
| Note 7: For the current technical report on the El Gallo Project see: "Resource Estimate for the El Gallo Complex, Sinaloa State, Mexico" dated and effective June 30, 2013, prepared by John Read , CPG, McEwen Mining's Senior Consultant, and Luke Willis, P.Geo, McEwen Mining's Director, Resource Modeling. Mr. Read and Mr. Willis are both Qualified Persons as defined in Canadian National Instrument 43-101. Note 8: For the current technical report on the Gold Bar Project see: “NI 43-101 Technical Report on Resources and Reserves Gold Bar Project, Eureka County, Nevada” dated February 24, 2012 with an effective date of November 28, 2011, prepared by J. Pennington, C.P.G., MSc., Frank Daviess, MAusIMM, Registered SME, Eric Olin,, MBA, RM-SME, MSc, Herb Osborn, P.E, Joanna Poeck, MMSA, B. Eng., Kent Hartley P.E. Mining, SME, BSc, Mike Levy, P.E, P.G, MSc., Evan Nikirk, P. E., Mark Allan Willow, M.Sc, C.E.M. and Neal Rigby, CEng, MIMMM, PhD, each of the forgoing is a Qualified Person and independent of the Company as defined by NI 43-101.Tonkin resources were derived from the report titled “Technical Report on the Tonkin Project” dated with an effective date of May 16, 2008, prepared by Alan C. Noble, P.E., Richard Gowans, and Steven Brown. Mr. Noble and Mr. Gowans are considered a Qualified Person and independent of the Company as defined by NI 43-101. Mr Brown at the time of report preparation was not independent of the Company. Note 9: For the current technical report on Tonkin see: “Technical Report on the Tonkin Project” dated with an effective date of May 16, 2008, prepared by Alan C. Noble, P.E., Richard Gowans, and Steven Brown. Mr. Noble and Mr. Gowans are considered a Qualified Person and independent of the Company as defined by NI 43-101. Mr Brown at the time of report preparation was not independent of the Company. Note 10: For the current technical report on the Limo Project see :“NI 43-101 Technical Report for the Limousine Butte Project, White Pine County, Nevada” dated with an effective date of July 1, 2009 prepared by John Welsh, P. Eng., Kim Drossulis, Senior Engineer, Jonathan Brown, M.B.A., C.P.G., Doug Willis, Geologist, Christine Ballard, Project Geotechnical Engineer, Eric Haddox, P. Eng., each of the forgoing is a Qualified Person and independent of the Company as defined by NI 43-101. Note 11: For the current technical report on the Los Azules project see: “Canadian National Instrument 43-101 Technical Report, Los Azules Porphyry Copper Project, San Juan Province, Argentina” dated with an effective date of August 1, 2013, prepared by Richard Kunter, FAusIMM, CP, QP, Robert Sim, PGeo, Bruce M. Davis, PhD, FAusIMM, James K. Duff, PGeo, William L. Rose, PE, Scott C. Elfen, PE, and Steven A. Pozder, PE, MBA. Each of the forgoing is a Qualified Person and each of the foregoing, other than Jim Duff, is independent of the Company as defined by NI 43-101. Cont’d |