CONSENT OF MICHAEL SHORT
Regal House 70 London Road
Twickenham, Middlesex, TW1 3QS, England
July 13, 2015
CONSENT OF EXPERT
VIA EDGAR
United States Securities and Exchange Commission:
RE: | Tasman Metals Ltd. Management's Discussion and Analysis for the Nine Months Ended May 31, 2015 (the "MD&A") |
To Whom It May Concern:
I have assisted with the preparation of the Amended & Restated Prefeasibility Study – NI 43-101 – Technical report for the Norra Karr Rare Earth Element Deposit dated July 10, 2015, Effective Date: January 13, 2015 (the "Study"). I refer to the following (collectively the "Information") which is referenced in the MD&A and/or documents incorporated by reference therein:
1. | The Study; and |
2. | The infrastructure design and cost estimation for the Study which was completed by GBM Minerals Engineering Consultants Limited under my supervision. |
I hereby consent to the use of my name and the Information, and summaries thereof, and inclusion and incorporation by reference thereof and information derived from such Information in the MD&A and/or Tasman Metals Ltd.'s Registration Statement on Form F-3 (File No. 333-190863), and any associated prospectus, filed with the United States Securities and Exchange Commission.
I confirm that I have read a draft of the MD&A and I have no reason to believe that there are any misrepresentations that are derived from the Information or that are within my knowledge as a result of the services I performed in connection with such Information.
Yours truly,
/s/ Michael Short
Michael Short, Principal Consultant