Free signup for more
- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
Content analysis
?Positive | ||
Negative | ||
Uncertain | ||
Constraining | ||
Legalese | ||
Litigous | ||
Readability |
8th grade Avg
|
New words:
abetted, absolute, accident, adjudication, admissible, admission, Affordability, Affordable, aid, aided, Aiken, aim, al, AMP, Analyzer, annum, augmenting, Baltimore, baseline, behavior, Blue, bolstered, campaign, Carolina, CATR, causation, Cawley, CFTC, clearance, commensurate, compete, competing, complementary, composed, conflicting, contending, corrosion, cracking, CRDM, DCR, deleting, demolished, demolition, destroyed, destroying, DFAX, diligence, discipline, display, disproportionate, disproportionately, divert, document, drove, DSI, duty, EasyGreen, Education, effluent, EME, enable, encroachment, entail, Erie, Evanson, exact, exceeded, explained, fallen, Farm, fault, feature, fiduciary, fifty, fit, flat, floating, flux, forma, formal, foundation, GenOn, healthcare, Home, Iberdrola, impropriety, inConnecticut, incumbent, indefinitely, inInternal, insignificant, inspection, intangible, Intercontinental, IntercontinentalExchange, JCPL, John, Jon, jury, Kinzua, language, Lash, leakage, licensure, lived, Louisiana, Mad, MDPSC, meaningful, Mercantile, migrated, modestly, MOU, MSHA, MTEP, MVP, nationwide, NBF, NDT, NEPA, NERA, nonmaterial, nozzle, NY, NYPSC, NYSEG, obsolete, occasionally, optimization, OTC, PAD, parallel, passage, passenger, Patient, pattern, penetrate, Peninsula, philosophy, pilot, Police, POLR, prefiling, pro, proactive, promptly, proximity, PSCWV, purported, Quest, question, railcar, ratably, reassessment, REC, redeemed, refinery, reform, reinstated, ReliabilityFirsta, ReliabilityFirstand, ReliabilityFirstbegan, ReliabilityFirstCorporation, ReliabilityFirstin, ReliabilityFirstissued, ReliabilityFirston, ReliabilityFirstperformed, ReliabilityFirstregion, ReliabilityFirststakeholder, relicensure, resumed, RPV, Russell, Salamanca, Seneca, Servicessegment, Skory, SMA, smaller, SMIP, socialization, solution, stemming, storm, subcritical, supercritical, susceptible, team, Thumb, timeline, timetable, tool, Top, twenty, UCS, UNAUDITED, unforced, unwarrantable, upper, urging, vigorously, voluntarily, VSCC, Wall, warmer, Washington, wasIn, weak, website, Westmoreland, wheeled, winter, WMB, Wolverine, write, wrong
Removed:
Absent, accommodate, agreeing, answer, approve, arbitration, assistance, averaging, bidder, bordering, catalytic, CAVR, chaired, conclusion, conditionally, confirm, Confirmation, coordinate, Council, counterclaim, cubic, deem, ECAR, Elliott, entering, estimable, evidentiary, fine, Governor, greatest, grievance, Hagan, identifying, Instruction, involvement, join, joined, judge, justifying, Kentucky, litigated, manufactured, moved, nineteen, noting, PennFuture, phase, PLR, postage, procedure, proceed, profile, proposing, protested, ready, recommend, recommended, rejected, Reliant, restoration, roadmap, Selective, session, setting, shifting, side, SNCR, stakeholder, stamp, stimulate, strike, Suisse, summit, suspended, trade, transitional, Transport, Unasserted, uniform, unpredictability, USA, vacate, violated
Filing tables
Filing exhibits
- 10-K Annual report
- 12.1 Exhibit 12.1
- 12.2 Exhibit 12.2
- 12.3 Exhibit 12.3
- 12.4 Exhibit 12.4
- 12.5 Exhibit 12.5
- 12.6 Exhibit 12.6
- 12.7 Exhibit 12.7
- 12.8 Exhibit 12.8
- 21 Exhibit 21
- 23.1 Exhibit 23.1
- 23.2 Exhibit 23.2
- 23.3 Exhibit 23.3
- 23.4 Exhibit 23.4
- 23.5 Exhibit 23.5
- 23.6 Exhibit 23.6
- 23.7 Exhibit 23.7
- 31.1 Exhibit 31.1
- 31.2 Exhibit 31.2
- 32 Exhibit 32
FirstEnergy Solutions similar filings
Filing view
External links
EXHIBIT 12.4
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY
CONSOLIDATED RATIO OF EARNINGS TO FIXED CHARGES
Year Ended December 31, | ||||||||||||||||||||
2006 | 2007 | 2008 | 2009 (b) | 2010 | ||||||||||||||||
(Dollars in thousands) | ||||||||||||||||||||
EARNINGS AS DEFINED IN REGULATION S-K: | ||||||||||||||||||||
Income before extraordinary items | $ | 307,946 | $ | 278,283 | $ | 286,486 | $ | (10,992 | ) | $ | 73,175 | |||||||||
Interest and other charges, before reduction for amounts capitalized and deferred | 141,710 | 138,977 | 125,976 | 137,171 | 133,351 | |||||||||||||||
Provision for income taxes | 188,662 | 163,363 | 136,786 | (10,183 | ) | 38,673 | ||||||||||||||
Interest element of rentals charged to income (a) | 45,955 | 29,829 | 1,919 | 2,380 | 1,782 | |||||||||||||||
Earnings as defined | $ | 684,273 | $ | 610,452 | $ | 551,167 | $ | 118,376 | $ | 246,981 | ||||||||||
FIXED CHARGES AS DEFINED IN REGULATION S-K: | ||||||||||||||||||||
Interest before reduction for amounts capitalized and deferred | $ | 141,710 | $ | 138,977 | $ | 125,976 | $ | 137,171 | $ | 133,351 | ||||||||||
Interest element of rentals charged to income (a) | 45,955 | 29,829 | 1,919 | 2,380 | 1,782 | |||||||||||||||
Fixed charges as defined | $ | 187,665 | $ | 168,806 | $ | 127,895 | $ | 139,551 | $ | 135,133 | ||||||||||
CONSOLIDATED RATIO OF EARNINGS TO FIXED CHARGES | 3.65 | 3.62 | 4.31 | 0.85 | 1.83 | |||||||||||||||
(a) | Includes the interest element of rentals where determinable plus 1/3 of rental expense where no readily defined interest element can be determined. | |
(b) | The earnings as defined in 2009 would need to increase $21,175,000 for the fixed charge ratio to be 1.0. |