Schedule III-Real Estate And Accumulated Depreciation (Detail) - USD ($) $ in Thousands | 12 Months Ended | | | |
Dec. 31, 2017 | Dec. 31, 2016 | Dec. 31, 2015 | Dec. 31, 2014 |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 1,038,767 | | | | |
Initial Costs, Land & Land Improvements | [1] | 241,227 | | | | |
Initial Costs, Building and Building Improvements | [1] | 2,235,690 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 13,345 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 231,543 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 254,572 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 2,467,233 | | | | |
Total | | 2,721,805 | [1],[2] | $ 2,692,074 | $ 2,588,903 | $ 1,721,429 |
Accumulated Depreciation | | (219,457) | [1] | $ (153,124) | $ (90,201) | $ (40,467) |
Primrose Retirement Community Casper, Wyoming | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | 11,535 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,910 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,310 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 30 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 296 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,940 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,606 | | | | |
Total | [1],[2] | 18,546 | | | | |
Accumulated Depreciation | [1] | $ (2,552) | | | | |
Date of construction | [1] | 2,004 | | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | | |
Primrose Retirement Community Of Grand Island | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 8,137 | | | | |
Initial Costs, Land & Land Improvements | [1] | 719 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,140 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 35 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 754 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,140 | | | | |
Total | [1],[2] | 12,894 | | | | |
Accumulated Depreciation | [1] | $ (1,957) | | | | |
Date of construction | [1] | 2,005 | | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | | |
Primrose Retirement Community Mansfield, Ohio | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 11,071 | | | | |
Initial Costs, Land & Land Improvements | [1] | 650 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,720 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 229 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 71 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 879 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,791 | | | | |
Total | [1],[2] | 17,670 | | | | |
Accumulated Depreciation | [1] | $ (2,706) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | | |
Primrose Retirement Community Marion, Ohio | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 9,183 | | | | |
Initial Costs, Land & Land Improvements | [1] | 889 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,305 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 889 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,305 | | | | |
Total | [1],[2] | 17,194 | | | | |
Accumulated Depreciation | [1] | $ (2,595) | | | | |
Date of construction | [1] | 2,006 | | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | | |
Sweetwater Retirement Community Billings Montana | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 9,973 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,578 | | | | |
Initial Costs, Building and Building Improvements | [1] | 14,205 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 19 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,597 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 14,205 | | | | |
Total | [1],[2] | 15,802 | | | | |
Accumulated Depreciation | [1] | $ (2,205) | | | | |
Date of construction | [1] | 2,006 | | | | |
Date Acquired | [1] | Feb. 16, 2012 | | | | |
HarborChase Community Lady Lake, Florida | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,165 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 986 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 15,424 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,151 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 15,424 | | | | |
Total | [1],[2] | 18,575 | | | | |
Accumulated Depreciation | [1] | $ (1,685) | | | | |
Date of construction | [1] | 2,013 | | | | |
Date Acquired | [1] | Aug. 29, 2012 | | | | |
Primrose Retirement Community Aberdeen, South Dakota | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 311 | | | | |
Initial Costs, Building and Building Improvements | [1] | 3,794 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 311 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 3,794 | | | | |
Total | [1],[2] | 4,105 | | | | |
Accumulated Depreciation | [1] | $ (526) | | | | |
Date of construction | [1] | 2,005 | | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | | |
Primrose Retirement Community Council Bluffs, Iowa | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,144 | | | | |
Initial Costs, Building and Building Improvements | [1] | 11,117 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 5 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,149 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 11,117 | | | | |
Total | [1],[2] | 12,266 | | | | |
Accumulated Depreciation | [1] | $ (1,585) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | | |
Primrose Retirement Community Decatur, Illinois | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 10,120 | | | | |
Initial Costs, Land & Land Improvements | [1] | 513 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,706 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 154 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 513 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,860 | | | | |
Total | [1],[2] | 17,373 | | | | |
Accumulated Depreciation | [1] | $ (2,287) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | | |
Primrose Retirement Community Lima, Ohio | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 944 | | | | |
Initial Costs, Building and Building Improvements | [1] | 17,115 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 8 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 4 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 952 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 17,119 | | | | |
Total | [1],[2] | 18,071 | | | | |
Accumulated Depreciation | [1] | $ (2,330) | | | | |
Date of construction | [1] | 2,006 | | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | | |
Primrose Retirement Community Zanesville, Ohio | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 11,421 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,184 | | | | |
Initial Costs, Building and Building Improvements | [1] | 17,292 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 67 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,184 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 17,359 | | | | |
Total | [1],[2] | 18,543 | | | | |
Accumulated Depreciation | [1] | $ (2,362) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Dec. 19, 2012 | | | | |
Capital Health of Symphony Manor Baltimore, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 14,697 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,319 | | | | |
Initial Costs, Building and Building Improvements | [1] | 19,444 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 79 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,319 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,523 | | | | |
Total | [1],[2] | 21,842 | | | | |
Accumulated Depreciation | [1] | $ (2,614) | | | | |
Date of construction | [1] | 2,011 | | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | | |
Curry House Assisted Living & Memory Care Cadillac, Michigan | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 7,743 | | | | |
Initial Costs, Land & Land Improvements | [1] | 995 | | | | |
Initial Costs, Building and Building Improvements | [1] | 11,072 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 8 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,003 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 11,072 | | | | |
Total | [1],[2] | 12,075 | | | | |
Accumulated Depreciation | [1] | $ (1,503) | | | | |
Date of construction | [1] | 1,966 | | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | | |
Tranquillity at Fredericktowne, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 20,501 | | | | |
Initial Costs, Land & Land Improvements | [1] | 808 | | | | |
Initial Costs, Building and Building Improvements | [1] | 14,291 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 5,747 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 808 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 20,038 | | | | |
Total | [1],[2] | 20,846 | | | | |
Accumulated Depreciation | [1] | $ (1,918) | | | | |
Date of construction | [1] | 2,000 | | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | | |
Brookridge Heights Assisted Living and Memory Care Marquette, Michigan | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 13,039 | | | | |
Initial Costs, Land & Land Improvements | [1] | 595 | | | | |
Initial Costs, Building and Building Improvements | [1] | 11,339 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 4,674 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 595 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,013 | | | | |
Total | [1],[2] | 16,608 | | | | |
Accumulated Depreciation | [1] | $ (1,672) | | | | |
Date of construction | [1] | 1,998 | | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | | |
Woodholme Gardens Assisted Living and Memory Care Pikesville, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 6,788 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,603 | | | | |
Initial Costs, Building and Building Improvements | [1] | 13,472 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 54 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,657 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 13,472 | | | | |
Total | [1],[2] | 15,129 | | | | |
Accumulated Depreciation | [1] | $ (1,826) | | | | |
Date of construction | [1] | 2,010 | | | | |
Date Acquired | [1] | Dec. 21, 2012 | | | | |
Batesville Healthcare Center Batesville, Arkansas | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 397 | | | | |
Initial Costs, Building and Building Improvements | [1] | 5,382 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 113 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 75 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 510 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 5,457 | | | | |
Total | [1],[2] | 5,967 | | | | |
Accumulated Depreciation | [1] | $ (598) | | | | |
Date of construction | [1] | 1,975 | | | | |
Date Acquired | [1] | May 31, 2013 | | | | |
Broadway Healthcare Center West Memphis, Arkansas | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 438 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,560 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 77 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 438 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,637 | | | | |
Total | [1],[2] | 11,075 | | | | |
Accumulated Depreciation | [1] | $ (1,189) | | | | |
Date of construction | [1] | 1,994 | | | | |
Date Acquired | [1] | May 31, 2013 | | | | |
Jonesboro Healthcare Center Jonesboro, Arkansas | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 527 | | | | |
Initial Costs, Building and Building Improvements | [1] | 13,493 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 5 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 527 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 13,498 | | | | |
Total | [1],[2] | 14,025 | | | | |
Accumulated Depreciation | [1] | $ (1,494) | | | | |
Date of construction | [1] | 2,012 | | | | |
Date Acquired | [1] | May 31, 2013 | | | | |
Magnolia Healthcare Center Magnolia, Arkansas | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 421 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,454 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 421 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,454 | | | | |
Total | [1],[2] | 10,875 | | | | |
Accumulated Depreciation | [1] | $ (1,177) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | May 31, 2013 | | | | |
Mine Creek Healthcare Center Nashville, Arkansas | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 135 | | | | |
Initial Costs, Building and Building Improvements | [1] | 2,942 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 11 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 36 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 146 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 2,978 | | | | |
Total | [1],[2] | 3,124 | | | | |
Accumulated Depreciation | [1] | $ (347) | | | | |
Date of construction | [1] | 1,978 | | | | |
Date Acquired | [1] | May 31, 2013 | | | | |
Searcy Healthcare Center Searcy, Arkansas | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 648 | | | | |
Initial Costs, Building and Building Improvements | [1] | 6,017 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 222 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 648 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 6,239 | | | | |
Total | [1],[2] | 6,887 | | | | |
Accumulated Depreciation | [1] | $ (710) | | | | |
Date of construction | [1] | 1,973 | | | | |
Date Acquired | [1] | May 31, 2013 | | | | |
LaPorte Cancer Center Westville, Indiana | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 7,571 | | | | |
Initial Costs, Land & Land Improvements | [1] | 433 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,846 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 96 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 529 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,846 | | | | |
Total | [1],[2] | 11,375 | | | | |
Accumulated Depreciation | [1] | $ (1,330) | | | | |
Date of construction | [1] | 2,010 | | | | |
Date Acquired | [1] | Jun. 14, 2013 | | | | |
Jefferson Medical Commons Jefferson City, Tennessee | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 8,354 | | | | |
Initial Costs, Land & Land Improvements | [1] | 151 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,236 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 195 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 151 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,431 | | | | |
Total | [1],[2] | 10,582 | | | | |
Accumulated Depreciation | [1] | $ (1,226) | | | | |
Date of construction | [1] | 2,001 | | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | | |
Physicians Plaza A at North Knoxville Medical Center Powell, Tennessee | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 13,673 | | | | |
Initial Costs, Land & Land Improvements | [1] | 262 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,976 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 29 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 262 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 17,005 | | | | |
Total | [1],[2] | 17,267 | | | | |
Accumulated Depreciation | [1] | $ (2,037) | | | | |
Date of construction | [1] | 2,005 | | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | | |
Physicians Plaza B at North Knoxville Medical Center Powell, Tennessee | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 16,614 | | | | |
Initial Costs, Land & Land Improvements | [1] | 303 | | | | |
Initial Costs, Building and Building Improvements | [1] | 18,754 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 318 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 303 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,072 | | | | |
Total | [1],[2] | 19,375 | | | | |
Accumulated Depreciation | [1] | $ (2,261) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | | |
Physicians Regional Medical Center - Central Wing Annex Knoxville, Tennessee | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 4,067 | | | | |
Initial Costs, Land & Land Improvements | [1] | 73 | | | | |
Initial Costs, Building and Building Improvements | [1] | 5,285 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 73 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 5,285 | | | | |
Total | [1],[2] | 5,358 | | | | |
Accumulated Depreciation | [1] | $ (632) | | | | |
Date of construction | [1] | 2,004 | | | | |
Date Acquired | [1] | Jul. 10, 2013 | | | | |
HarborChase of Jasper Jasper, Alabama | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 355 | | | | |
Initial Costs, Building and Building Improvements | [1] | 6,358 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 36 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 355 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 6,394 | | | | |
Total | [1],[2] | 6,749 | | | | |
Accumulated Depreciation | [1] | $ (747) | | | | |
Date of construction | [1] | 1,998 | | | | |
Date Acquired | [1] | Jul. 31, 2013 | | | | |
Chestnut Commons MOB Elyria, Ohio | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,053 | | | | |
Initial Costs, Building and Building Improvements | [1] | 15,650 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 59 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,112 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 15,650 | | | | |
Total | [1],[2] | 17,762 | | | | |
Accumulated Depreciation | [1] | $ (2,003) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | | |
Doctor's Specialty Hospital Leawood, Kansas | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 924 | | | | |
Initial Costs, Building and Building Improvements | [1] | 5,771 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 63 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 987 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 5,771 | | | | |
Total | [1],[2] | 6,758 | | | | |
Accumulated Depreciation | [1] | $ (716) | | | | |
Date of construction | [1] | 2,001 | | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | | |
Escondido Medical Arts Center Escondido, California | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,863 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,199 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,863 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,222 | | | | |
Total | [1],[2] | 14,085 | | | | |
Accumulated Depreciation | [1] | $ (1,402) | | | | |
Date of construction | [1] | 1,994 | | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | | |
John C. Lincoln Medical Office Plaza I Phoenix, Arizona | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 233 | | | | |
Initial Costs, Building and Building Improvements | [1] | 2,779 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 96 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 233 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 2,875 | | | | |
Total | [1],[2] | 3,108 | | | | |
Accumulated Depreciation | [1] | $ (394) | | | | |
Date of construction | [1] | 1,980 | | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | | |
John C. Lincoln Medical Office Plaza II Phoenix, Arizona | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 138 | | | | |
Initial Costs, Building and Building Improvements | [1] | 1,908 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 66 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 138 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 1,974 | | | | |
Total | [1],[2] | 2,112 | | | | |
Accumulated Depreciation | [1] | $ (234) | | | | |
Date of construction | [1] | 1,984 | | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | | |
North Mountain Medical Plaza Phoenix, Arizona | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 297 | | | | |
Initial Costs, Building and Building Improvements | [1] | 4,079 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 168 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 297 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 4,247 | | | | |
Total | [1],[2] | 4,544 | | | | |
Accumulated Depreciation | [1] | $ (541) | | | | |
Date of construction | [1] | 1,994 | | | | |
Date Acquired | [1] | Aug. 16, 2013 | | | | |
Raider Ranch Development (Lubbock, TX) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 4,992 | | | | |
Initial Costs, Building and Building Improvements | [1] | 48,818 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 481 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 12,077 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 5,473 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 60,895 | | | | |
Total | [1],[2] | 66,368 | | | | |
Accumulated Depreciation | [1] | $ (6,256) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Aug. 29, 2013 | | | | |
Town Village Oklahoma City, Oklahoma | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,020 | | | | |
Initial Costs, Building and Building Improvements | [1] | 19,847 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 76 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 1,271 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,096 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 21,118 | | | | |
Total | [1],[2] | 22,214 | | | | |
Accumulated Depreciation | [1] | $ (2,348) | | | | |
Date of construction | [1] | 2,004 | | | | |
Date Acquired | [1] | Aug. 29, 2013 | | | | |
Calvert Medical Arts Center Prince Frederick, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 12,030 | | | | |
Initial Costs, Land & Land Improvements | [1] | 20 | | | | |
Initial Costs, Building and Building Improvements | [1] | 17,838 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 1 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 86 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 21 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 17,924 | | | | |
Total | [1],[2] | 17,945 | | | | |
Accumulated Depreciation | [1] | $ (2,004) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Aug. 30, 2013 | | | | |
Calvert MOBs I, II, III Prince Frederick, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 10,217 | | | | |
Initial Costs, Land & Land Improvements | [1] | 51 | | | | |
Initial Costs, Building and Building Improvements | [1] | 14,334 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 286 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 51 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 14,620 | | | | |
Total | [1],[2] | 14,671 | | | | |
Accumulated Depreciation | [1] | $ (1,667) | | | | |
Date Acquired | [1] | Aug. 30, 2013 | | | | |
Calvert Medical Office Building I Prince Frederick, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 1,991 | | | | |
Calvert Medical Office Building II Prince Frederick, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 1,999 | | | | |
Calvert Medical Office Building III Prince Frederick, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,000 | | | | |
Dunkirk Medical Center Dunkirk, Maryland | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 2,875 | | | | |
Initial Costs, Land & Land Improvements | [1] | 351 | | | | |
Initial Costs, Building and Building Improvements | [1] | 2,991 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 20 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 25 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 371 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 3,016 | | | | |
Total | [1],[2] | 3,387 | | | | |
Accumulated Depreciation | [1] | $ (441) | | | | |
Date of construction | [1] | 1,997 | | | | |
Date Acquired | [1] | Aug. 30, 2013 | | | | |
Prestige Senior Living Beaverton Hills | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 9,010 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,387 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,324 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,387 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,324 | | | | |
Total | [1],[2] | 11,711 | | | | |
Accumulated Depreciation | [1] | $ (1,135) | | | | |
Date of construction | [1] | 2,000 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Prestige Senior Living High Desert | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 7,887 | | | | |
Initial Costs, Land & Land Improvements | [1] | 835 | | | | |
Initial Costs, Building and Building Improvements | [1] | 11,252 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 13 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 848 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 11,252 | | | | |
Total | [1],[2] | 12,100 | | | | |
Accumulated Depreciation | [1] | $ (1,286) | | | | |
Date of construction | [1] | 2,003 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
MorningStar of Billings | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 19,732 | | | | |
Initial Costs, Land & Land Improvements | [1] | 4,067 | | | | |
Initial Costs, Building and Building Improvements | [1] | 41,373 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 17 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 80 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 4,084 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 41,453 | | | | |
Total | [1],[2] | 45,537 | | | | |
Accumulated Depreciation | [1] | $ (4,793) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
MorningStar of Boise | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 21,142 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,663 | | | | |
Initial Costs, Building and Building Improvements | [1] | 35,752 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 12 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 80 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,675 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 35,832 | | | | |
Total | [1],[2] | 37,507 | | | | |
Accumulated Depreciation | [1] | $ (3,904) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Prestige Senior Living Huntington Terrace | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 10,107 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,236 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,083 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 2 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 45 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,238 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,128 | | | | |
Total | [1],[2] | 13,366 | | | | |
Accumulated Depreciation | [1] | $ (1,350) | | | | |
Date of construction | [1] | 2,000 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
MorningStar of Idaho Falls | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 17,617 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,006 | | | | |
Initial Costs, Building and Building Improvements | [1] | 40,397 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 5 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 159 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,011 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 40,556 | | | | |
Total | [1],[2] | 42,567 | | | | |
Accumulated Depreciation | [1] | $ (4,506) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Prestige Senior Living Arbor Place | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 8,306 | | | | |
Initial Costs, Land & Land Improvements | [1] | 355 | | | | |
Initial Costs, Building and Building Improvements | [1] | 14,083 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 355 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 14,083 | | | | |
Total | [1],[2] | 14,438 | | | | |
Accumulated Depreciation | [1] | $ (1,532) | | | | |
Date of construction | [1] | 2,003 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Prestige Senior Living Orchard Heights | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 12,122 | | | | |
Initial Costs, Land & Land Improvements | [1] | 545 | | | | |
Initial Costs, Building and Building Improvements | [1] | 15,544 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 6 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 81 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 551 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 15,625 | | | | |
Total | [1],[2] | 16,176 | | | | |
Accumulated Depreciation | [1] | $ (1,686) | | | | |
Date of construction | [1] | 2,002 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Prestige Senior Living Southern Hills | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 7,560 | | | | |
Initial Costs, Land & Land Improvements | [1] | 653 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,753 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 34 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 2 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 687 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,755 | | | | |
Total | [1],[2] | 11,442 | | | | |
Accumulated Depreciation | [1] | $ (1,189) | | | | |
Date of construction | [1] | 2,001 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
MorningStar of Sparks | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 23,435 | | | | |
Initial Costs, Land & Land Improvements | [1] | 3,986 | | | | |
Initial Costs, Building and Building Improvements | [1] | 47,968 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 3 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,989 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 47,991 | | | | |
Total | [1],[2] | 51,980 | | | | |
Accumulated Depreciation | [1] | $ (5,392) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Prestige Senior Living Five Rivers | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 7,752 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,298 | | | | |
Initial Costs, Building and Building Improvements | [1] | 14,064 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 5 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 125 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,303 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 14,189 | | | | |
Total | [1],[2] | 15,492 | | | | |
Accumulated Depreciation | [1] | $ (1,644) | | | | |
Date of construction | [1] | 2,002 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Prestige Senior Living Riverwood | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 4,576 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,028 | | | | |
Initial Costs, Building and Building Improvements | [1] | 7,429 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 80 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,028 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 7,509 | | | | |
Total | [1],[2] | 8,537 | | | | |
Accumulated Depreciation | [1] | $ (852) | | | | |
Date of construction | [1] | 1,999 | | | | |
Date Acquired | [1] | Dec. 2, 2013 | | | | |
Chula Vista Medical Arts Center - Plaza II | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,462 | | | | |
Initial Costs, Building and Building Improvements | [1] | 7,453 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 9 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 369 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,471 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 7,822 | | | | |
Total | [1],[2] | 10,293 | | | | |
Accumulated Depreciation | [1] | $ (846) | | | | |
Date of construction | [1] | 1,985 | | | | |
Date Acquired | [1] | Dec. 23, 2013 | | | | |
Coral Springs MOB I | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,614 | | | | |
Initial Costs, Building and Building Improvements | [1] | 11,220 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 1 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,615 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 11,243 | | | | |
Total | [1],[2] | 13,858 | | | | |
Accumulated Depreciation | [1] | $ (1,327) | | | | |
Date of construction | [1] | 2,005 | | | | |
Date Acquired | [1] | Dec. 23, 2013 | | | | |
Coral Springs MOB II | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,614 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,130 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 1 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,615 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,153 | | | | |
Total | [1],[2] | 14,768 | | | | |
Accumulated Depreciation | [1] | $ (1,327) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Dec. 23, 2013 | | | | |
Chula Vista Medical Arts Center - Plaza I | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 6,130 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,293 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 14 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 285 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 6,144 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,578 | | | | |
Total | [1],[2] | 16,722 | | | | |
Accumulated Depreciation | [1] | $ (1,124) | | | | |
Date of construction | [1] | 1,975 | | | | |
Date Acquired | [1] | Jan. 21, 2014 | | | | |
Prestige Senior Living Auburn Meadows | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 10,560 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,537 | | | | |
Initial Costs, Building and Building Improvements | [1] | 17,261 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 142 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,537 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 17,403 | | | | |
Total | [1],[2] | 19,940 | | | | |
Accumulated Depreciation | [1] | $ (1,855) | | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | | |
Prestige Senior Living Auburn Meadows One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,003 | | | | |
Prestige Senior Living Auburn Meadows Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,010 | | | | |
Prestige Senior Living Bridgewood | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 13,292 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,603 | | | | |
Initial Costs, Building and Building Improvements | [1] | 18,172 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,603 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 18,172 | | | | |
Total | [1],[2] | 19,775 | | | | |
Accumulated Depreciation | [1] | $ (1,930) | | | | |
Date of construction | [1] | 2,001 | | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | | |
Prestige Senior Living Monticello Park | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 17,752 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,981 | | | | |
Initial Costs, Building and Building Improvements | [1] | 23,056 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,981 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 23,056 | | | | |
Total | [1],[2] | 25,037 | | | | |
Accumulated Depreciation | [1] | $ (2,418) | | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | | |
Prestige Senior Living Rosemont | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 9,330 | | | | |
Initial Costs, Land & Land Improvements | [1] | 668 | | | | |
Initial Costs, Building and Building Improvements | [1] | 14,564 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 26 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 668 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 14,590 | | | | |
Total | [1],[2] | 15,258 | | | | |
Accumulated Depreciation | [1] | $ (1,511) | | | | |
Date of construction | [1] | 2,004 | | | | |
Date Acquired | [1] | Feb. 3, 2014 | | | | |
Prestige Senior Living Monticello Park One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,001 | | | | |
Prestige Senior Living Monticello Park Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,010 | | | | |
Wellmore of Tega Cay | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 28,000 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,445 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 2,740 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23,440 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 5,185 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 23,440 | | | | |
Total | [1],[2] | 28,625 | | | | |
Accumulated Depreciation | [1] | $ (1,959) | | | | |
Date of construction | [1] | 2,015 | | | | |
Date Acquired | [1] | Feb. 7, 2014 | | | | |
Isle at Cedar Ridge | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,525 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,277 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 185 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,525 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,462 | | | | |
Total | [1],[2] | 17,987 | | | | |
Accumulated Depreciation | [1] | $ (1,759) | | | | |
Date of construction | [1] | 2,011 | | | | |
Date Acquired | [1] | Feb. 28, 2014 | | | | |
Prestige Senior Living West Hills | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 8,809 | | | | |
Initial Costs, Land & Land Improvements | [1] | 842 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,603 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 842 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,603 | | | | |
Total | [1],[2] | 13,445 | | | | |
Accumulated Depreciation | [1] | $ (1,346) | | | | |
Date of construction | [1] | 2,002 | | | | |
Date Acquired | [1] | Mar. 3, 2014 | | | | |
HarborChase of Plainfield | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,596 | | | | |
Initial Costs, Building and Building Improvements | [1] | 21,832 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,596 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 21,832 | | | | |
Total | [1],[2] | 23,428 | | | | |
Accumulated Depreciation | [1] | $ (2,219) | | | | |
Date of construction | [1] | 2,010 | | | | |
Date Acquired | [1] | Mar. 28, 2014 | | | | |
Legacy Ranch Alzheimer's Special Care Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 917 | | | | |
Initial Costs, Building and Building Improvements | [1] | 9,982 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 917 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 9,982 | | | | |
Total | [1],[2] | 10,899 | | | | |
Accumulated Depreciation | [1] | $ (1,035) | | | | |
Date of construction | [1] | 2,012 | | | | |
Date Acquired | [1] | Mar. 28, 2014 | | | | |
The Springs Alzheimer's Special Care Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 595 | | | | |
Initial Costs, Building and Building Improvements | [1] | 9,658 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 595 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 9,658 | | | | |
Total | [1],[2] | 10,253 | | | | |
Accumulated Depreciation | [1] | $ (1,000) | | | | |
Date of construction | [1] | 2,012 | | | | |
Date Acquired | [1] | Mar. 28, 2014 | | | | |
Isle at Watercrest - Bryan | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,223 | | | | |
Initial Costs, Building and Building Improvements | [1] | 40,581 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 23 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 703 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,246 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 41,284 | | | | |
Total | [1],[2] | 44,530 | | | | |
Accumulated Depreciation | [1] | $ (4,197) | | | | |
Date of construction | [1] | 2,011 | | | | |
Date Acquired | [1] | Apr. 21, 2014 | | | | |
Watercrest at Bryan | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 997 | | | | |
Initial Costs, Building and Building Improvements | [1] | 24,635 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 997 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 24,635 | | | | |
Total | [1],[2] | 25,632 | | | | |
Accumulated Depreciation | [1] | $ (2,399) | | | | |
Date of construction | [1] | 2,011 | | | | |
Date Acquired | [1] | May 5, 2014 | | | | |
Houston Orthopedic & Spine Hospital | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 30,349 | | | | |
Initial Costs, Land & Land Improvements | [1] | 3,867 | | | | |
Initial Costs, Building and Building Improvements | [1] | 32,761 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,867 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 32,761 | | | | |
Total | [1],[2] | 36,628 | | | | |
Accumulated Depreciation | [1] | $ (3,061) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Jun. 2, 2014 | | | | |
Houston Orthopedic & Spine Hospital Medical Office Building | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 16,719 | | | | |
Initial Costs, Land & Land Improvements | [1] | 3,738 | | | | |
Initial Costs, Building and Building Improvements | [1] | 20,525 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 767 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 202 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 4,505 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 20,727 | | | | |
Total | [1],[2] | 25,232 | | | | |
Accumulated Depreciation | [1] | $ (1,975) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Jun. 2, 2014 | | | | |
Watercrest at Katy (Katy, Texas) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 26,300 | | | | |
Initial Costs, Land & Land Improvements | [1] | 4,000 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 90 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 32,358 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 4,090 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 32,358 | | | | |
Total | [1],[2] | 36,448 | | | | |
Accumulated Depreciation | [1] | $ (1,326) | | | | |
Date of construction | [1] | 2,016 | | | | |
Date Acquired | [1] | Jun. 27, 2014 | | | | |
Watercrest at Mansfield | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 25,676 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,191 | | | | |
Initial Costs, Building and Building Improvements | [1] | 42,740 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 55 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,191 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 42,795 | | | | |
Total | [1],[2] | 44,986 | | | | |
Accumulated Depreciation | [1] | $ (4,011) | | | | |
Date of construction | [1] | 2,010 | | | | |
Date Acquired | [1] | Jun. 30, 2014 | | | | |
HarborChase Of Shorewood (Shorewood, Wisconsin) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 14,706 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,200 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 296 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 19,862 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,496 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,862 | | | | |
Total | [1],[2] | 22,358 | | | | |
Accumulated Depreciation | [1] | $ (1,101) | | | | |
Date of construction | [1] | 2,015 | | | | |
Date Acquired | [1] | Jul. 8, 2014 | | | | |
Oklahoma City Inpatient Rehabilitation Hospital | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 15,426 | | | | |
Initial Costs, Land & Land Improvements | [1] | 3,341 | | | | |
Initial Costs, Building and Building Improvements | [1] | 19,249 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,341 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,249 | | | | |
Total | [1],[2] | 22,590 | | | | |
Accumulated Depreciation | [1] | $ (1,898) | | | | |
Date of construction | [1] | 2,012 | | | | |
Date Acquired | [1] | Jul. 15, 2014 | | | | |
Las Vegas Inpatient Rehabilitation Hospital | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 13,483 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,650 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,979 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,650 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,979 | | | | |
Total | [1],[2] | 19,629 | | | | |
Accumulated Depreciation | [1] | $ (1,693) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Jul. 15, 2014 | | | | |
South Bend Inpatient Rehabilitation Hospital | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 12,242 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,339 | | | | |
Initial Costs, Building and Building Improvements | [1] | 16,239 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 4 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,343 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,239 | | | | |
Total | [1],[2] | 18,582 | | | | |
Accumulated Depreciation | [1] | $ (1,641) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Jul. 15, 2014 | | | | |
Beaumont Specialty Hospital | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 20,322 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,749 | | | | |
Initial Costs, Building and Building Improvements | [1] | 28,863 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,749 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 28,863 | | | | |
Total | [1],[2] | 31,612 | | | | |
Accumulated Depreciation | [1] | $ (2,658) | | | | |
Date of construction | [1] | 2,013 | | | | |
Date Acquired | [1] | Aug. 15, 2014 | | | | |
Hurst Specialty Hospital | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 17,822 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,510 | | | | |
Initial Costs, Building and Building Improvements | [1] | 24,091 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,510 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 24,091 | | | | |
Total | [1],[2] | 26,601 | | | | |
Accumulated Depreciation | [1] | $ (2,221) | | | | |
Date Acquired | [1] | Aug. 15, 2014 | | | | |
Hurst Specialty Hospital One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,004 | | | | |
Hurst Specialty Hospital Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,012 | | | | |
Claremont Medical Office | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 14,643 | | | | |
Initial Costs, Land & Land Improvements | [1] | 6,324 | | | | |
Initial Costs, Building and Building Improvements | [1] | 13,533 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 35 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 6,324 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 13,568 | | | | |
Total | [1],[2] | 19,892 | | | | |
Accumulated Depreciation | [1] | $ (1,329) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Aug. 29, 2014 | | | | |
Lee Hughes Medical Building | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 17,572 | | | | |
Initial Costs, Land & Land Improvements | [1] | 69 | | | | |
Initial Costs, Building and Building Improvements | [1] | 22,967 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 216 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 69 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 23,183 | | | | |
Total | [1],[2] | 23,252 | | | | |
Accumulated Depreciation | [1] | $ (1,932) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Sep. 29, 2014 | | | | |
Newburyport Medical Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,614 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,135 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 36 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,650 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,135 | | | | |
Total | [1],[2] | 14,785 | | | | |
Accumulated Depreciation | [1] | $ (1,173) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Oct. 31, 2014 | | | | |
Northwest Medical Park | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 6,765 | | | | |
Initial Costs, Land & Land Improvements | [1] | 610 | | | | |
Initial Costs, Building and Building Improvements | [1] | 6,170 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 139 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 610 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 6,309 | | | | |
Total | [1],[2] | 6,919 | | | | |
Accumulated Depreciation | [1] | $ (630) | | | | |
Date of construction | [1] | 2,004 | | | | |
Date Acquired | [1] | Oct. 31, 2014 | | | | |
Fairfield Village of Layton | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 5,217 | | | | |
Initial Costs, Building and Building Improvements | [1] | 54,167 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 12 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 5 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 5,229 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 54,172 | | | | |
Total | [1],[2] | 59,401 | | | | |
Accumulated Depreciation | [1] | $ (4,745) | | | | |
Date of construction | [1] | 2,010 | | | | |
Date Acquired | [1] | Nov. 20, 2014 | | | | |
ProMed Building I | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 6,673 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,486 | | | | |
Initial Costs, Building and Building Improvements | [1] | 6,728 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 49 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,486 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 6,777 | | | | |
Total | [1],[2] | 9,263 | | | | |
Accumulated Depreciation | [1] | $ (603) | | | | |
Date of construction | [1] | 2,006 | | | | |
Date Acquired | [1] | Dec. 19, 2014 | | | | |
Midtown Medical Plaza | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 27,477 | | | | |
Initial Costs, Land & Land Improvements | [1] | 10 | | | | |
Initial Costs, Building and Building Improvements | [1] | 51,237 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 590 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 10 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 51,827 | | | | |
Total | [1],[2] | 51,837 | | | | |
Accumulated Depreciation | [1] | $ (3,943) | | | | |
Date of construction | [1] | 1,994 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Presbyterian Medical Tower | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 18,264 | | | | |
Initial Costs, Land & Land Improvements | [1] | 40 | | | | |
Initial Costs, Building and Building Improvements | [1] | 32,345 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 196 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 40 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 32,541 | | | | |
Total | [1],[2] | 32,581 | | | | |
Accumulated Depreciation | [1] | $ (2,500) | | | | |
Date of construction | [1] | 1,989 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Metroview Professional Building | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 8,676 | | | | |
Initial Costs, Land & Land Improvements | [1] | 11 | | | | |
Initial Costs, Building and Building Improvements | [1] | 15,910 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 97 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 11 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 16,007 | | | | |
Total | [1],[2] | 16,018 | | | | |
Accumulated Depreciation | [1] | $ (1,230) | | | | |
Date of construction | [1] | 1,971 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Physicians Plaza Huntersville | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 15,251 | | | | |
Initial Costs, Land & Land Improvements | [1] | 520 | | | | |
Initial Costs, Building and Building Improvements | [1] | 26,134 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 112 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 520 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 26,246 | | | | |
Total | [1],[2] | 26,766 | | | | |
Accumulated Depreciation | [1] | $ (2,114) | | | | |
Date of construction | [1] | 2,004 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Matthews Medical Office Building | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 10,701 | | | | |
Initial Costs, Land & Land Improvements | [1] | 350 | | | | |
Initial Costs, Building and Building Improvements | [1] | 19,624 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 25 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 350 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,649 | | | | |
Total | [1],[2] | 19,999 | | | | |
Accumulated Depreciation | [1] | $ (1,580) | | | | |
Date of construction | [1] | 1,994 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Outpatient Care Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 10,021 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,169 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,079 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 9 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,178 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,079 | | | | |
Total | [1],[2] | 13,257 | | | | |
Accumulated Depreciation | [1] | $ (953) | | | | |
Date of construction | [1] | 2,012 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Clyde, NC ("Asheville") 330 Physicians Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 18,610 | | | | |
Initial Costs, Land & Land Improvements | [1] | 12 | | | | |
Initial Costs, Building and Building Improvements | [1] | 26,868 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 12 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 26,868 | | | | |
Total | [1],[2] | 26,880 | | | | |
Accumulated Depreciation | [1] | $ (2,069) | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Clyde, NC ("Asheville") 330 Physicians Center one | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 1,987 | | | | |
Clyde, NC ("Asheville") 330 Physicians Center Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,005 | | | | |
Spivey Station Physicians Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 9,114 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,026 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,246 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,026 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,246 | | | | |
Total | [1],[2] | 13,272 | | | | |
Accumulated Depreciation | [1] | $ (1,033) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Spivey Station ASC Building | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 11,635 | | | | |
Initial Costs, Land & Land Improvements | [1] | 929 | | | | |
Initial Costs, Building and Building Improvements | [1] | 13,769 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 929 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 13,769 | | | | |
Total | [1],[2] | 14,698 | | | | |
Accumulated Depreciation | [1] | $ (1,142) | | | | |
Date of construction | [1] | 2,009 | | | | |
Date Acquired | [1] | Dec. 22, 2014 | | | | |
Novi Orthopaedic Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 19,825 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,314 | | | | |
Initial Costs, Building and Building Improvements | [1] | 26,239 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 30 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 26 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,344 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 26,265 | | | | |
Total | [1],[2] | 27,609 | | | | |
Accumulated Depreciation | [1] | $ (2,222) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Feb. 13, 2015 | | | | |
UT Cancer Institute Building | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 20,116 | | | | |
Initial Costs, Land & Land Improvements | [1] | 421 | | | | |
Initial Costs, Building and Building Improvements | [1] | 27,621 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 66 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 421 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 27,687 | | | | |
Total | [1],[2] | 28,108 | | | | |
Accumulated Depreciation | [1] | $ (2,086) | | | | |
Date of construction | [1] | 2,012 | | | | |
Date Acquired | [1] | Feb. 20, 2015 | | | | |
Fieldstone Memory Care | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,297 | | | | |
Initial Costs, Building and Building Improvements | [1] | 9,965 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,297 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 9,965 | | | | |
Total | [1],[2] | 11,262 | | | | |
Accumulated Depreciation | [1] | $ (777) | | | | |
Date of construction | [1] | 2,014 | | | | |
Date Acquired | [1] | Mar. 31, 2015 | | | | |
Bend Memorial Clinic MOB | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 9,069 | | | | |
Initial Costs, Building and Building Improvements | [1] | 19,867 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 9,069 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,867 | | | | |
Total | [1],[2] | 28,936 | | | | |
Accumulated Depreciation | [1] | $ (1,640) | | | | |
Date of construction | [1] | 1,976 | | | | |
Date Acquired | [1] | May 11, 2015 | | | | |
Stoneterra Medical Plaza | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,864 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,412 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 23 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,864 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,435 | | | | |
Total | [1],[2] | 13,299 | | | | |
Accumulated Depreciation | [1] | $ (773) | | | | |
Date of construction | [1] | 2,006 | | | | |
Date Acquired | [1] | May 29, 2015 | | | | |
Primrose Retirement Center of Anderson | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,342 | | | | |
Initial Costs, Building and Building Improvements | [1] | 19,083 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 33 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,342 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,116 | | | | |
Total | [1],[2] | 20,458 | | | | |
Accumulated Depreciation | [1] | $ (1,393) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | May 29, 2015 | | | | |
Primrose Retirement Center of Lancaster | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,840 | | | | |
Initial Costs, Building and Building Improvements | [1] | 21,884 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,840 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 21,884 | | | | |
Total | [1],[2] | 24,724 | | | | |
Accumulated Depreciation | [1] | $ (1,757) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | May 29, 2015 | | | | |
Primrose Retirement Center of Wausau | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,089 | | | | |
Initial Costs, Building and Building Improvements | [1] | 18,653 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,089 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 18,653 | | | | |
Total | [1],[2] | 19,742 | | | | |
Accumulated Depreciation | [1] | $ (1,307) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | May 29, 2015 | | | | |
Triangle Orthopaedic Durham | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 12,690 | | | | |
Initial Costs, Land & Land Improvements | [1] | 3,191 | | | | |
Initial Costs, Building and Building Improvements | [1] | 14,523 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 134 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,325 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 14,523 | | | | |
Total | [1],[2] | 17,848 | | | | |
Accumulated Depreciation | [1] | $ (1,070) | | | | |
Date of construction | [1] | 2,000 | | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | | |
Triangle Orthopaedic Roxboro | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 1,289 | | | | |
Initial Costs, Land & Land Improvements | [1] | 287 | | | | |
Initial Costs, Building and Building Improvements | [1] | 1,406 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 287 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 1,406 | | | | |
Total | [1],[2] | 1,693 | | | | |
Accumulated Depreciation | [1] | $ (111) | | | | |
Date of construction | [1] | 2,000 | | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | | |
Triangle Orthopaedic Chapel Hill | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 1,884 | | | | |
Initial Costs, Land & Land Improvements | [1] | 360 | | | | |
Initial Costs, Building and Building Improvements | [1] | 2,306 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 360 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 2,306 | | | | |
Total | [1],[2] | 2,666 | | | | |
Accumulated Depreciation | [1] | $ (165) | | | | |
Date of construction | [1] | 2,011 | | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | | |
Triangle Orthopaedic Oxford | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 2,776 | | | | |
Initial Costs, Land & Land Improvements | [1] | 658 | | | | |
Initial Costs, Building and Building Improvements | [1] | 3,074 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 658 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 3,074 | | | | |
Total | [1],[2] | 3,732 | | | | |
Accumulated Depreciation | [1] | $ (241) | | | | |
Date of construction | [1] | 2,011 | | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | | |
North Carolina Specialty Hospital | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 18,837 | | | | |
Initial Costs, Land & Land Improvements | [1] | 3,173 | | | | |
Initial Costs, Building and Building Improvements | [1] | 22,762 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 14 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,173 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 22,776 | | | | |
Total | [1],[2] | 25,949 | | | | |
Accumulated Depreciation | [1] | $ (1,575) | | | | |
Date of construction | [1] | 2,004 | | | | |
Date Acquired | [1] | Jun. 29, 2015 | | | | |
Doctor's Park Building B | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,161 | | | | |
Initial Costs, Building and Building Improvements | [1] | 2,919 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,161 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 2,919 | | | | |
Total | [1],[2] | 4,080 | | | | |
Accumulated Depreciation | [1] | $ (214) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Jun. 30, 2015 | | | | |
Doctor's Park Building C | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,323 | | | | |
Initial Costs, Building and Building Improvements | [1] | 6,351 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,323 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 6,351 | | | | |
Total | [1],[2] | 8,674 | | | | |
Accumulated Depreciation | [1] | $ (459) | | | | |
Date of construction | [1] | 2,006 | | | | |
Date Acquired | [1] | Jun. 30, 2015 | | | | |
Superior Residences of Panama City | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,099 | | | | |
Initial Costs, Building and Building Improvements | [1] | 19,367 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,099 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 19,367 | | | | |
Total | [1],[2] | 21,466 | | | | |
Accumulated Depreciation | [1] | $ (1,363) | | | | |
Date of construction | [1] | 2,015 | | | | |
Date Acquired | [1] | Jul. 15, 2015 | | | | |
540 New Waverly Place | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 6,665 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,476 | | | | |
Initial Costs, Building and Building Improvements | [1] | 11,009 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,476 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 11,009 | | | | |
Total | [1],[2] | 13,485 | | | | |
Accumulated Depreciation | [1] | $ (789) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Jul. 20, 2015 | | | | |
MedHelp | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,270 | | | | |
Initial Costs, Building and Building Improvements | [1] | 10,359 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,270 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 10,359 | | | | |
Total | [1],[2] | 12,629 | | | | |
Accumulated Depreciation | [1] | $ (688) | | | | |
Date of construction | [1] | 2,015 | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
Patriot Professional Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,912 | | | | |
Initial Costs, Building and Building Improvements | [1] | 11,781 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,912 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 11,781 | | | | |
Total | [1],[2] | 15,693 | | | | |
Accumulated Depreciation | [1] | $ (849) | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
Patriot Professional Center One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,006 | | | | |
Patriot Professional Center Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,014 | | | | |
Liberty Professional Center | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,977 | | | | |
Initial Costs, Building and Building Improvements | [1] | 4,462 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 10 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,987 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 4,462 | | | | |
Total | [1],[2] | 6,449 | | | | |
Accumulated Depreciation | [1] | $ (316) | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
Liberty Professional Center One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 1,979 | | | | |
Liberty Professional Center Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,013 | | | | |
The Hampton at Meadows Place | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 715 | | | | |
Initial Costs, Building and Building Improvements | [1] | 24,281 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 34 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 715 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 24,315 | | | | |
Total | [1],[2] | 25,030 | | | | |
Accumulated Depreciation | [1] | $ (1,533) | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
The Hampton at Meadows Place One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,007 | | | | |
The Hampton at Meadows Place Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,013 | | | | |
The Hampton at Meadows Place Three | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,014 | | | | |
The Pavilion at Great Hills | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,783 | | | | |
Initial Costs, Building and Building Improvements | [1] | 29,318 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,783 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 29,318 | | | | |
Total | [1],[2] | 31,101 | | | | |
Accumulated Depreciation | [1] | $ (1,867) | | | | |
Date of construction | [1] | 2,010 | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
The Beacon at Gulf Breeze | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 824 | | | | |
Initial Costs, Building and Building Improvements | [1] | 24,106 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 824 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 24,106 | | | | |
Total | [1],[2] | 24,930 | | | | |
Accumulated Depreciation | [1] | $ (1,581) | | | | |
Date of construction | [1] | 2,008 | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
Parc at Piedmont | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,529 | | | | |
Initial Costs, Building and Building Improvements | [1] | 43,080 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 16 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,529 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 43,096 | | | | |
Total | [1],[2] | 46,625 | | | | |
Accumulated Depreciation | [1] | $ (2,837) | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
Parc at Piedmont One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,001 | | | | |
Parc at Piedmont Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,011 | | | | |
Parc at Duluth | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 5,951 | | | | |
Initial Costs, Building and Building Improvements | [1] | 42,458 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 5,951 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 42,458 | | | | |
Total | [1],[2] | 48,409 | | | | |
Accumulated Depreciation | [1] | $ (2,792) | | | | |
Date Acquired | [1] | Jul. 31, 2015 | | | | |
Parc at Duluth One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,003 | | | | |
Parc at Duluth Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,012 | | | | |
Broadway Medical Plaza 1 | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 437 | | | | |
Initial Costs, Building and Building Improvements | [1] | 9,281 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 135 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 437 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 9,416 | | | | |
Total | [1],[2] | 9,853 | | | | |
Accumulated Depreciation | [1] | $ (624) | | | | |
Date of construction | [1] | 1,994 | | | | |
Date Acquired | [1] | Aug. 21, 2015 | | | | |
Broadway Medical Plaza 2 | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 386 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,460 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 386 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,460 | | | | |
Total | [1],[2] | 12,846 | | | | |
Accumulated Depreciation | [1] | $ (806) | | | | |
Date of construction | [1] | 1,999 | | | | |
Date Acquired | [1] | Aug. 21, 2015 | | | | |
Broadway Medical Plaza 4 | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 170 | | | | |
Initial Costs, Building and Building Improvements | [1] | 12,118 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 86 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 170 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 12,204 | | | | |
Total | [1],[2] | 12,374 | | | | |
Accumulated Depreciation | [1] | $ (751) | | | | |
Date of construction | [1] | 2,007 | | | | |
Date Acquired | [1] | Aug. 21, 2015 | | | | |
Waterstone on Augusta (Greenville, SC) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 18,302 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,253 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 2,064 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 20,770 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 4,317 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 20,770 | | | | |
Total | [1],[2] | 25,087 | | | | |
Accumulated Depreciation | [1] | $ (502) | | | | |
Date of construction | [1] | 2,017 | | | | |
Date Acquired | [1] | Aug. 31, 2015 | | | | |
Welbrook Senior Living Grand Junction (Grand Junction, CO) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,050 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 1,348 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 9,901 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,398 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 9,901 | | | | |
Total | [1],[2] | 12,299 | | | | |
Accumulated Depreciation | [1] | $ (286) | | | | |
Date of construction | [1] | 2,017 | | | | |
Date Acquired | [1] | Sep. 4, 2015 | | | | |
Wellmore of Lexington (Lexington, SC) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 33,423 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,300 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 3,143 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 43,081 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 5,443 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 43,081 | | | | |
Total | [1],[2] | 48,524 | | | | |
Accumulated Depreciation | [1] | $ (657) | | | | |
Date of construction | [1] | 2,017 | | | | |
Date Acquired | [1] | Sep. 14, 2015 | | | | |
Palmilla Senior Living | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 26,799 | | | | |
Initial Costs, Land & Land Improvements | [1] | 4,701 | | | | |
Initial Costs, Building and Building Improvements | [1] | 38,321 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 4,701 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 38,321 | | | | |
Total | [1],[2] | 43,022 | | | | |
Accumulated Depreciation | [1] | $ (2,362) | | | | |
Date of construction | [1] | 2,013 | | | | |
Date Acquired | [1] | Sep. 30, 2015 | | | | |
Cedar Lake Assisted Living and Memory Care | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,412 | | | | |
Initial Costs, Building and Building Improvements | [1] | 25,126 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,412 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 25,126 | | | | |
Total | [1],[2] | 27,538 | | | | |
Accumulated Depreciation | [1] | $ (1,546) | | | | |
Date of construction | [1] | 2,014 | | | | |
Date Acquired | [1] | Sep. 30, 2015 | | | | |
Fieldstone at Pear Orchard (Yakima, Washington) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 10,900 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,035 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 96 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 13,486 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,131 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 13,486 | | | | |
Total | [1],[2] | 14,617 | | | | |
Accumulated Depreciation | [1] | $ (379) | | | | |
Date of construction | [1] | 2,016 | | | | |
Date Acquired | [1] | Oct. 12, 2015 | | | | |
The Shores of Lake Phalen | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,724 | | | | |
Initial Costs, Building and Building Improvements | [1] | 25,093 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 10 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,734 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 25,093 | | | | |
Total | [1],[2] | 27,827 | | | | |
Accumulated Depreciation | [1] | $ (1,474) | | | | |
Date of construction | [1] | 2,012 | | | | |
Date Acquired | [1] | Nov. 10, 2015 | | | | |
Dogwood Forest of Grayson (Grayson, GA) | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 15,628 | | | | |
Initial Costs, Land & Land Improvements | [1] | 1,788 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 109 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 22,257 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,897 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 22,257 | | | | |
Total | [1],[2] | 24,154 | | | | |
Accumulated Depreciation | [1] | $ (335) | | | | |
Date of construction | [1] | 2,017 | | | | |
Date Acquired | [1] | Nov. 24, 2015 | | | | |
Center One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 8,294 | | | | |
Initial Costs, Building and Building Improvements | [1] | 21,756 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 1 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 153 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 8,295 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 21,909 | | | | |
Total | [1],[2] | 30,204 | | | | |
Accumulated Depreciation | [1] | $ (1,310) | | | | |
Date of construction | [1] | 2,006 | | | | |
Date Acquired | [1] | Nov. 30, 2015 | | | | |
Red Bank Professional Office Building | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,721 | | | | |
Initial Costs, Building and Building Improvements | [1] | 7,721 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,721 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 7,721 | | | | |
Total | [1],[2] | 9,442 | | | | |
Accumulated Depreciation | [1] | $ (455) | | | | |
Date of construction | [1] | 2,001 | | | | |
Date Acquired | [1] | Dec. 14, 2015 | | | | |
Park Place Senior Living at WingHaven | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,283 | | | | |
Initial Costs, Building and Building Improvements | [1] | 48,221 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,283 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 48,221 | | | | |
Total | [1],[2] | 49,504 | | | | |
Accumulated Depreciation | [1] | $ (2,539) | | | | |
Date Acquired | [1] | Dec. 17, 2015 | | | | |
Park Place Senior Living at WingHaven One | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,006 | | | | |
Park Place Senior Living at WingHaven Two | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Date of construction | [1] | 2,014 | | | | |
Siena Pavilion IV | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,454 | | | | |
Initial Costs, Building and Building Improvements | [1] | 4,786 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,454 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 4,786 | | | | |
Total | [1],[2] | 6,240 | | | | |
Accumulated Depreciation | [1] | $ (280) | | | | |
Date of construction | [1] | 2,002 | | | | |
Date Acquired | [1] | Dec. 18, 2015 | | | | |
Siena Pavilion V | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 3,944 | | | | |
Initial Costs, Building and Building Improvements | [1] | 20,355 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,944 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 20,355 | | | | |
Total | [1],[2] | 24,299 | | | | |
Accumulated Depreciation | [1] | $ (1,168) | | | | |
Date of construction | [1] | 2,003 | | | | |
Date Acquired | [1] | Dec. 18, 2015 | | | | |
Siena Pavilion VI | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 2,599 | | | | |
Initial Costs, Building and Building Improvements | [1] | 18,725 | | | | |
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements | [1] | 43 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,599 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 18,768 | | | | |
Total | [1],[2] | 21,367 | | | | |
Accumulated Depreciation | [1] | $ (1,011) | | | | |
Date of construction | [1] | 2,005 | | | | |
Date Acquired | [1] | Dec. 18, 2015 | | | | |
Hearthside Senior Living of Collierville | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,756 | | | | |
Initial Costs, Building and Building Improvements | [1] | 13,379 | | | | |
Costs Capitalized Subsequent to Acquisition, Land & Improvements | [1] | 7 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,763 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 13,379 | | | | |
Total | [1],[2] | 15,142 | | | | |
Accumulated Depreciation | [1] | $ (748) | | | | |
Date of construction | [1] | 2,014 | | | | |
Date Acquired | [1] | Dec. 29, 2015 | | | | |
Cobalt Rehabilitation Hospital Surprise | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 15,167 | | | | |
Initial Costs, Land & Land Improvements | [1] | 2,464 | | | | |
Initial Costs, Building and Building Improvements | [1] | 17,983 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 2,464 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 17,983 | | | | |
Total | [1],[2] | 20,447 | | | | |
Accumulated Depreciation | [1] | $ (1,021) | | | | |
Date of construction | [1] | 2,015 | | | | |
Date Acquired | [1] | Dec. 30, 2015 | | | | |
Cobalt Rehabilitation Hospital New Orleans | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Encumbrances | [1] | $ 19,421 | | | | |
Initial Costs, Land & Land Improvements | [1] | 3,283 | | | | |
Initial Costs, Building and Building Improvements | [1] | 20,142 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 3,283 | | | | |
Gross Amounts at which Carried at Close of period, Building & Building Improvements | [1],[2] | 20,142 | | | | |
Total | [1],[2] | 23,425 | | | | |
Accumulated Depreciation | [1] | $ (639) | | | | |
Date of construction | [1] | 2,016 | | | | |
Date Acquired | [1] | Oct. 19, 2016 | | | | |
Albuquerque, New Mexico - Unimproved Land | | | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | | | |
Initial Costs, Land & Land Improvements | [1] | $ 1,056 | | | | |
Gross Amounts at which Carried at Close of period, Land & Land Improvements | [1],[2] | 1,056 | | | | |
Total | [1],[2] | $ 1,056 | | | | |
Date Acquired | [1] | Sep. 7, 2017 | | | | |
| |
[1] | Buildings and building improvements are depreciated over 39 and 15 years, respectively. Tenant improvements are depreciated over the terms of their respective leases. | |
[2] | The aggregate cost for federal income tax purposes is approximately $3.0 billion. | |