- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
Content analysis
?Positive | ||
Negative | ||
Uncertain | ||
Constraining | ||
Legalese | ||
Litigous | ||
Readability |
H.S. freshman Avg
|
- 10-K Annual report
- 10.15 EX-10.15
- 10.16 EX-10.16
- 10.17 EX-10.17
- 10.18 EX-10.18
- 10.19 EX-10.19
- 21 EX-21
- 23.1 EX-23.1
- 23.6 EX-23.6
- 23.3 EX-23.3
- 23.5 EX-23.5
- 23.7 EX-23.7
- 23.8 EX-23.8
- 23.9 EX-23.9
- 23.10 EX-23.10
- 23.11 EX-23.11
- 23.12 EX-23.12
- 23.13 EX-23.13
- 23.14 EX-23.14
- 23.15 EX-23.15
- 23.16 EX-23.16
- 23.17 EX-23.17
- 23.18 EX-23.18
- 31.1 EX-31.1
- 31.2 EX-31.2
- 32 EX-32
- 95 EX-95
- Download Excel data file
- View Excel data file
Exhibit 23.12
CONSENT OF QUALIFIED PERSON
Regarding the "Gold Bar Project, S-K 1300 Technical Report Summary, Feasibility Study, Eureka County, Nevada", that is current as of December 31, 2021 (the "Technical Report Summary"):
In connection with the filing of the Annual Report of McEwen Mining Inc. for the year ended December 31, 2022 on Form 10-K (the "Form 10-K"), Benjamin Bermudez consents to:
• | the use of my name and status as a "Qualified Person" in the Form 10-K |
• | any quotation from, or summarization of any of the information that I am responsible for preparing in the Technical Report Summary in the Form 10-K |
Dated this March 13, 2023
Signed by:
/s/ Benjamin Bermudez
Benjamin Bermudez, PE (Nevada #029152)
M3 Engineering & Technology Corporation