Contingencies and Commitments | Contingencies and Commitments Unless specifically described to the contrary, all matters within Note P are the full responsibility of Arconic pursuant to the Separation and Distribution Agreement. Additionally, the Separation and Distribution Agreement provides for cross-indemnities between the Company and Howmet for claims subject to indemnification. Contingencies Environmental Matters. Arconic participates in environmental assessments and cleanups at several locations. These include owned or operating facilities and adjoining properties, previously owned or operating facilities and adjoining properties, and waste sites, including Superfund (Comprehensive Environmental Response, Compensation and Liability Act (CERCLA)) sites. A liability is recorded for environmental remediation when a cleanup program becomes probable and the costs can be reasonably estimated. As assessments and cleanups proceed, the liability is adjusted based on progress made in determining the extent of remedial actions and related costs. The liability can change substantially due to factors such as, among others, the nature and extent of contamination, changes in remedial requirements, and technological changes. The Company’s remediation reserve balance was $76 and $85 (of which $36 and $40, respectively, was classified as a current liability) at March 31, 2023 and December 31, 2022, respectively, and reflects the most probable costs to remediate identified environmental conditions for which costs can be reasonably estimated. In the 2023 first quarter, the Company recorded a charge of $1 (recorded in Cost of goods sold) and increased the remediation reserve by the same amount related to the estimated costs of future operations, maintenance, and monitoring activities at several sites. Payments related to remediation expenses applied against the reserve were $10 in the 2023 first quarter, which include expenditures currently mandated, as well as those not required by any regulatory authority or third party. The Separation and Distribution Agreement includes provisions for the assignment or allocation of environmental liabilities between Arconic and Howmet, including certain remediation obligations associated with environmental matters. In general, the respective parties are responsible for the environmental matters associated with their operations, and with the properties and other assets assigned to each. Additionally, the Separation and Distribution Agreement lists environmental matters with a shared responsibility between the two companies with an allocation of responsibility and the lead party responsible for management of each matter. For matters assigned to Arconic and Howmet under the Separation and Distribution Agreement, the companies have agreed to indemnify each other in whole or in part for environmental liabilities arising from operations prior to the Separation Date. The following description provides details regarding the Company's largest reserve (next largest is $6), which relates to one of Arconic's current operating locations. Massena, NY— Arconic has an ongoing remediation project related to the Grasse River, which is adjacent to the Company’s Massena plant site. Many years ago, it was determined that sediments and fish in the river contain varying levels of polychlorinated biphenyls (PCBs). The project, which was selected by the U.S. Environmental Protection Agency (EPA) in a Record of Decision issued in April 2013, was aimed at capping PCB contaminated sediments with concentration in excess of one part per million in the main channel of the river and dredging PCB contaminated sediments in the near-shore areas where total PCBs exceed one part per million. The EPA approved the final design phase of the project in March 2019. Following the EPA’s approval, the actual remediation fieldwork commenced. In April 2020, the EPA approved an addendum to the final remedial design to address newly-identified matters, including river navigation issues, which resulted in changing the original remedy for a specific segment of the river to dredging from capping. The Company attained substantial completion of remedial construction activities on the Grasse River in September 2021. In March 2022, an ice jam event occurred in a section of the river where the cap was installed. The ice accumulation caused a blockage in the river that restricted flow, which resulted in high forces being placed on the bottom sediments as the river worked its way through the obstruction. Once the ice cleared and it was safe to enter the river, Arconic investigated and analyzed the cap for any damage. It was determined that portions of the cap were damaged and there was disturbance to the underlying sediments. As a result, over the next several months, the Company performed extensive environmental, geotechnical, and ice modeling investigations to support the preparation of a proposed plan to repair the damaged cap and contain the exposed sediment. These activities were completed in September 2022 and led to a completed design and estimated cost of $22 for the proposed repair remedy, which included consideration of a temporary work stoppage due to the winter season extending the repair work into 2023 and the impact of cost inflation for labor and materials. Arconic’s existing reserve included consideration of potential future cap repairs given the magnitude and nature of the previously completed remediation project. As a result, in 2022, the Company increased the reserve balance for this matter by $13 for the incremental amount needed to cover the estimated cost of the proposed plan. On October 3, 2022, Arconic submitted an Analysis of Alternatives report to the EPA setting forth four potential remedies, including the Company’s proposed plan. On December 22, 2022, at the EPA’s request, Arconic submitted a revised Analysis of Alternatives report to address two additional repair remedies for a total of six potential alternatives. Arconic is now waiting on the EPA’s response, but continues to maintain an active dialogue with the EPA, as well as other stakeholders, all in support of the EPA making a final decision, which the Company expects in the near term. Arconic’s proposed remedy is consistent with the Record of Decision issued for the original remediation project (see above). In advance of the EPA’s decision, the Company performed a portion of the work associated with its proposed remedy in order to reduce the environmental risk associated with the exposed sediments. This work was completed by the end of November 2022. As the project progresses, further changes to the reserve may be required due to factors such as, among others, the EPA’s selection of a remedy that differs from Arconic’s proposed plan, additional changes in other remedial requirements, increased site restoration costs, and incremental ongoing operation and maintenance costs. At March 31, 2023 and December 31, 2022, the reserve balance associated with this matter was $31 and $38, respectively. Timing of expenditures is contingent on the EPA’s decision with respect to the repair remedy and the subsequent mobilization of third-party contractors. Litigation. All references to ParentCo in the matters described under this section Litigation refer to Arconic Inc. only and do not include its subsidiaries, except as otherwise stated. Reynobond PE —On June 13, 2017, the Grenfell Tower in London, U.K. caught fire resulting in fatalities, injuries, and damage. A French subsidiary of Arconic Corporation (of ParentCo at that time), Arconic Architectural Products SAS (AAP SAS), supplied a product, Reynobond PE, to its customer, a cladding system fabricator, which used the product as one component of the overall cladding system on Grenfell Tower. The fabricator supplied its portion of the cladding system to the facade installer, who then completed and installed the system under the direction of the general contractor. Neither ParentCo nor AAP SAS was involved in the design or installation of the system used at the Grenfell Tower, nor did it have a role in any other aspect of the building’s refurbishment or original design. Regulatory investigations into the overall Grenfell Tower matter are being conducted, including a criminal investigation by the London Metropolitan Police Service (the “Police”), a Public Inquiry by the British government, and a consumer protection inquiry by a French public authority. The Public Inquiry was announced by the U.K. Prime Minister on June 15, 2017 and subsequently was authorized to examine the circumstances leading up to and surrounding the Grenfell Tower fire in order to make findings of fact and recommendations to the U.K. Government on matters such as the design, construction, and modification of the building, the role of relevant public authorities and contractors, the implications of the fire for the adequacy and enforcement of relevant regulations, arrangements in place for handling emergencies, and the handling of concerns from residents, among other things. Hearings for Phase 1 of the Public Inquiry began on May 21, 2018 and concluded on December 12, 2018. Phase 2 hearings of the Public Inquiry began in early 2020 and concluded in 2022, following which a final report will be written and subsequently published. As Phase 2 of the public inquiry concluded, the testimony supported AAP SAS’s position that the choice of materials and the responsibility of ensuring compliance of the cladding system with relevant U.K. building code and regulations was with those individuals or entities who designed and installed the cladding system such as the architects, fabricators, contractors and building owners. The ongoing hearings in the U.K. have revealed serious doubts about whether these third parties had the necessary qualifications or expertise to carry out the refurbishment work at Grenfell Tower, adequately oversaw the process, conducted the required fire safety testing or analysis, or otherwise complied with their obligations under U.K. regulations. AAP SAS is participating as a Core Participant in the Public Inquiry and is also cooperating with the ongoing parallel investigation by the Police. Arconic Corporation does not sell and ParentCo previously stopped selling the PE product for architectural use on buildings. Given the preliminary nature of these investigations and the uncertainty of potential future litigation, Arconic Corporation cannot reasonably estimate at this time the likelihood of an unfavorable outcome or the possible loss or range of losses in the event of an unfavorable outcome. United Kingdom Litigation. Claims brought by Survivors and Estates of Decedents Beginning in 2020, multiple claimant groups comprised of survivors and estates of decedents of the Grenfell Tower fire comprised of approximately 1,000 claimants filed claims in the U.K. arising from that fire against numerous defendants including AAP SAS, Arconic Corporation, Howmet Aerospace Inc., and other defendants. These claims were consolidated and stayed by the Court in order for the claimants and defendants to discuss alternate dispute resolution. The substantial majority of these suits were settled in the first quarter of 2023 pursuant to the terms of a confidential settlement agreement and are now discontinued and closed. Those suits that have not settled are the subject of ongoing alternate dispute resolution discussions though there is no certainty that such discussions will result in any settlement. The suits that remain are stayed until the next case management conference, which will be heard on June 27, 2023. At December 31, 2022, based on a potential settlement of these suits, Arconic had recorded a reserve of $61 for its share of a settlement and a related receivable of $53 for costs to be covered by insurance proceeds. The reserve was reported in Other current liabilities and the receivable was reported in Prepaid expenses and other current assets on the accompanying Consolidated Balance Sheet. In the 2023 first quarter, the Company paid $43 for legal settlements applied against the reserve and received insurance proceeds of $41. Claims brought by Emergency Responders Beginning in 2020, multiple claimant groups comprised of emergency responders who attended the Grenfell Tower fire comprised of approximately 150 claimants filed claims against AAP SAS and other defendants in the London High Court arising out of the fire. These claims were consolidated and stayed by the Court in order for the claimants and defendants to discuss alternate dispute resolution. Those alternate dispute resolutions discussions are ongoing though there is no certainty that such discussions will result in any settlement. Given the preliminary nature of these matters and the uncertainty of litigation, Arconic cannot reasonably estimate at this time the likelihood of an unfavorable outcome or the possible loss or range of losses in the event of an unfavorable outcome in the above-referenced disputes. The next case management conference is scheduled for June 27, 2023. Claim brought by Royal Borough of Kensington and Chelsea and the Royal Borough of Kensington and Chelsea Tenant Management Organisation Ltd. In 2020, a claim was issued by the Royal Borough of Kensington and Chelsea and the Royal Borough of Kensington and Chelsea Tenant Management Organisation Ltd against AAP SAS and other defendants seeking damages in respect of their own losses and/or a contribution to the extent that they are found to be liable by the London High Court for any losses arising out of the Grenfell Tower fire. These claims were stayed by the Court in order for the claimants and defendants to discuss alternate dispute resolution. Those alternate dispute resolutions discussions are ongoing though there is no certainty that such discussions will result in any settlement. Given the preliminary nature of these matters and the uncertainty of litigation, Arconic cannot reasonably estimate at this time the likelihood of an unfavorable outcome or the possible loss or range of losses in the event of an unfavorable outcome in the above-referenced disputes. The next case management conference is scheduled for June 27, 2023. United States Litigation. Behrens et al. v. Arconic Inc. et al. On June 6, 2019, 247 plaintiffs comprised of survivors and estates of decedents of the Grenfell Tower fire filed a complaint against “Arconic Inc., Alcoa Inc., and Arconic Architectural Products, LLC” (collectively, for purposes of the description of such proceeding, the “ParentCo Defendants”), as well as Saint-Gobain Corporation, d/b/a Celotex and Whirlpool Corporation, in the Court of Common Pleas of Philadelphia County. The complaint alleges claims under Pennsylvania state law for products liability and wrongful death related to the fire. In particular, the plaintiffs allege that the ParentCo Defendants knowingly supplied a dangerous product (Reynobond PE) for installation on the Grenfell Tower despite knowing that Reynobond PE was unfit for use above a certain height. The ParentCo Defendants removed the case to the United States District Court for the Eastern District of Pennsylvania on June 19, 2019. On August 29, 2019, the ParentCo Defendants moved to dismiss the complaint on the bases, among other things, that the case should be heard in the United Kingdom, not the United States. On September 16, 2020, the Court issued an order granting ParentCo Defendants’ motion to dismiss on forum non conveniens grounds, subject to certain conditions, determining that the United Kingdom, and not the United States, is the appropriate place for plaintiffs to bring their case. Plaintiffs appealed this judgment and ParentCo Defendants cross-appealed one of the conditions. On July 8, 2022, the Third Circuit decided the appeal in the Behrens matter in the ParentCo Defendants’ favor and invalidated one of the trial court’s dismissal conditions that would have left open the possibility for plaintiffs to return to the United States for a trial on damages. On January 5, 2023, the plaintiffs filed a petition seeking review in the U.S. Supreme Court. The Supreme Court denied that petition on February 21, 2023. This case is fully dismissed and closed. Howard v. Arconic Inc. et al. A purported class action complaint related to the Grenfell Tower fire was filed on August 11, 2017 in the United States District Court for the Western District of Pennsylvania against ParentCo and Klaus Kleinfeld. A related purported class action complaint was filed in the United States District Court for the Western District of Pennsylvania on September 15, 2017, under the caption Sullivan v. Arconic Inc. et al. , against ParentCo, three former ParentCo executives, several current and former ParentCo directors, and banks that acted as underwriters for ParentCo’s September 18, 2014 preferred stock offering (the “Preferred Offering”). The plaintiff in Sullivan had previously filed a purported class action against the same defendants on July 18, 2017 in the Southern District of New York and, on August 25, 2017, voluntarily dismissed that action without prejudice. On February 7, 2018, on motion from certain putative class members, the court consolidated Howard and Sullivan , closed Sullivan , and appointed lead plaintiffs in the consolidated case. On April 9, 2018, the lead plaintiffs in the consolidated purported class action filed a consolidated amended complaint. The consolidated amended complaint alleged that the registration statement for the Preferred Offering contained false and misleading statements and omitted to state material information, including by allegedly failing to disclose material uncertainties and trends resulting from sales of Reynobond PE for unsafe uses and by allegedly expressing a belief that appropriate risk management and compliance programs had been adopted while concealing the risks posed by Reynobond PE sales. The consolidated amended complaint also alleged that between November 4, 2013 and June 23, 2017 ParentCo and Kleinfeld made false and misleading statements and failed to disclose material information about ParentCo’s commitment to safety, business and financial prospects, and the risks of the Reynobond PE product, including in ParentCo’s Form 10-Ks for the fiscal years ended December 31, 2013, 2014, 2015, and 2016, its Form 10-Qs and quarterly financial press releases from the fourth quarter of 2013 through the first quarter of 2017, its 2013, 2014, 2015, and 2016 Annual Reports, its 2016 Annual Highlights Report, and on its official website. The consolidated amended complaint sought, among other things, unspecified compensatory damages and an award of attorney and expert fees and expenses. On June 8, 2018, all defendants moved to dismiss the consolidated amended complaint for failure to state a claim. On June 21, 2019, the Court granted the defendants’ motion to dismiss in full, dismissing the consolidated amended complaint in its entirety without prejudice. On July 23, 2019, the lead plaintiffs filed a second amended complaint. The second amended complaint alleges generally the same claims as the consolidated amended complaint with certain additional allegations, as well as claims that the risk factors set forth in the registration statement for the Preferred Offering were inadequate and that certain additional statements in the sources identified above were misleading. The second amended complaint seeks, among other things, unspecified compensatory damages and an award of attorney and expert fees and expenses. On September 11, 2019, all defendants moved to dismiss the second amended complaint. On June 23, 2021, the Court granted in part and denied in part the defendants’ motion to dismiss the second amended complaint. The Court dismissed with prejudice plaintiffs’ claim against ParentCo, certain officers and directors and the underwriters based on the registration statement for the Preferred Offering, with the exception of one statement and only as to purchases made before October 23, 2015. In addition, plaintiffs’ claim based on ParentCo’s statements in other SEC filings, in product brochures, and on websites was dismissed in its entirety as to Kleinfeld and dismissed in part and allowed in part as to ParentCo. The Court also dismissed the control-person liability claims in their entirety. The Court held a status conference on September 14, 2022, and on December 2, 2022, the Court issued an initial Case Management Order (“CMO”) setting forth dates for class certification briefing and discovery. In March 2023, following successive mediation sessions, the parties reached a settlement in principle that remains subject to court approval and, among other things, is to be covered by insurance proceeds, in exchange for the dismissal of the action and a release of all claims against the defendants. The settlement is without admission of fault or wrongdoing by the defendants. Plaintiffs filed a Stipulation of Settlement, a motion to preliminarily approve the settlement, and related papers with the court on April 21, 2023. On May 2, 2023, the court issued an order granting plaintiffs’ motion to preliminarily approve the settlement and setting August 9, 2023 as the date of the final settlement approval hearing. At March 31, 2023, Arconic recorded a $74 charge to Costs of goods sold to establish a reserve for the settlement and a $74 benefit to Cost of goods sold for a related receivable for costs to be covered by insurance proceeds. The reserve was reported in Other current liabilities and the receivable was reported in Prepaid expenses and other current assets on the accompanying Consolidated Balance Sheet. Raul v. Albaugh, et al. On June 22, 2018, a derivative complaint was filed nominally on behalf of ParentCo by a purported ParentCo stockholder against the then members of ParentCo’s Board of Directors and Klaus Kleinfeld and Ken Giacobbe, naming ParentCo as a nominal defendant, in the United States District Court for the District of Delaware. The complaint raises similar allegations as the consolidated amended complaint and second amended complaint in Howard , as well as allegations that the defendants improperly authorized the sale of Reynobond PE for unsafe uses and asserts claims under Section 14(a) of the Securities Exchange Act of 1934, as amended, and Delaware state law. On July 13, 2018, the parties filed a stipulation agreeing to stay this case until the final resolution of the Howard case, the Grenfell Tower Public Inquiry in London, and the investigation by the Police and on July 23, 2018, the Court approved the stay. Given the preliminary nature of this matter and the uncertainty of litigation, Arconic Corporation cannot reasonably estimate at this time the likelihood of an unfavorable outcome or the possible loss or range of losses in the event of an unfavorable outcome. General. While Arconic believes that all the above referenced Reynobond PE cases are without merit and intends to challenge them vigorously, there can be no assurances regarding the ultimate resolution of these matters. Tax. Under the terms of the agreements that govern the 2016 Separation Transaction, Arconic may be entitled to future economic benefits resulting from Alcoa Corporation’s utilization of certain value-added tax credits that were generated, in part, by the Company’s former operations in Brazil in years prior to 2015. Because Arconic is not party to the regulatory filings with the Brazilian government and, therefore, does not have a basis to conclude on the realizability of these value-added tax credits by Alcoa Corporation, the Company will recognize income when amounts are realized, if any. Other. In 2018, Arconic entered into a consent order with the Iowa Department of Natural Resources (IDNR) to address overflows of stormwater combined with untreated process water from the Company’s Davenport plant which the IDNR alleged were unlawful bypasses prohibited by the facility’s wastewater discharge permit. These overflows occurred during periodic storm events which Arconic timely reported to the IDNR. The consent order required the Company to submit a feasibility study by November 1, 2022 evaluating the reasonableness, estimated cost, impact, and overall feasibility of all actions that could be implemented to avoid unlawful bypasses from occurring in the future. After conducting extensive monitoring, analysis, and investigative work, the Company submitted the feasibility study to the IDNR in October 2022. Arconic’s recommended approach, as documented in the feasibility study, consists of amending its wastewater discharge permit and constructing certain improvements to stormwater and process water systems expecting to result in estimated future capital expenditures of approximately $25 to $30, assuming Arconic’s approach is approved. In 2022, the Company established a reserve of $0.5 to cover future operating expenses associated with this proposed approach. On February 23, 2023, the IDNR informed Arconic of a regulatory approach that differs from Arconic’s proposed approach but that will require similar improvements. The Company now must submit a project schedule based on the IDNR’s approach by October 30, 2023. The consent order requires the Company to implement the approved remedy by November 1, 2028. Approval of a final remedy by the IDNR may result in additional expenditure and/or liability. General. In addition to the matters described above, various other lawsuits, claims, and proceedings have been or may be instituted or asserted against Arconic, including those pertaining to environmental, product liability, safety and health, employment, tax, and antitrust matters. While the amounts claimed in these other matters may be substantial, the ultimate liability is not readily determinable because of the considerable uncertainties that exist. Accordingly, it is possible that the Company’s liquidity or results of operations in a reporting period could be materially affected by one or more of these other matters. However, based on facts currently available, management believes that the disposition of these other matters that are pending or asserted will not have a material adverse effect, individually or in the aggregate, on the results of operations, financial position or cash flows of Arconic. |