Litigation, Contractual Commitments and Contingent Liabilities | Litigation, Contractual Commitments and Contingent Liabilities From time to time, CAC or CGP LLC may be subject to legal proceedings and claims in the ordinary course of business. Horseshoe Baltimore On October 21, 2013, CGP LLC purchased from CEOC the equity interests of Caesars Baltimore Investment Company, LLC (the "Maryland Joint Venture"), the entity that indirectly holds interests in the owner of the Horseshoe Baltimore Casino in Maryland, a licensed casino that opened in August 2014. Multiple lawsuits have been filed against CBAC Gaming, LLC ("CBAC Gaming") and CBAC Borrower, LLC ("CBAC Borrower"), the City of Baltimore, the Maryland Department of the Environment ("MDE") and other parties in relation to the location and the development of Horseshoe Baltimore. These cases allege violations of various environmental laws, violations of zoning laws and public nuisance, among other claims. In November 2012, the MDE granted approval of the Maryland Joint Venture's amended response action plan ("RAP") under MDE's Voluntary Cleanup Program that named the Maryland Joint Venture, rather than the City of Baltimore, as the party that will implement the RAP and redevelop the location of Horseshoe Baltimore. On February 20, 2013, a group of local residents working with the non-profit Inner Harbor Stewardship Foundation (the "Foundation") filed a complaint in the Maryland Circuit Court challenging the legality of the MDE's approval of the amended RAP. In the case, known as Ruth Sherrill, et al. v. State of Maryland Department of the Environment, et al., the plaintiffs claimed that the amended RAP was approved without complying with the public notice and participation requirements of Maryland law. The plaintiffs sought additional public notice and participation, and to obtain an injunction on, among other things, any construction activities at the site pending the resolution of the case. On March 14, 2013, the court denied the plaintiffs' motion for a Temporary Restraining Order and Preliminary Injunction ("TRO"). The plaintiffs' appeal of the TRO ruling was dismissed. On April 22, 2013, the plaintiffs filed an amended complaint adding a public nuisance claim to their original complaint. The defendants filed motions to dismiss the plaintiffs' amended complaint and a hearing was held on June 14, 2013. The amended complaint was dismissed on November 6, 2013. The plaintiffs filed a notice of appeal on December 6, 2013 and oral argument occurred on October 3, 2014. The Court of Special Appeals affirmed the dismissal on February 16, 2016. The time for Appellants to petition the Maryland Court of Appeals for a writ of certiorari has now lapsed. The plaintiffs issued a notice of intent to file a citizen suit under 42 U.S.C. §§ 6972(a)(1)(A) and (a)(1)(B) of the Resource Conservation and Recovery Act. This notice of intent indicated an intention to sue CBAC (a joint venture among Caesars Baltimore Investment Company, LLC, Rock Gaming Mothership LLC, CVPR Gaming Holdings, LLC, STRON-MD Limited Partnership and PRT Two, LLC), the City of Baltimore, Whiting-Turner, the general contractor for the construction of the Horseshoe Baltimore casino, and the Maryland Chemical Company, the former owner and operator of the site. The citizen suit was filed on September 19, 2013 but did not name Whiting-Turner. The defendants filed motions to dismiss on October 15, 2013 for lack of subject matter jurisdiction and failure to state a claim to which plaintiffs responded on November 1, 2013. The motions to dismiss were granted on July 16, 2014. An appeal was noted on August 13, 2014. Oral argument before the Fourth Circuit occurred on March 25, 2015. On July 1, 2015, the U.S. Court of Appeals for the Fourth Circuit reversed the motion to dismiss and remanded the matter back to the District Court. An order of dismissal was issued on July 5, 2016 following the settlement of the action by all parties. Dismissal of the action is with prejudice. The decision of the Board of Municipal Zoning Appeals to grant variances for the site for Horseshoe Baltimore was appealed by separate parties on the basis of alleged procedural irregularities. The appeals were dismissed for lack of standing on October 11, 2013 and no appeal of that decision was timely filed. On August 1, 2013, ten individuals claiming to represent a class of similarly situated individuals filed a complaint in the U.S. District Court for the Northern District of Maryland against the Maryland Department of the Environment, the City of Baltimore, the U.S. Environmental Protection Agency, CBAC Gaming, Whiting-Turner Contracting Company and Urban Green Environmental, LLC. The 11 count complaint alleged that the RAP for the location of Horseshoe Baltimore is inadequate and approved without appropriate public participation. The plaintiffs sought declaratory and injunctive relief, compensatory and punitive damages, and claim violations of civil rights laws and the Clean Water Act, civil conspiracy, and a variety of torts. The plaintiffs also sought a temporary restraining order, which the District Court denied on August 9, 2013. The plaintiffs amended their complaint on November 15, 2013 and again on December 26, 2013, adding 44 new plaintiffs and naming MDE, the Secretary of MDE, the City of Baltimore, the Mayor of the City of Baltimore, the Baltimore Development Corporation, and CBAC Gaming and CBAC Borrower as defendants. The defendants filed motions to dismiss on January 27, 2014 and the plaintiffs filed their oppositions on February 28, 2014. The case was dismissed on May 16, 2014 and no appeal was filed. From time to time, the City of Baltimore may be subject to legal proceedings asserting claims related to the site. CBAC and CGP LLC have not been named as parties to these proceedings. Four residents of Baltimore City and County issued a notice of intent to file a citizen suit under 33 U.S.C. § 1365(b) of the Clean Water Act against the City of Baltimore as owner of the site for water pollution alleged to originate there. A lawsuit was filed on behalf of two of the residents on July 2, 2013. The City of Baltimore moved to dismiss the complaint on August 28, 2013. One of the plaintiffs withdrew from the case on October 10, 2013. The U.S. District Court for the District of Maryland dismissed the case without prejudice on January 7, 2014 for lack of standing. Two residents of Baltimore City filed suit on May 20, 2013 against the City of Baltimore, as owner of the site, alleging that the City of Baltimore was in violation of Maryland water pollution laws as a result of groundwater contamination alleged to be migrating from the site. The City of Baltimore was served with the complaint on June 12, 2013. An amended complaint was filed on July 19, 2013, which the City of Baltimore moved to dismiss on August 6, 2013. The plaintiffs dismissed the complaint without prejudice on September 12, 2013. CAC and CGP LLC believe that the claims and demands described above against CBAC Borrower and CBAC Gaming are without merit and intend to defend themselves vigorously. At the present time, CAC and CGP LLC believe it is not probable that a material loss will result from the outcome of these matters. CAC and CGP LLC cannot provide assurance as to the outcome of these matters or of the range of reasonably possible losses should these matters ultimately be resolved against CAC and CGP LLC, due to the inherent uncertainty of litigation and, in some cases, the stage of the related litigation. Although CAC and CGP LLC believe that they have adequate defenses to these claims, an adverse judgment could result in additional costs or injunctions. CAC-CEC Proposed Merger On December 30, 2014, Nicholas Koskie, on behalf of himself and, he alleges, all others similarly situated, filed a lawsuit (the "Nevada Lawsuit") in the Clark County District Court in the State of Nevada against CAC, CEC and members of the CAC board of directors Marc Beilinson, Philip Erlanger, Dhiren Fonseca, Don Kornstein, Karl Peterson, Marc Rowan, and David Sambur (the individual defendants collectively, the "CAC Directors"). The Nevada Lawsuit alleges claims for breach of fiduciary duty against the CAC Directors and aiding and abetting breach of fiduciary duty against CAC and CEC. It seeks (1) a declaration that the claim for breach of fiduciary duty is a proper class action claim; (2) to order the CAC Directors to fulfill their fiduciary duties to CAC in connection with the Proposed Merger, specifically by announcing their intention to (a) cooperate with bona fide interested parties proposing alternative transactions, (b) ensure that no conflicts exist between the CAC Directors' personal interests and their fiduciary duties to maximize shareholder value in the Proposed Merger, or resolve all such conflicts in favor of the latter, and (c) act independently to protect the interests of the shareholders; (3) to order the CAC Directors to account for all damages suffered or to be suffered by the plaintiff and the putative class as a result of the Proposed Merger; and (4) to award the plaintiff for his costs and attorneys' fees. It is unclear whether the Nevada Lawsuit also seeks to enjoin the Proposed Merger. On October 14, 2016, the Nevada Lawsuit was dismissed without prejudice by the court for lack of prosecution. Pursuant to local rule, the case may be reinstated at the plaintiff's written request, provided such request is received no later than November 14, 2016. CAC and the CAC Directors believe this lawsuit is without merit and will defend themselves vigorously. We cannot provide assurance as to the outcome of this matter or of the range of reasonably possible losses should this matter ultimately be resolved against us due to the inherent uncertainty of litigation and the stage of the related litigation. CEOC Bondholder Litigation, or Noteholder Disputes On August 4, 2014, Wilmington Savings Fund Society, FSB, solely in its capacity as successor indenture trustee for the 10% Second-Priority Senior Secured Notes due 2018 (the "Notes"), on behalf of itself and, it alleges, derivatively on behalf of CEOC, filed a lawsuit (the "Delaware Second Lien Lawsuit") in the Court of Chancery in the State of Delaware against CEC, CEOC, CGP LLC, CAC, Caesars Entertainment Resort Properties, LLC ("CERP"), Caesars Enterprise Services, LLC ("CES"), Eric Hession, Gary Loveman, Jeffrey D. Benjamin, David Bonderman, Kelvin L. Davis, Marc C. Rowan, David B. Sambur, and Eric Press. The lawsuit alleges claims for breach of contract, intentional and constructive fraudulent transfer, breach of fiduciary duty, aiding and abetting breach of fiduciary duty, and corporate waste. The lawsuit seeks (1) an award of money damages; (2) to void certain transfers, the earliest of which dates back to 2010; (3) an injunction directing the recipients of the assets in these transactions to return them to CEOC; (4) a declaration that CEC remains liable under the parent guarantee formerly applicable to the Notes; (5) to impose a constructive trust or equitable lien on the transferred assets; and (6) an award to the plaintiffs for their attorneys' fees and costs. The only claims against CAC and CGP LLC are for intentional and constructive fraudulent transfer. CAC and CGP LLC believe this lawsuit is without merit and will defend themselves vigorously. A motion to dismiss this action was filed by CEC and other defendants in September 2014, and the motion was argued in December 2014. During the pendency of its Chapter 11 bankruptcy proceedings, the action has been automatically stayed with respect to CEOC. The motion to dismiss with respect to CEC was denied on March 18, 2015. In a Verified Supplemental Complaint filed on August 3, 2015, the plaintiff stated that due to CEOC's bankruptcy filing, the continuation of all claims was stayed pursuant to the bankruptcy except for Claims II, III, and X. These are claims against CEC only, for breach of contract in respect of the release of the parent guarantee formerly applicable to the Notes, for declaratory relief in respect of the release of this guarantee, and for violations of the Trust Indenture Act in respect of the release of this guarantee. CEC has informed us that fact discovery in the case is substantially complete, and cross-motions for summary judgment have been filed by the parties. On October 5, 2016, the Bankruptcy Court granted CEOC's motion for a stay of this proceeding (and others). The stay will remain in effect until the earlier of (a) the first omnibus hearing after the Bankruptcy Court issues its decision confirming or denying confirmation of the CEOC reorganization plan, (b) the termination of the Second Lien RSA, as defined below, or (c) further order of the Bankruptcy Court. On September 3, 2014, holders of approximately $21 million of CEOC Senior Unsecured Notes due 2016 and 2017 filed suit in federal district court in United States District Court for the Southern District of New York against CEC and CEOC, claiming broadly that an August 12, 2014 Note Purchase and Support Agreement between CEC and CEOC (on the one hand) and certain other holders of the CEOC Senior Unsecured Notes (on the other hand) impaired their own rights under the Senior Unsecured Notes. The lawsuit seeks both declaratory and monetary relief. On October 2, 2014, other holders of CEOC Senior Unsecured Notes due 2016 purporting to represent a class of all holders of these Notes from August 11, 2014 to the present filed a substantially similar suit in the same court, against the same defendants, relating to the same transactions. Both lawsuits (the "Senior Unsecured Lawsuits") were assigned to the same judge. The claims against CEOC have been automatically stayed during its Chapter 11 bankruptcy proceedings. The court denied a motion to dismiss both lawsuits with respect to CEC. The parties have completed fact discovery with respect to both plaintiffs' claims against CEC. On October 23, 2015, plaintiffs in the Senior Unsecured Lawsuits moved for partial summary judgment, and on December 29, 2015, those motions were denied. On December 4, 2015, plaintiff in the action brought on behalf of holders of CEOC's 6.50% Senior Unsecured Notes moved for class certification and briefing has been completed. The judge presiding over these cases thereafter retired, and a new judge was appointed to preside over these lawsuits. That judge set a new summary judgment briefing schedule, and the parties filed cross-motions for summary judgment which remain pending. On October 5, 2016, the Bankruptcy Court granted CEOC's motion for a stay of these proceedings (and others). The stay will remain in effect until the earlier of (a) the first omnibus hearing after the Bankruptcy Court issues its decision confirming or denying confirmation of the CEOC reorganization plan, (b) the termination of the Second Lien RSA or (c) further order of the Bankruptcy Court. CAC and CGP LLC are not parties to these lawsuits. On November 25, 2014, UMB Bank ("UMB"), as successor indenture trustee for CEOC's 8.5% senior secured notes due 2020, filed a verified complaint (the "Delaware First Lien Lawsuit") in Delaware Chancery Court against CEC, CEOC, CERP, CAC, CGP LLC, CES, and against an individual, and past and present members of the CEC and CEOC Boards of Directors, Gary Loveman, Jeffrey Benjamin, David Bonderman, Kelvin Davis, Eric Press, Marc Rowan, David Sambur, Eric Hession, Donald Colvin, Fred Kleisner, Lynn Swann, Chris Williams, Jeffrey Housenbold, Michael Cohen, Ronen Stauber, and Steven Winograd, alleging generally that defendants have improperly stripped CEOC of prized assets, have wrongfully affected a release of a CEC parental guarantee of CEOC debt and have committed other wrongs. Among other things, UMB has asked the court to appoint a receiver over CEOC. In addition, the Delaware First Lien Lawsuit pleads claims for fraudulent conveyances/transfers, insider preferences, illegal dividends, declaratory judgment (for breach of contract as regards to the parent guarantee and also as to certain covenants in the bond indenture), tortious interference with contract, breach of fiduciary duty, aiding and abetting breach of fiduciary duty, usurpation of corporate opportunities, and unjust enrichment, and seeks monetary and equitable as well as declaratory relief. CAC and CGP LLC believe this lawsuit is without merit and will defend themselves vigorously. All of the defendants have moved to dismiss the lawsuit, and that motion has been fully briefed. In addition, this lawsuit has been automatically stayed with respect to CEOC during the Chapter 11 process and, pursuant to the (a) Fifth Amended and Restated Restructuring Support and Forbearance Agreement dated October 7, 2015, with certain holders of claims in respect of claims under CEOC's first lien notes (the "First Lien Bond RSA") and (b) Restructuring Support and Forbearance Agreement dated August 21, 2015, with certain holders of claims in respect of claims under CEOC's first lien credit agreement (the "First Lien Bank RSA" and, together with the First Lien Bond RSA, the "RSAs"), has been subject to a consensual stay for all. On February 13, 2015, Caesars Entertainment received a Demand For Payment of Guaranteed Obligations (the "February 13 Notice") from Wilmington Savings Fund Society, FSB, in its capacity as successor Trustee for CEOC's 10.00% Second-Priority Notes. The February 13 Notice alleges that CEOC's commencement of its voluntary Chapter 11 bankruptcy case constituted an event of default under the indenture governing the 10.00% Second-Priority Notes; that all amounts due and owing on the 10.00% Second-Priority Notes therefore immediately became payable; and that Caesars Entertainment is responsible for paying CEOC's obligations on the 10.00% Second-Priority Notes, including CEOC's obligation to timely pay all principal, interest, and any premium due on these notes, as a result of a parent guarantee provision contained in the indenture governing the notes that the February 13 Notice alleges is still binding. The February 13 Notice accordingly demands that Caesars Entertainment immediately pay Wilmington Savings Fund Society, FSB, cash in an amount of not less than $3.7 billion , plus accrued and unpaid interest (including without limitation the $184 million interest payment due December 15, 2014 that CEOC elected not to pay) and accrued and unpaid attorneys' fees and other expenses. The February 13 Notice also alleges that the interest, fees and expenses continue to accrue. CAC and CGP LLC are not parties to this demand. On February 18, 2015, Caesars Entertainment received a Demand For Payment of Guaranteed Obligations (the "February 18 Notice") from BOKF, N.A. ("BOKF"), in its capacity as successor Trustee for CEOC's 12.75% Second-Priority Senior Secured Notes due 2018 (the " 12.75% Second-Priority Notes"). The February 18 Notice alleges that CEOC's commencement of its voluntary Chapter 11 bankruptcy case constituted an event of default under the indenture governing the 12.75% Second-Priority Notes; that all amounts due and owing on the 12.75% Second-Priority Notes therefore immediately became payable; and that CEC is responsible for paying CEOC's obligations on the 12.75% Second-Priority Notes, including CEOC's obligation to timely pay all principal, interest and any premium due on these notes, as a result of a parent guarantee provision contained in the indenture governing the notes that the February 18 Notice alleges is still binding. The February 18 Notice therefore demands that CEC immediately pay BOKF cash in an amount of not less than $750 million , plus accrued and unpaid interest, accrued and unpaid attorneys' fees, and other expenses. The February 18 Notice also alleges that the interest, fees and expenses continue to accrue. CAC and CGP LLC are not parties to this demand. On March 3, 2015, BOKF filed a lawsuit (the "New York Second Lien Lawsuit") against CEC in federal district court in Manhattan, in its capacity as successor trustee for CEOC's 12.75% Second-Priority Notes. On June 15, 2015, UMB filed a lawsuit (the "New York First Lien Lawsuit") against CEC, also in federal district court in Manhattan, in its capacity as successor trustee for CEOC's 11.25% Senior Secured Notes due 2017, 8.50% Senior Secured Notes due 2020, and 9.00% Senior Secured Notes due 2020. Plaintiffs in these actions allege that CEOC's filing of its voluntary Chapter 11 bankruptcy case constitutes an event of default under the indenture governing these notes, causing all principal and interest to become immediately due and payable, and that CEC is obligated to make those payments pursuant to a parent guarantee provision in the indentures governing these notes that plaintiffs allege are still binding. Both plaintiffs bring claims for violation of the Trust Indenture Act of 1939, breach of contract, breach of duty of good faith and fair dealing and for declaratory relief and BOKF brings an additional claim for intentional interference with contractual relations. The cases were assigned to the same judge presiding over the other Parent Guarantee Lawsuits, as defined below. CEC filed its answer to the BOKF complaint on March 25, 2015, and to the UMB complaint on August 10, 2015. On June 25, 2015, and June 26, 2015, BOKF and UMB, respectively, moved for partial summary judgment, specifically on their claims alleging a violation of the Trust Indenture Act of 1939, seeking both declaratory relief and damages. On August 27, 2015, those motions were denied. The court, on its own motion, certified its order with respect to the interpretation of the Trust Indenture Act for interlocutory appeal to the United States Court of Appeals for the Second Circuit, and on December 22, 2015, the appellate court denied CEC's motion for leave to appeal. On November 20, 2015, BOKF and UMB again moved for partial summary judgment. Those motions likewise were denied. The judge presiding over these cases thereafter retired, and a new judge was appointed to preside over these lawsuits. That judge set a new summary judgment briefing schedule, and the parties submitted cross-motions for summary judgment which remain pending. On October 5, 2016, the Bankruptcy Court granted CEOC's motion for a stay of the New York First Lien Lawsuit and the New York Second Lien Lawsuit (and others). The stay will remain in effect until the earlier of (a) the first omnibus hearing after the Bankruptcy Court issues its decision confirming or denying confirmation of the CEOC reorganization plan, (b) the termination of the restructuring support agreement with the Official Committee of Second Priority Noteholders (the "Second Lien RSA") or (c) further order of the Bankruptcy Court. CAC and CGP LLC are not parties to these lawsuits. On October 20, 2015, Wilmington Trust, National Association ("Wilmington Trust"), filed a lawsuit (the "New York Senior Notes Lawsuit" and, together with the Delaware Second Lien Lawsuit, the Delaware First Lien Lawsuit, the Senior Unsecured Lawsuits, the New York Second Lien Lawsuit, and the New York First Lien Lawsuit, the "Parent Guarantee Lawsuits") against CEC in federal district court in Manhattan in its capacity as successor indenture trustee for CEOC's 10.75% Senior Notes due 2016 (the "10.75% Senior Notes"). Plaintiff alleges that CEC is obligated to make payment of amounts due on the 10.75% Senior Notes pursuant to a parent guarantee provision in the indenture governing those notes that plaintiff alleges is still in effect. Plaintiff raises claims for violations of the Trust Indenture Act of 1939, breach of contract, breach of the implied duty of good faith and fair dealing, and for declaratory judgment, and seeks monetary and declaratory relief. CEC filed its answer to the complaint on November 23, 2015. As with the other parent guarantee lawsuits taking place in Manhattan, the judge presiding over these cases retired and a new judge was appointed to preside over these lawsuits. That judge set a new summary judgment briefing schedule and the parties submitted cross-motions for summary judgment which remain pending. On October 5, 2016, the Bankruptcy Court granted CEOC's motion for a stay of this proceeding (and others). The stay will remain in effect until the earlier of (a) the first omnibus hearing after the Bankruptcy Court issues its decision confirming or denying confirmation of the CEOC reorganization plan, (b) the termination of the Second Lien RSA or (c) further order of the Bankruptcy Court. In accordance with the terms of the applicable indentures and as previously disclosed, Caesars Entertainment believes that it is not subject to the above-described guarantees. As a result, Caesars Entertainment believes the demands for payment are without merit. The claims against CEOC have been stayed due to the Chapter 11 process and, except as described above, the actions against CEC have been allowed to continue. CAC and CGP LLC believe that the claims and demands described above against CAC and CGP LLC in the Delaware First Lien Lawsuit and Delaware Second Lien Lawsuit are without merit and intend to defend themselves vigorously. For the Delaware First Lien Lawsuit and Delaware Second Lien Lawsuit, at the present time, CAC and CGP LLC believe it is not probable that a material loss will result from the outcome of these matters. However, given the uncertainty of litigation, CAC and CGP LLC cannot provide assurance as to the outcome of these matters or of the range of reasonably possible losses should the matters ultimately be resolved against them. Should these matters ultimately be resolved through litigation outside of the financial restructuring of CEOC, which CAC and CGP LLC believe these matters would likely be long and protracted, and were a court to find in favor of the claimants in the Delaware First Lien Lawsuit or the Delaware Second Lien Lawsuit, such determination could have a material adverse effect on CAC and CGP LLC's business, financial condition, results of operations, and cash flows. As part of CEOC's bankruptcy proceeding, the Official Committee of Second Priority Noteholders ("Second Priority Noteholders") filed a standing motion in bankruptcy court on May 13, 2016 seeking standing to commence claims on behalf of CEOC's estate. The proposed complaint names as potential defendants CAC, CGP LLC, CIE, and CES as well as CEC and CERP among others, and seeks recovery of assets transferred from CEOC. The proposed complaint alleges claims on behalf of CEOC's estate ranging in value from $8.1 billion to $12.6 billion against all defendants, as valued by the Second Priority Noteholders. Of this amount, the Second Priority Noteholders allege potential claims against CAC, CGP LLC, and CIE ranging from $3.7 billion to $7.9 billion , without taking into account any duplicative recovery, based on calculations in an exhibit to the revised disclosure statement filed in the bankruptcy court on May 27, 2016. A hearing on the standing motion was held on October 19, 2016, and the standing motion was continued until January 17, 2017. On October 5, 2016, CEOC announced the execution of, or amendment and restatement of, restructuring support agreements with representatives of all of CEOC's major creditor groups, as well as agreement to the terms of CEOC's third amended plan of reorganization. Included among these was the Second Lien RSA. Pursuant to the terms of the Second Lien RSA, CEOC and the Second Priority Noteholders have agreed to stay certain discovery deadlines and to hold in abeyance various proceedings pending before the bankruptcy court. The Second Priority Noteholders' standing motion, various claim objections and motions to compel will all be held in abeyance until (a) the date on which the Debtors' third amended plan becomes effective or (b) seven days after the termination of the Second Lien RSA for any reason, whichever is earlier. The Second Lien RSA further requires the consenting Second Priority Noteholders to vote in favor of the plan. On August 9, 2016, CEOC and certain of its affiliates, each debtor in the Chapter 11 bankruptcy proceedings, filed an adversary complaint as part of the Chapter 11 bankruptcy proceeding against CAC, CIE, CGP LLC, and Caesars Growth Properties Holdings, LLC ("CGPH"), among others, including CEC, CES, and certain current and former directors of CEOC and CEC. In this adversary complaint, the plaintiffs assert claims against CAC for actual and constructive fraudulent conveyances and transfers. The plaintiffs allege, among other things, that certain transactions in which CAC purchased assets from CEOC constituted fraudulent conveyances, and that CAC did not provide CEOC with reasonably equivalent value for the assets acquired. The plaintiffs also claim certain transactions involving CIE constituted fraudulent transfers. The plaintiffs seek, among other relief, avoidance and/or rescission of the disputed transactions; return of assets transferred in those transactions; compensation from defendants for CEOC's alleged losses and damages; and an award to plaintiffs of the costs of the actions, including attorney's fees. CAC, CIE, CGP LLC, and CGPH believe the above-referenced adversary complaint is without merit and intend to defend it vigorously, including by filing a motion to dismiss at the appropriate time. The status and timing of the adversary proceeding is affected by the Bankruptcy proceedings. On August 10, 2016, CEOC filed an emergency motion seeking, among other relief, to stay the above-referenced adversary proceeding. On August 23, 2016, the bankruptcy court granted the relief requested until the October 19, 2016 omnibus hearing. At the October 19, 2016 omnibus hearing, the bankruptcy court continued the adversary proceeding until the November 16, 2016 omnibus hearing. Report of Bankruptcy Examiner The Bankruptcy Court previously engaged an independent examiner to investigate possible claims CEOC might have against CEC, CAC, CGP LLC, other entities and certain individuals. On March 15, 2016, the examiner released his report in redacted form (to the public) and in unredacted form (to certain entities and individuals). On May 16, 2016, the examiner issued a substantially unredacted version of his report. CAC, CGP LLC and CIE do not have access to the unredacted report, and accordingly the description below is based on the substantially unredacted publicly-available report. The examiner's report identifies a variety of potential claims against CAC, CGP LLC, CIE, other entities and certain individuals related to a number of transactions dating back to 2009. Most of the examiner's findings are based on his view that CEOC was "insolvent" at the time of the applicable transactions. The examiner's report includes his conclusions on the relative strength of these possible claims, many of which are described above. The examiner calculates an estimated range of potential damages for these potential claims as against all parties from $3.6 billion to $5.1 billion . The examiner calculates an estimated range of potential damages for potential claims against CAC, CGP LLC and CIE from $1.7 billion to $2.3 billion , ignoring potential duplication of recovery from other defendants. Neither calculation takes into account probability of success, likelihood of collection, or the time or cost of litigation. Although this report was prepared at the request of the Bankruptcy Court, none of the findings are legally binding on the Bankruptcy Court or any party. CAC, CGP LLC and CIE contest many of the examiner's findings, including his finding that CEOC did not receive fair value for assets transferred, any suggestion that certain of the potential claims against CAC, CGP LLC and CIE have merit, and his calculation of potential damages. CAC, CGP LLC and its subsidiaries believe that each of the disputed transactions involving them provided substantial value to CEOC that was reasonably equivalent to the value of the asset (s) transferred, and that they at all times acted in good faith. National Retirement Fund In January 2015, a majority of the Trustees of the National Retirement Fund ("NRF"), a multi-employer defined benefit pension plan, voted to expel CEC and its participating subsidiaries, the CEC Group, from the plan. Neither CAC, CGP LLC nor any of their subsidiaries are part of the CEC Group. NRF claims that CEOC's bankruptcy presents an "actuarial risk" to the plan because, depending on the outcome of the bankruptcy proceeding, CEC might no longer be liable to the plan for any partial or complete withdrawal liability. NRF has advised the CEC Grou |