Bounty Minerals, LLC Interests – SEC Price Case
August 5, 2022
Page 3
Reserve Estimation Methods
Reserves for proved developed producing wells were estimated using production performance methods for the vast majority of properties. Certain new producing properties with very little production history were forecast using a combination of production performance and analogy to similar production, both of which are considered to provide a relatively high degree of accuracy. We evaluated 1252 PDP properties as part of this review, with production volumes updated via state records through December 2021 and up to May 2022 as provided by Bounty.
Non-producing reserve estimates, including developed and undeveloped, were forecast using either volumetric or analogy methods, or a combination of both. These methods provide a relatively high degree of accuracy for predicting proved developed non-producing and undeveloped reserves. The assumptions, data, methods and procedures used herein are appropriate for the purpose served by this report.
New locations within the Bounty acreage include wells currently drilling, permitted wells, and / or wells expected to be drilled based on operator information or regional activity. For each new drill, a reserve category of PDNP, PUD, PROB or POSS was assigned based on proximity to production, geologic control, anticipated timing and regulatory considerations by state and reservoir. Reserves for each location were assigned based on offset analogy to production with preference given to modern completions.
The drill schedule was determined by operator based on completed lateral feet per year, well status, well reserve category, and recent historical operator activity. First, drilled locations were developed based on operator guidance where available or average completion rate per year beginning January 2022. Second, undeveloped locations were scheduled by operator in order of decreasing gross estimated ultimate recovery starting with PUD locations, followed by PROB and then POSS locations. The drill schedule applied was based on previous twelve month completed lateral feet per year estimates and normalized for recent historical rig activity.
SEC Conformance and Regulations
The reserve classifications and the economic considerations used herein conform to the criteria of the SEC. The reserves and economics are predicated on regulatory agency classifications, rules, policies, laws, taxes and royalties currently in effect except as noted herein. The possible effects of changes in legislation or other Federal or State restrictive actions which could affect the reserves and economics have not been considered. However, we do not anticipate nor are we aware of any legislative changes or restrictive regulatory actions that may impact the recovery of reserves.
The reserves shown in this report are estimates only and should not be construed as exact quantities. Proved reserves are those quantities of oil and gas which, by analysis of engineering and geoscience data, can be estimated with reasonable certainty to be commercially recoverable; probable and possible reserves are those additional reserves which are sequentially less certain to be recovered than proved reserves. Estimates of reserves may increase or decrease as a result of market conditions, future operations, changes in regulations, or actual reservoir performance.
This evaluation includes 129 PDNP cases consisting of new producing wells in which Bounty is awaiting payments, shut-in wells expected to return to production, and drilled uncompleted locations. This evaluation also includes 433 commercial proved undeveloped locations. Each of these drilling locations proposed as part of Bounty’s development plans conforms to the proved undeveloped standards as set forth by the SEC. In our opinion, the operators of these drills have indicated they have reasonably certain intent to complete this development plan within the next five years. Furthermore, operators of these locations have demonstrated through their actions that they have adequate company staffing, financial backing and prior development success to ensure this development plan will be executed.