| NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - September 29, 2010 | | | | | . | | Approximate actual and estimated unpaid down time days * |
| RIG | RIG DESIGN | YEAR BUILT / REBUILT | WATER DEPTH | LOCATION | | OPERATOR | ESTIMATED CONTRACT START DATE | | ESTIMATED CONTRACT EXPIRATION DATE | | FULL CONTRACT DAYRATE ($000) | COMMENTS | 3Q-10 | 3Q-10 | 4Q-10 |
| | | | | | | | | | | | | | A | E | E |
| |
| Mexico Semisubmersible (1) (c) |
| Noble Max Smith | Noble EVA 4000™ | 1980/1999 | 7,000' | Bay of Campeche | | Pemex | 8/01/2008 | | 7/31/2011 | | 483-485 | | | | |
| | | | | | | | | | | | | | | | |
| Mexico Jackups (12) (c, d) |
| Noble Bill Jennings | MLT Class 84-E.R.C. | 1975/1997 | 390’-IC | Bay of Campeche | | Pemex | 6/18/2010 | | 11/10/2010 | | 94-96 | Received contract extension. | 1 | | |
| | | | | | | | | | | | | | | | |
| Noble Eddie Paul | MLT Class 84-E.R.C. | 1976/1995 | 390’-IC | Bay of Campeche | | Pemex | 6/04/2010 | | 7/31/2010 | | 94-96 | Received a direct assignment. | | | |
| | | | | Mexico | | Shipyard | 8/01/2010 | | | | - | Available. | 60 | | |
| | | | | | | | | | | | | | | | |
| Noble Leonard Jones | MLT Class 53-E.R.C. | 1972/1998 | 390’-IC | Mexico | | Shipyard | 6/23/2010 | | | | - | Available. | 91 | | |
| | | | | | | | | | | | | | | | |
| Noble Johnnie Hoffman | Baker Marine BMC 300 | 1976/1993 | 300’-IC | Bay of Campeche | | Pemex | 4/15/2010 | | 7/25/2010 | | 84-86 | Received contract extension. | | | |
| | | | | Bay of Campeche | | Pemex | 7/26/2010 | | 10/13/2010 | | 74-76 | Received contract extension. | 1 | | |
| | | | | | | | | | | | | | | | |
| Noble Gene Rosser | Levingston Class 111-C | 1977/1996 | 300’-IC | Bay of Campeche | | Pemex | 6/20/2010 | | 12/19/2010 | | 79-81 | Received contract extension. | 1 | | |
| | | | | | | | | | | | | | | | |
| Noble John Sandifer | Levingston Class 111-C | 1975/1995 | 300’-IC | Bay of Campeche | | Pemex | 6/17/2010 | | 9/18/2010 | | 79-81 | Received contract extension. | | | |
| | | | | Mexico | | Shipyard | 9/19/2010 | | | | - | UWILD inspection, then available | 12 | | |
| | | | | | | | | | | | | | | | |
| Noble Lewis Dugger | Levingston Class 111-C | 1977/1997 | 300’-IC | Bay of Campeche | | Pemex | 5/30/2010 | | 10/18/2010 | | 79-81 | Received a direct assignment. We have received a request for an extension of the current direct assignment, which subject to agreement on dayrate, would extend the contract to November 15, 2010. | 1 | | |
| | | | | | | | | | | | | | | | |
| Noble Sam Noble | Levingston Class 111-C | 1982 | 300’-IC | Bay of Campeche | | Pemex | 3/22/2010 | | 9/19/2010 | | 84-86 | Received contract extension. | | | |
| | | | | Mexico | | Shipyard | 9/20/2010 | | | | - | UWILD inspection, then available. | 11 | | |
| | | | | | | | | | | | | | | | |
| Noble Roy Butler | F&G L-780 MOD II | 1982/1998 | 250’-IC (f) | Bay of Campeche | | Pemex | 4/24/2010 | | 7/30/2010 | | 59-61 | Received contract extension. | | | |
| | | | | Bay of Campeche | | Pemex | 7/31/2010 | | 4/09/2011 | | 62-64 | Received contract. | 22 | | |
| | | | | | | | | | | | | | | | |
| Noble Earl Frederickson | MLT Class 82-SD-C | 1979/1999 | 250’-IC | Bay of Campeche | | Pemex | 7/13/2010 | | 8/25/2010 | | 63-65 | This contract commenced 7/13/2008. The contract reprices every three months based on an index of jackup rates in seven international regions. On 7/13/2010, the contract repriced at a dayrate of $63k-$65k. | 25 | | |
| | | | | Bay of Campeche | | Pemex | 8/26/2010 | | 12/31/2010 | | 62-64 | Received contract extension. | | | |
| | | | | | | | | | | | | | | | |
| Noble Tom Jobe | MLT Class 82-SD-C | 1982 | 250’-IC | Bay of Campeche | | Pemex | 5/07/2010 | | 8/06/2010 | | 77-79 | This contract commenced 8/07/2008. The contract reprices every three months based on an index of jackup rates in seven international regions. On 5/07/2010, the contract repriced at a new dayrate of $77k-$79k. | | | |
| | | | | Bay of Campeche | | Pemex | 8/07/2010 | | 12/06/2011 | | 82-84 | On 8/07/2010, the contract repriced at a new dayrate of $82k-$84k. The next date on which the contract is expected to reprice is 11/07/2010. | 2 | | |
| | | | | | | | | | | | | | | | |
| Noble Carl Norberg | MLT Class 82-C | 1976/2003 | 250'-IC | Bay of Campeche | | Pemex | 6/02/2010 | | 9/01/2010 | | 76-78 | This contract commenced on 3/02/2009. The contract reprices every three months based on an index of jackup rates in seven international regions. On 6/02/2010, the contract repriced at a new dayrate of $76k-$78k. | 5 | | |
| | | | | | | | 9/02/2010 | | 3/02/2011 | | 80-82 | On 9/02/2010, the contract repriced at a new dayrate of $80k-$82k. The next date on which the contract is expected to reprice is 12/02/2010. | | | |
| | | | | | | | | | | | | | | | |
| Brazil Semisubmersibles (3) (c ) (h) |
| Noble Dave Beard-Newbuild | F&G 9500 Enhanced Pacesetter | 1986/2008 | 10,000'-DP | Brazil | | Petrobras | 3/19/2010 | | 3/18/2015 | | 219-221 | Eligible for a maximum 15% bonus. | 8 | | |
| | | | | | | | | | | | | | | | |
| Noble Paul Wolff | Noble EVA 4000™ | 1981/1999/2006 | 9,200'-DP | Brazil | | Petrobras | 11/04/2009 | | 11/03/2014 | | 427-429 | Eligible for a maximum 15% performance bonus. | 2 | | 15 |
| | | | | | | | | | | | | | | | |
| Noble Therald Martin (b) | Pentagone 85 | 1977/2004 | 4,000' | Brazil | | Petrobras | 4/11/2007 | | 10/17/2010 | | 113-115 | Eligible for a maximum of 15% performance bonus. | | | |
| | | | | Brazil | | Petrobras | 10/18/2010 | | 10/17/2015 | | 269-271 | Eligible for a maximum of 10% performance bonus. | 15 | | |
| | | | | | | | | | | | | | | | |
| Brazil Drillships (3) (c ) (h) |
| Noble Roger Eason (b) | NAM Nedlloyd-C | 1977/2005 | 7,200'-DP | Brazil | | Petrobras | 3/15/2010 | | 2/21/2012 | | 346-348 | Eligible for a maximum of 15% performance bonus. | 17 | | |
| | | | | Brazil | | Petrobras | 2/22/2012 | | 10/19/2012 | | 89-91 | Anticipate entering the shipyard for +/- 240 days for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k. | | | |
| | | | | Brazil | | Petrobras | 10/20/2012 | | 8/12/2016 | | 346-348 | Eligible for a maximum of 15% performance bonus. | | | |
| | | | | | | | | | | | | | | | |
| Noble Leo Segerius (b) | Gusto Engineering Pelican Class | 1981/2002 | 5,600’-DP | Brazil | | Petrobras | 6/30/2009 | | 3/07/2011 | | 300-302 | Eligible for a maximum of 15% performance bonus. | 1 | | |
| | | | | Brazil | | Petrobras | 3/08/2011 | | 11/03/2011 | | 89-91 | Anticipate entering the shipyard for +/- 240 days for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k. | | | |
| | | | | Brazil | | Petrobras | 11/04/2011 | | 1/23/2016 | | 300-302 | Eligible for a maximum of 15% performance bonus. | | | |
| | | | | | | | | | | | | | | | |
| Noble Muravlenko | Gusto Engineering Pelican Class | 1982/1997 | 4,900’-DP | Brazil | | Petrobras | 5/10/2009 | | 2/11/2013 | | 289-291 | Eligible for a maximum of 15% performance bonus. | 24 | | |
| | | | | Brazil | | Petrobras | 2/12/2013 | | 10/10/2013 | | 89-91 | Anticipate entering the shipyard for +/- 240 days for rig modifications, regulatory inspection, and sea trials, of which 150 days are expected to be paid at a dayrate of $89k-$91k. | | | |
| | | | | Brazil | | Petrobras | 10/11/2013 | | 8/14/2015 | | 289-291 | Eligible for a maximum of 15% performance bonus. | | | |
| Changes from last Fleet Status Report denoted by Red, Bold, Underlined type. |