Schedule III - Real Estate and Accumulated Depreciation (Details) - USD ($) $ in Thousands | 12 Months Ended | | | |
Dec. 31, 2017 | Dec. 31, 2016 | Dec. 31, 2015 | Dec. 31, 2014 |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 762,404 | | | |
Initial Cost to Company, Land | | 198,245 | | | |
Initial Cost to Company, Buildings and Improvements | | 833,416 | | | |
Initial Cost to Company, Total | | 1,031,661 | | | |
Costs Capitalized Subsequent to Acquisition | | 77,561 | | | |
Gross Amount Carried , Land | | 198,245 | | | |
Gross Amount Carried , Buildings and Improvements | | 884,560 | | | |
Gross Amount Carried , Total | | 1,082,805 | $ 1,029,349 | $ 942,755 | $ 650,314 |
Accumulated Depreciation and Amortization | | $ (91,649) | | | |
Arbors on Forest Ridge | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Arbors on Forest Ridge | Bedford | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 13,130 | | | |
Initial Cost to Company, Land | | 2,330 | | | |
Initial Cost to Company, Buildings and Improvements | | 10,475 | | | |
Initial Cost to Company, Total | | 12,805 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,755 | | | |
Gross Amount Carried , Land | | 2,330 | | | |
Gross Amount Carried , Buildings and Improvements | | 11,918 | | | |
Gross Amount Carried , Total | | $ 14,248 | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,140) | | | |
Cutter’s Point | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Cutter’s Point | Richardson | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 16,640 | | | |
Initial Cost to Company, Land | | 3,330 | | | |
Initial Cost to Company, Buildings and Improvements | | 12,515 | | | |
Initial Cost to Company, Total | | 15,845 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,947 | | | |
Gross Amount Carried , Land | | 3,330 | | | |
Gross Amount Carried , Buildings and Improvements | | 14,110 | | | |
Gross Amount Carried , Total | | $ 17,440 | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,499) | | | |
Eagle Crest | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Eagle Crest | Irving | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 29,510 | | | |
Initial Cost to Company, Land | | 5,450 | | | |
Initial Cost to Company, Buildings and Improvements | | 21,875 | | | |
Initial Cost to Company, Total | | 27,325 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,424 | | | |
Gross Amount Carried , Land | | 5,450 | | | |
Gross Amount Carried , Buildings and Improvements | | 23,645 | | | |
Gross Amount Carried , Total | | $ 29,095 | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (3,903) | | | |
Silverbrook | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Silverbrook | Grand Prairie | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 30,590 | | | |
Initial Cost to Company, Land | | 4,860 | | | |
Initial Cost to Company, Buildings and Improvements | | 25,540 | | | |
Initial Cost to Company, Total | | 30,400 | | | |
Costs Capitalized Subsequent to Acquisition | | 3,427 | | | |
Gross Amount Carried , Land | | 4,860 | | | |
Gross Amount Carried , Buildings and Improvements | | 28,174 | | | |
Gross Amount Carried , Total | | $ 33,034 | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (5,221) | | | |
Timberglen | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | [1] | Jan. 31, 2014 | | | |
Timberglen | Dallas | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 17,226 | | | |
Initial Cost to Company, Land | | 2,510 | | | |
Initial Cost to Company, Buildings and Improvements | | 14,440 | | | |
Initial Cost to Company, Total | | 16,950 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,762 | | | |
Gross Amount Carried , Land | | 2,510 | | | |
Gross Amount Carried , Buildings and Improvements | | 15,794 | | | |
Gross Amount Carried , Total | | $ 18,304 | | | |
Date Acquired | | Jan. 31, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,500) | | | |
Edgewater at Sandy Springs | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jul. 18, 2014 | | | |
Edgewater at Sandy Springs | Atlanta | Georgia | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 52,000 | | | |
Initial Cost to Company, Land | | 14,290 | | | |
Initial Cost to Company, Buildings and Improvements | | 43,710 | | | |
Initial Cost to Company, Total | | 58,000 | | | |
Costs Capitalized Subsequent to Acquisition | | 6,515 | | | |
Gross Amount Carried , Land | | 14,290 | | | |
Gross Amount Carried , Buildings and Improvements | | 48,295 | | | |
Gross Amount Carried , Total | | $ 62,585 | | | |
Date Acquired | | Jul. 18, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (8,389) | | | |
Beechwood Terrace | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jul. 21, 2014 | | | |
Beechwood Terrace | Antioch | Tennessee | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 20,150 | | | |
Initial Cost to Company, Land | | 1,390 | | | |
Initial Cost to Company, Buildings and Improvements | | 20,010 | | | |
Initial Cost to Company, Total | | 21,400 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,399 | | | |
Gross Amount Carried , Land | | 1,390 | | | |
Gross Amount Carried , Buildings and Improvements | | 22,000 | | | |
Gross Amount Carried , Total | | $ 23,390 | | | |
Date Acquired | | Jul. 21, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (3,211) | | | |
Willow Grove | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jul. 21, 2014 | | | |
Willow Grove | Nashville | Tennessee | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 14,818 | | | |
Initial Cost to Company, Land | | 3,940 | | | |
Initial Cost to Company, Buildings and Improvements | | 9,810 | | | |
Initial Cost to Company, Total | | 13,750 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,196 | | | |
Gross Amount Carried , Land | | 3,940 | | | |
Gross Amount Carried , Buildings and Improvements | | 11,708 | | | |
Gross Amount Carried , Total | | $ 15,648 | | | |
Date Acquired | | Jul. 21, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (1,946) | | | |
Woodbridge | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jul. 21, 2014 | | | |
Woodbridge | Nashville | Tennessee | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 13,677 | | | |
Initial Cost to Company, Land | | 3,650 | | | |
Initial Cost to Company, Buildings and Improvements | | 12,350 | | | |
Initial Cost to Company, Total | | 16,000 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,108 | | | |
Gross Amount Carried , Land | | 3,650 | | | |
Gross Amount Carried , Buildings and Improvements | | 14,124 | | | |
Gross Amount Carried , Total | | $ 17,774 | | | |
Date Acquired | | Jul. 21, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,225) | | | |
Abbington Heights | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Aug. 1, 2014 | | | |
Abbington Heights | Antioch | Tennessee | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 10,000 | | | |
Initial Cost to Company, Land | | 1,770 | | | |
Initial Cost to Company, Buildings and Improvements | | 16,130 | | | |
Initial Cost to Company, Total | | 17,900 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,237 | | | |
Gross Amount Carried , Land | | 1,770 | | | |
Gross Amount Carried , Buildings and Improvements | | 17,967 | | | |
Gross Amount Carried , Total | | $ 19,737 | | | |
Date Acquired | | Aug. 1, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,720) | | | |
The Summit at Sabal Park | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Aug. 20, 2014 | | | |
The Summit at Sabal Park | Tampa | Florida | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 13,560 | | | |
Initial Cost to Company, Land | | 5,770 | | | |
Initial Cost to Company, Buildings and Improvements | | 13,280 | | | |
Initial Cost to Company, Total | | 19,050 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,637 | | | |
Gross Amount Carried , Land | | 5,770 | | | |
Gross Amount Carried , Buildings and Improvements | | 14,513 | | | |
Gross Amount Carried , Total | | $ 20,283 | | | |
Date Acquired | | Aug. 20, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,393) | | | |
Courtney Cove | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Aug. 20, 2014 | | | |
Courtney Cove | Tampa | Florida | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 13,680 | | | |
Initial Cost to Company, Land | | 5,880 | | | |
Initial Cost to Company, Buildings and Improvements | | 13,070 | | | |
Initial Cost to Company, Total | | 18,950 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,420 | | | |
Gross Amount Carried , Land | | 5,880 | | | |
Gross Amount Carried , Buildings and Improvements | | 14,059 | | | |
Gross Amount Carried , Total | | $ 19,939 | | | |
Date Acquired | | Aug. 20, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,309) | | | |
The Ashlar | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Feb. 26, 2015 | | | |
The Ashlar | Dallas | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 14,520 | | | |
Initial Cost to Company, Land | | 4,090 | | | |
Initial Cost to Company, Buildings and Improvements | | 12,145 | | | |
Initial Cost to Company, Total | | 16,235 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,432 | | | |
Gross Amount Carried , Land | | 4,090 | | | |
Gross Amount Carried , Buildings and Improvements | | 14,215 | | | |
Gross Amount Carried , Total | | 18,305 | | | |
Accumulated Depreciation and Amortization | | $ (2,066) | | | |
Radbourne Lake | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Sep. 30, 2014 | | | |
Radbourne Lake | Charlotte | North Carolina | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 19,153 | | | |
Initial Cost to Company, Land | | 2,440 | | | |
Initial Cost to Company, Buildings and Improvements | | 21,810 | | | |
Initial Cost to Company, Total | | 24,250 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,066 | | | |
Gross Amount Carried , Land | | 2,440 | | | |
Gross Amount Carried , Buildings and Improvements | | 23,224 | | | |
Gross Amount Carried , Total | | $ 25,664 | | | |
Date Acquired | | Sep. 30, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (3,343) | | | |
Timber Creek | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Sep. 30, 2014 | | | |
Timber Creek | Charlotte | North Carolina | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 19,419 | | | |
Initial Cost to Company, Land | | 11,260 | | | |
Initial Cost to Company, Buildings and Improvements | | 11,490 | | | |
Initial Cost to Company, Total | | 22,750 | | | |
Costs Capitalized Subsequent to Acquisition | | 3,946 | | | |
Gross Amount Carried , Land | | 11,260 | | | |
Gross Amount Carried , Buildings and Improvements | | 14,637 | | | |
Gross Amount Carried , Total | | $ 25,897 | | | |
Date Acquired | | Sep. 30, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,365) | | | |
Belmont at Duck Creek | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Sep. 30, 2014 | | | |
Belmont at Duck Creek | Garland | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 10,943 | | | |
Initial Cost to Company, Land | | 1,910 | | | |
Initial Cost to Company, Buildings and Improvements | | 16,615 | | | |
Initial Cost to Company, Total | | 18,525 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,227 | | | |
Gross Amount Carried , Land | | 1,910 | | | |
Gross Amount Carried , Buildings and Improvements | | 18,406 | | | |
Gross Amount Carried , Total | | $ 20,316 | | | |
Date Acquired | | Sep. 30, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (2,622) | | | |
Parc500 | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jul. 27, 2016 | | | |
Parc500 | West Palm Beach | Florida | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 15,732 | | | |
Initial Cost to Company, Land | | 3,860 | | | |
Initial Cost to Company, Buildings and Improvements | | 19,424 | | | |
Initial Cost to Company, Total | | 23,284 | | | |
Costs Capitalized Subsequent to Acquisition | | 3,098 | | | |
Gross Amount Carried , Land | | 3,860 | | | |
Gross Amount Carried , Buildings and Improvements | | 22,031 | | | |
Gross Amount Carried , Total | | 25,891 | | | |
Accumulated Depreciation and Amortization | | $ (1,294) | | | |
Sabal Palm at Lake Buena Vista | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Nov. 5, 2014 | | | |
Sabal Palm at Lake Buena Vista | Orlando | Florida | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 37,680 | | | |
Initial Cost to Company, Land | | 7,580 | | | |
Initial Cost to Company, Buildings and Improvements | | 41,920 | | | |
Initial Cost to Company, Total | | 49,500 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,761 | | | |
Gross Amount Carried , Land | | 7,580 | | | |
Gross Amount Carried , Buildings and Improvements | | 42,294 | | | |
Gross Amount Carried , Total | | $ 49,874 | | | |
Date Acquired | | Nov. 5, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (5,136) | | | |
Southpoint Reserve at Stoney Creek | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | [1] | Dec. 18, 2014 | | | |
Southpoint Reserve at Stoney Creek | Fredericksburg | Virginia | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 13,600 | | | |
Initial Cost to Company, Land | | 6,120 | | | |
Initial Cost to Company, Buildings and Improvements | | 10,880 | | | |
Initial Cost to Company, Total | | 17,000 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,546 | | | |
Gross Amount Carried , Land | | 6,120 | | | |
Gross Amount Carried , Buildings and Improvements | | 11,934 | | | |
Gross Amount Carried , Total | | $ 18,054 | | | |
Date Acquired | | Dec. 18, 2014 | | | |
Accumulated Depreciation and Amortization | | $ (897) | | | |
Cornerstone | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jan. 15, 2015 | | | |
Cornerstone | Orlando | Florida | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 22,664 | | | |
Initial Cost to Company, Land | | 1,500 | | | |
Initial Cost to Company, Buildings and Improvements | | 30,050 | | | |
Initial Cost to Company, Total | | 31,550 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,800 | | | |
Gross Amount Carried , Land | | 1,500 | | | |
Gross Amount Carried , Buildings and Improvements | | 31,956 | | | |
Gross Amount Carried , Total | | $ 33,456 | | | |
Date Acquired | | Jan. 15, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (3,843) | | | |
Hollister Place | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Feb. 1, 2017 | | | |
Hollister Place | Houston | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 13,475 | | | |
Initial Cost to Company, Land | | 2,782 | | | |
Initial Cost to Company, Buildings and Improvements | | 21,902 | | | |
Initial Cost to Company, Total | | 24,684 | | | |
Costs Capitalized Subsequent to Acquisition | | 571 | | | |
Gross Amount Carried , Land | | 2,782 | | | |
Gross Amount Carried , Buildings and Improvements | | 21,541 | | | |
Gross Amount Carried , Total | | $ 24,323 | | | |
Date Acquired | | Jan. 2, 2017 | | | |
Accumulated Depreciation and Amortization | | $ (792) | | | |
The Preserve at Terrell Mill | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Feb. 6, 2015 | | | |
The Preserve at Terrell Mill | Marietta | Georgia | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 42,480 | | | |
Initial Cost to Company, Land | | 10,170 | | | |
Initial Cost to Company, Buildings and Improvements | | 47,830 | | | |
Initial Cost to Company, Total | | 58,000 | | | |
Costs Capitalized Subsequent to Acquisition | | 6,720 | | | |
Gross Amount Carried , Land | | 10,170 | | | |
Gross Amount Carried , Buildings and Improvements | | 52,736 | | | |
Gross Amount Carried , Total | | $ 62,906 | | | |
Date Acquired | | Feb. 6, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (6,879) | | | |
Rockledge Apartments | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Jun. 30, 2017 | | | |
Rockledge Apartments | Marietta | Georgia | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 68,100 | | | |
Initial Cost to Company, Land | | 17,451 | | | |
Initial Cost to Company, Buildings and Improvements | | 96,577 | | | |
Initial Cost to Company, Total | | 114,028 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,466 | | | |
Gross Amount Carried , Land | | 17,451 | | | |
Gross Amount Carried , Buildings and Improvements | | 95,022 | | | |
Gross Amount Carried , Total | | $ 112,473 | | | |
Date Acquired | | Jun. 30, 2017 | | | |
Accumulated Depreciation and Amortization | | $ (1,839) | | | |
Atera Apartments | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Oct. 25, 2017 | | | |
Atera Apartments | Dallas | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 29,500 | | | |
Initial Cost to Company, Land | | 22,371 | | | |
Initial Cost to Company, Buildings and Improvements | | 37,090 | | | |
Initial Cost to Company, Total | | 59,461 | | | |
Costs Capitalized Subsequent to Acquisition | | 20 | | | |
Gross Amount Carried , Land | | 22,371 | | | |
Gross Amount Carried , Buildings and Improvements | | 37,110 | | | |
Gross Amount Carried , Total | | $ 59,481 | | | |
Date Acquired | | Oct. 25, 2017 | | | |
Accumulated Depreciation and Amortization | | $ (737) | | | |
Heatherstone | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Feb. 26, 2015 | | | |
Heatherstone | Dallas | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 8,880 | | | |
Initial Cost to Company, Land | | 2,320 | | | |
Initial Cost to Company, Buildings and Improvements | | 7,130 | | | |
Initial Cost to Company, Total | | 9,450 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,982 | | | |
Gross Amount Carried , Land | | 2,320 | | | |
Gross Amount Carried , Buildings and Improvements | | 8,904 | | | |
Gross Amount Carried , Total | | $ 11,224 | | | |
Date Acquired | | Feb. 26, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (1,298) | | | |
Versailles | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Feb. 26, 2015 | | | |
Versailles | Dallas | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 23,880 | | | |
Initial Cost to Company, Land | | 6,720 | | | |
Initial Cost to Company, Buildings and Improvements | | 19,445 | | | |
Initial Cost to Company, Total | | 26,165 | | | |
Costs Capitalized Subsequent to Acquisition | | 4,213 | | | |
Gross Amount Carried , Land | | 6,720 | | | |
Gross Amount Carried , Buildings and Improvements | | 23,077 | | | |
Gross Amount Carried , Total | | $ 29,797 | | | |
Date Acquired | | Feb. 26, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (3,064) | | | |
Seasons 704 Apartments | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Apr. 15, 2015 | | | |
Seasons 704 Apartments | West Palm Beach | Florida | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 17,460 | | | |
Initial Cost to Company, Land | | 7,480 | | | |
Initial Cost to Company, Buildings and Improvements | | 13,520 | | | |
Initial Cost to Company, Total | | 21,000 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,969 | | | |
Gross Amount Carried , Land | | 7,480 | | | |
Gross Amount Carried , Buildings and Improvements | | 15,088 | | | |
Gross Amount Carried , Total | | $ 22,568 | | | |
Date Acquired | | Apr. 15, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (1,878) | | | |
Madera Point | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Aug. 5, 2015 | | | |
Madera Point | Mesa | Arizona | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 15,150 | | | |
Initial Cost to Company, Land | | 4,920 | | | |
Initial Cost to Company, Buildings and Improvements | | 17,605 | | | |
Initial Cost to Company, Total | | 22,525 | | | |
Costs Capitalized Subsequent to Acquisition | | 1,702 | | | |
Gross Amount Carried , Land | | 4,920 | | | |
Gross Amount Carried , Buildings and Improvements | | 18,678 | | | |
Gross Amount Carried , Total | | $ 23,598 | | | |
Date Acquired | | Aug. 5, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (2,045) | | | |
The Pointe at the Foothills | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Aug. 5, 2015 | | | |
The Pointe at the Foothills | Mesa | Arizona | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 34,800 | | | |
Initial Cost to Company, Land | | 4,840 | | | |
Initial Cost to Company, Buildings and Improvements | | 47,435 | | | |
Initial Cost to Company, Total | | 52,275 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,602 | | | |
Gross Amount Carried , Land | | 4,840 | | | |
Gross Amount Carried , Buildings and Improvements | | 48,604 | | | |
Gross Amount Carried , Total | | $ 53,444 | | | |
Date Acquired | | Aug. 5, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (4,707) | | | |
Venue at 8651 | Fort Worth | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | 13,734 | | | |
Initial Cost to Company, Land | | 2,350 | | | |
Initial Cost to Company, Buildings and Improvements | | 16,900 | | | |
Initial Cost to Company, Total | | 19,250 | | | |
Costs Capitalized Subsequent to Acquisition | | 3,371 | | | |
Gross Amount Carried , Land | | 2,350 | | | |
Gross Amount Carried , Buildings and Improvements | | 19,760 | | | |
Gross Amount Carried , Total | | $ 22,110 | | | |
Date Acquired | | Oct. 30, 2015 | | | |
Accumulated Depreciation and Amortization | | $ (2,075) | | | |
The Colonnade | Phoenix | Arizona | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | 28,093 | | | |
Initial Cost to Company, Land | | 8,340 | | | |
Initial Cost to Company, Buildings and Improvements | | 36,520 | | | |
Initial Cost to Company, Total | | 44,860 | | | |
Costs Capitalized Subsequent to Acquisition | | 2,027 | | | |
Gross Amount Carried , Land | | 8,340 | | | |
Gross Amount Carried , Buildings and Improvements | | 37,824 | | | |
Gross Amount Carried , Total | | $ 46,164 | | | |
Date Acquired | | Oct. 11, 2016 | | | |
Accumulated Depreciation and Amortization | | $ (1,799) | | | |
Old Farm | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Dec. 29, 2016 | | | |
Old Farm | Houston | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 52,886 | | | |
Initial Cost to Company, Land | | 11,078 | | | |
Initial Cost to Company, Buildings and Improvements | | 73,986 | | | |
Initial Cost to Company, Total | | 85,064 | | | |
Costs Capitalized Subsequent to Acquisition | | 964 | | | |
Gross Amount Carried , Land | | 11,078 | | | |
Gross Amount Carried , Buildings and Improvements | | 71,596 | | | |
Gross Amount Carried , Total | | $ 82,674 | | | |
Date Acquired | | Dec. 29, 2016 | | | |
Accumulated Depreciation and Amortization | | $ (2,763) | | | |
Stone Creek at Old Farm | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Date Acquired | | Dec. 29, 2016 | | | |
Stone Creek at Old Farm | Houston | Texas | | | | | |
Real Estate And Accumulated Depreciation [Line Items] | | | | | |
Encumbrances | | $ 15,274 | | | |
Initial Cost to Company, Land | | 3,493 | | | |
Initial Cost to Company, Buildings and Improvements | | 19,937 | | | |
Initial Cost to Company, Total | | 23,430 | | | |
Costs Capitalized Subsequent to Acquisition | | 251 | | | |
Gross Amount Carried , Land | | 3,493 | | | |
Gross Amount Carried , Buildings and Improvements | | 19,616 | | | |
Gross Amount Carried , Total | | $ 23,109 | | | |
Date Acquired | | Dec. 29, 2016 | | | |
Accumulated Depreciation and Amortization | | $ (751) | | | |
| |
[1] | Properties were classified as held for sale as of December 31, 2017. | |