SCHEDULE III – REAL ESTATE AND ACCUMULATED DEPRECIATION (Details) - USD ($) $ in Thousands | 12 Months Ended | | | |
Dec. 31, 2023 | Dec. 31, 2022 | Dec. 31, 2021 | Dec. 31, 2020 |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 36,818 | | | |
Initial Costs, Land & Land Improvements | 123,155 | | | |
Initial Costs, Building and Building Improvements | 1,267,517 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 14,238 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 235,062 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 137,393 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 1,502,579 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 1,639,972 | $ 1,631,968 | $ 1,630,482 | $ 1,640,534 |
Accumulated Depreciation | (381,570) | $ (338,350) | $ (303,767) | $ (262,394) |
Primrose Retirement Community of Casper Casper, Wyoming | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | 0 | | | |
Initial Costs, Land & Land Improvements | 1,910 | | | |
Initial Costs, Building and Building Improvements | 16,310 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 61 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 364 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,971 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 16,674 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 18,645 | | | |
Accumulated Depreciation | $ (5,278) | | | |
Date of Construction | 2004 | | | |
Date Acquired | Feb. 16, 2012 | | | |
Primrose Retirement Community of Grand Island Grand Island, Nebraska | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 719 | | | |
Initial Costs, Building and Building Improvements | 12,140 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 83 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 802 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 12,140 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 12,942 | | | |
Accumulated Depreciation | $ (3,993) | | | |
Date of Construction | 2005 | | | |
Date Acquired | Feb. 16, 2012 | | | |
Primrose Retirement Community of Mansfield Mansfield, Ohio | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 650 | | | |
Initial Costs, Building and Building Improvements | 16,720 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 230 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 83 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 880 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 16,803 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 17,683 | | | |
Accumulated Depreciation | $ (5,562) | | | |
Date of Construction | 2007 | | | |
Date Acquired | Feb. 16, 2012 | | | |
Primrose Retirement Community of Marion Marion, Ohio | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 889 | | | |
Initial Costs, Building and Building Improvements | 16,305 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 126 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 18 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,015 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 16,323 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 17,338 | | | |
Accumulated Depreciation | $ (5,281) | | | |
Date of Construction | 2006 | | | |
Date Acquired | Feb. 16, 2012 | | | |
Sweetwater Retirement Community Billings, Montana | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,578 | | | |
Initial Costs, Building and Building Improvements | 14,205 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 20 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 34 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,598 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 14,239 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 15,837 | | | |
Accumulated Depreciation | $ (4,480) | | | |
Date of Construction | 2006 | | | |
Date Acquired | Feb. 16, 2012 | | | |
HarborChase of Villages Crossing Lady Lake, Florida ("The Villages") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,165 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 1,036 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 15,573 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 3,201 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 15,573 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 18,774 | | | |
Accumulated Depreciation | $ (4,248) | | | |
Date of Construction | 2013 | | | |
Date Acquired | Aug. 29, 2012 | | | |
Primrose Retirement Community Cottages Aberdeen, South Dakota | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 311 | | | |
Initial Costs, Building and Building Improvements | 3,794 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 6 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 311 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 3,800 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 4,111 | | | |
Accumulated Depreciation | $ (1,158) | | | |
Date of Construction | 2005 | | | |
Date Acquired | Dec. 19, 2012 | | | |
Primrose Retirement Community of Council Bluffs Council Bluffs, Iowa (“Omaha”) | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,144 | | | |
Initial Costs, Building and Building Improvements | 11,117 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 60 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 20 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,204 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 11,137 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 12,341 | | | |
Accumulated Depreciation | $ (3,497) | | | |
Date of Construction | 2008 | | | |
Date Acquired | Dec. 19, 2012 | | | |
Primrose Retirement Community of Decatur Decatur, Illinois | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 513 | | | |
Initial Costs, Building and Building Improvements | 16,706 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 105 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 188 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 618 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 16,894 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 17,512 | | | |
Accumulated Depreciation | $ (5,080) | | | |
Date of Construction | 2009 | | | |
Date Acquired | Dec. 19, 2012 | | | |
Primrose Retirement Community of Lima Lima, Ohio | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 944 | | | |
Initial Costs, Building and Building Improvements | 17,115 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 8 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 26 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 952 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 17,141 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 18,093 | | | |
Accumulated Depreciation | $ (5,130) | | | |
Date of Construction | 2006 | | | |
Date Acquired | Dec. 19, 2012 | | | |
Primrose Retirement Community of Zanesville Zanesville, Ohio | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,184 | | | |
Initial Costs, Building and Building Improvements | 17,292 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 95 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,184 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 17,387 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 18,571 | | | |
Accumulated Depreciation | $ (5,214) | | | |
Date of Construction | 2008 | | | |
Date Acquired | Dec. 19, 2012 | | | |
Capital Health of Symphony Manor Baltimore, Maryland | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,319 | | | |
Initial Costs, Building and Building Improvements | 19,444 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 7 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 323 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,326 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 19,767 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 22,093 | | | |
Accumulated Depreciation | $ (5,822) | | | |
Date of Construction | 2011 | | | |
Date Acquired | Dec. 21, 2012 | | | |
Curry House Assisted Living & Memory Care Cadillac, Michigan | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 995 | | | |
Initial Costs, Building and Building Improvements | 11,072 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 45 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 466 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,040 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 11,538 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 12,578 | | | |
Accumulated Depreciation | $ (3,342) | | | |
Date of Construction | 1966 | | | |
Date Acquired | Dec. 21, 2012 | | | |
Tranquillity at Fredericktowne Frederick, Maryland | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 808 | | | |
Initial Costs, Building and Building Improvements | 14,291 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 41 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 6,723 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 849 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 21,014 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 21,863 | | | |
Accumulated Depreciation | $ (6,714) | | | |
Date of Construction | 2000 | | | |
Date Acquired | Dec. 21, 2012 | | | |
Brookridge Heights Assisted Living & Memory Care Marquette, Michigan | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 595 | | | |
Initial Costs, Building and Building Improvements | 11,339 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 137 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 5,230 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 732 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 16,569 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 17,301 | | | |
Accumulated Depreciation | $ (5,462) | | | |
Date of Construction | 1998 | | | |
Date Acquired | Dec. 21, 2012 | | | |
Woodholme Gardens Assisted Living & Memory Care Pikesville, Maryland (“Baltimore”) | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,603 | | | |
Initial Costs, Building and Building Improvements | 13,472 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 65 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 121 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,668 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 13,593 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 15,261 | | | |
Accumulated Depreciation | $ (4,052) | | | |
Date of Construction | 2010 | | | |
Date Acquired | Dec. 21, 2012 | | | |
HarborChase of Jasper Jasper, Alabama | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 355 | | | |
Initial Costs, Building and Building Improvements | 6,358 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 23 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 96 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 378 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 6,454 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 6,832 | | | |
Accumulated Depreciation | $ (1,788) | | | |
Date of Construction | 1998 | | | |
Date Acquired | Jul. 31, 2013 | | | |
Raider Ranch Lubbock, Texas | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 4,992 | | | |
Initial Costs, Building and Building Improvements | 48,818 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 793 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 13,679 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 5,785 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 62,497 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 68,282 | | | |
Accumulated Depreciation | $ (16,368) | | | |
Date of Construction | 2009 | | | |
Date Acquired | Aug. 29, 2013 | | | |
Town Village Oklahoma City, Oklahoma | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,020 | | | |
Initial Costs, Building and Building Improvements | 19,847 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 185 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 1,863 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,205 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 21,710 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 22,915 | | | |
Accumulated Depreciation | $ (6,107) | | | |
Date of Construction | 2004 | | | |
Date Acquired | Aug. 29, 2013 | | | |
Prestige Senior Living Beaverton Hills Beaverton, Oregon | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,387 | | | |
Initial Costs, Building and Building Improvements | 10,324 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 13 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 91 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,400 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 10,415 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 11,815 | | | |
Accumulated Depreciation | $ (2,818) | | | |
Date of Construction | 2000 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living High Desert Bend, Oregon | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 835 | | | |
Initial Costs, Building and Building Improvements | 11,252 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 17 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 430 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 852 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 11,682 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 12,534 | | | |
Accumulated Depreciation | $ (3,251) | | | |
Date of Construction | 2003 | | | |
Date Acquired | Dec. 02, 2013 | | | |
MorningStar of Billings Billings, Montana | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 4,067 | | | |
Initial Costs, Building and Building Improvements | 41,373 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 84 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 641 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 4,151 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 42,014 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 46,165 | | | |
Accumulated Depreciation | $ (11,994) | | | |
Date of Construction | 2009 | | | |
Date Acquired | Dec. 02, 2013 | | | |
MorningStar of Boise Boise, Idaho | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,663 | | | |
Initial Costs, Building and Building Improvements | 35,752 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 309 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 372 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,972 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 36,124 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 38,096 | | | |
Accumulated Depreciation | $ (9,791) | | | |
Date of Construction | 2007 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living Huntington Terrace Gresham, Oregon (“Portland”) | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,236 | | | |
Initial Costs, Building and Building Improvements | 12,083 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 2 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 485 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,238 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 12,568 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 13,806 | | | |
Accumulated Depreciation | $ (3,378) | | | |
Date of Construction | 2000 | | | |
Date Acquired | Dec. 02, 2013 | | | |
MorningStar of Idaho Falls Idaho Falls, Idaho | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,006 | | | |
Initial Costs, Building and Building Improvements | 40,397 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 141 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 443 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,147 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 40,840 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 42,987 | | | |
Accumulated Depreciation | $ (11,260) | | | |
Date of Construction | 2009 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living Arbor Place Medford, Oregon | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 355 | | | |
Initial Costs, Building and Building Improvements | 14,083 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 17 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 939 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 372 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 15,022 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 15,394 | | | |
Accumulated Depreciation | $ (3,930) | | | |
Date of Construction | 2003 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living Orchard Hills Salem, Oregon | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 545 | | | |
Initial Costs, Building and Building Improvements | 15,544 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 134 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 288 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 679 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 15,832 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 16,511 | | | |
Accumulated Depreciation | $ (4,225) | | | |
Date of Construction | 2002 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living Southern Hills Salem, Oregon | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 653 | | | |
Initial Costs, Building and Building Improvements | 10,753 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 55 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 193 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 708 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 10,946 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 11,654 | | | |
Accumulated Depreciation | $ (2,961) | | | |
Date of Construction | 2001 | | | |
Date Acquired | Dec. 02, 2013 | | | |
MorningStar of Sparks Sparks, Nevada | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 3,986 | | | |
Initial Costs, Building and Building Improvements | 47,968 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 16 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 1,194 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 4,002 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 49,162 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 53,164 | | | |
Accumulated Depreciation | $ (13,427) | | | |
Date of Construction | 2009 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living Five Rivers Tillamook, Oregon | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,298 | | | |
Initial Costs, Building and Building Improvements | 14,064 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 18 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 575 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,316 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 14,639 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 15,955 | | | |
Accumulated Depreciation | $ (4,131) | | | |
Date of Construction | 2002 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living Riverwood Tualatin, Oregon (“Portland”) | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,028 | | | |
Initial Costs, Building and Building Improvements | 7,429 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 12 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 238 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,040 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 7,667 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 8,707 | | | |
Accumulated Depreciation | $ (2,140) | | | |
Date of Construction | 1999 | | | |
Date Acquired | Dec. 02, 2013 | | | |
Prestige Senior Living Auburn Meadows Auburn, Washington ("Seattle") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,537 | | | |
Initial Costs, Building and Building Improvements | 17,261 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 214 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 1,626 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,751 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 18,887 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 21,638 | | | |
Accumulated Depreciation | $ (4,981) | | | |
Date Acquired | Feb. 03, 2014 | | | |
Prestige Senior Living Auburn Meadows Auburn, Washington ("Seattle") | Minimum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2003 | | | |
Prestige Senior Living Auburn Meadows Auburn, Washington ("Seattle") | Maximum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2010 | | | |
Prestige Senior Living Bridgewood Vancouver, Washington ("Portland") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,603 | | | |
Initial Costs, Building and Building Improvements | 18,172 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 10 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 727 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,613 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 18,899 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 20,512 | | | |
Accumulated Depreciation | $ (4,893) | | | |
Date of Construction | 2001 | | | |
Date Acquired | Feb. 03, 2014 | | | |
Prestige Senior Living Monticello Park Longview, Washington | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,981 | | | |
Initial Costs, Building and Building Improvements | 23,056 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 1 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 552 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,982 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 23,608 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 25,590 | | | |
Accumulated Depreciation | $ (6,111) | | | |
Date Acquired | Feb. 03, 2014 | | | |
Prestige Senior Living Monticello Park Longview, Washington | Minimum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2001 | | | |
Prestige Senior Living Monticello Park Longview, Washington | Maximum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2010 | | | |
Prestige Senior Living Rosemont Yelm, Washington | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 668 | | | |
Initial Costs, Building and Building Improvements | 14,564 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 14 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 719 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 682 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 15,283 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 15,965 | | | |
Accumulated Depreciation | $ (3,881) | | | |
Date of Construction | 2004 | | | |
Date Acquired | Feb. 03, 2014 | | | |
Wellmore of Tega Cay Tega Cay, South Carolina ("Charlotte") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,445 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 2,760 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 23,497 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 5,205 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 23,497 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 28,702 | | | |
Accumulated Depreciation | $ (6,671) | | | |
Date of Construction | 2015 | | | |
Date Acquired | Feb. 07, 2014 | | | |
Isle at Cedar Ridge Cedar Park, Texas ("Austin") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,525 | | | |
Initial Costs, Building and Building Improvements | 16,277 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 833 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,525 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 17,110 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 18,635 | | | |
Accumulated Depreciation | $ (4,663) | | | |
Date of Construction | 2011 | | | |
Date Acquired | Feb. 28, 2014 | | | |
Prestige Senior Living West Hills Corvallis, Oregon | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 842 | | | |
Initial Costs, Building and Building Improvements | 12,603 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 11 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 778 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 853 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 13,381 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 14,234 | | | |
Accumulated Depreciation | $ (3,535) | | | |
Date of Construction | 2002 | | | |
Date Acquired | Mar. 03, 2014 | | | |
HarborChase of Plainfield Plainfield, Illinois | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,596 | | | |
Initial Costs, Building and Building Improvements | 21,832 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 160 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 351 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,756 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 22,183 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 23,939 | | | |
Accumulated Depreciation | $ (5,844) | | | |
Date of Construction | 2010 | | | |
Date Acquired | Mar. 28, 2014 | | | |
Legacy Ranch Alzheimer's Special Care Center Midland, Texas | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 917 | | | |
Initial Costs, Building and Building Improvements | 9,982 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 34 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 219 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 951 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 10,201 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 11,152 | | | |
Accumulated Depreciation | $ (2,719) | | | |
Date of Construction | 2012 | | | |
Date Acquired | Mar. 28, 2014 | | | |
The Springs Alzheimer's Special Care Center San Angelo, Texas | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 595 | | | |
Initial Costs, Building and Building Improvements | 9,658 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 9 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 206 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 604 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 9,864 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 10,468 | | | |
Accumulated Depreciation | $ (2,650) | | | |
Date of Construction | 2012 | | | |
Date Acquired | Mar. 28, 2014 | | | |
Isle at Watercrest - Bryan Bryan, Texas | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 3,223 | | | |
Initial Costs, Building and Building Improvements | 40,581 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 70 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 3,037 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 3,293 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 43,618 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 46,911 | | | |
Accumulated Depreciation | $ (11,671) | | | |
Date of Construction | 2011 | | | |
Date Acquired | Apr. 21, 2014 | | | |
Isle at Watercrest - Mansfield Mansfield, Texas ("Dallas/Fort Worth") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 997 | | | |
Initial Costs, Building and Building Improvements | 24,635 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 4 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 478 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,001 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 25,113 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 26,114 | | | |
Accumulated Depreciation | $ (6,398) | | | |
Date of Construction | 2011 | | | |
Date Acquired | May 05, 2014 | | | |
Watercrest at Katy Katy, Texas ("Houston") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 20,668 | | | |
Initial Costs, Land & Land Improvements | 4,000 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 140 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 33,998 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 4,140 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 33,998 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 38,138 | | | |
Accumulated Depreciation | $ (6,507) | | | |
Date of Construction | 2016 | | | |
Date Acquired | Jun. 27, 2014 | | | |
Watercrest at Mansfield Mansfield, Texas ("Dallas/Fort Worth") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,191 | | | |
Initial Costs, Building and Building Improvements | 42,740 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 49 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 1,009 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,240 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 43,749 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 45,989 | | | |
Accumulated Depreciation | $ (11,214) | | | |
Date of Construction | 2010 | | | |
Date Acquired | Jun. 30, 2014 | | | |
HarborChase of Shorewood Shorewood, Wisconsin ("Milwaukee") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,200 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 304 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 19,890 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,504 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 19,890 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 22,394 | | | |
Accumulated Depreciation | $ (4,280) | | | |
Date of Construction | 2015 | | | |
Date Acquired | Jul. 08, 2014 | | | |
Fairfield Village of Layton Layton, Utah ("Salt Lake City") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 5,217 | | | |
Initial Costs, Building and Building Improvements | 54,167 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 374 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 761 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 5,591 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 54,928 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 60,519 | | | |
Accumulated Depreciation | $ (14,144) | | | |
Date of Construction | 2010 | | | |
Date Acquired | Nov. 20, 2014 | | | |
Primrose Retirement Center of Anderson Anderson, Indiana ("Muncie") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,342 | | | |
Initial Costs, Building and Building Improvements | 19,083 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 4 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 33 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,346 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 19,116 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 20,462 | | | |
Accumulated Depreciation | $ (4,635) | | | |
Date of Construction | 2008 | | | |
Date Acquired | May 29, 2015 | | | |
Primrose Retirement Center of Lancaster Lancaster, Ohio ("Columbus") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,840 | | | |
Initial Costs, Building and Building Improvements | 21,884 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 51 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 362 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,891 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 22,246 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 25,137 | | | |
Accumulated Depreciation | $ (5,887) | | | |
Date of Construction | 2007 | | | |
Date Acquired | May 29, 2015 | | | |
Primrose Retirement Center of Wausau Wausau, Wisconsin ("Green Bay") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,089 | | | |
Initial Costs, Building and Building Improvements | 18,653 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 3 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 15 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,092 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 18,668 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 19,760 | | | |
Accumulated Depreciation | $ (4,344) | | | |
Date of Construction | 2008 | | | |
Date Acquired | May 29, 2015 | | | |
Superior Residences of Panama City Panama City Beach, Florida | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,099 | | | |
Initial Costs, Building and Building Improvements | 19,367 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 14 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 971 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,113 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 20,338 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 22,451 | | | |
Accumulated Depreciation | $ (4,683) | | | |
Date of Construction | 2015 | | | |
Date Acquired | Jul. 15, 2015 | | | |
The Hampton at Meadows Place Fort Bend, Texas ("Houston") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 715 | | | |
Initial Costs, Building and Building Improvements | 24,281 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 11 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 516 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 726 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 24,797 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 25,523 | | | |
Accumulated Depreciation | $ (5,459) | | | |
Date of Construction | 2007 | | | |
Date Acquired | Jul. 31, 2015 | | | |
The Hampton at Meadows Place Fort Bend, Texas ("Houston") | Minimum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2013 | | | |
The Hampton at Meadows Place Fort Bend, Texas ("Houston") | Maximum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2014 | | | |
The Pavilion at Great Hills Austin, Texas | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,783 | | | |
Initial Costs, Building and Building Improvements | 29,318 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 53 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 330 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,836 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 29,648 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 31,484 | | | |
Accumulated Depreciation | $ (6,605) | | | |
Date of Construction | 2010 | | | |
Date Acquired | Jul. 31, 2015 | | | |
The Beacon at Gulf Breeze Gulf Breeze, Florida ("Pensacola") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 824 | | | |
Initial Costs, Building and Building Improvements | 24,106 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 96 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 418 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 920 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 24,524 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 25,444 | | | |
Accumulated Depreciation | $ (5,631) | | | |
Date of Construction | 2008 | | | |
Date Acquired | Jul. 31, 2015 | | | |
Parc at Piedmont Marietta, Georgia ("Atlanta") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 3,529 | | | |
Initial Costs, Building and Building Improvements | 43,080 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 36 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 1,853 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 3,565 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 44,933 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 48,498 | | | |
Accumulated Depreciation | $ (10,167) | | | |
Date Acquired | Jul. 31, 2015 | | | |
Parc at Piedmont Marietta, Georgia ("Atlanta") | Minimum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2001 | | | |
Parc at Piedmont Marietta, Georgia ("Atlanta") | Maximum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2011 | | | |
Parc at Duluth Duluth, Georgia ("Atlanta") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 5,951 | | | |
Initial Costs, Building and Building Improvements | 42,458 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 70 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 2,933 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 6,021 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 45,391 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 51,412 | | | |
Accumulated Depreciation | $ (10,057) | | | |
Date Acquired | Jul. 31, 2015 | | | |
Parc at Duluth Duluth, Georgia ("Atlanta") | Minimum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2003 | | | |
Parc at Duluth Duluth, Georgia ("Atlanta") | Maximum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2012 | | | |
Waterstone on Augusta Greenville, South Carolina | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,253 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 2,117 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 20,923 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 4,370 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 20,923 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 25,293 | | | |
Accumulated Depreciation | $ (4,558) | | | |
Date of Construction | 2017 | | | |
Date Acquired | Aug. 31, 2015 | | | |
Wellmore of Lexington Lexington, South Carolina ("Columbia") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,300 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 3,210 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 43,149 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 5,510 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 43,149 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 48,659 | | | |
Accumulated Depreciation | $ (8,562) | | | |
Date of Construction | 2017 | | | |
Date Acquired | Sep. 14, 2015 | | | |
Palmilla Senior Living Albuquerque, New Mexico | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 4,701 | | | |
Initial Costs, Building and Building Improvements | 38,321 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 68 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 333 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 4,769 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 38,654 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 43,423 | | | |
Accumulated Depreciation | $ (8,723) | | | |
Date of Construction | 2013 | | | |
Date Acquired | Sep. 30, 2015 | | | |
Cedar Lake Assisted Living and Memory Care Lake Zurich, Illinois ("Chicago") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,412 | | | |
Initial Costs, Building and Building Improvements | 25,126 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 49 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 148 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,461 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 25,274 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 27,735 | | | |
Accumulated Depreciation | $ (5,698) | | | |
Date of Construction | 2014 | | | |
Date Acquired | Sep. 30, 2015 | | | |
The Shores of Lake Phalen Maplewood, Minnesota ("St. Paul") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 2,724 | | | |
Initial Costs, Building and Building Improvements | 25,093 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 18 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 113 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 2,742 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 25,206 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 27,948 | | | |
Accumulated Depreciation | $ (5,596) | | | |
Date of Construction | 2012 | | | |
Date Acquired | Nov. 10, 2015 | | | |
Dogwood Forest of Grayson Grayson, Georgia | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,788 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 112 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 22,084 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,900 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 22,084 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 23,984 | | | |
Accumulated Depreciation | $ (3,754) | | | |
Date of Construction | 2017 | | | |
Date Acquired | Nov. 24, 2015 | | | |
Park Place Senior Living at WingHaven O'Fallon, Missouri ("St. Louis") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,283 | | | |
Initial Costs, Building and Building Improvements | 48,221 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 151 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 1,301 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,434 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 49,522 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 50,956 | | | |
Accumulated Depreciation | $ (10,625) | | | |
Date Acquired | Dec. 17, 2015 | | | |
Park Place Senior Living at WingHaven O'Fallon, Missouri ("St. Louis") | Minimum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2006 | | | |
Park Place Senior Living at WingHaven O'Fallon, Missouri ("St. Louis") | Maximum | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Date of Construction | 2014 | | | |
Hearthside Senior Living of Collierville Collierville, Tennessee ("Memphis") | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,756 | | | |
Initial Costs, Building and Building Improvements | 13,379 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 60 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 42 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,816 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 13,421 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 15,237 | | | |
Accumulated Depreciation | $ (3,012) | | | |
Date of Construction | 2014 | | | |
Date Acquired | Dec. 29, 2015 | | | |
Albuquerque, New Mexico – Vacant Land Albuquerque, New Mexico | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 0 | | | |
Initial Costs, Land & Land Improvements | 1,056 | | | |
Initial Costs, Building and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,056 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 0 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 1,056 | | | |
Accumulated Depreciation | $ 0 | | | |
Date Acquired | Sep. 07, 2017 | | | |
Finton Assisted Living Vinton, Iowa | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 2,423 | | | |
Initial Costs, Land & Land Improvements | 1,083 | | | |
Initial Costs, Building and Building Improvements | 3,439 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 9 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,083 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 3,448 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 4,531 | | | |
Accumulated Depreciation | $ (268) | | | |
Date of Construction | 2007 | | | |
Date Acquired | Aug. 31, 2012 | | | |
Webster City Assisted Living Webster City, Iowa | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 2,202 | | | |
Initial Costs, Land & Land Improvements | 912 | | | |
Initial Costs, Building and Building Improvements | 3,794 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 84 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 1 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 996 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 3,795 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 4,791 | | | |
Accumulated Depreciation | $ (302) | | | |
Date of Construction | 2007 | | | |
Date Acquired | Aug. 31, 2012 | | | |
Nevada Assisted Living Nevada, Iowa | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 4,919 | | | |
Initial Costs, Land & Land Improvements | 1,749 | | | |
Initial Costs, Building and Building Improvements | 7,196 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 0 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,749 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 7,196 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 8,945 | | | |
Accumulated Depreciation | $ (355) | | | |
Date of Construction | 2011 | | | |
Date Acquired | Aug. 31, 2012 | | | |
Grinnell Assisted Living Grinnell, Iowa | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 4,698 | | | |
Initial Costs, Land & Land Improvements | 1,690 | | | |
Initial Costs, Building and Building Improvements | 4,454 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 28 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 21 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 1,718 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 4,475 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 6,193 | | | |
Accumulated Depreciation | $ (354) | | | |
Date of Construction | 2005 | | | |
Date Acquired | Apr. 02, 2013 | | | |
Indianola Assisted Living Indianola, Iowa | | | | |
SEC Schedule, 12-28, Real Estate Companies, Investment in Real Estate and Accumulated Depreciation [Line Items] | | | | |
Encum- brances | $ 1,908 | | | |
Initial Costs, Land & Land Improvements | 986 | | | |
Initial Costs, Building and Building Improvements | 3,369 | | | |
Costs Capitalized Subsequent to Acquisition, Land & Land Improvements | 6 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | 29 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Land & Land Improvements | 992 | | | |
Gross Amounts at which Carried at Close of Period, Building and Building Improvements | 3,398 | | | |
Gross Amounts at which Carried at Close of Period, Construction in Process | 0 | | | |
Gross Amounts at which Carried at Close of Period, Total | 4,390 | | | |
Accumulated Depreciation | $ (251) | | | |
Date of Construction | 2004 | | | |
Date Acquired | Apr. 02, 2013 | | | |