Free signup for more
- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
Content analysis
?Positive | ||
Negative | ||
Uncertain | ||
Constraining | ||
Legalese | ||
Litigous | ||
Readability |
H.S. sophomore Avg
|
New words:
academic, Admit, Adrian, agricultural, analytical, analytically, analyzed, Ancaster, antidilutive, atmospheric, background, bag, barcode, barcoded, BBE, Bird, blue, Brown, CDM, chain, comparison, Concept, conclusive, context, count, CRM, crop, Dahrouge, destination, didymium, disallowed, disciplinary, discretionary, disseminated, dump, enable, Equator, equivalent, ESG, estate, Everett, excise, expel, expenditure, gauge, geology, geoscience, grammatical, hereto, highest, HREO, illustrating, inaccuracy, inch, inflation, Ing, inserted, insertion, invasion, JORC, Jumpstart, junction, Khwaja, kilometer, lab, labelling, landowner, Lepage, licensee, livestock, longstanding, lost, LREO, Magemi, Mahmood, Martin, Marx, matrix, Matt, member, Metallurgy, ministerial, modification, OPPD, organizational, Paragraph, pasturing, permissible, pillar, ppm, proponent, QC, quantify, Quebec, question, Rail, ratio, recession, reclassification, Red, REO, rigor, routine, row, Rural, Russian, rye, sharply, shed, shelf, sill, similarly, Situ, slight, smog, sorghum, sparse, square, statute, Steinauer, stripping, Subtotal, summation, Syracuse, Tech, Tetra, tin, town, TREO, tungsten, Ukraine, uncommitted, Understood, vicinity, visual, weakened, Wynand
Removed:
abandon, achievable, added, adequately, aim, amenable, American, ancestral, anniversary, anorthosite, Archean, attest, attestation, attractive, basalt, beneficiation, BSc, calculate, calculating, capped, Cautionary, Cell, character, charged, chosen, clastic, closely, CoG, complement, complying, composited, computing, consecutive, continent, controlled, conventional, Council, credited, deferral, deformation, deposition, designate, diorite, displaying, division, dominant, eliminating, Elimination, emplaced, exemption, expertise, exploitable, exploratory, exporting, extensional, external, extract, extremity, farther, fault, feature, Fen, Figure, fluctuate, Force, forecast, fossilized, funded, gate, gathered, Geo, Glen, golden, gpm, granite, Guide, Gunnison, HCl, Hill, importing, impounded, inclusion, inflow, inspection, Institute, interpreted, intervening, introduce, intrusive, invest, investigate, irrevocable, irrevocably, island, isotope, justified, kriging, Kuntz, left, limitation, machinery, magnitude, marketable, mimic, minable, mineralogy, MRE, Norway, oblique, October, open, opt, organic, OSC, outlined, oxidized, Paleozoic, parachute, pentoxide, phrase, Pollutant, predating, promissory, proximity, psig, pursuit, realistically, remained, replacing, represent, request, research, resembled, revealed, schist, scientific, serving, sheared, show, simple, smaller, Specialist, SRK, striking, subcontractor, suggest, suggesting, supervised, surficial, suture, sutured, target, Task, tectonic, tension, tentatively, tenure, terminology, thick, tranche, treating, trend, trending, unaudited, unchanged, undergoing, unpaid, unsuccessful, upfront, upgraded, validated, verified, vote, VWAP, widely, zone
Filing tables
Filing exhibits
- 10-K Annual report
- 4.13 Non-transferable Broker Warrant Certificate, Dated June 30, 2022
- 4.14 Non-transferable Broker Warrant Certificate, Dated June 30, 2022
- 4.15 Description of Securities
- 23.1 Consent of Bdo USA, LLP
- 23.2 Consent of Dahrouge Geological Consulting USA LTD.
- 23.3 Consent of Understood Mineral Resources LTD.
- 23.4 Consent of Optimize Group Inc.
- 23.5 Consent of Tetra Tech
- 23.6 Consent of Adrian Brown Consultants Inc.
- 23.7 Consent of Magemi Mining Inc.
- 23.8 Consent of L3 Process Development
- 23.9 Consent of Olsson
- 23.10 Consent of A2GC
- 23.11 Consent of Metallurgy Concept Solutions
- 23.12 Consent of Scott Honan, M.SC., Sme-rm, Niocorp
- 23.13 Consent of Everett Bird, P.e., Cementation
- 23.14 Consent of Matt Hales, P.e., Cementation
- 23.15 Consent of Mahmood Khwaja, P.e., CDM Smith
- 23.16 Consent of Martin Lepage, P.eng., Ing., Cementation
- 23.17 Consent of Wynand Marx, M.eng., Bbe Consulting
- 31.1 Certification of the Chief Executive Officer
- 31.2 Certification of the Chief Financial Officer
- 32.1 Certification of the Chief Executive Officer
- 32.2 Certification of the Chief Financial Officer
- 96.1 S-K 1300 Elk Creek Technical Report Summary
- Download Excel data file
- View Excel data file
NB similar filings
Filing view
External links