Commitments and Contingencies | 9 Months Ended |
Sep. 30, 2013 |
Commitments and Contingencies Disclosure [Abstract] | ' |
Commitments and Contingencies | ' |
Commitments and Contingencies |
|
Leases and Unconditional Purchase Obligations |
|
The minimum required payments for CVR’s lease agreements and unconditional purchase obligations are as follows: |
|
|
| | | | | | | |
| Operating | | Unconditional |
Leases | Purchase |
| Obligations(1) |
| (in millions) |
Three Months Ending December 31, 2013 | $ | 2.4 | | | $ | 85.3 | |
|
Year Ending December 31, | | | |
2014 | 9.3 | | | 113.1 | |
|
2015 | 7.9 | | | 101.4 | |
|
2016 | 6.8 | | | 94.2 | |
|
2017 | 4.2 | | | 93 | |
|
Thereafter | 8.2 | | | 953.7 | |
|
| $ | 38.8 | | | $ | 1,440.70 | |
|
| | | | | | | |
| | | | | | | |
| | | | | | | |
|
| | | | | | | |
-1 | This amount includes approximately $965.5 million payable ratably over eighteen years pursuant to petroleum transportation service agreements between CRRM and TransCanada Keystone Pipeline, LP (“TransCanada”). Under the agreements, CRRM receives transportation of at least 25,000 barrels per day of crude oil with a delivery point at Cushing, Oklahoma for a term of twenty years on TransCanada’s Keystone pipeline system. CRRM began receiving crude oil under the agreements in the first quarter of 2011. | | | | | | |
|
CVR leases various equipment, including rail cars, and real properties under long-term operating leases which expire at various dates. For the three months ended September 30, 2013 and 2012, lease expense totaled approximately $2.4 million and $1.2 million, respectively. For the nine months ended September 30, 2013 and 2012, lease expense totaled approximately $7.0 million and $3.9 million, respectively. The lease agreements have various remaining terms. Some agreements are renewable, at CVR’s option, for additional periods. It is expected, in the ordinary course of business, that leases will be renewed or replaced as they expire. Additionally, in the normal course of business, the Company has long-term commitments to purchase oxygen, nitrogen, electricity, storage capacity and pipeline transportation services. |
|
Crude Oil Supply Agreement |
|
On August 31, 2012, CRRM, and Vitol Inc. ("Vitol") entered into an Amended and Restated Crude Oil Supply Agreement (the "Vitol Agreement"). The Vitol Agreement amends and restates the Crude Oil Supply Agreement between CRRM and Vitol dated March 30, 2011, as amended. Under the Vitol Agreement, Vitol supplies the petroleum business with crude oil and intermediation logistics, which helps to reduce the Refining Partnership's inventory position and mitigate crude oil pricing risk. |
|
The Vitol Agreement has an initial term commencing on August 31, 2012 and extending through December 31, 2014 (the "Initial Term"). Following the Initial Term, the Vitol Agreement will automatically renew for successive one-year terms (each such term, a "Renewal Term") unless either party provides the other with notice of nonrenewal at least 180 days prior to the expiration of the Initial Term or any Renewal Term. |
|
Litigation |
|
From time to time, the Company is involved in various lawsuits arising in the normal course of business, including matters such as those described below under, “Environmental, Health, and Safety (“EHS”) Matters.” Liabilities related to such litigation are recognized when the related costs are probable and can be reasonably estimated. These provisions are reviewed at least quarterly and adjusted to reflect the impacts of negotiations, settlements, rulings, advice of legal counsel, and other information and events pertaining to a particular case. It is possible that management’s estimates of the outcomes will change due to uncertainties inherent in litigation and settlement negotiations. In the opinion of management, the ultimate resolution of any other litigation matters is not expected to have a material adverse effect on the accompanying condensed consolidated financial statements. There can be no assurance that management’s beliefs or opinions with respect to liability for potential litigation matters are accurate. |
|
On June 21, 2012, Goldman, Sachs & Co. ("GS") filed suit against CVR in state court in New York, alleging that CVR failed to pay GS approximately $18.5 million in fees allegedly due to GS by CVR pursuant to an engagement letter dated March 21, 2012, which according to the allegations set forth in the complaint, provided that GS was engaged by CVR to assist CVR and the CVR board of directors in connection with a tender offer for CVR's stock made by IEP and certain of its affiliates. CVR believes it has meritorious defenses and intends to vigorously defend against the suit. This amount has been fully accrued as of September 30, 2013. |
|
On August 10, 2012, Deutsche Bank ("DB") filed suit against CVR in state court in New York, alleging that CVR failed to pay DB approximately $18.5 million in fees allegedly due to DB by CVR pursuant to an engagement letter dated March 23, 2012, which according to the allegations set forth in the complaint, provided that DB was engaged by CVR to assist CVR and the CVR board of directors in connection with a tender offer for CVR's stock made by IEP and certain of its affiliates. CVR believes it has meritorious defenses and intends to vigorously defend against the suit. This amount has been fully accrued as of September 30, 2013. |
|
On December 17, 2012, Gary Community Investment Company, F/K/A The Gary-Williams Company and GWEC Holding Company, Inc. (referred to herein collectively as “Gary-Williams”) filed a lawsuit in the Supreme Court of New York, New York County (Gary Community Investment Co. v. CVR Energy, Inc., No. 654401/12) against CVR and CRLLC (referred to collectively for purposes of this paragraph as “CVR”). The action arises out of claims relating to CVR’s purchase of the Wynnewood, Oklahoma refinery pursuant to the Purchase and Sale Agreement entered into by the parties on November 2, 2011 (the “Purchase Agreement”). Specifically, CVR provided notice to Gary-Williams that it sought indemnification for various breaches of the Purchase Agreement and subsequently made a claim notice for payment of the entire escrow property pursuant to the Escrow Agreement by and among Gary-Williams, CRLLC, and the escrow agent, dated as of December 15, 2011. Gary-Williams, in its lawsuit, alleges that CVR breached the Purchase Agreement and the Escrow Agreement, and is seeking a declaratory judgment that CVR’s claims are without any legal basis, damages in an unspecified amount, and release of the full amount of the escrow property to Gary-Williams. |
|
CRNF received a ten-year property tax abatement from Montgomery County, Kansas in connection with the construction of the nitrogen fertilizer plant that expired on December 31, 2007. In connection with the expiration of the abatement, the county reclassified and reassessed CRNF's nitrogen fertilizer plant for property tax purposes. The reclassification and reassessment resulted in an increase in CRNF's annual property tax expense by an average of approximately $10.7 million per year for the years ended December 31, 2008 and 2009, $11.7 million for the year ended December 31, 2010, $11.4 million for the year ended December 31, 2011, and $11.3 million for the year ended December 31, 2012. CRNF protested the classification and resulting valuation for each of those years to the Kansas Court of Tax Appeals ("COTA"), followed by an appeal to the Kansas Court of Appeals. However, CRNF fully accrued and paid the property taxes the county claimed were owed for the years ended December 31, 2008 through 2012. The Kansas Court of Appeals, in a memorandum opinion dated August 9, 2013, reversed the COTA decision in part and remanded the case to COTA, instructing COTA to classify each asset on an asset by asset basis instead of making a broad determination that the entire plant was real property as COTA did originally. CRNF believes that when that asset by asset determination is done, the majority of the plant will be classified as personal property which would result in significantly lower property taxes for CRNF for 2008 and for those years after the conclusion of the property tax settlement noted below as compared to the taxes paid by CRNF prior to the settlement. The County has filed a motion for rehearing with the Kansas Court of Appeals seeking reconsideration of the Court’s August 9, 2013 decision and that motion was denied. The County also filed a petition for review with the Kansas Supreme Court and that petition is pending. |
|
On February 25, 2013, Montgomery County and CRNF agreed to a settlement for tax years 2009 through 2012, which will lower CRNF's property taxes by about $10.5 million per year for tax years 2013 through 2016 based on current mill levy rates. In addition, the settlement provides that Montgomery County will support CRNF's application before COTA for a ten-year tax exemption for the UAN expansion. Finally, the settlement provides that CRNF will continue its appeal of the 2008 reclassification and reassessment discussed above. |
|
Flood, Crude Oil Discharge and Insurance |
|
Crude oil was discharged from the Company’s Coffeyville refinery on July 1, 2007, due to the short amount of time available to shut down and secure the refinery in preparation for the flood that occurred on June 30, 2007. In May 2008, in connection with the discharge, the Company received notices of claims from sixteen private claimants under the Oil Pollution Act (“OPA”) in an aggregate amount of approximately $4.4 million (plus punitive damages). In August 2008, those claimants filed suit against the Company in the United States District Court for the District of Kansas in Wichita (the “Angleton Case”). In October 2009 and June 2010, companion cases to the Angleton Case were filed in the United States District Court for the District of Kansas in Wichita, seeking a total of approximately $3.2 million (plus punitive damages) for three additional plaintiffs as a result of the July 1, 2007 crude oil discharge. The Company has settled all of the claims with the plaintiffs from the Angleton Case and has settled all of the claims except for one of the plaintiffs from the companion cases. The settlements did not have a material adverse effect on the condensed consolidated financial statements. The Company believes that the resolution of the remaining claim will not have a material adverse effect on the condensed consolidated financial statements. |
|
On October 25, 2010, the Company received a letter from the United States Coast Guard on behalf of the U.S. Environmental Protection Agency (the “EPA”) seeking approximately $1.8 million in oversight cost reimbursement. The Company responded by asserting defenses to the Coast Guard’s claim for oversight costs. On September 23, 2011, the United States Department of Justice (“DOJ”), acting on behalf of the EPA and the United States Coast Guard, filed suit against CRRM in the United States District Court for the District of Kansas seeking recovery from CRRM related to alleged non-compliance with the Clean Air Act’s Risk Management Program (“RMP”), the Clean Water Act (“CWA”) and the OPA. CRRM reached an agreement with the DOJ resolving its claims under the CWA and the OPA. The agreement is memorialized in a Consent Decree that was filed with and approved by the Court on February 12, 2013 and March 25, 2013, respectively (the “2013 Consent Decree”). On April 19, 2013, CRRM paid a civil penalty (including accrued interest) in the amount of $0.6 million for the CWA violations and reimbursed the Coast Guard for oversight costs under OPA in the amount of $1.7 million. The 2013 Consent Decree also requires CRRM to make small capital upgrades to the Coffeyville refinery crude oil tank farm, develop flood procedures and provide employee training. The parties also reached an agreement to settle DOJ’s RMP claims, which was filed with and approved by the Court on May 21, 2013 and July 2, 2013, respectively, and provided for a civil penalty of $0.3 million. On July 29, 2013, CRRM paid the civil penalty related to the RMP settlement agreement. |
|
The Company is seeking insurance coverage for this release and for the ultimate costs for remediation and third‑party property damage claims. On July 10, 2008, the Company filed a lawsuit in the United States District Court for the District of Kansas against certain of the Company’s environmental insurance carriers requesting insurance coverage indemnification for the June/July 2007 flood and crude oil discharge losses. Each insurer reserved its rights under various policy exclusions and limitations and cited potential coverage defenses. Although the Court has now issued summary judgment opinions that eliminate the majority of the insurance defendants’ reservations and defenses, the Company cannot be certain of the ultimate amount or timing of such recovery because of the difficulty inherent in projecting the ultimate resolution of the Company’s claims. The Company has received $25.0 million of insurance proceeds under its primary environmental liability insurance policy which constitutes full payment to the Company of the primary pollution liability policy limit. |
|
The lawsuit with the insurance carriers under the environmental policies remains the only unsettled lawsuit with the insurance carriers related to these events. |
|
Environmental, Health, and Safety (“EHS”) Matters |
|
The petroleum and nitrogen fertilizer businesses are subject to various stringent federal, state, and local EHS rules and regulations. Liabilities related to EHS matters are recognized when the related costs are probable and can be reasonably estimated. Estimates of these costs are based upon currently available facts, existing technology, site-specific costs, and currently enacted laws and regulations. In reporting EHS liabilities, no offset is made for potential recoveries. |
|
CRRM, CRNF, Coffeyville Resources Crude Transportation, LLC (“CRCT”), Wynnewood Refining Company, LLC (“WRC”) and Coffeyville Resources Terminal, LLC (“CRT”) own and/or operate manufacturing and ancillary operations at various locations directly related to petroleum refining and distribution and nitrogen fertilizer manufacturing. Therefore, CRRM, CRNF, CRCT, WRC and CRT have exposure to potential EHS liabilities related to past and present EHS conditions at these locations. Under the Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA"), the Resource Conservation and Recovery Act ("RCRA"), and related state laws, certain persons may be liable for the release or threatened release of hazardous substances. These persons include the current owner or operator of property where a release or threatened release occurred, any persons who owned or operated the property when the release occurred, and any persons who disposed of, or arranged for the transportation or disposal of, hazardous substances at a contaminated property. Liability under CERCLA is strict, and under certain circumstances, joint and several, so that any responsible party may be held liable for the entire cost of investigating and remediating the release of hazardous substances. Similarly, the OPA generally subjects owners and operators of facilities to strict, joint and several liability for all containment and clean-up costs, natural resource damages, and governmental oversight costs arising from oil spills into waters of the United States, which has been broadly interpreted to include virtually any water bodies including intermittent streams and water bodies. |
|
CRRM and CRT have agreed to perform corrective actions at the Coffeyville, Kansas refinery and the now-closed Phillipsburg, Kansas terminal facility, pursuant to Administrative Orders on Consent issued under RCRA to address historical contamination by the prior owners (RCRA Docket No. VII-94-H-0020 and Docket No. VII-95-H-011, respectively). As of September 30, 2013 and December 31, 2012, environmental accruals of approximately $1.8 million and $2.3 million, respectively, were reflected in the Condensed Consolidated Balance Sheets for probable and estimated costs for remediation of environmental contamination under the RCRA Administrative Orders, for which approximately $0.4 million and $0.7 million, respectively, are included in other current liabilities. The Company’s accruals were determined based on an estimate of payment costs through 2031, for which the scope of remediation was arranged with the EPA, and were discounted at the appropriate risk free rates at September 30, 2013 and December 31, 2012, respectively. The accruals include estimated closure and post-closure costs of approximately $0.8 million for two landfills at both September 30, 2013 and December 31, 2012. The estimated future payments for these required obligations are as follows: |
|
| | | | |
| | | | | | | |
| Amount | | | | |
| (in millions) | | | | |
Three Months Ending December 31, 2013 | $ | 0.2 | | | | | |
| | | |
Year Ending December 31, | | | | | |
2014 | 0.4 | | | | | |
| | | |
2015 | 0.2 | | | | | |
| | | |
2016 | 0.1 | | | | | |
| | | |
2017 | 0.1 | | | | | |
| | | |
Thereafter | 1.1 | | | | | |
| | | |
Undiscounted total | 2.1 | | | | | |
| | | |
Less amounts representing interest at 2.34% | 0.3 | | | | | |
| | | |
Accrued environmental liabilities at September 30, 2013 | $ | 1.8 | | | | | |
| | | |
|
Management periodically reviews and, as appropriate, revises its environmental accruals. Based on current information and regulatory requirements, management believes that the accruals established for environmental expenditures are adequate. |
|
CRRM, CRNF, CRCT, WRC and CRT are subject to extensive and frequently changing federal, state and local, environmental and health and safety laws and regulations governing the emission and release of hazardous substances into the environment, the treatment and discharge of waste water, the storage, handling, use and transportation of petroleum and nitrogen products, and the characteristics and composition of gasoline and diesel fuels. The ultimate impact of complying with evolving laws and regulations is not always clearly known or determinable due in part to the fact that our operations may change over time and certain implementing regulations for laws, such as the federal Clean Air Act, have not yet been finalized, are under governmental or judicial review or are being revised. These laws and regulations could result in increased capital, operating and compliance costs. |
|
In 2007, the EPA promulgated the Mobile Source Air Toxic II (“MSAT II”) rule that requires the reduction of benzene in gasoline by 2011. CRRM and WRC are considered to be small refiners under the MSAT II rule and compliance with the rule is extended until 2015 for small refiners. However, the change in control resulting from the IEP Acquisition in 2012 triggered the companies to lose small refiner status. Accordingly, the MSAT II projects have been accelerated by three months. Total capital expenditures to comply with the rule are expected to be approximately $63.0 million for CRRM and $105.0 million for WRC. As of September 30, 2013, approximately $19.1 million and $35.4 million had been spent related to these projects by CRRM and WRC, respectively. |
|
The petroleum business is subject to the Renewable Fuel Standard ("RFS") which requires refiners to blend "renewable fuels" in with their transportation fuels or purchase renewable fuel credits, known as RINs, in lieu of blending. The EPA is required to determine and publish the applicable annual renewable fuel percentage standards for each compliance year by November 30 for the forthcoming year. The percentage standards represent the ratio of renewable fuel volume to gasoline and diesel volume. On August 6, 2013, the EPA announced the final 2013 renewable fuel percentage standard would be raised to 9.74%. Beginning in 2011, the Coffeyville refinery was required to blend renewable fuels into its transportation fuel or purchase RINs in lieu of blending, and in 2013, the Wynnewood refinery will be required to comply, unless the Wynnewood refinery receives relief from the rule in 2013 based on the "disproportionate economic impact" of the rule on the Wynnewood refinery. From time to time, the petroleum business may purchase RINs on the open market or waiver credits for cellulosic biofuels from the EPA in order to comply with RFS. While the petroleum business cannot predict the future prices of RINs or waiver credits, the cost of purchasing RINs has been extremely volatile and has significantly increased over the last year. The cost of RINs for the three and nine month periods ended September 30, 2012 was approximately $7.1 million and $16.5 million, respectively, and the cost of RINs for the three and nine month periods ended September 30, 2013 was approximately $57.4 million and $155.0 million, respectively. As of September 30, 2013 and December 31, 2012, the petroleum business’ biofuel blending obligation was approximately $47.5 million and $1.1 million, respectively, which was recorded in other current liabilities on the Condensed Consolidated Balance Sheets. The ultimate cost of RINs for the petroleum business in 2013 is difficult to estimate. In particular, the cost of RINs is dependent upon a variety of factors, which include the price at which RINs can be purchased, transportation fuel production levels, the mix of the petroleum business’ petroleum products, as well as the fuel blending performed at the its refineries, all of which can vary significantly from quarter to quarter. |
|
In 2013, the EPA proposed "Tier 3" gasoline sulfur standards. Based on the proposed standards, CRRM anticipates it will incur less than $20.0 million of capital expenditures to install controls in order to meet the anticipated new standards. The project is expected to be completed during the Coffeyville refinery’s next scheduled turnaround in 2016. It is not anticipated that the Wynnewood refinery will require additional controls or capital expenditures to meet the anticipated new standard. |
|
In March 2004, CRRM and CRT entered into a Consent Decree (the “2004 Consent Decree”) with the EPA and the Kansas Department of Health and Environment (the “KDHE”) to resolve air compliance concerns raised by the EPA and KDHE related to Farmland Industries Inc.’s prior ownership and operation of the Coffeyville crude oil refinery and the now-closed Phillipsburg terminal facilities. Under the 2004 Consent Decree, CRRM agreed to install controls to reduce emissions of sulfur dioxide, nitrogen oxides and particulate matter from its FCCU by January 1, 2011. In addition, pursuant to the 2004 Consent Decree, CRRM and CRT assumed clean-up obligations at the Coffeyville refinery and the now-closed Phillipsburg terminal facilities. |
|
In March 2012, CRRM entered into a "Second Consent Decree" with the EPA, which replaces the 2004 Consent Decree, as amended (other than certain financial assurance provisions associated with corrective action at the refinery and terminal under RCRA). The Second Consent Decree gives CRRM more time to install the FCCU controls from the 2004 Consent Decree and expands the scope of the settlement so that it is now considered a "global settlement" under the EPA's "National Petroleum Refining Initiative." Under the National Petroleum Refining Initiative, the EPA alleged industry-wide non-compliance with four "marquee" issues under the Clean Air Act: New Source Review, Flaring, Leak Detection and Repair, and Benzene Waste Operations NESHAP. The National Petroleum Refining Initiative has resulted in most U.S. refineries (representing more than 90% of the US refining capacity) entering into consent decrees requiring the payment of civil penalties and the installation of air pollution control equipment and enhanced operating procedures. Under the Second Consent Decree, the Company was required to pay a civil penalty of approximately $0.7 million and complete the installation of FCCU controls required under the 2004 Consent Decree, add controls to certain heaters and boilers and enhance certain work practices relating to wastewater and fugitive emissions. The remaining costs of complying with the Second Consent Decree are expected to be approximately $40.0 million. CRRM also agreed to complete a voluntary environmental project that will reduce air emissions and conserve water at an estimated cost of approximately $1.2 million. Additional incremental capital expenditures associated with the Second Consent Decree will not be material and will be limited primarily to the retrofit and replacement of heaters and boilers over a five to seven year timeframe. The Second Consent Decree was entered by the U.S. District Court for the District of Kansas on April 19, 2012. |
|
WRC entered into a Consent Order with the Oklahoma Department of Environmental Quality (the "ODEQ") in August 2011 (the "Wynnewood Consent Order"). The Wynnewood Consent Order addresses certain historic Clean Air Act compliance issues related to the operations of the refinery by the prior owner. Under the Wynnewood Consent Order, WRC paid a civil penalty of $950,000, and agreed to install certain controls, enhance certain compliance programs, and undertake additional testing and auditing. A substantial portion of the costs of complying with the Wynnewood Consent Order were expended during the last turnaround in 2012. The remaining costs are expected to be approximately $3.0 million. In consideration for entering into the Wynnewood Consent Order, WRC received a release from liability from ODEQ for matters described in the ODEQ order. |
|
From time to time, ODEQ conducts inspections of the Wynnewood refinery and identifies areas of alleged noncompliance. ODEQ routinely pursues enforcement related to the alleged noncompliance seeking civil penalties and injunctive relief, which may necessitate the installation of controls. ODEQ has advised the company that it is preparing to issue a full compliance evaluation report covering the period from 2010 through 2013. The agency has indicated that it will pursue enforcement related to the alleged noncompliance and that it expects to enter into a second Consent Order with the Company, which would necessitate the payment of a civil penalty and the implementation of injunctive relief to address the alleged noncompliance. The costs of any such enforcement action cannot be predicted at this time. However, based on our experience related to Clean Air Act enforcement and control requirements, the Company does not anticipate that the costs of any civil penalties, required additional controls or operational changes would be material. |
|
WRC has entered into a series of Clean Water Act consent orders with ODEQ. The latest Consent Order (the "CWA Consent Order"), which supersedes other consent orders, became effective in September 2011. The CWA Consent Order addresses alleged noncompliance by WRC with its Oklahoma Pollutant Discharge Elimination System permit limits. The CWA Consent Order requires WRC to take corrective action steps, including undertaking studies to determine whether the Wynnewood refinery's wastewater treatment plant capacity is sufficient. The Wynnewood refinery may need to install additional controls or make operational changes to satisfy the requirements of the CWA Consent Order. The cost of additional controls, if any, cannot be predicted at this time. However, based on our experience with wastewater treatment and controls, the Company does not anticipate that the costs of any required additional controls or operational changes would be material. |
|
From time to time, the EPA has conducted inspections and issued information requests to CRNF with respect to the Company’s compliance with RMP and the release reporting requirements under CERCLA and the EPCRA. These previous investigations have resulted in the issuance of preliminary findings regarding CRNF’s compliance status. In the fourth quarter of 2010, following CRNF’s reported release of ammonia from its cooling water system and the rupture of its UAN vessel (which released ammonia and other regulated substances), the EPA conducted its most recent inspection and issued an additional request for information to CRNF. The EPA has not made any formal claims against the Company and the Company has not accrued for any liability associated with the investigations or releases. |
|
Environmental expenditures are capitalized when such expenditures are expected to result in future economic benefits. For the three months ended September 30, 2013 and 2012, capital expenditures were approximately $35.5 million and $7.7 million, respectively, and were incurred to improve the environmental compliance and efficiency of the operations. For the nine months ended September 30, 2013 and 2012, capital expenditures were approximately $73.5 million and $18.7 million, respectively, and were incurred to improve the environmental compliance and efficiency of the operations. |
|
CRRM, CRNF, CRCT, WRC and CRT each believe it is in substantial compliance with existing EHS rules and regulations. There can be no assurance that the EHS matters described above or other EHS matters which may develop in the future will not have a material adverse effect on the Company's business, financial condition, or results of operations. |
|
Wynnewood Refinery Incident |
|
On September 28, 2012, the Wynnewood refinery experienced an explosion in a boiler unit during startup after a short outage as part of the turnaround process. Two employees were fatally injured. Damage at the refinery was limited to the boiler. Additionally, there was no environmental impact. The refinery was in the final stages of shutdown for turnaround maintenance at the time of the incident. The petroleum business completed an internal investigation of the incident and cooperated with OSHA in its investigation. OSHA also conducted a general inspection of the facility during the boiler incident investigation. In March 2013, OSHA completed its investigation and communicated its citations to WRC. OSHA also placed WRC in its Severe Violators Enforcement Program (“SVEP”). WRC is vigorously contesting the citations and OSHA’s placement of WRC in the SVEP. Any penalties associated with OSHA’s citations are not expected to have a material adverse effect on the condensed consolidated financial statements. On September 25, 2013, WRC agreed to pay a small civil penalty to settle rather than defend claims alleged by the EPA under the Clean Air Act's general duty clause related to the boiler incident. In addition to the above, the spouses of the two employees fatally injured have filed a civil lawsuit against WRC, CVR Refining and CVR Energy in Fort Bend County, Texas. The civil suit is in its preliminary stages and it is currently too early to assess a potential outcome. |
|
Affiliate Pension Obligations |
|
Mr. Icahn, through certain affiliates, owns approximately 82% of the Company’s capital stock. Applicable pension and tax laws make each member of a “controlled group” of entities, generally defined as entities in which there is at least an 80% common ownership interest, jointly and severally liable for certain pension plan obligations of any member of the controlled group. These pension obligations include ongoing contributions to fund the plan, as well as liability for any unfunded liabilities that may exist at the time the plan is terminated. In addition, the failure to pay these pension obligations when due may result in the creation of liens in favor of the pension plan or the Pension Benefit Guaranty Corporation ("PBGC") against the assets of each member of the controlled group. |
|
As a result of the more than 80% ownership interest in CVR Energy by Mr. Icahn's affiliates, the Company is subject to the pension liabilities of all entities in which Mr. Icahn has a direct or indirect ownership interest of at least 80%. One such entity, ACF Industries LLC (“ACF”), is the sponsor of several pension plans. All the minimum funding requirements of the Code and the Employee Retirement Income Security Act of 1974, as amended by the Pension Protection Act of 2006, for these plans have been met as of September 30, 2013. If the ACF plans were voluntarily terminated, they would be underfunded by approximately $116.9 million as of September 30, 2013. As a result of Mr. Icahn's affiliates obtaining approximately 80.7% of the outstanding common stock of Federal-Mogul Corporation (“Federal Mogul”) during the three months ended September 30, 2013, the Company is also subject to the pension liabilities of Federal-Mogul. If the plans of Federal-Mogul and ACF were voluntarily terminated, as of September 30, 2013, they would collectively be underfunded by approximately $702.9 million. These results are based on the most recent information provided by Mr. Icahn's affiliates based on information from the plans' actuaries. These liabilities could increase or decrease, depending on a number of factors, including future changes in benefits, investment returns, and the assumptions used to calculate the liability. As members of the controlled group, CVR Energy would be liable for any failure of ACF and Federal-Mogul to make ongoing pension contributions or to pay the unfunded liabilities upon a termination of their respective pension plans. In addition, other entities now or in the future within the controlled group that includes CVR Energy may have pension plan obligations that are, or may become, underfunded, and the Company would be liable for any failure of such entities to make ongoing pension contributions or to pay the unfunded liabilities upon a termination of such plans. The current underfunded status of the ACF and Federal-Mogul pension plans requires such entities to notify the PBGC of certain “reportable events,” such as if CVR Energy were to cease to be a member of the controlled group, or if CVR Energy makes certain extraordinary dividends or stock redemptions. The obligation to report could cause the Company to seek to delay or reconsider the occurrence of such reportable events. Based on the contingent nature of potential exposure related to these affiliate pension obligations, no liability has been recorded in the condensed consolidated financial statements. |