | Initial Response within five minutes after the Help Desk receives the Problem report, 95% of the time.
Status Updates given every hour until the Problem is Resolved to the first individual who reported the Problem to the Help Desk, unless otherwise agreed by the Parties. | | From Problem Management and Reporting System | | 80% of Problem Tickets Resolved within four hours |
| | | | | | | | |
Severity 2 | | Any Problem that (A) affects (i) the majority of End Users of the applicable Supported System, (ii) a Critical Services, (B) interferes with the proper operation or response of a Supported System, and (C) has a reasonable workaround. | | Initial Response within 30 minutes after the Help Desk receives the Problem report, 90% of the time.
Status Update given every three hours until the Problem is Resolved to the first individual who reported the Problem to the Help Desk, unless otherwise agreed to by the parties. | | From Problem Management and Reporting System | | 80% of tickets Resolved within one Business Day |
| | | | | | | | |
Severity 3 | | Any Problem that affects a limited number of End Users of the affected Supported System (e.g., less than approximately 25% of such users) and has a reasonable workaround. | | Initial Response (i) within four hours after the Help Desk receives the Problem report, 90% of the time during Peak Hours, or (ii) by the next Business Day, 90% of the time outside Peak Hours.
Status Update given every three Business Days until the Problem is Resolved (or until the Problem ticket is classified as “pending”) to the first individual who reported the Problem to the Help Desk, unless otherwise agreed to by the parties. | | From Problem Management and Reporting System | | 80% of tickets Resolved within 30 Business Days |
10
Problem Severity | | Description | | Performance Standard | | Measurement Technique | | Resolution Target |
Severity 4 | | Any other Problem affecting a Supported System that can be mitigated by using a workaround. | | Initial Response within one Business Day after the Help Desk receives the Problem report, 90% of the time during Peak Hours.
Status Update given every five Business Days until the Problem is Resolved (or until the Problem ticket is classified as “pending”) to the first individual who reported the Problem to the Help Desk, unless otherwise agreed to by the parties. | | From Problem Management and Reporting System | | 80% of tickets Resolved within 45 Business Days |
11
(b) Help Desk Responsiveness Matrix
Perot Systems will measure its performance of the Help Desk Services in accordance with the Key Measurements set forth in the Responsiveness Matrix table below.
Service Measurement | | Description | | Target Service Level | | Frequency | | Expected Performance | | Measurement Technique |
| | | | | | | | | | |
Speed to Answer | | The time for a user to have a call answered by the Help Desk as measured from the time the caller selects the menu options to the time the call is answered by a Help Desk agent. | | [REDACTED] second average | | [REDACTED]% | | [REDACTED] seconds | | ACD Statistics |
| | | | | | | | | | |
Abandon Rate | | The percentage of callers who hang up after the call is forwarded into the Help Desk agent queue but before speaking with a Help Desk agent regarding a Problem. Some percentage of callers will hang up during system-wide Problems once they hear the recorded message regarding the anticipated recovery time. These calls will not be included in the Abandon Rate Service Level statistics. | | [REDACTED]% | | [REDACTED]% | | [REDACTED]% to [REDACTED]% | | ACD Statistics |
| | | | | | | | | | |
Newco Customer Impact Report | | Production of final Newco Customer Impact Report | | 7:00 am ET Mon - Fri | | [REDACTED]% | | 7:00 a.m. ET Mon.-Fri. | | Posted to IT Online by 7:00 a.m. EST |
| | | | | | | | | | |
Calls Resolved with First Contact | | The percentage of calls to the Help Desk that are Resolved with no further contact necessary. (1) | | [REDACTED]% | | [REDACTED]% | | [REDACTED]% | | Problem Management and Reporting System |
| | | | | | | | | | |
Wait Time | | The maximum time an individual waits on the phone until a Help Desk agent answers the call, excluding broadcast message time | | [REDACTED] min. | | [REDACTED]% | | [REDACTED] secs. | | ACD Statistics – call wait times exceeding 3 minutes |
12
Notes on the Help Desk Responsiveness Matrix:
(1) The phrase “Resolved with no further contact necessary” means a Problem Ticket is opened and closed during the initial contact between the Help Desk agent and the originator of the call. Calls that must be addressed by a group other than Perot Systems will not be included in the calculation of the percentage of calls Resolved with the first contact.
13
2. Critical Service Levels – Data Network
Perot Systems will meet or exceed the Critical Service Levels for the Data Network set forth in the table below:
Site | | Period | | Prime/ non-Prime Hours (Eastern Time Zone) | | Reliability Service Level | |
Redundant Sites identified in Schedule 3.1(c) require (i) dual dedicated carrier circuits and (ii) dual 2600 Cisco routers utilizing HSRP or
(a) an ISDN circuit and (b) an appropriate router interface for dial back-up. | | M-SU (except for Scheduled Network Maintenance Days) | | Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | | | non-Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | Scheduled Network Maintenance Days | | Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | | | non-Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | | | | | | |
Non-Redundant Sites have none of the above and therefore no Data Network redundancy in the event of a failure. | | M-SU (except for Scheduled Network Maintenance Days) | | Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | | | non-Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | Scheduled Network Maintenance Days | | Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
| | | | non-Prime [REDACTED] – [REDACTED] | | [REDACTED] | % |
14
3. Enhancement Requests - Key Measurements
Perot Systems will measure its performance in estimating and delivery of enhancements to Supported Software in accordance with the Key Measurement table set forth below. For the purposes of this Key Measurement, “System Enhancement Requests” are those requests that require changes to Supported Software, Supported Hardware or the Data Network. All Enhancement Requests are subject to the Change Order Process.
Type | | Description | | Target |
Estimation | | Provide estimate to Newco | | As defined in Exhibit 1.4(a) |
Delivery | | Final estimated days versus actual days and costs. | | <[REDACTED]% variance on level of effort estimates |
Delivery | | Schedule variance on production delivery target date versus actual delivery date and costs. | | <[REDACTED]% variance on PIRs |
Delivery | | Final estimated costs versus actual costs for additional resources | | <[REDACTED]% variance on level of effort estimates |
4. Quality – Key Measurement
Perot Systems will measure its performance in the quality of the delivery of the Services set forth in the Key Measurement table set forth below:
Description | | Target | |
| | | |
Percent of Problem Resolutions that are implemented correctly the first time | | [REDACTED] | % |
Percent of Problem Resolutions that are implemented that do not cause other problems | | [REDACTED] | % |
Percent of User Support Requests that are completed correctly the first time | | [REDACTED] | % |
Percent of User Support Requests that are completed that do not cause other problems | | [REDACTED] | % |
Percent of System Enhancements that are completed correctly the first time | | [REDACTED] | % |
Percent of System Enhancements that are completed that do not cause other problems | | [REDACTED] | % |
15
PART F – SERVICE LEVELS – TRANSITIONED APPLICATIONS
1. Transition Period Measurements
(a) During the Transition Period, Perot Systems will measure Transitioned Application availability levels and transaction response times and create baselines to mutually agree upon Service Levels or Key Measurements for the Transitioned Applications. Perot Systems will also work with Newco to identify any Transitioned Applications to be designated as Critical Services and upon mutual agreement, will update Schedule 10.8 in accordance with the Change Control Process.
After the Transition Period, Perot Systems will
(i) update this Exhibit B in accordance with the Change Control Process; and
(ii) Perot Systems will commence measuring its performance and be subject to Critical Service Level Credits and Key Measurements as agreed to by the Parties.
2. Reliability – Key Measurements
During the Transition Period, Perot Systems will measure its performance against the Reliability Key Measurements for the Transitioned Applications set forth in the table below.
Application | | Reliability Target (2) | | Prime Hours (Eastern Time) | | Reliability Service Level (1) |
Peoplesoft HRMS (Human Resources, Payroll, Base Benefits) | | [REDACTED]% | | Payroll days [REDACTED] – payroll batch complete | | TBD |
Peoplesoft HRMS | | [REDACTED]% | | Monday – Friday Non-payroll days [REDACTED] – [REDACTED] | | TBD |
PAF Web Application | | [REDACTED]% | | Monday – Sunday [REDACTED] – [REDACTED] | | TBD |
Kronos Timekeeper and Krisp | | [REDACTED]% | | Payroll days [REDACTED] – payroll batch complete | | TBD |
Kronos Timekeeper and Krisp | | [REDACTED]% | | Monday – Friday Non-payroll days [REDACTED] – [REDACTED] | | TBD |
TCS | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
Peoplesoft Financials (Accounts Receivable, General Ledger, Asset Management, Accounts Payable) | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
ReportMart-Webscribe | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
T-Recs | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
Sungard Treasury | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
PTMS | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
16
Application | | Reliability Target (2) | | Prime Hours (Eastern Time) | | Reliability Service Level (1) |
UPCS | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
Fleet Database | | TBD | | TBD | | TBD |
Community Affairs | | [REDACTED]% | | Monday – Friday [REDACTED] – [REDACTED] | | TBD |
Alamo.com (Including TA and TOUR) | | [REDACTED]% | | Monday – Sunday [REDACTED] – [REDACTED] | | TBD |
Newco Online | | [REDACTED]% | | TBD | | TBD |
Newco Intranet | | [REDACTED]% | | TBD | | TBD |
Res2000 | | [REDACTED]% | | TBD | | TBD |
TA.Alamo.com | | TBD | | TBD | | TBD |
TOOR.Alamo.com | | TBD | | TBD | | TBD |
PATS and SSRT | | [REDACTED]% | | TBD | | TBD |
Nationalcar.com (new development, including ListServ) | | [REDACTED]% | | TBD | | TBD |
Team Builder | | [REDACTED]% | | TBD | | TBD |
IRMS | | [REDACTED]% | | TBD | | TBD |
CIS | | [REDACTED]% | | TBD | | TBD |
Performance Monitor | | [REDACTED]% | | TBD | | TBD |
Rubicon | | TBD | | TBD | | TBD |
Yield Management | | [REDACTED]% | | TBD | | TBD |
Mainframe IRMS/PM/Fleet Availability | | [REDACTED]% | | TBD | | TBD |
Project X | | [REDACTED]% | | TBD | | TBD |
ARES | | [REDACTED]% | | TBD | | TBD |
TuneUp | | [REDACTED]% | | TBD | | TBD |
ATS | | [REDACTED]% | | TBD | | TBD |
Mitchell (E-Claim and Ultramate) | | [REDACTED]% | | TBD | | TBD |
Warranty | | [REDACTED]% | | TBD | | TBD |
Pyramid (until Pyramid is decommissioned) | | [REDACTED]% | | TBD | | TBD |
National Data Warehouse / Data Mart | | TBD | | TBD | | TBD |
TOPS Warehouse | | TBD | | TBD | | TBD |
JRC | | TBD | | TBD | | TBD |
17
Application | | Reliability Target (2) | | Prime Hours (Eastern Time) | | Reliability Service Level (1) |
CUSTRPT | | TBD | | TBD | | TBD |
Sales Cubes | | TBD | | TBD | | TBD |
Advanced Res | | TBD | | TBD | | TBD |
PRDP (performance reference database, CBT and PF help functionality) | | TBD | | TBD | | TBD |
Accra Imaging | | TBD | | TBD | | TBD |
Infotrieve/Pitney Bowes Imaging | | TBD | | TBD | | TBD |
Alva Historical Rental History | | TBD | | TBD | | TBD |
IT Online | | TBD | | TBD | | TBD |
EDS Elite | | TBD | | TBD | | TBD |
18
3. Transaction Response Times for Transitioned Applications - Key Measurement
During the Transition Period, Perot Systems will benchmark the Key Measurements for the response times set forth in the table below. After the Transition Period, the parties will work in good faith to complete the table with mutually agreed response time Key Measurements and update the table in accordance with the Change Control Process. Upon such agreement, Perot Systems will measure its performance against the agreed Key Measurements.
System | | Transaction | | Anticipated Average Response Time | | Average Desired Response Time Per Transaction (2) |
Peoplesoft HRMS (Human Resources, Payroll, Base Benefits) | | TBD | | </= n Seconds | | <n Seconds |
Peoplesoft HRMS | | TBD | | </= n Seconds | | <n Seconds |
PAF Web Application | | TBD | | </= n Seconds | | <n Seconds |
Kronos Timekeeper and Krisp | | TBD | | </= n Seconds | | <n Seconds |
TCS | | TBD | | </= n Seconds | | <n Seconds |
Peoplesoft Financials (Accounts Receivable, General Ledger, Asset Management, Accounts Payable) | | TBD | | </= n Seconds | | <n Seconds |
ReportMart-Webscribe | | TBD | | </= n Seconds | | <n Seconds |
T-Recs | | TBD | | </= n Seconds | | <n Seconds |
Sungard Treasury | | TBD | | </= n Seconds | | <n Seconds |
PTMS | | TBD | | </= n Seconds | | <n Seconds |
UPCS | | TBD | | </= n Seconds | | <n Seconds |
Fleet Database | | TBD | | </= n Seconds | | <n Seconds |
Community Affairs | | TBD | | </= n Seconds | | <n Seconds |
Alamo.com (including TA and TOUR) | | TBD | | </= n Seconds | | <n Seconds |
Newco Online | | TBD | | </= n Seconds | | <n Seconds |
Newco Intranet | | TBD | | </= n Seconds | | <n Seconds |
Res2000 | | TBD | | </= n Seconds | | <n Seconds |
PATS and SSRT | | TBD | | </= n Seconds | | <n Seconds |
Nationalcar.com | | TBD | | </= n Seconds | | <n Seconds |
Team Builder | | TBD | | </= n Seconds | | <n Seconds |
IRMS | | TBD | | </= n Seconds | | <n Seconds |
CIS | | TBD | | </= n Seconds | | <n Seconds |
Performance Monitor | | TBD | | </= n Seconds | | <n Seconds |
Rubicon | | TBD | | </= n Seconds | | <n Seconds |
Yield Management This is part of Legacy | | TBD | | </= n Seconds | | <n Seconds |
Mainframe IRMS/PM/Fleet Availability | | TBD | | </= n Seconds | | <n Seconds |
Project X | | TBD | | </= n Seconds | | <n Seconds |
ARES | | TBD | | </= n Seconds | | <n Seconds |
TuneUp | | TBD | | </= n Seconds | | <n Seconds |
ATS | | TBD | | </= n Seconds | | <n Seconds |
Mitchell (E-Claim and Ultramate) | | TBD | | </= n Seconds | | <n Seconds |
Warranty | | TBD | | </= n Seconds | | <n Seconds |
19
Pyramid (until Pyramid is decommissioned) | | TBD | | </= n Seconds | | <n Seconds |
National Data Warehouse / Data Mart | | TBD | | </= n Seconds | | <n Seconds |
TOPS Warehouse | | TBD | | </= n Seconds | | <n Seconds |
JRC | | TBD | | </= n Seconds | | <n Seconds |
CUSTRPT | | TBD | | </= n Seconds | | <n Seconds |
Sales Cubes | | TBD | | </= n Seconds | | <n Seconds |
Advanced Res | | TBD | | </= n Seconds | | <n Seconds |
PRDP (performance reference database, CBT and PF help functionality) | | TBD | | </= n Seconds | | <n Seconds |
Accra Imaging | | TBD | | </= n Seconds | | <n Seconds |
Infotrieve/Pitney Bowes Imaging | | TBD | | </= n Seconds | | <n Seconds |
Alva Historical Rental History | | TBD | | </= n Seconds | | <n Seconds |
IT Online | | TBD | | </= n Seconds | | <n Seconds |
EDS Elite | | TBD | | </= n Seconds | | <n Seconds |
20
PART G – SERVICE LEVEL MONITORING TOOLS AND SERVICE LEVEL REPORTING
(a) SERVICE LEVEL MONITORING TOOLS
Product Name | | Platform | | Description |
IBM NTTUNEMON 2.1 | | Mainframe | | Network Control Program (NCP) monitoring tool |
CA OPS/MVS 4.3.2 / 4.4.1 | | Mainframe | | MVS automation tool used to monitor and act on system events and perform tasks on timely basis |
Candle Corporation Omegamon II CICS 500 | | Mainframe | | Omegamon II for CICS is a software performance monitor. It is a realtime monitor and alerts you to response time degradation. |
Candle Corporation Omegamon II MVS 500 | | Mainframe | | Omegamon II for MVS is a system performance monitor. It provides realtime information about MVS and system storage constraints. |
Candle Corporation Omegaview 300 | | Mainframe | | Omegaview is a graphical user interface monitor with status lights to indicate the status of any monitored product in MVS or CICS. |
IBM Netview 3.1 | | Mainframe | | Network management tool and network/Mainframe automation tool used to monitor and act on Network events |
Jobtrac | | Mainframe | | MVS scheduling |
LIST | | Mainframe | | Airline’s IBM/Other Status |
LDST | | Mainframe | | Airline’s Direct Connect Status |
LSTA | | Mainframe | | Airline’s Link Status |
IBM NetFinity Director 2.x | | IBM | | Monitor hardware components of IBM Servers |
| | | | |
IBM Tivoli 3.6.2 | | Unix and NT | | Remote system/database/application monitoring tool |
CA Autosys 3.4.4 | | Unix and NT | | Remote Job process monitoring tool |
HP Measureware C.03.05.00 | | Unix | | HP-UX Server performance monitoring tool |
HP Glance Plus C.02.40.00 | | Unix | | HP-UX realtime performance monitoring and diagnostic tool |
Compaq Insight Manager 4.x | | Compaq | | Monitors hardware components Compaq servers |
MicroSoft NT Event Log | | NT | | Operating system error monitoring |
Performance Monitor | | NT | | Server performance monitoring |
What’s Up Gold | | NT | | Network connectivity monitoring |
Timbuktu Pro | | NT | | Remote monitoring |
Enterprise Administration Tool | | NT | | Change user and group rights |
HP Openview | | Wide Area Network | | Monitors network routers. |
21
(b) SERVICE LEVEL REPORTING
Type | | Frequency | | Area | | Description |
Inventory Management (provided with the tools provided by ANC as of the Effective Date) | | Quarterly | | Desktop Services | | • | Inventory of Supported Hardware and Supported Software, including servers, systems software and workstations by type |
Procurement | | Monthly | | Infrastructure | | • | Procurement Pipeline Reports |
Contract Baseline Management | | Monthly | | All | | • | List of Project Work Orders and Forecasted Expenditures |
Service Level Report | | Monthly | | All | | • | Problem Resolution Targets |
| | | | | | • | Help Desk Responsiveness |
| | | | | | • | Data Network Availability and Reliability |
| | | | | | • | Legacy Systems Availability and Reliability |
| | | | | | • | Odyssey Availability and Reliability |
| | | | | | • | Ancillary Systems Availability and Reliability |
| | | | | | • | Others as agreed to by both parties. |
Project Management Office | | Monthly | | Project Office Reporting | | • | List of Prioritized Requests |
| | | | | | • | Project Status Reports |
| | | | | | • | Change Order Status Reports |
| | | | | | • | Resource Utilization Report |
Miscellaneous Report | | As agreed | | Project Office Reporting | | • | Proposals, and Financial Analysis |
| | | | | | • | Issues Log |
| | | | | | • | Risk Assessments |
| | | | | | • | Project Plans |
22
EXHIBIT C
CHARGES
Table of Contents
1. | DEFINITIONS | 1 |
1.1 | Certain Definitions | 1 |
2. | SERVICE CHARGES | 2 |
2.1 | Base Charges | 2 |
2.2 | ARCs/RRCs | 2 |
2.3 | Service Level Credits | 2 |
2.4 | Additional Service Charges | 3 |
2.5 | Pass-Through Expenses and Out-of-Pocket Expenses | 3 |
2.6 | Other Charges & Adjustments | 3 |
3. | TERMINATION & TERMINATION ASSISTANCE CHARGES | 3 |
3.1 | Termination For Convenience | 3 |
3.2 | Termination of Additional Services | 4 |
3.3 | Termination Assistance | 4 |
4. | OTHER ATTACHMENTS | 4 |
| | | |
C-i
List of Attachments
Attachment C-1: | Resource Units |
| |
Attachment C-2: | Annual Service Charges, Resource Baselines and ARC/RRC Rates |
| |
Attachment C-3: | T&M Rates |
| |
Attachment C-4: | Pass-Through Expenses and Certain Retained Expenses |
C-ii
EXHIBIT C
CHARGES
1. DEFINITIONS
1.1 Certain Definitions.
All capitalized terms used, but not defined, in this Exhibit C are defined and have the same meanings given them in the MSA or other Exhibits. As used in this Exhibit C:
(a) “Additional Resource Charges” or “ARCs” means the amount payable by Newco for consuming more Resource Units during a month than the applicable Resource Baselines.
(b) “Annual Services Charge” means the fixed amount payable by Newco for the Base Services during a Contract Year, prior to any adjustments allowed by the MSA. The Annual Services Charge is set forth in Attachment C-2 for each Contract Year.
(c) “Applications Support Pools” is defined in Exhibit A.
(d) “Applications Enhancement Pools” is defined in Exhibit A.
(e) “ARC Rate” means the amount to be paid by Newco for each Resource Unit above the applicable Resource Baseline that is consumed by Newco during a month. The “ARC Rate” for each Resource Category is set forth in Attachment C-2.
(f) “Change Order” is defined in Exhibit A.
(g) “Full Time Equivalent” or “FTE” means a level of effort, excluding vacation and other non-productive time (but including a reasonable amount of overtime), equivalent to that which one person working full time would provide, which equates to 1848 hours per year. One individual’s total effort cannot amount to more than one FTE.
(h) “Resource Baseline” means the number of Resource Units for the applicable Resource Category that are included within the Annual Services Charge, determined on a monthly basis. The Resource Baseline for each Resource Category is set forth in Attachment C-2.
(i) “Resource Categories” means any grouping of service delivery resources for which distinct volumes are measured and charging rates or other charging mechanisms apply. Resource Categories may be added from time to time by agreement of the Parties, and appropriate adjustments will be made to the existing or new Resource Baselines, as applicable.
(j) “Resource Reduction Credits” or “RRCs” means the amount creditable to Newco for consuming fewer Resource Units during a month than the applicable Resource Baselines.
(k) “Resource Unit” for any Resource Category means the unit of chargeable resource utilization for such Resource Category. The Resource Units for the Resource Categories are listed and defined in Attachment C-1.
(l) “RRC Rate” means the amount to be credited to Newco for each Resource Unit below the applicable Resource Baseline that is not consumed by Newco during a month. The “RRC Rate” for each Resource Category is set forth in Attachment C-2.
C-1
(m) “T&M Rates” means the time and materials rates for PSC Personnel set forth in Attachment C-3.
(n) “Variable Charges” means ARCs, RRCs, Service Level Credits, charges for Additional Services, Pass-Through Expenses and Out-of-Pocket Expenses.
(o) “Workstation” means a personal computer (desktop or laptop), together with its attached devices (e.g., monitors, keyboards, drives, docking stations, directly-connected printers, Network-connected printers, and hand-held computing devices) being utilized by (i) a Newco employee (permanent or temporary) or (ii) other Newco Personnel who regularly provide services at Newco Facilities.
2. SERVICE CHARGES
This Article 2 describes the methods used (i) to compute Perot Systems’ monthly charges for the Services and (ii) measuring and tracking the use of resources under the MSA.
2.1 Base Charges.
Perot Systems shall invoice Newco as provided in Section 7.8(a) of the MSA for one-twelfth of the Annual Services Charge for the Base Services to be performed during each calendar month of the Term, which amount shall be prorated for partial calendar months.
2.2 ARCs/RRCs.
(a) For each Resource Category in which the number of Resource Units consumed during a calendar month exceeded the applicable Resource Baseline (or the maximum noted for a Resource Baseline that is represented by a range), Perot Systems shall invoice Newco as provided in Section 7.8(a) of the MSA for an ARC in the amount equal to the product of (i) the applicable ARC Rate multiplied by (ii) the number of Resource Units consumed for such Resource Category during such calendar month minus the Resource Baseline (or the maximum noted for a Resource Baseline that is represented by a range) for such Resource Category.
(b) For each Resource Category in which the number of Resource Units consumed during a calendar month was less than the applicable Resource Baseline (or the minimum noted for a Resource Baseline that is represented by a range), Perot Systems shall credit Newco as provided in Section 7.3 of the MSA with a RRC in the amount equal to the product of (i) the applicable RRC Rate multiplied by (ii) the Resource Baseline (or the minimum noted for a Resource Baseline that is represented by a range) for such Resource Category minus the number of Resource Units consumed for such Resource Category during such calendar month.
(c) Where a Resource Baseline is provided for a Resource Category but no ARC Rate or RRC Rate is provided, such Resource Baseline is solely for the convenience of the Parties and shall not be used for purposes of adjusting charges under the MSA.
2.3 Service Level Credits.
(a) For each Service Level that Perot Systems fails to meet during a calendar month, Perot Systems shall credit Newco as provided in Section 7.3 and Exhibit B of the MSA for the applicable Service Level Credit.
C-2
(b) For each Service Level that Perot Systems has exceeded for three consecutive calendar months, Perot Systems shall invoice Newco as provided in Section 7.3 of the MSA for an amount equal to the Service Level Credit, if any, credited to Newco with respect to such Service Level during the calendar month preceding the first month of such three-consecutive month period.
2.4 Additional Service Charges.
For any Additional Services provided by Perot Systems during a calendar month, Perot Systems shall invoice Newco as provided in the applicable Change Order. Unless otherwise agreed in a Change Order, Perot Systems will provide Additional Services on a time and materials basis at the T&M Rates.
2.5 Pass-Through Expenses and Out-of-Pocket Expenses.
Perot Systems shall invoice Newco as provided in Section 7.3 of the MSA for [REDACTED] of any Pass-Through Expenses and Out-of-Pocket Expenses paid by Perot Systems during a calendar month.
2.6 Other Charges & Adjustments.
If (i) any new Supported Third Party Applications Software that requires material support resources is placed into production during a calendar month, or (ii) any Supported Third Party Applications Software that required material support resources is removed from production during a calendar month, the Parties, through the Change Control Process, shall make an appropriate adjustment to the Annual Services Charge to reflect, among other costs or expenses reasonably anticipated to be incurred or avoided by Perot Systems, appropriate changes to the Application Support Pool Resource Baseline and the Application Enhancement Pool Resource Baseline.
3. TERMINATION & TERMINATION ASSISTANCE CHARGES
3.1 Termination For Convenience.
If Newco terminates the MSA pursuant to Section 10.7 of the MSA, Newco shall pay to Perot Systems on or before the effective date of such termination the applicable Termination for Convenience Charge set forth in Table C-1 below for the Contract Year in which such effective date occurs.
Table C-1: Termination for Convenience Charges | |
| |
| | Contract Year 5 | | Contract Year 6 | | Contract Year 7 | | Contract Year 8 | | Contract Year 9 | | Contract Year 10 | |
Termination Charge | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
| | | | | | | | | | | | | | | | | | | |
Note: The charges set forth above are in U.S. dollars. | |
C-3
3.2 Termination of Additional Services.
Newco may, at any time, terminate any Additional Service without payment of a termination charge, unless the Parties establish a Termination for Convenience Charge with respect thereto in the applicable Change Order.
3.3 Termination Assistance.
Perot Systems shall provide Termination Assistance in accordance with the terms (including payment terms) of Section 10.9 of the MSA.
4. OTHER ATTACHMENTS
A general description of certain Pass-Through Expenses anticipated by the Parties to be incurred by Perot Systems, and certain Retained Expenses identified by the Parties is included in Attachment C-4 for the convenience of the Parties.
C-4
ATTACHMENT C-1
RESOURCE UNITS
1. HELP DESK SERVICES
1.1 Help Desk Calls.
Resource usage for this Resource Category will be established by determining the total number of calls to the Help Desk during a calendar month. [REDACTED] calls equal one Resource Unit (provided that the first call to the Help Desk in excess of the Resource Baseline shall result in an ARC.
2. DATA CENTER SERVICES
2.1 Database Size.
Resource usage for this Resource Category will be measured as the peak size of the VRS Database in terabytes during a calendar month.
2.2 CPU.
Resource usage for this Resource Category will be measured as the average sustained peak consumption of CPU capacity utilized to support the Services during a calendar month.
2.3 Memory.
Resource usage for this Resource Category will be measured as the number of memory gigabytes utilized to support the Services during a calendar month.
2.4 Transaction Volumes.
Resource usage for this Resource Category will be the number of monthly or average number of daily transactions for each transaction type during a calendar month.
2.4.1 Call Center Daily Reservations
Call Center Daily Reservations refers to the number of reservations booked during a day via the voice reservations channel, and is determined through the VRS RESF1310 report
2.4.2 GDS Daily Reservations
GDS Daily Reservations refers to the number of consummated bookings during a particular day by travel agents sending VRS an “end transact” to commit the reservation in the VRS database, whether it is generated from an availability request or a direct sell, and is determined by viewing the VRS GDS stats screen on-line or the associated daily report.
2.4.3 GDS Daily Messages
GDS Daily Messages refers to the number of messages received during a particular day through GDS, and is determined by viewing the VRS GDS stats screen only or the associated daily report.
C1-1
2.4.4 GDS Daily rate update volumes
GDS Daily rate update volumes refers to the number of summarized messages sent to GDS vendors, and is determined by viewing the VRS GDS stats screen only or the associated daily report.
2.4.5 Daily Sessions
Daily Sessions refers to number of connections to the nationalcar.com Internet address, and is determined by a daily SQL query of the VRS www summary table.
2.4.6 Rental Ops Rental Agreements
Rental Ops Rental Agreements per month refers to the number of rental returns during a month, and is determined by a monthly SQL query.
2.4.7 Billing Invoices
Billing Invoices per month refers to the number of billings by Newco in connection with rental agreements, either an original invoice or a credit/replacement invoice, and is determined by a monthly SQL query.
2.4.8 WWW Daily Reservations
WWW Daily Reservations refers to the number of daily reservations booked through the Alamo and National websites, and is determined by the daily production reports delivered to Newco.
2.5 Records.
Resource usage for this Resource Category will be measured as the peak number of each record type maintained during a calendar month.
2.5.1 CPM Driver Profiles
CPM Driver Profiles refers to the number of database records that identify core driver information, and is determined through a monthly SQL query of the VRS DVRS table.
2.5.2 CPM Emerald Club Profiles
CPM Emerald Club Profiles refers to the number of drivers who are members of National’s loyalty program, and is determined through a monthly SQL query of the VRS LOY Profile table.
2.5.3 CPM Products
CPM Products refers to the number of rental packages offered by Newco, and is determined through a monthly SQL query of the VRS Prod_Intsts table.
2.5.4 CPM Rates
CPM Rates refers to the number of rates offered by Newco, and is determined through a monthly SQL query of the VRS Rates_Header table.
C1-2
2.5.5 CPM Contracts
CPM Contracts refers to the number of vehicle rental contracts in effect between Newco and its customers, and is determined through a monthly SQL query of the VRS CONS table.
2.5.6 Fleet Ops Number of Vehicles
Fleet Ops Number of Vehicles refers to the number of active vehicles managed using the VRS, and is determined by the daily Rental Fleet Activity Summary report.
2.5.7 Rental Ops Number of Locations
Rental Ops Number of Locations refers to the number of stations defined in the VRS Station Details table, and is determined by the monthly station count reports delivered to Newco.
2.5.8 Billing Business Accounts
Billing Business Accounts refers to the number of Scheduled Bill Accounts, Travel Agencies, Tour Operators, Airlines, Licensees, Forced Charge Accounts and other entities that do business with Newco, and is determined by a monthly SQL query.
3. CORE APPLICATIONS SERVICES
3.1 Application Support Pools.
Resource usage in this Resource Category will be measured based on the number of FTEs provided by Perot Systems to perform Core Application Services during a calendar month, adjusted as authorized by Newco pursuant to Change Orders. One FTE assigned to the Application Support Pool equals one Resource Unit. This Resource Baseline for applications support will be increased (via ARCs) based on workload and by mutual agreement between Perot Systems and Newco.
3.2 �� Application Enhancement Pools.
Resource usage in this Resource Category will be measured based on the number of FTEs authorized by Newco to be provided by Perot Systems to perform Core Application Services during a calendar month. One FTE assigned to the Applications Enhancement Pool equals one Resource Unit. There are no RRCs with respect to reductions in Resource usage below the applicable Resource Baseline. This Resource Baseline for applications support will be increased (via ARCs) based on workload and by mutual agreement between Perot Systems and Newco.
4. DESKTOP SERVICES.
The Resource usage for this Resource Category will be established by adding together the Resource Units computed below for On-Site Workstations and Remote Workstations.
On-Site Workstations
The Resource usage for this Resource Category will be established by determining the total number of On-Site Workstations to be supported at each of the following Newco locations: (i) Plaza/Blue Lake Reservations Center; (ii) Minneapolis, Minnesota; (iii) Toronto, Ontario, Canada, (iv) Goose Creek Reservations Center; and (v) Salt Lake Reservations Center. Resource usage for this Resource Category will be determined at the end of each calendar month. Three hundred fifty Workstations to be supported equal one Resource Unit. ARCs and RRCs with respect to this Resource Category are based on an increase
C1-3
or decrease of one Desktop Support FTE for each increase or decrease of Resource Units used at a single location.
Remote Workstations
The Resource usage for this Resource Category will be established by determining the total number of Remote Workstations to be supported at each of the remote Newco locations as defined in Schedule Resource usage for this Resource Category will be determined at the end of each calendar month. One Thousand Remote Workstations to be supported equal one Resource Unit.
5. LAN, WAN AND REMOTE NETWORK MONITORING SERVICES
Resource usage in this category will be measured as the aggregate number of active Routers. A “Router” means a computer system connected to the Network that stores and forwards data packets between LANs and WANs. Twenty (20) Routers/Switches in service on the last day of the calendar month equals one Resource Unit.
6. DISASTER RECOVERY SERVICES
There are no Resource Units, Resource Baselines, ARCs or RRCs with respect to Disaster Recover Services.
7. SECURITY SERVICES
There are [REDACTED] Resource Units, Resource Baselines, ARCs or RRCs with respect to Security Services.
8. ADJUSTMENT PROCESS
8.1 Adjustment Process.
A minimum Resource Baseline and a maximum Resource Baseline for each Resource Category described in Section 2.1 through 2.5 above is set forth in Attachment C-2.
(a) If during any calendar month the maximum resource usage for any of such Resource Categories exceeds the Maximum Resource Baseline established for such Resource Category in Table C-2-1 for [REDACTED] consecutive peak measurement periods on a particular Supported System, then Perot Systems shall prepare and present to Newco an infrastructure capacity management recommendation that sets forth (i) the actions that Perot Systems could take to reduce usage of the applicable Resource Category on the applicable Supported System and the effects, if any, such actions may have on the Services and Service Levels, and (ii) the ARC that Newco would incur to increase the applicable Resource Baseline. Within 10 business days after receiving Perot Systems’ recommendation, Newco shall provide written instructions to Perot Systems to reduce usage of the applicable resource or to increase the applicable Resource Category. Perot Systems will carry out such instructions promptly and diligently and, the Charges will be adjusted as described in the infrastructure capacity management recommendation.
(b) If during any calendar month the minimum resource usage for any of such Resource Categories falls below the minimum Resource Baseline established for such Resource Category in Table C-2-1 for [REDACTED] consecutive peak measurement periods on a particular Supported System, then Perot Systems shall prepare and present to Newco an infrastructure capacity management recommendation that sets forth (i) the actions, if any, that Perot Systems could take to reduce the applicable Resource Baseline on the applicable Supported System and the effects, if any, such actions will have on the
C1-4
Services and Service Levels, and (ii) the RRC that Newco would receive if such actions were taken. Within 10 business days after receiving Perot Systems’ recommendation, Newco shall provide written instructions to Perot Systems to reduce or leave unchanged the applicable Resource Baseline. Perot Systems will carry out such instructions promptly and diligently and, the Charges will be adjusted as described in the infrastructure capacity management recommendation.
C1-5
ATTACHMENT C-2
ANNUAL SERVICE CHARGES,
RESOURCE BASELINES AND ARC/RRC RATES
1. ANNUAL SERVICE CHARGES
| | Contract Year 1 | | Contract Year 2 | | Contract Year 3 | | Contract Year 4 | | Contract Year 5 | |
Applications Maintenance | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Infrastructure | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
Contract Management | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
BASE SERVICES | | $ | [REDACTED] | (1) | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
| | | | | | | | | | | |
| | Contract Year 6 | | Contract Year 7 | | Contract Year 8 | | Contract Year 9 | | Contract Year 10 | |
Applications Maintenance | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Infrastructure | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
Contract Management | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
BASE SERVICES | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Notes:
(1) Perot Systems charges for the first month of contract year 1 will be equal to (i) one-twelfth of this amount, plus (ii) $[REDACTED] perot systems charges for the remaining months of contract year 1 will be one-twelfth of this amount.
C2-1
2. RESOURCE BASELINES AND ARC/RRC RATES
| | Resource Unit (Monthly) | | Resource Baseline | | ARC / RRC Rate (Monthly, US$) | |
Help Desk Services | | Help Desk Calls | | [REDACTED] (Note 1) | | $[REDACTED] | |
Data Center Services | | | | | | | |
Book-it / Call Center | | Call Center Daily Reservations | | Table C-2-1 | | Note 2 | |
Book-it / GDS | | GDS Daily Reservations | | Table C-2-1 | | Note 2 | |
Book-it / GDS | | GDS Daily Messages | | Table C-2-1 | | Note 2 | |
Book-it / GDS | | GDS Daily Rate Update Volume | | Table C-2-1 | | Note 2 | |
Book-it / CPM | | Driver Profiles | | Table C-2-1 | | Note 2 | |
Book-it / CPM | | Emerald Club Profiles | | Table C-2-1 | | Note 2 | |
Book-it / CPM | | Products | | Table C-2-1 | | Note 2 | |
Book-it / CPM | | Rates | | Table C-2-1 | | Note 2 | |
Book-it / CPM | | Contracts | | Table C-2-1 | | Note 2 | |
Book-it / WWW | | WWW Daily Reservations | | Table C-2-1 | | Note 2 | |
Book-it / WWW | | WWW Daily Sessions | | Table C-2-1 | | Note 2 | |
Rent-it / Fleet Ops | | Number of Vehicles | | Table C-2-1 | | Note 2 | |
Rent-it / Rental Ops | | Number of Locations | | Table C-2-1 | | Note 2 | |
Rent-it / Rental Ops | | Rental Agreements per mo | | Table C-2-1 | | Note 2 | |
| | | | | | | |
Bill-it / Billing | | Invoices per month | | Table C-2-1 | | Note 2 | |
Bill-it / Business Accounts | | Business Accounts | | Table C-2-1 | | Note 2 | |
Infrastructure / Database | | Size of Database | | Table C-2-2 | | Note 2 | |
Infrastructure / End users | | # of Concurrent Users | | Table C-2-2 | | Note 2 | |
Infrastructure / System | | CPU and Memory | | Table C-2-2 | | Note 2 | |
Core Applications Services | | | | | | | |
Production Support Pool | | | | | | | |
VRS / Odyssey System | | FTEs | | [REDACTED] | | Varies by Resource | |
Legacy System (until decommissioned) | | FTEs | | [REDACTED] | | Varies by Resource | |
Ancillary Systems | | | | | | | |
Revenue Management | | FTEs | | [REDACTED] | | Varies by Resource | |
Financial Management | | FTEs | | [REDACTED] | | Varies by Resource | |
Fleet Operations | | FTEs | | [REDACTED] | | Varies by Resource | |
DW / Reporting | | FTEs | | [REDACTED] | | Varies by Resource | |
Quality Assurance | | FTEs | | [REDACTED] | | Varies by Resource | |
C2-2
Applications Enhancement Pool | | | | | | | |
VRS / Odyssey System | | FTEs | | [REDACTED] | | Varies by Resource | |
| | | | | | | |
Ancillary Systems | | FTEs | | | | | |
Revenue Management | | FTEs | | [REDACTED] | | Varies by Resource | |
Financial Management | | FTEs | | [REDACTED] | | Varies by Resource | |
Fleet Operations | | FTEs | | [REDACTED] | | Varies by Resource | |
DW / Reporting | | FTEs | | [REDACTED] | | Varies by Resource | |
Quality Assurance | | FTEs | | [REDACTED] | | Varies by Resource | |
Desktop Services | | | | | | | |
On-Site/Remote Workstations | | Workstations | | [REDACTED] (Note 3) | | $[REDACTED] | |
LAN/WAN & Remote Network Monitoring Services | | Routers/Switches | | [REDACTED] | | $[REDACTED] | |
Disaster Recovery Services | | Not applicable | | N/A | | N/A | |
Security Services | | Not applicable | | N/A | | N/A | |
Notes:
1. During the mutually agreed 60-day period surrounding the VRS System rollout, the Resource Baseline for this Resource Unit will be increased by a mutually agreed number of Resource Units without additional charge.
2. Sections 2.4 and 2.5 of Attachment C-1 describes the process for establishing adjustments to the charges for this Resource Category.
3. No ARCs will be applied until the number of Resource Units exceeds 21.5 (i.e., 7,525 Workstations), and no RRCs will be applied until the number of Resource Units is less than 19.07 (i.e., 6,675 Workstations). In addition, no RRCs will apply if, as a reasonable result of such RRC, the number of Desktop Support FTEs supporting a particular Supported Location would be less than one Desktop Support FTE per operating shift at such Supported Location.
C2-3
TABLE C-2-1
BUSINESS TRANSACTION RESOURCE UNITS
Functional Area | | Sub- System | | Resource Unit | | National | | Alamo | | Minimum Resource Baseline | | Maximum Resource Baseline | |
Book-it | | Call Center | | Daily Reservations | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | | | | | | | | | | |
| | GDS | | Daily Reservations | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Daily Messages | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Daily Rate Update Volumes | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | | | | | | | | | | |
| | CPM | | Driver Profiles | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Emerald Club Profiles | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Products | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Rates | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Contracts | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | | | | | | | | | | |
| | www | | Daily Reservations | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Daily Sessions | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | | | | | (estimated) | | | | | |
Rent-it | | Fleet Ops | | Number of Vehicles | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | | | | | | | | | | |
| | Rental Ops | | Number of Locations | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Rental Agreements per month | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | | | | | | | | | | |
Bill-it | | Billing | | Invoices per month | | [REDACTED] | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | | | Business Accounts | | [REDACTED] | | TBD | | TBD | | TBD | |
C2-4
TABLE C-2-2
SYSTEM RESOURCE UNITS
Functional Area | | Sub-System | | Resource Unit | | Value | | Minimum Resource Baseline | | Maximum Resource Baseline | |
Infrastructure | | Database | | Terrabytes | | [REDACTED] | TB | [REDACTED] | TB | [REDACTED] | TB |
| | Concurrent Users | | Number | | [REDACTED] | | [REDACTED] | | [REDACTED] | |
| | System/Machine | | CPU—sustained peak consumption | | > [REDACTED] | % | > [REDACTED] | % | > [REDACTED] | % |
| | System/Machine | | Memory—sustained peak consumption | | > [REDACTED] | % | > [REDACTED] | % | > [REDACTED] | % |
C2-5
ATTACHMENT C-3
T&M RATES
1. INTRODUCTION
This Attachment C-3 sets forth Perot Systems’ T&M Rates for commonly used resources.
2. SCHEDULE OF PEROT SYSTEMS T&M RATES
Position Profiles (underlined) Job Roles/Skill Sets(1) | | Commercial Daily Rate(2), (3) | | Pre-Planned Daily Rate(2), (4) | | One Month Commitment Rate(2), (5) | | Three Month Commitment Rate(2), (6) | | Six Month Commitment Rate(2), (7) | |
Administrative Assistant | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Financial Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Help Desk Agent | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Support Center Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Sr. SE Developer | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Midlevel SE Developer | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
SE Developer | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Desktop Support Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
NT Server / Exchange System Administrator | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Procurement Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Data Security Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Project Manager | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Database Administrator | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
UNIX System Administrator | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Network Engineering Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Network Support Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Network Operations Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Mainframe Production Control Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Mainframe Storage Management Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
MVS & Program Product Support Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
MVS Operations Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Print Operations | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Business Continuity Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Tivoli Automation Support | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Capacity Planning Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Tape Operations | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Interactive Systems Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
Network Software Analyst | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | | $ | [REDACTED] | |
C3-1
Notes:
(1) Perot Systems warrants that the rates set forth in the foregoing table, as well as the rates for other position profiles and skill sets (which are available on request) are [REDACTED].
(2) All rates exclude travel, lodging, and other out-of-pocket expenses, which shall be paid by Newco in addition to such rates, subject to Newco’s prior approval.
(3) The “Commercial Daily Rate” applies to un-planned engagements that have no minimum purchase commitment for the individual resource.
(4) The “Daily Commitment Rate” applies to pre-planned engagements that have no minimum purchase commitment for the individual resource.
(5) The “One Month Commitment Rate” is a monthly rate that applies to engagements having a minimum purchase commitment of one month for the individual resource. The rate will be pro-rated for partial months provided that the minimum purchase requirement is satisfied.
(6) The “Three Month Commitment Rate” is a monthly rate that applies to engagements having a minimum purchase commitment of three months for the individual resource. The rate will be pro-rated for partial months provided that the minimum purchase requirement is satisfied.
(7) The “Six Month Commitment Rate” is a monthly rate that applies to engagements having a minimum purchase commitment of six months for the individual resource. The rate will be pro-rated for partial months provided that the minimum purchase requirement is satisfied.
C3-2
ATTACHMENT C-4
NEWCO RETAINED EXPENSES
1. INTRODUCTION
This Attachment C-4 sets forth a general description of (i) the types of Pass-Through Expenses anticipated by the Parties to be incurred by Perot Systems, and (ii) certain Retained Expenses identified by the Parties is included in Attachment C-4 for the convenience of the Parties.
2. PASS-THROUGH EXPENSES
The following types of Pass-Through Expenses are anticipated by the Parties to be incurred by Perot Systems in connection with the Base Services:
(a) Paper, toner, and other consumable supplies and materials, including magnetic and optical media used for backup and archival purposes or otherwise consumed by PSC Personnel while providing the Services at Newco’s facilities;
(b) Postage, courier and shipping fees and related insurance costs;
(c) Off-site storage costs and expenses, including deliveries to and from off-site storage facilities;
(d) Costs and expenses, including reasonable travel and lodging expenses for PSC Personnel, associated with activating Newco’s Disaster Recovery Plan;
(e) Costs and expenses, including reasonable travel and lodging expenses for PSC Personnel (and, where appropriate, their families), associated with activating Newco’s Business Continuity Plan;
(f) Retained Expenses paid by Perot Systems on behalf of Newco;
(g) Export license fees, import duties and similar government levies and related third party expenses associated with providing the Services (except such amounts incurred solely as a result of Perot Systems’ subcontracting any portion of the Services);
(h) Third party costs and expenses associated with SAS 70 and any similar audits; and
(i) Costs and expenses associated with new and replacement routers / switches.
3. CERTAIN RETAINED EXPENSES
In addition to other costs and expenses relating to the Services identified in the MSA as being retained by Newco, Newco will retain the following specific costs and expenses:
(a) Costs and expenses associated with Newco’s Chief Information Officer and any other Newco staff positions;
(b) Costs and expenses associated with the office, data center (including the Fort Lauderdale data center, if any) and other space and facilities provided by Newco to Perot Systems and PSC Personnel;
C4-1
(c) Costs and expenses associated with Newco’s disaster recovery hotsite (e.g., the Sungard agreement);
(d) Costs and expenses associated with the decommissioning, shutdown and relocation of the Fort Lauderdale data center and other facilities;
(e) Voice, data and other telecommunications expenses;
(f) Costs and expenses associated with the licensing or purchase of new Third Party Application Software, including any related costs for new or upgraded Hardware; and
(g) License, transfer and access fees due to Third Party Vendors in connection with Retained Managed Contracts and Required Consents.
C4-2
EXHIBIT D
FORM
OF
PARTIAL TERMINATION AND ASSIGNMENT AGREEMENT
among
PEROT SYSTEMS CORPORATION,
ANC RENTAL CORPORATION,
ANC INFORMATION TECHNOLOGY, L.P.,
NATIONAL CAR RENTAL SYSTEM, INC.,
ALAMO RENT-A-CAR L.L.C.,
and
VANGUARD CAR RENTAL USA INC.
PARTIAL TERMINATION AND ASSIGNMENT AGREEMENT
This Partial Termination and Assignment Agreement (the “Termination Agreement”) is entered into as of July 11, 2003 (the “Agreement Date”), by and among ANC Rental Corporation, a Delaware corporation having its principal place of business at 200 South Andrews Avenue, Ft. Lauderdale, Florida 33001 and Debtor-in-Possession in case number 01-11200 (MFW), pending in the United States Bankruptcy Court for the District of Delaware (“ANC Rental”), ANC Information Technology, L.P. (“ANC”), a Delaware limited partnership having its principal place of business at 200 South Andrews Avenue, Ft. Lauderdale, Florida, 33301, National Car Rental System, Inc. (“National”), a Delaware corporation having a principal place of business at 200 South Andrews Avenue, Ft. Lauderdale, Florida 33001, Alamo Rent-A-Car, L.L.C., a Delaware limited liability company having its principal place of business at 200 South Andrews Avenue, Ft. Lauderdale, Florida 33001 (“Alamo”), Vanguard Car Rental USA Inc., a Delaware corporation having a principal place of business at 200 South Andrews Avenue, Ft. Lauderdale, Florida 33001 (“Newco”), and Perot Systems Corporation (“Perot Systems”), a Delaware corporation having its principal place of business at 2300 West Plano Parkway, Plano, Texas 75075.
Recitals
Whereas, Newco has entered into an Asset Purchase Agreement, dated as of June 12, 2003, as amended, with ANC Rental and certain subsidiaries of ANC Rental, including but not limited to National, Alamo, and ANC (ANC Rental, National, Alamo, ANC and other such subsidiaries are collectively referred to as “Debtors”), pursuant to which Newco will acquire (the “Acquisition”) certain assets and assume certain liabilities of Debtors relating to their ownership and operation of car rental businesses and licensing of the right to operate car rental businesses in the airport leisure and business travel rental markets mainly throughout the United States, Canada and Europe;
Whereas, Perot Systems and National entered into a Services Agreement, dated as of September 30, 1997 (the “National Agreement”), pursuant to which Perot Systems (i) developed derivative works of, and additions and enhancements to, GreenWay 1.0 (as such term is defined in the National Agreement) (collectively, the “GreenWay Modifications”); (ii) sublicensed to National the use of GreenWay 1.0 and licensed to National the use of the GreenWay Modifications (collectively, the “GreenWay License and Sublicense”); and (iii) operated GreenWay 1.0 and the GreenWay Modifications for National; and a Termination Agreement dated September 30, 2000 (the “National Termination Agreement”) pursuant to which the National Agreement was terminated except as otherwise provided in the National Termination Agreement;
1
Whereas, Perot Systems and Alamo entered into an Outsourcing Agreement, dated as of December 7, 1998 (the “Alamo Agreement”), pursuant to which Perot Systems provided certain application support services and data center operations services to Alamo in support of Alamo’s legacy systems, and a Termination Agreement dated September 30, 2000 (the “Alamo Termination Agreement”) pursuant to which the Alamo Agreement was terminated except as otherwise provided in the Alamo Termination Agreement;
Whereas, Perot Systems and ANC entered into that certain Master Agreement as of September 30, 2000 (the “Master Agreement”), that certain Work Order #1 entered into effective as of September 30, 2000 (“WO#1”), that certain Work Order #2 entered into effective as of September 30, 2000 (“WO#2”), and that certain Work Order #3 entered into effective as of September 30, 2000 (“WO#3”; the Master Agreement, WO#1, WO#2 and WO#3 are collectively referred to as the “ANC Agreement”), pursuant to which Perot Systems has been providing information technology services, including application support and data center operations services, to ANC;
Whereas, pursuant to WO#1, Perot Systems developed certain derivative works of, and additions and enhancements to, Odyssey (as defined in the ANC Agreement) and Greenway 1.0 (collectively, the “Odyssey/GreenWay Modifications”), and the GreenWay License and Sublicense was extended to include the Odyssey/Greenway Modifications;
Whereas, Perot Systems and ANC desire to terminate the ANC Agreement with respect to the provision of services effective as of the date and time the Acquisition is consummated (the “Effective Date”), subject to certain exceptions as set forth below; and
Whereas, the parties desire for the sublicense to National of GreenWay 1.0 and Odyssey, and the license to National of the GreenWay Modifications and the Odyssey/GreenWay Modifications, the whole as expressed in the GreenWay License and Sublicense as extended pursuant to WO#1 (collectively, the GreenWay/Odyssey License”), to survive the termination of the ANC Agreement and continue in accordance with the terms set forth in this Termination Agreement.
Now, therefore, the parties agree as follows:
1. Definitions. Except as otherwise defined in this Termination Agreement, capitalized terms shall have the meanings ascribed thereto in the ANC Agreement.
2. Release of Liability. In exchange for the mutual promises and other consideration set forth herein, each Debtor, on behalf of itself and its past, present and future officers, directors, stockholders, attorneys, agents, representatives, employees, subsidiaries, affiliates (including but not limited to ANC, ANC Rental, National and Alamo), predecessors, successors in interest and assigns, and anyone else who may claim by or through such Debtor, hereby fully releases, relinquishes and forever discharges and holds harmless Perot Systems and its past, present and future officers, directors, stockholders, attorneys, agents, representatives, employees, subcontractors, subsidiaries, affiliates, predecessors, successors in interest and assigns, from any and all past, present or future claims, demands, obligations, actions, causes of action, liabilities, debts, suits, liens, damages, costs, losses and expenses of any kind and character, whether in law or in equity, in tort or in contract, whether now known, suspected, claimed, asserted or unasserted, contingent or fixed, arising prior to the Effective Date, which are based on or arise under the ANC Agreement (“Preexisting ANC Claims”). ANC further covenants that it will not initiate or assist, the furtherance of any litigation, arbitration, administrative or any other type of legal proceeding, regarding any Preexisting ANC
2
Claim. This release expressly includes any avoidance cause of action under 11 U.S.C. Section 550.
3. Termination of ANC Agreement. Except as specifically set forth in this Section 3, the ANC Agreement and all of the rights and obligations of ANC and Perot Systems thereunder are hereby terminated on, and shall be of no further force and effect after, the Effective Date; provided, however that, notwithstanding Section 3 of this Termination Agreement and Section 13.11 of the ANC Agreement, the GreenWay/Odyssey License, and all other rights and obligations of ANC, National and Perot Systems set forth in Sections 6.1(a), (b), (c) and (e) of the National Agreement, and Sections 6.1, 6.2 and 6.3 of WO#1, and only such provisions, shall survive and continue in full force and effect.
4. Assignment of Rights under GreenWay/Odyssey License. ANC and National hereby assign to Newco, and Perot Systems hereby consents to the assignment to Newco of, all rights of ANC and National under the GreenWay/Odyssey License including, without limitation, the perpetual, non-exclusive, non-transferable, fully-paid license and sublicense (as applicable) to copy, use perform, distribute and make Derivative Works of GreenWay 1.0, Odyssey, the GreenWay Modifications and the GreenWay/Odyssey Modifications.
5. Payment. On the Effective Date, ANC shall pay Perot Systems, all amounts payable under the ANC Agreement with respect to goods and services provided between May 1, 2003 through the Effective Date.
6. Certain Terms. The following provisions are hereby incorporated into this Termination Agreement by reference (a) Article 12.0 of the ANC Agreement, and (b) Sections 10.1 through 10.7, 13.2, 13.4, 13.5, and 13.8 of the ANC Agreement.
7. Perot Systems’ Claims. Perot Systems reserves the right to assert any general, unsecured claims that Perot Systems or its Affiliates may have against the Debtors under the ANC Agreement under Sections 502(a) and (b) of the Bankruptcy Code (or, to the extent that such claims are deemed to be arising from the Debtors’ rejection of the ANC Agreement, Section 502(g) of the Bankruptcy Code); provided, however, that Perot Systems hereby agrees that any such claims will be asserted only as general unsecured claims and not as an administrative expense priority claim or any other type of priority claim in the Debtors’ bankruptcy cases, except that any claim for amounts payable by ANC under the ANC Agreement for services provided between the date the Debtors filed their bankruptcy cases and the Effective Date shall be asserted by Perot Systems, and treated by the Debtors, as an administrative expense priority claim.
3
The parties have executed this Termination Agreement on the Agreement Date through their duly appointed and authorized representatives.
ANC Information Technology, L.P. | Perot Systems Corporation |
| |
By: | ANC Information Technology, Inc. | |
| its General Partner | |
| |
| |
By: | | | By: | | |
| |
Name: | | | Name: | | |
| |
Title: | | | Title: | | |
| |
| |
ANC Rental Corporation | Alamo Rent-A-Car L.L.C. |
| |
| |
By: | | | By: | | |
| |
Name: | | | Name: | | |
| |
Title: | | | Title: | | |
| |
National Car Rental System, Inc. | Vanguard Car Rental USA Inc. |
| |
| |
By: | | | By: | | |
| |
Name: | | | Name: | | |
| |
Title: | | | Title: | | |
| | | | | | |
4
EXHIBIT E
FORM OF CUSTOMER SATISFACTION SURVEY
.
CUSTOMER SATISFACTION SURVEY
FOR
VANGUARD CAR RENTAL USA INC.
How would you rate Perot Systems on each one of the following aspects of performance?
Rating Criteria
1-Unacceptable | | 2-Poor | | 3-So-So | | 4-Good | | 5-Excellent | | 6-NA |
Perot Systems Account Leadership Team | | |
Demonstrating a clear sense of direction | | |
Portraying a sense of urgency | | |
Taking action when issues are defined | | |
Creating an atmosphere of mutual trust and respect | | |
| | |
Customer Focus | | |
Understanding issues impacting Vanguard Car Rental USA Inc. | | |
Providing effective solutions | | |
Responding in a timely manner to requests | | |
Delivering services on time, as agreed upon | | |
Performing effective project planning | | |
Operating as business partners | | |
Providing value-added services | | |
| | |
Communication | | |
Keeping Vanguard Car Rental USA Inc. informed of critical issues | | |
Listening to what Vanguard Car Rental USA Inc. says | | |
Maintaining effective two-way communication | | |
| | |
Staffing/People | | |
Providing the expected level of functional expertise | | |
Matching the “right” skill sets to the “right” job | | |
Doing what we say we’re going to do | | |
Doing more than is expected | | |
Working as a team with Vanguard Car Rental USA Inc. | | |
5
GLOBAL QUESTIONS
1. Overall, how satisfied are you with the performance of Perot Systems?
Very Dissatisfied o | | Somewhat Dissatisfied o | | Somewhat Satisfied
| | Very Satisfied o | | Extremely Satisfied o | |
2. How likely would you be to recommend Perot Systems to a colleague?
Definitely Would Not Recommend o | | Probably Would Not Recommend o | | Might or Might Not Recommend o | | Probably Would Recommend o | | Definitely Would Recommend o | |
3. How likely are you to do additional business with Perot Systems in the future?
Definitely Would Not Do Business o | | Probably Would Not Do Business o | | Might or Might Not Do Business o | | Probably Would Do Business o | | Definitely Would Do Business o | |
ADDITIONAL QUESTIONS
What one thing did we do well in this relationship?
What one thing would you most like to see us improve?
6
What do you believe our competitors do better than our company?
Any additional comments or concerns not covered in this survey?
Please return this survey to:
Perot Systems Corporation
ATTN: xxxxxxxxx
7
EXHIBIT F
CHANGE CONTROL PROCESS
Table of Contents
1. | Introduction | 2 |
2. | Definitions | 2 |
3. | Change Control Governance | 2 |
4. | Change Control Process | 2 |
4.1 | | Change Initiation Request | 2 |
4.2 | | Rough Order of Magnitude Estimate | 3 |
4.3 | | Change Order | 4 |
4.4 | | Implementation of Change Orders | 6 |
4.5 | | Changes to Change Orders | 7 |
4.6 | | Other Perot Systems Obligations | 7 |
5. | Testing and Acceptance of Deliverables | 7 |
5.1 | | Test Plan | 8 |
5.2 | | Acceptance Testing | 9 |
5.3 | | Acceptance Criteria | 9 |
5.4 | | Newco’s Responsibilities for Testing of Deliverables | 10 |
6. | Closure of Change Orders | 10 |
7. | Payment | 11 |
Attachment F-1 | 12 |
1
1. INTRODUCTION
The Parties will follow the procedures set forth in this Exhibit F to the MSA, to initiate, control, revise and close out Changes.
2. DEFINITIONS
“Acceptance Criteria” is defined in Section 5.3 of this Attachment.
“Acceptance Testing” is defined in Section 5.2 of this Attachment.
“Additional Services Hours” is defined as the number of hours of Additional Services, if any, provided by Perot Systems under a Change Order.
“Change Initiation Request” or “CIR” is defined as the document to be completed by Newco and provided to Perot Systems to initiate a Change through the Change Control Process described herein.
“Deliverables” is defined as those items described in a Change Order to be delivered to Newco.
“IT Steering Committee” is defined in Section 3.
“Labor Hours” is defined as the number of hours provided by the Applications Enhancement Pool or the Application Support Pool under a Change Order.
“Rough Order of Magnitude Estimate” or “ROM” is defined in Section 4.2 of this Attachment.
3. CHANGE CONTROL GOVERNANCE
Each party shall appoint two representatives to a governing body (the “IT Steering Committee”), which shall meet at least once a week until the completion of the VRS Project, and thereafter on a schedule to be agreed, for the purpose of: (i) reviewing progress and performance of each party under the MSA and any Change Orders; and (ii) reviewing any disputes among the Parties that are related to Change Orders or otherwise directed to be resolved by the Change Control Process under the MSA.
2
4. CHANGE CONTROL PROCESS
4.1 Change Initiation Request
Unless otherwise agreed, all requests for Changes by Newco shall be communicated in writing or in email by Newco’s Account Manager or designee to Perot Systems Account Manager or designee via a CIR. The Parties will follow the process described in this Section 4 to initiate a Change.
4.2 Rough Order of Magnitude Estimate
Unless otherwise agreed, Perot Systems shall provide Newco with a rough order of magnitude estimate (“Rough Order of Magnitude Estimate” or “ROM”) for each CIR submitted to Perot Systems within seven business days of receipt of the CIR, provided that for complex CIRs that Perot Systems initially determines will require more than 1000 Labor Hours or if Newco has submitted more than 10 CIRs in any calendar month, the time period shall be extended if reasonably necessary to a mutually agreed period. In responding to CIRs, Perot Systems shall give due consideration to Newco’s prioritization of the CIRs under review. Each ROM shall include:
(i) the estimated Labor Hours to complete the Change;
(ii) any Additional Services resources required and the estimated Additional Service Hours and related charges for such resources;
(iii) estimated Pass-Through Expenses related to the Change;
(iv) any additional hardware, software or network charges;
(v) the known impact of the Change on other approved and scheduled Changes;
(vi) the estimated Labor Hours, estimated Additional Services Hours (and related Perot System’s charges), estimated charges, expenses and infrastructure costs, and estimated Pass-Through Expenses for completion of final requirements for the Change Order; and
(vii) the estimated charges and expenses for completion of the Change.
After submittal of the ROM to Newco, Newco shall use reasonable efforts to promptly notify Perot Systems of the approval or disapproval of the ROM. Approval of the ROM may be in written or electronic form. Unless otherwise agreed by the Parties, no further action is required for a ROM that has been rejected by Newco, subject to Newco’s right to revise and resubmit any rejected CIR.
3
4.3 Change Order
Upon approval of each ROM for projects other than Major Projects by Newco and unless otherwise agreed, Perot Systems shall complete and deliver a Change Order, in the form of Attachment F-1 hereto. Pricing of Change Orders will reflect the mutually agreed upon desires of both parties. Accordingly, Change Orders may be fixed in price, time and materials based, cost-plus based or based upon such other economic arrangement as the parties agree. Unless otherwise agreed, charges, if any, for Additional Services under a Change Order will be on a time and materials basis and will be based upon the appropriate Additional Services Rates referenced in Exhibit C of the MSA.
For Major Projects, each Change Order must include at least the following information:
(i) Project Managers
This section will identify Newco’s and Perot Systems’ respective Project Managers including name, address, telephone number, pager number, and fax number.
(ii) Purpose and Scope of Work
This section will provide a summary of the overall purpose of the Change Order and define the scope of work to be performed.
(iii) Assumptions and Dependencies
This section will describe any key assumptions or dependencies upon which the Change Order was based or is dependent upon for successful completion, or both.
(iv) Definitions
This section will define any terms specific to the Change Order.
(v) Perot Systems Responsibilities
This section will describe the responsibilities that Perot Systems is required to perform in order to complete the Change Order.
(vi) Newco Responsibilities
This section will describe the responsibilities that Newco is required to perform in order to complete the Change Order.
4
(vii) Required Equipment and Materials
This section will list all required equipment and materials including, hardware, software and services, that Newco or Perot Systems must provide in order to facilitate completion of the Change Order, including, without limitation, identification of any pre-existing software components (e.g., code libraries), tools to be used and Perot Systems’ assumption regarding the provision of such required equipment and materials.
(viii) Deliverables
This section will provide a description of any items to be delivered by Perot Systems under the Change Order, including, without limitation, (a) any project management reports that will be provided; (b) the applicable testing plan and acceptance criteria for the deliverables, if any; and (c) ownership of any intellectual property, if any, created under the Change Order.
(ix) Estimated Schedule
This section will provide the project plan consisting of an estimated schedule for completion of the Change Order, including milestones, dependencies among milestones (i.e., predecessors), and the project’s critical path and hours to achieve milestones and other required resources for activities to be performed by Perot Systems.
(x) Completion Criteria
This section will state the criteria that Perot Systems must meet in order to satisfy its obligations under the Change Order.
(xi) Charges
This section will specify the applicable charges, if any, for the Change Order (for example, included within the Annual Services Charge or performed for additional charges on a fixed price or time and materials basis).
(xii) Total Cost
This section will contain the estimate of Newco’s Total Cost for the Change Order (“Total Cost”). The Total Cost estimate shall include (i) Perot Systems’ charges and expenses; (ii) the cost of additional Perot Systems-managed infrastructure (e.g., hardware, software and services) to be provided by Perot Systems; and (iii) the specifications for additional Perot
5
Systems-managed infrastructure (e.g., hardware, software and network services) to be provided by a third party.
(xiii) Additional or Unique Terms and Service Levels and Credits
This section will identify terms and conditions, if any, in addition to or different from the terms and conditions of the MSA.
Upon completion, Perot Systems will submit the completed Change Order to the Change Control Board for approval. The Change Control Board will evaluate the Change Order and will within 60 days approve or reject such Change Order. If after 60 days either party has not signed the proposed Change Order, then the proposed Change Order will be closed without action unless otherwise mutually approved by the Parties. Unless otherwise agreed, the estimates provided by Perot Systems in the Change Order are valid for 60 days after the date of the applicable document. If Newco has not approved the document within such 60 day time period, Perot Systems reserves the right to revise the estimates.
4.4 Implementation of Change Orders
Upon execution of a Change Order by Newco, Perot Systems shall perform the services under the Change Order consistent with terms of the Change Order, including, without limitation, adhering to the schedule included in the Change Order and the estimated Labor Hours in the Change Order and the estimated costs and expenses of the Change covered by the Change Order.
All Change Orders will become obligations of the respective parties only through the execution of a Change Order signed by the Account Managers or designees of each of the respective parties. The Change Control Board will prioritize such newly approved Change Orders in conjunction with other outstanding Change Orders. The Change Control Board will discuss such prioritization in light of available resources and implementation schedules and shall reach a mutual decision regarding the feasible priority of such Change Order in the workload queue.
After approval or rejection of a Change Order, the Change Control Board will take action to inform affected parties of the approved or rejected status of the Change Order. If a Change Order is rejected, the Change Control Board will communicate the rationale for the rejection.
Perot Systems shall select the method by which each Change agreed to in a Change Order (excluding Changes to the MSA, Exhibits and Schedules themselves, e.g. contractual-type changes) is implemented using its reasonable discretion. Perot Systems will consult with Newco regarding Changes agreed to in a Change Order relative to Newco’s preferences
6
regarding the implementation of such Change, if any, and shall, to the extent reasonably practicable incorporate such preferences in its implementation of the applicable Change.
If, during performance of a Change Order, Perot Systems determines that the charges or Total Cost is likely to exceed the estimate set forth in the Change Order by greater than 10%, then Perot Systems shall promptly suspend work and notify the Newco Project Manager. The Project Managers shall then meet to discuss the reasons for the cost overruns and potential solutions. If the Project Managers do not agree on a solution, then either Project Manager may submit the issue to the Change Control Board for resolution. Further work on such Change Order may be re-started only by the written agreement of Newco and Perot Systems. If work is not re-started and completed, then any payment for such Change shall be the same as for a terminated Change Order.
It is acknowledged by both parties that Change Orders may be for updating purposes only (as compared to Changes which might be contractual or economic modifications) such as those that might be used to keep current the MSA, Exhibits and Schedules. As such each Change Order must be agreed upon on its own merits and be evaluated in light of the entirety of Change that may result from such Change Order.
4.5 Changes to Change Orders
Either Party may request changes to the scope or requirements of Change Orders at any time by agreement of the Parties. Such requests may be in written or electronic form. As soon as reasonably practical after receipt of the request, Perot Systems will revise the Change Order and obtain Newco’s approval and re-prioritization of the Services affected by the change. Upon Newco’s approval, Perot Systems will commence providing the Services in accordance with the approved changes. In the event that changes are not approved by Newco, Perot Systems shall continue performing the Services specified in the Change Order (including any previously agreed upon changes).
4.6 Other Perot Systems Obligations
Within 90 days of the Effective Date, Perot Systems shall establish procedures to enable tracking of ongoing scope changes for Change Orders, and provide a basis for auditing changes.
7
5. TESTING AND ACCEPTANCE OF DELIVERABLES
Unless otherwise mutually agreed, Perot Systems and Newco shall test Deliverables provided under each Change Order as defined below:
5.1 Test Plan
For each Deliverable identified in an applicable Change Order, Perot Systems shall develop a test plan (“Test Plan”) with assistance from Newco. Upon Newco’s approval of the Test Plan it shall become part of the Change Order documentation and Perot Systems shall test the Deliverable(s) in accordance with the Test Plan. Such testing will include unit and function (development) testing, system integration and regression testing (quality assurance) utilizing a set of mutually developed, object test cases or criteria, all as described in the Test Plan. Perot Systems shall assist Newco in performing Newco’s own testing and end user-related testing, subject to the terms of the applicable Change Order. Perot Systems’ responsibilities for testing of Deliverables with respect to each Test Plan shall include:
(i) provide specific written documentation on testing as requested by Newco, which may include comparison reports, explanations of test results, and reports of what went into tests and actual test results;
(ii) establish and maintain test baselines (e.g., scripts, databases) and update such test baselines as appropriate;
(iii) perform support and maintenance activities as agreed (e.g. data refresh) of all test regions and environments;
(iv) perform data refresh if needed after each major release of Supported Software;
(v) provide Newco access to all test systems;
(vi) develop recommendations for Newco about possible alterations to the testing environment which Newco can pursue as potential Enhancement/New Development including risks, high level costs;
(vii) perform Supported Software assurance reviews with Newco for major Supported System and sub-system releases; and
(viii) test Supported Software after implementation (e.g. check-out) and provide proper back-out procedures. If implementations of Supported Software occur after business hours, Perot Systems shall provide after hours on-site support as necessary.
(ix) respond to and correct Supported System outages and address End User impact as a result of the implementation of a Change Order;
8
(x) facilitate daily release status call and coordinate go/no-go decisions for implementation of releases for Supported Software;
(xi) facilitate post-implementation status call on the morning of the implementation of a release of Supported Software; and
(xii) provide software demo for each release of Supported Software and coordinate with Newco.
5.2 Acceptance Testing
Upon completion of testing under a Test Plan, Perot Systems shall deliver to Newco the input and output test results, in a mutually agreed format, which shall include matrices of how it tested each Deliverable and other requirements as set forth in the Test Plan (collectively, “Acceptance Testing”). The Acceptance Testing process shall include an audit trail capability for tracking and correcting problems and specify the time period to perform Acceptance Testing as specified in the mutually agreed planned release schedule or the Change Order, whichever is applicable. If Perot Systems believes a Deliverable conforms to its applicable Acceptance Criteria, Perot Systems will notify Newco that such Deliverable is ready for Newco’s review and approval. Newco will promptly review such Deliverable and promptly notify Perot Systems of any non-conformance it observes with reasonable supporting detail. Any non-conformance will be addressed as described below. Subject to the terms of the applicable Change Order, Perot Systems will assist Newco in conducting its own acceptance tests.
5.3 Acceptance Criteria
As applicable for each Deliverable in a Change Order, Perot Systems shall demonstrate to Newco that the Deliverable, has materially conformed to the following (collectively, “Acceptance Criteria”):
(i) the Deliverable has been fully and properly installed or completed in accordance as set forth in the Change Order;
(ii) the Deliverable meets the specified functional, technical and End User requirements set forth in the Change Order, the functional requirements document or the analysis and design documents, as applicable;
(iii) the Deliverable operates in conformity with applicable documentation; and
9
(iv) the Deliverable complies with specified levels of performance, if any, set forth in the Change Order.
A Deliverable is deemed “Accepted” when Perot Systems demonstrates to the reasonable satisfaction of Newco that the Deliverable materially conforms to the applicable Acceptance Criteria and to the mutually agreed, objective acceptance tests set forth in the Test Plan. Newco shall promptly notify Perot Systems of its acceptance or rejection of each Deliverable. In the event that Newco rejects a Deliverable, Newco will provide Perot Systems with a written explanation for its rejection and Perot Systems shall promptly correct such Deliverable.
5.4 Newco’s Responsibilities for Testing of Deliverables
Newco shall provide or perform the following in order to facilitate Perot Systems’ testing of Deliverables:
(i) review and approved each Test Plan;
(ii) review test results;
(iii) provide user test time required;
(iv) participate in software demos;
(v) review release reporting;
(vi) provide detailed reason for any rejection of a Test Plan or test result review to Perot Systems;
(vii) participate in daily release calls with Perot Systems during release testing;
(viii) participate in the implementation status call with Perot Systems; and
(ix) provide input to go/no-go decision on implementation.
10
6. CLOSURE OF CHANGE ORDERS
A Change Order shall be deemed closed when any one of the following events occurs:
(i) The Parties agree that Perot Systems has completed the Core Application Services and the Deliverables materially meet Acceptance Criteria, both as set forth in the Change Order.
(ii) Termination or expiration of the MSA, subject to the terms of the MSA with respect to Termination Assistance Services.
(iii) Newco terminates the Change Order.
(iv) Newco terminates the Change Order; provided, however, that Newco shall be financially responsible for Perot Systems’ actual documented and reasonable expenses related to the displacement of assets and/or PSC Personnel (provided that expenses related to displacement of PSC personnel shall not include expenses related to displacement of personnel within the Application Enhancement Pool or Application Support Pool) due to Newco’s termination of the Change Order prior to its expiration date (i.e., wind down costs).
7. PAYMENT
With respect to Changes accepted by Newco, Newco shall pay Perot Systems for such Changes in accordance with the applicable Change Order. With respect to Change Orders terminated by Newco, any disputes regarding payment or deliverables with respect to a terminated Change Order will be subject to the dispute resolution process set forth in Article 15 of the MSA.
11
ATTACHMENT F-1
Form of Change Order
Change Order No.
Perot Systems Corporation (“Perot Systems”) and Vanguard Car Rental USA Inc. (“Newco”) hereby enter into this Change Order No. under the Master Information Technology Services Agreement between such parties, effective as of (the “MSA”), on the following terms. This Change Order incorporates all terms and conditions of the Agreement, except where otherwise expressly provided. To the extent that there is any conflict between the terms of this Change Order and the MSA, the terms of this Change Order shall prevail. Unless otherwise specifically provided, capitalized terms will have the meanings set forth in the MSA.
1. Term. This Change Order will commence on (the “Change Order Effective Date”) and will continue until , unless earlier terminated in accordance with the MSA. Subject to agreement on rates and services, this Change Order may be extended upon mutual written agreement of the parties.
2. Perot Systems Responsibilities. Perot Systems will provide the resources described in Section 4 and will, to the extent possible with the resources provided during the term of this Change Order, work on the activities described below:
[INSERT A DETAILED DESCRIPTION OF THE SERVICES THAT WILL BE PERFORMED.]
4. Newco Responsibilities. In addition to its obligations in the MSA, Newco will provide or perform the following to allow Perot Systems to perform its obligations hereunder:
[INSERT A DETAILED DESCRIPTION OF ALL NEWCO OBLIGATIONS UPON WHICH PEROT SYSTEMS’ PERFORMANCE WILL DEPEND.]
5. Resources and Payments.
5.1 Pool Resources. During the term of this Change Order, Perot Systems will utilize the following Pool resources to perform the Services described in Section 2:
Resource Type | | Estimated Duration | | Application Enhancement or Support Pool | |
| | | | | |
| | | | | |
| | | | | |
12
5.2 Additional Services Resources. During the term of this Change Order, Perot Systems will provide the following Additional Services resources to perform the Services described in Section 2 at the T&M Rates set forth in Attachment C-3 to Exhibit C-3 of the MSA:
Job Roles/Skill Sets | | Estimated Duration | | Daily or Monthly Rate | |
| | | | | |
| | | | | |
| | | | | |
5.3 Out of Pocket Expenses. Newco will reimburse Perot Systems for the following out-of-pocket expenses:
Out-of-pocket Expense | | Estimated Total | |
| | | |
| | | |
| | | |
5.4 Hardware, Software, Licenses and Third Party Services. Newco will pay Perot Systems for the hardware, licenses to software, and third party services provided under this Change Order as set forth below.
Item | | Quantity | | (a) Unit Price | | (b) Estimated Total | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
13
6. Other Terms.
[FOR MAJOR PROJECTS, INSERT THE INFORMATION REQUIRED UNDER EXHIBIT F, INCLUDING THE PROJECT MANAGERS, PURPOSE AND SCOPE OF WORK, DEFINITIONS, REQUIRED MATERIALS, ESTIMATED SCHEDULE, COMPLETION CRITERIA, CHARGES, TOTAL COST AND ANY ADDITIONAL OR UNIQUE TERMS AND SERVICE LEVELS AND CREDITS.]
Except as described herein, all other terms and conditions of the MSA remain unchanged.
AGREED: | | |
| | |
VANGUARD CAR RENTAL USA INC. | | PEROT SYSTEMS CORPORATION |
| | |
| | |
By: | | | By: | |
| | |
Name: | | | Name: | |
| | |
Date: | | | Date: | |
| | | | | | | | |
14
SCHEDULE 2.4(b)
NEWCO RETAINED FUNCTIONS
• Office of the Chief Information Officer will be retained by Newco along with the responsibilities described below:
• Newco’s Chief Information Officer (CIO) will have the following retained functions:
• Serves as Newco’s primary point of contact for managing the day to day relationship with Perot Systems;
• Works with Perot Systems Account Manager to ensure Newco requirements are disclosed to Perot Systems; and
• Provides reasonably requested business information necessary for the preparation of the Annual Technology Plans.
• Infrastructure Director
• Aligns with Perot Systems infrastructure manager as Newco representative and provides support to Perot Systems as required to address any Newco related issues;
• Reviews reports provided by Perot Systems detailing Perot Systems’ performance against the Service Levels; and
• Provides any necessary information for Perot Systems to ensure required maintenance & lease agreements are in place for required systems software and hardware.
• Applications Director
• Acts as Newco’s representative and provides information to Perot as required for Perot’s Systems to address any Newco related issues;
• Reviews reports provided by Perot Systems detailing Service Level performance relative to Core Application Services; and
• Provides any necessary information for Perot Systems to ensure required Managed Contracts are in place for required third party software licenses and maintenance.
NOTE: Newco Personnel performing the foregoing functions may carry different job titles from those described above, and the duties of Newco Personnel may diverge or overlap such that any one or more Newco Personnel may be responsible for performing any of the foregoing functions.
• Except for the support provided by Perot Systems for the Reservation bridges from European Supported Affiliates to Odyssey/Legacy Systems, all information technology services and support for international Supported Affiliates of Newco.
SCHEDULE 2.4(c)
EXCLUSIVE SERVICES AND SOFTWARE
1. Legacy System
2. VRS Modifications (other than the Maintenance Modifications)
3. Developed Software (other than the Maintenance Modifications)
Schedule 3.1 c
Supported Affiliates and Franchises/Licensees
Part A – Supported Affiliates
SUPPORTED AFFILIATES
International Automotive Group Insurance Company, Ltd. |
ARG Funding Corp. |
ARG Funding Corp. II |
National Car Rental (Canada) Inc. |
National Car Rental System (Canada) Inc. |
NT Limited Partnership |
National Car Rental Financing Corporation |
National Car Rental Financing Limited Partnership |
Car Temps Financing LP |
Car Temps Financing, LLC |
Alamo Financing, LP |
Alamo Financing, LLC |
Alamo Rent-A-Car (Canada) Inc. |
Republic Industries Automotive Rental Group (Switzerland) AG |
Republic Industries Automotive Rental Group (Belgium) Inc. |
ANC Rental Corporation (Holdings) Limited |
ANC Rental Corporation (Group) PLC |
ANC Rental Corporation Limited |
Provincial Assessors, Ltd. |
ANC Rental Corporation (Properties) Limited |
ANC Rental Corporation (Franchising) Limited |
ANC Marketing Services Middle East Ltd. |
ANC Rental Corporation (UK) Limited |
Provincial Securities, Ltd. |
Ganymed 196 GmbH |
Ganymed 197 GmbH |
ANC Autovermietung GmbH & Co. KG |
ANC Rental Pension Scheme Trustees Ltd. |
Republic Industries Automtoive Rental Group (Holland) BV |
ANC Rental Corporation (Insurances) Limited |
Diplema 272 Limited |
Diplema 274 Limited |
National Car Rental Hawaii |
1
Part B – Franchisees/Licensees
LICENSEES - U.S.
ACME CAR RENTALS, INC. |
AIRPORT EQUIPMENT RENTALS, INC. |
ALASKA SALES & SERVICES, INC. |
ARELCO, INC. |
ATLANTIC LEASING, LTD (will be re-licensed once eff.- inactive) |
B & J AUTO RENTALS, INC. |
BARKER CAR RENTAL COMPANY |
BDD ENTERPRISES, LLC |
BEMIDJI AVIATION SERVICES, INC. |
BERT ADAMS LEASE-RENTALS, INC. |
BREK RENTALS, INC. |
BRIGHTWELL MOTORS, INC. |
BROWN INVESTMENTS, INC. |
BSI RENTALS, INC. |
CAPE COD AUTO RENTALS, INC. |
CORNHUSKER RENT-A-CAR, INC. |
CORPAT, INC. |
CRABB’S CAR RENTAL, INC. |
CURRY L & R CORP. |
DAN DEERY MOTOR CO. INC. |
DENISE MCNULTY & ASSOCIATES, INC. |
DES MOINES SERVICE CORP. |
DESARNO ENTERPRISES, INC. |
DRIVEN, INC. |
DUFFY INTERNATIONAL CORPORATION |
EATMAN LEASING, INC. DBA EATMAN RENTALS |
F.M.K. ENTERPRISES, INC. |
FIRST HOLIDAY TOUR & TRAVEL, INC. |
FITZCO, INC. |
JIM DUNWORTH, INC. |
JMN, INC. |
JOHN W. MILLER, JR. CO., INC. |
JONES MOTORCARS, INC. |
KAR ENTERPRISES, INC. |
KEWEENAW PARK TRANSPORT COMPANY |
LAMB CAR RENTAL, INC. |
LAREDO CAR RENTALS, INC. |
LEIGHTON LEASING, INC. |
LEWIS GENE WARNER |
MGM RENTAL, LLC |
MIDWEST CAR CORPORATION |
MINNEHAHA LEASING, INC. |
NATIONAL CAR RENTAL, ARIZONA, INC. |
NATIONAL CAR RENTALS OF CORPUS CHRISTI, INC. |
2
NEHLS RENTAL & LEASING CO. |
NORTHEAST RENT-A-CAR & LEASING CORP. |
NORTHEAST TRANSPORTATION, LTD. |
PENNSYLVANIA LEASING CORP. |
QUANTUM, INC. |
R. J. II ENTERPRISES, LLC |
RAH CORPORATION |
RICK JACOBSEN |
RTJ INVESTMENTS, INC. |
RUHE MOTOR CORP. |
RYDELL AUTO CENTER, INC. |
SHEPARD CHEVROLET, INC. |
SHERER’S CAR RENTAL, INC. |
SHERIDAN MOTORS, INC. |
SMOKY MOUNTAIN RENTALS, INC. |
SUNSET MOTORS, INC |
T & M AUTO LEASING INC. |
T.B.M LEASING, INC. |
TCM HERITAGE INC. |
TOWER MOTORS OF BRAINERD, INC. |
TREADS, INC. |
TRIM RENTAL AND LEASING, INC. |
UNIVERSAL ACCEPTANCE CORPORATION |
V. A. RENTING & LEASING, INC. |
WATERFORD SYSTEMS, INC. |
WB RENTALS, LLC |
WILLIAM B. HART |
WILSON BROS. LEASING CO., INC. |
LICENSEES - CANADA
056527 N.B. LTEE. - TRACADIE-SHEILA |
1006336 ONTARIO INC |
1109701 ONTARIO LIMITED |
1117608 ONTARIO INC |
1392612 ONTARIO INC |
1425149 ONTARIO INC. |
1534362 ONTARIO INC |
3105-3143 QUEBEC INC |
486728 BRITISH COLUMBIA LTD |
514939 ONTARIO LIMITED |
516941 ONTARIO LIMITED |
656290 ONTARIO LIMITED |
695835 ONTARIO LTD. |
847846 ALBERTA LTD |
854006 ONTARIO LIMITED |
90456 CANADA LTEE |
9033-9979 QUEBEC INC. (LOCATION D’AUTOS M.C.R) |
3
9102-3465 QUEBEC INC |
9120-5823 QUEBEC INC. |
988707 ONTARIO LTD. |
ABCAT INC |
ADVANTAGE LEASING & RENTALS |
ALPINE AUTO RENTALS LIMITED |
AMP ENTERPRISES |
ANDREW MURRAY MOTORS LIMITED |
ARTHAVEN INVESTMENTS LTD. |
AUTOMOBILES JOLIBOURG INC |
BANCROFT MOTORS LTD |
C. GIGNAC AUTOMOBILES INC. |
CANADA EAST TOURS LTD |
CHIBOUGAMAU AUTOMOBILE INC |
CLEARWAY RENTALS INC. |
CURRY MOTORS LIMITED |
DOWNTOWN PONTIAC BUICK GMC |
EASTVIEW CHEVROLET OLDSMOBILE PONTIAC BUICK GMC LTD. |
ECONOMY LEASING LTD |
GESTION PORLIER LIMITEE |
GINWAL ENTERPRISES LTD. |
GORRUD LIMITED |
GREY MOTORS PONTIAC BUICK GMC LTD |
HALT HOLDINGS LTD |
IVEY AVIATION LTD |
J CLARK & SON LIMITED |
LAKE LOUISE INVESTMENTS LTD |
LEWIS MOTOR SALES INC |
LOCATION 3 ETOILES INC |
LOCATION AUBE LTEE |
LOCATION D’AUTOS WABUSH LTEE |
LOCATION D AUTOS HAUTERIVE |
LOCATION D’AUTOS B.C. INC |
LOCATION GROUPE DION INC. |
LOCATION ELITE INC |
LOCATION G ROYER INC |
LOCATION LBS INC |
MACMASTER PONTIAC BUICK GMC (1999) INC. |
MASSET SERVICES LTD. |
MELS U-DRIVE (1978) LTD |
MID ALTA MOTORS LTD. - RED DEER |
MONTMAGNY TOYOTA |
MURDOCH GROUP INC |
MURRAY CHEV OLDS CADILLAC LTD |
NORCAN LEASING LTD |
PAUL GAMELIN & FILS INC |
4
RAINBOW MOTORS LIMITED |
RAYMOND JOHNSON COMPANY LTD |
ROBERT A FOX SALES & RENTAL |
ROCKY MOUNTAIN LEASING LTD |
SALMON ARM MOTORS LTD |
SHAWINIGAN CHEVROLET OLDSMOBILE LTEE |
SKEENA RENT A CAR LTD |
SPADONI LEASING LTD |
SPENCER’S CAR & TRUCK RENTALS |
STEINBACH DODGE CHRYSLER LTD |
TEDS U-DRIVE LTD |
THOMPSON CHRYSLER LTD |
WESTERN AUTO RENTALS INC. |
WESTERN CHEV OLDS CADILLAC |
WHIRLWIND AUTO RENTALS |
WOODWARD RENT A CAR LIMITED |
INTERNATIONAL LICENSES
Country | | Licensee Name |
Antigua | | Laco International |
Aruba | | Enrique Car Rental |
Australia | | Delta Car Rental |
Austria | | Denzel Auto-Vertriebesellschaft mbH |
Bahrain | | Allied Car Rental W.L.L. |
Belgium | | Berg’O’Tool N.V. |
Bonaire | | Total Car Rental |
Bosnia & Herzegovina | | Max Auto d.o.o. |
Burkina Faso | | Citer S.A. |
Chile | | Ervo Rent A Car |
Colombia | | Chewgwin Goekel LTDA |
Colombia | | Rentaniza |
Costa Rica | | Ada Rent A Car - Autos de Alquiler |
Costa Rica | | Pequi S.A. |
Croatia | | Premium Rent A Car |
Curacao | | Caribe Car Rental N.V. |
Cyprus | | Astra Self Drive Cars Ltd |
Denmark | | Danecars APS |
Dominican Republic | | Motor Plan S.A. |
El Salvador | | Uno Rent A Car S.A. de C.V. |
Estonia | | A Rental Limited |
France | | Citer S.A. |
France-Corsica | | Citer S.A. |
5
Country | | Licensee Name |
French Guyana | | Citer S.A. |
Germany | | ANC Autovermietung GmbH & Co. KG |
Greece | | Executive Lease S.A. |
Guadeloupe | | Citer S>A. |
Guam | | National/Alamo |
Holland | | Kroymans Car Rental Holland B.V. |
Honduras | | Promotora de Transporte S.A. |
Hungary | | Denzel Autofennataro Kft |
Iceland | | Holdur ehf. / Bilaleiga Akureyrar |
Indonesia | | P.T. Bimainti Gunacitra |
Ireland | | Centre Point Rent A Car Ltd |
Israel | | Eldan Rent A Car |
Italy | | Maggiore Rent S.P.A. |
Japan | | Nippon Rent-A-Care Service |
Korea | | Sam Bo Rent-A-Car Co. Ltd |
Kuwait | | KGL Transport CO |
La Reunion | | C/O National Citer |
Latvia | | National-Auto 5 Ltd |
Lebanon | | National/Medstar |
Luxembourg | | Kroymans Car Rental Holland B.V. |
Malaysia | | Emasewa Sdn Bhd / Boustead Holdings Bhd |
Malta | | John’s Garage Ltd |
Martinique | | Citer S.A. |
Mauritius | | Agritec Car Hire Ltd |
Macedonia | | Premium d.o.o. |
Mauritania | | Citer S.A. |
Mexico | | Class Rent A Car S.A. de C.V. |
Mexico | | Rentas Nacionales de Vehiculos S.A. de C.V. |
Morocco | | Rabat Cartour S.A. |
Namibia | | CMH Car Hire Trading as National Car Rental |
Nicaragua | | Autos de Alquiler S.A. |
Norway | | Bay Industries A.S. |
Panama | | Servicios Turisticos Panamenos |
Paraguay | | Amigos S.R.L. |
Peru | | Copa S.A. |
Philippines | | International Car Rentals Inc., Philippines |
Poland | | Filkar Sp. Z.o.o.-National Car Rental |
Portugal | | Guerin Rent A Car (Dois) Lda |
Puerto Rico | | Duffy International Corp |
Qatar | | Al Mana Car Rental Enterprises |
Romania | | National Romania |
Saipan | | Marianas Rental Corp. |
6
Country | | Licensee Name |
Senegal | | La Senegalaise De L’automobile |
Singapore | | Hong She Motors Pte. Ltd. |
Slovak Republic | | Czech Auto Rent |
Slovenia | | Emona Globtour Domestic and International Tourism and Rent A Car Service |
South Africa | | Combined Motor Holdings Ltd (CMH) |
Spain | | Autotransporte Touristico Espanol S.A. (ATESA) |
St. Barthelemy | | Rudma |
St. Maarten | | Ourista N.V. |
Sweden | | Bucab Biluthyrning AB |
Switzerland | | Republic Industries Automotive Rental Group (Switzerland) AG |
Thailand | | S.M.T. Rent –A-Car Co., Ltd. |
Tortola | | Tropica Rentals LTD |
Turkey | | Yes Oto Kiralama Ve Turizm Yatirmlari A.S. |
Tunisia | | Victory Car SARL |
UK | | ANC Rental Corp. |
United Arab Emirates | | Sanam Rent A Car LLC |
Yugoslavia | | Premium d.o.o. |
7
Schedule 3.4
Service Locations
The following are Supported Sites:
Location | | Street Address | | City | | State/ Province | | Zip/Postal Code | |
Reservation Centers | | | | | | | | | |
Salt Lake City, UT (R) | | 155 N 400 West | | Salt Lake City | | UT | | 84103 | |
Goose Creek, SC (R) | | 208 St. James Ave. | | Goose Creek | | SC | | 29445 | |
Boca Raton, FL (R) | | 4680 Blue Lake Drive | | Boca Raton | | FL | | 33431 | |
Data Center Locations | | | | | | | | | |
Fort Lauderdale, FL | | 5301 NW 33rd Av | | Fort Lauderdale | | FL | | 33309 | |
Plano Technology Center (PTC) | | 2300 W. Plano Parkway | | Plano | | TX | | 75075 | |
Richardson Information Management Facility | | 1780 Jay Ell Drive | | Richardson | | TX | | 75081 | |
Headquarter Locations | | | | | | | | | |
Fort Lauderdale, FL – Plaza | | 200 South Andrews | | Fort Lauderdale | | FL | | 33301 | |
Boca Raton, FL – T-Rex (R) | | 4680 Blue Lake Drive | | Boca Raton | | FL | | 33431 | |
Minneapolis, MN (R) | | 7700 France Avenue | | Minneapolis | | MN | | 55435 | |
280 Atwell Drive | | 280 Atwell Drive | | Etobicoke | | Ont | | M9W 5B2 | |
Note to Table: (R) denotes a redundant site as described in Part F of Exhibit B
1
The following are Remote Support Sites:
US NATIONAL REMOTE SUPPORT SITES
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
ABEC02 | | ALLENTOWN - SUMNER AVENUE | | 1501 SUMNER AVENUE | | | | ALLENTOWN | | PA | | 18102 | |
ABET01 | | ALLENTOWN ARPT | | LEHIGH VALLEY INTL ARPT | | | | ALLENTOWN | | PA | | 18103 | |
ABQT01 | | ALBUQUERQUE ARPT | | 3400 UNIVERSITY SUITE K | | | | ALBUQUERQUE | | NM | | 87106 | |
ABRT01 | | ABERDEEN ARPT | | ABERDEEN REGIONAL ARPT | | 4430 EAST HIGHWAY 12 | | ABERDEEN | | SD | | 57401 | |
ABYT01 | | ALBANY ARPT | | ALBANY SW GEORGIA REGIONAL ARPT | | 3905 NEWTON ROAD | | ALBANY | | GA | | 31701 | |
ACTT01 | | WACO AIRPORT | | MADISON COOPER AIRPORT | | 7909 KARL MAY DRIVE | | WACO | | TX | | 76708 | |
ACVC01 | | MCKINLEYVILLE *BOOK THROUGH ACVT01* | | ARCATA / EUREKA ARPT | | 3561 BOEING AVE. | | MCKINLEYVILLE | | CA | | 95519 | |
ACVC02 | | ARCATA *BOOK THROUGH ACVT01* | | ARCATA / EUREKA ARPT | | | | MCKINLEYVILLE | | CA | | 95519 | |
ACVT01 | | EUREKA-ARCATA AIRPORT | | EUREKA-ARCATA ARPT | | 3561 BOEING AVENUE | | MCKINLEYVILLE | | CA | | 95519 | |
AEXT01 | | ALEXANDRIA ARPT | | ALEXANDRIA ARPT | | 1303 BILLY MITCHELL RD | | ALEXANDRIA | | LA | | 71303 | |
AGST01 | | AUGUSTA ARPT | | AUGUSTA BUSH FIELD ARPT | | 1511 AVIATION WAY | | AUGUSTA | | GA | | 30906 | |
AIDC02 | | ANDERSON - E 53RD ST | | 1203 E 53RD ST | | | | ANDERSON | | IN | | 46013 | |
ALBN02 | | ALBANY/LATHAM - SHAKER ROAD | | 850 ALBANY SHAKER ROAD | | | | LATHAM | | NY | | 12110 | |
ALBT01 | | ALBANY COUNTY ARPT | | ALBANY COUNTY ARPT | | | | LATHAM | | NY | | 12110 | |
ALOT01 | | WATERLOO MUNICIPAL ARPT | | WATERLOO MUNICIPAL ARPT | | 2790 LIVINGSTON LANE | | WATERLOO | | IA | | 50703 | |
ALOW01 | | CEDAR FALLS - UNIVERSITY AVE. | | CEDAR FALLS | | 7404 UNIVERSITY AVE | | CEDAR FALLS | | IA | | 50613 | |
AMAT01 | | AMARILLO AIRPORT | | AMARILLO INTL AIRPORT | | 10801 AIRPORT BLVD | | AMARILLO | | TX | | 79111 | |
ANAC02 | | ANAHEIM - WEST KATELLA | | ANAHEIM | | 711 WEST KATELLA | | ANAHEIM | | CA | | 92802 | |
ANCC44 | | ANC ADMIN OFFICE | | 4540 WEST 50TH | | | | ANCHORAGE | | AK | | 99502 | |
ANCC48 | | ANCC48 - WALKUP ONLY | | 6160 CARL BRADY DRIVE | | | | ANCHORAGE | | AK | | 99502 | |
ANCE02 | | ANCHORAGE - EAST 5TH AVENUE | | ANCHORAGE ALASKA SALES & SERVICE | | 1300 EAST 5TH AVE | | ANCHORAGE | | AK | | 99501 | |
ANCT01 | | ANCHORAGE ARPT | | ANCHORAGE INTL ARPT | | 5000 WEST INTL ARPT RD | | ANCHORAGE | | AK | | 99502 | |
AOHO01 | | LIMA | | 1111 EAST KIBBY ST | | | | LIMA | | OH | | 45804 | |
APFT01 | | NAPLES ARPT | | NAPLES ARPT | | 560 TERMINAL DRIVE | | NAPLES | | FL | | 33942 | |
2
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
ARBT01 | | ANN ARBOR AIRPORT | | ANN ARBOR AIRPORT | | 801 AIRPORT DRIVE | | ANN ARBOR | | MI | | 48108 | |
ASEO01 | | ASPEN | | THE INN AT ASPEN | | 38750 HIGHWAY 82 | | ASPEN | | CO | | 81611 | |
ASLO01 | | MARSHALL | | NEHLS CHEV OLDS CADILLAC | | 4801 EAST END BLVD SOUTH | | MARSHALL | | TX | | 75670 | |
ATLC48 | | CORP REG OFF SOUTHEAST | | 3600 NATURALY FRESH BLVD | | | | COLLEGE PARK | | GA | | 30349 | |
ATLN08 | | ATLANTA NORTHEAST | | 1716 NE EXPY I-85 ACCESS ROAD | | 1716 NE EXPRESSWAY | | ATLANTA | | GA | | 30329 | |
ATLT01 | | ATLANTA ARPT (R) | | ATLANTA INTL ARPT | | 4205 CAR RENTAL ROAD | | ATLANTA | | GA | | 30320 | |
ATWE02 | | KAUKAUNA - INTOWN DELANGLADE STREET | | GUSTMAN CHEV-PONT-OLDS | | 1450 DELANGLADE STREET | | KAUKAUNA | | WI | | 54130 | |
ATWT01 | | APPLETON ARPT | | OUTAGAMIE COUNTY ARPT | | 217 CHALLENGER DR | | APPLETON | | WI | | 54915 | |
AUMC39 | | AUSTIN/HORMEL CO. ONLY | | HORMEL | | | | AUSTIN | | MN | | 55111 | |
AUST01 | | AUSTIN BERGSTROM INTL ARPT (R) | | AUSTIN BERGSTROM INTL ARPT | | 3600 PRESIDENTIAL SUITE #108 | | AUSTIN | | TX | | 78719 | |
AVLC02 | | ASHEVILLE DOWNTOWN | | 52 COXE AVENUE | | | | ASHEVILLE | | NC | | 28801 | |
AVLT01 | | ASHEVILLE ARPT | | ASHEVILLE ARPT | | 702 AIRPORT RD | | FLETCHER | | NC | | 28732 | |
AVPT01 | | SCRANTON INTL ARPT | | WILKES - BARRE / | | SCRANTON INTL ARPT | | AVOCA | | PA | | 18641 | |
AZOT01 | | KALAMAZOO ARPT | | KALAMAZOO/BATTLE CR INTL | | 5239 PORTAGE ROAD | | KALAMAZOO | | MI | | 49001 | |
BCTC01 | | BOCA RATON | | 1300 N. W. 1ST AVENUE | | | | BOCA RATON | | FL | | 33432 | |
BCTC39 | | SIEMENS CORPORATE/BOCA RATON | | 1155 BROKEN SOUND PARKWAY NW B10 | | | | BOCA RATON | | FL | | 33487 | |
BDLC41 | | PERKIN ELMER - SHELTON ONLY | | PERKIN ELMER INSTRUMENTS | | 710 BRIDGEPORT AVE | | SHELTON | | CT | | 6484 | |
BDLC43 | | OXFORD - DOW CHEMICAL ONLY !! | | KEYSTONE AVIATION | | 288 CHRISTIAN STREET | | OXFORD | | CT | | 6478 | |
BDLT01 | | HARTFORD ARPT | | HARTFORD BRADLEY INTL ARPT | | | | WINDSOR LOCKS | | CT | | 6096 | |
BFLT01 | | BAKERSFIELD ARPT | | MEADOWS FIELD-KERN ARPT | | 1401 SKYWAY DRIVE | | BAKERSFIELD | | CA | | 93308 | |
BGMT01 | | BINGHAMTON ARPT | | BROOME COUNTY ARPT | | E.A. LINK FIELD | | BINGHAMTON | | NY | | 13902 | |
BGRT01 | | BANGOR ARPT | | BANGOR INTL ARPT | | 299 GODFREY BLVD, STE 8 | | BANGOR | | ME | | 4401 | |
BHMT01 | | BIRMINGHAM ARPT | | BIRMINGHAM ARPT | | 5900 MESSER AIRPORT HIGHWAY | | BIRMINGHAM | | AL | | 35212 | |
3
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
BILC49 | | BIL AIRPORT WALKUP | | BILLINGS LOGAN FIELD INTL ARPT | | | | BILLINGS | | MT | | 59105 | |
BILT01 | | BILLINGS ARPT | | BILLINGS LOGAN FIELD INTL ARPT | | | | BILLINGS | | MT | | 59105 | |
BJIT01 | | BEMIDJI ARPT | | BEMIDJI BELTRAMI ARPT | | 4125 MOBERG DR | | BEMIDJI | | MN | | 56601 | |
BMGC01 | | BLOOMINGTON - BUICK CADILLAC BLVD | | 2850 BUICK CADILLAC BLVD | | | | BLOOMINGTON | | IN | | 47401 | |
BMIT01 | | BLOOMINGTON ARPT | | 3201 CIRA DRIVE | | SUITE 116 | | BLOOMINGTON | | IL | | 61704 | |
BNAT01 | | NASHVILLE ARPT | | NASHVILLE INTL ARPT | | | | NASHVILLE | | TN | | 37217 | |
BOIT01 | | BOISE MUNICIPAL ARPT | | BOISE MUNICIPAL ARPT | | 3201 ARPT WAY | | BOISE | | ID | | 83705 | |
BOSN02 | | CAMBRIDGE - MASSACHUSETTS AVE | | 1663 MASSACHUSETTS AVE | | | | CAMBRIDGE | | MA | | 2138 | |
BOST01 | | BOSTON INTL ARPT (R) | | BOSTON LOGAN INTL ARPT | | | | BOSTON | | MA | | 2128 | |
BPTC39 | | ENERGY COUNTRY FORD/BEAUMONT | | 4545 TWIN CITY HWY | | | | PORT ARTHUR | | TX | | 77701 | |
BPTT01 | | BEAUMONT/PORT ARTHUR | | 6000 AIRLINE DRIVE | | STE 109 | | BEAUMONT | | TX | | 77705 | |
BRDT01 | | BRAINERD ARPT | | BRAINERD COUNTY ARPT | | 16384 AIRPORT ROAD, SUITE #2 | | BRAINERD | | MN | | 56401 | |
BTRC39 | | DOW CHEMICAL | | 9211 GENERAL CHENAULT | | | | BATON ROUGE | | LA | | 70807 | |
BTRT01 | | BATON ROUGE ARPT | | BATON ROUGE METROPOLITAN ARPT | | 9430 JACKIE COCHRAN DR | | BATON ROUGE | | LA | | 70807 | |
BTVC48 | | BURLINGTON WALKUP | | 1944 WILLISTON RD | | | | BURLINGTON | | VT | | 5403 | |
BTVT01 | | BURLINGTON ARPT | | BURLINGTON ARPT | | 1200 AIRPORT DRIVE #10 | | SOUTH BURLINGTON | | VT | | 5403 | |
BUFT01 | | BUFFALO ARPT | | BUFFALO INTL ARPT | | | | BUFFALO | | NY | | 14225 | |
BURT01 | | BURBANK ARPT | | HOLLYWOOD BURBANK ARPT | | 2627 HOLLYWOOD WAY | | BURBANK | | CA | | 91505 | |
BWIC45 | | BALTIMORE - TB ADMIN | | 763 ELKRIDGE LANDING ROAD | | | | LINTHICUM | | MD | | 21090 | |
BWIT01 | | BALTIMORE ARPT | | BALTIMORE-WASHINGTON ARPT | | | | BALTIMORE | | MD | | 21240 | |
BZNT01 | | BOZEMAN ARPT | | BOZEMAN GALLATIN FIELD | | | | BELGRADE | | MT | | 59714 | |
BZTT01 | | BRAZORIA COUNTY AIRPORT | | 220 COUNTY ROAD | | | | ANGLETON | | TX | | 77515 | |
CAET01 | | COLUMBIA ARPT | | COLUMBIA METRO ARPT | | 3210 SERVICE DRIVE | | WEST COLUMBIA | | SC | | 29170 | |
4
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
CAKO01 | | AKRON/CANTON ARPT | | AKRON / CANTON ARPT | | 5910 MAYFAIR ROAD | | NORTH CANTON | | OH | | 44720 | |
CCRT01 | | CONCORD - JOHN GLENN DRIVE | | BUCHANAN AIRFIELD | | 101 JOHN GLENN DRIVE STE 12 | | CONCORD | | CA | | 94520 | |
CDCT01 | | CEDAR CITY ARPT | | CEDAR CITY ARPT | | 2281 KITTY HAWK | | CEDAR CITY | | UT | | 84720 | |
CGIT01 | | CAPE GIRARDEAU ARPT | | CAPE GIRARDEAU REGIONAL ARPT | | PO BOX 619 | | CAPE GIRARDEAU | | MO | | 63701 | |
CHAC49 | | CHA ARPT WALK-UP | | LOVELL FIELD | | 1001 AIRPORT ROAD | | CHATTANOOGA | | TN | | 37421 | |
CHAT01 | | CHATTANOOGA ARPT | | LOVELL FIELD | | 1001 ARPT RD | | CHATTANOOGA | | TN | | 37421 | |
CHIC02 | | CHICAGO - NORTH LASALLE | | THE CONCOURSE | | 203 NORTH LASALLE | | CHICAGO | | IL | | 60601 | |
CHIS04 | | HARVEY - SOUTH HALSTED | | 15908 SOUTH HALSTED | | | | HARVEY | | IL | | 60426 | |
CHON02 | | CHARLOTTESVILLE - GREENBRIER DR | | CRENSHAW SERVICE | | 29 N & GREENBRIER DR | | CHARLOTTESVILLE | | VA | | 22901 | |
CHOT01 | | CHARLOTTESVILLE ARPT | | CHARLOTTESVILLE ARPT | | 201 BOWEN LOOP | | CHARLOTTESVILLE | | VA | | 22901 | |
CHST01 | | CHARLESTON ARPT | | CHARLESTON INTL ARPT | | | | CHARLESTON | | SC | | 29411 | |
CIDC02 | | CEDAR RAPIDS - 1ST AVE NORTHEAST | | 3124 1ST AVE NE | | | | CEDAR RAPIDS | | IA | | 52402 | |
CIDC44 | | CIDC44 - ADMIN | | 9505 18TH SW #2 | | | | CEDAR RAPIDS | | IA | | 52404 | |
CIDT01 | | EASTERN IOWA AIRPORT | | EASTERN IOWA AIRPORT | | 2515 WRIGHT BROTHERS BLVD SW | | CEDAR RAPIDS | | IA | | 52404 | |
CKVC01 | | CLARKSVILLE - COLLEGE STREET | | 722 COLLEGE STREET | | | | CLARKSVILLE | | TN | | 37041 | |
CLEC02 | | CLEVELAND AIRCRAFT | | BUSINESS AIRCRAFT CENTER | | 18809 MAPLEWOOD AVE | | CLEVELAND | | OH | | 44141 | |
CLET01 | | CLEVELAND ARPT | | CLEVELAND HOPKINS ARPT | | 18809 MAPLEWOOD AVE | | CLEVELAND | | OH | | 44135 | |
CLTT01 | | CHARLOTTE ARPT | | DOUGLAS INTL ARPT | | 4108 RENTAL ROAD | | CHARLOTTE | | NC | | 28219 | |
CLUC01 | | COLUMBUS - 25TH ST | | 1711 25TH STREET | | | | COLUMBUS | | IN | | 47201 | |
CMHT01 | | COLUMBUS ARPT | | PORT COLUMBUS INTL ARPT | | 4600 INTERNATIONAL ARPT | | COLUMBUS | | OH | | 43219 | |
CMIC02 | | CHAMPAIGN - W. KIRBY AVENUE | | 115 W. KIRBY AVENUE | | | | CHAMPAIGN | | IL | | 61820 | |
CMIT01 | | CHAMPAIGN ARPT - SAVOY | | WILLARD ARPT | | # 11 AIRPORT RD | | SAVOY | | IL | | 61874 | |
CMXT01 | | HOUGHTON/HANCOCK/CALUMET ARPT | | HOUGHTON COUNTY APT | | 23810 AIRPARK BLVD STE 123 | | CALUMET | | MI | | 49913 | |
COIC06 | | COCOA BEACH - N ATLANTIC AVE | | COCOA BEACH | | 1675 N. ATLANTIC AVE | | COCOA BEACH | | FL | | 32931 | |
5
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
COST01 | | COLORADO SPRINGS ARPT | | COLORADO SPRINGS ARPT | | 7770 E. DRENNAN RD | | COLORADO SPRINGS | | CO | | 80916 | |
CRPT01 | | CORPUS CHRISTI ARPT | | CORPUS CHRISTI INTL ARPT | | 1000 INTL DRIVE | | CORPUS CHRISTI | | TX | | 78406 | |
CRWC39 | | DOW CHEMICAL EXECUTIVE AIR | | EXECUTIVE AIR | | 300 EAGLE MOUNTAIN ROAD | | CHARLESTON | | WV | | 25311 | |
CRWT01 | | CHARLESTON ARPT | | YEAGER COUNTY ARPT | | | | CHARLESTON | | WV | | 25311 | |
CSGC01 | | COLUMBUS, GA IN TOWN | | 4231 MACON DRIVE | | | | COLUMBUS | | GA | | 31907 | |
CSGT01 | | COLUMBUS METRO ARPT | | COLUMBUS METRO ARPT | | | | COLUMBUS | | GA | | 31909 | |
CVGC39 | | SPRINGDALE - SHERATON LANE | | BEST WESTERN HOTEL | | 11911 SHERATON LANE | | SPRINGDALE | | OH | | 45246 | |
CVGT01 | | CINCINNATI ARPT | | GREATER CINCINNATI ARPT | | 3230 LOOMIS ROAD | | HEBRON | | KY | | 41048 | |
CWAN01 | | WAUSAU *BOOK THROUGH CWAT01* | | WAUSAU/CENTRAL WISCONSIN AIRPORT | | 100 CWA DR.#104 | | MOSINEE | | WI | | 54455 | |
CWAT01 | | MOSINEE ARPT | | CENTRAL WISCONSIN ARPT | | 100 CWA DR STE 104 | | MOSINEE | | WI | | 54455 | |
DABT01 | | DAYTONA BEACH ARPT | | DAYTONA BEACH ARPT | | 700 TERMINAL DR. | | DAYTONA BEACH | | FL | | 32114 | |
DALT02 | | DALLAS LOVE FIELD ARPT | | DALLAS LOVE FIELD | | 3377 EDWARDS AVENUE | | DALLAS | | TX | | 75235 | |
DAYT01 | | DAYTON ARPT | | DAYTON INTL ARPT | | | | VANDALIA | | OH | | 45377 | |
DBQT01 | | DUBUQUE REGIONAL ARPT | | DUBUQUE REGIONAL ARPT | | 11000 AIRPORT RD | | DUBUQUE | | IA | | 52003 | |
DCAT01 | | WASHINGTON REAGAN ARPT | | WASHINGTON REAGAN ARPT | | | | WASHINGTON DC | | VA | | 20001 | |
DENE02 | | DENVER - SMITH ROAD | | 7070 SMITH RD | | | | DENVER | | CO | | 80207 | |
DENT01 | | DENVER ARPT (R) | | DENVER INTL ARPT | | 24200 EAST 78TH AVE | | DENVER | | CO | | 80249 | |
DFWN01 | | PLANO | | 1600 NORTH CENTRAL EXPRESSWAY | | | | PLANO | | TX | | 75074 | |
DFWT01 | | DALLAS/FT WORTH ARPT (R) | | DALLAS/FT WORTH ARPT | | | | DALLAS | | TX | | 75261 | |
DHNT01 | | DOTHAN ARPT | | DOTHAN HOUSTON COUNTY ARPT | | 800 ARPT DR STE 11 | | DOTHAN | | AL | | 36303 | |
DLHT01 | | DULUTH ARPT | | DULUTH INTL ARPT | | 4701 GRINDEN DR. | | DULUTH | | MN | | 55811 | |
DROC01 | | DURANGO - MAIN AVENUE | | STRATER HOTEL | | 699 MAIN AVENUE | | DURANGO | | CO | | 81301 | |
DROC02 | | DURANGO - CAMINO DEL RIO | | 501 CAMINO DEL RIO | | | | DURANGO | | CO | | 81301 | |
DROT01 | | DURANGO ARPT | | DURANGO LA PLATA CNTY ARPT | | 1000 ARPT RD #13 | | DURANGO | | CO | | 81301 | |
DSMC01 | | DES MOINES SE SUBURB | | 4700 SE 14 ST | | | | DES MOINES | | IA | | 50320 | |
6
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
DSMT01 | | DES MOINES INTL ARPT | | DES MOINES INTL ARPT | | FLEUR DRV & ARMY POST RD | | DES MOINES | | IA | | 50321 | |
DSMW01 | | CLIVE | | 10095 HICKMAN COURT | | SUITE # 6 | | CLIVE | | IA | | 50325 | |
DTTC39 | | DETROIT/GM SHUTTLE ONLY | | GM AIR TRANS,BLDG 530, | | E SVC DR, PO BOX 42010 | | DETROIT | | MI | | 48242 | |
DTTN02 | | SOUTHFIELD | | 23093 TELEGRAPH ROAD | | | | SOUTHFIELD | | MI | | 48034 | |
DTWT01 | | DETROIT METRO ARPT (R) | | DETROIT METRO ARPT | | BLDG 338, LUCAS DRIVE | | DETROIT | | MI | | 48242 | |
DXRC39 | | DANBURY - DOW CHEMICAL/HONEYWELL | | CORPORATE CENTER | | 39 OLD BRIDGEBERRY ROAD | | DANBURY | | CT | | 6817 | |
EENO01 | | KEENE | | 597 MAIN ST | | | | KEENE | | NH | | 3431 | |
EENW02 | | BRATTLEBORO - PUTNEY ROAD | | 801 PUTNEY ROAD | | | | BRATTLEBORO | | VT | | 5301 | |
EGET01 | | VAIL/EAGLE COUNTY/GYPSUM | | EAGLE COUNTY AIRPORT | | 0217 ELDON WILSON ROAD | | GYPSUM | | CO | | 81637 | |
ELMT01 | | ELMIRA ARPT | | ELMIRA / CORNING REGIONAL ARPT | | 276 SINGSING ROAD | | HORSEHEADS | | NY | | 14845 | |
ELPT01 | | EL PASO ARPT | | EL PASO INTL ARPT | | | | EL PASO | | TX | | 79925 | |
ERIT01 | | ERIE ARPT | | ERIE INTL ARPT | | | | ERIE | | PA | | 16505 | |
ERVC01 | | KERRVILLE - MAIN STREET | | 620 MAIN STREET | | | | KERRVILLE | | TX | | 78028 | |
ESCT01 | | ESCANABA ARPT | | DELTA COUNTY ARPT | | 3300 ARPT ROAD | | ESCANABA | | MI | | 49829 | |
EUGT01 | | EUGENE ARPT | | MAHLON SWEET FIELD | | 28801 DOUGLAS DRIVE STE 7 | | EUGENE | | OR | | 97402 | |
EVVC02 | | TRI-STATE AERO | | EVANSVILLE REGIONAL ARPT | | 7801 BUSSING DR. HWY 57 | | EVANSVILLE | | IN | | 47725 | |
EVVT01 | | EVANSVILLE AIRPORT | | EVANSVILLE REGIONAL ARPT | | 7801 BUSSING DR. HWY 57 | | EVANSVILLE | | IN | | 47725 | |
EWNT01 | | NEW BERN ARPT | | CRAVEN COUNTY REGIONAL ARPT | | 200 TERMINAL DRIVE | | NEW BERN | | NC | | 28560 | |
EWRC45 | | EWRC45 — ADMIN (R) | | 575 SOUTH STREET | | | | NEWARK | | NJ | | 7105 | |
EWRS02 | | KEYPORT - HWY 35 & MAPLE PLACE | | HIGHWAY 35 & MAPLE PLACE | | | | KEYPORT | | NJ | | 7735 | |
EWRS03 | | EDISON - WOOD AVE | | DANA REALTY | | 15 WOOD AVE | | EDISON | | NJ | | 8820 | |
EWRT01 | | NEWARK ARPT (R) | | NEWARK INTL ARPT | | BUILDING 25 | | NEWARK | | NJ | | 7114 | |
EYWO01 | | KEY WEST | | 2516 NORTH ROOSEVELT BLVD | | | | KEY WEST | | FL | | 33040 | |
FAIC02 | | FAIRBANKS INTOWN | | 1246 NOBLE STREET | | | | FAIRBANKS | | AK | | 99701 | |
FAIT01 | | FAIRBANKS | | 6450 AIRPORT WAY | | | | FAIRBANKS | | AK | | 99701 | |
7
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
FART01 | | FARGO ARPT | | HECTOR AIRPORT | | 2801 32ND AVENUE NW | | FARGO | | ND | | 58102 | |
FATT01 | | FRESNO ARPT | | FRESNO AIR TERMINAL | | 5175 E. CLINTON AVENUE | | FRESNO | | CA | | 93727 | |
FAYT01 | | FAYETTEVILLE ARPT | | FAYETTEVILLE ARPT | | 2885 CORPORATE ROAD | | FAYETTEVILLE | | NC | | 28306 | |
FCAT01 | | GLACIER PARK INTL AIRPORT | | GLACIER PARK INTL AIRPORT | | 4170 HIGHWAY 2 EAST | | KALISPELL | | MT | | 59901 | |
FLGC02 | | FLAGSTAFF - EAST LUCKY LANE | | HOLIDAY INN | | 2320 EAST LUCKY LANE | | FLAGSTAFF | | AZ | | 86004 | |
FLGT01 | | FLAGSTAFF ARPT | | FLAGSTAFF PULLIAM FIELD ARPT | | 6200 S. PULLIAM DRIVE | | FLAGSTAFF | | AZ | | 86001 | |
FLLT01 | | FT LAUDERDALE INTL ARPT (R) | | FT LAUDERDALE INTL ARPT | | 1425 MERLE FOGG ROAD | | DANIA | | FL | | 33004 | |
FLOT01 | | FLORENCE ARPT | | FLORENCE REGIONAL ARPT | | 2100 TERMINAL DR | | FLORENCE | | SC | | 29506 | |
FMHC01 | | FALMOUTH - DEPOT AVENUE | | 14 DEPOT AVENUE | | | | FALMOUTH | | MA | | 2540 | |
FNTT01 | | FLINT ARPT | | FLINT BISHOP ARPT | | G 3825 WEST BRISTOL RD | | FLINT | | MI | | 48507 | |
FSDC01 | | SIOUX FALLS - S LOUISE AVE | | SIOUX FALLS | | 5200 S LOUISE AVE | | SIOUX FALLS | | SD | | 57108 | |
FSDT01 | | SIOUX FALLS ARPT | | JOE FOSS FIELD | | 2801 JAYCEE LANE | | SIOUX FALLS | | SD | | 57104 | |
FSMT01 | | FT SMITH ARPT | | FORT SMITH MUNICIPAL ARPT | | 6700 MCKENNON BLVD-STE 115 | | FT SMITH | | AR | | 72903 | |
FWAC49 | | FWAC49 - WALKUP ONLY | | 3829 W. FERGUSON RD | | | | FORT WAYNE | | IN | | 46809 | |
FWAT01 | | FT WAYNE INTL ARPT | | FT WAYNE INTL ARPT | | 3829 W.FERGUSON RD | | FORT WAYNE | | IN | | 46809 | |
FYVT01 | | BOOK XNAT01 FOR FAYETTEVILLE | | 3535 NORTH COLLEGE | | | | FAYETTEVILLE | | AR | | 72703 | |
GAIC39 | | GAITHERSBURG/BECHTEL ONLY | | NATIONAL CAR RENTAL | | 9801 WASHINGTON BLVD | | GAITHERSBURG | | MD | | 20878 | |
GEGT01 | | SPOKANE ARPT | | SPOKANE INTL ARPT | | | | SPOKANE | | WA | | 99219 | |
GFKC48 | | GRAND FORKS PREP CENTER | | 2700 SOUTH WASHINGTON | | | | GRAND FORKS | | ND | | 58201 | |
GFKT01 | | GRAND FORKS ARPT | | MARK ANDREWS INTL ARPT | | 2815 AIRPORT DR #5 | | GRAND FORKS | | ND | | 58203 | |
GGGT01 | | LONGVIEW ARPT | | GREGG COUNTY ARPT | | ROUTE 3 | | LONGVIEW | | TX | | 75603 | |
GJTT01 | | GRAND JUNCTION ARPT | | GRAND JUNCTION WALKER FIELD ARPT | | | | GRAND JUNCTION | | CO | | 81506 | |
GNVT01 | | GAINESVILLE ARPT | | GAINESVILLE REGIONAL ARPT | | 3880 N.E.39TH AVE/STE G | | GAINESVILLE | | FL | | 32609 | |
GPTT01 | | GULFPORT ARPT | | GULFPORT-BILOXI ARPT | | 14035 AIRPORT ROAD | | GULFPORT | | MS | | 39503 | |
GRBT01 | | GREEN BAY ARPT | | AUSTIN STRAUBEL ARPT | | 2077 ARPT DRIVE | | GREEN BAY | | WI | | 54313 | |
8
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
GRIO01 | | GRAND ISLAND | | 2710 NORTH DIERS AVENUE | | SUITE B | | GRAND ISLAND | | NE | | 68803 | |
GRRT01 | | GRAND RAPIDS ARPT | | GERALD R. FORD INTL ARPT | | 5500-44TH STREET SE | | GRAND RAPIDS | | MI | | 49508 | |
GSOT01 | | GREENSBORO ARPT | | PIEDMONT TRIAD INTL ARPT | | 6319 BRYAN BLVD | | GREENSBORO | | NC | | 27409 | |
GSPC02 | | GREENVILLE - N PLEASANTBURG DR | | 152 N PLEASANTBURG DR | | | | GREENVILLE | | SC | | 29607 | |
GSPS03 | | GREENVILLE | | 2305 AIRPORT RD | | | | GREER | | SC | | 29651 | |
GSPT01 | | GREENVILLE SPARTANBURG ARPT | | NATIONAL CAR RENTAL | | 500 AVIATION DR SUITE 15 | | GREER | | SC | | 29651 | |
GTFT01 | | GREAT FALLS INTL ARPT | | GREAT FALLS INTL ARPT | | 2800 TERMINAL DRIVE | | GREAT FALLS | | MT | | 59404 | |
GYYE03 | | PORTAGE - MELTON RD | | 6162 MELTON RD | | | | PORTAGE | | IN | | 46368 | |
GYYO01 | | GARY | | 5201 SOUTH BROADWAY | | | | GARY | | IN | | 46410 | |
HDQT01 | | GDS TEST LOCATION | | MINNEAPOLIS ARPT | | | | MINNEAPOLIS | | MN | | 55111 | |
HHHT01 | | HILTON HEAD ARPT | | HILTON HEAD ARPT | | 120 BEACH CITY RD | | HILTON HEAD | | SC | | 29925 | |
HLNT01 | | HELENA REGIONAL ARPT | | HELENA REGIONAL ARPT | | | | HELENA | | MT | | 59601 | |
HNLC01 | | HONOLULU - ALA MOANA BLVD | | HONOLULU - ALA MOANA BLVD | | 1778 ALA MOANA BLVD | | HONOLULU | | HI | | 96815 | |
HNLC48 | | CORP REGION OFFICE - HAWAII | | 9419 AIRPORT BLVD. | | SUITE 200 | | LOS ANGELES | | CA | | 90045 | |
HNLR07 | | HONOLULU - KAHALA AVENUE | | ATTN: NATIONAL CAR RENTAL | | 5000 KAHALA AVENUE | | KAHALA HONOLULU | | HI | | 96816 | |
HNLT01 | | HONOLULU ARPT | | HONOLULU INTL ARPT | | 2912 AOLELE ST | | HONOLULU | | HI | | 96819 | |
HOBT01 | | HOBBS ARPT | | LEE COUNTY ARPT | | STAR ROUTE A | | HOBBS | | NM | | 88240 | |
HOUC39 | | HOUSTON/CONOCO ONLY | | CONOCO OIL COMPANY | | 16901 JFK BLVD | | HOUSTON | | TX | | 77032 | |
HOUC42 | | DOW CHEMICAL | | 400 W. SAM HOUSTON PARKWAY | | | | HOUSTON | | TX | | 77205 | |
HOUS13 | | HOUSTON - WESTHEIMER RD | | DOUBLE TREE GUEST STES | | 5353 WESTHEIMER RD | | HOUSTON | | TX | | 77056 | |
HOUT02 | | HOUSTON HOBBY AIRPORT | | HOUSTON HOBBY ARPT | | 7600 AIRPORT BLVD | | HOUSTON | | TX | | 77061 | |
HOUW05 | | HOUSTON - NORTH DAIRY ASHFORD | | CONOCO GAS / CONVENIENCE | | 700 NORTH DAIRY ASHFORD | | HOUSTON | | TX | | 77079 | |
HPNC40 | | STAMFORD - XEROX ONLY | | 800 LONG RIDGE ROAD | | | | STAMFORD | | CT | | 6905 | |
HPNE03 | | STAMFORD - MAIN ST | | HOLIDAY INN | | 700 MAIN ST | | STAMFORD | | CT | | 6901 | |
HPNT01 | | WESTCHESTER COUNTY ARPT | | WESTCHESTER COUNTY ARPT | | 240 AIRPORT ROAD STE 103 | | WHITE PLAINS | | NY | | 10604 | |
9
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
HRLT01 | | HARLINGEN ARPT | | VALLEY INTL ARPT | | TERMINAL BUILDING | | HARLINGEN | | TX | | 78550 | |
HSIO01 | | HASTINGS | | HOLIDAY INN HOTEL | | 2205 OSBORNE DRIVE | | HASTINGS | | NE | | 68901 | |
HSVT01 | | HUNTSVILLE ARPT | | HUNTSVILLE ARPT | | 1000 GLENNHEARN BLVD | | HUNTSVILLE | | AL | | 35824 | |
HUFC01 | | TERRE HAUTE - S 3RD ST | | 1200 S 3RD ST | | | | TERRE HAUTE | | IN | | 47802 | |
HVNC21 | | NEW HAVEN - CROWN ST | | 255 CROWN STREET | | | | NEW HAVEN | | CT | | 6511 | |
HVNE01 | | BRANFORD - NORTH MAIN | | 66 NORTH MAIN | | | | BRANFORD | | CT | | 6405 | |
HVNN02 | | WALLINGFORD - N COLONY ST | | 505 NORTH COLONY ST | | | | WALLINGFORD | | CT | | 6492 | |
HYAO01 | | HYANNIS | | 215 IYANNOUGH RD | | | | HYANNIS | | MA | | 2601 | |
HYAW01 | | BOURNE - MACARTHUR BLVD | | 148 MACARTHUR BLVD. | | | | BOURNE | | MA | | 2532 | |
IADT02 | | WASHINGTON DULLES INTL ARPT | | WASHINGTON DULLES INTL ARPT | | 23430 AUTOPILOT DR | | DULLES | | VA | | 20166 | |
IAHC48 | | HOUSTON WALKUP | | 2815 N BELTWAY 8 | | | | HOUSTON | | TX | | 77032 | |
IAHT01 | | HOUSTON INTL ARPT (R) | | HOUSTON INTL ARPT | | 4551 WILL CLAYTON PARKWAY | | HOUSTON | | TX | | 77205 | |
ICTT01 | | WICHITA ARPT | | WICHITA MID-CONTINENT ARPT | | | | WICHITA | | KS | | 67277 | |
IDAT01 | | IDAHO FALLS ARPT | | 2140 NORTH SKYLINE DRIVE #16 | | FANNING FALLS AIRPORT | | IDAHO FALLS | | ID | | 83402 | |
ILEC01 | | KILLEEN - S FT HOOD STREET | | NATIONAL CAR RENTAL | | 102 SOUTH FT HOOD STREET | | KILLEEN | | TX | | 76541 | |
ILET01 | | KILLEEN ARPT | | KILLEEN MUNICIPAL ARPT | | 1525 AIRPORT DRIVE | | KILLEEN | | TX | | 76543 | |
ILGT01 | | WILMINGTON ARPT | | NEW CASTLE COUNTY APRT | | 151 NORTH DUPONT HWY. (RT. 13) | | NEW CASTLE | | DE | | 19720 | |
ILMT01 | | WILMINGTON ARPT | | WILMINGTON INT’L AIRPORT | | 1740 AIRPORT BLVD. | | WILMINGTON | | NC | | 28405 | |
INDC03 | | INDIANAPOLIS - BEECHCRAFT HANGAR | | INDIANAPOLIS RAYTHEON | | INDIANAPOLIS INTL ARPT | | INDIANAPOLIS | | IN | | 46241 | |
INDC05 | | GREENWOOD - SOUTH US 31 | | 1250 US 31 SOUTH | | | | GREENWOOD | | IN | | 46143 | |
INDC07 | | INDIANAPOLIS - PIKE PLAZA | | 5336 PIKE PLAZA ROAD | | | | INDIANAPOLIS | | IN | | 46251 | |
INDC39 | | DOW AGRO SCIENCES | | 9330 N ZIONSVILLE RD | | | | INDIANAPOLIS | | IN | | 46268 | |
INDC40 | | DOW AGRO SCIENCES | | 6551 PIERSON DR. | | | | INDIANAPOLIS | | IN | | 46241 | |
INDC44 | | INDC44 - ADMIN | | 7111 WEST WASHINGTON ST | | | | INDIANAPOLIS | | IN | | 46241 | |
INDC49 | | INDC49 - WALKUP ONLY | | SIGNATURE FLIGHT SUPPORT | | 6390 TURNER DRIVE | | INDIANAPOLIS | | IN | | 46241 | |
10
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
INDN01 | | CARMEL - E 116TH ST | | 1748 EAST 116TH ST | | | | CARMEL | | IN | | 46032 | |
INDT01 | | INDIANAPOLIS ARPT | | INDIANAPOLIS INTL ARPT | | 6100 WEST RAYMOND | | INDIANAPOLIS | | IN | | 46241 | |
INDW06 | | INDIANAPOLIS - W WASHINGTON STREET | | TRUCK & VAN CENTER | | 7111 WEST WASHINGTON ST | | INDIANAPOLIS | | IN | | 46241 | |
INLC44 | | INLC44 - ADMIN | | 2300 HWY 53 SOUTH | | | | INTERNATIONAL FALLS | | MN | | 56649 | |
INLT01 | | INTERNATIONAL FALLS ARPT | | INTL FALLS ARPT | | | | INTERNATIONAL FALLS | | MN | | 56649 | |
ITHC03 | | ITHACA - WEST STATE STREET | | EDDIE’S SUPER SERVICE | | 435 WEST STATE STREET | | ITHACA | | NY | | 14850 | |
ITOT01 | | HILO ARPT | | HILO ARPT | | | | HILO | | HI | | 96720 | |
JANT01 | | JACKSON ARPT | | ALLEN C THOMPSON FIELD | | 143 SOUTH HANGAR DRIVE | | JACKSON | | MS | | 39298 | |
JAXC04 | | JACKSONVILLE - ATLANTIC BLVD | | 10916 ATLANTIC BLVD STE 4 | | 10916 ATLANTIC BLVD | | JACKSONVILLE | | FL | | 32225 | |
JAXC39 | | CSX - HANGAR | | YOUNG DRIVE | | CSX HANGAR | | JACKSONVILLE | | FL | | 32229 | |
JAXT01 | | JACKSONVILLE INTL ARPT | | JACKSONVILLE INTL ARPT | | | | JACKSONVILLE | | FL | | 32229 | |
JBKC48 | | JBKC48 - WALKUP ONLY | | 920 UNIVERSITY AVE | | | | BERKELEY | | CA | | 94710 | |
JFKT01 | | JFK ARPT | | JOHN F. KENNEDY INTL ARPT | | BLDG. 308, FEDERAL CIRCLE | | JAMAICA | | NY | | 11430 | |
JHMO01 | | KAANAPALI | | KAANAPALI TRANSPORTATION | | CENTER BLDG 30 | | KAANAPALI/MAUI | | HI | | 96761 | |
JNUT01 | | JUNEAU INTL ARPT | | JUNEAU INTL ARPT | | 1873 SHELL SIMMONS DRIVE | | JUNEAU | | AK | | 99801 | |
JOTC01 | | JOLIET - W. JEFFERSON STREET | | 1705 W. JEFFERSON ST | | | | JOLIET | | IL | | 60435 | |
KOAT01 | | KONA ARPT | | KEAHOLE ARPT | | | | KONA | | HI | | 96740 | |
KPDC08 | | KING OF PRUSSIA - N HENDERSON RD | | VALLEY FORGE CAR WASH | | 175 NORTH HENDERSON RD | | KING OF PRUSSIA | | PA | | 19406 | |
LAFT01 | | LAFAYETTE ARPT | | LAFAYETTE ARPT | | PURDUE UNIVERSITY ARPT | | WEST LAFAYETTE | | IN | | 47906 | |
LANT01 | | LANSING ARPT | | LANSING CAPITOL CITY ARPT | | | | LANSING | | MI | | 48906 | |
LAST01 | | LAS VEGAS ARPT | | MCCARRAN INTL ARPT | | 6855 BERMUDA ROAD | | LAS VEGAS | | NV | | 89119 | |
LAXC48 | | CORP REGION OFFICE - WEST | | 9419 AIRPORT BLVD. | | SUITE 200 | | LOS ANGELES | | CA | | 90045 | |
LAXT01 | | LOS ANGELES INTL ARPT (R) | | LOS ANGELES INTL ARPT | | 9419 AIRPORT BLVD | | LOS ANGELES | | CA | | 90045 | |
LBBT01 | | LUBBOCK ARPT | | LUBBOCK INTL ARPT | | | | LUBBOCK | | TX | | 79403 | |
LBFT01 | | NORTH PLATTE ARPT | | LEE BIRD FIELD | | 54OO EAST LEE BIRD DRIVE, STE 8 | | NORTH PLATTE | | NE | | 69101 | |
11
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
LCHT01 | | LAKE CHARLES ARPT | | LAKE CHARLES ARPT | | | | LAKE CHARLES | | LA | | 70605 | |
LEBT01 | | WEST LEBANON ARPT | | W LEBANON MUNICIPAL ARPT | | 5 AIRPARK ROAD | | W LEBANON | | NH | | 3784 | |
LEXT01 | | LEXINGTON ARPT | | BLUEGRASS FIELD | | 4000 TERMINAL DRIVE STE 103 | | LEXINGTON | | KY | | 40510 | |
LFTT01 | | LAFAYETTE ARPT | | LAFAYETTE REGIONAL ARPT | | 200 TERMINAL DRIVE | | LAFAYETTE | | LA | | 70508 | |
LGAT02 | | LAGUARDIA ARPT | | LA GUARDIA ARPT | | 95-10 DITMARS BLVD | | EAST ELMHURST | | NY | | 11369 | |
LGBT01 | | LONG BEACH ARPT | | LONG BEACH ARPT | | 4100 DONALD DOUGLAS DRIVE | | LONG BEACH | | CA | | 90808 | |
LIHT01 | | LIHUE ARPT | | LIHUE ARPT | | | | LIHUE | | HI | | 96766 | |
LITC44 | | LITC44 - ADMIN | | LITTLE ROCK - ROOSEVELT ROAD | | 3501 EAST ROOSEVELT ROAD | | LITTLE ROCK | | AR | | 72206 | |
LITN02 | | NORTH LITTLE ROCK | | NATIONAL CAR RENTAL | | 3919 PIKE AVENUE | | NORTH LITTLE ROCK | | AR | | 72114 | |
LITT01 | | LITTLE ROCK ARPT | | LITTLE ROCK ARPT | | #1 AIRLINE DRIVE | | LITTLE ROCK | | AR | | 72202 | |
LNKT01 | | LINCOLN ARPT | | LINCOLN MUNICIPAL ARPT | | 2400 W. ADAMS / STE 111 | | LINCOLN | | NE | | 68522 | |
LRDT01 | | LAREDO INTL ARPT | | LAREDO INTL ARPT | | 5210 BOB BULLOCK LOOP# 6 | | LAREDO | | TX | | 78041 | |
LSEC44 | | LSEC44 - ADMIN | | 2850 AIRPORT DRIVE | | | | LACROSSE | | WI | | 54603 | |
LSET01 | | LA CROSSE MUNICIPAL ARPT | | LA CROSSE MUNICIPAL ARPT | | 2850 ARPT ROAD | | LA CROSSE | | WI | | 54603 | |
LVKC24 | | LIVERMORE - EAST AVENUE | | LIVERMORE EAST AVENUE SERVICES | | 4186 EAST AVENUE | | LIVERMORE | | CA | | 94550 | |
LWBT01 | | LEWISBURG ARPT | | GREENBRIER VALLEY ARPT | | US ROUTE 219 NORTH | | LEWISBURG | | WV | | 24901 | |
MAFT01 | | MIDLAND-ODESSA ARPT | | MIDLAND-ODESSA ARPT | | | | MIDLAND | | TX | | 79711 | |
MBLT01 | | MANISTEE | | BLACKER AIRPORT | | 2323 AIRPORT ROAD | | MANISTEE | | MI | | 49660 | |
MBSC01 | | SAGINAW - STATE STREET | | MCDONALD PONTIAC CADILLAC GMS | | 5155 STATE ST | | SAGINAW | | MI | | 48603 | |
MBSC39 | | DOW CORNING | | MAIN CLOCK ROOM AURBURN | | | | AURBURN | | MI | | 48623 | |
MBSE39 | | DOW CORNING | | AURBURN SITE | | | | AURBURN | | MI | | 48623 | |
MBSE40 | | DOW CORNING | | DC2 AURBURN | | | | AURBURN | | MI | | 48623 | |
MBSE41 | | DOW CORNING | | HANGER 4 AURBURN | | | | AURBURN | | MI | | 48623 | |
MBSE42 | | DOW CORNING | | HEMLOCK SEMI CONDUCTOR | | | | HEMLOCK | | MI | | 48623 | |
MBSE43 | | DOW CORNING | | HEMLOCK MEDICAL | | | | HEMLOCK | | MI | | 48623 | �� |
12
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
MBSN39 | | DOW CHEMICAL | | 2010 BUILDING | | | | MIDLAND | | MI | | 48623 | |
MBSN40 | | DOW CHEMICAL | | 47 BUILDING | | | | MIDLAND | | MI | | 48623 | |
MBSN41 | | DOW CHEMICAL | | GATE 11 | | | | MIDLAND | | MI | | 48623 | |
MBSN42 | | DOW CHEMICAL | | GATE 76 | | | | MIDLAND | | MI | | 48623 | |
MBSN43 | | DOW CHEMICAL | | LARKIN LAB | | | | MIDLAND | | MI | | 48623 | |
MBST01 | | SAGINAW - MBS AIRPORT | | MBS AIRPORT | | 8600 GARFIELD RD | | SAGINAW | | MI | | 48623 | |
MBSW39 | | DOW CHEMICAL | | 100 LARKIN | | | | MIDLAND | | MI | | 48623 | |
MBSW40 | | DOW CHEMICAL | | HANGER 5 | | | | MIDLAND | | MI | | 48623 | |
MBSW41 | | DOW CORNING | | DC2 | | | | MIDLAND | | MI | | 48623 | |
MBSW42 | | DOW CORNING | | MAIN CLOCKROOM | | | | MIDLAND | | MI | | 48623 | |
MBSW43 | | DOW CORNING | | HANGER 4 | | | | MIDLAND | | MI | | 48623 | |
MCIT01 | | KANSAS CITY ARPT | | KANSAS CITY INTL ARPT | | 868 TEL AVIV | | KANSAS CITY | | MO | | 64153 | |
MCNT01 | | MACON MUNICIPAL AIRPORT | | LEWIS B. WILSON ARPT | | 1000 TERMINAL AVE | | MACON | | GA | | 31297 | |
MCOT01 | | ORLANDO INTL ARPT (R) | | ORLANDO INTL ARPT | | | | ORLANDO | | FL | | 32827 | |
MDTC39 | | HARRISBURG ARMSTRONG COMPANY ONLY | | BUILDING 25 | | HARRISBURG INTL AIRPORT | | MIDDLETOWN | | PA | | 17057 | |
MDTC48 | | HARRISBURG DOWNTOWN | | 13TH & PAXTON STREET | | | | HARRISBURG | | PA | | 17105 | |
MDTT01 | | HARRISBURG ARPT | | HARRISBURG INTL ARPT | | TERMINAL BUILDING | | MIDDLETOWN | | PA | | 17057 | |
MDWT02 | | CHICAGO MIDWAY ARPT (R) | | MIDWAY ARPT | | 4625 W 55TH STREET | | CHICAGO | | IL | | 60638 | |
MEMT01 | | MEMPHIS ARPT | | MEMPHIS INTL ARPT | | 2680 RENTAL ROAD | | MEMPHIS | | TN | | 38118 | |
MFET01 | | MCALLEN INTL ARPT | | MILLER INTL ARPT | | 2500 S. BICENTENNIAL BLVD. | | MCALLEN | | TX | | 78503 | |
MFRT01 | | MEDFORD ARPT | | ROGUE VALLEY INTL ARPT | | 3650 BIDDLE ROAD BOX 15 | | MEDFORD | | OR | | 97501 | |
MGMC44 | | MGMC44 - ADMIN | | 4520 HWY 80 W | | | | MONTGOMERY | | AL | | 36108 | |
MGMT01 | | MONTGOMERY ARPT | | MONTGOMERY ARPT DANNELLY FIELD | | 4445 SELMA HIGHWAY | | MONTGOMERY | | AL | | 36108 | |
MHKT01 | | MANHATTAN ARPT | | MANHATTAN MUNICIPAL ARPT | | 5500 FT. RILEY BLVD | | MANHATTAN | | KS | | 66502 | |
MHTE03 | | HAMPTON - LAFAYETTE RD | | WALLACE MOTORS | | 641 LAFAYETTE RD | | HAMPTON | | NH | | 3842 | |
13
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
MHTT01 | | MANCHESTER ARPT | | MANCHESTER ARPT | | MAIN TERMINAL | | MANCHESTER | | NH | | 3103 | |
MHTW02 | | PETERBOROUGH - JAFFFREY RD | | TIRES UNLIMITED | | 74 JAFFREY RD RT 202 S | | PETERSBOROUGH | | NH | | 3458 | |
MIAC01 | | NORTH MIAMI BEACH/SUNNY ISLES BEACH | | 18080 C0LLINS AVENUE | | | | SUNNY ISLES | | FL | | 33160 | |
MIAS01 | | SOUTH MIAMI BEACH | | SOUTH MIAMI BEACH | | 2401 COLLINS AVE | | MIAMI BEACH | | FL | | 33140 | |
MIAT01 | | MIAMI INTL ARPT | | MIAMI INTL ARPT | | 2301 NW 33 AVENUE | | MIAMI | | FL | | 33142 | |
MIEC02 | | MUNCIE AVIATION | | MUNCIE AVIATION | | | | MUNCIE | | IN | | 47308 | |
MIEC39 | | MUNCIE/FOSTER GLASS CO. ONLY | | NATIONAL CAR RENTAL | | 401 N. TERMINAL DRIVE | | MUNICE | | IN | | 47304 | |
MIET01 | | MUNCIE ARPT | | MUNCIE DELAWARE COUNTY ARPT | | 401 WEST CARL SIMMONS DR. | | MUNCIE | | IN | | 47304 | |
MKET01 | | MILWAUKEE ARPT | | GENERAL MITCHELL FIELD | | 5300 S HOWELL AVENUE | | MILWAUKEE | | WI | | 53207 | |
MKEW02 | | BROOKFIELD - S MORELAND RD | | EMBASSY SUITES HTL | | 1200 S. MORELAND RD | | BROOKFIELD | | WI | | 53008 | |
MKGT01 | | MUSKEGON ARPT | | MUSKEGON COUNTY ARPT | | 101 SINCLAIR DRIVE | | MUSKEGON | | MI | | 49441 | |
MLBT01 | | MELBOURNE REGIONAL ARPT | | MELBOURNE REGIONAL ARPT | | ONE AIR TERMINAL PARKWAY | | MELBOURNE | | FL | | 32901 | |
MLIT01 | | MOLINE ARPT | | MOLINE QUAD CITY ARPT | | | | MOLINE | | IL | | 61265 | |
MLUT01 | | MONROE ARPT | | MONROE REGIONAL ARPT | | 5400 OPERATIONS ROAD | | MONROE | | LA | | 71203 | |
MMUC39 | | MORRISTOWN/ALLIED CHEMICAL ONLY | | ALLIED CORPORATION | | | | MORRISTOWN | | NJ | | 7960 | |
MOBT01 | | MOBILE REGIONAL ARPT | | MOBILE REGIONAL ARPT | | 8400 ARPT BLVD | | MOBILE | | AL | | 36608 | |
MOTT01 | | MINOT ARPT | | MINOT INTL ARPT | | 25 AIRPORT ROAD STE 19 | | MINOT | | ND | | 58703 | |
MQTS01 | | MARQUETTE *BOOK THROUGH MQTT01* | | SAWYER INTL ARPT | | 225 AIRPORT AVE | | GWINN | | MI | | 49841 | |
MQTT01 | | MARQUETTE SAWYER INTL ARPT | | SAWYER INTL ARPT | | 225 AIRPORT AVE | | GWINN | | MI | | 49841 | |
MRYT01 | | MONTEREY ARPT | | MONTEREY PENINSULA ARPT | | OLMSTEAD ROAD | | MONTEREY | | CA | | 93940 | |
MSNT01 | | MADISON ARPT | | DANE COUNTY REGIONAL ARPT | | 4000 INTL LANE | | MADISON | | WI | | 53704 | |
MSOC01 | | MISSOULA | | 2000 W. BROADWAY | | SUITE B | | MISSOULA | | MT | | 59808 | |
MSOT01 | | MISSOULA ARPT | | NATIONAL CAR RENTAL | | #9 JOHNSON BELL FIELD | | MISSOULA | | MT | | 59802 | |
MSPT01 | | MINNEAPOLIS-ST.PAUL ARPT | | MINNEAPOLIS - ST. PAUL ARPT | | | | ST. PAUL | | MN | | 55116 | |
14
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
MSYS02 | | NEW ORLEANS - SOUTH RAMPART | | 324 SOUTH RAMPART | | | | NEW ORLEANS | | LA | | 70141 | |
MSYT01 | | NEW ORLEANS ARPT | | NEW ORLEANS INTL ARPT | | | | NEW ORLEANS | | LA | | 70062 | |
MTJT01 | | MONTROSE ARPT | | MONTROSE ARPT | | 2100 ARPT ROAD | | MONTROSE | | CO | | 81401 | |
MYRT01 | | MYRTLE BEACH ARPT | | MYRTLE BEACH JETPORT | | 1100 JETPORT RD | | MYRTLE BEACH | | SC | | 29577 | |
NYCC01 | | MANHATTAN - W. 40TH STREET | | 252 WEST 40TH STREET | | | | MANHATTAN | | NY | | 10021 | |
NYCC03 | | MANHATTAN - E. 80TH STREET | | 305 EAST 80TH STREET | | | | MANHATTAN | | NY | | 10019 | |
NYCC05 | | MANHATTAN - E. 12TH STREET | | 21 EAST 12TH STREET | | | | MANHATTAN | | NY | | 10003 | |
NYCC06 | | MANHATTAN - E. 31ST STREET | | 142 EAST 31ST STREET | | | | MANHATTAN | | NY | | 10016 | |
NYCC07 | | MANHATTAN - E. 50TH STREET | | 138-146 EAST 50TH ST | | SUITE #200 | | MANHATTAN | | NY | | 10022 | |
NYCC08 | | MANHATTAN - W. 77TH STREET | | 219 WEST 77TH STREET | | | | MANHATTAN | | NY | | 10024 | |
NYCE44 | | NYCE44 - ADMIN | | 95-10 DITMARS BLVD | | | | EAST ELMHURST | | NY | | 11369 | |
OAJT01 | | JACKSONVILLE ARPT | | ALBERT J ELLIS ARPT | | 264 ALBERT ELLIS APT RD | | RICHLANDS | | NC | | 28574 | |
OAKT01 | | OAKLAND ARPT | | OAKLAND INTL ARPT | | 100 ARPT DRIVE | | OAKLAND | | CA | | 94621 | |
OAKW02 | | BERKELEY - UNIVERSITY AVE | | BERKELEY | | 920 UNIVERSITY AVENUE | | BERKELEY | | CA | | 94710 | |
OGGT01 | | KAHULUI ARPT | | KAHULUI ARPT | | 142 MOKUEA PLACE | | KAHULUI/MAUI | | HI | | 96732 | |
OKCT01 | | OKLAHOMA CITY ARPT | | WILL ROGERS WORLD ARPT | | 6501 W. GUY FULLER RD | | OKLAHOMA CITY | | OK | | 73159 | |
OKKO01 | | KOKOMO | | KOKOMO | | 3839 LAFOUNTAIN STREET | | KOKOMO | | IN | | 46902 | |
OMAT01 | | OMAHA ARPT | | EPPLEY AIR FIELD | | | | OMAHA | | NE | | 68110 | |
ONTT01 | | ONTARIO ARPT | | ONTARIO INTL ARPT | | 3450 EAST ARPT DRIVE STE 300 | | ONTARIO | | CA | | 91761 | |
ORDC48 | | CORP REGION OFFICE - CENTRAL | | 2340 S. ARLINGTON HEIGHTS | | SUITE 620 | | ARLINGTON HEIGHTS | | IL | | 60005 | |
ORDT01 | | CHICAGO O’HARE ARPT (R) | | CHICAGO O’HARE INTL ARPT | | | | CHICAGO | | IL | | 60666 | |
ORFC44 | | ORFC44 - ADMIN | | 3445 N MILITARY HWY | | | | NORFOLK | | VA | | 23518 | |
ORFC45 | | ORFC45 - ADMIN - RETURNS | | 7000 ROBIN HOOD RD | | | | NORFOLK | | VA | | 23518 | |
ORFT01 | | NORFOLK ARPT | | NORFOLK INTL ARPT | | 999 ARPT RD | | NORFOLK | | VA | | 23518 | |
ORHT01 | | WORCESTER ARPT | | WORCESTER ARPT | | 375 ARPT DRIVE | | WORCESTER | | MA | | 1605 | |
ORLC02 | | HOLIDAY INN SELECT NCR | | 12125 HIGH TECH AVE | | | | ORLANDO | | FL | | 32817 | |
15
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
ORLC40 | | ORLANDO/SIEMENS ONLY | | 8350 HANGAR BLVD. | | | | ORLANDO | | FL | | 32827 | |
ORLR01 | | ORLANDO - SHERATON STUDIOS | | SHERATON STUDIOS | | 5905 INTERNATIONAL DRIVE | | ORLANDO | | FL | | 32809 | |
ORLR02 | | ORLANDO- WALT DISNEY CAR CARE CNTR. | | 1000 CAR CARE DRIVE | | | | LAKE BUENA VISTA | | FL | | 32832 | |
ORLR03 | | LAKE BUENA VISTA | | LAKE BUENA VISTA | | 1900 LAKE BUENA VISTA DRIVE | | LAKE BUENA VISTA | | FL | | 32830 | |
ORLR05 | | ORLANDO ROSEN CENTER | | ROSEN CENTER | | 9840 INTERNATIONAL DRIVE | | ORLANDO | | FL | | 32819 | |
ORLR13 | | ORLANDO -WALT DISNEY DOLPHIN RESORT | | WALT DISNEY WORLD DOLPHIN | | 1500 EPCOT RESORT BLVD | | ORLANDO | | FL | | 32830 | |
PBIC44 | | PBIC44 - ADMIN | | 2600 TURNAGE BLVD | | | | WEST PALM BEACH | | FL | | 33406 | |
PBIN02 | | JUPITER - NORTH US 1 | | JUPITER | | 1612 NORTH US 1 | | JUPITER | | FL | | 33469 | |
PBIT01 | | WEST PALM BEACH ARPT | | PALM BEACH INTL ARPT | | 2121 BELVEDERE RD | | W PALM BEACH | | FL | | 33406 | |
PDXT01 | | PORTLAND ARPT | | PORTLAND INTL ARPT | | PARKING GARAGE SECOND LEVEL | | PORTLAND | | OR | | 97220 | |
PFNT01 | | PANAMA CITY ARPT | | FANNIN FIELD MUNICIPAL ARPT | | 3173 AIRPORT ROAD | | PANAMA CITY | | FL | | 32405 | |
PHFT01 | | NEWPORT NEWS ARPT | | NEWPORT NEWS / | | WILLIAMSBURG INTL ARPT | | NEWPORT NEWS | | VA | | 23602 | |
PHLC01 | | PHILADELPHIA - S 19TH & LUDLOW | | 36 SOUTH 19TH & LUDLOW | | | | PHILADELPHIA | | PA | | 19102 | |
PHLC08 | | PHILADELPHIA - 30TH STREET | | 30TH ST TRAIN STATION | | | | PHILADELPHIA | | PA | | 19104 | |
PHLC44 | | PHLC44 - ADMIN **WALK-UP ONLY** | | 6950 NORWITCH DRIVE | | | | PHILADELPHIA | | PA | | 19153 | |
PHLC49 | | PHILADELPHIA FLEET | | 6950 NORWICH DRIVE | | | | PHILADELPHIA | | PA | | 19153 | |
PHLE06 | | CHERRY HILL - ROUTE 70 | | 404 ROUTE 70 EAST | | | | CHERRY HILL | | NJ | | 8034 | |
PHLT01 | | PHILADELPHIA ARPT | | PHILADELPHIA INTL ARPT | | | | PHILADELPHIA | | PA | | 19153 | |
PHXC02 | | PHOENIX - SOUTH 24TH STREET | | PHOENIX | | 1402 SOUTH 24TH STREET | | PHOENIX | | AZ | | 85034 | |
PHXN03 | | PHOENIX - WEST GREENWAY ROAD | | PHOENIX EMBASSY SUITES | | 2577 WEST GREENWAY RD | | PHOENIX | | AZ | | 85023 | |
PHXT01 | | PHOENIX SKY HARBOR ARPT | | PHOENIX SKY HARBOR INTL ARPT | | 3400 SKY HARBOR BLVD | | PHOENIX | | AZ | | 85034 | |
PIAC39 | | PEORIA/CATERPILLAR ONLY | | 578 HILLSDALE | | | | PEORIA | | IL | | 61604 | |
PIAT01 | | PEORIA ARPT | | GREATER PEORIA AIRPORT | | 6100 EVERETT DIRSKEN MCKINLEY PKWY | | PEORIA | | IL | | 61607 | |
16
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
PIET01 | | ST PETERSBURG/CLEARWATER ARPT | | ST.PETERSBURG/CLEARWATER ARPT | | | | ST PETERSBURG | | FL | | 33520 | |
PITT01 | | PITTSBURGH ARPT | | PITTSBURGH INTL ARPT | | | | PITTSBURGH | | PA | | 15231 | |
PITW02 | | ALIQUIPPA - GREEN GARDEN ROAD | | 3000 GREEN GARDEN ROAD | | | | ALIQUIPPA | | PA | | 15001 | |
PNST01 | | PENSACOLA ARPT | | PENSACOLA ARPT | | 2430 ARPT BLVD | | PENSACOLA | | FL | | 32504 | |
PSCT01 | | PASCO ARPT | | TRI CITIES ARPT | | 3601 NORTH 20TH STREET | | PASCO | | WA | | 99301 | |
PSFC01 | | PITTSFIELD - EAST ST | | 745 EAST ST | | | | PITTSFIELD | | MA | | 1201 | |
PSMC02 | | PORTSMOUTH - MIRONA RD | | 155 MIRONA ROAD | | | | PORTSMOUTH | | NH | | 3801 | |
PSMT01 | | PORTSMOUTH ARPT | | PEASE INTL TRADEPORT | | TERMINAL BUILDING | | PORTSMOUTH | | NH | | 3801 | |
PSPT01 | | PALM SPRINGS ARPT | | PALM SPRINGS MUNICIPAL ARPT | | 3400 E. TAHQUITZ CANYON WAY #5 | | PALM SPRINGS | | CA | | 92262 | |
PVDT01 | | PROVIDENCE ARPT | | PROVIDENCE ARPT | | 2053 POST ROAD | | WARWICK | | RI | | 2886 | |
PWMS02 | | YORK - US ROUTE ONE | | ROUTE ONE COLLISION AUTO BODY | | 337 US ROUTE ONE | | YORK | | ME | | 3909 | |
PWMT01 | | PORTLAND ARPT | | PORTLAND INTL JETPORT ARPT | | | | PORTLAND | | ME | | 4102 | |
RAPT01 | | RAPID CITY ARPT | | RAPID CITY REGIONAL ARPT | | 4550 TERMINAL RD | | RAPID CITY | | SD | | 57703 | |
RDMT01 | | REDMOND ARPT | | REDMOND MUNICIPAL ARPT | | 2522 SE ARPT WAY | | REDMOND | | OR | | 97756 | |
RDUT01 | | RALEIGH-DURHAM ARPT | | RALEIGH DURHAM INTL ARPT | | 1001 RENTAL CAR RD | | RALEIGH | | NC | | 27623 | |
RFDR01 | | ROCKFORD INTOWN | | CLOCK TOWER RESORT | | 7801 EAST STATE STREET | | ROCKFORD | | IL | | 61108 | |
RFDT01 | | ROCKFORD ARPT | | ROCKFORD ARPT | | 2 ARPT CIRCLE | | ROCKFORD | | IL | | 61109 | |
RHIT01 | | RHINELANDER ARPT | | RHINELANDER-ONEIDA ARPT | | 3375 ARPT ROAD | | RHINELANDER | | WI | | 54501 | |
RICC39 | | RICHMOND/ALLIED SIG-HONEYWELL ONLY | | RICHMOND JET CENTER | | | | RICHMOND | | VA | | 23231 | |
RICT01 | | RICHMOND INTL ARPT | | RICHMOND INTL ARPT | | 1 RICHARD E. BYRD TR DR STE 115 | | RICHMOND | | VA | | 23250 | |
RKDO01 | | ROCKLAND | | SHEPARD CHEVROLET | | US ROUTE 1, NEW COUNTY RD | | ROCKLAND | | ME | | 4841 | |
RNOT01 | | RENO ARPT | | RENO INTL ARPT | | 2001 EAST PLUMB LANE | | RENO | | NV | | 89502 | |
ROAC01 | | ROANOKE - COULTER DR. | | 1411 COULTER DR NW | | | | ROANOKE | | VA | | 24018 | |
ROAT01 | | ROANOKE REGIONAL ARPT | | ROANOKE REGIONAL ARPT | | 5202 AVIATION RD | | ROANOKE | | VA | | 24012 | |
17
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
ROCC39 | | ROCHESTER - XEROX US AIRPORT HANGAR | | US AIRPORT HANGAR | | MONROE COUNTY AIRPORT | | ROCHESTER | | NY | | 14624 | |
ROCC40 | | KODAK - HANGER | | MONROE COUNTY AIRPORT | | 1200 BROOKS AVE | | ROCHESTER | | NY | | 14624 | |
ROCC44 | | ROC44 - ADMIN | | MONROE COUNTY ARPT | | 1200 BROOKS AVE | | ROCHESTER | | NY | | 14624 | |
ROCT01 | | ROCHESTER ARPT | | MONROE COUNTY ARPT | | 1200 BROOKS AVE | | ROCHESTER | | NY | | 14624 | |
RSTC02 | | ROCHESTER - SOUTH BROADWAY | | HOLIDAY INN CITY CENTRE | | 220 SOUTH BROADWAY | | ROCHESTER | | MN | | 55901 | |
RSTT01 | | ROCHESTER ARPT | | ROCHESTER INTL ARPT | | HELGERSON DRIVE | | ROCHESTER | | MN | | 55902 | |
RSWT01 | | FT MYERS SOUTHWEST FLORIDA INTL APT | | SOUTHWEST FLORIDA INTL ARPT | | 16006 CHAMBERLAIN PKWY SE | | FT MYERS | | FL | | 33913 | |
RUTT01 | | RUTLAND ARPT | | RUTLAND STATE ARPT | | COLUMBIA AIR SERVICES-FBO | | NORTH CLARENDON | | VT | | 5759 | |
RWIC02 | | ROCKY MOUNT - N CHURCH STREET | | 501 N CHURCH ST | | | | ROCKY MOUNT | | NC | | 27804 | |
RWIT01 | | ROCKY MOUNT ARPT | | ROCKY MOUNT ARPT | | ROUTE 2 - 250 ARPT DRIVE | | ELM CITY | | NC | | 27822 | |
SANN03 | | ESCONDIDO - WEST 4TH AVENUE | | ESCONDIDO | | 515 WEST 4TH AVENUE | | ESCONDIDO | | CA | | 92025 | |
SANN04 | | DEL MAR/SOLANA BEACH - HIGHWAY 101 | | SOLANA BEACH | | 617 S. HIGHWAY 101 | | SOLANA BEACH | | CA | | 92075 | |
SANT01 | | SAN DIEGO ARPT (R) | | SAN DIEGO LINDBERGH FIELD ARPT | | 3280 NORTH HARBOR DRIVE | | SAN DIEGO | | CA | | 92101 | |
SATC02 | | SAN ANTONIO NE LOOP 410 | | 8927 INTERNATIONAL DRIVE | | | | SAN ANTONIO | | TX | | 78216 | |
SATC03 | | SAN ANTONIO PARKING LOT | | AIRPORT SECURITY PRKG LOT | | SAN ANTONIO INTL ARPT | | SAN ANTONIO | | TX | | 78216 | |
SATT01 | | SAN ANTONIO ARPT | | SAN ANTONIO INTL ARPT | | 9700 ARPT BLVD | | SAN ANTONIO | | TX | | 78216 | |
SAVT01 | | SAVANNAH ARPT | | SAVANNAH INTL ARPT | | 400 AIRWAYS AVENUE | | SAVANNAH | | GA | | 31408 | |
SBAT01 | | SANTA BARBARA ARPT | | SANTA BARBARA ARPT | | 114 WILLIAM MOFFETT RD BLDG 120 | | GOLETA | | CA | | 93117 | |
SBNT01 | | SOUTH BEND REGIONAL ARPT | | SOUTH BEND REGIONAL ARPT | | 4637 PROGRESS DRIVE | | SOUTH BEND | | IN | | 46628 | |
SCEC02 | | STATE COLLEGE - HIGH TECH ROAD | | 2175 HIGH TECH ROAD | | | | STATE COLLEGE | | PA | | 16803 | |
SCET01 | | STATE COLLEGE ARPT | | UNIVERSITY PARK ARPT | | 2493 FOX HILL ROAD | | STATE COLLEGE | | PA | | 16803 | |
SCFT01 | | SCOTTSDALE AIRPORT | | NATIONAL CAR RENTAL | | 15000 N. AIRPORT DRIVE | | SCOTTSDALE | | AZ | | 85260 | |
SDFC39 | | DOW CORNING FBO | | 1131 STANDFORD / AV CENTER | | | | LOUISVILLE | | KY | | 40209 | |
18
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
SDFT01 | | LOUISVILLE INTL ARPT | | STANDIFORD FIELD | | 4221 PARK BOULEVARD | | LOUISVILLE | | KY | | 40209 | |
SEAC01 | | SEATTLE - DOWNTOWN | | 1301 6TH AVE | | | | SEATTLE | | WA | | 98101 | |
SEAT01 | | SEATTLE ARPT | | SEATTLE SEATAC ARPT | | | | SEATTLE | | WA | | 98158 | |
SFBT01 | | SANFORD ORLANDO INTERNATIONAL | | 1801 AIRLINE AVE. | | | | SANFORD | | FL | | 32773 | |
SFOC01 | | SAN FRANCISCO CONVENTION CENTER | | SAN FRANCISCO CONVENTION CENTER | | 687 FOLSOM STREET | | SAN FRANCISCO | | CA | | 94107 | |
SFOC07 | | SAN FRANCISCO - MISSION STREET | | SAN FRANCISCO - INTOWN | | 1600 MISSION STREET | | SAN FRANCISCO | | CA | | 94103 | |
SFON05 | | SAN RAFAEL - BELLAM BLVD | | SAN RAFAEL INTOWN | | 10 BELLAM BLVD | | SAN RAFAEL | | CA | | 94901 | |
SFOS06 | | PALO ALTO - EL CAMINO REAL | | PALO ALTO INTOWN | | 4218 EL CAMINO REAL | | PALO ALTO | | CA | | 94306 | |
SFOT01 | | SAN FRANCISCO ARPT (R) | | SAN FRANCISCO INTL ARPT | | 780 MCDONNELL ROAD | | SAN FRANCISCO | | CA | | 94128 | |
SFYN08 | | NORTHAMPTON - KING STREET | | 72 KING STREET | | | | NORTHAMPTON | | MA | | 1060 | |
SGFT01 | | SPRINGFIELD REGIONAL ARPT | | SPRINGFIELD REGIONAL ARPT | | 5000 W KEARNEY | | SPRINGFIELD | | MO | | 65803 | |
SGUT01 | | ST GEORGE ARPT | | ST GEORGE MUNICIPAL ARPT | | 620 SW AIRPORT ROAD-PO BOX 1658 | | ST GEORGE | | UT | | 84770 | |
SHVE02 | | BOSSIER CITY - TRAFFIC STREET | | 325 TRAFFIC STREET | | | | BOSSIER CITY | | LA | | 71111 | |
SHVT01 | | SHREVEPORT ARPT | | SHREVEPORT REGIONAL ARPT | | | | SHREVEPORT | | LA | | 71109 | |
SJCT01 | | SAN JOSE AIRPORT | | SAN JOSE INTL AIRPORT | | 2300 AIRPORT BLVD., SUITE 120 | | SAN JOSE | | CA | | 95110 | |
SJUT01 | | SAN JUAN INTERNATIONAL APT | | SAN JUAN INTL AIRPORT | | ISLA VERDE | | SAN JUAN | | PR | | 628 | |
SLCT01 | | SALT LAKE CITY ARPT | | SALT LAKE INTL ARPT | | 606 NORTH 3800 WEST | | SALT LAKE CITY | | UT | | 84122 | |
SLEO01 | | SALEM | | DELON OLDSMOBILE | | 695 LIBERTY STREET N.E | | SALEM | | OR | | 97301 | |
SMFT01 | | SACRAMENTO ARPT | | SACRAMENTO METRO ARPT | | 6230 MCNAIR CIRCLE | | SACRAMENTO | | CA | | 95837 | |
SMOC01 | | SANTA MONICA - 1027 BROADWAY | | 1027 BROADWAY | | | | SANTA MONICA | | CA | | 90401 | |
SNAT01 | | ORANGE COUNTY ARPT | | ORANGE COUNTY ARPT | | 19051 AIRPORT WAY NORTH | | SANTA ANA | | CA | | 92707 | |
SPZT01 | | SPRINGDALE ARPT | | SPRINGDALE MUNICIPAL ARPT | | 802 ARPT ROAD | | SPRINGDALE | | AR | | 72764 | |
SRQT01 | | SARASOTA ARPT | | SARASOTA-BRADENTON ARPT | | 6000 AIRPORT CIRCLE | | SARASOTA | | FL | | 34243 | |
STLT01 | | ST LOUIS INTL ARPT | | 10124 NATURAL BRIDGE RD. | | | | ST LOUIS | | MO | | 63134 | |
19
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
SUXC48 | | SUXC48 - WALKUP ONLY | | SIOUX CITY GATEWAY ARPT | | 6115 MITCHELL | | SIOUX CITY | | IA | | 51111 | |
SUXT01 | | SIOUX CITY ARPT | | SIOUX CITY GATEWAY ARPT | | 6115 MITCHELL | | SIOUX CITY | | IA | | 51111 | |
SWFT01 | | NEWBURGH/NEW WINDSOR | | STEWART INTL. ARPT | | 1180 FIRST STREET | | NEW WINDSOR | | NY | | 12553 | |
SYRT01 | | SYRACUSE ARPT | | SYRACUSE HANCOCK INTL ARPT | | | | SYRACUSE | | NY | | 13220 | |
TEXT01 | | TELLURIDE COUNTY ARPT | | TELLURIDE COUNTY ARPT | | 1500 LAST DOLLAR ROAD | | TELLURIDE | | CO | | 81435 | |
TLHT01 | | TALLAHASSEE ARPT | | TALLAHASSEE ARPT | | 3300 CAPITAL CIRCLE SW | | TALLAHASSEE | | FL | | 32310 | |
TNUC39 | | NEWTON/MAYTAG CO. ONLY | | NO ADDRESS | | | | NEWTON | | IA | | 1234 | |
TOLS02 | | MAUMEE - INTOWN CONANT STREET | | 1373 CONANT STREET | | | | MAUMEE | | OH | | 43537 | |
TOLT01 | | TOLEDO ARPT | | TOLEDO EXPRESS ARPT | | 11013 ARPT HWY | | SWANTON | | OH | | 43558 | |
TPAC45 | | TPAC45 - ADMIN/FLEET | | 5402 WEST LAUREL | | | | TAMPA | | FL | | 33607 | |
TPAO01 | | TAMPA INTL ARPT | | 5111 W. SPRUCE STREET | | | | TAMPA | | FL | | 33607 | |
TPLO01 | | TEMPLE | | 4130 SW LOOP 363 | | | | TEMPLE | | TX | | 76505 | |
TRIT01 | | TRI CITY/BLOUNTVILLE ARPT | | TRI CITY REGIONAL ARPT | | | | BLOUNTVILLE | | TN | | 37617 | |
TULT01 | | TULSA ARPT | | TULSA INTERNATIONAL AIRPORT | | 2222 NORTH 73RD EAST AVENUE | | TULSA | | OK | | 74115 | |
TUSC02 | | TUCSON - NORTH ORACLE | | TUCSON N. ORACLE | | 5151 NORTH ORACLE STE 133 | | TUCSON | | AZ | | 85704 | |
TUSC03 | | TUCSON - NORTH KOLB ROAD | | TUCSON EAST SIDE | | 1037 NORTH KOLB ROAD | | TUCSON | | AZ | | 85710 | |
TUST01 | | TUCSON INTL ARPT | | TUCSON INTL ARPT | | 7250 SOUTH TUCSON BLVD | | TUCSON | | AZ | | 85706 | |
TVCT01 | | TRAVERSE CITY | | CHERRY CAPITOL AIRPORT | | 1330 AIRPORT ACCESS ROAD | | TRAVERSE CITY | | MI | | 49686 | |
TWFT01 | | TWIN FALLS APT | | MAGIC VALLEY REGIONAL ARPT | | 524 AIRPORT LOOP | | TWIN FALLS | | ID | | 83301 | |
TXKT01 | | TEXARKANA ARPT | | TEXARKANA REGIONAL ARPT | | 311 AIRPORT DR-BOX 11 | | TEXARKANA | | AR | | 71854 | |
TYRT01 | | TYLER ARPT | | TYLER POUNDS FIELD ARPT | | 700 SKYWAY BLVD, SUITE 109 | | TYLER | | TX | | 75704 | |
TYST01 | | KNOXVILLE ARPT | | MCGHEE - TYSON ARPT | | | | ALCOA | | TN | | 37701 | |
VPST01 | | FT WALTON BEACH/EGLIN AIRFORCE BASE | | OKALOOSA COUNTY AIR TERM | | STATE ROAD 85 | | EGLIN AFB | | FL | | 32542 | |
WASC08 | | WASHINGTON - UNION STATION | | UNION STATION | | 50 MASSACHUSETTS AVE NE | | WASHINGTON | | DC | | 20002 | |
20
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | ST | | Zip | |
XNAT01 | | NORTHWEST ARKANSAS REGIONAL AIRPORT | | NORTHWEST ARKANSAS REGIONAL ARPT | | 1 ARPT BLVD SUITE 113 | | BENTONVILLE | | AR | | 72712 | |
Note to Table: (R) denotes a redundant site as described in Part F of Exhibit B
CANADA NATIONAL REMOTE SUPPORT SITES
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
DUQC01 | | DUNCAN - ALLENBY ROAD | | HALT HOLDINGS LTD | | 3030 ALLENBY ROAD | | DUNCAN | | BC | | V9L4T8 | |
FSGT01 | | GDS TEST LOCATION | | MONTREAL DORVAL, QC ARPT | | | | MONTREAL | | QC | | H4Y1AZ | |
SSQC01 | | LA SARRE - 2ND ST E | | LOCATION ELITE INC | | 1 ROUTE 111 OUEST | | LA SARRE | | QC | | J9Z1R5 | |
XBRO01 | | BROCKVILLE - CHELSEA STREET W | | 514939 ONTARIO LIMITED | | 801-A CHELSEA STREET W | | BROCKVILLE | | ON | | K6V3H9 | |
XPNC01 | | BRAMPTON - ONTARIO | | NATIONAL CAR RENTAL | | 169 RUTHERFORD ROAD SOUTH | | BRAMPTON | | ON | | L6W 3J7 | |
XPNN01 | | ORANGEVILLE - ONTARIO | | MACMASTER PONTIAC BUICK GMC (1999) | | HIGHWAY # 9 EAST | | ORANGEVILLE | | ON | | L9W 2Z5 | |
YAGT01 | | FT FRANCES ARPT | | IVEY AVIATION LTD | | RMB #19, R.R.#1 | | FORT FRANCES | | ON | | P9A3M2 | |
YAMC01 | | SAULT ST MARIE-GREAT NORTHERN ROAD | | SPADONI LEASING LTD. | | 308 GREAT NORTHERN ROAD | | SAULT STE MARIE | | ON | | P6B4Z7 | |
YAMT01 | | SAULT ST MARIE ARPT | | SAULT STE MARIE AIRPORT | | | | SAULT STE MARIE | | ON | | P6B2V1 | |
YAYC01 | | ST ANTHONY - WEST STREET | | WOODWARD RENT A CAR LIMITED | | 116 WEST STREET | | ST ANTHONY | | NL | | A0K4S0 | |
YAYP01 | | ST BARBE, NF | | WOODWARD RENT A CAR LIMITED | | P.O.BOX 21297 | | ST BARBE | | NL | | A0K1M0 | |
YAYS02 | | HAWKES BAY - VIKING TRAIL | | WOODWARD RENT A CAR | | ROUTE 430 VIKING TRAIL | | HAWKES BAY | | NL | | A0A3BO | |
YAYT01 | | ST ANTHONY ARPT | | ST. ANTHONY AIRPORT | | AIRPORT ROAD | | ST ANTHONY | | NL | | A0K4S0 | |
YBAO01 | | BANFF | | CORNER OF LYNX & CARIBOU ST | | | | BANFF | | AB | | T0L0C0 | |
21
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YBAW05 | | LAKE LOUISE - SAMPSON MALL | | LAKE LOUISE INVESTMENTS LTD | | BOX 250 | | LAKE LOUISE | | AB | | T0L1E0 | |
YBCC01 | | BAIE COMEAU - BOUL LAFLECHE | | LOCATION D AUTOS HAUTERIVE | | 707 BOUL LAFLECHE | | BAIE COMEAU | | QC | | G5C2T1 | |
YBCT01 | | BAIE COMEAU ARPT | | BAIE COMEAU AIRPORT | | 707 BLVD LAFLECHE | | BAIE COMEAU | | QC | | G5C2T1 | |
YBGC01 | | CHICOUTIMI - JACQUES CARTIER EAST | | 3105-3143 QUEBEC INC | | 74 JACQUES CARTIER EAST | | CHICOUTIMI | | QC | | G7H1Y2 | |
YBGT01 | | BAGOTVILLE ARPT | | 3105-3143 QUEBEC INC | | 100 CHEMIN DE L’AEROPORT | | VILLE DE LA BAIE | | QC | | G7BH3N81Y | |
YBLC02 | | CAMPBELL RIVER-SOUTH ISLAND HWY | | 486728 BRITISH COLUMBIA LTD | | 2092 SOUTH ISLAND HWY | | CAMPBELL RIVER DOWNTOWN | | BC | | V9W1C1 | |
YBLT01 | | CAMPBELL RIVER ARPT | | 486728 BRITISH COLUMBIA LTD | | 2000 JUBILEE PARKWAY | | CAMPBELL RIVER | | BC | | V9W1C1 | |
YBRO01 | | BRANDON | | MURRAY CHEV OLDS CADILLAC LTD | | 1500 RICHMOND AVENUE | | BRANDON | | MB | | R7A6A4 | |
YBXO01 | | BLANC SABLON | | 1066 RUE CAMILLE MARCOUX | | CTE DUPLESSIS | | BLANC SABLON | | QC | | G0G1W0 | |
YCCO01 | | CORNWALL | | 516941 ONTARIO LIMITED | | 1520 VINCENT MASSEY DR | | CORNWALL | | ON | | K6H5R6 | |
YCDC01 | | NANAIMO - NORTHFIELD RD | | HALT HOLDINGS LTD | | 1602 NORTHFIELD RD | | NANAIMO | | BC | | V9S3A7 | |
YCDT01 | | NANAIMO ARPT | | HALT HOLDINGS LTD | | 3350 SPITFIRE RD | | NANAIMO | | BC | | V0R 1H0 | |
YCGC01 | | CASTLEGAR - COLUMBIA AVENUE | | AMP ENTERPRISES | | 2141 COLUMBIA AVENUE | | CASTLEGAR | | BC | | V1N2W9 | |
YCGT01 | | CASTLEGAR ARPT | | AMP ENTERPRISES | | CASTLEGAR AIRPORT | | CASTLEGAR | | BC | | V1N2W6 | |
YCMO01 | | ST CATHARINES | | 695835 ONTARIO LTD. | | 162 CHURCH ST | | ST CATHARINES | | ON | | L2R3E5 | |
YCMS02 | | WELLAND - NIAGARA ST | | 695835 ONTARIO LTD. | | 607 NIAGARA STREET | | WELLAND | | ON | | L3C 1L9 | |
YCNC01 | | COCHRANE - 1ST STREET | | MURDOCH GROUP INC | | C/O HUSKY TRUCK SHOP | | COCHRANE | | ON | | P0L 1C0 | |
YCNO01 | | COCHRANE ARPT | | MURDOCH GROUP INC | | C/O HUSKY TRUCK STOP | | COCHRANE | | ON | | P0L1C0 | |
YCWC01 | | CHILLIWACK - BRITISH COLUMBIA | | CLEARWAY RENTALS INC. | | 45750-B LUCKAKUCK WAY | | CHILLIWACK | | BC | | V2R4E8 | |
YDAC01 | | DAWSON CITY | | GOLD CITY TOURS | | 1034 FRONT STREET | | DAWSON | | YT | | Y1A3E5 | |
YDFC02 | | DEER LAKE - TRANS CANADA HIGHWAY | | (DEER LAKE OFF AIRPORT) | | 9A TRANS CANADA HIGHWAY | | DEER LAKE | | NL | | A8A2E5 | |
YDFT01 | | DEER LAKE ARPT | | WOODWARD RENT A CAR LIMITED | | 1 AIRPORT ROAD SUITE 9 | | DEER LAKE | | NL | | A8A1A3 | |
22
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YDQC01 | | DAWSON CREEK - 101 AVENUE | | MELS U-DRIVE (1978) LTD | | 1809-96 AVE | | DAWSON CREEK | | BC | | V1G4H8 | |
YDQT01 | | DAWSON CREEK ARPT | | MELS U-DRIVE (1978) LTD | | 1445 101 AVENUE | | DAWSON CREEK | | BC | | V1G2A6 | |
YEAC01 | | EDMONTON-DOWNTOWN 9943 JASPER AVE | | NATIONAL CAR RENTAL | | 9943 JASPER AVENUE | | EDMONTON | | AB | | T5J2X4 | |
YEAN05 | | EDMONTON-CALGARY TRAIL NORTHBOUND | | NATIONAL CAR RENTAL | | 5116 CALGARY TRAIL NORTHBOUND | | EDMONTON | | AB | | T6H2H4 | |
YEAW03 | | HINTON - CARMICHAEL LANE | | WHIRLWIND AUTO RENTALS | | 678 CARMICHAEL LANE | | HINTON | | AB | | T7V1S9 | |
YEGT01 | | EDMONTON ARPT | | NATIONAL CAR RENTAL | | PARKADE - LOWER LEVEL | | EDMONTON | | AB | | T5J2T2 | |
YELC01 | | ELLIOT LAKE - PERINI RD | | MURDOCH GROUP INC | | 23 PERINI RD | | ELLIOT LAKE | | ON | | P5A2T1 | |
YELT01 | | ELLIOT LAKE ARPT | | MURDOCH GROUP INC | | ELLIOT LAKE AIRPORT | | ELLIOT LAKE | | ON | | P5A2T1 | |
YEVT01 | | INUVIK ARPT | | INUVIK ARPT | | PO BOX 2568 | | INUVIK | | NT | | X0E0T0 | |
YEYO01 | | AMOS | | LOCATION ELITE INC | | 23 ROUTE 111 WEST | | AMOS | | QC | | J9T2X6 | |
YFCC01 | | FREDERICTON - PROSPECT STREET | | J CLARK & SON LIMITED | | 817 PROSPECT STREET | | FREDERICTON | | NB | | E3B5Y4 | |
YFCT01 | | FREDERICTON ARPT | | J CLARK & SON LIMITED | | FREDERICTON AIRPORT | | FREDERICTON | | NB | | E3B4Z2 | |
YGPT01 | | GASPE ARPT | | AEROPORT DE GASPE | | | | GASPE | | QC | | G4X2K2 | |
YGRT01 | | ILES DE LA MADELEINE ARPT | | ILES DE LA MADELEINE ARPT | | 205 CH DE L’AEROPORT, PB 758 CAP | | ILES DE LA MADELEINE | | QC | | GOB1G0 | |
YHDC01 | | DRYDEN - GOVERNMENT ST | | SPADONI LEASING LTD | | 369 GOVERNMENT ST.(BEST WESTERN) | | DRYDEN | | ON | | P8N2Y8 | |
YHDT01 | | DRYDEN ARPT | | SPADONI LEASING LTD | | DRYDEN AIRPORT | | DRYDEN | | ON | | P8N2Y8 | |
YHFO01 | | HEARST | | EASTVIEW PONTIAC BUICK | | 1416 FRONT STREET | | HEARST | | ON | | P0L1N0 | |
YHMC04 | | OAKVILLE - MAPLEGROVE DRIVE | | SPENCERS CAR & TRUCK RENTAL | | 497 MAPLEGROVE DRIVE | | OAKVILLE | | ON | | L6J7P5 | |
YHMC05 | | HAMILTON - BURLINGTON STREET | | NATIONAL CAR RENTAL | | 776 BURLINGTON ST. | | HAMILTON | | ON | | L9B 1B9 | |
YHME02 | | OAKVILLE-SPEERS RD | | ABCAT INC | | 1149 SPEERS RD | | OAKVILLE | | ON | | L6L2X5 | |
YHMS01 | | SIMCOE - ONTARIO | | NATIONAL CAR RENTAL | | 61 QUEENSWAY EAST | | SIMCOE | | ON | | N3Y4L2 | |
YHMS02 | | BRANTFORD - ONTARIO | | 1117608 ONTARIO INC | | 14 EASTON ROAD | | BRANTFORD | | ON | | N3P 1J5 | |
YHMW03 | | BURLINGTON - FAIRVIEW STREET | | ARTHAVEN INVESTMENTS CORPORATION | | 4235 FAIRVIEW STREET UNIT #2 | | BURLINGTON | | ON | | L7L2A4 | |
23
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YHSO01 | | SECHELT | | W L LIFE CONSULTANTS LTD | | 5623 WHARF ROAD | | SECHELT | | BC | | V0N3AO | |
YHZC06 | | HALIFAX - BARRINGTON STREET | | NATIONAL CAR RENTAL | | 2156 BARRINGTON STREET | | HALIFAX | | NS | | B3K2W4 | |
YHZC07 | | HALIFAX - WESTIN HOTEL | | NATIONAL CAR RENTAL | | 1181 HOLLIS STREET | | HALIFAX | | NS | | B3H2P6 | |
YHZC44 | | ENFIELD - AEROTECH DR | | NATIONAL CAR RENTAL | | 81 BELL BOULEVARD EXTENSION | | ENFIELD | | NS | | B2T 1K3 | |
YHZE04 | | DARTMOUTH - PORTLAND ST | | NATIONAL CAR RENTAL | | 580 PORTLAND ST | | DARTMOUTH | | NS | | B2W2M3 | |
YHZN05 | | TRURO - ROBIE STREET | | RAINBOW MOTORS LIMITED | | 204 ROBIE STREET | | TRURO | | NS | | B2N5G6 | |
YHZS01 | | HALIFAX - KEMPT ROAD | | NATIONAL CAR RENTAL | | 3484 KEMPT ROAD | | HALIFAX | | NS | | B3K 4X7 | |
YHZT01 | | HALIFAX ARPT | | NATIONAL CAR RENTAL | | PO BOX 2121 | | HALIFAX | | NS | | B3J3B7 | |
YJAO01 | | JASPER NATIONAL PARK-TRAIN STATION | | ALPINE AUTO RENTALS | | 607 CONNAUGHT DRIVE | | JASPER | | AB | | T0E1E0 | |
YJTC02 | | STEPHENVILLE - WEST STREET | | 73 WEST STREET | | | | STEPHENVILLE | | NL | | A2N1E5 | |
YJTN01 | | CORNER BROOK - MAMATEEK INN | | WOODWARD RENT A CAR LIMITED | | MAPLE VALLEY RD. BOX 245 | | CORNER BROOK | | NL | | A2H6C9 | |
YJTS01 | | PORT AUX-BASQUES | | A1 AUTO | | 2 INDUSTRIAL PARK | | PORT AUX-BASQUES | | NL | | A0M1C0 | |
YJTT01 | | STEPHENVILLE ARPT | | WOODWARD RENT A CAR LIMITED | | 170 TENNESEE DRIVE | | STEPHENVILLE | | NL | | A2N2Y3 | |
YKAC01 | | KAMLOOPS - WEST VICTORIA STREET | | NATIONAL CAR RENTAL | | 174 WEST VICTORIA STREET | | KAMLOOPS | | BC | | V2C1A4 | |
YKAT01 | | KAMLOOPS ARPT | | NATIONAL CAR RENTAL | | KAMLOOPS AIRPORT | | KAMLOOPS | | BC | | V2C2G9 | |
YKFC28 | | KITCHENER 926 KING STREET E | | 656290 ONTARIO LIMITED | | 449 ST CHARLES ST. EAST | | KITCHENER | | ON | | N2G4G1 | |
YKFE01 | | CAMBRIDGE- ONTARIO | | 1117608 ONTARIO INC | | 2235 EAGLE ST N | | CAMBRIDGE | | ON | | N1R6J8 | |
YKFE04 | | GUELPH - ONTARIO | | 1117608 ONTARIO INC | | 895 WOODLAWD ROAD WEST | | GUELPH | | ON | | N1K1B7 | |
YKLO01 | | SCHEFFERVILLE | | GESTIOR PORLIER LIMITEE | | 524 RUTH ST. | | SCHEFFERVILLE | | QC | | G0G2T0 | |
YKXC01 | | KIRKLAND LAKE - GOVERNMENT RD E. | | MURDOCH GROUP INC | | 22 GOVERNMENT RD E. | | KIRKLAND LAKE | | ON | | P2N1A3 | |
YKXS02 | | NEW LISKEARD - WHITEWOOD AVENUE | | MURDOCH GROUP INC | | 375 WHITEWOOD AVENUE | | NEW LISKEARD | | ON | | P0J1P0 | |
YKXT01 | | KIRKLAND LAKE ARPT | | KIRKLAND LAKE AIRPORT | | | | KIRKLAND LAKE | | ON | | PAN1A3 | |
YLQC01 | | LA TUQUE - QUEBEC | | NATINAL CAR RENTAL | | 1070 BOULEVARD DUCHARME | | LA TUQUE | | QC | | G9X 3C4 | |
24
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YLWC01 | | KELOWNA - SPRINGFIELD ROAD | | NATIONAL CAR RENTAL | | 1790 B SPRINGFIELD ROAD | | KELOWNA | | BC | | V1Y5V6 | |
YLWT01 | | KELOWNA ARPT | | NATIONAL CAR RENTAL | | #13-5533 KELOWNA AIRPORT | | KELOWNA | | BC | | V1V1S1 | |
YMEC01 | | VILLE DE MATANE | | LOCATION DAUTOS BC INC | | 161 RUE FRASER | | MATANE | | QC | | G4W3H2 | |
YMEE01 | | STE-ANNE-DES-MONTS - QUEBEC | | LOCATION D’AUTOS B.C. INC. | | 456, BOUL. STE-ANNE OUEST | | STE-ANNE-DES-MONTS | | QC | | G4V1T3 | |
YMGT01 | | MANITOUWADGE ARPT | | SPADONI MOTORS LIMITED | | MANITOU ROAD | | MANITOUWADGE | | ON | | P0T2S0 | |
YMJO01 | | MOOSE JAW - HIGH STREET WEST | | NATIONAL CAR RENTAL | | 817 HIGH STREET W | | MOOSE JAW | | SK | | S6H6L7 | |
YMMC01 | | FT MCMURRAY RR# 1 | | FORT MCMURRAY | | RR#1 2-1 AIRPORT | | FORT MCMURRAY | | AB | | T9H5B5 | |
YMMT01 | | FT MCMURRAY ARPT | | MELS U-DRIVE (1978) LTD | | RR #1 | | FORT MCMURRAY | | AB | | T9H5B5 | |
YMQC10 | | MONTREAL RUE STANLEY STREET | | NATIONAL LOCATION D’AUTOS | | 1200 RUE STANLEY STREET | | MONTREAL | | QC | | H3B2S8 | |
YMQE02 | | QUEBEC - CLOSED STATION | | NATIONAL CAR RENTAL | | 8055, BOUL. LANGELIER | | ST-LEONARD | | QC | | H1P2B7 | |
YMQE07 | | ST LAURENT QUEBEC | | NATIONAL CAR RENTAL | | 310 DECARIE BLVD | | ST LAURENT | | QC | | H4N2M2 | |
YMQE13 | | MCMASTERVILLE - LAURIER BLVD | | 541 LAURIER BLVD | | | | MCMASTERVILLE | | QC | | J3G1R1 | |
YMQE25 | | ST-HYACINTHE | | NATIONAL CAR RENTAL | | 5765 BOULEVARD LAURIER | | ST-HYACINTHE | | QC | | J2S3V9 | |
YMQN01 | | MONTREAL NORTH-MOZART STREET EAST | | NATIONAL CAR RENTAL | | 33 MOZART STREET EAST | | MONTREAL NORTH | | QC | | H2S1B1 | |
YMQN05 | | MONTREAL - ST-LEONARD, QC | | NATIONAL CAR RENTAL | | 8055, LANGELIER | | ST-LEONARD, MONTREAL | | QC | | H1P2B7 | |
YMQN08 | | LAVAL - BLVD DES LAURENTIDES | | NATIONAL CAR RENTAL | | 1585 BLVD DES LAURENTIDES | | LAVAL | | QC | | H7N4Y6 | |
YMQN09 | | MONTREAL - ST JACQUES STREET WEST | | NATIONAL CAR RENTAL | | 6511 ST JACQUES STREET WEST | | MONTREAL | | QC | | H4B1V3 | |
YMQN17 | | REPENTIGNY - NOTRE DAME ST | | 701 NOTRE DAME | | | | REPENTIGNY | | QC | | J6A2X1 | |
YMQN20 | | JOLIETTE - VISITATION STREET | | 600 VISITATION STREET | | | | ST CHARLES DE BORROMEE | | QC | | J6E4P6 | |
YMQN21 | | JONQUIERE - BOUL HARVEY | | 3105-3143 QUEBEC INC | | 3635 BOUL HARVE | | JONQUIERE | | QC | | G7X3B2 | |
YMQN22 | | MONT-TREMBLANT - ROUTE 117 NORD | | LOCATION G ROYER INC | | 1595- ROUTE 17 | | MONT-TREMBLANT | | QC | | J8E2X9 | |
YMQN24 | | ST AGATHE DES MONTS - PRINCIPAL ST | | LOCATION G ROYER INC | | 661 PRINCIPAL STREET | | ST AGATHE DES MONTS | | QC | | J8C1L1 | |
25
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YMQN26 | | ST EUSTACHE - BLVD INDUSTRIEL | | 10 BLVD INDUSTRIEL | | | | ST EUSTACHE | | QC | | J7R5B8 | |
YMQN28 | | ST JEROME - SIR WILFRED LAURIER | | 14315 SIR WILFRID LAURIER | | | | ST JEROME | | QC | | J7T5T4 | |
YMQN29 | | BLAINVILLE - CURE LABELLE | | 620 CURE LABELLE | | | | BLAINVILLE | | QC | | J7C2H9 | |
YMQN32 | | MONTREAL - CHOMEDEY, QUEBEC | | NATIONAL CAR RENTAL | | 2460, BOUL. CURE LABELLE | | CHOMEDEY | | QC | | H7T1R1 | |
YMQS05 | | LEMOYNE - TASCHEREAU BLVD. | | NATIONAL CAR RENTAL | | 1080 TASCHEREAU BLVD. | | LEMOYNE | | QC | | J4P3P6 | |
YMQS11 | | VILLE LASALLE-BOULEVARD NEWMAN | | 9100 BOULEVARD NEWMAN | | | | VILLE LASALLE | | QC | | H8R1Y8 | |
YMQS23 | | SOREL - ROUTE MARIE-VICTORIN | | PAUL GAMELIN & FILS INC | | 2628 BOUL FISET | | SOREL-TRACY | | QC | | J3P5J9 | |
YMQS35 | | VALLEYFIELD - CHEMIN LAROQUE | | 90456 CANADA LTEE | | 430 CHEMIN LAROQUE | | VALLEYFIELD | | QC | | J6T4C5 | |
YMQW06 | | POINTE CLAIRE - ST JEAN BLVD | | NATIONAL CAR RENTAL | | 601 ST. JEAN BLVD. | | POINTE CLAIRE | | QC | | H9R3K1 | |
YMQW15 | | VAUDREUIL - BLVD HARWOOD | | 200 BOULEVARD HARWOOD | | | | VAUDREUIL / DORION | | QC | | J7V1Y2 | |
YMTO01 | | CHIBOUGAMAU | | CHIBOUGAMAU AUTOMOBILE INC | | 859-3E RUE | | CHIBOUGAMAU | | QC | | G8P1R1 | |
YMXT02 | | MONTREAL MIRABEL ARPT | | NATIONAL CAR RENTAL | | TERMINAL B1-10 | | MONTREAL | | QC | | J7N1A2 | |
YNDC01 | | HULL - OTTAWA | | NATIONAL CAR RENTAL | | 725H DE LA CARRIERE | | HULL | | QC | | J8Y6T9 | |
YNDC03 | | GATINEAU - OTTAWA | | NATIONAL CAR RENTAL | | 415 BOUL MALONEY OUEST | | GATINEAU | | QC | | J8P 6W2 | |
YOJC01 | | HIGH LEVEL-ESSO STATION HIGHWAY 35 | | 847846 ALBERTA LTD | | LOT C2 HIGH LEVEL AIRPORT | | HIGH LEVEL | | AB | | T0H1Z0 | |
YOJT01 | | HIGH LEVEL ARPT | | LOT C2 HIGH LEVEL AIRPORT | | | | HIGH LEVEL | | AB | | TOH1Z0 | |
YOOC01 | | OSHAWA-ONTARIO | | NATIONAL CAR RENTAL | | 282 KING STREET WEST | | OSHAWA | | ON | | L1J2J9 | |
YOSC01 | | OWEN SOUND - ONTARIO | | GREY MOTORS PONTIAC BUICK GMC LTD. | | R.R. 5, BOX 790 | | OWEN SOUND | | ON | | N4K 5W9 | |
YOWC05 | | OTTAWA-QUEEN STREET | | NATIONAL CAR RENTAL | | 226 QUEEN STREET | | OTTAWA | | ON | | K1P5Z4 | |
YOWC09 | | OTTAWA-BANK STREET(SOUTHSIDE) | | NATIONAL CAR RENTAL | | 1770 BANK ST | | OTTAWA | | ON | | K1V7Y6 | |
YOWC39 | | OTTAWA / CANADA POST ONLY | | NATIONAL CAR RENTAL | | 2701 RIVERSIDE DRIVE | | OTTAWA | | ON | | K1A 0B1 | |
YOWC40 | | OTTAWA TELESAT**DO NOT BOOK ** | | 1601 TELESAT COURT | | | | GLOUCESTER | | ON | | K1B 5P4 | |
26
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YOWS04 | | OTTAWA-ST LAURENT BLVD | | NATIONAL CAR RENTAL | | 1733 ST LAURENT BLVD | | OTTAWA | | ON | | K1G3V4 | |
YOWS05 | | MANOTICK-ONTARIO | | 1534362 ONTARIO INC | | 3788 PRINCE OF WALES DRIVE | | MANOTICK | | ON | | K4M1A3 | |
YOWT01 | | OTTAWA ARPT | | NATIONAL CAR RENTAL | | 50 AIRPORT ROAD | | OTTAWA | | ON | | K1V9B4 | |
YOWW07 | | KANATA OTTAWA CARBROOKE RD | | NATIONAL CAR RENTAL | | 7 CARBROOKE RD | | KANATA | | ON | | K2L1B1 | |
YOWW20 | | ARNPRIOR - BASKIN DRIVE | | NATIONAL CAR RENTAL | | 19 BASKIN DRIVE | | ARNPRIOR | | ON | | K7S3G8 | |
YPET01 | | PEACE RIVER ARPT | | MELS U-DRIVE (1978) LTD | | BOX 7014 | | PEACE RIVER | | AB | | T8S1S7 | |
YPQC01 | | PETERBOROUGH | | 1392612 ONTARIO INC | | 779 ERSKINE AVENUE | | PETERBOROUGH | | ON | | K9J5V1 | |
YPQN03 | | HALIBURTON - ONTARIO | | CURRY MOTORS LIMITED | | BOX 30, HIGHLAND STREET | | HALIBURTON | | ON | | K0M1S0 | |
YPQN04 | | LINDSAY - ANGELINE ST NORTH | | ECONOMY LEASING LTD | | 129 ANGELINE ST NORTH | | LINDSAY | | ON | | K9V4M9 | |
YPQN05 | | BANCROFT | | BANCROFT MOTORS LTD | | 1 VALLEYFIELD DRIVE BOX 1420 | | BANCROFT | | ON | | K0L1C0 | |
YPQS03 | | COBOURG - DIVISON STREET | | 1006336 ONTARIO INC | | 7789 HIGHWAY #2 WEST RR# 4 | | COBOURG | | ON | | K9A4J7 | |
YPRC01 | | PRINCE RUPERT - 2ND AVE WEST | | NATIONAL CAR RENTAL | | 815 FIRST AVENUE WEST SUITE 106 | | PRINCE RUPERT | | BC | | V8J 1B8 | |
YPRT01 | | PRINCE RUPERT ARPT | | NATIONAL CAR RENTAL | | 815 FIRST AVENUE WEST SUITE 106 | | PRINCE RUPERT | | BC | | V8J 1B8 | |
YPSC01 | | PORT HAWKESBURY/PORT HASTINGS | | NATIONAL CAR RENTAL | | 46 PAINT STREET | | PORT HAWKESBURY | | NS | | B9A3K1 | |
YQBC01 | | QUEBEC - BOUL. CHAREST | | NATIONAL CAR RENTAL | | 542 BOUL. CHAREST EST | | QUEBEC | | QC | | G1K8L1 | |
YQBN05 | | QUEBEC - JEAN TALON | | NATIONAL CAR RENTAL | | 2238 JEAN TALON NORD | | STE-FOY | | QC | | G1N2G3 | |
YQBS03 | | ST GEORGE DE BEAUCE - LACROIX BLVD | | 9015 LACROIX BLVD | | | | ST GEORGE DE BEAUCE | | QC | | G5Y2B4 | |
YQBS26 | | LEVIS - QUEBEC | | NATIONAL CAR RENTAL | | 72 PRESIDENT KENNEDY | | LEVIS | | QC | | G6V6C9 | |
YQBT01 | | QUEBEC AEROPORT INT’L JEAN-LESAGE | | AEROPORT INT’L JEAN-LESAGE | | 510 ROUTE PRINCIPALE | | STE-FOY | | QC | | G2E5W1 | |
YQBW15 | | COWANSVILLE - RUE RIVIERE | | 352 RUE RIVIERE | | | | COWANSVILLE | | QC | | J2K1M8 | |
YQBW20 | | DRUMMONDVILLE - BOUL ST JOSEPEH | | 1210 BOUL LEMIRE | | | | DRUMMONDVILLE | | QC | | J2C7W6 | |
YQBW25 | | GRANBY -QUEBEC | | NATIONAL CAR RENTAL | | 565 RUE PRINCIPALE | | GRANBY | | QC | | J2G2X4 | |
27
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YQFC01 | | RED DEER - TAYLOR DRIVE | | MID ALTA MOTORS LTD | | 2319 TAYLOR DRIVE | | RED DEER | | AB | | T4R2RL | |
YQGC02 | | WINDSOR-HOWARD AVE | | NATIONAL CAR RENTAL | | 2545 HOWARD AVE | | WINDSOR | | ON | | N8X3W1 | |
YQGT01 | | WINDSOR ARPT | | NATIONAL CAR RENTAL | | 3200 COUNTY RD #42 | | WINDSOR | | ON | | N9A6J3 | |
YQKC01 | | KENORA - 9TH ST NORTH | | IVEY AVIATION LTD | | 1335 9TH ST NORTH | | KENORA | | ON | | P9N2T8 | |
YQKC02 | | SIOUX LOOKOUT | | ARPT PARKING | | | | SIOUX LOOKOUT | | ON | | | |
YQKT01 | | KENORA ARPT | | IVEY AVIATION LTD | | 1335 9TH ST NORTH | | KENORA | | ON | | P9N2T8 | |
YQLC01 | | LETHBRIDGE | | NATIONAL CAR RENTAL | | 304 STAFFORD DRIVE NORTH | | LETHBRIDGE | | AB | | T1H2A6 | |
YQLT01 | | LETHBRIDGE ARPT | | NATIONAL CAR RENTAL | | 417 STUBB ROSS ROAD | | LETHBRIDGE | | AB | | T1K7N3 | |
YQMC01 | | MONCTON - MOUNTAIN RD | | J CLARK & SON LIMITED | | 548 MOUNTAIN RD | | MONCTON | | NB | | E1C2N8 | |
YQMT01 | | MONCTON ARPT | | MONCTON AIRPORT | | 1575 CHAMPLAIN STREET | | DIEPPE | | NB | | E1A7P5 | |
YQQC02 | | COURTENAY - OLD ISLAND HIGHWAY | | HALT HOLDINGS LTD | | 320 OLD ISLAND HIGHWAY | | COURTENAY | | BC | | V9N3P2 | |
YQQT01 | | COMOX ARPT | | HALT HOLDINGS LTD | | COMOX REGIONAL AIRPORT | | LAZO | | BC | | V0R2K0 | |
YQRC48 | | REGINA - SASKATCHEWAN | | NATIONAL CAR RENTAL | | 2361 A 1ST AVE. | | REGINA | | SK | | S4R 8G4 | |
YQRT01 | | REGINA ARPT | | NATIONAL CAR RENTAL | | 2627 AIRPORT ROAD | | REGINA | | SK | | S4W1A4 | |
YQTC01 | | THUNDER BAY - SIFTON AVE | | SPADONI LEASING LTD | | 450 SIFTON AVE | | THUNDER BAY | | ON | | P7E6M2 | |
YQTN10 | | GERALDTON - MAIN STREET | | SPADONI LEASING LTD | | 854 MAIN STREET | | GERALDTON | | ON | | P0T1M0 | |
YQTT01 | | THUNDER BAY ARPT | | THUNDER BAY AIRPORT | | | | THUNDER BAY | | ON | | P7C4W4 | |
YQUC04 | | GRANDE PRAIRIE - 121 AVENUE | | MELS U-DRIVE (1978) LTD | | 9904 - 121 AVENUE | | GRANDE PRAIRIE | | AB | | T8V4J1 | |
YQUT01 | | GRANDE PRAIRIE ARPT | | MELS U-DRIVE (1978) LTD | | 9904 - 121 AVENU | | GRANDE PRAIRIE | | AB | | T8V4J1 | |
YQXC01 | | GANDER INTOWN | | 112 TRANS CANADA HIGHWAY | | | | GANDER | | NL | | A1V1P8 | |
YQXP01 | | LEWISPORTE, NF | | LABRADOR FERRY TERMINAL | | P.O. BOX 21297 | | LEWISPORTE | | NL | | A0G3A0 | |
YQXT01 | | GANDER ARPT | | WOODWARD RENT A CAR LIMITED | | GANDER AIRPORT | | GANDER | | NL | | A1V1W5 | |
YQYS02 | | NORTH SYDNEY - QUEENS ST | | NATIONAL CAR RENTAL | | 158 QUEENS ST | | NORTH SYDNEY | | NS | | B2A1B3 | |
YQYT01 | | SYDNEY ARPT | | SYDNEY AIRPORT | | | | SYDNEY | | NS | | B1P5K9 | |
YQZC01 | | QUESNEL - FRONT ST | | NATIONAL CAR RENTAL | | 310 FRONT STREET | | QUESNEL | | BC | | V2J2M2 | |
28
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YQZT01 | | QUESNEL ARPT | | NATIONAL CAR RENTAL | | QUESNEL AIRPORT | | QUESNEL | | BC | | V2J2Y5 | |
YRIC01 | | RIVIERE DU LOUP | | LOCATION DAUTOS BC INC | | 7 COTE ST-JACQUES | | RIVIERE DU LOUP | | QC | | G5R2N7 | |
YRJT01 | | ROBERVAL ARPT | | AIR ROBERVAL LTEE | | R R #1 AEROPORT | | ROBERVAL | | QC | | G8H2M9 | |
YRQC03 | | TROIS RIVIERES | | NATIONAL CAR RENTAL | | 7300 NOTRE DAME | | TROIS RIVIERES | | QC | | G9B1W8 | |
YRQE02 | | ST HILAIRE - BOUL LAURIER | | 733 BOUL LAURIER | | | | SAINT HILAIRE | | QC | | J3H4X8 | |
YRQN10 | | SHAWINIGAN - QUEBEC | | NATIONAL CAR RENTAL | | 5570 BOULEVARD ROYAL | | SHAWINIGAN | | QC | | G9N4R8 | |
YRVE10 | | GOLDEN - 11TH AVENUE SOUTH | | RAYMOND JOHNSON COMPANY LTD | | 915-11TH AVENUE SOUTH | | GOLDEN | | BC | | V0A1H0 | |
YSBC02 | | SUDBURY - KINGSWAY | | MURDOCH GROUP INC | | 1150 KINGSWAY | | SUDBURY | | ON | | P3B2E5 | |
YSBC03 | | CHELMSFORD - RADISSON AVE | | TOTAL AUTO GLASS | | 3248 RADISSON AVE UNIT #2 | | CHELMSFORD | | ON | | P0M1L0 | |
YSBS04 | | VAL CARON - BELISLE DRIVE | | IMPERIAL COLLISION | | 2854 BELISLE DRIVE | | VAL CARON | | ON | | P3N1B3 | |
YSBT01 | | SUDBURY ARPT | | SUDBURY AIRPORT | | SKEAD ROAD | | SUDBURY | | ON | | | |
YSCC03 | | SHERBROOKE - QUEBEC | | NATIONAL CAR RENTAL | | 4339 BOULEVARD BOURQUE | | SHERBROOKE | | QC | | J1N1S4 | |
YSCN05 | | VICTORIAVILLE - BOUL BOIS FRANC SUD | | LOCATION D AUTOS S R S ENR | | 163 BOUL BOIS FRANC SUD | | VICTORIAVILLE | | QC | | G6P4S5 | |
YSCN06 | | VICTORIAVILLE - QUEBEC | | NATIONAL CAR RENTAL | | 885 NOTRE-DAME EST | | VICTORIAVILLE | | QC | | G6P4B8 | |
YSJC01 | | SAINT JOHN - ROTHESAY AVE | | J CLARK & SON LIMITED | | 242 ROTHESAY AVE | | SAINT JOHN | | NB | | E2L4B3 | |
YSJT01 | | SAINT JOHN ARPT | | J CLARK & SON LIMITED | | 242 ROTHESAY AVE | | ST JOHN | | NB | | E2N1L7 | |
YSNC01 | | SALMON ARM - TRANS CANADA HWY WEST | | SALMON ARM MOTOR U-DRIVE | | 911 TRANS CANADA HWY WEST | | SALMON ARM | | BC | | V1E4N7 | |
YSPC01 | | MARATHON | | PENINSULA ROAD | | | | MARATHON | | ON | | P0T2E0 | |
YTAC01 | | PEMBROKE - PEMBROKE ST W | | MURDOCH GROUP INC | | 379 PEMBROKE ST W. | | PEMBROKE | | ON | | K8A6X9 | |
YTAE01 | | RENFREW - ONTARIO | | PROTYRE SALES AND SERVICE | | HIGHWAY 60 WEST | | RENFREW | | ON | | K7V1A1 | |
YTAO01 | | PEMBROKE ARPT | | MURDOCH GROUP INC | | 379 PEMBROKE ST WEST | | PEMBROKE | | ON | | K8A6X9 | |
YTAS02 | | PERTH - ONTARIO | | MURDOCH GROUP INC | | 65 DUFFERIN STREET | | PERTH | | ON | | K7H3A5 | |
YTAW01 | | DEEP RIVER - HIGHWAY 17 EAST | | MURDOCH GROUP INC | | 20 HIGHWAY 17 EAST | | DEEP RIVER | | ON | | K0J1P0 | |
YTFC02 | | ALMA - AVE DU PONT SUD | | 3105-3143 QUEBEC INC | | 495 AVE DU PONT SUD | | ALMA | | QC | | G7H1Y2 | |
YTHC01 | | THOMPSON - MANITOBA | | THOMPSON CHRYSLER LTD. | | 40 STATION ROAD | | THOMPSON | | MB | | R8N ON4 | |
29
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YTHT01 | | THOMPSON AIRPORT | | NATIONAL CAR RENTAL | | THOMPSON AIRPORT | | THOMPSON | | MB | | R8N ON4 | |
YTJT01 | | TERRACE BAY ARPT | | TERRACE BAY AIRPORT | | | | TERRACE BAY | | ON | | | |
YTOC01 | | TORONTO - YONGE AND BLOOR | | NATIONAL CAR RENTAL | | 930 YONGE ST | | TORONTO | | ON | | M4W3C9 | |
YTOC02 | | TORONTO-UNION STATION | | NATIONAL CAR RENTAL | | 65 FRONT STREET WEST | | TORONTO | | ON | | M5J1E6 | |
YTOC03 | | TORONTO ISLAND AIRPORT | | TORONTO ISLAND AIRPORT | | 65 FRONT STREET EAST | | TORONTO | | ON | | M5J1E6 | |
YTOC04 | | MARKHAM-5 MCINTOSH DR. | | NATIONAL CAR RENTAL | | 5 MCINTOSH DRIVE | | MARKHAM | | ON | | L3R8C7 | |
YTOC05 | | TORONTO-FAIRVIEW MALL | | NATIONAL CAR RENTAL | | 1800 SHEPPARD AVENUE EAST | | TORONTO | | ON | | M2J5A7 | |
YTOC06 | | TORONTO - HOLIDAY INN AIRPORT | | NATIONAL CAR RENTAL | | 600 DIXON ROAD - HOLIDAY INN | | TORONTO | | ON | | M9W1J1 | |
YTOC07 | | TORONTO - JARVIS AND RICHMOND | | NATIONAL CAR RENTAL | | 128 RICHMOND STREET EAST | | TORONTO | | ON | | M5C1P1 | |
YTOC08 | | MISSISSAUGA-DIXIE & DUNDAS ONTARIO | | NATIONAL CAR RENTAL | | 1525 DUNDAS STREET EAST | | MISSISSAUGA | | ON | | L4X1L3 | |
YTOE12 | | TORONTO-VICTORIA PARK | | NATIONAL CAR RENTAL | | 1900 VICTORIA PARK | | SCARBOROUGH | | ON | | M1R1T6 | |
YTOE21 | | TORONTO-BLOOR AND ISLINGTON | | NATIONAL CAR RENTAL | | 3300 BLOOR ST WEST | | ETOBICOKE | | ON | | M8X2W8 | |
YTON11 | | SIMCOE REGIONAL ARPT | | SIMCOE REGIONAL AIRPORT | | FAIRGROUNDS ROAD LINE #7 | | ORO STATION | | ON | | L0L2E0 | |
YTON14 | | TORONTO - YONGE & SHEPPARD | | NATIONAL CAR RENTAL | | 4728 YONGE STREET | | WILLOWDALE | | ON | | M2N5M6 | |
YTON30 | | BARRIE - ANNE ST. S. | | MURDOCH GROUP INC | | 134 ANNE STREET SOUTH, UNIT B | | BARRIE | | ON | | L4N6A2 | |
YTON33 | | COLLINGWOOD - HUME STREET | | LEWIS MOTOR SALES INC | | 40 SOUTH SERVICE ROAD | | COLLINGWOOD | | ON | | L9Y5A7 | |
YTON36 | | ORILLIA - FRONT ST N | | MURDOCH GROUP INC | | 59 FRONT ST N | | ORILLIA | | ON | | L3V4R7 | |
YTOW01 | | MILTON - ONTARIO | | GORRUD LIMITED | | 410 STEELES AVENUE | | MILTON | | ON | | L9T1Y4 | |
YTOW26 | | TORONTO - REXDALE AND HIGHWAY 27 | | NATIONAL CAR RENTAL | | 360 REXDALE BOULEVARD | | REXDALE | | ON | | M1W1R7 | |
YTOW27 | | GEORGETOWN - MOUNTAINVIEW RD N. | | ANDREW MURRAY MOTORS LIMITED | | 33 MOUNTAINVIEW RD N. | | GEORGETOWN | | ON | | L7G4J7 | |
YTOW29 | | MISSISSAUGA - 1 CITY CENTRE DRIVE | | NATIONAL CAR RENTAL | | 1 CITY CENTRE DRIVE | | MISSISSAUGA | | ON | | L5B1M2 | |
YTRO01 | | TRENTON | | 1006336 ONTARIO INC | | 106 FRONT STREET | | TRENTON | | ON | | K2V4N7 | |
30
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YTSC01 | | TIMMINS - ALGONQUIN EAST | | MURDOCH GROUP INC | | 470 ALGONQUIN EAST | | TIMMINS | | ON | | P4N1B7 | |
YTST01 | | TIMMINS ARPT | | TIMMINS AIRPORT | | | | TIMMINS | | ON | | | |
YULT01 | | MONTREAL DORVAL ARPT | | NATIONAL CAR RENTAL | | 975 ROME0 VACHON SUITE CT-1 | | MONTREAL | | QC | | H4Y 1H1 | |
YUYC01 | | ROUYN NORANDA - AVENUE LARIVIERE | | LOCATION DION | | 1083 AVENUE LARIVIERE | | ROUYN NORANDA | | QC | | J9X4K9 | |
YUYT01 | | ROUYN NORANDA ARPT | | ROUYN NORANDA AIRPORT | | | | ROUYN NORANDA | | QC | | J9X5C8 | |
YVOC01 | | VAL DOR - AVENUE CENTRALE | | LOCATION AUBE LTEE | | 50 4 AVENUE | | VAL D’OR | | QC | | J9P1G1 | |
YVOT01 | | VAL DOR ARPT | | VAL DOR AIRPORT | | | | VAL DOR | | QC | | J9P1G1 | |
YVRC06 | | VANCOUVER - W GEORGIA ST | | NATIONAL CAR RENTAL | | 1130 WEST GEORGIA STREET | | VANCOUVER | | BC | | V6E3H7 | |
YVRC08 | | VANCOUVER-WEST BROADWAY | | NATIONAL CAR RENTAL | | 1770 WEST BROADWAY | | VANCOUVER | | BC | | V6J1Y1 | |
YVRC09 | | VANCOUVER PAN PACIFIC HOTEL | | NATIONAL CAR RENTAL | | 999 CANADA PLACE | | VANCOUVER | | BC | | V6C 3B5 | |
YVRC10 | | VANCOUVER SE MARINE DRIVE | | QUALITY INN MOTEL | | 729 SE MARINE DRIVE | | VANCOUVER | | BC | | V5X2T9 | |
YVRE03 | | SURREY - SCOTT ROAD | | NATIONAL CAR RENTAL | | 6280 120TH STREET | | SURREY | | BC | | V3X1Y7 | |
YVRE07 | | VANCOUVER-LOUGHEED HWY | | NATIONAL CAR RENTAL | | 3545 LOUGHEED HWY | | VANCOUVER | | BC | | V7L1L8 | |
YVRE08 | | SURREY CITY CENTRE-KING GEORGE HWY | | NATIONAL CAR RENTAL | | 10376 KING GEORGE HIGHWAY | | SURREY | | BC | | V3T 2W5 | |
YVRS02 | | BURNABY HILTON METROTOWN | | NATIONAL CAR RENTAL | | 6083 MCKAY AVE | | BURNABY | | BC | | V5H2W7 | |
YVRS05 | | RICHMOND - HILTON HOTEL | | NATIONAL CAR RENTAL | | 111 - 5911 MINORU BOULEVARD | | RICHMOND | | BC | | V6X4C7 | |
YVRS06 | | VANCOUVER SOUTH TERMINAL | | NATIONAL CAR RENTAL | | 4400 COWLEY CRESCENT | | RICHMOND | | BC | | V6X1B8 | |
YVRS07 | | LANGLEY - BRITISH COLUMBIA | | NATIONAL RENTALS INC. | | 20168 FRASER HWY | | LANGLEY | | BC | | V3A4E6 | |
YVRT01 | | VANCOUVER INTL ARPT | | NATIONAL CAR RENTAL | | 3866 MC DONALD RD | | RICHMOND | | BC | | V7L1L8 | |
YWGC02 | | WINNIPEG-ELLICE AVE | | NATIONAL CAR RENTAL | | 283 ELLICE AVE | | WINNIPEG | | MB | | R3B1X6 | |
YWGC04 | | WINNIPEG-WAVERLEY STREET | | NATIONAL CAR RENTAL | | 1700 WAVERLEY STREET | | WINNIPEG | | MB | | R3T5V7 | |
YWGC05 | | WINNIPEG-ESSO AVITAT | | NATIONAL CAR RENTAL | | 10 HANGER LINE RD | | WINNIPEG | | MB | | R3J3Y7 | |
YWGC06 | | WINNIPEG-2405 PEMBINA HWY | | NATIONAL CAR RENTAL | | 2405 PEMBINA HWY | | WINNIPEG | | MB | | R3T2H4 | |
YWGC07 | | WINNIPEG-REGENT AVENUE | | NATIONAL CAR RENTAL | | 1355 REGENT AVENUE | | WINNIPEG | | MB | | R2C3B2 | |
YWGC08 | | WINNIPEG - MCPHILIPS | | NATIONAL CAR RENTAL | | S.B. 1425 MCPHILLIPS STREET | | WINNIPEG | | MB | | R2V 3C8 | |
31
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YWGS03 | | STEINBACH - MAIN STREET | | STEINBACH DODGE CHRYSLER LTD | | 208 MAIN STREET | | STEINBACH | | MB | | R0A2AO | |
YWGS05 | | WINNIPEG-WAVERLY ESSO | | NATIONAL CAR RENTAL | | 1437 WAVERLY STREET | | WINNIPEG | | MB | | R3TOP7 | |
YWGT01 | | WINNIPEG ARPT | | NATIONAL CAR RENTAL | | 2000 WELLINGTON AVE | | WINNIPEG | | MB | | R2R0S6 | |
YWKN01 | | LABRADOR CITY - AVALON DRIVE | | LOCATION D AU O WABUSH LTEE | | 55 AVALON DRIVE | | LABRADOR CITY | | NL | | A2V1K3 | |
YWKT01 | | WABUSH ARPT | | LOCATION D AU O WABUSH LTEE | | WABUSH AIRPORT | | WABUSH | | NL | | A0R1B0 | |
YWLC01 | | WILLIAMS LAKE - DONALD ROAD | | NATIONAL CAR RENTAL | | #4 N. BROADWAY | | WILLIAMS LAKE | | BC | | V2G1B9 | |
YWLT01 | | WILLIAMS LAKE ARPT | | NATIONAL CAR RENTAL | | # 4 NORTH BROADWAY | | WILLIAMS LAKE | | BC | | V2G 1B8 | |
YXCC01 | | CRANBROOK - CRANBROOK STREET NORTH | | 565682 BC LTD | | 1725 CRANBROOK STREET NORTH | | CRANBROOK | | BC | | V1C3S9 | |
YXCT01 | | CRANBROOK ARPT | | 565682 BC LTD | | 9370 AIRPORT ACCESS ROAD | | CRANBROOK | | BC | | VIC7E4 | |
YXDN08 | | EDMONTON-ESSO AVIATION/COUNTER ONLY | | NATIONAL CAR RENTAL | | 77 AIRPORT ROAD | | EDMONTON | | AB | | T5G 0W6 | |
YXEC02 | | SASKATOON - AVENUE C NORTH | | NATIONAL CAR RENTAL | | 111-2301 AVENUE C NORTH | | SASKATOON | | SK | | S7L5Z5 | |
YXEC03 | | SASKATOON - AVENUE C SOUTH | | NATIONAL CAR RENTAL | | 222 AVENUE C SOUTH | | SASKATOON | | SK | | S7M1N2 | |
YXET01 | | SASKATOON ARPT | | SASKATOON AIRPORT | | 2625 AIRPORT DRIVE (306-665-7703) | | SASKATOON | | SK | | S7L 7L1 | |
YXHT01 | | MEDICINE HAT ARPT | | ADVANTAGE LEASING & RENTALS | | MEDICINE HAT MUNICIPAL AIRPORT | | MEDICINE HAT | | AB | | T1A4G9 | |
YXJC01 | | FORT ST JOHN | | MELS U-DRIVE (1978) LTD | | RR #1,SITE 7, COMP.11 | | FORT ST JOHN | | BC | | V1J4M6 | |
YXJT01 | | FT ST JOHN ARPT | | MELS U-DRIVE (1978) LTD | | RR#1, SITE 7, COMP 11 | | FORT ST JOHN | | BC | | V1J4M6 | |
YXKO01 | | RIMOUSKI | | LOCATION DAUTOS BC INC | | 370 MONTEE INDUSTRIELLE CP 668 SUC | | RIMOUSKI | | QC | | G5L7C7 | |
YXRO01 | | EARLTON | | MURDOCH GROUP INC | | EARLTON AIRPORT | | EARLTON | | ON | | | |
YXSC01 | | PRINCE GEORGE - 7TH AVENUE | | NATIONAL CAR RENTAL | | 1350 7TH AVENUE | | PRINCE GEORGE | | BC | | V2L3P1 | |
YXST01 | | PRINCE GEORGE ARPT | | NATIONAL CAR RENTAL | | 4141 AIRPORT RD | | PRINCE GEORGE | | BC | | V2L2Y6 | |
YXTC01 | | TERRACE - LAKELSE AVENUE | | NATIONAL CAR RENTAL | | 4542 LAKELSE AVENUE | | TERRACE | | BC | | V8G1P8 | |
YXTT01 | | TERRACE ARPT | | NATIONAL CAR RENTAL | | TERRACE AIRPORTAR LTD | | TERRACE | | BC | | V8G1P8 | |
YXUC04 | | LONDON-HORTON ST. EAST | | NATIONAL CAR RENTAL | | 290 HORTON ST. EAST | | LONDON | | ON | | N6B1L4 | |
32
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YXUN01 | | ST. MARYS - QUEEN STREET WEST | | DOWNTOWN PONTIAC BUICK GMC | | 449 QUEENS STREET WEST | | ST. MARYS | | ON | | N4X1B7 | |
YXUT01 | | LONDON ARPT | | NATIONAL CAR RENTAL | | 1750 CRUMLIN RD | | LONDON | | ON | | N5V3B6 | |
YXXO01 | | ABBOTSFORD - BRITISH COLUMBIA | | CLEARWAY RENTALS INC. | | 31808 SOUTH FRASER WAY | | ABBOTSFORD | | BC | | V2T1V3 | |
YXYC01 | | WHITEHORSE - RANGE ROAD | | NORCAN LEASING LTD | | 213 RANGE ROAD | | WHITEHORSE | | YT | | Y1A3E5 | |
YXYT01 | | WHITEHORSE ARPT | | WHITEHORSE AIRPORT | | | | WHITEHORSE | | YT | | Y1AIB4 | |
YXZC04 | | WAWA - MISSION RD | | SPADONI LEASING LTD. | | 70 MISSION RD | | WAWA | | ON | | P0S1K0 | |
YXZT01 | | WAWA ARPT | | WAWA AIRPORT | | HIGHWAY 101 SOUTH | | WAWA | | ON | | P0S1K0 | |
YYBC01 | | NORTH BAY - SEYMOUR STREET | | MURDOCH GROUP INC | | 1864 SEYMOUR STREET | | NORTH BAY | | ON | | P1B8J8 | |
YYBS04 | | HUNTSVILLE - HOWLAND DR | | CHECKERED FLAG TRK & AUTO | | 10 HOWLAND DR | | HUNTSVILLE | | ON | | P1H1M3 | |
YYBT01 | | NORTH BAY ARPT | | MURDOCH GROUP INC | | NORTH BAY ARPT | | NORTH BAY | | ON | | P1B8J8 | |
YYCC01 | | CALGARY-5TH AVE S.E. | | NATIONAL CAR RENTAL | | 114 5TH AVE S.E. | | CALGARY | | AB | | T2E7L2 | |
YYCC02 | | CALGARY-MACLEOD TRAIL SOUTH | | NATIONAL CAR RENTAL | | 4206 MACLEOD TRAIL S.W. | | CALGARY | | AB | | T2G2R7 | |
YYCC03 | | CALGARY-BLACKFOOT TRAIL SE | | NATIONAL CAR RENTAL | | 5940 BLACKFOOT TRAIL S.E. | | CALGARY | | AB | | T2H2B5 | |
YYCC12 | | CALGARY-BOW TRAIL S.W. | | NATIONAL CAR RENTAL | | 1720 BOW TRAIL S.W. | | CALGARY | | AB | | T2T5P7 | |
YYCN20 | | DRUMHELLER - HIGHWAY 9 SOUTH | | WESTERN CHEV OLDS CADILLAC | | 910 HIGHWAY 9 SOUTH | | DRUMHELLER | | AB | | T0J0Y0 | |
YYCS11 | | CALGARY-78TH AVE NE | | NATIONAL CAR RENTAL | | 2335-78TH AVENUE N.E. | | CALGARY | | AB | | T2E7L2 | |
YYCT01 | | CALGARY ARPT | | NATIONAL CAR RENTAL | | 2000 AIRPORT RD N.E. | | CALGARY | | AB | | T2E6W5 | |
YYDC01 | | SMITHERS - HIGHWAY 16 WEST | | NATIONAL CAR RENTAL | | HIGHWAY 16 WEST | | SMITHERS | | BC | | V0J2N0 | |
YYDT01 | | SMITHERS ARPT | | NATIONAL CAR RENTAL | | SMITHERS AIRPORT | | SMITHERS | | BC | | V0J2N0 | |
YYEC01 | | FT NELSON - 50TH AVE NORTH | | MELS U-DRIVE (1978) LTD | | 4528 50TH AVE NORTH | | FORT NELSON | | BC | | V0C1R0 | |
YYET01 | | FT NELSON ARPT | | MELS U-DRIVE (1978) LTD | | BOX 2221 | | FORT NELSON | | BC | | V0C1R0 | |
YYFC01 | | PENTICTON-WESTMINSTER AVE WEST | | AMP ENTERPRISES | | 188 WESTMINSTER AVENUE WEST | | PENTICTON | | BC | | V2A1J8 | |
YYFT01 | | PENTICTON ARPT | | PENTICTON AIRPORT | | | | PENTICTON | | BC | | V2A6E9 | |
YYGC01 | | CHARLOTTETOWN - PRINCE STREET | | NATIONAL CAR RENTAL | | 10 PRINCE STREET | | CHARLOTTETOWN | | PE | | C1A4P6 | |
33
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YYGC03 | | CHARLOTTETOWN - EXHIBITION DRIVE | | NATIONAL CAR RENTAL | | 30A EXHIBITION DRIVE | | CHARLOTTETOWN | | PE | | C1A5Z5 | |
YYGT01 | | CHARLOTTETOWN ARPT | | NATIONAL CAR RENTAL | | 250 MAPLE HILLS AVENUE | | CHARLOTTETOWN | | PE | | C1C1N2 | |
YYJC01 | | VICTORIA DOWNTOWN & INNER HARBOUR | | HALT HOLDINGS LTD | | 767 DOUGLAS STREET | | VICTORIA | | BC | | V8W2B4 | |
YYJC04 | | VICTORIA - TRAVELLERS INN MIDTOWN | | HALT HOLDINGS LTD | | TRAVELERS INN 2898 DOUGLAS STREET | | VICTORIA | | BC | | V8T 4M9 | |
YYJT01 | | VICTORIA INTERNATIONAL ARPT | | HALT HOLDINGS LTD | | 1640 ELECTRA BLVD | | VICTORIA | | BC | | V8W2B4 | |
YYJW01 | | VICTORIA - COLWOOD | | HALT HOLDINGS LTD | | #103 - 1830 ISLAND HWY | | VICTORIA | | BC | | V9B 1J2 | |
YYRC01 | | HAPPY VALLEY - TENTH STREET | | 2 TENTH STREET | | PO BOX 913 STN A | | GOOSE BAY/LABRADOR | | NL | | A0P1SO | |
YYRT01 | | GOOSE BAY ARPT | | GOOSE BAY AIRPORT | | PO BOX 913, STN A | | GOOSE BAY,LABRADOR | | NL | | A0P1SO | |
YYTC01 | | ST JOHNS - NEW GOWER STREET | | WOODWARD RENT A CAR LIMITED | | 120 NEW GOWER STREET | | ST JOHN’S | | NL | | A1C1P1 | |
YYTC44 | | YYTC44 - ADMIN | | WOODWARD RENT A CAR LIMITED | | 152 AIRPORT ROAD | | ST JOHNS | | NL | | A1A 5G6 | |
YYTT01 | | ST JOHNS ARPT | | ST JOHNS ARPT | | TERMINAL ACCESS ROAD | | ST JOHN’S | | NL | | A1A5G6 | |
YYTW10 | | BAY ROBERTS - CONCEPTION BAY HWY | | P O BOX 1020 | | CONCEPTION BAY HWY | | BAY ROBERTS | | NL | | A0A1G0 | |
YYUC01 | | KAPUSKASING - RIVERSIDE DRIVE | | EASTVIEW CHEVROLET OLDSMOBILE | | 222 GOVERNMENT RD | | KAPUSKASING | | ON | | P5N2X2 | |
YYUT01 | | KAPUSKASING ARPT | | KAPUSKASING AIRPORT | | | | KAPUSKASING | | ON | | P5N1A6 | |
YYYT01 | | MONT JOLI ARPORT | | AERPORT DE MONT-JOLI | | | | MONT JOLI | | QC | | G5H4A4 | |
YYZT01 | | TORONTO ARPT | | NATIONAL CAR RENTAL | | PEARSON INTERNATIONAL AIRPORT | | TORONTO | | ON | | L5P1A2 | |
YZEO01 | | GORE BAY / MANITOULIN ISLE | | MURDOCH GROUP INC | | RR #2, HIGHWAY 540 | | GORE BAY | | ON | | P0P1H0 | |
YZFN01 | | YELLOWKNIFE - 50TH STREET | | TEDS U-DRIVE LTD | | 5118 50TH STREET | | YELLOWKNIFE | | NT | | X1A2N2 | |
YZFT01 | | YELLOWKNIFE ARPT | | TED’S U DRIVE LTD. | | YELLOWKNIFE AIRPORT | | YELLOWKNIFE | | NT | | X1A2N2 | |
YZRC01 | | SARNIA - SOUTH VIDAL | | 1109701 ONTARIO LIMITED | | 623 SOUTH VIDAL | | SARNIA | | ON | | N7T7L7 | |
YZRS01 | | WALLACEBURG - ONTARIO | | 988707 ONTARIO LTD. | | 304 ARNOLD STREET | | WALLACEBURG | | ON | | N8A 3P5 | |
YZRT01 | | SARNIA ARPT | | 1109701 ONTARIO LIMITED | | 623 SOUTH VIDAL | | SARNIA | | ON | | N7W1B6 | |
YZTT01 | | PORT HARDY ARPT | | AIRPORT ROAD | | | | PORT HARDY | | BC | | V0N2P0 | |
34
Station Id | | Station Name | | Address Line 1 | | Address Line 2 | | City | | St | | Zip | |
YZUT01 | | WHITECOURT ARPT | | MELS U-DRIVE (1978) LTD | | 3530 KEPLER STREET | | WHITECOURT | | AB | | T0E2L0 | |
YZVC01 | | SEPT ILES - BLVD LAURE | | LOCATION DAUTOS BC INC | | 289 BLVD LAURE | | SEPT ILES | | QC | | G4R1W8 | |
YZVT01 | | SEPT ISLES ARPT | | SEPT ILES AIRPORT | | BG 2016 | | SEPT ISLES | | QC | | G4R 4K2 | |
ZBFE02 | | TRACADIE SHEILA - MAIN STREET | | 056527 N.B. LTEE. | | 2892 MAIN STREET | | TRACADIE-SHEILA | | NB | | E1X1G5 | |
ZBFT01 | | BATHURST ARPT | | CANADA EAST TOURS LTD | | 1420 VANIER BLVD | | BATHURST | | NB | | E2A4H7 | |
ZMTO01 | | MASSET | | MASSET SERVICES LTD. | | 1504 OLD BEACH RD | | MASSET | | BC | | V0T1M0 | |
US ALAMO REMOTE SUPPORT SITES
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
3264 | | CAK | | AKRON/CANTON AP | | 5910 MAYFAIR ROAD | | NORTH CANTON | | OH | | 44720 | |
3241 | | ALB | | ALBANY ARPT | | ALBANY COUNTY ARPT | | ALBANY | | NY | | 12110 | |
3239 | | 2AE | | ALBANY/LATHAM | | 850 ALBANY SHAKER RD | | LATHAM | | NY | | 12110 | |
0195 | | ABQ | | ALBUQUERQUE | | P.O. BOX 9618 | | ALBUQUERQUE | | NM | | 87119 | |
3233 | | ABE | | ALLENTOWN ARPT | | LEHIGH VALLEY INTL A | | ALLENTOWN | | PA | | 18103 | |
3997 | | 2AA | | ALLENTOWN DTWN | | 1501 SUMNER AVENUE | | ALLENTOWN | | PA | | 18102 | |
0470 | | AMA | | AMARILLO | | 10801 AIRPORT BLVD | | AMARILLO | | TX | | 79111 | |
0187 | | ANA | | ANAHEIM/DISNEY | | 711 WEST KATELLA | | ANAHEIM | | CA | | 92802 | |
3204 | | ANC | | ANCHORAGE | | 5000 W. INTL ARPT RD | | ANCHORAGE | | AK | | 99502 | |
3238 | | 2AD | | ANDERSON | | 1203 E 53 RD STREET | | ANDERSON | | IN | | 46013 | |
3248 | | ATW | | APPLETON ARPT | | 217 CHALLENGER DR | | APPLETON | | WI | | 54915 | |
35
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
3205 | | AVL | | ASHEVILLE ARPT | | 702 AIRPORT ROAD | | FLETCHER | | NC | | 28732 | |
3470 | | 2FV | | ASHEVILLE DTWN | | 52 COXE AVE | | ASHEVILLE | | NC | | 28801 | |
0172 | | ASE | | ASPEN | | 38750 W HIGHWAY 82 | | ASPEN | | CO | | 81611 | |
0210 | | ATL | | ATLANTA | | 4205 CAR RENTAL RD | | ATLANTA | | GA | | 30320 | |
0203 | | A1T | | ATLANTA NORTH | | 1716 NORTHEAST EXWAY | | ATLANTA | | GA | | 30329 | |
0200 | | AGS | | AUGUSTA | | 1511 AVIATION WAY | | AUGUSTA | | GA | | 30906 | |
0430 | | AUS | | AUSTIN (R) | | 3600 PRESIDENTIAL | | AUSTIN | | TX | | 78719 | |
0236 | | BWI | | BALTIMORE | | BALTI/WASH INTL ARPT | | BALTIMORE | | MD | | 21240 | |
0225 | | BGR | | BANGOR | | 299 GODFREY BLVD, #8 | | BANGOR | | ME | | 04401 | |
1118 | | BPT | | BEAUMONT | | 6000 AIRLINE DRIVE | | BEAUMONT | | TX | | 77705 | |
3217 | | 2DW | | BERKELEY | | 920 UNIVERSITY AVE | | BERKELEY | | CA | | 94710 | |
3206 | | BIL | | BILLINGS ARPT | | BILLINGS LOGAN FIELD | | BILLINGS | | MT | | 59105 | |
0268 | | BGM | | BINGHAMTON | | BROOME COUNTY ARPT | | BINGHAMTON | | NY | | 13902 | |
0248 | | BHM | | BIRMINGHAM | | 5900 MESSER ARPT HWY | | BIRMINGHAM | | AL | | 35212 | |
3232 | | BF2 | | BLOEMFONTEIN | | 26 KRUGER AVENUE | | BLOEMFONTEIN | | ZA | | 09301 | |
1005 | | BCT | | BOCA RATON | | 1300 N. W. 1ST AVE | | BOCA RATON | | FL | | 33432 | |
0220 | | BOS | | BOSTON | | 2 TOMAHAWK DRIVE | | EAST BOSTON | | MA | | 02128 | |
1020 | | WBU | | BOULDER | | 2745 MAPLETON DRIVE | | BOULDER | | CO | | 80303 | |
3965 | | BZN | | BOZEMAN ARPT | | GALLATIN FIELD ARPT | | BELGRADE | | MT | | 59714 | |
0257 | | BUF | | BUFFALO | | BUFFALO INTL ARPT | | CHEEKTOWAGA | | NY | | 14225 | |
0123 | | BUR | | BURBANK | | BURBANK AIRPORT | | BURBANK | | CA | | 91505 | |
3262 | | BTV | | BURLINGTON ARPT | | 1200 AIRPORT DR #10 | | S. BURLINGTON | | VT | | 05403 | |
3263 | | 2AP | | BURLINGTON DWTN | | 1944 WILLISTON RD | | S.BURLINGTON | | VT | | 05403 | |
0221 | | C1B | | CAMBRIDGE | | 1663 MASSACHUSTTS AV | | CAMBRIDGE | | MA | | 02138 | |
3346 | | 2CL | | CARMEL | | 1748 EAST 116TH ST | | CARMEL | | IN | | 46032 | |
3208 | | CID | | CEDAR RAPIDS | | 2515 WRIGHT BROTHERS | | CEDAR RAPIDS | | IA | | 52404 | |
36
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
3267 | | 2AR | | CEDAR RAPIDS | | 3124 1ST AVENUE NE | | CEDAR RAPIDS | | IA | | 52402 | |
3272 | | CMI | | CHAMPAIGN ARPT | | 11 AIRPORT ROAD | | SAVOY | | IL | | 61874 | |
3271 | | 2AU | | CHAMPAIGN DTWN | | 115 WEST KIRBY AVE | | CHAMPAIGN | | IL | | 61820 | |
0239 | | CHS | | CHARLESTON | | CHARLESTON INTL ARPT | | N CHARLESTON | | SC | | 29418 | |
0216 | | CLT | | CHARLOTTE | | 4108 RENTAL ROAD | | CHARLOTTE | | NC | | 28219 | |
0272 | | CHA | | CHATTANOOGA | | 1001 ARPT RD | | CHATTANOOGA | | TN | | 37421 | |
0510 | | ORD | | CHICAGO | | CHICAGO O’HARE INTL | | CHICAGO | | IL | | 60666 | |
0509 | | X26 | | CHICAGO DWTN | | 203 NORTH LASALLE | | CHICAGO | | IL | | 60601 | |
0511 | | MDW | | CHICAGO MIDWAY | | 4625 W 55TH STREET | | CHICAGO | | IL | | 60638 | |
0520 | | CVG | | CINCINNATI | | 3230 S. LOOMIS RD | | HEBRON | | KY | | 41048 | |
0039 | | MC1 | | CLARION PLAZA | | 9700 INTERNATIONL DR | | ORLANDO | | FL | | 32819 | |
0031 | | PIE | | CLEARWATER | | 14640 46TH STREET N | | CLEARWATER | | FL | | 34622 | |
0522 | | CLE | | CLEVELAND | | 18809 MAPLEWOOD AVE | | CLEVELAND | | OH | | 44135 | |
3473 | | 2FX | | CLIVE | | 10095 HICKMAN COURT | | CLIVE | | IA | | 50325 | |
0174 | | COS | | COLORADO SPRNGS | | 7770 DRENNAN ROAD | | COLORADO SPRNGS | | CO | | 80916 | |
0219 | | CAE | | COLUMBIA | | 3210 SERVICE DRIVE | | W COLUMBIA | | SC | | 29170 | |
3209 | | CMH | | COLUMBUS | | 4600 INTL GATEWAY | | COLUMBUS | | OH | | 43219 | |
3270 | | 2AT | | COLUMBUS-25THST | | 1711 25TH STREET | | COLUMBUS | | IN | | 47201 | |
3207 | | CCR | | CONCORD | | 101 JOHN GLENN DRIVE | | CONCORD | | CA | | 94520 | |
0410 | | DFW | | DALLAS (R) | | DALLAS/FT WORTH ARPT | | DALLAS | | TX | | 75261 | |
0412 | | DAL | | DALLAS - LOVE | | 3377 EDWARDS AVENUE | | DALLAS | | TX | | 75235 | |
0070 | | DAB | | DAYTONA | | 700 TERMINAL DR. | | DAYTONA BEACH | | FL | | 32114 | |
| | | | DEL MAR | | 617 S HIGHWAY 101 | | SOLANA BEACH | | CA | | 92075 | |
0170 | | DEN | | DENVER | | 24200 EAST 78 AVE | | DENVER | | CO | | 80249 | |
3285 | | DSM | | DES MOINES ARPT | | FLEUR DR & ARMY POST | | DES MOINES | | IA | | 50321 | |
0512 | | DTW | | DETROIT | | BLDG 338, LUCAS DR. | | ROMULUS | | MI | | 48174 | |
37
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
0048 | | OR5 | | DISNEY CAR CARE | | 1000 CAR CARE DRIVE | | LKE BUENA VISTA | | FL | | 32832 | |
0049 | | OR6 | | DISNEY DOLPHIN | | 1500 EPCOT RES BLVD | | ORLANDO | | FL | | 32830 | |
3279 | | DBQ | | DUBUQUE AIRPORT | | 11000 AIRPORT ROAD | | DUBUQUE | | IA | | 52003 | |
0529 | | DLH | | DULUTH ARPT | | 4701 GRINDEN DRIVE | | DULUTH | | MN | | 55811 | |
3016 | | DRO | | DURANGO AIRPORT | | 1000 AIRPORT RD #13 | | DURANGO | | CO | | 81301 | |
3284 | | 2BD | | DURANGO-CAMINO | | 501 CAMINO DEL RIO | | DURANGO | | CO | | 81301 | |
3283 | | 2BC | | DURANGO-MAIN AV | | 699 MAIN AVENUE | | DURANGO | | CO | | 81301 | |
0058 | | WD2 | | ECONO LODGE MAN | | 7514 W HIGHWAY 192 | | KISSIMMEE | | FL | | 34747 | |
0269 | | ELM | | ELMIRA | | 276 SINGSING RD | | HORSEHEADS | | NY | | 14845 | |
3293 | | ERI | | ERIE AIRPORT | | ERIE INTERNATL ARPT | | ERIE | | PA | | 16505 | |
3295 | | ESC | | ESCANABA ARPT | | 3300 AIRPORT ROAD | | ESCANABA | | MI | | 48929 | |
3471 | | 1CN | | ESCONDIDO | | 515 WEST 4TH AVENUE | | ESCONDIDO | | CA | | 92025 | |
0173 | | EUG | | EUGENE | | MAHLON SWEET FIELD | | EUGENE | | OR | | 97402 | |
3203 | | ACV | | EUREKA-ARCATA | | 3561 BOEING AVENUE | | MCKINLEYVILLE | | CA | | 95519 | |
3297 | | EVV | | EVANSVILLE ARPT | | 7801 BUSSING DR | | EVANSVILLE | | IN | | 47725 | |
3213 | | FAI | | FAIRBANKS ARPT | | 6450 AIRPORT WAY | | FAIRBANKS | | AK | | 99701 | |
3020 | | 2BL | | FAIRBANKS INTWN | | 1246 NOBLE STREET | | FAIRBANKS | | AK | | 99701 | |
5241 | | 4MA | | FALL RIVER | | 1500 BRAYTON AVE | | FALL RIVER | | MA | | 02721 | |
| | | | FALMOUTH - DEPO | | 14 DEPOT AVENUE | | FALMOUTH | | MA | | 2540 | |
3953 | | FAR | | FARGO AIRPORT | | 2801 32ND AVENUE NW | | FARGO | | ND | | 58102 | |
0275 | | FAY | | FAYETTEVILLE | | 2885 CORPORATE RD. | | FAYETTEVILLE | | NC | | 28306 | |
3960 | | 2BM | | FLAGSTAFF | | 2320 EAST LUCKY LANE | | FLAGSTAFF | | AZ | | 86004 | |
3976 | | FNT | | FLINT AIRPORT | | G. 3825 BRISTOL RD | | FLINT | | MI | | 48507 | |
0289 | | FLO | | FLORENCE | | 2100 TERMINAL DRIVE | | FLORENCE | | SC | | 29506 | |
0132 | | FAT | | FRESNO | | 5175 E. CLINTON AVE | | FRESNO | | CA | | 93727 | |
0020 | | FLL | | FT LAUDERDALE (R) | | 2601 S FEDERAL HWY | | FT LAUDERDALE | | FL | | 33316 | |
38
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
0080 | | RSW | | FT MYERS | | 16006 CHAMBERLIN PKW | | FT MYERS | | FL | | 33913 | |
0089 | | VPS | | FT WALTON BEACH | | OKALOOSA TM ST RD 85 | | EGLIN AFB | | FL | | 32542 | |
3958 | | FCA | | GLACIER INT’L | | 4170 HIGHWAY 2 EAST | | KALISPELL | | MT | | 59901 | |
3224 | | GFK | | GRAND FORKS | | 2815 ARPT DRIVE #5 | | GRAND FORKS | | ND | | 58203 | |
3474 | | 2GA | | GRAND FORKS | | 2700 S WASHINGTON ST | | GRAND FORKS | | ND | | 58201 | |
| | | | GRAND FORKS | | 2815 ARPT DRIVE #5 | | GRAND FORKS | | ND | | 58203 | |
3963 | | GJT | | GRAND JUNCTION | | GRAND JCT WALKER FLD | | GRAND JUNCTION | | CO | | 81506 | |
0513 | | GRR | | GRAND RAPIDS | | 5500-44TH STREET SE | | GRAND RAPIDS | | MI | | 49508 | |
3975 | | GTF | | GREAT FALLS | | 2800 TERMINAL DRIVE | | GREAT FALLS | | MT | | 59404 | |
3978 | | GRB | | GREEN BAY ARPT | | 2077 AIRPORT DRIVE | | GREEN BAY | | WI | | 54313 | |
0218 | | GSO | | GREENSBORO | | 6319 BRYAN BLVD | | GREENSBORO | | NC | | 27409 | |
3323 | | 2BV | | GREENVILLE | | 152 N PLEASANTBURG D | | GREENVILLE | | SC | | 29607 | |
3324 | | GSP | | GREENVILLE | | 500 AVIATION DR | | GREER | | SC | | 29651 | |
| | | | GREENVILLE | | 152 N PLEASANTBURG D | | GREENVILLE | | SC | | 29607 | |
3364 | | MDT | | HARRISBURG | | BUILDING 25 | | MIDDLETOWN | | PA | | 17057 | |
0222 | | BDL | | HARTFORD | | BRADLEY INTL AIRPORT | | WINDSOR LOCKS | | CT | | 06096 | |
0830 | | ITO | | HILO | | HILO INTL. AIRPORT | | HILO | | HI | | 96720 | |
0204 | | HHH | | HILTON HEAD | | 120 BEACH CITY RD | | HILTON HEAD | | SC | | 29925 | |
0059 | | 1DD | | HOLIDAY INN | | 12125 HIGH TECH AVE | | ORLANDO | | FL | | 32817 | |
8104 | | 1DD | | HOLIDAY INN | | 12125 HIGH TECH AVE | | ORLANDO | | FL | | 32819 | |
0810 | | HNL | | HONOLULU | | 3055 N NIMITZ HWY | | HONOLULU | | HI | | 96819 | |
0420 | | IAH | | HOU/INTERCONT’L | | 4551 WILL CLAYTON PK | | HOUSTON | | TX | | 77205 | |
3273 | | CMX | | HOUGHTON ARPT | | 23810 AIRPARK BLVD | | CALUMET | | MI | | 49913 | |
0421 | | HOU | | HOUSTON/HOBBY | | 7600 AIRPORT BLVD | | HOUSTON | | TX | | 77061 | |
0550 | | HSV | | HUNTSVILLE INTL | | 1000 GLENN HEARN BLV | | HUNTSVILLE | | AL | | 35824 | |
3469 | | HYA | | HYANNIS | | 215 IYANNOUGH RD | | HYANNIS | | MA | | 02601 | |
39
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
3215 | | IND | | INDIANAPOLIS | | 6100 WEST RAYMOND ST | | INDIANAPOLIS | | IN | | 46241 | |
5192 | | 1IV | | IRVING | | 1437 N.BELTLINE ROAD | | IRVING | | TX | | 75061 | |
0249 | | JAN | | JACKSON | | 143 SOUTH HANGAR DR | | JACKSON | | MS | | 39298 | |
3186 | | JAC | | JACKSON HOLE | | 1250 E AIRPORT ROAD | | JACKSON HOLE | | WY | | 83001 | |
0085 | | JAX | | JACKSONVILLE | | JACKSONVILLE INTL AP | | JACKSONVILLE | | FL | | 32229 | |
3381 | | OAJ | | JACKSONVILLE | | 264 ALBERT J ELLIS | | RICHLANDS | | NC | | 28574 | |
3349 | | JNU | | JUNEAU ARPT | | 1873 SHELL SIMMONS | | JUNEAU | | AK | | 99801 | |
3385 | | 2DY | | JUPITER | | 1612 NORTH US 1 | | JUPITER | | FL | | 33469 | |
3250 | | AZO | | KALAMAZOO ARPT | | 5239 PORTAGE ROAD | | KALAMAZOO | | MI | | 49001 | |
0545 | | MCI | | KANSAS CITY | | 868 TEL AVIV | | KANSAS CITY | | MO | | 64153 | |
3247 | | 2AJ | | KAUKAUNA | | 1450 DELANGLADE ST | | KAUKAUNA | | WI | | 54130 | |
0014 | | EYW | | KEY WEST | | 2516 N ROOSEVELT BLV | | KEY WEST | | FL | | 33040 | |
8108 | | EY1 | | KEY WEST | | 2516 N ROOSEVELT BLV | | KEY WEST | | FL | | 33040 | |
0243 | | TYS | | KNOXVILLE | | MCGHEE-TYSON AIRPORT | | ALCOA | | TN | | 37701 | |
3384 | | OKK | | KOKOMO | | 3839 LAFOUNTAIN ST | | KOKOMO | | IN | | 46902 | |
0840 | | KOA | | KONA | | KE-AHOLE AIRPORT | | KAILUA-KONA | | HI | | 96745 | |
0281 | | LFT | | LAFAYETTE | | LAFAYETTE REGNL ARPT | | LAFAYETTE | | LA | | 70508 | |
3974 | | LAF | | LAFAYETTE ARPT | | PURDUE AIRPORT | | WEST LAFAYETTE | | IN | | 47906 | |
0140 | | LAS | | LAS VEGAS (R) | | 6855 BERMUDA ROAD | | LAS VEGAS | | NV | | 89119 | |
3358 | | LWB | | LEWISBURG ARPT | | US ROUTE 219 NORTH | | LEWISBURG | | WV | | 24957 | |
0860 | | LIH | | LIHUE | | 3276 HO’OLIMALIMA PL | | LIHUE, KAUAI | | HI | | 96766 | |
0547 | | LNK | | LINCOLN | | 2400 W.ADAMS/STE 111 | | LINCOLN | | NE | | 68522 | |
3218 | | LIT | | LITTLE ROCK | | # 1 AIRLINE DRIVE | | LITTLE ROCK | | AR | | 72202 | |
0044 | | LBN | | LKE BUENA VISTA | | 1900 BUENA VISTA DR | | LKE BUENA VISTA | | FL | | 32830 | |
0124 | | LGB | | LONG BEACH | | 4100 DON DOUGLAS DR | | LONG BEACH | | CA | | 90808 | |
0120 | | LAX | | LOS ANGELES (R) | | 9020 AVIATION BLVD | | INGLEWOOD | | CA | | 90301 | |
40
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
0247 | | SDF | | LOUISVILLE | | LOUISVILLE INTL AP | | LOUISVILLE | | KY | | 40209 | |
0415 | | LBB | | LUBBOCK INT’L | | LUBBOCK INTL ARPT | | LUBBOCK | | TX | | 79403 | |
3363 | | MCN | | MACON AIRPORT | | 1000 TERMINAL AVE | | MACON | | GA | | 31297 | |
0223 | | MHT | | MANCHESTER | | MANCHESTER AIRPORT | | MANCHESTER | | NH | | 03103 | |
0264 | | N5Y | | MANHATTAN E 12 | | 21 EAST 12TH STREET | | MANHATTAN | | NY | | 10003 | |
0262 | | N4Y | | MANHATTAN E 31 | | 142 EAST 31ST STREET | | MANHATTAN | | NY | | 10016 | |
0252 | | NYB | | MANHATTAN E 50 | | 138-146 E. 50TH ST. | | NEW YORK | | NY | | 10022 | |
0266 | | N7Y | | MANHATTAN E 80 | | 305 EAST 80TH STREET | | NEW YORK | | NY | | 10019 | |
0253 | | NYA | | MANHATTAN W 40 | | 252 W. 40TH STREET | | NEW YORK | | NY | | 10021 | |
0265 | | N6Y | | MANHATTAN W 77 | | 219 WEST 77TH STREET | | NEW YORK | | NY | | 10024 | |
3221 | | MQT | | MARQUETTE ARPT | | 225 AIRPORT AVENUE | | GWINN | | MI | | 49841 | |
0820 | | OGG | | MAUI | | 905 MOKUEA PLACE | | KAHULUI, MAUI | | HI | | 96732 | |
0825 | | JHM | | MAUI WEST | | KAANAPALI TRANS CTR | | KAANAPALI | | HI | | 96761 | |
0169 | | MFR | | MEDFORD | | 3650 BIDDLE RD BX 15 | | MEDFORD | | OR | | 97501 | |
0075 | | MLB | | MELBOURNE | | ONE AIR TERM. PKWY | | MELBOURNE | | FL | | 32901 | |
0244 | | MEM | | MEMPHIS | | 2680 RENTAL ROAD | | MEMPHIS | | TN | | 38118 | |
0010 | | MIA | | MIAMI (R) | | 3355 NW.22ND ST. RD. | | MIAMI | | FL | | 33142 | |
0444 | | MAF | | MIDLAND/ODESSA | | MIDLAND/ODESSA ARPT | | MIDLAND | | TX | | 79711 | |
5510 | | ML1 | | MIDLOTHIAN-083S | | 11841 MIDLOTHIAN TUR | | MIDLOTHIAN | | VA | | 23113 | |
3373 | | MKE | | MILWAUKEE | | 5300 S HOWELL AVENUE | | MILWAUKEE | | WI | | 53207 | |
0527 | | MSP | | MINNEAPOLIS | | MNPLS/S PAUL INTL AP | | ST. PAUL | | MN | | 55116 | |
3377 | | MOT | | MINOT INTL ARPT | | 25 AIRPORT RD STE19 | | MINOT | | ND | | 58703 | |
3962 | | 2DS | | MISSOULA | | 2000 W. BROADWAY | | MISSOULA | | MT | | 59808 | |
3222 | | MSO | | MISSOULA ARPT | | 9 JOHNSON BELL FIELD | | MISSOULA | | MT | | 59802 | |
0245 | | MOB | | MOBILE | | 8400 ARPT BLVD | | MOBILE | | AL | | 36608 | |
0508 | | MLI | | MOLINE | | MOLINE QUAD CITY ARP | | MOLINE | | IL | | 61265 | |
41
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
0147 | | MRY | | MONTEREY | | OLMSTEAD ROAD | | MONTEREY | | CA | | 93940 | |
3220 | | MGM | | MONTGOMERY ARPT | | 4445 SELMA HIGHWAY | | MONTGOMERY | | AL | | 36108 | |
3371 | | MIE | | MUNCIE ARPT | | 401 W CARL SIMMONS D | | MUNCIE | | IN | | 47304 | |
3375 | | MKG | | MUSKEGON ARPT | | 101 SINCLAIR DRIVE | | MUSKEGON | | MI | | 49441 | |
0227 | | MYR | | MYRTLE BEACH | | 1100 JETPORT RD | | MYRTLE BEACH | | SC | | 29577 | |
0242 | | BNA | | NASHVILLE | | NASHVILLE INT’L ARPT | | NASHVILLE | | TN | | 37217 | |
0240 | | MSY | | NEW ORLEANS | | 225 AIRLINE HIGHWAY | | KENNER | | LA | | 70062 | |
0254 | | EWR | | NEWARK | | RT 1&9 S.(INT’L WAY) | | NEWARK | | NJ | | 07114 | |
3431 | | SWF | | NEWBURGH | | 1180 FIRST STREET | | NEW WINDSOR | | NY | | 12553 | |
0012 | | NMB | | NORTH MIAMI BCH | | 18080 COLLINS AVENUE | | SUNNY ISLES | | FL | | 33160 | |
8105 | | NB2 | | NORTH MIAMI BCH | | 18080 COLLINS AVENUE | | SUNNY ISLES | | FL | | 33160 | |
3955 | | LBF | | NORTH PLATTE | | 5400 E LEE BIRD DR | | NORTH PLATTE | | NE | | 69101 | |
0548 | | OMA | | OMAHA | | EPPLEY AIRFIELD | | OMAHA | | NE | | 68110 | |
0155 | | ONT | | ONTARIO | | 3450 AIRPORT DR #600 | | ONTARIO | | CA | | 91764 | |
0150 | | SNA | | ORANGE COUNTY | | 19051 ARPT WAY N | | SANTA ANA | | CA | | 92707 | |
0040 | | MCO | | ORLANDO (R) | | ORLANDO INTL. ARPT. | | ORLANDO | | FL | | 32827 | |
0125 | | PSP | | PALM SPRINGS | | 3400 E TAHQITZ WAY 5 | | PALM SPRINGS | | CA | | 92262 | |
3223 | | 2ER | | PALO ALTO | | 4218 EL CAMINO REAL | | PALO ALTO | | CA | | 94306 | |
0097 | | PFN | | PANAMA CITY | | 3173 AIRPORT ROAD | | PANAMA CITY | | FL | | 32405 | |
0156 | | PSC | | PASCO | | 3601 NORTH 20TH ST | | PASCO | | WA | | 99301 | |
0095 | | PNS | | PENSACOLA | | 2430 AIRPORT BLVD | | PENSACOLA | | FL | | 32504 | |
0234 | | PHL | | PHILADELPHIA | | PHILA INTN’TL AIRPRT | | PHILADELPHIA | | PA | | 19153 | |
0288 | | P2H | | PHILADELPHIA 30 | | 30TH ST TRAIN STN | | PHILADELPHIA | | PA | | 19104 | |
0238 | | PH3 | | PHILADELPHIA DT | | 36 S 19TH & LUDLOW | | PHILADELPHIA | | PA | | 19102 | |
3391 | | PHX | | PHOENIX | | 1402 S. 24TH STREET | | PHOENIX | | AZ | | 85034 | |
3390 | | 2EC | | PHOENIX EMBASSY | | 2577 W GREENWAY ROAD | | PHOENIX | | AZ | | 85023 | |
42
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
0233 | | PIT | | PITTSBURGH | | PITTSBURGH INTL ARPT | | PITTSBURGH | | PA | | 15231 | |
0166 | | PDX | | PORTLAND | | PKNG GARAGE GRND FLR | | PORTLAND | | OR | | 97220 | |
0224 | | PWM | | PORTLAND | | PORTLAND INT’L | | PORTLAND | | ME | | 04102 | |
3397 | | 2EG | | PORTSMOUTH | | 155 MIRONA ROAD | | PORTSMOUTH | | NH | | 03801 | |
3398 | | PSM | | PORTSMOUTH ARPT | | TERMINAL BUILDING | | PORTSMOUTH | | NH | | 03801 | |
3225 | | PVD | | PROVIDENCE | | 2053 POST ROAD | | WARWICK | | RI | | 02886 | |
0546 | | OA2 | | PUERTO ESCONDID | | AV PEREZ GASGA S/N | | PUERTO ESCONDID | | MX | | 71980 | |
0217 | | RDU | | RALEIGH-DURHAM | | 1011 TRADE CT | | RALEIGH | | NC | | 27623 | |
0145 | | RNO | | RENO | | 2001 EAST PLUMB LN | | RENO | | NV | | 89502 | |
0235 | | RIC | | RICHMOND | | RICHMOND INTL ARPT | | SANDSTON | | VA | | 23250 | |
3954 | | ROA | | ROANOKE AIRPORT | | 5202 AVIATION ROAD | | ROANOKE | | VA | | 24012 | |
3475 | | 1DF | | ROANOKE COULTER | | 1411 COULTER DR NW | | ROANOKE | | VA | | 24018 | |
0255 | | ROC | | ROCHESTER | | 1200 BROOKS AVENUE | | ROCHESTER | | NY | | 14624 | |
9464 | | 459 | | ROCHESTER | | MONROE COUNTY AIRPT | | ROCHESTER | | NY | | 14624 | |
3021 | | RFD | | ROCKFORD ARPT | | 2 ARPT CIRCLE | | ROCKFORD | | IL | | 61109 | |
3993 | | 2FF | | ROCKFORD INTOWN | | 7801 EAST STATE ST | | ROCKFORD | | IL | | 61108 | |
0041 | | MC2 | | ROSEN CENTER | | 9840 INTERNATIONL DR | | ORLANDO | | FL | | 32819 | |
8107 | | SB6 | | S. MIAMI BEACH | | 2401 COLLINS AVENUE | | MIAMI BEACH | | FL | | 33139 | |
0137 | | SMF | | SACRAMENTO | | 6320 MCNAIR CIRCLE | | SACRAMENTO | | CA | | 95837 | |
3362 | | MBS | | SAGINAW ARPT | | 8600 GARFIELD RD | | SAGINAW | | MI | | 48623 | |
3360 | | 2CQ | | SAGINAW-STATE | | 5155 STATE ST | | SAGINAW | | MI | | 48603 | |
3426 | | SLC | | SALT LAKE CITY | | 3780 W. TERMINAL WAY | | SALT LAKE CITY | | UT | | 84122 | |
0440 | | B28 | | SAN ANTONIO (R) | | 8530 EASTERN AVE | | SAN ANTONIO | | TX | | 78216 | |
3956 | | 2EL | | SAN ANTONIO | | 8927 INTERNATL DRIVE | | SAN ANTONIO | | TX | | 78216 | |
3957 | | SAT | | SAN ANTONIO APT | | 9700 AIRPORT BLVD | | SAN ANTONIO | | TX | | 78216 | |
0110 | | SAN | | SAN DIEGO | | 2942 KETTNER BLVD | | SAN DIEGO | | CA | | 92101 | |
43
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
3964 | | 2EO | | SAN FRAN INTOWN | | 1600 MISSION STREET | | SAN FRANCISCO | | CA | | 94103 | |
0130 | | SFO | | SAN FRANCISCO | | 780 MCDONNELL RD | | SAN FRANCISCO | | CA | | 94128 | |
0135 | | SJC | | SAN JOSE | | 2300 ARPT BVD STE120 | | SAN JOSE | | CA | | 95110 | |
3227 | | 2EQ | | SAN RAFAEL | | 10 BELLAM BLVD | | SAN RAFAEL | | CA | | 94901 | |
0074 | | SFB | | SANFORD INTL | | 1801 AIRLINE AVE | | SANFORD | | FL | | 32773 | |
0127 | | SBA | | SANTA BARBARA | | 114 WLM MOFFETT B120 | | GOLETA | | CA | | 93117 | |
3428 | | 2ET | | SANTA MONICA | | 1027 BROADWAY | | SANTA MONICA | | CA | | 90401 | |
0060 | | SRQ | | SARASOTA | | 6000 AIRPORT CIRCLE | | SARASOTA | | FL | | 34243 | |
0212 | | SAV | | SAVANNAH | | 400 AIRWAYS AVENUE | | SAVANNAH | | GA | | 31408 | |
3452 | | SCF | | SCOTTSDALE ARPT | | 15000 N.AIRPORT DR | | SCOTTSDALE | | AZ | | 85260 | |
3249 | | AVP | | SCRANTON ARPT | | 100 TERMINAL ROAD | | AVOCA | | PA | | 18641 | |
0165 | | SEA | | SEATTLE | | SEA-TAC INTL AIRPORT | | SEATTLE | | WA | | 98188 | |
0164 | | SE1 | | SEATTLE-DTWN | | 1301 6TH AVE | | SEATTLE | | WA | | 98101 | |
8106 | | SF6 | | SF D/T CONV | | 687 FOLSOM STREET | | SAN FRANCISCO | | CA | | 94107 | |
0139 | | SF2 | | SF DOWNTOWN N | | 750 BUSH STREET | | SAN FRANCISCO | | CA | | 94108 | |
0138 | | SF1 | | SF DOWNTOWN S | | 687 FOLSOM STREET | | SAN FRANCISCO | | CA | | 94107 | |
0042 | | ITL | | SHERATON STUDIO | | 5905 INTERNAT’L DR | | ORLANDO | | FL | | 32819 | |
3228 | | SUX | | SIOUX CITY ARPT | | 6115 MITCHELL | | SIOUX CITY | | IA | | 51111 | |
3451 | | 2BO | | SIOUX FALLS | | 5200 S LOUISE AVENUE | | SIOUX FALLS | | SD | | 57108 | |
3959 | | FSD | | SIOUX FALLS APT | | 2801 JAYCEE LANE | | SIOUX FALLS | | SD | | 57104 | |
3961 | | SBN | | SOUTH BEND ARPT | | 4637 PROGRESS DRIVE | | SOUTH BEND | | IN | | 46628 | |
1007 | | SBC | | SOUTH MIAMI BCH | | 2401 COLLINS AVENUE | | MIAMI BEACH | | FL | | 33139 | |
1109 | | 1DE | | SOUTHFIELD | | 23093 TELEGRAPH RD | | SOUTHFIELD | | MI | | 48034 | |
0541 | | SGF | | SPRINGFIELD | | 5000 WEST KEARNEY | | SPRINGFIELD | | MO | | 65803 | |
0540 | | STL | | ST. LOUIS INT’L | | 10124 NATURAL BRIDGE | | ST. LOUIS | | MO | | 63134 | |
3994 | | SCE | | STATE COLLEGE | | 2493 FOX HILL ROAD | | STATE COLLEGE | | PA | | 16803 | |
44
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
0256 | | SYR | | SYRACUSE | | HANCOCK INTL AIRPORT | | SYRACUSE | | NY | | 13220 | |
0090 | | TLH | | TALLAHASSEE | | 3300 CAPITAL CIR,SW | | TALLAHASSEE | | FL | | 32310 | |
0030 | | TPA | | TAMPA | | 5111 W SPRUCE ST | | TAMPA | | FL | | 33607 | |
3433 | | TEX | | TELLURIDE ARPT | | 1500 LAST DOLLAR RD | | TELLURIDE | | CO | | 81435 | |
0517 | | TOL | | TOLEDO AIRPORT | | 11013 AIRPORT HWY | | SWANTON | | OH | | 43558 | |
3444 | | TVC | | TRAVERSE CITY | | 1330 ARPT ACCESS RD | | TRAVERSE CITY | | MI | | 49686 | |
3439 | | TRI | | TRI CITY | | TRI CITY REGIONAL | | BLOUNTVILLE | | TN | | 37617 | |
3443 | | TUS | | TUCSON | | TUCSON INTL AIRPORT | | TUCSON | | AZ | | 85706 | |
3442 | | 2FC | | TUCSON N.KOLB | | 1037 N KOLB ROAD | | TUCSON | | AZ | | 85710 | |
3441 | | 2FB | | TUCSON N.ORACLE | | 5151 NORTH ORACLE | | TUCSON | | AZ | | 85704 | |
0482 | | TUL | | TULSA | | TULSA INTL AIRPORT | | TULSA | | OK | | 74115 | |
3019 | | EGE | | VAIL/EAGLE CNTY | | 217 ELDON WILSON RD | | GYPSUM | | CO | | 81637 | |
3355 | | LEB | | W.LEBANON ARPT | | 5 AIRPARK ROAD | | WEST LEBANON | | NH | | 03784 | |
3347 | | 2CM | | W.WASHINGTON ST | | 7111 W.WASHINGTON ST | | INDIANAPOLIS | | IN | | 46241 | |
0815 | | WK1 | | WAIKIKI ILIKAI | | 1777 ALA MOANA BLVD | | HONOLULU | | HI | | 96815 | |
0232 | | IAD | | WASH DC, DULLES | | 23320 AUTOPILOT DR | | DULLES | | VA | | 20166 | |
0230 | | DCA | | WASH DC, NAT’L | | 2780 JEFF. DAVIS HWY | | ARLINGTON | | VA | | 22202 | |
0270 | | DC9 | | WASHINGTON, DC | | 50 MASSACHUSETTS AVE | | WASHINGTON | | DC | | 20002 | |
0050 | | PBI | | WEST PALM BEACH | | 2121 BELVEDERE RD | | WEST PALM BEACH | | FL | | 33406 | |
0276 | | HPN | | WESTCHESTER ARP | | 240 AIRPORT RD ST103 | | WHITE PLAINS | | NY | | 10604 | |
3966 | | ICT | | WICHITA ARPT | | MID-CONTINENT ARPT | | WICHITA | | KS | | 67277 | |
0267 | | ILG | | WILMINGTON ARPT | | 151 N.DUPONT HWY.R13 | | NEW CASTLE | | DE | | 19720 | |
3343 | | ILM | | WILMINGTON ARPT | | 1740 AIRPORT BLVD | | WILMINGTON | | NC | | 28405 | |
45
CANADA ALAMO REMOTE SUPPORT SITES
City Number | | City Alpha | | City Title | | Address | | City | | State | | Zip | |
0291 | | YUL | | MONTREAL | | 975 BOUL. ROMEO-VACH | | DORVAL QUEBEC | | PQ | | 00000 | |
0292 | | YVR | | VANCOUVER | | VANCOUVER INT’L AIR | | VANCOUVER B.C. | | BC | | 00000 | |
0293 | | YYZ | | TORONTO ARPT | | PEARSON INT’L | | MISSISSAUGA | | ON | | 00000 | |
0294 | | YYC | | CALGARY | | 2000 AIRPORT ROAD NE | | CALGARY ALBERTA | | AB | | 00000 | |
0295 | | YMQ | | MONTREAL D/T | | 1206 STANLEY STREET | | MONTREAL | | PQ | | 00000 | |
0296 | | YV1 | | VANCOUVER D/T | | 1132 W. GEORGIA ST. | | VANCOUVER | | BC | | 00000 | |
0297 | | 3BB | | TORONTO DTWN | | 920 YONGE STREET | | TORONTO DTWN | | ON | | 00000 | |
0298 | | YEG | | EDMONTON | | 405 11TH AVE | | NISKU | | AB | | 00000 | |
Note to Table: (R) denotes a redundant site as described in Part F of Exhibit B
46
Schedule 5.4
Key Employees
Position | | Name |
Perot Systems Account Executive | | Eugene Pizinger |
Perot Systems Program Manager | | Bob Fritz |
Perot Systems Transition Manager | | Rene Francisco |
Perot Systems VRS Project Manager | | Mike McNall |
Perot Systems Infrastructure Manager | | Chad Medlin |
Perot Systems Helpdesk Manager | | Marcus Gaccione |
1
SCHEDULE 6.1
RESPONSIBILITY ALLOCATION MATRIX
| | | | Acquisition / Capital Cost | | Support / Operational Expense | |
| | | | Legal Responsibility(1) | | Capital Cost Financial Responsibility(2) | | Operational Responsibility(3) | | Financial Support Cost Responsibility(4) | | | |
| | Services | | Existing Assets/ Owned | | Existing Assets/ Leased/ Licensed | | Future Assets (Owned & Leased/ Licensed) | | Upgrades/ Enhance ments | | Growth | | Tech- nology Refresh | | Charging Mechan- ism | | Install | | Sup- port | | Mainten- ance | | Move / Add / Change | | Disaster Recovery(6) | | PS or Newco | | Charging Mechanism | | Admin- istrative Respon- sibility(5) | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
1. | | Mainframe—Legacy Systems and Ancillary Systems | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
2. | | Supported Hardware (Owned) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
3. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
4. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees(8) | | PS | |
5. | | Supported Hardware (Leased) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
6. | | - Assigned Leases | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
7. | | - Retained Leases | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
8. | | Third Party Systems Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
9. | | - Assigned Licenses | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
10. | | - Retained Licenses | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
11. | | Newco Systems Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
12. | | Third Party Applications Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
13. | | - Assigned Licenses | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
14. | | - Retained Licenses | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
15. | | Newco Applications Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
16. | | Third Party Service Contracts – Supported Hardware – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
17. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
18. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
19. | | Third Party Service Contracts – Third Party Systems Software – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
20. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
21. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
22. | | Third Party Service Contracts – Newco Systems Software – Maintenance | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
23. | | Third Party Service Contracts – Third Party Applications Software – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
24. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
25. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
Newco/PS CONFIDENTIAL
J-1
| | | | Acquisition / Capital Cost | | Support / Operational Expense | |
| | | | Legal Responsibility(1) | | Capital Cost Financial Responsibility(2) | | Operational Responsibility(3) | | Financial Support Cost Responsibility(4) | | | |
| | Services | | Existing Assets/ Owned | | Existing Assets/ Leased/ Licensed | | Future Assets (Owned & Leased/ Licensed) | | Upgrades/ Enhance ments | | Growth | | Tech- nology Refresh | | Charging Mechan- ism | | Install | | Sup- port | | Mainten- ance | | Move / Add / Change | | Disaster Recovery(6) | | PS or Newco | | Charging Mechanism | | Admin- istrative Respon- sibility(5) | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
26. | | Third Party Service Contracts – Newco Applications Software – Maintenance | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
27. | | Third Party Service Contracts – Other | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
28. | | Servers—VRS Systems | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
29. | | Supported Hardware (Owned) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
30. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
31. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
32. | | Supported Hardware (Leased) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
33. | | - Assigned Leases | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
34. | | - Retained Leases | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
35. | | Third Party Systems Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
36. | | - PS Owned Licenses | | PS | | PS | | Newco | | Newco | | Newco | | Newco | | Pass-Through (9) | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
37. | | - Retained Licenses | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
38. | | Newco Systems Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
39. | | Third Party Applications Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
40. | | - Assigned Licenses | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
41. | | - Retained Licenses | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
42. | | Newco Applications Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
43. | | Third Party Service Contracts – Supported Hardware – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
44. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
45. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
46. | | Third Party Service Contracts – Third Party Systems Software – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
47. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
48. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
49. | | Third Party Service Contracts – Newco Systems Software – Maintenance | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
50. | | Third Party Service Contracts – Third Party Applications Software – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
51. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
52. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
53. | | Third Party Service Contracts – Newco Applications Software – Maintenance | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
J-2
54. | | Third Party Service Contracts – Other | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
55. | | LAN/WAN (e.g., Routers, LAN hubs and switches, DSU’s, Firewalls, Multiplexers, DNS Servers, WINS Servers, DHCP Servers, Network Gateways, Voice/FAX over IP Gateways) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
56. | | Supported Hardware (Owned) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
57. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
58. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
59. | | Supported Hardware (Leased) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
60. | | - Assigned Leases | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
61. | | - Retained Leases | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
62. | | Third Party Systems Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
63. | | - PS Owned Licenses | | PS | | PS | | Newco | | Newco | | Newco | | Newco | | Pass-Through (9) | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
64. | | - Retained Licenses | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
65. | | Newco Systems Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
66. | | Third Party Applications Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
67. | | - Assigned Licenses | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
68. | | - Retained Licenses | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
69. | | Newco Applications Software | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
70. | | Third Party Service Contracts – Supported Hardware – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
71. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
72. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
73. | | Third Party Service Contracts – Third Party Systems Software – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
74. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
75. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
76. | | Third Party Service Contracts – Newco Systems Software – Maintenance | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
77. | | Third Party Service Contracts – Third Party Applications Software – Maintenance | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
78. | | - Assigned | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | | N/A | |
79. | | - Retained | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
80. | | Third Party Service Contracts – Newco Applications Software – Maintenance | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
81. | | Third Party Service Contracts – Other | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
82. | | Consumable Supplies | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | Newco | | Retained | | PS | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
83. | | Facilities Management – Newco Location | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
J-3
84. | | Data Center Raised Floor Equipment | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
85. | | Data Center Raised Floor Power | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
86. | | Facilities Management – PS Location | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
87. | | Data Center Raised Floor Equipment | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
88. | | Data Center Raised Floor Power | | PS | | PS | | PS | | PS | | PS | | PS | | PS | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
89. | | Desktop / Workstations and Related Infrastructure | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
90. | | Servers provided by PS at PS Service Locations | | N/A | | N/A | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
91. | | Servers provided by PS at Newco Facilities | | N/A | | N/A | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
92. | | Network Printers (for Transitioned Employees) at PS Facilities | | Newco | | Newco | | PS | | PS | | PS | | PS | | PS Fees | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
93. | | Network Printers (for End Users or Transitioned Employees) at Newco Facilities | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
94. | | Desktop / Workstations (for Transitioned Employees) at Newco Facilities or PS Service Locations | | Newco | | Newco | | PS | | PS | | PS | | PS | | PS Fees | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
95. | | Desktop / Workstations (for End Users) at Newco Facilities | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
96. | | Telecommunications: Voice / LAN / WAN | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
97. | | Voice Services including PBX and Handsets at PS Service Locations | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
98. | | Voice Services including data communication circuits, local and long distance services, PBX and Handsets at Newco Facilities | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
99. | | WAN / LAN Infrastructure – PS at PS Service Locations | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
100. | | WAN / LAN Infrastructure at Newco Facilities | | Newco | | Newco | | Newco | | Newco | | Newco | | Newco | | Retained | | PS | | PS | | PS | | PS | | PS | | PS | | PS Fees | | PS | |
(1) This column specifies whether the asset is Perot Systems Owned/Leased or Newco Owned/Leased. In the case of maintenance contracts, this column specifies which Party’s name is on the maintenance contract.
(2) This column specifies which Party shall have financial responsibility for an asset’s capital cost, which: (i) for Equipment or Software, means that such Party shall be responsible for all current (applicable immediately after the effective date of such financial responsibility) and future financial costs and expenses related to, depending on the type of asset (i.e., whether the asset is Equipment or Software): acquisition, lease, license, or other ownership costs for such current and future Assets, including upgrades, enhancements, new releases, expanded license rights, changes due to growth and technology refreshments
J-4
(including third Party hardware and software maintenance agreements); and (ii) for third Party service contracts, means that such Party shall be responsible for all current and future financial costs and expenses related to such contract.
(3) This column specifies which Party shall be responsible for operational support of an asset, including (i) the unpacking, configuration, staging, setup and installation of such asset; (ii) the support of such asset; (iii) the maintenance of such asset; (iv) moves/adds/changes; and (v) disaster recovery.
(4) This column specifies which Party shall have financial responsibility for an asset’s operational support costs, which (i) for Equipment or Software, means that such Party shall be responsible for all current (applicable immediately after the effective date of such financial responsibility) and future financial costs and expenses related to, depending on the type of asset (i.e., whether the asset is Equipment or Software): operational support for such current and future Assets, including installation, support and maintenance, moves, adds or changes, disaster recovery, and Service Levels; and (ii) for third party service contracts, means that such Party shall be responsible for all current and future financial costs and expenses related to such contract.
(5) This column specifies which Party shall be responsible for managing an asset, including (i) the tracking of renewal dates and license compliance provisions, (ii) providing notice to the Party with legal responsibility when actions need to be taken with respect to such asset (e.g., notification of renewal of the license for such asset), and (iii) receiving invoices from third party vendors, promptly reviewing such invoices, and providing to the Party with financial responsibility the original invoice together with a statement identifying which charges are proper and valid and should be paid.
(6) Where this Schedule 6.1 identifies PS as having responsibility with respect to Disaster Recovery, such Services shall be provided in accordance with and only to the extent of PS’ responsibilities with respect to Disaster Recovery as provided in the MSA and Exhibit A.
(7) The applicable asset will be “managed” only to the extent that the Required Consent necessary to transfer and assign the asset cannot be obtained, thereby causing Newco to retain legal responsibility. This is subject to the provisions of the Agreement pursuant to which Newco’s consent must be obtained in the event that a Required Consent cannot be obtained by PS and PS proposes a work-around.
(8) The charging mechanism for items represented by “PS Fees” is the Annual Service Charges.
(9) Perot Systems will pass through the costs of these licenses until such time as Newco procures the licenses in its own name.
J-5
SCHEDULE 6.2(a)
SUPPORTED HARDWARE – OWNED BY NEWCO
PART A – ASSIGNED HARDWARE (OWNED)
PART B – RETAINED HARDWARE (OWNED)
ROUTERS – DATA CENTER(1) |
|
Vendor | | Router Name | | Model | | Serial Number |
TBD | | ALAMO-RAS-1 | | AS5300 | | TBD |
CISCO | | DCFLFTL-CIP1 | | 7507 | | TBD |
CISCO | | DCFLFTL-CIP2 | | 7507 | | TBD |
CISCO | | DCFLFTL-CIP3 | | 7505 | | TBD |
CISCO | | DCFLFTL-R1 | | 7204 | | TBD |
CISCO | | DCFLFTL-R2 | | 7204 | | TBD |
CISCO | | DCFLFTL-R3 | | 7507 | | TBD |
CISCO | | DCFLFTL-R4 | | 7507 | | TBD |
CISCO | | DLSW-1 | | 7204 | | TBD |
CISCO | | DLSW-2 | | 7204 | | TBD |
TBD | | FLL-IGX | | IGX | | TBD |
TBD | | IMA-FLL | | 3620 | | TBD |
TBD | | INTERNET-1 | | 3640 | | TBD |
TBD | | INTERNET-2 | | 3640 | | TBD |
CISCO | | ALM-PLAZA-R1 | | 3620 | | TBD |
CISCO | | ALM-STUN-01 | | 2500 | | TBD |
(1) Above routers located at Newco Data Center, 5301 NW 33rd Avenue, Ft. Lauderdale, FL 33309
ROUTERS – REMOTE Perot Systems Data Center(1) |
|
Vendor | | Router Name | | Model | | Serial Number | | Location |
TBD | | IMA-RIMF | | 3620 | | TBD | | RIMF |
CISCO | | NIR-RMF-01-RIMF | | 7507 | | TBD | | RIMF |
CISCO | | NIR-RMF-02-RIMF | | 7507 | | TBD | | RIMF |
TBD | | RIMF-RSM1 | | RSM | | TBD | | RIMF |
(1) Above routers located at Perot Systems Data Center, 1780 Jay Ell Drive, Richardson, TX 75081-6785
1
Remote Routers (Cisco) |
|
Router Name | | Model | | Address | | City | | ST |
+ | | 2610 | | 778 BURLWAY ROAD | | SAN Francisco | | CA |
alm-1405-c | | 2524 | | 6327 AVAITION DR SUITE B | | SACRAMENTO | | CA |
alm-1408-c | | 2524 | | 2001 E PLUM WAY | | Reno | | NV |
alm-1411-c | | 2524 | | 17801 PACIFIC HWY S | | SEATAC | | WA |
alm-2331-c | | 2610 | | 19601 MAPLEWOOD AV | | Cleveland | | OH |
alm-2360-c | | 2610 | | MCGHEE/TYSON ARPT | | ALCOA | | TN |
alm-2382hh | | 2524 | | 4300 GLUEMACK DRIVE | | Minneapolis | | MN |
alm-2421-c | | 2610 | | 10701 LAMBERT INTL BLVD. | | ST. LOUIS | | MO |
alm-3313-c | | 2610 | | 9700 AIRPORT BLVD | | SAN ANTONIO | | TX |
alm-4430-c | | 2524 | | BRADENTON AIRPT/MAIN TERM | | Sarasota | | FL |
alm-5322-c | | 2524 | | BALTIMORE WASHINGTON IAP BUILDING 152 | | Baltimore | | MD |
alm-5328-c | | 2524 | | 4479 GENESEE STREET EAST TERM | | Buffalo | | NY |
anc-1125-c | | 2610 | | 2300 AIRPORT BL. | | SAN JOSE | | CA |
anc-1125-HH-c | | 2524 | | 2300 AIRPORT BL. | | SAN JOSE | | CA |
anc-3092-01-c | | 2610 | | 2424 EAST 38TH ST | | IRVING | | TX |
anc-3092-02-c | | 2610 | | 2424 EAST 38TH ST | | IRVING | | TX |
arg-barrie | | 2610 | | 134 ANNE ST. | | BARRIE | | ON |
arg-yam-arpt | | 2600 | | HWY 565 | | SAULT STE MARIE | | ON |
arg-yam-dntwn | | 2600 | | 308 GREAT NORTHERN RD | | SAULT STE MARIE | | ON |
arg-ycd-arp | | 2610 | | SPITFIRE ROAD | | NANAIMO | | BC |
arg-ycd-dntwn | | 2610 | | 1602 NORTHFIELD RD | | NANAIMO | | BC |
arg-yfc-arpt | | 2600 | | 2570 ROUTE 102 | | LINCOLN | | NB |
arg-yfc-dntwn | | 2600 | | 235 PROSPECT STREET W. | | FREDERICTON | | NB |
arg-yhd-dryden | | 2610 | | 349 GOVERNMENT ST | | DRYDEN | | ON |
arg-yka-dntwn | | 2610 | | 174 WEST VICTORIA STREET | | KAMLOOPS | | BS |
arg-ykx-kirkland | | 2610 | | 22 GOVERNMENT RD TWEEDSMUIR | | KIRKLAND LAKE | | ON |
arg-yqm-arpt | | 2600 | | 1575 CHAMPLAIN STREET | | DIEPPE | | NB |
arg-yqm-dntwn | | 2600 | | 548 MOUNTAIN RD SHIRLEY | | MONCTON | | NB |
arg-yqt-admin | | 2600 | | 450 SIFTON AV PRINCESS | | THUNDER BAY | | ON |
arg-yqu-dntwn | | 2600 | | 100TH ST 9904-121 AV | | GRANDE PRAIRIE | | AB |
arg-ysb-arpt | | 2610 | | AIRPORT ROAD | | SUDBURY | | ON |
arg-ysb-dntwn | | 2610 | | 1150 THE KINGSWAY | | SUDBURY | | ON |
arg-ysj-arpt | | 2610 | | 4180 Loch Lomond Rd | | ST. JOHN | | NB |
arg-ysj-dntwn | | 2610 | | 242 ROTHESAY AV RUSSEL | | ST. JOHN | | NB |
arg-yta-pembroke | | 2610 | | 379 Pembroke St. W. Pembroke | | Pembroke | | ON |
arg-yts-arpt | | 2600 | | Airport Access Road | | TIMMINS | | ON |
arg-yts-dntwn | | 2600 | | 470 ALGONQUIN BLVD. E. | | TIMMINS | | ON |
arg-yxs-dntwn | | 2610 | | 4141 Airport Rd | | Prince George | | BC |
arg-yxt-dntwn | | 2610 | | MAIN ST 4542 LAKESLE AV TERRACE | | TERRACE | | BC |
arg-yyb-arpt | | 2610 | | Airport Road | | NORTH BAY | | ON |
arg-yyb-dntwn | | 2610 | | HWY 11 S 1864 SEYMOUR ST | | NORTH BAY | | ON |
arg-yyj-dntwn | | 2610 | | 767 DOUGLAS ST | | VICTORIA | | BC |
arg-yyt-admin | | 2610 | | 152 Airport Rd | | ST JOHNS | | NF |
2
Router Name | | Model | | Address | | City | | ST |
nir-003-01-ohare | | 2610 | | 560 BESSIE COLEMAN DR | | CHICAGO | | IL |
nir-003-02-ohare | | 2524 | | 560 BESSIE COLEMAN DR | | CHICAGO | | IL |
nir-008 | | 2524 | | 203 NORTH LA SALLE STREET Bldg Info | | CHICAGO | | IL |
nir-011 | | 2524 | | 2200 69TH AV | | MOLINE | | IL |
nir-014 | | 2524 | | 4221 PK BLVD/AIRPORT | | LOUISVILLE | | KY |
nir-01-476 | | 2524 | | 3280 N HARBOR DR. | | SAN DIEGO | | CA |
nir-01-tml | | 2524 | | 11655 QUEENS BL | | FOREST HILLS | | NY |
nir-01-xpedite | | 2524 | | 446 HWY 35 BLDG C | | EATONTOWN | | NJ |
nir-020-01-TriCity-Airport | | 2524 | | 8600 GARFIELD RD | | FREELAND | | MI |
nir-021-01 | | 2524 | | 338 LUCUS DR | | ROMULUS | | MI |
nir-021-02 | | 2610 | | 338 LUCUS DR | | ROMULUS | | MI |
nir-02-476 | | 2524 | | 3280 N HARBOR DR. | | SAN DIEGO | | CA |
nir-028-01-Duluth-Airport | | 2524 | | 4701 ARPT RD | | DULUTH | | MN |
nir-034 | | 2524 | | 2400 W ADAMS | | LINCOLN | | NE |
nir-037-01-Toledo-Airport | | 2524 | | 11013 ARPT HWY | | SWANTON | | OH |
nir-055 | | 2524 | | 1705 W JEFFERSON ST | | JOLIET | | IL |
nir-056 | | 2524 | | 11 Airport Rd. | | Savoy | | IL |
nir-062-c | | 2524 | | 6100 W RAYMOND | | INDIANAPOLIS | | IN |
nir-067 | | 2524 | | 7111 W WASHINGTON ST | | INDIANAPOLIS | | IN |
nir-072 | | 2524 | | 4647 TERMINAL DR/MICHIANA | | SOUTH BEND | | IN |
nir-073 | | 2524 | | 22946 US HWY 20 W | | SOUTH BEND | | IN |
nir-089 | | 2524 | | G3425 W BRISTOL RD | | FLINT | | MI |
nir-09 | | 2524 | | 15908 S HALSTEAD | | HARVEY | | IL |
nir-095 | | 2524 | | 1 ARPT ENTRANCE RD | | FRANKLIN TOWNSHIP | | MI |
nir-100 | | 2524 | | 220 BROADWAY S | | ROCHESTER | | MN |
nir-10-01-MOLINE | | 2524 | | 2430 69TH AV | | MOLINE | | IL |
nir-102 | | 2524 | | SPRINGFIELD REGIONAL ARPT 5000 W KEARNEY | | SPRNGFIELD | | MO |
nir-104-c-b | | 2524 | | 10701 LAMBERT INTL BL | | ST. LOUIS | | MO |
nir-106 | | 2524 | | CAPE MUNI AIRPT AHN 702 | | CAPE GIRARDEAU | | MO |
nir-109 | | 2524 | | 2815 ARPT DR | | GRAND FORK | | ND |
nir-110 | | 2524 | | 2801 32ND AV N W | | FARGO | | ND |
nir-111 | | 2524 | | 25 ARPT RD | | MINOT | | ND |
nir-1119 | | 2524 | | 1500 LAST DOLLAR ROAD | | TELLURIDE | | CO |
nir-1120 | | 2524 | | 61 AIRPARK DR SUITE A4 | | GYPSUM | | CO |
nir-1122-c | | 2524 | | 3450 E. AIRPORT DR | | ONTARIO | | CA |
nir-1126 | | 2524 | | 1600 MISSION AVE | | SAN FRANCISCO | | CA |
nir-1128 | | 2524 | | 10 Bellam Blvd. | | San Rafael | | CA |
nir-1129 | | 2524 | | 4218 El Comino Real | | Palo Alto | | CA |
nir-112-northplatte | | 2524 | | 5400 E LEE BIRD DR | | NORTH PLATTE | | NE |
nir-113 | | 2524 | | 3773 SKY PK RD | | GRAND ISLAND | | NE |
nir-1130 | | 2524 | | 101 JOHN GLENN DRIVE | | CONCORD | | CA |
nir-1131 | | 2524 | | 920 UNIVERSITY AV | | BERKLEY | | CA |
nir-1132 | | 2524 | | 501 CAMINO DEL RIO | | DURANGO | | CO |
nir-1133 | | 2524 | | 617 S HWY 101 | | SOLANA BEACH | | CA |
nir-1135 | | 2524 | | 2475 Clark Drive | | Lake Havasu City | | AZ |
3
Router Name | | Model | | Address | | City | | ST |
nir-1138 | | 2610 | | 2988 CIVIC DR | | PALM SPRINGS | | CA |
nir-114 | | 2524 | | 4600 INTL GATEWAY | | Columbus | | OH |
nir-1140 | | 2610 | | 1840 DE HAVILLAND DR | | THOUSAND OAKS | | CA |
nir-115-01 | | 2524 | | 3795 INTL GATEWAY | | Columbus | | OH |
nir-1151 | | 2524 | | 620 S. AIRPORT RD | | SAINT GEORGE | | UT |
nir-1152 | | 2610 | | 1027 Broadway | | Santa Monica | | CA |
nir-117 | | 2610 | | 1373 CONANT ST | | MAUMEE | | OH |
nir-118 | | 2524 | | 1111 E KIRBY ST | | LIMA | | OH |
nir-119 | | 2524 | | 5430 LAUBY RD N W | | N. CANTON | | OH |
nir-120 | | 2524 | | 2801 JAYCEE LN | | SIOUX FALLS | | SD |
nir-121 | | 2524 | | 4550 TERMINAL RD | | RAPID CITY | | SD |
nir-122 | | 2524 | | 2302 COMMERCIAL AV | | MADISON | | WI |
nir-123 | | 2524 | | 4000 INTERNATIONAL LN | | MADISON | | WI |
nir-125 | | 2524 | | 1450 DELANGLADE ST | | KAUKAUNA | | WI |
nir-126 | | 2524 | | W 6390 CHALLANGER DR | | APPLETON | | WI |
nir-127 | | 2524 | | 2850 ARPT DR | | LA CROSSE | | WI |
nir-129-b | | 2524 | | 5934 S HOWELL AV | | MILWAUKEE | | WI |
nir-131 | | 2524 | | 1200 S MORELAND RD | | BROOKFIELD | | WI |
nir-133-01-Rhinelander | | 2524 | | 3375 ARPT RD | | RHINELANDER | | WI |
nir-136 | | 2524 | | 2077 ARPT DR | | GREEN BAY | | WI |
nir-137-b | | 2524 | | YAGER ARPT | | CHARLESTON | | WV |
nir-13-b | | 2524 | | 600 TERMINAL DR | | LOUISVILLE | | KY |
nir-141 | | 2524 | | BRADLEY INTERNATIONAL ARPT | | WINDSOR LOCK | | CT |
nir-142-01-NewHaven | | 2524 | | 255 CROWN ST | | NEW HAVEN | | CT |
nir-143 | | 2524 | | 700 MAIN ST | | STAMFORD | | CT |
nir-144 | | 2524 | | WASHINGTON NATIONAL AIRPT | | WASHINGTON | | DC |
nir-145 | | 2524 | | WASHINGTON NATIONAL AIRPT | | WASHINGTON | | DC |
nir-146 | | 2524 | | WASHINGTON NATIONAL AIRPT | | WASHINGTON | | DC |
nir-147-b | | 2524 | | 400 NORTH SERVICE ROAD | | Washington | | DC |
nir-147-booth | | 2524 | | 400 NORTH SERVICE ROAD | | Washington | | DC |
nir-149 | | 2524 | | 50 MASS AV N E | | WASHINGTON | | DC |
nir-150 | | 2524 | | 151 N DUPONT HWY | | NEW CASTLE | | DE |
nir-151 | | 2524 | | 235 MARGINAL ST | | CHELSEA | | MA |
nir-152 | | 2524 | | 72 KING ST | | NORTHAMPTON | | MA |
nir-15-b | | 2524 | | 4018 VERSAILLES RD/AIRPORT | | LEXINGTON | | KY |
nir-16 | | 2524 | | 3230 LOOMIS ROAD | | Hebron | | KY |
nir-160-01-Boston | | 2524 | | 50 LOGAN ARPT DR | | EAST BOSTON | | MA |
nir-160-02-Boston | | 2524 | | 50 LOGAN ARPT DR | | EAST BOSTON | | MA |
nir-161 | | 2524 | | 1663 MASSACHUSSETTS AVE | | Cambridge | | MA |
nir-162 | | 2524 | | 375 ARPT DR | | WORCESTER | | MA |
nir-163 | | 2524 | | BALTIMORE/WASHINGTN AIRPT | | BALTIMORE | | MD |
nir-164 | | 2524 | | 763 ELKRIDGE LANDING RD | | LINTHICUM | | MD |
nir-166-c-b | | 2524 | | BALTIMORE/WASHINGTN AIRPT | | BALTIMORE | | MD |
nir-167-b | | 2524 | | BALTIMORE/WASHINGTN AIRPT | | BALTIMORE | | MD |
anc-2015 | | 2610 | | 3230 LOOMIS ROAD | | Hebron | | KY |
nir-170 | | 2524 | | 299 GODFREY BL | | BANGOR | | ME |
4
Router Name | | Model | | Address | | City | | ST |
nir-172 | | 2524 | | 1 ARPT RD | | MANCHESTER | | NH |
nir-173 | | 2524 | | 101 COLUMBIA RD | | MORRISTOWN | | NJ |
nir-175-01-NewarkAirport | | 2524 | | NEWARK INTL AIRPT/BLD 26 | | NEWARK | | NJ |
nir-176 | | 2524 | | NEWARK INT’L AIRPT/EXIT | | NEWARK | | NJ |
nir-177 | | 2524 | | NEWARK INT’L AIRPT/BLD 26 | | NEWARK | | NJ |
nir-178-01-Newark | | 2610 | | NEWARK INT’L AIRPT/BLD 25 | | NEWARK | | NJ |
nir-178-02-Newark | | 2524 | | NEWARK INT’L AIRPT/BLD 25 | | NEWARK | | NJ |
nir-181 | | 2524 | | 404 STATE HWY 70 | | CHERRY HILL | | NJ |
nir-183-c-b | | 2524 | | 4200 GENESEE ST/AIRPORT | | CHEEKTOWAGA | | NY |
nir-185-c-b | | 2524 | | 4955 Genesee Dr | | CHEEKTOWAGA | | NY |
nir-186 | | 2524 | | HANCOCK INT’L ARPT | | SYRACUSE | | NY |
nir-188 | | 2524 | | 435 W STATE ST | | ITHACA | | NY |
nir-18-b | | 2524 | | 5225 44TH ST SE/BLDG 105 | | GRAND RAPIDS | | MI |
nir-190 | | 2524 | | 2488 ARPT RD | | JOHNSON CITY | | NY |
nir-193-b | | 2524 | | JFK AIRPORT/BLDG 308 | | JAMAICA | | NY |
nir-194-b | | 2524 | | LAGUARDIA/95-10 DITMARS BL | | EAST ELMHURST | | NY |
nir-195-02-Rochester | | 2524 | | 1200 BROOKS AVE/AIRPORT | | ROCHESTER | | NY |
nir-195-03-Rochester | | 2524 | | 1200 BROOKS AVE/AIRPORT | | ROCHESTER | | NY |
nir-195-b | | 2524 | | 1200 BROOKS AVE/AIRPORT | | ROCHESTER | | NY |
nir-196-b | | 2524 | | 1300 BROOKS AVE/AIRPORT | | ROCHESTER | | NY |
nir-197 | | 2524 | | 276 SING-SING RD/AIRPORT | | HORSEHEADS | | NY |
nir-198-b | | 2524 | | NEW TERM IN WHITE PLAINS | | WHITE PLAINS | | NY |
nir-199-b | | 2524 | | NEW TERM IN WHT PLAINS | | WHITE PLAINS | | NY |
nir-19-b | | 2524 | | 5500 44TH ST | | GRAND RAPIDS | | MI |
nir-1-b | | 2524 | | CHICAGO O’HARE INTL ARPT LOWER LEVEL TERMINAL 3 | | Chicago | | IL |
nir-2000 | | 2610 | | 5700 S CICERO | | Chicago | | IL |
nir-201 | | 2524 | | 252 W 40TH ST | | NEW YORK | | NY |
nir-2013 | | 2610 | | 4018 VERSAILLES | | LEXINGTON | | KY |
nir-202 | | 2524 | | 305 E 80TH ST | | NEW YORK | | NY |
nir-2025-c | | 2610 | | 4300 GLUEMACK DRIVE | | MINNEAPOLIS | | MN |
nir-203 | | 2524 | | 21 E 12TH ST | | NEW YORK | | NY |
nir-2031 | | 2610 | | 4701 ABBOTT DR. | | OMAHA | | NE |
nir-204 | | 2524 | | 142 E 31ST ST | | NEW YORK | | NY |
nir-2045 | | 2524 | | 855 1st Avenue SE | | Cedar Rapid | | IA |
nir-205 | | 2524 | | 138-146 E 50TH ST | | NEW YORK | | NY |
nir-207-b | | 2524 | | 219 W 77TH ST | | NEW YORK | | NY |
nir-212 | | 2524 | | 36 S 19TH ST | | PHILADELPHIA | | PA |
nir-213-b | | 2524 | | 6950 NORWITCH DR | | PHILADELPHIA | | PA |
nir-214 | | 2524 | | 2955 MARKET ST | | PHILADELPHIA | | PA |
nir-215 | | 2524 | | 175 N HENDERSON RD | | KING OF PRUSSIA | | PA |
nir-216-b | | 2524 | | READY RD/RICHMOND ARPT | | RICHMOND | | VA |
nir-217-b | | 2524 | | TERMINAL DR/RICHMOND AIRPT | | RICHMOND | | VA |
nir-218 | | 2524 | | 1215 SEMINOLE TRAIL | | CHARLOTTESVILLE | | VA |
nir-219 | | 2524 | | 201 BOWEN LOOP RD | | CHARLOTTESVILLE | | VA |
nir-220 | | 2524 | | 900 BLAND AV | | NEWPORT NEWS | | VA |
5
Router Name | | Model | | Address | | City | | ST |
nir-221 | | 2524 | | 999 ARPT RD | | NORFOLK | | VA |
nir-222 | | 2524 | | 3445 N MILITARY HWY | | NORFOLK | | VA |
nir-227 | | 2524 | | 480 BARNSTABLE RD | | HYANNIS | | MA |
nir-228 | | 2524 | | 14 DEPOT AV | | FALMOUTH | | MA |
nir-229 | | 2524 | | US ROUTE 1, NEW COUNTY RD | | Rockland | | ME |
nir-23 | | 2524 | | 810 Airport Dr | | PITTSFIELD | | MI |
nir-230 | | 2524 | | 155 MIRONA RD | | PORTSMOUTH | | NH |
nir-231 | | 2524 | | 5 AIRPARK ROAD | | W. LEBANON | | NH |
nir-232 | | 2524 | | 597 MAIN ST | | KEENE | | NH |
nir-233 | | 2524 | | 35 S AND MAPLE PLC | | KEYPORT | | NJ |
nir-234-01-Albany-Latham | | 2524 | | 859 ALBANY SHAKER ROAD | | Latham | | NY |
nir-236 | | 2524 | | 737 ALBANY SHAKER RD | | LOUDONVILLE | | NY |
nir-239 | | 2524 | | ARPT DR/BLDG 25/AIRPORT | | MIDDLETOWN | | PA |
nir-240 | | 2524 | | ARPT DR/HARRISBURG INT’L | | MIDDLETOWN | | PA |
nir-241 | | 2524 | | 3311 ARPT RD | | ALLENTOWN | | PA |
nir-242 | | 2524 | | 1501 SUMNER AV | | ALLENTOWN | | PA |
nir-243 | | 2524 | | WILKES-BARR SCRANTON AIRPT | | AVOCA | | PA |
nir-246 | | 2524 | | 2175 HIGH TECH RD | | STATE COLLEGE | | PA |
nir-247 | | 2524 | | 2493 FOX HILL RD | | STATE COLLEGE | | PA |
nir-248 | | 2524 | | 4411 W 12TH ST | | ERIE | | PA |
nir-25-c | | 2524 | | 2500 STEWART AV | | ST. PAUL | | MN |
nir-253 | | 2524 | | 2053 POST ROAD | | Warwick | | RI |
nir-254 | | 2524 | | 2000 POST ROAD | | Warwick | | RI |
nir-255-roanoke | | 2524 | | 5202 AVIATION DR | | ROANOKE | | VA |
nir-256 | | 2524 | | 5550 ARPT RD | | ROANOKE | | VA |
nir-258 | | 2524 | | 1200 ARPT DR | | SOUTH BURLINGTON | | VT |
nir-259-01-Huntsville | | 2524 | | 116 HOUSTON GOODSON WAY | | HUNTSVILLE | | AL |
nir-260-01-Huntsville | | 2524 | | 1000 GLENN HEARD BL | | HUNTSVILLE | | AL |
nir-261-c | | 2524 | | 5529 AIRLINE DR | | BIRMINGHAM | | AL |
nir-262 | | 2610 | | 5900 MESSER ARPT HWY | | BIRMINGHAM | | AL |
nir-263-c-b | | 2610 | | 5900 MESSER ARPT HWY | | BIRMINGHAM | | AL |
nir-264-b | | 2524 | | 8400 ARPT BLVD/BLDG 49 | | MOBILE | | AL |
nir-265-b | | 2524 | | 8400 ARPT BL | | MOBILE | | AL |
nir-266 | | 2524 | | 1000 ARPT RD | | DURANGO | | CO |
nir-268-b | | 2524 | | 1020 AIRLINE HWY/INTL AIRPT | | KENNER | | LA |
nir-269 | | 2524 | | 200 TERMINAL DR/STE 102 | | LAFAYETTE | | LA |
nir-270-b | | 2524 | | 143 HANGER DR | | JACKSON | | MS |
nir-271-b | | 2524 | | 100 INTERNATIONAL DR | | JACKSON | | MS |
nir-272 | | 2524 | | 14035 ARPT RD | | GULF PORT | | MS |
nir-277-c-b | | 2524 | | 2510 N 76TH E AV | | TULSA | | OK |
nir-278 | | 2610 | | 2680 RENTAL RD/SERV-ADMIN | | MEMPHIS | | TN |
nir-280-b | | 2524 | | 760 HANGER LANE/ADMIN | | NASHVILLE | | TN |
nir-281-c-b | | 2524 | | 1 TERMINAL DR | | NASHVILLE | | TN |
nir-283-b | | 2524 | | MCGHEE/TYSON ARPT | | ALCOA | | TN |
nir-284-c-b | | 2524 | | MCGHEE/TYSON ARPT | | ALCOA | | TN |
nir-285 | | 2524 | | 1001 ARPT RD/MAIN TERM | | CHATTANOOGA | | TN |
6
Router Name | | Model | | Address | | City | | ST |
nir-286 | | 2524 | | #1 WARLICK/LOVELL FIELD | | CHATTANOOGA | | TN |
nir-291 | | 2524 | | 3377 EDWARDS AVE/RETURN | | DALLAS | | TX |
nir-292 | | 2524 | | 3377 Edwards Ave | | DALLAS | | TX |
nir-295 | | 2524 | | 524 W BELT LINE RD STE4 | | RICHARDSON | | TX |
nir-300 | | 2524 | | 16901 JFK BLVD/CONOCO | | HOUSTON | | TX |
nir-301-c-b | | 2524 | | 3500 N TERMINAL RD/TERM C | | HOUSTON | | TX |
nir-302 | | 2524 | | 700 N DAIRY - ASHFORD | | HOUSTON | | TX |
nir-304-c-b | | 2524 | | 7708 AIRPORT BLVD | | HOUSTON | | TX |
nir-305-01-Houston | | 2524 | | 5353 WESTHEIMER | | HOUSTON | | TX |
nir-306 | | 2524 | | 5401 N MLK | | LUBBOCK | | TX |
nir-3069 | | 2610 | | 7700 AIRPORT BLVD | | HOUSTON | | TX |
nir-307 | | 2524 | | 10801 ARPT BL | | AMARILLO | | TX |
nir-3090 | | 2524 | | 102 SOUTH FORT HOOD STREET | | KILLEEN | | TX |
nir-3092 | | 2524 | | #1 Airport Blvd Suite 113 | | Bentonville | | AR |
nir-3093 | | 2524 | | 3720 South 26th | | IRVING | | TX |
nir-3094 | | 2524 | | 10101 W COUNTY RD 116 | | MIDLAND | | TX |
nir-3097 | | 2524 | | 7777 E. Apatche | | Tulsa | | OK |
nir-3099 | | 2610 | | 2800 Girard SE | | Albuquerque | | NM |
nir-30-b | | 2610 | | 868 TEL AVIV | | Kansas City | | MO |
nir-310 | | 2524 | | 2322 29TH ST | | HARLINGEN | | TX |
nir-311 | | 2524 | | 3030 ARPT DR | | HARLINGEN | | TX |
nir-312-01-McAllen | | 2524 | | 2600 S MAIN ST | | MCALLEN | | TX |
nir-31-2-KC-counter-2 | | 2524 | | 868 TEL AVIV | | Kansas City | | MO |
nir-31-2-KC-exitbooth | | 2524 | | 868 Tel Aviv | | Kansas City | | MO |
nir-315-01-Houston | | 2610 | | 4551 WILL CLAYTON PKWY | | HOUSTON | | TX |
nir-315-02-Houston | | 2524 | | 4551 WILL CLAYTON PKWY | | HOUSTON | | TX |
nir-317 | | 2524 | | 4445 SELMA HWY | | MONTGOMERY | | AL |
nir-318 | | 2524 | | 4520 HWY 80 WEST/ADMIN | | MONTGOMERY | | AL |
nir-31-b | | 2524 | | 868 TEL AVIV | | Kansas City | | MO |
nir-321 | | 2524 | | DOTHAN COUNTY ARPT | | DOTHAN | | AL |
nir-322 | | 2524 | | 3501 E ROOSEVELT RD | | LITTLE ROCK | | AR |
nir-323-b | | 2524 | | 3501 E ROOSEVELT RD | | LITTLE ROCK | | AR |
nir-326 | | 2524 | | 5600 ARPT BL | | FORT SMITH | | AR |
nir-327-b | | 2524 | | 3200 SKYHARBOR BL | | PHOENIX | | AZ |
nir-328-b | | 2524 | | 3400 SKYHARBOR BL | | PHOENIX | | AZ |
nir-329-b | | 2524 | | 3800 SKYHARBOR BL | | PHOENIX | | AZ |
nir-32-oma-admin | | 2524 | | 2323 FAIRCHILD COURT EPPLEY AIRFIELD | | Omaha | | NE |
nir-330-b | | 2610 | | 1402 S 22ND ST | | PHOENIX | | AZ |
nir-331 | | 2524 | | 2577 W GREENWAY RD | | PHOENIX | | AZ |
nir-336 | | 2524 | | 2320 E LUCKY LN | | FLAGSTAFF | | AZ |
nir-337 | | 2524 | | 325 TRAFFIC ST/ADMIN | | BOSSIER CITY | | LA |
nir-338 | | 2524 | | 5103 HOLLYWOOD STREET | | SHREVEPORT | | LA |
nir-339 | | 2524 | | 9430 JACKIE COCHRON DR | | BATON ROUGE | | LA |
nir-33-b | | 2524 | | 2323 FAIRFIELD COURT EPPLEY AIRFIELD | | Omaha | | NE |
nir-340 | | 2524 | | 1303 BILLY MITCHELL BL | | ALEXANDRIA | | LA |
7
Router Name | | Model | | Address | | City | | ST |
nir-341 | | 2524 | | 500 ARPT BLVD/MAIN TERM | | LAKE CHARLES | | LA |
nir-342-Monroe | | 2524 | | 5400 OPERATIONS RD/MAIN | | MONROE | | LA |
nir-344 | | 2524 | | LEE COUNTY ARPT | | HOBBS | | NM |
nir-346 | | 2524 | | 7100 TERMINAL DR | | OKLAHOMA CITY | | OK |
nir-347 | | 2524 | | 6501 W GUY FULLER RD | | OKLAHOMA CITY | | OK |
nir-348 | | 2524 | | 2525 HWY 75 SUITE 19 | | BLOUNTVILLE | | TN |
nir-349 | | 2524 | | JEFFERSON COUNTY ARPT | | NEDERLAND | | TX |
nir-350 | | 2524 | | 335 PINSON DR | | CORPUS CHRISTI | | TX |
nir-35-02-c | | 2524 | | 19601 MAPLEWOOD AV | | CLEVELAND | | OH |
nir-35-03-c | | 2524 | | 19601 MAPLEWOOD AV | | CLEVELAND | | OH |
nir-351 | | 2524 | | 1000 INTERNATIONAL DR | | CORPUS CHRISTI | | TX |
nir-352 | | 2524 | | 620 MAIN ST | | KERRVILLE | | TX |
nir-353 | | 2524 | | 6701 CONVAIR RD | | EL PASO | | TX |
nir-354 | | 2524 | | 6500 CONVAIR RD | | EL PASO | | TX |
nir-355 | | 2524 | | 9506 LA FORCE BL | | MIDLAND | | TX |
nir-357 | | 2524 | | 1154 HALM BL | | SAN ANTONIO | | TX |
nir-358-c-b | | 2524 | | 9800 AIRPORT BLVD | | SAN ANTONIO | | TX |
nir-359-c | | 2524 | | 9700 AIRPORT BLVD | | SAN ANTONIO | | TX |
nir-35-c-b | | 2524 | | 19601 MAPLEWOOD AV | | CLEVELAND | | OH |
nir-360 | | 2524 | | 1525 ARPT DR | | KILLEEN | | TX |
nir-363 | | 2524 | | 5200 BOB BULLOCK LOOP | | LAREDO | | TX |
nir-3101 | | 2524 | | 14601 Hwy 64 W | | Tyler | | TX |
nir-365 | | 2524 | | HWY 322 GREGG CTY AIRPT | | LONGVIEW | | TX |
nir-36-b | | 2524 | | 18809 MAPLEWOOD AV | | CLEVELAND | | OH |
nir-375 | | 2524 | | OKALOOSA AIRPT/STATE RD 85 | | EGLIN AFB | | FL |
nir-377-c | | 2524 | | 3230 Capitol Circle South West | | Tallahassee | | FL |
nir-378-c-b | | 2524 | | 2430 ARPT BL | | PENSACOLA | | FL |
nir-380 | | 2610 | | 3173 ARPT RD | | PANAMA CITY | | FL |
nir-38-01-Vandalia | | 2524 | | DAYTON INTERNATIONAL APRT MAIN TERMINAL | | Vandalia | | OH |
nir-381-c | | 2524 | | REGIONAL SW AIRPORT 16060 CHAMBERLAIN PKWY SE | | FT MYERS | | FL |
nir-382-c | | 2524 | | 16000 CHAMBERLIN PKWY | | FT. MYERS | | FL |
nir-384 | | 2524 | | 520 TERMINAL DR | | NAPLES | | FL |
nir-385-b | | 2524 | | 2030 RENTAL CAR LN | | JACKSONVILLE | | FL |
nir-386-b | | 2524 | | INTL AIRPT/EXPRESS BOOTH | | JACKSONVILLE | | FL |
nir-387 | | 2524 | | 10916 ATLANTIC BL | | JACKSONVILLE | | FL |
nir-388-b | | 2524 | | 2400 YANKEE CLIPPER DR S | | JACKSONVILLE | | FL |
nir-389 | | 2524 | | 3400 N E 39TH AV | | GAINSVILLE | | FL |
nir-39-02-Vandalia | | 2524 | | 3350 VALET Drive | | Vandalia | | OH |
nir-392-b | | 2524 | | 1000 CAR CARE DR/DISNEY W | | ORLANDO | | FL |
nir-393 | | 2610 | | 8450 HANGER BLVD. | | Orlando | | FL |
nir-394 | | 2524 | | 8997 ARPT BLVD/QTA | | ORLANDO | | FL |
nir-395-ExitA-b | | 2524 | | 9217 ARPT BL | | ORLANDO | | FL |
nir-397-01 | | 2610 | | 8997 ARPT BLVD/Terminal A | | ORLANDO | | FL |
nir-398-01 | | 2610 | | 8997 AIRPORT BLVD Terminal B | | ORLANDO | | FL |
nir-400-ExitB | | 2524 | | 9217 ARPT BL | | ORLANDO | | FL |
nir-401 | | 2524 | | DISNEY WORLD DOLPHIN HOTEL | | ORLANDO | | FL |
8
Router Name | | Model | | Address | | City | | ST |
nir-408 | | 2524 | | 200 TERMINAL DR | | DANIA | | FL |
nir-409-c | | 2524 | | 100 TERMINAL DR | | DANIA | | FL |
nir-4104 | | 2610 | | 14700 Roosevelt Blvd | | Clearwater, | | FL |
nir-411-c | | 2524 | | 300 TERMINAL DR | | DANIA | | FL |
anc-tampa-b-c | | 2610 | | 5109 W SPRUCE ST | | TAMPA | | FL |
nir-413-01-BocaRaton | | 2524 | | 1300 N W 1ST AV | | BOCA RATON | | FL |
nir-415-c-b | | 2524 | | 700 CATALINA DR/AIRPORT | | DAYTONA BEACH | | FL |
nir-416-01-Melbourne | | 2524 | | 1 TERMINAL PKWY/AIRPORT | | MELBOURNE | | FL |
nir-417 | | 2524 | | 1050 TED HUFF RD | | MELBOURNE | | FL |
nir-418 | | 2524 | | 1675 NORTH ATLANTIC AVE | | COCOA BEACH | | FL |
nir-420-c-b | | 2524 | | BRADENTON AIRPT/MAIN TERM | | SARASOTA | | FL |
nir-422-01 | | 2524 | | CAR RENTAL RD. | | COLLEGE PARK | | GA |
nir-422-02 | | 2524 | | CAR RENTAL RD. | | COLLEGE PARK | | GA |
nir-423-b | | 2524 | | HARTSFIELD ATLANTA IAP NEXT TO ADMIN OFFICE | | ATLANTA | | GA |
nir-431 | | 2524 | | 1511 AVIATION WAY | | AUGUSTA | | GA |
nir-432 | | 2524 | | SAVANNAH INT’L | | SAVANNAH | | GA |
nir-433 | | 2610 | | SAVANNAH INT’L/MAIN TERMINAL | | SAVANNAH | | GA |
atl-sales-b | | 2610 | | 900 ASHWOOD PKWY | | ATLANTA | | GA |
nir-435 | | 2524 | | 6319 ARPT PKWY | | GREENSBORO | | NC |
nir-436 | | 2524 | | 6315 ARPT PKWY | | GREENSBORO | | NC |
nir-437-b | | 2524 | | 1001 RENTAL CAR DR | | MORRISVILLE | | NC |
nir-439 | | 2524 | | 1 ARPT TERMINAL BLDG | | FAYETTEVILLE | | NC |
nir-43-b | | 2610 | | RENTAL CAR ACCESS RD/LOT7 | | PITTSBURGH | | PA |
nir-441-b | | 2524 | | CHARLOTTE/DOUGLAS INTL AP 4108 RENTAL CAR ROAD | | CHARLOTTE | | NC |
nir-442-b | | 2610 | | 4108 RENTAL CAR RD | | CHARLOTTE | | NC |
nir-443 | | 2524 | | 3440 RENTAL CAR LANE | | N CHARLESTON | | SC |
nir-444-c | | 2524 | | 5500 INTERNATIONAL BL | | CHARLESTON | | SC |
nir-445-01-Myrtle-Beach | | 2524 | | 1100 JETPORT RD | | MYRTLE BEACH | | SC |
nir-446 | | 2524 | | 1050 JETPORT RD | | MYRTLE BEACH | | SC |
nir-447 | | 2524 | | 3210 AIR COMMERCE DRIVE | | W COLUMBIA | | SC |
nir-448-b | | 2524 | | 3000 AVIATION WAY | | W COLUMBIA | | SC |
nir-449 | | 2524 | | 2100 TERMINAL DR | | FLORENCE | | SC |
nir-44-b | | 2524 | | PITTSBURGH INTL ARPT | | PITTSBURGH | | PA |
nir-450 | | 2524 | | REGIONAL AIRPORT/MAIN TERM | | HILTON HEAD | | SC |
nir-451 | | 2524 | | 1612 N US HWY 1 | | JUPITER | | FL |
nir-452 | | 2524 | | 1000 TERMINAL AV | | MACON | | GA |
nir-453 | | 2524 | | 3250 W BRITT DAVID RD | | COLUMBUS | | GA |
nir-455 | | 2524 | | 3905 NEWTON RD | | ALBANY | | GA |
nir-456 | | 2524 | | 710 NEW ARPT RD | | FLETCHER | | NC |
nir-457-Wilmington | | 2524 | | 1740 AIRPT BLVD/MAIN TERM | | WILMINGTON | | NC |
nir-45-b | | 2524 | | 1 AIRSIDE | | FINDLAY | | PA |
nir-460 | | 2524 | | 7285 AIR TERMINAL DR | | ELM CITY | | NC |
nir-462 | | 2524 | | 501 N CHURCH ST | | ROCKY MOUNT | | NC |
nir-463 | | 2524 | | 200 TERMINAL DRIVE | | NEW BERN | | NC |
nir-465 | | 2524 | | 264 ALBERT J ELLIS APT RD | | RICHLANDS | | NC |
9
Router Name | | Model | | Address | | City | | ST |
nir-467-01 | | 2524 | | 2000 JETPORT RD | | GREER | | SC |
nir-467-2 | | 2524 | | 2000 JETPORT RD | | GREER | | SC |
nir-468 | | 2524 | | 2305 ARPT RD | | GREER | | SC |
nir-469 | | 2524 | | 152 N PLEASANTBURG DR | | GREENVILLE | | SC |
nir-47 | | 2524 | | 2816 WRIGHT BROTHERS BL | | CEDAR RAPIDS | | IA |
nir-473-b | | 2524 | | 4511 EMPIRE AVENUE | | BURBANK | | CA |
nir-474-b | | 2524 | | 2627 HOLLYWOOD WAY | | BURBANK | | CA |
nir-475 | | 2524 | | 2627 HOLLYWOOD WAY | | BURBANK | | CA |
nir-481 | | 2524 | | 4242 CAMPUS DR | | NEWPORT BEACH | | CA |
nir-482 | | 2524 | | 19051 AIRPORT WAY | | SANTA ANA | | CA |
nir-483-c-b | | 2524 | | ORANGE COUNTY AIRPORT 19051 AIRPORT WAY NORTH | | SANTA ANA | | CA |
nir-484 | | 2524 | | 711 W KATELLA AV. | | ANAHEIM | | CA |
nir-486 | | 2524 | | 4100 DONALD DOUGLAS DR | | LONG BEACH | | CA |
nir-487 | | 2524 | | 1947 CONVENTION CTR WAY | | ONTARIO | | CA |
nir-49 | | 2524 | | 9505 18 STREET SW, SUITE #2 | | CEDAR RAPIDS | | IA |
nir-490 | | 2524 | | 3300 TAHQUITZ CANYON WAY | | PALM SPRINGS | | CA |
nir-491-01-Goleta | | 2524 | | 114 MOFFETT PL | | GOLETA | | CA |
nir-494-monterey | | 2524 | | MONTEREY PENINSULA AIRPT | | MONTEREY | | CA |
nir-497-fresno | | 2524 | | 2444 N ASHLEY AV 103 | | FRESNO | | CA |
nir-498-b | | 2524 | | 5175 E CLINTON AV | | FRESNO | | CA |
nir-499-01-Bakersfield | | 2524 | | 1401 SKYWAY DR/MEADOWS | | BAKERSFIELD | | CA |
nir-4-b | | 2524 | | CHICAGO O’HARE INTL ARPT LOWER LEVEL TERMINAL 3 | | Chicago | | IL |
nir-50 | | 2524 | | FLEUR DR/INTL ARPT | | DES MOINES | | IA |
nir-500 | | 2524 | | 6230 MCNAIR CIR | | SACRAMENTO | | CA |
nir-5007 | | 2524 | | 5275 Westview Drive | | Frederick | | MD |
nir-501-c-b | | 2524 | | 6327 AVAITION DR SUITE B | | SACRAMENTO | | CA |
nir-502 | | 2524 | | 165 98TH AVENUE | | OAKLAND | | CA |
nir-5030 | | 2524 | | 1000 AIRPORT BLV NORTH | | NORTH SYRACUSE | | NY |
nir-505-b | | 2524 | | 100 ARPT DR | | OAKLAND | | CA |
nir-506 | | 2524 | | 4186 East Ave | | Livermore | | CA |
nir-51 | | 2524 | | 2403 OGDEN AV | | SIOUX CITY | | IA |
nir-5114-01 | | 2610 | | 860 NORTH AVE EAST | | ELIZABETH | | NJ |
nir-5115 | | 2610 | | 1200 North Fayette ST | | ALEXANDRIA | | VA |
nir-5119 | | 2524 | | 7000 ROBIN HOOD RD | | Norfolk | | VA |
nir-5121 | | 2610 | | 148 McArthur Blvd | | Bourne | | MA |
nir-5122 | | 2610 | | 997 Little Britain Rd. | | New Windsor | | NY |
nir-5123 | | 2610 | | 148 McArthur Blvd | | Bourne | | MA |
nir-52 | | 2524 | | 2790 ARPT BL | | WATERLOO | | IA |
nir-521 | | 2524 | | Main Terminal - United Airlines Baggage Claim H | | Honolulu | | HI |
nir-522 | | 2610 | | Interisland Term-Hawaiian A/L | | Honolulu | | HI |
nir-523 | | 2524 | | Main Terminal - American A/L Baggage Claim G | | HONOLULU | | HI |
nir-524 | | 2524 | | Interisland Term-Aloha A/L | | Honolulu | | HI |
nir-525 | | 2524 | | 2912 Aolele St (Honolulu Arpt Return) | | Honolulu | | HI |
nir-526 | | 2524 | | 1778 Ala Moana Blvd | | Honolulu | | HI |
nir-527 | | 2524 | | 5000 Kahala Avenue Kahala Mandarin Oriental Hotel | | Honolulu | | HI |
10
Router Name | | Model | | Address | | City | | ST |
nir-528 | | 2524 | | 142 MOKUEA PLACE Bldg Info N/A | | KAHULUI | | HI |
nir-528a-c | | 2524 | | 142 MOKUEA PLACE Inside Arpt counter | | KAHULUI | | HI |
nir-529 | | 2524 | | 142 MOKUEA PLACE MAINTAINANCE BUILDING | | KAHULUI | | HI |
nir-53 | | 2524 | | 11000 ARPT RD | | DUBUQUE | | IA |
nir-531-c | | 2524 | | Keahole-Kona Airport / Rental counter | | Kailua-Kona | | HI |
nir-532 | | 2524 | | CAR RENTAL SERVICE AREA KEAHOLE AIRPORT | | KONA | | HI |
nir-533 | | 2524 | | ENTRANCE TO HILO AIRPORT MAIN ENTRANCE TO AIRPORT | | HILO | | HI |
nir-534-c | | 2524 | | General Lyman Field / Rental Counter | | Hilo | | HI |
nir-535 | | 2524 | | 3106 PELEKE STREET Bldg Info N/A | | LIHUE | | HI |
nir-536-c | | 2524 | | 3106 PELEKE STREET Bldg Info N/A | | LIHUE | | HI |
nir-539-b | | 2524 | | 5757 WAYNE NEWTON BL | | LAS VEGAS | | NV |
nir-542-c-b | | 2524 | | 2001 E PLUM WAY | | RENO | | NV |
nir-545-b | | 2524 | | 9225 N E ARPT WAY | | PORTLAND | | OR |
nir-546-PDX-counter | | 2524 | | 7320 N E AIRPORT WAY | | PORTLAND | | OR |
nir-547 | | 2524 | | 3650 BIDDLE RD | | MEDFORD | | OR |
nir-548 | | 2524 | | 28801 DOUGLAS DRIVE #7 | | EUGENE | | OR |
nir-549 | | 2524 | | 9000 ARPT DR | | SPOKANE | | WA |
nir-550 | | 2524 | | 9000 ARPT DR | | SPOKANE | | WA |
nir-551 | | 2524 | | 17801 PACIFIC HWY S | | SEATAC | | WA |
nir-552-b | | 2524 | | 17801 PACIFIC HWY S | | SEATAC | | WA |
nir-5537 | | 2524 | | 1 AIRPORT RD STE 170 | | MANCHESTER | | NH |
nir-553-c-b | | 2610 | | 17801 PACIFIC HWY S | | SEATAC | | WA |
nir-554-01-Seattle-NWBag | | 2524 | | 17801 PACIFIC HWY S | | SEATAC | | WA |
nir-556 | | 2524 | | 3601 NORTH 20TH AVENUE | | Pasco | | WA |
nir-557 | | 2524 | | 1256 NOBLE STREET | | Fairbanks | | AK |
nir-563 | | 2524 | | 2620 E ARPT DR/RETURN | | TUCSON | | AZ |
nir-564 | | 2524 | | 7250 S TUCSON BL | | TUCSON | | AZ |
nir-565 | | 2524 | | 1037 N KOLB RD | | TUCSON | | AZ |
nir-566 | | 2524 | | 5151 N ORACLE RD | | TUCSON | | AZ |
nir-568 | | 2524 | | 2828 WALKER FIELD | | GRAND JUNCTION | | CO |
nir-569-b | | 2524 | | 24200 E 78TH AV | | DENVER | | CO |
nir-57 | | 2524 | | 115 W KIRBY AV | | CHAMPAIGN | | IL |
nir-570-denver-01 | | 2524 | | 24200 E 78TH AVE/ADMIN | | DENVER | | CO |
nir-570-denver-02 | | 2524 | | 24200 E 78TH AVE/ADMIN | | DENVER | | CO |
nir-574 | | 2524 | | 3201 ARPT WAY | | BOISE | | ID |
nir-575-Idaho-Falls | | 2524 | | 2140 N SKYLINE DR | | IDAHO FALLS | | ID |
nir-576 | | 2524 | | 5225 HWY 10 W | | MISSOULA | | MT |
nir-577 | | 2524 | | GLACIER INT’L ARPT | | KALISPELL | | MT |
nir-578 | | 2524 | | LOGAN FIELD INT’L ARPT | | BILLINGS | | MT |
nir-579 | | 2524 | | 2800 TERMINAL DR | | GREAT FALLS | | MT |
nir-58 | | 2524 | | 2 ARPT CIR | | ROCKFORD | | IL |
nir-580 | | 2524 | | GALLATIN FIELD ARPT | | BELGRADE | | MT |
nir-581 | | 2524 | | 2850 SKYWAY DR | | HELENA | | MT |
nir-583-slc-lobby | | 2524 | | 606 N 3800 W | | SALT LAKE CITY | | UT |
nir-584 | | 2524 | | 606 N 3800 W | | SALT LAKE CITY | | UT |
11
Router Name | | Model | | Address | | City | | ST |
nir-59 | | 2524 | | RT 9 E RURAL RT 1 | | BLOOMINGTON | | IL |
nir-5-b | | 2524 | | CHICAGO O’HARE INTL ARPT LOWER LEVEL TERMINAL 3 | | Chicago | | IL |
nir-60 | | 2524 | | 6100 EMD PKWY | | PEORIA | | IL |
nir-601 | | 2524 | | 6200 S PULLIAM RD | | FLAGSTAFF | | AZ |
nir-606 | | 2524 | | 15 WOOD AV | | EDISON | | NJ |
nir-619-juneau | | 2524 | | 1873 SHELL SIMMONS DRIVE | | JUNEAU | | AK |
nir-620 | | 2524 | | 2560 SHALLOWFORD RD N E | | ATLANTA | | GA |
nir-623 | | 2524 | | 524 ARPT LOOP/ STE 5 | | TWIN FALLS | | ID |
nir-624 | | 2524 | | 818 W CENTRAL AV | | MISSOULA | | MT |
nir-631 | | 2524 | | 745 E ST | | PITTSFIELD | | MA |
nir-634 | | 2524 | | 6211 TIPPEN AV | | PENSACOLA | | FL |
nir-636-anchorage | | 2524 | | 4891 W 50th Avenue Bldg Info | | ANCHORAGE | | AK |
nir-637-anchorage | | 2524 | | 1300 E 5th Bldg Info | | ANCHORAGE | | AK |
nir-639 | | 2524 | | 1511 AVIATION WAY/BUSH FLD | | AUGUSTA | | GA |
nir-63-b | | 2524 | | 6100 W RAYMOND | | INDIANAPOLIS | | IN |
nir-64 | | 2524 | | 1748 E. 116TH ST. | | Carmel | | IN |
nir-644 | | 2524 | | 6851 S COUNTRY CLUB RD | | TUCSON | | AZ |
nir-646-Puerto-Rico | | 2524 | | Avenue Salvador Caro Louis Mounoz Marin APO | | CARLINA | | PR |
nir-647-Puerto-Rico | | 2524 | | Avenue Salvador Caro Louis Mounoz Marin APO | | CARLINA | | PR |
nir-648-Puerto-Rico | | 2524 | | Avenue Salvador Caro Louis Mounoz Marin APO | | CARLINA | | PR |
nir-649 | | 2524 | | 801 PUTNEY RD | | BRATTLEBORO | | VT |
nir-651 | | 2524 | | RT 219 NORTH/AIRPORT | | LEWISBURG | | WV |
nir-657 | | 2524 | | 5155 STATE ST | | SAGINAW | | MI |
nir-66 | | 2524 | | 1203 E. 53RD St. | | Anderson | | IN |
nir-69-kokomo | | 2524 | | 3839 LAFOUNTIAN ST | | KOKOMO | | IN |
nir-70 | | 2524 | | 2850 BUICK-CADILLAC BLVD | | Bloomington | | IN |
nir-71 | | 2524 | | 7801 BUSSING DR HWY 57 | | EVANSVILLE | | IN |
nir-74 | | 2524 | | 1711 25TH STREET | | COLUMBUS | | IN |
nir-75 | | 2524 | | AIRPT RD/PRUDUE UNIV AIRPT | | WEST LAFAYETTE | | IN |
nir-76 | | 2524 | | 401 TERMINAL DR | | MUNCIE | | IN |
nir-77 | | 2524 | | 1200 S 3RD ST | | TERRE HAUTE | | IN |
nir-80 | | 2524 | | 3829 W FURGENSON RD | | FT. WAYNE | | IN |
nir-82 | | 2524 | | 3906 PIPER DR | | FT. WAYNE | | IN |
nir-83 | | 2524 | | 2299 AIRPT RD/WICHITA AIR | | WICHITA | | KS |
nir-84 | | 2524 | | 1300 AIRPT RD/WICHITA AIRPT | | WICHITA | | KS |
nir-85 | | 2524 | | 5500 FT RILEY BL | | MANHATTEN | | KS |
nir-87 | | 2524 | | 3300 ARPT RD | | ESCANABA | | MI |
nir-88 | | 2524 | | 101 SINCLAIR DR/AIRPORT | | MUSKEGON | | MI |
nir-90 | | 2524 | | 4100 CAPITAL CITY BL | | LANSING | | MI |
nir-91 | | 2524 | | 1330 ARPT ACCESS RD | | TRAVERSE CITY | | MI |
nir-92 | | 2524 | | 5239 PORTAGE RD | | KALAMAZOO | | MI |
nir-94 | | 2524 | | 225 AIRPORT AV | | GWINN | | MI |
nir-96 | | 2524 | | 2300 HWY 53 S | | INTERNATIONAL FALLS | | MN |
nir-97 | | 2524 | | 4015 MOBERG DR N W | | BEMIDJI | | MN |
nir-98 | | 2524 | | 2425 ARPT RD N E | | BRAINARD | | MN |
12
Router Name | | Model | | Address | | City | | ST |
nir-99-b | | 2524 | | ROCHESTER INT’L ARPT | | ROCHESTER | | MN |
nir-alamo-training | | 2524 | | 1011 TRADECOURT | | Raleigh | | NC |
nir-cbl-01-campbell | | 2524 | | 1100 E. Campbell | | Richardson | | TX |
nir-csn-02-GooseCreek | | 2610 | | 208 ST JAMES AV | | GOOSE CREEK | | SC |
nir-lax-01-LosAngeles | | 3620 | | 9419 ARPT BL | | LOS ANGELES | | CA |
nir-lax-02-LosAngeles | | 2524 | | 9419 ARPT BL | | LOS ANGELES | | CA |
nir-McKinleyville | | 2610 | | 3561 BOEING AVE | | MCKINLEYVILLE | | CA |
nir-montrose | | 2524 | | 2100 ARPT RD | | MONTROSE | | CO |
nir-ord-01-arlhgts | | 2524 | | 2340 S ARLINGTON HEIGHTSRD/STE 620 | | ARLINGTON HEIGHTS | | IL |
nir-ord-02-service-admin | | 2524 | | 570 BESSIE COLEMAN DR | | CHICAGO | | IL |
nir-herndon-va | | 3620 | | PSC 13880 Dulles Corner Lane Park West at Dulles Corner | | Herndon | | VA |
nir-rmf-01-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-01-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-01-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-01-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-02-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-02-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-02-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-02-rimf | | 7507 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-08-rimf | | 3620 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-08-rimf | | 3620 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-09-nat-amex | | 2500 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-rmf-09-nat-amex | | 2500 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-sfo-01-Burlingame | | 2524 | | 40 EDWARDS CT | | BURLINGAME | | CA |
nir-sfo-01-c | | 2610 | | SAN FRAN INTL ARPT BLDG 78 | | SOUTH SAN FRANCISCO | | CA |
nir-sfo-02-c | | 2610 | | SAN FRAN INTL ARPT BLDG 78 | | SOUTH SAN FRANCISCO | | CA |
nir-x25-r1-prod | | 3640 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-x25-r2-prod | | 3640 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-x25-r2-prod | | 3640 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-x25-r3-test | | 3640 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-x25-r3-test | | 3640 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-x25-r4-back | | 3640 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-x25-r4-back | | 3640 | | 1780 Jay Ell Drive | | Richardson | | TX |
nir-022 | | 2610 | | 4625 W 55th Street | | Chicago | | IL |
nir-xxx-01-houston | | 2524 | | 4551 WILL CLAYTON PKWY | | HOUSTON | | TX |
nir-yeg-01-edmonton | | 3620 | | INTERNATIONAL AIRPORT | | EDMONTON | | AB |
nir-yhz-01-halifax | | 3620 | | D188 HALIFAX INT’L ARPT | | Enfield | | NS |
nir-yhz-01-halifax | | 3620 | | D188 HALIFAX INT’L ARPT | | Enfield | | NS |
nir-yhz-bellroad | | 2524 | | 180 Bell Road | | HALIFAX | | NS |
nir-ymj-01-moosejaw | | 2524 | | 614 MAIN STREET | | MOOSEJAW | | SK |
nir-ymj-01-moosejaw | | 2524 | | 614 MAIN STREET | | MOOSEJAW | | SK |
13
Router Name | | Model | | Address | | City | | ST |
nir-yow-01-ottawa | | 3620 | | 50 Airport Rd | | OTTAWA | | ON |
nir-yow-01-ottawa | | 3620 | | 50 Airport Rd | | OTTAWA | | ON |
nir-yow-01-ottawa | | 3620 | | 50 Airport Rd | | OTTAWA | | ON |
nir-yow-02-ottawa-b | | 2524 | | 50 Airport Rd | | OTTAWA | | ON |
nir-yow-03-ottawa-k | | 2524 | | 50 Airport Rd | | OTTAWA | | ON |
nir-yow-04-eastend | | 3620 | | 1733 ST LAURENT BLVD | | OTTAWA | | ON |
nir-yow-04-eastend | | 3620 | | 1733 ST LAURENT BLVD | | OTTAWA | | ON |
nir-yow-04-eastend | | 3620 | | 1733 ST LAURENT BLVD | | OTTAWA | | ON |
nir-yow-arnprior | | 2610 | | 19 Baskin Drive | | ARNPRIOR | | ON |
nir-yqg-airport | | 2610 | | MAIN ST 3200 COUNTRY RD 42 | | WINDSOR | | ON |
nir-yqr-01-regina | | 2524 | | 2627 AIRPORT ROAD Bldg Info | | REGINA | | SK |
nir-yqr-01-regina | | 2524 | | 2627 AIRPORT ROAD Bldg Info | | REGINA | | SK |
nir-yqy-01-sydney | | 2524 | | SYDNEY AIRPORT Bldg Info | | SYDNEY | | NS |
nir-yqy-01-sydney | | 2524 | | SYDNEY AIRPORT Bldg Info | | SYDNEY | | NS |
nir-yul-01-montreal | | 2520 | | ROMEO VACHON | | DORVAL | | PQ |
nir-yul-01-montreal | | 2520 | | ROMEO VACHON | | DORVAL | | PQ |
nir-yul-01-montreal | | 2520 | | ROMEO VACHON | | DORVAL | | PQ |
nir-yul-02-motreal-k | | 2524 | | ROMEO VACHON | | DORVAL | | PQ |
nir-yul-03-montreal-intl | | 2524 | | 975 Romeo Vachon Blvd Suite CT1 | | DORVAL | | PQ |
nir-yul-04-montreal-g | | 2524 | | ROMEO VACHON | | DORVAL | | PQ |
nir-yul-05-stanley | | 3620 | | 1200 Stanly St | | Montreal | | PQ |
nir-yul-06-mozart | | 2524 | | 33 MOZART STREET EAS | | MONTREAL | | PQ |
nir-yvr-01-vancouver | | 2524 | | 5140 GRANT MCCONACHIE | | RICHMOND | | BC |
nir-yvr-01-vancouver | | 2524 | | 5140 GRANT MCCONACHIE | | RICHMOND | | BC |
nir-yvr-01-vancouver | | 2524 | | 5140 GRANT MCCONACHIE | | RICHMOND | | BC |
nir-yvr-02-cityadmin | | 3620 | | 3866 McDonald Dr | | Vancouver | | BC |
nir-yvr-02-cityadmin | | 3620 | | 3866 McDonald Dr | | Vancouver | | BC |
nir-ywg-01-winnipeg | | 3620 | | 2000 WELLINGTON Bldg Info | | WINNIPEG | | MB |
nir-ywg-01-winnipeg | | 3620 | | 2000 WELLINGTON Bldg Info | | WINNIPEG | | MB |
nir-ywg-ellice | | 2610 | | 283 Ellice Ave | | Winnipeg | | MB |
nir-yxe-01-saskatoon | | 2524 | | 2625 AIRPORT DRIVE | | SASKATOON | | SK |
nir-yxe-01-saskatoon | | 2524 | | 2625 AIRPORT DRIVE | | SASKATOON | | SK |
nir-yxu-01-london | | 2524 | | 750 Crumlin Rd London ON N5V 3B6 | | LONDON | | ON |
nir-yxu-01-london | | 2524 | | 750 Crumlin Rd London ON N5V 3B6 | | LONDON | | ON |
nir-yyc-01-calgary | | 2524 | | 2000 AIRPORT ROAD N.E. Bldg Info | | CALGARY | | AB |
nir-yyc-01-calgary | | 2524 | | 2000 AIRPORT ROAD N.E. Bldg Info | | CALGARY | | AB |
nir-yyc-01-calgary | | 2524 | | 2000 AIRPORT ROAD N.E. Bldg Info | | CALGARY | | AB |
nir-yyc-04-78thave | | 3620 | | 2335 78TH AVENUE N.E. | | CALGARY | | AB |
nir-yyc-04-78thave | | 3620 | | 2335 78TH AVENUE N.E. | | CALGARY | | AB |
nir-yyz-01-attwell | | 4500 | | 280 Atwell Dr | | TORONTO | | ON |
nir-yyz-02-attwell | | 3620 | | 280 Atwell Dr | | TORONTO | | ON |
14
Router Name | | Model | | Address | | City | | ST |
nir-yyz-03-toronto-t1 | | 2524 | | Toronto Person Airport | | Toronto | | ON |
nir-yyz-03-toronto-t1 | | 2524 | | Toronto Person Airport | | Toronto | | ON |
nir-yyz-03-toronto-t1 | | 2524 | | Toronto Person Airport | | Toronto | | ON |
nir-yyz-04-toronto-t1k | | 2524 | | Toronto Person Airport | | Toronto | | ON |
nir-yyz-05-toronto-t2 | | 2520 | | Toronto Pearson Airport | | Toronto | | ON |
nir-yyz-05-toronto-t2 | | 2520 | | Toronto Pearson Airport | | Toronto | | ON |
nir-yyz-05-toronto-t2 | | 2520 | | Toronto Pearson Airport | | Toronto | | ON |
nir-yyz-06-toronto-t2k | | 2524 | | Toronto Pearson Airport | | Toronto | | ON |
nir-yyz-07-toronto-t3 | | 2524 | | Airport Road / Dixon Road Terminal 3 | | Toronto | | ON |
nir-yyz-07-toronto-t3 | | 2524 | | Airport Road / Dixon Road Terminal 3 | | Toronto | | ON |
nir-yyz-08-toronto-t3k | | 2524 | | Airport Road / Dixon Road Terminal 3 | | Toronto | | ON |
nir-yyz-09-burlington | | 2524 | | 4121 Morris Dr | | Burlington | | ON |
nir-yyz-09-burlington | | 2524 | | 4121 Morris Dr | | Burlington | | ON |
nir-yyz-10-yonge | | 3620 | | 930 YONGE STREET | | TORONTO | | ON |
nir-yyz-10-yonge | | 3620 | | 930 YONGE STREET | | TORONTO | | ON |
nir-yyz-10-yonge | | 3620 | | 930 YONGE STREET | | TORONTO | | ON |
nir-yyz-11-union | | 2524 | | 65 Front St West | | TORONTO | | ON |
nir-yyz-11-union | | 2524 | | 65 Front St West | | TORONTO | | ON |
nir-yyz-11-union | | 2524 | | 65 Front St West | | TORONTO | | ON |
nir-yyz-12-union-k | | 2524 | | 65 Front St (Parking Lot Booth) | | TORONTO | | ON |
nir-yyz-hamilton | | 2524 | | 766 Burlington Street | | Hamilton | | ON |
Prologix | | 2524 | | 539 JACKSONVILLE ROAD | | WARMINSTER | | PA |
nir-yeg-svc-rd | | 2610 | | Service Road National Car Service Lot | | Edmonton | | AL |
yka-arpt | | 2610 | | KAMLOOPS AIRPORT | | KAMLOOPS | | BS |
nir-yqr-cityadmin | | 2610 | | 2627 AIRPORT ROAD Bldg Info N/A | | REGINA | | SK |
ywg-regent | | 2524 | | 1355 Regent Ave Unit C, Winnipeg, MB. R2C 3B2 | | WINNIPEG | | MB |
nir-yxe-avenue-c | | 2610 | | 111-2301 AVENUE C NORTH Bldg Info N/A | | SASKATOON | | SK |
arg-yca-dntwn | | 2610 | | RYAN RD 320 OLD ISLAND HWY | | COURTNEY | | BC |
arg-ypr | | 2610 | | 5TH ST 213-500 2ND AV W | | PRINCE RUPERT | | BC |
nir-5101 | | cisco 2610 | | 1090 King Georges Post Rd. | | Edison | | NJ |
nir-yto-oshawa | | cisco 2524 | | 282 King Street West | | Oshawa | | ON |
nir-yea-jasper | | cisco 2524 | | 9943 Jasper Ave | | Edmonton | | AB |
nir-3100 | | cisco 2610 | | 7909 Karl May Dr | | Waco | | TX |
nir-1141 | | cisco 2610 | | 15000 N. Airport Dr. | | Scottsdale | | AZ |
nir-4129 | | cisco 2610 | | 50 Terminal Dr Terminal 1,Ft Laud Int’l | | Ft. Lauderdale | | FL |
nir-3085 | | cisco 2610 | | 8927 International Street | | San Antonio | | TX |
nir-yhz-bellroad | | cisco 2524 | | 180 Bell Road | | Halifax | | NS |
nir-3111 | | 1600 | | 220 County Road / Brazoria County Airport | | Angleton | | TX |
nir-5140 | | 1602 | | 39 Old Ridgeberry Rd | | Danbury | | CT |
nir-5140 | | 1602 | | 39 Old Ridgeberry Rd | | Danbury | | CT |
15
Router Name | | Model | | Address | | City | | ST |
nir-5140 | | 1602 | | 39 Old Ridgeberry Rd | | Danbury | | CT |
nir-6084 | | 2524 | | 158 Queen St | | North Sydney | | NS |
nir-6084 | | 2524 | | 158 Queen St | | North Sydney | | NS |
nir-6084 | | 2524 | | 158 Queen St | | North Sydney | | NS |
nir-402-02 | | 2524 | | 2301 N W 33RD AV | | MIAMI | | FL |
nir-402-01 | | 2610 | | 2301 N W 33RD AV | | MIAMI | | FL |
nir-402-01 | | 2610 | | 2301 N W 33RD AV | | MIAMI | | FL |
nir-402-01 | | 2610 | | 2301 N W 33RD AV | | MIAMI | | FL |
nir-402-01 | | 2610 | | 2301 N W 33RD AV | | MIAMI | | FL |
nir-402-c | | 2524 | | MIAMI INTL AIRPORT INTERNATIONAL ARRIVALS | | MIAMI | | FL |
nir-402-c | | 2524 | | MIAMI INTL AIRPORT INTERNATIONAL ARRIVALS | | MIAMI | | FL |
nir-402-b | | 2524 | | MIAMI INT’L AIRPORT AMERICAN COUNTER/ZONE C | | MIAMI | | FL |
nir-402-b | | 2524 | | MIAMI INT’L AIRPORT AMERICAN COUNTER/ZONE C | | MIAMI | | FL |
alm-4400-a | | 804 | | 2301 NW 33rd Ave | | MIAMI | | FL |
alm-4400-a | | 804 | | 2301 NW 33rd Ave | | MIAMI | | FL |
alm-4400-b | | 804 | | 2301 NW 33rd Ave | | MIAMI | | FL |
alm-4400-b | | 804 | | 2301 NW 33rd Ave | | MIAMI | | FL |
alm-4400-c | | 804 | | 2301 NW 33rd Ave | | MIAMI | | FL |
alm-4400-e | | 804 | | 2301 NW 33rd Ave | | MIAMI | | FL |
alm-4400-e | | 804 | | 2301 NW 33rd Ave | | MIAMI | | FL |
sccb-res-center | | 2610 | | 1430 CONFEDERATE AV | | COLUMBIA | | SC |
nir-3102 | | 2610 | | 900 Airline Drive | | Kenner | | LA |
nir-1142 | | 2610 | | 2401 Airport Blvd | | San Jose | | CA |
nir-5124 | | 2610 | | 9 Roseland Ave | | Warwick | | RI |
nir-4130 | | 2524 | | 12125 High Tech Ave | | ORLANDO | | FL |
nir-yqr-broad-st | | 2524 | | 789 Broad Street | | Regina | | SK |
nir-2150 | | 2610 | | 2524 N Airport | | Springfield | | MO |
arg-yyg-arpt-t1 | | 2610 | | 250 Maple Hills Ave | | Charlottetown | | PE |
arg-yyg-arpt-t1 | | 2610 | | 250 Maple Hills Ave | | Charlottetown | | PE |
arg-yyg-arpt-t1 | | 2610 | | 250 Maple Hills Ave | | Charlottetown | | PE |
arg-yca-duncan | | 2610 | | 3030 Allenby Rd | | Duncan | | BC |
arg-yca-duncan | | 2610 | | 3030 Allenby Rd | | Duncan | | BC |
arg-yca-duncan | | 2610 | | 3030 Allenby Rd | | Duncan | | BC |
yyg-dwtn | | 804 | | 10 Prince Street | | Charlottetown | | PE |
arg-yxx-abbotsford | | 2610 | | 31808 South Fraser Way | | Abbotsford | | BC |
arg-yxx-abbotsford | | 2610 | | 31808 South Fraser Way | | Abbotsford | | BC |
arg-yxx-abbotsford | | 2610 | | 31808 South Fraser Way | | Abbotsford | | BC |
arg-yxx-abbotsford | | 2610 | | 31808 South Fraser Way | | Abbotsford | | BC |
arg-yca-comox | | 2610 | | 1330 Military Row | | Lazo | | BC |
arg-yxx-chilliwack | | 2610 | | 45750B Luckakuck Way | | Chilliwack | | BC |
arg-yxx-chilliwack | | 2610 | | 45750B Luckakuck Way | | Chilliwack | | BC |
TRN-IAD-01 | | 2610 | | 23430 Autopilot Drive | | Dulles | | VA |
TRN-TOL-01 | | 2610 | | 11013 Airport Highway | | Swanton | | OH |
TRN-YWG-DT | | C2600 | | 283 Elice Ave | | Winnipeg | | MA |
TRN-YWG-01 | | C2600 | | 2000 Wellington Ave | | Winnipeg | | MA |
16
Router Name | | Model | | Address | | City | | ST |
TRN-YXE-DT | | 2610 | | 111-231 Avenue C North | | Saskatoon | | SA |
TRN-ROC-01 | | 2610 | | 1300 Brooks Avenue | | Rodchester | | NY |
TRN-RIC-01 | | 2610 | | 1 Richard E Byrd Terminal Drive | | Richmond | | VA |
TRN-PIT-01 | | 2610 | | Greater Pittsburgh Intl Arpt P O Box 12413 Lot #7 | | Pittsburgh | | PA |
TRN-AUS-01 | | 2610 | | 3600 Presidential #108 | | Austin | | TX |
TRN-TUL-01 | | 2610 | | 2222 N. 73rd. Ave. | | Tulsa | | OK |
TRN-MOB-01 | | 2610 | | Mobile Region Airport 88009 | | Mobile | | AL |
TRN-JAN-01 | | 2610 | | 143 S. Hangar Drive | | Jackson | | MS |
TRN-YOW-ADMIN | | 2610 | | 1733 St. Laurent Blvd | | Ottawa | | ON |
TRN-OMA-01 | | 2610 | | 2323 Fairchild Court | | Omaha | | NE |
TRN-SDF-01 | | 2610 | | 4557 Crittenden Drive | | Louisville | | KY |
TRN-DAY-01 | | 2610 | | 3350 Valet Drive | | Vandalia | | OH |
TRN-CVG-01 | | 2610 | | 3230 Loomis Road | | Hebron | | KY |
TRN-YYC-ADMIN | | 2610 | | 2335 78th. Ave | | Calgary | | AB |
TRN-NYC-01 | | 2610 | | 219 W. 77 Street | | New York | | NY |
TRN-DTW-01 | | 2610 | | Bldg 338 Lucas Drive | | Detroit | | MI |
TRN-IAH-01 | | 2610 | | 4551 Will Clayton Pkwy | | Houston | | TX |
TRN-MSY-01 | | 2610 | | 1020 Airline Hwy Service Rd A | | Kenner | | LA |
TRN-BNA-01 | | 2610 | | 760 Hangar Lane | | Nashville | | TN |
TRN-MEM-01 | | 2610 | | 2680 Rental Road | | Memphis | | TN |
TRN-MEM-01 | | 2610 | | 2680 Rental Road | | Memphis | | TN |
TRN-YQR-OPS | | 2610 | | 2627 Airport Rd | | Regina | | SA |
TRN-HSV-01 | | 2610 | | 1000 Gleen Hearn Blvd | | Huntsville | | AL |
TRN-ITO-01 | | 2610 | | Hilo Intl Airport | | Hilo | | HI |
TRN-MONTREAL-DT | | 2610 | | 1200 Stanley St | | Montreal | | QU |
TRN-BC-ADMIN | | 2610 | | 3866 McDonald Rd | | Richmond | | BC |
TRN-CAN-HQ | | 2610 | | 280 Attwell Drive | | Etobicoke | | ON |
TRN-SAV-01 | | 2610 | | 44 Ida J. Gadsden Drive | | Savannah | | GA |
TRN-MKC-01 | | 2610 | | 868 Tel Aviv | | Kansas City | | MO |
TRN-BHM-01 | | 2610 | | 5527 Airline Drive | | Birmingham | | AL |
TRN-TYS-01 | | 2610 | | 1933 Alcoa Hgwy | | Alcoa | | TN |
TRN_SYR_01 | | 2610 | | CE Hancock Airport | | Syracuse | | NY |
TRN-SAN-01 | | 2610 | | 3280 North Harbor Drive | | San Diego | | CA |
TRN-MCO-02 | | 2610 | | 8350 Hangar Blvd | | Orlando | | FL |
TRN-BOS-01 | | 2610 | | 6 Tomanahwk Drive | | East Boston | | MA |
TRN-CLE-01 | | 2610 | | 18809 Maplewood Ave | | Cleveland | | OH |
TRN-MIA-01 | | 2610 | | 3355 NW 22nd. Street | | Miami | | FL |
TRN-RDU-01 | | 2610 | | 1001 Car Rental Road | | Raleigh | | NC |
TRN-MSP-01 | | 2610 | | 2500 Stewart Ave | | ST Paul | | MN |
TRN-ORD-01 | | 2610 | | 560 Bessie Coleman Dr | | Chicago | | IL |
TRN-YEG-01 | | 2610 | | Service Road National Car Service Lot | | Edmonton | | AL |
TRN-YEG-ADMIN | | 2610 | | Service Road National Car Service Lot | | Edmonton | | AL |
TRN-HOU-01 | | 2610 | | 7600 Airport Blvd | | Houston | | TX |
TRN-HRL-01 | | 2610 | | 3030 Airport Drive | | Harlingen | | TX |
TRN-JAX-01 | | 2610 | | 2030 Rental Car Lane | | Jacksonville | | FL |
TRN-CHS-01 | | 2610 | | 3440 Rental Car Lane | | Charleston | | SC |
17
Router Name | | Model | | Address | | City | | ST |
TRN-PNS-01 | | 2610 | | 2430 Airport Blvd | | Pensacola | | FL |
TRN-MYR-01 | | 2610 | | 1050 Jetport Rd | | Myrtle Beach | | SC |
TRN-CAE-01 | | 2610 | | 3210 Service Drive | | West Columbia | | SC |
TRN-PFN | | 2610 | | 3173 Airport Road | | Panama City | | FL |
TRN-CLT-01 | | 2610 | | 4108 Rental Car Raod | | Charlotte | | NC |
TRN-MLB-01 | | 2610 | | 1050 SOUTH JOE WALKER RD Bldg Info N/A | | MELBOURNE | | FL |
TRN-SEA-01 | | 2610 | | 19707 Pacific Highway | | Seattle | | WA |
TRN-SJC-01 | | 2610 | | 2300 Airport Blvd | | San Jose | | CA |
TRN-PDX-01 | | 2610 | | 9225 NE Airport Way | | Portland | | OR |
TRN-OAK-01 | | 2610 | | 165 98th. Avenue | | Oakland | | CA |
TRN-GEG-01 | | 2610 | | P O Box 19130 | | Spokane | | WA |
TRN-ATL-01 | | 2610 | | 3600 Naturally Fresh Blvd | | College Park | | GA |
TRN-SFO-01 | | 2610 | | 780 McDonnell Rd | | San Francisco | | CA |
TRN-GSO-01 | | 2610 | | 6319 Bryan Blvd | | Greensboro | | NC |
TRN-CHA-01 | | 2610 | | 1001 Airport Road | | Chattanooga | | TN |
TRN-BDL | | 2610 | | SCHOEPHOESTER ROAD BRADLEY IAP | | WINDSOR LOCKS | | CT |
TRN-BUF-01 | | 2610 | | 4499 Genesee Street | | Cheetowaga | | NY |
TRN-LGA-01 | | 2610 | | 95-10 Ditmars Blvd | | E. Elmhurst | | NY |
TRN-DFW-01 | | C2600 | | 2424 38th Ave | | Dallas | | Tx |
TRN-VPS-01 | | 2610 | | Okaloosa County Air Terminal,Satae Rd 85 | | Eglin AFB | | FL |
TRN-GRR-01 | | 2610 | | 5500 4th Street SE, Cascade TWP | | Grand Rapids | | MI |
TRN-MHT-01 | | 2610 | | Main Terminal, (LON) | | Manchester | | NH |
TRN-PWM-01 | | 2610 | | 60 Darling Avenue | | South Portland | | ME |
TRN-YVR-DT | | 2610 | | 1130 West Georgia St | | Vanvouver | | BC |
TRN-YHZ-01 | | 2610 | | 81 Bell Ave | | Enfield | | NS |
TRN-HNL-01 | | 2610 | | 2912 Aolele St | | Honolulu | | HI |
TRN-MDW-01 | | 2610 | | 4625 W. 55th St | | Chicago | | IL |
TRN-LAX-02 | | C2600 | | 9419 Airport Blvd | | Los Angeles | | CA |
TRN-DCA-01 | | C2600 | | Reagan Washington National Airport | | Washington | | DC |
TRN-SNA-01 | | 2610 | | 4361 Birch St | | Newport Beach | | CA |
nir-1150 | | 2524 | | 2912 Aolele St | | Honolulu | | HI |
TRN-EWR-01 | | C2600 | | Newark Int’l Airport Bldg 25 | | Newark | | NJ |
TRN-YUL-ADMIN | | 2610 | | 666 Albert de Niverville | | Dorval | | QU |
TRN-TLH-01 | | TRN-TLH-01 | | 3000 Capital City Circle SW | | Tallahassee | | FL |
TRN-PHF-01 | | 2610 | | News/Williamsburg Int’l Airport | | Newport News | | VA |
nir-4142 | | 2524 | | 4231 Macon Road, Suite 6 | | Columbus | | GA |
nir-5125 | | 2524 | | 1944 Williston Road | | South Burlington | | VT |
yow-gatineau | | 804 | | 415 Maloney Blvd Ouest | | Gatineau | | PQ |
NIR-1153 | | 2610 | | 1256 NOBLE STREET Bldg Info N/A | | FAIRBANKS | | AK |
nir-yqb-arpt | | 2610 | | 510 Route Principale | | St Foy | | PQ |
nir-yqb-arpt | | 2610 | | 510 Route Principale | | St Foy | | PQ |
nir-yqb-arpt | | 2610 | | 510 Route Principale | | St Foy | | PQ |
yqb-levis | | 804 | | 72 Route President Kennedy | | Levis | | PQ |
nir-421 | | 2610 | | 5325 Buffington Rd | | College Park | | GA |
ncr-fll | | 2610 | | 1795 Perimeter Road FT LAUDERDALE INTL ARPT | | DANIA | | FL |
18
Router Name | | Model | | Address | | City | | ST |
nir-honolulu-admin-02 | | 2610 | | 3015 KOAPAKA STREET | | HONOLULU | | HI |
nir-ytaw01-deepriver | | 2610 | | 20 Highway 17 East | | Deep River | | ON |
nir-ytaw01-deepriver | | 2610 | | 20 Highway 17 East | | Deep River | | ON |
nir-ytaw01-deepriver | | 2610 | | 20 Highway 17 East | | Deep River | | ON |
nir-ywg-waverly | | 804 | | 1437 Waverley Street | | Winnipeg | | MB |
nir-ywg-waverly | | 804 | | 1437 Waverley Street | | Winnipeg | | MB |
yvr-broadway | | Cisco 804 | | 1770 West Broadway | | Vancouver | | BC |
yvr-broadway | | Cisco 804 | | 1770 West Broadway | | Vancouver | | BC |
yto-dixon | | 2610 | | 600 Dixon Road | | Toronto | | ON |
yto-dixon | | 2610 | | 600 Dixon Road | | Toronto | | ON |
yto-dixon | | 2610 | | 600 Dixon Road | | Toronto | | ON |
nir-yyz-01-attwell | | 4500 | | 280 Attwell Dr., | | ETOBICOKE | | ON |
nir-langley | | 2610 | | 20168 Fraser Hwy | | Langley | | BC |
nir-langley | | 2610 | | 20168 Fraser Hwy | | Langley | | BC |
nir-480 | | 2524 | | 515 West 4th Ave | | Escondido | | CA |
nir-397-02 | | 2610 | | 8997 AIRPORT BLVD Terminal A | | ORLANDO | | FL |
nir-398-02 | | 2610 | | 8997 AIRPORT BLVD Terminal B | | ORLANDO | | FL |
yqb-jeantalon | | 772 | | 2240 Jean Talon Nord | | Ste Foy | | PQ |
yqb-charest | | cisco 804 | | 542 Charest Est | | Quebec City | | PQ |
yqb-charest | | cisco 804 | | 542 Charest Est | | Quebec City | | PQ |
nir-yqb-arpt | | 2610 | | 510 Route Principale | | St Foy | | PQ |
argr-hqt-02 | | Cisco 3620 | | 7700 France Avenue, South EDINA | | MINNEAPOLIS | | MN |
anc-plh-cnt | | 2610 | | Philadelphia Airport | | PHILADELPHIA | | PA |
alm-1300 | | 2610 | | 24530 E 78TH AV | | DENVER | | CO |
alm-1301 | | 2610 | | 8200 PENA BL | | DENVER | | CO |
alm-1302 | | 2610 | | 38750 W HWY 82 | | ASPEN | | CO |
alm-1303 | | 2610 | | 7770 E DRENNAN RD | | COLORADO SPRINGS | | CO |
alm-1304 | | 2610 | | 7744 JIM IRWIN RD | | COLORADO SPRINGS | | CO |
alm-1305 | | 2610 | | 706 N 3800 W | | SALT LAKE CITY | | UT |
alm-1306 | | 2524 | | 776 N TERMINAL DR | | SALT LAKE CITY | | UT |
alm-1307 | | 2610 | | 1250 E ARPT RD | | JACKSON HOLE | | WY |
alm-1308 | | 2610 | | 1250 E ARPT RD | | JACKSON HOLE | | WY |
alm-1310 | | 2610 | | 2620 E ARPT DR | | TUCSON | | AZ |
alm-1311 | | 2610 | | 2620 E ARPT DR | | TUCSON | | AZ |
alm-1321 | | 2524 | | 3200 SKY HARBOR BL | | PHOENIX | | AZ |
alm-1322 | | 2524 | | 3400 SKY HARBOR BL | | PHOENIX | | AZ |
alm-1323 | | 2610 | | 3600 SKY HARBOR BL | | PHOENIX | | AZ |
alm-1325-01 | | 2610 | | 6855 BERMUDA ROAD | | LAS VEGAS | | NV |
alm-1325-02 | | 2610 | | 6855 BERMUDA ROAD | | LAS VEGAS | | NV |
alm-1325-controllers | | 2524 | | 6855 BERMUDA ROAD | | LAS VEGAS | | NV |
alm-1326-01 | | 2610 | | 9020 AVIATION BLVD — 1ST FLR | | INGLEWOOD | | CA |
alm-1326-02 | | 2610 | | 9020 AVIATION BLVD — 1ST FLR | | INGLEWOOD | | CA |
alm-1326hh | | 2524 | | 9020 AVIATION BLVD — 1ST FLR | | INGLEWOOD | | CA |
alm-1327 | | 2610 | | 9121 AVIATION BL | | INGLEWOOD | | CA |
alm-1328 | | 2610 | | 500 WORLD WAY | | LOS ANGELES | | CA |
19
Router Name | | Model | | Address | | City | | ST |
alm-1331 | | 2610 | | 100 WORLD WAY TERMINAL #1 | | INGLEWOOD | | CA |
alm-1334 | | 2610 | | 4529 EMPIRE AV | | BURBANK | | CA |
alm-1335 | | 2610 | | 2627 N HOLLYWOOD WAY T B | | BURBANK | | CA |
alm-1336 | | 2610 | | 2627 N HOLLYWOOD WAY | | BURBANK | | CA |
alm-1337 | | 2610 | | 9020 AVIATION WAY | | INGLEWOOD | | CA |
alm-1338 | | 2610 | | 300 WORLD WAY | | INGLEWOOD | | CA |
alm-1352 | | 2610 | | 4361 BIRCH ST | | NEWPORT BCH | | CA |
alm-1355 | | 2610 | | 3450 EAST AIRPORT BLVD | | ONTARIO | | CA |
alm-1358 | | 2610 | | 2942 KETTNER BL | | SAN DIEGO | | CA |
alm-1358HH | | 2524 | | 2942 KETTNER BL | | SAN DIEGO | | CA |
alm-1360 | | 2610 | | 3 West MOKUEA PLACE/Admin | | KAHULUI MAUI | | HI |
alm-1362 | | 2610 | | 3055 N. NIMITZ HWY | | HONOLULU | | HI |
alm-1364 | | 2610 | | 1777 ALA MOANA BLVD | | HONOLULU | | HI |
alm-1366 | | 2610 | | 905 MOKUEU PLACE | | KAHULUI | | HI |
alm-1368 | | 2610 | | 30-C Halawai Drive | | West Maui | | HI |
alm-1369-c | | 2524 | | General Lyman Field | | Hilo | | HI |
alm-1370 | | 2610 | | 131 KEKUANAA PLACE | | HILO | | HI |
alm-1371 | | 2610 | | P O Box 449 | | Kailua Kona | | HI |
alm-1372-c | | 2610 | | Keahole-Kona Airport | | Kailua-Kona | | HI |
alm-1373 | | 2610 | | P O Box 449 | | Kailua Kona | | HI |
alm-1374 | | 2610 | | 3276 Hoolimalima Place | | Lihue | | HI |
alm-1375-c | | 2610 | | 3106 Peleke Street | | Lihue | | HI |
alm-1376 | | 2610 | | 3073 Aukele St. | | LIHUE KAUAI | | HI |
alm-1400 | | 2610 | | 40 EDWARDS COURT | | BURLINGAME | | CA |
alm-1400hh | | 2524 | | 40 EDWARDS COURT Bldg Info | | BURLINGAME | | CA |
alm-1402 | | 2610 | | 687 FOLSOM ST | | SAN FRANCISCO | | CA |
alm-1403 | | 2610 | | 750 BUSH ST | | SAN FRANCISCO | | CA |
alm-1404 | | 2610 | | 2752 DE LA CRUZ BLVD | | SANTA CLARA | | CA |
alm-1406 | | 2610 | | 6320 MC NAIR CIR | | SACRAMENTO | | CA |
ala-rno-base | | 2610 | | 1120 TERNINAL WAY | | RENO | | NV |
alm-1409 | | 2524 | | 20636 PACIFIC HWY S | | SEATTLE | | WA |
alm-1410 | | 2610 | | 21002 PACIFIC HWY S | | SEATTLE | | WA |
alm-1412 | | 2610 | | 17801 PACIFIC HWY S | | SEATAC | | WA |
alm-1413 | | 2610 | | 17801 PACIFIC HWY S | | SEATAC | | WA |
alm-1414 | | 2610 | | 1301 6TH AV | | SEATTLE | | WA |
alm-1420 | | 2610 | | 5000 WEST INTERNATIONAL ROAD | | ANCHORAGE | | AK |
alm-2321 | | 2610 | | 4600 INTERNATL GATEWAY | | COLUMBUS | | OH |
alm-2321hh | | 2610 | | 4600 INTERNATL GATEWAY | | COLUMBUS | | OH |
alm-2361 | | 2610 | | 135 JUDSON DR | | ALCOA | | TN |
alm-2390 | | 2610 | | 5300 SOUTH HOWELL AVENUE | | MILWAUKEE | | WI |
alm-2400-01-c | | 2610 | | 3800 NORTH MANNHEIM ROAD | | FRANKLIN PARK | | IL |
alm-2410 | | 2610 | | 6525 S CICERO AV | | CHICAGO | | IL |
alm-2420 | | 2610 | | 4534 WOODSON RD | | SAINT LOUIS | | MO |
alm-2420hh | | 2610 | | 4534 WOODSON RD | | SAINT LOUIS | | MO |
alm-3312-c | | 2524 | | 9800 AIRPORT BLVD | | SAN ANTONIO | | TX |
alm-3314 | | 2610 | | 8530 Eastern Ave | | San Antonio | | TX |
alm-3315-01 | | 2610 | | 9310 Presidential Blvd | | AUSTIN | | TX |
20
Router Name | | Model | | Address | | City | | ST |
alm-3315-02 | | 2610 | | 9310 Presidential Blvd | | AUSTIN | | TX |
alm-3315hh | | 2524 | | 9310 Presidential Blvd | | Austin | | TX |
alm-3315-HH | | 2524 | | 9310 Presidential Blvd | | Austin | | TX |
alm-3321 | | 2610 | | 2911 N SAM HOUSTON PKWY E | | HOUSTON | | TX |
alm-3350 | | 2610 | | 3721 E ROOSEVELT | | LITTLE ROCK | | AR |
alm-3351 | | 2610 | | 1 ARPT RD | | LITTLE ROCK | | AR |
alm-4325 | | 2610 | | 3480 Rental Car Lane | | Charleston | | SC |
alm-4326-c | | 2524 | | 5500 INTERNATIONAL BL | | CHARLESTON | | SC |
alm-4340 | | 2610 | | 1011 TRADE CT | | RALEIGH | | NC |
Alm-4348 | | 2524 | | ONE SIGNIA PLAZA, STE 900 | | Greenville | | SC |
alm-4351 | | 2610 | | 1720 RICHARD PETTY BL | | DAYTONA BCH | | FL |
alm-4360 | | 2610 | | 1801 AIRLINE AV | | SANFORD | | FL |
alm-4361 | | 2610 | | 2101 E ARPT BL | | SANFORD | | FL |
alm-4370 | | 2610 | | 1720 CAPITAL CIR S W | | TALLAHASSEE | | FL |
alm-4376 | | 2524 | | 200 Terminal Drive | | Fort Lauderdale | | FL |
alm-4400-01 | | 2610 | | 3355 NW 22ND ST-RD | | MIAMI | | FL |
alm-4400-02 | | 2610 | | 3355 NW 22ND ST-RD | | MIAMI | | FL |
alm-4401 | | 2610 | | 4000 NW 31st Street | | MIAMI | | FL |
alm-4410 | | 2610 | | 18080 COLLINS AV | | MIAMI BEACH | | FL |
alm-4420 | | 2610 | | 2516 N Roosevelt Blvd | | Key West | | FL |
alm-4431 | | 2524 | | 1130 RENTAL CAR RD | | SARASOTA | | FL |
alm-4450 | | 2610 | | 2401 COLLINS AVENUE | | Miami Beach | | FL |
alm-4470 | | 2610 | | 14640 46TH ST N | | CLEARWATER | | FL |
alm-4500-01 | | 2610 | | 8200 MCCOY ROAD | | Orlando | | FL |
alm-4500-Controlers | | 2524 | | 8200 MCCOY ROAD | | Orlando | | FL |
alm-4501-01 | | 2610 | | 8100 MCCOY ROAD | | ORLANDO | | FL |
alm-4510 | | 2610 | | 9840 INTERNATIONAL DR | | ORLANDO | | FL |
alm-4515 | | 2610 | | 5905 INTERNATIONAL DR | | ORLANDO | | FL |
alm-4525 | | 2610 | | 1900 LAKE BUENA VISTA DR | | LAKE BUENA VISTA | | FL |
alm-4530 | | 2610 | | 7514 W HWY 192(HAWAIIAN R | | KISSIMMEE | | FL |
alm-4535 | | 2610 | | 2121 BELVEDERE RD | | W PALM BCH | | FL |
alm-4536 | | 2610 | | 3000 BELVEDERE RD BL 1000 | | WEST PALM BEACH | | FL |
alm-4545-01 | | 2610 | | 2601 S FEDERAL HWY | | FT LAUDERDALE | | FL |
alm-4545-02 | | 2610 | | 2601 S FEDERAL HWY | | FT LAUDERDALE | | FL |
alm-5309 | | 2524 | | 2 TOMAHAWK DR | | EAST BOSTON | | MA |
alm-5312 | | 2610 | | 134 MARGINAL ST. | | CHELSEA | | MA |
alm-5313 | | 2610 | | 1000 Westbrook St | | PORTLAND | | ME |
alm-5318 | | 2524 | | 8800 ESSINGTON AV | | PHILADELPHIA | | PA |
alm-5320 | | 2610 | | 776 ELKRIDGE LANDING ROAD | | LINTHICUM | | MD |
alm-5321 | | 2610 | | BALT-WASH ARPRT S TERM | | BALTIMORE | | MD |
alm-5323 | | 2610 | | 7074 ELM ST | | LINTHICUM | | MD |
alm-5324 | | 2610 | | 775 ELKRIDGE LANDING RD | | LINTHICUM | | MD |
alm-5331 | | 2524 | | 2780 JEFFERSON DAVIS HWY | | ARLINGTON | | VA |
alm-5333 | | 2610 | | 2000 POST ROAD | | WARWICK | | RI |
alm-5335 | | 2524 | | 69 SPRING STREET | | Ramsey | | NJ |
alm-5336 | | 2524 | | 116-55 QUEENS BLVD. | | Forest Hills | | NY |
alm-6306 | | 2610 | | 666 Albert De Niverville | | Montreal | | PQ |
21
Router Name | | Model | | Address | | City | | ST |
alm-6307 | | 2610 | | 975 ROMEO-VACHON BLV N | | DORVAL | | PQ |
alm-6308 | | 2610 | | 1200 BAY ST SUITE | | TORONTO | | ON |
alm-slt-res-02-b | | 2524 | | 155 N. 400 W. suite 200 | | SaltLake City | | UT |
alm-slt-res-1 | | 2610 | | 155 N. 400 W. suite 200 | | SaltLake City | | UT |
alm-stun-01 | | 2500 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
arg-dmz | | 2524 | | 1780 Jay Ell Drive | | Richardson | | TX |
arg-dmz | | 2524 | | 1780 Jay Ell Drive | | Richardson | | TX |
BlueLake-SE-R4 | | 2610 | | 4680 Blue Lake Dr | | Boca Raton | | FL |
DCFLFTL-CIP1 | | 7507 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
DCFLFTL-CIP1 | | 7507 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
DCFLFTL-CIP2 | | 7507 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
DCFLFTL-CIP2 | | 7507 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
DCFLFTL-R1 | | 7507 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
DCFLFTL-R1 | | 7507 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
DCFLFTL-R1 | | 7507 | | 5301 NW 33rd Avenue | | Fort Lauderdale | | FL |
nir-5118 | | 2524 | | 763 Elridge Landing Rd | | Baltimore | | MD |
Accenture-R1 | | 2611 | | 100 Peach Tree St NW Suite1300 | | Atlanta | | GA |
Accenture-R1 | | 2611 | | 100 Peach Tree St NW Suite1300 | | Atlanta | | GA |
alm-5325 | | cisco 2524 | | 2300 York Road,Suite 208 | | Timonium | | MD |
alm-4378 | | cisco 2524 | | 1 Red Cleveland Blvd, Sanford Airport | | Sanford | | FL |
alm-4377 | | 2610 | | 16006 Chamberlain Pkwy | | FT MYERS | | FL |
alm-tulsa-hh-c | | 2524 | | 7777 E Apache | | Tulsa | | OK |
alm-albq-hh | | 2524 | | 2601 Yale SE | | Albuquerque | | NM |
alm-tampa-hh | | 2524 | | 5111 West Spruce ST | | TAMPA | | FL |
alm-1300-02 | | 2610 | | 24530 E 78TH AV | | DENVER | | CO |
nir-3101 | | 2610 | | 7777 E. Apatche | | Tulsa | | OK |
nir-3101 | | 2610 | | 7777 E. Apatche | | Tulsa | | OK |
nir-3101 | | 2610 | | 7777 E. Apatche | | Tulsa | | OK |
alm-4400-02 | | 2610 | | 3355 NW 22ND ST-RD | | MIAMI | | FL |
alm-4400-02 | | 2610 | | 3355 NW 22ND ST-RD | | MIAMI | | FL |
alm-4400-02 | | 2610 | | 3355 NW 22ND ST-RD | | MIAMI | | FL |
alm-4400-02 | | 2610 | | 3355 NW 22ND ST-RD | | MIAMI | | FL |
alm-2400-02-c | | 2610 | | 3800 NORTH MANNHEIM ROAD | | FRANKLIN PARK | | IL |
TRN-STL-01 | | C2600 | | 10124 Natural Bridge Rd | | St Louis | | MO |
TRN-BWI-01 | | C2600 | | 763 Elkridge Landing Road | | Linthicum | | MD |
TRN-WEST-RO | | C2600 | | 778Burlway Road | | Burlingame | | CA |
TRN-NYRO | | C2600 | | 860 North Avenue Eas | | Elizabeth | | NJ |
TRN-PHL-01 | | C2600 | | 6950 Norwich Drive | | Philadelphia | | PA |
TRN-ABQ-01 | | C2600 | | 3400 University Building K | | Albuquerque | | NM |
TRN-SRQ-01 | | C2600 | | 1130 Rental Car Road | | Sarasota | | FL |
TRN-PBI-01 | | C2600 | | 2121 Belevedere Road | | West Palm Beach | | FL |
TRN-RSW-01 | | C2600 | | 16006 Chamberlain Parkway S.E. | | Fort Myers | | FL |
TRN-FLL-01 | | C2600 | | 2601 South Federal Highway | | Ft Lauderdale | | FL |
TRN-TPA-01 | | C2600 | | 5111 West Spruce St | | Tampa | | FL |
TRN-OGG-01 | | C2600 | | 905 Mokuea Place | | Kahului | | HI |
TRN-LAS-01 | | C2600 | | 6855 Bermuda Rd | | Las Vaga | | NV |
TRN-BUR-01 | | C2600 | | 2627 N. Hollywood Way Bldg 9 Suite 112 | | Burbank | | CA |
22
Router Name | | Model | | Address | | City | | ST |
TRN-RNO-01 | | C2600 | | 2555 Aviation Way | | Reno | | NV |
TRN-ONT-01 | | C2600 | | 3450 Airport Drive Suite 300 | | Ontario | | CA |
TRN-LIH-01 | | C2600 | | 3276 Hoolimalima Pl | | Lehue | | HI |
TRN-HNL-02 | | C2600 | | 3055 N. Nimitz Hwy | | Honolulu | | HI |
alm-4375 | | 2610 | | 2430 Airport Rd | | Pensacola | | FL |
TRN-DEN-01 | | C2600 | | 24530 E. 78Th. Avenue | | Denver | | CO |
TRN-LAX-01 | | C2600 | | 9020 Aviation Blvd | | Inglewood | | CA |
TRN-SMF-01 | | C2600 | | 6320 McNair Circle | | Sacramento | | CA |
alm-4536-2 | | 2524 | | 3000 BELVEDERE RD BL 1000 | | WEST PALM BEACH | | FL |
TRN-KOA-01 | | c2600 | | Kea-Hoe Airport | | Kona | | HI |
alm-west-palm | | 2610 | | 2121 BELVEDERE ROAD | | W. PALM BEACH | | FL |
ala-nyc-admin | | 2610 | | 17 East 12th | | New York | | NY |
ala-nyc-admin | | 2610 | | 17 East 12th | | New York | | NY |
ala-nyc-admin | | 2610 | | 17 East 12th | | New York | | NY |
23
SCHEDULE 6.2(b)
SUPPORTED HARDWARE – LEASED BY NEWCO
PART A – ASSIGNED HARDWARE (LEASED)
PART B – RETAINED HARDWARE (LEASED)
UNIX SERVERS – DATA CENTER(1) | |
| |
Vendor | | Server Name | | Model | | Function | | Serial Number | |
Clariion | | | | Mod 30 | | DASD ARRAY | | TBD | |
EMC | | | | 3930 | | SYMMETRIX | | 5265-5333 | |
EMC | | DASD Consolidation | | 8830-73 | | SYMMETRIX | | TBD | |
EMC | | | | EC-1200 | | CONNECTRIX | | TBD | |
EMC | | | | TBD | | CELERRA | | TBD | |
EMC | | Data Warehouse | | 8830-73 | | SYMMETRIX | | TBD | |
HP | | HQRN005 | | L2000 | | PS HR PRODUCTION | | USS4104FD1 | |
HP | | HQRND05 | | L 2000 | | PS HR DEV-APP | | USS4103EUS | |
HP | | HQRN020 | | V2200 | | RMS PERF MON PROD | | US10072102 | |
HP | | HQRN026 | | V2500 | | CRS/IRMS PROD | | USR39210EP | |
HP | | HQRN006 | | N4000 | | PS PROD DB | | USM41049YN | |
HP | | HQRND06 | | N4000 | | PS HR DEV-DB | | USM4105AlK | |
HP | | HQRND26 | | K570 | | CRS/IRMS DEV | | 3828A9869 | |
HP | | HQRND20 | | D380 | | RMS PERF MON-DEV | | 3712A7320 | |
HP | | HQRN021 | | K370 | | NCR CLAIMS - PROD | | 3821A28269 | |
HP | | PSMMDB14 | | K460 | | PS FINANCIAL - DEV | | 3638A20664 | |
HP | | HQRN010 | | K570 | | PS FINANCIAL APP PROD | | 3753A75833 | |
HP | | HQRN011 | | k570 | | PS FINANCIAL DB PROD | | 3750A69872 | |
HP | | HQRN023 | | K580 | | TUNEUP PROD | | 3853A64576 | |
HP | | HQRND23 | | K580 | | TUNEUP DEV | | 3853A64562 | |
1
Vendor | | Server Name | | Model | | Function | | Serial Number | |
HP | | HQRN025 | | K370 | | AUTO SYS REPORT MART | | 3742A49002 | |
HP | | HQRND25 | | D380 | | AUTO SYS REPORT MART | | 3840A53521 | |
HP | | HQRN022 | | K380 | | KRONOS PROD | | 3836A48983 | |
HP | | HQRN008 | | N4000 | | OMNI BACK | | USM39292DP | |
IBM | | HQRN030 | | 7025-M80 | | MEMBERSHIP PROD DB | | 10-004AF 24X7 | |
IBM | | MINE01 | | 7025-F50 | | DATA WAREHOUSE PROD | | 26-08163 | |
IBM | | ALVRU1 | | 7009-C20 | | VOICE RECOGNITION | | 26-19439 | |
IBM | | HQRND30 | | 7025-M80 | | MEMBERSHIP DEV-DB | | 10-0053F | |
IBM | | HQRN024 | | 7012-39H | | COMM SERVER | | 26-87256 | |
IBM | | HQRN031 | | P610 | | WEB SPHERE | | 10-20AQA | |
IBM | | HQRN032 | | P610 | | WEB SPHERE | | 10-20ADA | |
IBM | | HQRN033 | | P610 | | WEB SPHERE | | 10-20A5A | |
IBM | | HQRN034 | | P610 | | WEB SPHERE | | 10-209CA | |
IBM | | HQRNLOAN1 | | 7025-F50 | | WEB SPHERE | | 10-15874 | |
IBM | | | | 7133-020 | | SSA DASD | | 57-71791 | |
IBM | | | | 7133-020 | | SSA DASD | | 57-72196 | |
IBM | | | | 7133-020 | | SSA DASD | | 57-72226 | |
IBM | | | | 7133-020 | | SSA DASD | | 57-83052 | |
IBM | | | | 7133-020 | | SSA DASD | | 57-71797 | |
IBM | | | | 7133-020 | | SSA DASD | | 57-75402 | |
IBM | | | | 7133-020 | | SSA DASD | | 26-21688 | |
IBM | | | | 7133-020 | | SSA DASD | | 26-21687 | |
STK | | LTO Tape | | L700E70 | | LIBRARY | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
2
Vendor | | Server Name | | Model | | Function | | Serial Number | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
STK | | LTO Tape | | TLTOP01 | | TAPE | | TBD | |
(1) Above servers located at Newco Data Center, 5301 NW 33rd Avenue, Ft. Lauderdale, FL 33309
ODYSSEY | |
| |
Vendor/ | | Hardware Type/Model | | Description | | Serial Number | | Data Center/ Location | |
PRODUCTION | |
EMC | | 8730 | | SYM 86 | | 000184701786 | | RIMF | |
HP | | V2500 / 32 | | pddbs05 | | US10072117 | | RIMF | |
HP | | 712/1 | | pddbc05 | | US69116985 | | RIMF | |
HP | | V2500 / 32 | | pddbs06 | | US10072027 | | RIMF | |
HP | | 712/1 | | pddbc06 | | US69116726 | | RIMF | |
HP | | V2200 / 16 | | pdapl02 | | US10071956 | | RIMF | |
HP | | 712/1 | | pdpac02 | | 6804A58809 | | RIMF | |
HP | | V2200 / 16 | | pdapl03 | | US10072074 | | RIMF | |
HP | | 712/1 | | pdapc03 | | 6803A57441 | | RIMF | |
HP | | V2200 / 16 | | pdapl04 | | US10071981 | | RIMF | |
HP | | 712/1 | | pdapc04 | | 6751A56213 | | RIMF | |
HP | | N4000 / 8 | | pdapl05 | | 24R3-79926-001 | | RIMF | |
HP | | 712/1 | | pdapc05 | | TBD | | RIMF | |
HP | | K370 / 2 | | pdcca01 | | 3823A31449 | | RIMF | |
HP | | K370 / 2 | | pdcca02 | | 3823A31447 | | RIMF | |
HP | | K370 / 3 | | pdprt01 | | 3810A02149 | | RIMF | |
HP | | K370 / 3 | | pdprt02 | | 3810A02151 | | RIMF | |
HP | | K370 / 3 | | pdgds01 | | 3812A05877 | | RIMF | |
HP | | K370 / 3 | | pdgds02 | | 3810A02147 | | RIMF | |
IBM | | D240 | | pdgds03 | | S70431041514 | | RIMF | |
HP | | L2000 | | pdgds04 | | USS411933C | | RIMF | |
HP | | L2000 | | pdgds05 | | USS41329C9 | | RIMF | |
HP | | 12H | | AUTORaid | | 0000000FB276 | | RIMF | |
HP | | 12H | | AUTORaid | | 0000000FBDBC | | RIMF | |
HP | | 12H | | AUTORaid | | 0000000F4FBD | | RIMF | |
HP | | 12H | | AUTORaid | | 0000000F4C74 | | RIMF | |
HP | | 12H | | AUTORaid | | 000000137093 | | RIMF | |
HP | | 12H | | AUTORaid | | 00000013D52B | | RIMF | |
HP | | 12H | | AUTORaid | | 0000000F5488 | | RIMF | |
HP | | 12H | | AUTORaid | | 00000025C446 | | RIMF | |
HP | | 12H | | AUTORaid | | 0000000FB838 | | RIMF | |
HP | | 12H | | AUTORaid | | 000000057F09 | | RIMF | |
HP | | 12H | | AUTORaid | | 0000000576FB | | RIMF | |
HP | | 12H | | AUTORaid | | 00000005801A | | RIMF | |
3
Vendor/ | | Hardware Type/Model | | Description | | Serial Number | | Data Center/ Location | |
HP | | 12H | | AUTORaid | | 000000057AD6 | | RIMF | |
HP | | NETSERVER STORAGE SYSTEM/8 | | | | | | RIMF | |
F5 | | BigIP | | PDBIP01 | | 0101S | | RIMF | |
F5 | | BigIP | | PDBIP02 | | 0085S | | RIMF | |
F5 | | BigIP | | PDBIP03 | | 9209S | | RIMF | |
F5 | | BigIP | | PDBIP04 | | 9206S | | RIMF | |
Compaq | | DL580 | | PDWEB01 | | D035DYV1K021 | | RIMF | |
Compaq | | DL580 | | PDWEB02 | | D038DYV1K174 | | RIMF | |
Compaq | | DL580 | | PDWEB03 | | D036DYV1K003 | | RIMF | |
Compaq | | DL580 | | PDWEB04 | | D036DYV1K021 | | RIMF | |
Compaq | | 6000R | | PDDNS01 | | D028CJR3K052 | | RIMF | |
Compaq | | 6000R | | PDDNS02 | | D028CJR3K142 | | RIMF | |
HP | | Netserver | | ORI1 | | US82702186 | | RIMF | |
HP | | Netserver | | ORI2 | | US73401408 | | RIMF | |
Compaq | | DL580 | | PDIMG01 | | D036DYV1K017 | | RIMF | |
Compaq | | DL580 | | PDIMG02 | | D036DYV1K031 | | RIMF | |
TESTING AND TRAINING | |
HP | | V2500 / 8 | | tddbs02 | | USR39300V1 | | RIMF | |
HP | | K370 / 3 | | tdapl01 | | 3810A01933 | | RIMF | |
HP | | K370 / 2 | | tdgds01 | | 3812A06006 | | RIMF | |
HP | | K420 / 2 | | tdcca01 | | 3740A43967 | | RIMF | |
F5 | | BigIP | | TDBIP01 | | 6854S | | FLL DC | |
F5 | | BigIP | | TDBIP02 | | 8243S | | FLL DC | |
Compaq | | DL580 | | TDWEB01 | | D038DYV1K129 | | FLL DC | |
Compaq | | DL580 | | TDWEB02 | | D038DYV1K126 | | FLL DC | |
Compaq | | DL580 | | TDDNS01 | | D036DYV1K027 | | FLL DC | |
Compaq | | DL580 | | TDDNS02 | | D038DYV1K132 | | FLL DC | |
Compaq | | DL580 | | TDIMG01 | | D036DYV1K005 | | FLL DC | |
Compaq | | DL580 | | TDIMG02 | | D036DYV1K068 | | FLL DC | |
SYSTEM SERVICES | |
STEK | | 9710 | | SILO 1 | | USS394904T | | RIMF | |
STEK | | 9710 | | SILO 2 | | 3828A39869 | | RIMF | |
HP | | L2000 / 3 | | pdsys01 | | USS394904T | | RIMF | |
HP | | K570 / 3 | | pdsys02 | | 3828A39869 | | RIMF | |
HP | | D370 / 1 | | pdhpv01 | | 3816A15387 | | RIMF | |
ODYSSEY DEVELOPMENT | |
HP | | K370 / 2 | | drdbs02 | | 3812A06351 | | HERNDON | |
HP | | K420 / 4 | | drapl02 | | 3738A3806 | | HERNDON | |
HP | | K420 / 4 | | drapl03 | | 3740A43967 | | HERNDON | |
HP | | D390 / 2 | | drapl04 | | 3849A61114 | | HERNDON | |
STEK | | 9714 | | SILO | | 266000000697 | | HERNDON | |
HP | | D370 / 1 | | drsys01 | | 3814A10815 | | HERNDON | |
HP | | HP Netserver LX Pro | | Nrcc-Usa-S001 | | US73500621 | | HERNDON | |
HP | | HP Vectra | | Remx | | US72752870 | | HERNDON | |
HP | | HP Vectra | | Nrcc-Usa-S002 | | US73854685 | | HERNDON | |
HP | | HP Vectra | | CCTest | | US73452020 | | HERNDON | |
HP | | HP Vectra | | Nrcc-Usa-BDC | | | | HERNDON | |
Cisco | | 3600 | | N/A | | 362017661 | | HERNDON | |
Cisco | | 5000 | | N/A | | 66063489 | | HERNDON | |
4
Vendor/ | | Hardware Type/Model | | Description | | Serial Number | | Data Center/ Location | |
HP | | Netserver LXr Pro | | RIADH01NCR01 | | US73900951 | | HERNDON | |
F5 | | BigIP | | DRBIP01 | | 8061 | | FLL DC | |
F5 | | BigIP | | DRBIP02 | | 8034 | | FLL DC | |
HP | | Netserver | | DRWEB01 | | US82901866 | | HERNDON | |
HP | | Netserver | | DRWEB02 | | US82900296 | | HERNDON | |
Compaq | | DL580 | | DRDNS01 | | D025CJR3K198 | | HERNDON | |
Compaq | | DL580 | | DRDNS02 | | D028CJR3K061 | | HERNDON | |
HP | | K370/3 | | Drdbs01 | | 7F004433 | | HERNDON | |
ODYSSEY DEVELOPMENT | |
HP | | D250 / 2 | | dlgds01 | | 3746A58769 | | LEXINGTON | |
NT SERVERS – DATA CENTER(1) | |
| |
Vendor | | Server Name | | Model | | Function | | Serial Number | |
COMPAQ | | BFLLC01ARG01 | | C6500 | | Alamo Data Mart | | | |
COMPAQ | | BFLLC01ARG02 | | C6500 | | National Data Mart | | | |
COMPAQ | | DBCTH01ARG03 | | 1850R | | NIDOMHQT01 BDC | | | |
COMPAQ | | DBCTH01ARG04 | | DL380 | | Alamo BDC | | | |
COMPAQ | | DCHQAL02 | | C2500R | | SYSM gateway/sync | | | |
COMPAQ | | DCHQAL04 | | C2500R | | REVENUE F&P | | | |
IBM | | DCHQAL05 | | PCS520 | | SMS | | | |
IBM | | DCHQAL10 | | PCS330 | | FILE/PRINT | | | |
COMPAQ | | DCHQAL14 | | C2500R | | ACCOUNTING/TRECS prod | | | |
DELL | | DCHQAL1401 | | PE6300 | | FILE/PRINT | | | |
COMPAQ | | DCHQAL15 | | C3000R | | BDC/EXCHANGE | | | |
IBM | | DCHQAL16 | | PCS520 | | TRECS development | | | |
DELL | | DCHQAL18 | | PE6300 | | FILE/PRINT | | | |
DELL | | DCHQAL19 | | PE6300 | | FILE/PRINT | | | |
COMPAQ | | DCHQALPDC | | C2500R | | ALAMO PDC / DNS | | | |
COMPAQ | | DCHQARG01 | | C3000R | | BDC | | | |
COMPAQ | | DCHQARG02 | | C3000R | | PDC | | | |
COMPAQ | | DFLLH01ANC00 | | 1850R | | PDC | | | |
COMPAQ | | DFLLH01ANC01 | | C1850R | | BDC | | | |
COMPAQ | | DFLLH01ARG01 | | C3000R | | NIDOMHQT01 BDC | | | |
IBM | | INFOSYS1 | | PCS330 | | FILE/PRINT | | | |
IBM | | INTRANET1 | | PCS325 | | WEB SERVER | | | |
COMPAQ | | MFLLH01ANC06 | | 1850R | | EXCHANGE | | | |
COMPAQ | | MFLLH01ARG01 | | P2500 | | EXCHANGE | | | |
5
Vendor | | Server Name | | Model | | Function | | Serial Number | |
DELL | | MFLLH01ARG02 | | PE6300 | | EXCHANGE | | | |
DELL | | MFLLH01ARG03 | | PE6300 | | EXCHANGE | | | |
COMPAQ | | MFLLH01ARG04 | | 1850R | | EXCHANGE | | | |
COMPAQ | | MFLLH01ARG06 | | C1850R | | EXCHANGE | | | |
COMPAQ | | MHQTH01ARG02 | | 1850R | | EXCHANGE | | | |
COMPAQ | | MTHQAL02 | | C1850R | | EXCHANGE | | | |
COMPAQ | | NFLLH01ANC00 | | C1850R | | WINS (servers) | | | |
COMPAQ | | NFLLH01ANC01 | | C1850R | | WINS (workstations) & DHCP | | | |
COMPAQ | | NFLLH01ANC03 | | C6500 | | ISA (Proxy) Server | | | |
IBM | | NFLLH01ARG00 | | NetFinity 6000R | | TACACS Auth. / VPN | | | |
HP | | NFLLH01ARG01 | | NetServer LD Pro | | WEB/PROXY SERVER | | | |
HP | | RFLLH01ARG00 | | NetServer LH Pro | | ROBOMON MASTER SERVER | | | |
COMPAQ | | SBCTH01ARG01 | | 3000 | | Tape Backups / F&P / BDC / SMS / SQL | | | |
COMPAQ | | SBCTH01ARG07 | | 1850R | | F&P / BDC / SQL / Web / DFS | | | |
COMPAQ | | SBCTH01ARG10 | | DL380 | | FILE/PRINT | | | |
COMPAQ | | SFLLC01ARG01 | | C6500 | | NCR OLAP | | | |
COMPAQ | | SFLLC01ARG02 | | C6500 | | ANC DEV | | | |
COMPAQ | | SFLLC01ARG03 | | C6500 | | Alamo OLAP/ETL | | | |
COMPAQ | | SFLLC01ARG04 | | C6500 | | NCR Reporting - Cognos / AutoSys | | | |
COMPAQ | | SFLLC01ARG05 | | C6500 | | KRONOS WINFRAME | | | |
COMPAQ | | SFLLC01ARG06 | | C6400R | | NCR Reporting - Cognos / AutoSys | | | |
COMPAQ | | SFLLC01NCR01 | | C5500R | | KRONOS COM | | | |
COMPAQ | | SFLLC01NCR02 | | 1850R | | KRONOS COM | | | |
COMPAQ | | SFLLC01NCR03 | | C3000R | | KRONOS COM | | | |
COMPAQ | | SFLLC01NCR04 | | C5500R | | KRONOS WINFRAME | | | |
COMPAQ | | SFLLC01NCR05 | | C5500R | | KRONOS SQL | | | |
COMPAQ | | SFLLC01NCR05 Backup | | C3000R | | KRONOS SQL | | | |
COMPAQ | | SFLLC02ARG01 | | C1850R | | KRONOS COM | | | |
COMPAQ | | SFLLC02ARG02 | | C1850R | | KRONOS COM | | | |
COMPAQ | | SFLLC02ARG03 | | C6500 | | KRONOS WINFRAME | | | |
COMPAQ | | SFLLC02ARG04 | | C6500 | | KRONOS WINFRAME | | | |
COMPAQ | | SFLLH01ANC01 | | 3000 | | ANC Intranet Site | | | |
6
Vendor | | Server Name | | Model | | Function | | Serial Number | |
COMPAQ | | SFLLH01ANC02 | | 3000 | | Not yet in production | | | |
COMPAQ | | SFLLH01ANC03 | | 3000 | | Tivoli Management for QuickSilver | | | |
COMPAQ | | SFLLH01ANC04 | | 1850R | | AutoSys / SQL | | | |
IBM | | SFLLH01ANC05 | | Netfinity 4500R | | Tivoli Gateway / WhatsUp Gold | | | |
COMPAQ | | SFLLH01ANC06 | | Proliant 3000 | | RAM db | | | |
IBM | | SFLLH01ANC08 | | Netfinity 6000 | | Pyramid MetaFrame | | | |
HP | | SFLLH01ANC09 | | NetServer LD Pro | | Mitchell/E-Claims Data Extractor | | | |
COMPAQ | | SFLLH01ANC10 | | 3000 | | Attendance/Performance db | | | |
COMPAQ | | SFLLH01ANC11 | | 3000 | | Attendance/Performance db | | | |
COMPAQ | | SFLLH01ANC12 | | 3000 | | IT_RES_DEV PDC | | | |
COMPAQ | | SFLLH01ANC13 | | ML 530 | | SMS - Top of Tree | | | |
IBM | | SFLLH01ANC14 | | Netfinity 6000R | | WebScribe PROD | | | |
IBM | | SFLLH01ANC15 | | Netfinity 6000R | | Pyramid MetaFrame | | | |
COMPAQ | | SFLLH01ANC16 | | 2500 | | Archive Server | | | |
COMPAQ | | SFLLH01ANC17 | | Prosignia 200 | | ICVERIFY | | | |
COMPAQ | | SFLLH01ANC18 | | 3000 | | AutoSys TEST | | | |
COMPAQ | | SFLLH01ANC19 | | 3000 | | Alamo Warranty / WebShere | | | |
COMPAQ | | SFLLH01ANC20 | | 6500 | | TeamBuilder | | | |
IBM | | SFLLH01ANC21 | | Netfinity 6000R | | TeamBuilder / SQL | | | |
“Clone” | | SFLLH01ANC22 | | “Clone” | | Kronos Citrix Upgrade TEST | | | |
COMPAQ | | SFLLH01ANC24 | | 6500 | | InterWise Millenium / Multicaster | | | |
IBM | | SFLLH01ANC26 | | xSeries 360 Type 8686 | | Kronos COM (BGP/Oracle Test) | | | |
COMPAQ | | SFLLH01ARG01 | | 2500 | | Tape Backups | | | |
COMPAQ | | SFLLH01ARG03 | | C3000R | | FILE/PRINT | | | |
COMPAQ | | SFLLH01ARG04 | | C6500 | | METAFRAME Pyramid - 2 | | | |
COMPAQ | | SFLLH01ARG05 | | C6500 | | METAFRAME Pyramid - 1 | | | |
COMPAQ | | SFLLH01ARG06 | | 1850R | | Contract Managerment / SQL | | | |
COMPAQ | | SFLLH01ARG07 | | 1850R | | Treasury F/P | | | |
COMPAQ | | SFLLH01ARG08 | | 1850R | | File Server | | | |
COMPAQ | | SFLLH01ARG09 | | 1850R | | F&P / PeopleSoft | | | |
IBM | | SFLLH01NAS00 | | NAS-100 (5190R12) | | NAS File Server | | | |
IBM | | SFLLH01NAS01 | | NAS-100 (5190R12) | | NAS File Server | | | |
7
Vendor | | Server Name | | Model | | Function | | Serial Number | |
COMPAQ | | SFLLH01PPS01 | | C3000R | | PeopleSoft WEB Server | | | |
COMPAQ | | SFLLH01PPS02 | | C3000R | | PeopleSoft (non-Web) | | | |
COMPAQ | | SFLLH02ARG01 | | 1850R | | SMS/CCM Plaza | | | |
COMPAQ | | SFLLH02ARG02 | | 1850R | | CCM Development | | | |
HP | | SFLLH02ARG04 | | Vectra XU | | SourceSafe | | | |
COMPAQ | | SFLLH03ARG01 | | 1850R | | SMS/CCM 1401 building | | | |
COMPAQ | | SHQTH01ARG03 | | 1850R | | TCS Application Server | | | |
COMPAQ | | SHQTH01ARG04 | | 1850R | | TCS Oracle Database Server | | | |
COMPAQ | | SHQTH01ARG05 | | 1850R | | TCS Application Server | | | |
NETAPPL | | SHQTH01ARG07 | | NETAPPL | | FILE/PRINT | | | |
HP | | SHQTH01ARG09 | | LD PRO | | WARRANTY DEV | | | |
COMPAQ | | SHQTH01ARG11 | | 1850R | | IT Online / “ALAMO How-To” | | | |
COMPAQ | | SHQTH01ARG14 | | 1850R | | REPLICATION | | | |
COMPAQ | | SHQTH01ARG18 | | 6500R | | TCS Metaframe Server | | | |
HP | | SLABH01ARG01 | | LD PRO | | Mitchell/E-Claims Check-In Server | | | |
IBM | | SOFTDIS1 | | PCS520 | | XCELLNET | | | |
COMPAQ | | SRHQAL04 | | C3000R | | REVENUE / Reports FTP | | | |
COMPAQ | | SRHQAL08 | | C3000R | | WEB DEV / PROD Lanyon | | | |
COMPAQ | | SRHQAL09 | | C3000R | | WINFRAME Hyperion | | | |
COMPAQ | | SRHQAL10 | | 6400R | | Hyperion | | | |
COMPAQ | | SRHQAL12 | | C3000R | | PSC Infrastructure Web Site | | | |
DELL | | SRHQAL15 | | PE6300 | | WEBSCRIBE DEVELOPMENT | | | |
DELL | | SRHQAL16 | | PE4300 | | WEBSCRIBE PRODUCTION | | | |
DELL | | SRHQAL17 | | PE4300 | | RAS Authentication | | | |
Dell | | SRHQAL25 | | PE6300 | | F&P / OmniBack / Time Master | | | |
COMPAQ | | SRHQARG01 | | C3000R | | GOALAMO WEB | | | |
COMPAQ | | SRHQARG02 | | C3000R | | WebTrends | | | |
DELL | | SRHQARG03 | | PE4300 | | Unity Mail / FTP | | | |
COMPAQ | | SRHQARG04 | | C6500 | | TA / Tour / ANCRENTAL.COM | | | |
COMPAQ | | SRHQARG05 | | C6500 | | GOALAMO Front-End | | | |
IBM | | SRHQARG06 | | NETFINITY 6000R | | GOALAMO Front-End | | | |
IBM | | SRHQARG07 | | NETFINITY 6000R | | GOALAMO Front-End | | | |
COMPAQ | | SRHQARG10 | | 6400R | | GOALAMO SQL | | | |
IBM | | SRHQARG11 | | NETFINITY 6000R | | DEXTER SQL | | | |
COMPAQ | | SRHQARG13 | | DL580 | | GOALAMO Front-End | | | |
COMPAQ | | SRHQARG14 | | DL580 | | GOALAMO Front-End | | | |
8
Vendor | | Server Name | | Model | | Function | | Serial Number | |
COMPAQ | | SRHQIS03 | | C3000R | | Open Connect | | | |
COMPAQ | | TEMS_Exch | | DeskPro | | Exchange Monitor | | | |
COMPAQ | | WBCTR04ARG34 | | EN350 | | TCS Listen Server | | | |
COMPAQ | | WFLLC01NCR01 | | DP2000 | | Kronos Test TIMEKEEPER | | | |
COMPAQ | | WFLLC01NCR02 | | DP2000 | | Kronos Test TIMEKEEPER | | | |
COMPAQ | | WFLLC01NCR03 | | DP2000 | | Kronos PROD TIMEKEEPER | | | |
COMPAQ | | SFLLH01ANC07 | | Proliant 800 | | Sales & Marketing | | | |
IBM | | SFLLH01ANC25 | | Netfinity 6000R | | SAN Config & Mgt (ECC) Server | | | |
IBM | | SRHQARG08 | | Netfinity 6000R | | ListServe (Mktg. Mass Mailing) | | | |
COMPAQ | | ALAMO GMSERVER | | Prosignia 300 | | GM Interface; formal name unknown | | | |
COMPAQ | | CARTEMPS | | Prosignia 300 | | Function & formal name unknown | | | |
COMPAQ | | NATIONAL GMACCESS | | Prosignia 300 | | GM Interface; formal name unknown | | | |
(1) Above servers located at Newco Data Center, 5301 NW 33rd Avenue, Ft. Lauderdale, FL 33309
NT SERVERS – REMOTE & PEROT SYSTEMS DATA CENTER (RIMF) | |
| |
Vendor | | Server Name | | Model | | Function | | Serial Number | | Location | |
COMPAQ | | MHQTH51ARG01 | | 1850-R | | EXCHANGE | | D848BZQ30260 | | RIMF | |
COMPAQ | | MHQTH52ARG01 | | 1850-R | | EXCHANGE | | D850BZQ30459 | | RIMF | |
COMPAQ | | MHQTH53ARG01 | | 1850-R | | EXCHANGE | | D847BZQ30349 | | RIMF | |
COMPAQ | | MHQTH54ARG01 | | 1850-R | | EXCHANGE | | Not legible | | RIMF | |
COMPAQ | | MHQTH55ARG01 | | 1850-R | | EXCHANGE | | D850BZQ30437 | | RIMF | |
HP | | MRIMF01NCR01 | | LHPro | | EXCHANGE | | USxxxxxxxx | | RIMF | |
COMPAQ | | MRMFH01ANC01 | | 1850-R | | EXCHANGE | | illegible | | RIMF | |
COMPAQ | | MRMFH01ANC06 | | 1850-R | | EXCHANGE | | D852BZQ30575 | | RIMF | |
COMPAQ | | TestExchange | | 1850-R | | EXCHANGE | | | | RIMF | |
COMPAQ | | DHQTH51ARG01 | | 1850-R | | BDC | | D838BZQ31743 | | RIMF | |
COMPAQ | | DHQTH52ARG01 | | 1850-R | | BDC | | D847BZQ30278 | | RIMF | |
COMPAQ | | DHQTH53ARG01 | | 1850-R | | BDC | | D848BZQ30803 | | RIMF | |
COMPAQ | | DHQTH54ARG01 | | 1850-R | | BDC | | D848BZQ30726 | | RIMF | |
COMPAQ | | DHQTH55ARG01 | | 1850-R | | BDC | | D848BZQ30410 | | RIMF | |
COMPAQ | | SHQTH51ARG01 | | 1850-R | | BDC / SMS | | D848BZQ30655 | | RIMF | |
COMPAQ | | SHQTH52ARG01 | | 1850-R | | BDC / SMS | | D847BZQ30278 | | RIMF | |
COMPAQ | | SHQTH53ARG01 | | 1850-R | | BDC / SMS | | D848BZQ30803 | | RIMF | |
9
Vendor | | Server Name | | Model | | Function | | Serial Number | | Location | |
COMPAQ | | SHQTH54ARG01 | | 1850-R | | BDC / SMS | | D848BZQ30726 | | RIMF | |
COMPAQ | | SHQTH55ARG01 | | 1850-R | | BDC / SMS | | D848BZQ30410 | | RIMF | |
COMPAQ | | NRMFH01ARG00 | | 1850-R | | WINS/DHCP/DNS | | D847BZQ30323 | | RIMF | |
COMPAQ | | NRMFH01ARG01 | | 1850-R | | WINS/DHCP | | D847BZQ30324 | | RIMF | |
COMPAQ | | NRMFH01ARG02 | | 1850-R | | PROXY | | D847BZQ30346 | | RIMF | |
COMPAQ | | MCLTH01ARG01 | | Proliant 3000 | | EXCHANGE | | | | Charlotte, NC | |
COMPAQ | | DCLTH01ARG01 | | Proliant 3000 | | BDC | | | | Charlotte, NC | |
COMPAQ | | SCLTH01ARG01 | | Proliant 3000 | | BDC / SMS | | | | Charlotte, NC | |
COMPAQ | | NCLTH01ARG01 | | Desk Pro 350 | | WINS/DHCP/DNS | | | | Charlotte, NC | |
HP | | SDFWH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | Dallas | |
HP | | SORDH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | Franklin Park, IL. | |
HP | | MGSCH01NCR01 | | LHPro | | EXCHANGE | | | | Goose Creek, SC | |
HP | | DGSCH01NCR01 | | LHPro | | BDC | | | | Goose Creek, SC | |
HP | | SGSCH01ARG01 | | LHPro | | SMS/SQL/File&Print | | | | Goose Creek, SC | |
Intel | | SGSCH01NCR03 | | Intel | | BackUp Server/FTP | | | | Goose Creek, SC | |
Intel | | SGSCH01NCR04 | | Intel | | Software Image Storage | | | | Goose Creek, SC | |
HP | | SHNLH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | Hawaii | |
HP | | MHNLH01ARG01 | | LHPro | | EXCHANGE | | | | Honolulu, HI | |
HP | | SIAHH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | Houston | |
HP | | SLAXH01ARGOO | | LHPro | | BDC / SMS / File & Print | | | | Los Angeles | |
HP | | SEWRH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | New Jersey | |
HP | | SMCOH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | Orlando | |
HP | | SSFOH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | San Francisco | |
COMPAQ | | MSLCH01NCR01 | | Proliant 3000 | | EXCHANGE | | | | SLC, UT | |
COMPAQ | | DSLCH01NCR01 | | Proliant 3000 | | BDC | | | | SLC, UT | |
COMPAQ | | SSLCH01NCR01 | | Proliant 3000 | | BDC / SMS | | | | SLC, UT | |
COMPAQ | | NSLCH01NCR01 | | Desk Pro 350 | | WINS/DHCP/DNS | | | | SLC, UT | |
HP | | SDCAH01ARG00 | | LHPro | | BDC / SMS / File & Print | | | | Washington DC | |
RIMF means: Perot Systems Data Center, Richardson, TX
BOCA RATON means: 4680 BLUE LAKE DR, BOCA RATON, FL 33431
10
CANADA means: 1200 BAY ST SUITE, TORONTO, ON M5R2A5
GOOSE CREEK means: 208 ST. JAMES AVE, GOOSE CREEK, SC 29445
DALLAS means: 3410 HAWES ST, DALLAS, TX 75235
HAWAII means: 3055 N NIMITZ HWY, HONOLULU, HI 96819
MSP means: 4300 GLUEMACK DR, MINNEAPOLIS, MN 55439
PLAZA means: 200 S ANDREWS DR, FT LAUDERDALE, FL 33309
SLC means: 606 N 3800 W, SALE LAKE CITY, UT 84122
UK means: 126 DYKE RD, BRIGHTON, UK BN12SU
ROUTERS - REMOTE | |
| |
Vendor | | Router Name | | Model | | Serial Number | | Location | |
TBD | | BLUELAKE-SE-R1 | | MSFC | | TBD | | BOCA RATON | |
TBD | | BLUELAKE-SE-R2 | | MSFC | | TBD | | BOCA RATON | |
CISCO | | BLUELAKE-SE-R3 | | 7206 | | TBD | | BOCA RATON | |
TBD | | BLUELAKE-SE-R4 | | 2610 | | TBD | | BOCA RATON | |
TBD | | PLAZA-5TH-R1 | | MSFC | | TBD | | PLAZA | |
TBD | | PLAZA-5TH-R2 | | MSFC | | TBD | | PLAZA | |
TBD | | PLAZA-R1 | | 3620 | | TBD | | PLAZA | |
TBD | | PLAZA-R1 SPARE | | 3620 | | TBD | | PLAZA | |
BOCA RATON means: 4680 BLUE LAKE DR, BOCA RATON, FL 33431
PLAZA means: 200 S ANDREWS DR, FT LAUDERDALE, FL 33309
11
UNIX SERVERS – DATA CENTER(1) | |
| |
Vendor | | Server Name | | Model | | Function | | Serial Number | |
HP | | ALTMR01 | | D370 | | TIVOLI SERVER | | 3732A70237 | |
IBM | | HQRN027 | | 7025-F50 | | TIVOLI BACKUP GATEWAY | | 10-28791 | |
IBM | | HQRN007 | | G40 | | TIVOLI/TEC SERVER | | 26-85817 | |
(1)Above servers located at Newco Data Center, 5301 NW 33rd Avenue, Ft. Lauderdale, FL 33309
MAINFRAME - DATA CENTER(1) | |
| |
Vendor | | Hardware Type/Model | | Description | | Serial Number | |
EMC | | 8830-73 | | SYMETRIX DASD | | TBD | |
IBM | | 2064-Z104 | | CPU | | 114F8 | |
IBM | | 2105-F20 | | SHARK DASD | | TBD | |
IBM | | 3174-21L | | CONSOLE CONTROLLER | | KY607 | |
IBM | | 3174-21L | | CONSOLE CONTROLLER | | KB562 | |
IBM | | 3174-21L | | CONSOLE CONTROLLER | | KB576 | |
IBM | | 3174-21L | | CONSOLE CONTROLLER | | KB581 | |
IBM | | 3174-21L | | CONSOLE CONTROLLER | | KE879 | |
IBM | | 3745-31A | | COMM CONTROLLER | | 60605 | |
IBM | | 3746-900 | | COMM CONTROLLER | | 90517 | |
IBM | | 6262 | | PRINTER | | TBD | |
IBM | | 9032 | | ESCON DIRECTOR | | 21456 | |
IBM | | 9032 | | ESCON DIRECTOR | | 21457 | |
IBM | | 9032 | | ESCON DIRECTOR | | 21458 | |
IBM | | 9032 | | ESCON DIRECTOR | | 22555 | |
IBM | | 9037-001 | | MAINFRAME TIMER | | 01235 | |
IBM | | 9037-001 | | MAINFRAME TIMER | | 01236 | |
IBM | | 9672-R56 | | CPU9 | | 51720 | |
IBM | | 9674 CFacility | | MAINFRAME | | TBD | |
STK | | 9310-001 | | POWDERHORN | | 004-5457 | |
STK | | 9310-001 | | POWDERHORN | | 004-6458 | |
STK | | 9310-001 | | POWDERHORN | | 004-8958 | |
STK | | 9311-001 | | POWDERHORN COMPONENT | | 008-6434 | |
STK | | 9311-001 | | POWDERHORN COMPONENT | | 008-6470 | |
STK | | 9311-001 | | POWDERHORN COMPONENT | | 008-9059 | |
STK | | 4420-001 | | TAPE UNIT | | 005-5871 | |
STK | | 4420-001 | | TAPE UNIT | | 005-8766 | |
STK | | 4420-001 | | TAPE UNIT | | 005-8777 | |
STK | | 9330-001 | | POWDERHORN COMPONENT | | 216-761 | |
12
Vendor | | Hardware Type/Model | | Description | | Serial Number | |
STK | | 9330-001 | | POWDERHORN COMPONENT | | 216-770 | |
STK | | 9490-M32 | | TAPE UNIT | | 232-179 | |
STK | | 9490-M32 | | TAPE UNIT | | 272-353 | |
STK | | 9490-M32 | | TAPE UNIT | | 272-354 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-106 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-107 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-108 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-113 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-194 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-195 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-253 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-278 | |
STK | | 9490-M34 | | TAPE UNIT | | 232-5965 | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | 9840-BL2 | | T9840B, LIBRARY, ESCON | | TBD | |
STK | | VSM -TBD | | VIRTUAL STORAGE MANAGER | | TBD | |
STK | | VSM -TBD | | VIRTUAL STORAGE MANAGER | | TBD | |
XEROX | | TBD | | PRINTER | | TBD | |
XEROX | | TBD | | PRINTER | | TBD | |
XEROX | | TBD | | PRINTER | | TBD | |
(1) Above mainframe hardware located at Newco Data Center, 5301 NW 33rd Avenue, Ft. Lauderdale, FL 33309
NT SERVERS — DATA CENTER(1) | |
| |
Vendor | | Server Name | | Model | | Function | | Serial Number | |
HP | | SNA1 (SNA3OLD) | | LHPro | | SNA | | | |
HP | | SNA2 | | LHPro | | SNA | | | |
HP | | SNA3 | | LHPro | | SNA | | | |
13
Vendor | | Server Name | | Model | | Function | | Serial Number | |
HP | | SNA4 | | LHPro | | SNA | | | |
COMPAQ | | XGWSNAAM | | DeskPro | | Project X | | | |
IBM | | XGWALCSA2 | | PS/ValuePoint 466DX2 | | Project X - Sabre | | | |
HP | | GHQTH01ARG07 | | Vectra VA Pentium | | Project X - Sabre | | | |
IBM | | XDCSGM1 | | PC350-P166 | | Project X | | | |
IBM | | XDCSGM2 | | PC350-P133 | | Project X | | | |
IBM | | XDCSGM3 | | PC - model unknown | | Project X | | | |
IBM | | XGWALCAM | | PS/ValuePoint 433 SX/D | | Project X | | | |
| | XGWALCAP | | Unidentifiable - possible clone | | Project X | | | |
| | XGWALCSA | | Unidentifiable - possible clone | | Project X | | | |
IBM | | XGWALCWS | | PC 350 | | Project X | | | |
COMPAQ | | XGWSNAAP | | DeskPro | | Project X | | | |
| | XPOWER2 | | Unidentifiable - possible clone | | Project X | | | |
IBM | | XSERVER1 | | PC Server 320 | | Project X | | | |
(1) Above servers located at Newco Data Center, 5301 NW 33rd Avenue, Ft. Lauderdale, FL 33309
REMOTE (ALAMO) HARDWARE (IBM Remote Controllers) | |
| |
Vendor | | Hardware Type | | Model | | Serial Number | | Location(1) | |
IBM | | 3174 | | 91R | | 000050989 | | 0130 BURLNGME | |
IBM | | 4232 | | 302 | | 0000AC123 | | 0130 BURLNGME | |
IBM | | 4232 | | 302 | | 0000AC128 | | 0130 BURLNGME | |
IBM | | 4232 | | 302 | | 0000AC114 | | 0130 BURLNGME | |
IBM | | 4232 | | 302 | | 0000AC113 | | 0130 BURLNGME | |
IBM | | 3174 | | 95R | | 000054100 | | A 0010 MIAMI | |
IBM | | 3174 | | 11R | | 0000AV792 | | A 0010 MIAMI | |
IBM | | 4232 | | 302 | | 0000AB646 | | A 0010 MIAMI | |
IBM | | 4232 | | 302 | | 0000AB645 | | A 0010 MIAMI | |
IBM | | 4232 | | 302 | | 0000AB644 | | A 0010 MIAMI | |
IBM | | 4232 | | 302 | | 0000AB643 | | A 0010 MIAMI | |
IBM | | 4232 | | 302 | | 0000AB642 | | A 0010 MIAMI | |
IBM | | 3174 | | 91R | | 000048094 | | A 0012 N MIAMI | |
IBM | | 3174 | | 91R | | 000033308 | | A 0013 MIAMI | |
IBM | | 3174 | | 91R | | 000050479 | | A 0014 KEY WEST | |
IBM | | 3174 | | 95R | | 000054539 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AB835 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AE007 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AD998 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AE008 | | A 0020 FT LAUD | |
14
Vendor | | Hardware Type | | Model | | Serial Number | | Location(1) | |
IBM | | 4232 | | 302 | | 0000AE011 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AT313 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AB950 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AB959 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AD548 | | A 0020 FT LAUD | |
IBM | | 4232 | | 302 | | 0000AB963 | | A 0020 FT LAUD | |
IBM | | 3174 | | 91R | | 000017032 | | A 0022 FT LAUD | |
IBM | | 3174 | | 91R | | 000039838 | | A 0037 CLRWTR | |
IBM | | 3174 | | 91R | | 000046537 | | A 0037 CLRWTR | |
IBM | | 3174 | | 21R | | 0000KT180 | | A 0040 ORLANDO | |
IBM | | 3174 | | 95R | | 000054956 | | A 0040 ORLANDO | |
IBM | | 3174 | | 95R | | 000054955 | | A 0040 ORLANDO | |
IBM | | 3174 | | 95R | | 000054957 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AB957 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AB955 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AB956 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AB949 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AR364 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AB961 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AB960 | | A 0040 ORLANDO | |
IBM | | 4232 | | 302 | | 0000AB948 | | A 0040 ORLANDO | |
IBM | | 3174 | | 91R | | 000050480 | | A 0042 ORLANDO | |
IBM | | 3174 | | 91R | | 000050481 | | A 0043 KISSIMME | |
IBM | | 3174 | | 91R | | 000050486 | | A 0044 LK BUENA | |
IBM | | 3174 | | 91R | | 000052699 | | A 0050 W PLM BC | |
IBM | | 3174 | | 91R | | 000050482 | | A 0060 SARASOTA | |
IBM | | 3174 | | 91R | | 000050735 | | A 0095 PENSACOL | |
IBM | | 3174 | | 95R | | 000058816 | | A 0107 SCRMNTO | |
IBM | | 3174 | | 91R | | 000030443 | | A 0108 SCRMNTO | |
IBM | | 3174 | | 91R | | 000053040 | | A 0110 SAN DIEG | |
IBM | | 4232 | | 302 | | 0000AC115 | | A 0110 SAN DIEG | |
IBM | | 4232 | | 302 | | 0000AC117 | | A 0110 SAN DIEG | |
IBM | | 4232 | | 302 | | 0000AC127 | | A 0110 SAN DIEG | |
IBM | | 4232 | | 302 | | 0000AC130 | | A 0110 SAN DIEG | |
IBM | | 4232 | | 302 | | 0000AE473 | | A 0110 SAN DIEG | |
IBM | | 3174 | | 91R | | 000041027 | | A 0120 INGLEWD | |
IBM | | 3174 | | 23R | | 0000KM221 | | A 0120 INGLEWD | |
IBM | | 3174 | | 23R | | 0000KM222 | | A 0120 INGLEWD | |
IBM | | 3174 | | 91R | | 000041437 | | A 0120 INGLEWD | |
IBM | | 3174 | | 91R | | 000041136 | | A 0120 INGLEWD | |
15
Vendor | | Hardware Type | | Model | | Serial Number | | Location(1) | |
IBM | | 3174 | | 91R | | 000045787 | | A 0120 INGLEWD | |
IBM | | 3174 | | 91R | | 000045789 | | A 0120 INGLEWD | |
IBM | | 3174 | | 23R | | 0000KM220 | | A 0120 INGLEWD | |
IBM | | 4232 | | 302 | | 0000AB965 | | A 0120 INGLEWD | |
IBM | | 4232 | | 302 | | 0000AB964 | | A 0120 INGLEWD | |
IBM | | 4232 | | 302 | | 0000AB966 | | A 0120 INGLEWD | |
IBM | | 4232 | | 302 | | 0000AB954 | | A 0120 INGLEWD | |
IBM | | 4232 | | 302 | | 0000AT316 | | A 0120 INGLEWD | |
IBM | | 4232 | | 302 | | 0000AB953 | | A 0120 INGLEWD | |
IBM | | 3174 | | 91R | | 000046244 | | A 0135 SAN JOSE | |
IBM | | 3174 | | 95R | | 000054004 | | A 0135 SAN JOSE | |
IBM | | 3174 | | 91R | | 000046246 | | A 0135 SAN JOSE | |
IBM | | 3174 | | 61R | | 0000Y2749 | | A 0137SCRAMENT | |
IBM | | 3174 | | 61R | | 0000X9450 | | A 0138 SAN FRAN | |
IBM | | 3174 | | 61R | | 0000X9445 | | A 0139 SAN FRAN | |
IBM | | 3174 | | 51R | | 0000P3372 | | A 0140 LAS VEGA | |
IBM | | 3174 | | 11R | | 0000AB241 | | A 0140 LAS VEGA | |
IBM | | 3174 | | 11R | | 0000AU939 | | A 0140 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AC119 | | A 0140 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AC118 | | A 0140 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AC120 | | A 0140 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AC122 | | A 0140 LAS VEGA | |
IBM | | 3174 | | 91R | | 000052629 | | A 0141 LAS VEGA | |
IBM | | 3174 | | 91R | | 000038875 | | A 0141 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AH681 | | A 0141 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AH683 | | A 0141 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AI086 | | A 0141 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AI087 | | A 0141 LAS VEGA | |
IBM | | 4232 | | 302 | | 0000AI097 | | A 0141 LAS VEGA | |
IBM | | 3174 | | 01R | | 0000F0838 | | A 0155 ONTARIO | |
IBM | | 3174 | | 91R | | 000032422 | | A 0155 ONTARIO | |
IBM | | 3174 | | 91R | | 000051250 | | A 0155 ONTARIO | |
IBM | | 3174 | | 61R | | 0000Y2443 | | A 0160 TUCSON | |
IBM | | 3174 | | 91R | | 000051779 | | A 0160 TUCSON | |
IBM | | 3174 | | 91R | | 000045025 | | A 0165 SEATTLE | |
IBM | | 3174 | | 11R | | 0000AU935 | | A 0165 SEATTLE | |
IBM | | 3174 | | 11R | | 0000CW480 | | A 0165 SEATTLE | |
IBM | | 3174 | | 91R | | 000051776 | | A 0165 SEATTLE | |
IBM | | 4232 | | 302 | | 0000AC116 | | A 0165 SEATTLE | |
IBM | | 4232 | | 302 | | 0000AC131 | | A 0165 SEATTLE | |
16
Vendor | | Hardware Type | | Model | | Serial Number | | Location(1) | |
IBM | | 4232 | | 302 | | 0000AC126 | | A 0165 SEATTLE | |
IBM | | 4232 | | 302 | | 0000AC125 | | A 0165 SEATTLE | |
IBM | | 3174 | | 11R | | 0000AU938 | | A 0166 PORTLAND | |
IBM | | 3174 | | 11R | | 000039331 | | A 0166 PORTLAND | |
IBM | | 4232 | | 302 | | 0000AE004 | | A 0166 PORTLAND | |
IBM | | 4232 | | 302 | | 0000AE003 | | A 0166 PORTLAND | |
IBM | | 3174 | | 95R | | 000054651 | | A 0170 DENVER | |
IBM | | 3174 | | 01R | | 0000A8708 | | A 0170 DENVER | |
IBM | | 3174 | | 95R | | 000053749 | | A 0170 DENVER | |
IBM | | 4232 | | 302 | | 0000AD106 | | A 0170 DENVER | |
IBM | | 4232 | | 302 | | 0000AD114 | | A 0170 DENVER | |
IBM | | 4232 | | 302 | | 0000AR405 | | A 0170 DENVER | |
IBM | | 4232 | | 302 | | 0000AD105 | | A 0170 DENVER | |
IBM | | 4232 | | 302 | | 0000AD102 | | A 0170 DENVER | |
IBM | | 3174 | | 91R | | 000050487 | | A 0174 COLORADO | |
IBM | | 3174 | | 91R | | 000045899 | | A 0174 COLORADO | |
IBM | | 4232 | | 302 | | 0000AC626 | | A 0180 PHOENIX | |
IBM | | 4232 | | 302 | | 0000AC627 | | A 0180 PHOENIX | |
IBM | | 3174 | | 91R | | 000039121 | | A 0188 LAS VEGA | |
IBM | | 3174 | | 61R | | 0000X3516 | | A 0190 SALT LK | |
IBM | | 3174 | | 95R | | 000053744 | | A 0190 SALT LK | |
IBM | | 4232 | | 302 | | 0000AD104 | | A 0190 SALT LK | |
IBM | | 4232 | | 302 | | 0000AD111 | | A 0190 SALT LK | |
IBM | | 4232 | | 302 | | 0000AD109 | | A 0190 SALT LK | |
IBM | | 3174 | | 61R | | 0000X9391 | | A 0217 RALEIGH | |
IBM | | 3174 | | 61R | | 0000Y2444 | | A 0217 RALEIGH | |
IBM | | 3174 | | 91R | | 000051251 | | A 0220 E BOSTON | |
IBM | | 3174 | | 91R | | 000050732 | | A 0220 E BOSTON | |
IBM | | 3174 | | 11R | | 0000AU933 | | A 0220 E BOSTON | |
IBM | | 3174 | | 91R | | 000050323 | | A 0220 E BOSTON | |
IBM | | 4232 | | 302 | | 0000AD703 | | A 0220 E BOSTON | |
IBM | | 4232 | | 302 | | 0000AC637 | | A 0220 E BOSTON | |
IBM | | 4232 | | 302 | | 0000AC636 | | A 0220 E BOSTON | |
IBM | | 3174 | | 91R | | 000045902 | | A 0224 PORTLAND | |
IBM | | 3174 | | 01R | | 0000E6039 | | A 0234 PHILADEL | |
IBM | | 4232 | | 302 | | 0000AD147 | | A 0234 PHILADEL | |
IBM | | 4232 | | 302 | | 0000AD149 | | A 0234 PHILADEL | |
IBM | | 4232 | | 302 | | 0000AD148 | | A 0234 PHILADEL | |
IBM | | 3174 | | 01R | | 0000E3390 | | A 0240 KENNER | |
IBM | | 3174 | | 91R | | 000050985 | | A 0246 LTL ROCK | |
17
Vendor | | Hardware Type | | Model | | Serial Number | | Location(1) | |
IBM | | 3174 | | 91R | | 000039946 | | A 0256 N SYRACU | |
IBM | | 3174 | | 91R | | 000057580 | | A 0407 DALLAS | |
IBM | | 3174 | | 91R | | 000034454 | | A 0408 DALLAS | |
IBM | | 3174 | | 95R | | 000053978 | | A 0412 DALLAS | |
IBM | | 3174 | | 91R | | 000050468 | | A 0430 AUSTIN | |
IBM | | 3174 | | 91R | | 000050469 | | A 0440 SAN ANTO | |
IBM | | 3174 | | 91R | | 000037564 | | A 0489 LANSING | |
IBM | | 4232 | | 302 | | 0000AE010 | | A 0518 INDIANAP | |
IBM | | 4232 | | 302 | | 0000AE009 | | A 0518 INDIANAP | |
IBM | | 4232 | | 302 | | 0000AG337 | | A 0522 CLEVELAN | |
IBM | | 3174 | | 91R | | 000052540 | | A 0540 ST LOUIS | |
IBM | | 3174 | | 91R | | 000038305 | | A 0801 HONOLULU | |
IBM | | 4232 | | 302 | | 0000AC500 | | A 0810 HONOLULU | |
IBM | | 4232 | | 302 | | 0000AC505 | | A 0810 HONOLULU | |
IBM | | 4232 | | 302 | | 0000AC504 | | A 0810 HONOLULU | |
IBM | | 3174 | | 91R | | 000050594 | | A 0812 HONOLULU | |
IBM | | 3174 | | 91R | | 000031114 | | A 0815 HONOLULU | |
IBM | | 3174 | | 91R | | 000051249 | | A 0815 HONOLULU | |
IBM | | 3174 | | 91R | | 000035986 | | A 0815 HONOLULU | |
IBM | | 3174 | | 91R | | 000050600 | | A 0820 KAHALUI | |
IBM | | 3174 | | 95R | | 000058817 | | A 0820 KAHALUI | |
IBM | | 4232 | | 302 | | 0000AC502 | | A 0820 KAHALUI | |
IBM | | 4232 | | 302 | | 0000AC501 | | A 0820 KAHALUI | |
IBM | | 4232 | | 302 | | 0000AC506 | | A 0820 KAHALUI | |
IBM | | 4232 | | 302 | | 0000AD704 | | A 0822 MAUI | |
IBM | | 3174 | | 91R | | 000050300 | | A 0830 HILO | |
IBM | | 4232 | | 302 | | 0000AG355 | | A 0830 HILO | |
IBM | | 3174 | | 91R | | 000050475 | | A 0840 KAILUA | |
IBM | | 3174 | | 95R | | 000054664 | | A 0840 KAILUA | |
IBM | | 4232 | | 302 | | 0000AG356 | | A 0840 KAILUA | |
IBM | | 4232 | | 302 | | 0000AG357 | | A 0840 KAILUA | |
IBM | | 3174 | | 95R | | 000053670 | | A 0860 LIHUE | |
IBM | | 3174 | | 91R | | 000050473 | | A 0860 LIHUE | |
IBM | | 4232 | | 302 | | 0000AR759 | | A 0860 LIHUE | |
IBM | | 4232 | | 302 | | 000077277 | | A 0860 LIHUE | |
IBM | | 3174 | | 91R | | 000050177 | | A 0970 FT LAUD | |
IBM | | 3174 | | 91R | | 000050988 | | A 0970 FT LAUD | |
IBM | | 3174 | | 91R | | 000048148 | | A 0970 FT LAUD | |
IBM | | 3174 | | 91R | | 000039064 | | A 0970 FT LAUD | |
IBM | | 3174 | | 91R | | 000038980 | | A 0970 FT LAUD | |
18
Vendor | | Hardware Type | | Model | | Serial Number | | Location(1) | |
IBM | | 3174 | | 91R | | 000038807 | | A 0970 FT LAUD | |
IBM | | 3174 | | 23R | | 0000KX248 | | A 0975 FT LAUD | |
IBM | | 3174 | | 91R | | 000033593 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000034993 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000034991 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000030478 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000030596 | | A 1378 FTLAUD | |
IBM | | 3174 | | 11R | | 0000AU932 | | A 1378 FTLAUD | |
IBM | | 3174 | | 81R | | 000008346 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000037416 | | A 1378 FTLAUD | |
IBM | | 3174 | | 51R | | 0000Q2248 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000044263 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000042993 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000041135 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000039776 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000039432 | | A 1378 FTLAUD | |
IBM | | 3174 | | 61R | | 0000W7374 | | A 1378 FTLAUD | |
IBM | | 3174 | | 01R | | 0000G8995 | | A 1378 FTLAUD | |
IBM | | 3174 | | 23R | | 0000KR794 | | A 1378 FTLAUD | |
IBM | | 3174 | | 23R | | 0000KR787 | | A 1378 FTLAUD | |
IBM | | 3174 | | 23R | | 0000KW892 | | A 1378 FTLAUD | |
IBM | | 3174 | | 23R | | 0000KW889 | | A 1378 FTLAUD | |
IBM | | 3174 | | 23R | | 0000KX792 | | A 1378 FTLAUD | |
IBM | | 3174 | | 51R | | 0000P8456 | | A 1378 FTLAUD | |
IBM | | 3174 | | 51R | | 0000P2245 | | A 1378 FTLAUD | |
IBM | | 3174 | | 23R | | 0000KY634 | | A 1378 FTLAUD | |
IBM | | 3174 | | 21R | | 0000KC468 | | A 1378 FTLAUD | |
IBM | | 3174 | | 21R | | 0000KD245 | | A 1378 FTLAUD | |
IBM | | 3174 | | 21R | | 0000KD246 | | A 1378 FTLAUD | |
IBM | | 3174 | | 23R | | 0000KK358 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000045027 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000080346 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000045028 | | A 1378 FTLAUD | |
IBM | | 3174 | | 95R | | 000054980 | | A 1378 FTLAUD | |
IBM | | 3174 | | 95R | | 000058819 | | A 1378 FTLAUD | |
IBM | | 3174 | | 95R | | 000054056 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000053041 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000045788 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000053551 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000053877 | | A 1378 FTLAUD | |
19
Vendor | | Hardware Type | | Model | | Serial Number | | Location(1) | |
IBM | | 4232 | | 302 | | 0000AD112 | | A 1378 FTLAUD | |
IBM | | 4232 | | 302 | | 0000AC296 | | A 1378 FTLAUD | |
IBM | | 4232 | | 302 | | 0000AE303 | | A 1378 FTLAUD | |
IBM | | 4232 | | 302 | | 0000AG359 | | A 1378 FTLAUD | |
IBM | | 4232 | | 302 | | 0000AE304 | | A 1378 FTLAUD | |
IBM | | 3174 | | 91R | | 000048024 | | ANC RENTAL(2) | |
IBM | | 4232 | | 302 | | 0000AC628 | | ANC RENTAL(2) | |
IBM | | 4232 | | 302 | | 0000AR351 | | COMP PROD/ALAMO(2) | |
IBM | | 4232 | | 302 | | 0000AR353 | | COMP PROD/ALAMO(2) | |
IBM | | 4232 | | 302 | | 0000AR354 | | COMP PROD/ALAMO(2) | |
IBM | | 4232 | | 302 | | 0000AR404 | | COMPUT PRODUCTS(2) | |
IBM | | 4232 | | 302 | | 0000AR756 | | REPUBLIC PLAZA(2) | |
IBM | | 4232 | | 302 | | 0000BB230 | | SALEM/ALAMO REN(2) | |
IBM | | 4232 | | 302 | | 0000BB231 | | SALEM/ALAMO REN(2) | |
IBM | | 3174 | | 01R | | 0000E0837 | | -A-(2) | |
(1) Most sites have a minimum of one and up to five controllers per city. Cannot verify serial number of functioning controllers with out further investigation.
(2) These controllers are not connected – Newco to determine if they need to stay on maintenance.
20
SCHEDULE 6.4(a)
THIRD PARTY SYSTEMS SOFTWARE
PART A –SYSTEMS SOFTWARE LICENSES – OWNERSHIP RETAINED BY PEROT SYSTEMS
Perot Systems will retain ownership of the systems software in the following tables:
Company | | Product Number (if applicable) | | Description | | Current Release | |
MIDRANGE | |
BEA | | | | TUXEDO (RTK & SDK) | | | |
CHECKPOINT | | | | HELP DESK SUPPORT, PATCHES & UPDATES | | | |
F5 NETWORKS | | | | BIGIP | | | |
STONESOFT | | | | STONEBEAT (M-SB) | | | |
SYSTEMS SOFTWARE TOOLS | |
| |
Company | | Product Name | | Function | |
COMPUTER ASSOCIATES | | AUTOSYS | | | |
VERISIGN | | SSL ENCRYPTION KEYS | | | |
1
PART B – NEWCO RETAINED SYSTEMS SOFTWARE LICENSES
Company | | Product Number (if applicable) | | Description | | Current Release | |
MIDRANGE | |
AGE LOGIC | | | | SOFTWARE | | 4.0 | |
APACHE | | | | APACHE WEB SERVER | | | |
BUSINESS OBJECTS | | | | BUSINES OBJECTS | | | |
CHECKPOINT | | | | VPN/EEC | | | |
CLICK2LEARN | | | | | | | |
CLICK2LEARN | | | | TOOLBOOK | | | |
COGNOS | | | | “COGNOS PRODUCT” 430 RIGHT TO COPY | | | |
COGNOS | | | | DESKTOP | | | |
COGNOS | | | | IMPROMPTU ADMIN 2 LIC | | | |
COGNOS | | | | IMPROMPTU ADMIN/ENTERPRISE/POWERPLAY 4 LIC | | | |
COGNOS | | | | POWERPLAY ADMIN 2 LIC | | | |
COGNOS | | | | POWERPLAY TRANSFORMER SERVER | | | |
COGNOS | | | | POWERPLAY/IMPROMPTU - 50 LIC | | | |
COGNOS | | | | POWERPLAY/IMPROMPTU - 6 LIC | | | |
COMPUSERV | | | | PAL | | | |
EDS | | | | ELITE | | | |
EMBARCADERO TECHNOLOGIES | | | | DB ARTISTAN ORACLE 2 USER | | | |
EMBARCADERO TECHNOLOGIES | | | | DB ARTISTAN ORACLE, SYBASE, MS SQL 4 USER | | | |
EMC | | | | EMC DB TUNER | | | |
GROUP 1 SOFTWARE | | | | CODE 1 PLUS | | | |
GROUP 1 SOFTWARE | | | | CODE 1 PLUS SUBSCRIPTION 6 PER YEAR | | | |
GROUP 1 SOFTWARE | | | | LIST CONVERSION PLUS | | | |
GROUP 1 SOFTWARE | | | | MERGE PURGE PLUS | | | |
HEROIX | | | | ROBOMON | | | |
HUMMINGBIRD COMMUNICATIONS | | | | EXCEED OF WINDOWS NT | | | |
HUMMINGBIRD COMMUNICATIONS | | | | HOST EXPLORER FOR WINDOWS NT | | | |
HP | | | | HP-UX | | | |
HP | | | | OMNIBACK II | | | |
IBM | | | | AIX | | | |
IBM | | | | AIX AD AND AE SUPPORTLINE | | | |
IBM | | | | DB2 | | 6.1 | |
2
Company | | Product Number (if applicable) | | Description | | Current Release | |
IBM | | | | SNA SERVER FOR AIX | | | |
IBM | | | | SECURE WAY DIRECTORY (LDAP) | | | |
IBM | | | | WEBSPHERE | | | |
IBM | | | | WEBSPHERE WSAD | | | |
IBM | | | | VISUALAGE FOR JAVA | | 4.0 | |
ILOG | | | | AMPL | | | |
ILOG | | | | CPLEX BASE AND MIP OPTION | | | |
ILOG | | | | CPLEX SUITE | | | |
ILOG | | | | CPLEX SUITE | | | |
ILOG | | | | CPLEX SUITE | | | |
ILOG | | | | CPLEX SUITE | | | |
INFORMATICA | | | | INFORMATICA | | | |
INTERWISE | | | | | | | |
MCAFEE | | | | ANTIVIRUS | | | |
MCAFEE | | | | NETSHIELD NT | | | |
MCAFEE | | | | NETSHIELD 2000 | | 4.5 | |
MICROPUBLISHER | | | | | | | |
MICROSOFT | | | | FRONT PAGE 2000 | | | |
MICROSOFT | | | | INTERNET EXPLORER | | | |
MICROSOFT | | | | IIS | | | |
MICROSOFT PREMIER SUPPORT | | | | MICROSOFT (OPERATIING SYSTEM SOFTWARE) | | | |
MICROSOFT | | | | OUTLOOK | | | |
NCS | | | | ACCURA | | | |
NETG (THOMPSON/NETG) | | | | VARIOUS PRODUCTS/COURSES ON A ROTATING BASIS | | | |
NETIQ | | | | 1 * EEM SENTRY ENTERPRSIE EVENT MGR | | | |
NETIQ | | | | 10,000 * DRA 6.X SINGLE USER | | | |
NETIQ | | | | 20 * DRA 6.X | | | |
NETIQ | | | | 2000 * DRA 6.X | | | |
NETIQ | | | | 3 * EEM SENTRY ENTERPRISE EVENT MGR | | | |
NETIQ | | | | 3500 * DRA 6.X | | | |
NETIQ | | | | 4000 * DRA 6.X SINGLE USER LIC. | | | |
NETIQ | | | | 7500 * EXA 6.X SINGLE USER | | | |
NETOPIA | | | | TIMBUKTU PRO | | | |
OMTOOLS | | | | 23 ADDL LINES | | | |
OMTOOLS | | | | NT FAX SERVER, UNLIMITED USERS | | | |
ORACLE | | | | DEVELOPER/2000 | | | |
ORACLE | | | | ENTERPRISE MANAGER PERF. PACK | | | |
ORACLE | | | | OBJECTS OPTION | | | |
3
Company | | Product Number (if applicable) | | Description | | Current Release | |
ORACLE | | | | ORACLE8 ENTERPRISE EDITION | | | |
ORACLE | | | | PARALLEL SERVER OPTION | | | |
ORACLE | | | | PARTITIONING OPTION | | | |
ORACLE | | | | DESIGNER/2000 | | | |
ORACLE | | | | PROGRAMMER/2000 | | | |
OSM | | | | COS PRINT XPRESS | | | |
OSM | | | | COSPRINT | | | |
OTG | | | | DISK XTENDER | | | |
PLATINUM | | | | ADVISOR | | | |
PLATINUM | | | | AUTOSECURE ACCESS CONTROL | | | |
PLATINUM | | | | AUTOSYS | | | |
PLATINUM | | | | AUTOSYS EXPERT | | | |
PLATINUM | | | | CCC/HARVEST | | | |
PLATINUM | | | | DATABASE ANALYZER FOR ORACLE | | | |
PLATINUM | | | | DBVISION | | | |
PLATINUM | | | | DECISION BASE | | | |
PLATINUM | | | | DESKTOP DBA | | | |
PLATINUM | | | | ERWIN | | | |
PLATINUM | | | | PEOPLESOFT ADAPTER | | | |
PLATINUM | | | | PLAN ANALYZER | | | |
PLATINUM | | | | SQL STATION | | | |
PLATINUM | | | | TSREORG W/FAST UNLOAD | | | |
RED HAT | | | | LINUX | | | |
REMEDY | | | | HELP DESK SW LICENSE (PER USER) | | | |
SAS INSTITUTE | | | | BASE SAS - N - AIX - F50 | | | |
SAS INSTITUTE | | | | BASE SAS – R | | | |
SAS INSTITUTE | | | | SAS/ACCESS ORACLE - R | | | |
SAS INSTITUTE | | | | SAS/CONNECT - R | | | |
SAS INSTITUTE | | | | SAS/ETS – R WNDW 10 USERS | | | |
SAS INSTITUTE | | | | SAS/INSIGHT - R WNDW 10 USERS | | | |
SAS INSTITUTE | | | | SAS/OR - R WNDW 10 USERS | | | |
SAS INSTITUTE | | | | SAS/STAT - N - AIX - F50 | | | |
SAS INSTITUTE | | | | SAS/STAT - N - ENTMINER - AIX - F50 | | | |
SAS INSTITUTE | | | | SAS/STAT - R | | | |
SAS INSTITUTE | | | | SAS/STAT - R WNDW 10 USERS | | | |
SAS INSTITUTE | | | | WINDOW SAS - ENTMINER - 5 USERS | | | |
SAS INSTITUTE | | | | WNDW ECO BASIC - R10 USERS | | | |
SCANSOFT | | | | DRAGON NATURALLY SPEAKING PROF. | | | |
SCANSOFT | | | | ONMIPAGE | | | |
SEAGATE | | | | CRYSTAL REPORTS | | | |
4
Company | | Product Number (if applicable) | | Description | | Current Release | |
SOFTSKILLS | | | | VARIOUS PRODUCTS/COURSES ON A ROTATING BASIS | | | |
STERLING COMMERCE | | | | CONNECT ENTERPRISE | | | |
STERLING COMMERCE | | | | CONNECT MAILBOX | | Not supported | |
STERLING COMMERCE | | | | CONNECT DIRECT | | | |
SYBASE | | | | ACCESS SERVER CICS | | | |
SYBASE | | | | ADAPTIVE SERVER - SUN | | | |
SYBASE | | | | ADAPTIVE SERVER - SUN | | | |
SYBASE | | | | ADAPTIVE SERVER ENTERPRISE (RISC) | | | |
SYBASE | | | | ADAPTIVE SERVER ENTERPRISE (SUN) | | | |
SYBASE | | | | ADAPTIVE SERVER IQ (RISC) | | | |
SYBASE | | | | ADAPTIVE SERVER IQ (RISC) | | | |
SYBASE | | | | ADAPTIVE SERVER IQ (RISC) | | | |
SYBASE | | | | DB GATEWAY MVS/PC/WIN | | | |
SYBASE | | | | DB GATEWAY MVS/PC/WIN | | | |
SYBASE | | | | EMBEDDED SQL/C (SUN) | | | |
SYBASE | | | | ENTERPRISE OMNICONNECT PC/WIN | | | |
SYBASE | | | | ENTERPRISE OMNICONNECT PC/WIN | | | |
SYBASE | | | | ODBC DRIVER - PC/WIN | | | |
SYBASE | | | | OPEN CLIENT C DEVELOPER (SUN) | | | |
SYBASE | | | | OPEN CLIENTCONNECT CICS | | | |
SYBASE | | | | OPEN SERVERCONNECT CICS | | | |
SYBASE | | | | SQL MONITOR BUNDLE (SUN) | | | |
SYBASE | | | | SYBASE | | | |
TIVOLI SYSTEMS | | | | BASE PRODUCTS CONVERTED TO POINTS | | | |
TIVOLI SYSTEMS | | | | SECURITY & GEM | | | |
VERITAS | | | | NETBACKUP | | | |
VISUAL NETWORKS | | | | PAM | | | |
WILSON LEARNING | | | | VARIOUS PRODUCTS/COURSES ON AROTATING BASIS | | | |
5
SYSTEMS SOFTWARE TOOLS | |
| |
Company | | Product Name | | Function | |
ASL | | WHATS UP GOLD V5.0 | | | |
MICROSOFT | | SQL SERVER | | | |
QUEST | | SQL NAVIGATOR | | | |
QUEST | | T.O.A.D. TOOL FOR ORACLE | | | |
SOFTARTISAN SA | | FILEUP SERVER DAEMON | | | |
6
Company | | Product Number (if applicable) | | Description | | Current Release | |
MAINFRAME | |
| | | | PEOPLETOOLS | | 8.17.08 GO | |
ALLEN SYSTEMS | | | | VIA/CENTER | | 4.5 (131) | |
ALLEN SYSTEMS | | | | VIA/CENTER IDMS | | 4.5 (131) | |
ALLEN SYSTEMS | | | | VIA/CENTER-APPL-MLS | | 4.5 (131) | |
ALLEN SYSTEMS | | | | VIA/CENTER-AUTHORIZE | | 4.5 (100) | |
ALLEN SYSTEMS | | | | VIA/INSIGHT | | 4.6 (003) | |
ALLEN SYSTEMS | | | | VIA/SMARTEDIT | | 2.5 (101) | |
ALLEN SYSTEMS | | | | VIA/ SMARTTEST | | 3.6 (003) | |
ALLEN SYSTEMS | | | | VIA/SMARTTEST-CICS | | 3.6 (005) | |
ALLEN SYSTEMS | | | | VIA/SMARTTEST-CICS-FS | | 3.6 (001) | |
ALLEN SYSTEMS | | | | VIA/SMARTTEST-CICS-TCA | | 3.6 (001) | |
ALLEN SYSTEMS | | | | VIA/SMARTTEST-CICS-TSO | | 3.6 (001) | |
ALLEN SYSTEMS GR. | | | | ASG-DBOL | | 1405 | |
ALLEN SYSTEMS GR. | | | | FAST ACCESS | | 5.1.0 | |
ANACOMP | | | | ALVA | | | |
AONIX | | | | NOMAD | | 6.5 | |
BMC | | | | SUPER OPTIMIZER CICS | | 3.0.01 | |
CANDLE CORPORATION | | | | COMMAND CENTER MQ | | 300 (PSP 9952) | |
CANDLE CORPORATION | | | | OMEGAMON II CICS | | 500 | |
CANDLE CORPORATION | | | | OMEGAMON II MVS | | 500 | |
CANDLE CORPORATION | | | | OMEGAVIEW | | 300 | |
COMPUTER ASSOCIATES | | | | CA ELEVEN | | 2.2 (9710) | |
COMPUTER ASSOCIATES | | | | CA JOBTRAC | | 3.4 (9910) | |
COMPUTER ASSOCIATES | | | | CA-ADS/ONLINE | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMS | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMS DATA DICTIONARY | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMS DC | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMS DISTRIBUTED DATABASE | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | DB:ARCH. INTEGRATED | | ANC see Note 1 | |
COMPUTER ASSOCIATES | | | | IDMS ICMS | | ANC see Note 1 | |
7
Company | | Product Number (if applicable) | | Description | | Current Release | |
COMPUTER ASSOCIATES | | | | IDMS SQL EXT ARCH | | ANC see Note 1 | |
COMPUTER ASSOCIATES | | | | IDMS PERFORMANCE MONITOR | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMS ONLINE QUERY | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMSPRESSPACK | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMS CULPRIT | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | IDMS CV | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | LIBRARY OF ROUTINES | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | CA OPS/MVS II CICS INTERFACE | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | CA-OPS/MVS II JES3 | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | CA-OPS.MVS II MULTI-SYSTEM FAC | | ANC SEE NOTE 1 | |
COMPUTER ASSOCIATES | | | | CA SYSVIEW W/E JES COMP | | 7.3 | |
COMPUTER ASSOCIATES | | | | CA LIBRARIAN BASE + LIB/AM | | 4.2 (9811) | |
COMPUTER ASSOCIATES | | | | CA ONE | | 5.2 (9910L052) | |
COMPUTER ASSOCIATES | | | | CA AUTOMATION POINT FOR OS | | ANC SEE NOTE 1 | |
GEAC | | | | G/L | | ANC SEE NOTE 1 | |
GEAC | | | | AP | | ANC SEE NOTE 1 | |
GEAC | | | | HRS | | ANC SEE NOTE 1 | |
GROUP 1 | | | | CODE 1 PLUS | | ANC SEE NOTE 1 | |
GROUP 1 | | | | CODE 1 PLUS SUBSCRIPTION | | ANC SEE NOTE 1 | |
H&W | | | | SYSM | | 6.6.1 | |
H&W | | | | SYSM/IIN | | ANC SEE NOTE 1 | |
H&W | | | | SYSM/DSI | | ANC see Note 1 | |
IBM | | | | ACF/NCP | | V 7.0 | |
IBM | | | | ASSEMBLER | | R 2.0 | |
IBM | | | | BOOKMANAGER | | R 3.0 | |
IBM | | | | C/370 | | 2.2 | |
IBM | | | | COBOL II | | R 4.0 | |
IBM | | | | DFSMS | | 1.2 | |
IBM | | | | DFSORT | | R 12.0 | |
IBM | | | | EREP | | 3.5 | |
IBM | | | | EXPEDITE | | 4.4 | |
8
Company | | Product Number (if applicable) | | Description | | Current Release | |
IBM | | | | GDDM | | 2.3 | |
IBM | | | | HCD | | 5.2 | |
IBM | | | | ICKDSF | | R 16.0 | |
IBM | | | | IP PRINTWAY | | 1.3 | |
IBM | | | | ISPF | | 4.1 | |
IBM | | | | JES/328X | | ANC SEE NOTE 1 | |
IBM | | | | JES2 | | 5.2.0 | |
IBM | | | | MQM | | 1.1.3 | |
IBM | | | | NETVIEW | | 3.1 | |
IBM | | | | NPM | | 2.2 | |
IBM | | | | NTUNEMON | | 2.1 | |
IBM | | | | OGL | | R 1.0 | |
IBM | | | | OS390 | | V2.10 | |
IBM | | | | PL/I | | 2.3 | |
IBM | | | | PPFA | | R 1.0 | |
IBM | | | | PSF | | 2.2.0 | |
IBM | | | | RACF (SECURITY SERVER 2.10) | | 2.2 | |
IBM | | | | RMF | | 5.2.0 | |
IBM | | | | SDSF | | R 5.0 | |
IBM | | | | SMP/E | | 8.1 | |
IBM | | | | SSP | | 4.3 | |
IBM | | | | TCP/IP | | 3.2 | |
IBM | | | | TRANSACTION SERVER (CICS) | | 1.3 | |
IBM | | | | TSO/E | | 2.4 | |
IBM | | | | VTAM | | 4.3 | |
IBM | | | | X.25 NPSI | | V 3.0 | |
IBM | | | | PRINT SERVICES ACCESS FACILITY | | | |
IBM | | | | NETVIEW FTP | | | |
IBM | | | | AD/CYCLE COBOL/370 FULL FUNCTION | | | |
IBM | | | | TIVOLI NETVIEW ENTERPRISE | | | |
IBM | | | | OS/VS RPGII COMPILER | | V1 | |
MACKINNEY | | | | ISPF/VSAM UTILITY | | 2.4 | |
MOBIUS | | | | INFOPAC | | 6.1 (LC3282) | |
MOBIUS | | | | VIEW DIRECT | | ANC SEE NOTE 1 | |
MOBIUS | | | | WRITE DIRECT | | ANC SEE NOTE 1 | |
MOBIUS | | | | DOCUMENT DIRECT | | ANC SEE NOTE 1 | |
OPEN CONNECT | | | | WEBCONNECT | | ANC SEE NOTE 1 | |
PATHLORE | | | | PREFERENCE/PHOENIX | | 7.7.1 | |
PITNEY BOWES | | | | INFOTRIEVE | | | |
PROGINET | | | | IND$FILE | | 3.2B | |
9
Company | | Product Number (if applicable) | | Description | | Current Release | |
SAS INSTITUTE | | | | SAS | | 8 | |
SEA | | | | $AVRS | | 5.0A-22 | |
STERLING COMMERCE | | | | CONNECT ENTERPRISE | | | |
T A CONSULTING TEAM | | | | DB-CROSS MVS | | C81001 | |
T A CONSULTING TEAM | | | | DBSYNCHRO | | C81001 | |
10
SCHEDULE 6.4(b)
THIRD PARTY APPLICATIONS SOFTWARE
PART A – ASSIGNED APPLICATIONS SOFTWARE LICENSES
PART B – RETAINED APPLICATIONS SOFTWARE LICENSES
Company | | Product Number (if applicable) | | Description | | Current Release | |
PEOPLESOFT | | | | PEOPLESOFT HRMS (HUMAN RESOURCES, PAYROLL, BASE BENEFITS, E-PAY, E-PROFILE, E-COMPENSATION, E-BENEFITS, E-DEVELOPMENT | | 8.01 | |
PEOPLESOFT | | | | PAF WEB APPLICATION | | | |
KRONOS | | | | KRONOS TIMEKEEPER | | 2A.03 SP3 (UPGRADING TO 3.4) | |
KRONOS | | | | KRISP | | | |
ASPECT | | | | TCS | | 5.0.8.2 | |
PEOPLESOFT | | | | PEOPLESOFT FINANCIALS (ACCOUNTS RECEIVABLE, GENERAL LEDGER, ASSET MANAGEMENT ACCOUNTS PAYABLE) | | 7.02 | |
BRIO TECHNOLOGIES | | | | REPORTMART-WEBSCRIBE | | 1.1 | |
CHESAPEAKE SYSTEMS SOLUTIONS | | | | T-RECS | | 3.0 | |
SUNGARD | | | | SUNGARD TREASURY | | 1.0 | |
TCI | | | | PTMS | | 2.71 | |
CHESAPEAKE SYSTEMS SOLUTIONS | | | | UPCS | | 4.0 | |
TEAM BUILDER | | | | TEAM BUILDER | | | |
MANUGISTICS | | | | IRMS | | 2.5.1 | |
RUBICON | | | | RUBICON | | | |
ADP/DSI | | | | TUNEUP | | 2.3.1 | |
MITCHELL | | | | MITCHELL (E-CLAIM 2.0 AND ULTRAMATE 4.7) | | | |
PYRAMID SERVICES | | | | PYRAMID | | 1.2C | |
1
APPLICATIONS SOFTWARE TOOLS | |
| |
Company | | Product Name | | Function | |
ACTIVE + | | SERVICE KEEPER | | | |
ADOBE | | ACROBAT | | | |
ADOBE | | FRAMEMAKER | | | |
ADOBE | | PAGEMAKER | | | |
ADOBE | | PHOTOSHOP | | | |
ADOBE | | TYPE MANAGER | | | |
ALTOVA | | XML SPY | | | |
ARAXIS | | MERGE | | | |
CATALYST | | SOCKETWRENCH V3.1 | | | |
CATALYST | | SOCKETWRENCH (FREEWARE) V3.6 | | | |
COREL | | DRAW | | | |
COREL | | PHOTPAINT | | | |
CVS | | CVS (FREEWARE) | | | |
EHELP | | ROBOHELP | | | |
FINITE MATTERS, LTD | | FRAMESCRIPT | | | |
HP | | C++ | | | |
HP | | C++ COMPILER | | | |
J-INTEGRA | | JAVA-COM BRIDGE | | | |
LSOFT | | LISTSERV | | | |
MACROMEDIA | | DREAMWEAVER MX STUDIO | | | |
MACROMEDIA | | FLASH | | | |
MACROMEDIA | | FREE HAND | | | |
MESSAGE MEDIA | | UNITY MAIL | | | |
MICROSOFT | | VISUAL STUDIO VISUAL BASIC VISUAL INTERDEV VISUAL SOURCE SAFE | | | |
MICROSOFT | | PROJECT | | | |
MICROSOFT | | VISIO | | | |
NETIQ | | WEBTRENDS REPORTING CENTER EBUSINESS EDITION | | | |
PEARL | | PEARL (FREEWARE) | | | |
ROGUE WAVE | | ROGUEWAVE LIBRARIES | | | |
SYBASE | | POWERBUILDER/PFC | | | |
2
PART B – RETAINED APPLICATIONS SOFTWARE LICENSES
Company | | Product Number (if applicable) | | Description | | Current Release | |
? | | | | PRDP (PERFORMANCE DATABASE, CBT, AND PF HELP FUNCTIONALITY) | | | |
? | | | | ACCRA IMAGING | | | |
INTERWISE | | | | INTERWISE | | | |
CLICK TO LEARN | | | | CLICK TO LEARN | | | |
NETG | | | | NETG/DIGITAL | | | |
3
PART C – NEWCO APPLICATIONS SOFTWARE
LEGACY SYSTEMS |
RESERVATIONS |
FLEET |
FINANCE |
RENT |
USER REPORTING |
JRC (LACEK INTERFACE) |
ANCILLARY APPLICATIONS |
FLEET DATABASE |
COMMUNITY AFFAIRS |
ALAMO.COM |
ANC ONLINE |
ANC INTRANET |
RES2000 |
OPS WEB SITE |
TA.ALAMO.COM |
TOUR.ALAMO.COM |
PATS |
SSRT |
CIS |
PERFORMANCE MONITOR |
YEILD MANAGEMENT |
MAINFRAME IRMS/PM/FLEET AVAILABILITY INTERFACES |
PROJECT X |
ARES |
ATS |
NATIONAL DATA WAREHOUSE |
ANC DATA WAREHOUSE |
TOPS WARE HOUSE |
CUSTRPT |
SALES CUBES |
ADVANCED RES |
WARRANTY |
IT ONLINE |
4
SCHEDULE 6.6
THIRD PARTY SERVICE CONTRACTS
PART A – ASSIGNED THIRD PARTY SERVICE CONTRACTS
PART B – RETAINED THIRD PARTY SERVICE CONTRACTS
Software Maintenance Contracts
System (Odyssey, Legacy, Shared, Other) | | Vendor Name | | Description | |
Odyssey | | BEA | | | |
Odyssey | | Group 1 Software | | | |
Odyssey | | Hummingbird | | | |
Odyssey | | IpSwitch | | | |
Odyssey | | Merant | | | |
Odyssey | | Oracle | | | |
Odyssey | | Rational | | | |
Odyssey | | Sterling Software | | | |
Odyssey | | Verifone | | | |
Odyssey | | Veritas Software | | | |
Odyssey | | Checkpoint | | | |
Odyssey | | Additional SW Maint. | | Web Security Project | |
Other | | Brio | | ReportMart Maintenance | |
Other | | Bankoe | | Custom Kronos Program Maintenance | |
Other | | Platinum | | Decisionbase, CCC/Harvest, Advisor, Erwin Maintenance | |
Other | | PeopleSoft | | HRMS Maintenance | |
Other | | Kronos | | Lease Payment | |
Other | | PeopleSoft | | Financials Maintenance | |
Other | | Dealer Solutions | | Tune Up Maintenance | |
Other | | Sybase | | Sybase Subscription and Support | |
Other | | Cyrano | | Workbench subscription and support | |
Other | | Cyrano | | Impact subscription and support | |
Other | | Informatica | | Extract transform and load tool for DW | |
Other | | Business Objects | | End User Query and Reporting Tool | |
Other | | Computer Associates | | Erwin - Database desgn tool | |
Other | | Embarcadero | | DBArtisan | |
Other | | Group 1 | | Address standardization and merge tool | |
Other | | Webtrends | | Webtrends Enterprise | |
Other | | Verisign | | Encryption software | |
Other | | TBD | | Direct Links project | |
Other | | Computer Mail Services | | | |
Other | | Network Appliance | | | |
Other | | Norton | | Why needed if MacaFee isused as well | |
Other | | Verisign | | | |
Other | | Additional SW Maint. | | Salesforce Consoidation Proj. | |
Other | | 3COM RAS | | | |
Other | | Visual Networks | | | |
Other | | Remedy | | License Fee | |
1
Shared | | Checkpoint | | | |
Shared | | Cognos | | | |
Shared | | Embarcadero Technologies | | | |
Shared | | Group 1 Software | | | |
Shared | | Heroix | | | |
Shared | | ILOG aka CPLEX | | | |
Shared | | McAfee | | Support | |
Shared | | McAfee (Corp. Software) | | | |
Shared | | Microsoft Premier | | | |
Shared | | NetIQ (MCS - Mission Critical) | | | |
Shared | | Netopia | | | |
Shared | | Omtool Ltd. | | | |
Shared | | Oracle | | | |
Shared | | OSM | | | |
Shared | | OTG | | | |
Shared | | Platinum Technology | | | |
Shared | | SAS Institute | | | |
Shared | | Sterling Software | | | |
Shared | | StoneSoft Inc | | | |
Shared | | Tivoli Systems | | | |
Shared | | Citrix Systems | | Connectivity software | |
Software Maintenance required until Legacy system is decommissioned:
System (Odyssey, Legacy, Shared, Other) | | Vendor Name | | Description | |
Legacy | | Listserv | | Listserv email software | |
Legacy | | Allen Systems | | | |
Legacy | | AONIX | | | |
Legacy | | BMC | | | |
Legacy | | Candle | | | |
Legacy | | Computer Associates | | | |
Legacy | | Group 1 Software | | | |
Legacy | | H & W | | | |
Legacy | | IBM | | | |
Legacy | | MacKinney Systems | | | |
Legacy | | Metainfo | | | |
Legacy | | Mobius | | | |
Legacy | | Open Connect | | | |
Legacy | | Pathlore (Renewed Nov 2001) | | | |
Legacy | | Proginet Corp | | | |
Legacy | | SAS Institute | | | |
Legacy | | SEA | | | |
Legacy | | Softworks | | | |
Legacy | | TACT | | | |
Legacy | | Viasoft (billed by Allen Systems - ASG) | | | |
2
Hardware Maintenance Contracts
System (Odyssey, Legacy, Shared, Other) | | Vendor Name | | Description | |
Odyssey | | Cranel Service | | STK 9710 tape silo | |
Odyssey | | EMC | | RIMF | |
Odyssey | | Hewlett Packard | | BCS Odyssey | |
Odyssey | | StorNet | | Dallas | |
Other | | TBD | | Direct Links project | |
Other | | Foundry Network (added per Sharon) | | | |
Other | | IBM | | Ft. Lauderdale Data Center (Value) | |
Other | | Network Appliance | | | |
Other | | Avaya-Mtce-LBS | | Blue Lake switch maintenance | |
Other | | Computer Products Corp (CPC) | | Campus Depot maintenance and Field routers | |
Other | | Comtec Printers (National) | | National HH printer repairs | |
Other | | Datavision Prologix | | Helpdesk, AP’s, Depot Repair HH National, US and Canada, Asset Tracking | |
Other | | DCT | | Laptops and Kronos Clocks Maintenance | |
Other | | GlobelStar USA | | Satellite phones | |
Other | | Heartland | | Depot repair Alamo Handhelds | |
Other | | IBM | | Maintenance for IBM 3270 Controllers | |
Other | | Williams Communications | | Plaza switch maintenance | |
Other | | Visual Networks | | Management software and hardware | |
Other | | Hardware Repairs | | CPC, D1, DCT (Out of Scope) | |
Other | | TBD | | Server & Proxy Maint. for eLearning | |
Other | | NCS | | Imaging Equipment EDS | |
Other | | Arink | | Printer EDS | |
Other | | XFP Com | | Com Microfiche EDS | |
Other | | Kodak | | Maintenance EDS | |
Other | | IBM | | Printer EDS | |
Other | | Kodak | | User Micro Machines | |
Other | | Anacomp | | Reader Printer AR | |
Other | | Additional HW Maint. | | Web Security Project | |
Shared | | EMC | | Ft. Lauderdale Data Center | |
Shared | | EMC | | Ft. Lauderdale, Minneapolis | |
Shared | | Hewlett Packard | | FLL, CSS RIMF | |
Shared | | Moore (Annual Cost estimated) | | | |
Shared | | Sun Microsystems | | RIMF | |
Shared | | Xerox | | Ft. Lauderdale Data Center | |
System (Odyssey, Legacy, Shared, Other) | | Vendor Name | | Description | |
Other | | EDS (Electronic Data System) | | Ft. Laud Data Center (Base Sat. Srv) | |
Other | | DecisionOne (Alamo) | | Maintenance for Field PC’s and Printers | |
Other | | DecisionOne (National) | | Maintenance for Field PC’s and Printers | |
Other | | GE Canada | | Maintenance for Alamo and National PC’s (Canadian dollars) | |
Other | | EDS | | Micro Maintenance | |
Other | | NextwareOne | | Northern Telecom Hardware Maintenance | |
3
Hardware Maintenance required until Legacy is decommissioned:
System (Odyssey, Legacy, Shared, Other) | | Vendor Name | | Description | |
Legacy | | IBM | | Ft. Lauderdale Data Center (ANC) | |
Legacy | | StorageTek | | Ft. Lauderdale Data Center | |
Legacy | | Iron Mountain (Arcus) | | | |
Lease Agreements
System (Odyssey, Legacy, Shared, Other) | | Lessor | | Schedule No. | | Start Date | | End Date | | Term | |
Odyssey | | Compaq Capital | | 100782000015 | | 10/30/2000 | | 9/30/2003 | | 36 | |
Odyssey | | Fleet Business Credit/EMC | | 0012093-003 | | 6/1/2001 | | #NAME? | | 39 | |
Odyssey | | Fleet Business Credit/EMC | | 0012093-004 | | 6/1/2001 | | #NAME? | | 39 | |
Odyssey | | Hewlett Packard | | 5518B | | 6/1/1998 | | 5/31/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518BA | | 1/22/1999 | | 5/21/2003 | | 29 | |
Odyssey | | Hewlett Packard | | 5518E | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518F | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518FA | | 5/22/1999 | | 8/21/2001 | | 27 | |
Odyssey | | Hewlett Packard | | 5518G | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518H | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518I | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518L | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518N | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518O | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518P | | 6/22/1998 | | 6/30/2002 | | 36 | |
Odyssey | | Hewlett Packard | | 5518R | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518S | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518T | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518U | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518V | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518W | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518X | | 8/22/1998 | | 5/21/2003 | | 36 | |
Odyssey | | Hewlett Packard | | 5518Y | | 6/22/1998 | | 6/21/2001 | | 36 | |
Odyssey | | Hewlett Packard | | 6473N | | 1/22/1999 | | 12/21/2001 | | 36 | |
Odyssey | | IBM Credit Corp. | | D00804803 | | 3/1/2000 | | 2/28/2003 | | 36 | |
Odyssey | | IBM Credit Corp. | | D00804819 | | 3/1/2000 | | 2/28/2003 | | 36 | |
Odyssey | | IBM Credit Corp. | | D00808479 | | 5/1/2000 | | 4/30/2000 | | 36 | |
Odyssey | | IBM Credit Corp. | | D00824376 | | 5/1/2000 | | 4/30/2002 | | 24 | |
Odyssey | | IBM Credit Corp. | | D00846219 | | 6/30/2000 | | 6/29/2003 | | 36 | |
Odyssey | | IBM Credit Corp. | | D00873962 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Odyssey | | IBM Credit Corp. | | D00913209 | | 12/29/2000 | | 12/28/2003 | | 36 | |
Odyssey | | IBM Credit Corp. | | D00933292 | | 1/1/2001 | | 1/1/2004 | | 36 | |
Other | | Xerox | | 666757 | | 3/13/2001 | | 3/12/2005 | | 48 | |
Other | | Xerox | | 952571206 | | 3/13/2001 | | 3/12/2005 | | 48 | |
Other | | Xerox | | 952573459 | | 3/13/2001 | | 3/12/2005 | | 48 | |
Other | | Xerox | | 954718375 | | 3/13/2001 | | 3/12/2005 | | 48 | |
Other | | Xerox | | 954718391 | | 3/13/2001 | | 3/12/2005 | | 48 | |
Other | | Cisco Capital | | 001-000 | | 9/1/2000 | | 8/31/2003 | | 36 | |
Other | | Cisco Capital | | 002-000 | | 5/1/2000 | | 4/30/2003 | | 36 | |
Other | | Cisco Capital | | 003-000 | | 9/1/2000 | | 8/31/2003 | | 36 | |
4
Other | | Cisco Capital | | 004-000 | | 10/1/2000 | | 9/30/2003 | | 36 | |
Other | | Cisco Capital | | 007-000 | | 2/1/2000 | | 1/31/2004 | | 48 | |
Other | | TCF Leasing, Inc | | 0002256-500 | | | | | | | |
Other | | Compaq Capital | | 100068000017 | | 11/30/1998 | | 10/30/2000 | | 24 | |
Other | | Compaq Capital | | 100068000018 | | 11/30/1998 | | 10/30/2000 | | 24 | |
Other | | Compaq Capital | | 100068000036 | | 5/1/1999 | | 4/1/2002 | | 36 | |
Other | | Compaq Capital | | 100782000005 | | 4/1/2000 | | 3/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000005 | | 4/1/2000 | | 3/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000007 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000009 | | 6/1/2000 | | 5/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000009 | | 6/1/2000 | | 5/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000009 | | 6/1/2000 | | 5/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000009 | | 6/1/2000 | | 5/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000010 | | 6/1/2000 | | 5/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000012 | | 9/30/2000 | | 9/29/2002 | | 24 | |
Other | | Compaq Capital | | 100782000012 | | 9/30/2000 | | 9/29/2002 | | 24 | |
Other | | Compaq Capital | | 100782000012 | | 9/30/2000 | | 9/29/2002 | | 24 | |
Other | | Compaq Capital | | 100782000012 | | 9/30/2000 | | 9/29/2002 | | 24 | |
Other | | Compaq Capital | | 100782000013 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Other | | Compaq Capital | | 100782000013 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Other | | Compaq Capital | | 100782000013 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Other | | Compaq Capital | | 100782000016 | | 1/1/2001 | | 12/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000016 | | 1/1/2001 | | 12/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000016 | | 1/1/2001 | | 12/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000016 | | 1/1/2001 | | 12/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000016 | | 1/1/2001 | | 12/31/2003 | | 36 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100782000017 | | 1/1/2001 | | 12/31/2002 | | 24 | |
Other | | Compaq Capital | | 100068-1022 | | 4/1/1999 | | 3/31/2002 | | 36 | |
Other | | Compaq Capital | | 100068-1028 | | 4/1/1999 | | 3/31/2002 | | 36 | |
Other | | Compaq Capital | | 100068-1029 | | 4/1/1999 | | 3/31/2002 | | 36 | |
Other | | Compaq Capital | | 100068-1038 | | 4/1/1999 | | 3/31/2002 | | 36 | |
Other | | Dell Leasing | | 001-3256193-010 | | | | | | | |
Other | | Dell Leasing | | 001-3256193-011 | | | | | | | |
Other | | EMC thru Perot | | | | | | | | | |
Other | | Fleet Business Credit/EMC | | 0012093-001 | | 3/1/2000 | | #NAME? | | 30 | |
Other | | Fleet Business Credit/EMC | | 0012093-002 | | 7/1/2000 | | #NAME? | | 30 | |
Other | | Hewlett Packard | | 11977A | | 1/15/1999 | | 1/14/2002 | | 36 | |
Other | | Hewlett Packard | | 11977D | | 3/1/1999 | | 2/28/2002 | | 36 | |
Other | | Hewlett Packard | | 11977E | | 2/22/1999 | | 2/21/2002 | | 36 | |
Other | | Hewlett Packard | | 11977F | | 1/15/1999 | | 2/28/2002 | | 36 | |
Other | | Hewlett Packard | | 11977G | | 3/1/1999 | | 2/28/2002 | | 36 | |
Other | | Hewlett Packard | | 11977I | | 6/22/1999 | | 6/21/2002 | | 36 | |
5
Other | | Hewlett Packard | | 11977J | | 7/15/2000 | | 1/15/2002 | | 18 | |
Other | | Hewlett Packard | | 14375A | | 3/22/1999 | | 7/21/2002 | | 36 | |
Other | | Hewlett Packard | | 14376A | | 3/22/1999 | | 3/21/2002 | | 36 | |
Other | | Hewlett Packard | | 16085A | | 6/1/1999 | | 6/1/2002 | | 36 | |
Other | | Hewlett Packard | | 16689A | | 7/22/1999 | | 6/21/2002 | | 36 | |
Other | | Hewlett Packard | | 16689B | | 7/22/1999 | | 7/21/2002 | | 36 | |
Other | | Hewlett Packard | | 16689C | | 7/22/1999 | | 7/21/2002 | | 36 | |
Other | | Hewlett Packard | | 16689D | | 3/22/2000 | | 7/21/2002 | | 28 | |
Other | | Hewlett Packard | | 16689E | | 7/22/2000 | | 7/21/2002 | | 24 | |
Other | | Hewlett Packard | | 19948A | | 8/1/1999 | | 4/30/2001 | | 21 | |
Other | | Hewlett Packard | | 3767A | | 1/22/1998 | | 12/31/2001 | | 36 | |
Other | | Hewlett Packard | | 5113A | | 5/1/1998 | | 6/30/2002 | | 36 | |
Other | | Hewlett Packard | | 5426B | | 6/22/1998 | | 6/30/2002 | | 36 | |
Other | | Hewlett Packard | | 5426C | | 6/22/1998 | | 12/31/2001 | | 36 | |
Other | | Hewlett Packard | | 5518PA | | 1/22/1999 | | 1/21/2002 | | 29 | |
Other | | Hewlett Packard | | 5518Q | | 8/22/1998 | | 8/21/2001 | | 36 | |
Other | | Hewlett Packard | | 5518Z | | 1/22/1999 | | 1/22/2002 | | 36 | |
Other | | Hewlett Packard | | 6473A | | 1/22/1999 | | 1/22/2002 | | 36 | |
Other | | Hewlett Packard | | 6473B | | 8/22/1998 | | 12/31/2001 | | 36 | |
Other | | Hewlett Packard | | 6473C | | 1/22/1999 | | 1/22/2002 | | 36 | |
Other | | Hewlett Packard | | 6473D | | 1/22/1999 | | 1/22/2002 | | 36 | |
Other | | Hewlett Packard | | 6473E | | 1/22/1999 | | 1/22/2002 | | 36 | |
Other | | Hewlett Packard | | 6473G | | 8/22/1998 | | 12/31/2001 | | 36 | |
Other | | Hewlett Packard | | 6473H | | 1/22/1999 | | 1/21/2001 | | 24 | |
Other | | Hewlett Packard | | 6473I | | 1/22/1999 | | 1/21/2002 | | 36 | |
Other | | Hewlett Packard | | 6473L | | 1/22/1999 | | 1/21/2002 | | 36 | |
Other | | Hewlett Packard | | 6473O | | 3/1/1999 | | 2/28/2002 | | 36 | |
Other | | Hewlett Packard | | 6473P | | 03/01/999 | | 2/28/2002 | | 36 | |
Other | | Hewlett Packard | | 6473R | | 10/22/1998 | | 10/21/2001 | | 36 | |
Other | | Hewlett Packard | | 6473U | | 7/22/1999 | | 1/22/2002 | | 30 | |
Other | | IBM Credit Corp. | | 4456620FE | | 6/17/1998 | | 6/17/2008 | | 120 | |
Other | | IBM Credit Corp. | | 6003656FE | | 5/24/1999 | | 5/23/2001 | | 24 | |
Other | | IBM Credit Corp. | | 8012954FE | | 4/27/1998 | | 4/27/2008 | | 120 | |
Other | | IBM Credit Corp. | | 8012954FE | | 4/27/1998 | | 4/27/2008 | | 120 | |
Other | | IBM Credit Corp. | | C00206332 | | 2/28/1998 | | 2/28/2008 | | 120 | |
Other | | IBM Credit Corp. | | D00798329 | | 3/1/2000 | | 2/28/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00808465 | | 3/1/2000 | | 2/28/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00846573 | | 6/30/2000 | | 6/29/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00867262 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00867263 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00873797 | | 10/1/2000 | | 9/30/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00875282 | | 11/1/2000 | | 10/31/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00876777 | | 11/1/2000 | | 10/31/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00887533 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00887534 | | 9/30/2000 | | 9/29/2003 | | 36 | |
Other | | IBM Credit Corp. | | D00943305 | | 2/1/2001 | | 1/31/2004 | | 36 | |
Other | | IBM Credit Corp. | | D00947134 | | 3/1/2001 | | 3/1/2004 | | 36 | |
Other | | IBM Credit Corp. | | D00949634 | | 2/1/2001 | | 2/1/2004 | | 36 | |
Other | | IBM Credit Corp. | | D00959222 | | 5/1/2001 | | 4/30/2004 | | 36 | |
Other | | IBM Credit Corp. | | D00966903 | | 4/1/2001 | | 9/30/2003 | | 29 | |
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
6
Other | | IBM Credit Corp. | | D00971431 | | 7/1/2001 | | 6/30/2003 | | 24 | |
Other | | IBM Credit Corp. | | E00031351 | | 12/03/00 | | 12/03/10 | | 120 | |
Other | | IBM Credit Corp. | | E00036609 | | 2/1/2000 | | 1/31/2002 | | 12 | |
Other | | IBM Credit Corp. | | VD0456550 | | 5/1/2000 | | 5/1/2010 | | 120 | |
Other | | IBM Credit Corp. | | VD0498661 | | 6/1/2000 | | 6/1/2010 | | 120 | |
System (Odyssey, Legacy, Other) | | Lessor | | Schedule No. | | Start Date | | End Date | | Term | |
Leegacy/Other | | Sungard | | 3000563900 | | 4/1/1999 | | #NAME? | | 36 | |
Legacy | | Cisco Capital | | Schedule 1 | | 1/1/1998 | | #NAME? | | 24 | |
Legacy | | Compaq Capital | | 100782000014 | | 9/30/2000 | | #NAME? | | 36 | |
Legacy | | Compaq Capital | | 100782000016 | | 1/1/2001 | | #NAME? | | 36 | |
Legacy | | Dell Leasing | | 001-3256193-199 | | | | | | | |
Legacy | | IBM Credit Corp. | | C00206332 | | 2/28/1998 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | C00703809 | | 7/1/1999 | | #NAME? | | 18 | |
Legacy | | IBM Credit Corp. | | C00703809 | | 7/1/1999 | | #NAME? | | 18 | |
Legacy | | IBM Credit Corp. | | C00825666 | | 5/16/2000 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | C00985830 | | 7/1/2001 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | C00985836 | | 7/1/2001 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | D00911140 | | 12/29/2000 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | D00916195 | | 12/29/2000 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | D00918014 | | 12/29/2000 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | D00918014 | | 12/29/2000 | | #NAME? | | 36 | |
Legacy | | IBM Credit Corp. | | E00024842-3 | | 7/1/1999 | | #NAME? | | 18 | |
Legacy | | IBM Credit Corp. | | E00024842-3 | | 7/1/1999 | | #NAME? | | 18 | |
Legacy | | IBM Credit Corp. | | E00024842-3 | | 7/1/1999 | | #NAME? | | 18 | |
Legacy | | IBM Credit Corp. | | E00042982-1 | | 4/20/2000 | | #NAME? | | 12 | |
Legacy | | IBM Credit Corp. | | E00042982-1 | | 4/20/2000 | | #NAME? | | 12 | |
Legacy | | IBM Credit Corp. | | E00042982-1 | | 5/1/2000 | | #NAME? | | 12 | |
Legacy | | IBM Credit Corp. | | E00044639-2 | | 5/5/2000 | | #NAME? | | 36 | |
Legacy | | STK | | DC96-01 | | 5/1/1999 | | #NAME? | | 32 | |
Legacy | | STK | | DC96-06B | | 12/1/1996 | | #NAME? | | 60 | |
Legacy | | STK | | 2002-01L | | 10/1/02 | | #NAME? | | 36 | |
Odyssey | | Sungard | | 3000557200 | | 4/1/1999 | | 3/31/2002 | | 36 | |
Other | | Sungard | | 3000557200 | | 4/1/1999 | | 3/31/2002 | | 36 | |
Other | | Sungard | | 3000557200 | | 10/1/2000 | | 3/31/2002 | | 18 | |
7
Schedule 8.3
PSC Software and PSC Tools
Name | | Description | |
OdyMon | | Response Monitor Tool | |
INFRASTRUCTURE | | Technical Documentation Intranet Web Site | |
AutoSys Calendar Application | | AutoSys Job Scheduling Tool | |
Admin200 | | System for performing remotely on a Network utilizing a Graphical User. | |
Praetor and IMS Pearl Monitor | | Queue Monitor Tool | |
Exchange Naming Convention Methodology | | Procedural document | |
SMARTS | | Node Monitor Tool | |
Odyssey (VRS) | | Vehicle Rental System | |
1
SCHEDULE 8.7(b)
NEWCO PROPRIETARY INFORMATION
• Emerald Club – the direct computational processes and informational accesses transacted within the system that support National’s customer loyalty program as described more fully herein. At the front end of the rental process, the system allows Emerald Club members to by-pass the rental counter through the simple electronic-swipe of an Emerald Club card and the presentation of a valid driver’s license at the drive-out booth. The system accomplishes this paperless, rapid transaction by automating the processes whereby the customer’s membership details including frequent flyer programs, rental preferences, corporate/affiliation pricing routines, member credit card billing preferences and card number, insurance coverage (integrating corporate coverage/preferences), master rental agreement and authorizing signature are available in a National-defined, rules-driven environment. Likewise, the system enables the Emerald Club program to provide rate downgrades, vehicle guarantees and service levels linked to the specific capabilities of rental location. The system also gives the Emerald Club member the ability to create, update, or use the Emerald Club program via the Internet. The system supports the process to reserve and charge different car classes based on loyalty tier.
• Quality Service Process - the direct computational processes and informational accesses transacted within the system that support National’s customer service incident capture, tracking and response system as described more fully below. The system contains code that allows a National representative who is dealing with the customer at a given point in time to retrieve a history of that customer’s service incidents. Likewise, it allows a customer contact representative to create an on-the-fly new incident notation so as to note any problems or compliments that the customer may now be experiencing. Further, if appropriate, it allows the customer contact representative to offer certain predefined financial concessions on the spot to the customer and to have such concessions make their way into the customer’s final bill. Finally, the quality service process contains a series of predefined standard reports which allow for trends in service quality to be identified.
• Yield Management Reporting functionality in the Legacy System which entails creating specifically enumerated reports that deal with projection of future reservations volumes and related revenues.
• Up to Discounting functionality in the Legacy System and Odyssey System that provides the ability to establish a new customer charge rate based upon another product and its related rules but enforcing not-greater-than discounting limits contained within the rules relating to that specific customer or to that customer’s affinity group.
• Pick System - The ANC system to handle mileage management is designed to match the right car to the right customer. Essentially, each customer is assigned a value of 1 - 9 and each car is assigned a value of 1 - 9. To effectively manage vehicle mileage, the system
1
matches a high mileage renter with a low mileage car or a low mileage renter with a high mileage car. A number of system variables go into each of the priorities, including past rental history of the renter, previous mileage of the vehicle and time in fleet.
• Res2000 – The legacy reservation interface system which allows users to ‘fill in the blanks’ rather than having to memorize codes. It also allows for control of messaging and location specific information.
• HandControl (HC) Database - This database is a stand-alone system with no interfaces into the mainframe. It allows for a tracking of inventory (by location and for ANC combined) for hand controls and spinner knobs to be used by customers with special needs. (Approx. 60 users).
• Yield Management (Legacy System) - Yield Management Screens give the ability to compare booked days and rate for a specific period to another specific period. This can be further viewed by segment, car class, type of business (daily, weekly, weekend), and contracted or non contracted.
• IRMS algorithms, which provide RM Controllers with information to set rates and vehicle, inventory levels.
• QuickRent - QuickRent is an online rental process that enables customers without an MRA to book a car online and receive counter bypass service at time of rental. The online process requires the customer to fill out all rental information and National validates criteria such as Driver’s License and Credit Card. The customer must sign a digital agreement before completing their QuickRent online. This serves as their rental contract.
• TA.Alamo.com - - TA.Alamo.com is a full-service car rental website specifically tailored to the Travel Agency community. The site supports several processes and delivery of information including real-time booking capabilities, location information, fleet information, rental policies, partner information, program enrollment and travel tools. Travel Agents log-in to the site using either an IATA or Alamo Account #. TA’s can enroll in Alamo’s CashIn Club program and then check program balances online as well as redeem CashIn Club points.
• TO.Alamo.com - - TO.Alamo.com is a website specifically tailored to the Alamo Tour Operator network. The site requires secure login and the login determines the site tools that a specific tour operator can use. The site supports several processes and delivery of information including online booking capabilities, location information, fleet information, rental policies, partner information and travel tools. Additionally, tour operators may view their vouchers online to reconcile their monthly invoices.
• One-click / Nationalcar.com - Nationalcar.com is a full-service car rental website which provides real-time booking capabilities, location information, fleet information, rental policies, partner information, program enrollment and travel tools. Emerald Club customers
2
can book a car in one easy step with the One-Click reservation process. Emerald Club customers can also register with the site to update their profile.
• AIM (Account Information Master) - Houses all account information and details including revenue, account contact information, IATA number, consortia code and Sales representative code. Tracks current and historical revenue, market share, reservation trends as it relates to plan codes, consortia codes, representative codes, and account numbers. AIM account numbers remain constant and flow through the system from the Reservation to the Rental and Account Billing.
• Choice Software related to the process for customers to select their own car instead of an agent assigning the vehicle.
3
Schedule 8.11(b)
Embedded Software
Part A – Software Embedded in the Legacy System
Vendor Name | | Software Description | | Owner | |
Group 1 | | Address Standardization and Merge Tool | | Newco | |
Group 1 | | Name and Address Cleansing Tool | | Newco | |
H & W | | MF E-Mail System | | Newco | |
ILOG | | RMS Tools | | Newco | |
Pathlore | | Help Software (MF) | | Newco | |
Part A – Software Embedded in the Odyssey System
Vendor Name | | Software Description | | Owner | |
Trintech | | Omnihost | | Perot Systems | |
1
SCHEDULE 10.8
CRITICAL SERVICES
LEGACY SYSTEMS
The Legacy Systems applications listed below shall be Critical Services until such time as the Legacy System is decommissioned in accordance with the VRS Project described in Attachment A-3 to Exhibit A:
ALAMO SYSTEM APPLICATION
Alamo Rentals (CPU1 and CPU7)
Alamo Reservations
Integrated Vehicle System (IVS)
Alamo Reservation Airline GDS Links
ANCILLARY APPLICATIONS
The following Ancillary Applications shall be Critical Services 90 days after the Effective Date:
ANCILLARY APPLICATION
Alamo.com
RES2000
PeopleSoft HRMS (Payroll days only)
Kronos Timekeeper (Payroll days only)
VRS APPLICATIONS
The entire VRS application shall be considered Critical Services. In addition to VRS, the following related Supported Software applications shall be Critical Services:
SUPPORTED SOFTWARE APPLICATION
NationalCar.com
National Reservation Airline GDS Links
1
SCHEDULE 10.9
RESTRICTED ACQUIRERS
Advantage
Avis
Budget
Dollar
Electronic Data Systems Corp.
EURODOLLAR
Enterprise
Europcar InterRent
Hertz
INTERAMERICAN CAR RENTAL
Payless
Thrifty
Value
1
SCHEDULE 10.10
TERMINATION ASSISTANCE SERVICES
1. Perot Systems shall continue to perform the Services then being performed by Perot Systems under the MSA, the MSA Exhibits and Schedules and any Project Work Orders.
2. Perot Systems shall develop, with the assistance of Newco or its designee, a plan for the transition of the Services from Perot Systems to Newco or its designee.
3. Perot Systems shall provide training for personnel of Newco or its designee in the performance of the Services then being transitioned to Newco.
4. Perot Systems shall waive, and hereby does waive, Section 16.1 of the MSA and Perot Systems’ contractual right, if any, under any employment agreement to prohibit (A) any PSC Personnel engaged principally in performing the Services from accepting an offer of employment from Newco or its designee or (B) any subcontractor or consultant performing any portion of the Services from entering into a contractual relationship with Newco. In addition, Perot Systems shall allow Newco reasonable access to such personnel for interviews and recruitment.
5. Perot Systems shall use reasonable commercial efforts to grant, subject to reasonable terms and conditions, or to assist Newco or its designee to obtain, a sublicense or other right to use any software owned or licensed by Perot Systems that is then used by Perot Systems to perform the Services. In addition, Perot Systems shall use reasonable commercial efforts to provide Newco or its designee with appropriate interface information for software that is not commercially available, provided that Perot Systems has or can readily obtain the necessary rights, provided that Newco reimburses Perot Systems for any out-of-pocket costs that it incurs in connection with obtaining such rights in accordance with the MSA. For Software used or provided by Perot Systems exclusively for or to Newco (whether generated by Perot Systems or provided by Perot Systems from third party), Perot Systems shall license or sublicense (as applicable) such software on similar terms (including with respect to exclusivity and length of term) as such software is being provided at the time of transaction.
6. Perot Systems shall use reasonable commercial efforts to assist Newco or its designee to obtain any third party services then being used by Perot Systems in the performance of the Services on similar terms as such are being provided at the time of transaction.
7. Upon the request of Newco, assist Newco or its designee in transitioning from the PSC Software and PSC Tools to Newco-identified replacement software or tools or, alternatively, Perot Systems shall provide licensing to Newco of such PSC Software and PSC Tools .
1