Commitments and Contingencies Disclosure [Text Block] | 17. AGREEMENTS AND COMMITMENTS |
|
Quijano Agreements |
|
The agreements which have historically been reported under this heading have been superseded by the June 26, 2014 International Centre for Dispute Resolution International Arbitration Tribunal delivered a Final Award in the matter of Global Gold Corporation vs. Amarant Mining Ltd and Alluvia Mining, Ltd. awarding Global Gold $16,800,000 USD plus $68,570.25 USD in interest, costs, and fess, with post-award interest on unpaid amounts accruing at 9% plus injunctive relief reported in this filing. |
|
On August 9, 2007 and August 19, 2007, the Company, through Minera Global, entered agreements to form a joint venture and on October 29, 2007, the Company closed its joint venture agreement with members of the Quijano family by which Minera Global assumed a 51% interest in the placer and hard rock gold Madre de Dios and Pureo properties. The name of the joint venture company is Compania Minera Global Gold Valdivia S.C.M. (“Global Gold Valdivia” or “GGV”). |
|
On July 24, 2009, Global Gold entered into an amendment with members of the Quijano family (“Quijano”) to the October 29, 2007 Global Gold Valdivia joint venture subject to final board approval on or before July 31, 2009 whereby GGV will become wholly owned by Global Gold and retain only the Pureo Claims Block (approximately 8,200 hectares), transferring the Madre De Dios claims block to the sole ownership to members of the Quijano family. On July 28, 2009, the amendment was approved by the Company’s board of directors. |
|
Key terms of the amendment included that on or before August 15, 2009, GGV transfer to Quijano or his designee one hundred percent (100%) interest in the current GGV claims identified as the Madre De Dios Claims Block and Quijano transfer to Global Gold one hundred percent (100%) interest in the GGV, or its designee, and the remaining claims identified as the Pureo Claims Block. All transfers were closed in Santiago, Chile on August 14, 2009 which terminated the joint venture. If GGV does not commence production on a commercial basis on the property being transferred to its sole control pursuant to this agreement within two years (subject to any time taken for permitting purposes), the property shall revert to Quijano. |
|
Quijano shall be entitled a 3% NSR royalty interest in all metals produced from the properties retained in GGV up to a maximum of 27 million Euros, subject to Quijano’s initial repayment of $200,000 to Global Gold. For three years, GGV or its designee shall have a right of first refusal on any bona fide offers for all or any part of the properties transferred to Quijano (to be exercised within five (5) days). For three years, Quijano shall also have a right of first refusal on any bona fide offers for all or any part of the properties retained by GGV or its designee (to be exercised within twenty (20) days). The Company's obligations, as amended, were transferred to Amarant. |
|
Coventus/Amarant Agreements |
|
The agreements which have historically been reported under this heading have been superseded by the June 26, 2014 International Centre for the Settlement of Investment Disputes International Arbitration Final Award in the matter of Global Gold Corporation vs. Amarant Mining Ltd and Alluvia Mining, Ltd. awarding Global Gold $16,800,000 USD plus $68,570.25 USD in interest, costs, and fess, with post-award interest on unpaid amounts accruing at 9% plus injunctive relief reported in this filing. |
|
On October 27, 2010, the Company entered into an agreement with Conventus Ltd. a BVI corporation (“Conventus”) for the sale of 100% interest in GGV which holds the Pureo mining assets in Chile. The Company will provide Conventus with consulting services and technical assistance for development, production, exploration, and expansion of the GGV mining properties in further consideration of the payment terms below. |
|
On December 2, 2011, the Company closed an amended agreement with Conventus and Amarant, originally entered into on October 27, 2010, for the sale of 100% interest in the GGV which held the Pureo mining assets in Chile. As part of the amendment and closing, Global Gold also sold 100% interest in its wholly owned subsidiaries Global Oro and Global Plata, both of which are Delaware Limited Liability Corporations, and are each 50% owners of Minera Global in exchange for additional compensation, payable on or before December 15, 2011, of a 1% interest in Amarant. GGV is owned by Minera Global (51%) and Global Oro (49%). Conventus has assigned its right and obligations from this agreement to Amarant. Key terms included that Amarant shall pay the $4.0 million USD remaining of the $5.0 million USD sale price obligation as follows: $1,000,000 on or before December 15, 2011; $1,000,000 on or before December 15, 2012; $1,000,000 on or before December 15, 2013; and $1,000,000 on or before December 31, 2014 subject to the terms and conditions in the agreement. As additional consideration, if within seven years, Amarant or any of its successors produces 150,000 ounces of gold from the Pureo property then Amarant shall pay the Company a one-off and once only $2,500,000 bonus within 60 days of achieving such production. |
|
On April 13, 2012, the Company entered into an "Amended Joint Membership Interest Purchase Agreement" with Amarant to amend the parties' December 2, 2011 "Joint Membership Interest Purchase Agreement" as follows: the 1 million dollar payment from Amarant due the Company on December 15, 2011 shall be paid by April 20, 2012; the three "Additional Payments" of 1 million dollars due on each of December 15, 2012, December 15, 2013, and December 15, 2014 shall all be paid in a lump sum of three million dollars prior to May 31, 2012, as further described in Exhibit 10.49. On April 13, 2012, the Company also received a guaranty from Contender Kapital AB of Stockholm Sweden (“Contender”) that if Amarant fails to make the 1 million dollar payment to the Company on or before Friday April 20, 2012, Contender will satisfy the 1 million dollar payment, as further described in Exhibit 10.50. On May 10, 2012, the Company and Amarant agreed that the Company would forego legal actions in exchange for payment by Amarant of the $800,000 balance due plus a $50,000 additional compensation payment by May 11, 2012 and the shortening of the grace period for late payment of the $3 million dollar payment due from Amarant to the Company from 60 days to 10 days after May 31, 2012. On May 9, 2012, Contender acknowledged that it had received notice of its obligation to pay on a valid guaranty of $1 million, and reaffirmed its guaranty. Contender defaulted on its guaranty. On May 18, 2012, Amarant and its principal, Mr. Ulander, agreed to pay Global an additional $50,000 payment (in addition to the previously agreed $50,000 additional payment) in exchange for foregoing legal action. On June 15, 2012, the Company conditionally agreed to a revised schedule of debt repayment through August 30, 2012. The revised schedule provides the Company to receive; a) 20% of net proceeds of funds raised by Alluvia or Amarant or their affiliates with a ceiling of $3,250,000 (which includes additional compensation) from any source; b) a $250,000 payment, and c) an additional $200,000 payment to the company. Also, the Company agreed to conditionally waive its right of first refusal with respect to transfer of GGV shares as part of this revision, but these conditions were not met and the Company has advised that the purported assignment to Alluvia is invalid. As one provision of the amended sale closed on December 2, 2011, the Company was to receive certain shares or ownership of Amarant, amounting to 533,856 shares of Amarant. These shares were received in July 2012. No value has been recorded for these shares for the following reasons; a) there is currently no active trading market to value these shares except the “Mangold List” in Sweden, b) we do not have access to the financials of Amarant to aid in calculating a value, and c) these shares received present a small minority ownership of Amarant. Amarant and Alluvia remain in default of certain material provisions of this sale agreement with Amarant. |
|
On November 28, 2012, the Company and Amarant (the “Parties”) entered into an Amended Joint Membership Interest Purchase Agreement (the “Amendment”), which again restructured the terms of the Joint Interest Membership Interest Purchase Agreement (the “MIPA”), dated December 2, 2011, among the Company, Amarant, and the other parties signatory thereto and amended on April 13, 2012 (“Amended MIPA”). Pursuant to the MIPA and all of its amendments the Parties agree that as of November 28, 2012 Amarant owes $3,275,000 to the Company. Interest accrues at 12% per annum. |
|
Key terms of the Amendment include: Amarant agrees that it shall pay the Company the following amounts by the close of business Central European Time (“CET”) on the indicated dates: (i) $200,000 on November 29, 2012; (ii) $150,000 on or before November 30, 2012, (iii) $450,000 on or before December 6, 2012; (iv) $700,000 on or before December 17, 2012 and; (v) $1,775,000 on or before December 28, 2012. With respect to the payments in (iii), (iv) and (v) as the largest shareholder of Alluvia Mining Ltd. (“Alluvia”), Amarant guarantees that 50% of all funds raised by Alluvia shall be paid to the Company until such payments are satisfied in full. As further consideration and in satisfaction of any and all alleged damages resulting from of Amarant’s failure to perform any obligation prior hereto, Amarant agrees to transfer to the Company One Million (1,000,000) ordinary shares of Alluvia held by Amarant, within 15 days of a fully executed lock-up agreement whereby the Company will be restricted from transferring any of such shares for a period of 6 months from the date of transfer. The Parties agree to act in good faith to prepare and agree on the terms of the lock-up agreement within 5 business days from the date hereof. Lastly, in the event that Amarant fails to make any payments hereunder on a timely basis, it hereby confesses to an arbitral award as to the unpaid amounts and the parties authorize the entry of such an arbitral award pursuant to the American Arbitration Association arbitration clauses previously agreed; this confession of arbitral award is verified by the undersigned who have personal knowledge of the facts and affirm that they are for just debts arising from the sale of property, and this confession is signed by each of the undersigned under oath that the terms are true to the best of their knowledge. The parties further agree to execute and deliver any other documents which may be necessary to effectuate this confession and authorization of arbitral award within 48 hours of a request by the other party or the arbitrator. The Amendment had a confidentiality provision which is no longer operational. The Amendment also provided that subject to Amarant’s performance of the payment obligations, the Company would waive rights to object to Amarant’s transfer of the property to Alluvia; however, Amarant did not meet its payment obligations. The Amendment further provided that the Company would extend the time for Amarant to effect certain name changes until March 31, 2013 with Amarant’s performance of the payment obligations, but Amarant failed to meet its payment obligations. The Company has received the 1,000,000 shares of Alluvia which are restricted for 6 months, until May 28, 2013. No value has been recorded for these shares for the following reasons; a) there is currently no active trading market to value these shares except the “Mangold List” in Sweden, b) we do not have access to the financials of Alluvia to aid in calculating a value, and c) these shares received present a small minority ownership of Alluvia. Amarant and Alluvia remain in default of certain material provisions of the agreements with the Company. See attached Exhibit 10.60. |
|
Forbearance and other agreements increased the principal amount to be paid to Global Gold to $2,509,312 providing for payments to Global Gold by May 22, 2013, May 28, 2013, June 17, 2013 and June 30, 2013. Amarant and Alluvia defaulted on these agreements and payment schedules. |
|
On August 6, 2013, the American Arbitration Association issued a Partial Final Award in favor of the Company for $2,512,312 as a liquidated principal debt plus 12% interest and excluding any additional damages, attorney fees, or costs which will be discussed at a later time. Additionally, the American Arbitration Association enjoined Amarant and Alluvia from assigning or alienating any assets or performing or entering transactions which would have the effect of alienating its respective assets pending payment of $2,512,312 to Global Gold. Amarant and Alluvia have not complied with the arbitral award to pay, produce records, or, apparently, enter transactions pending payment in full to Global Gold. |
|
Subsequent to the arbitral award, Amarant and Alluvia announced on the Amarant website that “[t]he companies have reached an agreement with a UAE based consortium to sell material parts of their assets. The deal was signed on the 30th September in London and consists of three parts. The first stage consists of the sales of the shares in Mineral Invest and Alluvia that are pledged as security for various bridge financing solutions and short term financing. In a second stage the consortium will provide the operational companies MII and Alluvia with necessary funding to start the operations and settle off short term debts and obligations in Alluvia and Mineral Invest including, but not limited to, legal fees to the SOVR law firm, license fees, funds owed to Global Gold related to the purchase of the Valdevia, Chile property and remaining payments against NSR commitments in connection with the Huakan deal. The first two stages are expected to be completed by the end of 2013.” Global Gold was contacted by Mr. Ulander and separately by the former Chairman of Alluvia, Mr. Thomas Dalton, as the representative of the consortium, Gulf Resource Capital, referenced in the Amarant/Alluvia announcement to settle the arbitration award and despite the expectation of payments, no payments have been made and the parties have not reached a definitive agreement. There can be no assurance that Gulf Resource Capital will pay on behalf of Amarant and Alluvia, Global Gold will continue to seek enforcement of the arbitral award to the full extent. |
|
Industrial Minerals/Linne/Jacero Agreements |
|
March 24, 2009, the Company signed a supply contract agreement with Industrial Minerals SA (“IM”), a Swiss Company. The agreement is for IM to purchase all of the gold and silver concentrate produced at the Company's Toukhmanuk facility at 85% of LBMA less certain treatment and refining charges. |
|
On February 25, 2010, the Company, through its wholly owned subsidiary Mego entered into an agreement with IM to provide Mego with an advance of $450,000 from IM against future sales of gold and silver concentrate (the “Advance”). The Advance was provided by IM on February 26, 2010. The Company owed $87,020 from the Advance as of December 31, 2014 and 2013. |
|
Key terms include; that Mego provides IM with an exclusive off-take agreement for its gold and silver concentrate in Armenia through December 31, 2012; for 2009 and until February 25, 2010, the price IM paid Mego for gold and silver concentrate was calculated based on 85% of the London AM/PM Gold Fixation and London Silver Spot (“London Rates”), until Mego delivers 2,250 metric tons of concentrate the 85% is reduced to 80%, after 2,250 metric tons have been delivered the price will revert to 85% of London Rates; Mego provides IM with a security interest in its current ore stockpile in Armenia; and the Company provides for a corporate guarantee for repayment of the Advance. |
|
On July 5, 2013, the Company through its majority owned subsidiary Global Gold Consolidated Resources Limited, a Jersey Island private limited liability company (“GGCRL”), and GGCRL wholly owned subsidiaries GGCR Mining, LLC, a Delaware limited liability company (“GGCR Mining”), and Mego-Gold, LLC, a limited liability company incorporated in the Republic of Armenia (“Mego”), concluded a fifteen year mine operating agreement, all as further described in Exhibit 10.62 below, with Linne Mining LLC, a limited liability company incorporated in the Republic of Armenia (“Linne”), as the operator along with an $8,800,000 debt facilities agreement to fund future production at the central section of the Toukhmanuk gold-silver open pit mine in Armenia. The debt facility includes interest at LIBOR plus 8%, and the operator, Linne, has an incentive based compensation model, to be paid approved costs plus 10% of the actual sales of gold, all as further described in Exhibit 10.63 below. The Company has signed as a Guarantor on the debt facility agreement. The mine operator has begun mobilization to restart production this year. |
|
The existing offtake agreement with Industrial Minerals, SA was also extended until the end of 2027, all as further described in Exhibit 10.64 below, and share options for up to 10% in GGCRL or the subsidiary project company in Armenia were also granted in related agreements with Jacero Holdings Limited, a limited liability company incorporated in the Republic of Cyprus (“Jacero”), all as further described in Exhibit 10.65 below. |
|
Viking Investment/CREO Agreements |
|
On July 5, 2013, GGCRL, and its wholly owned affiliates Mego, and Getik Mining Company, a limited liability company incorporated in the Republic of Armenia (“Getik”), also finalized an agreement effective June 20, 2013 with Creo Design (Pty) Limited, a company incorporated in the Republic of South Africa (“CREO”), and Viking Investment Limited, a company incorporated in the Hong Kong (“Viking”). The agreement is for CREO to manage the technical work with local employees and contractors leading to feasibility studies at the Getik property in Armenia as well as at the 50 plus square kilometer exploration license area surrounding the central section of the Toukhmanuk mine. The Armenian government recently extended this exploration license to July 2, 2016 and the English and Armenian of the current license have been posted on the Global Gold website. The agreement also calls for Viking to finance the initial budgeted expenses until GGCRL is publicly listed at a charge of costs plus 10%, all as further described in Exhibit 10.66 below. |
|
As of December 31, 2014, Viking and CREO have failed to meet their obligations and are in material breach of the contract. The Company is reviewing its options with respect to the breaches of contract and to preserve the Getik licenses. |
|
Signature Gold |
|
On September 5, 2013, the Company through GGCRL, concluded a Binding Heads of Agreement contract with Signature Gold Limited of Sydney Australia (“Signature”) to merge the Armenian and Australian gold projects, into the renamed Global Signature Gold entity planned to be listed on the Australian Stock Exchange. |
|
Caldera Agreements |
|
On November 10, 2014, the International Centre for Dispute Resolution Final Award, with retired Justice Herman Cahn as the sole arbitrator, ruled in favor of Global Gold on damages and a range of other outstanding issues. The total damage award is $10,844,413 with interest at 9% and penalties continuing to accrue if Caldera does not comply with the equitable relief granted. Of the total damage award, $3 million is compensation and $1 million is punitive damages for the defamatory publications by Caldera's principal Vasilios Bill Mavridis against Global Gold and its principals. This Final Award terminates the arbitration proceedings which Caldera instituted against Global Gold in 2010. Global Gold prevailed in the first, liability phase of the arbitration and four prior court cases, as summarized and reported in April 2013. A full copy of the 42 page Final Award as well as the other rulings is available at the Global Gold website: www.globalgoldcorp.com. Previous rulings in this matter included that Montreal based Caldera Resources, led by the brothers John Mavridis and Bill Mavridis, failed to make agreed payments to Global Gold despite having raised almost $5 million, failed to issue stock due, misrepresented the approval of the Toronto Stock Exchange of the parties' contract, and otherwise breached the joint venture agreement. Caldera through its Biomine, LLC subsidiary also acquired a "Marjan West" license area which it claimed was adjacent to Marjan but in fact overlapped with Marjan. Armenian Courts at three levels found that Caldera had deceptively and illegally registered full control over the Marjan Mining Company to itself without the signatures or authorization of Global Gold, and a U.S. Federal Court confirmed the phase 1 arbitration findings while rejecting Caldera's arguments to vacate the award. The November 10, 2014 Final Award resolved all other outstanding issues with the following specific findings and rulings requiring Caldera to: |
|
| 1 | turn over to Global Gold at its offices in Rye, New York all books, records, contracts, communications, and property related in any way to the Marjan property in Armenia and the Marjan Mining Company, including specifically the Armenian Marjan Mining Company seal, and shall pay Global Gold $50,000 plus $250 per day for every day following issuance of this Final Award that such materials are not delivered; |
|
| 2 | turn over to Global Gold at its offices in Rye, New York communications Caldera and/or Mr. Mavridis has had with third parties concerning Global Gold its officers, agents, directors and business…Without limitation, the following shall also be turned over to Global Gold: all direct and indirect (for example through a translator or agent) communications with the following individuals and organizations: Azat Vartanian, Petros Vartanian, …, Joseph Borkowski, Jeffrey Marvin,… Prem Premraj…, Rasia FZE, Johan Ulander, Ecolur,… Tom Prutzman, …, Stockhouse, Investor's Hub, shareholders of Global Gold, and any governmental or regulatory authorities-- Caldera shall pay Global Gold $100 per day for every day following issuance of this Final Award that such materials are not delivered; |
|
| 3 | issue a press release correcting the April 30, 2013 Caldera release …stating that the original release is retracted with all property books and records (including all exploration data) related to the Marjan property transferred to Global Gold and that neither Caldera nor its successors retain rights to the Marjan mine in Armenia and shall pay Global Gold $50,000 plus $100 per day for every day following issuance of this Final Award that such correcting release is not issued; |
|
| 4 | Caldera did not spend the minimum $1 million threshold necessary to be eligible for an NSR Royalty interest and therefore Caldera has no NSR Royalty or any other interest in the Marjan property; |
|
| 5 | the $150,000 which Caldera paid to Global Gold was not pursuant to the JV Agreement (which did not become effective) but pursuant to the December 2009 Agreement therefore Global Gold is not obligated to make any payments to Caldera; |
|
| 6 | pay Global Gold $115,000 for Caldera's refusal to turn over 500,000 shares of stock in 2010; |
|
| 7 | pay Global Gold $3,174,209 for Caldera's failure to make agreed payments to Global Gold; |
|
| 8 | pay Global Gold $577,174 for legacy governmental liabilities concerning the Marjan property and shall indemnify and hold Global Gold harmless (including attorney fees) from any governmental claims or liabilities associated with the time they control the seal of the Marjan Mining Company; |
|
| 9 | pay Global Gold $967,345 for violating Paragraph (1) of the Final Partial Award requiring turnover of property and [for] interference in Global Gold's development of Marjan and shall relinquish the portions of the Marjan West license which overlap or in any way impinge on Marjan; |
|
| 10 | Caldera is liable for defamation and tortious interference with contractual and business relations with regard to Global Gold and its related personnel and so shall (i) pay Global Gold $3 million in compensatory damages…, (ii) pay Global Gold $1 million in punitive or exemplary damages…, (iii) remove all the materials and websites controlled in any way by them which were admitted as exhibits on defamatory publications in this case from the internet and other locations, (iv) remove and be permanently enjoined from using Global Gold's trading symbol without permission; (v) not share those materials with others or arrange to have them posted anonymously or otherwise- (vi) independently, … Global Gold and those who have been named by Caldera and Bill Mavridis in the admitted exhibits on defamatory publications as well as their attorneys [are granted] the authority to contact internet service providers, search engine firms, social media sites, stock discussion boards (including but not limited to Google, Yahoo, Facebook, Twitter, Stockhouse, Investor's Hub and Bing) to use this Final Award to remove the material as defamatory; |
|
| 11 | for the breaches of the Confidentiality Stipulations and Orders in this case, …all publications of "confidential" or attorney eyes only material [shall] be removed from the internet and any other locations and that their substance not be republished and …Global Gold and its attorneys [are granted] the authority to contact internet service providers, search engine firms, social media sites, stock discussions board (including but not limited to Google, Yahoo, Facebook, Twitter, Stockhouse, Investor's Hub and Bing) to use this Final Award to remove the material-- Caldera shall pay Global Gold for $100 per day every day that persons associated with Caldera remain in violation of the Confidentiality Stipulation and Order following the issuance of this Final Award including for each day until full disclosure of all emails and other communications with third parties that the information was shared with or discussed; |
|
| 12 | pay $1,822,416 for attorney fees and costs; |
|
| 13 | reimburse Global Gold $88,269 paid to the arbitration association and for the compensation and expenses of the arbitrator. |
|
The Final Award was certified for purposes of Article I of the United Nations New York Convention on the Recognition and Enforcement of Foreign Arbitral Awards and for purposes of the Federal Arbitration Act. |
|
On December 18, 2009, the Company entered into an agreement with Caldera Resources Inc. (“Caldera”) outlining the terms for a joint venture on the Company’s Marjan property in Armenia (“Marjan JV”). |
|
Key terms included that Caldera shall, subject to terms and conditions, earn a 55% interest in the Marjan Gold-Silver-Polymetallic Project after completing a bankable feasibility study on the project or spending US$3.0M on the property. |
|
As additional consideration, Caldera made a non-refundable US$50,000 deposit by December 30, 2009 and issued 500,000 shares of the company on a post-consolidated basis. Caldera was also to make a payment of US$100,000 no later than March 30, 2010. A definitive agreement was to be signed as soon as possible, upon completion of due diligence review, respective board approvals and any regulatory approval that may be required. The Company received the US$50,000 deposit on December 29, 2009, and (after March 31, 2010) the $100,000 payment. |
|
On March 24, 2010, the Company entered into an agreement with Caldera establishing the terms for a joint venture on the Company’s Marjan property in Armenia (“Marjan JV”) which amended the terms of the December 18, 2009 agreement. |
|
Key terms included that Caldera would own 55% of the shares of a newly created joint venture company, become the operator of the project, and be responsible for all expenses. To maintain its 55% interest, Caldera was obligated to spend up to US$ 3,000,000 on the Property, and issue 500,000 shares of Caldera to the Company. The joint venture board would have two Caldera representatives and one Global Gold representative. However, certain actions including adoption of the annual operating and capital budgets require unanimous consent. Should Caldera not perform in accordance with the terms of the Marjan JV, then Global Gold would have 100% interest of the Marjan JV transferred back and Caldera will receive a Net Smelter Royalty (“ NSR “) on the Marjan property equal to .5% for each tranche of US$ 1,000,000 up to a maximum NSR of 3% without any prorating. |
|
Also under the terminated joint venture agreement Caldera would own 100% in the Marjan Gold-Silver Project by making quarterly payments totaling US$ 2,850,000, starting September 30, 2010. If Caldera missed one of its quarterly payments based on its failure to raise funds from capital markets, it was entitled to an automatic 30 day extension from each quarterly payment; if Caldera defaulted on an extended payment then Caldera would forfeit its shares of the Marjan JV, be relieved of its investment commitment, but still be liable for the payments to Global Gold which would accrue interest at 10%, and possibly retain a royalty interest as described above. If Caldera made its payments and completed its obligations, Global Gold would retain a 1.5% NSR on all production on the Central zone and a 2.5% NSR on all production on the Northern zone. Caldera could prepay the payments, fulfill the investment commitment, and take 100% interest of the JV at any time. |
|
The agreement was subject to approval by the TSX Venture Exchange and the Board of Directors of the respective companies. As of April 30, 2010, Caldera paid the Company $100,000. Caldera further informed the Company that it received TSX Venture Exchange approval on the transaction, which subsequently proved to be untrue. On October 7, 2010, the Company terminated the Marjan JV for Caldera’s non-payment and non-performance as well as Caldera’s illegal registrations in Armenia and other actions. In October 2010, Caldera filed for arbitration in New York City. In September 2010, at Caldera’s invitation, the Company filed to reverse the illegal registration in Armenia. That litigation and the New York arbitration were subsequently resolved in favor of the Company, restoring the Company’s 100% ownership of Marjan. The Armenian Government issued a new mining license to the Company’s wholly owned subsidiary Marjan Mining Company on March 5, 2013. |
|
The arbitration hearing with respect to Global Gold’s costs, attorney fees, and counterclaims for damages took place on September 10, 2014 in New York City. |
|
See Item 1A “Risk Factors” and Item 3 “Legal Proceedings”. |
|
Consolidated Resources Agreement |
|
As of March 17, 2011, the Company entered into an agreement (the “Formation Agreement”) with Consolidated Resources USA, LLC, a Delaware company (“CRU”) for a joint venture on the Company’s Toukhmanuk and Getik properties in Armenia (the “Properties”). Upon payment of the initial consideration as provided below, Global Gold and CRU will work together for twelve months (the “12 Month Period”) to develop the Properties and cause the Properties to be contributed to a new joint venture company, whose identity and terms will be mutually agreed, (the “JVC”). Rasia, a Dubai-based principal advisory company, acted as sole advisor on the transaction. |
|
Key terms include CRU paying initial consideration of $5,000,000 as a working capital commitment to Global Gold payable by: a $500,000 advance immediately following the execution of the Formation Agreement (the “Advance”); $1,400,000 payable following the satisfactory completion of due diligence by CRU and the execution of definitive documents in 30 days from the date of this Agreement; and $3,100,000 according to a separate schedule in advance and payable within 5 business days of the end of every calendar month as needed. |
|
On April 27, 2011, the Company entered into an agreement with Consolidated Resources Armenia, an exempt non-resident Cayman Islands company (“CRA”); and its affiliate CRU, (hereinafter collectively referred to as “CR”), to fund development and form a joint venture on the Properties (the “JV Agreement”). The JV Agreement was entered pursuant to the Formation Agreement. |
|
CR completed its due diligence with satisfaction, and as of the date of the JV Agreement completed the funding of the required $500,000 Advance. Upon the terms and subject to the conditions of JV Agreement, CR will complete the funding of the remaining $4,500,000 of its $5,000,000 working capital commitment related to Toukhmanuk and Getik according to an agreed, restricted funding schedule which includes $1,400,000 payable following the execution of the Agreement and the remaining $3,100,000 payable over the next 12 months with payments occurring within 5 business days of the end of each calendar month as needed. In addition, Mr. Jeffrey Marvin of CR was elected a member of the Global Gold Board of Directors and attended the Company's annual meeting on June 10, 2011. As of December 31, 2011, the Company received the full $5,000,000 funding from CR. Mr. Marvin resigned from the Global Gold board on February 24, 2012 for personal reasons. |
|
Pursuant to the JV Agreement, Global Gold and CR were working together for twelve months (the “12 Month Period”) from the date of the JV Agreement to develop the Properties, improve the financial performance and enhance shareholder value. The JV Agreement enables Global Gold to complete its current Toukhmanuk production expansion to 300,000 tonnes per year and advance exploration in Armenia. Global Gold and CR agree to form a new Joint Venture Company (“JVC”) to be established by CR, subject to terms and conditions mutually and reasonably agreed with Global Gold, provided that JVC shall have no liabilities, obligations, contingent or not, or commitments, except pursuant to a shareholders’ agreement. Global Gold and CR intend to integrate all of Global Gold’s Toukhmanuk and Getik mining and exploration operations into the JVC. |
|
The JVC will (i) own, develop and operate Toukhmanuk and Getik, (ii) be a company listed on an exchange fully admitted to trading or be in the process of being listed on such exchange and (iii) have no liabilities, obligations, contingent or not, or commitments except pursuant to the shareholders agreement. The JVC will issue new shares to the Company such that following any reverse merger or initial public offering of JVC's shares ("IPO"), Global Gold shall directly or indirectly hold the greater of (a) 51% of the equity of JVC, or (b) $40.0 million in newly issued stock of JVC, calculated based on the volume weighted average price ("VWAP") of such shares over the first 30 (thirty) days of trading following the IPO, assuming issuance of all shares issuable in the IPO, and assuming issuance of all shares issuable as management shares and conversion of the Notes issued under the Instrument (as defined) and all other convertible securities and exercise of any warrants or other securities issued in connection with the IPO, such that if following any reverse merger or IPO, the value of $40.0 million in newly issued shares based on VWAP of JVC shares is greater than the Global Gold's 51% equity ownership in JVC valued as above, new shares in JVC will be issued to the Global Gold such that the aggregate value of Global Gold's ownership in JVC is shares having a value of $40.0 million based on VWAP, and the Company shall remain in control of the JVC following the public listing. |
|
On February 6, 2012, the Company received consent from shareholders representing a majority over 65% of its outstanding Common Stock to transfer the 100% interests in Mego and Getik Mining Company, LLC into GGCR Mining, LLC, a Delaware limited liability company, owned by a joint venture company, Global Gold Consolidated Resources Limited, a Jersey Island private limited company (“GGCR”), per the terms of the April 27, 2011 Joint Venture Agreement with Consolidated Resources Armenia, an exempt non-resident Cayman Islands company (“CRA“). The JVC was to issue new shares to the Company such that following any reverse merger or initial public offering of JVC's shares ("IPO"), Global Gold shall directly or indirectly hold the greater of (a) 51% of the equity of JVC, or (b) $40.0 million in newly issued stock of JVC, calculated based on the volume weighted average price ("VWAP") of such shares over the first 30 (thirty) days of trading following the IPO, assuming issuance of all shares issuable in the IPO, and assuming issuance of all shares issuable as management shares and conversion of the Notes issued under the Instrument (as defined) and all other convertible securities and exercise of any warrants or other securities issued in connection with the IPO, such that if following any reverse merger or IPO, the value of $40.0 million in newly issued shares based on VWAP of JVC shares is greater than the Global Gold's 51% equity ownership in JVC valued as above, new shares in JVC will be issued to the Global Gold such that the aggregate value of Global Gold's ownership in JVC is shares having a value of $40.0 million based on VWAP, and the Company shall remain in control of the JVC following the public listing, all as further described in exhibit 10.34 below. The Board of Directors of Global Gold Corporation previously approved the same transaction, discussed above, on January 5, 2012. |
|
Based on the approval of the Board of Directors of Global Gold received on January 5, 2012 and on receiving consent from its shareholders representing over a 65% majority of its outstanding Common Stock on February 6, 2012, to transfer the 100% interest in Mego and Getik Mining Company, LLC into GGCR Mining, LLC, a Delaware limited liability company (“GGCR Mining”), owned by a joint venture company, Global Gold Consolidated Resources Limited, a Jersey Island private limited company (“GGCR”), per the terms of the April 27, 2011 Joint Venture Agreement with Consolidated Resources Armenia, an exempt non-resident Cayman Islands company (“CRA”), the Company entered into the following agreements on or about February 19, 2012 updating previous agreements, all as further described in the exhibits attached, on the following dates: |
|
| ● | Shareholders Agreement for GGCR dated February 18, 2012 (Exhibit 10.36) |
| ● | Supplemental Letter dated February 19, 2012 (Exhibit 10.37) |
| ● | Getik Assignment and Assumption Agreement dated February 19, 2012 (Exhibit 10.38) |
| ● | MG Assignment and Assumption Agreement dated February 19, 2012 (Exhibit 10.39) |
| ● | Guaranty dated February 19, 2012 (by GGC to CRA) (Exhibit 10.40) |
| ● | Guaranty dated February 19, 2012 (by GGCR Mining to CRA) (Exhibit 10.41) |
| ● | Security Agreement dated February 19, 2012 (by GGCR and GGCR Mining to CRA) (Exhibit 10.42) |
| ● | Action by Written Consent of the Sole Member of GGCR Mining, LLC dated February 19, 2012 (Exhibit 10.43) |
| ● | Certificate of Global Gold Corporation dated February 19, 2012 (Exhibit 10.44) |
| ● | Global Gold Consolidated Resources Limited Registered Company No 109058 Written resolutions by all of the directors of the Company (Exhibit 10.45) |
| ● | Action by Written Consent of the Board of Managers of GGCR Mining, LLC (Exhibit 10.46) |
|
Key terms included that Global Gold will retain 51% of the shares of GGCR, which will be a subsidiary of the Company, per the terms of the April 27, 2011 Joint Venture Agreement as approved and described above. The Board of Directors of GGCR Mining would be comprised of Van Krikorian, from GGC, Premraj, from CRA, and three non-executive independent directors to be selected in the future. Pending the closing, if any, GGM was designated as the manager of the Toukhmanuk and Getik properties, with reasonable costs incurred by GGM with respect thereto being passed through to GGCRL and GGCR Mining, as applicable, for reimbursement. The April 26, 2012 deadline set in the April 2011 JV Agreement to close the transaction passed without a closing for several reasons, as previously reported, clarification and settlement efforts followed. |
|
On September 26, 2012, GGM entered into two Share Transfer Agreements with GGCR Mining covering the transfer of all the shares of the Armenian companies Mego and the Getik Mining Company, LLC which respectively hold the Toukhmanuk and Getik mining properties in Armenia. The Share Transfer Agreements were concluded in accordance with the previously disclosed agreements with Consolidated Resources Armenia and Consolidated Resources USA, LLC, a Delaware limited liability company to fund development and form a joint venture on the Company’s Toukhmanuk and Getik properties in Armenia. GGCR Mining will (i) own, develop and operate Toukhmanuk and Getik gold mining properties, and be a (ii) be a company listed on an exchange fully admitted to trading. As of September 19, 2012, GGCRL resolved reported outstanding issues which had blocked implementation of the joint venture agreement and execution of the Share Transfer Agreements. Global Gold’s ownership in GGCRL is and shall be the greater value of either 51% or the pro forma value of $40.0 million 30 days after the stock is publicly traded. The sole officers of GGCRL as of September 19, 2012 are: Mr. Van Krikorian, Executive Chairman; Mr. Jan Dulman, Financial Controller/CFO/Treasurer; and Mr. Ashot Boghossian Armenia Managing Director, with Ogier -Corporate Services (Jersey) Limited continuing as secretary of the Company. See attached Exhibits 10.58 and 10.59. |
|
On October 26, 2012, the shares of Mego and Getik were registered, subject to terms and conditions as stated in the transfer documents, with the State Registry of the Republic of Armenia, as being fully owned by GGCR Mining. The registration was completed after approval was given by ABB which required Global Gold to guaranty the ABB line of credit payable. |
|
See Item 1A “Risk Factors” and Item 3 “Legal Proceedings”. |
|
Rent Agreements |
|
The Company rents office space in a commercial building at 45 East Putnam Avenue, Greenwich, CT where it signed a 5-year lease starting on March 1, 2006 at a starting annual rental cost of $44,200. On October 1, 2006, the Company expanded its office space by assuming the lease of the adjacent office space. The assumed lease had less than one year remaining, through September 30, 2008, at an annual rental cost of $19,500. The assumed lease was extended for an additional year through September 30, 2009 at an annual rental cost of $22,860 for that period. The assumed lease was further extended through October 15, 2009 at which point the Company vacated the additional space. Messrs.Gallagher and Krikorian gave personal guarantees of the Company's performance for the first two years of the lease. On April 1, 2011, the Company moved its corporate headquarters from Greenwich, CT to 555 Theodore Fremd Avenue, Rye, NY 10580. The new lease is for five years and had annual costs of; $63,045 in year 1, $64,212 in year 2, $65,380 in year 3, $66,547 in year 4, and $67,715 in year 5. |