
COMPANY OBJECTIVES - Negotiate toll processing agreements and maximize the Phoenix facilities processing potential.
- Assemble and sell modular processing plants to other mining companies. These systems will use our E.F.F.E.C.T. technology for the recovery of precious metals and generate royalties from license agreements.
- Initiate a new plan of operations for approval by the BLM to drill and develop recovery of fine grain gold deposits in sedimentary strata of the 1920 acre claims in Piute Valley Nevada.
- Negotiate a joint venture contract with Deer Trail Mining LLC in Marysvale, Utah to: process concentrates from their active mining and milling operations and deep drill multiple targets on their 2,800 acres of private patented claims. In excess of 60,000 acres could be available under a joint venture contract.
- Negotiate a joint venture with SINDUR for a toll processing refinery in Mazatlan.
- Negotiate toll processing agreements with associates of SINDUR located in Mexico.
- Joint venture the Greene Lyon business model to process electronic scrap, expand the model to include whole e- scrap and pursue possible opportunities with government grants and subsidy allocations from government agencies.
STRENGTHS OF RMMC Peoplewith experience in production, mining, toll processing ore, and operating a public company; Facility: we have our own pilot facility to extract precious metals from any ore type at up to 10 tons/day. Technology: we have technologies that make processing precious metals efficient, cost effective and environmentally friendly WWW.ROYALMMC.COM | | EXPANSION OF EXISTING PHOENIX FACILITY– We need to immediately expand our current operations from 1,000 lbs per hour to 2,000 lbs per hour as well as add a large electrowinning system to handle significant quantities of high silver concentrate. We will need to further expand our own facilities to accommodate 4 tons per hour as soon as possible.Investment required: Stage one $600,000; Stage two$5,000,000 MODULAR EQUIPMENT PROCESSING PLANTS –We have strong interest from numerous entities that need our processing equipment and EFFECT technology. We have outstanding quotes for multiple systems currently active. These packages, if accepted, will result in cash flow into RMMC from the associated license royalties. PIUTE VALLEY NEVADA PROJECTS –We have ongoing concentration testing on several properties in the Searchlight Nevada area. These areas have shown values in gold and require additional testing and drilling to validate the commercialization of the deposits. We are presently preparing a permit application for approval to expand our investigations. DEER TRAIL MINING LLC (DTM)has significant historic mining and production records that show over $182,000,000 in extracted gold and over $38,000,000 in extracted silver value in today’s dollars ($900 Au and $12 Ag value used for calculations). Existing mining and milling operations are ongoing but need significant expansion. Millions of dollars have been invested by DTM and associated partners on the active 300 ton per day milling and concentration circuit. RMMC is presently processing concentrate produced at the DTM. We are actively negotiating a joint venture that requires $2,000,000 to initiate. This will encompass expansion of existing mining operations and redevelopment of historic workings. Concentrate produced at the mill site will be stockpiled and sent to the RMMC Phoenix facility for refinement at a maximum rate of 25 tons per day. While this is ongoing, we will need to construct a 4 ton per hour EFFECT circuit on joint venture RMMC / Deer Trail Mine property in order to keep up with the process rate.Investment required: Stage one $2.0 million, Stage 2 $5.0 million. GREENE LYONis an existing licensee of RMMC. They need to construct an e-scrap recycling facility. They have commitments from suppliers for the e-ore as well as all of the technical expertise to build the facility and run the operations. If RMMC funds the initial development, we can participate in a 40% ownership. The repayment of the initial investment could be accomplished within 15 months. The long term goal is to construct and operate regional e-scrap processing centers in major metropolitan centers. Remediation of e-scrap waste is an environmental imperative and should be a positive business model.Investment required: $7.0 million. SINDURhas ownership of active mines in the state of Sinaloa, Mexico. We are in negotiations to develop a joint venture refinery located in Mazatlan.Investment required: $5.0 million. |