Valaris Limited (VAL) 8-KRegulation FD Disclosure
Filed: 26 Jul 19, 12:00am
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
New Contracts and Extensions Floaters • Rowan Relentless awarded a one-well contract with EnVen Energy in the U.S. Gulf of Mexico that is expected to commence in October 2019• ENSCO DS-12 contract with BP offshore Senegal extended by one well, with an estimated duration of 60 days• ENSCO DPS-1 contract with Woodside offshore Australia extended by one well with an estimated duration of 15 days Jackups • ENSCO 120 contract with ConocoPhillips in the North Sea extended by two years• ENSCO 122 awarded a two-well contract with Shell in the North Sea that is expected to commence in January 2020• Rowan Gorilla V contract with Total in the North Sea extended by six months• ENSCO 72 awarded a 40-well P&A contract with Eni in the North Sea that is expected to commence in November 2019• ENSCO 101 awarded a one-well contract with Eni in the North Sea that is expected to commence in September 2019• ENSCO 109 contract with Chevron offshore Angola extended by two years• ENSCO 107 awarded a five-month contract with Chevron offshore Australia that is expected to commence in September 2019• ENSCO 104 contract with ADNOC offshore UAE extended by seven months• ENSCO 96 contract with Saudi Aramco offshore Saudi Arabia extended by three months• ENSCO 102 awarded a one-well contract with W&T Offshore in the U.S. Gulf of Mexico that is expected to commence in August 2019• ENSCO 102 awarded a one-well contract with GulfSlope Energy in the U.S. Gulf of Mexico that is expected to commence in October 2019• Joe Douglas contract with BP offshore Trinidad extended by one-well, with an estimated duration of 100 days• Rowan EXL II contract with BP offshore Trinidad extended by one-well, with an estimated duration of 45 daysOther • ENSCO 102 contracts with W&T Offshore and GulfSlope Energy, noted above, partially replace a previously disclosed contract with Fieldwood• Rowan Gorilla IV sold | |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Asset Type / Status / Rig | Design | Year Delivered | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | |||||||
Drillships | ||||||||||||||
Marketed | ||||||||||||||
Rowan Relentless (DS-18) | GustoMSC P10000 | 2015 | ExxonMobil EnVen | U.S. GOM U.S. GOM | Sep. 18 Oct. 19 | Oct. 19 Nov. 19 | ----- Contracted for one well. Plus two 1-well options | |||||||
Rowan Reliance (DS-17) | GustoMSC P10000 | 2014 | Available | U.S. GOM | Rig to be mobilized to Spain where it will be available for hire | |||||||||
Rowan Resolute (DS-16) | GustoMSC P10000 | 2014 | Fieldwood | U.S. GOM | Mar. 19 | Mar. 20 | Contracted for one year. Plus three 90-day unpriced options | |||||||
Rowan Renaissance (DS-15) | GustoMSC P10000 | 2014 | Total Petronas | Mexico Mexico | Jan. 19 Jun. 19 | May 19 Sep. 19 | Contracted for one well | |||||||
ENSCO DS-12 | DSME 12000 | 2014 | BP | Senegal | Apr. 19 | Sep. 19 | Contracted for three wells. Plus three 1-well options | |||||||
ENSCO DS-11 | DSME 12000 | 2013 | Available | Spain | ||||||||||
ENSCO DS-10 | Samsung GF12000 | 2017 | Shell | Nigeria | Mar. 18 | Mar. 20 | Plus four 1-year priced options | |||||||
ENSCO DS-9 | Samsung GF12000 | 2015 | Total | Brazil | Jun. 19 | May 20 | Contracted for four wells. Plus two 1-well options | |||||||
ENSCO DS-8 | Samsung GF12000 | 2015 | Total | Angola | Nov. 15 | Nov. 20 | Day rate of approx. $620,000, plus approx. $14,000 p/d amortized through Nov. 20 for mobilization. Plus one 14-month priced option | |||||||
ENSCO DS-7 | Samsung 96K | 2013 | Burullus | Egypt | Apr. 19 | Oct. 19 | Contracted for 180 days. Plus eight 1-well options | |||||||
ENSCO DS-6 | Samsung 96K | 2012 | Available | Spain | ||||||||||
ENSCO DS-4 | Samsung 96K | 2010 | Chevron | Nigeria | Aug. 17 | Jul. 19 | Rig to be mobilized to Spain where it will be available for hire | |||||||
Under Construction | ||||||||||||||
ENSCO DS-13 | DSME 12000 | Under Construction | South Korea | Scheduled delivery date 3Q19 | ||||||||||
ENSCO DS-14 | DSME 12000 | Under Construction | South Korea | Scheduled delivery date 2Q20 | ||||||||||
Preservation Stacked | ||||||||||||||
ENSCO DS-5 | Samsung 96K | 2011 | Preservation Stacked(2) | Spain | ||||||||||
ENSCO DS-3 | Samsung 96K | 2010 | Preservation Stacked(2) | Spain |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Asset Type / Status / Rig | Design | Year Delivered | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | |||||||
Semisubmersibles | ||||||||||||||
Marketed | ||||||||||||||
ENSCO DPS-1 | F&G ExD Millennium, DP | 2012 | Woodside Woodside | Australia Australia | Feb. 18 Feb. 20 | Jul. 19 Jun. 20 | Contracted for 12 wells Contracted for three wells. Plus one 7-well option | |||||||
ENSCO 8505 | ENSCO 8500 Series, DP + Moored | 2012 | Eni | U.S. GOM | Jan. 19 | Feb. 20 | Contracted for six wells in the U.S. GOM and for two wells in Mexico | |||||||
ENSCO 8504 | ENSCO 8500 Series, DP + Moored | 2011 | JAPEX Demobilizing | Japan ----- | Apr. 19 | Jul. 19 | Rig is en route to Malaysia where it will be available for hire | |||||||
ENSCO 8503 | ENSCO 8500 Series, DP + Moored | 2010 | Talos Apache Kosmos | Mexico U.S. GOM U.S. GOM | Nov. 18 Jul. 19 Sep. 19 | Jun. 19 Sep. 19 Apr. 20 | Contracted for four wells Contracted for six wells. Plus one 140-day option | |||||||
ENSCO MS-1 | F&G ExD Millennium, Moored | 2011 | Available | Malaysia | ||||||||||
ENSCO 6002 | Megathyst, DP | 2001 | Petrobras | Brazil | Jul. 13 | Dec. 19 | Day rate of approx. $248,000, plus approx. $17,000 per day amortized through Dec. 19 for capital upgrades. Plus cost adjustments | |||||||
ENSCO 5006 | Bingo 8000, Moored | 1999 | INPEX | Australia | Jan. 15 | Aug. 19 | Day rate of approx. $362,000, plus approx. $125,000 per day amortized through Aug. 19 for capital upgrades and day rates during shipyard stay and mobilizations | |||||||
ENSCO 5004 | F&G Enhanced Pacesetter, Moored | 1982 | Mellitah | Mediterranean | Aug. 14 | Feb. 20 | Planned inspection for approx. 14 days in 3Q19 | |||||||
Preservation Stacked | ||||||||||||||
ENSCO 8506 | ENSCO 8500 Series, DP | 2012 | Preservation Stacked(2) | U.S. GOM | ||||||||||
ENSCO 8502 | ENSCO 8500 Series, DP | 2010 | Preservation Stacked(2) | U.S. GOM | ||||||||||
ENSCO 8501 | ENSCO 8500 Series, DP | 2009 | Preservation Stacked(2) | U.S. GOM | ||||||||||
ENSCO 8500 | ENSCO 8500 Series, DP | 2008 | Preservation Stacked(2) | U.S. GOM |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Segment / Asset Type / Rig | Design | Year Delivered | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | |||||||
Jackups | ||||||||||||||
Heavy Duty Ultra-Harsh Environment(3) | ||||||||||||||
Rowan Norway (292) | KFELS N Class | 2011 | Turkish Petroleum ConocoPhillips | Turkey Norway | Nov. 18 Sep. 19 | Jul. 19 Mar. 20 | Plus one 6-month and one 13-month priced options | |||||||
Rowan Stavanger (291) | KFELS N Class | 2011 | Repsol Equinor | Norway Norway | Nov. 18 Sep. 19 | Apr. 19 Feb. 20 | Plus one 5-well priced option and recurring 6-month priced options through Dec. 25 | |||||||
Rowan Viking (290) | KFELS N Class | 2010 | MOL Lundin | Norway Norway | Apr. 19 Mar. 20 | Aug. 19 Nov. 20 | Contracted for seven wells, with minimum duration of 265 days. Plus four 1-well priced options | |||||||
Bob Palmer (250) | MLT Super Gorilla XL | 2003 | Saudi Aramco | Saudi Arabia | Jun. 18 | Jun. 21 | Leased to ARO Drilling(5) | |||||||
Rowan Gorilla VII (249) | MLT Super Gorilla | 2002 | Chrysaor | UK | May 18 | Nov. 19 | Plus two 1-year unpriced options | |||||||
Rowan Gorilla VI (248) | MLT Super Gorilla | 2000 | Shell | Trinidad | Apr. 18 | Sep. 19 | Contracted for drilling program until Apr. 19 then accommodation mode until Sep. 19. Plus one 2-month priced option | |||||||
Rowan Gorilla V (247) | MLT Super Gorilla | 1998 | Total | UK | Sep. 17 | Mar. 20 | Plus one 8-month, one 3-month and one 6-month priced options |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Segment / Region / Rig | Design | Year Delivered | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | |||||||
Jackups | ||||||||||||||
Heavy Duty Harsh Environment(3) | ||||||||||||||
ENSCO 123 | KFELS Super A | 2019 | Contract Prep. Premier Premier | UK UK UK | Aug. 19 Jun. 20 | Dec. 19 Jul. 21 | Contracted for two wells. Plus one 1-well option Contracted for four wells. Plus three 1-well options(4) | |||||||
ENSCO 122 | KFELS Super A | 2014 | NAM Shell | UK UK | Sep. 17 Jan. 20 | Oct. 19 Oct. 20 | ----- Contracted for two wells. Plus seven 1-well priced options | |||||||
ENSCO 121 | KFELS Super A | 2013 | Eni ONE Premier | UK UK/Netherlands UK | Dec. 18 Apr. 19 Mar. 20 | Apr. 19 Dec. 19 May 20 | Contracted for three wells. Plus three 1-well options Contracted for one well. Plus two 1-well options(4) | |||||||
ENSCO 120 | KFELS Super A | 2013 | ConocoPhillips | UK | Jul. 17 | Jul. 22 | ----- | |||||||
ENSCO 102 | KFELS MOD V-A | 2002 | Arena Renaissance W&T Offshore GulfSlope Fieldwood | U.S. GOM U.S. GOM U.S. GOM U.S. GOM U.S. GOM | Nov. 17 May 19 Aug. 19 Oct. 19 Nov. 19 | Apr. 19 Aug. 19 Sep. 19 Nov. 19 Dec. 19 | Contracted for one well Contracted for one well | |||||||
ENSCO 101 | KFELS MOD V-A | 2000 | Neptune Eni | Netherlands UK | Oct. 18 Sep. 19 | Aug. 19 Oct. 19 | Inspection for 21 days in 2Q19 Contracted for one well | |||||||
ENSCO 100 | MLT Gorilla | 1987 | Repsol-Sinopec Faroe Petroleum | UK UK | Jun. 19 Nov. 19 | Nov. 19 Jun. 20 | Contracted for five wells Contracted for nine P&A wells. Plus twelve 1-well options |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Segment / Region / Rig | Design | Year Delivered | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | |||||||
Jackups | ||||||||||||||
Heavy Duty(3) | ||||||||||||||
Joe Douglas (118) | LT 240-C | 2011 | BP | Trinidad | Aug. 16 | Sep. 19 | ||||||||
Ralph Coffman (117) | LT 240-C | 2009 | GulfSlope Undisclosed Operator CGX | U.S. GOM Trinidad Guyana | Jul. 18 Jul. 19 Oct. 19 | Jun. 19 Oct. 19 Dec. 19 | Contracted for three wells. Plus four 2-well priced options after completion of CGX contract Contracted for one well | |||||||
Rowan Mississippi (116) | LT 240-C | 2008 | Saudi Aramco | Saudi Arabia | Dec. 18 | Dec. 21 | Leased to ARO Drilling(5) | |||||||
ENSCO 115 | Pacific Class 400 | 2013 | Mubadala Petroleum | Thailand | Mar. 19 | Jan. 20 | Contracted for ten months. Plus one 2-month option and three 4-month options | |||||||
ENSCO 114 | Pacific Class 400 | 2012 | Cold Stacked | Philippines | ||||||||||
ENSCO 113 | Pacific Class 400 | 2012 | Cold Stacked | Philippines | ||||||||||
ENSCO 111 | KFELS MOD V-B | 2003 | Cold Stacked | Malta | ||||||||||
ENSCO 110 | KFELS MOD V-B | 2015 | North Oil Company | Qatar | Sep. 17 | Sep. 20 | Plus two 1-year priced options | |||||||
ENSCO 109 | KFELS MOD V-Super B | 2008 | Chevron | Angola | Dec. 14 | Jul. 21 | Inspection for 15 days in 2Q19 | |||||||
ENSCO 108 | KFELS MOD V-B | 2007 | Saudi Aramco | Saudi Arabia | Nov. 18 | Nov. 21 | ||||||||
ENSCO 107 | KFELS MOD V-B | 2006 | Jadestone Energy Chevron | Australia Australia | Mar. 19 Sep. 19 | May 19 Jan. 20 | Contracted for five months. Plus four 30-day priced options | |||||||
ENSCO 106 | KFELS MOD V-B | 2005 | BP | Indonesia | Jan. 18 | Jan. 23 | Plus 13 1-well priced options. Planned inspection for approx. 15 days in 4Q19 and 20 days in 1Q20 | |||||||
ENSCO 105 | KFELS MOD V-B | 2002 | Preservation Stacked(2) | Singapore | ||||||||||
ENSCO 104 | KFELS MOD V-B | 2002 | ADNOC | UAE | Feb. 18 | Dec. 19 |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Segment / Region / Rig | Design | Year Delivered | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | |||||||
Jackups | ||||||||||||||
Standard Duty - Modern | ||||||||||||||
Earnest Dees (148) | LT Super 116-E | 2013 | Saudi Aramco | Saudi Arabia | Aug. 19 | Aug. 22 | Leased to ARO Drilling(5) | |||||||
Bess Brants (147) | LT Super 116-E | 2013 | Saudi Aramco | Saudi Arabia | Jul. 19 | Jul. 22 | Leased to ARO Drilling(5) | |||||||
Rowan EXL IV (146) | LT Super 116-E | 2011 | Saudi Aramco | Saudi Arabia | Sep. 18 | Sep. 21 | Leased to ARO Drilling(5) | |||||||
Rowan EXL III (145) | LT Super 116-E | 2010 | Cantium | U.S. GOM | Nov. 18 | Jul. 19 | ----- | |||||||
Rowan EXL II (144) | LT Super 116-E | 2010 | BP Repsol | Trinidad Guyana | Apr. 18 Sep. 19 | Aug. 19 Oct. 19 | Contracted for one well | |||||||
Rowan EXL I (143) | LT Super 116-E | 2010 | Saudi Aramco | Saudi Arabia | Oct. 18 | Oct. 21 | Leased to ARO Drilling(5) | |||||||
ENSCO 112 (142) | LT Super 116-E | 2008 | Cold Stacked | Malta | ||||||||||
ENSCO 141 | LT Super 116-E | 2016 | Saudi Aramco | Saudi Arabia | Aug. 18 | Aug. 21 | ||||||||
ENSCO 140 | LT Super 116-E | 2016 | Saudi Aramco | Saudi Arabia | Jul. 18 | Jun. 21 | ||||||||
ENSCO 76 | MLT Super 116-C | 2000 | Saudi Aramco | Saudi Arabia | Jan. 15 | Dec. 22 | Inspection for 15 days in 2Q19. Planned inspection for approx. 60 days in 1Q20 | |||||||
ENSCO 75 | MLT Super 116-C | 1999 | Talos | U.S. GOM | May 18 | Sep. 19 | Plus one 90-day option |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Segment / Region / Rig | Design | Year Delivered | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | |||||||
Jackups | ||||||||||||||
Standard Duty | ||||||||||||||
ENSCO 96 | Hitachi 250-C | 1982 | Saudi Aramco | Saudi Arabia | Feb. 15 | Oct. 19 | ||||||||
ENSCO 92 | MLT 116-C | 1982 | ConocoPhillips | UK | Feb. 17 | Dec. 22 | ||||||||
ENSCO 88 | MLT 82 SD-C | 1982 | Saudi Aramco | Saudi Arabia | Nov. 13 | Nov. 19 | Day rate of approx. $65,000 | |||||||
ENSCO 87 | MLT 116-C | 1982 | ExxonMobil Available | U.S. GOM U.S. GOM | Nov. 18 | Jun. 19 | ||||||||
ENSCO 84 | MLT 82 SD-C | 1981 | Saudi Aramco | Saudi Arabia | Jan. 17 | Aug. 21 | Day rate of approx. $72,000. Planned inspection for approx. 60 days in 3Q20 and 60 days in 4Q20 | |||||||
ENSCO 72 | Hitachi K1025N | 1981 | Petrofac Eni | UK UK | May 19 Nov. 19 | Jul. 19 Aug. 22 | Contracted for 40-well P&A program. Planned inspection for 14 days in 2Q20 | |||||||
ENSCO 71 | Hitachi K1032N | 1982 | Preservation Stacked(2) | UK | ||||||||||
ENSCO 70 | Hitachi K1032N | 1981 | Preservation Stacked(2) | UK | ||||||||||
ENSCO 68 | MLT 84-CE | 1976 | Castex Ankor Castex | U.S. GOM U.S. GOM U.S. GOM | Aug. 18 May 19 Aug. 19 | Apr. 19 Jun. 19 Sep. 19 | Contracted for one well | |||||||
ENSCO 67 | MLT 84-CE | 1976 | Pertamina | Indonesia | Jan. 19 | May 20 | Contracted for 500 days | |||||||
ENSCO 54 | F&G L-780 Mod II-C | 1982 | Saudi Aramco | Saudi Arabia | Sep. 14 | Sep. 22 | Day rate of approx. $72,000, plus approx. $5,000 per day for upgrade costs and mobilization amortized through Sep. 22 | |||||||
Rowan California (42) | MLT 116-C | 1983 | Cold Stacked | Bahrain | ||||||||||
Arch Rowan (37) | MLT 116-C | 1981 | Saudi Aramco | Saudi Arabia | Sep. 18 | Sep. 21 | Leased to ARO Drilling(5) | |||||||
Charles Rowan (36) | MLT 116-C | 1981 | Saudi Aramco | Saudi Arabia | Sep. 18 | Sep. 21 | Leased to ARO Drilling(5) | |||||||
Rowan Middletown (22) | MLT 116-C | 1980 | Saudi Aramco | Saudi Arabia | Sep. 18 | Sep. 21 | Leased to ARO Drilling(5) |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |
Segment / Rig | Design | Customer/ Status | Location | Contract Start Date | Contract End Date(1) | Comments | ||||||
Other | ||||||||||||
Drilling Management | ||||||||||||
Thunder Horse | Deepwater Semisubmersible | BP | U.S. GOM | Jan. 17 | Jan. 22 | Day rate of approx. $127,000 from Apr. 19. Plus five 1-year options | ||||||
Mad Dog | Deepwater Spar Drilling Rig | BP | U.S. GOM | Jan. 17 | Jan. 22 | Day rate of approx. $86,000 from Apr. 19. Plus five 1-year options | ||||||
ARO Drilling | ||||||||||||
Jackup Rigs Owned by ARO Drilling | ||||||||||||
Gilbert Rowe | MLT 116-C | Saudi Aramco | Saudi Arabia | Oct. 17 | Oct. 20 | Day rate of approx. $69,000 | ||||||
Bob Keller | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct. 17 | Oct. 20 | Day rate of approx. $130,000 | ||||||
J.P. Bussell | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct. 17 | Oct. 20 | Day rate of approx. $130,000 | ||||||
Hank Boswell | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct. 18 | Oct. 21 | Undisclosed day rate. Inspection for 14 days in 3Q19 | ||||||
Scooter Yeargain | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct. 18 | Oct. 21 | Undisclosed day rate | ||||||
SAR 201 | BMC 200-H | Saudi Aramco | Saudi Arabia | Feb. 18 | Feb. 21 | Day rate of approx. $79,000 | ||||||
SAR 202 | KFELS Super B | Saudi Aramco | Saudi Arabia | Oct. 17 | Oct. 20 | Day rate of approx. $195,000 | ||||||
Held for Sale | ||||||||||||
Rowan Gorilla IV | MLT Gorilla | Sold |
![]() | Ensco Rowan plc Fleet Status Report July 25, 2019 |