Development Services: services provided by GCT to eCOMBUSTIBLE that entail works directed to increase the technological maturity of an application of eCOMBUSTIBLE gas to a specific industry. These services will include engineering designs, research, testing, potential prototypes, and pilot plant trials, amongst others. Development Services may include the introduction of third-party vendors, research facilities, and other parties necessary in the development of any particular application. Development Services will focus on developing and improving the technical certainty, or the mitigation of risks, for the application of the eCOMBUSTIBLE product and its integration to diverse industrial applications. As means of example, the described works may consist of the application and development of eCOMBUSTIBLE i) into the steel industry, ii) in large scale kilns for the cement industry, and iii) as fuel for large turbines in electric power generation.
Energy: the hydrogen fuel produced using the proprietary Intellectual Property of eCOMBUSTIBLE for the production of electricity, heat or any other secondary commercial application using the hydrogen fuel as a primary source of energy.
Engineering Services: services provided by GCT to eCOMBUSTIBLE in relation to each specific project that will include concept engineering, basic engineering, detailed engineering (if applicable), procurement and contract management, and commissioning support. The described services will need to be drafted in a document including the scope of work and approved in writing by eCOMBUSTIBLE prior to initiation of the Engineering Services.
Gas Billing Date: the Date on which eCOMBUSTIBLE issues the monthly invoice to a Customer for the eCOMBUSTIBLE provided.
Group Company: an entity which is a direct or indirect subsidiary of an entity or which is a direct or indirect subsidiary of any holding company of an entity.
Hourly Cost: a weighted average of the hourly cost foreseen for each skill needed when providing the Services. This Hourly Cost is expected to reflect the total cost to GCT for pooling these specialized skills to service each specific Project without any mark-ups. As reference the initial mutually agreed hourly cost shall be $95 per hour as referenced in section 4.2 of this Agreement.
Hours Estimated: number of total hours estimated by GCT and approved by eCOMBUSTIBLE to complete the scope of a particular Project that will be facilitated to eCOMBUSTIBLE prior to the initialization of the requested Services. This estimate will be the basis for the invoiced costs of the provided Services, and therefore will define an approximation to a fixed price for the Services provided by GCT.
Intellectual Property: any patent, copyright, registered design, unregistered design right, trademark or other industrial or intellectual property owned or used by eCOMBUSTIBLE relating to the production of its fuel or any by-product together with any current applications for any registrable items of the foregoing.
Initial Term: five (5) years upon the full execution by both Parties of this Agreement.
Phase: Testing Services, Engineering Services and Development Services will generally entail the subdivision of the services to be provided in stages. In these cases, the existence of a second, third or ulterior phase will depend on the fulfilment of the previous phase.
2