Schedule III - Real Estate Investments (Details) - USD ($) $ in Thousands | 12 Months Ended | | | |
Dec. 31, 2020 | Dec. 31, 2019 | Dec. 31, 2018 | Dec. 31, 2017 |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 92,947 | | | |
Initial costs of buildings and improvements | 373,326 | | | |
Initial costs of construction in progress | 349,243 | | | |
Costs capitalized subsequent to acquisition, land | 72,162 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 2,465,934 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 679,521 | | | |
Gross carrying amount, land | 165,109 | | | |
Gross carrying amount, buildings and improvements | 2,839,260 | | | |
Gross carrying amount, construction in progress | 1,028,764 | | | |
Accumulated depreciation and amortization | (702,944) | $ (558,560) | $ (467,644) | $ (394,823) |
Owned Properties | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | 92,947 | | | |
Initial costs of buildings and improvements | 312,254 | | | |
Initial costs of construction in progress | 349,243 | | | |
Costs capitalized subsequent to acquisition, land | 72,162 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 2,443,381 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 679,142 | | | |
Gross carrying amount, land | 165,109 | | | |
Gross carrying amount, buildings and improvements | 2,755,635 | | | |
Gross carrying amount, construction in progress | 1,028,385 | | | |
Accumulated depreciation and amortization | (674,468) | | | |
Owned Properties | Ashburn, Virginia (DC-1) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | 16,476 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 371,725 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 13,653 | | | |
Gross carrying amount, land | 16,476 | | | |
Gross carrying amount, buildings and improvements | 371,725 | | | |
Gross carrying amount, construction in progress | 13,653 | | | |
Accumulated depreciation and amortization | $ (23,423) | | | |
Year of acquisition | 2017 | | | |
Owned Properties | Ashburn, Virginia (DC-2) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 20,603 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 0 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 109,254 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 0 | | | |
Gross carrying amount, construction in progress | 129,857 | | | |
Accumulated depreciation and amortization | $ 0 | | | |
Year of acquisition | 2019 | | | |
Owned Properties | Ashburn, Virginia (DC-3) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 35,198 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 0 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 7,194 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 0 | | | |
Gross carrying amount, construction in progress | 42,392 | | | |
Accumulated depreciation and amortization | $ 0 | | | |
Year of acquisition | 2017 | | | |
Owned Properties | Atlanta, Georgia (DC-1) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 2,078 | | | |
Initial costs of buildings and improvements | 35,473 | | | |
Initial costs of construction in progress | 2,209 | | | |
Costs capitalized subsequent to acquisition, land | 11,212 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 538,751 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 991 | | | |
Gross carrying amount, land | 13,289 | | | |
Gross carrying amount, buildings and improvements | 574,224 | | | |
Gross carrying amount, construction in progress | 3,200 | | | |
Accumulated depreciation and amortization | $ (221,800) | | | |
Year of acquisition | 2006 | | | |
Owned Properties | Atlanta, Georgia (DC-2) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 10,569 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 124,864 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 124,252 | | | |
Gross carrying amount, land | 10,569 | | | |
Gross carrying amount, buildings and improvements | 124,864 | | | |
Gross carrying amount, construction in progress | 124,252 | | | |
Accumulated depreciation and amortization | $ (2,737) | | | |
Year of acquisition | 2017 | | | |
Owned Properties | Atlanta, Georgia Land | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 23,572 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 52,754 | | | |
Costs capitalized subsequent to acquisition, land | 7,726 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 1,054 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 10,866 | | | |
Gross carrying amount, land | 31,298 | | | |
Gross carrying amount, buildings and improvements | 1,054 | | | |
Gross carrying amount, construction in progress | 63,619 | | | |
Accumulated depreciation and amortization | $ (449) | | | |
Year of acquisition | 2017, 2019, 2020 | | | |
Owned Properties | Chicago, Illinois | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 17,764 | | | |
Costs capitalized subsequent to acquisition, land | 9,400 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 250,335 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 86,353 | | | |
Gross carrying amount, land | 9,400 | | | |
Gross carrying amount, buildings and improvements | 250,335 | | | |
Gross carrying amount, construction in progress | 104,117 | | | |
Accumulated depreciation and amortization | $ (34,134) | | | |
Year of acquisition | 2014 | | | |
Owned Properties | Dulles, Virginia | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 3,154 | | | |
Initial costs of buildings and improvements | 29,583 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 24,740 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 4,148 | | | |
Gross carrying amount, land | 3,154 | | | |
Gross carrying amount, buildings and improvements | 54,323 | | | |
Gross carrying amount, construction in progress | 4,148 | | | |
Accumulated depreciation and amortization | $ (17,191) | | | |
Year of acquisition | 2017 | | | |
Owned Properties | Eemshaven, Netherlands | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 29,915 | | | |
Costs capitalized subsequent to acquisition, land | 5,366 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 21,712 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 17,616 | | | |
Gross carrying amount, land | 5,366 | | | |
Gross carrying amount, buildings and improvements | 21,712 | | | |
Gross carrying amount, construction in progress | 47,531 | | | |
Accumulated depreciation and amortization | $ (1,017) | | | |
Year of acquisition | 2019 | | | |
Owned Properties | Fort Worth, Texas | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 136 | | | |
Initial costs of buildings and improvements | 610 | | | |
Initial costs of construction in progress | 48,984 | | | |
Costs capitalized subsequent to acquisition, land | 8,943 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 123,444 | | | |
Costs capitalized subsequent to acquisition, construction in progress | (47,920) | | | |
Gross carrying amount, land | 9,079 | | | |
Gross carrying amount, buildings and improvements | 124,054 | | | |
Gross carrying amount, construction in progress | 1,064 | | | |
Accumulated depreciation and amortization | $ (8,967) | | | |
Year of acquisition | 2016 | | | |
Owned Properties | Groningen, Netherlands | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 1,743 | | | |
Initial costs of buildings and improvements | 8,640 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 153 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 2,566 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 3,730 | | | |
Gross carrying amount, land | 1,896 | | | |
Gross carrying amount, buildings and improvements | 11,206 | | | |
Gross carrying amount, construction in progress | 3,730 | | | |
Accumulated depreciation and amortization | $ (1,456) | | | |
Year of acquisition | 2019 | | | |
Owned Properties | Hillsboro, Oregon | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 25,657 | | | |
Costs capitalized subsequent to acquisition, land | 18,414 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 34,594 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 52,733 | | | |
Gross carrying amount, land | 18,414 | | | |
Gross carrying amount, buildings and improvements | 34,594 | | | |
Gross carrying amount, construction in progress | 78,390 | | | |
Accumulated depreciation and amortization | $ (880) | | | |
Year of acquisition | 2017 | | | |
Owned Properties | Irving, Texas | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 5,808 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 8,606 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 386,467 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 99,591 | | | |
Gross carrying amount, land | 8,606 | | | |
Gross carrying amount, buildings and improvements | 392,275 | | | |
Gross carrying amount, construction in progress | 99,591 | | | |
Accumulated depreciation and amortization | $ (81,213) | | | |
Year of acquisition | 2013 | | | |
Owned Properties | Lenexa, Kansas | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 400 | | | |
Initial costs of buildings and improvements | 3,100 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 37 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 781 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 0 | | | |
Gross carrying amount, land | 437 | | | |
Gross carrying amount, buildings and improvements | 3,881 | | | |
Gross carrying amount, construction in progress | 0 | | | |
Accumulated depreciation and amortization | $ (703) | | | |
Year of acquisition | 2011 | | | |
Owned Properties | Manassas Virginia (DC-1) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 27,484 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 25 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 33,586 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 25 | | | |
Gross carrying amount, construction in progress | 61,070 | | | |
Accumulated depreciation and amortization | $ (2) | | | |
Year of acquisition | 2018 | | | |
Owned Properties | Manassas Virginia (DC-2) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 5,911 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 0 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 92 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 0 | | | |
Gross carrying amount, construction in progress | 6,003 | | | |
Accumulated depreciation and amortization | $ 0 | | | |
Year of acquisition | 2018 | | | |
Owned Properties | Miami, Florida | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 1,777 | | | |
Initial costs of buildings and improvements | 6,955 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 24,934 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 577 | | | |
Gross carrying amount, land | 1,777 | | | |
Gross carrying amount, buildings and improvements | 31,889 | | | |
Gross carrying amount, construction in progress | 577 | | | |
Accumulated depreciation and amortization | $ (13,796) | | | |
Year of acquisition | 2008 | | | |
Owned Properties | Phoenix, Arizona | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 24,668 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 0 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 13,061 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 0 | | | |
Gross carrying amount, construction in progress | 37,729 | | | |
Accumulated depreciation and amortization | $ 0 | | | |
Year of acquisition | 2017 | | | |
Owned Properties | Piscataway, New Jersey | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 7,466 | | | |
Initial costs of buildings and improvements | 80,366 | | | |
Initial costs of construction in progress | 13,900 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 41,810 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 16,501 | | | |
Gross carrying amount, land | 7,466 | | | |
Gross carrying amount, buildings and improvements | 122,176 | | | |
Gross carrying amount, construction in progress | 30,401 | | | |
Accumulated depreciation and amortization | $ (16,600) | | | |
Year of acquisition | 2016 | | | |
Owned Properties | Princeton, New Jersey | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 20,700 | | | |
Initial costs of buildings and improvements | 32,126 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 3,135 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 5 | | | |
Gross carrying amount, land | 20,700 | | | |
Gross carrying amount, buildings and improvements | 35,261 | | | |
Gross carrying amount, construction in progress | 5 | | | |
Accumulated depreciation and amortization | $ (6,319) | | | |
Year of acquisition | 2014 | | | |
Owned Properties | Richmond, Virginia | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 2,000 | | | |
Initial costs of buildings and improvements | 11,200 | | | |
Initial costs of construction in progress | 7,029 | | | |
Costs capitalized subsequent to acquisition, land | 180 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 222,727 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 113,548 | | | |
Gross carrying amount, land | 2,180 | | | |
Gross carrying amount, buildings and improvements | 233,927 | | | |
Gross carrying amount, construction in progress | 120,577 | | | |
Accumulated depreciation and amortization | $ (84,389) | | | |
Year of acquisition | 2010 & 2019 | | | |
Owned Properties | Sacramento, California | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 1,481 | | | |
Initial costs of buildings and improvements | 52,753 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 13,546 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 12 | | | |
Gross carrying amount, land | 1,481 | | | |
Gross carrying amount, buildings and improvements | 66,299 | | | |
Gross carrying amount, construction in progress | 12 | | | |
Accumulated depreciation and amortization | $ (16,325) | | | |
Year of acquisition | 2012 | | | |
Owned Properties | San Antonio, Texas | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 37,167 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 0 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 3,213 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 0 | | | |
Gross carrying amount, construction in progress | 40,380 | | | |
Accumulated depreciation and amortization | $ 0 | | | |
Year of acquisition | 2020 | | | |
Owned Properties | Santa Clara, California | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 15,838 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 101,505 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 9,385 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 117,343 | | | |
Gross carrying amount, construction in progress | 9,385 | | | |
Accumulated depreciation and amortization | $ (52,742) | | | |
Year of acquisition | 2007 | | | |
Owned Properties | Suwanee, Georgia (Atlanta-Suwanee) | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 1,395 | | | |
Initial costs of buildings and improvements | 29,802 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 2,126 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 154,665 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 6,701 | | | |
Gross carrying amount, land | 3,521 | | | |
Gross carrying amount, buildings and improvements | 184,467 | | | |
Gross carrying amount, construction in progress | 6,701 | | | |
Accumulated depreciation and amortization | $ (90,323) | | | |
Year of acquisition | 2005 | | | |
Leased Properties | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 61,072 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 22,553 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 379 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 83,625 | | | |
Gross carrying amount, construction in progress | 379 | | | |
Accumulated depreciation and amortization | (28,476) | | | |
Leased Properties | Jersey City, New Jersey | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | 0 | | | |
Initial costs of buildings and improvements | 1,985 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 28,178 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 223 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 30,163 | | | |
Gross carrying amount, construction in progress | 223 | | | |
Accumulated depreciation and amortization | $ (15,455) | | | |
Year of acquisition | 2006 | | | |
Leased Properties | Overland Park, Kansas | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | $ 0 | | | |
Initial costs of buildings and improvements | 0 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | 866 | | | |
Costs capitalized subsequent to acquisition, construction in progress | 154 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 866 | | | |
Gross carrying amount, construction in progress | 154 | | | |
Accumulated depreciation and amortization | (508) | | | |
Lease Facilities acquired in 2015 | | | | |
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items] | | | | |
Initial costs of land | 0 | | | |
Initial costs of buildings and improvements | 59,087 | | | |
Initial costs of construction in progress | 0 | | | |
Costs capitalized subsequent to acquisition, land | 0 | | | |
Costs capitalized subsequent to acquisition, buildings and improvements | (6,491) | | | |
Costs capitalized subsequent to acquisition, construction in progress | 2 | | | |
Gross carrying amount, land | 0 | | | |
Gross carrying amount, buildings and improvements | 52,596 | | | |
Gross carrying amount, construction in progress | 2 | | | |
Accumulated depreciation and amortization | $ (12,513) | | | |
Year of acquisition | 2015 | | | |