Schedule III-Real Estate And Accumulated Depreciation (Detail) - USD ($) $ in Thousands | 12 Months Ended | | | |
Dec. 31, 2015 | Dec. 31, 2014 | Dec. 31, 2013 | Dec. 31, 2012 |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 840,656 | | | |
Initial Costs, Land & Land Improvements | | 238,787 | | | |
Initial Costs, Buildings & Building Improvements | | 2,215,548 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | | 4,803 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | | 81,788 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | | 47,977 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | | 243,590 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | | 2,297,336 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | | 47,977 | | | |
Total | | 2,588,903 | $ 1,721,429 | $ 859,877 | $ 235,945 |
Accumulated Depreciation | | (90,201) | $ (40,467) | $ (11,011) | $ (1,702) |
Primrose Retirement Community Casper, Wyoming | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | 12,031 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,910 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,310 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 9 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,910 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,319 | | | |
Total | [1] | 18,229 | | | |
Accumulated Depreciation | [1] | $ (1,653) | | | |
Date of construction | [1] | 2,004 | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | |
Primrose Retirement Community Of Grand Island | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 8,487 | | | |
Initial Costs, Land & Land Improvements | [1] | 719 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,140 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 25 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 744 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,140 | | | |
Total | [1] | 12,884 | | | |
Accumulated Depreciation | [1] | $ (1,284) | | | |
Date of construction | [1] | 2,005 | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | |
Primrose Retirement Community Mansfield, Ohio | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 11,548 | | | |
Initial Costs, Land & Land Improvements | [1] | 650 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,720 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 228 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 6 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 878 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,726 | | | |
Total | [1] | 17,604 | | | |
Accumulated Depreciation | [1] | $ (1,756) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | |
Primrose Retirement Community Marion, Ohio | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 9,579 | | | |
Initial Costs, Land & Land Improvements | [1] | 889 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,305 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 889 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,305 | | | |
Total | [1] | 17,194 | | | |
Accumulated Depreciation | [1] | $ (1,705) | | | |
Date of construction | [1] | 2,006 | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | |
Sweetwater Retirement Community Billings Montana | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 10,403 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,578 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 14,205 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 20 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,598 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 14,205 | | | |
Total | [1] | 15,803 | | | |
Accumulated Depreciation | [1] | $ (1,449) | | | |
Date of construction | [1] | 2,006 | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | |
HarborChase Community Lady Lake, Florida | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,165 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 986 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 15,424 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,151 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 15,424 | | | |
Total | [1] | 18,575 | | | |
Accumulated Depreciation | [1] | $ (843) | | | |
Date of construction | [1] | 2,013 | | | |
Date Acquired | [1] | Aug. 29, 2012 | | | |
Dogwood Forest of Acworth | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1],[2] | $ 1,750 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1],[2] | 277 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1],[2] | 15,994 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,027 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 15,994 | | | |
Total | [1],[2] | 18,021 | | | |
Accumulated Depreciation | [1],[2] | $ (617) | | | |
Date Acquired | [1],[2] | Dec. 18, 2012 | | | |
Primrose Retirement Community Aberdeen, South Dakota | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 311 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 3,794 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 311 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 3,794 | | | |
Total | [1] | 4,105 | | | |
Accumulated Depreciation | [1] | $ (316) | | | |
Date of construction | [1] | 2,005 | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | |
Primrose Retirement Community Council Bluffs, Iowa | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,144 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 11,117 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,144 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 11,117 | | | |
Total | [1] | 12,261 | | | |
Accumulated Depreciation | [1] | $ (951) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | |
Primrose Retirement Community Decatur, Illinois | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 10,558 | | | |
Initial Costs, Land & Land Improvements | [1] | 513 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,706 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 513 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,706 | | | |
Total | [1] | 17,219 | | | |
Accumulated Depreciation | [1] | $ (1,358) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | |
Primrose Retirement Community Lima, Ohio | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 944 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 17,115 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 8 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 4 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 952 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 17,119 | | | |
Total | [1] | 18,071 | | | |
Accumulated Depreciation | [1] | $ (1,396) | | | |
Date of construction | [1] | 2,006 | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | |
Primrose Retirement Community Zanesville, Ohio | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 11,915 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,184 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 17,292 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,184 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 17,292 | | | |
Total | [1] | 18,476 | | | |
Accumulated Depreciation | [1] | $ (1,411) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | |
Capital Health of Symphony Manor Baltimore, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,131 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,319 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 19,444 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 78 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,319 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,522 | | | |
Total | [1] | 21,841 | | | |
Accumulated Depreciation | [1] | $ (1,564) | | | |
Date of construction | [1] | 2,011 | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | |
Curry House Assisted Living & Memory Care Cadillac, Michigan | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 6,253 | | | |
Initial Costs, Land & Land Improvements | [1] | 995 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 11,072 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 995 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 11,072 | | | |
Total | [1] | 12,067 | | | |
Accumulated Depreciation | [1] | $ (901) | | | |
Date of construction | [1] | 1,966 | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | |
Tranquillity at Fredericktowne, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 6,032 | | | |
Initial Costs, Land & Land Improvements | [1] | 808 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 14,291 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 97 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 235 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 808 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 14,388 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 235 | | | |
Total | [1] | 15,431 | | | |
Accumulated Depreciation | [1] | $ (1,149) | | | |
Date of construction | [1] | 2,000 | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | |
Brookridge Heights Assisted Living and Memory Care Marquette, Michigan | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 6,189 | | | |
Initial Costs, Land & Land Improvements | [1] | 595 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 11,339 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 31 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 94 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 595 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 11,370 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 94 | | | |
Total | [1] | 12,059 | | | |
Accumulated Depreciation | [1] | $ (909) | | | |
Date of construction | [1] | 1,998 | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | |
Woodholme Gardens Assisted Living and Memory Care Pikesville, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,285 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,603 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 13,472 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,603 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 13,472 | | | |
Total | [1] | 15,075 | | | |
Accumulated Depreciation | [1] | $ (1,092) | | | |
Date of construction | [1] | 2,010 | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | |
Batesville Healthcare Center Batesville, Arkansas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 397 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 5,382 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 397 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 5,382 | | | |
Total | [1] | 5,779 | | | |
Accumulated Depreciation | [1] | $ (362) | | | |
Date of construction | [1] | 1,975 | | | |
Date Acquired | [1] | May 31, 2013 | | | |
Broadway Healthcare Center West Memphis, Arkansas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 438 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,560 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 77 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 438 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,637 | | | |
Total | [1] | 11,075 | | | |
Accumulated Depreciation | [1] | $ (721) | | | |
Date of construction | [1] | 1,994 | | | |
Date Acquired | [1] | May 31, 2013 | | | |
Jonesboro Healthcare Center Jonesboro, Arkansas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 527 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 13,493 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 5 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 527 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 13,498 | | | |
Total | [1] | 14,025 | | | |
Accumulated Depreciation | [1] | $ (908) | | | |
Date of construction | [1] | 2,012 | | | |
Date Acquired | [1] | May 31, 2013 | | | |
Magnolia Healthcare Center Magnolia, Arkansas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 421 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,454 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 421 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,454 | | | |
Total | [1] | 10,875 | | | |
Accumulated Depreciation | [1] | $ (716) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | May 31, 2013 | | | |
Mine Creek Healthcare Center Nashville, Arkansas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 135 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 2,942 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 11 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 10 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 146 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 2,952 | | | |
Total | [1] | 3,098 | | | |
Accumulated Depreciation | [1] | $ (209) | | | |
Date of construction | [1] | 1,978 | | | |
Date Acquired | [1] | May 31, 2013 | | | |
Searcy Healthcare Center Searcy, Arkansas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 648 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 6,017 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 50 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 648 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 6,067 | | | |
Total | [1] | 6,715 | | | |
Accumulated Depreciation | [1] | $ (420) | | | |
Date of construction | [1] | 1,973 | | | |
Date Acquired | [1] | May 31, 2013 | | | |
LaPorte Cancer Center Westville, Indiana | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 8,013 | | | |
Initial Costs, Land & Land Improvements | [1] | 433 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,846 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 433 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,846 | | | |
Total | [1] | 11,279 | | | |
Accumulated Depreciation | [1] | $ (750) | | | |
Date of construction | [1] | 2,010 | | | |
Date Acquired | [1] | Jun. 14, 2013 | | | |
Jefferson Medical Commons Jefferson City, Tennessee | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,719 | | | |
Initial Costs, Land & Land Improvements | [1] | 151 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,236 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 162 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 151 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,398 | | | |
Total | [1] | 10,549 | | | |
Accumulated Depreciation | [1] | $ (681) | | | |
Date of construction | [1] | 2,001 | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | |
Physicians Plaza A at North Knoxville Medical Center Powell, Tennessee | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,044 | | | |
Initial Costs, Land & Land Improvements | [1] | 262 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,976 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 262 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,976 | | | |
Total | [1] | 17,238 | | | |
Accumulated Depreciation | [1] | $ (1,132) | | | |
Date of construction | [1] | 2,005 | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | |
Physicians Plaza B at North Knoxville Medical Center Powell, Tennessee | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 14,487 | | | |
Initial Costs, Land & Land Improvements | [1] | 303 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 18,754 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 318 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 303 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,072 | | | |
Total | [1] | 19,375 | | | |
Accumulated Depreciation | [1] | $ (1,255) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | |
Physicians Regional Medical Center - Central Wing Annex Knoxville, Tennessee | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 3,838 | | | |
Initial Costs, Land & Land Improvements | [1] | 73 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 5,285 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 73 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 5,285 | | | |
Total | [1] | 5,358 | | | |
Accumulated Depreciation | [1] | $ (351) | | | |
Date of construction | [1] | 2,004 | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | |
HarborChase of Jasper Jasper, Alabama | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 355 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 6,358 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 1 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 355 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 6,359 | | | |
Total | [1] | 6,714 | | | |
Accumulated Depreciation | [1] | $ (408) | | | |
Date of construction | [1] | 1,998 | | | |
Date Acquired | [1] | Jul. 31, 2013 | | | |
Chestnut Commons MOB Elyria, Ohio | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,053 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 15,650 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,053 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 15,650 | | | |
Total | [1] | 17,703 | | | |
Accumulated Depreciation | [1] | $ (1,077) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | |
Doctor's Specialty Hospital Leawood, Kansas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 924 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 5,771 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 16 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 940 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 5,771 | | | |
Total | [1] | 6,711 | | | |
Accumulated Depreciation | [1] | $ (385) | | | |
Date of construction | [1] | 2,001 | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | |
Escondido Medical Arts Center Escondido, California | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,863 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,199 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,863 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,222 | | | |
Total | [1] | 14,085 | | | |
Accumulated Depreciation | [1] | $ (754) | | | |
Date of construction | [1] | 1,994 | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | |
John C. Lincoln Medical Office Plaza I Phoenix, Arizona | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 233 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 2,779 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 34 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 233 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 2,813 | | | |
Total | [1] | 3,046 | | | |
Accumulated Depreciation | [1] | $ (200) | | | |
Date of construction | [1] | 1,980 | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | |
John C. Lincoln Medical Office Plaza II Phoenix, Arizona | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 138 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 1,908 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 138 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 1,908 | | | |
Total | [1] | 2,046 | | | |
Accumulated Depreciation | [1] | $ (138) | | | |
Date of construction | [1] | 1,984 | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | |
North Mountain Medical Plaza Phoenix, Arizona | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 297 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 4,079 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 297 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 4,079 | | | |
Total | [1] | 4,376 | | | |
Accumulated Depreciation | [1] | $ (290) | | | |
Date of construction | [1] | 1,994 | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | |
Raider Ranch Development (Lubbock, TX) | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,992 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 48,818 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,992 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 48,818 | | | |
Total | [1] | 50,810 | | | |
Accumulated Depreciation | [1] | $ (2,999) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Aug. 29, 2013 | | | |
The Club at Raider Ranch Development Lubbock, Texas | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1],[2] | $ 7,528 | | | |
Initial Costs, Land & Land Improvements | [1],[2] | 3,000 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1],[2] | 170 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1],[2] | 4,905 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1],[2] | 7,824 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,170 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 4,905 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1],[2] | 7,824 | | | |
Total | [1],[2] | $ 15,899 | | | |
Date Acquired | [1],[2] | Aug. 29, 2013 | | | |
Town Village Oklahoma City, Oklahoma | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,020 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 19,847 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 45 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,020 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,892 | | | |
Total | [1] | 20,912 | | | |
Accumulated Depreciation | [1] | $ (1,205) | | | |
Date of construction | [1] | 2,004 | | | |
Date Acquired | [1] | Aug. 29, 2013 | | | |
Calvert Medical Arts Center Prince Frederick, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,427 | | | |
Initial Costs, Land & Land Improvements | [1] | 20 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 17,838 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 1 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 72 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 21 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 17,910 | | | |
Total | [1] | 17,931 | | | |
Accumulated Depreciation | [1] | $ (1,077) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Aug. 30, 2013 | | | |
Calvert MOBs I, II, III Prince Frederick, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 10,554 | | | |
Initial Costs, Land & Land Improvements | [1] | 51 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 14,334 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 319 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 51 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 14,653 | | | |
Total | [1] | 14,704 | | | |
Accumulated Depreciation | [1] | $ (890) | | | |
Date Acquired | [1] | Aug. 30, 2013 | | | |
Calvert Medical Office Building I Prince Frederick, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | [1] | 1,991 | | | |
Calvert Medical Office Building II Prince Frederick, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | [1] | 1,999 | | | |
Calvert Medical Office Building III Prince Frederick, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | [1] | 2,000 | | | |
Dunkirk Medical Center Dunkirk, Maryland | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 2,970 | | | |
Initial Costs, Land & Land Improvements | [1] | 351 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 2,991 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 10 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 351 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 3,001 | | | |
Total | [1] | 3,352 | | | |
Accumulated Depreciation | [1] | $ (235) | | | |
Date of construction | [1] | 1,997 | | | |
Date Acquired | [1] | Aug. 30, 2013 | | | |
Prestige Senior Living Beaverton Hills | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 9,235 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,387 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,324 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,387 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,324 | | | |
Total | [1] | 11,711 | | | |
Accumulated Depreciation | [1] | $ (579) | | | |
Date of construction | [1] | 2,000 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Prestige Senior Living High Desert | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,988 | | | |
Initial Costs, Land & Land Improvements | [1] | 835 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 11,252 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 835 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 11,252 | | | |
Total | [1] | 12,087 | | | |
Accumulated Depreciation | [1] | $ (656) | | | |
Date of construction | [1] | 2,003 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
MorningStar of Billings | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 19,673 | | | |
Initial Costs, Land & Land Improvements | [1] | 4,067 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 41,373 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 5 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 2 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 4,072 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 41,375 | | | |
Total | [1] | 45,447 | | | |
Accumulated Depreciation | [1] | $ (2,441) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
MorningStar of Boise | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 21,000 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,663 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 35,752 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 12 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,675 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 35,752 | | | |
Total | [1] | 37,427 | | | |
Accumulated Depreciation | [1] | $ (1,991) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Prestige Senior Living Huntington Terrace | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 10,229 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,236 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,083 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 6 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,236 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,089 | | | |
Total | [1] | 13,325 | | | |
Accumulated Depreciation | [1] | $ (688) | | | |
Date of construction | [1] | 2,000 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
MorningStar of Idaho Falls | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 17,966 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,006 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 40,397 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 5 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,011 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 40,397 | | | |
Total | [1] | 42,408 | | | |
Accumulated Depreciation | [1] | $ (2,294) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Prestige Senior Living Arbor Place | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 8,224 | | | |
Initial Costs, Land & Land Improvements | [1] | 355 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 14,083 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 355 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 14,083 | | | |
Total | [1] | 14,438 | | | |
Accumulated Depreciation | [1] | $ (782) | | | |
Date of construction | [1] | 2,003 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Prestige Senior Living Orchard Heights | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,351 | | | |
Initial Costs, Land & Land Improvements | [1] | 545 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 15,544 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 18 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 545 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 15,562 | | | |
Total | [1] | 16,107 | | | |
Accumulated Depreciation | [1] | $ (856) | | | |
Date of construction | [1] | 2,002 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Prestige Senior Living Southern Hills | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,506 | | | |
Initial Costs, Land & Land Improvements | [1] | 653 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,753 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 653 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,753 | | | |
Total | [1] | 11,406 | | | |
Accumulated Depreciation | [1] | $ (605) | | | |
Date of construction | [1] | 2,001 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
MorningStar of Sparks | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 23,811 | | | |
Initial Costs, Land & Land Improvements | [1] | 3,986 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 47,968 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 3 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,986 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 47,971 | | | |
Total | [1] | 51,957 | | | |
Accumulated Depreciation | [1] | $ (2,750) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Prestige Senior Living Five Rivers | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,738 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,298 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 14,064 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 48 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,298 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 14,112 | | | |
Total | [1] | 15,410 | | | |
Accumulated Depreciation | [1] | $ (837) | | | |
Date of construction | [1] | 2,002 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Prestige Senior Living Riverwood | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 4,489 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,028 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 7,429 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 37 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,028 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 7,466 | | | |
Total | [1] | 8,494 | | | |
Accumulated Depreciation | [1] | $ (434) | | | |
Date of construction | [1] | 1,999 | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | |
Chula Vista Medical Arts Center - Plaza II | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,462 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 7,453 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 331 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,462 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 7,784 | | | |
Total | [1] | 10,246 | | | |
Accumulated Depreciation | [1] | $ (418) | | | |
Date of construction | [1] | 1,985 | | | |
Date Acquired | [1] | Dec. 23, 2013 | | | |
Coral Springs MOB I | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,614 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 11,220 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,614 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 11,220 | | | |
Total | [1] | 13,834 | | | |
Accumulated Depreciation | [1] | $ (664) | | | |
Date of construction | [1] | 2,005 | | | |
Date Acquired | [1] | Dec. 23, 2013 | | | |
Coral Springs MOB II | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,614 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,130 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 1 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,615 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,130 | | | |
Total | [1] | 14,745 | | | |
Accumulated Depreciation | [1] | $ (663) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Dec. 23, 2013 | | | |
Chula Vista Medical Arts Center - Plaza I | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 6,130 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,293 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 3 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 200 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 6,133 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,493 | | | |
Total | [1] | 16,626 | | | |
Accumulated Depreciation | [1] | $ (543) | | | |
Date of construction | [1] | 1,975 | | | |
Date Acquired | [1] | Jan. 21, 2014 | | | |
Prestige Senior Living Auburn Meadows | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 10,549 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,537 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 17,261 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,537 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 17,261 | | | |
Total | [1] | 19,798 | | | |
Accumulated Depreciation | [1] | $ (905) | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | |
Prestige Senior Living Auburn Meadows One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,003 | | | |
Prestige Senior Living Auburn Meadows Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,010 | | | |
Prestige Senior Living Bridgewood | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 13,188 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,603 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 18,172 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,603 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 18,172 | | | |
Total | [1] | 19,775 | | | |
Accumulated Depreciation | [1] | $ (945) | | | |
Date of construction | [1] | 2,001 | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | |
Prestige Senior Living Monticello Park | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 18,401 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,981 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 23,056 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,981 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 23,056 | | | |
Total | [1] | 25,037 | | | |
Accumulated Depreciation | [1] | $ (1,183) | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | |
Prestige Senior Living Monticello Park One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,001 | | | |
Prestige Senior Living Monticello Park Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,010 | | | |
Prestige Senior Living Rosemont | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 9,503 | | | |
Initial Costs, Land & Land Improvements | [1] | 668 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 14,564 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 668 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 14,564 | | | |
Total | [1] | 15,232 | | | |
Accumulated Depreciation | [1] | $ (739) | | | |
Date of construction | [1] | 2,004 | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | |
Wellmore of Tega Cay (Tega Cay, South Carolina) | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 23,695 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,445 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 2,733 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23,380 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 5,178 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 23,380 | | | |
Total | [1] | 28,558 | | | |
Accumulated Depreciation | [1] | $ (391) | | | |
Date Acquired | [1] | Feb. 7, 2014 | | | |
Isle at Cedar Ridge | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,525 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,277 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 10 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,525 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,287 | | | |
Total | [1] | 17,812 | | | |
Accumulated Depreciation | [1] | $ (834) | | | |
Date of construction | [1] | 2,011 | | | |
Date Acquired | [1] | Feb. 28, 2014 | | | |
Prestige Senior Living West Hills | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 8,815 | | | |
Initial Costs, Land & Land Improvements | [1] | 842 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,603 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 842 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,603 | | | |
Total | [1] | 13,445 | | | |
Accumulated Depreciation | [1] | $ (644) | | | |
Date of construction | [1] | 2,002 | | | |
Date Acquired | [1] | Mar. 3, 2014 | | | |
HarborChase of Plainfield | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,596 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 21,832 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,596 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 21,832 | | | |
Total | [1] | 23,428 | | | |
Accumulated Depreciation | [1] | $ (1,036) | | | |
Date of construction | [1] | 2,010 | | | |
Date Acquired | [1] | Mar. 28, 2014 | | | |
Legacy Ranch Alzheimer's Special Care Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 917 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 9,982 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 917 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 9,982 | | | |
Total | [1] | 10,899 | | | |
Accumulated Depreciation | [1] | $ (483) | | | |
Date of construction | [1] | 2,012 | | | |
Date Acquired | [1] | Mar. 28, 2014 | | | |
The Springs Alzheimer's Special Care Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 595 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 9,658 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 595 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 9,658 | | | |
Total | [1] | 10,253 | | | |
Accumulated Depreciation | [1] | $ (467) | | | |
Date of construction | [1] | 2,012 | | | |
Date Acquired | [1] | Mar. 28, 2014 | | | |
Isle at Watercrest - Bryan | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 714 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 18,140 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 4 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 6 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 718 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 18,146 | | | |
Total | [1] | 18,864 | | | |
Accumulated Depreciation | [1] | $ (809) | | | |
Date of construction | [1] | 2,011 | | | |
Date Acquired | [1] | Apr. 21, 2014 | | | |
Watercrest at Bryan | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,509 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 22,441 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 4 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 14 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,513 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 22,455 | | | |
Total | [1] | 24,968 | | | |
Accumulated Depreciation | [1] | $ (1,084) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Apr. 21, 2014 | | | |
Isle at Watercrest - Mansfield | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 997 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 24,635 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 997 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 24,635 | | | |
Total | [1] | 25,632 | | | |
Accumulated Depreciation | [1] | $ (1,090) | | | |
Date of construction | [1] | 2,011 | | | |
Date Acquired | [1] | May 5, 2014 | | | |
Houston Orthopedic & Spine Hospital | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 31,480 | | | |
Initial Costs, Land & Land Improvements | [1] | 3,867 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 32,761 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,867 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 32,761 | | | |
Total | [1] | 36,628 | | | |
Accumulated Depreciation | [1] | $ (1,353) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Jun. 2, 2014 | | | |
Houston Orthopedic & Spine Hospital Medical Office Building | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 17,348 | | | |
Initial Costs, Land & Land Improvements | [1] | 3,738 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 20,525 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 170 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,738 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 20,695 | | | |
Total | [1] | 24,433 | | | |
Accumulated Depreciation | [1] | $ (859) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Jun. 2, 2014 | | | |
Watercrest at Katy (Katy, Texas) | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 10,632 | | | |
Initial Costs, Land & Land Improvements | [1] | 4,000 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 22,565 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 4,000 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 22,565 | | | |
Total | [1] | $ 26,565 | | | |
Date Acquired | [1] | Jun. 27, 2014 | | | |
Watercrest at Mansfield | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 26,628 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,191 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 42,740 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 56 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,191 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 42,796 | | | |
Total | [1] | 44,987 | | | |
Accumulated Depreciation | [1] | $ (1,718) | | | |
Date of construction | [1] | 2,010 | | | |
Date Acquired | [1] | Jun. 30, 2014 | | | |
HarborChase Of Shorewood (Shorewood, WI) | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,469 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,200 | | | |
Costs Capitalized Subsequent to Acquisition, Land and Improvements | [1] | 294 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 19,805 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,494 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,805 | | | |
Total | [1] | 22,299 | | | |
Accumulated Depreciation | [1] | $ (44) | | | |
Date Acquired | [1] | Jul. 8, 2014 | | | |
Oklahoma City Inpatient Rehabilitation Hospital | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 16,203 | | | |
Initial Costs, Land & Land Improvements | [1] | 3,341 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 19,249 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,341 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,249 | | | |
Total | [1] | 22,590 | | | |
Accumulated Depreciation | [1] | $ (814) | | | |
Date of construction | [1] | 2,012 | | | |
Date Acquired | [1] | Jul. 15, 2014 | | | |
Las Vegas Inpatient Rehabilitation Hospital | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 14,163 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,650 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,979 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,650 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,979 | | | |
Total | [1] | 19,629 | | | |
Accumulated Depreciation | [1] | $ (726) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Jul. 15, 2014 | | | |
South Bend Inpatient Rehabilitation Hospital | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,860 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,339 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 16,239 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,339 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 16,239 | | | |
Total | [1] | 18,578 | | | |
Accumulated Depreciation | [1] | $ (703) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Jul. 15, 2014 | | | |
Beaumont Specialty Hospital | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 21,347 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,749 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 28,863 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,749 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 28,863 | | | |
Total | [1] | 31,612 | | | |
Accumulated Depreciation | [1] | $ (1,102) | | | |
Date of construction | [1] | 2,013 | | | |
Date Acquired | [1] | Aug. 15, 2014 | | | |
Hurst Specialty Hospital | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 18,722 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,510 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 24,091 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,510 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 24,091 | | | |
Total | [1] | 26,601 | | | |
Accumulated Depreciation | [1] | $ (921) | | | |
Date Acquired | [1] | Aug. 15, 2014 | | | |
Hurst Specialty Hospital One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,004 | | | |
Hurst Specialty Hospital Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,012 | | | |
Claremont Medical Office | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,683 | | | |
Initial Costs, Land & Land Improvements | [1] | 6,324 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 13,533 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 6,324 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 13,533 | | | |
Total | [1] | 19,857 | | | |
Accumulated Depreciation | [1] | $ (532) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Aug. 29, 2014 | | | |
Lee Hughes Medical Building | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 18,632 | | | |
Initial Costs, Land & Land Improvements | [1] | 69 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 22,967 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 17 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 69 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 22,984 | | | |
Total | [1] | 23,053 | | | |
Accumulated Depreciation | [1] | $ (743) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Sep. 29, 2014 | | | |
Newburyport Medical Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,614 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,135 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,614 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,135 | | | |
Total | [1] | 14,749 | | | |
Accumulated Depreciation | [1] | $ (432) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Oct. 31, 2014 | | | |
Northwest Medical Park | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,008 | | | |
Initial Costs, Land & Land Improvements | [1] | 610 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 6,170 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 610 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 6,170 | | | |
Total | [1] | 6,780 | | | |
Accumulated Depreciation | [1] | $ (232) | | | |
Date of construction | [1] | 2,004 | | | |
Date Acquired | [1] | Oct. 31, 2014 | | | |
Fairfield Village of Layton | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 5,217 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 54,167 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 5 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 5,217 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 54,172 | | | |
Total | [1] | 59,389 | | | |
Accumulated Depreciation | [1] | $ (1,667) | | | |
Date of construction | [1] | 2,010 | | | |
Date Acquired | [1] | Nov. 20, 2014 | | | |
ProMed Medical Building I | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,050 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,486 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 6,728 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,486 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 6,728 | | | |
Total | [1] | 9,214 | | | |
Accumulated Depreciation | [1] | $ (201) | | | |
Date of construction | [1] | 2,006 | | | |
Date Acquired | [1] | Dec. 19, 2014 | | | |
Midtown Medical Plaza | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 29,378 | | | |
Initial Costs, Land & Land Improvements | [1] | 10 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 51,237 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 3 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 10 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 51,240 | | | |
Total | [1] | 51,250 | | | |
Accumulated Depreciation | [1] | $ (1,314) | | | |
Date of construction | [1] | 1,994 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Presbyterian Medical Tower | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 19,528 | | | |
Initial Costs, Land & Land Improvements | [1] | 40 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 32,345 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 40 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 32,345 | | | |
Total | [1] | 32,385 | | | |
Accumulated Depreciation | [1] | $ (832) | | | |
Date of construction | [1] | 1,989 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Metroview Professional Building | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 9,276 | | | |
Initial Costs, Land & Land Improvements | [1] | 11 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 15,910 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 11 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 15,910 | | | |
Total | [1] | 15,921 | | | |
Accumulated Depreciation | [1] | $ (409) | | | |
Date of construction | [1] | 1,971 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Physicians Plaza Huntersville | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 16,306 | | | |
Initial Costs, Land & Land Improvements | [1] | 520 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 26,134 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 520 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 26,134 | | | |
Total | [1] | 26,654 | | | |
Accumulated Depreciation | [1] | $ (705) | | | |
Date of construction | [1] | 2,004 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Matthews Medical Office Building | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 11,441 | | | |
Initial Costs, Land & Land Improvements | [1] | 350 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 19,624 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 350 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,624 | | | |
Total | [1] | 19,974 | | | |
Accumulated Depreciation | [1] | $ (527) | | | |
Date of construction | [1] | 1,994 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Outpatient Care Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 10,690 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,169 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,079 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,169 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,079 | | | |
Total | [1] | 13,248 | | | |
Accumulated Depreciation | [1] | $ (317) | | | |
Date of construction | [1] | 2,012 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Clyde, NC ("Asheville") 330 Physicians Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 19,901 | | | |
Initial Costs, Land & Land Improvements | [1] | 12 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 26,868 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 12 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 26,868 | | | |
Total | [1] | 26,880 | | | |
Accumulated Depreciation | [1] | $ (690) | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Clyde, NC ("Asheville") 330 Physicians Center one | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 1,987 | | | |
Clyde, NC ("Asheville") 330 Physicians Center Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,005 | | | |
Spivey Station Physicians Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 9,735 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,026 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,246 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,026 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,246 | | | |
Total | [1] | 13,272 | | | |
Accumulated Depreciation | [1] | $ (345) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Spivey Station ASC Building | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 12,448 | | | |
Initial Costs, Land & Land Improvements | [1] | 929 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 13,769 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 929 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 13,769 | | | |
Total | [1] | 14,698 | | | |
Accumulated Depreciation | [1] | $ (381) | | | |
Date of construction | [1] | 2,009 | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | |
Novi Orthopaedic Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 19,825 | | | |
Initial Costs, Land & Land Improvements | [1] | 1,314 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 26,239 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,314 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 26,239 | | | |
Total | [1] | 27,553 | | | |
Accumulated Depreciation | [1] | $ (697) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Feb. 13, 2015 | | | |
UT Cancer Institute Building | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 21,503 | | | |
Initial Costs, Land & Land Improvements | [1] | 421 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 27,621 | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 3 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 421 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 27,624 | | | |
Total | [1] | 28,045 | | | |
Accumulated Depreciation | [1] | $ (614) | | | |
Date of construction | [1] | 2,012 | | | |
Date Acquired | [1] | Feb. 20, 2015 | | | |
Fieldstone Memory Care | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,297 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 9,965 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,297 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 9,965 | | | |
Total | [1] | 11,262 | | | |
Accumulated Depreciation | [1] | $ (212) | | | |
Date of construction | [1] | 2,014 | | | |
Date Acquired | [1] | Feb. 13, 2015 | | | |
Bend Memorial Clinic MOB | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 9,069 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 19,867 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 9,069 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,867 | | | |
Total | [1] | 28,936 | | | |
Accumulated Depreciation | [1] | $ (410) | | | |
Date of construction | [1] | 1,976 | | | |
Date Acquired | [1] | May 11, 2015 | | | |
Stoneterra Medical Plaza | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,864 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,412 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,864 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,412 | | | |
Total | [1] | 13,276 | | | |
Accumulated Depreciation | [1] | $ (175) | | | |
Date of construction | [1] | 2,006 | | | |
Date Acquired | [1] | May 29, 2015 | | | |
Primrose Retirement Center of Anderson | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,342 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 19,083 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,342 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,083 | | | |
Total | [1] | 20,425 | | | |
Accumulated Depreciation | [1] | $ (314) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | May 29, 2015 | | | |
Primrose Retirement Center of Lancaster | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,840 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 21,884 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,840 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 21,884 | | | |
Total | [1] | 24,724 | | | |
Accumulated Depreciation | [1] | $ (397) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | May 29, 2015 | | | |
Primrose Retirement Center of Wausau | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,089 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 18,653 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,089 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 18,653 | | | |
Total | [1] | 19,742 | | | |
Accumulated Depreciation | [1] | $ (295) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | May 29, 2015 | | | |
Triangle Orthopaedic Durham | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,191 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 14,523 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,191 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 14,523 | | | |
Total | [1] | 17,714 | | | |
Accumulated Depreciation | [1] | $ (210) | | | |
Date of construction | [1] | 2,000 | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | |
Triangle Orthopaedic Roxboro | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 287 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 1,406 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 287 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 1,406 | | | |
Total | [1] | 1,693 | | | |
Accumulated Depreciation | [1] | $ (22) | | | |
Date of construction | [1] | 2,000 | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | |
Triangle Orthopaedic Chapel Hill | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 360 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 2,306 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 360 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 2,306 | | | |
Total | [1] | 2,666 | | | |
Accumulated Depreciation | [1] | $ (33) | | | |
Date of construction | [1] | 2,011 | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | |
Triangle Orthopaedic Oxford | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 658 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 3,074 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 658 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 3,074 | | | |
Total | [1] | 3,732 | | | |
Accumulated Depreciation | [1] | $ (48) | | | |
Date of construction | [1] | 2,011 | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | |
North Carolina Specialty Hospital | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,173 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 22,762 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,173 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 22,762 | | | |
Total | [1] | 25,935 | | | |
Accumulated Depreciation | [1] | $ (315) | | | |
Date of construction | [1] | 2,004 | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | |
Doctor's Park Building B | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,161 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 2,919 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,161 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 2,919 | | | |
Total | [1] | 4,080 | | | |
Accumulated Depreciation | [1] | $ (43) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Jun. 30, 2015 | | | |
Doctor's Park Building C | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,323 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 6,351 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,323 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 6,351 | | | |
Total | [1] | 8,674 | | | |
Accumulated Depreciation | [1] | $ (92) | | | |
Date of construction | [1] | 2,006 | | | |
Date Acquired | [1] | Jun. 30, 2015 | | | |
Superior Residences of Panama City | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,099 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 19,367 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,099 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 19,367 | | | |
Total | [1] | 21,466 | | | |
Accumulated Depreciation | [1] | $ (273) | | | |
Date of construction | [1] | 2,015 | | | |
Date Acquired | [1] | Jul. 15, 2015 | | | |
540 New Waverly Place | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | [1] | $ 7,048 | | | |
Initial Costs, Land & Land Improvements | [1] | 2,476 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 11,009 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,476 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 11,009 | | | |
Total | [1] | 13,485 | | | |
Accumulated Depreciation | [1] | $ (136) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Jul. 20, 2015 | | | |
MedHelp | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,270 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 10,359 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,270 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 10,359 | | | |
Total | [1] | 12,629 | | | |
Accumulated Depreciation | [1] | $ (119) | | | |
Date of construction | [1] | 2,015 | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
Patriot Professional Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,912 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 11,781 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,912 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 11,781 | | | |
Total | [1] | 15,693 | | | |
Accumulated Depreciation | [1] | $ (146) | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
Patriot Professional Center One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,006 | | | |
Patriot Professional Center Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,014 | | | |
Liberty Professional Center | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,977 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 4,462 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,977 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 4,462 | | | |
Total | [1] | 6,439 | | | |
Accumulated Depreciation | [1] | $ (54) | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
Liberty Professional Center One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 1,979 | | | |
Liberty Professional Center Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,013 | | | |
The Hampton at Meadows Place | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 715 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 24,281 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 715 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 24,281 | | | |
Total | [1] | 24,996 | | | |
Accumulated Depreciation | [1] | $ (263) | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
The Hampton at Meadows Place One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,007 | | | |
The Hampton at Meadows Place Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,013 | | | |
The Hampton at Meadows Place Three | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,014 | | | |
The Pavilion at Great Hills | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,783 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 29,318 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,783 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 29,318 | | | |
Total | [1] | 31,101 | | | |
Accumulated Depreciation | [1] | $ (321) | | | |
Date of construction | [1] | 2,010 | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
The Beacon at Gulf Breeze | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 824 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 24,106 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 824 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 24,106 | | | |
Total | [1] | 24,930 | | | |
Accumulated Depreciation | [1] | $ (273) | | | |
Date of construction | [1] | 2,008 | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
Parc at Piedmont | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,529 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 43,080 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,529 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 43,080 | | | |
Total | [1] | 46,609 | | | |
Accumulated Depreciation | [1] | $ (489) | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
Parc at Piedmont One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,001 | | | |
Parc at Piedmont Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,011 | | | |
Parc at Duluth | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 5,951 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 42,458 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 5,951 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 42,458 | | | |
Total | [1] | 48,409 | | | |
Accumulated Depreciation | [1] | $ (481) | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | |
Parc at Duluth One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,003 | | | |
Parc at Duluth Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,012 | | | |
Broadway Medical Plaza 1 | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 437 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 9,281 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 437 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 9,281 | | | |
Total | [1] | 9,718 | | | |
Accumulated Depreciation | [1] | $ (89) | | | |
Date of construction | [1] | 1,994 | | | |
Date Acquired | [1] | Aug. 21, 2015 | | | |
Broadway Medical Plaza 2 | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 386 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,460 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 386 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,460 | | | |
Total | [1] | 12,846 | | | |
Accumulated Depreciation | [1] | $ (115) | | | |
Date of construction | [1] | 1,999 | | | |
Date Acquired | [1] | Aug. 21, 2015 | | | |
Broadway Medical Plaza 4 | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 170 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 12,118 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 170 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 12,118 | | | |
Total | [1] | 12,288 | | | |
Accumulated Depreciation | [1] | $ (107) | | | |
Date of construction | [1] | 2,007 | | | |
Date Acquired | [1] | Aug. 21, 2015 | | | |
Waterstone | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,253 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 4,932 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,253 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 4,932 | | | |
Total | [1] | $ 7,185 | | | |
Date Acquired | [1] | Aug. 31, 2015 | | | |
Welbrook Senior Living Grand Junction (Grand Junction, CO) | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,050 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 2,148 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,050 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 2,148 | | | |
Total | [1] | $ 3,198 | | | |
Date Acquired | [1] | Sep. 4, 2015 | | | |
Wellmore of Lexington (Lexington, SC) | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,300 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 6,423 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,300 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 6,423 | | | |
Total | [1] | $ 8,723 | | | |
Date Acquired | [1] | Sep. 14, 2015 | | | |
Palmilla Senior Living | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 4,701 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 38,321 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 4,701 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 38,321 | | | |
Total | [1] | 43,022 | | | |
Accumulated Depreciation | [1] | $ (261) | | | |
Date of construction | [1] | 2,013 | | | |
Date Acquired | [1] | Sep. 30, 2015 | | | |
Cedar Lake Assisted Living and Memory Care | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,412 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 25,126 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,412 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 25,126 | | | |
Total | [1] | 27,538 | | | |
Accumulated Depreciation | [1] | $ (171) | | | |
Date of construction | [1] | 2,014 | | | |
Date Acquired | [1] | Sep. 30, 2015 | | | |
Fieldstone at Pear Orchard (Yakima, Washington) | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,035 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 1,571 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,035 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 1,571 | | | |
Total | [1] | $ 2,606 | | | |
Date Acquired | [1] | Oct. 12, 2015 | | | |
The Shores of Lake Phalen | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,724 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 25,093 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,724 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 25,093 | | | |
Total | [1] | 27,817 | | | |
Accumulated Depreciation | [1] | $ (113) | | | |
Date of construction | [1] | 2,012 | | | |
Date Acquired | [1] | Nov. 10, 2015 | | | |
Dogwood Forest of Grayson | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,788 | | | |
Costs Capitalized Subsequent to Acquisition, Construction in Process | [1] | 2,185 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,788 | | | |
Gross Amounts at which Carried at Close of period, Construction in Process | [1] | 2,185 | | | |
Total | [1] | $ 3,973 | | | |
Date Acquired | [1] | Nov. 24, 2015 | | | |
Center One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 8,294 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 21,756 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 8,294 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 21,756 | | | |
Total | [1] | $ 30,050 | | | |
Date of construction | [1] | 2,006 | | | |
Date Acquired | [1] | Nov. 30, 2015 | | | |
Red Bank Professional Office Building | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,721 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 7,721 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,721 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 7,721 | | | |
Total | [1] | 9,442 | | | |
Accumulated Depreciation | [1] | $ (18) | | | |
Date of construction | [1] | 2,001 | | | |
Date Acquired | [1] | Dec. 14, 2015 | | | |
Park Place Senior Living at WingHaven | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,283 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 48,221 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,283 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 48,221 | | | |
Total | [1] | $ 49,504 | | | |
Date Acquired | [1] | Dec. 17, 2015 | | | |
Park Place Senior Living at WingHaven One | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,006 | | | |
Park Place Senior Living at WingHaven Two | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Date of construction | | 2,014 | | | |
Siena Pavilion IV | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,454 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 4,786 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,454 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 4,786 | | | |
Total | [1] | $ 6,240 | | | |
Date of construction | [1] | 2,002 | | | |
Date Acquired | [1] | Dec. 18, 2015 | | | |
Siena Pavilion V | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,944 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 20,355 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 3,944 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 20,355 | | | |
Total | [1] | $ 24,299 | | | |
Date of construction | [1] | 2,003 | | | |
Date Acquired | [1] | Dec. 18, 2015 | | | |
Siena Pavilion VI | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,599 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 18,725 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,599 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 18,725 | | | |
Total | [1] | $ 21,324 | | | |
Date of construction | [1] | 2,005 | | | |
Date Acquired | [1] | Dec. 18, 2015 | | | |
Hearthside Senior Living of Collierville | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,905 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 13,379 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 1,905 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 13,379 | | | |
Total | [1] | $ 15,284 | | | |
Date of construction | [1] | 2,014 | | | |
Date Acquired | [1] | Dec. 29, 2015 | | | |
Cobalt Rehabilitation Hospital Surprise | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,464 | | | |
Initial Costs, Buildings & Building Improvements | [1] | 17,983 | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1] | 2,464 | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1] | 17,983 | | | |
Total | [1] | $ 20,447 | | | |
Date of construction | [1] | 2,015 | | | |
Date Acquired | [1] | Dec. 30, 2015 | | | |
| |
[1] | Buildings and building improvements are depreciated over 39 and 15 years, respectively. Tenant improvements are depreciated over the terms of their respective leases. | |
[2] | Land and land improvements, initial cost, include the purchase price of land under development which is included as a component of construction in process in the consolidated balance sheets. As of December 31, 2015 these properties were under development; therefore, depreciation is not applicable. | |