Valaris Limited (VAL) 8-KRegulation FD Disclosure
Filed: 16 Mar 15, 12:00am
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Floaters | ||||||||||||||
North & South America (excluding Brazil) | ||||||||||||||
ENSCO DS-3 | Drillship, DP3 Samsung | 10000/12000 | BP | High 480s | U.S. Gulf of Mexico | Jun. 16 | Zero rate for approx. 8 days in 1Q15. Plus cost adjustments | |||||||
ENSCO DS-4 | Drillship, DP3 Samsung | 10000/12000 | BP | Low 560s | U.S. Gulf of Mexico | Jul. 16 | Zero rate for approx. 12 days in 1Q15. Plus cost adjustments | |||||||
ENSCO DS-5 | Drillship, DP3 Samsung | 10000/12000 | Petrobras----- | Mid 430s | U.S. Gulf of Mexico | Jul. 16 | -----. Eligible for bonus opportunity up to 17%, plus cost adjustments | |||||||
ENSCO 8500 | Semisubmersible DP | 8500/10000 | Anadarko/Eni | Low 310s | U.S. Gulf of Mexico | Sep. 15 | Plus cost adjustments and two 1-year same-rate options | |||||||
ENSCO 8501 | Semisubmersible DP | 8500/10000 | U.S. Gulf of Mexico | |||||||||||
ENSCO 8502 | Semisubmersible DP | 8500/10000 | -----Cold Stacking Preparations | U.S. Gulf of Mexico | ----- | |||||||||
ENSCO 8503 | Semisubmersible DP | 8500/10000 | LLOG | Low 350s | U.S. Gulf of Mexico | 4Q17 | Next to complete Talos contract initially with ENSCO 8502 under amended terms with customer. Then to Stone Energy May 15 to Aug. 15, low 350s. Then planned upgrade and inspection for approx. 60 days in 3Q15. Back to Stone Energy Oct. 15 to 4Q17, low 350s. Plus four 90-day options | |||||||
ENSCO 8505 | Semisubmersible DP | 8500/10000 | Deep Gulf Energy | Mid 370s | U.S. Gulf of Mexico | May 15 | ||||||||
ENSCO 8506 | Semisubmersible DP | 8500/10000 | Anadarko | Low 540s | U.S. Gulf of Mexico | Jul. 15 | Plus cost adjustments |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Floaters | ||||||||||||||
Brazil | ||||||||||||||
ENSCO 6001 | Semisubmersible - DP Megathyst | 5600 | Petrobras | Mid 350s | Brazil | Jun. 18 | Zero rate for approx. 12 days in 1Q15. Plus approx. $20,000 per day amortized Dec. 14 to Jun. 18 for capital upgrades. Plus cost adjustments | |||||||
ENSCO 6002 | Semisubmersible - DP Megathyst | 5600 | Petrobras | Mid 350s | Brazil | Ju1. 18 | Mid 160s average rate during planned shipyard upgrade for approx. 60 days in 2Q15 and approx. 26 days in 3Q15. Plus approx. $23,000 per day amortized Aug. 15 to Jul. 18 for capital upgrades. Plus cost adjustments | |||||||
ENSCO 6003 | Semisubmersible - DP Megathyst | 5600 | Petrobras | Mid 310s | Brazil | Jan. 17 | Eligible for bonus opportunity up to 15%, plus cost adjustments | |||||||
ENSCO 6004 | Semisubmersible - DP Megathyst | 5600 | Petrobras | Mid 310s | Brazil | Oct. 16 | Eligible for bonus opportunity up to 15%, plus cost adjustments |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Floaters | ||||||||||||||
Europe & Mediterranean | ||||||||||||||
ENSCO 5004 | Semisubmersible - Conv F & G Enhanced Pacesetter | 1500 | Mellitah | High 290s | Mediterranean | Jan. 17 | Zero rate for approx. 15 days in 1Q15. Plus approx. $30,000 per day for mobilization and reimbursable upgrades amortized Aug. 14 to Jan. 17 | |||||||
Africa | ||||||||||||||
ENSCO DS-1 | Drillship - DP Gusto 10,000 | 6000/10000 | TOTAL | Mid 360s | Angola | Jan. 16 | Plus cost adjustments and unpriced options. Eligible for bonus opportunity up to 5% | |||||||
ENSCO DS-6 | Drillship, DP3 Samsung | 10000/12000 | BP | High 540s | Angola | Feb. 18 | Zero rate for approx. 8 days in 1Q15. Plus approx. $102,000 per day amortized Feb.13 to Feb. 18 for special day rate ahead of mobilization, upgrade costs and reimbursable mobilization expenses. Plus cost adjustments and two 1-year options at mutually agreed rates | |||||||
ENSCO DS-7 | Drillship, DP3 Samsung | 10000/12000 | TOTAL | Mid 630s | Angola | Nov. 16 | Plus periodic rate increases resulting in high 640s average rate over contract. Plus approx. $28,000 per day amortized Nov. 13 to Nov. 16 for mobilization |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Floaters | ||||||||||||||
Asia & Pacific Rim | ||||||||||||||
ENSCO 8504 | Semisubmersible DP | 8500/10000 | Shell | Mid 560s | Malaysia | May 15 | Assigned to Inpex in Malaysia Nov. 14 to Mar. 15. Plus cost adjustments. Plus approx. $8,000 per day for mobilization amortized Jul.13 to May 15 | |||||||
ENSCO 5006 | Semisubmersible - Conv Bingo 8,000 | 7000/7500 | Inpex | Mid 470s | Australia | May 18 | Plus periodic rate increases that will result in low 500s average rate over drilling program. Plus approx. $220,000 per day amortized over the duration of the drilling program for capital upgrades and day rates during shipyard stay and mobilizations | |||||||
ENSCO 5005 | Semisubmersible - Conv F & G Enhanced Pacesetter | 1500/1700 | PTTEP | Low 230s | Myanmar | Jun. 15 | Plus approx. $11,000 per day for upgrade costs and mobilization amortized Aug. 14 to May 15 ----- | |||||||
Under Construction | ||||||||||||||
ENSCO DS-8 | Drillship, DP3 Samsung GF12000 | 10000/12000 | Under construction/ Contracted | South Korea | 4Q20 | Contracted to Total in Angola from 4Q15 to 4Q20, initially low 600s. Plus periodic rate increases resulting in high 630s average rate over drilling program. Plus approx. $15,000 per day amortized over primary contract term for capital upgrades. Plus mob fee of approx. $26 million to be amortized over primary contract term. Plus one 1-year priced option | ||||||||
ENSCO DS-9 | Drillship, DP3 Samsung GF12000 | 10000/12000 | Under construction/ Contracted | South Korea | 4Q18 | Contracted to ConocoPhillips in U.S. Gulf of Mexico from 4Q15 to 4Q18, low 550s. Plus mob fee of approx. $32 million to be amortized over primary contract term. Plus cost adjustments and two 1-year unpriced options | ||||||||
ENSCO DS-10 | Drillship, DP3 Samsung GF12000 | 10000/12000 | Under construction | South Korea | 3Q15 |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(1) | Comments | |||||||
Jackups | ||||||||||||||
North & South America (excluding Brazil) | ||||||||||||||
U.S. Gulf of Mexico | ||||||||||||||
ENSCO 68 | MLT 84-CE | 400 | Chevron | High 110s | Gulf of Mexico | Oct. 15 | Planned inspection and maintenance for approx. 28 days in 3Q15. Day rate does not include certain extra reimbursable costs | |||||||
ENSCO 75 | MLT Super 116-C | 400 | Talos | See comments | Gulf of Mexico | Jul. 15 | Terms amended in conjunction with ENSCO 8503 contract as noted on Page 1 | |||||||
ENSCO 81 | MLT 116-C | 350 | Stacking Preparations | Gulf of Mexico | ||||||||||
ENSCO 82 | MLT 116-C | 300 | Stacking Preparations | Gulf of Mexico | ||||||||||
ENSCO 86 | MLT 82 SD-C | 250 | Century | Mid 70s | Gulf of Mexico | May 15 | ||||||||
ENSCO 87 | MLT 116-C | 350 | -----Arena | Mid 70s | Gulf of Mexico | May 15 | ----- | |||||||
ENSCO 99 | MLT 82 SD-C | 250 | Stacking Preparations | Gulf of Mexico |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Jackups | ||||||||||||||
Europe | ||||||||||||||
ENSCO 70 | Hitachi K1032N | 250 | UK | ----- | ----- | |||||||||
ENSCO 71 | Hitachi K1032N | 225 | Maersk | Low 170s | Denmark | Jun. 15 | Planned inspection for approx. 23 days in 3Q15. Plus one 1-year priced option and one 1-year option at mutually agreed rate | |||||||
ENSCO 72 | Hitachi K1025N | 225 | Maersk | Low 170s | Denmark | Sep. 15 | Plus one 1-year priced option and one 1-year option at mutually agreed rate | |||||||
ENSCO 80 | MLT 116-CE | 225 | GDF | Mid 140s | UK | Apr. 17 | Plus cost adjustments and unpriced option | |||||||
ENSCO 92 | MLT 116-C | 225 | ConocoPhillips | Low 150s | UK | Aug. 18 | ||||||||
ENSCO 100 | MLT 150-88-C | 350 | Ithaca | Mid 160s | UK | Jun. 18 | Planned inspection for approx. 30 days in 2Q15. Plus cost adjustments. Then assigned to Suncor in UK May 15 to Jun. 15, mid 180s. Next to Premier Jun. 15 to Jun. 18, mid 180s | |||||||
ENSCO 101 | KFELS MOD V-A | 400 | -----BP | High 210s | UK | Jan. 16 | Inspection for approx. 57 days in 1Q15. -----. Plus cost adjustments and two 6-month unpriced options | |||||||
ENSCO 102 | KFELS MOD V-A | 400 | ConocoPhillips | Low 210s | UK | May 15 | Plus cost adjustments | |||||||
ENSCO 120 | ENSCO 120 Series | 400 | Nexen | Mid 230s | UK | May 16 | Plus approx. $13,000 per day for mobilization amortized Mar. 14 to Nov. 15. Plus cost adjustments and eleven 1-well options | |||||||
ENSCO 121 | ENSCO 120 Series | 400 | Wintershall | Low 230s | Netherlands | Jun. 16 | Plus approx. $11,000 per day for mobilization amortized Jun. 14 to Jun. 16. Plus one 1-year unpriced option | |||||||
ENSCO 122 | ENSCO 120 Series | 400 | NAM | Mid 230s | UK | Nov. 16 | Plus approx. $14,000 per day for mobilization amortized Nov. 14 to Nov. 16. Plus cost adjustments and two 1-year unpriced options |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Jackups | ||||||||||||||
Middle East | ||||||||||||||
ENSCO 53 | F&G L-780 Mod II-C | 300 | NDC | Low 100s | UAE | Feb. 16 | Plus two 1-year unpriced options | |||||||
ENSCO 54 | F&G L-780 Mod II-C | 300 | Saudi Aramco | Mid 110s | Saudi Arabia | Sep. 17 | Plus approx. $39,000 per day for upgrade costs and mobilization amortized Sep. 14 to Sep. 17. Plus one 1-year priced option | |||||||
ENSCO 76 | MLT Super 116-C | 350 | Saudi Aramco | High 150s | Saudi Arabia | Dec. 18 | Planned inspection for approx. 30 days in 1Q15. Rate increases Dec. 15 to low 170s | |||||||
ENSCO 84 | MLT 82 SD-C | 250 | Saudi Aramco | Mid 70s | Saudi Arabia | Mar. 19 | Planned inspection for approx. 32 days in 2Q15. Rate increases Mar. 16 to mid 120s | |||||||
ENSCO 88 | MLT 82 SD-C | 250 | Saudi Aramco | Low 100s | Saudi Arabia | Nov. 16 | Plus one 1-year priced option | |||||||
ENSCO 91 | Hitachi Zosen Drill Hope C-150 | 270 | Saudi Aramco | High 60s | Saudi Arabia | Apr. 15 | Plus one 1-year priced option | |||||||
ENSCO 94 | Hitachi 250-C | 250 | Saudi Aramco | Low 100s | Saudi Arabia | May 16 | Plus one 1-year priced option | |||||||
ENSCO 96 | Hitachi 250-C | 250 | Saudi Aramco | Mid 70s | Saudi Arabia | Feb. 19 | Rate increases Feb. 16 to mid 120s | |||||||
ENSCO 97 | MLT 82 SD-C | 250 | Saudi Aramco | Mid 70s | Saudi Arabia | Feb. 19 | Rate increases late Jan. 16 to mid 120s | |||||||
Africa | ||||||||||||||
ENSCO 109 | KFELS MOD V-Super B | 350 | Chevron | Low 170s | Angola | Jan. 18 | Plus $13,000 per day for mobilization amortized Jan. 15 to Jan. 18. Plus cost adjustments |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Jackups | ||||||||||||||
Asia & Pacific Rim | ||||||||||||||
ENSCO 52 | F&G L-780 Mod II-C | 300 | Murphy | High 90s | Malaysia | Aug. 17 | Plus cost adjustments and one 1-year unpriced option | |||||||
ENSCO 56 | F&G L-780 Mod II-C | 300 | Pertamina | Mid 110s | Indonesia | Jun. 15 | -----. Plus approx. $4,000 per day for mobilization amortized Jul. 13 to May 15 | |||||||
ENSCO 67 | MLT 84-CE | 400 | Pertamina | Mid 130s | Indonesia | Jun. 15 | ----- | |||||||
ENSCO 104 | KFELS MOD V-B | 400 | PVEP | Mid 150s | Myanmar | Apr. 15 | Plus approx. $33,000 per day for mobilization amortized Dec. 14 to Feb. 15 | |||||||
ENSCO 105 | KFELS MOD V-B | 400 | Shell | High 190s | China | Jul. 15 | Plus approx. $12,000 per day for capital upgrades amortized Nov.14 to Jun. 15 | |||||||
ENSCO 106 | KFELS MOD V-B | 400 | CPOC | Mid 150s | Malaysia | Aug. 15 | Plus cost adjustments and two priced options of 90 days each and approx. $5,000 per day for mobilization amortized Nov.14 to Aug. 15 | |||||||
ENSCO 107 | KFELS MOD V-B | 400 | OMV | Mid 230s | New Zealand | Jun. 15 | Plus approx. $62,000 per day for contract preparations and mobilization to be amortized Mar. 14 to Feb. 15. Plus cost adjustments | |||||||
ENSCO 108 | KFELS MOD V-B | 400 | PTTEP | High 150s | Thailand | Apr. 17 | Plus cost adjustments and one 1-year priced option |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Jackups | ||||||||||||||
Under Construction | ||||||||||||||
ENSCO 140 | ENSCO 140 Series | 340/400 | Under construction | UAE | 2Q16 | |||||||||
ENSCO 141 | ENSCO 140 Series | 340/400 | Under construction | UAE | 3Q16 | |||||||||
ENSCO 123 | ENSCO 120 Series | 400 | Under construction | Singapore | 2Q16 | |||||||||
ENSCO 110 | KFELS MOD V-B | 400 | -----Delivered | Singapore | Mar. 15 | |||||||||
Other | ||||||||||||||
Drilling Management | ||||||||||||||
Thunder Horse | Deepwater Semisubmersible | 6000 | BP | Low 100s | U.S. Gulf of Mexico | Jan. 16 | Plus one 1-year priced options, plus cost adjustments | |||||||
Mad Dog | Deepwater Spar Drilling Rig | 4500 | BP | Mid 60s | U.S. Gulf of Mexico | Jan. 16 | Plus cost adjustments | |||||||
ENSCO 83 | MLT 82 SD-C | 250 | Pemex | Low 90s | Mexico | Oct. 16 | Planned inspection for approx. 14 days in 2Q15 | |||||||
ENSCO 89 | MLT 82 SD-C | 250 | Pemex | Low 90s | Mexico | Nov. 15 | Planned inspection for approx. 14 days in 4Q15 | |||||||
ENSCO 98 | MLT 82 SD-C | 250 | Pemex | Low 90s | Mexico | Aug. 15 | Planned inspection for approx. 14 days in 3Q15 |
![]() | Ensco plc Fleet Status Report 16 March 2015 |
Segment / Region / Rig | Design | Water Depth'(1) | Customer/ Status | Day Rate $000′s US | Location | Est. Avail(2) | Comments | |||||||
Discontinued Operations | ||||||||||||||
ENSCO 93 | MLT 82 SD-C | 250 | Pemex | Low 90s | Mexico | Jun. 15 | Planned inspection for approx. 14 days in 2Q15 | |||||||
Held for Sale | ||||||||||||||
ENSCO 7500 | Semisubmersible DP | 7500/8000 | Cold Stacked | Spain | ||||||||||
ENSCO DS-2 | Drillship - DP Gusto 10,000 | 6000/10000 | Cold Stacked | Spain | ||||||||||
ENSCO 6000 | Semisubmersible - DP Amethyst | 3400/4000 | Cold Stacked | Spain | ||||||||||
ENSCO 5002 | Semisubmersible - Conv Aker H-3 | 1000/3000 | Cold Stacked | Singapore | ||||||||||
ENSCO 5001 | Semisubmersible - Conv Sonat | 6500 | Mobilizing | Mobilizing to Malaysia for cold stacking | ||||||||||
ENSCO 90 | MLT 82 SD-C | 250 | Cold Stacked | Gulf of Mexico | ||||||||||
ENSCO 58 | F&G L-780 Mod II | 250 | Cold Stacked | Saudi Arabia |
![]() | Ensco plc Fleet Status Report 16 March 2015 |