DISCLAIMERS AND DEFINITIONS
The information contained in this Fleet Status Report (the “Information”) is as of the date of the report only and is subject to change without notice to the recipient. Transocean Ltd. assumes no duty to update any portion of the Information.
DISCLAIMER. NEITHER TRANSOCEAN LTD. NOR ITS AFFILIATES MAKE ANY EXPRESS OR IMPLIED WARRANTIES (INCLUDING, WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE) REGARDING THE INFORMATION CONTAINED IN THIS REPORT, WHICH INFORMATION IS PROVIDED “AS IS.” Neither Transocean Ltd. nor its affiliates will be liable to any recipient or anyone else for any inaccuracy, error or omission, regardless of cause, in the information set forth in this report or for any damages (whether direct or indirect, consequential, punitive or exemplary) resulting therefrom.
No Unauthorized Publication or Use. All information provided by Transocean in this report is given for the exclusive use of the recipient and may not be published, redistributed or retransmitted without the prior written consent of Transocean.
Customer Contract Duration, Timing and Dayrates and Risks Associated with Operations. The duration and timing (including both starting and ending dates) of the customer contracts are estimates only, and customer contracts are subject to cancellation, suspension and delays for a variety of reasons, including some beyond the control of Transocean. Also, the dayrates set forth in the report are estimates based upon the full contractual operating dayrate. However, the actual average dayrate earned over the course of any given contract will be lower and could be substantially lower. The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, etc.) including some beyond the control of Transocean. Our customer contracts and operations are generally subject to a number of risks and uncertainties, and we urge you to review the description and explanation of such risks and uncertainties in our filings with the Securities and Exchange Commission (SEC), which are available free of charge on the SEC’s website at www.sec.gov. The dayrates do not include revenue for mobilizations, demobilizations, upgrades, shipyards or recharges.
Out of Service Days (Shipyards, Mobilizations, Demobilizations, Contract Preparation). Changes in estimated out of service time are noted where changes in the time Transocean anticipates that a rig is scheduled to be out of service and not be available to earn an operating dayrate have changed by a period of 15 days or longer for all rig classifications since the previously issued Monthly Fleet Update Summary or Comprehensive Fleet Status Report. The changes to estimated out of service time included in this Fleet Status may not be firm and could change significantly based on a variety of factors. Any significant changes to our estimates of out of service time will be reflected in subsequent Monthly Fleet Updates and Comprehensive Fleet Status Reports, as applicable.
Contract Preparation refers to periods during which the rig is undergoing modifications or upgrades as a result of contract requirements. Shipyards refers to periods during which the rig is out of service as a result of other scheduled shipyards, surveys, repairs, regulatory inspections or other scheduled service or work on the rig.
In some instances such as certain mobilizations, demobilizations, upgrades and shipyards, we are paid compensation by our customers that is generally recognized over the life of the primary contract term of the drilling project, although such compensation is not typically significant in relation to the revenues generated by the dayrates we charge our customers. When mobilization or demobilization occurs during a contract period, we recognize revenues as earned. In instances where mobilization or demobilization time occurs before or between the start of a contract period, the stated estimated contract start date represents the expected commencement date for the primary contract term of the drilling project and the point at which we expect to begin recognizing revenues.
Forward-Looking Statement. The statements made in the Fleet Update that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements made in the Fleet Update include, but are not limited to, statements involving the estimated duration of customer contracts, contract dayrate amounts, future contract commencement dates and locations and planned shipyard projects and other out of service time. Such statements are subject to numerous risks, uncertainties and assumptions, including but not limited to, uncertainties relating to the level of activity in offshore oil and gas exploration and development, exploration success by producers, oil and gas prices, competition and market conditions in the contract drilling industry, shipyard delays, actions and approvals of third parties, possible cancellation or suspension of drilling contracts as a result of mechanical difficulties or performance, Transocean’s ability to enter into and the terms of future contracts, the availability of qualified personnel, labor relations and the outcome of negotiations with unions representing workers, operating hazards, factors affecting the duration of contracts including well-in-progress provisions, the actual amount of downtime, factors resulting in reduced applicable dayrates, hurricanes and other weather conditions, terrorism, political and other uncertainties inherent in non-U.S. operations (including the risk of war, civil disturbance, seizure or damage of equipment and exchange and currency fluctuations), the impact of governmental laws and regulations, the adequacy of sources of liquidity, the effect of litigation and contingencies and other factors described above and discussed in Transocean’s most recently filed Form 10-K, in Transocean’s Forms 10-Q for subsequent periods and in Transocean’s other filings with the SEC, which are available free of charge on the SEC’s website at www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those indicated. You should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the particular statement, and we undertake no obligation to publicly update or revise any forward looking statements, except as required by law.
Fleet Classifications. Transocean uses classifications for its drillships, semisubmersibles, and jackup rigs. The classifications reflect the company’s strategic focus on the ownership and operations of premium, high- specification units and are as follows: “Ultra-Deepwater” are the latest generation of drillships and semisubmersible rigs and are capable of drilling in water depths equal to or greater than 7,500 feet; “Deepwater” rigs are drillships and semisubmersible rigs capable of drilling in water depths equal to or greater than 4,500 feet and less than 7,500 feet; “Harsh Environment” are premium rigs equipped for year-round operations in harsh environments; “Midwater Floaters” are semisubmersible rigs capable of drilling in water depths up to 4,499 feet; and "High-Specification Jackups" are high‑performance, independent cantilever jackup rigs that are capable of drilling in water depths of 350’ or greater.
Stacking. An "Idle" rig is between contracts, readily available for operations, and operating costs are typically at or near normal levels. A "Stacked" rig, on the other hand, is manned by a reduced crew or unmanned and typically has reduced operating costs and is (i) preparing for an extended period of inactivity, (ii) expected to continue to be inactive for an extended period, or (iii) completing a period of extended inactivity. However, stacked rigs will continue to incur operating costs at or above normal operating costs for 30 to 60 days following initiation of stacking.