MAXIMUM PRICE CONSTRUCTION SERVICES
PNK (BATON ROUGE) PARTNERSHIP | MANHATTAN CONSTRUCTION COMPANY | |||||
By: | PNK DEVELOPMENT 8, LLC | By: | /s/ Duane K. Duffy | |||
Duane K. Duffy | ||||||
Its: | Managing Partner |
By: | PINNACLE ENTERTAINMENT, INC. | Its: | Executive Vice President | |||||
Its: | Sole Member |
By: | /s/ Anthony M. Sanfilippo | |||||
Its: | President and Chief Executive Officer |
AGREEMENT FOR GUARANTEED
MAXIMUM PRICE CONSTRUCTION
SERVICES
8918 Spanish Ridge
Las Vegas, NV 89148
RE: | Pinnacle Entertainment Baton Rouge Casino and Hotel | |
Subject: | Guaranteed Maximum Price (GMP) Proposal |
Exhibit “A” Description of the Site(See Original Agreement)
Exhibit “B” Project Schedule (Data Date of 4/20/11 and Run Date 5/02/11)
Exhibit “C” Contractors Personnel dated 5/11/11
Exhibit “D” Contractors Owned Equipment dated 5/11/11
Exhibit “E” Drawings dated 5/11/11
Exhibit “F” The Work dated 5/11/11
Exhibit “G” GMP Premises and Assumptions dated 5/11/11
Exhibit “H” Conditional Waiver and Release Upon Progress Payment(See Original Agreement)
Exhibit “I” Unconditional Waiver and Release Upon Progress Payment(See Original Agreement)
Exhibit “J” Contractor’s Certificate(See Original Agreement)
Exhibit “K” Technical Studies and Reports(See Original Agreement)
Exhibit “L” Permits, Approvals and Entitlements(See Original Agreement)
Exhibit “M” Unconditional Final Waiver and Release(See Original Agreement)
Exhibit “N” Contractor’s Project Safety and Health Guidelines dated 5/11/11
Exhibit “O” OCIP Manual(Not Applicable)
Exhibit “P” Required Insurance (Certificate of Liability Insurance Issued 4/11/11)
Exhibit “Q” Value Engineering Log dated 5/11/11
Exhibit “R” GMP Allowances dated 5/11/11
Exhibit “S” Back of House Finish Schedule dated 5/11/11
Exhibit “T” FF&E Matrix dated 5/11/11
Exhibit “U” General Conditions Estimate Breakdown dated 5/11/11
Manhattan Construction Company | ||||
2120 Montrose Blvd. | Houston, Texas 77006 Ph: (713) 529-0000 | Fax: (713) 526-9176 |
PINNACLE ENTERTAINMENT: BATON ROUGE CASINO & HOTEL | ||
MANHATTAN CONSTRUCTION COMPANY | DATE: 5/11/2011 | |
SUMMARY OF COSTS — ALL AREAS | ||
PROJECT NAME: BATON ROUGE SCHEME #6 PROGRAM | ||
GMP 04-21-2011 (WITH VE INCLUDED); REVISED 05/02/11 |
SUB | ||||||||||||||||||||
JOB | AREA DATA | TOTAL AMOUNT | COST / S.F. | SF | NOTES | |||||||||||||||
0.02 | SITEWORK & RELATED IMPROVEMENTS | $ | 34,932,060 | |||||||||||||||||
0.03 | CASINO — FLOAT | $ | 48,321,103 | $ | 294.77 | 163,929 | ||||||||||||||
0.04 | PARKING GARAGE | $ | 13,091,648 | $ | 42.07 | 311,207 | ||||||||||||||
0.05 | HOTEL — 206 KEYS, 12 FLOORS | $ | 40,832,350 | $ | 207.10 | 197,166 | ||||||||||||||
0.06 | MARINE WORK | $ | 15,199,814 | $ | 67.07 | 226,634 | ||||||||||||||
0.07 | CENTRAL PLANT / SUPPORT FACILITY | $ | 14,755,235 | $ | 581.62 | 25,369 | ||||||||||||||
0.08 | VESSEL | $ | 24,356,932 | $ | 107.47 | 226,634 | ||||||||||||||
0.09 | GENERAL CONDITIONS: See Note #1 Below | SEE BELOW | ||||||||||||||||||
0.10 | PRECONSTRUCTION SERVICES | $ | 301,000 | |||||||||||||||||
0.12 | CASINO LOW RISE (FIXED) | $ | 30,713,299 | $ | 463.79 | 66,222 | ||||||||||||||
0.12 | SKYBRIDGE & PORTE-COCHERE | $ | 5,607,025 | $ | 882.86 | 6,351 | ||||||||||||||
0.13 | MODEL ROOMS & MOCKUP | $ | 311,042 | |||||||||||||||||
EMPLOYEE WALKWAY | $ | 289,834 | $ | 38.64 | 7,500 | |||||||||||||||
PUBLIC PARKING WALKWAY | $ | 0 | Not in Contract | |||||||||||||||||
TOTAL ALL AREAS | $ | 228,711,342 | 1,231,012 | |||||||||||||||||
1 | TOTAL GENERAL CONDITIONS AMOUNT | $ | 9,567,835 | |||||||||||||||||
1 of 93
Level 1 | Level 2 | |||||||||||
Casino Public | ||||||||||||
1206 Video Poker | 751 | |||||||||||
1142 Womens Toilets | 458 | |||||||||||
1147 Mens Toilets | 380 | |||||||||||
1157 Buffet | 12,430 | |||||||||||
1173 Womens Toilets | 719 | |||||||||||
1175 Mens Toilets | 628 | |||||||||||
1198 Poker Room | 1,493 | |||||||||||
1197 Vestibule | 115 | |||||||||||
1195 Feature Bar | 2,753 | |||||||||||
1194/1214 High Limit Gaming | 5,053 | |||||||||||
1190 My Choice | 114 | |||||||||||
1185 Mens Toilet | 456 | |||||||||||
1187 Womens Toilet | 523 | |||||||||||
Casino | 48,852 | |||||||||||
2103 Public Circulation / Prefunction | 7,124 | |||||||||||
2105 Mens Toilets | 595 | |||||||||||
2104 Womens Toilets | 678 | |||||||||||
2148 Coats | 69 | |||||||||||
2150 MPR | 13,031 | |||||||||||
2188 VIP Lounge | 3,199 | |||||||||||
TOTAL CASINO PUBLIC | 99,421 | |||||||||||
Casino BOH | ||||||||||||
1192 Storage | 93 | |||||||||||
1189 Room | 78 | |||||||||||
1188 Data | 96 | |||||||||||
1191 Office | 539 | |||||||||||
1177 Data | 74 | |||||||||||
1178 Data | 99 | |||||||||||
1176/79 Service Bar | 552 | |||||||||||
1174 Janitor | 64 | |||||||||||
1144 Employee Entry | 118 | |||||||||||
1136 BOH Circulation | 489 | |||||||||||
1135 Main Kitchen | 121 | |||||||||||
1148 Service Bar | 375 | |||||||||||
1155 Room | 72 | |||||||||||
1150 Office | 93 | |||||||||||
1149 Data | 101 | |||||||||||
1154 Credit | 116 | |||||||||||
1151 Slot | 589 | |||||||||||
1153 Cage | 837 | |||||||||||
1120 BOH Circ | 271 | |||||||||||
1146 Janitor | 76 | |||||||||||
1186 Janitor | 54 | |||||||||||
2112 BOH Circ | 1,190 | |||||||||||
2108 Storage | 975 | |||||||||||
2109 Mech | 407 | |||||||||||
2110 Security | 437 | |||||||||||
2111 Head Security | 215 | |||||||||||
2112 BOH Circ | 8,580 | |||||||||||
2113 Data/UPS | 668 | |||||||||||
2116 Room | 636 | |||||||||||
2118 BOH | 822 | |||||||||||
2119 Storage | 156 | |||||||||||
2121 State Police | 289 | |||||||||||
2120 Audit | 107 | |||||||||||
2122 Trooper | 106 | |||||||||||
2124 BOH | 327 |
2 of 93
Level 1 | Level 2 | |||||||||||
2135 Training | 1,085 | |||||||||||
2125 Security Dispatch | 212 | |||||||||||
2123 Employee Control | 266 | |||||||||||
2140 BOH | 689 | |||||||||||
2133 Surveillance | 1,441 | |||||||||||
2139 IT | 884 | |||||||||||
2134 BOH RAMP | 143 | |||||||||||
2132 AV | 1,285 | |||||||||||
2120 Room | 167 | |||||||||||
2131 Room | 82 | |||||||||||
2149 Room | 173 | |||||||||||
2115 Room | 117 | |||||||||||
2138 Bar Storage | 889 | |||||||||||
2136 G Room | 160 | |||||||||||
2202 Green Room Toilet | 54 | |||||||||||
2155 Room | 717 | |||||||||||
2154 Banquet Kitchen | 2,357 | |||||||||||
2176 EDR Kitchen | 1,018 | |||||||||||
2175 EDR | 3,305 | |||||||||||
2180 Team Lounge | 494 | |||||||||||
2177 Room | 127 | |||||||||||
2178 Mens Toilet | 293 | |||||||||||
2179 Womens Toilet | 305 | |||||||||||
2191 Vessel Support | 1,557 | |||||||||||
2190 Room | 230 | |||||||||||
2200 Office | 320 | |||||||||||
2201 Generator | 880 | |||||||||||
2194 Employee Terrace | 1,518 | |||||||||||
2189 Storage | 81 | |||||||||||
2171 Storage | 284 | |||||||||||
2169 Green Room | 168 | |||||||||||
2170 Green Rom Toilet | 49 | |||||||||||
2153 AV Storage | 72 | |||||||||||
2152 Room | 59 | |||||||||||
2196 AGM | 206 | |||||||||||
2197 Conference | 289 | |||||||||||
2199 GM | 285 | |||||||||||
2198 Special Event | 193 | |||||||||||
2184 MKTG | 2,804 | |||||||||||
2185 Dir MKTG | 176 | |||||||||||
2183 Dir MKTG | 174 | |||||||||||
2181 Conference | 288 | �� | ||||||||||
2167 MKTG Storage | 312 | |||||||||||
2168 Tables | 176 | |||||||||||
2166 Slot/Tables | 801 | |||||||||||
2163 Dir F&B | 202 | |||||||||||
2164 Dir Slots | 169 | |||||||||||
2172 Vestibule | 256 | |||||||||||
2165 F&B Offices | 705 | |||||||||||
2147 Storage | 888 | |||||||||||
2143 Storage | 850 | |||||||||||
Folding Door Storage | 212 | |||||||||||
2186 VIP Terrace | 1,797 | |||||||||||
TOTAL CASINO BOH | 52,086 | |||||||||||
TOTAL CASINO OCCUPIED | 151,507 | |||||||||||
Casino Level 1 | 84,252 | |||||||||||
Casino Level 2 | 79,677 | |||||||||||
TOTAL CASINO | 163,929 | |||||||||||
Deduct Casino Occupied | (151,507 | ) | ||||||||||
Casino Misc Circ / Dead Space | 12,422 | |||||||||||
3 of 93
Level 1 | Level 2 | |||||||||||
Low Rise Public | ||||||||||||
1102 Entry Vestibule | 698 | |||||||||||
1105 My Choice | 409 | |||||||||||
1140 Promenade | 12,180 | |||||||||||
1180 Steakhouse | 3,608 | |||||||||||
1161 Womens Toilets | 152 | |||||||||||
1160 Mens Toilets | 110 | |||||||||||
1167 Mens Toilet | 296 | |||||||||||
1166 Womens Toilet | 359 | |||||||||||
1168 Toilet | 56 | |||||||||||
1202 2 Meal | 4,396 | |||||||||||
1207 Patio | 574 | |||||||||||
1205 Grab N Go | 479 | |||||||||||
2101 Bridge Promenade | 3146 | |||||||||||
TOTAL LOW RISE PUBLIC | 23,317 | 3146 |
4 of 93
Level 1 | Level 2 | |||||||||||
Low Rise BOH | ||||||||||||
1103 Storage | 297 | |||||||||||
1104 Office | 318 | |||||||||||
1201 EVS | 142 | |||||||||||
1169 Janitor | 22 | |||||||||||
1165 Vestibule | 243 | |||||||||||
1163 Trash | 164 | |||||||||||
1162/64 Steakhouse Kitchen | 1,886 | |||||||||||
1215 Electrical | 88 | |||||||||||
1199 Electrical | 103 | |||||||||||
1183 Service Bar | 287 | |||||||||||
1136 BOH Circ | 178 | |||||||||||
1127 BOH Circ | 1,943 | |||||||||||
1133 Janitor | 57 | |||||||||||
1132 Dry Storage | 234 | |||||||||||
1131 Refrig | 139 | |||||||||||
1130 Soda | 101 | |||||||||||
1129 Liquor | 152 | |||||||||||
1134 Electrical | 121 | |||||||||||
1128 Electrical | 239 | |||||||||||
1126 Womens Toilets | 124 | |||||||||||
1128 Mens Toilets | 124 | |||||||||||
1141 F&B Office | 120 | |||||||||||
1124 F&B Office | 107 | |||||||||||
1121 Exit Corridor | 601 | |||||||||||
1120 BOH Circ | 558 | |||||||||||
1116 Trap | 50 | |||||||||||
1112 Evs | 79 | |||||||||||
1115 Cage Mgr | 128 | |||||||||||
1117 Card/Dice | 144 | |||||||||||
1118 Cart Storage | 303 | |||||||||||
1119 Trap | 99 | |||||||||||
1113 Soft Count | 594 | |||||||||||
1110 Vault | 381 | |||||||||||
1111 Shift Mgr | 423 | |||||||||||
1109 Exit Corridor | 333 | |||||||||||
1108 3 Meal Kitchen | 2,297 | |||||||||||
1123/35 Main Kitchen & Bakery | 6,695 | |||||||||||
TOTAL LOW RISE BOH | 19,874 | |||||||||||
TOTAL LOW RISE OCCUPIED | 43,191 | |||||||||||
Low Rise Level 1 | 45,729 | |||||||||||
Low Rise Level 2 | 17,347 | |||||||||||
TOTAL LOW RISE AREA | 63,076 | |||||||||||
Deduct Occupied | (43,191 | ) | ||||||||||
Low Rise Misc Circ / Dead Space | 19,885 |
5 of 93
Spaces | ||||||||||||
Garage | ||||||||||||
Level 1 Elevation +29 | 103047 | 253 | ||||||||||
Level 2 Elevation +41 | 103208 | 262 | ||||||||||
Level 3 Elevation +53 | 102772 | 274 | ||||||||||
Level 4 — Elevation 77 | 2180 | |||||||||||
TOTAL GARAGE | 311207 | 789 | ||||||||||
Area | ||||||||||||
Hotel Public | ||||||||||||
2120 Vestibule | 269 | |||||||||||
2119 Lobby | 1,475 | |||||||||||
2124 Corridor | 213 | |||||||||||
2100 Corridor | 982 | |||||||||||
2117 Elev Lobby | 350 | |||||||||||
2122 Sundries | 789 | |||||||||||
2120 Storage | 60 | |||||||||||
3124 Corridor | 1,398 | |||||||||||
3121 Ice Room | 83 | |||||||||||
4100 — 1100 Corridor | 11,136 | |||||||||||
4121 — 1121 Ice Room | 656 | |||||||||||
Guestrooms | 91,652 | |||||||||||
TOTAL HOTEL PUBLIC | 109,063 | |||||||||||
Hotel BOH | ||||||||||||
0110 Service Corridor | 1,961 | |||||||||||
0112 BOH Offices | 565 | |||||||||||
0101 Pool Furniture Storage | 1,995 | |||||||||||
0104 Room | 195 | |||||||||||
0105 Room | 206 | |||||||||||
0106 HR | 1,421 | |||||||||||
0108 Housekeeping | 1,104 | |||||||||||
0109 BOH Circ | 350 | |||||||||||
0126 Dock | 350 | |||||||||||
0124 Dock Office | 139 | |||||||||||
0125 Trash Holding | 352 | |||||||||||
0122 Room Service Kitchen | 1,508 | |||||||||||
0121 Office | 95 | |||||||||||
0120 Unassigned | 119 | |||||||||||
0119 Dry Storage | 136 | |||||||||||
0118 Electrical | 301 | |||||||||||
0117 Emergency Electrical | 211 | |||||||||||
0116 Mechanical | 569 | |||||||||||
1101 Storage File | 120 | |||||||||||
1104 Finance | 557 | |||||||||||
1100 BOH Circ | 692 | |||||||||||
1103 Womens RR | 142 | |||||||||||
1102 Mens RR | 147 | |||||||||||
1105 Conference | 122 | |||||||||||
1106 Director Finance | 158 | |||||||||||
1122 Accounting | 635 | |||||||||||
1120 Lead Audit | 147 | |||||||||||
1121 Internal Audit | 137 | |||||||||||
1124 Acct Spvr | 140 |
6 of 93
Area | ||||||||||||
1123 Audit Spvr | 190 | |||||||||||
1125 Dir Resort Ops | 149 | |||||||||||
1128 Baggage | 825 | |||||||||||
1127 Baggage | 136 | |||||||||||
1.5 Equip | 4,055 | |||||||||||
1.5 Room | 163 | |||||||||||
1.5 Room | 164 | |||||||||||
1.5 Elect | 515 | |||||||||||
1.5 Elec Control | 167 | |||||||||||
1.5 Room | 48 | |||||||||||
2125 Housekeeping | 389 | |||||||||||
2123 Room | 39 | |||||||||||
3125 Housekeeping | 391 | |||||||||||
3123 Room | 41 | |||||||||||
4125 Housekeeping | 387 | |||||||||||
4123 Room | 40 | |||||||||||
TOTAL HOTEL BOH | 22,273 | |||||||||||
TOTAL HOTEL OCCUPIED | 131,336 | |||||||||||
7 of 93
Area | ||||||||||||
Service Level | 13,672 | |||||||||||
Level 1 | 13,667 | |||||||||||
Level 1.5 | 5,684 | |||||||||||
Level 2 (17 Keys) | 13,520 | |||||||||||
Level 3 (19 Keys) | 13,673 | |||||||||||
Level 4 (21 Keys) | 13,654 | |||||||||||
Level 5 (21 Keys) | 13,654 | |||||||||||
Level 6 (21 Keys) | 13,654 | |||||||||||
Level 7 (21 Keys) | 13,654 | |||||||||||
Level 8 (21 Keys) | 13,654 | |||||||||||
Level 9 (21 Keys) | 13,654 | |||||||||||
Level 10 (21 Keys) | 13,654 | |||||||||||
Level 11 (21 Keys) | 13,654 | |||||||||||
Level 11.5 | 7,921 | |||||||||||
Level 12 (2 Keys) | 6,386 | |||||||||||
Mech Penthouse | 6,013 | |||||||||||
Total SF | 175,834 | 13,934 | ||||||||||
Pool Deck at Level 12 | 7,398 | |||||||||||
TOTAL HOTEL | 197,166 | |||||||||||
TYPICAL ROOMS (K/QQ) | 141 | |||||||||||
ADA TYPICAL ROOMS | 9 | |||||||||||
EXTENDED TYPICAL ROOMS | 26 | |||||||||||
ADA JR STE | 1 | |||||||||||
JUNIOR SUITE | 9 | |||||||||||
ADA BRIDGE | 1 | |||||||||||
BRIDGE SUITE | 9 | |||||||||||
2-BAY SUITES | 9 | |||||||||||
3-BAY SUITES | 1 | |||||||||||
TOTAL KEYS | 206 | |||||||||||
Pedestrian Bridge | ||||||||||||
Elevation 53 Casino Vestibule | 810 | |||||||||||
Elevation 53 Hotel Vestibule | 2344 | |||||||||||
Elevation 77 Walkway | 3197 | |||||||||||
TOTAL PEDESTRIAN BRIDGE | 6351 | |||||||||||
Porte Cochere | 9329 |
8 of 93
Area | ||||||||||||
Support Facility | ||||||||||||
1102 Fire Command | 188 | SF | ||||||||||
1103 Security Control | 527 | SF | ||||||||||
1104 Employee Entry | 389 | SF | ||||||||||
1108 Wait | 196 | SF | ||||||||||
1110 Toilet | 55 | SF | ||||||||||
1109 Storage | 41 | SF | ||||||||||
1107 Office | 137 | SF | ||||||||||
11XX | 232 | SF | ||||||||||
1115 Facilities | 1,934 | SF | ||||||||||
1118 Womens RR | 249 | SF | ||||||||||
1119 Mens RR | 258 | SF | ||||||||||
1120 Pump Room | 643 | SF | ||||||||||
1130 Mens Locker | 828 | SF | ||||||||||
1131 Womens Locker | 819 | SF | ||||||||||
1132 Ref Prep Rms | 1,671 | SF | ||||||||||
1140 Storage | 842 | SF | ||||||||||
1141 Uniform | 2,557 | SF | ||||||||||
1132 Warehouse | 4,643 | SF | ||||||||||
1132 Bulk Liqour | 227 | SF | ||||||||||
1133 Purchasing | 280 | SF | ||||||||||
1134 Chemical Storage | 139 | SF | ||||||||||
1136 Trash | 297 | SF | ||||||||||
1117 Janitors Closet | 50 | SF | ||||||||||
1116 Circulation | 3,125 | SF | ||||||||||
1105 Storage | 648 | SF | ||||||||||
1121 MDF Room | 698 | SF | ||||||||||
1122 Generator Room | 825 | SF | ||||||||||
1123 Emergency Elec | 575 | SF | ||||||||||
1124 Normal Elec | 622 | SF | ||||||||||
Total Support Facility (Occupied) | 23695 | SF | ||||||||||
Support Facility Footprint | 25369 | |||||||||||
Deduct Occupied | -23695 | |||||||||||
Misc Circ / Dead Space | 1674 |
9 of 93
Manhattan Construction Company
BATON ROUGE SITEWORK
GMP 04-21-2011 (WITH VE INCLUDED); | GSF | |||||||||||||||
REVISED 05/02/11 | ||||||||||||||||
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
MASS EXCAVATION: Dry Side Sitework | ||||||||||||||||
Clear & Grub Site | 4 | ACRES | $ | 1,817.07 | 7,268 | |||||||||||
Erosion Control | 1 | LS | $ | 18,987.10 | 18,987 | |||||||||||
Demo Asphalt @ Old River Road Tie-Ins | 1 | LS | $ | 5,000.00 | 5,000 | |||||||||||
Strip & Store Top Soil/Mass Excavation Cut & Fill | 1 | LS | $ | 2,639,463.59 | 2,639,464 | |||||||||||
Mass Excavation: Site Import Fill Fuel Up charge | 239,108 | TMCY | $ | 1.50 | 358,662 | |||||||||||
Geo-foam w/ Filter Fabric | 4,550 | SF | $ | 8.28 | 37,695 | |||||||||||
Geo-foam Seal Slab | 4,550 | SF | $ | 4.50 | 20,475 | |||||||||||
Top Soil @ Back-of-Curbs / Sidewalks | 933 | CY | $ | 32.00 | 29,870 | |||||||||||
Open Cut Outfall Drainage Swales: On Site | 5,029 | LF | $ | 4.62 | 23,248 | |||||||||||
3,140,669 | 0 | |||||||||||||||
0 | ||||||||||||||||
Amphitheater Mass Earthwork | 1 | LS | 0 | |||||||||||||
0 | ||||||||||||||||
#A-60 | Amphitheater Electrical / Low Voltage Service Allowance | 1 | ALLOW | $ | 100,000.00 | 100,000 | ||||||||||
100,000 | ||||||||||||||||
0 | ||||||||||||||||
Lime Stabilization: 6″ (Drive Lanes) | 1,795 | SY | $ | 5.67 | 10,178 | |||||||||||
Lime Stabilization: 9″ (Surface Parking Areas) | 72,231 | SY | $ | 4.35 | 314,205 | |||||||||||
324,383 | ||||||||||||||||
SITE SURFACE DEWATERING | ||||||||||||||||
Subsurface Dewatering (Site Maintenance) | 1 | LS | $ | 125,000.00 | 125,000 | |||||||||||
125,000 | ||||||||||||||||
TEMPORARY ROADS & LAYDOWN: | ||||||||||||||||
Temporary Roads: Hotel & Site | 21,500 | SY | $ | 35.00 | 752,500 | |||||||||||
752,500 | ||||||||||||||||
SITE UTILITIES — SUBCONTRACT | ||||||||||||||||
Water | ||||||||||||||||
12″ Combination Fire/Water Main (New River Road to Meter Pit)(NOT IN CONTRACT) | 151 | LF | $ | — | 0 | |||||||||||
8″ Fire Main Loop: Site Loop | 4,826 | LF | $ | 65.00 | 313,690 | |||||||||||
Fire Hydrants @ Parking Lot | 5 | EA | $ | 4,200.00 | 21,000 | |||||||||||
8″ Fire Main from Central Plant to Hotel | 850 | LF | $ | 65.00 | 55,250 | |||||||||||
8″ Fire Main from Wet/Dry Side Tee to Casino(Insulated & Exposed @ Levee) | 220 | LF | $ | 120.00 | 26,400 | |||||||||||
8″ Domestic Water Main: Meter Pit to Central Plant | 540 | LF | $ | 65.00 | 35,100 | |||||||||||
8″ Domestic Water Main: Central Plant to Wet/Dry Side Tee(See Directional Bore Below) | 440 | LF | $ | — | 0 | |||||||||||
6″ Domestic Water Main: Tee to Hotel(See Directional Bore Below) | 440 | LF | $ | — | 0 | |||||||||||
6″ Domestic Water Main: Wet/Dry Side Tee to Casino(Insulated & Exposed @ Levee) | 220 | LF | W/ Mechanical | |||||||||||||
6″ Domestic Water Main: Central Plant to Hotel(Directional Boring) | 850 | LF | $ | 60.00 | 51,000 |
10 of 93
GMP 04-21-2011 (WITH VE INCLUDED); | GSF | |||||||||||||||
REVISED 05/02/11 | ||||||||||||||||
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
6″ Site Irrigation Water Main(From where to where?) | 540 | LF | $ | 50.00 | 27,000 | |||||||||||
#A-62 | Reduce 500 LF for 6″ Irrigation Water Line (Meter to be close to River Road) | 1 | ALLOW | $ | (25,000.00 | ) | -25,000 | |||||||||
Above Ground Double Check Valve BFP for Each Water Line: 8″ (2EA) & 6″ (1 EA) | 3 | EA | $ | 18,500.00 | 55,500 | |||||||||||
559,940 | ||||||||||||||||
Water Meter Pit & 10″ Meter | 1 | EA | NIC | |||||||||||||
Fire Water Meter Pit & 8″ Meter | 1 | EA | NIC | |||||||||||||
Irrigation Water Meter Pit & 3″ Meter | 1 | EA | NIC | |||||||||||||
Sanitary | ||||||||||||||||
10″ Sanitary Sewer Force Main(NIC) | 0 | LF | NIC | |||||||||||||
10″ Sanitary Sewer Gravity Flow (1/16″/ft): Hotel / Central Plant / Support Facility / Towers to Public MH 100′ before Lift Station | 2,500 | LF | $ | 65.00 | 162,500 | |||||||||||
#A-66 | Modify routing of sanitary sewer outfall piping | 1 | ALLOW | $ | (52,000.00 | ) | -52,000 | |||||||||
6″ Sanitary Sewer Force Main from Wet Side to Dry Side | 650 | LF | $ | 45.00 | 29,250 | |||||||||||
Sanitary Manholes | 5 | EA | $ | 4,500.00 | 22,500 | |||||||||||
162,250 | ||||||||||||||||
Site Grease Piping | ||||||||||||||||
4″ Grease Line: Hotel Gravity Flow | 50 | LF | $ | 50.00 | 2,500 | |||||||||||
2,500 | ||||||||||||||||
Gas Main | ||||||||||||||||
Gas Main (By Utility) | 700 | LF | NIC | |||||||||||||
4″ Gas Main: Low Pressure Side @ Central Plant | 100 | LF | $ | 25.00 | 2,500 | |||||||||||
4″ Gas Main: Central Plant to Hotel(Directional Boring) | 850 | LF | $ | 75.00 | 63,750 | |||||||||||
4″ Gas Main: Hotel Tee to Casino | 220 | LF | $ | 50.00 | 11,000 | |||||||||||
77,250 | 0 | |||||||||||||||
Misc. Site Pits / Vaults/ Bores | 0 | |||||||||||||||
Directional Bore @ River Road | 0 | LF | $ | — | 0 | |||||||||||
Precast Utility Trench: Not Required | 0 | LF | $ | — | 0 | |||||||||||
Vaults/Pits @ River Road | 0 | EA | $ | — | 0 | |||||||||||
Levee Piping SOG Support (Assume 30′ L x 20′ W x 5″ SOG) | 600 | SF | $ | 5.00 | 3,000 | |||||||||||
3,000 | ||||||||||||||||
SITE CW/CWR Pre-lnsulated Piping | ||||||||||||||||
CW Lines from CP to Hotel & Casino (GMP) | 1 | LS | $ | 715,213.00 | 715,213 | |||||||||||
CW Lines (Central Plant to Hotel) | 1,100 | LF | $ | 325.00 | w/above | |||||||||||
CW Lines (Central Plant to Casino) | 1,100 | LF | $ | 325.00 | w/above | |||||||||||
LF | $ | 315.00 | Removed — VE | |||||||||||||
LF | $ | 315.00 | Removed — VE | |||||||||||||
715,213 |
11 of 93
GMP 04-21-2011 (WITH VE INCLUDED); | GSF | |||||||||||||||
REVISED 05/02/11 | ||||||||||||||||
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Site Duct Banks (River Road to Central Plant) | ||||||||||||||||
Primary Electrical Duct Bank | 600 | LF | $ | 150.00 | 90,000 | |||||||||||
(Assume Primary Wire Furnished by Utility Company) | 600 | LF | $ | — | 0 | |||||||||||
Secondary Feeder: T-Pad to Switchgear Room | 200 | LF | W/ Site Electrical | |||||||||||||
Telecom Duct Bank | 750 | LF | $ | 75.00 | 56,250 | |||||||||||
146,250 | ||||||||||||||||
Grease Traps | ||||||||||||||||
#A-61 | Grease Trap: Hotel Dry Side (Assume 2.000 Gallon) | 1 | ALLOW | $ | 25,000.00 | 25,000 | ||||||||||
25,000 | ||||||||||||||||
Lift Station (BY OFFSITE CONTRACTOR) | ||||||||||||||||
Lift Station FOB Jobsite | 1 | LS | NIC | |||||||||||||
Dewatering for Lift Station | 1 | LS | NIC | |||||||||||||
Excavation / Installation / Backfill | 1 | LS | NIC | |||||||||||||
0 | ||||||||||||||||
Site Storm Drainage System: ON SITE | ||||||||||||||||
4′ & 8″ PVC | 212 | LF | $ | 30.75 | 6,519 | |||||||||||
10″ A-2000 | 60 | LF | $ | 34.85 | 2,091 | |||||||||||
12″ A-2000 | 317 | LF | $ | 35.88 | 11,372 | |||||||||||
15″ A-2000 | 569 | LF | $ | 38.95 | 22,163 | |||||||||||
18″ A-2000 | 401 | LF | $ | 45.10 | 18,085 | |||||||||||
24″ A-2000 | 142 | LF | $ | 63.55 | 9,024 | |||||||||||
30″ A-2000 | 34 | LF | $ | 65.60 | 2,230 | |||||||||||
18″ RCPA | 177 | LF | $ | 64.58 | 11,430 | |||||||||||
24″ RCPA | 710 | LF | $ | 85.08 | 60,403 | |||||||||||
30″ RCPA | 122 | LF | $ | 104.55 | 12,755 | |||||||||||
36″ RCPA | 146 | LF | $ | 136.33 | 19,903 | |||||||||||
Pipe Bedding | 586 | TON | $ | 36.90 | 21,623 | |||||||||||
Single Catch Basin | 21 | EA | $ | 2,080.75 | 43,696 | |||||||||||
10″ Trench Drain @ Guest Asphalt Parking Lot | 377 | LF | $ | 259.33 | 97,766 | |||||||||||
6″ French Drain w/ Lift Station @ PG | 427 | LF | $ | 35.88 | 15,319 | |||||||||||
Paved Gutter Drain | 12 | EA | $ | 4,069.25 | 48,831 | |||||||||||
Curb Inlet | 12 | EA | $ | 2,967.38 | 35,609 | |||||||||||
CB-01 | 3 | EA | $ | 2,897.68 | 8,693 | |||||||||||
Drain Manhole | 5 | EA | $ | 4,538.70 | 22,694 | |||||||||||
Concrete Flumes | 21 | EA | $ | 288.03 | 6,049 | |||||||||||
Riprap @ Flume End Treatments | 69 | EA | $ | 518.65 | 35,787 | |||||||||||
512,041 |
12 of 93
GMP 04-21-2011 (WITH VE INCLUDED); | GSF | |||||||||||||||
REVISED 05/02/11 | ||||||||||||||||
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Site Storm Drainage System: OFF SITE | ||||||||||||||||
Erosion Control | 10,000 | LF | $ | 14.44 | 144,385 | |||||||||||
Seeding — with above | 35 | ACRE | 0 | |||||||||||||
Detention Basin: Open Cut & Dispose on Site | 161,000 | CY | $ | 2.34 | 457,260 | |||||||||||
Open Cut Outfall Drainage Swales | 40,500 | CY | $ | 2.81 | 113,698 | |||||||||||
36" x 38" RCPA w/ Headwalls & Outfall Ditches | 3 | EA | $ | 5,585.67 | 16,757 | |||||||||||
732,100 | ||||||||||||||||
INITIAL OUTFALL DRAINAGE | ||||||||||||||||
Add Site Earth Berm: 25' wide/10'x3,845 LF(see detail 2A/C-10.1) Seal Constr. — Open Purch | 1 | LS | $ | 48,000.00 | 48,000 | |||||||||||
48,000 | ||||||||||||||||
SITE DUCT ELECTRICAL BANKS | ||||||||||||||||
PRIMARY | ||||||||||||||||
Electrical — Sitework GMP | 1 | LS | $ | 4,188,010.00 | 4,188,010 | |||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | $ | 62.820.15 | 62,820 | |||||||||||
Primary Electrical Duct Bank (Central Plant to Buildings) | 710 | LF | $ | 1,233.00 | W/ Elect. GMP | |||||||||||
(Assume Primary Wire Furnished by Utility Company) | LF | |||||||||||||||
Secondary Feeder: T-Pad to Main Switchgear Room | 710 | LF | $ | 262.00 | W/ Elect. GMP | |||||||||||
4,250,830 | ||||||||||||||||
SECONDARY | ||||||||||||||||
Secondary Electrical Duct Bank (Central Plant to Buildings) | 850 | LF | $ | 1,233.00 | 1,048,050 | |||||||||||
Secondary Feeder: T-Pad to Main Switchgear Room | 0 | LF | $ | 262.00 | W/ Elect. GMP | |||||||||||
1,048,050 | ||||||||||||||||
Temporary Power Feeders | ||||||||||||||||
Temp Power / Conduits for Tower Cranes 1 & 2 | 1 | LS | $ | 350,000.00 | 350,000 | |||||||||||
Temp Power / Conduits for Tower Cranes 3 & 4 | 1 | LS | $ | 250,000.00 | 250,000 | |||||||||||
600,000 | 0 | |||||||||||||||
LOW VOLTAGE | ||||||||||||||||
Telecom Duct Bank: Assume racked under bridge | 600 | LF | $ | 200.00 | W/ Elect. GMP | |||||||||||
Low Voltage Site Cabling: Security | LF | w/ SF Unit Prices | ||||||||||||||
Low Voltage Site Cabling: Data/Communication | LF | w/ SF Unit Prices | ||||||||||||||
SITE CONCRETE | ||||||||||||||||
Site Reinforcing Material | 92 | TN | $ | 763.00 | 70,196 | |||||||||||
Site Reinforcing Labor | 92 | TN | $ | 295.00 | 27,140 | |||||||||||
Site Concrete — Ready Mix Material | 1,826 | CY | $ | 97.01 | 177,140 | |||||||||||
Sidewalks: F/P/P/F | 39,100 | SF | $ | 2.50 | 97,750 | |||||||||||
10" Concrete Paving: F/P/P/F | 36,205 | SF | $ | 4.50 | 162,923 | |||||||||||
Light Pole Bases | 0 | EA | W/ Elect. GMP | |||||||||||||
Handicap Ramps | 39 | EA | $ | 500.00 | 19,500 | |||||||||||
554,649 |
13 of 93
GMP 04-21-2011 (WITH VE INCLUDED); | GSF | |||||||||||||||
REVISED 05/02/11 | ||||||||||||||||
Sys. Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
STRIPING/HC SIGNS/PRECAST BUMPERS | ||||||||||||||||
Lot Striping/Handicap Signs/Precast Bumpers | 1 | LS | $ | 15,375.00 | 15,375 | |||||||||||
15,375 | ||||||||||||||||
CURB & GUTTER | ||||||||||||||||
Concrete Curb & Gutter | 20,170 | LF | $ | 19.00 | 383,230 | |||||||||||
383,230 | ||||||||||||||||
#A-67 | ASPHALT PAVING: ALLOWANCE | 16,285 | TONS | $ | 125.00 | 2,035,625 | ||||||||||
4" Asphalt Paving at Employee Parking | 16,245 | SY | ||||||||||||||
4" Asphalt Paving at Guest Parking | 44,730 | SY | ||||||||||||||
7" Asphalt Paving at Roadways | 9,167 | SY | ||||||||||||||
Total SY | 70,142 | SY | ||||||||||||||
2,035,625 | ||||||||||||||||
STONE BASE | 35,114 | TN | $ | 31.40 | 1,102,548 | |||||||||||
Surface Parking: 8" Stone Base | 32,263 | TONS | ||||||||||||||
Drive Lanes: 12" Stone Base | 1,197 | TONS | ||||||||||||||
Loading Dock Paving: 8" Stone Base | 1,654 | TONS | ||||||||||||||
1,102,548 | ||||||||||||||||
Re-grade PL Stone Base: Soft Spots & Add 1.25" | 4,676 | TN | $ | 35.62 | 166,558 | |||||||||||
166,558 | ||||||||||||||||
SITE LIGHTING | ||||||||||||||||
Site Light Poles/Circuitry | 0 | EA | W/ Elect. GMP | |||||||||||||
Site Light Poles/Circuitry: Poles @ Roundabout Entry Drives | EA | $ | 8,500.00 | W/ Elect. GMP | ||||||||||||
Decorative Light Poles @ Elevated Roadway (Upgrades, every 60׳ at both sides of road) | 65 | EA | $ | 8,500.00 | 552,500 | |||||||||||
#A-51 | Reduce Cost/Pole AL for Decorative Light Poles @ Elevated Rd. from $8,500 to $5,500 | 1 | ALLOW | $ | (195,000.00 | ) | -195,000 | |||||||||
357,500 | ||||||||||||||||
River Road Relocation | ||||||||||||||||
River Road Improvements | 1 | LS | $ | 5,230,114.00 | 5,230,114 | |||||||||||
Lighting at River Road | 1 | LS | $ | 805,985.00 | 805,985 | |||||||||||
Additional Shoulder Embankment at Detour | 1 | LS | $ | 20,000.00 | 20,000 | |||||||||||
Work Stoppage due to ACOE MOD Approval: 01/26/11 thru 02/05/11 | 1 | LS | $ | 126,084.00 | 126,084 | |||||||||||
Additional Mobilization due to Water Levels | 1 | LS | $ | 40,000.00 | 40,000 | |||||||||||
6,222,183 | ||||||||||||||||
#A-65 | Mill/Overlay Existing River Road from Gardere to Central Plant | 1 | ALLOW | $ | 100,000.00 | 100,000 | ||||||||||
100,000 |
14 of 93
GMP 04-21-2011 (WITH VE INCLUDED); | GSF | |||||||||||||||
REVISED 05/02/11 | ||||||||||||||||
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
ELEVATED ROAD STRUCTURE | ||||||||||||||||
Elevated Road Form/Pump/Place/Finish (includes bents) | 101,000 | SF | $ | 25.30 | 2,555,300 | |||||||||||
Reinforcing Steel Material for Elevated Road | 921 | TN | $ | 763.00 | 702,723 | |||||||||||
Reinforcing Steel Labor for Elevated Road | 921 | TN | $ | 295.00 | 271,695 | |||||||||||
Ready Mix Material for Elevated Road | 10,947 | CY | $ | 103.55 | 1,133,562 | |||||||||||
Ready Mix Material for Revetment | 2,500 | CY | $ | 97.01 | 242,525 | |||||||||||
4" Sloped Paving (Revetment) | 155,700 | SF | $ | 1.27 | 198,500 | |||||||||||
Elev. Roadway Structure Levee Spread Footing (with above) | ||||||||||||||||
6" Galv Rail at top of wall | 2,400 | LF | $ | 110.00 | 264,000 | |||||||||||
Custom Planter Boxes (FFE) | ||||||||||||||||
Caulking of Control Joints | 50,720 | LF | $ | 1.20 | 60,864 | |||||||||||
5,429,169 | 53.75 | $/SF | ||||||||||||||
Elevated Roadway Levee Earthwork | ||||||||||||||||
Erosion Control | 2,500 | LF | $ | 3.30 | 8,250 | |||||||||||
Seeding&Mulching | 25 | ACRE | $ | 1,450.00 | 36,250 | |||||||||||
Strip & Store Topsoil on Site | 4,630 | CY | $ | 6.75 | 31,250 | |||||||||||
Import Select Fill | 18,519 | TMCY | $ | 16.00 | 296,296 | |||||||||||
Premium for Working on Levee | 18,519 | TMCY | $ | 4.35 | 80,556 | |||||||||||
452,602 | ||||||||||||||||
Vessel Veh. Elev. Emergency Egress Walkway | 0 | SF | 0 | |||||||||||||
Vehicular Galv. Railing: Not Rqd (Jersey Barr.) | 0 | LF | 0 | |||||||||||||
(Vessel to top of Levee) | ||||||||||||||||
0 | ||||||||||||||||
Levee Paving Adjacent to Elevated Roads/Walks | 0 | SF | 0 | |||||||||||||
(Includes earthwork & base.) | ||||||||||||||||
Levee Paving Between Road and Elevated Walk | 0 | SF | 0 | |||||||||||||
(20’w x 515 LF) | ||||||||||||||||
0 | ||||||||||||||||
Elevated Walkways | ||||||||||||||||
Elevated Emerg Egress Walkways North (w/ Low Rise) | 305 | SF | 0 | |||||||||||||
Elevated Emerg Egress Walkways South (w/ Low Rise) | 290 | SF | 0 | |||||||||||||
Elevated Loading Dock at Vessel (w/ Low Rise) | 2,000 | SF | 0 | |||||||||||||
Upgraded Elevated Structure for Utility Lines at Service Dock(Assumed 30 W x 180 L) | 5,400 | SF | $ | 62.00 | 334,800 | |||||||||||
Box Culvert at Gravel Drive (Top of Levee) | 0 | LF | $ | 500.00 | 0 | |||||||||||
334,800 | ||||||||||||||||
Elevated Walkways / Roads Gangway (EJ) | 175 | LF | $ | 250.00 | 43,750 | |||||||||||
43,750 |
15 of 93
GSF
REVISED 05/02/11
Sys. | ||||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||||
POOL(w/Hotel) | ||||||||||||||||||||
Pool Bar (w/ Hotel) | 0 | LS | 0 | |||||||||||||||||
Pool Bar: Food Service Equipment (w/ Hotel) | 0 | LS | 0 | |||||||||||||||||
Pool & Hardscaping Allowance (w/ Hotel) | 0 | LS | 0 | |||||||||||||||||
Pool Podium Elev. Structure Allowance (w/ Hotel) | 0 | SF | 0 | |||||||||||||||||
0 | ||||||||||||||||||||
Landscape & Irrigation | ||||||||||||||||||||
Landscaping & Irrigation (includes 45 gal trees and Medjool Palms) - PINNACLE PURCHASE | 1 | LS | NIC | |||||||||||||||||
0 | 0 | |||||||||||||||||||
0 | ||||||||||||||||||||
Site Maintenance / Mowing | 0 | |||||||||||||||||||
Erosion Control /. SWPPP | 18 | MO | $ | 1,750.00 | 31,500 | |||||||||||||||
31,500 | ||||||||||||||||||||
On-Site Mowing: 06/2010 thru 04/2011 | 1 | LS | $ | 86,186.48 | 86,186 | |||||||||||||||
On-Site Mowing: 05/2011 thru 03/2012 | 11 | MO | $ | 1,737.14 | 19,109 | |||||||||||||||
Off-Site Mowing: 06/2010 thru 04/2011 | 1 | LS | $ | 70,937.88 | 70,938 | |||||||||||||||
On-Site Mowing: 05/2011 thru 03/2012 | 11 | MO | $ | 1,737.14 | 19,109 | |||||||||||||||
195,341 | ||||||||||||||||||||
0 | ||||||||||||||||||||
Site Low Voltage Lighting | 0 | |||||||||||||||||||
#A-50 | Landscaping Lighting | 1 | ALLOW | $ | — | W/ Elect. GMP | ||||||||||||||
0 | ||||||||||||||||||||
TOTAL COST | 30,522,964 | |||||||||||||||||||
Cost of Work Subtotal | $ | 30,522,964 | ||||||||||||||||||
Sub Guard @ 1.25% | $ | 381,537 | ||||||||||||||||||
General Conditions | $ | 1,590,351 | ||||||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 93,347 | ||||||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 107,151 | ||||||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 244,184 | ||||||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 6,105 | ||||||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||||||
Project Subtotal | $ | 32,945,638 | ||||||||||||||||||
MCC Fee @ 3.25% | 3.25 | % | $ | 1,070,733 | ||||||||||||||||
Project Total | $ | 34,016,371 | ||||||||||||||||||
MCC Contingency @ 3% times Cost of Work | 3.00 | % | $ | 915,689 | ||||||||||||||||
Area Total | $ | 34,932.060 |
16 of 93
Manhattan Construction Company
BATON ROUGE CASINO (FLOAT)
FOH 99,421 | ||
BOH 64,508 GSF 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||||
DIVISION 3 | ||||||||||||||||||||
Place and Finish: Cellular Deck 3500LW SOMD | 72,996 | SF | 1.30 | 94,895 | ||||||||||||||||
Place and Finish: 3500LW SOMD Level 1 | 24,175 | SF | 1.30 | 31,428 | ||||||||||||||||
Place and Finish: 3500LW SOMD Level 2 | 82,400 | SF | 1.30 | 107,120 | ||||||||||||||||
Form, Place and Finish: Perimeter Wall Curbs | 1,290 | LF | 8.00 | 10,320 | ||||||||||||||||
243,762 | 0 | |||||||||||||||||||
Metal Pan Stair Fill | 1,255 | SF | 4.00 | 5,021 | ||||||||||||||||
Misc. Equipment Pads | 1,000 | SF | 5.50 | 5,500 0 | ||||||||||||||||
Reinforcing Steel Materials (Bars) | 19 | TN | 763.00 | 14,497 | ||||||||||||||||
Reinforcing Steel Materials (Mesh) | 1,780 | SQS | 19.40 | 34,536 | ||||||||||||||||
49,033 | 0 | |||||||||||||||||||
Reinforcing Installation | 0 | |||||||||||||||||||
Bars | 19 | TN | 295.00 | 5,605 | ||||||||||||||||
Mesh | 1,780 | SQS | 11.00 | 19,580 | ||||||||||||||||
25,185 | 0 | |||||||||||||||||||
Ready-mix Materials | 0 | |||||||||||||||||||
2500 PSI Mud Slabs (w/Marine Work) | 0 | CY | 0 | |||||||||||||||||
5000 PSI Pipe Fill (w/Marine Work) | 0 | CY | 0 | |||||||||||||||||
5000 PSI Basin Wall (w/Marine Work) | 0 | CY | 0 | |||||||||||||||||
3500 LW Perimeter Curb | 25 | CY | 112.27 | 2,807 | ||||||||||||||||
Cellular Deck 3500 LW SOMD | 1,152 | CY | 112.27 | 129,335 | ||||||||||||||||
3500 LW SOMD | 1,726 | CY | 112.27 | 193,778 | ||||||||||||||||
325,920 | 0 | |||||||||||||||||||
Crane #1-Liebherr 630 | 8 | MO | 24,750.00 | 198,000 | ||||||||||||||||
Crane Foundation: F/P/P/F | 1 | EA | 40,350.00 | 40,350 | ||||||||||||||||
Crane Operator | 32 | WK | 3,800.00 | 121,600 | ||||||||||||||||
ACP Piles for TC1 | 1 | LS | 33,760.00 | 33,760 | ||||||||||||||||
Lull Rent | 4 | MO | 2,600.00 | 10,400 | ||||||||||||||||
Lull Fuel&Maintenance | 4 | MO | 1,000.00 | 4,000 | ||||||||||||||||
Lull Operator | 17 | WKS | 3,800.00 | 64,600 | ||||||||||||||||
Safety Rails @ Podium: Maintenance | 3,200 | LF | 7.82 | 25,024 | ||||||||||||||||
Temporary Ladders / Hole Covers | 1 | LS | 4,500.00 | 4,500 | ||||||||||||||||
502,234 | 0 | |||||||||||||||||||
SBTL | Division 3 — Subtotal | 7.06 | 1,156,654 | |||||||||||||||||
DIVISION 4 | ||||||||||||||||||||
Masonry | — | 0 | ||||||||||||||||||
SBTL | Division 4 — Subtotal | — | 0 | |||||||||||||||||
DIVISION 5 | ||||||||||||||||||||
Structural Steel | 864 | TN | 2,215.00 | 1,913,760 | ||||||||||||||||
Structural Steel Design Revisions 10.27.10 | 1 | LS | 426,510.00 | 426,510 | ||||||||||||||||
Structural Steel Design Revisions 12.15.10 | 1 | LS | 11,206.00 | 11,206 | ||||||||||||||||
Structural Steel Mill Increase | 1 | LS | 114,422.00 | 114,422 | ||||||||||||||||
01-2011 LPA DD | 1 | LS | 267,875.00 | 267,875 | ||||||||||||||||
Structural Steel Design Revisions 01.28.11 (ASI #15) | 1 | LS | 211,298.00 | 211,298 |
17 of 93
FOH 99,421 | ||
BOH 64,508 GSF 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||||
Floor Deck (with Structural Steel) | 82,400 | SF | W/ Above | |||||||||||||||||
Metal Roof Deck (with Structural Steel) | 74,400 | SF | W/ Above | |||||||||||||||||
Floor Deck at Level 1: F & I | 24,175 | SF | 3.05 | 73,734 | ||||||||||||||||
Transport Columns to Postel from Kyle, TX | 1 | LS | 17,600.00 | 17,600 | ||||||||||||||||
3,036,405 | 0 | |||||||||||||||||||
Storage Fees Due to Water Level | 0 | |||||||||||||||||||
Postel Steel Handling and Storage | 1 | LS | 42,500.00 | 42,500 | ||||||||||||||||
42,500 | 0 | |||||||||||||||||||
0 | ||||||||||||||||||||
CORDECK @ L1 (Material) | 72,996 | SF | 7.05 | 514,622 | ||||||||||||||||
Install CORDECK @ L1 | 72,996 | SF | 1.85 | 135,043 | ||||||||||||||||
649,664 | 0 | |||||||||||||||||||
Miscellaneous Metals (.75 # / SF) No Stairs | 61 | TN | 4,000.00 | 245,894 | ||||||||||||||||
Metal Pan Stairs w/ Railings (3 ea) | 314 | RISERS | 650.00 | 203,966 | ||||||||||||||||
Picket Railing at Vessel Perimeter | 657 | LF | 250.00 | 164,250 | ||||||||||||||||
Picket Railing at VIP Patio | 53 | LF | 300.00 | 15,900 | ||||||||||||||||
630,009 | 0 | |||||||||||||||||||
Support Steel Privacy Screen at Roof (10#/SF) | 41 | TN | 4,000.00 | 165,060 | ||||||||||||||||
#A-2 | Delete Support Steel Privacy Screen at Roof (10#/SF) | 1 | ALLOW | (165,060.00 | ) | -165,060 | ||||||||||||||
0 | ||||||||||||||||||||
Ornamental Metals | 0 | |||||||||||||||||||
Ornamental Stair (NONE) | 0 | 0 | ||||||||||||||||||
0 | ||||||||||||||||||||
0 | ||||||||||||||||||||
Decorative Rail @ VIP Terrace | 100 | LF | 400.00 | 40,000 | ||||||||||||||||
40,000 | 0 | |||||||||||||||||||
SBTL | Division 5 – Subtotal | 26.83 | 4,398,578 | |||||||||||||||||
DIVISION 6 | ||||||||||||||||||||
Rough Carpentry | 163,929 | GSF | 1.25 | 204,911 | ||||||||||||||||
Temporary Protection | 163,929 | GSF | 0.75 | 122,947 | ||||||||||||||||
327,858 | ||||||||||||||||||||
0 | ||||||||||||||||||||
Public Restrooms (Rm 1173/1175/1145/1147/1187/1185/2104/2105) | 0 | |||||||||||||||||||
Rustic Wood Casing and Header at Restroom Entry | 75 | LF | 115 | 8,625 | ||||||||||||||||
Stone Vanity Top / Angled Vanity Panel | 192 | LF | 487 | 93,504 | ||||||||||||||||
Door Casing / Crown Moulding | 1 | LS | 34,494 | 34,494 | ||||||||||||||||
Mirror (FFE) | 0 | |||||||||||||||||||
Wall Hung Stone Pilasters, Solid Surface Partitions and Wood Doors | 63 | EA | 5,321 | 335,223 | ||||||||||||||||
#A-13 | Revised Toilet Partitions to Drywall Front with Louvered Doors | 1 | ALLOW | -114,723 | -114,723 | |||||||||||||||
Urinal Screens | 270 | SF | 117 | 31,590 | ||||||||||||||||
388,713 | 0 |
18 of 93
FOH 99,421 | ||
BOH 64,508 GSF 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||||
Cage | 0 | |||||||||||||||||||
Main Cage Counter (with Grillwork and Granite top) | 30 | LF | 2,802 | 84,060 | ||||||||||||||||
Casino Cage Back Counter | 36 | LF | 443 | 15,948 | ||||||||||||||||
Employee Cage Counter (with Grillwork and Granite) | 9 | LF | 3,561 | 32,049 | ||||||||||||||||
Wood Base at Credit Offices | 116 | LF | 50 | 5,800 | ||||||||||||||||
Applied Moulding at Credit Office | 20 | LF | 25 | 500 | ||||||||||||||||
138,357 | 0 | |||||||||||||||||||
Casino (Marnell Entry Concept) | 0 | |||||||||||||||||||
“Fluted” millwork at entry die wall / soffit at elev +24 | 1,296 | SF | 550 | 712,800 | ||||||||||||||||
#A-13 | Use painted MDF at Casino Entry “Fluted” millwork at entry die wall / soffit at elev +24 | 1 | ALLOW | -421,200 | -421,200 | |||||||||||||||
“Fluted” False Beams at Columns | 1,296 | SF | 550 | 712,800 | ||||||||||||||||
#A-13 | Use painted MDF at Casino Entry “Fluted” Columns | 1 | ALLOW | -421,200 | -421,200 | |||||||||||||||
“Fluted” False Beams at Casino Side | 1,458 | SF | 550 | 801,900 | ||||||||||||||||
#A-13 | Use painted MDF at Casino Entry “Fluted” False Beams | 1 | ALLOW | -473,850 | -473,850 | |||||||||||||||
Bronze Column Front and Back | 1,440 | SF | 125 | 180,000 | ||||||||||||||||
#A-13 | Delete Casino Entry Bronze Column Front and Back and paint Bronze | 1 | ALLOW | -178,760 | -178,760 | |||||||||||||||
Host / ID Stand | 1 | EA | 7,500 | 7,500 | ||||||||||||||||
Colored Glass “Waves” at Eyebrow | 72 | LF | 850 | 61,200 | ||||||||||||||||
StyleMark Corners | 960 | LF | 6 | 5,760 | ||||||||||||||||
986,950 | 0 | |||||||||||||||||||
36.5’ Decorative metal Front (Cat Tail Design, Laser Cut) | 110 | LF | 3,500 | 385,000 | ||||||||||||||||
#A-13 | 36.5’ Decorative metal Front (Cat Tail Design, Laser Cut) | 110 | LF | -3,500 | -385,000 | |||||||||||||||
Reduce allowance for metal grillework to $250k | 1 | ALLOW | 250,000 | 250,000 | ||||||||||||||||
Rail at ID Stand | 10 | LF | 400 | 4,000 | ||||||||||||||||
254,000 | 0 | |||||||||||||||||||
Structural Framing at Entry (Radiused 12” channel / Cross Member, Clad with Bronze to match columns) | 2 | TONS | 8,000 | 16,320 | ||||||||||||||||
Bronze Cladding at Radiused Entry Steel | 544 | SF | 125 | 68,000 | ||||||||||||||||
Structural Framing at “Octagon” Shapes (C12x30, Clad with Bronze to match columns) | 4 | TONS | 8,000 | 28,000 | ||||||||||||||||
Bronze Cladding at “Octagon) Steel | 800 | SF | 125 | 100,000 | ||||||||||||||||
212,320 | 0 | |||||||||||||||||||
Casino Columns (GFRG, backlight, Hardwood kickers) | 13 | EA | 4,608 | 59,904 | ||||||||||||||||
Trim / Moulding | 1 | LS | 28,077 | 28,077 | ||||||||||||||||
Wood / Stone Base at Casino Columns (2" 4″ tall) | 1 | LS | 69,490 | 69,490 | ||||||||||||||||
157,471 | 0 |
19 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
Pendants in Ceiling (wagon wheel beams and planks) | 19 | EA | 7,003 | 133,057 | ||||||||||||||
Stained Wood Beam, Various Height above Table Games | 1 | LS | 698,830 | 698,830 | ||||||||||||||
#A-13 | Replace Stained Wood Beams above Table Games with MDF “boxes” with OFCI Wood Wallcovering | 1 | ALLOW | -610,830 | -610,830 | |||||||||||||
831,887 | 0 | |||||||||||||||||
Poker Room | 0 | |||||||||||||||||
Host Stand and Granite Top | 17 | LF | 701 | 11,917 | ||||||||||||||
Glass Boxes at Entry | 3 | EA | 7,446 | 22,338 | ||||||||||||||
Wood Base, Chair, Picture, Crown Moulding | 370 | LF | 126 | 46,620 | ||||||||||||||
Wood Frame at TV’s | 8 | EA | 1,040 | 8,320 | ||||||||||||||
89,195 | 0 | |||||||||||||||||
High Limit Tables / Gaming | 0 | |||||||||||||||||
Petrified Wood at Entry Columns/Header | 240 | SF | 434 | 104,160 | ||||||||||||||
Petrified Wood at Cashier Walls | 60 | SF | 434 | 26,040 | ||||||||||||||
#A-13 | Reduce Petrified Wood to Front Face only at the Entries, replace with OFCI Upholstery | 1 | ALLOW | -74,940 | -74,940 | |||||||||||||
55,260 | 0 | |||||||||||||||||
Millwork Panelling at Entry | 1 | LS | 136,356 | 136,356 | ||||||||||||||
Decorative Polished Bronze Rail at Entry | 52 | LF | 853 | 44,356 | ||||||||||||||
Metal Screen at Cage Area at Entry | 14 | LF | 1,500 | 21,000 | ||||||||||||||
Metal Screen at My Choice | 18 | LF | 1,500 | 27,000 | ||||||||||||||
Wood Panelling with Leather Upholstery at Radius Room | 1 | LS | 147,229 | 147,229 | ||||||||||||||
Buffet with Stone Top at Radius Room | 10 | LF | 1,093 | 10,930 | ||||||||||||||
Main Bar Counter at Radius Room | 13 | LF | 766 | 9,958 | ||||||||||||||
Back Bar Counter at Radius Room | 11 | LF | 709 | 7,799 | ||||||||||||||
Crown at Radius Room Bar | 67 | LF | 125 | 8,375 | ||||||||||||||
Base at Radius Room Bar | 67 | LF | 125 | 8,375 | ||||||||||||||
Counter at Cashier | 16 | LF | 750 | 12,000 | ||||||||||||||
Counter at My Choice | 34 | LF | 1,322 | 44,948 | ||||||||||||||
Metal Screen at Cage Area (from inside High Limit) | 28 | LF | 1,489 | 41,692 | ||||||||||||||
Back Counters at Cashier | 12 | LF | 705 | 8,460 | ||||||||||||||
Crown at Cashier | 95 | LF | 50 | 4,750 | ||||||||||||||
Base at Cashier | 95 | LF | 50 | 4,750 | ||||||||||||||
Window “Cage” at Cashier | 4 | LF | 1,500 | 6,000 | ||||||||||||||
Counter at Window “Cage” | 4 | LF | 150 | 600 | ||||||||||||||
Wood Base at Cashier Offices | 83 | LF | 50 | 4,150 | ||||||||||||||
Chair Rail / Base / Crown at Gaming Area & Elevator Lobby | 1 | LS | 133,064 | 133,064 | ||||||||||||||
681,792 | 0 | |||||||||||||||||
Wood Plank and Beam Ceiling at Tables | 1 | LS | 153,428 | 153,428 |
20 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
#A-13 | Deduct Wood Plank and Beam Ceilings and use wallcovering | 1 | ALLOW | -139,028 | -139,028 | |||||||||||||
Applied Moulding at Offices, Elev Lobby and Hallway | 115 | LF | 40 | 4,600 | ||||||||||||||
Wood Beams at Gaming Area | 520 | LF | 37 | 19,240 | ||||||||||||||
38,240 | 0 | |||||||||||||||||
Buffet | 0 | |||||||||||||||||
Decorative Metal Handrail at Houses / Servery | 250 | LF | 750 | 187,500 | ||||||||||||||
#A-13 | Reduce cost of Handrail to $250/LF | 1 | ALLOW | -125,000 | -125,000 | |||||||||||||
Queing Rails (fixed) | 175 | LF | 436 | 76,300 | ||||||||||||||
#A-13 | Reduce cost of queing rails to $250/LF | 1 | ALLOW | -32,550 | -32,550 | |||||||||||||
Hostess Stand | 30 | LF | 527 | 15,810 | ||||||||||||||
Beverage Station at Lighthouse | 15 | LF | 627 | 9,405 | ||||||||||||||
Servery Millwork / Counter | 155 | LF | 637 | 98,735 | ||||||||||||||
Back Counter | 100 | LF | 434 | 43,400 | ||||||||||||||
Decorative Fixture at Hood | 300 | SF | 155 | 46,500 | ||||||||||||||
Bookcases at Private Dining (Fireplace) | 16 | LF | 853 | 13,648 | ||||||||||||||
#A-13 | Added Millwork at Deleted Fireplace | 1 | ALLOW | 15,000 | 15,000 | |||||||||||||
Cypress Veneer at Columns | 7 | EA | 5,993 | 41,951 | ||||||||||||||
Stylemark Corners | 1,200 | LF | 11 | 13,200 | ||||||||||||||
Banquette Diewalls at Houses | 101 | LF | 215 | 21,715 | ||||||||||||||
425,614 | 0 | |||||||||||||||||
Sloped Louver Awning on Metal Butress | 360 | SF | 152 | 54,720 | ||||||||||||||
Standing Seam Metal Roof at Lighthouse | 580 | SF | 73 | 42,340 | ||||||||||||||
Standing Seam Metal Roof at House | 1,296 | SF | 73 | 94,608 | ||||||||||||||
191,668 | 0 | |||||||||||||||||
Wood Battens at Food Servery / Houses | 1,600 | LF | 5 | 8,000 | ||||||||||||||
Wood Battens at Radius Area | 2,600 | LF | 13 | 33,800 | ||||||||||||||
Crown (Throughout) | 1 | LS | 12,617 | 12,617 | ||||||||||||||
GFRG Domes at Dining Area | 7 | EA | 2,496 | 17,472 | ||||||||||||||
Painted Murals at Dining (FFE) | 0 | 0 | 0 | |||||||||||||||
71,889 | 0 | |||||||||||||||||
10’ Oiled Black Glass Wall at Lighthouse (with operable doors) | 680 | SF | 175 | 119,000 | ||||||||||||||
#A-13 | Revise Oiled Black Glass Wall System to Wood Glass System at Lighthouses | 1 | ALLOW | -34,000 | -34,000 | |||||||||||||
10’ Oiled Black Glass Wall at Dining Areas (Houses) | 2,500 | SF | 140 | 350,000 | ||||||||||||||
#A-13 | Revise Oiled Black Glass Wall System to Wood Glass System at Dining Areas | 1 | ALLOW | -37,500 | -37,500 | |||||||||||||
10’ Oiled Black Glass Wall at Private Dining | 600 | SF | 140 | 84,000 | ||||||||||||||
#A-13 | Revise Oiled Black Glass Wall System to Wood Glass System at Private Dining | 1 | ALLOW | -9,000 | -9,000 | |||||||||||||
Operable Doors at Dining Areas / Private Dining | 11 | PR | 3,139 | 34,529 | ||||||||||||||
12’ Oiled Black Glass Wall at Open Seating | 530 | SF | 140 | 74,200 |
21 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
#A-13 | Revise Oiled Black Glass Wall System to Wood Glass System at Private Dining at Open Seating | 1 | ALLOW | -7,950 | -7,950 | |||||||||||||
7’ Oiled Black Glass Wall at Host Stand | 133 | SF | 140 | 18,620 | ||||||||||||||
#A-13 | Revise Oiled Black Glass Wall System to Wood Glass System at Private Dining at Host Stand | 1 | ALLOW | -1,995 | -1,995 | |||||||||||||
591,899 | 0 | |||||||||||||||||
Feature Bar | 0 | |||||||||||||||||
GFRG Column Wrap with Glass Box | 1 | EA | 8,618 | 8,618 | ||||||||||||||
12’ Cocobolo Veneer Backlight Wall System | 1,060 | BF | 60 | 63,600 | ||||||||||||||
Millwork Bar w Down Light Panels and Footrail (Radiused) | 85 | LF | 1,088 | 92,480 | ||||||||||||||
Back bar with Bottle Display Shelf | 30 | LF | 1,250 | 37,500 | ||||||||||||||
Banquettes OFCI | 6 | EA | 5,130 | 30,780 | ||||||||||||||
Drapery Pockets | 1 | LS | 3,858 | 3,858 | ||||||||||||||
236,836 | 0 | |||||||||||||||||
Textured Cork Ceiling at Bar | 340 | SF | 65 | 22,100 | ||||||||||||||
Stained Wood Beams at Varoius Heights | 1 | LS | 69,874 | 69,874 | ||||||||||||||
91,974 | 0 | |||||||||||||||||
Pre Function | 0 | |||||||||||||||||
Stained Wood Base / Casing | 902 | LF | 35 | 31,570 | ||||||||||||||
Picture Frames / Wood Door Casing | 502 | LF | 35 | 17,570 | ||||||||||||||
Wood Battens at Portable Bar Area | 290 | SF | 55 | 15,950 | ||||||||||||||
Applied Moulding at Ceiling | 1,085 | LF | 125 | 135,625 | ||||||||||||||
200,715 | 0 | |||||||||||||||||
Multi Purpose Room | 0 | |||||||||||||||||
Base / Chair / Crown / Door Casing | 1 | LS | 57,606 | 57,606 | ||||||||||||||
Wood Box Panel with FFE Light Fixture | 12 | EA | 500 | 6,000 | ||||||||||||||
Wood Casing at Stage Area | 102 | SF | 126 | 12,852 | ||||||||||||||
Curved Wood Stair at Stage Area | 1 | EA | 7,500 | 7,500 | ||||||||||||||
83,958 | 0 | |||||||||||||||||
VIP Lounge | 0 | |||||||||||||||||
Marble Fireplace Surround | 18 | LF | 300 | 5,400 | ||||||||||||||
Restroom Vanity with Onyx Top | 14 | LF | 751 | 10,514 | ||||||||||||||
#A-13 | Replace onyx top with standard granite | 1 | ALLOW | -5,614 | -5,614 | |||||||||||||
10,300 | 0 | |||||||||||||||||
Base and Crown at Elevator Lobby | 70 | LF | 20 | 1,400 | ||||||||||||||
Stained Wood Base and Casing at VIP Area | 565 | LF | 45 | 25,425 | ||||||||||||||
Wall Cap at Half Wall | 7 | LF | 20 | 140 | ||||||||||||||
Host Stand | 1 | EA | 4,960 | 4,960 | ||||||||||||||
Millwork Buffet with Granite Top | 18 | LF | 700 | 12,600 | ||||||||||||||
Millwork Frame at TV above Buffet | 32 | LF | 1,050 | 33,600 | ||||||||||||||
2-Sided Double Bookshelf / Open Millwork Display at Fireplace | 1 | EA | 34,565 | 34,565 | ||||||||||||||
Stained Mantle at Fireplace | 8 | LF | 45 | 360 | ||||||||||||||
VIP Bar with Antique Mirrors and Glass Shelves | 32 | LF | 2,207 | 70,624 | ||||||||||||||
Banquette? | 24 | LF | 100 | 2,400 | ||||||||||||||
186,074 | 0 |
22 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | City | U of M | Unit Cost | Activity Cost | |||||||||||||
Ceilings at VIP Lounge | 1 | LS | 284,456 | 284,456 | ||||||||||||||
Applied Moulding at Ceilings | 565 | LF | 0 | 0 | ||||||||||||||
Wood Beams at Bar | 100 | LF | 0 | 0 | ||||||||||||||
Antique Mirrors at Ceiling | 235 | SF | 0 | 0 | ||||||||||||||
284,456 | 0 | |||||||||||||||||
Stone Pilaster with Solid Surface Partition and Wood Louvered Door | 3 | EA | 3,272 | 33,600 | ||||||||||||||
Urinal Screens | 20 | SF | 117 | 34,565 | ||||||||||||||
68,165 | ||||||||||||||||||
Misc BOH Millwork | 0 | |||||||||||||||||
Green Room 2136 Base, Chair, Crown | 61 | LF | 50 | 3,050 | ||||||||||||||
Green Room 2136 Bae Cabinet | 6 | LF | 200 | 1,200 | ||||||||||||||
Toilet 2202 Vanity | 2 | LF | 200 | 400 | ||||||||||||||
Green Room 2169 Base, Chair, Crown | 61 | LF | 50 | 3,050 | ||||||||||||||
Green Room 2169 Base Cabinet | 6 | LF | 200 | 1,200 | ||||||||||||||
Toilet 2170 Vanity | 2 | LF | 200 | 400 | ||||||||||||||
Men’s Toilet 2178 Vanity | 6 | LF | 200 | 1,200 | ||||||||||||||
Women’s Toilet 2179 Vanity | 6 | LF | 200 | 1,200 | ||||||||||||||
Vessel Support Office 2200 | 10 | LF | 250 | 2,500 | ||||||||||||||
Conference 2182 Base, Chair, Crown | 68 | LF | 50 | 3,400 | ||||||||||||||
AGM 2196 Base, Chair, Crown | 58 | LF | 50 | 2,900 | ||||||||||||||
Conference 2197 Base, Chair, Crown | 71 | LF | 50 | 3,550 | ||||||||||||||
GM 2199 Base, Chair, Crown | 66 | LF | 50 | 3,300 | ||||||||||||||
Special Event Coord 2189 Base, Chair, Crown | 57 | LF | 50 | 2,850 | ||||||||||||||
EDR?? | 1 | LS | 5,000 | 5,000 | ||||||||||||||
Team Lounge?? | 1 | LS | 2,500 | 2,500 | ||||||||||||||
37,700 | 0 | |||||||||||||||||
SBTL | Division 6 —Subtotal | 60.66 | 6,030,466 | |||||||||||||||
DIVISION 7 | ||||||||||||||||||
Roofing: Vessel — TPO (Pitched Structure) | 1 | LS | 1,246,695.00 | 1,246,695 | ||||||||||||||
0 | ||||||||||||||||||
Roof Pavers @ VIP Terrace (C/LA6.00) with Roofing | 1,790 | SF | — | 0 | ||||||||||||||
0 | ||||||||||||||||||
Sheet Membrane Dampproofing at Exterior (W/ EIFS) | LS | 0 | ||||||||||||||||
Deduct Sheet Membrane Dampproofing at Panelized Areas (W/ EIFS) | LS | 0 | ||||||||||||||||
0 | ||||||||||||||||||
Exterior Wall Insulation with Div 9 Framing Sub | 0 | |||||||||||||||||
1,246,695 | ||||||||||||||||||
0 | ||||||||||||||||||
Joint Sealants @ EIFS System | 44,077 | SF | 1.50 | 66,116 | ||||||||||||||
Joint Sealants @ Glazing Perimeter (w/ Glass) | 770 | LF | 0 | |||||||||||||||
66,116 | ||||||||||||||||||
EIFS | 38,450 | SF | 12.75 | 490,238 | ||||||||||||||
EIFS #2 (Corrugated Metal Look) | 5,627 | SF | 15.00 | 84,405 |
23 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | �� | |||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
EIFS Soffit at VIP Lounge | 1,256 | SF | 12.75 | 16,014 | ||||||||||||||
ElFS Soffit at Feature Bar | 1,444 | SF | 12.75 | 18,411 | ||||||||||||||
Scaffold for EIFS | 1 | LS | 125,000.00 | 125,000 | ||||||||||||||
734,068 | 0 | |||||||||||||||||
0 | ||||||||||||||||||
Metal Fascia at Feature Bar | 2,055 | SF | 28.00 | 57,540 | ||||||||||||||
Metal Fascia at VIP Lounge | 1,195 | SF | 28.00 | 33,460 | ||||||||||||||
91,000 | ||||||||||||||||||
0 | ||||||||||||||||||
Porcelain Tile at Feature Bar | 512 | SF | 30.00 | 15,360 | ||||||||||||||
15,360 | ||||||||||||||||||
0 | ||||||||||||||||||
Equipment Screen @ Roof- 18’ Average Height | 5,696 | SF | 25.00 | 142,400 | ||||||||||||||
Equipment Screen @ Roof- 21’ Average Height | 2,557 | SF | 26.00 | 66,482 | ||||||||||||||
#A-2 | Eliminate Privacy/Equipment Screens at Roof of Casino (Add paint at Mechanical Equipment) | 1 | ALLOW | (208,882.00 | ) | -208,882 | ||||||||||||
0 | ||||||||||||||||||
0 | ||||||||||||||||||
SFRM Fireproofing @ Lvl 2 (+20’-2” BOS) | 85,496 | SF | 1.50 | 128,244 | ||||||||||||||
SFRM Fireproofing @ Main Roof (+15’-0” BOS) | 53,015 | SF | 1.50 | 79,523 | ||||||||||||||
SFRM Fireproofing @ Prefunctn Roof (+11’-6” BOS) | 8,122 | SF | 1.50 | 12,183 | ||||||||||||||
Multiple Mobilizations | 3 | EA | 2,500.00 | 7,500 | ||||||||||||||
227,450 | 0 | |||||||||||||||||
Thermal Insulation below Elev +53 | 0 | SF | — | 0 | ||||||||||||||
(Assumed Not Required) | ||||||||||||||||||
Bellows @ Vessel | 600 | LF | 150.00 | 90,000 | ||||||||||||||
EJ1-S (Interior Floor) | 210 | LF | 150.00 | 31,500 | ||||||||||||||
EJ1X-S (Interior Floor) | 350 | LF | 150.00 | 52,500 | ||||||||||||||
EJ4-S (Interior Floor- BOH) | 18 | LF | 150.00 | 2,700 | ||||||||||||||
EJ6-FRS (Exterior Vertical) | 24 | LF | 150.00 | 3,600 | ||||||||||||||
EJ7-FRS (Interior Vertical) | 52 | LF | 150.00 | 7,800 | ||||||||||||||
EJ7-S (Interior Vertical) | 360 | LF | 150.00 | 54,000 | ||||||||||||||
EJ8-FR (Exterior Vertical) | 14 | LF | 150.00 | 2,100 | ||||||||||||||
EJ8-FRS (Exterior Vertical) | 56 | LF | 150.00 | 8,400 | ||||||||||||||
EJ10-FR @ Roof | 255 | LF | 150.00 | 38,250 | ||||||||||||||
EJ10-FRS @ Roof | 395 | LF | 150.00 | 59,250 | ||||||||||||||
EJ10-FRS @ Roof | 385 | LF | 150.00 | 57,750 | ||||||||||||||
EJ11-S (Exterior @ Canopy) | 15 | LF | 150.00 | 2,250 | ||||||||||||||
410,100 | 0 | |||||||||||||||||
SBTL | Division 7 — Subtotal | 17.02 | 2,790,788 | |||||||||||||||
DIVISION 8 | ||||||||||||||||||
Hollow Metal Frames: 3o 7o Interior | 80 | EA | 95.92 | 7,674 | ||||||||||||||
Hollow Metal Frames: 6o 7o Interior | 39 | EA | 100.28 | 3,911 | ||||||||||||||
Hollow Metal Frames: 3o 7o Exterior | 5 | EA | 95.92 | 480 | ||||||||||||||
Hollow Metal Frames: 6o 7o Exterior | 7 | EA | 100.28 | 702 | ||||||||||||||
131 | ||||||||||||||||||
Hollow Metal Doors: 3o 7o Interior | 65 | LVS | 231.08 | 15,020 | ||||||||||||||
Hollow Metal Doors: 6o 7o PR Interior | 40 | LVS | 231.08 | 9,243 | ||||||||||||||
Hollow Metal Doors: 3o 7o Exterior | 5 | LVS | 231.08 | 1,155 | ||||||||||||||
Hollow Metal Doors: 6o 7o PR Exterior | 14 | LVS | 231.08 | 3,235 |
24 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
PL Doors @ Admin Offices: 3o 7o | 15 | LVS | 194.02 | 2,910 | ||||||||||||||
PL Doors @ Admin Offices: 6o 7o PR | 2 | LVS | 194.02 | 388 | ||||||||||||||
Hardware Sets @ Back of House Doors | 141 | SETS | 286.17 | 40,350 | ||||||||||||||
Add for Electrified Security Hardware (F & I by Security Contractor) | 0 | EA | 0 | |||||||||||||||
85,068 | ||||||||||||||||||
Wood Doors- Custom @ FOH Casino- 3o 7o | 12 | LVS | 1,000.00 | 12,000 | ||||||||||||||
Wood Doors- Custom @ FOH Casino- 6o 7o PR | 34 | LVS | 1,000.00 | 34,000 | ||||||||||||||
Wood Doors- Custom @ FOH Casino- 6o 7o Bifold | 3 | EA | 2,000.00 | 6,000 | ||||||||||||||
52,000 | ||||||||||||||||||
Custom Hardware @ FOH Casino Doors | 49 | SETS | 750.00 | 36,750 | ||||||||||||||
36,750 | ||||||||||||||||||
Unload/Distribute Doors & Frames | 131 | EA | 17.00 | 2,227 | ||||||||||||||
Hang Doors | 190 | LVS | 65.00 | 12,350 | ||||||||||||||
0 | ||||||||||||||||||
Install Hardware | 190 | LVS | 100.00 | 19,000 | ||||||||||||||
Set Up Hardware Room | 1 | ALLOW | 10,000.00 | 10,000 | ||||||||||||||
43,577 | ||||||||||||||||||
0 | ||||||||||||||||||
Overhead Door at Loading Dock (with Low Rise) | 2 | EA | 0 | |||||||||||||||
0 | ||||||||||||||||||
Type ‘AA’ Ext Storefront | 124 | SF | 65.00 | 8,060 | ||||||||||||||
Type ‘BB’ Ext Storefront | 130 | SF | 65.00 | 8,450 | ||||||||||||||
Type ‘S’ Ext Storefront | 170 | SF | 65.00 | 11,050 | ||||||||||||||
Type ‘T’ Ext Storefront | 165 | SF | 65.00 | 10,725 | ||||||||||||||
Type ‘U’ Ext Storefront | 244 | SF | 65.00 | 15,880 | ||||||||||||||
Type ‘V’ Ext Storefront | 124 | SF | 65.00 | 8,060 | ||||||||||||||
Type ‘W’ Ext Storefront | 526 | SF | 65.00 | 34,190 | ||||||||||||||
Type ‘X’ Ext Storefront | 345 | SF | 65.00 | 22,425 | ||||||||||||||
Type ‘Y’ Ext Storefront | 91 | SF | 65.00 | 5,915 | ||||||||||||||
Type ‘Z’ Ext Storefront @ VIP (Segmented) | 1,430 | SF | 65.00 | 92,950 | ||||||||||||||
Interior Storefront @ Lvl 77/Admin Offices | 375 | SF | 40.00 | 15,000 | ||||||||||||||
Interior Storefront @ Lvl 77/ Prefunction Area | 390 | SF | 40.00 | 15,600 | ||||||||||||||
248,285 | ||||||||||||||||||
Exterior Doors- Alum Storefront 3o x 7o | 4 | LVS | 4,250.00 | 17,000 | ||||||||||||||
Exterior Doors- Alum Storefront 6o x 7o PR | 8 | LVS | 4,250.00 | 34,000 | ||||||||||||||
51,000 | ||||||||||||||||||
Clean Exterior Glass | 3,349 | SF | 0.50 | 1,675 | ||||||||||||||
1,675 | ||||||||||||||||||
Misc. Interior Glazing | 99,421 | SF | 0.10 | 9,942 | ||||||||||||||
Glass wall at High Limit Cashier Offices | 193 | SF | 65 | 12,513 | ||||||||||||||
22,455 | ||||||||||||||||||
SBTL | Division 8 — Subtotal | 3.30 | 540,809 |
25 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
DIVISION 9 | ||||||||||||||||||
Exterior Framing (W/ Dense Glass & Thermal) | 50,027 | SF | 12.00 | 600,324 | ||||||||||||||
Interior Drywall | 163,929 | GSF | 11.00 | 1,803,219 | ||||||||||||||
Additional Drywall Framing at New Casino Entry Ceilings | 1 | LS | 30,000 | 30,000 | ||||||||||||||
2,433,543 | 0 | |||||||||||||||||
Public Restrooms (Rm 1173/1175/1145/1147/1187/1185/2104/2105) | 0 | |||||||||||||||||
Tile Surfaces | 1 | LS | 188,088 | 188,088 | ||||||||||||||
Tile Floor | 4,680 | SF | 0 | 0 | ||||||||||||||
Tile Wall Wainscot | 3,621 | SF | 0 | 0 | ||||||||||||||
#A-11 | Utilize epoxy blend grout ILO Epoxy Grout at Public/BOH Restooms | 1 | ALLOW | (18,257.00 | ) | -18,257 | ||||||||||||
169,831 | 0 | |||||||||||||||||
Cage | 0 | |||||||||||||||||
Carpet Install | 1 | LS | 1,596 | 1,596 | ||||||||||||||
Carpet Install, F&l Pad | 90 | SY | 0 | 0 | ||||||||||||||
1,596 | 0 | |||||||||||||||||
Casino (Marnell Entry Concept) | 0 | |||||||||||||||||
Wood Floor at Casino Entry | 905 | SF | 24 | 21,859 | ||||||||||||||
Stone Flooring at Casino Entry | 1,240 | SF | 19 | 23,196 | ||||||||||||||
Antique Bronze Glass Tile at Column Sides | 2,430 | SF | 50 | 121,500 | ||||||||||||||
0 | ||||||||||||||||||
12”x12” Hunter Douglas Open Grid Ceiling in Casino | 19,200 | SF | 29 | 556,800 | ||||||||||||||
#A-18 | Utilize 26”x26”x5” HD Grid ILO 12”x12”x5” | 1 | ALLOW | -204,872 | -204,872 | |||||||||||||
Carpet Installation (with Pad) | 1 | LS | 108,432 | 108,432 | ||||||||||||||
Special Finish at Table Game Ceiling | 10,100 | SF | 18 | 181,800 | ||||||||||||||
808,715 | 0 | |||||||||||||||||
Poker Room | ||||||||||||||||||
Lay In Ceiling Tile (Wood Appearance) | 890 | SF | 34 | 29,984 | ||||||||||||||
Carpet Install | 1 | LS | 2,821 | 2,821 | ||||||||||||||
Carpet Install, F&l Pad | 166 | SY | 0 | |||||||||||||||
32,805 | 0 | |||||||||||||||||
High Limit Tables / Gaming | 0 | |||||||||||||||||
Venetian Plaster at Columns | 140 | SF | 18 | 2,520 | ||||||||||||||
Venetian Plaster at Back Bar | 804 | SF | 18 | 14,472 | ||||||||||||||
Special Finish Ceiling at Back Bar | 220 | SF | 3 | 660 | ||||||||||||||
17,652 | 0 | |||||||||||||||||
Tile Surfaces | 1 | LS | 233,849 | 233,849 | ||||||||||||||
#A-14 | Delete Petrified Wood | 1 | ALLOW | -88,600 | -88,600 | |||||||||||||
Tile at High Limit Back Bar | 100 | SF | 0 | |||||||||||||||
Antique Mirror Tiles at Back Bar | 56 | SF | 0 | |||||||||||||||
Deco Glass Panel at Back Bar | 33 | SF | 0 | |||||||||||||||
145,249 | 0 | |||||||||||||||||
Carpet / Wood Floor | 1 | LS | 48,062 | 48,062 | ||||||||||||||
Wood Floor | 1,215 | SF | 0 | |||||||||||||||
Carpet Install, F&I Pad | 417 | SY | 0 | |||||||||||||||
48,062 | 0 | |||||||||||||||||
Buffet | 0 | |||||||||||||||||
Wood Lay In Ceiling at Dining | 1,639 | SF | 34 | 54,907 | ||||||||||||||
0 |
26 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
Tile Surfaces | 1 | LS | 335,239 | 335,239 | ||||||||||||||
Wood Plank Tile at Serving Line Front | 543 | SF | 0 | |||||||||||||||
Wood Plank Tile at Entry Die Wall | 300 | SF | 0 | |||||||||||||||
Hand Paint Tile at Cookline (Per Marnell Budget) | 0 | |||||||||||||||||
#A-14 | Replace Accent Tile with $30/sf material | 1 | ALLOW | -40,000 | -40,000 | |||||||||||||
9’ Subway Tile at Cookline | 1,710 | SF | 0 | |||||||||||||||
Hand Painted Accent Tile at Cookline (10%) | 171 | SF | 0 | |||||||||||||||
Ceramic Tile with Metal Inlay at Servery | 1,675 | SF | 0 | |||||||||||||||
Ceramic Floor Tile | 2,395 | SF | 0 | |||||||||||||||
Wood Floor Tiles | 3,435 | SF | 0 | |||||||||||||||
Fireplace facade | 180 | SF | 46 | 8,280 | ||||||||||||||
#A-14 | Delete Fireplace Façade | 1 | ALLOW | -8,280 | -8,280 | |||||||||||||
0 | ||||||||||||||||||
Carpet Install, Wood Ceilings | 1 | LS | 93,562 | 93,562 | ||||||||||||||
Carpet Install, F&l Pad | 108 | SY | 0 | |||||||||||||||
Wood Plank Ceiling with Wood Battens at Dining A | 6,638 | SF | 0 | |||||||||||||||
#A-14 | Delete Wood Tile at Ceilings (in millwork) | 1 | ALLOW | -80,000 | -80,000 | |||||||||||||
443,708 | 0 | |||||||||||||||||
Feature Bar | 0 | |||||||||||||||||
Venetian Plaster at Walls | 648 | SF | 18 | 11,664 | ||||||||||||||
#A-19 | Delete Venetian Plaster at Walls | 1 | ALLOW | -11,664 | -11,664 | |||||||||||||
Venetian Plaster at Ceilings | 1,023 | SF | 18 | 18,414 | ||||||||||||||
0 | ||||||||||||||||||
GFRC Frame at Firebox | 15 | LF | 120 | 1,800 | ||||||||||||||
Decorative Glass Wall Panel | 44 | SF | 200 | 8,800 | ||||||||||||||
0 | ||||||||||||||||||
Tile Surfaces | 1 | LS | 18,631 | 18,631 | ||||||||||||||
Onxy Cladding at Fireplace (with above) | 104 | SF | 0 | |||||||||||||||
Porcelain Tile at Bar (with above) | 470 | SF | 0 | |||||||||||||||
Vinyl Plank Flooring at Stage | 200 | SF | 7 | 1,400 | ||||||||||||||
0 | ||||||||||||||||||
Carpet Install | 1 | LS | 5,575 | 5,575 | ||||||||||||||
Carpet Install, F&l Pad | 181 | SY | 0 | |||||||||||||||
0 | ||||||||||||||||||
Motorized Drop Down TV | 4 | EA | 2,500 | 10,000 | ||||||||||||||
Motorized Drop Down Projector | 1 | EA | 2,500 | 2,500 | ||||||||||||||
Motorized Drop Down Projector Screen | 1 | EA | 2,500 | 2,500 | ||||||||||||||
69,620 | 0 | |||||||||||||||||
Pre Function | 0 | |||||||||||||||||
Upgrade Framing at Stone Framed Openings (5#/sf) | 1.5 | TONS | 2,800 | 4,095 | ||||||||||||||
#A-14 | Delete Upgraded Framing at Stone Faced Openings | 1 | ALLOW | -4,095 | -4,095 | |||||||||||||
Stone Framed Openings at Portable Bars (2 openings) | 585 | SF | 80 | 46,800 | ||||||||||||||
Ceramic Tile | 3,886 | SF | 19 | 73,834 | ||||||||||||||
0 | ||||||||||||||||||
Carpet Install | 1 | LS | 47,124 | 47,124 | ||||||||||||||
Carpet Install, F&l Pad | 629 | SY | 0 | |||||||||||||||
167,758 | 0 |
27 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
Multi Purpose Room | 0 | |||||||||||||||||
USG Woodgrain Perferated Ceiling Tile | 8,380 | SF | 34 | 281,568 | ||||||||||||||
Carpet (with Pre -Function) | 1,392 | SY | 0 | |||||||||||||||
Stage Flooring | 500 | SF | 8 | 4,000 | ||||||||||||||
285,568 | 0 | |||||||||||||||||
VIP Lounge | 0 | |||||||||||||||||
Tile Surfaces | 1 | LS | 83,775 | 83,775 | ||||||||||||||
Tile at Bar Area (Or epoxy?) | 230 | SF | 0 | |||||||||||||||
Tile at Buffet Area | 190 | SF | 0 | |||||||||||||||
Marble Tile at Restroom Floor | 352 | SF | 0 | |||||||||||||||
Full Height Tile at Restroom Walls | 1,206 | SF | 0 | |||||||||||||||
0 | ||||||||||||||||||
Carpet / Wood Floor | 1 | LS | 35,554 | 35,554 | ||||||||||||||
Wood Flooring | 1,135 | SF | 0 | |||||||||||||||
Carpet Install, F&l Pad | 112 | SY | 0 | |||||||||||||||
119,329 | 0 | |||||||||||||||||
BOH Finishes | 0 | |||||||||||||||||
FRP at Kitchens (Full Height) | 280 | SF | 5.00 | 1,400 | ||||||||||||||
Washable Ceiling Tiles at Kitchen | 4,774 | SF | 3.00 | 14,322 | ||||||||||||||
0 | ||||||||||||||||||
Install Carpet (direct glue) | 1,467 | SY | 4.05 | 5,943 | ||||||||||||||
Vinyl Base | 9,920 | LF | 1.00 | 9,920 | ||||||||||||||
VCT | 23,090 | SF | 3.50 | 80,815 | ||||||||||||||
0 | ||||||||||||||||||
Tile Floor at BOH Restrooms / EDR | 3,298 | SF | 8.00 | 26,382 | ||||||||||||||
Wainscot Wall Tile at BOH Restrooms | 1,098 | SF | 12.00 | 13,176 | ||||||||||||||
0 | ||||||||||||||||||
Sealed Concrete | 6,991 | SF | 0.75 | 5,243 | ||||||||||||||
Epoxy Flooring at Kitchens | 4,774 | SF | 12.00 | 57,288 | ||||||||||||||
Epoxy at Buffet Serving Line | 2,234 | SF | 12.00 | 26,808 | ||||||||||||||
EpoxyFloor at Feature Back Bar | 240 | SF | 12.00 | 2,880 | ||||||||||||||
244,177 | 0 | |||||||||||||||||
0 | ||||||||||||||||||
Paint and Wallcovering BOH | 64,508 | GSF | 3.00 | 193,524 | ||||||||||||||
Paint and Wallcovering PUBLIC | 99,421 | GSF | 5.00 | 497,105 | ||||||||||||||
Special Finish at Table Game Ceiling | 10,000 | SF | 3.00 | 30,000 | ||||||||||||||
Paint Above Open Grid Ceiling | 19,200 | SF | 3.00 | 57,600 | ||||||||||||||
Upgrade Wallcovering Application at Ceiling (Gold Leaf Wallcovering) at Casino Entry | 3,906 | SF | 3.00 | 11,718 | ||||||||||||||
#A-2 | Paint Rooftop Mechanical Equipment where Privacy Screens were deleted | 8 | ALLOW | 5,000.00 | 40,0000 | |||||||||||||
829,947 | 0 | |||||||||||||||||
Final Clean | 163,929 | GSF | 0.35 | 57,375 | ||||||||||||||
57,375 | ||||||||||||||||||
0 |
28 of 93
FOH | 99,421 | |||
BOH | 64,508 | |||
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||
SBTL | Division 9 — Subtotal | 35.35 | 5,794,935 | |||||||||||||||
DIVISION 10 | ||||||||||||||||||
Raised Floor @ Lvl 77 Surveillance/ IT Rm | 3,790 | SF | 12.00 | 45,480 | ||||||||||||||
45,480 | 0 | |||||||||||||||||
Public Area Grab Bar- 36” | 10 | EA | 38.60 | 386 | ||||||||||||||
Public Area Grab Bar- 42” | 26 | EA | 42.48 | 1,104 | ||||||||||||||
Public Area Paper Towel/ Trash Receptacle | 10 | EA | 272.50 | 2,725 | ||||||||||||||
Public Area Sanitary Napkin Disp | 5 | EA | 381.50 | 1,908 | ||||||||||||||
Public Area Soap Dispenser | 56 | EA | 45.78 | 2.564 | ||||||||||||||
Public Area Toilet Paper Disp | 73 | EA | 49.05 | 3,581 | ||||||||||||||
Public Area Toilet Seat Cover Disp | 73 | EA | 207.10 | 15,118 | ||||||||||||||
Public Area Vanity Mirrors- FFE | 65 | EA | 0 | |||||||||||||||
BOH Grab Bar- 36” | 2 | EA | 38.60 | 77 | ||||||||||||||
BOH Grab Bar- 42” | 6 | EA | 42.48 | 255 | ||||||||||||||
BOH Janitor Accessories/ Mop Hook | 3 | EA | 54.50 | 164 | ||||||||||||||
BOH Paper Towel/ Trash Receptacle | 2 | EA | 272.50 | 545 | ||||||||||||||
BOH Sanitary Napkin Disp | 1 | EA | 381.50 | 382 | ||||||||||||||
BOH Soap Dispenser | 6 | EA | 45.78 | 275 | ||||||||||||||
BOH Toilet Paper Disp | 9 | EA | 49.05 | 441 | ||||||||||||||
BOH Toilet Seat Cover Disp | 9 | EA | 207.10 | 1,864 | ||||||||||||||
BOH Framed Mirrors | 6 | EA | 100.00 | 600 | ||||||||||||||
31,988 | ||||||||||||||||||
Toilet & Bath Accessories Installation | 362 | EA | 25.00 | 9,050 | ||||||||||||||
9,050 | ||||||||||||||||||
Public Area Toilet Compartments- ADA (with Millwork) | 10 | EA | 0 | |||||||||||||||
Public Area Toilet Compartments- Standard (with Millwork) | 63 | EA | 0 | |||||||||||||||
Public Area Urinal Screen (with Millwork) | 29 | EA | 0 | |||||||||||||||
0 | ||||||||||||||||||
BOH Toilet Compartments- ADA | 2 | EA | 1,600.00 | 3,200 | ||||||||||||||
BOH Toilet Compartments- Standard | 7 | EA | 1,500.00 | 10,500 | ||||||||||||||
BOH Urinal Screen | 2 | EA | 750.00 | 1,500 | ||||||||||||||
15,200 | 0 | |||||||||||||||||
Operable Partitions at MPR | 3,790 | SF | 35.00 | 132,650 | ||||||||||||||
132,650 | ||||||||||||||||||
0 | ||||||||||||||||||
Way Finding Graphics (Code Required) | 163,929 | GSF | 0.75 | 122,947 | ||||||||||||||
Specialty Signage (OFOI) | 0 | |||||||||||||||||
#A-24 | Delete Way Finding Graphics (Code Required) — OFOI | 1 | ALLOW | (122,947.00 | ) | -122,947 | ||||||||||||
0 | 0 | |||||||||||||||||
0 |
29 of 93
FOH | 99,421 | |
BOH | 64,508 | |
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
SBTL | Division 10 — Subtotal | 1.43 | 234,367 | |||||||||||||
DIVISION 11 EQUIPMENT | ||||||||||||||||
Fireplace at Buffet, Includes box and block | 1 | EA | 40,000 | 40,000 | ||||||||||||
#A-? | Delete FP at Buffet | 1 | ALLOW | -40,000 | -40,000 | |||||||||||
2 Sided Fireplace at Feature Bar, includes box and block | 1 | EA | 45,000 | 45,000 | ||||||||||||
VIP Lounge Fireplace -2 sided, includes box and block | 1 | EA | 45,000 | 70,624 | ||||||||||||
115,624 | ||||||||||||||||
Mecho Shades Buffet | 450 | SF | 10.00 | 4,500 | ||||||||||||
4,500 | ||||||||||||||||
Kitchen Equipment: Allowance | ||||||||||||||||
#A-33 | Kitchen Equipment | 1 | ALLOW | 971,850.00 | 971,850 | |||||||||||
#A-33 | Beverage Conduit | 1,000 | LF | 80.00 | 80,000 | |||||||||||
1,051,850 | ||||||||||||||||
MPR Platform | 1,100 | SF | 75.00 | 82,500 | ||||||||||||
82,500 | ||||||||||||||||
Service Dock Equipment | 1 | ALLOW | 50,000.00 | 50,000 | ||||||||||||
#A-31 | Delete Service Dock Equip | 1 | ALLOW | (50,000.00 | ) | -50,000 | ||||||||||
0 | ||||||||||||||||
Division 11 — Subtotal | 7.65 | 1,254,474 | ||||||||||||||
DIVISION 12 FURNISHINGS | ||||||||||||||||
Furnishings: OFOI | ||||||||||||||||
SBTL | Division 12 — Subtotal | — | 0 | |||||||||||||
DIVISION 13 SPECIAL CONSTRUCTION | ||||||||||||||||
Marine Work | ||||||||||||||||
MPR: Sound Attenuation Blankets | 13,031 | SF | 7.50 | 97,733 | ||||||||||||
97,733 | ||||||||||||||||
Vessel Special Construction | ||||||||||||||||
Pilot House (W/ Finishes) | 1 | LS | — | 0 | ||||||||||||
Smoke Stacks | 2 | EA | 5,000.00 | 10,000 | ||||||||||||
10,000 | ||||||||||||||||
Vessel Truss Access Hatches | 12 | EA | 2,500.00 | 30,000 | ||||||||||||
30,000 | ||||||||||||||||
Theatrical Lighting & Trusses: OFOI | ||||||||||||||||
SBTL | Division 13 — Subtotal | 0.84 | 137,733 | |||||||||||||
DIVISION 14 | ||||||||||||||||
Conveying Systems: Passenger — CP-2/CP-3/CP-4 | 1 | LS | 388,184.00 | 388,184 | ||||||||||||
#A-41 | Conveying Systems: Passenger Cab Finishes | 3 | ALLOW | 15,000.00 | 45,000 | |||||||||||
Conveying Systems: Freight — DS-1 | 1 | LS | 138,368.00 | 138,368 | ||||||||||||
Escalator — W/Bridge | 0 | RISERS | 3,500.00 | 0 | ||||||||||||
571,552 |
30 of 93
FOH | 99,421 | |
BOH | 64,508 | |
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Interior Elevator Operator | 13 | WK | 1,500.00 | 19,485 | ||||||||||||
#A-40 | Hoistway Working Platforms | 4 | ALLOW | 2,500.00 | 10,000 | |||||||||||
29,485 | ||||||||||||||||
SBTL | Division 14 — Subtotal | 3.67 | 601,037 | |||||||||||||
DIVISION 15 | ||||||||||||||||
Mechanical Systems — GMP | 1 | LS | 9,291,860.00 | 9,291,860 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 139,377.90 | 139,378 | ||||||||||||
#A-49 | HVAC Exhaust/Supply Requirement changes for Vessel Support/Generators | 1 | ALLOW | (50,000.00 | ) | -50,000 | ||||||||||
#A-48 | Modify hot water design scheme to incorporate a single 140 degree hot water loop with local point of use water mixing valves to provide 120 degree domestic hot water | 1 | ALLOW | (25,000.00 | ) | -50,000 | ||||||||||
Mechanical Systems: L1 | Incl. Above | w/ Mech GMP | ||||||||||||||
Mechanical Systems: L2 Shell | Incl. Above | w/ Mech GMP | ||||||||||||||
Mechanical Tie -In’s: CW/CHR/SS/Domestic | Incl. Above | w/ Mech GMP | ||||||||||||||
Supply Fans, Exhaust Piping — Vessel Support | w/ Mech GMP | |||||||||||||||
9,331,238 | 56.92 | |||||||||||||||
Fire Protection | 163,929 | SF | 2.87 | 470,476 | ||||||||||||
470,476 | 0 | |||||||||||||||
Fuel Lines to Generators (per LPA) | 415 | LF | w/ Mech GMP | |||||||||||||
Pump Platform — Pumps & Pump Piping (NONE) | 0 | |||||||||||||||
#A-46 | Pump Platform- Sanitary /Grease Pits & Pumps (in truss areas) | 1 | ALLOW | 170,000.00 | 170,000 | |||||||||||
Change (4) sanitary lift station tanks to fiberglass in lieu of Highland (as specified) | ||||||||||||||||
170,000 | ||||||||||||||||
BAS | 163,503 | SF | w/ Mech GMP | |||||||||||||
SBTL | Division 15 — Subtotal | 60.83 | 9,971,714 | |||||||||||||
DIVISION 16 | ||||||||||||||||
Electrical GMP | 1 | LS | 5,993,743.00 | 5,993,743 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 89,906.15 | 89,906 | ||||||||||||
#A-53 | Reduce Light Fixture Package by Providing Alternate Fixture Manufactures | 1 | ALLOW | (650,000.00 | ) | -650,000 | ||||||||||
Electrical | 163,929 | SF | w/ Elect. GMP | |||||||||||||
Electrical: L2 Shell | w/ Elect. GMP | |||||||||||||||
Pump Platform Electrical | w/ Mech. AL | |||||||||||||||
Primary/Secondary Duct Bank: In Site | 0 | |||||||||||||||
Communication Duct Bank: In Site | 0 | |||||||||||||||
Temp Power for Construction | 1 | LS | w/ Elect. GMP | |||||||||||||
UPS: 25 KVA & 50 KVA | 1 | LS | w/ Elect. GMP | |||||||||||||
Vessel Support — (Sheet NA E11) Previously with LPA budget | 1 | LS | w/ Elect. GMP | |||||||||||||
(2) 910 kw Generators | 1 | LS | w/ Elect. GMP | |||||||||||||
(1) 400 kw Generator | 1 | LS | w/ Elect. GMP | |||||||||||||
Fuel Tanks and Fuel | 1 | LS | w/ Elect. GMP | |||||||||||||
Paralleling Switchgear | 1 | LS | w/ Elect. GMP | |||||||||||||
Switchboard CBH | 1 | LS | w/ Elect. GMP |
31 of 93
FOH | 99,421 | |
BOH | 64,508 | |
GSF | 163,929 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Installation of Vessel Support Equipment | 1 | LS | w/ Elect. GMP | |||||||||||||
Barge Lighting | 1 | LS | w/ Elect. GMP | |||||||||||||
5,433,649 | 33.15 | |||||||||||||||
Fire Alarm | 163,929 | SF | w/ Elect. GMP | |||||||||||||
w/ Elect. GMP | ||||||||||||||||
Specialty Lighting: Casino Public Areas | 99,421 | SF | 10.00 | 994,210 | ||||||||||||
#A-55 | Reduce Specialty Lighting — ALLOWANCE | 1 | ALLOW | (497,105.00 | ) | -497,105 | ||||||||||
Dimming System at MPR (with above) | ||||||||||||||||
497,105 | ||||||||||||||||
Low Voltage: Allowance | ||||||||||||||||
#A-59 | Casino Surveillance/Security: No Equipment | 163,929 | SF | 15.00 | 2,458,935 | |||||||||||
FOH & BOH Surv./Security: No Equipment | 0 | SF | 5.00 | 0 | ||||||||||||
Cameras (OFCI) | ||||||||||||||||
2,458,935 | ||||||||||||||||
#A-57 | Communication/Data: No Devices/Equipment | 163,929 | SF | 2.50 | 409,823 | |||||||||||
409,823 | ||||||||||||||||
#A-58 | AV/Sound | 163.929 | SF | 2.00 | 327,858 | |||||||||||
(MPR Theatrical Sound System: OFOl) | ||||||||||||||||
327,858 | ||||||||||||||||
SBTL | Division 16 — Subtotal | 55.68 | 9,127,370 | |||||||||||||
TOTAL COST | 256.45 | 42,038,925 | ||||||||||||||
Cost of Work Subtotal | $ | 42,038,925 | ||||||||||||||
Sub Guard @ 1.25% | $ | 525,487 | ||||||||||||||
General Conditions (5.25%) | $ | 2,180,223 | ||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 82,119 | ||||||||||||||
Building Permit (ABS, No City Inspection Rq’d) | ||||||||||||||||
General Liability Insurance ( Cost of Work times .008) | $ | 336,311 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond 4 City Bond (Cost of Work times .0002) | $ | 3,408 | ||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 45,171,473 | ||||||||||||||
MCC Fee @ 3.25% | $ | 1,468,073 | ||||||||||||||
Project Total | $ | 46,639,546 | ||||||||||||||
MCC Contingency @ 4% times Cost of Work | 4.00 | % | $ | 1,631,557 | ||||||||||||
Area Total | $ | 48,321,103 | ||||||||||||||
$/SF | 294.77 |
32 of 93
Manhattan Construction Company
BATON ROUGE CASINO PRECAST GARAGE
GSF | 311,207.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
DIVISION 2 | ||||||||||||||||
Test Pile Program (split hotel/garage/low rise) — drive /mobilization | 1 | LS | 81,298.00 | 81,298 | ||||||||||||
Temp Roads for Test Pile Program | 1 | LS | 25,000.00 | 25,000 | ||||||||||||
0 | ||||||||||||||||
Auger Cast Piles (18” x 120’) | 43.360 | LF | 26.25 | 1,269,450 | ||||||||||||
Pile Mobilization: In & Out | 1 | EA | 86,000.00 | 86,000 | ||||||||||||
Unforeseen Subsurface Condition — Stump/Log | 1 | EA | 23,304.00 | 23,304 | ||||||||||||
1,485,052 | 0 | |||||||||||||||
Geofoam at Garage ((No Suggestions) system, seal slab with SITEWORK) | 2,500 | SF | 0 | |||||||||||||
0 | ||||||||||||||||
Site Utilities: See Sitework Budget | 0 | |||||||||||||||
Structural Excavation & Backfill | W/ Div 3 Concrete | |||||||||||||||
Excavate/Haul 1’ at footprint to use standard forms | 4,978 | CY | 8.00 | 39,827 | ||||||||||||
Backfill at Foundations | 1 | LS | 25,000.00 | 25,000 | ||||||||||||
64,827 | ||||||||||||||||
SBTL | Division 2 — Subtotal | 4.98 | 1,549,879 | |||||||||||||
DIVISION 3 | ||||||||||||||||
Form, Pump Place Finish (to Bottom of Slab) | 0 | |||||||||||||||
Concrete: Pile Caps & Footings, Beams, Seal Slab | 129 | EA | 3,535.00 | 456,015 | ||||||||||||
Additional Mobilization | 1 | EA | 6,500.00 | 6,500 | ||||||||||||
6,500 | 0 | |||||||||||||||
Level 1 Form Place & Finish | 0 | |||||||||||||||
Concrete: F/P/P/F PG L1 Structural Slab | 101,065 | SF | 6.08 | 614,475 | ||||||||||||
614,475 | 0 | |||||||||||||||
Pump Place Finish Topping Slab | 0 | |||||||||||||||
Concrete: Precast 4” Topping Slab | 203,720 | SF | 1.62 | 330,026 | ||||||||||||
330,026 | ||||||||||||||||
�� | ||||||||||||||||
Tape Double T Joints | 203,720 | SF | 0.10 | 20,372 | ||||||||||||
Topping Slab Ramp Edge Forms | 740 | LF | 5.49 | 4,063 | ||||||||||||
Topping Slab CJ/Bulkheads | 1,440 | LF | 4.83 | 6,948 | ||||||||||||
Topping Slab: Saw Cut Joints: 3/8” x 1” | 13,180 | LF | 0.75 | 13,635 | ||||||||||||
45,018 | 0 | |||||||||||||||
0 | ||||||||||||||||
Concrete: Structural Walls | 5,937 | SF | 18.30 | 108,647 | ||||||||||||
0 | ||||||||||||||||
Perimeter Wall at Crawl Space | 6,600 | SF | 22.00 | 145,200 | ||||||||||||
145,200 |
33 of 93
GSF | 311,207.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Concrete: Curbs/Pads | 1 | LS | 19,300.00 | 19,300 | ||||||||||||
19,300 | ||||||||||||||||
Concrete: Pan Stair Infill (SW Only) | 484 | SF | 6.50 | 3,147 | ||||||||||||
3,147 | ||||||||||||||||
Concrete: Slab on Metal Deck at Elev Tower | 3,780 | SF | 1.25 | 4,725 | ||||||||||||
4,725 | 0 | |||||||||||||||
Ready Mix Material | 0 | |||||||||||||||
Pile Caps (5000 psi) | 1,916 | CY | 99.19 | 190,048 | ||||||||||||
Mud Slab (2500 psi) | 1,373 | CY | 87.20 | 119,726 | ||||||||||||
Walls (5000 psi) | 175 | CY | 97.01 | 16,977 | ||||||||||||
Interior Grade Beams (5000 psi) | 693 | CY | 97.01 | 67,228 | ||||||||||||
Supported Slab (Level 1) | 4,349 | CY | 116.63 | 507,224 | ||||||||||||
Topping Slabs (4500 psi) | 2,392 | CY | 99.19 | 286,857 | ||||||||||||
Pan Filled Stairs | 7 | CY | 99.19 | 694 | ||||||||||||
Slab on Metal Deck at Elev Tower | 90 | CY | 112.27 | 10,104 | ||||||||||||
0 | ||||||||||||||||
Place Embeds: Assumed Quantity @ Shear Walls | 130 | EA | 26.60 | 3,458 | ||||||||||||
Place Anchor Bolts: PC Columns / Roof LP Bases | 99 | SETS | 111.72 | 11,060 | ||||||||||||
14,518 | ||||||||||||||||
0 | ||||||||||||||||
Reinforcing Steel Materials (Bars) (No Shearwalls) | 501 | TN | 763.00 | 382,263 | ||||||||||||
Reinforcing Steel Materials (Bars) (Shearwalls) | 19 | TN | 763.00 | 14,497 | ||||||||||||
Formsaver Material | 230 | EA | 14.17 | 3,259 | ||||||||||||
Reinforcing Steel Installation (Bars) | 520 | TN | 295.00 | 153,400 | ||||||||||||
Reinforcing Steel Materials (Mesh) | 2,520 | SQS | 116.09 | 292,534 | ||||||||||||
Reinforcing Steel Installation (Mesh) | 2,520 | SQS | 11.00 | 27,720 | ||||||||||||
Formsaver Installation | 230 | EA | 10.00 | 2,300 | ||||||||||||
875,973 | 0 | |||||||||||||||
Precast Garage (Material) | 1 | LS | 1,991,866.00 | 1,991,866 | ||||||||||||
Precast Stairs (Material) | 1 | LS | 21,809.00 | 21,809 | ||||||||||||
Precast Shearwalls (Material) Cast in Place | LS | 93,595.00 | 0 | |||||||||||||
Precast Garage (Erection) | 1 | LS | 390,328.00 | 390,328 | ||||||||||||
Precast Stairs (Erection) | 1 | LS | 6,000.00 | 6,000 | ||||||||||||
Precast Shearwalls (Erection) Cast in Place | LS | 10,000.00 | 0 | |||||||||||||
Precast Double T Garage (338 Pcs) | 195,164 | SF | 0 | |||||||||||||
Precast Spandrels (95 Pcs) | 18,390 | SF | 0 | |||||||||||||
Precast Columns (80 Pcs) | 2,320 | SF | 0 | |||||||||||||
Precast Beams (128 Pcs) | 3,361 | SF | 0 | |||||||||||||
2,410,003 | 12.35 | 0 | ||||||||||||||
MAE Design Fee for CIP Shearwall to Precast | 1 | LS | 10,000.00 | 10,000 | ||||||||||||
10,000 |
34 of 93
GSF | 311,207.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Hoisting (with Precast) | 0 | |||||||||||||||
Safety Handrails | LS | 0 | ||||||||||||||
Engineering / Layout | LS | 0 | ||||||||||||||
Lull | LS | 0 | ||||||||||||||
Crawler Crane Timber Mats | EA | 0 | ||||||||||||||
0 | 0 | |||||||||||||||
SBTL | Division 3 — Subtotal | 20.06 | 6,242,406 | |||||||||||||
DIVISION 4 | ||||||||||||||||
Masonry (Misc. Electrical & Equipment) | 1,764 | SF | 12.00 | 21,168 | ||||||||||||
Full Ht Wall at Level 1 Ramp | 2,028 | SF | 12.00 | 24,336 | ||||||||||||
45,504 | 0 | |||||||||||||||
CMU Reinforcing Steel | 2 | TON | 763.00 | 1,526 | ||||||||||||
1,526 | ||||||||||||||||
SBTL | Division 4 — Subtotal | 0.15 | 47,030 | |||||||||||||
DIVISION 5 | ||||||||||||||||
Misc. Metals(Assumed .10#/sf) | 311,207 | GSF | 0.53 | 165,690 | ||||||||||||
Delete East Stair #G2 & #G3 (Keep Rails) — See Precast | 83 | RISERS | -300.00 | -24,900 | ||||||||||||
Elevator Stair G1 (with above) | 83 | RISERS | W/ Above | |||||||||||||
Bollards | 30 | EA | W/ Above | |||||||||||||
Elevator Guide Rails/Support Framing | W/ Above | |||||||||||||||
CMU Supports | W/ Above | |||||||||||||||
Structural Steel Framing & Metal Floor / Roof Deck at Elevator / Stair #G1 Connector Tower | 76 | TONS | 3,552.63 | 270,000 | ||||||||||||
Structural Steel Framing at Stair Tower #G2 & #G3 Canopy (8#/SF) | 2 | TONS | 4,500.00 | 8,640 | ||||||||||||
Stair Tower #G2 & #G3 Canopy Roof Metal Deck | 400 | SF | 4.50 | 1,800 | ||||||||||||
421,230 | ||||||||||||||||
Chain with Eye Hooks at Level 1 | 330 | LF | 5.00 | 1,650 | ||||||||||||
1,650 | ||||||||||||||||
0 | ||||||||||||||||
Speed Ramp Barrier Cable Rails: FOB (11 EA Side) | 13,000 | LF | 1.45 | 18,850 | ||||||||||||
Speed Ramp Barrier Cable Rails: Install | 6,500 | LBS | 0.50 | 3,250 | ||||||||||||
22,100 | ||||||||||||||||
0 | ||||||||||||||||
SBTL | Division 5 — Subtotal | 1.43 | 444,980 | |||||||||||||
DIVISION 6 | ||||||||||||||||
Millwork at Level 4 Elevator Lobby | 880 | SF | 30.00 | 26,400 | ||||||||||||
26,400 | ||||||||||||||||
�� | ||||||||||||||||
SBTL | Division 6 — Subtotal | 0.08 | 26,400 | |||||||||||||
DIVISION 7 | ||||||||||||||||
Moisture Control and Caulking | 311,207 | GSF | 0.15 | Incl. Below | ||||||||||||
Traffic Coating above Electrical Rooms | 1 | LS | 5,975.00 | 5,975 | ||||||||||||
Traffic Coating at Top Deck | 0 | LS | 0 | |||||||||||||
Joint Sealants — Pre-Cast, CMU, Concrete Joints | 1 | LS | 61,815.00 | 61,815 | ||||||||||||
Bentonite @ Elevator Pit Walls | 1 | LS | 3,915.00 | 3,915 | ||||||||||||
TPO Roofing at Elev / Stair Towers | 2,650 | SF | 15.00 | 39,750 | ||||||||||||
TPO Roofing at East Stair Towers/Gutters/DS | 400 | SF | 24.00 | 9,600 | ||||||||||||
121,055 |
35 of 93
GSF | 311,207.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Membrane Waterproofing/Flashing at Elevator Tower (at EIFS) | 1 | LS | W/ EIFS | |||||||||||||
Joint Sealants @ Glazing Perimeter (w/ Glass) | 600 | LF | 0 | |||||||||||||
Elevator Tower ElFS | 7,236 | SF | 12.50 | 90,450 | ||||||||||||
EIFS at Shear Walls (Exterior Only) | 2,160 | SF | 12.00 | 25,920 | ||||||||||||
116,370 | ||||||||||||||||
EJ1 (Floor Joint- Lvl 1 Elev Lobby to Garage) | 22 | LF | 150.00 | 3,300 | ||||||||||||
EJ1-FR (Floor Joint- Lvl 2/3 Elev Lobby to Garage) | 44 | LF | 150.00 | 6,600 | ||||||||||||
EJ3 (Floor Joint- Lvl 1 Elev Lobby to Garage) | 50 | LF | 150.00 | 7,500 | ||||||||||||
EJ3-FR (Floor Joint- Lvl 2/3 Elev Lobby to Garage) | 140 | LF | 150.00 | 21,000 | ||||||||||||
EJ14 (Traffic Cover @ Paving) | 85 | LF | 150.00 | 12,750 | ||||||||||||
ED5-FR (Vertical @ Interior) | 240 | LF | 150.00 | 36,000 | ||||||||||||
ED6-FR (Vertical @ Exterior) | 360 | LF | 150.00 | 54,000 | ||||||||||||
EJ @ Roof w/ Roofing | 0 | |||||||||||||||
141,150 | 0 | |||||||||||||||
Fireproofing at Elevator Tower | 3,096 | SF | 2.00 | 6,192 | ||||||||||||
6,192 | ||||||||||||||||
SBTL | Division 7 — Subtotal | 1.22 | 378,575 | |||||||||||||
DIVISION 8 | ||||||||||||||||
Hollow Metal Frames: 6o 7o Interior | 1 | EA | 100.28 | 100 | ||||||||||||
Hollow Metal Frames: 3o 7o Exterior | 7 | EA | 95.92 | 671 | ||||||||||||
Hollow Metal Frames: 6o 7o Exterior | 3 | EA | 100.28 | 301 | ||||||||||||
11 | ||||||||||||||||
Hollow Metal Doors: 6o 7o PR Interior | 2 | LVS | 231.08 | 462 | ||||||||||||
Hollow Metal Doors: 3o 7o Exterior | 7 | LVS | 231.08 | 1,618 | ||||||||||||
Hollow Metal Doors: 6o 7o PR Exterior | 6 | LVS | 231.08 | 1,386 | ||||||||||||
4,539 | 15 | |||||||||||||||
Unload/Distribute HM Frames & Doors | 26 | LVS | 17.00 | 442 | ||||||||||||
Hang HM Doors | 26 | LVS | 65.00 | 1,690 | ||||||||||||
2,132 | ||||||||||||||||
Hardware | 15 | EA | 286.17 | 4,293 | ||||||||||||
Install Hardware | 15 | EA | 150.00 | 2,250 | ||||||||||||
6,543 | ||||||||||||||||
Exterior Storefront @ Elevator Tower | 2.118 | SF | 60.00 | 127,080 | ||||||||||||
Storefront Doors | EA | 3,500.00 | 0 | |||||||||||||
127,080 | ||||||||||||||||
0 | ||||||||||||||||
SBTL | Division 8 — Subtotal | 0.45 | 140,293 | |||||||||||||
DIVISION 9 | ||||||||||||||||
Exterior Framing at EIFS | 7,236 | SF | 12.00 | 86,832 | ||||||||||||
86,832 | ||||||||||||||||
Finishes: Power Wash & Paint Bottom of Structure | 311,207 | SF | 0.80 | 248,966 | ||||||||||||
Finishes: Paint Precast Spandrels | 19,500 | SF | 1.50 | 29,250 | ||||||||||||
278,216 |
36 of 93
GSF 311,207.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Finishes: Elevator Lobbies | 3,096 | SF | 30.00 | 92,880 | ||||||||||||
Paint Elevator Lobbies | 3,096 | SF | 3.00 | 9,288 | ||||||||||||
102,168 | ||||||||||||||||
Finishes: Paint Striping | 311,207 | GSF | 0.05 | 15,560 | ||||||||||||
15,560 | ||||||||||||||||
SBTL | Division 9 — Subtotal | 1.55 | 482,776 | |||||||||||||
DIVISION 10 | ||||||||||||||||
Specialties | 311,207 | GSF | 0.05 | 15,560 | ||||||||||||
15,560 | ||||||||||||||||
Wayfinding and Graphics (code required) | 311,207 | GSF | 0.20 | 62,241 | ||||||||||||
#A-25 | Delete Wayfinding and Graphics (code required) OFOI | 1 | ALLOW | -62,241.00 | -62,241 | |||||||||||
0 | ||||||||||||||||
SBTL | Division 10 — Subtotal | 0.25 | 77,802 | |||||||||||||
DIVISION 11 | ||||||||||||||||
Equipment (Parking Control) | 0 | |||||||||||||||
SBTL | Division 11 — Subtotal | — | 0 | |||||||||||||
DIVISION 12 | ||||||||||||||||
Furnishings | 0 | |||||||||||||||
SBTL | Division 12 — Subtotal | — | 0 | |||||||||||||
DIVISION 13 | ||||||||||||||||
Special Construction: Elevator Lobby Enclosure | 0 | |||||||||||||||
SBTL | Division 13 — Subtotal | — | 0 | |||||||||||||
DIVISION 14 | ||||||||||||||||
Conveying Systems: 4 Passenger (4 stops EA) | 1 | LS | 647,323.00 | 647,323 | ||||||||||||
647,323 | ||||||||||||||||
#A-43 | Conveying Systems: Passenger Cabs Finish | 4 | ALLOW | 15,000.00 | 60,000 | |||||||||||
60,000 | ||||||||||||||||
#A-40 | Hoistway Working Platforms | 2 | ALLOW | 2,500.00 | 5,000 | |||||||||||
5,000 | ||||||||||||||||
SBTL | Division 14 — Subtotal | 2.27 | 707,323 | |||||||||||||
DIVISION 15 | ||||||||||||||||
Plumbing at Garage: Drains & Hose Bibs | 311,207 | SF | w/ Mech GMP | |||||||||||||
HVAC at Garage: Open Air PG | 311,207 | SF | w/ Mech GMP | |||||||||||||
Mechanical GMP | 1 | LS | 331,008.00 | 331,008 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 3,310.08 | 3,310 | ||||||||||||
331,008 | ||||||||||||||||
Fire Protection: Standpipe Only | 311,207 | SF | 0.17 | 52,905 | ||||||||||||
52,905 | ||||||||||||||||
SBTL | Division 15 — Subtotal | 1.24 | 387,223 |
37 of 93
GSF 311,207.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
DIVISION 16 | ||||||||||||||||
Electrical GMP | 1 | LS | 793,804.00 | 793,804 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 7,938.04 | 7,938 | ||||||||||||
Electrical (No Sound or Specialty Lighting) | 311,207 | SF | w/ Elect. GMP | |||||||||||||
Electrical: Fire Alarm (Lobby Only — Not Required) | 311,207 | SF | w/ Elect. GMP | |||||||||||||
801,742 | ||||||||||||||||
Low Voltage: Allowance | ||||||||||||||||
#A-59 | PG: Security & Surveillance — Devices OFCI | 311,207 | SF | 0.25 | 77,802 | |||||||||||
#A-59 | PG Elev Lobby: Security & Surveillance | 3,096 | SF | 4.00 | 12,384 | |||||||||||
90,186 | ||||||||||||||||
#A-57 | PG Elev Lobby Comm./Data: No Devices/Equip. | 3,096 | SF | 2.00 | 6,192 | |||||||||||
6,192 | ||||||||||||||||
#A-58 | PG Elev. Lobby: AV/ Sound | 3,096 | SF | 2.00 | 6,192 | |||||||||||
6,192 | ||||||||||||||||
SBTL | Division 16 — Subtotal | 2.91 | 904,312 | |||||||||||||
TOTAL COST | 36.51 | 11,363,475 | ||||||||||||||
Cost of Work Subtotal | $ | 11,363,475 | ||||||||||||||
Sub Guard @ 1.25 % | $ | 142,043 | ||||||||||||||
General Conditions (5.25%) | $ | 589,523 | ||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 26,109 | ||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 25,000 | ||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 90,908 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond&City Bond (Cost of Work times .0002) | $ | 2,273 | ||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 12,239,330 | ||||||||||||||
MCC Fee @ 3.25% | $ | 397,778 | ||||||||||||||
Project Total | $ | 12,637,109 | ||||||||||||||
MCC Contingency @ 4% times Cost of Work | 4.00 | % | $ | 454,539 | ||||||||||||
Area Total | $ | 13,091,648 | ||||||||||||||
$/SF | 42.07 |
38 of 93
Manhattan Construction Company
BATON ROUGE HOTEL
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Division 2 — Sitework: | ||||||||||||||||
Earthwork | ||||||||||||||||
Test Pile Program (split hotel/garage/low rise) — drive /mobilization | 1 | LS | 81,298.00 | 81,298 | ||||||||||||
Temp Roads for Test Pile Program | 1 | LS | 25,000.00 | 25,000 | ||||||||||||
Pile Inspections, Oversight, Testing (By Owner) | ||||||||||||||||
Test Pile Program — material | ||||||||||||||||
18” Auger Cast Piles at Hotel (18”x120’) | 40,440 | LF | 28.40 | 1,148,496 | ||||||||||||
Piles at Stair Towers (6 piles each x 120’) (With Above) | 1,440 | LF | ||||||||||||||
Mobilization: In/Out — | 1 | LS | 86,000.00 | 86,000 | ||||||||||||
1,340,794 | ||||||||||||||||
Work Stoppage due to ACOE MOD Approval: Crew & Equipment Standby Time 1/26/2011 through 2/08/2011 | 1 | LS | 199,672.00 | 199,672 | ||||||||||||
Work Stoppage due to ACOE MOD Approval: Relocate Crane & Crew Standby Time - 03/04/11 thru 03/18/11 | 1 | LS | 167,411.00 | 167,411 | ||||||||||||
Work Stoppage due to ACOE MOD Approval: Equipment Only Standby Time - 3/04/11 thru 06/15/11 | 1 | LS | 232,256.00 | 232,256 | ||||||||||||
Work Stoppage due to ACOE MOD Approval: QAQC MANDATED Equipment Upgrade Installation | 1 | LS | 12,500.00 | 12,500 | ||||||||||||
Work Stoppage due to ACOE MOD Approval: QAQC MANDATED Equipment Upgrade Rental Only — 04/20/11 thru 6/23/11 | 1 | LS | 13,000.00 | 13,000 | ||||||||||||
Work Stoppage due to ACOE MOD Approval: QAQC MANDATED Equipment Upgrade Technician During Hotel Pile Completion Only — 06/16/11 thru 6/23/11 | 1 | LS | 6,300.00 | 6,300 | ||||||||||||
631,139 | 0 | |||||||||||||||
Field Engineering/Layout — | 1 | LS | ||||||||||||||
0 | ||||||||||||||||
Backfill at foundations (with Levee improvement) | 1 | LS | 0 | |||||||||||||
0 | 0 | |||||||||||||||
0 | ||||||||||||||||
SBTL | Division 2 — Subtotal | 10.00 | 1,971,933 | |||||||||||||
Division 3 — Concrete: | ||||||||||||||||
Concrete Foundations | ||||||||||||||||
Concrete Frame Foundations (caps/plinths) | 27 | EA | 12,287.00 | 331,749 | ||||||||||||
Additional Mobilization | 1 | EA | 6,500.00 | 6,500 | ||||||||||||
Concrete Frame Pan Filled Stairs | 7,025 | SF | 6.50 | 45,663 | ||||||||||||
Mud Slab at Hotel (with Foundations) | 12,800 | SF | 0 | |||||||||||||
Perimeter Wall at Crawl Space | 3,000 | SF | 22.00 | 66,000 | ||||||||||||
449,912 | 0 |
39 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Concrete Frame | 1 | LS | ||||||||||||||
Form, Pump Place and Finish Concrete Frame through ASI #18 | 183,400 | SF | W/ Above | |||||||||||||
1,673,048 | ||||||||||||||||
Delay Concrete Frame Start Date Due to River Rising (with above) | 1 | LS | 25,000.00 | 25,000 | ||||||||||||
25,000 | ||||||||||||||||
Reinforcing Steel Materials (Bars) | 822 | TN | 763.00 | 627,186 | ||||||||||||
PT Back Up Bars | 22 | TN | 763.00 | 16,786 | ||||||||||||
Formsaver Material | 350 | EA | 19.62 | 6,867 | ||||||||||||
650,839 | ||||||||||||||||
Post Tension Material | 83,000 | LBS | 1.04 | 85,947 | ||||||||||||
Post Tension Material ASI 18 | 1,300 | LBS | 1.04 | 1,346 | ||||||||||||
Stud Rails at Columns | 74 | EA | 16.90 | 1,250 | ||||||||||||
Stud Rails at Columns ASI 18 | 107 | EA | 16.90 | 1,808 | ||||||||||||
90,351 | ||||||||||||||||
Reinforcing Steel Labor (Bars) | 844 | TN | 295.00 | 248,980 | ||||||||||||
Reinforcing Steel Labor (Stud Rails) | 74 | EA | 17.00 | 1,258 | ||||||||||||
Formsaver Labor | 350 | EA | 10.00 | 3,500 | ||||||||||||
Post Tension Labor | 83,000 | LBS | 0.46 | 38,180 | ||||||||||||
291,918 | ||||||||||||||||
Ready Mix Material | ||||||||||||||||
Pile Caps | 2,532 | CY | 99.19 | 251,149 | ||||||||||||
Grade Beams | 41 | CY | 97.01 | 3,977 | ||||||||||||
Plinths | 18 | CY | 99.19 | 1,785 | ||||||||||||
Columns (5000 psi) | 508 | CY | 94.83 | 48,174 | ||||||||||||
Columns (7000 psi) | 377 | CY | 103.55 | 39,038 | ||||||||||||
Walls (5000 psi) | 999 | CY | 94.83 | 94,735 | ||||||||||||
Walls (7000 psi) | 911 | CY | 103.55 | 94,334 | ||||||||||||
Supported Slabs (PT) | 3,128 | CY | 116.63 | 364,819 | ||||||||||||
Supported Slabs (Conventional Reinforcing) | 2,712 | CY | 94.83 | 257,179 | ||||||||||||
Pan Filled Stairs | 51 | CY | 99.19 | 5,059 | ||||||||||||
Mud Slab | 186 | CY | 87.20 | 16,219 | ||||||||||||
1,176,469 | ||||||||||||||||
Install Embeds & Inserts: Assumed Quantity | 300 | EA | 35.00 | 10,500 | ||||||||||||
Install Curtainwall Halfen Inserts | 310 | EA | 16.00 | 4,960 | ||||||||||||
15,460 | ||||||||||||||||
Crane #3— Liebherr 630 | 6 | MO | 24,500.00 | 147,000 | ||||||||||||
Crane Foundation: F/P/P/F | 1 | EA | 40,350.00 | 40,350 | ||||||||||||
Crane #— Liebherr 420 | 5 | MO | 18,600.00 | 93,000 | ||||||||||||
Crane Foundation: F/P/P/F | 1 | EA | 40,350.00 | 40,350 | ||||||||||||
Crane Operators | 47 | WK | 3,800.00 | 178,600 | ||||||||||||
Personnel Hoist (includes operator) | 7 | MO | 30,000,00 | 210,000 | ||||||||||||
Lull Rent | 6 | MO | 2,600.00 | 15,600 | ||||||||||||
Lull Fuel & Maint | 6 | MO | 1,000.00 | 6,000 | ||||||||||||
Lull Operator | 25 | WKS | 3,800.00 | 95,000 | ||||||||||||
825,900 | 0 |
40 of 93
Keys 206
GSF | 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Concrete Testing | 0 | |||||||||||||||
Material Testing Services/Inspection (By Owner) | 0 | |||||||||||||||
SBTL | Division 3 — Subtotal | 26.37 | 5,198,896 | |||||||||||||
Division 4 — Masonry: | ||||||||||||||||
Brick at Exterior Below Service Level (DELETED) | 4,100 | SF | 0 | |||||||||||||
CMU Infill at East Hotel Elevation, Level 2 | 3,240 | SF | 14.00 | 45,360 | ||||||||||||
45,360 | 0 | |||||||||||||||
CMU Reinforcing Steel | 4 | TN | 763.00 | 3,052 | ||||||||||||
3,052 | ||||||||||||||||
Granite tops at Public Restrooms (with Millwork) | 56 | SF | 0 | |||||||||||||
Granite tops at Front Desk (with Millwork) | 90 | SF | 0 | |||||||||||||
0 | ||||||||||||||||
Granite Tops at Typical, ADA, Extended Guestroom (with millwork) | 1,760 | SF | 0 | |||||||||||||
Granite Tops at Junior/Bridge Suites (with millwork) | 370 | SF | 0 | |||||||||||||
Granite Tops at Two-Bay Suite (with millwork) | 486 | SF | 0 | |||||||||||||
Granite Tops at Three-Bay Suite (with millwork) | 26 | SF | 0 | |||||||||||||
0 | ||||||||||||||||
Granite Shower Seats at Typical, ADA, Extended Guestroom (with Div 9) | 0 | |||||||||||||||
Granite Shower Seats at Junior/Bridge Suites (With Div 9) | 0 | |||||||||||||||
Granite Shower Seats at Two-Bay Suite (With Div 9) | 0 | |||||||||||||||
Granite Shower Seats at Three-Bay Suite (With Div 9) | 0 | |||||||||||||||
0 | 0 | |||||||||||||||
SBTL | Division 4 — Subtotal | 0.25 | 48,412 | |||||||||||||
Division 5 — Metals: | ||||||||||||||||
Structural Steel / Misc Steel | 197,166 | GSF | 6.30 | 1,242,146 | ||||||||||||
Mise Steel Level 1 : F & I | TONS | W/ Above | ||||||||||||||
Mise Steel Tower: F & I | TONS | W/ Above | ||||||||||||||
Elevator support framing | TONS | W/ Above | ||||||||||||||
Metal Stair 2 ea (with Tower Framing) | 241 | RISERS | W/ Above | |||||||||||||
Pit ladders | EA | W/ Above | ||||||||||||||
Elevator beams | EA | W/ Above | ||||||||||||||
Framing at Roof Canopy | TONS | W/ Above | ||||||||||||||
Embeds at Slab Edge for EIFS | 1 | LS | 94,000.00 | 94,000 | ||||||||||||
1,336,146 | 0 | |||||||||||||||
Ornamental Metals (with Millwork) | GSF | 0 | ||||||||||||||
Glass Handrail at Level 3 (with Div 8) | LF | 0 | ||||||||||||||
0 | 0 | |||||||||||||||
Structural Steel Framing for Screen at Pool Deck (10#/SF) | 8 | TONS | 4,500.00 | 35,550 | ||||||||||||
35,550 |
41 of 93
Keys 206
GSF | 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Structural Steel Framing for High Roof Screenwall Eyebrow(10#/SF) | 25 | TONS | 4.500.00 | 112,500 | ||||||||||||
112,500 | ||||||||||||||||
SBTL | Division 5 — Subtotal | 7.53 | 1,484,196 | |||||||||||||
Division 6 — Carpentry: | ||||||||||||||||
Rough Carpentry — Guestroom Tower | 106,470 | GSF | 0.30 | 31,941 | ||||||||||||
Rough Carpentry — BOH | 22,273 | GSF | 0.30 | 6,682 | ||||||||||||
Rough Carpentry — Public | 2,593 | GSF | 0.30 | 778 | ||||||||||||
Parapet Wall Sheathing: Installation (W/ Roofing) | 0 | |||||||||||||||
39,401 | 0 | |||||||||||||||
Architectural Woodwork | 0 | |||||||||||||||
Hotel | 0 | |||||||||||||||
Typical Guest Rooms | 141 | EA | 5,040.00 | 710,640 | ||||||||||||
ADA Typical Rooms | 9 | EA | 5,040.00 | 45,360 | ||||||||||||
Extended Typical Rooms | 26 | EA | 5,040.00 | 131,040 | ||||||||||||
ADA Junior Suite | 1 | EA | 8,519.00 | 8,519 | ||||||||||||
Junior Suites | 9 | EA | 8,519.00 | 76,671 | ||||||||||||
ADA Bridge Suite | 1 | EA | 8,519.00 | 8,519 | ||||||||||||
Bridge Suites | 8 | EA | 8,519.00 | 68,152 | ||||||||||||
LVL 12 Bridge Suite | 1 | EA | 12,000.00 | 12,000 | ||||||||||||
2-Bay Suites | 9 | EA | 8,269.00 | 74,421 | ||||||||||||
3-Bay Suite | 1 | EA | 15,000.00 | 15,000 | ||||||||||||
Elevator Lobbies | 11 | EA | 8,211.00 | 90,321 | ||||||||||||
Corridors | 11 | EA | 7,263.00 | 79,893 | ||||||||||||
1,320,536 | 0 | |||||||||||||||
Public Areas Millwork | 0 | |||||||||||||||
Lobby / VIP Reg / Front Desk / Public Circ | 0 | |||||||||||||||
VIP Registration Desk (Wood Top with mirror front) | 8 | LF | 1,325.00 | 10,600 | ||||||||||||
VIP Registration Bookcase/Bar | 7 | LF | 425.00 | 2,975 | ||||||||||||
VIP Base/Chair/Crown | 90 | LF | 25.00 | 2,250 | ||||||||||||
Lobby Valet Desk with Stone Top | 8 | LF | 1,325.00 | 10,600 | ||||||||||||
Antique Mirror with Metal Grillwork at Fireplace | 150 | SF | 425.00 | 63,750 | ||||||||||||
#A-13 | Utilize MDF ILO Metal Grillwork at Lobby Fireplace | 1 | ALLOW | (18,750.00 | ) | -18,750 | ||||||||||
Wood Paneling at Lobby | 1 | LS | 75,000.00 | 75,000 | ||||||||||||
14’ Open Grillwork at Front Desk (to Corridor) | 84 | SF | 350.00 | 29,400 | ||||||||||||
Front Desk with Stone Top | 19 | LF | 1,325.00 | 25,175 | ||||||||||||
6’ Wainscot at Corridor | 1,080 | SF | 75.00 | 81,000 | ||||||||||||
#A-13 | Delete Wainscot at Corridor and add base, chair, crown and wallcovering | 1 | ALLOW | (68,760.00 | ) | -68,760 | ||||||||||
Base / Crown / Door Trim at Elev Lobby | 75 | LF | 10.00 | 750 | ||||||||||||
Elevator Door Trim | 72 | LF | 17.00 | 1,224 | ||||||||||||
Ceiling Trim at Lobby/VIP/Front Desk/Elev Lobby | 1 | LS | 62,992.00 | 62,992 | ||||||||||||
278,206 | 0 | |||||||||||||||
Meeting Room / Pantry | 0 | |||||||||||||||
4’ Wainscot at Meeting Room | 456 | SF | 75 | 34,200 | ||||||||||||
(2) Base Cabinet with Stone Top at Meeting Room | 16 | LF | 425 | 6,800 |
42 of 93
Keys 206
GSF | 197,156 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Buffet with Stone Top at Pantry | 15 | LF | 222 | 3,330 | ||||||||||||
Buffet with Stone Top at Meeting Room | 13 | LF | 600 | 7,800 | ||||||||||||
Ceiling Trim | 1 | LS | 8,430 | 8,430 | ||||||||||||
60,560 | ||||||||||||||||
Multipurpose Room | 0 | |||||||||||||||
6’ Wood Wainscot | 798 | SF | 75 | 59,850 | ||||||||||||
#A-13 | Delete Wainscot at Corridor and add base, chair, crown and wallcovering | 1 | LS | -48,098 | -48,098 | |||||||||||
Built in Bookcases at Fireplace | 10 | LF | 850 | 8,500 | ||||||||||||
Buffet with Stone Top | 13 | LF | 600 | 7,800 | ||||||||||||
Ceiling Trim | 350 | LF | 75 | 26,250 | ||||||||||||
54,302 | 0 | |||||||||||||||
Public Restrooms (1110, 1112, 12114, 12115) | 0 | |||||||||||||||
Vanity with Stone Top | 43 | LF | 323 | 13,889 | ||||||||||||
Ceiling Trim | 150 | LF | 11 | 1,650 | ||||||||||||
Crown Moulding | 198 | LF | 11 | 2,178 | ||||||||||||
17,717 | 0 | |||||||||||||||
Level 2 Lobby | 0 | |||||||||||||||
6’ Wood Wainscot | 720 | SF | 75 | 54,000 | ||||||||||||
Custom Ceiling (Broken Board Look) | 1,475 | SF | 110 | 162,250 | ||||||||||||
Wood Column Wraps | 6 | EA | 3,500 | 21,000 | ||||||||||||
237,250 | 0 | |||||||||||||||
Fitness Center | 0 | |||||||||||||||
Cabinet with Stone Top | 8 | LF | 300.00 | 2,400 | ||||||||||||
2,400 | 0 | |||||||||||||||
Misc BOH Millwork | 0 | |||||||||||||||
1102 Men’s Restroom (Vanity / Skirt) | 5 | LF | 120.00 | 600 | ||||||||||||
1103 Women’s Restroom (Vanity / Skirt) | 5 | LF | 120.00 | 600 | ||||||||||||
1105 Conference (Base / Chair / Crown) | 45 | LF | 25.00 | 1,125 | ||||||||||||
1106 Director Finance (Base / Chair / Crown) | 53 | LF | 25.00 | 1,325 | ||||||||||||
4' Diamond Plate Wainscot w 2x6 chair and base at BOH Corridor (478LF) | 2,020 | SF | 25.00 | 50,500 | ||||||||||||
54,150 | 0 | |||||||||||||||
Temp Protection | 197,166 | GSF | 0.35 | 69,008 | ||||||||||||
69,008 | ||||||||||||||||
SBTL | Division 6 — Subtotal | 10.82 | 2,133,530 | |||||||||||||
Division 7 — Waterproofing: | ||||||||||||||||
Moisture Control | ||||||||||||||||
Bentonite @ Elevator Pits | 1 | LS | 4,382.00 | 4,382 | ||||||||||||
4,382 | ||||||||||||||||
Urethane Traffic Coating @ French Balconies | 1 | LS | 5,142.00 | 5,142 | ||||||||||||
Urethane Traffic Coating @ Back of House | 1 | LS | 67,456.00 | 67,456 | ||||||||||||
Mechanical Room @ Level 1.5 | 4,075 | SF | 0 | |||||||||||||
Mechanical Room @ Penthouse | 3,200 | SF | 0 | |||||||||||||
Intermediate Areas @ Pool Deck | 7,600 | GSF | 0 | |||||||||||||
72,598 | 0 | |||||||||||||||
Pool Deck Paver System including Hot Fluid Applied WP / Drainage Board | 7,600 | SF | 34.10 | 259,160 | ||||||||||||
259,160 | 0 |
43 of 93
Keys 206
GSF | 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Waterproofing at Exterior (with EIFS) | ||||||||||||||||
Sheet Membrane Damproofing at Exterior (with EIFS) | ||||||||||||||||
Caulking at Exterior | 1 | LS | 38,695.00 | 38,695 | ||||||||||||
38,695 | 0 | |||||||||||||||
0 | ||||||||||||||||
Thermal Insulation below Lvl 1 Slab (Unconditioned Crawlspace below)- 2# Foam w/ Flame Spread Weather Resistant Paint NIC | 13,672 | SF | NIC | |||||||||||||
Thermal Insulation @Lvl 12 Slab-w/ Pool Deck Waterproofing System | 0 | |||||||||||||||
0 | 0 | |||||||||||||||
Fireproofing at Stair Towers | 7,488 | SF | 3.00 | 22,464 | ||||||||||||
22,464 | 0 | |||||||||||||||
EIFS | 1 | LS | 819,650.00 | 819,650 | ||||||||||||
EIFS (Framing with Div 9) | 70,000 | SF | 0 | |||||||||||||
EIFS/Framing at Pool Overhang (with above) | 2,615 | SF | 0 | |||||||||||||
Scaffolding (with above) | 1 | LS | 0 | |||||||||||||
Cornice (Metal Panel) | 1,950 | LF | 30.00 | 58,500 | ||||||||||||
EIFS for Garage Elev Tower (with Garage) | 0 | |||||||||||||||
878,150 | 0 | |||||||||||||||
Expansion Joint Assemblies (at Pedestrian Bridge) | LF | W/ Bridge | ||||||||||||||
Expansion Joint Assemblies (at Porte Cochere) | LF | W/ Garage | ||||||||||||||
Facade Sealants (with waterproofing) | SF | 0 | ||||||||||||||
0 | 0 | |||||||||||||||
Screen at Pool Deck (with Div 8) | 1,580 | SF | 0 | |||||||||||||
0 | 0 | |||||||||||||||
Roofing & Sheet Metal -meets 140 MPH Code | 0 | |||||||||||||||
TPO Built-up Roofing at Mechanical Room | 3,725 | SF | 18.00 | 67,050 | ||||||||||||
Roofing: Hotel Porte Cochere | SF | W/ Bridge | ||||||||||||||
Standing Seam Roof at Pool Overhangs | 1 | LS | 62,300 | 62,300 | ||||||||||||
129,350 | ||||||||||||||||
Temporary Roof | ||||||||||||||||
Level 10 Temporary Roof: In & Out | 13,500 | SF | 3.00 | 40,500 | ||||||||||||
40,500 | ||||||||||||||||
SBTL | Division 7 — Subtotal | 7.33 | 1,445,299 | |||||||||||||
Hollow Metal Doors | 0 | |||||||||||||||
BOH | 38 | LVS | 245.25 | 9,320 | ||||||||||||
Public | 0 | LVS | 0 | |||||||||||||
9,320 | 0 | |||||||||||||||
Hollow Metal Frames | 0 | |||||||||||||||
Hotel Single | 439 | EA | 95.92 | 42,109 | ||||||||||||
Hotel Double | 12 | EA | 100.28 | 1,203 | ||||||||||||
BOH Single | 80 | EA | 95.92 | 7,674 | ||||||||||||
BOH Double | 8 | EA | 100.28 | 802 | ||||||||||||
Public Single | 6 | EA | 95.92 | 576 |
44 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Public Double | 3 | EA | 100.28 | 301 | ||||||||||||
0 | ||||||||||||||||
Unload/Distribute HM Doors & Frames | 586 | EA | 17.00 | 9,962 | ||||||||||||
Hang HM Doors | 38 | EA | 65.00 | 2,470 | ||||||||||||
65,096 | �� | 0 | ||||||||||||||
Primed MDO Wood Doors | 0 | |||||||||||||||
Typical Guestroom Entry | 141 | LVS | 194.02 | 27,357 | ||||||||||||
Typical Guestroom Bathroom (Barn Door) | 141 | LVS | 146.06 | 20,594 | ||||||||||||
Typical Guestroom Water Closet | 141 | LVS | 381.50 | 53,792 | ||||||||||||
Connector Doors | 92 | LVS | 324.82 | 29,883 | ||||||||||||
0 | ||||||||||||||||
ADA Typical Guestroom Entry | 9 | LVS | 194.02 | 1,746 | ||||||||||||
ADA Typical Guestroom Bathroom (Barn Door) | 9 | LVS | 146.06 | 1,315 | ||||||||||||
ADA Typical Guestroom Water Closet | 9 | LVS | 381.50 | 3,434 | ||||||||||||
0 | ||||||||||||||||
Extended Typical Guestroom Entry | 26 | LVS | 194.02 | 5,045 | ||||||||||||
Extended Typical Guestroom Bathroom (Barn Door) | 26 | LVS | 146.06 | 3,798 | ||||||||||||
Extended Typical Guestroom Water Closet | 26 | LVS | 381.50 | 9,919 | ||||||||||||
0 | ||||||||||||||||
Junior Suite Entry | 9 | LVS | 194.02 | 1,746 | ||||||||||||
Junior Suite Bathroom (Pocket Door) | 9 | LVS | 146.06 | 1,315 | ||||||||||||
Junior Suite Bedroom (Pocket Door) | 9 | LVS | 146.06 | 1,315 | ||||||||||||
Junior Suite Water Closet | 9 | LVS | 381.50 | 3,434 | ||||||||||||
Junior Suite Closet (Sliding) | 18 | LVS | 146.06 | 2,629 | ||||||||||||
0 | ||||||||||||||||
ADA Junior Suite Entry | 1 | LVS | 194.02 | 194 | ||||||||||||
ADA Junior Suite Bathroom (Pocket Door) | 1 | LVS | 146.06 | 146 | ||||||||||||
ADA Junior Suite Bedroom (Pocket Door) | 1 | LVS | 146.06 | 146 | ||||||||||||
ADA Junior Suite Water Closet | 1 | LVS | 381.50 | 382 | ||||||||||||
ADA Junior Suite Closet (Sliding) | 2 | LVS | 146.06 | 292 | ||||||||||||
Bridge Suite Entry | 9 | LVS | 194.02 | 1,746 | ||||||||||||
Bridge Suite Bathroom (Pocket Door) | 9 | LVS | 146.06 | 1,315 | ||||||||||||
Bridge Suite Bedroom (Pocket Door) | 9 | LVS | 146.06 | 1,315 | ||||||||||||
Bridge Suite Water Closet | 9 | LVS | 381.50 | 3,434 | ||||||||||||
Bridge Suite Closet (Bi Fold) | 18 | LVS | 152.60 | 2,747 | ||||||||||||
0 | ||||||||||||||||
ADA Bridge Suite Entry | 1 | LVS | 194.02 | 194 | ||||||||||||
ADA Bridge Suite Bathroom (Pocket Door) | 1 | LVS | 146.06 | 146 | ||||||||||||
ADA Bridge Suite Bedroom (Pocket Door) | 1 | LVS | 146.06 | 146 | ||||||||||||
ADA Bridge Suite Water Closet | 1 | LVS | 381.50 | 382 | ||||||||||||
ADA Bridge Suite Closet (Bi Fold) | 2 | LVS | 152.60 | 305 | ||||||||||||
2 Bay Suite Entry | 9 | LVS | 194.02 | 1,746 | ||||||||||||
2 Bay Suite Bedroom (Pocket) | 9 | LVS | 146.06 | 1,315 | ||||||||||||
2 Bay Suite Closet (Bi-fold)) | 9 | LVS | 307.38 | 2,766 | ||||||||||||
2 Bay Suite Bathroom (Pocket) | 9 | LVS | 137.34 | 1,236 | ||||||||||||
2 Bay Suite Water Closet | 9 | LVS | 381.50 | 3,434 | ||||||||||||
3 Bay Suite Entry (Upgrade, Stained Deco Wood) | 1 | LVS | 545.00 | 545 | ||||||||||||
3 Bay Suite Powder (Pocket) | 1 | LVS | 146.06 | 146 | ||||||||||||
3 Bay Suite Bedroom (Pocket) | 1 | LVS | 146.06 | 146 |
45 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
3 Bay Suite Bedroom (Bi-fold — Antique Mirror) | 4 | LVS | 307.38 | 1,230 | ||||||||||||
3 Bay Suite Bathroom (Pocket) | 3 | LVS | 146.06 | 438 | ||||||||||||
3 Bay Suite Bedroom (Barn Door) | 1 | LVS | 146.06 | 146 | ||||||||||||
Elevator Lobby Doors | 24 | LVS | 194.02 | 4,656 | ||||||||||||
Public Area | 14 | LVS | 194.02 | 2,716 | ||||||||||||
BOH (Hollow Metal) | 58 | LVS | 231.08 | 13,403 | ||||||||||||
Custom Wood Doors at Public Area: W/ Millwork? | 0 | LVS | 0 | |||||||||||||
214,131 | 0 | |||||||||||||||
Unload/Distribute Wood/PLAM Doors | 930 | LVS | 12.00 | 11,160 | ||||||||||||
Hang Wood/PLAM Doors | 930 | LVS | 35.00 | 32,550 | ||||||||||||
Install Pocket/ Bi-fold Door Tracks | 75 | EA | 50.00 | 3,750 | ||||||||||||
Install Sliding Door Tracks | 20 | EA | 50.00 | 1,000 | ||||||||||||
48,460 | 0 | |||||||||||||||
0 | ||||||||||||||||
Hardware | ||||||||||||||||
BOH Hollow Metal | 38 | EA | 299.75 | 11,391 | ||||||||||||
Guestroom/Suite Entry | 206 | EA | 272.50 | 56,135 | ||||||||||||
Guestroom/Suite Entry — automatic door bottoms (with above) | 206 | EA | 0 | |||||||||||||
Guestroom/Suite Watercloset Doors | 205 | EA | 272.50 | 55,863 | ||||||||||||
Connector Doors | 92 | EA | 272.50 | 25,070 | ||||||||||||
Pocket Doors | 81 | EA | 245.25 | 19,865 | ||||||||||||
Bi-fold Doors | 33 | EA | 245.25 | 8,093 | ||||||||||||
Barn Doors | 179 | EA | 245.25 | 43,900 | ||||||||||||
Elevator Lobby | 24 | EA | 381.50 | 9,156 | ||||||||||||
Public Area | 14 | EA | 381.50 | 5,341 | ||||||||||||
BOH PLAM | 58 | EA | 299.75 | 17,386 | ||||||||||||
Electrified Security Hardware (F & I by Security Contractor) | 0 | EA | — | 0 | ||||||||||||
252,199 | 0 | |||||||||||||||
Install Hardware | 930 | SETS | 75.00 | 69,750 | ||||||||||||
Set Up Hardware Room | 1 | LS | 10,000.00 | 10,000 | ||||||||||||
79,750 | ||||||||||||||||
Exterior Glass & Glazing | 0 | |||||||||||||||
Exterior Curtainwall (includes metal panel at slab edge) | 26,589 | SF | 65.00 | 1,728,285 | ||||||||||||
Louvers at Level 1.5, (Type 4D, with above) | 800 | SF | 0 | |||||||||||||
Operable Doors at Level 12 Suites | 4 | EA | 3,000.00 | 12,000 | ||||||||||||
Storefront Doors | 14 | EA | 3,000.00 | 42,000 | ||||||||||||
Automatic Doors (W/Ped. Bridge Vestibule) | 0 | EA | 0 | |||||||||||||
Balcony Rails at Suites | 240 | LF | 250.00 | 60,000 | ||||||||||||
1,842,285 | 0 | |||||||||||||||
Interior Glass & Glazing | 0 | |||||||||||||||
VIP Check In (Frameless) | 156 | SF | 60.00 | 9,360 | ||||||||||||
Sundries | 126 | SF | 60.00 | 7,560 | ||||||||||||
Balcony Rail at Level 3 Lobby | 23 | LF | 400.00 | 9,200 | ||||||||||||
Mirror at Fitness Center | 288 | SF | 15.00 | 4,320 | ||||||||||||
Glass Entry at Fitness Center | 130 | SF | 60.00 | 7,800 | ||||||||||||
Vanity Mirrors at Guestrooms (FFE) | 3,960 | SF | 0 |
46 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Vanity Mirrors at Suites (FFE) | 2,100 | SF | 0 | |||||||||||||
38,240 | 0 | |||||||||||||||
Clean Exterior Glass | 26,589 | SF | 0.75 | 19,942 | ||||||||||||
19,942 | ||||||||||||||||
0 | ||||||||||||||||
Window Wall Test (BY OWNER) | 0 | |||||||||||||||
Fixed Airfoil Louvers @ Lvl Pool (4B) | 2,860 | SF | 46.45 | 132,847 | ||||||||||||
Aluminum Grille System (4C)- sim Aerolite Angular Bar Grille (at Level 11.5) MATERIAL | 2,560 | SF | 31.71 | 81,173 | ||||||||||||
Aluminum Grille System (4C)- sim Aerolite Angular Bar Grille (at Level 11.5) INSTALL | 2,560 | SF | 2.50 | 6,400 | ||||||||||||
#A-6 | Delete Louvers at 11.5 and replace with EIFS | 1 | ALLOW | (23,573.00 | ) | -23,573 | ||||||||||
Acoustical Louver (4J) at Mech Penthouse | 1,208 | SF | 35.00 | 42,280 | ||||||||||||
Greenscreen System at Service Level | 1,600 | SF | 14.00 | 22,400 | ||||||||||||
261,527 | ||||||||||||||||
0 | ||||||||||||||||
Curtainwall Consultant (BY OWNER) | 0 | |||||||||||||||
Overhead Coiling Door at Loading Dock | 3 | EA | 10,000.00 | 30,000 | ||||||||||||
30,000 | ||||||||||||||||
0 | ||||||||||||||||
SBTL | Division 8 — Subtotal | 14.51 | 2,860,949 | |||||||||||||
Division 9 — Finishes: | ||||||||||||||||
Exterior Framing (W/ Dense Glass & Thermal) | 1 | LS | 1,022,406.00 | 1,022,406 | ||||||||||||
Drywall & Acoustical (Interior Only) | 197,166 | GSF | 9.25 | 1,823,786 | ||||||||||||
2,846,192 | 0 | |||||||||||||||
GUESTROOMS / SUITES | 0 | |||||||||||||||
176 Keys | Typical/ADA/Extended Room Carpet Install (includes pad material) | 5,322 | SY | 10.35 | 55,081 | |||||||||||
Typical/ADA/Extended Room Wood at Entries | 8,131 | SF | 18.00 | 146,358 | ||||||||||||
Typical/ADA/Extended Room Resilient Base | 17,637 | LF | 4.70 | 82,894 | ||||||||||||
Typical/ADA/Extended Room Tile Surfaces | 1 | LS | 977,680.00 | 977,680 | ||||||||||||
Typical/ADA/Extended Room Tile Floors (with above) | 18,368 | SF | 0 | |||||||||||||
Typical Room Tile Walls (with above) | 23,661 | SF | 0 | |||||||||||||
Typical Room Tile Walls (Accent) (with above) | 581 | SF | 0 | |||||||||||||
Typical Room Tile Base (with above) | 7,357 | LF | 0 | |||||||||||||
Typical Room Shower Seat (with above) | 1,837 | SF | 0 | |||||||||||||
1,262,013 | 0 | |||||||||||||||
9 Keys | JR Suite Carpet Install (includes pad material) | 554 | SY | 10.35 | 5,738 | |||||||||||
JR Suite Wood at Entries | 554 | SF | 18.00 | 9,979 | ||||||||||||
JR Suite Resilient Base | 1,643 | LF | 4.70 | 7,724 | ||||||||||||
JR Suite Tile Surfaces | 1 | LS | 210,627.00 | 210,627 | ||||||||||||
JR Suite Tile Floors (with above) | 1,129 | SF | 0 | |||||||||||||
JR Suite Tile Walls (with above) | 1,663 | SF | 0 | |||||||||||||
JR Suite Tile Walls Accent (with above) | 30 | SF | 0 | |||||||||||||
JR Suite Tile Walls at Bar (with above) | 238 | SF | 0 | |||||||||||||
JR Suite Tile Base (with above) | 802 | LF | 0 | |||||||||||||
JR Suite Shower Seat (with above) | 99 | SF | 0 | |||||||||||||
234,068 |
47 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
1 Key | ADA JR Suite Carpet Install (includes pad material) | 62 | SY | 10.35 | 638 | |||||||||||
ADA JR Suite Wood at Entries | 62 | SF | 18.00 | 1,109 | ||||||||||||
ADA JR Suite Resilient Base | 183 | LF | 4.70 | 858 | ||||||||||||
ADA JR Suite Tile Surfaces | 1 | LS | 23,403.00 | 23,403 | ||||||||||||
ADA JR Suite Tile Floors (with above) | 125 | SF | 0 | |||||||||||||
ADA JR Suite Tile Walls (with above) | 185 | SF | 0 | |||||||||||||
ADA JR Suite Tile Walls Accent (with above) | 4 | SF | 0 | |||||||||||||
ADA JR Suite Tile Walls at Bar (with above) | 26 | SF | 0 | |||||||||||||
ADA JR Suite Tile Base (with above) | 89 | LF | 0 | |||||||||||||
26,008 | ||||||||||||||||
8 Keys | Bridge Suite Carpet Install (includes pad material) | 559 | SY | 10.35 | 5,784 | |||||||||||
Bridge Suite Wood at Entries | 598 | SF | 18.00 | 10,771 | ||||||||||||
Bridge Suite Resilient Base | 1,602 | LF | 4.70 | 7,528 | ||||||||||||
Bridge Suite Tile Surfaces | 1 | LS | 187,224.00 | 187,224 | ||||||||||||
Bridge Suite Tile Floors (with above) | 1,408 | SF | 0 | |||||||||||||
Bridge Suite Tile Walls (with above) | 1,126 | SF | 0 | |||||||||||||
Bridge Suite Tile Walls Accent (with above) | 26 | SF | 0 | |||||||||||||
Bridge Suite Tile Walls at Bar (with above) | 282 | SF | 0 | |||||||||||||
Bridge Suite Tile Base (with above) | 678 | LF | 0 | |||||||||||||
211,306 | ||||||||||||||||
1 Key | LVL 12 Bridge Suite Carpet Install (includes pad material) | 70 | SY | 10.35 | 729 | |||||||||||
LVL 12 Bridge Suite Wood at Entries | 75 | SF | 18.00 | 1,346 | ||||||||||||
LVL 12 Bridge Suite Resilient Base | 200 | LF | 4.70 | 941 | ||||||||||||
LVL 12 Bridge Suite Tile Surfaces | 1 | LS | 40,353.00 | 40,353 | ||||||||||||
LVL 12 Bridge Suite Tile Floors (with above) | 176 | SF | 0 | |||||||||||||
LVL 12 Bridge Suite Tile Walls (with above) | 141 | SF | 0 | |||||||||||||
LVL 12 Bridge Suite Tile Walls Accent (with above) | 4 | SF | 0 | |||||||||||||
LVL 12 Bridge Suite Tile Walls at Bar (with above) | 35 | SF | 0 | |||||||||||||
LVL 12 Bridge Suite Tile Base (with above) | 85 | LF | 0 | |||||||||||||
43,369 | ||||||||||||||||
1 Key | ADA Bridge Suite Carpet Install (includes pad material) | 70 | SY | 10.35 | 729 | |||||||||||
ADA Bridge Suite Wood at Entries | 75 | SF | 18.00 | 1,346 | ||||||||||||
ADA Bridge Suite Resilient Base | 200 | LF | 4.70 | 941 | ||||||||||||
ADA Bridge Suite Tile Surfaces | 1 | LS | 23,403.00 | 23,403 | ||||||||||||
ADA Bridge Suite Tile Floors (with above) | 176 | SF | 0 | |||||||||||||
ADA Bridge Suite Tile Walls (with above) | 152 | SF | 0 | |||||||||||||
ADA Bridge Suite Tile Walls Accent (with above) | 4 | SF | 0 | |||||||||||||
ADA Bridge Suite Tile Walls at Bar (with above) | 35 | SF | 0 | |||||||||||||
ADA Bridge Suite Tile Base (with above) | 85 | LF | 0 | |||||||||||||
26,419 | ||||||||||||||||
9 Keys | 2-Bay Suite Carpet Install (includes pad material) | 564 | SY | 10.35 | 5,841 | |||||||||||
2-Bay Suite Wood at Entries | 564 | SF | 18.00 | 10,157 | ||||||||||||
2-Bay Suite Tile Surfaces | 1 | LS | 210,627.00 | 210,627 | ||||||||||||
2-Bay Suite Tile Floors (with above) | 1,832 | SF | 0 | |||||||||||||
2-Bay Suite Tile Walls (with above) | 1,505 | SF | 0 | |||||||||||||
2-Bay Suite Tile Walls Accent (with above) | 30 | SF | 0 | |||||||||||||
2-Bay Suite Tile Walls at Bar (with above) | 188 | SF | 0 | |||||||||||||
2-Bay Suite Tile Base (with above) | 663 | LF | 0 | |||||||||||||
2-Bay Suite Wood Base (with Millwork) | 1,575 | LF | — | 0 |
48 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
2-Bay Suite Shower Seat (with above) | 40 | SF | 0 | |||||||||||||
226,625 | ||||||||||||||||
1 Key | 3-Bay Suite Carpet Install (includes pad material) | 29 | SY | 10.35 | 296 | |||||||||||
3-Bay Suite Wood at Entries | 803 | SF | 18.00 | 14,454 | ||||||||||||
3-Bay Suite Tile Surfaces | 1 | LS | 40,353.00 | 40,353 | ||||||||||||
3-Bay Suite Tile Floors (with above) | 251 | SF | 0 | |||||||||||||
3-Bay Suite Tile Shower Walls (with above) | 108 | SF | 0 | |||||||||||||
3-Bay Suite Tile Walls Accent (with above) | 51 | SF | 0 | |||||||||||||
3-Bay Suite Tile Walls at Bar (with above) | 49 | SF | 0 | |||||||||||||
3-Bay Suite Tile Base (with above) | 103 | LF | 0 | |||||||||||||
3-Bay Suite Shower Seat (with above) | 18 | SF | 0 | |||||||||||||
3-Bay Suite Wood Base (with Millwork) | 272 | LF | — | 0 | ||||||||||||
3-Bay Suite Fireplace Surround (with above) | 11 | LF | 0 | |||||||||||||
3-Bay Suite Venetian Plaster | 1,840 | SF | 18.00 | 33,120 | ||||||||||||
3-Bay Suite Glass Walls (FFE) | 18 | LF | 0 | |||||||||||||
3-Bay Suite Mecho Shade | 456 | SF | 10.00 | 4,560 | ||||||||||||
Tile at Level 12 Balcony | 200 | SF | 12.00 | 2,400 | ||||||||||||
95,183 | ||||||||||||||||
#A-8 | Delete Waterproofing at guestroom floors | 1 | ALLOW | (120,000.00 | ) | -120,000 | ||||||||||
#A-9 | Utilize epoxy blend grout ILO Epoxy Grout at Guestrooms | 1 | ALLOW | (30,000.00 | ) | -30,000 | ||||||||||
#A-12 | Add Schluter “Tile Ready” pan system at guestrooms | 1 | ALLOW | 118,800.00 | 118,800 | |||||||||||
#A-15 | Replace vanity accent tile with $20/sf tile at Suites | 1 | ALLOW | (145,000.00 | ) | -145,000 | ||||||||||
#A-16 | Replace glass tile at wet bar in Suite with $30/sf | 1 | ALLOW | (33,000.00 | ) | -33,000 | ||||||||||
0 | ||||||||||||||||
Elevator Lobby / Corridor Carpet Install | 2,046 | SY | 15.00 | 30,690 | ||||||||||||
Elevator Lobby / Corridor Wood Floors | 1,634 | SF | 18.00 | 29,403 | ||||||||||||
Elevator Lobby / Corridor Carpet Base | 6,375 | LF | 1.00 | 6,375 | ||||||||||||
66,468 | 0 | |||||||||||||||
0 | ||||||||||||||||
Lobby / VIP Reg / Front Desk / Public Circ | 0 | |||||||||||||||
Venetian Plaster at VIP Registration | 1,314 | SF | 18.00 | 23,652 | ||||||||||||
Venetian Plaster at Front Desk | 1,577 | SF | 18.00 | 28,382 | ||||||||||||
Venetian Plaster above wainscot at Corridor | 810 | SF | 18.00 | 14,580 | ||||||||||||
#A-17 | Utilize wallcovering ILO Venetian Plaster at Corridor | 1 | ALLOW | (12,150.00 | ) | -12,150 | ||||||||||
54,464 | 0 | |||||||||||||||
Tile Surfaces | 1 | LS | 133,551.00 | 133,551 | ||||||||||||
Tile Mural at Back Wall of Front Desk | 162 | SF | — | 0 | ||||||||||||
#A-20 | Replace Mural Tile with $30/sf material | 1 | ALLOW | (18,250.00 | ) | -18,250 | ||||||||||
Wood Floor at VIP Registation | 430 | SF | — | 0 | ||||||||||||
Wood Floor at Elev Lobby | 160 | SF | — | 0 | ||||||||||||
Stone Floor at Lobby / Front Desk | 1059 | SF | — | 0 | ||||||||||||
Stone Floor at Corridor | 725 | SF | �� | — | 0 | |||||||||||
Stone Surround at Fireplace | 20 | LF | 300 | 6,000 | ||||||||||||
121,301 | 0 | |||||||||||||||
Inset Rug at Lobby / Front Desk | 47 | SY | 15.00 | 698 | ||||||||||||
Carpet at Elev Lobby | 17 | SY | 15.00 | 262 | ||||||||||||
960 | 0 |
49 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Meeting Room / Pantry | 0 | |||||||||||||||
Slate Flooring at Pantry | 220 | SF | 17 | 3,740 | ||||||||||||
Carpet at Meeting Room | 78 | SY | 15 | 1,167 | ||||||||||||
4,907 | ||||||||||||||||
Multipurpose Room | 0 | |||||||||||||||
Venetian Plaster above wainscot at Multipurpose | 1,197 | SF | 18 | 21,546 | ||||||||||||
#A-22 | Utilize wallcovering ILO Venetian Plaster at MPR | 1 | ALLOW | -21,546 | -21,546 | |||||||||||
Wood Floor at Multipurpose | 560 | SF | 19 | 10,640 | ||||||||||||
Inset Rug at Multipurpose | 46 | SY | 15 | 685 | ||||||||||||
11,325 | 0 | |||||||||||||||
Public Restrooms (1110, 1112, 12114, 12115) | 0 | |||||||||||||||
Tile Surfaces | 1 | LS | 44,480 | 44,480 | ||||||||||||
Tile Floor | 566 | SF | 0 | 0 | ||||||||||||
Accent Tile at Mirrors (Mirror Surround) | 52 | SF | 0 | 0 | ||||||||||||
6" Tile Wall Wainscot | 900 | SF | 0 | 0 | ||||||||||||
Stone Pilasters, Solid Surface Partitions w Wood Doors | 11 | EA | 3,408 | 37,488 | ||||||||||||
Urinal Screens | 4 | EA | 150 | 600 | ||||||||||||
82,568 | 0 | |||||||||||||||
Level 2 Lobby | 0 | |||||||||||||||
Venetian Plaster above Wood Wainscot | 1,000 | SF | 18 | 18,000 | ||||||||||||
#A-21 | Utilize wallcovering ILO Venetian Plaster at Level 2 Lobby | 1 | ALLOW | -15,000 | -15,000 | |||||||||||
Stone Flooring | 1,744 | SF | 19 | 33,136 | ||||||||||||
36,136 | 0 | |||||||||||||||
Fitness Center | 0 | |||||||||||||||
Rubber Flooring at Fitness Center (Capri Cork 9mm) | 820 | SF | 22.50 | 18,450 | ||||||||||||
Wood Lay In Ceiling at Fitness Center | 820 | SF | 33.60 | 27,552 | ||||||||||||
46,002 | 0 | |||||||||||||||
Sundries (per PNK)—Allowance | ||||||||||||||||
#A-23 | Interior Finishes | 849 | SF | 175.00 | 148,575 | |||||||||||
148,575 | 0 | |||||||||||||||
0 | ||||||||||||||||
BOH | 0 | |||||||||||||||
BOH Floor Tile | 1,571 | SF | 12.00 | 18,850 | ||||||||||||
BOH Wall Tile | 408 | SF | 15.00 | 6,120 | ||||||||||||
BOH Vinyl Base | 5,662 | LF | 1.10 | 6,228 | ||||||||||||
BOH Install Carpet (Direct Glue) | 726 | SY | 4.10 | 2,977 | ||||||||||||
BOH VCT | 9,659 | SF | 3.50 | 33,807 | ||||||||||||
BOH Sealed Concrete | 10,106 | SF | 0.75 | 7,579 | ||||||||||||
Stonhard Floor at Kitchens | 1,659 | SF | 12.00 | 19,906 | ||||||||||||
BOH ACT (with Drywall) | SF | 0 | ||||||||||||||
BOH FRP at Kitchen Walls | 2,050 | SF | 5.00 | 10,250 | ||||||||||||
BOH Washable Ceiling Tiles at Kitchen | 1,659 | SF | 3.00 | 4,976 | ||||||||||||
110,692 | 0 | |||||||||||||||
0 | ||||||||||||||||
Painting & Textured Coatings | 197,166 | GSF | 3.50 | 690,081 | ||||||||||||
Elastomeric Coating at CMU at T4 Line | 3,240 | SF | 2.00 | 6,480 | ||||||||||||
FRP at Janitors Closet and Kitchen | 2,500 | SF | 3.00 | 7,500 | ||||||||||||
Float Concrete Ceilings at Guestrooms/Suites | 58,936 | SF | W/ Paint | |||||||||||||
704,061 | 0 |
50 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Hotel Porte Cochere Finishes (with Pedestrian Bridge) | SF | 0 | ||||||||||||||
0 | ||||||||||||||||
Final Clean | 197,166 | GSF | 0.35 | 69,008 | ||||||||||||
69,008 | ||||||||||||||||
0 | ||||||||||||||||
On Site Mock Up (separate sub job) | 1 | LS | 0 | |||||||||||||
0 | ||||||||||||||||
SBTL | Division 9 — Subtotal | 31.54 | 6,218,449 | |||||||||||||
Division 10 — Specialties: | ||||||||||||||||
Corner Guards | ||||||||||||||||
Corner Guards: Anodized Aluminum (Public Corridors)- International Extrusions- Dk Bronze Anodized 3"x3"x8' | 193 | EA | 14.17 | 2,735 | ||||||||||||
Corner Guards: Stainless Steel (BOH)- Inpro- SS 3"x3"x8' | 50 | EA | 59.95 | 2,998 | ||||||||||||
Corner Guards: Installation | 243 | EA | 25.00 | 6,075 | ||||||||||||
11,807 | 0 | |||||||||||||||
Fire Protection Specialties | 0 | |||||||||||||||
FE Cabinet (Recessed/ Non Fire Rated)- JL Industries AMB 1012V10 | 12 | EA | 83.21 | 999 | ||||||||||||
FE Cabinet (Recessed/ Fire Rated)- JL Industries AMB 1012V11 | 2 | EA | 144.52 | 289 | ||||||||||||
FE Cabinet@Kitchen- JL Industries AMB 1012V10 | 2 | EA | 83.21 | 166 | ||||||||||||
Fire Extinguishers- 10# ABC | 16 | EA | 69.92 | 1,119 | ||||||||||||
FE Cabinets: Installation | 14 | EA | 25.00 | 350 | ||||||||||||
2,923 | 0 | |||||||||||||||
Toilet & Bath Accessories | 0 | |||||||||||||||
Typical/Extended Guestroom Robe Hooks-Seachrome Chrome Finish 700400-CR-1 | 334 | EA | 23.34 | 7,795 | ||||||||||||
Typical/Extended Guestroom Towel Bar-Symmons 24" 513TB-24-STN Satin Nickel | 167 | EA | 110.29 | 18,418 | ||||||||||||
Typical/Extended Guestroom TP Holder-American Standard 8040.230-234 Satin Nickel | 167 | EA | 58.48 | 9,766 | ||||||||||||
Typical/Extended Guestroom Shower Basket-Waterworks Satin Nickel 22-60457-57882 | 167 | EA | 182.36 | 30,454 | ||||||||||||
66,432 | 0 | |||||||||||||||
ADA Guestroom Robe Hooks- Seachrome Chrome Finish 700400-CR-1 | 18 | EA | 23.34 | 420 | ||||||||||||
ADA Guestroom Towel Bar-Symmons 24" 513TB-24-STN Satin Nickel | 9 | EA | 110.29 | 993 | ||||||||||||
ADA Guestroom TP Holder-American Standard 8040.230-234 Satin Nickel | 9 | EA | 58.48 | 526 | ||||||||||||
ADA Guestroom Shower Basket-Waterworks Satin Nickel 22-60457-57882 | 9 | EA | 182.36 | 1,641 | ||||||||||||
ADA Guestroom Shower Seat-CWECO Padded/ Satin Finish | 9 | EA | 241.78 | 2,176 | ||||||||||||
ADA Guestroom Shower Rod-CWECO 60" Straight/ Satin Finish | 9 | EA | 29.77 | 268 | ||||||||||||
ADA Guestroom Grab Bars- CWECO 42"/ Mirror Finish | 18 | EA | 42.48 | 765 | ||||||||||||
6,789 | 0 |
51 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Suite Robe Hooks- Seachrome Chrome Finish 700400-CR-1 | 56 | EA | 23.34 | 1,307 | ||||||||||||
Suite Towel Bar- Symmons 24" 513TB-24-STN Satin Nickel | 58 | EA | 110.29 | 6,397 | ||||||||||||
Suite TP Holder- American Standard 8040.230-234 Satin Nickel | 29 | EA | 58.48 | 1,696 | ||||||||||||
Suite Shower Basket- Waterworks Satin Nickel 22-60457-57882 | 28 | EA | 182.36 | 5,106 | ||||||||||||
14,505 | 0 | |||||||||||||||
ADA Suite Robe Hooks- Seachrome Chrome Finish 700400-CR-1 | 4 | EA | 23.34 | 93 | ||||||||||||
ADA Suite Towel Bar- Symmons 24" 513TB-24-STN Satin Nickel | 4 | EA | 110.29 | 441 | ||||||||||||
ADA Suite TP Holder- American Standard 8040.230 234 Satin Nickel | 2 | EA | 58.48 | 117 | ||||||||||||
ADA Suite Shower Basket- Waterworks Satin Nickel 22-60457-57882 | 2 | EA | 182.36 | 365 | ||||||||||||
ADA Suite Shower Seat- CWECO Padded/ Satin Finish | 2 | EA | 241.78 | 484 | ||||||||||||
ADA Suite Shower Rod- CWECO 60" Straight/ Satin Finish | 2 | EA | 29.77 | 60 | ||||||||||||
ADA Suite Grab Bars- CWECO 42"/ Mirror Finish | 4 | EA | 42.48 | 170 | ||||||||||||
1,729 | ||||||||||||||||
Public Area Toilet Paper Holder | 12 | EA | 49.05 | 589 | ||||||||||||
Public Area Toilet Seat Cover Disp | 12 | EA | 207.10 | 2,485 | ||||||||||||
Public Area Paper Towel Disp / Trash Disp | 6 | EA | 272.50 | 1,635 | ||||||||||||
Public Area Sanitary Napkin Disp | 2 | EA | 381.50 | 763 | ||||||||||||
Public Area Grab Bars | 8 | EA | 42.48 | 340 | ||||||||||||
Public Area Soap Disp | 6 | EA | 45.78 | 275 | ||||||||||||
6,086 | 0 | |||||||||||||||
Toilet & Bath Accessories Installation | 1,153 | EA | 20.00 | 23,060 | ||||||||||||
23,060 | 0 | |||||||||||||||
Way Finding Graphics (Code required) | 197,166 | GSF | 0.50 | 98,583 | ||||||||||||
#A-26 | Delete Way Finding Graphics (Code required) OFOI | 1 | ALLOW | (98.583.00 | ) | -98,583 | ||||||||||
0 | ||||||||||||||||
Specialty Signage (OFOI) | 0 | |||||||||||||||
Display Board with Trim at Meeting Room | 50 | SF | 25 | 1,250 | ||||||||||||
1,250 | ||||||||||||||||
Shower Enclosures at Typical Guestrooms | 167 | EA | 1,500.00 | 250,500 | ||||||||||||
Shower Enclosures at Suites | 28 | EA | 3,000.00 | 84,000 | ||||||||||||
334,500 | 0 | |||||||||||||||
Louvers at Level 11.5 (With Div 8 Curtainwall) | 900 | SF | 0 | |||||||||||||
0 | ||||||||||||||||
Automatic Emergency Defibrillator Units at Elevator Lobbies | 12 | EA | 2,250.00 | 27,000 | ||||||||||||
27,000 | ||||||||||||||||
SBTL | Division 10 — Subtotal | 2.52 | 496,081 |
52 of 93
Keys 206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Division 11—Equipment: | ||||||||||||||||
Window Washing Davits | 1 | LS | 76,715.00 | 76,715 | ||||||||||||
Window Washing Davits (cast in concrete) | 1 | LS | 7,500.00 | 7,500 | ||||||||||||
84,215 | 0 | |||||||||||||||
Loading Dock (none) | 0 | LS | — | 0 | ||||||||||||
0 | ||||||||||||||||
Linen Chute | 13 | FLS | 3,000.00 | 39,000 | ||||||||||||
Install Linen Chute | 13 | FLS | 500.00 | 6,500 | ||||||||||||
45,500 | 0 | |||||||||||||||
KITCHEN EQUIPMENT: Allowance | ||||||||||||||||
#A-33 | Kitchen Equipment | 1 | LS | 355,300.00 | 355,300 | |||||||||||
Room Service Kitchen (w/ Above) | 0 | |||||||||||||||
Vending Room Ice Machines: FF&E | 0 | |||||||||||||||
355,300 | 0 | |||||||||||||||
FIREPLACES | 0 | |||||||||||||||
#A-32 | Lobby — 2 Sided, Includes box and block | 1 | EA | 45,000.00 | 45,000 | |||||||||||
Delete 1 FP at Lobby (Only 1 sided) | 1 | ALLOW | (22,500.00 | ) | -22,500 | |||||||||||
Level 12 Suite, Includes box and block | 1 | EA | 40,000.00 | 40,000 | ||||||||||||
62,500 | 0 | |||||||||||||||
SBTL | Division 11 — Subtotal | 2.78 | 547,515 | |||||||||||||
Division 12 — Furniture: | ||||||||||||||||
FF&E Warehousing/Installation—with owner | ||||||||||||||||
Typical Guest Rooms | 0 | |||||||||||||||
Suite | 0 | |||||||||||||||
Public Area Installation | 0 | |||||||||||||||
SBTL | Division 12 — Subtotal | — | 0 | |||||||||||||
Division 13 — Special Construction: | ||||||||||||||||
#A-37 | Pool Bar | 1 | ALLOW | $ | 100,000.00 | 100,000 | ||||||||||
100,000 | ||||||||||||||||
Pool Bar: Food Service Equipment (W/ Div. 10) | 1 | LS | 0 | |||||||||||||
0 | ||||||||||||||||
Pool - Shell Mat’l Purchase/Shell Install | 1 | LS | $ | 215,000.00 | 215,000 | |||||||||||
Pool - Equipment/Piping F&l | 1 | LS | $ | 150,000.00 | 150,000 | |||||||||||
Finishes in Pool (coping, tile, etc) | 1 | LS | $ | 25,000.00 | w/Pool Material | |||||||||||
365,000 | ||||||||||||||||
Water Feature | 1 | ALLOW | $ | 100,000.00 | 100,000 | |||||||||||
#A-36 | Delete Water Feature | 1 | ALLOW | $ | (100,000.00 | ) | -100,000 | |||||||||
100,000 | 0 | |||||||||||||||
0 | ||||||||||||||||
Fire Feature NONE | 0 | |||||||||||||||
0 | 0 | |||||||||||||||
Pool Podium Elev. Structure Allowance | 0 | SF | 0 | |||||||||||||
0 | ||||||||||||||||
SBTL | Division 13 — Subtotal | 2.36 | 465,000 |
53 of 93
Keys206
GSF 197,166 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Division 14 — Conveying Systems: | ||||||||||||||||
Conveying Systems: Passenger — TP-1, 2 & 3 | 1 | LS | 675,662.00 | 675,662 | ||||||||||||
Conveying Systems: Freight — TS-1, 2 | 1 | LS | 455,642.00 | 455,642 | ||||||||||||
Conveying Systems: Freight — TS3 (Roped Hydro) | 1 | LS | 132,227.00 | 132,227 | ||||||||||||
Overtime to Meet Accelerated Schedule | 1 | LS | 92,820.00 | 92,820 | ||||||||||||
Overtime for Off-hour Crane Usage | 1 | LS | 10,000.00 | 10,000 | ||||||||||||
Hoistway Working Platforms | 2 | EA | 2,500.00 | 5,000 | ||||||||||||
1,371,351 | 0 | |||||||||||||||
#A-42 | Conveying Systems: Passenger Cabs Finish | 3 | ALLOW | 15,000.00 | 45,000 | |||||||||||
45,000 | ||||||||||||||||
0 | ||||||||||||||||
Interior Elevator Operator (2 each) | 30 | WK | 1,500.00 | 45,000 | ||||||||||||
45,000 | ||||||||||||||||
0 | ||||||||||||||||
#A-39 | Custom Etching Passenger Elevator Doors | 3 | ALLOW | 5,000.00 | 15,000 | |||||||||||
15,000 | ||||||||||||||||
SBTL | Division 14 — Subtotal | 7.49 | 1,476,351 | |||||||||||||
Division 15 — Mechanical: | ||||||||||||||||
Plumbing/HVAC GMP | 1 | LS | 5,910,853.00 | 5,910,853 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 59,108.53 | 59,109 | ||||||||||||
Plumbing/HVAC | 197,166 | GSF | w/ Mech GMP | |||||||||||||
#A-47 | Utilize Alternate Plumbing Manufactures | 1 | ALLOW | (200,000.00 | ) | -200,000 | ||||||||||
Hotel | GSF | Incl. Above | w/ Mech GMP | |||||||||||||
BOH (No Laundry) | GSF | Incl. Above | w/ Mech GMP | |||||||||||||
Public | GSF | Incl. Above | w/ Mech GMP | |||||||||||||
5,769,962 | ||||||||||||||||
Fire Protection Systems | ||||||||||||||||
Fire Protection: New | 197,166 | GSF | 1.65 | 325,324 | ||||||||||||
Temp. Standpipe during Construction | 1 | LS | 32,000.00 | 32,000 | ||||||||||||
Hotel Porte Cochere — (Ped Bridge) | SF | 0 | ||||||||||||||
357,324 | ||||||||||||||||
Temperature Controls | ||||||||||||||||
BAS DDC System | GSF | w/ Mech GMP | ||||||||||||||
SBTL | Division15 —Subtotal | 31.08 | 6,127,285 | |||||||||||||
Division 16 — Electrical: | ||||||||||||||||
Electrical GMP | 1 | LS | 4,280,549.00 | 4,280,549 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 42,805.49 | 42,805 | ||||||||||||
Electrical | 197,166 | GSF | w/ Elect GMP | |||||||||||||
#A-54 | Reduce Light Fixture Package by Providing Alternate Fixture Manufactures | 1 | ALLOW | (200,000.00 | ) | -200,000 | ||||||||||
4,280,549 | ||||||||||||||||
Fire Alarm System | 0 | |||||||||||||||
Fire Alarm: Design/Materials/Testing | 197,166 | GSF | w/ Elect GMP | |||||||||||||
Low Voltage: Allowance | ||||||||||||||||
#A-59 | Hotel Surveillance/Security: No Equipment | 197,166 | GSF | 1.50 | 295,749 | |||||||||||
295,749 |
54 of 93
Keye206
GSF 197,166 |
REVISED 05/02/11
Sys. Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
0 | ||||||||||||||||
0 | ||||||||||||||||
#A-57 | Communication/Data: No Devices/Equipment | 197,166 | GSF | 1.75 | 345,041 | |||||||||||
345,041 | 0 | |||||||||||||||
0 | ||||||||||||||||
#A-58 | AV/Sound | 197,166 | GSF | 1.00 | 197,166 | |||||||||||
Suite Bose Systems (By owner) | 0 | EA | 25,000.00 | 0 | ||||||||||||
197,166 | ||||||||||||||||
0 | ||||||||||||||||
Install OFCI TV Brackets | 224 | EA | 45.00 | 10,080 | ||||||||||||
$10,080 | ||||||||||||||||
SBTL | Division 16 — Subtotal | 25.21 | 4,971,390 | |||||||||||||
TOTAL COSTS | 179.77 | 35,445,286 | ||||||||||||||
Cost of Work Subtotal | $ | 35,445,286 | ||||||||||||||
Sub Guard @ 1.25% | $ | 443,066 | ||||||||||||||
General Conditions (5.25%) | $ | 1,825,563 | ||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 91,341 | ||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 77,980 | ||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 283,562 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 7,089 | ||||||||||||||
MCC P&P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 38,173,887 | ||||||||||||||
MCC Fee @ 3.25% | $ | 1,240,651 | ||||||||||||||
Project Total | $ | 39,414,538 | ||||||||||||||
MCC Contingency @ 4% times Cost of Work | 4.00 | % | $ | 1,417,811 | ||||||||||||
Area Total | $ | 40,832,350 | ||||||||||||||
$ | 198,215 | Key $/SF | $ | 207 | ||||||||||||
55 of 93
Manhattan Construction Company
BATON ROUGE CASINO MARINE
GSF | 226,634 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Marine Work | ||||||||||||||||
Pump Platform, Pipes & Casing: In Concrete Frame | 1 | LS | — | 0 | ||||||||||||
0 | 0 | |||||||||||||||
Basin Water System | ||||||||||||||||
Casino Make Up Water System and Controls | 1 | LS | 50,000.00 | 50,000 | ||||||||||||
(Pumping System is in the Casino Vessel Budget) | 0 | |||||||||||||||
50,000 | ||||||||||||||||
H-Piles & Sheet Piles | ||||||||||||||||
12’ x 555’ Sheet Piling for Basin Concrete Wall | 6,660 | SF | 42.50 | 283,050 | ||||||||||||
H14 x 73 x 60’ Battered Piles at Basin Concrete Wall | 16,560 | LF | 37.00 | 612,720 | ||||||||||||
Mobilization: In/Out | 1 | EA | 0 | |||||||||||||
895,770 | ||||||||||||||||
CIP T-Wall | 1 | LS | 653,495.00 | 653,495 | ||||||||||||
15’ x 487’ x 2’ Concrete Wall at Basin | 7,605 | SF | 0 | |||||||||||||
13’ x 487’ x 2.5’ Concrete Footing at Basin Wall | 6,591 | SF | 0 | |||||||||||||
Seal slab | 1 | LS | 14,039.00 | 14,039 | ||||||||||||
Reinforcing material for T wall | 1 | LS | 70,888.00 | 70,888 | ||||||||||||
Muckout T-wall footing for Seal Slab | 1 | LS | 66,930.00 | 66,930 | ||||||||||||
805,352 | ||||||||||||||||
Mass Earthwork | ||||||||||||||||
Clear & Grub Site: (Durr & Beard) | 1 | LS | 0 | |||||||||||||
0 | ||||||||||||||||
Excavation at Basin (Durr) | 1 | LS | 254,104.00 | 254,104 | ||||||||||||
Excavate addition 4” for revetment to flush out with T-wall | 1 | LS | 7,237.00 | 7,237 | ||||||||||||
Load, Haul, Spread Unsuitable Soil | 1 | LS | 8,961.00 | 8,961 | ||||||||||||
Vessel: Dry Cut Basin: +27” to +20’ + 1’ Undercut (120,000SF) | 35,556 | CY | 0 | |||||||||||||
Vessel: Berm at Basin | 6,000 | CY | 0 | |||||||||||||
Under cut and clay liner (None required) | NIC | |||||||||||||||
Low Rise: Dry Cut Basin: +27 to +20 (Assume 130,000SF) | 38,519 | CY | — | 0 | ||||||||||||
Low Rise: Berm at Basin | 0 | CY | — | 0 | ||||||||||||
0 | ||||||||||||||||
On Site Haul/Spread Excess Spoils | 68,074 | CY | — | 0 | ||||||||||||
270,302 | ||||||||||||||||
Haul Roads & Temporary Lay Down: In and Out | ||||||||||||||||
Phase I Earthwork & Temporary Lay Down (Beard Constr.) | 1 | LS | 41,972.00 | 41,972 | ||||||||||||
Phase I Earthwork & Temporary Lay Down (Barber Constr.) | 1 | LS | 366,001.00 | 366,001 |
56 of 93
GSF | 226,634 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Batture Muck Out / Import | 1 | LS | 205,014.00 | 205,014 | ||||||||||||
0 | ||||||||||||||||
Fill at Temp Road at Levee Wet Side: w/Barber | 14,000 | CY | — | 0 | ||||||||||||
Fill at Temporary Road at Levee Dry Side: w/Barber | 14,000 | CY | — | 0 | ||||||||||||
Temporary Road at Levee Dry Side: w/ Barber | 1 | LS | — | 0 | ||||||||||||
Temp Lay Down at Basin | 1 | LS | 320,000.00 | 320,000 | ||||||||||||
Temporary Roads for concrete Frame: Move & Re-Grade | SY | 0 | ||||||||||||||
8” Gravel Temp. Road at Levee Wet Side: Maintenance | 1 | LS | 75,000.00 | 75,000 | ||||||||||||
Additional Board Roads for Steel Erection (8’x16’) | 50 | EA | 963.00 | 48,150 | ||||||||||||
Remove Temp Road at Levee (leave in place) | 1 | LS | 0 | |||||||||||||
Widen North Levee Access Road for 2-Way Traffic | 1 | LS | 17,000.00 | 17,000 | ||||||||||||
1,073,137 | ||||||||||||||||
South Levee Ramp Road & Stability Berm | ||||||||||||||||
Construction of South Levee Ramp Earthwork & Stone | 1 | LS | 111,080.00 | 111,080 | ||||||||||||
Construction of North Levee Ramp Earthwork & Stone | 1 | LS | 20,027.73 | 20,028 | ||||||||||||
Construction of Stability Berm | 1 | LS | 258,410.00 | 258,410 | ||||||||||||
389,518 | ||||||||||||||||
South Levee Ramp Road | ||||||||||||||||
Asphalt Paving | 411 | TONS | 125.00 | 51,375 | ||||||||||||
Striping | 210 | LF | 2.00 | 420 | ||||||||||||
51,795 | ||||||||||||||||
Rip Rap | ||||||||||||||||
Rip Rap at Concrete T-Wall 9’ X 555’ | 500 | TN | 140.00 | 70,000 | ||||||||||||
#A-64 | Delete Rip Rap at T-Wall and use shoreblock | 1 | ALLOW | (35,035.00 | ) | -35,035 | ||||||||||
Added ACOE Rip Rap Behind T Wall | 2,175 | TN | 140.00 | 304,500 | ||||||||||||
#A-63 | Delete Added ACOE Rip Rap behind T wall and use shoreblock | 1 | ALLOW | (177,625.00 | ) | -177,625 | ||||||||||
Filter Fabric (included with above) | 0 | |||||||||||||||
339,465 |
57 of 93
GSF | 226,634 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Pipe Piles | ||||||||||||||||
42” x 132’ Pipe Piles @ Basin: FOB Job Site | 9,504 | LF | 169.22 | 1,608,267 | ||||||||||||
42” x 132’ Mooring Pipe Piles @ Basin: Install + Conc. Fill | 1 | LS | 595,000.00 | 595,000 | ||||||||||||
Mobilization: In/Out | 1 | EA | 130,000.00 | 130,000 | ||||||||||||
Engineering and Layout (with above) | 1 | EA | W/Above | |||||||||||||
Project Management | 3 | MO | 14,000.00 | 42,000 | ||||||||||||
Upgrade Hammer for Pile Driving | 1 | LS | 415,908.00 | 415,908 | ||||||||||||
Added Steel Between Mooring Pipe Piles | 1 | LS | 215,000.00 | 215,000 | ||||||||||||
MAE Design Fee for Mooring Pile As-Builts | 1 | LS | 12,900.00 | 12,900 | ||||||||||||
Shim Plates for Mooring Pile Cap Columns | 1 | LS | 12,000.00 | 12,000 | ||||||||||||
Install Shim Plates for Mooring Pile Cap Columns | 144 | EA | 500.00 | 72,000 | ||||||||||||
3,103,075 | ||||||||||||||||
Pile Caps & Guides (F&l) | 72 | EA | 10,139.00 | 730,008 | ||||||||||||
Add stiffeners at pile cap assemblies | 72 | EA | 490.50 | 35,316 | ||||||||||||
Alignment Welding | 1 | LS | 38,321.00 | 38,321 | ||||||||||||
803,645 | ||||||||||||||||
Pile Caps Chain/Clevis/Tumbuckle: FOB Job Site | 72 | EA | 14,000.00 | 1,008,000 | ||||||||||||
Delete Galv at Mooring Chains / Add Asphaltic Varnish Coating | 1 | LS | 720.00 | 720 | ||||||||||||
Provide Nuts at Strainsert Pins | 1 | LS | 4,428.00 | 4,428 | ||||||||||||
Delete End Link Component | 1 | LS | (19,800.00 | ) | -19,800 | |||||||||||
Sandblast Mooring Chain Assemblies | 1 | LS | 34,560.00 | 34,560 | ||||||||||||
1,027,908 | ||||||||||||||||
Vessel Moorings/Trusses/Capturing Devices | 1 | LS | 2,183,000.00 | 2,183,000 | ||||||||||||
Pad Eye Installation (by Bollinger) | 72 | EA | W/Above | |||||||||||||
Temp Mooring | 3 | EA | W/Above | |||||||||||||
Install Pile Capture Devices | 72 | EA | W/Above | |||||||||||||
Install Truss Sections at Bridge Beam Infill (by Bollinger) | 72 | EA | W/Above | |||||||||||||
Install Bridge Beams (2 ea 12’ x 240’) | 5,760 | SF | W/Above | |||||||||||||
Pile Caps Chain/Clevis/Tumbuckle: Install | 72 | EA | W/Above | |||||||||||||
Furnish Temp Bridge Beams (28EA x W13 x 108) | 49 | TONS | W/Above | |||||||||||||
Gusset Plates / Temp Chocks | 4 | TONS | W/Above | |||||||||||||
2,183,000 | ||||||||||||||||
MCC Support for Temp Mooring | ||||||||||||||||
Additional Tug Time | 2 | DAYS | 4,800.00 | 9,600 | ||||||||||||
#A-38 | Installation of Paddlewheel | 1 | ALLOW | 15,000.00 | 15,000 | |||||||||||
24,600 |
58 of 93
GSF | 226,634 |
REVISED 05/O2/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Shoreblock | ||||||||||||||||
Basin Shoreblock system (includes fabric, anchors, gravel, grout and concrete) | 1 | LS | 1,276,026.00 | 1,276,026 | ||||||||||||
Added Revetment per RFl 67 | 1 | LS | 125,426.00 | 125,426 | ||||||||||||
RFI 06 Grout / Cut in at Low Rise Structure | 1 | LS | 93,530.00 | 93,530 | ||||||||||||
Vessel: ShoreBlock (includes anchors and void fill, with above) | 196,242 | SF | W/Above | |||||||||||||
Vessel: Concrete at end of shore blocks (20% Swell, with above) | 30 | CY | W/Above | |||||||||||||
Vessel: Filter fabric at blocks (with above) | 196,242 | SF | W/Above | |||||||||||||
Low Rise: ShoreBlock (includes anchors and void fill) | 26,000 | SF | 7.00 | 182,000 | ||||||||||||
Low Rise: Concrete at end of shore blocks (20% Swell) (included with above) | CY | W/Above | ||||||||||||||
Low Rise: Filter fabric at blocks (with above) | 26,000 | SF | W/Above | |||||||||||||
1,676,982 | 0 | |||||||||||||||
AOCE Work Stoppage | ||||||||||||||||
Work Stoppage due to ACOE MOD Approval: 01/26/11 thru 01/27/11 | 1 | LS | $ | 28,064.00 | 28,064 | |||||||||||
28,064 | ||||||||||||||||
Utility Connections to Casino (with Site) | W/ M & E GMP | |||||||||||||||
Concrete Utility Trench To Barge (3/C-14.2) | 0 | LF | Not Required | |||||||||||||
Connection at Bridges to Barge (4/C-14.2) W/ Bridge (Above ground) | 0 | LF | W/ M & E GMP | |||||||||||||
Chilled water lines (With Site Utilities) | 0 | LF | W/Site | |||||||||||||
Domestic, Hot and cold water lines (With Site Utilities) | 0 | LF | W/Site | |||||||||||||
2” Gas line (With Site Utilities) | 0 | LF | W/Site | |||||||||||||
Electrical Conduits 4” (With Site Utilities) | 0 | LF | W/ M & E GMP | |||||||||||||
0 | ||||||||||||||||
Ballasting and Connection Support (LPA) | 1 | LS | 150,000.00 | 150,000 | ||||||||||||
150,000 | ||||||||||||||||
Pump Room Final Ballast/Bilge Site Install | ||||||||||||||||
Final Install and commissioning of Ballast/Bilge Monitoring System | 1 | LS | 8,000.00 | 8,000 | ||||||||||||
Cabling from Pump Room to Remote Panel at Vessel Control Room (W/ Electrical) | 1 | LS | 0 | |||||||||||||
8,000 | ||||||||||||||||
Vessel Restraint Field Adjustments/Ballasts (MCC) | 26 | WKS | 3,000.00 | 77,940 | ||||||||||||
77,940 |
59 of 93
GSF | 226,634 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Vessel Restraint Monitoting System | ||||||||||||||||
Strain Gauges | 72 | EA | 5,034.00 | 362,448 | ||||||||||||
Cables for Strain Gauges | 72 | EA | 660.00 | 47,520 | ||||||||||||
Additional Technical Support | 1 | WK | 7,500.00 | 7,500 | ||||||||||||
Low Volatge Cabling / Connectors for Strain Gauge Local & Control Room Monitoring System | 72 | EA | 1,600.00 | 115,200 | ||||||||||||
532,668 | 0 | |||||||||||||||
0 | ||||||||||||||||
TOTAL COSTS | 13,313,596 | |||||||||||||||
Cost of Work Subtotal | 13,313,596 | |||||||||||||||
Sub Guard @ 1.25% | 166,420 | |||||||||||||||
General Conditions (5.25%) | 690,325 | |||||||||||||||
Extended General Conditions through May 31, 2012 | 25,732 | |||||||||||||||
Building Permit (Cost of Work times .0022) | 29,290 | |||||||||||||||
General Liability Insurance (Cost of Work times .008) | 106,509 | |||||||||||||||
Builders Risk Insurance (By Owner) | 0 | |||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | 2,663 | |||||||||||||||
MCC P&P Bond Premium (Not Required) | 0 | |||||||||||||||
Project Subtotal | 14,334,534 | |||||||||||||||
MCC Fee @ 3.25% | 465,872 | |||||||||||||||
Project Total | 14,800,406 | |||||||||||||||
MCC Contingency @ 3% times Cost of Work | 3.00 | % | 399,408 | |||||||||||||
Area Total | 15,199,814 | |||||||||||||||
$/SF | 67 |
60 of 93
Manhattan Construction Company
BATON ROUGE CENTRAL PLANT — SCHEME 5
GSF | 25,369 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Division 2 — Sitework: | ||||||||||||||||
Earthwork | ||||||||||||||||
Clear and Grub | 1 | LS | 7,358.00 | 7,358 | ||||||||||||
Grading / Backfill | 1 | LS | 22,482.00 | 22,482 | ||||||||||||
29,840 | ||||||||||||||||
Pile Inspections, Oversight Testing (By Owner) | 0 | |||||||||||||||
18” Auger Cast Piles at Support Facility (18”x120) | 15,640 | LF | 25.76 | 402,886 | ||||||||||||
Mobilization: In/Out - | 1 | LS | 86,000.00 | 86,000 | ||||||||||||
Unforeseen Site Conditions — Abandoned Tank | 1 | LS | 69,911.00 | 69,911 | ||||||||||||
Unforeseen Site Conditions — Abandoned Tank | 1 | LS | 7,500.00 | 7,500 | ||||||||||||
566,297 | ||||||||||||||||
Clean Top of Pile | 120 | EA | 25.00 | 3,000 | ||||||||||||
3,000 | ||||||||||||||||
SBTL | Division 2 — Subtotal | 7.99 | 599,137 | |||||||||||||
Division 3 — Concrete: | ||||||||||||||||
Concrete Frame (F/P/F) — Support Facility/Central Plant | 32,363 | SF | 20.83 | 674,121 | ||||||||||||
Concrete Frame (F/P/F) — Equipment Yard | 1 | LS | 121,973.00 | 121,973 | ||||||||||||
796,094 | ||||||||||||||||
�� | ||||||||||||||||
ACOE Work Stoppage | ||||||||||||||||
Work Stoppage due to ACOE MOD Approval: 01/26/11 thru 02/08/11 | 1 | LS | 41,528.00 | 41,528 | ||||||||||||
41,528 | ||||||||||||||||
Pile Caps (with above) | 5,628 | CF | W/ Above | |||||||||||||
Plinths (with above) | 196 | LF | W/ Above | |||||||||||||
Reinforcing Steel Materials | ||||||||||||||||
Bars(10#/SF) | 189 | TN | 763.00 | 144,207 | ||||||||||||
Mesh | SQS | 19.40 | 0 | |||||||||||||
Form Saver Material | 256 | EA | 22.89 | 5,860 | ||||||||||||
150,067 | ||||||||||||||||
Rein installation (with Concrete Frame) | — | |||||||||||||||
Bars | 189 | TN | 295.00 | 55,755 | ||||||||||||
Mesh | 0 | SQS | 0 | |||||||||||||
Form Saver Labor | 256 | EA | 10.00 | 2,560 | ||||||||||||
58,315 | ||||||||||||||||
Ready-mix Materials | ||||||||||||||||
5000 PSI Grade Beams / Caps | 602 | CY | 97.01 | 58,400 | ||||||||||||
5000 PSI SOG (Cooling Tower Area) | 57 | CY | 97.01 | 5,530 | ||||||||||||
2000 PSI Mud Slab | 584 | CY | 87.20 | 50,925 | ||||||||||||
5000 PSI Perimeter Wall | 546 | CY | 103.55 | 56,538 | ||||||||||||
5000 PSI Plinths | 12 | CY | 99.19 | 1,190 |
61 of 93
GSF | 25,369 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
5000 PSI 12” Flat Slab (includes equip yard) | 1,422 | CY | 94.83 | 134,848 | ||||||||||||
5000 PSI Cooling Tower Columns | 34 | CY | 94.83 | 3,224 | ||||||||||||
310,655 | ||||||||||||||||
Housekeeping Equipment Pads at Central Plant | 2,000 | SF | 5.00 | 10,000 | ||||||||||||
10,000 | ||||||||||||||||
Walk-In Cooler | ||||||||||||||||
Styrafoam | 2,000 | SF | 3.00 | 6,000 | ||||||||||||
F/R/P/P/F Topping Slab | 2,000 | SF | 6.00 | 12,000 | ||||||||||||
18,000 | ||||||||||||||||
Vertical Hoisting | 1 | LS | W/ Above | |||||||||||||
Engineering / Layout | 1 | LS | W/ Above | |||||||||||||
Fuel, Filter and Operator with above | 1 | LS | W/ Above | |||||||||||||
Lull Rent | 2 | MO | 2,600.00 | 5,200 | ||||||||||||
Lull Fuel&Maint | 2 | MO | 1,000.00 | 2,000 | ||||||||||||
Lull Operator | 9 | WKS | 3,800.00 | 32,908 | ||||||||||||
40,108 | 0 | |||||||||||||||
Concrete Testing | ||||||||||||||||
Material Testing Services/Inspection (By Owner) | NIC | |||||||||||||||
SBTL | Division 3 — Subtotal | 19.01 | 1,424,768 | |||||||||||||
Division 4 — Masonry: | ||||||||||||||||
Interior CMU Partitions @ Support Facility Warehouse/ MEP Areas (Average 28’ Tall) | 17,080 | SF | 12.00 | 204,960 | ||||||||||||
Interior CMU Partitions @ Central Plant (Average 19’ Tall) | 608 | SF | 12.00 | 7,296 | ||||||||||||
Exterior CMU @ Central Plant | 5,600 | SF | 14.00 | 78,400 | ||||||||||||
Exterior CMU Partitions @ X-Fmr Yard (10’ AFF | 2,850 | SF | 14.00 | 39,900 | ||||||||||||
330,556 | ||||||||||||||||
CMU Reinforcing Steel | 5 | TN | 763.00 | 3,815 | ||||||||||||
3,815 | ||||||||||||||||
SBTL | Division 4 — Subtotal | 4.46 | 334,371 | |||||||||||||
Division 5 — Metals: | ||||||||||||||||
Support Facility | ||||||||||||||||
Metal Building — Furnish | 26,589 | SF | 10.60 | 281,843 | ||||||||||||
Metal Building — Install | 26,589 | SF | 7.60 | 202,076 | ||||||||||||
483,920 | ||||||||||||||||
Central Plant/ Cooling Tower Structural Steel Package per Addendum 17 (Postel Industries) | 1 | LS | 205,670 | 205,670 | ||||||||||||
Central Plant Roof Framing Structure (8#/SF) | 30 | TN | W/ Above | |||||||||||||
Cooling Tower Supports (1,800 SF @ 12#/SF) | 11 | TN | W/ Above | |||||||||||||
Cooling Tower Isolation Beams | 2 | TN | W/ Above | |||||||||||||
Access Walkway Grating at Towers | 1,800 | SF | 20.00 | 36,000 | ||||||||||||
Cooling Tower Railing (6 line, 42”) | 360 | LF | 150.00 | 54,000 | ||||||||||||
Cooling Tower Access Ladder | 1 | EA | 2,500.00 | 2,500 | ||||||||||||
Add Additional Electrical Steel Platform / Grating | 240 | SF | 30.00 | 7,200 | ||||||||||||
305,370 |
62 of 93
GSF25,369 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Misc Metals (.5#/SF) | 6 | TN | 4,500.00 | 28,540 | ||||||||||||
28,540 | ||||||||||||||||
SBTL | Division 5 — Subtotal | 10.91 | 817,830 | |||||||||||||
Division 6 — Carpentry: | ||||||||||||||||
Rough Carpentry | 25,369 | GSF | 0.50 | 12,685 | ||||||||||||
Temp Protection | 25,369 | GSF | 0.25 | 6,342 | ||||||||||||
19,027 | ||||||||||||||||
Vanities at Locker Rooms | 48 | LF | 75.00 | 3,600 | ||||||||||||
Vanities at Restrooms | 10 | LF | 75.00 | 750 | ||||||||||||
4,350 | ||||||||||||||||
4’ Diamond Plate Wainscot w 2x6 chair and base at BOH Corridor (454LF) | 1,816 | SF | 25.00 | 45,400 | ||||||||||||
12,685 | ||||||||||||||||
SBTL | Division 6 — Subtotal | 0.92 | 68,777 | |||||||||||||
Division 7 — Waterproofing: | ||||||||||||||||
WP, DP, Caulking | 5,600 | SF | 1.25 | 7,000 | ||||||||||||
Expansion Joint Assemblies | 0 | LF | 0 | |||||||||||||
7,000 | ||||||||||||||||
Roofing & Sheet Metal — meets 140 MPH Code | ||||||||||||||||
SBS Built-up Roofing at Central Plant Building | 7,611 | SF | 18.00 | 136,998 | ||||||||||||
Roofing at Support Facility w/ Mtl Building Supplier | 26,250 | SF | — | 0 | ||||||||||||
$136,998 | ||||||||||||||||
SBTL | Division 7 — Subtotal | 1.92 | 143,998 | |||||||||||||
Division 8 — Doors & Windows: | ||||||||||||||||
Hollow Metal Doors / Frames / Hardware | ||||||||||||||||
Hollow Metal Frames: 3o 7o Interior | 22 | EA | 95.92 | 2,110 | ||||||||||||
Hollow Metal Frames: 6o 7o Interior | 12 | EA | 100.28 | 1,203 | ||||||||||||
Hollow Metal Frames: 3o 7o Exterior | 2 | EA | 95.92 | 192 | ||||||||||||
Hollow Metal Frames: 6o 7o Exterior | 8 | EA | 100.28 | 802 | ||||||||||||
Hollow Metal Doors: 3o 7o Interior | 22 | LVS | 231.08 | 5,084 | ||||||||||||
Hollow Metal Doors: 6o 7o PR Interior | 24 | LVS | 231.08 | 5,546 | ||||||||||||
Hollow Metal Doors: 3o 7o Exterior | 2 | LVS | 231.08 | 462 | ||||||||||||
Hollow Metal Doors: 6o 7o PR Exterior | 16 | LVS | 231.08 | 3,697 | ||||||||||||
19,097 | ||||||||||||||||
Unload/Distribute HM Doors & Frames | 64 | EA | 12.00 | 768 | ||||||||||||
Hang HM Doors | 64 | EA | 65.00 | 4,160 | ||||||||||||
Install Hardware | 64 | SETS | 100.00 | 6,400 | ||||||||||||
11,328 | 0 | |||||||||||||||
Hardware | 64 | SETS | 325.00 | 20,800 | ||||||||||||
Add for Electrified Security Hardware (F & I by Security Contractor) | 0 | EA | 0 | |||||||||||||
20,800 |
63 of 93
GSF25,369 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Overhead Doors | ||||||||||||||||
Exterior OH Coiling Doors (10’x12’ Electric) | 4 | EA | 12,000.00 | 48,000 | ||||||||||||
Interior OH Coiling Doors- Warehouse (8’x10’) | 2 | EA | 5,000.00 | 10,000 | ||||||||||||
58,000 | ||||||||||||||||
SBTL | Division 8 — Subtotal | 1.46 | 109,225 | |||||||||||||
Division 9 — Finishes: | ||||||||||||||||
Support Facility | ||||||||||||||||
Drywall | 25,369 | GSF | 15.00 | 380,535 | ||||||||||||
Acoustical Ceilings | 12,057 | SF | 3.00 | 36,171 | ||||||||||||
Gyp Board Walls- One Side (Perimeter) to 10’ AFF | 3,350 | SF | 0 | |||||||||||||
Gyp Board Walls- Two Side Interior to 10’ AFF | 5,500 | SF | 0 | |||||||||||||
Gyp Board Walls- Two Side MR @ Wet Areas to 10’ AFF | 3,000 | SF | 0 | |||||||||||||
416,706 | ||||||||||||||||
Ceramic Tile | ||||||||||||||||
1 | LS | 53,012.00 | 53,012 | |||||||||||||
Ceramic Tile at Floor | 2,167 | SF | 0 | |||||||||||||
Ceramic Tile at Showers | 924 | SF | 0 | |||||||||||||
Ceramic Tile at Wet Walls | 1,026 | SF | 0 | |||||||||||||
53,012 | ||||||||||||||||
Carpet Install / VCT | 1 | LS | 12,403.20 | 12,403 | ||||||||||||
VCT | 6,937 | SF | 0 | |||||||||||||
Carpet Install (Direct Glue Down) | 207 | SY | 0 | |||||||||||||
12,403 | ||||||||||||||||
Sealed Concrete | 12,811 | SF | 0.75 | 9,608 | ||||||||||||
9,608 | ||||||||||||||||
Painting & Textured Coatings | 25,369 | GSF | 2.25 | 57,080 | ||||||||||||
57,080 | ||||||||||||||||
Central Plant | ||||||||||||||||
Paint Exterior CMU Screenwall | 5,547 | SF | 3.00 | 16,641 | ||||||||||||
16,641 | ||||||||||||||||
SBTL | Division 9 — Subtotal | 7.54 | 565,451 | |||||||||||||
Division 10 — Specialties: | ||||||||||||||||
Fire Protection Specialties | ||||||||||||||||
FE & Cabinets | 3 | EA | 100.00 | 300 | ||||||||||||
FE Cabinets: Installation | 3 | EA | 85.00 | 255 | ||||||||||||
555 | ||||||||||||||||
Toilet & Bath Accessories | ||||||||||||||||
Framed Mirrors | 11 | EA | 80.00 | 880 | ||||||||||||
Grab Bar- 30” | 5 | EA | 28.00 | 140 | ||||||||||||
Grab Bar- 36” | 13 | EA | 30.00 | 390 | ||||||||||||
Janitor Accessories/ Mop Hook | 1 | EA | 50.00 | 50 | ||||||||||||
Paper Towel/ Trash Receptacle | 5 | EA | 250.00 | 1,250 | ||||||||||||
Sanitary Napkin Disp | 2 | EA | 250.00 | 500 | ||||||||||||
Shower Curtain/ Rod | 12 | EA | 100.00 | 1,200 |
64 of 93
GSF | 25,369 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Soap Dispenser | 11 | EA | 43.00 | 473 | ||||||||||||
Toilet Compartments- ADA | 4 | EA | 1,600.00 | 6,400 | ||||||||||||
Toilet Compartments- Standard | 10 | EA | 1,500.00 | 15,000 | ||||||||||||
Toilet Paper Disp | 15 | EA | 45.00 | 675 | ||||||||||||
Towel Hook | 12 | EA | 25.00 | 300 | ||||||||||||
Urinal Screen | 2 | EA | 750.00 | 1,500 | ||||||||||||
Toilet & Bath Accessories Installation | 103 | EA | 25.00 | 2,575 | ||||||||||||
31,333 | ||||||||||||||||
Louver @ Generator Room | 115 | SF | 45.00 | 5,175 | ||||||||||||
Louvers @ Central Plant Building | 905 | SF | 45.00 | 40,725 | ||||||||||||
45,900 | ||||||||||||||||
Awnings @ Support Building Exit Doors | 285 | SF | 25.00 | 7,125 | ||||||||||||
Covered Walkway @ Loading Dock | 1,040 | SF | 25.00 | 26,000 | ||||||||||||
33,125 | ||||||||||||||||
SBTL | Division 10 — Subtotal | 1.48 | 110,913 | |||||||||||||
Division 11 — Equipment: | ||||||||||||||||
#A-29 | Loading Dock Equipment | 1 | ALLOW | 50,000.00 | 50,000 | |||||||||||
50,000 | ||||||||||||||||
Kitchen Equipment | ||||||||||||||||
Support/Warehouse Equipment | 1 | LS | 362,615.00 | 362,615 | ||||||||||||
Refrigeration Racks | 1 | LS | 574,750.00 | 574,750 | ||||||||||||
937,365 | ||||||||||||||||
Walk-In Cooler/Freezer Slabs | ||||||||||||||||
Styrofoam (Assume 2,000 SF) | 2,000 | SF | 2.50 | 5,000 | ||||||||||||
Topping Slab (Assume 2,000SF) | 2,000 | SF | 3.50 | 7,000 | ||||||||||||
12,000 | ||||||||||||||||
SBTL | Division 11 — Subtotal | 13.33 | 999,365 | |||||||||||||
Division 12 — Furniture: | ||||||||||||||||
SBTL | Division 12 — Subtotal | — | 0 | |||||||||||||
Division 13 — Special Construction: | ||||||||||||||||
SBTL | Division 13 — Subtotal | — | 0 | |||||||||||||
Division 14 — Conveying Systems: | ||||||||||||||||
SBTL | Division 14 — Subtotal | — | 0 | |||||||||||||
Division 15 — Mechanical: | ||||||||||||||||
Mechanical GMP — Central Plant | 1 | LS | 2,971,977.00 | 2,971,977 | ||||||||||||
Extended General Conditions thru 5/21/2012 | 1 | LS | 44,579.66 | 44,580 | ||||||||||||
Plumbing (with HVAC) | 25,369 | GSF | w/ Mech GMP | |||||||||||||
HVAC — Chillers/Pumps/CT’s/Piping in Plant | 2,400 | TN | w/ Mech GMP | |||||||||||||
TN | Removed — VE | |||||||||||||||
LS | Removed — VE | |||||||||||||||
Diesel Fuel Tank Pumping System | 1 | LS | w/ M & E GMP | |||||||||||||
3,016,557 |
65 of 93
GSF25,369 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Mechanical GMP — Support Facility | 1 | LS | 1,052,132.00 | 1,052,132 | ||||||||||||
Support Facility (HVAC/Plumbing/HW&CW Piping to Plant Overhead) | 25,369 | GSF | w/ Mech GMP | |||||||||||||
1,052,132 | ||||||||||||||||
Fire Protection Systems | ||||||||||||||||
Fire Protection: New | 25,369 | GSF | 2.50 | 63,423 | ||||||||||||
Diesel Fire Pump System | 1 | LS | 96,000.00 | 96,000 | ||||||||||||
159,423 | ||||||||||||||||
SBTL | Division 15 — Subtotal | 56.41 | 4,228,111 | |||||||||||||
Division 16 — Electrical: | ||||||||||||||||
Electrical GMP | 1 | LS | 3,007,584.00 | 3,007,584 | ||||||||||||
Extended General Conditions thru 5/21/2012 | 1 | LS | 45,113.76 | 45,114 | ||||||||||||
Electrical | 25,369 | GSF | w/ Elect GMP | |||||||||||||
(2) 2000 KW Generators and 10,000 gal Tanks | 4 | kw | w/ Elect GMP | |||||||||||||
Switchgear for Hotel | 197,166 | GSF | w/ Elect GMP | |||||||||||||
Switchgear for Vessel | 163,929 | GSF | w/ Elect GMP | |||||||||||||
Switchgear for Low Rise | 66,222 | GSF | w/ Elect GMP | |||||||||||||
3,052,698 | ||||||||||||||||
Low Voltage: Allowance | ||||||||||||||||
#A-59 | Hotel Surveillance/Security: No Equipment | 25,369 | GSF | 2.00 | 50,738 | |||||||||||
50,738 | ||||||||||||||||
#A-57 | Communication/Data: No Devices/Equipment | 25,369 | GSF | 2.00 | 50,738 | |||||||||||
50,738 | ||||||||||||||||
#A-58 | AV/Sound | 25,369 | GSF | 1.00 | 25,369 | |||||||||||
25,369 | ||||||||||||||||
Fire Alarm System | ||||||||||||||||
Fire Alarm: Design/Materials/Testing | 25,369 | GSF | w/ Elect GMP | |||||||||||||
Fire Alarm Installation: Electrician | ||||||||||||||||
SBTL | Division 16 — Subtotal | 42.42 | 3,179,543 | |||||||||||||
TOTAL COSTS | ||||||||||||||||
12,581,488 |
66 of 93
GSF | 25,369 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Cost of Work Subtotal | $ | 12,581,488 | ||||||||||||||
Sub Guard @ 1.25% | $ | 157,269 | ||||||||||||||
General Conditions (5.25%) | $ | 658,183 | ||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 31,870 | ||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 27,679 | ||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 100,652 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 2,516 | ||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 13,559,657 | ||||||||||||||
MCC Fee @ 3.25% | $ | 440,689 | ||||||||||||||
Project Total | $ | 14,000,346 | ||||||||||||||
MCC Contingency @ 4% times Cost of Work | 4.00 | % | $ | 754,889 | ||||||||||||
Area Total | $ | 14,755,235 | ||||||||||||||
$/SF | 581.62 |
67 of 93
Manhattan Construction Company
BATON ROUGE CASINO VESSEL
GSF226,634 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Vessel Barges & Trusses: Bollinger | 1 | LS | 20,065,329 | 20,065,329 | ||||||||||||
Vessel Barges Truss In-Fill: Bollinger | 1 | LS | 284,215 | 284,215 | ||||||||||||
Addendum #2 - LPA document revisions | 1 | LS | 2,119,570 | 2,119,570 | ||||||||||||
Addendum #3 - LPA document revisions | 1 | LS | — | 0 | ||||||||||||
Addendum #4 - LPA document revisions | 1 | LS | 722,922 | 722,922 | ||||||||||||
Contingency for Truss Pile Cap Alignment Addenda (with Addenda 2) | 0 | |||||||||||||||
Remote Ballasting Tank Monitoring System (W/ Marine Work) | 1 | LS | W/ Marine | |||||||||||||
Beam Doubler Plates (Temp Barge Beams) | 1 | LS | 48,299 | 48,299 | ||||||||||||
Pile Capture Chain Restraint Receive / Load Out | 72 | EA | 650 | 46,800 | ||||||||||||
23,287,135 | ||||||||||||||||
Hydraulic Motor System | ||||||||||||||||
Paddlewheel Hydro Motor System | 1 | LS | 295,000 | 295,000 | ||||||||||||
Install Paddlewheel Hydro Motor System | 1 | LS | 139,000 | 139,000 | ||||||||||||
434,000 | ||||||||||||||||
Premium to Apply Deck Top Coat at the Site | 77,760 | SF | 0.30 | 23,328 | ||||||||||||
23,328 | ||||||||||||||||
Safety Rails | ||||||||||||||||
Barge Safety Rails @ Barge Platforms | 2,100 | LF | 10.00 | 21,000 | ||||||||||||
Barge Safety Cages: Ships Ladder Temporary Cage | 6 | EA | 1,000.00 | 6,000 | ||||||||||||
Safety Equipment for Ballast Tank Air Quality | 1 | LS | 10,000.00 | 10,000 | ||||||||||||
Air Compressors Air Purging | 3 | MO | 1,150.00 | 3,450 | ||||||||||||
Temp Generator for Air Purging | 3 | MO | 4,000.00 | 12,000 | ||||||||||||
Vessel Tank Venting Labor | 4 | WKS | 4,000.00 | 16,000 | ||||||||||||
Air Quality Engineer Certification | 40 | HR | 200.00 | 8,000 | ||||||||||||
76,450 | ||||||||||||||||
Installation of Paddlewheel (with Marine) | 1 | LS | W/ Marine | |||||||||||||
TOTAL COST | 105.11 | 23,820,913 |
68 of 93
GSF | 226,634 |
REVISED 05/02/11
Sys. | ||||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||||
Cost of Work Subtotal | 23,820,913 | |||||||||||||||||||
Sub Guard@ 1.25% | 5,425 | |||||||||||||||||||
General Conditions | 0 | |||||||||||||||||||
Building Permit | ||||||||||||||||||||
General Liability Insurance (Cost of Work times .007) | 166,746 | |||||||||||||||||||
Builders Risk Insurance (By Owner) | 0 | |||||||||||||||||||
LA Sales Tax Bond & City Bond (Cost of Work times .0002) | 4,764 | |||||||||||||||||||
MCC P & P Bond Premium (Not Required) | 0 | |||||||||||||||||||
Project Subtotal | 23,997,849 | |||||||||||||||||||
MCC Fee @ 1.00% | 239,978 | |||||||||||||||||||
Project Total | 24,237,827 | |||||||||||||||||||
MCC Contingency @ .50% times Cost of Work | 0.50 | % | 119,105 | |||||||||||||||||
Area Total | 24,356,932 | |||||||||||||||||||
$/SF | 107.47 |
69 of 93
Manhattan Construction Company
BATON ROUGE CASINO FIXED CASINO, LOW RISE
FOH | 26,463.00 | |||
BOH | 39,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
DIVISION 2 | ||||||||||||||||
Test Pile Program (split hotel/garage/low rise) — drive /mobilization | 1 | LS | 81,298.00 | 81,298 | ||||||||||||
Temp Road for Test Pile Program | 1 | LS | 25,000.00 | 25,000 | ||||||||||||
106,298 | ||||||||||||||||
Auger Cast Piles | ||||||||||||||||
Auger Cast Piles (18′x122′) | 28,600 | LF | 21.50 | 614,900 | ||||||||||||
Auger Cast Pile Mobilization | 1 | EA | 74,000.00 | 74,000 | ||||||||||||
Add 51 ACP at Low Rise (issued after bid-IFC drawings) | 1 | LS | 171,202.00 | 171,202 | ||||||||||||
Add Rebar for Longer ACP @ Raised Caps in Berms | 1 | LS | 17,810.00 | 17,810 | ||||||||||||
RFI 006 Raise Top of Pile at Basin Berm | 1 | LS | 3,251.00 | 3,251 | ||||||||||||
ASI 006 Add ACP for Revised Column Location | 1 | LS | 3,595.00 | 3,595 | ||||||||||||
884,758 | ||||||||||||||||
Form / Place / Finish Pile Caps | 1 | LS | 180,290.00 | 180,290 | ||||||||||||
Structural Excavation and Backfill for Pile Caps | 1 | LS | 86,410.00 | 86,410 | ||||||||||||
Concrete and Reinforcing for Pile Caps | 1 | LS | 147,673.00 | 147,673 | ||||||||||||
RFI 49 Enlarge Podium Grade Beams | 1 | LS | 7,240.00 | 7,240 | ||||||||||||
Drill & Epoxy Additional Anchor Bolts | 1 | LS | 19,718.00 | 19,718 | ||||||||||||
441,331 | ||||||||||||||||
Stockpile Berm and Work around LR Steel | 1 | LS | 41,856.00 | 41,856 | ||||||||||||
Excavate Test Hole at Basin for Geo Eng | 1 | LS | 12,986.00 | 12,986 | ||||||||||||
Add Fill at Basin Added Ramp | 1 | LS | 12,986.00 | 12,986 | ||||||||||||
67,828 | ||||||||||||||||
SBTL | Division 2 - Subtotal | 22.65 | 1,500,215 | |||||||||||||
DIVISION 3 | ||||||||||||||||
Pump/Place/Finish Concrete SOMD | 70,601 | SF | 1.25 | 88,251 | ||||||||||||
Misc. Equipment Pads | 1,000 | SF | 5.50 | 5,500 | ||||||||||||
93,751 | ||||||||||||||||
Reinforcing Steel Materials (Bars) | 168 | TONS | 763.00 | 128,184 | ||||||||||||
Reinforcing Steel Materials (Mesh) | 774 | SQS | 19.40 | 15,017 | ||||||||||||
Formsaver Material at Pile Caps | 2,028 | EA | 21.66 | 43,923 | ||||||||||||
RFI 49 Enlarge Podium Grade Beams | 1 | LS | 5,462.00 | 5,462 | ||||||||||||
192,586 | ||||||||||||||||
Reinforcing Installation (Mesh) | 774 | SQS | 11.00 | 8,514 | ||||||||||||
Reinforcing Installation (Bars) | 168 | TONS | 295.00 | 49,560 | ||||||||||||
58,074 | ||||||||||||||||
Ready-mix Materials 3500psi | 1,497 | CY | 88.29 | 132,170 | ||||||||||||
Ready-mix Materials 3500 LW | 16 | CY | 112.27 | 1,796 | ||||||||||||
133,966 |
70 of 93
FOH | 26,463.00 | |||
BOH | 39,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Crane #2- Liebherr 630 | 12 | MO | 22,800.00 | 273,600 | ||||||||||||
Crane Foundation: F/P/P/F | 1 | EA | 40,350.00 | 40,350 | ||||||||||||
ACP Piles for TC2 | 1 | LS | 33,760.00 | 33,760 | ||||||||||||
Crane Operators | 52 | WK | 3,800.00 | 197,448 | ||||||||||||
Lull Rent | 4 | MO | 2,600.00 | 10,400 | ||||||||||||
Lull Fuel & Maint | 4 | MO | 1,000.00 | 4,000 | ||||||||||||
Lull Operator | 17 | WKS | 3,800.00 | 64,600 | ||||||||||||
Safety Rails @ Podium: Install & Maintain | 800 | LF | 9.40 | 7,520 | ||||||||||||
631,678 | ||||||||||||||||
SBTL | Division 3 - Subtotal | 16.76 | 1,110,056 | |||||||||||||
DIVISION 4 | ||||||||||||||||
Masonry (10′ tall BOH Corridor) | 5,580 | SF | 12.00 | 66,960 | ||||||||||||
66,960 | ||||||||||||||||
CMU Reinforcing Steel | 2 | TON | 763.00 | 1,526 | ||||||||||||
1,526 | ||||||||||||||||
SBTL | Division 4 - Subtotal | 1.03 | 68,486 | |||||||||||||
DIVISION 5 | ||||||||||||||||
Structural Steel | 1,187 | TN | 2,420.00 | 2,872,540 | ||||||||||||
Structural Steel Design Changes per ASI #15 | 1 | LS | 238,400.00 | 238,400 | ||||||||||||
Structural Steel Mill Order Price Increase | 1 | LS | 54,000.00 | 54,000 | ||||||||||||
Store Steel for to Work Stoppage due to Programming Approval | 1 | LS | 12,500.00 | 12,500 | ||||||||||||
Move / Re-handle Steel due to Work Stoppage | 1 | LS | 30,000.00 | 30,000 | ||||||||||||
Structural Steel Design Changes: (12-28-10 to IFC) | 1 | LS | 352,208.00 | 352,208 | ||||||||||||
EPIC Deck Upgrade | 1 | LS | 156,000.00 | 156,000 | ||||||||||||
3,715,648 | ||||||||||||||||
Area 3 Steel Erection Escalation | ||||||||||||||||
Premium for Steel Erection due to River Level | 1 | LS | 90,000.00 | 90,000 | ||||||||||||
Premium for Steel Erection Divers | 18 | DAYS | 2,500.00 | 45,000 | ||||||||||||
135,000 | ||||||||||||||||
Metal Floor Deck (with above) | 37,200 | SF | W/ Above | |||||||||||||
Metal Roof Deck (with above) | 88,100 | SF | W/ Above | |||||||||||||
Miscellaneous Metals | ||||||||||||||||
Miscellaneous Metals (.75#/SF) | 25 | TN | 4,500.00 | 111,750 | ||||||||||||
Rail at Cat Walk | 720 | LF | 110.00 | 79,200 | ||||||||||||
Guard Rail at Exit Bridge | 1 | LS | 17,000.00 | 17,000 | ||||||||||||
Vessel Perimeter Picket Railing | 531 | LF | 250.00 | 132,750 | ||||||||||||
Stair #1 | 40 | RISER | 650.00 | 26,000 | ||||||||||||
Stair #2 | 134 | RISER | 650.00 | 87,100 | ||||||||||||
Stair #4 | 15 | RISER | 650.00 | 9,750 | ||||||||||||
463,550 |
71 of 93
FOH | 26,463.00 | |||
BOH | 33,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
RTU Privacy Screen | ||||||||||||||||
Support Steel Privacy Screen at Roof (10#/SF) | 22 | TN | 4,000.00 | 86,180 | ||||||||||||
Support Steel Privacy Screen at Roof (10#/SF) | 14 | |||||||||||||||
#A-1 | Delete Support Steel Privacy Screen at Roof (10#/SF) | 1 | ALLOW | (86,180.00 | ) | -86,180 | ||||||||||
0 | ||||||||||||||||
Ornamental Metals (with Div 9 Buildout) | W/ Div. 9 & 6 | |||||||||||||||
0 | ||||||||||||||||
SBTL | Division 5 - Subtotal | 65.15 | 4,314,198 | |||||||||||||
DIVISION 6 | ||||||||||||||||
Rough Carpentry | 66,222 | GSF | 1.00 | 66,222 | ||||||||||||
Temporary Protection | 66,222 | GSF | 1.50 | 99,333 | ||||||||||||
165,555 | ||||||||||||||||
Plywood | ||||||||||||||||
TPO Plywood Substrate Deck @ Epideck | 16,245 | SF | 3.50 | 56,858 | ||||||||||||
56,858 | ||||||||||||||||
Misc BOH Millwork | ||||||||||||||||
Storage 1103 Uppers / Lowers | 8 | LF | 280 | 2,240 | ||||||||||||
Office 1104 Uppers / Lowers | 8 | LF | 280 | 2,240 | ||||||||||||
Coats 1200 Shelf / Hanging Rod | 17 | LF | 150 | 2,550 | ||||||||||||
Men’s Toilet 1125 Vanity | 2 | LF | 200 | 400 | ||||||||||||
Women’s Toilet 1126 Vanity | 2 | LF | 200 | 400 | ||||||||||||
Diamond Plate Wainscot with 2x6 Top/Bottom | 412 | SF | 25 | 10,300 | ||||||||||||
18,130 | 0 | |||||||||||||||
Promenade / My Choice / Valet | 0 | |||||||||||||||
Vestibule | 1 | LS | 22,320 | 22,320 | ||||||||||||
Valet Counter / key Unit | 1 | EA | 32,370 | 32,370 | ||||||||||||
My Choice Counter / Cabinets | 1 | EA | 33,158 | 33,158 | ||||||||||||
Conceirge Desk | 1 | EA | 15,000 | 15,000 | ||||||||||||
Storage / Office Upper and Lowers | 1 | LS | 5,158 | 5,158 | ||||||||||||
Oil Rubbed Bronze at Header Elev +24 / +44 | 8,500 | SF | 47 | 399,500 | ||||||||||||
#A-13 | Delete Oil Rubbed Bronze at Promenade and use bronze chem metal product | 1 | ALLOW | -246,500 | -246,500 | |||||||||||
Ornamental Rail at Level 2 Bridge | 260 | LF | 400 | 104,000 | ||||||||||||
#A-13 | Simplify guardrail at Level 2 Promenade Bridge (reduce allowance) | 1 | ALLOW | -52,000 | -52,000 | |||||||||||
Trim at Level 2 Bridge | 780 | LF | 25 | 19,500 | ||||||||||||
Stylemark Corners | 9,120 | LF | 11 | 100,320 | ||||||||||||
Oiled Bronze with deco elements and wood louvers at Fireplace | 500 | SF | 280 | 140,000 | ||||||||||||
Bronze beveled mirror with Black Frame at Fireplace | 335 | SF | 508 | 170,180 | ||||||||||||
0 | ||||||||||||||||
Gold Colored Glass at Fireplace | 36 | SF | 150 | 5,400 | ||||||||||||
False Glass Wall System at Restroom Entry | 410 | SF | 137 | 56,170 | ||||||||||||
804,576 | 0 |
72 of 93
FOH | 26,463.00 | |||
BOH | 39,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
2 Meal / Grab N Go | 0 | |||||||||||||||
Main Bar at 2 Meal with Glass Counter Top with undermont TV / lower diewall | 70 | LF | 902 | 63,140 | ||||||||||||
Back Up Bar with Granite Counter Top at 2 Meal | 40 | LF | 673 | 26,920 | ||||||||||||
Bottle Display at Corner | 1 | EA | 10,734 | 10,734 | ||||||||||||
POS at Grab N Go | 1 | EA | 6,386 | 6,386 | ||||||||||||
Radiused Grab N Go Counter with lower diewall and display case | 42 | LF | 2,310 | 97,020 | ||||||||||||
Back Up Bar with Granite Counter Top at Grab N Go | 40 | LF | 335 | 13,400 | ||||||||||||
Metal Strapped Columns | 3 | EA | 1,744 | 5,232 | ||||||||||||
Wood Plank at Entry with Bronze Filagree | 421 | SF | 26 | 10,946 | ||||||||||||
Menu Boards | 4 | EA | 1,240 | 4,960 | ||||||||||||
Stylemark Corners | 2,320 | LF | 11 | 25,520 | ||||||||||||
0 | ||||||||||||||||
Bronze Standing Seam Metal Roof at 2 Meal Entry | 1,400 | SF | 101 | 141,400 | ||||||||||||
#A-13 | Delete Standing Seam Metal Roof at 2 Meal and replace with painted metal roofing | 1 | ALLOW | -85,400 | -85,400 | |||||||||||
Bronze Standing Seam Metal Roof at GNG Entry | 1,005 | SF | 101 | 101,505 | ||||||||||||
#A-13 | Delete Standing Seam Metal Roof at GNG and replace with painted metal roofing | 1 | ALLOW | -61,305 | -61,305 | |||||||||||
“Hopes” Bronze Storefront at Entry to 2 Meal | 160 | LF | 767 | 122,720 | ||||||||||||
#A-13 | Delete “Hopes” Bronze Storefront at Entry to 2 Meal and replace with standard bronze Aluminum Storefront | 1 | ALLOW | -74,720 | -74,720 | |||||||||||
Glazing for “Hopes” Bronze Storefront at Entry to 2 Meal | 2,400 | SF | 83 | 199,200 | ||||||||||||
#A-13 | Glazing for “Hopes” Bronze Storefront at Entry to 2 Meal | 1 | ALLOW | -139,200 | -139,200 | |||||||||||
Operable “Garage Doors” at Entry to 2 Meal | 3 | EA | 51,925 | 155,775 | ||||||||||||
“Hopes” Bronze Storefront at Entry to Grab N Go | 67 | LF | 798 | 53,466 | ||||||||||||
#A-13 | Delete “Hopes” Bronze Storefront at Entry to Grab N Go and replace with standard bronze Aluminum Storefront | 1 | ALLOW | -33,366 | -33,366 | |||||||||||
Red Tinted Glazing for “Hopes” Bronze Storefront at Entry to Grab N Go | 1,005 | SF | 118 | 118,590 | ||||||||||||
#A-13 | Replace Red Glazing for “Hopes” Bronze Storefront at Entry to Grab N Go to red tinited glass | 1 | ALLOW | -93,465 | -93,465 | |||||||||||
Red Bronze Mullion Glass Interior Walls (4′ Knee Walls) | 60 | LF | 483 | 28,980 | ||||||||||||
Red Bronze Mullion Glass Interior Walls (12′ Full Ht Walls) | 45 | LF | 483 | 21,735 | ||||||||||||
720,173 | 0 |
73 of 93
FOH | 26,463.00 | |||
BOH | 39,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Steakhouse | 0 | |||||||||||||||
Host Stand at Entry | 1 | LS | 6,820 | 6,820 | ||||||||||||
Curved Bar at Promenade with Glass Bar Top and “waved” bar front | 70 | LF | 1,460 | 102,200 | ||||||||||||
Back Up Bar at Curved Bar with Granite Top with stemware display | 24 | LF | 1,576 | 37,824 | ||||||||||||
Wine Storage Cabinets w Black Metal Wine Racks and Colored Glass | 26 | LF | 1,413 | 36.738 | ||||||||||||
Blackened Wood Plank w Polished St Stl Straps at Wall on “L” line | 572 | SF | 105 | 60,060 | ||||||||||||
Black Metal Column Wraps at Main Dining | 6 | EA | 17,468 | 104,808 | ||||||||||||
#A-13 | Change Black Metal Column Wraps (formed) at Main Dining in Steakhouse to drywall wrap wth metal cladding | 1 | ALLOW | -40,308 | -40,308 | |||||||||||
Rivots at Columns | 1 | LS | 11,315 | 11,315 | ||||||||||||
Black Metal Column Wraps at Private Dining | 4 | EA | 3,798 | 15,192 | ||||||||||||
Wood / Glass Doors at RR Stalls | 3 | EA | 1,500 | 4,500 | ||||||||||||
Back Walls (6) Banquettes | 6 | EA | 5,890 | 35,340 | ||||||||||||
Booth Blockhead | 2 | EA | 6,340 | 12,680 | ||||||||||||
Table Low Walls | 3 | EA | 3,090 | 9,270 | ||||||||||||
Use of “reclaimed / Local” wood products | 1 | LS | 24,800 | 24,800 | ||||||||||||
Vanity and Granite Countertop at Restrooms | 28 | SF | 216 | 6,048 | ||||||||||||
0 | ||||||||||||||||
Black Metal Tie Back Rods and Trellis | 1 | LS | 260,400 | 260,400 | ||||||||||||
#A-13 | Reduce Size and Design of Trellis System | 1 | ALLOW | -100,000 | -100,000 | |||||||||||
Standing Seam Metal Roof Structure at Entry | 1 | LS | 121,483 | 121,483 | ||||||||||||
#A-13 | Change Standing Seam Metal Roof to Paint Grade Metal at Entry | 1 | ALLOW | -25,000 | -25,000 | |||||||||||
Scotch Barrel Ceiling at Private Dining | 250 | SF | 126 | 31,500 | ||||||||||||
Black Metal Buttress at Ceiling | 6 | EA | 17,722 | 106,332 | ||||||||||||
#A-13 | Change Black Metal Buttresses to Wood | 1 | ALLOW | -46,332 | -46,332 | |||||||||||
Black Wood Beam Ceiling Finishes | 1 | LS | 157,403 | 157,403 | ||||||||||||
Black Wood Plank / Beam Ceiling at Entry (with above) | 358 | SF | 0 | 0 | ||||||||||||
Black Wood Plank Ceiling at Wine Storages (with above) | 114 | SF | 0 | 0 | ||||||||||||
Beveled Mirror with Black Frame at Ceilings above booths (with above) | 645 | SF | 0 | 0 | ||||||||||||
Blackened Wood Plank w Polished St Stl Straps at Ceiling above Booths, on vertical surface (with above) | 540 | SF | 0 | 0 | ||||||||||||
Beams at Fan Pop Ups (with above) | 7 | EA | 0 | 0 | ||||||||||||
#A-13 | Delete Beveled/ Colored Glass Glazing System at Wine Storage and Restroom Wall at Steakhouse (Elev 8 & 9 22.001) and replace with Planked Wood with Pol Stl Straps (sim to 4/22.002) | 1 | ALLOW | -46,240 | -46,240 | |||||||||||
Beveled/ Colored Glass Glazing System at Private Dining, Wine Storage and Restroom Wall | 140 | LF | 1,645 | 230,300 |
74 of 93
FOH | 26,463.00 | |||
BOH | 39,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Decorative Metal Screen at Private Dining | 480 | SF | 77 | 36,960 | ||||||||||||
Sliding Doors at Private Dining | 4 | PR | 9,959 | 39,836 | ||||||||||||
Swing Door at Private Dining | 2 | PR | 3,991 | 7,982 | ||||||||||||
Glazing system with Black Mullions at Steakhouse Façade / Entry | 42 | LF | 1,767 | 74,214 | ||||||||||||
#A-13 | Change Glazing System from Steel to Wood at Exterior | 1 | ALLOW | -23,814 | -23,814 | |||||||||||
Glazing system with Black Mullions at Steakhouse Entry | 20 | LF | 1,767 | 35,340 | ||||||||||||
#A-13 | Change Glazing System from Steel to Wood at ENTRY | 1 | ALLOW | -11,340 | -11,340 | |||||||||||
0 | ||||||||||||||||
Wood Framed Mirror at Restrooms (FFE) | 0 | EA | 0 | 0 | ||||||||||||
1,276,311 | 0 | |||||||||||||||
Public Restrooms (Rm 1166 / 1167 / 1168) | 0 | |||||||||||||||
Vanity Apron / Granite Countertop | 24 | LF | 487 | 11,688 | ||||||||||||
Crown Moulding | 100 | LF | 40 | 4,000 | ||||||||||||
Wall Hung Solid Surface Partitions / Pilasters w Wood Doors | 9 | EA | 5,321 | 47,889 | ||||||||||||
#A-13 | Revised Toilet Partitions to Drywall Front with Louvered Doors | 1 | ALLOW | -16,389 | -16,389 | |||||||||||
Urinal Screens | 10 | EA | 117 | 1,170 | ||||||||||||
48,358 | 0 | |||||||||||||||
SBTL | Division 6 - Subtotal | 46.66 | 3,089,961 | |||||||||||||
DIVISION 7 | ||||||||||||||||
Low-Rise Flat Roofs (TPO) | 1 | LS | 530,430 | 530,430 | ||||||||||||
Promenade SS Roofing over SIPS System | 1 | LS | 531,360 | 531,360 | ||||||||||||
#A-3 | Delete Standing Seam room at Loading Dock | 1 | ALLOW | (60,140 | ) | -60,140 | ||||||||||
1,001,650 | ||||||||||||||||
Dampproofing @ EIFS System (with EIFS) | 32,584 | SF | W/ EIFS | |||||||||||||
Waterproofing @ Metal Panel System | 8,958 | SF | 6.15 | 55,092 | ||||||||||||
55,092 | ||||||||||||||||
Sheet Membrane Dampproofing at Exterior (with EIFS) | 1 | LS | W/ EIFS | |||||||||||||
0 | ||||||||||||||||
Thermal Insulation beneath Lvl 53 Slab (open to exterior below)- 2# Foam NONE REQUIRED | 45,729 | SF | NIC | |||||||||||||
Thermal Insulation beneath Lvl 53 Slab at coolers | 2,000 | SF | 6.00 | 12,000 | ||||||||||||
12,000 | ||||||||||||||||
Exterior Wall Insulation (with Div 9 Framing Sub) | W/ Drywall | |||||||||||||||
Waterproofing/ Soil Liner @ Planter- D2/LA5.10 | 2,340 | SF | 4.00 | 9,360 | ||||||||||||
Stainless Steel Liner at Planter (Deleted per PNK) | NIC | |||||||||||||||
9,360 |
75 of 93
FOH | 26,463.00 | |||
BOH | 39,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Joint Sealants @ EIFS System | 32,584 | SF | 0.50 | 16,292 | ||||||||||||
Joint Sealants @ Glazing Perimeter (w/ Glass) | 4,150 | LF | W/ Glazing | |||||||||||||
16,292 | ||||||||||||||||
EIFS | 20,920 | SF | 12.75 | 266,730 | ||||||||||||
EIFS #2 (Corrugated Metal Look) | 11,664 | SF | 15.00 | 174,960 | ||||||||||||
Scaffold for EIFS | 1 | LS | 125,000.00 | 125,000 | ||||||||||||
566,690 | ||||||||||||||||
Decorative Panels at Tower (Signage by PNK) | NIC | |||||||||||||||
0 | ||||||||||||||||
#A-30 | Feature Tower Upgrades Allowance | 1 | ALLOW | 100,000.00 | 100,000 | |||||||||||
100,000 | ||||||||||||||||
Corrugated Metal Panel System | 6,552 | SF | 15.00 | 98,280 | ||||||||||||
Composite Metal Panel at Planter | 1,365 | SF | 28.00 | 38,220 | ||||||||||||
#A-4 | Delete Composite Metal Panel at Planter and replace with corrugated Metal Panel | 1 | ALLOW | (17,745.00 | ) | -17,745 | ||||||||||
Composite Metal Soffit at Steakhouse | 362 | SF | 28.00 | 10,136 | ||||||||||||
Metal Fascia at Steakhouse/East Elevation | 495 | LF | 28.00 | 13,860 | ||||||||||||
Composite Metal Panel at Steakhouse (Above windows) | 647 | SF | 28.00 | 18,116 | ||||||||||||
Column Wraps at Steakhouse | 902 | SF | 28.00 | 25,256 | ||||||||||||
#A-5 | Replace Column Wraps at Steakhouse with EIFS | 1 | ALLOW | (7,216.00 | ) | -7,216 | ||||||||||
178,907 | ||||||||||||||||
Equipment Screenwall- 20′ Avg Height | 3,144 | SF | 25.00 | 78,600 | ||||||||||||
Equipment Screenwall- 8′ Avg Height | 1,165 | SF | 25.00 | 29,125 | ||||||||||||
Equipment Screenwall at 2 Meal | 2,700 | SF | 25.00 | 67,500 | ||||||||||||
#A-1 | Eliminate Privacy/Equipment Screens at Roof of Low Rise (Add paint at Mechanical Equipment, does not include 2 Meal screen) | 1 | ALLOW | (107,725.00 | ) | -107,725 | ||||||||||
67,500 | ||||||||||||||||
Planter Screen Wall | 6,552 | SF | 3.00 | 19,656 | ||||||||||||
19,656 | ||||||||||||||||
Expansion Joints | ||||||||||||||||
EJ1X (Interior Floor) | 48 | LF | 150.00 | 7,200 | ||||||||||||
EJ2-S (Exterior Floor) | 46 | LF | 150.00 | 6,900 | ||||||||||||
EJ7-FR (Interior Vertical) | 24 | LF | 150.00 | 3,600 | ||||||||||||
EJ8-FR (Interior Vertical) | 38 | LF | 150.00 | 5,700 | ||||||||||||
EJ10-FR (Roof to Building) | 72 | LF | 150.00 | 10,800 | ||||||||||||
EJ14 (Exterior Floor) | 120 | LF | 150.00 | 18,000 | ||||||||||||
52,200 | ||||||||||||||||
Fireproofing | ||||||||||||||||
Intumescent Coating (None) | 0 |
76 of 93
FOH | 26,463.00 | |||
BOH | 39,759.00 | |||
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Cementitious Fireproofing @ Bottom of Lvl 53 Floor: | 59,613 | SF | NIC | |||||||||||||
SFRM Fireproofing @ Lvl 69 Roof (+13′-6″ BOS) | 4,324 | SF | 2.00 | 8,648 | ||||||||||||
SFRM Fireproofing @ Lvl 73 Roof GSF (+17′-9″ BOS) | 27,376 | SF | 2.00 | 54,752 | ||||||||||||
SFRM Fireproofing @ Lvl 79 Stkhse Roof- (+23′-6″ BOS) | 2,732 | SF | 2.00 | 5,464 | ||||||||||||
SFRM Fireproofing @ Lvl 77 Bridge GSF (+20′-8″ BOS) | 3,090 | SF | 2.00 | 6,180 | ||||||||||||
SFRM Fireproofing High Promenade Roof- Area above LvI 77 Bridge only (lowest BOS ~19′-5″ AFF) | 3,090 | SF | 2.00 | 6,180 | ||||||||||||
SFRM Fireproofing at remainder of High Promenade Roof assumed not required- (Lowest BOS ~45′-5″ AFF) | 19,800 | SF | — | 0 | ||||||||||||
Additional Mobilizations | 3 | EA | 2,000.00 | 6,000 | ||||||||||||
87,224 | ||||||||||||||||
SBTL | Division 7 - Subtotal | 32.72 | 2,166,571 | |||||||||||||
DIVISION 8 | ||||||||||||||||
Hollow Metal Frames: 3o 7o Interior | 30 | EA | 95.92 | 2,878 | ||||||||||||
Hollow Metal Frames: 6o 7o Interior | 14 | EA | 100.28 | 1,404 | ||||||||||||
Hollow Metal Frames: 3o 7o Exterior | 7 | EA | 95.92 | 671 | ||||||||||||
Hollow Metal Frames: 6o 7o Exterior | 18 | EA | 100.28 | 1,805 | ||||||||||||
Hollow Metal Doors: 3o 7o Interior | 30 | LVS | 231.08 | 6,932 | ||||||||||||
Hollow Metal Doors: 6o 7o PR Interior | 28 | LVS | 231.08 | 6,470 | ||||||||||||
Hollow Metal Doors: 3o 7o Exterior | 7 | LVS | 231.08 | 1,618 | ||||||||||||
Hollow Metal Doors: 6o 7o PR Exterior | 36 | LVS | 231.08 | 8,319 | ||||||||||||
30,097 | ||||||||||||||||
Standard Hardware @ HM Doors | 101 | SETS | 286.17 | 28,903 | ||||||||||||
Add for Electrified Security Hardware (F & I by Security Contractor) | 21 | SETS | — | 0 | ||||||||||||
28,903 | ||||||||||||||||
Wood Doors- Custom @ FOH- 3o 7o | 4 | LVS | 1,000.00 | 4,000 | ||||||||||||
Wood Doors- Custom @ FOH- 6o 7o PR | 8 | LVS | 1,000.00 | 8,000 | ||||||||||||
Wood Doors- Custom @- 3o 7o Bi-fold | 4 | EA | 2,000.00 | 8,000 | ||||||||||||
Wood Doors- Custom @- 6o 7o Bi-fold | 4 | EA | 2,000.00 | 8,000 | ||||||||||||
28,000 | ||||||||||||||||
Custom Hardware @ FOH Doors | 20 | SETS | 500.00 | 10,000 | ||||||||||||
10,000 | ||||||||||||||||
Unload/Distribute Doors | 121 | EA | 17.00 | 2,057 | ||||||||||||
Hang Doors | 121 | EA | 65.00 | 7,865 | ||||||||||||
9,922 | ||||||||||||||||
Install Hardware | 121 | EA | 100.00 | 12,100 | ||||||||||||
12,100 |
77 of 93
FOH | 26,463.00 | |
BOH | 39,759.00 | |
GSF | 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Overhead Doors | ||||||||||||||||
OH Doors at Loading Dock | 2 | EA | 7,500.00 | 15,000 | ||||||||||||
15,000 | ||||||||||||||||
Wood Doors- Garage Type @ 2-Meal 8-6x11-6 (WITH MILLWORK) | 3 | EA | W/ Millwork | |||||||||||||
Glass Rail @ Bridge Promenade Balcony (NONE) | 250 | LF | 0 | |||||||||||||
0 | ||||||||||||||||
Skylight at Atrium (NONE) | 0 | SF | 0 | |||||||||||||
0 | ||||||||||||||||
Glass & Glazing | ||||||||||||||||
Type ‘A’ Ext Storefront | 431 | SF | 65.00 | 28,015 | ||||||||||||
Type ‘B’ Ext Storefront | 134 | SF | 65.00 | 8,710 | ||||||||||||
Type ‘C’ Ext Storefront | 136 | SF | 65.00 | 8,840 | ||||||||||||
Type ‘CC’ Ext Storefront | 497 | SF | 65.00 | 32,305 | ||||||||||||
Type ‘D’ Ext Curtainwall | 1,319 | SF | 65.00 | 85,735 | ||||||||||||
Type ‘DD’ Ext Storefront | 276 | SF | 65.00 | 17,940 | ||||||||||||
Type ‘E’ Ext Curtainwall | 90 | SF | 65.00 | 5,850 | ||||||||||||
Type ‘F’ Ext Storefront | 314 | SF | 65.00 | 20,410 | ||||||||||||
Type ‘FF’ Ext Curtainwall | 500 | SF | 65.00 | 32,500 | ||||||||||||
Type ‘G’ Ext Storefront | 90 | SF | 65.00 | 5,850 | ||||||||||||
Type ‘GG’ Ext Curtainwall | 764 | SF | 65.00 | 49,660 | ||||||||||||
Type ‘H’ Ext Storefront | 370 | SF | 65.00 | 24,050 | ||||||||||||
Type ‘HH’ Ext Storefront | 604 | SF | 65.00 | 39,260 | ||||||||||||
Type ‘I’ Ext Storefront | 493 | SF | 65.00 | 32,045 | ||||||||||||
Type ‘II’ Ext Storefront | 382 | SF | 65.00 | 24,830 | ||||||||||||
Type ‘M’ Ext Storefront | 209 | SF | 65.00 | 13,585 | ||||||||||||
Type ‘N’ Ext Storefront | 393 | SF | 65.00 | 25,545 | ||||||||||||
Type ‘NN’ Ext Storefront | 570 | SF | 65.00 | 37,050 | ||||||||||||
Type ‘O’ Ext Storefront | 413 | SF | 65.00 | 26,845 | ||||||||||||
Type ‘P’ Ext Storefront | 225 | SF | 65.00 | 14,625 | ||||||||||||
Type ‘Q’ Ext Storefront | 1,488 | SF | 65.00 | 96,720 | ||||||||||||
Type ‘R’ Ext Storefront | 392 | SF | 65.00 | 25,480 | ||||||||||||
655,850 | ||||||||||||||||
Exterior Doors- Alum Storefront 3o x 7o | 2 | LVS | 4,250.00 | 8,500 | ||||||||||||
Exterior Doors- Alum Storefront 6o x 7o PR | 6 | LVS | 4,250.00 | 25,500 | ||||||||||||
Exterior Doors- Alum Storefront 8o x 7o PR | 4 | LVS | 4,250.00 | 17,000 | ||||||||||||
Exterior Doors- Alum Storefront 3o x 7o FIRE RATED | 10 | LVS | 7,500.00 | 75,000 | ||||||||||||
126,000 | ||||||||||||||||
Storefront: Entry & Vestibule (Doors with Bridge) | SF | 0 | ||||||||||||||
0 | ||||||||||||||||
Misc. Interior Glazing | 26,463 | SF | 0.10 | 2,646 | ||||||||||||
Storefront: Retail: Assume 12′ x 10′ DELETED | 1 | EA | NIC | |||||||||||||
2,646 |
78 of 93
FOH 26,463.00 | ||||
BOH 39,759.00 | ||||
GSF 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Clean Exterior Glass | 10,090 | SF | 0.50 | 5,045 | ||||||||||||
5,045 | ||||||||||||||||
Louver- Type ‘J’ | 896 | SF | 35.00 | 31,360 | ||||||||||||
Louver- Type ‘JJ’ | 385 | SF | 35.00 | 13,475 | ||||||||||||
Louver- Type ‘KK’ | 245 | SF | 35.00 | 8,575 | ||||||||||||
53,410 | ||||||||||||||||
SBTL | Division 8 — Subtotal | 14.75 | 976,973 | |||||||||||||
DIVISION 9 | ||||||||||||||||
Exterior Framing | 34,495 | SF | 12.00 | 413,940 | ||||||||||||
Drywall (Interior) | 66,222 | GSF | 11.00 | 728,442 | ||||||||||||
Upgrade Framing/Structural Steel at Promenade Fireplace Stone (5#/sf) | 1 | TNS | 2,800 | 3,290 | ||||||||||||
1,145,672 | ||||||||||||||||
Promenade / My Choice / Valet | ||||||||||||||||
Tile / Stone Surfaces | 1 | LS | 753,952 | 753,952 | ||||||||||||
#A-14 | Reduce scope of stone pilasters in Promenade and replace with resin panel or chem metal | 1 | ALLOW | -200,000 | -200,000 | |||||||||||
Stone with divider strips and granite base at Promenade Columns up to Elev 44, includes decorative capital | 9 | EA | 0 | 0 | ||||||||||||
Stone Base (North Wall only) | 220 | LF | 0 | 0 | ||||||||||||
24"x24" Stone | 2,530 | SF | 0 | 0 | ||||||||||||
24"x24" Stone at Level 2 Bridge | 1,200 | SF | 0 | 0 | ||||||||||||
4"x4" Ceramic Tile at Steakhouse Bar | 400 | SF | 0 | 0 | ||||||||||||
4"x4" Ceramic Tile at Grab N Go | 88 | SF | 0 | 0 | ||||||||||||
Wood Plank Tile | 1,942 | SF | 0 | 0 | ||||||||||||
Wood Plank Tile at Level 2 Bridge | 1,000 | SF | 0 | 0 | ||||||||||||
Stone at Fireplace | 470 | SF | 0 | 0 | ||||||||||||
Hearth at Fireplace | 80 | SF | 107 | 8,560 | ||||||||||||
0 | ||||||||||||||||
Carpet Installation | 1 | LS | 22,045 | 22,045 | ||||||||||||
Carpet Install, F&I Pad | 902 | SY | 0 | 0 | ||||||||||||
Carpet Install, F&I Pad at Level 2 Bridge | 98 | SY | 0 | 0 | ||||||||||||
Carpet at Stair | 1 | LS | 0 | 0 | ||||||||||||
584,557 | ||||||||||||||||
2 Meal / Grab N Go | ||||||||||||||||
ACT Ceiling above Plank Ceiling (with Drywall) | 4,643 | SF | 0 | 0 | ||||||||||||
Linear Wood Plank Ceiling | 2,457 | SF | 15 | 36,855 | ||||||||||||
0 | ||||||||||||||||
Tile / Stone Surfaces | 1 | LS | 148,599 | 148,599 | ||||||||||||
Subway Tiles | 408 | SF | 0 | 0 | ||||||||||||
Brick Walls | 2,688 | SF | 0 | 0 | ||||||||||||
Brick at Entry Header (Wrapped Beam) | 950 | SF | 0 | 0 | ||||||||||||
Limestone at Header Soffit | 285 | SF | 0 | 0 | ||||||||||||
Concrete Tile w Image frames at wall / Bar Fronts | 414 | SF | 0 | 0 | ||||||||||||
Wood Plank Tiles | 2,289 | SF | 0 | 0 | ||||||||||||
0 | ||||||||||||||||
3/8” Stained Concrete | 2,543 | SF | 12 | 30,516 |
79 of 93
FOH 26,463.00 | ||||
BOH 39,759.00 | ||||
GSF 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Epoxy Floor behind Bar | 973 | SF | 12 | 11,676 | ||||||||||||
227,646 | ||||||||||||||||
Steakhouse | ||||||||||||||||
Tile / Stone Surfaces | 1 | LS | 88,992 | 88,992 | ||||||||||||
Tile Floor at Restroom | 264 | SF | 0 | 0 | ||||||||||||
Tile Wall at Restroom | 1,206 | SF | 0 | 0 | ||||||||||||
Tile Ceiling at Restroom | 264 | SF | 0 | 0 | ||||||||||||
Stone Base | 85 | LF | 0 | 0 | ||||||||||||
0 | ||||||||||||||||
Carpet Install / Wood Flooring | 1 | LS | 36,818 | 36,818 | ||||||||||||
Wood Plank Flooring | 1,674 | SF | 0 | 0 | ||||||||||||
Wood Plank Flooring at Walls | 220 | SF | 0 | 0 | ||||||||||||
Carpet Install, F&l Pad | 181 | SY | 0 | 0 | ||||||||||||
125,810 | ||||||||||||||||
Public Restrooms (Rm 1166 / 1167 / 1168) | ||||||||||||||||
Tile Surfaces | 1 | LS | 56,241 | 56,241 | ||||||||||||
Tile Floor | 715 | SF | 0 | 0 | ||||||||||||
Tile Wall Wainscot (6' 6") | 585 | SF | 0 | 0 | ||||||||||||
#A-10 | Utilize epoxy blend grout ILO Epoxy Grout at Public/BOH Restrooms | 1 | ALLOW | (8,971.00 | ) | -8,971 | ||||||||||
56,241 | ||||||||||||||||
BOH Finishes | ||||||||||||||||
FRP at Kitchens (Full Height) | 10,770 | SF | 5.00 | 53,850 | ||||||||||||
Washable Ceiling Tiles at Kitchen | 10,878 | SF | 3.00 | 32,634 | ||||||||||||
86,484 | ||||||||||||||||
Install Carpet (direct glue) | 119 | SY | 4.70 | 558 | ||||||||||||
Vinyl Base | 3,237 | LF | 1.00 | 3,237 | ||||||||||||
VCT | 5,273 | SF | 3.50 | 18,457 | ||||||||||||
22,252 | ||||||||||||||||
Tile Floor at BOH Restrooms | 270 | SF | 8.00 | 2,160 | ||||||||||||
Wainscot Wall Tile at BOH Restrooms | 412 | SF | 12.00 | 4,944 | ||||||||||||
7,104 | ||||||||||||||||
Stonhard Flooring at Kitchens / Bars | 12,376 | SF | 12.00 | 148,513 | ||||||||||||
Sealed Concrete | 2,420 | SF | 0.75 | 1,815 | ||||||||||||
150,328 | ||||||||||||||||
Paint and Wallcovering at BOH | 39,759 | GSF | 3.00 | 119,277 | ||||||||||||
Paint and Wallcovering at PUBLIC | 26,463 | GSF | 5.00 | 132,315 | ||||||||||||
Paint Exposed Promenade Deck | 16,245 | SF | 2.00 | 32,490 | ||||||||||||
Paint at Exposed Ductwork in 2 Meal | 4,643 | SF | 3.00 | 13,929 | ||||||||||||
Touch-Up Exposed Promenade Trusses | 16,245 | SF | 1.50 | 24,368 | ||||||||||||
#A-1 | Paint Rooftop Mechanical Equipment where Privacy Screens were deleted | 4 | ALLOW | 5,000.00 | 20,000 | |||||||||||
342,379 | ||||||||||||||||
Final Clean | 66,222 | GSF | 0.35 | 23,178 | ||||||||||||
23,178 |
80 of 93
FOH 26,463.00 | ||||
BOH 39,759.00 | ||||
GSF 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Architectural Microtopping at Balcony Walk (At Steakhouse) | 3,055 | SF | 8.00 | 24,440 | ||||||||||||
24,440 | ||||||||||||||||
SBTL | Division 9 — Subtotal | 42.09 | 2,787,120 | |||||||||||||
DIVISION 10 | ||||||||||||||||
Public Area Grab Bar- 36" | 5 | EA | 38.60 | 193 | ||||||||||||
Public Area Grab Bar- 42" | 9 | EA | 42.48 | 382 | ||||||||||||
Public Area Paper Towel / Trash Receptacle | 5 | EA | 272.50 | 1,363 | ||||||||||||
Public Area Sanitary Napkin Disp | 2 | EA | 381.50 | 763 | ||||||||||||
Public Area Soap Dispenser | 10 | EA | 45.78 | 458 | ||||||||||||
Public Area Toilet Paper Disp | 13 | EA | 49.05 | 638 | ||||||||||||
Public Area Toilet Seat Cover Disp | 13 | EA | 207.10 | 2,692 | ||||||||||||
Public Area Vanity Mirrors- FFE | 10 | EA | 0 | |||||||||||||
BOH Grab Bar- 36" | 2 | EA | 32.70 | 65 | ||||||||||||
BOH Grab Bar- 42" | 2 | EA | 35.00 | 70 | ||||||||||||
BOH Janitor Accessories/ Mop Hook | 1 | EA | 50.00 | 50 | ||||||||||||
BOH Paper Towel/ Trash Receptacle | 2 | EA | 381.50 | 763 | ||||||||||||
BOH Sanitary Napkin Disp | 1 | EA | 45.78 | 46 | ||||||||||||
BOH Soap Dispenser | 2 | EA | 49.05 | 98 | ||||||||||||
BOH Toilet Paper Disp | 3 | EA | 49.05 | 147 | ||||||||||||
BOH Toilet Seat Cover Disp | 3 | EA | 207.10 | 621 | ||||||||||||
BOH Framed Mirrors | 2 | EA | 100.00 | 200 | ||||||||||||
8,549 | ||||||||||||||||
Toilet & Bath Accessories Installation | 85 | EA | 20.00 | 1,700 | ||||||||||||
1,700 | ||||||||||||||||
Toilet Partitions at Public Area Restrooms (with millwork) | 17 | EA | W/ Millwork | |||||||||||||
Urinal Screens at Public Area Restrooms (with millwork) | 3 | EA | W/ Millwork | |||||||||||||
Public Area Toilet Compartments- ADA (with Millwork) | 2 | EA | W/ Millwork | |||||||||||||
Public Area Toilet Compartments- Standard (with Millwork) | 7 | EA | W/ Millwork | |||||||||||||
Public Area Urinal Screen (with Millwork) | 2 | EA | W/ Millwork | |||||||||||||
BOH Toilet Compartments- ADA | 2 | EA | 1,600.00 | 3,200 | ||||||||||||
BOH Toilet Compartments- Standard | 1 | EA | 1,500.00 | 1,500 | ||||||||||||
BOH Urinal Screen | 1 | EA | 750.00 | 750 | ||||||||||||
5,450 |
81 of 93
FOH 26,463.00 | ||||
BOH 39,759.00 | ||||
GSF 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Way Finding Graphics (Code required) | 66,222 | GSF | 0.75 | 49,667 | ||||||||||||
#A-27 | Delete Way Finding Graphics (Code required) OFOI | 1 | ALLOW | (49,667.00 | ) | -49,667 | ||||||||||
-1 | ||||||||||||||||
Specialty Signage (OFOI) | NIC | |||||||||||||||
0 | ||||||||||||||||
SBTL | Division 10 — Subtotal | 0.24 | 15,699 | |||||||||||||
DIVISION 11 EQUIPMENT | ||||||||||||||||
Fireplace at Promenade (includes box and block | 1 | EA | 40,000.00 | 40,000 | ||||||||||||
40,000 | ||||||||||||||||
MechoShades at 2 Meal (2ea 8' x 16', 2ea 16' x 16") | 768 | SF | 10 | 7,680 | ||||||||||||
Mecho Shade at Steakhouse Exterior Windows | 1,408 | SF | 10 | 14,080 | ||||||||||||
21,760 | ||||||||||||||||
KITCHEN EQUIPMENT: Allowance | ||||||||||||||||
#A-33 | Kitchen Equipment | 1 | ALLOW | 2,831,950.00 | 2,831,950 | |||||||||||
#A-33 | Beverage Conduit: Allowance | 500 | LF | 80.00 | 40,000 | |||||||||||
2,871,950 | ||||||||||||||||
Walk-In Cooler/Freezer Slabs | ||||||||||||||||
Styrofoam (Assume 2,000 SF) — no depressions | 2,000 | SF | — | 0 | ||||||||||||
Topping Slab (Assume 2,000 SF) — no depressions | 2,000 | SF | — | 0 | ||||||||||||
0 | ||||||||||||||||
Loading Dock Equip (with Casino) | ||||||||||||||||
0 | ||||||||||||||||
SBTL | Division 11 — Subtotal | 44.30 | 2,933,710 | |||||||||||||
DIVISION 12 FURNISHINGS | ||||||||||||||||
Furnishings: OFOI | ||||||||||||||||
SBTL | Division 12 — Subtotal | — | 0 | |||||||||||||
DIVISION 13 SPECIAL CONSTRUCTION | ||||||||||||||||
SBTL | Division 13 — Subtotal | — | 0 | |||||||||||||
DIVISION 14 | ||||||||||||||||
Conveying Systems: Freight — CS-1/CS-2 | 1 | LS | 286,092.00 | 286,092 | ||||||||||||
286,092 | ||||||||||||||||
#A-40 | Hoistway Working Platforms | 2 | ALLOW | 2,500.00 | 5,000 | |||||||||||
SBTL | Division 14 — Subtotal | 4.40 | 291,092 |
82 of 93
FOH 26,463.00 | ||||
BOH 39,759.00 | ||||
GSF 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
DIVISION 15 | ||||||||||||||||
Mechanical — GMP | 1 | LS | 3,097,287.00 | 3,097,287 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 46,459.31 | 46,459 | ||||||||||||
#A-48 | Modify hot water design scheme to incorporate a single 140 degree hot water loop with local point of use water mixing valves to provide 120 degree domestic hot water | 1 | ALLOW | (50,000.00 | ) | -50,000 | ||||||||||
Mechanical Systems | 66,222 | SF | w/Mech GMP | |||||||||||||
3,097,287 | ||||||||||||||||
Mechanical Tie-In’s: CW/CHR/SS/Domestic | w/ Vessel | EA | ||||||||||||||
#A-46 | Sanitary Lift Station & Pumps at Catwalk | 1 | ALLOW | 225,000.00 | 225,000 | |||||||||||
225,000 | ||||||||||||||||
Fire Protection | 66,222 | SF | 2.87 | 190,057 | ||||||||||||
190,057 | ||||||||||||||||
BAS | 26,463 | SF | w/Mech GMP | |||||||||||||
SBTL | Division 15 — Subtotal | 52.99 | 3,508,803 | |||||||||||||
DIVISION 16 | ||||||||||||||||
Electrical GMP | 1 | LS | 3,464,356.00 | 3,464,356 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 51,965.34 | 51,965 | ||||||||||||
#A-52 | Reduce Light Fixture Package by Providing Alternate Fixture Manufactures | 1 | ALLOW | (350,000.00 | ) | -350,000 | ||||||||||
Electrical | 66,222 | SF | w/Elect. GMP | |||||||||||||
3,464,356 | ||||||||||||||||
Fire Alarm | 66,222 | SF | w/EIect. GMP | |||||||||||||
Specialty Lighting: Promenade Public Areas | 26,463 | SF | 10.00 | 264,630 | ||||||||||||
#A-56 | Reduce Specialty Lighting — ALLOWANCE | 1 | ALLOW | (132,315.00 | ) | -132,315 | ||||||||||
264,630 | ||||||||||||||||
Low Voltage: Allowance | ||||||||||||||||
#A-59 | FOH & BOH Surv./Security: No Equipment | 66,222 | SF | 2.00 | 132,444 | |||||||||||
132,444 | ||||||||||||||||
#A-57 | Communication/Data: No Devices/ Equipment | 66,222 | SF | 1.50 | 99,333 | |||||||||||
99,333 | ||||||||||||||||
#A-58 | AV/Sound | 66,222 | SF | 2.00 | 132,444 | |||||||||||
132,444 | ||||||||||||||||
(No Theatrical or Performance Sound Systems) | ||||||||||||||||
SBTL | Division 16 — Subtotal | 55.31 | 3,662,857 | |||||||||||||
TOTAL COST | 399.05 | 26,425,740 |
83 of 93
FOH 26,463.00 | ||||
BOH 39,759.00 | ||||
GSF 66,222.00 |
REVISED 05/02/11
Sys. | ||||||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||||||
Cost of Work Subtotal | $ | 26,425,740 | ||||||||||||||||||
Sub Guard @ 1.25% | $ | 330,322 | ||||||||||||||||||
General Conditions (5.25%) | $ | 1,382,701 | ||||||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 53,249 | ||||||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 58,137 | ||||||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 211,406 | ||||||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 5,285 | ||||||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||||||
Project Subtotal | $ | 28,466,840 | ||||||||||||||||||
MCC Fee @ 3.25% | $ | 925,172 | ||||||||||||||||||
Project Total | $ | 29,392,012 | ||||||||||||||||||
MCC Contingency @ 5% times Cost of Work | 5.00 | % | $ | 1,321,287 | ||||||||||||||||
Area Total | $ | 30,713,299 | ||||||||||||||||||
$/SF | 463.79 |
84 of 93
Manhattan Construction Company
BATON ROUGE CASINO SKYBRIDGE
Bridge 6,351 | ||||
Porte Cochere 9,329 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Division 2 — Sitework: | ||||||||||||||||
Earthwork | ||||||||||||||||
Pile Inspections, Oversight, Testing (By Owner) | NIC | |||||||||||||||
Earthwork | ||||||||||||||||
Excavation and Backfill | 1 | LS | 7,500.00 | 7,500 | ||||||||||||
7,500 | ||||||||||||||||
SBTL | Division 2 — Subtotal | 7,500 | ||||||||||||||
DIVISION 3 | ||||||||||||||||
Place and Finish: L1 6" Lightweight SOMD | 6,961 | SF | 1.25 | 8,701 | ||||||||||||
Spread Footings | 740 | SF | 25.00 | 18,500 | ||||||||||||
Stamped Concrete at Porte Cochere | 17,600 | SF | 13.00 | 228,800 | ||||||||||||
256,001 | ||||||||||||||||
Rebar Material | 5 | TN | 763.00 | 3,815 | ||||||||||||
Mesh | 61 | SQS | 19.40 | 1,184 | ||||||||||||
4,999 | ||||||||||||||||
Install Rebar Material (Bars) | 5 | TN | 295.00 | 1,475 | ||||||||||||
Install Rebar Material (Mesh) | 61 | SQS | 11.00 | 671 | ||||||||||||
2,146 | ||||||||||||||||
Lightweight | 129 | CY | 136.25 | 17,564 | ||||||||||||
17,564 | ||||||||||||||||
SBTL | Division 3 — Subtotal | 280,709 | ||||||||||||||
DIVISION 4 | ||||||||||||||||
Masonry | 0 | |||||||||||||||
SBTL | Division 4 — Subtotal | 0 | ||||||||||||||
DIVISION 5 | ||||||||||||||||
Structural Steel at Walkway/Porte Cochere | 322 | TONS | 3,705.00 | �� | 1,193,010 | |||||||||||
1,193,010 | ||||||||||||||||
Ornamental Metals (W/ Finish Allowance) | W/ Div. 6 & 9 | |||||||||||||||
0 | ||||||||||||||||
SBTL | Division 5 — Subtotal | 1,193,010 | ||||||||||||||
DIVISION 6 | ||||||||||||||||
Rough Carpentry at Walkway | 6,351 | SF | 1.25 | 7,939 | ||||||||||||
Rough Carpentry at Porte Cochere | 9,329 | SF | 1.25 | 11,661 | ||||||||||||
Temporary Protection: Walkway | 6,351 | SF | 1.00 | 6,351 | ||||||||||||
25,951 | ||||||||||||||||
Plywood | ||||||||||||||||
TPO Plywood Substrate Deck @ Epideck | 5,600 | SF | 3.50 | 19,600 | ||||||||||||
19,600 | ||||||||||||||||
SBTL | Division 6 — Subtotal | 45,551 |
85 of 93
Bridge 6,351 | ||||
Porte Cochere 9,329 |
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
DIVISION 7 | ||||||||||||||||
Roofing: Porte Cochere — Standing Seam | 1 | LS | Incl. below | |||||||||||||
Standing Seam Roof over SIPS System | 1 | LS | 393,280 | 393,280 | ||||||||||||
393,280 | ||||||||||||||||
Aluminum Panels at Vestibule Soffit | 4,000 | SF | 25 | 100,000 | ||||||||||||
Aluminum Panels at Slab Line | 1,628 | SF | 25 | 40,700 | ||||||||||||
Metal Panels at Porte Cochere Soffit (Simplex System, Includes Back Up Framing) | 9,329 | SF | 26.00 | 242,554 | ||||||||||||
383,254 | ||||||||||||||||
Caulking & Sealants | 15,680 | SF | 0.75 | 11,760 | ||||||||||||
11,760 | ||||||||||||||||
Cementitious Sprayed on Fireproofing: Walkway: | 6,351 | SF | 3.00 | 19,053 | ||||||||||||
Sprayed on Fireproofing: Porte Cochere | 9,329 | SF | NIC | |||||||||||||
Cementitious (?) Fireproofing @ Lvl 53 (BOS Varies from Grade) — Not Required | 3,032 | SF | NIC | |||||||||||||
SFRM Fireproofing @ Lvl 77 Vestibules (+22'-8" BOS) — Not Required | 3,050 | SF | NIC | |||||||||||||
SFRM Fireproofing @ Lvl 77 Bridge/ Porte Cochere Areas- Open to Exterior Below (+22'-8" BOS) — Not Required | 12,123 | SF | NIC | |||||||||||||
19,053 | ||||||||||||||||
Expansion Joints | ||||||||||||||||
EJ1X-S (Floor Joint- Lvl 1 Casino to Vestibule) | 115 | LF | 150.00 | 17,250 | ||||||||||||
EJ1X-FRS (Floor Joint- Lvl 1 Casino to Tower) | 62 | LF | 150.00 | 9,300 | ||||||||||||
EJ2-S (Floor Joint @ Vestibule Doors) | 100 | LF | 150.00 | 15,000 | ||||||||||||
EJ6-S (Exterior Vertical) | 200 | LF | 150.00 | 30,000 | ||||||||||||
EJ8-FRS (Exterior Vertical @ Curtainwall) | 100 | LF | 150.00 | 15,000 | ||||||||||||
EJ9-FRS (Low Roof to Adjacent Bldg) | 150 | LF | 150.00 | 22,500 | ||||||||||||
EJ11-S (Low SS Mtl Roof) | 170 | LF | 150.00 | 25,500 | ||||||||||||
EJ11-FRS (High SS Mtl Roof) | 110 | LF | 150.00 | 16,500 | ||||||||||||
EJ13-S (Curtainwall to Low Roof) | 860 | LF | 150.00 | 129,000 | ||||||||||||
EJ15-FRS (Floor Joint @ Tower Vestibule) | 20 | LF | 150.00 | 3,000 | ||||||||||||
EJ16-FRS (Floor Joint @ Tower Vestibule) | 20 | LF | 150.00 | 3,000 | ||||||||||||
286,050 | ||||||||||||||||
SBTL | Division 7 — Subtotal | 1,093,397 | ||||||||||||||
DIVISION 8 | ||||||||||||||||
Exterior Doors- Alum Storefront 6o x 7o PR | 18 | LVS | 4,250.00 | 76,500 | ||||||||||||
76,500 | ||||||||||||||||
Exterior Storefront @ Lvl 77 | 5,762 | SF | 65.00 | 374,530 | ||||||||||||
Exterior Storefront @ Vestibules (Elev 53) | 4,248 | SF | 65.00 | 276,120 | ||||||||||||
650,650 | ||||||||||||||||
Fixed Airfoil Louvers @ Lvl 77 | 5,762 | SF | 46.45 | 267,645 | ||||||||||||
#A-7 | Reduce Airfoil by 2/3 at Ped Bridge | 1 | ALLOW | (167,600.00 | ) | -167,600 | ||||||||||
100,045 | ||||||||||||||||
SBTL | Division 8 — Subtotal | 827,195 |
86 of 93
Bridge 6,351 | ||||
Porte Cochere 9,329 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
DIVISION 9 | ||||||||||||||||
Drywall | 6,351 | SF | 7.00 | 44,457 | ||||||||||||
44,457 | ||||||||||||||||
Tile Border at Walkway | 1,130 | SF | 19.00 | 21,470 | ||||||||||||
Tile Wainscot at Walkway | 1,816 | SF | 35.00 | 63,560 | ||||||||||||
85,030 | ||||||||||||||||
Carpet Install (includes purchase of pad) at Walkway | 1 | LS | 9,848.40 | 9,848 | ||||||||||||
9,848 | ||||||||||||||||
Finishes at Porte Cochere (not including ceiling) | 9,329 | SF | 0 | |||||||||||||
Column Wraps | 8 | EA | 8,000.00 | 64,000 | ||||||||||||
False Beam Wraps (NONE) | 0 | |||||||||||||||
Fascia Wrap at Floor Line (With Div 7 Metals) | 0 | |||||||||||||||
64,000 | ||||||||||||||||
Paint at Walkway | 6,351 | SF | 3.00 | 19,053 | ||||||||||||
Paint Exposed Epic Deck (Factory prime painted only.) | 5,600 | SF | 2.00 | 11,200 | ||||||||||||
Paint Structural Steel (High Performance Coating) | 1 | LS | 90,000.00 | 90,000 | ||||||||||||
120,253 | ||||||||||||||||
Final Clean | 1 | LS | 10,000.00 | 10,000 | ||||||||||||
10,000 | ||||||||||||||||
SBTL | Division 9 — Subtotal | 333,588 | ||||||||||||||
DIVISION 10 | ||||||||||||||||
Specialties — Walkway | 6,351 | SF | 0 | |||||||||||||
Specialties — Porte Cochere | 9,329 | SF | 0 | |||||||||||||
FEC | 2 | EA | 150.00 | 300 | ||||||||||||
300 | ||||||||||||||||
Won Door @ Connector: (2) 15'W x 9'-6" H (with bridge) | 285 | SF | 130.00 | 37,050 | ||||||||||||
Won Door @ Connector: (2) 15'W x 19' H (with bridge) | 570 | SF | 130.00 | 74,100 | ||||||||||||
111,150 | ||||||||||||||||
Way Finding/Graphics — Walkway (Code Required) | 6,351 | SF | 1.00 | 6,351 | ||||||||||||
#A-28 | Delete Way Finding/Graphics — Walkway (Code Required) OFOI | 1 | ALLOW | (6,351.00 | ) | -6,351 | ||||||||||
Way Finding/Graphics — Porte Cochere (Code Required) | 9,329 | SF | — | 0 | ||||||||||||
0 | ||||||||||||||||
SBTL | Division 10 — Subtotal | 111,450 | ||||||||||||||
DIVISION 11 EQUIPMENT | ||||||||||||||||
Install OFCI TV Brackets | 12 | EA | 40.00 | 480 |
87 of 93
Bridge 6,351 | ||||
Porte Cochere 9,329 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
SBTL | Division 11 — Subtotal | 480 | ||||||||||||||
DIVISION 12 FURNISHINGS | ||||||||||||||||
Furnishings: OFOI | NIC | |||||||||||||||
SBTL | Division 12 — Subtotal | 0 | ||||||||||||||
DIVISION 13 SPECIAL CONSTRUCTION | ||||||||||||||||
SBTL | Division 13 — Subtotal | 0 | ||||||||||||||
DIVISION 14 | ||||||||||||||||
Conveying Systems: Passenger — CP-1 | 1 | LS | 95,626.00 | 95,626 | ||||||||||||
Escalators — EC-1 & EC-2 | 1 | LS | 247,614.00 | 247,614 | ||||||||||||
343,240 | ||||||||||||||||
#A-44 | Conveying Systems: Passenger Cabs Finish | 1 | ALLOW | 15,000.00 | 15,000 | |||||||||||
15,000 | ||||||||||||||||
Interior Elevator Operator | 17 | WK | 1,500.00 | 25,500 | ||||||||||||
25,500 | ||||||||||||||||
SBTL | Division 14 — Subtotal | 383,740 | ||||||||||||||
DIVISION 15 | ||||||||||||||||
HVACs/Plumbing — GMP | 1 | LS | 165,504.00 | 165,504 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 1,655.04 | 1,655 | ||||||||||||
Plumbing at Walkway | 6,351 | SF | w/ Mech GMP | |||||||||||||
Plumbing at Porte Cochere | 9,329 | LS | w/ Mech GMP | |||||||||||||
HVAC at Walkway | 6,351 | LS | w/ Mech GMP | |||||||||||||
HVAC at Porte Cochere | 9,329 | LS | w/ Mech GMP | |||||||||||||
167,159 | ||||||||||||||||
Fire Protection at Walkway | 6,351 | SF | 2.00 | 12,702 | ||||||||||||
Fire Protection at Porte Cochere (Dry System) | 9,329 | SF | 2.50 | 23,323 | ||||||||||||
36,025 | ||||||||||||||||
SBTL | Division 15 — Subtotal | 203,184 | ||||||||||||||
DIVISION 16 | ||||||||||||||||
Electrical GMP | 1 | LS | 141,425.00 | 141,425 | ||||||||||||
Extended General Conditions thru 5/31/2012 | 1 | LS | 1,414.25 | 1,414 | ||||||||||||
Electrical at Walkway | 6,351 | SF | 26.20 | w/ Elect. GMP | ||||||||||||
Electrical at Porte Cochere | 9,329 | SF | 18.00 | w/ Elect. GMP | ||||||||||||
142,839 | ||||||||||||||||
Fire Alarm at Walkway | 6,351 | SF | 1.50 | w/ Elect. GMP | ||||||||||||
Fire Alarm at Porte Cochere | 9,329 | SF | 1.50 | w/ Elect. GMP | ||||||||||||
0 | ||||||||||||||||
Low Voltage: Allowance | ||||||||||||||||
#A-59 | Ped. Bridge Surveillance/Security: No Equip. | 6,351 | SF | 3.00 | 19,053 | |||||||||||
#A-59 | Porte Cochere Surveillance/Security: No Equip. | 9,329 | SF | 3.00 | 27,987 | |||||||||||
47,040 |
88 of 93
Bridge 6,351 | ||||
Porte Cochere 9,329 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
#A-57 | Ped. Bridge Comm./Data: No Devices/ Equip. | 6,351 | SF | 2.00 | 12,702 | |||||||||||
#A-57 | Porte Cochere Comm./Data: No Devices/Equip. | 9,329 | SF | 2.00 | 18,658 | |||||||||||
31,360 | ||||||||||||||||
#A-58 | Ped. Bridge AV/Sound | 6,351 | SF | 5.00 | 31,755 | |||||||||||
#A-58 | Porte Cochere AV/Sound | 9,329 | SF | 5.00 | 46,645 | |||||||||||
78,400 | ||||||||||||||||
SBTL | Division 16 — Subtotal | 47.18 | 299,639 | |||||||||||||
TOTAL COST | 752.55 | 4,779,443 | ||||||||||||||
Cost of Work Subtotal | $ | 4,779,443 | ||||||||||||||
Sub Guard @ 1.25% | $ | 59,743 | ||||||||||||||
General Conditions (5.25%) | $ | 252,715 | ||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 11,185 | ||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 10,515 | ||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 38,236 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 956 | ||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 5,152,793 | ||||||||||||||
MCC Fee @ 3.25% | $ | 167,466 | ||||||||||||||
Project Total | $ | 5,320,259 | ||||||||||||||
MCC Contingency @ 6% times Cost of Work | 6.00 | % | $ | 286,767 | ||||||||||||
Area Total | $ | 5,607,025 | ||||||||||||||
$/SF | 882.86 |
89 of 93
Manhattan Construction Company
BATON ROUGE CASINO FIXED CASINO, MODEL ROOM
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Clear & Grub Site | 1 | LS | 10,301.00 | 10,301 | ||||||||||||
Fabric and Stone | 3,413 | SY | 23.60 | 80,547 | ||||||||||||
Fencing | 1 | LS | 9,180.00 | 9,180 | ||||||||||||
Temporary Utilities (Entergy) (BY OWNER) | 1 | LS | — | |||||||||||||
Hook up Electrical at Metal Building Complex | 1 | LS | 31,000.00 | 31,000 | ||||||||||||
Hook up Plumbing at Metal Building Complex | 1 | LS | 3,500.00 | 3,500 | ||||||||||||
Structural Slab (with metal building) | — | |||||||||||||||
Metal Building Slab | 1 | LS | 35,000.00 | 35,000 | ||||||||||||
Metal Building | 1 | LS | 31,000.00 | 31,000 | ||||||||||||
Drywall / EIFS | 1 | LS | 9,891.00 | 9,891 | ||||||||||||
Painting | 1 | LS | 4,990.00 | 4,990 | ||||||||||||
Glass Shower Enclosure | 1 | LS | 2,590.00 | 2,590 | ||||||||||||
Tile & Wood Flooring | 1 | LS | 13,400.00 | 13,400 | ||||||||||||
Carpet | 1 | LS | 1,405.00 | 1,405 | ||||||||||||
Millwork | 1 | LS | 7,861.00 | 7,861 | ||||||||||||
Doors & Hardware | 1 | LS | 5,355.00 | 5,355 | ||||||||||||
Bathroom Accessories | 1 | LS | 3,005.00 | 3,005 | ||||||||||||
Mechanical (with GMP) | 0 | LS | W/ Mech. GMP | |||||||||||||
Electrical (with GMP) | 0 | LS | W/ Elec. GMP | |||||||||||||
Glass & Glazing | 168 | SF | 75.00 | 12,600 | ||||||||||||
Install Owner FF&E | 1 | LS | 2,500.00 | 2,500 | ||||||||||||
Final Clean | 1 | LS | 1,000.00 | 1,000 | ||||||||||||
TOTAL COSTS | 265,125 |
90 of 93
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Cost of Work Subtotal | $ | 265,125 | ||||||||||||||
Sub Guard @ 1.25% | $ | 3,314 | ||||||||||||||
General Conditions (5.25%) | $ | 14,025 | ||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 623 | ||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 583 | ||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 2,121 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 53 | ||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 285,844 | ||||||||||||||
MCC Fee @ 3.25% | $ | 9,290 | ||||||||||||||
Project Total | $ | 295,134 | ||||||||||||||
MCC Contingency @ 6% times Cost of Work | 6.00 | % | $ | 15,907 | ||||||||||||
Area Total | $ | 311,042 |
91 of 93
Manhattan Construction Company
BATON ROUGE CASINO FIXED CASINO, EMPLOYEE COVERED WALKWAY
GSF 7,500 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Employee Walkway @ Levee: Assumed 750' Long x 10' Wide | ||||||||||||||||
#A-35 | Erosion Control | 1,500 | LF | $ | 2.50 | 3,750 | ||||||||||
#A-35 | Strip Topsoil & Stockpile | 208 | CY | $ | 18.00 | 3,750 | ||||||||||
#A-35 | Import Select Fill | 1,042 | TMCY | $ | 24.00 | 25,000 | ||||||||||
#A-35 | Premium for Working on Levee | 1,042 | TMCY | $ | 5.00 | 5,208 | ||||||||||
#A-35 | 0 | |||||||||||||||
#A-35 | Structural SOG: F/R/P/P/F | 7,500 | SF | $ | 15.00 | 112,500 | ||||||||||
#A-35 | Structural Steel Framing @ 6#/SF | 23 | TONS | $ | 4,500.00 | 101,250 | ||||||||||
#A-35 | Walkway Railings | LF | 0 | |||||||||||||
#A-35 | Walkway Metal Stud Prefabricated Trusses | 7,500 | SF | $ | 4.00 | 30,000 | ||||||||||
#A-35 | Standing Seam Metal Roofing @ Ext Walkways | 1 | LS | $ | 233,456 | 233,456 | ||||||||||
#A-35 | Plywood Sub-Roof | 7,500 | SF | $ | 3.00 | 22,500 | ||||||||||
#A-35 | Plaster Soffit (NONE — exposed) | 7,500 | SF | 0 | ||||||||||||
#A-35 | Painting | 7,500 | SF | $ | 3.00 | 22,500 | ||||||||||
#A-35 | Electrical: Lighting | 7,500 | SF | $ | 4.00 | 30,000 | ||||||||||
#A-35 | Low Voltage — Security / Surveillance | 7,500 | SF | $ | 3.00 | 22,500 | ||||||||||
#A-35 | LowVoltage — Data / Communication | 7,500 | SF | $ | 2.00 | 15,000 | ||||||||||
#A-35 | Low Voltage — A/V | 7,500 | SF | $ | 3.00 | 22,500 | ||||||||||
589,914 | 78.66 | |||||||||||||||
A-35 | Delete Walkway and leave SOG with $30/Sf prefab walkway structure | 1.00 | ALLOW | $ | (411,416.00 | ) | -411,416 | |||||||||
TOTAL COST | 31.80 | 238,498 | ||||||||||||||
Cost of Work Subtotal | $ | 238,498 | ||||||||||||||
Sub Guard @ 1.25% | $ | 2,981 | ||||||||||||||
General Conditions (5.25%) | $ | 13,116 | ||||||||||||||
Extended General Conditions through May 31, 2012 | $ | 536 | ||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 525 | ||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 1,908 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 48 | ||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 257,612 | ||||||||||||||
MCC Fee @ 3.25% | $ | 8,372 | ||||||||||||||
Project Total | $ | 265,984 | ||||||||||||||
MCC Contingency @ 10% times Cost of Work | 10.00 | % | $ | 23,850 | ||||||||||||
Area Total | $ | 289,834 |
92 of 93
Manhattan Construction Company
BATON ROUGE CASINO FIXED CASINO, PUBLIC PARKING COVERED WALKWAY
GSF 6,000 |
REVISED 05/02/11
Sys. | ||||||||||||||||
Code | Description | Qty | U of M | Unit Cost | Activity Cost | |||||||||||
Dry Side Guest Parking Covered Walkway: assumed 600' Long x 10' Wide) | ||||||||||||||||
#A-34 | Import Select Fill | 556 | TMCY | $ | 24.00 | 13,333 | ||||||||||
#A-34 | Structural SOG: F/R/P/P/F | 6,000 | SF | $ | 15.00 | 90,000 | ||||||||||
#A-34 | Walkway Railings | LF | 0 | |||||||||||||
#A-34 | Structural Steel Framing @ 6#/SF | 18 | TONS | $ | 4,500.00 | 81,000 | ||||||||||
#A-34 | Walkway Metal Stud Prefabricated Trusses | 6,000 | SF | $ | 4.00 | 24,000 | ||||||||||
#A-34 | Standing Seam Metal Roofing @ Ext Walkways | 6,000 | LS | $ | 31 | 186,000 | ||||||||||
#A-34 | Plywood Sub-Roof | 6,000 | SF | $ | 3.00 | 18,000 | ||||||||||
#A-34 | Plaster Soffit (NONE — exposed) | 6,000 | SF | 0 | ||||||||||||
#A-34 | Painting | 6,000 | SF | $ | 3.00 | 18,000 | ||||||||||
#A-34 | Electrical: Lighting | 6,000 | SF | $ | 4.00 | 24,000 | ||||||||||
#A-34 | Low Voltage — Security / Surveillance | 6,000 | SF | $ | 3.00 | 18,000 | ||||||||||
#A-34 | Low Voltage — Data / Communication | 6,000 | SF | $ | 2.00 | 12,000 | ||||||||||
#A-34 | Low Voltage — A/V | 6,000 | SF | $ | 3.00 | 18,000 | ||||||||||
502,333 | 83.72 | 0 | ||||||||||||||
Value Engineering Item #122 | ||||||||||||||||
#A-34 | Delete Canopy | 1.00 | LS | $ | (502,333.00 | ) | -502,333 | |||||||||
0 | ||||||||||||||||
TOTAL COST | 0 | |||||||||||||||
Cost of Work Subtotal | $ | 0 | ||||||||||||||
Sub Guard @ 1.25% | $ | 0 | ||||||||||||||
General Conditions (5.25%) | $ | — | ||||||||||||||
Building Permit (Cost of Work times .0022) | $ | 0 | ||||||||||||||
General Liability Insurance (Cost of Work times .008) | $ | 0 | ||||||||||||||
Builders Risk Insurance (By Owner) | $ | — | ||||||||||||||
LA. Sales Tax Bond & City Bond (Cost of Work times .0002) | $ | 0 | ||||||||||||||
MCC P & P Bond Premium (Not Required) | $ | — | ||||||||||||||
Project Subtotal | $ | 0 | ||||||||||||||
MCC Fee @ 3.25% | $ | 0 | ||||||||||||||
Project Total | $ | 0 | ||||||||||||||
MCC Contingency @ 10% times Cost of Work | 10.00 | % | $ | 0 | ||||||||||||
Area Total | $ | 0 |
93 of 93
EXH’ T [ E RECE PT OF USACOE PERMT (Or g Su m ss on) J HO Y A 0N .P STAF.TCONS C NTP N.T.P. START CONSTRUCT ON 0 Zv n A 17 UN10 A P KTST a TOHa. L R VER PROJECT START DELA Y DUE TOH GH R VER 2£ UAJM T _____ U oumun [HEXCAVRESTRCTON 1 SWOFLEVEÊ RWER > 13’ R V R2 EXCAV RESTR CT ON 1 60ff OF LEVEE R VER +13’ 1 0 13MAR11A 11APR11 A CWRESm ™.3WOF flS R t r S VER3 EXCAV RESTR CT ON 300’ OF LEVEE R VER +1 V 1 £9 13MAR11 A 16JUN11 CAS NO CAS NO/ AS N CONSTRUCT ON (HAMMOCK) 546’ 341 ‘ 17AUG10 A 31MAY12 _____ m H0AD CONSTRUCT ON (HAMUOCK) RR TJ R VER RCAD CONSTRUCT ON (HAMVCCK) 210J 77’ 10NOV10A 20JUL11 ARKNO.GARAGE HAMNK.OO GARAGE PARK NG GARAGE (HAMMOCK) 371 276 29DEC10 A 15MAR12 HOTEL coNSTRUCTlot W T HOTEL CONSTRUCT ON (HAMMOCK) 434 286 ‘ 12JAN11 A 30MAY12 . CENTRALF TCONSTRUCT (HMMOCK) CPLANT CENTRAL PLANT CONSTRUCT ON (HAMMOCK) J73 _J5; 10FE 11 A 01SEP11 M FTORT SERV S ES CONSTRL C r ON (HAMMOCK SUPPORT SUPPORT SERV CES CONSTRUCT ON (HAmOCK) 240; J3 1QFE 11 A 19NOV11 Hm m PARKLOT PARK NG LOT CONSTRUCT ON (HAMMOCK) 164J; 164’ 17MAY11 30NOV11 \ LEVATOHS;ESCALATOR ELEVATORS E LEVAT ORS / ESCALATORS (HAMMOCK) 1 9’ 139 03OCT11 21MAY12 Wr COOPERAT VE ENDEAVOR AGREEMENT (CEA) 6 0 10DEC1OA m fmmm Mmmrvm RRPERM T RECE VE R VER ROAD LADOTD PERM T 0 l DÊC FKCMR L ™. . 1 RG LAUNCH& EG NTEST NGOF ARGEA 5 18FE 11 A AUNÇR TEST.GOF AHOEA _Tl rr2 . T.. . n n n Hoecm T OLAUNCH& EG N ÉST NGOF ARGE ARGE LAUNCH & EG N T EST NGOF ARGE 0 0 19FE 11 A v o nm u j 2 . . n no..A ru 1 n O LAUNCH S EGH TESTtJGOP ARGEC ARGEC LAUNCH& EG NT EST NGOF ARGE C 0 0 08M0.R11 A v . . T 7 TJV ‘a n H n O DEL VERCASNO ARGE(SocfonA) 13 DEL VERCAS NO ARGE S onA 0 0 14M4R11 A HOT ™ ™ HTLFNDPERM RECE VE HOTEL FOUNDAT ONPERM T 0 0 27MAY11 ENTRALPUNTFOUNOAT RM ‘ CPFNDPERM RECE VE CENTRAL PLANT FOUNDAT ON PERMT 0 0 04JUN11 v . . r 7 77T r 7 T n S n t H MV’: ORECEWECENTRAL PLANT ELEVATED STRUCT PERM T CPSTRPERM RECE VE CENTRAL PLANT ELEVATESTRUCT 0 0 04 UN a Ru™. ELRFNDFERM RECE VE ELEVAT ED ROAD FONDAT ON PERMT 0 0 UN . F ELRSTRPERM RECE VE ELEVATED ROAD STRUCTURE PERMT 0 0 04JUN11 ™p muUTO.n™w HTLSTRPERM RECE VE HOTEL ELEVATED STRUCT PERM T 0 0 04JUN11 v . .. S S n. ml ‘ ‘ RECELE PAR KH 3 GARAGE FOU NDAT ÛN PERM T PGFNDPERM RECE VE PARK NG GARAGE FOUNDAT ON PERMT 0 0 _____ 4JUN J PARK GARASEEL STRUCTFER PGSTRPERM RECE VEPAHK NGGARAGEELEVATEDSTRUCT 0 0 04JUN OP. ™™™ XYFNDPEHM RECE VE TRANSFORMER YARD FONDAT ON PERMT 0 0 Q4JUN11 M1200 TEMPORARYPOWERAVA LA LETOS1TE 0 0 21JUN11 v _____ T ‘ A n M M H OOPEN NEW R VER ROAD (RELOCATED) J E ±H2 OPEN NEW R VER ROAD PE TEff 0 0 _____ 20JUL11 P. .T E ‘ M122Q PERMANENT POWER AVA LA LE (DRY S DE) 0 0 SAUG %F MANENTF0WERAVALAaE(WET3CE M1240 PERMANENT POWER AVA LA LE (WET S DE 0 0 15SEP11 w . . . OCOMDmaNED A R AVA LA LE® CAS NO M3Q20 CQND T ONED A R AVA LA LE CAS NO 0 0 . 05NOV OC0NDm0NED AVA E HCTEL M300Q COND T ONED A R AVA LA LE HOTEL 0 0 12DE 1 CAWOREQUUTO Y WW M10Q20 CAS NO REGULATORY APPROVALS RECE VED . _0 0 17MAR 2 OCONTRACTORS COMFLET N TR FLANT M10010 CONTRACTOR SU ST COMPLET QN CENTRAL PLANT 0 0 01 P OOOT™cro aJ rC MnONSUPr v M10030 CONTRACTOR SU ST COMPLET ON 5UPT SERV CES 00 Z1NOV11 0 cONTR TORSUESTCOMPLET M10Q40 CONTRACTOR SU ST COMPLET QN PARK NG 0 0 21MAR12 ACOMTRACTORSU ST M1000Q CONTRACTOR SU ST COMPLET ON HOTEL Q 0 31MAY12 OCONTRACTOREJ ST M 0050 CONTRACTOR SU ST COMPLET ON PED R DGE 0 0 31MAY12 S rKtete 26AFR10 L7ZZ Early ar agM aMff tlj P nnacle Enterta nment rT LT Z S Rra H tel Cas no ton Rouge LA. M Sur nary ar Pat ennm ef 1A M CC PROJECT 3278 start m lestonG po nt® Pr mav ra Systems lnc. p F n shm lestonepo nt |
; f H50%5D OD UDGET PREPARAT ON 4PHES TATDN PSQ D 50% SD/PD UDGET PflEFARAT ON S 26 0 12NOVtO A 17DEC1C A _____ H œyD a m Wam Hr aamT1 KOWFt) GMPDT 100%SDmDGM> PREPARAT ONS 36 0 13JAN11 A 15MAR11 A 90%CDG P GMPCD L CO( P _____ Lj#‹L T T _____ ERECTTC 1(WETS DE) 3 OlOSJAN A Q J T lT ‘ F un T( t1 jcjACSE 225’ 135 05JAN11 A 27SEP11 . £L1 TC 1 USAGE dSFP11 27SEP11 DSMANTLETC TC1 1W D SMWTLETCtl 3 3 24SEP11 27 PH EF ÊC TC J[WETEDE) tCZ 100 ERECTTC 2(WETS PE) 3 0 08JAN11 A 11JAN11A EKECTTC WETS.PE) TC2 11Q TC 2 USAGE 303’ 216 QgJANV 05JAN12 _____ 1) NTLETC 2 1 TC2 120 D SMWTLETC 2 3J 3 o3JAN12 Q5JAN12 f TC4 100 ERECT TC 3 (HOTEL SOUTH END) 3 3 21JUL11 23JUL11 TC TC 3 USAGE 129’ 129’21JUL11 22DEC11 ™3 TCT 2 D S TLETC 3 g 3 20DEC n 22DEC11 tammMJJZLt TC5 100 ERECTTC 4(HOTELNORTHEND 3 3 25JUL11 27JUL11 ‘ 1 . . . fl H TC 44 USAGE TC5 110 TC 4ÙS G 10 10 ‘25JUL11 01DEC11 _____ ; ™ . _____ 1 VJ u VJ TT w v _____ D 3MANTLETC 4 TC5 120 D SWNTLE TC 4 A A 29NOV11 101DEC11 ‘ . S M 1 HO ST DEL VERHO ST °] 0 22SEPn DRW HO T HO4ST10 HO ST USAGE (HA CCK) 137; 137 22SEP11 05MAR12 0_LEH HOlST20 _____ [D SMANTLE HO ST ° ° 05MAFt12 _____ .. . _____ mWa DEVELOPMEHTOFCCTJCEPTUALPLAN(SCHEME3) O 19APR10 A 26APR1Q MZ OwmO C™ ™ T PRESENTAT ONS APPRL OFCOHCEPTUAL 26APR1Q A 22JUN10 A FRE TATPN ArwLOFco UA PLA A 9 QWNER REPLACES WA ARCH TECTS w/ MARNELL 3 0 23JUN10 A 25JUN10 A OWNE F CE AAHCH ECTSW NELLARCH DÛVU ‘ PRESENTAT ONS APPR OFCOHCEPTU L S 2 JUN10 A TS P TT ŒPR W OFCONCEH ™ D RNELL SSUE CONCEPTUAL DES GN MSEP X W mcwywam . _____ D W P NNACLE OARD APPROVAL 0F CONCEPTUAL 5 21SEP10A . wm. D TÊÛ GAWNG CESS ON APPROVAL OF CONCE pfU L l J N T o M.oco ss APP OFCONCE nES D 1200 p RELlMFOUNDAT10HANALYS S (TEST P LES) 3o Q AUG OA SEP OA . R F0u P TOH retTE8rPUg Star date 26APR10 S Early ar efùj g P nnacle Enterta nment ScS S S f > Cas/no ton Rouge LA. Sr Panenumher 2A MCC PROJECT 3278 ç Start m lestone po nt 6 Pr marera S tems. nc. o F n sh rr lestone po nt |
F 0 240 RNALFOUNDAT OMANALY5 5 (DRY & WET) 20 0 27SEP10 A > . _____ A COEVEH ALJ™OVALOF CONCEPTS DES GN rJT Q CO VER ALAPPROVALOFCONCEP UAL U kJ _____ 0 0 gg _____ M WEraDED K H AnoNa D1165 A N WET S DE DES GN MOD F CAT ONS 33 0 155EF1QA a xn ft _____ gCoEAPmovALOFAMEN0EDCON EF uALDES C N Qy j C E APPROVAL OF AWENDED CONCEPTUAL DES GN 30 13 01NOV10 A 06MAY1J COEPWT.APFWLOf AyENDEO CONCERNA . OESG ‘01163 coEPART.APRVLOFAM NDEDCOMCEPTUAL O APF 1 T r r grD1 . Al Mjnmn A H DEVELOPMENTOFSÇ&DDSOl lSa E : 0 10œ pEVELOP.vENTOFSD&DD50% SSUE 36 0 2™ 1ZNOV1 A S HltE WT .1 WmW8D400 MUE D C1040 PRESENTAT ON APPROVAL OFSD& DP 50% SSUE 15 0 3NOV 0 A DEC 0 A W DEVELOPMENT OF SD S DP 100% SSUE 33 0 13NOV10A _____ 1A _____ fflMnU.m oF M11 ( PC1120 PRÉSENTAT ON APPROVAL OFSD& DP 100% 15 l JU TOFCW D CH60 DEVELOPMENT OFCDS 90% SSUE 76 0 N W A HN T OFCO O E P C1200 F NAL ZAT ONOFCD’S 90% SSUE 15 . . J D RR1000 1 DES GN w/REV SEP AL GNANT 18J 0 2aJUL10 A [24SEP10 A 6SH DESGN EVSED AL MENT DflHT LADOTO REV EW OF 95% P PACKAGE st 24SEP10 A l CnoT U . ™ . t RR RECE VE 95% P PACKAGE 24S P X W WKDHW f 5TRR 6 RECE VE DETOUR ROAD RELOCAT ON DES GN 07QCT10A HEC ETOURRO ELOCA™ D RR1114 A tv CORRECT ONS perLADOTD 2nd SU MSS ON ‘ TT 5 20OCT10 A 04NOV1Q A HA CORRECTON LADOTD ™ D RR1120 LADOTD F NAL RE V E W/PERMJTAPPROVAL 2nd 1Q 0 17NOV10 A 10DEC10_AJ . r CL DEVELOPMENT OFSD& DP 50% SSUE 3 o 22SEP10 A 12NOV10 A Wmmmtgmav w >m mK D CL1040 PRESENTAT ON & APPROVAL OFSD & P 50% SSUE 5 13NOV10 A f C T R T . . W DEVELOPPENT OF SD & DD 100% SSUE 33 0 13NOV10 A TST NTWT DE OF TO OD OO E W5 ÛT0 PRESENTAT ON & APPROVAL OF SD & P 100% 15 14JAN11 A 2F T7T mESENTATO o oFso.DC . D ;L1160 PEVELOPMENTOFCD’s 90% SSUE 76 14JAN11A 6MftR11 A W M M .TOM JD CL12Q0 RNAL ZAT CMQFCP 90% SSUE l 15 15 7MAR11A 06MAY1 flfm OFCP m E j D GH10QO DEVELOPN¢æNTOFSO&DD50% SSUE 3 J o 22SEP10 A 12NOV10 A M DEVELOPMENT OFSD SDD5O% E D GH104O PRESENTAT ON & APPROVAL OFSD & DP 50% SSUE l 13NOV10A 17DEC10A V DD 50% S E D GH10 0 DEVELOPMENT OFSD&PP 100% SSUE 55 13NOV10 A l j NTnT OMfl M r> 2 PRESENTAT ON & APPROVAL OFSD DP 1 % Vs J OT Q2r X; W n WQWL0r D W E D GH1160 DEVELOPMENT OFCP’s 90% SSUE 6 14JAN11 A 16MAR11 A P 1 1 ... D H T F NAL ZAT ON OFOP’s 90% SSUE rldge T R nJ PR X F MTONOFCD 9O E D GH1180 nNAL aVTlOWOFCm aHtlSSUE SuptfGMafle 15 £ 7MAR11A 21APRTT OFC ECtW . Startdate 26APR10 j ] Eafly ar EUatuas auugoz P/m acte Enterta nment s f ‘ Da a date 20APR11 DO .. . . n Cnt cal ar Rund P Q2MAY pœ ote Cas/no ton Rouge LA. L SurmHry Paoenum er 3A M CC PROJECT 3278 Start m lestone po nt S) Pr mawsraSystems. nç. l > F n sh m lestone po nt |
Wff Sfe H gf S FSg9og1 uE t ffo 9 _____ y j ZZ 1 nl j jQCP n Ah lMrWHl A ‘ DEVELOPMENT OFSDSODSO SL E FER10 Û DEVELOPMENT OF SD & DP 50% SSUE 36 0 22 Plu A f ‘ ™ Ç HPRESEmATON&tfPROVALOFSD&DDWN.ESUÉ D ER1040 PRESENTAT ON & APPROVAL OF SD & DP 50% SSUE 10 0 SNOV O HP £l£fL OPMÊWS OD OO E D T S DEVELOPMENT OF SD & DP 100% SSUE 33 0 13NOV10 A 13JAN11 A Lm K um 01 W D ER1120 ‘ PRESENTAT ON 6 APPROVAL OF SD & DP 100% 15 0 1 4JANV _A 02FE 11 A D wT0fC w 8UE D ER1160 ‘ DEVELOPPANT OFCD’s90% SSUE 76 0 14JAN11 A J6MftR11A _____ .. ALJW WOFCL WM E p ER1200 RNAL ZAT ON OFCDs 90% SSUE 15[ 15 17MAR W . . . . . .. . T 71 n cmm fl PMTw CT0P W K N OT FC ATON J PON TC HARTHJW LD PLD1000 PART AL STOP WK NOT F CAT ON y 0 0 26JAN11 A [ S FULL STOP WK NOT F CAT ON y PONTCHARTRA N 5 27J N TT PULLS OT T PONTCHAT™ pLD COE/PNK RELEASE PART AL( U LD ERMS/SPO L 23JAN11A ‘ c Rarer ™™ l gwQ PLD/COE/FNK RELEASE ALL WK EXCEPT HOTEL 5 0E8JAN11A C ofWa w R S PLD/COE/PNKSTOP ALLWK EXCEPT AS N/G Rp 31JAN11 A PUK K ALLWK ™ pfp T PLD/COE/PNK RELEASE ALL WK EXCEPT AS RR Q 0 08FE 11 A ‘ n £ m mu.mmllmwmmnm PLD 55 PLP/CO PNK RELEASE AUGERCAST/LQW RJSJ TJAPR T PLMO C K PLDWO /COE/PNK RELEASEXLLRErM N NGWORK j j v l 1 ça K a Ha K D Gf H RECE VE S TE DRAW NGS’ Cl 9FÊ T REC STEDFA GS D GHJa30 C TY REV EW & SSUE S TE PERMT 2o 2l o9FE 11 A 13MftYrJ .cm s Esre \ Q GH130Q RECE VE S TE ELECTR CAL DRAW NGS o 0 23NOV10A QHEca aKlHMLQ UMW D GH1 20 C TY REV EW S SSUE S TE ELECTR CAL PERMT ANOV O A 7 MV mcW mmemt l RECE VE FOUNDAT Ct DRAW NGS XHff YARD [ ] 0 04NOV10A MFO D 1 GH M C TY REV EW & SSUE FOUNDAT ON PERMT X’FMR 2 ¥T 05NOV10 A 13 WY11 c mH . EFOUNr PEwrxMWlD 3 H 27 RECE VE FOUNDAT ON DRAW NGS GARAGE Q4NOV10A Q EC FCUH TONDRAWW65 SARAGE GH 3 C TY REV EW & SSUE FOUNDAT ON FERMT 20 27 5N V M YTl orrYREv EFOUNDAT Mrr.GAHAGE GHT S RECE VE FOUMDAT ON DRAW NGS HOTEL 04MOV10A QR FOUNDAT.O.DRA SS. MOTEL TTGHÛS C TY REV EW & SSUE FOUNDAT ON FERM H T T 2 33 05NOV10 A 27M 7TT j cm HEV EWSSUEPOUHD P . TTGH RECE VE FOUNDAT ON DRAW NGS CNTL ‘ 04NOV10A 0RKE OU TDR CMTL™T PP rUSûS C TY REV EW 4 SSUE FOUNDAT ON PERMT CNTL 21 05NOV1Q À 13MAY11 a™ ™’ ™™ ™™ ™™™ EM3H1330 RECE VE FOUNDAT ON DRAW NGS ELEVATED ROAD d o l7MftR11 A] RECH EEOUWDATCN DRAW S ÉLEV TES ROA Startdate 26APR10 L Early ar £f S 7 P/nnacte Enterta nment Stf Dat tjat 20A£R11 Untol n nn Raton Rnuae LA 4A 1 Cnt cal ar Rundate 02MAY11 t Otel OaSJ/JO aro/1 HOUge LA. Summary ar P; aenum er 4A MCC PROJECT 3278 Q Start m l estone po nt© Pr mera Sysl6ms ns o F n sh m lestone po nt |
fff 5m6 cffvHÈv EW&l3sllSEFaUND ON PERM T LV’O 20 3a 1 MAR11 A 04JUN1J ‘ yjHECEWErajNDATONDRAWr SS R DSÊ nf H1 RFCF VE FOUNDAT ON DRAW NGS R DGE £ 0 09FE 11 A _____ jc rvREV EW& SUEFOuNDATON PERM T HEGE D GH1390 C TY REV EW MSSUEFCUNDAT O PERM T 2flj 33 o3FE 11 AJ27MAY11 j _____ .. _____ .. j . RECENES HlKnUREDRAWMGS. GARAGE D GH1480 RECE VE ST RUCT URE DRAW NGS GARAGE 0 0 09FE 11 A HME D H1500 C TY RE V EW & SSUE STRUCTURE PEHM T GARAGE 20 27 08FE 11 A 2QyAY11_ CENESTRUCTUREDFAW NGS.CNRPLNTSUPP D GH1560 RECE VE STRUCTURE DRAW NGS CNTL PLNT/SUPP 0 _____ 0 09FE 11A j D Hl S C TY REV EW & SSUE STRUCTURE PERMT NTL 20 21 OgFE 13MAY11 X ELEVATE RUCTUKEDFAV S ROTÉL D GH1620 RECE VE ELEVATED STRUCTURE DRAW NGS 0 0 17MAR11 A sacvREvw.W E uc UMF H TEL D GH1640 C TY REV EW & SSUE STRUCTURE PERMT HO EL 20 _____ 3 16MAR11A gMAYll ES RE 3 C D H1650 HECE VE STRUCTURE DRAW NGS R DGE 0 0 09FE 1 A P E>GE D GH1660 C TY REV EW & SSUE STRUCTURE PERM T R DGE 20 33 09FE 1 A 27MAY11 T KUCTUREORAW.NGS LO R.E D H 74 RECE VE STRUCTURE DRAW NGS LOW R SE 0 0 9FE A { D GH1750 C TY REV.EW & SSUE STRUCTURE PERMT LOW 20 33 09FE 11 A 27MAY11 _____ E a D GH1520RECE VESTRUCTUREDRAW NGS ELEVATEDROAD 0 0 17MAR11 A v _____ .. pJmSo ç TY REV EW & SSUE STRUCTURE 2o 39 16MAR 4JL a RE E CTUREF rr .EWEQRE SjT _____ RFPMftss EXCAVAT ON S AWARD 15 o 17AUG10 A 17S PT X W M J P C0920 cONTRACT M SS EXCAV 1 p 185EP10 A 2OCT10 A CONTRACT MASSER STEEL pjLE CAPS su M TTAL REC VMPPROVE 13 o 01SEP10 AllTSEP X WHO CT STEEL P LE CAPS FA ; EL ( n t al) 27 0 18SEP10 A 1 OCT10 A m MCW M/jaw P C1100 RFP STRUCTURAL STEEL 18 0 18NQV 0 A 1SDEC10 A RFPSTFUCTURALSTEEL TCT M STRUCURAL STEEL SU MTTAL RECWPROVE S 5 25JAN11 A lO RH A SWUCURAL EL MrTALHEC v ovE p TT4 STRUCURAL STEEL FA / EL ( n t al) 8 4 14MHR11A 05M.Y11 _____ .. _ 1 _____ Tc RFP CONCRETE (SCW)SLA S 18 1fl14MAY11 rJ JUN T HRFFC0NCRETE(S™OT prcTÛ CONCRETE (SMOD) SU M TTAL RECV/APPRVL 5 9 06 JUN11 TSJÛNTT . LREC m p C1166 CONCRETE (SMOD) FA /DEL ( n t al) M 12 l6JUN11 39JÛNTT H CONCRÈTES FA EL ) ENCLOSURE . _____ FPE FS p c ‘ û RFP E FS 23l 16 30MAR11 A 07MAY11 U RFPE FS r TT: . . ..M E3 E FS SU M TAL. F C’WAPPRVL P C1155 E FS SU M TTAL RECV/APPRVL 18 18 31MAY11 20JUN11 7 g n MHH nllll l QEFS FA DEL MtHl P C115 E FS FA /DEL { n t al} > 18 21JUN11 12JUL11 P C1170 RFP GLASS/GLAZ NG 20 25 07MAY11 06JUN11 3RFPG..ASS GLAZ NG r ‘ . p ;rn: 7; .. HGLA3SGLAZKGSU Mrr™.REC’V/APFRVL LSl GLASS/GLAZ NG SU MTTAL RECV/APPRVL 15 11 . ALUMNUM FA /DEL ( n t al) _____ 48 48 MUL gEP GLASSGLAZfJ0FAaoa P C117G GLASS/GLAZ NG FA /D L ( n t al) 72 72 16JUL11 0aOCT11 P o RFP TALWALL PANEL PACKAGE 15 15APR11 A 14MAY11 aTETflLW L™eLPTER APPF. r r z .m Q nu OMEmWALLPNL.SU MtTTALREÇ’WAPPRVL P 1164 TAL WALL PNL SU M TTAL R CV/APPRVL lj 15 07 UN 23JUN ; h LV L r F EL P C1165 WETAL WALL PANEL FA /DEL ( n t al) 36 36 24JUN11 05AUG11 . _____ l ‘ rp1 n .m \ e MU C3HFPHOOF NGSAWARD P C1185 [RFPRCOF NG&AWARD 251 25 07W\Y11 06JUN11 _____ Startdate 26APR10 j f Early or 21 p/nnac/e Enterta nment S XSS Da ta date 20APR11 nnm .. . . _____ .. _____ ... c. R Cnt cal ar RJuttate Q2MAY11 R03 Hote/ Casmo ton Rouge LA. ™ Summary ar Pat enum er 5A MCC PROJECT 3278 Start m l estone po nt©Pr mavera Systems. re. p F n sh rr estme po nt |
P Ss nOCflNG U MrT LRECWAPPHV 2£ 1£ 21£t£Nn _____ 05JUL11 aROOFMG.FAaOELluM NTER ORS . 1 r j HRFFNTÉn OHFHAMNG/DRYWALL p.c 200 [RFP NTER ORFRAM NG/DRYWALL 24 24 07 AYV1_Q4JUN11 _____ afMmWKmMXmmm LH ymmVA. p_c12 o FRAM1NG/DRYWALL SU M1TTAL REC’WAFPRVL 12. 12 Q6JUN11 18JUN11 aFHSM NGORyw LLFAEOEL[hte ) p JC122C FHAMNGTJRYWALL FA /DEL ( n t al) 15 15 20JUM11 07JUL1J STTJRFP A AHCEMTEHJORS P C1230 ‘ RFP ALANCE NTER ORS 48 07MAY11 02JUL11 71M MCF TEHCRS SUAMOTALHECVWffl . P C1240 ALANCE NTER ORS SU MTTAL REC’V /APPRVL 43 48 28 MA Y11 25JUL11 JWE 1H M.F P C125Q ALANCE NTER ORS FA fDEL ( n t al) 48 48 £QJUN11 _____ 15AUG11 Éa OT w D flD P C1260 RFP M LLWORK AND AWARD . 2 22 15APR1 _____ A 14MAY11 Qu LwonKSUwn TALRECWflU. P C1270 MLLWORK SU M TTAL RECV/APPRVL J8 1 13JUL11 02AUG11 _____ M LLWûn FWDEL alj P C128 M LLWORK FA /PEL ( n t al) [ 72 r2\Q3AU&>l _ _____ T w PREPARE RFP R VER ROAD DETOUR NTERVW& 18] 0 01OCT10 AJ N WX H flWW Wl .P W W U P DR1Q20 MATER AL SU MTTALRECV/APPROVE 6 5 11NOV10 A t N yl TT mw. MW nwmo P DR1040 MftTER AL FA /DEL ( n t al) s oj 18NÇW1DA 3gjW10A _____ MW .W FWD . W P WS1000 RFP AUGERCAST P LES & AWARD 12 o 01OCT10 A 19OCT10 A MPWaac r pD P WS1O20 AUGERCAST P LES SU MTTALRECV/APPRV 6J o 20CCT10 At04NOV10 A H GERC H APPRV P W51040 [AUGERCAST P LE WTER AL FA /PEL ( n t al) e o 04NOV10 AJTW W lwmoan.tUMaH. wm.9m l P DS1QQ0 RFP AUGERCAST P LES S AWARD 1S 0105NOV10 A 06DlC 7T RFP/WGERCASTF A D P DS1Q20 AUGER CAST P LES SU MTTAL RECV / APPHV S TT C £3D C 0 AUGERCA LES SU ALRÊC VMPPRV J P DS1040 UGER CAST P LE MUTEFUAL FA / EL ( m ) § o 27DEC10 A 27DÊCK jura l rem rtt/KM 1 X71 n HOAD 311 A l rtRFPGR AD N G & AWW D P PK106O RFP GRAD NG & AWARD 24 0 Q2MAR11 A 18APR11 A ™ P TSTS GflAD UG SU WTTALRECVHAPPRV 8 6 Q3MHY11 CÊMAYlT AGR A™™ 1P PK108Û GRAD NG MATER ALS FA /DEL ( n t al) s s\wUAVU l6MAY D S FASS Wzx . . . 1 TT71 m. . _____ ... ln/l M11 QHFPPAVWG UH S t;& AWARD P PK1000 RFP PAV NG/CUR S/ETC& AWARD 2 24 Y j _____ HMW.s)M M Wffl P PK1010 PAV NG SU M TTAL REC’V &APPRV 6 S06JUN11 11JUN11 n .M HQ M RAV NaMATER ALS FAeOEL(lratHl) P PK1020 PAV NG MATEH ALS FA /DEL ( n t al) 6 6 13JUN11 [1SJUN11 Startdate Pf APRlO \ Early ar F n shdate 31MAY12 P nnarte Enterta nment l Progress ar EST mmSS fSSSSS. UL STX Panenum er 6A MCC PROJECT 3278 Start m lestone po nt©Fr ma raSvflçmsJnc. _____ p F n sh mjlestooe po nt |
P _____ 1 7 7 [ FLFP STOR M DRA NAGE & AWARD P PK1 3 HFP STORM DRA NAGE & AWARD _____ Q 02WftR11 A 18AP sToRMDRAWAGE.su MrfTALFEC VfcAFPRV P.PK1Q4 STORM DRA NAGE SU M TTAL RECT & AFHHV 6 6 Q3 MA Y11 09MAY1J ORMDRANAGEMAT F ALS.FAS EL (h fc. l p PK1050 lSTOHM DRA NAGE MATEH ALS FA /DEL ( n t al) 6 6 10MAY11 1 MAY11 _____ RFPUTL lESSAWARD P PK1O90 RFP UT L T ES & AWARD 2£ 24 Q7MAY11 04JUN11 1UT .mES 9u M rTALRÊC PPH P PK1110 UT L T ES SU M TTAL RECV S APPRV 5 6 06JUN11 11JUN11 UT L TÉS MATER ALS ma w p:pK1130 UT L T ES MATER ALS FA /DEL ( n t al) 6] 6J13JLJm aJUN \ _____ STHUCTURE . . . a o Mn\/ f a H HFP FOU N DAT ONS s AW AH D P CL10 RFP FOUNDAT ONS & AWARD 21 0 290CT10 A 22NOV10 A L _____ 77; n mnc A nncr fl A g FOUNDAT ONS SU MrrTALHECWAFffW P L1020 FONDAT ONS SU MTTAL RECV / APPRV _Jg g DATONS’FA FL ° FOUNDAT ONS FA /DEL M 5 D COA HRFPS™UC™UEEL AW™ P CL1100 RFP STRUCTURAL STEEL& AWARD 12 Q 1SNOV1Q A 15DEC10 A ™ t PTCLV 2 STRUCTURAL STEEL SU M TTAL RECV/APPRV Ph 20 Q 07JAN11 A N X STHU STFH. S ALRED VF _____ p L Û STRUCTURAL STEEL FA / EL PHASE 64 17 10JAN11 A 09MAY11 L U pTcT S STRUCTURAL STEEL SU MTTAL RECV/APPRV Ph 14 5 7FE 11 A 28FE 1 Em mmmummm TcT s RESU M TTAL/APPRV PHASE DES GN CHANGES 1 0 01MAR11 A 19APF TX H ™H KV PHASE DES GN CHANGES p CÛ M STRUCTURAL STEEL FA S DEL VER PHASE 35 21 2QAPR11 A TsM vTl STRUCTURALSTER FA ASE. T T RFP SLA PLACE/F N SH & AWARD le 13MW11 03JUN T Or™.™™. ™ . ‘ ‘ . . n. . . MTT LACEfn 5HSU MtTTALREC’V/APPRV P CL1280 PLACE/F N SH SU MTTAL REC’V/APPRV 9 9 04JUN11 14JUN11 P CL1290 PLACE/F N SH FA /DEL ( n t al) s s l5JUN11 gUUN11 lmcEF m Woa.[hM pNGL1 aaF’E RFP SK N (E FS) & AWARD 23 1 30MAR11 A 07M YTT RffaWlW JfLWAm p CL T E FS SU M TTAL RECV/APPRVL 18 13 31MAY11 20 Wwm 777 777 M o ‘. T CSEFS FA DEHH tal P CL1200 E FS FA /DEL ( n t al) 24 24 21JUN11 19JUL11 p CL 2 RFP GLASS/GLAZ NG PACKAGE 2Q 25 07Wm 06JUN11 SRFPQLASSA3LAZ NGP _____ r CÛ ‘ GLASS/GLAZ NG SU MTTAL RECV/APPRVL 8 18 28JUN11 19JUL11 QgGLASSGLAz e TTALKECWPHVL _____ 777 TS . JH nn QA lJM NUMFRAMES FA OEL(H taO P CL1230 ALUN NUM FRAMES FA /DEL ( n t al) 18 18 20JUL11 Q9AUG11 ™ P CL1240 GLA2 NGFA /DEL (ln l al) 72 72 20JUL11 12QCT11 P CL125Q RFP M TAL PANEL SYSTEMS 8 22 15APR11 A 14MAY11 H RFPUETAL PANEL SYSTEMS pTc T r4ETAL PANELS SU MTTAL RECV/APPRVL 5 T5 07JUN11 23JUN11 ‘ lm Wffl PTCL127 TAL PANELS FA /DEL ( n t al) ‘ M 36 24JUN11 05AUG11 _____ .. M™ fj _____ CL TS RFP RCOF NG & AWARD 25 07MAY11 ‘ 06JUM11 EJ RFFROOFNG AWARD P CL1390 RCOF NG SU MTTAL RECV/APPRV 12 12 14JUN11 27JUN11 ™ 1 1 . 7 7r rT 7T TS TS n 111M11 m n 11 E nOOrlhG FA nEL(l l al) P CL1410 RCOF NG FA /DEL ( n t al) 18 18 28JUN11 19JUL11 J j NTER ORS . . 1 _____ .. r . v .. . [3 RFPWTEHKJH FRAMNG/DR WALL1 AWARD P CL1300 RFP NTER OR FRAM NG/DRYWALL & AWARD 24 24 07MAY11 04JUN11 e ncf . ™ 77; H . H . r; FHAM NG/DRVWALL SU MrTTALHEC’V/AfTHV P CL1310 FRAM NG/DRYWALL SU M TTAL RECV/APPRV 18 18 06JUN11 25JUN11 7 TT T7j o M r7T; n 11 QFRAM NGCRW(ALL FAaDEL(h4al) P CL1320 FRAMNG/DHYWALL FA /DEL ( n t al) V2 12 27JUN11 11JUL11 p L1330 ‘ RFP ALANCE NTER ORS ‘ ‘ 48 48 07MAY11 02JUL11 MHFP ALAHCEWTEP ORS r L1 J; £ £ 1 1 2: .. c 1 3HLANUE MTERlOnS SU M.TTALHECV APPRVl P CL1340 ALANCE NTER ORS SU8M TTAL HECV / APPRVL 48 48J28MAY11 J25JUL11 San (Ma Pf APR o Early ar f f P nnacle Enterta nment ™ SfLf Paoenum er 7A WCO HrlUJc l ffJ /o Startm lestonepo nt© Pr mera Systems nc. F n sh n les ons po nt |
H _____ s _____ a jN _fll HM _____ wfe wH T o T T j n t ff SnW SNC NT R OR n S _____ 48 20JUN11 1SAUG11 _____ aRFPUnwORKAND ARO p.CL136Q RFP M LLWORK AND AWARD _____ 2 15AFR11 A 1W1 HMlLLWORKSUEMn™. EC’WVWVL p.CL13eo MLLWORK SU MTTAL RECV/APPRVL 18 18 13JUL11 Q2 l fû #‹’t . _____ rr; A KAPP M a RFPH.EVA H>FOAD AWAHO T R1000 FRFP ELEVATED ROAD & AWARD _____ .. 0 16FE 11 A 15AKH A _____ j _____ o. _____ ..g . HEC V AFPRV p R 1TEVATEDROAD SU MTTALRECV/APPRV 1212MAPRn 13MAY awmDHa > p ER1040 ELEVATEO ROAD FA /DELfln t al) 12 12 14MAY11 27MAY11 D 1 k nnn 1 RPF FVFF Mft S EXCAV & AWARD 18 0 15FE 11 A 15APH11 A P LM1020SELECT F LL PROCTORS SU M T / APPROVE \ 4 4 27APR11 [30APR11 L CRUX MCC SSUE CO FOR CENTRAL PLANT STRUCTSTEELJ 1fl 6 23FE 11 APPR T M n l wram TCP 6 CENTRAL PLANT STRCT SU ML RECV/AFPRV Q 5FMTT7T 12 R T T P CP11070 [CENTRAL PLANT STRUCT STEEL FA /DEL 1 jh Qp T PR X S STRUCTSTE FL E 5P 3 RFP SUPPORT SERV CES PEM3& AWARD T sl 2 01MAR11 A 21 APRlT . .P . TD SUPP LDGPR OR TY J SP’ SU RECVT PPRV 6 06 MA Y11 12 1 l l Marf1W W W1 5RW SUPP SERV CES PE SU M.TTAL RECV/APPRV 12 6 6MHY11 12MAY11 . ™ 5 0 PR OR TY SUPP LDG ‘SJ SCT FA /DEL 6 13MAY11 17JUN11 H w F :P1Q50 SUPP SERV CES PE FA /DEL g _____ 3o l8JUNnJ23JL s.PrsEPvCFSF.E _____ EL '' _____ .. HSQ RFP SUPER STRUCTURES AWARD 2z 0 27JAN11 A 02WR11 A SRPP STRUC™ ™ Hf SUPER STRUCTURE SU MTTAL RECV / APPRV 12 14 23MM11 A 5WYT _____ .. nM HT 4 SUPER STRUCTURE FA / EL ( n t al LewH. 6 5 06M4Y11 a Y11 ZT T ‘ ‘ HfTTs RFP STA R/RA L PACKAGES AWARD >4 MM T 04JUN11 T ™ . r. . . . JSSTAtlRAJLFACKAGE SU MnTALRFCWAPPFlV jl STA R/RA L PACKAGE SU MTTAL RECV/APPRV 24 24 06JUN1 UU1 _____ .. E _____ ™.™ F L SS. HT 1160 STA R/RA L PACKAGE FA / OEL ( nt l al S S r) 4S 48J05JUL11 [39AUG11 _____ CLOSURE _____ r ulnocrp n Aln jmAV 11 _____ 3 RFP SK N (EFS) & AWARD (t c l Etes tlFr al) HT 1270 RFP SK N (E FS) S AWARD ( ncl est & F nal _____ 12 08FE 11 A 03MAY11 HT1280 SK N SU MTTAL RECV/APPRV 30 04MAY11 08JUN11 HT1290 SK N FA /DEL ( n t al) 24 60 09JUN11 11SAUG11 HT1200 RFPALUyNUM/aLASSSREJECT DS 20 oj 13FE 11 A 08Mft.R11 A ] FFjmMHWUGuawn lECT M Start ta 26APR10 F n sh date 1MAY12 P nnacle Enterta nment Progress ar Pagenum er 8A MCC PROJECT 3278 start m lestons po nt S) Pr mera Systems. nc. o F n sh m lestone po nt |
ff E OA JSUMGRS WARD _____ L_1 01APR11_A Z 2J EaAUJU NUM/euss su M TTALF EC’v/AOTV P.HT122 ALUM NUM/ GLASS SU M TTAL RECV / APPRV 20 30 09 MA Y11 13JUM1 c 2 ALUU NUM FA OEL (n tel) P.HT124 LUMHUM FA / DE L ( n t al) 60 14JJN11 23AUGV . . 30l ASS FA PEUHM P HT126Q GLASS FA / DEL ( n t al) Z2. 72 14JUN11 C7SEP11 E3RFPROOF NG&AWARD P HT1300 RFP HOOF NG & AWAHD 1 5 07MftY11 6J g HQOF NG SU M TTAL ECWPFW P HT1310 HOQRNG SU MTTALRECT/APPRV J3 lglJJUN11 27JU 11 HOOf NG.FMP .l n at } NT E R ORS p r 1 TTT j 1 . A FP TER OF FH J NG RYWAL L P HT133 ]RFP NT R OR FRAWNG/DRYWALL 24 24 07MAY11 04JUN11 FFtAMMGnHYWALL suEwrrALREC v F v P HT1340 FRAM NG/DRYWALL SU M TTAL REC’VAPPRV JLÊ 15 Q6JUN11 22JUN11 mmM S 0H™ L vw m F HT13S0 FRAMNG/PRYWALL FA /PEL ( n t al) ‘ . . . . 1 rr . . tn mnm tt H RFP PRECASTMATLSAWfRD P PR1 OQ TRFP PHECAST MAT’L & AWARD £8 0 03FE 11 A 01MAR11 A P PCJ OU Hl r rn H31 #‹ c. Ar .n KHM HH PRECAST SU MrTTALREC’V APPFtV l P PG1220 PRECAST SU M TTAL RECV/APPRV 72 40 15MAR11 A 06JUN11 P PG1240 PRECAST FA DEL ( n t al) _g y U P.PGt300 RFP PRECAST ERECT ON S AWARD 4 f3 n n nu . . r GtjlQ PRECAST ERECT ON SU M TTAL RECWPRV 1 2 06 UL 19JUL1 HraECASrEnECTK>N F a P PG1320 PRECAST ERECT ON FA /DEL 1 15 20JUL11 02AUG11 . _____ P PG1000 [RFp STRUCTURAL STEEL S AWARD f 24 Q OSFE 11 A [03MAR1 t FPsmucTORALSTEEL AWfflD r rmmuu nrr J nu m rr. j _____ .. nn ;TT; uU ‘ S STRUCTURAL STEEL SU M TTAL REC WAPPRV P PG1Q20STRUCTURALSTEEL SU MTTALRECV/APPRV 36 21 19APR11 A 13MAY11 ppG104o sTRUCTTjR L T r FA / EL ( n t al) M Ylll UL W : rML O [RECEWEELEV/ESCALPROGRAM Q 0 04OCT10A RECE™ pTETS RFP ELEVATORS / ESCALATORS & PREL MAWARD 9 14DEC10A 21JAN11 A M p TW W0 ELEVATOR AFO& F NAL AWARD 07FE 11 A 16FE 11 A ™ ™.™ . M™ F Û TO ELEV/ESCALS PROCURE SU MTTALS 40 5T7FE 11 A ZUKwT . Fv mocu. pT L S ELEV ESCALS REV EW/APPROVE SU MTTALS W 3 23W T FR aœ ™ ™™ P EL1030 ELEV/ESCALS FA ANDDEUVER 1 ao 120 23A pRTrj 3S ELEWESCALS FA CCE R R VER ROAD D VERS ON rRm 50 M3 L ZAT ON 1 0 10NOV10 AllONOV O A MO LZATCN RR TU LAYOUT 5 0 11HOV1QA12NOV10A lLW0UT HR1190 JCLEAR/GRU 3j o 15NOV10 A 17NOV1Q A CLEAR/GH Startdato P6AP 1Q 3 Early ar mmz P nnacle Enterta nment STlf P te 2QAEHJJ a 03 rtfta/ r :nrt . Ha rtn Raua( LA SA Cr t cat R ndale 02MAY11 WOW LAS DO t awn HOUge LM. Summary ar Paoenum er 9A MCC PROJECT 3278 \Q Start m lestone po nt ) Pr mgwF ra Systems. rr. > F n sh m lestone po nt |
ÉUM muj g 5 0 19NOV10A10DEC10A T RR1210 EXCAVAT ON / F LL _____ .. . _____ 2 X6S CK RR1270 24 X5 C P 1 Q 23NOV10 A 23NOV10 WE NOTCEOFHWÊRHOADSH TDOWND J.V RR124Q WEEK NOT CE OF R VER ROAD SHUT DOWN DELAY 7 0 H S ™g ° GEGTExaEFAF C Jm prnTtvT F PflRP f 3 0 29NOV10A 17DEC10 A U 3 ALTWEAR NG 13DEC10 A 20DEC10 A RR1250 J ftsruftLl vvrftn mj T nr.. n . n . STR P NG S GNAGE HRH1260 sTR P NG/S1GNAGE A o 20DEC1u A)22DEC10 A _____ .. . j . Wr Kr 1 5 O DEC OAfrDEC OA RR104#‹ _____ .. lAYOUT T ..1n.. r. T %nrnnr HÉDES GNOFGARDERE DMERSON RR 55 REDES GN OFGARDERE D VERS ON 18 0 E4NOV10A 16DEC1QA RRT 55 S LT FENC NG 3 0 17DEC10 A 20D C10 A ‘ l RR10 0 CL AR/GRU 5 0 23DEC10 A 23DEC10 A £J J RF 7 EXCAVAT ON/F LL 1 0 23DEC10A 03JAN11 A FLL . RR1140 24 X92’CMP Z _____ Z 1 0 27DEC10 A 27DEC10 A 2J RRT C STON ASE 2 0 29DEC10 A 08JAN11 A STONE ASE. SR 5 STR1P NG/S1GNAGE ‘J _____ 0 13JAN11A 17JAN11A ST P NG NWE RH O ASPHALT PAVEWENT 1 4J 0 l4JAWnA l4JANlf ASW LT PA ENT GARDERE ROUNDA OUT ... S TFFNCKG Rm3T5 S LT FENC NG 5 0 090EC10 A 09DEC10 A S LTFENCNG R 3 0 LAYOUT S Q22DEC10A22DEC10A lL rauT RR 33 CLEAR/GRU 3 0 23DEC10 A 23DEC10 A CLEAR/SRU RR1340 REMOVALOFM SC. 2 Q 23DEC10 A 23DEC10 A REMOWLOFMSC. R 390 EXCAVAT ON/F LL 20 0 28DEC10A 18JAN11A m. RR1370 24 CDPA ‘ 2 0 13JAN11 A 14JAN11 A src0 ] RR DEMO EX 1ST NG GARDERE 4 Q 18JAN11 A 18JAN11 A MW RRT E ANK NT/ ACKF LL ‘ 3 02FE 11 A 12FE 11 A . T CKFLL RR 38 ELECTR CAL UNDERGROUND Z 5 Mr T HFE 11 A laKTnpaLUNDHWHOUND rl D SCOVER NCŒRECT FA D CATCH AS NS 5 5T F TT NC { RRl sS FA AND DEL VER NEW CATCH AS NS (A l) P 21FE 11 A rJSM R TT ..SHN .WM. m W REMOVE EXTG AND NSTALL CORRECT C S T 5 F TT F TwT REUOVEEXTG NSTALLCORRECTSUS RR 4T SO LCEU/ENT 7 û 15MAH11 A 17MAR11 A SOLCEMES RRU20 ‘STONE ASE COURSE 7 0 21MAR11 A 26MAR11 A STONE ASE COURSE RR143 CUR &GUTTER 15 0 26MAR11 A 05APR11 A a CUR LUTTER RRÛTF UNDERDRA N SYSTEM 11 0 04APR11 A 09APR11 A UHllffl m SHT l RR 4M ASFHALTPAV NG NDER COURSE 5 11APR11 A APRTTX l mALTPA G. .ERCOURSE RR T APPROVAL OF REV1SED L GHT POLES Y LADODT 5 11APH11A 1 j #‹FR D LGHTPOLES YLADOT RRTS CONCRETE PAV NG 6 2 5 1SAPR11 A 17APR11 A (CONCRÈTE WWG . RR 5 6 L GHT POLE ASES {R ver Dépendent) 4 1 20APR11 23APR11 _____ umT Xt W ° RR153Q PCCP10 3 1 26APR11 26APR11 recp > RR 535 ASPHALTWEAR COURSE 2 r 27APH11 27 PRTT W LTW HCOUWE RR ûT TE PORARY STR P NG To Open ThrcughT ffc 3 129APR11 29 PRTT MOWf Vsm ToO Tto 1 R2 75 OPENROUNOA OUT FORTES USE 3 APRn oPENRouNOA O.TPORTE use HR 52 L GHT NG ‘ 10 S 12MAY11 20MAY11 LK3H™G _____ HRR1490 STR P NG/S GNAGE 3 3 aJUM1 )21JUN11 l mc/aMME Startdate 26APR10 j ‘ EaNy ar Qf a t™ Plnnacle Enterta nment ™ r Tlf Date date 20APR11 anm . _____ D. _____ Cr tcal ar Rl nc Q2MAY11 m3 Wote/ Casj/ o ton Rouge LA. y to Paaenum er flA M CC PROJECT 3278 Q start m lestons po nt O Pr mamrfl $yjtflfT . p lo F n sh m lestone po nt |
STAT ONS202 216zx . . QJQ6DEC10 A DECVulT mr WW Pg 3 Q07DEC10A07DEC1C #‹ ‘ f g ALOFMSC C 7DÊC X . E ALOFMSC 5 DÊC 0 TD C X j £2 £rT£mt l/R L g 11PEC10A21FE 11A ( EXCAVAT FLL RR1600 EXCAVAT ON /F LL . HDRANASÉ nm .. : 3 0 14JAN11 A 31JAN11A HDHAHAGE RR1590 DRA NAGE . Lr mH n ‘CC H A OEM ANKMENT ACKFLL RR1650 EM ANKMENT / ACKF LL 3 0 14FE 11 A . REM WGAND S ALL CORRECT ces RR 595 REMOVEEXTGANO NSTALL CORRECT C ‘S 1 0 01MAR11 A 04MAR11 A la3[c8 T 551R n son CEMENT 7 0 17MAR11 A 18WWR11 A solCMtHT RR161Q SO LlhM Nt . : .. REMOVE R PUCEFAlLa) SOLCEMENT(N SS. OL.nd) DCH E: aFMTWF R RFPLACE FA LED SO L 7 0 12APR11 A 13APR11 A . _____ RR1615 REMTJV & HhMLAL fc rtLLUU au L HJ PP . .VUDDH a STONESMSECOUF SE RRT 55 STONE ASE COURSE 7 0 14APR11 A 17APR11 A CUF seurTER RH1f 0 CUR &GUTTER 15 Q 19APR11 A 22APR11 A RH1630 UH &UU cn _____ o ap T ASFH lTPMNG NDmCOURSE RR1635 ASPHALTPAV NG NDER COURSE 2 2 25APR11 A 21APR11 . r . ; oTflPHH LHSHT POLE ASES (R ver DepsmteM) RR2106 L GHT POLE ASES (R verDépendent) 3 3 25APH11 /AKHl RR 635 ASPHALTWEAR COURSE 12 2 19MAY11 20MAY11 . Mcow e _____ RRT66 UN0ERDRA1N SYSTEM T T Y JMÛZ1 ‘ l m’ RR 67 STR P NG/S GNAGE 3 3 21MAY11 24MAY11 frmfWJJMNAŒ l _____ L GHT NG(ADDED POLES W/REV SED LAYOUT) 1 10 2 M YT 2JÛN T H HT ADDEDFOLESW ™ RR1690 [LANDSCAP NG l llo3JUN11 03JUNT1 LAMDSCA G STAT ONS 216 233 . _T .M RR 7 S LTFENC1NG T 5 0 06DEC10 A 07DEC10 A SLTFENCNG RR1720 CLEAR/GRU 3 0 07DEC10 A 07OEC10 A CLEAFWGRU RF 73 REMOVALOFM SC. 2 Q 07DEC10 A 07DEC10 A REMOVALCFMSÇ. RR 7 5 EXCAVAT ON; F LL 20 0 08DEC1O A 01MW11 A _____ SH EXCAVATON/F LL RF 7 LAYOUT _J Q 11DEC10 A 13DEC10 A >LwrauT j _____ RR174 DRA NAGE Z H 0 26JAN11 A 05MAR11 A HoFA f AGE RR181Q EM ANKMENT / ACKF LL 3 0 18FE 11 A 24FE 11 A S M wOTfMOWU RR 75 ELECTR CAL UNDERGROUND Û 5 28FE 11 A T2MAR11 A MDp fcM OH RR5T REMOVE EXTG AND NSTALL COflRECT C ‘S 3rMF T M R TX wwywm HWUCCwrOM RR 770 SO L CEMENT Z 5 0 28MAR11 A 01APR11 A _____ SOLCÉMENT _____ RR TS STONE ASE COURSE ‘ 5 0 Q2APR11 A 11APH11 A USTONE ASE COUR SE RR 82 UNDERDRA1N SYSTEM 1 ê PRTT7 15APR11 A UN0ERDR svsre RRlTM CUR &GLTTTER 15 0 11APR11 A 14APR11 A l cuF. S0UTTff RRTT ASPHALT PAV NG NDER COURSE 4 5TT PRTT 2 RTPr \ mmH.lMmm.MmmCOURSE RR1860 PCCP’W 3 1 27APR11 27APR11 . PCCP1° mm L GHT POLE ASES (R ver Dépendent) 2 2 28APR11 PR T T E TO WO ASPHALTWEAR COURSE 21MAY11 24M TT HAL EARCOU E RR STR P NG/S GNAGE ‘ 3 3 25MAY11 27MAY11 (S flPWQ/aaNAQE RR1870 LANDSCAP NG 1 [ 2eMAY11 28MAY11 NDSCAPUS RR1850 L GHT NG 10 10 Q3JUM11 [l4JUN11 LleHT1WG STAT ONS 233 240 + 50 RR1890 S LTFENC NG 5 0 0 DEC10 A O DEC10 A SLTFENCWG RR188 LAYOUT 1 s 0 14DEC10 A 15DEC10 A LATOUT Startdate 6APR10 L 3 Early ar É&to 1 P nnac e Enterta nment SSS %%& 0SV1 H tel Cas no ton Rouge LA. S™ Paaenum er UA MCC PROJECT 3278 Q start m lestone po nt© Pr era gWfrmsJnç. Q F n sh m lestone po nt |
US . nyjjy j É w a sJAN 1 A .. RR1900 CLEAR/GRU _____ .. REMOVALOFM SC. f[ S REMDVALOFM SC. _J _____ j™N11 A £gj JftvmL l nR 9 EXCAVAT ON / HLL gg £ 26JAN11A 8W A laKTU E p en Qnl f pMFMT 3 0 26MftR11 A28MAR11A SO LCLMLN RR1950 SO L CEKENT . . . no . STONE ASE COURSE l n 0 ncn gmMFRAqp ml RSE 3 # 01APR11 A 06AFR11 A _____ j _____ .. _____ .... RR1960 STONE ASE lUUhfo . . .rumT KUR SGUTt R aD aTn H H aflnTTFR 13 0 Q7APR11 A 14APR11 A T RR197Q CUH &taUl H . u N D ERD H AJN SYSTEM p onnn UNnFRDRA N SYSTEM 11 0 08APR11 A 13APR11 A ‘. RRa000 UNLfcKUHA NarS tWl . o APC M a 1 ASPHALT PAVUCEMOER COURSE 7 m975 ASPHALT FAV1NG NDER COURSE 4 0 17APR11 A 21APR11 A RR2040 PCCP 10 1 lg APF 11 £aAPR11 La RR2050 LANDSCAP NG . _____ 1 PR11 29APR11 l HTrol£ R rD RR2190 L GHT POLE ASES (R ver Dépendent) 2 2 30APR11 02MAY11 nn _____ .. . C...V11 ASPHALTWEARCOURSE RR1980ASPHALT WEAH COURSE 7 2 25MAY11 26MAY11 ™™ .™ RR e STR1P NG/S1GNAGE 3 3 27MAY11 31MAY11 smWKWWHME RR203O L GHT NG Q O 5JUN 25JUN L aH r G . GARDERE LANE D VERS ON t.vntrr RR206Q LAYOUT ‘ 3 3 02WY11 ]04MAY11 lL TOUT SS5 R DEMO D VERS ON LANE 5 5 05MAY11 10MAY11 DEMOD VEHSONLANE RR20 0 U WJU VtHS Ul LrtlNt: _____ H . .vyr T ljjvn H™ N RELOCATÉD R VER HOAD ATGAFlDERE RR2090 T E N RE LOCATE DR VER ROAD AT GAROERE 7 7 11MAY11 1 MAY11 _____ R V RHOADT E N+1Q0 . RR2100 TLÀYOUT 31 3M7JUN11 20JUN11 LATO1JT RR211C T E N AT R VER ROAD 5 5 20JUN11 24JUN11 TEWWR HRO RR2130 oEM3EX ST NG R VER ROAD s 3 JUM1 UN r E M.RW R VER HOAD T E N+240 _____ _____ .. . _____ .. . n JAnF RR2160 llNSTALL DRA NAGE 3 3 17JUM11 2QJUN11 NSTALL DRAGAGE RR2 4 T E N AT R VER ROAD 5 S 17JUM1 22JUN11 T.ENATRNERROAD RR2 5 DEMOR VER ROAD D VERS ON l\ 22JUN11 aSJÛN DÉMO ROAD D VERSE J 1 _____ RR 5 lARCHEOLOG CALD G(N C) 177j 73 03 WY10 A Q2AUG T j CH JLOQCALD NO RR 2T TEM ORARY DETOUR ROAD AVA LA LE 220EC10A T FORAP.YDETC.URROAEAVA E RR TEfrPORARY DETOUR ROAD N USE (HA MXK) W W 22D C JUHT J ARVCETOUKROAnNUSE OCKJ RRQ96Q CLEAR & GRU ROAD AREA (Archeo D g Area Crnpl) 0 29NOV10 A 29NOV10 A çumua KfUHAVtotUHmCm HRR S O LADOT F NAL NSPECT ON &ACCEPTANCE ts 1s 27JUN11 lsJ ÛT H AaQTP sPE ACCEPTA CE 1 SU0900 DESN/PROC/ KST NEW O/HELECT SERV CE ( Y 40 0 22OCT1O f\Z D oa KK WH W W.MWMlHél l Û O PHASE 1 PR MARY / LOW VOLTAGE DUCT ANK 16 22NOV10 A 17JAN11 A Œ m L0WVOLTAQ DucT AN . TT T .. . un . SS M TEMP ELECTRC AL SECOND ARfSDE SU1030 TEMPELECTR CALSECONDARYS DE 30 4 13DEC10 A 21JUN11 sU NDCMEST CWATER SERV CE 10 10 20JUN11 30JUN11 T n uf ™TCfJ [ SU1060 FORCED MA N SAN TARY SEWER NCL L FT STAT ON 2o 2o oUUL11 25JUL11 t data Pf APmo jjL 3 Early ar S fs mmz P nnacle Enterta nment 5S5 R’ : SAYT 1 f œ Wote/ Cas/no ton Rouge LA. { Summar y ar Paaenum er 12A MCC PROJECT03278 0 Start m l estone po nt ePr rrwa System nc. p F n sh r lestone po nt |
SU1120 GREASE UNES . 2 3 10 um PH E PR MAHY OWVOLTAGED JCT ANK HOTEL) SU11S0 PHASE 2 PRll RY/LOW VOLTAGE DUCT ANK 28 0 17JAN11A ggMftH 1 A PHASESPR WY/LOwmTAGEDUCT ANK CAS NO) gUT PHASE 2 PR WHY/LOW VOLTAGE DUCT ANK 10 10 24MAY11 04JUN11 mECHllJC0Nt9lœw0MHnG WATER HO EL SU 240 S TE CH LUCONDENSER/DOMEST C WATER (HOTEL) 18 _____ 13 18MAY11 08JUN11 _____ .. SSrrECH LLCONDENSÈfW)OMEsr C WATER(CAS NO) SU1246 S TE CH LL/CONDENSER/DONEST C WATER 18 18 09JUN11 29J 1 joFFsrrESANrrAf YAVA ELF. 5U1252 OFFS TESAN TARYAVAtLA LE 0 #‹ #‹ >0FFsmEWATH AVA LA LE SU125 OFF S TE WATER AVA LA LE 0 0 02M Y1 oFFsrTEGASAVAJLAEŒ SU1264 loFFS TEGASAVA LA LE 0J #‹l 02MftY11 Z 1 _____ .. _____ .... 7; [K LEVEE MASS EAFTHWOFtK : rptunan l PVFF MASS EARTHWORK 21 40 17JUN11 03AUG11 CRL 1090 L V h rmsa mm mvunr JFOUNDATDNS SPREADFOO MGSNCLWAL WAYJ GRE 1060 FOUNDAT ONS (SPREAD FOOT NGS NCL WALKWAY) 54 54 05JUL11 06SEP11 _____ m nm. .le C 110O FRPSLOPEDPAV NG . . 4 54 12JUL11 13SEP11 F COL. WAU.S CRE2400 P/R/P ENTS COL’s WALLS 60 S0 19JUL11 27SEP11 CHE25Q F/R/P DECK SLA S 50 6O09AUG11 1SOCT11 _____ FWDECKSLAK _____ XT . T:; . n H: ‘ Qr.TWEftRReRWALLS PLANTEHS CRE2600 F/R/P ARR ER WALLS & PLANT ERS 24 24 05OCT11 0 NOV11 . . _____ CRE2630 ELEVAT ED ROADWAY L GHT NG 18 18 09WR12 29MAR12 PORTECOCHERETOF CRE26S0 UNDER PORTE COCHERE TOPP NG SLA (COAT NG) 12 12 30t R12 12APR12 . \ CR F LU GRADE 24 24J21JUL11 [17AUG11 EJFLL/GRADE CR T S UO UT L T ES 18 04AUG11 24AUG11 HUGUT mES CR1200 ROAD AS 18 18 25AUG11 15S P11 F OADMSÉ CR1300 F/R/P ROAD 3o 3o o9SEP11 l3QCT11 MWHOW j . ERECTANDD TA LSTRUCTURALSTEEL 42 42 Q9MOV11 31DEC l HÉRÉCTAKO ™™ P T 3 METAL DECK NG/FRP TOPP NG SLA 6 6 3J N MJ N 2 ALOEC FRPTOF P 6 EP C ROOF DECK 12 12 03JAN12 16JAN12 HEPK RaoFoeK _____ ‘ D H . HC .HH VESTeULE PORTECOCHERE ROOF EGK P 1080 VEST ULE/PORTE COCHERE ROOF DECK S 6 10JAN12 16JAN12 _____ T . .. . H r. . . .. :; GLASSSL PPORTFQNYWALL P 1530 GLASS SUPPORT PONY WALL fa 6 10JAN12 16JAN12 nVn .m .m SPR AYED FH EPF QC FM G FLÛO R EEAMS P 1560 SPRAYEDF REPROOF NGFLOOR EAM3 9 9 10JAN12 19JAN13 u ™ MT lwHr3 STAND NG SEAM TAL ROOF NG SYSTÉ 7 H Zg J ggfl K SZSSS P 1550 SPEC AL PA NT EXPOSED R DGE STEEL 18 18 17JAN12 06FE 12 ™ r;; ™ n.nn nnccm ] O MEP U N O EH FLQOH H. P 152Q MEP UNDERFLOOR R l. 18 18 20JAN12 09FE 12 n n r TT: # FASC ACLOSUHF SGUTTERSTR M P 1090 FASC A/CLOSURES/GUTTERS/TR M 15 llZZllo tZlll P 1110 GLASS /TRUSS CLOSURE ASSEM LY 15 15 07FE 12 23FE 12 . . r r r r TTT ra7n H METAL SDFFTT FAN FJ S P 1070 l flETAL SOFF T PANELS 15 15 10FE 12 27FE 12 rD VJ’ C’ rnn uj .. E3 GLASSS.GLAZHG SYSTEM (WALN P 1100 GLASS a GLAZ NG S YST E M (WALKWAY & 24 24 24FE 12 22MAR12 P 1570 VEST ULE CE L NG SYSTEM 12 12 23MftR12 05APR12 _____ .. _____ .. _____ P 1020 PA NT/TOUCH UP EXPOSED STRUCTUHAL S 6 29MAR12 Q4APR12 _J Startdate P6APR1Q [ t 1 Early ar 2UUÛ02 P/ msc/e Enterta nment ™ r7 r f Da aoao 20APR11 . _____ n Cr t cal ar RHnr ats Q2MAY11 8ROa O / CSS/OO SafOn / O /pe M. Summary ar Paaenum er m MCC PROJECT 3278 3tart m lestons po nt #˜ Prtmavçrgftqtemsjnç F n shm lestonepo nt |
t jfl J MM W U _____ M_H TOK S UTFR T S SSANS OWST OTERS 5 RJ WAL 6 6 02APR12 07APR a _____ QUEPTHMolmED oFc L GH T PTR M OUT/LED/OFC L GH l N. HX . UH _j _____ jg g Jg g p 15D5 CARPET Z _____ .. 7 28APR 2 _____ 25AMH1 _____ (JPL NCH WD FNAL 11 1050 1 PUNCH AN. F NAL e] 6 Y12 h _____ .. 1 O FLL /GRADE EPL20Q0 F LL GRADE 1 _____ 17MAY11 07JU 1 ouNDEHGHOUNDUTL r ESJL GHTfOLES EPL2010 ‘ UNDERGROUND UT L T ES / L GHT POLES g _____ g at W Y11 2SMAY1J _____ vsrof1a D .TT rnRM FWFfl3R08JUN11 1SJUN11 EPL2040 STOHM tWtrt . _____ LOTEWSE p _____ TfrrRAo 6 6 17JUN11 23JUN11 PL2080 LOT A fc . _____ QcUR ANDGUTTER Sn f mR aN nrt lTTPR 6 6 24JUN11 30JUN11 _____ ... EPL2090 CUH ANU U LH . _____ ASPHALTLOT EPL2120 ASPHALTLOT . 1. 14 01JUL11 1 JUL11 CLEAN (.STRKLOT.MEC e w KWNC EPL2 CLEAN & STR PE LOT / MSC F1N SHES / PUNCH S 8J19JUL11 [27JUL11 _____ l : _____ ‘ l _____ GPL1Q 1 F LL/GRADE 30] 30 21JUL11 24AUG11 E _____ F LL. GRADE jrL1U U . rlLL unftuL . _____ .. _____ ; UNDERGROUND UT L T E5/L SHT ROLES GPL101Q UNDERGROUND UT L T ES /L GHT POLES 6 6 25JUL11 30JUL11 7TT . . . Vco oT 0STORMSEWER GPL1040 STORMSEWER 18 13 25AUG11 15SEP11 GPL10 0 L T ASE 14 14 16SEP11 01OCT11 JS. m. GPL1Q9Q CUR ANDGUTTER _J2 12 030CT11 150CT11 _____ .. _____ 13 GPL1120 ASPHALTLOT 18 1S17CCT11 Q5NOV11 ALT_T _____ .. _____ .. . . nt /MlT LAN DSCAPE/ RR GAT ON P 7f ANDÇCAPF / RR GAT ON G 6 07NOV11 12NOV11 _____ 12_: LA ML)a A ‘ nM.1l n N _____ nM ... CLEAN STmre OT/M C FM SUES/PUNCH QPL1190 CLEAN &STR1PE LOT ; MSC F N SHES f PUNCH 1 _____ 12 14NQV.1 J30NOV11 . l gT T CLEAR/GRU ATTURE&TEMPROADS 4. Ol 14JUN10 AJ27AUG10 A f HS c. AR.GR TTURÉSTEMJ AD. CA51Q00 FA /DEL VER P PE P LES 75 0 15JUN10A 18AUG10A _____ F/_D_W F t F3 CAST5 DR VE P PE P LE OTTOM5 & WELD TOPS 4 5 17AUG10 A 06OCT10 A _____ M RWP _™ mDTaR C sTlT DEL VER 230 TON CRANE & 265 K P HAt ER 0 24AUG10 A 22SEF10 A DE TONCRAN EH C S T FA / DEL VER ATTEHEO P LES S 15SEP10 A 24SEP10 A F/ _____ R1 TT _PL _____ CAS1120 DR VE P PE P LES 19 ) g>SEP10 A 13CCT10 A DRNEFKFWS CAS1300 CONCRETE F LL©P LES 7 0 Q30CT10 A 19OCT10 A coNCR TEFLLeP p CASH 25 MO L ZE MASS EXCAV CONTRACTOR 2 5 13OCT10 A _____ C hmMW WfNlM T C sn ‘ DEGRADE R VER ANK [Per Lower R ver Level) 6 T4CCn 2 OCT10A 0E_l _Rl_™fl r _____ r l L _____ CAS 1400 NSTALLSTEELHP LECAPS 50 0 18OCT10 A 13DEC10 A _____ MhST_Lsr _____ hj P E CAPS _____ ST5 EXCAVATETWALL FOOT NG 5 19OCT10A Q NOV OA _____ TW L FOÇT G C S OT SHEET P LE/ ATTERED P LES £5 Q gSOCT O A 06D C10 A sH_ETF _____ Tp_oP _____ s ST9 F/R/P T WALL FOOT NG & WALL TO LEV _ff 5 0 _NOV10 T7PEC1Q A . / .ropr . . _____ CAS 1700 EXCAVATE AS N 18 0 13DEC10 A 28DEC10 A HEXCAVATERAaN CAS 1800 ‘ REVETANT MATS AS N 36 Q 2.DEC10 A 11MftR11 A _____ REVE™ÉNTMATS. A _____ f s gno SOUTH AS N ERM 8 0 24JAN11 A 02FE 11 A SOUTHaASW E M CAS1630 REMA N NG ERMS(NORTH&EAST) 4 ok ANÛ E ûf] HHaW H _____ slN0 TH. r) Hhrtdat Pf AFFM. L 1 Early ar Qn l ttf 21 2 P nnacle Enterta nment cZ7LT Data date P0APR11 _____ ... . n J u H Cnt cal ar Hundl 02MAY11 R( ote/ C . LA Sumrrery ar Paoenum par 14A MCC PROJECT 3278 Startm lestonepo nt©Pr rna ra Wrr f. nc. [Q F n sh m lestone po nl |
P Ç K WAL rof MR TCepend 10 10 13JUL11 ‘ 23JULV F LL ATsrœLr7T MM ;tASTEERM) CAS162 F LL AT ST A L T Y ERM 3 (EAST ERKft 4 4 Q3AUG11 06AUG1J F EVETU JTMATS.UNDERF OD UMUOWR SE çAS1610 REVETANT MATS UNPER POD UM LOWR SE l 8J03AUG11 16AUQ11 ZZ ZZ J 6ET ARGE’RNE LEVEL DEPENDENT (HAMMOCK) CA53Q00 SET ARGE ‘R VER LEVEL DEPENDENT (HAMdOCK) 61 [ 26 ‘ 10MAR11 A ‘0 1L 3u rww nw C S3 55 LAUNCH & TEST ARGE SECT ON A 7 0 13FE 11 A 25FE 11 A RA SPORT EARGESECT™ A(RWERLVLDÉPENDENT CAS301G ‘ TRANSPORT ARGE SECT ON A (R VER LVL 5 0 10MAR11 A 14MAR11 A n mgMmm taW Wl M W S3Q2r T MP MOCR/ N T AL 13 P LE CAPTURE OEV1 S 6 0 15MAR11 A 24MAP 11 A luu nWW M N CAS30 5 LAUNCH TEST ARGE SECT ON 7 0 E A TOA T(VU™E™6 CAS3060 THANSPORT ARGE SECT ONS S 0 2MAR A 17WR A wM mfr. lMM r CAS3Q70 TEUP MOOR/ N T AL16 P LE CAPTURE OEVlC S 9 0 1 MAR1 A W A 4a ™ FLL . 0 CE PLEURE SECTES S W ALLAST/ NF LU AL. OCf P LE CAPTURE SECT(A > 30 26 28MAR A Y JH C CAS3115 LAUNCH & TEST ARGE SECT ON C ‘ 0 0SMAR11 A 13MAR11 A ; n . HPH A auucn A TRAN SPORT AH GE SECT ON C CAS3120TRANSPORT ARGE SECT ONC 6 0 14MAR11 A 2ÛMAR11 A . . S SS/ N T AL 16 P LE CAPTURE OEV S 1 5 26 R T PR T ; l ZZ L C S nTS ALLAST/ NF LU AL.10OF P LE CAPTURE SECT( C) 30 15 T PRTTA Tg YTT mfH mmMamMmHmm C S3 7 WELD PAD EYÊS 18 18 04JUN11 24JUN11 HWELDPADEYK t A ‘J1 WCLUr WL/ClCO _____ 1H SPEFU ANENTMOOR NGCHA N CAS3310 PERMANENT MOOR NG CHA N 12 12 25JUN11 09JUL11 £CT n TRUCTURALSTEEL CAS350Q ERECT & DETA L STRUCTURAL STE L 36 60 19MHY11 29JUL11 Gl ERÉCTaDETALSTRUCTUR . STEEL S55 T CAS NOGAMNGAREACELL DECK NG/PRES TS f8 Z7 Q1JUL11 02AUG11 OGM GAH CELLDEC PRE.ETS sW lEV r2FLCORDECK NG&RCOFDECK l l lU l û RF™™ CAS3400 FRPTOPP NGSLA LEVEL 1 20 £0 03AUG11 25AUG11 HFRFTOP GSLA LEVEL . r ; 7Z n.. . O FFFTOFflNG SLA LEVEL2 CAS3G0O FRPTOPP NGSLA LEVEL 2 17 1706AUG11 25AUG11 ™ L AajOUU rnr lurn TOomuL :. _____ 7 g n o’tTSV FHPPERMETEf WALL CUR S LEVEL 1 CAS3620 JFRPPER >ETERWALLCUR SLEVEL1 6 6J26AUG11 [Q1SEP11 \ 1 CAS4040 SETROOFTOPEQU PMENT [ 2 12 0SAUG11 19AUG11 OsETROOFTOREOL ENT C S473 SCREENWALLFRAMNG 6 6 20AUG11 2 MmT ‘ m™ ° C S4755 SPRAYF REPROOF NGLEVELS1&2 18 18 26AUG11 T S PTT SSPRAvnREPRC LEVÉLS 15 S4 EXT/FHA /SHEATH/E.rSgaEARSf H CL PS 2 4 2671. 23 1 a ( . CAS4000 ERECT PRE FA E FS PANELS SE SW NW 12 12 02SEP11 16SEP11 ERECTPRE PA OFSPANELS SE sw NW _____ 77; .rn TTTt c n T Q LOW ROUF EASTTOSOUTH CAS4310 LOW ROOF EASTTO SOUTH 18 18G2 rP 1 23SEP11 #‹ 3 v _____ .. . .. _____ HJO nT; V ccon lNSTALLHOOFTODCr.WALLEJASSEM LYTOPOD UM CAS4330 NSTALLRCOFTOEXT. WALLEJ ASSEM LYTO 9 9 14SEP11 23SEP11 1 . . rr . nj T : ER ECT SC R EEW WALL FAC AD E CAS4320 ERECT SCREEN WALL FAÇADE 9 9 24SEP11 04OCT11 CAS43Û0 H GH ROOF 13 12 24S P11 07OCT11 HHGHROOF CAS4500 EF S (F NAL COAT/CAULK NG) 24 24 28SEP11 25QCT11 _a _____ cAS4700 GLASS/GLAZ NG Z4 24 lOOCT11 O5NOV11 E3 SLASSGLAZKG _____ CASH 060 MEP OVERHEAD ROUGH N 12 12 16AUG11 29AUG11 A™LTSTORTRACK CAS 101Q LAYOUT&TOPTRACK ‘ ‘ a 8 17AUG11 25AUG11 HLATOL T4TOP™ H L A llUlU LWTUU ft UT HHUV ... ‘ T EFT D LACKDUT(DR FALLPAlNTfCEl GSTRUCTURE CASH 170 J LACK PUT (DRY FALL PA NT) CE L NG STRUCTURE 6[ 6 3QAUG11 [06SEP11 ; ‘ [ Startdate 26APR10 EarlV ar ™% Sf P nnacte Enterta nment rZT R. n oPMAY Ma H tel Cas no ton Rouge LA. nn Summary ar Paaenurrfcef 1$A MCC PROJECT 3278 $ g mj estone po nt©Pr rnaveraSystems. nc. F n shm lestonepo nt |
P Sl U W ErL NGS 8 3 07SEF11 15SEP11 MEHW LLH CAS 1040 NEP WALL R. . 6 S_SEP11 _____ 22SEP11 CUVER UP NSPECT ON CASH050 COVER UP NSPECT ON ° ° f l]] TTrW nrjHYWALL C SH07 DRYWALL 0 OCT11 170CT T DR W WEANDFLOAT 8 13CCT11 210CT11 CASH 090 ‘ PA NT 1. SPTU .g OCT11 SPÉC AL FLOOR G m UFFET SEHTOG UNE CAS1142 SPEC AL FLOOfl NG UFFET 5ERV NG UNE 3 3290CT11 Q1NOV11 . DM LLWORHWDCOUNTCRTOF S.TEMPA CASH 130 M LLWORK AND COUNTER TOPS TEMF A R 9 9 29CCT11 08NOV1J SET UFFP UNE FOOO SERV CE EOU PMENT CASH410 SET UFFET UNE FOOD SERV CE EOJ PWEN 12 12 02NOV11 15NOT11_ wU.lU H .l LRl CAS 1150 WALLT LE& SPEC AL WALL F N SHES 12 \J _____ 09NOV11 _____ 22NOV11 HNTER ORGLAa.GaGUtfNGFe.AMES CASH 160 NTER OR GLAZ NG & GLAZ NG FHAM S 13 13 14NOV11 01DEC11 sTONE/TŒFLOORrJG C S T STONE/T LE FLOOR NG 3 5 15NOV11 19NOV11 CASH 110 SPEC AL CE L NGS 9 21NOV11 03DEC11 MEPTFM0UT rA 11190 H/FPTR MQÙT S 6 03DEC11 09DEC11 OA j \A tr H nnmJ WOOD FLOOR NG CAS11220 WOOD FLOOR NG 5 5 100EC11 15DEC11 _____ r WT CASH £30 CARPET _____ 3 3 16DEC11 19DEC11 T5 S 1440 CLEAN PUNCH & F NAL 9 9 20DEC11 30DEC11 _____ OCLEAN.RJNCR F NAL CAS’1 OWNERFURN SHED/ NSTALLEDFF&E 0 0 31DEC11 s OCONF TO O FLETON CAS 1760 CONTRACTORSU ST COMPLET ON °l Ql 31DEC11 Z. FEATURE AR/H L M TS/POKER _____ RhnA rn n qPp MEPOVERHEADROUGH. N CASH 180 UEP OVERHEAD ROUGH N 6 6 30AUG11 06SEP11 p r mcr n n orn ( LAVOUTSTOPTHACK rA l l9 1 l AYOUT & TOP TRACK 5 5 07SEP11 12SEP11 CA >[1190 LATUU & UT \ . LACKOUT(DP yFALLPA lT) FEATUHE AH CLNGAREA CAS 1250 LACKOUT (DRY FALL PA NT FEATURE AR CLNG 2 2 13SEP11 14SEP11 ‘. CASH 460 F REPLACE ROUGH CONSTRUCT ON 5 5 15SEP11 20SEP11 . . rn ocnn fl FR AME WALLS & C E LN GS CAS 1210 FRAME WALLS & CE L NGS 9 9 16SEP11 26SEP11 CAS 1240 MEP WALL R1 6 23SEP11 29SEP11 MEPWALLR. . US œVER UP NSPECT ON Q 3 S PT1 ™ CASH 270 DRYWALL 9 9 1 OCT11 27QCT11 ODRYWALL CASH 280 TAPE AND FLOAT 9 9 220CT11 01NOV11 APEANDFLOAT CASH 290 PA NT ‘ ‘ 6 6 02NOV11 08NOV11 l l _____ .. . ; _____ ; :. MLL WORKAN D COU NTER TOPS TEMP A R CASH300 MLLWORK AND COUNTERTOPS TEMP A R 3 07NOV11 15NOV11 CAS 11750 SET HOOK UP P RE PLACE 4 4 16NOV11 19NOV11 SET HOOK UPF REF ACE CASH310 SPEC AL WALL F N SHES 18 18 16NOV11 09DEC11 SSPECW.W .LF HES rAS tlPf) STONE/T LE FLOOfl NG 5 5 10DEC11 15DEC11 Sf L AR AREAZER COUNTER EQUANT g gl D n 1 CASH350 SPEC AL CE L NGS 9 9 16DEC11 27DEC11 HSPECWLCEL1M3S CAS 1360 MEPTR MOUT 6 6 27DEC11 03JAN12 TnZZ r CAS 133 WOOD FLOOR NG _____ J 5 04JAM2 09JAN12 wowwxmwa CASH 340 C RP T 5 5 10JAN12 14JAN12 CARPET L #‹ ‘ #‹ U WnrL ‘ . . ttCLEAN PUNCH SFHAL CAS 1430 CLEAN PUNCHS F NAL 9 9 1QJAN12 19JAN12 _____ CLEAN NGH AL T z _____ .. . . O OWNER FURNlSHED lNSTALLED FFSE CAS’1610 OWNERFURN SHED/ NSTALLE0FF&E 0 0 20JAN12 CONTRER au esr COMPLETS CASH 770 CONTRACT OR 5 U ST COMPLET ON o 0 20JAN12 Z PU L C RESTROOMS/SERV NG STATTOS/ OH .J EP FP MEPOVERHEA.RO H .M CASH360 P OVERHEAD ROUGH N 8 3 07SEP11 15SEP11 l cAS 1390 LAYOUT&TOPTRAÇK 5 s l6S P11 21SEP11 LArouTSTOPTR K Sta date 2 APR10 ‘L lEarly S f gS f P nnacle Enterta nment ESSu Da a date 20APR11 m . .. n n > A 1G Cntcal ar Run tP 02MAY 1 Rœ Wote/ Cas/no Saton Rouge LA. Suramary ar Panflnumter 16A MCC PROJECT 3278 Start m lestone po nt e Pr nce Sreterrt jr c. lo F n sh m lestons po nt |
Jffg SgggggHc lL N g 1 _____ 6 g P11 SEP11 _____ EPWALLRJ CASH 480 MEPWALLR. . . 1 fa Zlt _L OCOVÊRUPMSPECTON l CAS 1490 COVERUP NSPECT ON _____ °. 006OCT11 QDRVWAU C S 50 DRYWALL _____ £ T/1 #‹ % WE T fes TAPEANDFLOAT g. g 02 NO VU % _____ pANT 5SS 52 PA NT .1 9£gNOV111SNOV11 a l™EFL0OH LS CASH 540 T LE/STONE FLOORSWALLS 1£ 19N0V11 °6DEC11 0 TO ET PA TrrowsœC ESSORES CASH560 TO LET P ART T ONS/ACCES S OR fc S 9 03DEC11 13DEC11 SM LLWORKA MDCOUNTEFTOPS 11 CASH 530 M1LLWORK AND COUNTERTOPS 15 15 07DECV _____ £3DEC11 C PET.RESLENT l CAS115 Q CARFET/RES L ENT _____ .. 2 5 24DEC1 1 30DEÇ11 HSCT CONNECTSERV CEEOT EQU™ENT CASH 740 SET / CONNECT SERV CE AR EQU PMENT 15 15 24DEC11 12JAN12 lù0QfmmW CASH570 ‘ DOORS/HARDWARE 4 4 31DEC11 05JAN12 _____ MEPTHMOUT fflgu Rn SpPTRtMOUT G e 10JAN12 16JAN12 ... CAS 1550 Vfcl 1 t HMUU . flCLEAN PUNCH &F MAL r j\cn Kn r FAN PUNCH F NAL 9 9 17JAN12 26JAN12 CAS H 450 CLfcAN KU w n a T NHL _____ .. OOWNERFURN 5HEG S™_LEDFFSE l CASH820 OWNERFURN SHED/ NSTALLEDEF& E 0 0 27JAN12 OCOKTRACTCRSU ST COMP.ET CA.SH780 cONTRACTORSU STANT AL COLLET ON [ 0 0 27JAN12 GMMNQFLOOH CAPE _____ h.nrru Ea.effl HHD wjeH.1. CAS 140Q MEP OVERHEAD ROUGH N 36 36 30AUG11 11QCT11 ‘ CAS 1590 LAYOUT&TOPTRACK(FURRDOWNS) 9 9 120CT11 21CCT11 gjjûjjjjT ttACK PUT (ORV PALLPA NTglUNCS HUC U g g TZ r T CAS 11610 FRAME WALLS/ FURRDOWNS/CE L NGS V 11 290CT11 10NOV11 CASH 620 vEP WALL R 5 5 11NOV11 16NOV11 MEPWfflj.n CAS 1640 COVERUP NSPECT ON 0 0 17NOV11 v CAS 1630 DRYWALL 15 1S1 NOV11 08DEC11 D™1 M CAS 11 650 TAPEANDFLOAT 15 15 23NOV11 13DEC11 DTAPEAND FLOAT CAS 11660 PA NT 15 15 30NOV11 16DEC11 mmn al100U r ECAGO.’ LLWORH M VALS CAS 1730 CAGEMLLWORK/METALS 15 15 07DEC11 23DEC11 X . > 7 nl:f.t OSTONEeR CKVYALL F N SH ES CAS 1 70 STONE/ R CK WALL F N SHES 9 9 14DEC11 230EC11 amrm w l FrlKH™ CASH 680 SPEC AL WALL F N SHES 12 12 20DEC11 04JAN12 ™ T. 1 CASH 690 SPEC AL CE L NGS 36 36 05JAN12 15FE 12 7 CASH 700 CARPET 24 24 25JAN12 22FE 12 ™ CASM71 NEPTR MOUT 27 27 26JAN12 25FE 1Z _____ GHMEFTH UOUT 11720 CLEAH PUNCH AND RNAL H 24 W 2 _____ 7gR12 _____ T . CASH 790 CQNTflACTOR SU ST COMPLET ON 0 0 19W\R12 _____ CAS 1930 lAMADJUSTSECUR TYCAMEHA’S ( N T AL) 15 15 26JAN12 11FE 12 . HJUPOOU CASH 920 SURVE LLANCE ROCfA EQU P COMdSS ON NG F 16 23J 2 _____ 15FE 12 T Z1 TT CASH 950 OWNER FF&E GAUNG EQU PANT NSTALLAT ONS 30 30 30JAN12 03NWR12 r rL H T CASH970 sTATEPOL CE/A S F NAL NSPECT ONS &CERT F. 3o 3o l3FE 12 l7MAR12 STATEPOL ASSF sreT PU L C RESTROOMS/SERV NG STAT ONS/ OH SET OLEWH HYDRAULCF MPMU CAS12005SET PADDLE WHEEL HYDRAUL C PUNP EQU P UENT 6 26AUG11 015EP11 _____ .. SETG NERATORSONFLOOH CAS 12010 SET GENE RAT ORS ON FLOOR 6 6 29AUG11 03SEP11 CAS12000 NCPOHROUGH 24 24 120CT11 08NOV11 QMEPO ROUGH C ST2020 LAYOJT&TOPTRACK 12 1g l40CT11 270CT11 l LAWT W1 K Startdale 26APR10 t a a Early ar Ea te m&g P nnac e Enterta nment ™ rT f [’atadate 2QAPR11 _____ ... _____ .. _____ .. Crt cal ar RmdJe 02MAY11 RM H tel Cas no ton Rouge LA. Surm ary ar Paaenum er TA MCC PROJECT 3278 stgrt m lestone po nt©Pr m er System; pc p F n sh rr estonepo nt |
rff SsSf FRA ™ wALL s s CE UNGS . 11 f 2 OCT _____ ;7NOV ‘ ‘ Q . EPWALL . rT cS PWALLR. . 15 1508N° 1 °V11 oo UP m CAS 2050 COVERUP NSPECT ON _° _____ Q 29NOV11 DRYVYALL C S15 6 DHVWALL ™ 12 30NOV11 glL HTMFL0AT l 1 ™ TAPEANDFLOAT 9 g°™C11 16DEC11 T CAS 2 § 7 PA NT 12 12DEC11 MDECV . l CAS 2090 CE L NGS 9 9 17D C11 23PEC11 fl M U WORKAND COUNTERTOPS CAS 2110 MLLWORKANDCQUNTE TOPS £ 9 20DEG11 30DEC11 SPK FLOORNGSK TCHENS CAS 2120 SPEC AL FLOOR NG® K TCHENS S 29DEC11 05JAN12 HTVPCALFLOOR N G/ ASE CAS 2130 TVP CALFLOOH NGf ASE 9 9 29DEC11 09JAN12 DTL£WALLSSFL0ORS CAS 21Q0 T LEWALLS&FLOORS 31DEC11 Q7JAN12 esETFOODSSRv CEEQUfMENT/HEPCO CAS 2150 SET FOOD SERV CE EQU PANT / MEP CONNECT 18 18 06JAN12 26JAN12 ETFWTTOH M CH MM CAS 12170 TO LET PAHTlT ONS;ACCESSOH ES 5 5 09JAN12 13JAN12 OMEPTH MOUT CA5 2140 NEP TR MOUT ‘ 9 9 2QJAN12 30JAN12 fta TtU mer m v w _____ .... . . _____ ...MO DOORSWD HARDWARE n ç o cn nnORÇ ANO HARDWARE 9 JUJAN 2 CA jl21 O UUUHa flWU nrtnunwnE . H CLEW PUNCH AND F NAL CASmao ‘CLEAN. PUNCH AN D F MAL 15 15 31JAN12 16FE 12 OW UR HED TALUDPF CAS 2560 CWNER FURN SHEMNSTALLED FF & E 0 1 TCHENS CAS 2590 CWNER URN N K TCHENS 12 12 17FE 12 01MAR12 J lL _____ T . dCONTRACTORSU STCOMPLET ON CAS 253Q cOfJTRACTORSU STCOMPLET ON of #‹l [17FE 12 Z. PRE FUNCT ON/MULT1PURPOSE . . a nwn>/11 n nPn POHROWH CA5 2190NEPOHROUGH _____ 1 18 10NOV11 Q3DEC11 CAS 2200 LAYOUT&TOPTRACK 12 12 12NOV11 29NOV11 UVOUTSTOPTMCK CAS 2220 FRA SE WALLS & CE L NGS Û 8N V 17DEC11 SFRAMEWALLSACE OS C S 22 MEP WALL R1 18 18 19DEC11 1CJAN1 E MEPWALL.t CAS 2240 COVER UP NSPECT ON ( n t al) 0 0 30DEC11 _____ HnR™ Lw .LS CHLKGS CAS 2250 DRYWALL WALLS & CE L NGS 15 15 31DEC11 1SJAN12 PF WnF nAT CAS 2260 TAPE AND FLQAT 12 12 10JAN12 23JAN12 ™ CAS 2270 PA NT 15 15 16JAN12 01FE 12 777 TTTTTTTTS ngggmn S MLLWO KSCOUNTE TOPS CAS’g LLWORK.COUNTEHTOPS AN FP WUH mM.. S 2M° WALL & FLOPS T LE RRs p FR H ON FLOO TAS 2110 STONE/T LE FLCOR NG 12 12 02FE812 15FE 12 L Aa ASJU a urcc/ LE rmun nm _____ T EET TO LET PAR T TONS/ACC ESSOR es CAS 2390 TOLET PART T ONS ACCESSOR ES 3 9 11FE 12 21FE 12 CAS 2290 MEP TR MOUT 3 15FE 12 23FE 12 .n™1 C . T[ ™ CAS 2340 OPERA LE PART T ONS 6 6 16FE 12 22FE 12 OPERA LEPART ONS CAS 2360 CARPET 12 12 01MAR12 14MAR12 HC flPEr : nH. ; DOOHSAND HARDWARE CAS 2370 DOORS AND HARDWARE J 9 06 R12 _____ 15 R12 CUAN PUNCH AN™ CAS.23 0 CLEAN PUNCH AND F NAL 12 12 16MAR12 29MAR1 > OO RFUR E ST CAS.2570 OWNER FURN SHEDMSTALLED FF & E _____ ‘ Muaa o CONTRACTORS.SSTCOMFU CAS 2540 CONTRACTOR S U ST COMPLET ON 0 0 [30MAR12 _____ V P LOUNGE F N SHES fl7 ra.11 h9Mnul1 TERHACEGUARDRAL CAS 2520 TERRACEGUARDRA L 6 6 Q7NOV11 12NOV11 TH1FFC C OAT G CAS 251Q TERRACE TRAFF CCOAT NG 4 4 14NOV11 17H0V11 TERRAOE TRAFFCCOAT G fta D U mnnHOE mnm HMa _ r 7Tt... c rr FFEPUACEROUGH CONSTRUCT ON CAS 25O0 P RE PLACE ROUGH CONSTRUCT ON 5 5 3WCT11 05DEC OUT.DR LP CAS 2210 LACKa T(ORV FALLPA NTt AR qL ffLH H H . CAS 2460 HARD CE L NGS W TH MOULD NG [GFRG ) 15 15 l9JAW2 F _____ tar date 26APR10 L ù Early ar t shHfte ™ P/ macte Enterta nment Sf gyg SV H te/ as no afon A LA SjS r Panenum er 1SA MCC PROJECT 3278 Q Start m lestone po nt©Pr maveragw1em lnc;. o F n sh m lestone po nt |
l CAS 12410 STOME/T LE aOOR MG H 02FE 12 _____ 15FE 1g _____ HMLLWORK SU MLLWORK 2 24Q4FE 12 ° R12 wwmcalWM CAS 247Q PA NT/SPEC AL CE L NG F1N SHES 6 6 D6FE 12 j1 FE 1£ f SETMOOKUP AR ÉQU PENT CAS 244 SET/HOOK UP AR EQU PANT 5 5 15FE 12 20FE 12 Tw0OD EW CEL NQ CA512310 WOOD EAM CE L NG 3 3 1SFE 12 18FE 1J HHTOlLETP HTm0H9ACCEaaOR E C S 248C FTTO LET PART T ONS/ ACCES S PR E S 5 5 16FE 12 21FE 12 MEPTF MOJT l CAS12490 _____ H/EPTR1MOUT _____ 6 6 1 FE 12 24FE 12 OwooDFLOORfja C S 236 WOODFLCOR1NG 9 20FE 12 _____ 29FE 12 cmpCT C ST243 CARPET 6 g01MftH12 07 R12 CT;HaoKupFf) CA512450 SET / HOOK UP F REPLACE f 4 03MAR12 Q7MAR12 _____ CLEW PUNCH AND PWAL ‘CAS 12400 CLEAN. PUNCH AND F NAL 5 5 03W\R12 13MAR12 0OVYNEP.FU™ HM AU_ED CAS 2580 OWNER FURN SHED/ NSTALLED FF & E 0 0 14MAR12 coNTRACTORSUGSTCOMFt CAS 2550 CONT RACT OR S U ST COMPLET ON ] 0 0 UMftR12 jzx _____ .. 1 ;rn VJnnfvrn n . nl DOCKSERVCEELEVATOR (DS 1 ) CASSE1 1Q0 .DOCK SERV CE ELEVATORpS 1) j _gNOVn CASPE4 100 PASSENGER ELEVATOR (CP 4) M 24 5NOV 06DEC fflaflraw. T.ffl CASPE4 110 P ASSENGE RELEVAT OR (CP 4) NT. F N SHES 10 10 07DEC11 17DEC11 . T £ ;:; . 1 . PASSENGER ELEVATOR (CP A) E5TSADJU: CASPE4 190 PASSENGER ELEVAT OR (CP 4) TEST & ADJUST 6 6 19DEC11 24DEC11 ou CÀSPE2 1Q PASSENGER ELEVATOR (CP 2) 24 24 03OCT11 04NOV11 WasajaEREtEW w GP j cTs V PAsgNŒR ELEVATOR CP 2J NT. F N SHES H Q5 v7 T N vTl CA3PE2 190 PMSENGEREŒVATOR TEST ADJUST 6 7N V T û XZZvZZZ CASPE3 100 PASSENGER ELEVATOR (CP 3) 24 24 05NOV11 06DEC11 PASSER ELEVATC H.C™ NT PN ES CASPE3.50 PASSENGERELEVATORtCP NrF N SHES _J0 _____ 0 07DEC1 _____ 17DEC11 ££££%£££ CASPE3 190 PASSENGER ELEVATOR (CP 3) TEST & ADJUST 6 6J19DEC11 24DEC11 SRp165Q ERECTSTEEL SERV CE DR VE TRANS T ON 5 5 23AUG11 27AUG T TWW ™ ™ sRP1670 FRPSLA ON METAL DECK 3 S AUGn 31AÛ PSLA ONmECK ‘. _____ 1 CLR1040 AUGERCAST P LES 30 0 08NOV10 A 16DÊCTQ T ŒAUGERCASTPLES CLF 7 F/R/P TOWER CRANE 1 FOUNDAT ONS 6 TDEC TTD C O A flWfflWM Wtl WUHDSnQNS CLH10 0 FOUNDAT ONS 23 0 13DEC1Q A 22JAN11 A FOUHWJWM çLR1090 F/R/P TOWER CRANE 2 FOUNDAT ONS 1o o[gTDÊC10 A 30DEC10 A FWTG PWN l CLR1650 lERECT STRUCTURAL 5TEEL/ ECK (HA M)CK) 143 82 19APR11 A 05CCT11 mMHxmMmmamwm H CLR 675 luPGRADELOWR SE FOUNDAT ONS (AS 04) S o 16APR11 42WR TXl J ELOWR FO D S O startcta 26APR10 lE Early ar S fs mmg P nnacle Enterta nment rZTT gfr S H te/ Cas no ton Rouge LA SSt Paaenum er S MCC PROJECT 3278 Q Slart m estone po nt gPr’ma a9w1ans n£ Ho F n sh m lestonepo nt |
HL H Œ H H _____ H SSuJÊÊ Ê /à MÊ 5 _PRT S RS GHDS5 T 3 T ff lO ff KEC REA GR r _____ ‘ . 5 19APR11 A 06JUL11 _____ pHASE EH CT.AHEA lGR DSG SJTaSa— l ‘CLH1720 PHASE ERECT ARE A 1 (GR DS G 5) TQ53’ S 12 19AP 11 A 22JUL1 _____ PHASE EflKT ARÉAz GR SA.G)TOW’ CLR1700 PHASE ERECT AREA 2 (GR DS A G) TO 53’ 7 14 19AFR11 A C2AUG11 m . ajT M. > ‘ CLR1746 PHASE EHECT AREAS 2 1 3 1 54 03AUG11 05OCT1J HFHPSLA ON MÉTAL OECKLEVELS S2 CLR171Q FRP SLA ON METAL OECK LEVELS 1 & 2 2 12 06OCT11 19QCT11 _____ H SFTWON F REPFOOF NG CLR1750 SPRAY ON F REPROOF NG _____ 12 13QCT11 26QCT11 FRPPERWETE CURES lHcLR173Q FRPP R METERCUR S 1 S 6120OCT11 26QCT11 . l ‘ ::’ _____ _____ .. _____ .. . 1 ; 1 TT SET ROOFTQFKWPMENT CLR1970 SETRCOFTOP£QUtPMENT .. S 06CCT11 lOCTl SC ALLFRAWJG CLR198Û 5CHEENWALLFRAMNG 5 J 12QCT11 17QGT11 ECTPREFAS PANELSCOLUMN G CLR16S0 ERECT PREFA EF S PANELS COLUK’N G _____ 5 5 18NOV11 23NOV11 lf LASE eLJ 7 G mRon R1 Agc GLAZ MG 6 2 NOV11 Q3DEC11 CL R 630 jLftaa/ULfta NU _____ .. lNSTALLEOTER ORWALL EXPANS ON JO NTSC CLR1990 ERECT SCREENWALL FAÇADE 6 6 12PEC11 17DEC11 kjl r 33 ; STTTHET n nrpn 0 FMALFK SH COATEF SPANELS G CLR16 0 HNAL F N SH COAT EF S PANELS G 9 9 12DEC11 21DEC11 . . . g r; EXTEH OR FAÇADE ACCENTS CLR1770 EXTER OR FAÇADE ACCENTS 7\ 7 15DEC11 [22DEC11 j _____ ; STUDS/SHEATH NGEXTER ORCOLU S 1.6 8.6 12 12127CCT11 _____ Mj _____ : WMœ ™™ TO5 E FSATSTEAKHOUSERESTURANT 9 5 ToN W 19NOV11 D E.SATSTEAKHOUSE REST T ÇÛÛWO E FS FAÇADE UPPER AND (ONLY) ‘ 4 4 21 NOM 1 28NOV11 ™ ™ (0f RW U LT UP RCQF NG STEAKHOUSE RESTUR W 12 glNO / 07DEC11 .PROO™ ™ ™ 7 TT .. n. _____ ..n pH: SGLASSGLAZ NG CLR1910 SLASS/GLAZ NG 15 15 29NQV11 15DEC11 031920 STAND NG SEAM ROOF SYSTEM 12 F D T 2 D cT m ™ ™ ™ CLR1940 ‘ TAL FASC A PANELS 15 15 22DEC11 10JAN12 MÉTAL FASCW PANELS cLm935 NSTALLEXTER QR WALL EXPANS ON j jsQDEC11 jûJw T .S ALL mH WALL EXPANSÉ PU L C RESTROOMS/SERV NG STAT QNS/ OH _____ ... C R M E/POHROUGH 2Q 20120OCT11 11NQV M FOHHOUGH CLR 12 LAYOUT&TOPTRACK 5 5 _____ UWÛUT4TOPTP CK LRT72l5 FRA WALLS&CE UNGS 9 TSN vT r5TD cTl Ç_g _____ gM _____ J gPWAU.R... 5 5 02DEC11 07DEC11 LPE™N CLR 1250 COVER UP NSPECT ON 0 D Q8DEC11 _____ v CLR 126 DRYWALL 2 12 120EC11 24DEC11 DRYWALL CLR 1270 T PEANDFLOAT 12 12 16DEC11 30DEC11 QTAPÊAND FLOAT CLRH280 PA NT 12 200EC11 04JAN12 HPAHT CLR 129 CE L NGS 7 7 05JAN12 12JAN12 DCELKGS LM 1 U _____ ; .. ... a . r; SFEClALFLOOHMGATKrrCHEN CLR 1310 SPEC AL FLOOH NG AT K TCHEN 5 5 13JAN12 18JAN12 _____ .. _____ .. r f r E CLR 1320 TYP CALFLOOR Na ASE 9 9 13JAN12 23JAN12 jrrP Aaow.MQWœ l S sETFOOD SERV CE EQU PMENT (SERVES UFFET) j 1s l9JAN12 o6FE 12 WW WCEEauM.T W rtdate 26APR10 E 3 EarlyLw Data date 20APR11 QDn _____ D . _____ ... UHM Cntjcal ar R datg Q2MAY11 RM Wote/ Casmo ton Rouge LA. _____ umrtwyter Paoe num er 20A MCC PROJECT 3278 0 s art rr lestone po nt Q Pr mera Systems nç. lo F n sh m lestone po nt |
HlSo . ; : : :. #‹ Um . l a ‘ CLRlg040 NST ALL WALL/CE L NG EXPANS ON JO NT g _____ 6 O F l n tm.: n D OOR s ANO HARDWARE CLR 1350 DOORS AND HARDWARE 6 6 09FE 12 15FE 1 . CLEAN.PUNCHANDF NAL CLR11360 CLEAN PUNCH AND F NAL _____ 9 15FE 12 25FE 12 $OWNERFUHN6HED STALLEDFF CLR 209 OWNER FURN SHED/ NSTALLED FF & 0 Q 27FE 12 _____ gowNÉR URN N K rcHEN EQU CLH 2120 OWNER URN N K TCHEN EGU PMENT _____ 12 27FE 12 1QMAR12 CON mACTOHSU STCOMPLEnO CLR 15 0 cQNTRACTORSU STCOMPLET ON [ 0 0 [27FE 12 ‘ 3 WEAL RESTURANT . . . . MEPOHROUGH rYmtvon ngp OH ROUGH 1 \ 1212NOV11 29NOV11 CLR 1220 ft/tK UH Humj . . LAVOJT TOPTEACK CLR 1370 LAYCUT&TOPTRACK 3 3 29NOV11 01DEC11 LACKÛUT (oRV FALL PA NT)CE LMOSTRLOT; CLR 143Q LACK PUT (DRY FALL PA NT) CE L NG STRUCTURE _____ 4 30NOV11 03PEC11 FRAKmuwûa.MGS CLR 1360 FRAME WALLS & CE1L NGS 15 15 02DEC11 19DEC11 MER LLANDCELKGR CLR 1200 VEPWALL AND CE L NG R.l. 23 23 08PEC11 C5JAN12 (w _____ &MM) CLR 1390 COVEH UP NSPECT ON ( n t al hard l d) 0 0 27DEC11 ranRYWALL CLR 1410 DRYWALL 15 15 27DEC11 13JAN12 OTAK DFUDAT CLR11420 TAPE AND FLOAT _____ 12 05JAN12 13JAN12 l CLR 1440 ‘PA NT 12 12 10JAN12 23JAN12 ZDAP D C LNGS CLR 1550 STANDARD CE L NGS _____ #‹ WC T a 1 50 LLWORKANDCOUNTERTOPS . 1 18 27 AN 2 16FE 1SP FLW GAT CLR 1540 SPEC AL FLOOR NGAT K TCHEN a 5 31JAN12 04FE 12 _____ r n n n n n E3 SET H 00 K U P FOOD SER VC E CMP CLR 1560 SET HOOK UP FOOD SERV CE EQU PANT 13 1f _____ ™\\ UE ™ ™ CLR11460 T LE& R CK WALLF N SHES 15 15 17FE 1 05MAR12 CLR 1480 STONE/T LE FLOOR NG S ‘ 3 22FE 12 24FE 12 _____ STONOTLFFLOOH S CLR 1940 SUPPORT NTER OR GLAZ NG FOR METAL ROOF 10 10 25FE 12 07MAR12 H H .3LAWÛFO . . n. QlNTFROHGLAZNG&GLAZ NCFR CLR 1470 NTER OR GLAZ NG & GLAZ NG FRAMES 16 15 01MAR12 17MAR12 CTR WOOD EAMCE L NGS 6 06MAR12 12MAR12 WOOD ÉAMCEL NGS CLR 1500 MEPTR MOUT S 3 0 MAR12 16MAR12 MEPTR MOJT 20 NSTALL WALL/CE L NG EXPANS ON JO NT S 8 TM T TêWP . LRT S r W0ODPLANKT LE FLOOR NG 9 9 m T’22MAR12 J ™™ LR 52 SPEC AL CONCRETE FLOOR F N SH 12 12 23 R12 5 PR Z Z CLR 1S3° CLEAN PUNCH AND F NAL 9 9 OSAPH 2 10APR12 Kmm mmmmw CLR 2080 OWNER FURN SHED/ NSTALL D FF& E 0 0 17APR12 v CLR 2110 OWNER URN N K TCHENEQU PŒNT 12 12 17APR12 30APR12 ‘ ZZ CLR 189Q [CONTRACTORSU ST COMPLET ON 0 0 [17APR12 _____ STEAKHOUSE RESTURANT nMnv11 hunrr ‘ HMEPOVERHEADROUGH. CLR 1100 MEP OVERHEAD ROUGH N 15 15 30NOV11 16DEC11 CLR 1110 LAYOUT&TOPTRACK 6 G 17DEC11 23DEC11 ... . ™ m Q FRA E WALLS & CE L NGS MD CT 9J N r: ZZZ T CLR 195Q ROUGH N F REPLACE 5 5 03JAN12 07JAN12 RODGH NFREPLAOE 1 .. . .. MEPK WALL R.L CLH 1140 P.NWALLR... 6 6 7 AN 13JAM2 0com CLR11150 COVER UP NSPECT ON 0 0 14JAN12 CLR T DRYWALL 7 7 _____ J _____ WANDFLDAT CLR 1170 TAPE AND FLOAT 7 7 20JAN12 27JAN12 TAPEAND FLDAT [CLR 1180 JPA NT 1 H 7J27JAN12 o3FEET2 [ °PAflT gtartdate 26APR10 L J Early ar Ega _____ a a_££ P/nr cto Enterta nment ™ Thsfr Data date 20APR11 an . _____ .. . Ktfd Cr t cal ar RunV Q2MAY11 FTO 0 / CaS /70 atOfl ROUÇe LA. a _____ K_ummary . Paqenum er 2JA MCC PROJECT 3278 0 start m lestonepo nt® Pr mera SystmJnç. lO F n sh mJlestone po nt |
ff Sn S uNGS ffcH J _____ ‘ l U4FE 12 sTONEfrLÉWALL5 aO0HSHESrHO l CLR 1590 STONE/T LE WALLS S FLOORS RESTROQM jj 6 Q4FE 12 10FE 12 SPÉC AL FLOOH N G 5>WTCH EN CLR 3 SPEC AL FLCOR NG §> K TCHEN 4 4 06FE 12 09FE 12 HM LLWOF K.W0ODWALLSWDC0U l CLR 140Q TJLLWORK WQOD WALLS AND COUNTERTOPS 8 18 0SFE 12 25FE 12 TOLETACCESSOR ES CLRH620 TO LET ACCESSOH ES 1 11FE 1£ 15FE 12 H NTER OR GLAZ NG emznc FRA CLR 161Q NTER OR GLA2 NG & GLAZ NG FRAMES 1 12 27FE 12 10MAR12 a SETHOOKUPFOOD SERVCEEÛU CLRH570 SET HOOK UP FOOD SEHV CE EQU PMENT 12 12 01MAR12 14MAR12_ £p W.0a 3S(l OFa)CL CLR 1630 SPEC AL CE L NGS (M RRORED CLNG GLASS C NGST 9 9 06MAR12 15MAR12 WOODFLOOH CTR 64 WQODFLOOH _____ 9 1SMAR12 26MAR12 MEPTR T LRtT S MEPTR MOUT 5 6 17MAR12 23NKR12 aHg P HpFT 5 5 27MAR12 31MAR12 . CLR 1650 CAMPtlzx . SETF HEFLACE 1F RER.ACEW CLR 1970 SET F REPLACE a F REPLACE WALL F N SHES 6 630MAR12 05APR12 ooaRSANDHARDWARE CLRH730 DCORS AND HARDWARE 3 JS02APR12 04APR12 _____ E GLASS CL S PROMENADES CLR 196 GLASS CLG PROMENADE/STEAKHOUSE AR 15 15 Q4APR12 20APR12 SCLEAN PUNCH AN DFNAL ÇLHT.66Q CLEAN PUNCH AND F NAL 12 12 29APR12 11MAY12 _____ M UM l CLR 2Q70 OWNER FURN SHED/1NSTALLED FF S E D g 12MAY12 HOVYNER URN .N K™ çTRlàlOO OWNER URN N K TCHEN EQU PMENT 12 12 12MAY12 25MAY12 coNTRACTORSUK rcf. CLR 1990 CONTRACTOR SU ST COMPLET ON °l °l 12MAY12 PROMENADE . r .r r’ ..M H EPOVEHHEADROUGH > CLR 1670 MEPOVERHEADROUGH N 15 15 17DEC11 05JAN12 1 lllTnralp CLR 1680 AYOUT S TOP TRACK 5 5 30DEC11 05JAN12 LAYO T&TOPTRACK OLrl 00 LMTW a wr mrwr ..M lFHAMEWALLS&C LNGS COMMONSR CLR 1690 FRAME WALLS & CE L NGS COMMONS RR 5 5 10JAN12 14JAN12 V Ln 11 _____ : 77; . . . .. n H PROMENADE EAM&COLUMN FRAM NG CLR 1700 PROMENADE AMa COLUW FRAW NG 12 12 16JAN12 28JAN12 n m . CCD MEPWALLCOLU mFURRH CLR 1710 MEPWALL/CC UMNFURRR. . 9 30JAN g 0SFE 12 OCOVER NSPKT™ CLR 1720 COVER UP NSPECT ON £ 0 09FE 12 CLR 174C 1 RYW LL 1 12 10FE 12 23FE 12 ™™ CLR 1750 TAPE AND FLOAT 12 12 14FE 12 27FE 12 HJ lP jgj>ORT0UCHUP PA NT PROMENADE RCOF _6 28FE 12 05MAR12 HZ ™ CLR a°° PA NT CO NROOMS . 6 6 28FE 2 R . O COUNTERTOPS’ CLR S2° MLLWORK&COUNTERTOPS 4 406MAR 2 09MAR 2 l M NMM N CLR11980 METAL EAMWRAP ALONG GR D K 9 9 06MAR12 15MAR12 CLR 1790 WALLa FLOOR T LE AT COMMON RR 8 6 08MAR12 14MAR12 PA.NTAN ALLCOVER FH CLR 1760 PA NT AND WALLCOVER NG PROMENADE 15 15 13MAR12 29MAR12 CLR 1770 MEP TR MOUT 12 12 3ÛMAR12 12APR12 wmMOUT 77T ... _____ ‘ nn DSTON&T LEFLOORATPROME CLR 1850 STONE/T LE FLCOR AT PROMENADE 12 12 30MAR12 12APR12 ™ CLR 2Q20 _____ NSTALL FLOOR EXPANS ON JO NT ASSE W L ES 18 13 02APR12 21APR12 NSTALLFLOOR EXPANSÉ. CLRH83Q COMWNROOMFLOOR F N SHES 2 2 03APR 2 MA wu m M CLR 1810 TQLET PART T ONS & ACCESSOR ES 6 6 03APR12 09APR12 CLR 1840 COMMON DCORS AND FRAMES 4 4 Q5APR12 09APR12 _____ CLR 1S60 PROMENADE CARPET 6 6 13APR12 19APR12 VjLn #‹#‹ 77; _____ CLEAN.FUNCHANCFlNA CLR11 70 CLEAN PUNCH AND F NAL 12 12 30APR12 12MAY12 UL g/1J UCH W rm n nnu r nn OoWNEFlFL RN SH D KS CLR 2060 OWNER FURN SHED/ NSTALLED FF &E 0 0 14MAY12 v CLR 200Q CQNTHACTOR SU ST COMPLET ON Q 0 14MAY12 . Z. PROMENADE R DGE _____ .. . OMEPOVERHEADf OUGR. N COMaFJEw CLR 186Q MEP OVERHEAD ROUGH N COMPLETE w/ CLR 1670 Q o Q5JAN12 v jaartdma 26APR10 Z 3 Early ar fs 2 02 P nnacle Enterta nment ™ 5 Data date 2QAPR11 nom . _____ .. . Cnt cal ar RundarP 02MAY11 R03 Wofe/ CaSfHD afon Rouge LA. Summary ar Paae num ef 22h MCC PROJECT 3278 start m lestone po nt©PrjfwaSystems nc. lo F r shm lestcf epdnt |
ff HPlofo T LOOR NG™ _____ 5 e .1 .P R_l _____ j1APR1 NST n oon EXPANS ON . f. R pn o NSTALL FLOOR EXPANS ON JO NT ASSEM LES 3 3 23APR12 25APR12 HSETGLASSHANDRALS gg SET GLASS HANDRA LS Jg2 ™ l’ ‘ E. CLR 93 CLEAN PUNCH AND F NAL 5 l 24MAY12 30MAY12 coNTRACTOnsuEST rCLR 2010 [cONTRACTORSU ST COMPLET ON o f 31MAY12 _____ Z 3 r ‘ S SERV CE ELEVATOR (CS 2) ‘ÇLRSE2 100 SERV CEELEVATOR(CS 2) 3#‹ 30 05PEC11 10JAN12 GasERVCEELEWTomcs l) CLRS 1 100 SERV CE ELEVATOR (CS 1) 2f 24 11JAN12 07FE 12 gpASSEN0EH jCM CLRPE1 100 PASSENGER ELEVATOR (CP 1) 13 18 08FE 12 28FE 12 g FfgS GSR ajasTOfl MT.FN SH CLRPE1 150 PASSENGER ELEVATOR NT. F N SHES (CP 1) 12 12 29FE 12 13MAR12 OPASSENGE ELÉVATOR CP 1) T CLRPE1 190 PASSENGER ELEVATOR (CP 1) TEST & AOJUST 6 6 14WR12 20MAR12 ESCAmTORNO CLRES1 100 ESCALATOR NO. 1 4 48 22DEC11 17FE 12 1EawuTOf NO rclHLS tr ESCALATORNQ.2 48 48J07JAN J02MAR12 _____ .. . > CP112C F/R/P STRUCTURAL SLA 19 0J2SMAR11 A 04APR11 A F STRUCTURAL SLAE ; _____ (CLEAR&GRU 6 0 16DEC10 A 1SDEC1Q A CLEWuam CP T F/R/PTEMP TRANSFORMER PAD Q 18DEC10 A 18DEC10 A F TEMPTRANSFORMER F CP 3 AUGER P LES©TRANSFORMER YARD (R G 1) 2 06JAN11 A TOJ N TA WSERPLES SPORUERYAR CP1050 UNFORESEEN UNDERGROUND O STRUCT ON Z ANTT 08JAN11 A ZSŒSSZS r CPT S RR/P TRANSFORMER YARD & P LE CAPS 6 Q 24JAN11 A 11FE 11A WmmfmaaÊmmùUlMO m CP 4 AUGERCAST P LES (CNTL PLNT & SUPT S RVŒ 10FE 11 A 18FE 1 l ™™™™™. ™ _____ .. 7 nrcem A O ‘ S H FRPPLECAPS PLNTHS CP1080 FRP P LE CAPS & PL NTHS ]8 1 17FE 11 A 19JUL11 CPH00 u/S MEP 18J 0 28FE 11 A 2NKR11 A L SMEP CP 7 SET/CONNECTTE TRANSFORMER 2J 0 20JAN11 AJ22JAN11 7T S CONNECTTÉMPTR FORUER CPT u ERECT CENTRAL PLANT STRUCTURAL ST L 9 MPR T APR T F CENTR T URALSTEEL S k MVE/PROUGH N AND CONNECT ONS 84 O 11 APRtl A s ÛG T N U N O CT.ONS _____ lZ 7 ...mm MU / . EXTER OHV ALLEMCLOSURE CP1810 EXTER ORWALLENCLOSURE 4 12 10MAY11 23MAY11 CP 8 5 NSTALL ROOF NG SYSTEM ‘ 6 o YTT 2 YTT STALLPO0 QSKTE CP1700 SET EQU PANT 6 5Û3JUN11 14JUN11 Sœo TOWEHS CP2 55 SETCCOL NGTOWERS 6 6 08JUN11 14JUN11 SETCOOLNGTOWERS . z m H DtTE PRDOORarRAMEaH flCWWlE C EXTER ORDOORS/FRA S/HARDWARE 1 MWtU CP1600 SCREENWALL ELECTR CALYARD HWU MU>.H0HMT #‹ P P NGLA EUNG& D NOPA NT l 2aJUL11 AUG MmS0H . rta CP1610 PA NT EXTER OR DOORS/FRAMES 3 3 1SAUG11 18AUG11 ptartrtate 26APR10 ‘ j Early ar JMÉ Mà mmf P nnacle Enterta nment ™ rZT Data data 0AFR11 a ; n D . a f A 23A L J Crlt cal RmdZ 02MAY11 RC3 Wote/ Cas no Saton ffOUpe M. Surrmary ar Pane num er 23A MCC PROJECT 3278 Q start m lestone po nt Pr ma veraSystems. nc ; lo F n shm lestQnepo nt |
Z E ECTPEM SUPPSERVKESGH JS 30 S JS S5 j SP lEH CT PEM SUPP SERV CES GR DS SO SJ xS4 S5 1 S 6 16JUN11 24JUN1J LMOJTANDTOPTHACKRATEDMEPWALLS SP1Q20 LAYOUT ANDTOP TRACK AT D MER WALLS 4 j a5JUN1T _____ 29JUN11 SETGENffl OR3 SP1060 SET GENERA ORS J> _____ G 25JUN1J O JULl] 1M OVEHHEAD EL TR£AL ÊN ATOHROOMS SP 1030 MEPOVERHEAD ELECTR CAL/GENERATORROOMS 6 6 27JUN1j _____ 02JUL11 F EOUT/F aK ENE ATORROOMS SP1040 FRAME OUT/F N SH ELECT/GENERATOR ROCW S 6 05JUL11 UJUL11 SEraKTOC . JUMSHT’ SP1070 SET ELECTR CAL EQU PANT J 6 12JUL11 16JUL11 _____ lEXTEH onDOORS AM AnDWAHE SP108Q EXTER ORDOOHS;FRAMES/HARDWARE [ 4 4]19JUL11 ]22JUL11 u 5[jrp El 10 03MAR11 A 28JUN11 l a lU6 MEP SP1005 F/H/P STRUCTURAL SLA 10 S 01APH11 A 25JUL11 Sr ERECT ALANCE OFSUPP SERV CES PEM3 1 16 26JUL11 S UGTT . P S .vEPOHROUGH N 8 S ÛG M Û ; . . H AYOUTAND TOP THACKWALLS SP1090 LAYOUT ANDTOP TRACK WALLS 8 8 1 AUG11 26AUG11 SP1100 FRANE WALLS 12 _____ 12 27AUG11 10SEP11 SPH l EP N WALL R 9 9 03SEP11 14SEP11 H MEP w WA .L R MnU Utr H ULL U COVEP HP NSPECT ON SP112Q COVER UP NSPECT ON 0 0 15SEP11 . _____ 77; . . 0P.YWALL WALLSCEL NGS SP1130 DRYWALLWALLS/CE L NGS 12 12 16SEP11 29SEP11 7X t cr). rt 7/v TH H QTAPEANDFLOAT SP1140 TAPEANDFLQAT 12 12 24SEP11 Q7QCT11 . ... . . _____ SP1150 Pf Mf 12 12 29SEP11 120CT11 af AKJ L 77; TTj n./v r ory T flCEHAM CT .E RRJLOCKER OOMS SP1170 CERAM CT LE RR/LOCKERROOMS 12 12 04OCT11 170CT11 . . T _____ .. ; . nnf f r H MLLW0f K AND COUNTEHTOPS SP1220 M LLWORK AND COUNTERTOPS 9 9 11QCT11 20OCT11 PT 5 MSCFLOOR NG TYPES (t d) 9 9 130CT11 CTTr HMSCFLOO . tp\Z S T COC ERS/FREEZERS/COLD PREP EQU PANT Ts 15 13QCT11 f J SSETCOOLE REEZE SCCLDP ™ P 95 TO LET PART T FS a ACCESSOR ES § 9 18QCT11 27 CT T TO LETPARTTT ACCE™ . r anpT LOCKE S& ENCHES SP1200 LOCKERS& ENCHES 6 6 220CT11 28QCT11 SP 240 DOORS A HARDWARE 6 624QCT11 29QCT11 DOOFS HARDWARE SPl M HtPTR MOUT 9 240CT11 02NOV11 T MGUT #˜P 235 OHDOORS 6 6 310CT11 05NOV11 OROOORS ar_L£ ufl u’J JnJ . .. ‘ el FAN PUNCHANDFNAL SP1250 CLEAN PUNCH AND F NAL 12 12Q7NOV11 19NOV11 CLEAN PUNCH ANU AL _____ r : OOWNER NSTALLEE FF &E SP1270 OWNER NSTALLED FF& E 0 021NOV11 v j ll£l unrcn r ftUJurra : CONTRACTO SueSTCOMFLET ON SP126Q CONTRACTOR SU ST COMPLET ON ° 0 21NOV11 1 04 lAUGERCAST P LES T 3[ 7 12JAN11 A 30JUN11 AueERCAsrr .ES H1090 FRP TOWER CRANE 4 FOUNDAT ON (NORTH) 3 8 23JUM11 01JUL11 P FRP P LE CAPS 30 15 01JUL11 19JUL11 OFRPF LÉCAPS T S FRP TOWER CRANE 3 FOUNDAT ON (SOUTHj 8 02JUU 12JUL11 Startdata 26APR10 m V ar s te mm P nnacle Enterta nment ŒrTTlf g aSSl ote Cas no ton Rouge LA SS Sr P aenum er 24A MCC PROJECT 3278 start rr les one po nt©Pr m f 9vstgms1Jap. o F r shm lestonepo nt |
H1200 ll/SMEP . L J l F l 0FMfSEHV CELEVH(34] H3000 ‘ f /R/P SERV CE LEVEL (341 5 8 26JULr C3AUG11 WALLS/COLSERU CETOLÉVEL H Tr WALLS/ COL SERV CE TO LEVEL 1 _____ 3 3 04AUG11 06AUG1 j OhRFLEVEL (CAS NOLEVEL531 T 3 6 RR/P LEVEL 1 (CAS NO LEVEL 53’) 8 S 08AUG1T _____ 16AUG11 W .L9CQLUML TO .5 P ™. H3112 WALLS/ COL LEVEL 1 T01.5 & g PART AL 2 2 17AUG11 18AUG11 _____ M EL W H315Q RR/P LEVEL 1.5 (641 . _____ 1. 3 £AUG11 22AUGJJ WALLS COL LEVEL 1.5 TO 2 ALANCE W5Ê WALLS/ COL LEVEL 1.5 TO 2 ALANCE 2 2 23AUG11 24AUG11 RWLML H32QQ RR/P LEVEL 2 (77) a 3 19AUQ11 27AUG11 _____ w SC0UJL _____ ..zTO rsann WAl et; rfll 9 LEVEL 2 T0 3 3 3 29AUG11 31AUG11 rr;.nn F/R;P l FVF T (86 671 5 4 01SEP11 06SEP11 H34O0 F/R/P LEVEL J(H .af ] .. WAU9COL5LEV L3TO1 T W LLST LS LEVEL 3TQ4 Z Z f _£ ™g W H3600 F/R/P LEVEL 4 (96.33] . 1 EP 1 EP11 w acCLSLML4TO9 H37 WALL5/COLSLEVEL4TQ5 2 2 13SEP11 14SEP11 . _. . H3800 RR/P LEVEL 5 (1081 4 14SEP11 17SEP11 WAUSOQLSLH&STOO H3955 WALL5/COLSLEVEL5T06 2 S 19SEP11 20SEP11 WALLS COLSLEVELS . 7 nccm Mcm F™ LEVEL6 115 67 ) H4Q00 RR/P LEVEL 6(115.67’) S 420SEP 23SEP COLLEV TO _H#}1 WALLS/COL LEVEL 8 TO7 2 2 SEP 2 SEP 42#‹#‹ . FW LEVEL 7 [125.331 4 4 26SEP 29SEP WALL COLSLEVEL7TOe H4300 WALLS/COLS LEVEL 7 TO 8 2 2 30SEP11 01OCT11 . 7 T . . ntfVTll FJRPLEVEL 8(135 ) J#} F/R/P LEVEL8(1351 4 4 01OCT 05OCT . UWOUK L. S WALLS/COLS LEVEL8TQ9 2 2 06OCT 07OCT LEVEL9( JW H4600 F/R/P LEVEL 9 (144.671 4 4 07OCT11 11QCT11 W V 7; .onfT ‘ nfY T WALLS COLSLEVEL9TO10 H4700 WALLS/COLS LEVEL 9 T010 2 2 120CT11 13QCT11 . 7 ; T TTTTFTT 1F/PJPLEVEL 10 (15433’) H4800 F/H/P LEVEL 10 (154.331 . . 4 4 3CCT 70CT K ooMa H4900 WALLS/COLS LEVEL 10TO 11 2 2 OCTH J90CT11 H5 F/R/P LEVEL 11 (1641 4 4 190CT11 22QCT11 FWLEva.n ( MJ H jUUU U J . .. 7. ;VjfvT 1 EnrTl1 W .LSCOLSLEVEL11TOWTEHSnr l H5100 WALLS/ COLS LE VEL 11 TO NT E RST T AL 2 2 240CT11 250CT11 . . . rH; nofVTn Ffl/PNTEHSrr lAL LEVEL ( 174’) ‘ H560Q RR/P NTERST T AL LEVEL (1741 . 6 4 5CCTn 280CTn _____ U u UWrn n .ll UL T 57 WALLS/CaS/WELLS/CUR S NTERST T AL TOLVL 2 5230CT NOV paOL a H5800 F/R/P LEVEL 12/POOL DECK (186.501 3 04NOV11 10HOV11 . : . .. ... . . . JWALLSCOLSLEVEL12TOPH LEVEL (NCLSTlJ Ct H5806 WALLS/CC S L VEL 12 TOPH LEVEL ( HCL STU 3 3 11HOV11 14N0V11 _____ H55 MSC.STEELg LEVEL 12 (POOL DECK) 18 6 11NOV11 17NOV11 .S LEVEL FOOLQECK nJ3U L_. T . . . r . SETF OOFTOPEaUlPMENT H5920 SET ROOF TOP EQU PMENT 6 .: 11NOV1 17NOV11 CM Hr 17 7 5812 F/R/P PH LEVEL (193.171 2 3 15NOV11 17NOV11 l wm MM M. 7) n3° . . . WALLSCOLSLEVELPH LEVEL TOMACHNEHOaW H5818 WALLS/COLS LEVEL PH LEVEL TOtVttCH NE HOOM g 3 18NOV11 21NOV S OL WL ± Ê 1 _____ PH. . g POOL CRAWL SPACE T S 8NoS r W f H5824 RR/P/ ECH NE HOOM (198.51 £ 3 22NW S8NOV ECTmsc.EEN LSTEEL H5836 ER CTPHSCREENWALLSTEEL 6 6 29NOV11 05OEC11 . . . ; . . . .. WATEF PHOOF N TER STTT AL LEVEL H5843 WATERPROOF NTERST T AL LEVEL 6 06DEC 2DEC wn UM H5842 SCREENWALLLOUVERS S FAÇADE 12 12 SDEC 9DEC llmlL rwro U H4 06 NSTALLDRYCAPON OthFLOOR 3 3 1£DEC11 J14DEC11 . Slartdate 26APR10 Earlyfcar rr S£f P nnacle Enterta nment ™ rXT f Data date 20APR11zx . Cnt cal ar Rundate 02MAY11 Rœ te/ Cas no ton flouge LA. Summary ar Paoe num er E5A MCC PROJECT 3278 Q start m lestone po nt® Pr ma era Systems. nc. Q F n sh m lestone po nt |
Z ZZ Efl CTSTEEUSTAf 5SEFlV CELEV La j s 5 (l F ECT STEEL/STA RS SERV CE LEVEL L3 S 6 19SEP11 24SEPJJ 0EHEC STEEUSTAKSLVL3 6 p£5§5 ERECT STEEL/STA RS LVL 3 6 6Q60CTn _____ 12 11 FnEPROOFSTÉEL SERV CE LEVEL er H5866 F F EPROOF STEEL SERV CE LEVEL 6th 3 3 13QCT11 15QCT1J lEnECTsreeuSTA HSLVLS s TS T ÉRECT STEEL/STA RS LVL 6 9 6 6240CT11 29QCT11 eF STST MDWeLVlS.1 1 TS Q ERECT STEEL/STA RS LVL 9 12 j> 611NOV11 17NOV11 F REPF OOFSTEELLEVEL6 TOP H59aQ F REPROOFSTEELLEVEL TGP NOVH NOVlT ( _____ .. ERECTSTEEL£TA FSSERV1CELEVH L3 ‘H5 10 ERECT STEEUSTA RS SERV CE LEVEL L3 6 6 26SEP11 Q10CT11 CTsrH l LVLW 7 582 EHECT STEEL/STA RS LVL 3 6 S 6 13QCT11 190CT11 _____ F1HEPRooFSTEELSERw;ELEvEL e t. H5 a6 F REPROCf STEEL SERV CE LEVEL 6th 3 3 20OCT11 22QCT11 fflKTSTEEL TmsLVL H583È ERECT STEEL/STA RS LVL 6 9 6 _____ 6 31QCT11 05NOV11 HERECTSTEEUSTAJRSLVLS Z Me;HAn ‘ FHFfT STEEL/STA RS LVL 9 12 6 6 18MOV11 28NOV11 H5840 H ll & tfcua M na LYL a \e. . . . F REPROOPSTEELLEVEL 6 TOP H5940 F REPRCOFSTEELLEVEL6 T0P 6] 3 29NOV11 [01DEC11 _____ .. T r l.n u . rj T T H EF eCTPHE.FA E FSFWaS2 4WEST pJTo ERECT PRE FA E FS PANELS 2 4 WEST 8 2 180CT11 190CT11 _____ .. . Tr.fv T ERECT PRE FA E FSPANELS4 6 WEST Lj7020 ERECT PRE FA E FS PANELS 4 6 WEST 8 2 210CT11 22CXT11 H/l U C CV rnC r #‹ C . . _____ .... . n ; ERECTPRE FA E FSPANELS6 8WEST H7f RECT PRE FA E FS PANELS 6 8 WEST S 2 2aOCT1 : 2COCT ; M/t) j tnt rncmnc rarH Kua _____ ;; .. n r r ERECTFP.E FA FJFSPANELSS 10WEST TrmZnFRFCT PRE FA E FS PANELS 8 10 WEST 8 2 280CT11 290CT11 H704#‹ LH L KH hADL raFHHCUO _____ ... ER CTPP.E FAHFJFSPANaS10 NTERSTWEST H7 5 ERECT PRE FA E FS PANELS 10 NTERST WEST 8 2 01KOV11 02NOV1 . ERV.ELEV VUWEST H7080 FRAME/SHEATH SERV CE LEVEL & LVL 1 WEST _____ 2 _____ 2 03NOV11 16NOV VEL L 0. H7490 E FS SERV.LEVEL & L1 WEST (Foam/Utesh/E FS Compl) 14 14 17NOV11 06DEC11 # EFS AL CSATW EST ÉLEVA H7410 E FS F NALCQAT WEST ELEVAT ON 25 24 05JAN12 01FE 12 . . 1 . . r . r .fvT H EaECTPRE FA E FSPANELS2 4EAST \ H7070 ERECT PRE FA E FS PANELS 2 4 EAST 8 2 9QCT OCTzx _____ .. H717Q ERECT PRE FA E FS PANELS 4 6 EAST 8 2 220CT 240CT ERECTPRE FA ELS EAST 7180 ERECT PRE FA E FS PANELS 6 8 EAST 8 1 260CT 27QCT .ERECTP.EF ERECTPRE FA E FSPANELS8 10EAST 8 2 OCT _____ OCT ERECTPR PANEL. STEAST TfT ERECT PRE FA E FS PANELS 10 NTERST EAST 8 02NCV 3NOV flFRA EATHSERVCELEVEL EAST H 10 FRAME/SHEATH SERV CE LEVEL S LVL 1 EAST 12 12 04NOV11 17NOV .™ LEVELL1 oa s c H7590 E FS SERV.LEVEL L1 EAST (Foam/Mash/E FS Compl) 14 _____ 4 1 NW11 07DEC11 Kr CWTwraH H743 E FS F NAL CQAT EAST ELEVAT ON 25 24J05JAN12 [01FE 12 . . 1 r _____ .. rVcnf r n 0 FRAM SHEATH SEHVEE LVL 6 SOUTH H710Q FRAME SHEATH SERV CE LVL 6 SOUTH 8 8 170CT11 250CT11 H/1Ut 1 HftMCfOnCrt n annvlVC LVL O J .JU _____ .... . QFRAME/SHEATHSEFV CELVL.ONaHTH H7 n FRA MF .’S F AT H SERV CE LVL 6 NORTH 3 8 240CT11 Q1NOV11 H7280 E FS SERV CE LVL 6 SOUTH (Fo a m/Me s h/ ase Coat) 3 8 260CT11 03NOV11 f U L . . D EFSSEHVCÉ LVL 6 MO RTH (Foan teshflase CoaO H7290 E FS SERV CE LVL 6 NORTH (Foam/Mash/ ase Coat) S 3 02 OV11 10NOV11 FRAM6SHEATHLMS6 TOPSOUTH H7120 FRAME/SHEATH LVLS 6 TOP SOLTT H 3 3 22NOV11 03DEC11 . _____ H7130 FRAN¢æ/SHEATH LVLS 6 TOP NORTH 8 8 02DEC11 10DEC11 ‘ ‘#‹U . 1 1 : ‘ r 0EFSLVLSf TOFSOUTH(Foa;rtMestl&SGCoa1 H7300 E FS LVLS 6 TOP SOUTH (Foam/Mssh/ ase Coat) 8 8 05DEC11 13DEC11 tartdate 2 A R10 E E™ y ar F n sh date mMlZ P nnacle Enterta nment SS Sr gSV Wotey Cas/no ton Jtagp M. S Pana n m er 2SA MCC PROJECT 3278 ç Start nllestonepo nt a Pr rnavera Systems. nc. > F n sh m lestone po nt |
SR . : . S rSS as SS 8 8 12DEC11 [20O C11 _____ F NACOATSOU H/NORTHELEVAT C H7420 E FS F NALCOAT SUUTH/NORTH ELEVAT ONS \ \ 12 g9DEC11 J12JAN 2 . ERECTPfl&FA E FSPANELSL POOLWEA l rH76g#‹ lERECTPRE FA E FS PANELS L12 POOL AREA 6 fl l8HOtf11 28NOV11 1 . . 1 FR M SHE THf ASECOATLU.S1 /PH/MAG ] 11 H7720 FRA SHEATH/ ASEC0ATLVLS13/PH/MACHR 1£ a 06DEC11 19DEC11 . _____ .. wmM L K>UT W 5T HGW1Q00 N T AL LAYOUT WEST 20j 1 24QCT11 05NOV11 a HSTAU CL EST HGW1020 NSTALL CL PS WEST 20 18 31QCT11 19NOV1J J CUHTAHW .L JN rEEOSYsrEM WESrTOLV HGW1100 CURTA NWALL UN T ZED SYSTEM WESTTOLVLT 40 30 03NOV11 10DEC11 cUFfrwwALLUN œ)5 ST w SrAK HGW1106 CURTA NWALL UN T ZED SYSTEM WEST A OVE 10 6 12J20OEC11 [04JAN1E _____ .. . _____ HGE1000 N T AL LAYOUT EAST 20] 1£ 250CT11 07NOV11 Z TrQE 0go NSTALL CL PS EAST 20 18 OTNOV11 21NOV11 H NSTALLCL F EAS HGE1100 CURTA NWALL UN T ZED SYSTEM EAST TOLVL10 40 30 04MOV11 12DEC11 lu™nelm. as K _____ .. r JT: TT1. .. . CURTANVYALLUNrnZEDS’fSTEM ÊASTA O HGE1106 çuRTA NWALL UN T ZED SYSTEM EAST A OVE 10 6 12 20DEC11 ]04JAN12 HGNS1300 ALUM NUM&GLASSSYSTEM SOUTH 6 12 09D C11 \f™ _____ UMKU U™E™ HGNS1500 ALUMNUMSGLASSSYSTEM NORTH \ 6J 12 23DEC11 07JAN12 ; H7960 HKOROOF NG H GHROOFfTE ONLY) 5 5 20DEC11 24DEC T OROCHNGS EMPEF ENT H8000 ROOF NG SYSTEM PERMANENT 78] 12 27DEC11 [10JAN12zx . _____ .. . . _____ .. 1 F cl rocn ‘; .OCCD FMME&SHEETH0CK NTER OF OFELECROOMS Tl T FRAME&SHEETROCK1NTER OROFELECROOMS 5 5 07SEP11 12SEP11 T FF œn0nMS ™£ 5 U LD OUTOFELECROOMS 3 3 13SEP 5SEP SET T on FLoo H 1070 SET AHU T 3 ON FLOOR 2 2 07SEP11 08SEP11 Tjg Z LAYgUTaTœTRACK j ZZ Z NOV OV ST H 1030 OH MEP R . R1SERS 12 12 29NOV11 12DEC11 ... _____ Lu Murf H 4 FRAME WALLS 6 G 06DEC11 12DEC11 ™ts T W Û PW TLSRl 6 6 13DEC11 19DEC11 0 MEFWALLSR H 10S0 COVER UP NSPECT ON 0 0 20DEC11 v DF1 WALL H 1080 DRYWALL 6 6 03MHR12 09M4R12 TAPFANDFLOAT H M TAPE ANC FLOAT 6 6 10WR12 16WF11 . . _____ ‘ H TT2 PA NT Z S S14W1AR12 22MAR12 HM qn TE L NGS S 6 23MAR12 29MAR12 Hl115° E L WJS F ...r.Jf. nJ.nn EPECW.FLO0R NGATH rCH H 1140 SPEC AL FLOOR NG AT K TCHEN 5 5 30M4R12 04APR12 FL00RU G H 1220 TYP CALFLOOR NG/ ASE 6 6 3Q R12 05APR12 T H T130 SET FOOD SERV CE EQU PMEHT 1S 1 Q5APR12 25APR12 Starlr ata 26APR10 [ J Early ar pot hda aufloa P/nnac/e Enterta nment S Data date 20APR11 . . Cnt cal ar Rund tP 02MAY11 HoM Cas no atOn Rouge LA. 2 Summary ar Panf numher 27A MCC PROJECT 3278 Q Start m lestonepo nt©Pr mavera Systems lnç. o F n sh m lsstone po nt |
UM 24APR12 23APR12 DOOHSWD HARDWARE H 1160 EP 1 H MUU 7V.nR1 m MA V l H 3 5 nOORS AND HARDWARE J £ 2oAPR12 _____ 01 MA Y V PUNCHANE>FWAL H S PUNCH AND F NAL 5 S 0gMAY12 _____ 07MAY12 n ffW H1135Q OWNER NSTALLED FF S E jj 0£8MAY12 noWNE UNN WK rw HH360 OWNER URN N K TCH N 1z 1ZJQ MHY12 21MAY12 _____ j ‘ . _____ LAYOUT 1TOPTRACK H2020 LAYOUT & TOP TRACK ° _____ OMMEFR R SEHS _____ _____ n u urp n o qFHS ‘ 6 6 09DEC11 15DEC11 H2030 OH MEH H.l. Hl tH FRAMÊWALLS H2040 FRAMEWALLS 6 6 l D Cn 17DECH H2Q5C 1S PWALLSR. . 5 g 19DEC11 24DEC11 COVERUP CTCN H2060 ‘ COVERUP NSPECT ON 0 0 27DEC11 DRYWALL TP HRVWA l 6 6 10MAR12 16MftRl2 H2070 UHYWALL . . . APEAND FLOAT H nnn TAPF AND FLOAT S 6 17MAR12 23MAR12 M o _____ H20S0 ftr z H NU ruuH . PAKT ACKOFHOUSE H nqn ‘P NT ACK OF HOUSE 6 6 22MAR12 28MAR12 up1T5 C L NGS ACK OF HOUSE 6 8 29MAR12 06APR12 H2170 FLOOR NG/ ASE ACK OF HOUSE 8 07APR12 13AFR12 _____ LoœwwMrTaFHOUŒF H2 6Q LO Y/FRONT OF HOUSE RN SHES 28 _____ 23 07APH12 09MAY12 T V N TJES l l ™2Z lc M H2200 CERA CT LE RR 5 5 27APR12 02MAY12 D0OF 5HWDWAf E H O DœRS/HARDWARE 6 6 01gY12 _____ 07 12 Z™ H2210 TO LET PART T ONS/ACCY 3 3 03MAY12 05MAY12 _____ H2 8 MEPTR MOUT 6 09MAY12 1 MAY12 UEPTRN OUT H 1aU wcr 1 r lMUUl _____ .. . . PUNCH AND F NAL H ™ PUNCHANORNAL 12 12 16MAY12 30MAY12 H2330 oWNEH NSTALLED FF& E 0 0 31MAY12 _____ .. . . ; 1 n H nf rm nnc m FR AME S. 3H EETROC K N TEH 0 R OF ELEC. ROOM H2130FRAME & SHEETROCK NTER OR OF LEC. ROOM 5 5 195EP11 235EP11 r H crn t U1LD.QUTOFELEC.R0OW U LD OUTOFELECROOM 3 3 SE SEP . .T.ONFLCOH H 50 SETAHlftT1 T2.T3.T4 0 n.OOR 6 6 19SEP 24SEP &TOPTRA H2100 LAYOUT & TOP TFLACK 3 3 13PEC11 15DEC11 f TTlT O/HMEPR. .R SERS 6 fl 14DEC11 20DEC11 C ™ T u FRAKC WALLS 3 3 19DEC11 21DEC11 f T 224 _____ MEP WALL R . 3 3 22DEC11 24DEC11 [r FW .LH H2260 COVERUP NSPECT ON 0 Û27DEC11 v H227 ‘ DRYWALL 3 3 17MAR12 2QMAR12 H22 TAPE AND FLOAT 3 3 21MAR12 23MAR12 _____ m . . _____ H q0 pA NT ‘ 2 2 24MAR12 26MAR12 ‘ H2325 DOORS AND HARDWARE ‘ 2 2 27NWR12 23MAR12 TJ23 MEPTR MOUT 3 3 27MAR12 29MAR12 ML HW 11H2300 PUNCHANORNAL 5 5J30 R12 04APR12 . \ . . 1 n nrn1 rnl; DEFNN/GR ND/PATCH 0TTOM0FLEVEL3 T DEF NN / GR ND / PATCH OTTOM OF LEVEL 3 5 5 10SEP11 15SEP11 ljH3020 LAYOUT & TOP TRACK e 6J16SEP11 J22SEP1 TWT TOPT K Startdate 26APR10 Early ar EgaMae %$$$ P nnacle Enterta nment ar’ST Da a date 20APR11 DQ _____ .. . _____ \mmk Cnt ca ar RundJ 02MAY11 fm H tel Cas no ton Rouge LA. SL rm y ar PR( R numter 28A ‘ MCC PROJECT 3278 ç Start m lestone po nt Pr mafflrag n nc. p F n sh m lestone po nt |
l H3 4 FRAMEWALLS ZZ 1 g °Jg M™ U R5MÛ VEP WALLS R.l. . ° aE> > n n ‘ wAU COveRUPNSPECT ON H3190 WAL COVERUF NSPECT ON 0 j DEC DFWAU. H32 DRYWALL _____ J 5DEC11_ 21 D Ul TOTANDR.OAT S TAPEANDFLOAT 6 S22DECt1 29DEC11 _____ S PA NT f 6 30DEC11_0&.AM2 T1LEWDOTDNE HM T LEANOSTONE 605JAN12 J1JAN12 lMH.TOwauf T MEP TR MOUT £ 2 07JAN12 09JAjng _____ mLw0RK ... . wnaw 6 6 1QJAN12 16JAN12 H3110 M LLWORK _____ SHOWERENCLOSURES H312Q SHOWERENCLOSURES 6 6 1QJAN12 1SJAN12 .LETACC ESSORES H3130 TO L T ACCESSOR ES £ _____ G 12JAN12 1SJAN12 DOOH s AN 0 HARDWARE T43 4 DOOR5 AND HARDWARE 6 17JAN 2 23JAN12 CAHFET 1WO0D ‘ u 1cn r AHPFT ft wnnn 6 6 21JAN12 27JAN12 H3160 CAHPt: & WUUU _____ nUN[rPUNCHANDFNAL H323Q UN T PUNCH AND F NAL 6 AN12 03FE 12 oovYNERFF&EAVA LA LEDa VEHY H322° OWNER FF & E AVA LA LE DEUVERY DATE (FLR2 ) 0 0 1SFE 12 CORROORF N6HES MEPTRMOL H3 7 CORR DOR F N SHES S MEP TR MOUT 4 4 21FE 12 24FE 12 [PJNCHANDFNA H.3180 PUNCH AND F NAL 5 5 25FE 12 0tMft.R12 . r r. ... nr;’ rm DEF NN/GR NO /PATCH OTTOMOFLEVELJ T T D F NH/GR ND/PATCH OTT0MOFLEVEL4 5 & SSEPU 21SEP11 n™™ ™ ™ JJ1££ _UYOUT&TOPTRACK 6 1 35 P SEP OWMEP 1 s H4030 O/HMEP R. . H SERS 6 6 27SEP11 03QCT11 TTTS ‘ f rWTPTn nr FrT FHAMEWALLS H4040 FRAJ WALLS 6 6 04OCT11 10OCT11 MEPWALLSR l H4n5() UEPWALLSRJ 6 S11CCT11 170CT11 _____ ... ... . m ou vcr V fl .J n. . _____ .. OWALLCOVEH ll F NSPECT ON H406Û WALL COVER UP NSPECT ON 0 0 13QCT11 v nnR WA L Tw DRYWALL 6 6 22DEC11 29DEC11 J j H 5 TAPE AND FLOAT 8 6 30DEC11 06JAN12 ™ D L TH4 3 PA NT 6 6 07JAN12 13JAN12 1TLE&STONE H4150 T LE&STONE 6 S 12JAN12 18JAN12 . ... _____ ™ H42 MEP TR MOUT 2 2 14JAN12 15JAN12 M™ H4 4 MLLW RrT ‘ 6 6 17JAN12 23JAN12 TMT3 SHOWERENCLOSURES 6 6 17JAN12 23JANT2 o TOLETACCESSOR.ES TnT7Q TO LET ACCESSOR ES 6 6 19JAN12 25JAN12 0 TOL ET AC CESSOR.ES H417° ruL wn eaaun t3 .JlflM g T nrr DOORSAND HARDWARE H4190 OOORS AND HARDWARE 6 6 24JAN12 30JAN12 HCARPET WOOD H4160 CARPET & WOOO S 6 23JAN12 03FE 12 r™’° n J _____ .. r o. MP UN[rFUNCHANO F NAL H4230 UN T PUNCH AND F NAL 6 6 04FE 12 10FE 12 Ç E T H4220 OWNER FF S E AVA LA LE DEL VERY DATE (FLR 2 4} 0 0 18FE 12 _____ 0CflH oHRMSHESM m.MO ‘ H4080 CORR DOR F N SHES & MEP TR MOUT 4 4 25FE 12 29FE 12 PUNCHAND F NAL H4090 PUNCH AND F NAL 5 5 Q1MAH 2 06MAR12zx . 1 5 J gn OTOCDH DEFHN/GRHDJFATCH OTTOMOFLEVEL5 rH5 DEF N / GR ND / PATCH 0TT0MOF LEVEL 5 5 5 22SEP11 27SEP11 n .VOUTSTOPTRACK H5 2 LAY0UT&TOPTRACK 6 6 305EP11 06CCT11 Z RZ T 53y oHlgPM.H SERS e 6 04OCT11 lOOCTTTn ‘ StarttfetR 26APR10 1 [1S3 Early ar ™ \ to HÇ 2 P nnacle Enterta nment arZ f rr aasV > eaton m SSSS r Panf num er 29A MCC PROJECT 3278 Startm lestonepo n© Pr mavera Systems. nc. F n sh r lestons po nt |
S Ê UÊÉ m 6 110CT11 17QCT1J MÈPWALLS .1. S S P WALLS H. . 1 0CT11 24UU11 AUCOVER JPWSPECT™ H506Q WALLCOVER JP NSPECT ON _____ £. ° 2gl _____ DKYWML TST DRYWALL 6 30DECV _Q6 JftNV TAFEANDFLOAT T™ TAPEANDFLOAT 6 g 05JAN1g _____ 11JAN12 pMT S ST 6 14JAM2 20JAN12 flTLE sroNE S THFtSTONE S gmlAN g Z5JAN12 S PTR MOUT 2 21JAN12 23JAN12 . Trsû M LLWOHK 6.24JAN12 30JAN12 SHOWER ENCLOSES Tr T SHOWER ENCLOSURES . 6 6 24JAN12 30JAN12 _____ TOL ET ACCESSOR ES H5170 TO LET ACCESSOR ES 6 6 26JAN12 01FE 12 Q OOORS AN D HARDWARE H5190 DOORS AND HARDWARE S 6 31JAN12 06FE812 CARPE SWOOD H516Q ‘C RPET&WOOD 6. 6 04FE 12 10FE 12 luNrTPUNCH AHDF lAL H522 UN T PUNCH AND F NAL _____ G 6 11FE 12 17FE 12 OWNERFF&EAVA LA LEDELNERY 115200 OWNER FF S E AVA1LA LE DEL VERY DATE FLR M) 0 0 16FE 12 ( meHES œ.THJ A H508 CORR DOR F N SHES & MEP TR MOUT 4 4 ÇHMAFU2 Q5WR12 PUNOHAND HNA. . H5090 PUNCH AND F NAL 5 S 06MAR12 10MAR12 _____ H6010 DEF NN / GR ND / PATCH OTTOM OF LEVEL 6 5 5 23SEP11 03OCT11 H6020 LAYOUT & TOP TRACK 6 6 07OCT11 13QCT11 laHMEPf LREERS H6030 CM NEP R. . R SERS 6 6 11QCT11 17QCT11 FRAMEWALLS H6Q40 FRAME WALLS 6 6 18CCm 24CCT11 0MEPWALLSH H605° PWALLSR . 1 l 310CT o mHLWteu emmm H6060 WALLCOVER UP NSPECT ON 0 0 Q1NOV11 nRYwAu _____ HT DRYWALL S 6 07JAN12 13JAN12 TAPEANDFLQAT T T TAPE AND FLOAT 6 6 12JAN12 18JAN12 : n7n(Vj PA MT 6 6 21JAN12 27JAN12 H/UUd rrt m . _____ T1_E&STONE H7005 TlLE&STONE 8 6 26JAN12 01FE 12 . ... . LTH 0UT H7011 PTR MOUT 2 2 2 JAN12 30JAN12 ‘ u7ntM ‘ M LLWÛRK 8 6 31JAN12 06FE 12 H’UU4 M LLVVUH S 0 SHOWER EN CLOSUR ES HT SHOW6R ENCLOSURES 8 6 31JAN12 06FE 12 .TOLETACCESSOR.ES L.7nf 7 TO LET ACCESSOR ES 6 6 02FE 12 08FE 12 H7QQ/ tU L zl WU t aun M H . . DOORSAND HARDWARE H7009 DOORS AND HARDWARE _____ 5 6 07FE 12 13FE 12 CARPET&WOOO u7nnK fùRPFT & WOOD 6 8 11FE 12 17FE 12 H/OU lAHhEl 6 UYUUU gUN TPUNCH AND F NAL R6150 UN T PUNCH AND F NAL 6 6 1SFE 12 24FE 12 H5Q70 OWNER FF& E AVA LA LE DEL VERY DATE (FLR 5 7) 0 0 QMftR g cOHHOOHFW H S e’l lK H O CORR DOR RN SHES & EPTR MOUT 4 4 10MAR12 14MAR12 PONCHANDF AL H6090 PUNCH AND F NAL 5 5 15MAR12 20MftR12 ; Z Z. . 1 1 Jzx . rTo TH DEF NN/GHr D/PATCH6OTTOM0FLEVa.7 H6100 DEF NN/GR ND / PATCH OTTOMCf LEVEL 7 5 5 04OCT11 O OCTn KAYOUT TOPTRACK H6110 LAYOUT & TOP TRACK 6 6 14QCT11 20OCT11 H6120 OH PM FUSERS 8 1 180CT FHAMEWALS H6130 FRA E WALLS 6[ 6 25QCT11 31QCT11 j 1ZT : Startdate 26APR1Q Early ar F’n s e 31 l P/nrac/e Enterta nment Sr %Z% SU Hofc/ Cas/no Alton Rouge LA. SlnlfL Pane numter 30A MCC PROJECT 3278 Q Start rr lestonepo nt S Pr maue R Systems. nc. o F n sh m lestone po nt |
H j M _____ S C ll ra rT WALLCOVER UP NSPECT ON #‹ ° _____ D™ H5 3 DRYWALL Z _____ 6 HJAN12 _____ 2QJAN12 TAPEANDFLOAT P TAPEANOFLOAT j T4H7w p NT . e 5 2 JAN12 U3\ ta d T LE STONÊ H9CQ5 rH1 ‘ S mFFR l flf FF 12 _____ T 9 07 T’ LE & STON 6 02FE 12 O h O [MÊPTR1MOUT UJ JZr rl 5 204FE 12 0SFE 12 H90 MEP TR MOUT f U4l to _____ ™ _____ m lwoHK H9006 MLLWORK 1 _____ H L ™ OWEHENCLOSE H9 0 SHOWERENCLOSURES ° wrt £ _____ jrco QTOLETACC ESSOR ES J9Q 9 TO LET ACCESSOR ES \ 6 09FE 12 15FE 12 QOORSANOHARDWARE H9 V DOOR5 AND HARDWARE S 6 14FE 12 20FE 12 flCARPET&WOOD HQQ CARPET &. WOOD J 6 18FE 12 24FE 12 lUN PUNCHANDFMAL H908 L N T PUNCH AND F NAL 6 6 25FE 12 Q2MAR1 OWNERFFSEAVA .A LEO LMH R T 2 OWN RFF&EAVAlLA LEDEL VERYDATE(FLR5 7) 0 _____ G QMAHlg CORP DORF SHESSMEP™ M T sQ CORR DOR F N SHES & MEP TR MOUT 4 4 15MAR12 19MAR12 HU eHANPW . l H9002 lPUNCH AND F NAL M 5 20MAR12 [24MAR12 _____ .. 1 1 1 _. . DEF NN/GRt D/PATCH OTTOMOF LEVEL H6200 DEF NN GR ND ; PATCH OTTOMOF LEVEL 8 5 _____ 5 10CCT11 14QCT11 LAYOUT( TOPTRACK H6210 LAYOUT&TOPTRACK Z _____ Z_Z 6. S21QCT11 27QCT11 0™UFPnl R ERS H aHMEPR. .R SERS 5 6 2500711 310CT11 ™ H6230 r À WALLS 6 6 270CT11 02MOVH LSR HG24Q MEPWALLSR.l. 03NW °9N0V11 OOW Hr tt. K90: 0 WALL COV R UP NSPECT ON 0 0 10NOV11 DHYWALL T Qf 5T fSRYWALL ‘ 6 6 21JAN12 27JAN12 H9U2J U lTVVftLL _____ TAPEANDFLOAT R5TJ24 TAPE AND FLOAT 6 6 26JAN12 01FE 12 T 5n ‘P WT ‘ ‘ 6 6 04FE 12 10FE 12 nvods rA m _____ DT LESSTONE T 9527 ‘T LE&STONE 6 6 09FE 12 15FE 12 _____ .. .... lMEp.RM0UT H9032 MEP TR MOUT 2 2 11F 12 13FE 12 H9026 MLLWORK 6 6 14FE 12 20FE 12 SnOW£H ENCLOS ES H9O30 SHOWER ENCLOSURES 6 _____ 6 14FE 12 20FE 12 TO LÊTACCESSOHES T qnPq TO LET ACCESSOR ES 5 6 16FE 12 22FE 12 H9U 9 mLC H caaun cj gDOORSANDHARDWARE H903 DOORS ANO HARDWARE 6 j> 21FE 12 27FE 12 CAf PCTlwO0D j n5 rARPET ‘wO D 6 25FE 12 02MAR12 H9Q2S AHKt: & WUUU _____ UN[TFUNCH AND FKAL Hqt™ UN T PUNCH AND F NAL 6 6 03MAR12 09MAR12 HSW J rU nfl mn WL _____ AoWNERFFlEAVAJLAEUEDELWER H9058 OWNER FF & E AVA LA LE DEL VERY DATE (FLR S 7) 0 0 10WR12 CoHR DORF NeRES4MEPTRM H9 2 CORR DOR F N SHES & MEP TR MOUT 4 4 20MAR12 23MAR12 PUNCH AND F AL H9022 PUNCH ANP F NAL S 24MAR12 [29MAR12 . . . . F. rn nny v fn DEF NN fQH NO/PATCH OTTQMOF LEVEL 9 H6300 DEF hJN / GR NO / PATCH OTTOMOF LEVEL9 6 5 15QCT11 UUOMl DLA OlJT TOPTRACK H6310 LAYOUT&TOPTRACK 6 6 280CT11 03NOV11 . . _____ H63 7HMÊPR. . R SERS 6 6 01NOV11 07NOV11 ™ H sûT FRAMEWALLS 6 6 03NOV11 09NOV11 1MEPW SR H6340 MEPWALLSR. . H 6 lOMOV11 l6N0V11 j Startdate 26APR10 LZZJEarly ar M sm 21 P nnacle Enterta nment S S f ara sasa o M S Page nurrtoer 31A MCC PROJECT 3278 > Startm lestonepo n Pr m wqr qSvstf ms. nc. O F n shm lestonepo nt |
‘fSw .. :. . .: NSPECT ON _____ 0 _____ J17NOVV _____ DRYWALL R Ss P NT ZL. 2 11FE 1S jZl#˜g g_ TLESSTONE T T T LE&STONE _____ É _____ 11 _____ l T l SU MEPTR MOUf g2 1 FE 12 2QFE 12 _____ MLLWDRK TT9046 MLLWCRK . . g g HnT . CUW E f 55g5 SHOWERENCLOSURES £ ° a l l /rcp TOLETACCESSORES H9049 TO LET ACCESSOR ES t 6 23FE 12 S9FE 12 DOOHSANDHARDWARE TS 5 OOORS AND HARDWARE ‘ _____ 6 6 28FE 12 05MAR12 CARPEUWOOD H9 48 CARP T & WOOD 5 6 03WR1 Q9MAR12 _____ mu n H957 UN T PUNCH AND F NAL 6 6 10MAR12 16MAR12 DWt tFF& AWUaEDEU H9 Q OWNER FF& E AVA LA LE DEL VERY DATE (FLR8 10) 0 0 02APR12 _____ COHF DORFN SHESSMEPTR H9Q41 CORR DOR F N SHES & MEP TR MPUT 4 4 02APR12 05APR12 PUNCH AND FNAL H9042 PUNCH AND F NAL 5 5 0SAPR12 11APR12 j _____ .. . . . 1 ZT .1. j; MnrT 1 DEF NNJGR ND /PATCH OTTOMOFLEVEL ]0 T S4 DEF W / GR MD / PATCH OTTOM OF LEVEL 10 5 5 21QCT11 2 OCT1 ™jT aPllucK 64 LAYOJT1TCFTRACK 6 8 04NOV 1GNOV1 7ZT H& 2T CTH MEP R. . R SERS 6 6 08NOV11 14NOV11 . EWALLS H643 FRAMEWALLS 6 6 10NOV 16NOV11 ‘ H644Q M PWALLSR.L 6 17NOV11 23NOV11 U TH9 6 WALL COVEFUJP NSPECT ON 0 0 28NOV11 ... _____ T 9 63 DHYWALL ‘ S 6 04FE 12 10FE 12 re OJ unT fVrtU. . _____ D TAPEANO FLOAT mm TAPE AND FLOAT 6 S Q9FE 12 15FE 12 H9 65 PA NT 8 6 16FE 12 24FE 12 TL SSr0NE H9067 T LE&STONE 6 6 23FE 12 29FE 12 _____ ... .. MEPTR MOUT 1 072 MEPTR MOUT 2 2 25FE 12 27FE 12 .TLTFT LJSQ6e M LLWORK 6 6 28FE 12 05MAR12 Mt)Ut t WlLKVUn N .A . T SHOWER NCLOSUHES uon7n SHOWER ENCLOSURES 6 6 23FE 12 05MAR12 H9070 tlHUWLH t NULUOUMCO _____ .. TOLETACC ESSORÉS TTanf Q TO LET ACCESSOR ES 6 6 01MAR12 07MAR12 HaU M 1 U U Hl/UCaoun cj . DOOHSAND HARDWARE H9 7T ‘ DOOF S AND HARDWARE 6 6 06MAR 2 12MftR12 CARFEr WooD uanf a CARPET & WOOD 6 10MAR 2 16MAR12 H9063 lAHP l & WUUU _____ OUN TPUNCHANDF NAL H9111 UN T PUNCH AND F NAL . 6 6 17MAR12 23MAR12 NERFF.EAVA ED H9121 ‘ OWNER FF S E AVA LA LE DEL VERY DATE (FLR 8 10) 0 0 02APR12 KOH OR SHES TR H9 6 CORR DOR F1N SHES & MEP TR M PUT 4 4 06APR12 10APR12 H9062 PUNCH AND F NAL 5[ 5 1APR12 16AFR12 _____ p .. + r3 nr DEFMN/GRlND PATCH OTTOUOF LEVEL 11 mgg OEF NN/GR ND/PATCH OTTOM OF LEVEL 5 S 24QCTn _____ 2gOCTr LAYOUTSTOPTRACK H6510 LAYOUT&TOPTHACK 8 6 11NOV11 17NOV1 0O PH R S TH6525 OHHEPH. .n 3EHS 8 6 5NOVn 21NOV11 .FRAMEWAU.S T 653 FRAMEWALLS S 6 7NOV11 23NPVH Z H6540 MEPWALLSR. . . 6 6 2 NOV1 03DECn WA LCO .uPWSPÊCTON H9095 WALLCOVER UP NSPECT ON Q) 0 05DECn art data g6APR10 [CTEarly ar F n sh date 1MAY12 P nnacle Enterta nment Progress ar Paoenum er 32A MCC PROJECT 3278 ç 5tart mj estone po nt PjPr mavf ra vstams. lnc. Q F n sh m lestona po nt |
m M ... mn/mm S KH T™rL™ H9 4 TAPEANDFLQAT t : _____ .. 22FE 12 pwJT S PA NT 6 _____ 25FEr o2NftR 2 _____ mOTE S PTR MOUT2_J03MftR12 05MftR12 MlLW0RK S MLLWORK S 6 06WR1 g ggHJj CLMUR TT9D9G SHOWERENCLOSUHES 6 06MAH12 12MAR12 flTOLETACCESSORKS H9 89 TO LET ACCESSOR ES 5 6 08WR12 14MHR12 DOOFSANDHARDWAHE 9 9 DOORSAND HARDWARE . 63tttR2 _____ 19M W12 ‘ _____ rer woco ‘ H9038 C HPET&WOOD ‘ 6 6 19WR12 24MAR12 _____ llwlrmNcH . > L H9Q9 UN T PUNCH AND F NAL 6 6 26MAR12 31W.R12 owNERFF&EWALA LEDaf H9 22 CfWNER FF & E AVA LA LE DEL VERY DATE (FLR 8 10) 0 0 02APR12 CORR DOR F N SHES&MÊFT H9 9T CORR DOR F N SHES & MEPTR MOUT 4 _____ 4 11APR12 14APR12 _____ P_CHANDFNAL H9102 [PUNCH AND F NAL H 5 16APR12 20APR12 _____ .. . . 1 p ;r.. l. . f .m D EFN N/GH N D / PATC H 0TTOM QF LEV . 12 H66 DEF NN/GR ND/PATCH OTT0MOFLEVEL12 5 5 11NOV11 16NOV11 m lT ™T K H6610 WCUT.TCPTRACK ‘ 6 NW11 28NOV11 n ZT H665 O/HMEPR. .R SERS ‘ 6 6 22NOV11 01D C11 . Hf o0 FRA E WALLS ‘ 6 S2 NOV11 03DEC11 FF ™EW _L5 H663Q hHAWfc WALLS T’... . MEPWJ_SFU Tjf f dr S P WALLS R 6 6 05DEC11 10DEC11 . _____ ... H 1270 WALL COVER UP NSPECT ON 0 0 12DEC11 H 1170 DRYWALL 6 6 1 FE 12 24FE 12 ™D U( _____ T m û TAPE AND FLOAT g 6 23FE 12 29FE 12 ‘ W PA NT 6 6 03MAR12 09MAR12 HT LE Sr0NE H 2 T L_&STCtJ ‘ 6 6 08MHR12 14MAR12zx . W Vo PTR MOUT 2 2 1QM4R12 12M R12 J™ T LLWORK g13WR1g 19M R12 _____ H1124Q SHOWERENCLOSURES 6 6 3 12 19 2 _____ HH230 TOLET ACCESSOR ES 6 e R lDOO OH™mE H 25 DOORS AND HARDWARE 8 6 20MAR12 _____ 26MAR12 _____ ... . _____ .. _woc. HTT™ CARPET & WOOD 6 6 27MAH12 02APR1E H 1320 UN T PUNCH AND F NAL _____ 6 6 03APR12 09APR12 0WN RFF E Mt £DE H 134Q OWNER FF E AVA LA LE DEL VERY DATE (FLR 0 0 18APR12 lQmmmmm r H 26 CORH DOR F N S HES & ME P T RM PUT 4 4 13APR12 21APR12 11H 1 gSO [PUNCH AND F NAL 5 5 23APR12 [27APR12 _____ [LAYOUTSTOPTRACK 6j 6 02DEC11 Q3DECT LWJT TOPTR K H67Q OHMEPR. .R 3ERS 6 6 03DEC11 Q90EC11 V LT H 7T FRAWE WALLS 8 6 10DEC11 18DEC11 MEP LSR H 72 HEP WALLS R 6 :.: 17DEC11 23DEC11 Mer 6/20 >_r VVftLLO n.l. A Wj COVEF UP NSPECT ON H 1211Û WALL COVER UP NSPECT ON _____ 0 0 24DEC11 _____ H 12Q10 DRYWALL _____ 6 25FE 12 02MAR12 TWEANDFLOAT H 12020 TAPEANDFLQAT 6 f 01MAR12 07MAR12 Startdata 26APR1Q mEarly ar Qtteyas S1 12 P /jnac/e Enterta nment rr L R : OPMA Rra Wote/ as/no Saton Rouge LA Summary ar Pansm m er 33A MCC PROJECT 3278 Q Start m l estone po nt gLPr mav ra msJnc. Q F n sh m l estone po nt |
S TTLE STONE _e m g m _____ lMEPTRMOlJT T55 MEPTR MOUT £ 4 mjAR 21 MA R12 _____ m RK H MTO SHOWER ENCLOSURES 6 20MAR12 26MARt2 DOOF SAND HARDWARE HH2080 DOORS AND HARDWARE 6 27MAH12 02APR12 TOLETACC ESSOR ES HH2060’ TO L T ACCESSOR ES 6 6 31MAR12 06APR12 CAHPET&WOOD HH2100 CARPET S WOOD 6 04APR12 10AFR12 J’™ DUNrrpuNCHANcrHAL H 12130 UN T PUNCH AND F NAL 6 6 11APR12 17APR12 OWNERF EAVALA LEDE HH2140 QWNER FF & E AVA LA LE DEL VERY DATE (FLR 0 Q 18APR12 COHH DOPFN SHES&W EP H 12090 CORR DOR F N SHES & UEP TR MOUT 4 4 23APR12 26APR12 PUNCH ANDFWAL HT 2l PUNCH AND F NAL 5J 5 27APR12 02M Y12 . . . HTSE1 1000 [SERV CE ELEVATOR ÇTS 1) 53 53 0 FE 2 f ssÉm EELEVATOP. HTSE2 10Q0 SERV CE ELEVATOR (TS 2) 53 53 27DEC11 57FE 12 se eaP/ATOR f a HTSE3 1000 SERV CE ELEVATOR (TS 3) 36 36 07MAR12 17APR12 HTPEM000 PASSENGER ELEVATOR fTP 1) 60 l Zlll r ™™ . HTPE1 1500 PASSENENGER ELEVATOR (TP 1) NT. F N SHES 10 6 07MAR12 13MAR12 . _____ n PAS GER ELEVATOR TP ) T HTPE1 19Q0 PASSENGER ELEVATOR (TF p TEST S. ADJUST 6 fl 14MAR12 20MAR12 Tp . N u aEwr9n p HTPE2 1000 PASSENGER ELEVATOR ÇTP 2) O 60 2EFE 12 07MAY12 P SSENGER ELEVATO (T HTPE24500 PASSENGER ELEVATOR (TP 2) NT. F N SHES 10 _____ 6 0 MAY12 14MAY12 PASSENGEP ELEVATOP.( HTPE2 1900 ‘ PASSENGER ELEVATOR (TP 2) TEST & AOJUST 6 6 15MAY12 21MAY12 G PASSÉNGEP ELEVATOR(TP HT P E3 1000 P ASSE NGE R ELEVAT OR (TP 3) 50 60 2 FE 12 07MAY12 _____ PASSENGEHELEVflT0R(T HTPE3 1500 PASSENGER ELEVATOR (TP 3) NT. F N SHES 10 60 MAY12 14MAY12 PASSENQE aEVftTOR’ HTPE3 1900 P ASSENGER ELEVAT OR (TP 3) TEST & ADJUST e e l5MAY12 21MAY12 j msEHGERELEW . . [ J S :;..r n nonAom LAYOLWFH AME H EMA N M G WALLS H7160 LAYOJT/FRA.CREMA N NGWALLS HO ST 3 3 06MAR 2 8MAR 2 .PR G TH G ATROCE H7060 FRAM NG/SHEATH NGAT HO ST REMOVAL 6 6 06MAR12 12MAR12 Ù7220 WP WALL R S 6 09MAR12 15MAR12 MEPWALLR. . H7090 £ FS AT HO ST REMOVAL (Foam/Mss h/ ase Coat) 6 6 13MAR12 19MAR12 OCOVERUP NSPECT ON H75 fl COVER UP NSPECT ON 0 0 16MAR12 V H JU LUVLhun TOr HJ S . E FSF NALCOATATHO STREMO H7140 E FS F NAL COAT AT HO ST REMOVAL 6 S 20MAR12 26MAR12 J2 _____ .. . ng. ADJ ALUMKUMSUASSWWnOWSAT H7150 ALUMNUMGLASS/W NDOWS AT HO ST REMOVAL 6 S 20WH12 26MAR12 H7240 DRYWALL S 6 27MAR12 02APR12 T Dfu r T 7 5 TAPE AND FLOAT 6 _____ 6 03APR12 09APR12 ‘ TJ726 PA.NT 3 10APR12 12APR12 . ™ uT H7270 P TR MOUT _J 4 13APR12 17APR lFL0ORtJGA H7320 FLOOR NG AND ASE _____ 1 4 1SAPR12 21APR12 [ H7330 PUNCH AND F NAL 3J 3 23APR12 J25APR12 \ gta tdate 26APR10 Early ar a KJf P nnacle Enterta nment JSSf a S 1 H Wote/ Cas/no aton Roage M. çn Paaer umto 34A M CC PROJECT 3278 Star m lestone po nt©Pr mavgra tfm Jnç. [o F n sh m lestone po nt |
· J r TF wl.ll ]> lufvrc PfYT 1 72l 72 13DEC11 07MAR12 POOL100 HOTEL POOL M M 1 Z Z H T 1 n f n .Un flon fl AU GE CAST P LES ( PR CR TO H VEP F OAD C OMPLETE) j PG1040 lAUGERCAST P LES (PR OR TO H VER ROAD 45 0 29DEC10A 04MftH11 A _____ # FRPPLE CAPS (R ver LeveL Dflpandent) pG FHP P LE CAPS (H verLevel Dépendent) 36 13 J AJUNH 06JUL11 U MEP u MEP 12 10 22JUN11 02JUL11 PG1190 Lt/ÙNCr . _____ C]FRPPL NTHS/FOUNDAT10NWrt.LS nfH on C P WTWS / m lNDAT ON WALLS 20 18 24JUN11 15JUL11 PG1180 FHP PL NT H& f hUUNUA lun wn t a 1 an Rn™AnF FM s ft FRPLEVEL 1 SLA PG1260 RQUGHGRADEJSEAL SLA & FRP LEVEL1 SLA 27 27 09JUL11 09AUG11 _____ .. A DP n MTR \7F a FRFOT AUGERCAST R G 6 6 16JUN11 24JUN11 PG11 6 MUH Ll L & Hfcl 1 LKjCn O r KH H A GERCACTPl ES(AFTERRNER ROAD COMPLETE) >Q1 2Q AUGERCAST P LES (AFTEH R VER ROAD COKFLETE) 10 10 25JUN11 07JUL11 r . M H .r .. DL /SMEP(AFTERHH ER ROAD COMPLETE) PG1260 U/SMEP [AFTERR VEH ROAD COMPLETE) 27 10 08JUL11 19JUL11 ™ r ™ u 3lvcr ‘ ‘ . . _____ .. T. > 77 77 : fa ll n SFOUNDATONS(AFT6ftRWEH ROAD COMPLETE) PG1240 FOUNDAT ONS (AFTER R VER ROAD COMPLETE 18 18 08JUL11 28JUL11 PG1300 JROUGHGRADE/SEAL SLA S FRP LEV L 1 SLA 27 27 10AUG11 10SEP11 ™ . 120Q ERECTPHECA3T 54 60 1 OCT11 30DEC11 L _____ EFECTmECAST pG WELD GROUT DETA L PRECAST S 66 03NOV11 28JAN12 MWELD GROUT DETA LPP.ECAST PG1230 TOPP MG SLA S / STA RS S RA L NGS 40 40 26NOV11 14JAN12 _____ PG1290 O/H NEP & L GHT F XTURES 55 36 23DEC11 04FE 12 . . . .M j n.. ( H GARAGE F N EH ES (PAlNT STR PNe/S PG1250 GARAGE F N SH ES 36 35 16JAN12 25FE 12 j PG1270 çLEAN& PUNCH 3o 3o p6FE 12 l0MAR12 CLEA PUNC PG4000 lAUGERCAST P LES 3j 3 28JL NT1 [30JUN11 AUGERCAST P LES PG4 FRP FOUNDAT ONS/STRUCTURAL SLA (EL 39.00) ‘ 2 oUUL 15JUL11 FRPFOU ATHNSST UCTWALSLA O TO42 ERECT STRUCTURAL STEEL/METAL DECK/RCOF 6 6 0 NOV11 14N0V11 ‘ E.ECTSTF.CTUR LSTEE AL. OOFC PG4400 FRP SLA S ON fcETAL DECK _____ 2 2 15N0V11 lENCyTr FRP ON MÉTAL OEC TG422LT ERECT PAN STA RS & RA L NGS 6 6 15NQW11 21NOV11 _____ ... DEFECTP A P SS _____ PG45 F REPROOF NG 4 4 17NOV11 21NOV11 F EPROOF NG T T FRAME/SHEATHJE FS 12 Ta 22NOVTr 15DEC11 G3FRAME PG48 ROORNG U LT UP 6 6 02DEC11 0 DEC11 ROOF NG HJ TUP PG49 aH EPROUGH N S 5 2 09DEC11 T ÊC . ‘ROUGH ra T 5 EXTER OR GLASS & gAZ NQVEST ULE 8 9D cT 30DEC11 .. _____ ‘ f. . M 1 ‘ VE3T LLEFRAM NG PG5040 VEST ULE FRAM NG 6 6 31DEC11 07JAN12 r J . . r _____ ELEWTOH LO NTERCRFP AMW( PG5000 ELEVATORLO Y NTER ORFRAMNG 12 3 20FE 12 22FE 12 r r ...0. KTEF OHfW SHES/MEPTHMOUT PG5200 NTER OR F N SHES / KEP TR MOUT 24 18 23FE 12 14WR12 PG5300 CLEAN& PUNCH 1 18J01 R12 2 m R £ OL MWNCH Startda s f APR10 j Early ar EMa ga P nnacle Enterta nment S f fl Data date P0APR11 . . ¥ A C CZacr t cal ar RnnrtJ OPMAV f 3 Atote/ &S/00 fl OT Rouge LA 3 SurT nary ar PHaenum er 3gA MCC PROJECT 3278 0 Start m lestone po nt QPr PyqSffterrg hc. lo F n sh n lestone po nt |
H ™ ‘ S PASSENGER ELEVATOR ( GP 3) PGPE3 1000 JPASSENGER ELEVATOR (GP 3) 3Q 30 16DECn 21JAN12 l>ASSE GÉSaEWT0R GP 3) NT. PGPE3 15QQ PASSENGER ELEVATOR (GP 3) NT. F N SHES 10 JO 23JAN12 02FE 12 pASSENeEH ELEWTOR (QP 3) TEST S PGPE3 1900 PASSEMGER ELEVATOR (GP 3) TEST & AOJUST S _____ 5 03FE 12 09FE 12 PASSENOE ELEVATOH(GP 1) ‘PGPE1 1000 PASSENGER ELEVATOR (GP 1) ™ 16DEC11 21JAH12 0 PASSENGER ELEVATOP (ap.f HT.F N PGPE1 15 PASSENGER ELEVATOR (GP 1) NT. F N SHES 10 10 23JAN12 02FE 12 .qppssmQs p. GF.n.TESTS PGPE1 1900 PASSENGER ELEVATOR (GP 1) TEST & ADJUST 6 6 03FE 12 09FE 12 pASSENe£f Q on(GP.4l PGPE4 1000 PASSENGER ELEVATOR (GP 4) 30 30 23JAN 12 g5FE 12 HPASSe GEHELEVATOR GFM NT PGPE4 15 PASSENGER ELEVATOR (GP 4) NT. F N SHES Jl0 _____ 10 27FE 12 08MAR12 FASSENGERELEVA OR GP 4> T PGPE4 19Q0 PASSENGER ELEVATOR (GP 4) TEST & ADJUST 6 6 09W.R12 15MAR12 ŒPASSENGEP. ELEVATOR (GP 2) PGPE2 1000 PASSENGER ELEVATOR (GP 2) J30 30 23JAN12 25FE 12 apASS£NaER ( 3P.2). PGPE2 1500 PASSENGER ELEVATOH (GP 2) NT. F N SHES 10 10 27FE 12 03rMR12 PASSÉNGERELEVATOH(GP.2>.T PGPE2 1900 PASSENGER ELEVATOR (GP 2J TEST & ADJUST 6 09MAR12 15MAR12 fflartdate 26APR10 ''Earty ar ™fe %Ugg P nnacle Enterta nment R f Data date 0APR11 . . . n n A . 1 Cnt cal ar RMncfata Q2MAY11 Ht note cas no tsa on muge LM. Summary ar Pans num Rr 36A MCC PROJECT 3278 Start m l estone po nt©Pr nq ra3y$tmlnç. > F n sh m l estone po nt |
PINNACLE ENTERTAINMENT BATON ROUGE CASINO & RESORT
DESCRIPTION: CONTRACTORS PERSONNEL & RATES
DATE: 11 -May-11
Weekly Salary w/ | ||||||||||||||||||||||||||||||||
FUTA & SUTA; | Monthly | |||||||||||||||||||||||||||||||
MCC | SS & Medicare; | Computer | Monthly | TOTAL | ||||||||||||||||||||||||||||
PAYROLL | Worker’s Comp.; | Equip/Software/ | Estimated On | WEEKLY | ||||||||||||||||||||||||||||
CLASS | MCC DESCRIPTION / | Health Insurance; | Monthly Cell | Network/Server/ | Monthly Truck | Sits Safety and | BILLABLE | |||||||||||||||||||||||||
# | CLASSIFICATION | EMPLOYEE NAME | 401 K | Phone Expenses | TI Line | Rental Charges | Quality Training | RATE | NOTES | |||||||||||||||||||||||
5 | PROJECT EXECUTIVE | Duane K Duffy | 6,517 | 150 | 490 | 216 | 7,373 | |||||||||||||||||||||||||
15 | SR PROJECT MANAGER | Michael Thompson | 3,827 | 125 | 490 | 127 | 4,569 | |||||||||||||||||||||||||
15 | SR PROJECT MANAGER | Timothy Norton | 3,870 | 125 | 490 | 128 | 4,613 | |||||||||||||||||||||||||
20 | PROJECT MANAGER LI | TBD | ||||||||||||||||||||||||||||||
25 | PROJECT MANAGER Lll | Larry Rooney | 2,210 | 125 | 490 | 82 | 2,907 | |||||||||||||||||||||||||
25 | PROJECT MANAGER Lll | TBD | ||||||||||||||||||||||||||||||
30 | ASST PROJECT MANAGER | Jeffrey Allen | 2,105 | 125 | 490 | 69 | 2,789 | |||||||||||||||||||||||||
35 | SR SUPERINTENDENT | Raymond Craig | 3,992 | 125 | 490 | 900 | 132 | 5,639 | ||||||||||||||||||||||||
40 | SUPERINTENDENT LI | David Morton | 2,544 | 125 | 490 | 900 | 84 | 4,143 | ||||||||||||||||||||||||
40 | SUPERINTENDENT LI | TBD | ||||||||||||||||||||||||||||||
40 | SUPERINTENDENT LI | TBD | ||||||||||||||||||||||||||||||
45 | SUPERINTENDENT Lll | David Keith Juneau | 2,656 | 125 | 490 | 900 | 88 | 4,259 | ||||||||||||||||||||||||
45 | SUPERINTENDENT Lll | William Gary King | 2,549 | 125 | 490 | 900 | 84 | 4,148 | ||||||||||||||||||||||||
45 | SUPERINTENDENT Lll | Ronnie Dunlop | 2,314 | 125 | 490 | 900 | 76 | 3,905 | ||||||||||||||||||||||||
45 | SUPERINTENDENT LII | TBD | ||||||||||||||||||||||||||||||
50 | ASST SUPERINTENDENT | TBD | ||||||||||||||||||||||||||||||
50 | ASST SUPERINTENDENT | TBD | ||||||||||||||||||||||||||||||
55 | SR PROJECT ENGINEER | Lucas Duffy | 1,889 | 125 | 490 | 62 | 2,566 | |||||||||||||||||||||||||
60 | MEP COORDINATOR | TBD | ||||||||||||||||||||||||||||||
65 | PROJECT ENGINEER LI | TBD | ||||||||||||||||||||||||||||||
65 | PROJECT ENGINEER LI | TBD | ||||||||||||||||||||||||||||||
70 | PROJECT ENGINEER Lll | Patrick Layhee | 1,606 | 125 | 490 | 53 | 2,274 | |||||||||||||||||||||||||
70 | PROJECT ENGINEER Lll | George Ryan Lee | 1,417 | 125 | 490 | 47 | 2,079 | |||||||||||||||||||||||||
70 | PROJECT ENGINEER Lll | David Steger | 1,417 | 125 | 490 | 47 | 2,079 | |||||||||||||||||||||||||
70 | PROJECT ENGINEER Lll | TBD | ||||||||||||||||||||||||||||||
70 | PROJECT ENGINEER Lll | TBD | ||||||||||||||||||||||||||||||
74 | SR SAFETY ENGINEER | Charlie Myers | 2,328 | 125 | 490 | 77 | 3,020 | |||||||||||||||||||||||||
74 | SR SAFETY ENGINEER | Chris Vollenweider | 2,372 | 125 | 490 | 78 | 3,065 | |||||||||||||||||||||||||
75 | SAFETY ENGINEER | TBD | ||||||||||||||||||||||||||||||
80 | FIELD ENGINEER LI | Troy Anderson | 2,093 | 125 | 490 | 69 | 2,777 | |||||||||||||||||||||||||
80 | FIELD ENGINEER LI | Andy Dupuy | 2,066 | 125 | 490 | 68 | 2,749 | |||||||||||||||||||||||||
85 | FIELD ENGINEER Lll | William Teter | 1,769 | 125 | 490 | 58 | 2,442 | |||||||||||||||||||||||||
86 | FIELD ENGINEER HELPER | TBD | ||||||||||||||||||||||||||||||
90 | FIELD OFFICE MANAGER | Joye Frith | 1,118 | 125 | 490 | 37 | 1,770 | |||||||||||||||||||||||||
90 | FIELD OFFICE MANAGER | Rhonda Rougeau | 1,032 | 125 | 490 | 34 | 1,681 | |||||||||||||||||||||||||
95 | SECRETARY | TBD | ||||||||||||||||||||||||||||||
110 | SR ESTIMATOR | TBD | ||||||||||||||||||||||||||||||
115 | ESTIMATOR | Beverly Girgis | 1,963 | 125 | 490 | 65 | 2,643 | |||||||||||||||||||||||||
ADMIN ASST | TBD |
CONTRACTOR’S OWNED EQUIPMENT
5/11/11
Ave. Monthly | ||||||||||
Serial Number | Description | Daily Rate | Rate | |||||||
DS47A26600 | DATA COLLECTOR | 1.17 | 35.00 | |||||||
ZD3018 | THEODOLITE | 23.10 | 693.00 | |||||||
TBD | TOTAL STATION (WITH ACCESSORIES) | 40.00 | 1,200.00 | |||||||
A16622732 | ROTATING LASER-LASERMARK | 9.50 | 285.00 | |||||||
TBD | ICE MACHINE | 6.33 | 190.00 | |||||||
TX LIC #83M169 | TRAILER MOUNT GENERATOR | 10.83 | 325.00 | |||||||
TBD | GENERATOR 5-6KW | 8.33 | 250.00 | |||||||
VARIES | PICKUP TRUCK | 30.00 | 900.00 | |||||||
E45685 | 16’ UTILITY TRAILER | 6.00 | 180.00 | |||||||
0088 | ATV | 20.00 | 600.00 | |||||||
1555 | ATV | 20.00 | 600.00 | |||||||
54773-01 | OFFICE TRAILER | 10.00 | 300.00 | |||||||
54740-01 | OFFICE TRAILER | 10.00 | 300.00 | |||||||
54705-01 | OFFICE TRAILER | 10.00 | 300.00 | |||||||
CUH618799 | TOSHIBA DP2840 COPIER | 13.03 | 391.00 | |||||||
A31621603266 | LUCENT PHONE SYSTEM (25 HAND SETS) | 12.50 | 380.00 | |||||||
VARIES | COMPUTER (WITH T1, NETWORK, ET. AL.) | 16.33 | 490.00 | |||||||
VARIES | COMPUTER AIRCARD (SPRINT) | 2.00 | 60.00 | |||||||
HC40357 | STORAGE CONTAINER 40’ | 8.25 | 250.00 | |||||||
TBD | STORAGE CONTAINER 20’ | 6.25 | 190.00 | |||||||
VARIES | MOBILE PHONE | 4.17 | 125.00 | |||||||
10H55JS064037A | TELESCOPIC FORKLIFT 10,000# | 80.00 | 2,400.00 | |||||||
TBD | TELESCOPIC FORKLIFT 6,000# | 36.17 | 1,085.00 | |||||||
TBD | CONCRETE BUCKET 1 CY | 8.33 | 250.00 | |||||||
TBD | CONCRETE BUCKET 2 CY | 12.50 | 375.00 | |||||||
TBD | CONCRETE BUCKET 3 CY | 15.00 | 450.00 | |||||||
TBD | CONCRETE (GEORGIA) BUGGY | 15.00 | 450.00 | |||||||
TBD | CONCRETE VIBRATOR | — | 65.00 | |||||||
4TC6U0907349 | BACKHOE LOADER | 66.67 | 2,000.00 | |||||||
TBD | SKIDSTEER | 36.67 | 1,100.00 | |||||||
TBD | SWEEPER | 43.00 | 1,290.00 | |||||||
TBD | WATER TRUCK 2000 GAL | 46.50 | 1,395.00 | |||||||
TBD | LIGHT PLANT | 12.50 | 375.00 | |||||||
TBD | SCISSOR LIFT 19’ | 8.33 | 250.00 | |||||||
TBD | 60’ STRAIGHT BOOM LIFT (60’ DIESEL) | 45.00 | 1,350.00 | |||||||
CONTRACT DOCUMENT LOG
PINNACLE BATON ROUGE HOTEL AND CASINO
MANNING ARCHITECTS SCHEME #6 PROGRAM
Volume 1: Site | ||||||
A0.10 | Drawing Index | 2/10/2011 | ||||
C-1 | Index and Keymap | 2/10/2011 | ||||
C-10.1 | Offsite Drainage | 2/10/2011 | ||||
C-10.2 | Offsite Drainage | 2/10/2011 | ||||
C-10.3 | Offsite Drainage | 2/10/2011 | ||||
C-10.1 | Offsite Drainage | 1/20/2011 | ||||
C-11.1 | Stormwater Pollution Prevention | 2/10/2011 | ||||
C-3 | Overall Site Plan | 2/10/2011 | ||||
C-4.1 | Demolition Plan | 2/10/2011 | ||||
C-4.2 | Demolition Plan | 2/10/2011 | ||||
C-5.9 | Sections | 2/10/2011 | ||||
C-7.2 | Concrete Sloped Pavement and Details | 2/10/2011 | ||||
C-7.3 | Crane Foundation Plan | 2/10/2011 | ||||
C-8.1 | Drainage Layout | 2/10/2011 | ||||
C-8.2 | Drainage Layout | 2/10/2011 | ||||
C-8.3 | Drainage Layout | 2/10/2011 | ||||
C-8.4 | Drainage Layout | 2/10/2011 | ||||
C-8.5 | Drainage Layout | 2/10/2011 | ||||
C-8.6 | Drainage Layout | 2/10/2011 | ||||
C-8.7 | Drainage Layout | 2/10/2011 | ||||
C-8.8 | Overall Drainage Plan | 2/10/2011 | ||||
C-9.1 | Grading Layout | 2/10/2011 | ||||
C-9.10 | Hotel-Garage Building pad Grading Plan | 2/10/2011 | ||||
C-9.2 | Grading Layout | 2/10/2011 | ||||
C-9.3 | Grading Layout | 2/10/2011 | ||||
C-9.4 | Grading Layout | 2/10/2011 | ||||
C-9.5 | Grading Layout | 2/10/2011 | ||||
C-9.6 | Grading Layout | 2/10/2011 | ||||
C-9.7 | Grading Layout | 2/10/2011 | ||||
C-9.8 | Overall Grading Plan | 2/10/2011 | ||||
C-9.9 | Overall Building Pad Layout Plan | 2/10/2011 | ||||
A1.00 | Overall Architectural Site Plan | 1/14/2011 | ||||
C-10.4 | Plan & Profile – Baseline A | 12/21/2010 | ||||
C-10.5 | Plan & Profile – Baseline A | 12/21/2010 | ||||
C-10.6 | Plan & Profile – U.S. Army Corps Baseline | 12/21/2010 | ||||
C-10.7 | Plan & Profile – U.S. Army Corps Baseline | 12/21/2010 | ||||
C-11.2 | Stormwater Pollution Prevention | 2/10/2011 | ||||
C-12.1 | Utility Layout | 12/21/2010 | ||||
C-12.2 | Onsite Utility Layout | 12/21/2010 | ||||
C-14.1 | Levee Improvements – Plan Profile | 1/14/2011 | ||||
C-14.10 | Levee Improvements – Cross Sections | 1/14/2011 |
1 of 54
C-14.11 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.12 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.13 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.14 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.15 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.16 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.17 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.18 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.19 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.2 | Levee Improvements – Plan Profile | 1/14/2011 | ||||
C-14.3 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.4 | Levee Improvements – Typical Sections | 1/14/2011 | ||||
C-14.5 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.6 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.7 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.8 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.9 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-16.3 | Miscellaneous Details | 2/10/2011 | ||||
C-16.4 | Miscellaneous Details | 2/10/2011 | ||||
C-16.5 | Miscellaneous Details | 2/10/2011 | ||||
C-16.6 | Miscellaneous Details | 2/10/2011 | ||||
C-2 | Existing Conditions | 12/21/2010 | ||||
C-5.1 | Pavement Layout | 12/21/2010 | ||||
C-5.2 | Typical Sections | 12/21/2010 | ||||
C-5.3 | Typical Sections | 12/21/2010 | ||||
C-5.4 | Typical Sections | 12/21/2010 | ||||
C-5.5 | Typical Sections | 12/21/2010 | ||||
C-5.6 | Typical Sections | 12/21/2010 | ||||
C-5.7 | Typical Sections | 12/21/2010 | ||||
C-5.8 | Typical Sections | 12/21/2010 | ||||
C-6.1 | Geometric Layout | 12/21/2010 | ||||
C-6.2 | Geometric Layout | 12/21/2010 | ||||
C-6.3 | Geometric Layout | 12/21/2010 | ||||
C-6.4 | Geometric Layout | 12/21/2010 | ||||
C-6.5 | Geometric Layout | 12/21/2010 | ||||
C-6.6 | Geometric Layout | 12/21/2010 | ||||
C-6.7 | Geometric Layout | 12/21/2010 | ||||
C-7.1 | Basin Layout | 12/21/2010 | ||||
E1.00 | Electrical Overview Site | 12/21/2010 | ||||
E1.11 | Electrical Site Plan | 12/21/2010 | ||||
E1.12 | Electrical Site Plan | 12/21/2010 | ||||
E1.13 | Electrical Site Plan | 12/21/2010 | ||||
E1.15 | Electrical Site Plan | 12/21/2010 | ||||
E1.16 | Electrical Site Plan | 12/21/2010 | ||||
E1.17 | Electrical Site Plan | 12/21/2010 | ||||
E1.18 | Electrical Site Plan | 12/21/2010 | ||||
E1.19 | Electrical Site Plan | 12/21/2010 | ||||
E1.21 | Electrical Site Plan | 12/21/2010 |
2 of 54
E1.22 | Electrical Site Plan | 12/21/2010 | ||||
E1.23 | Electrical Site Plan | 12/21/2010 | ||||
E1.24 | Electrical Site Plan | 12/21/2010 | ||||
E1.25 | Electrical Site Plan | 12/21/2010 | ||||
E1.26 | Electrical Site Plan | 12/21/2010 | ||||
L1.01 | Landscape Sheet Index | 12/21/2010 | ||||
L1.02 | Landscape Orientation Plan | 12/21/2010 | ||||
L1.03 | Landscape Finish Schedule | 12/21/2010 | ||||
L1.04 | Landscape Site Graphic | 12/21/2010 | ||||
L2.01 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.02 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.03 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.04 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.05 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.06 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.07 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.08 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.09 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.10 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.11 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.12 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.13 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.14 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.15 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.16 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.17 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.18 | Landscape Call Out Plan | 12/21/2010 | ||||
L2.19 | Landscape Call Out Plan | 12/21/2010 | ||||
L3.01 | Landscape Notes/Legends | 12/21/2010 | ||||
M1.00 | Mechanical Overview Site Plan | 12/21/2010 | ||||
M1.22 | Mechanical Site Plan | 12/21/2010 | ||||
M1.23 | Mechanical Site Plan | 12/21/2010 | ||||
M1.27 | Mechanical Site Plan | 12/21/2010 | ||||
P1.00 | Plumbing Overview Site Plan | 12/21/2010 | ||||
P1.22 | Plumbing Site Plan | 12/21/2010 | ||||
P1.23 | Plumbing Site Plan | 12/21/2010 | ||||
P1.27 | Plumbing Site Plan | 12/21/2010 | ||||
A0.00 | Site Cover Sheet | 1/14/2011 | ||||
A0.11 | Drawing Index | 1/14/2011 | ||||
A0.30 | Overall Architectural Key Plan | 1/14/2011 | ||||
A1.10 | Site Plan | 12/21/2010 | ||||
A1.11 | Site Plan | 12/21/2010 | ||||
A1.12 | Site Plan | 12/21/2010 | ||||
A1.13 | Site Plan | 12/21/2010 | ||||
A1.14 | Site Plan | 12/21/2010 | ||||
A1.15 | Site Plan | 12/21/2010 | ||||
A1.16 | Site Plan | 12/21/2010 | ||||
A1.17 | Site Plan | 12/21/2010 |
3 of 54
A1.18 | Site Plan | 12/21/2010 | ||||
A1.19 | Site Plan | 12/21/2010 | ||||
A1.20 | Site Plan | 12/21/2010 | ||||
A1.21 | Site Plan | 12/21/2010 | ||||
A1.22 | Site Plan | 12/21/2010 | ||||
A1.23 | Site Plan | 12/21/2010 | ||||
A1.24 | Site Plan | 12/21/2010 | ||||
A1.25 | Site Plan | 12/21/2010 | ||||
A1.26 | Site Plan | 12/21/2010 | ||||
A1.27 | Site Plan | 12/21/2010 | ||||
C-10.10 | Plan & Profile – U.S. Army Corps Baseline | 11/12/2010 | ||||
C-10.11 | Plan & Profile – U.S. Army Corps Baseline | 11/12/2010 | ||||
C-10.12 | Plan & Profile – U.S. Army Corps Baseline | 11/12/2010 | ||||
C-10.8 | Plan & Profile – U.S. Army Corps Baseline | 11/12/2010 | ||||
C-10.9 | Plan & Profile – U.S. Army Corps Baseline | 11/12/2010 | ||||
C-12.3 | Utility Details | 11/12/2010 | ||||
C-13.1 | Plan and Profile – Baseline A | 12/21/2010 | ||||
C-13.2 | Plan and Profile – Baseline A | 12/21/2010 | ||||
C-13.3 | Plan and Profile – Baseline A | 12/21/2010 | ||||
C-13.4 | Plan and Profile – Baseline A | 12/21/2010 | ||||
C-13.5 | Plan and Profile – Baseline A | 12/21/2010 | ||||
C-14.20 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.21 | Levee Improvements – Cross Sections | 1/14/2011 | ||||
C-14.22 | South Levee – Cross Sections | 1/14/2011 | ||||
C-14.23 | South Levee – Cross Sections | 1/14/2011 | ||||
C-14.24 | South Levee – Cross Sections | 1/14/2011 | ||||
C-14.25 | South Levee – Cross Sections | 1/14/2011 | ||||
C-14.26 | South Levee – Cross Sections | 1/14/2011 | ||||
C-14.27 | South Levee – Cross Sections | 1/14/2011 | ||||
C-14.28 | South Levee – Cross Sections | 1/14/2011 | ||||
C-15.1 | Striping and Signage Layout | 12/21/2010 | ||||
C-15.2 | Striping and Signage Layout | 12/21/2010 | ||||
C16.1 | ADA Details | 12/21/2010 | ||||
C16.2 | Miscellaneous Details | 12/21/2010 | ||||
C-6.8 | Curve Data Tables | 11/12/2010 | ||||
C-7.2A | Concrete Sloped Pavement | 1/14/2011 | ||||
C-7.2B | Concrete Sloped Pavement and Details | 1/14/2011 | ||||
C-7.4 | Joint Layout | 12/21/2010 | ||||
C-8.9 | Overall Drainage Plan | 11/12/2010 | ||||
C-9.11 | Support facility Building Pad Grading Plan | 2/10/2011 | ||||
CS-1 | Phase 1 Construction General Notes | 1/14/2011 | ||||
CS-2 | Phase 1 Construction General Layout | 1/14/2011 | ||||
CS-3 | Phase 1 Construction Foundation Plan | 1/14/2011 | ||||
CS-4 | Phase 1 Construction Bents 46R, 47R & 52R-62R Plan & Elevation | 1/14/2011 | ||||
CS-5 | Phase 1 Construction Bents 48R – 51R Plan & Elevation | 1/14/2011 | ||||
CS-6 | Phase 1 Construction Loading Dock Drive Platform Deck Plan | 1/14/2011 | ||||
CS-7 | Phase 1 Construction Deck Details (1 of 2) | 1/14/2011 | ||||
CS-8 | Phase 1 Construction Deck Details (2 of 2) | 1/14/2011 |
4 of 54
CS-9 | Phase 1 Construction Miscellaneous Details | 1/14/2011 | ||||
E0.10 | Symbol List | 12/21/2010 | ||||
E0.11 | Standard Details Grounding Methods | 12/21/2010 | ||||
E1.10 | Electrical Site Plan | 11/12/2010 | ||||
E1.14 | Electrical Site Plan | 11/12/2010 | ||||
E1.20 | Electrical Site Plan | 11/12/2010 | ||||
E1.27 | Electrical Site Plan | 11/12/2010 | ||||
E3.00 | Single Line Diagram – Normal | 11/12/2010 | ||||
E3.01 | Single Line Diagram – Emergency | 11/12/2010 | ||||
E3.02 | Low Voltage Riser Diagram | 12/21/2010 | ||||
E4.00 | Feeder, Transformer, and Light Fixture Schedule | 11/12/2010 | ||||
E4.00 | Feeder, Transformer, and Light Fixture Schedule | 12/21/2010 | ||||
E4.10 | Panel Schedules – Normal | 11/12/2010 | ||||
E4.10 | Panel Schedules – Normal | 12/21/2010 | ||||
E4.11 | Panel Schedules – Emergency | 11/12/2010 | ||||
E4.20 | Distribution Equipment Schedules | 11/12/2010 | ||||
E4.30 | Ductbank Sections | 12/21/2010 | ||||
E4.31 | Ductbank Sections | 12/21/2010 | ||||
L3.02 | Landscape Construction Details | 12/21/2010 | ||||
L4.01 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.02 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.03 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.04 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.05 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.06 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.07 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.08 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.09 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.10 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.11 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.12 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.13 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.14 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.15 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.16 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.17 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.18 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L4.19 | Landscape Irrigation Master Plan | 12/21/2010 | ||||
L5.01 | Landscape Irrigation Notes/Legends | 12/21/2010 | ||||
L5.02 | Landscape Irrigation Details | 12/21/2010 | ||||
L5.03 | Landscape Irrigation Details | 12/21/2010 | ||||
L6.01 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.02 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.03 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.04 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.05 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.06 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.07 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 |
5 of 54
L6.08 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.09 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.10 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.11 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.12 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.13 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.14 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.15 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.16 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.17 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.18 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
L6.19 | Landscape Planting Plan Trees and Groundcover | 12/21/2010 | ||||
M0.10 | General Notes, Abbreviations, and Symbol List | 12/21/2010 | ||||
M0.20 | Mechanical Details | 12/21/2010 | ||||
M0.21 | Mechanical Details | 12/21/2010 | ||||
M0.22 | Mechanical Details | 12/21/2010 | ||||
M0.23 | Mechanical Details | 12/21/2010 | ||||
P0.10 | General Notes, Abbreviations, and Symbol List | 12/21/2010 | ||||
P0.20 | Plumbing Details | 12/21/2010 | ||||
P0.21 | Plumbing Details | 12/21/2010 | ||||
S-1 | Foundation Plan | 11/12/2010 | ||||
S-10 | Bents 42-50 Plan & Elevation | 11/12/2010 | ||||
S-2 | Foundation Plan | 11/12/2010 | ||||
S-3 | Foundation Plan | 11/12/2010 | ||||
S-4 | Bents 26-34 Plan & Elevation | 11/12/2010 | ||||
S-5 | Bents 28-31 Plan & Elevation | 11/12/2010 | ||||
S-6 | Bents 35-36 Plan & Elevation | 11/12/2010 | ||||
S-7 | Bent 37 Plan & Elevation | 11/12/2010 | ||||
S-8 | Bents 38-39 Plan & Elevation | 11/12/2010 | ||||
S-9 | Bents 40-41 Plan & Elevation | 11/12/2010 | ||||
Volume 2: Tower | ||||||
AV0.01 | Symbols and Legends | 12/21/2010 | ||||
AV1.00 | Overall Audio/Visual Site Plan | 12/21/2010 | ||||
AV1.16 | Audio/Visual Site Plan | 12/21/2010 | ||||
AV1.22 | Audio/Visual Site Plan | 12/21/2010 | ||||
AV1.23 | Audio/Visual Site Plan | 12/21/2010 | ||||
AV4.01 | A/V Fixture Schedule | 12/21/2010 | ||||
AV7.01 | Overall AV Topology – Site | 12/21/2010 | ||||
AV7.02 | Overall Topology | 11/12/2010 | ||||
LD0.01 | Symbols and Legends | 12/21/2010 | ||||
LD0.02 | Notes | 12/21/2010 | ||||
LD1.00 | Overall Lighting Site Plan | 12/21/2010 | ||||
LD1.13 | Lighting Site Plan | 12/21/2010 | ||||
LD1.15 | Lighting Site Plan | 12/21/2010 | ||||
LD1.16 | Lighting Site Plan | 12/21/2010 | ||||
LD1.17 | Lighting Site Plan | 12/21/2010 | ||||
LD1.18 | Lighting Site Plan | 12/21/2010 |
6 of 54
LD1.20 | Lighting Site Plan | 12/21/2010 | ||||
LD1.21 | Lighting Site Plan | 12/21/2010 | ||||
LD1.22 | Lighting Site Plan | 12/21/2010 | ||||
LD1.23 | Lighting Site Plan | 12/21/2010 | ||||
LD1.26 | Lighting Site Plan | 12/21/2010 | ||||
LD1.27 | Lighting Site Plan | 12/21/2010 | ||||
LD4.01 | Lighting Fixture Schedule | 12/21/2010 | ||||
LD4.01 | Lighting Fixture Schedule | 11/12/2010 | ||||
LD7.02 | Overall Topology | 11/12/2010 | ||||
TA0.00 | Cover Sheet | 2/4/2011 | ||||
TA0.10 | Drawing Index | 2/15/2011 | ||||
TA0.10 | Drawing Index | 2/4/2011 | ||||
TA0.10 | Drawing Index | 2/2/2011 | ||||
TA0.11 | Drawing Index | 2/4/2011 | ||||
TA0.12 | Drawing Index | 12/21/2010 | ||||
TA0.13 | Drawing Index | 12/21/2010 | ||||
TA0.14 | Drawing Index | 11/23/2010 | ||||
TA0.17 | Drawing Index | 11/23/2010 | ||||
TA0.20 | Information Site Package | 12/21/2010 | ||||
TA0.21 | ADA Notes and Figures | 12/21/2010 | ||||
TA0.30 | Overall Architectural Key Plan | 12/21/2010 | ||||
TA0.40 | Wall Types | 12/21/2010 | ||||
TA0.41 | Wall Types | 12/21/2010 | ||||
TA1.00 | Overall Architectural Site Plan | 11/23/2010 | ||||
TA2.10 | Hotel Tower Floor Plans Level 0 Level 1 | 12/21/2010 | ||||
TA2.20 | Hotel Tower Floor Plans Level 1.5 Level 2 | 12/21/2010 | ||||
TA2.30 | Hotel Tower Floor Plans Level 3 Level 4-11 | 12/21/2010 | ||||
TA2.40 | Hotel Tower Floor Plans Level 12 Roof Plan | 12/21/2010 | ||||
TA2.50 | Hotel Tower Lower Roof Plan Upper Roof Plan | 12/21/2010 | ||||
TA3.10 | Hotel Tower East Elevation | 12/21/2010 | ||||
TA3.20 | Hotel Tower West Elevation | 12/21/2010 | ||||
TA3.30 | Hotel Tower North and South Elevations | 12/21/2010 | ||||
TA3.40 | Hotel Tower South Elevation | 12/21/2010 | ||||
TA3.50 | Hotel Tower Building Section | 12/21/2010 | ||||
TA3.60 | Hotel Tower Building Section | 12/21/2010 | ||||
TA3.70 | Hotel Tower Building Section | 12/21/2010 | ||||
TA4.10 | Room Finish Schedule | 12/21/2010 | ||||
TA4.20 | Door Schedule | 12/21/2010 | ||||
TA4.21 | Door Schedule | 12/21/2010 | ||||
TA4.22 | Door Schedule | 12/21/2010 | ||||
TA4.30 | Head, Jamb, Sill Details | 12/21/2010 | ||||
TA4.31 | Head, Jamb, Sill Details | 12/21/2010 | ||||
TA6.01 | Hotel Shower Details | 12/21/2010 | ||||
TA6.01 | Hotel Shower Details | 11/12/2010 | ||||
TA6.02 | Guestroom Details | 12/21/2010 | ||||
TA6.03 | Enlarged Elevations | 12/21/2010 | ||||
TA7.00 | Hotel Tower Stair Plans | 12/21/2010 | ||||
TA7.10 | Hotel Tower Stair Plans & Sections | 12/21/2010 |
7 of 54
TA7.20 | Hotel Tower Stair Plans & Sections | 12/21/2010 | ||||
TA8.00 | Enlarged Plans Guestroom Mock-Up Package | 11/12/2010 | ||||
TA8.01 | Schedule & Details Mock-Up Package | 11/12/2010 | ||||
TA8.10 | Hotel Tower Enlarged Guestroom Plans/RCPS | 12/21/2010 | ||||
TA8.11 | Hotel Tower Enlarged Guestroom Plans/RCPS | 12/21/2010 | ||||
TA8.12 | Hotel Tower Enlarged Guestroom Plans/RCPS | 12/21/2010 | ||||
TA8.13 | Hotel Tower Enlarged Guestroom Plans/RCPS | 12/21/2010 | ||||
TA8.14 | Hotel Tower Enlarged Guestroom Plans/RCPS | 12/21/2010 | ||||
TA8.16 | Hotel Tower Enlarged Typical Guestroom Bath Plans | 12/21/2010 | ||||
TA8.17 | Hotel Tower Enlarged Typical Guestroom Bath Plans | 12/21/2010 | ||||
TA8.30 | Hotel Tower Enlarged Sections | 12/21/2010 | ||||
TA8.31 | Hotel Tower Enlarged Sections | 12/21/2010 | ||||
TA9.10 | Hotel Tower Reflected Ceiling Level 0 Level 1 | 12/21/2010 | ||||
TA9.20 | Hotel Tower Reflected Ceiling Level 1.5 Level 2 | 12/21/2010 | ||||
TA9.30 | Hotel Tower Reflected Ceiling Plans Level 3 Levels 4-11 | 12/21/2010 | ||||
TA9.40 | Hotel Tower Reflected Plan Level 12 Roof Plan | 12/21/2010 | ||||
TAS 2.50 | Hotel Tower Slab Plans Lower/Upper Roof Level | 12/21/2010 | ||||
TAS2.10 | Hotel Tower Slab Plans Level 0 and Level 1 | 2/4/2011 | ||||
TAS2.20 | Hotel Tower Slab Plans Level 1.5 and Level 2 | 2/4/2011 | ||||
TAS2.30 | Hotel Tower Slab Plans Level 3 and levels 4-11 | 2/4/2011 | ||||
TAS2.40 | Hotel Tower Slab Plan Level 12 Roof Slab | 2/4/2011 | ||||
TAS2.50 | Thotel Tower Slab Plan Roof Level | 2/4/2011 | ||||
TAS2.60 | Garage Elevator Tower Slab Plan | 2/4/2011 | ||||
TAV0.01 | Symbols and Legends | 12/21/2010 | ||||
TAV2.10 | Hotel Tower Audio Visual Plans Level 0 and 1 | 12/21/2010 | ||||
TAV2.20 | Hotel Tower Audio Visual Plans Level 1.5 and 2 | 12/21/2010 | ||||
TAV2.40 | Hotel Tower Audio Visual Plans Level 12 | 12/21/2010 | ||||
TAV4.01 | AV Fixture Schedule | 12/21/2010 | ||||
TAV7.01 | Overall Topology Hotel Tower | 12/21/2010 | ||||
TAV9.10 | Hotel Tower Audio Visual RCP Level 1 (Casino) | 12/21/2010 | ||||
TAV9.20 | Hotel Tower Audio Visual RCP Level 2 | 12/21/2010 | ||||
TAV9.40 | Hotel Tower Audio Visual RCP Level 12 | 12/21/2010 | ||||
TC1.00 | Tower Grading | 2/4/2011 | ||||
TE0.10 | Symbol List and General Notes | 12/21/2010 | ||||
TE0.10 | Symbol List, Specifications & Panel Schedule | 11/12/2010 | ||||
TE0.11 | Standard Details and Grounding Methods | 12/21/2010 | ||||
TE0.20 | Single Line Diagram, Panel & Lighting Fixture Schedules | 11/12/2010 | ||||
TE2.10 | Hotel Tower Power/Signal Plans Level 1 & 2 | 12/21/2010 | ||||
TE2.20 | Hotel Tower Power/Signal Plans Level 1.5 & 2 | 12/21/2010 | ||||
TE2.30 | Hotel Tower Power/Signal Plans Level 3 & 4 | 12/21/2010 | ||||
TE2.31 | Hotel Tower Power/Signal Plans Level 5 & 6 | 12/21/2010 | ||||
TE2.32 | Hotel Tower Power/Signal Plans Level 7 & 8 | 12/21/2010 | ||||
TE2.33 | Hotel Tower Power/Signal Plans Level 9 & 10 | 12/21/2010 | ||||
TE2.34 | Hotel Tower Power/Signal Plan Level 11 & 12 | 12/21/2010 | ||||
TE2.40 | Hotel Tower Power/Signal Plans Level 11.5 & 12 | 12/21/2010 | ||||
TE2.50 | Hotel Tower Power Lower Roof and Upper Roof Plans | 12/21/2010 | ||||
TE2.60 | Hotel Tower Power/Signal Plans Level 9 & 10 | 11/12/2010 | ||||
TE2.70 | Hotel Tower Power/Signal Plans Level 11 & 12 | 11/12/2010 |
8 of 54
TE2.80 | Hotel Tower Power/Signal Plans Roof Levels | 11/12/2010 | ||||
TE3.00 | Single Line Diagram – Normal | 12/21/2010 | ||||
TE3.01 | Single Line Diagram – Emergency | 12/21/2010 | ||||
TE3.10 | Riser Diagrams | 12/21/2010 | ||||
TE3.11 | Riser Diagrams | 12/21/2010 | ||||
TE3.12 | Riser Diagrams | 12/21/2010 | ||||
TE4.00 | Feeder, Transformer & Lighting Fixture Schedules | 12/21/2010 | ||||
TE4.01 | Lighting Fixture and Compliance Certificate | 12/21/2010 | ||||
TE4.10 | Panel Schedules – Normal | 11/12/2010 | ||||
TE4.11 | Panel Schedules – Normal | 12/21/2010 | ||||
TE4.12 | Panel Schedules – Normal | 11/12/2010 | ||||
TE4.13 | Panel Schedules – Emergency | 12/21/2010 | ||||
TE4.20 | Distribution Equipment Schedules | 12/21/2010 | ||||
TE5.00 | Enlarged Electrical Plans | 12/21/2010 | ||||
TE5.01 | Enlarged Electrical Plans | 12/21/2010 | ||||
TE8.00 | Enlarged Guestrooms Electrical Plans | 11/12/2010 | ||||
TE8.10 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TE8.11 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TE8.12 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TE8.20 | Hotel Tower Enlarged Typical Cooridor | 12/21/2010 | ||||
TE9.10 | Hotel Tower Lighting Plans Level 0 & 1 | 12/21/2010 | ||||
TE9.20 | Hotel Tower Lighting Plans Level 1.5 & 2 | 12/21/2010 | ||||
TE9.30 | Hotel Tower Lighting Plans Level 3 & Levels 4-11 | 12/21/2010 | ||||
TE9.31 | Hotel Tower Lighting Plans Level 5 & 6 | 12/21/2010 | ||||
TE9.32 | Hotel Tower Lighting Plans Level 7 & 8 | 12/21/2010 | ||||
TE9.33 | Hotel Tower Lighting Plans Level 9 & 10 | 12/21/2010 | ||||
TE9.34 | Hotel Tower Lighting Plans Level 11 | 12/21/2010 | ||||
TE9.40 | Hotel Tower Lighting Plans Level 12 and Roof | 12/21/2010 | ||||
TE9.50 | Hotel Tower Lighting Plans Level 7 & 8 | 11/12/2010 | ||||
TE9.60 | Hotel Tower Lighting Plans Level 9 & 10 | 11/12/2010 | ||||
TE9.70 | Hotel Tower Lighting Plans Level 11 & 12 | 11/12/2010 | ||||
TFA0.01 | Hotel Fire Alarm General Notes | 12/21/2010 | ||||
TFA0.10 | Hotel Tower Fire Alarm Plan Level 0 | 12/21/2010 | ||||
TFA0.20 | Hotel Tower Fire Alarm Plan Level 1 | 12/21/2010 | ||||
TFA0.30 | Hotel Tower Fire Alarm Plan Level 1.5 | 12/21/2010 | ||||
TFA0.40 | Hotel Tower Fire Alarm Plan Level 2 | 12/21/2010 | ||||
TFA0.50 | Hotel Tower Fire Alarm Plan Level 3 | 11/12/2010 | ||||
TFA0.60 | Hotel Tower Fire Alarm Plan Level 4-11 | 11/12/2010 | ||||
TFA0.70 | Hotel Tower Fire Alarm Plan Level 11.5 | 11/12/2010 | ||||
TFA0.80 | Hotel Tower Fire Alarm Plan Level 12 | 11/12/2010 | ||||
TFP0.00 | Hotel Tower Fire Protection General Notes | 12/21/2010 | ||||
TFP0.10 | Hotel Tower Fire Protection Plan Level 0 | 12/21/2010 | ||||
TFP0.20 | Hotel Tower Fire Protection Plan Level 1 | 12/21/2010 | ||||
TFP0.30 | Hotel Tower Fire Protection Plan Level 1.5 | 12/21/2010 | ||||
TFP0.40 | Hotel Tower Fire Protection Plan Level 2 | 12/21/2010 | ||||
TFP0.50 | Hotel Tower Fire Protection Plan Level 3 | 11/12/2010 | ||||
TFP0.60 | Hotel Tower Fire Protection Plan Level 4-11 | 11/12/2010 | ||||
TFP0.70 | Hotel Tower Fire Protection Plan Level 11.5 | 11/12/2010 |
9 of 54
TFP0.80 | Hotel Tower Fire Protection Plan Level 12 | 11/12/2010 | ||||
TFP0.90 | Hotel Tower Fire Protection Plan Roof Plan | 11/12/2010 | ||||
TFP5.00 | Hotel Tower Fire Protection Details | 12/21/2010 | ||||
TFP5.01 | Hotel Tower Fire Protection Details | 12/21/2010 | ||||
T-FSA1 | Room Service Floor Plan | 12/21/2010 | ||||
T-FSA2 | Room Service Equipment Schedule and Requirements | 12/21/2010 | ||||
T-FSA3 | Room Service Food Service Plumbing Plan | 12/21/2010 | ||||
T-FSA4 | Room Service Food Service Electrical Plan | 12/21/2010 | ||||
T-FSA5 | Room Service Food Service Building Conditions Beverage Conduits | 12/21/2010 | ||||
T-FSA6 | Room Service Food Service Refridgeration Plan | 12/21/2010 | ||||
T-FSA6.1 | Room Service Food Service Refridgeration Plan | 12/21/2010 | ||||
T-FSA7 | Room Service Exhaust Hood Plan | 12/21/2010 | ||||
T-FSA7.1 | Room Service Exhaust Hood Plan | 12/21/2010 | ||||
T-FSA7.2 | Room Service Exhaust Hood Plan | 12/21/2010 | ||||
T-FSA7.3 | Room Service Exhaust Hood Plan | 12/21/2010 | ||||
T-FSA7.4 | Room Service Exhaust Hood Plan | 12/21/2010 | ||||
T-FSB1 | Meeting Rooms Food Service Floor Plan and Schedule | 12/21/2010 | ||||
T-FSB2 | Meeting Rooms Food Service Plumbing Plan Electrical Plan | 12/21/2010 | ||||
T-FSC1 | Pool bar Floor Plan Schedule and Requirements | 12/21/2010 | ||||
T-FSC2 | Pool Bar Plumbing Plan Electrical Plan | 12/21/2010 | ||||
T-FSC3 | Pool Bar Building Conditions Beverage Conduits Refridgeration Plan | 12/21/2010 | ||||
TID0.00 | Cover Sheet | 11/12/2010 | ||||
TID0.01 | General Notes | 12/21/2010 | ||||
TID0.02 | Sheet Index | 11/12/2010 | ||||
TID0.03 | BOH Interiors Finish Schedule | 12/21/2010 | ||||
TID0.10 | General Notes Guestroom Mock-Up Package | 11/12/2010 | ||||
TID0.11 | Schedules Guestroom Mock-Up Package | 11/12/2010 | ||||
TID1.00 | Overall Plan Service Level | 12/21/2010 | ||||
TID1.00 | Plan & RCP Guestroom Mock-Up Package | 11/12/2010 | ||||
TID1.01 | Overall RCP Service Level | 12/21/2010 | ||||
TID1.10 | Overall Plan Floor 2 | 12/21/2010 | ||||
TID1.11 | Overall RCP Floor 2 | 12/21/2010 | ||||
TID1.20 | Overall Plan Floor 2 | 11/12/2010 | ||||
TID1.20 | Overall Plan 1.5 | 12/21/2010 | ||||
TID1.21 | Overall RCP Floor 2 | 11/12/2010 | ||||
TID1.21 | Overall RCP 1.5 | 12/21/2010 | ||||
TID1.30 | Overall Plan Floor 3 | 11/12/2010 | ||||
TID1.30 | Overall Plan Floor 2 | 12/21/2010 | ||||
TID1.31 | Overall RCP Floor 3 | 11/12/2010 | ||||
TID1.31 | Overall RCP Floor 2 | 12/21/2010 | ||||
TID1.40 | Overall Plans Floors 4-11 | 11/12/2010 | ||||
TID1.40 | Overall Plan Floor 3 | 12/21/2010 | ||||
TID1.41 | Overall RCP Floors 4-11 | 11/12/2010 | ||||
TID1.41 | Overall RCP Floor 3 | 12/21/2010 | ||||
TID1.50 | Overall Plan Floor 12 | 11/12/2010 | ||||
TID1.50 | Overall Plan Floors 4-11 | 12/21/2010 | ||||
TID1.51 | Overall RCP Floor 12 | 11/12/2010 | ||||
TID1.51 | Overall RCP Floors 4-11 | 12/21/2010 |
10 of 54
TID1.60 | Overall Plan Floor 12 | 12/21/2010 | ||||
TID1.61 | Overall RCP Floor 12 | 12/21/2010 | ||||
TID2.00 | Entry & Lobby Enlarged Plan | 12/21/2010 | ||||
TID2.00 | Elevations Dbl Queen Guestroom Mock-Up Package | 11/12/2010 | ||||
TID2.01 | Entry & Lobby Enlarged RCP | 12/21/2010 | ||||
TID2.01 | Elevations Dbl Queen Guestroom Mock-Up Package | 11/12/2010 | ||||
TID2.02 | Elevations King Guestroom Mock-Up Package | 11/12/2010 | ||||
TID2.03 | Elevations King Guestroom Mock-Up Package | 11/12/2010 | ||||
TID2.04 | Elevations Corridor Guestroom Mock-Up Package | 11/12/2010 | ||||
TID2.10 | Meeting Room & Offices Enlarged Plan | 12/21/2010 | ||||
TID2.11 | Meeting Room & Offices Enlarged RCP | 12/21/2010 | ||||
TID2.11 | Meeting Room Elevations Floor 1 | 12/21/2010 | ||||
TID2.20 | Restroom Plan Floor 1 | 12/21/2010 | ||||
TID2.21 | Restroom RCPs Floor 1 | 12/21/2010 | ||||
TID2.22 | Lobby Restroom Elevations | 12/21/2010 | ||||
TID2.23 | BOH Restrooms Elevations | 12/21/2010 | ||||
TID2.30 | Entry & Lobby Enlarged Plan Floor 2 | 12/21/2010 | ||||
TID2.31 | Entry & Lobby Enlarged RCP Floor 2 | 12/21/2010 | ||||
TID3.00 | Elevator Lobby Enlarged Plan Floors 1-11 | 11/12/2010 | ||||
TID3.00 | Elevator Lobby Plans | 12/21/2010 | ||||
TID3.00 | Details Guestroom Mock-Up Package | 11/12/2010 | ||||
TID3.01 | Elevator Lobby Enlarged RCP Floors 1-11 | 11/12/2010 | ||||
TID3.01 | Elevator Lobby RCPs | 12/21/2010 | ||||
TID3.02 | Elevator Lobby Elevations | 12/21/2010 | ||||
TID3.03 | Elevator Lobby Elevations | 12/21/2010 | ||||
TID3.10 | Elevator Lobby Enlarged Plan Floor 12 | 11/12/2010 | ||||
TID3.10 | Elevator Cars Enlarged Plans, RCPs & Elevations | 12/21/2010 | ||||
TID3.11 | Elevator Lobby Enlarged RCP Floor 12 | 11/12/2010 | ||||
TID3.40 | Hotel Cooridor Elevations | 12/21/2010 | ||||
TID3.41 | Hotel Cooridor Elevations | 12/21/2010 | ||||
TID3.42 | Hotel Cooridor Elevations | 12/21/2010 | ||||
TID3.43 | Hotel Cooridor Elevations | 12/21/2010 | ||||
TID3.44 | Hotel Cooridor Elevations | 12/21/2010 | ||||
TID3.45 | Hotel Cooridor Elevations | 12/21/2010 | ||||
TID3.46 | Hotel Cooridor Elevations | 12/21/2010 | ||||
TID4.00 | Typical King Enlarged Plan Floors 2-11 | 12/21/2010 | ||||
TID4.01 | Typ. King Enlarged RCP Floors 2-11 | 12/21/2010 | ||||
TID4.02 | Typ King Elevations Floors 2-11 | 12/21/2010 | ||||
TID4.03 | Typ King Elevations Floors 2-12 | 12/21/2010 | ||||
TID4.10 | Typ. Dbl. Queen Enlarged Plan Floors 2-11 | 12/21/2010 | ||||
TID4.11 | Typ. Dbl. Queen Enlarged RCP Floors 2-11 | 12/21/2010 | ||||
TID4.12 | Typ Queen Elevations Floors 2-11 | 12/21/2010 | ||||
TID4.13 | Typ Queen Elevations Floors 2-12 | 12/21/2010 | ||||
TID4.20 | King ADA Enlarged Plan | 12/21/2010 | ||||
TID4.21 | King ADA Enlarged RCP | 12/21/2010 | ||||
TID4.22 | ADA King Elevations | 12/21/2010 | ||||
TID4.23 | ADA King Elevations | 12/21/2010 | ||||
TID4.30 | Ext. Dbl. Queen Enlarged Plan Floors 2-11 | 12/21/2010 |
11 of 54
TID4.31 | Ext. Dbl. Queen Enlarged RCP Floors 2-11 | 12/21/2010 | ||||
TID4.32 | Junior Suite Enlarged Plan Floors 2-11 | 12/21/2010 | ||||
TID4.33 | Extended Double Queen Elevations | 12/21/2010 | ||||
TID4.40 | Junior Suite Enlarged Plan Floors 2-11 | 11/12/2010 | ||||
TID4.41 | Junior Suite Enlarged RCP Floors 2-11 | 11/12/2010 | ||||
TID4.60 | Drawing Name | 11/12/2010 | ||||
TID4.61 | Bridge Suite Enlarged RCP Floors 4-11 | 11/12/2010 | ||||
TID4.65 | Drawing Name | 11/12/2010 | ||||
TID4.66 | Bridge Suite Enlarged RCP Floor 12 | 11/12/2010 | ||||
TID4.80 | Two Bay Suite Enlarged Plan Floors 3-11 | 11/12/2010 | ||||
TID4.81 | Two Bay Suite Enlarged RCP Floors 3-11 | 11/12/2010 | ||||
TID5.00 | Junior Suite Enlarged Plan Floors 2-11 | 12/21/2010 | ||||
TID5.00 | Three Bay Suite Enlarged Plan Floor 12 | 11/12/2010 | ||||
TID5.01 | Junior Suite Enlarged Plan Floors 2-12 | 12/21/2010 | ||||
TID5.02 | Junior Suite Elevations | 12/21/2010 | ||||
TID5.03 | Junior Suite Elevations | 12/21/2010 | ||||
TID5.04 | Junior Suite ADA Bathroom Elevations Floor 2 Only | 12/21/2010 | ||||
TID5.20 | Bridge Suite Enlarged Plan Floors 3-11 | 12/21/2010 | ||||
TID5.21 | Bridge Suite Enlarged Plan Floors 3-11 | 12/21/2010 | ||||
TID5.22 | Bridge Suite Elevations | 12/21/2010 | ||||
TID5.23 | Bridge Suite Elevations | 12/21/2010 | ||||
TID5.24 | Bridge Suite ADA Bathroom Elevations Floor 11 Only | 12/21/2010 | ||||
TID5.30 | Two Bay Suite Enlarged Plan Floors 2-11 | 12/21/2010 | ||||
TID5.31 | Two Bay Suite Enlarged RCP Floors 2-11 | 12/21/2010 | ||||
TID5.32 | Two Bay Suite Elevations | 12/21/2010 | ||||
TID5.33 | Two Bay Suite Elevations | 12/21/2010 | ||||
TID6.00 | Bridge Suite Enlarged Plan Floor 12 | 12/21/2010 | ||||
TID6.00 | Sundries Enlarged Plan Floor 2 | 11/12/2010 | ||||
TID6.01 | Bridge Suite Enlarged RCP Floor 12 | 12/21/2010 | ||||
TID6.02 | Bridge Suite Elevations Floor 12 | 12/21/2010 | ||||
TID6.03 | Bridge Suite Elevations Floor 13 | 12/21/2010 | ||||
TID6.10 | Three Bay Suite Enlarged Plan Floor 12 | 12/21/2010 | ||||
TID6.11 | Three Bay Suite Enlarged RCP Floor 12 | 12/21/2010 | ||||
TID6.12 | Three Bay Suite Elevations Floor 12 | 12/21/2010 | ||||
TID6.13 | Three Bay Suite Elevations Floor 12 | 12/21/2010 | ||||
TID6.14 | Three Bay Suite Elevations | 12/21/2010 | ||||
TID7.00 | Sundries Enlarged Plan Floor 2 | 12/21/2010 | ||||
TID7.01 | Sundries Enlarged Plan Floor 2 | 12/21/2010 | ||||
TID7.02 | Sundries Elevations Floor 2 | 12/21/2010 | ||||
TID7.03 | Sundries Elevations Floor 2 | 12/21/2010 | ||||
TID8.00 | Pool Area Enlarged Plan Floor 12 | 12/21/2010 | ||||
TID8.10 | Fitness Area & Restrooms Plan Floor 12 | 12/21/2010 | ||||
TID8.11 | Fitness Area & Restrooms RCP Floor 12 | 12/21/2010 | ||||
TID8.12 | Fitness Area Elevations | 12/21/2010 | ||||
TID8.13 | Restroom Elevations Floor 12 | 12/21/2010 | ||||
TID8.14 | Restroom Elevations Floor 12 | 12/21/2010 | ||||
TL1.01 | Sheet Index | 12/21/2010 | ||||
TL1.02 | Finish Schedule | 12/21/2010 |
12 of 54
TL2.01 | Call Out Plan | 12/21/2010 | ||||
TL2.02 | Finish Plan | 12/21/2010 | ||||
TL3.01 | Notes and Legends | 12/21/2010 | ||||
TL3.02 | Construction Details | 12/21/2010 | ||||
TL4.00 | Irrigation Master Plan | 12/21/2010 | ||||
TL4.01 | Irrigation Plan – Trees and Palms | 12/21/2010 | ||||
TL4.02 | Irrigation Plan – Shrubs and Vines | 12/21/2010 | ||||
TL5.01 | Irrigation Notes and Legends | 12/21/2010 | ||||
TL5.02 | Irrigation Details | 12/21/2010 | ||||
TL6.01 | Planting Plan – Trees and Shrubs | 12/21/2010 | ||||
TLD0.01 | Symbols & Legends | 12/21/2010 | ||||
TLD0.02 | Notes | 12/21/2010 | ||||
TLD2.10 | Hotel Tower Lighting Plans Level 0 and 1 | 12/21/2010 | ||||
TLD2.20 | Hotel Tower Lighting Plan Level 2 | 12/21/2010 | ||||
TLD2.30 | Hotel Tower Lighting Plans Level 3 and 4-11 | 12/21/2010 | ||||
TLD2.40 | Hotel Tower Lighting Plans Level 11.5 and 12 | 12/21/2010 | ||||
TLD3.10 | Hotel Tower Lighting Elevation (East) | 12/21/2010 | ||||
TLD3.20 | Hotel Tower Lighting Elevation (West) | 12/21/2010 | ||||
TLD3.30 | Hotel Tower Lighting Elevation (North and South) | 12/21/2010 | ||||
TLD4.01 | Lighting Fixture Schedule | 12/21/2010 | ||||
TLD4.31 | Dimming Fixture Schedule | 12/21/2010 | ||||
TLD7.01 | Overall Topology | 12/21/2010 | ||||
TLD7.10 | Control Room Locations Level 1.5 | 12/21/2010 | ||||
TLD7.11 | Control Room Locations Level 12 | 12/21/2010 | ||||
TLD7.40 | Dimming Oneline Hotel Tower | 12/21/2010 | ||||
TLD7.70 | Control Rack Details | 12/21/2010 | ||||
TLD7.71 | General Control Details | 12/21/2010 | ||||
TLD7.80 | Cable Specifications | 12/21/2010 | ||||
TLD8.00 | Enlarged Plans Guestroom Mock-Up Package Lighting | 11/12/2010 | ||||
TLD8.10 | Enlarged Typical Guestroom Lighting Plans/RCPs | 12/21/2010 | ||||
TLD8.11 | Enlarged Typical Guestroom Lighting Plans/RCPs | 12/21/2010 | ||||
TLD8.12 | Enlarged Typical Guestroom Lighting Plans/RCPs | 12/21/2010 | ||||
TLD9.10 | Hotel Tower Lighting RCP Level 0 and 1 | 12/21/2010 | ||||
TLD9.20 | Hotel Tower Lighting RCP Level 2 | 12/21/2010 | ||||
TLD9.30 | Hotel Tower Lighting RCP Level 3 and 4-11 | 12/21/2010 | ||||
TLD9.40 | Hotel Tower Lighting RCP Level 12 | 12/21/2010 | ||||
TLV0.10 | Symbol List and General Notes | 12/21/2010 | ||||
TLV2.10 | Hotel Tower Low Voltage Plans Level 0 &1 | 12/21/2010 | ||||
TLV2.20 | Hotel Tower Low Voltage Plans Level 1.5 & 2 | 12/21/2010 | ||||
TLV2.30 | Hotel Tower Low Voltage Plans Level 3 & 4 | 12/21/2010 | ||||
TLV2.31 | Hotel Tower Low Voltage Plans Level 5 & 6 | 12/21/2010 | ||||
TLV2.32 | Hotel Tower Low Voltage Plans Level 7 & 8 | 12/21/2010 | ||||
TLV2.33 | Hotel Tower Low Voltage Plans Level 9 & 10 | 12/21/2010 | ||||
TLV2.34 | Hotel Tower Low Voltage Plans Level 11 | 12/21/2010 | ||||
TLV2.40 | Hotel Tower Low Voltage Plans Level 11.5 & 12 | 12/21/2010 | ||||
TLV5.00 | Hotel Tower Low Voltage Plans | 12/21/2010 | ||||
TLV9.10 | Hotel Tower Low Voltage Plans Level 0 &1 | 12/21/2010 | ||||
TLV9.20 | Hotel Tower Low Voltage Plans Level 1.5 & 2 | 12/21/2010 |
13 of 54
TLV9.30 | Hotel Tower Low Voltage Plans Level 3 & 4 | 12/21/2010 | ||||
TLV9.31 | Hotel Tower Low Voltage Plans Level 5 & 6 | 12/21/2010 | ||||
TLV9.32 | Hotel Tower Low Voltage Plans Level 7 & 8 | 12/21/2010 | ||||
TLV9.33 | Hotel Tower Low Voltage Plans Level 9 & 10 | 12/21/2010 | ||||
TLV9.34 | Hotel Tower Low Voltage Plans Level 11 | 12/21/2010 | ||||
TLV9.40 | Hotel Tower Low Voltage Plans Level 11.5 & 12 | 12/21/2010 | ||||
TM0.10 | General Notes, Abbreviations, and Symbol List | 12/21/2010 | ||||
TM0.10 | Symbol List, Specifications & Abbreviations | 11/12/2010 | ||||
TM0.20 | Mechanical Details | 12/21/2010 | ||||
TM0.20 | Mechanical Details | 11/12/2010 | ||||
TM0.21 | Mechanical Details | 12/21/2010 | ||||
TM0.22 | Mechanical Details | 12/21/2010 | ||||
TM2.10 | Hotel Tower Mechanical Plans Level 0 & 1 | 12/21/2010 | ||||
TM2.20 | Hotel Tower Mechanical Plans Level 1.5 & 2 | 12/21/2010 | ||||
TM2.30 | Hotel Tower Mechanical Plans Levels 3 & 4-11 | 12/21/2010 | ||||
TM2.40 | Hotel Tower Mechanical Plans Level 12 & Roof | 12/21/2010 | ||||
TM2.50 | Hotel Tower Mechanical Lower Roof Plan & Upper Roof Levels | 12/21/2010 | ||||
TM3.10 | Hotel Tower Piping Plans Level 0 & 1 | 12/21/2010 | ||||
TM3.20 | Hotel Tower Piping Plans Level 1.5 & 2 | 12/21/2010 | ||||
TM3.30 | Hotel Tower Piping Plans Level 3 & 4-11 | 12/21/2010 | ||||
TM3.40 | Hotel Tower Piping Plans Level 12 & Roof | 12/21/2010 | ||||
TM4.00 | Mechanical Schedules | 12/21/2010 | ||||
TM4.00 | Mechanical Schedules | 11/12/2010 | ||||
TM4.01 | Mechanical Schedules | 12/21/2010 | ||||
TM4.02 | Mechanical Schedules | 12/21/2010 | ||||
TM6.00 | Mechanical Control Diagrams | 12/21/2010 | ||||
TM6.01 | Mechanical Control Diagrams | 12/21/2010 | ||||
TM7.00 | Mechanical Riser Diagrams | 12/21/2010 | ||||
TM7.01 | Mechanical Riser Diagrams | 12/21/2010 | ||||
TM7.02 | Mechanical Riser Diagrams | 12/21/2010 | ||||
TM8.10 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TM8.10 | Enlarged Guestroom Mechanical Plan | 11/12/2010 | ||||
TM8.11 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TM8.12 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TP0.10 | General Notes, Abbreviations, and Symbol List | 2/4/2011 | ||||
TP0.20 | Plumbing Details | 2/4/2011 | ||||
TP0.21 | Plumbing Details | 2/4/2011 | ||||
TP2.10 | Hotel Tower Waste and Vent Plans Level 0 and 1 | 2/4/2011 | ||||
TP2.20 | Hotel Tower Waste & Vent Plans Level 1.5 & 2 | 12/21/2010 | ||||
TP2.30 | Hotel Tower Waste & Vent Plans Level 3 & 4-11 | 12/21/2010 | ||||
TP2.40 | Hotel Tower Waste & Vent Plans Level 12 & Roof | 12/21/2010 | ||||
TP2.50 | Hotel Tower Plumbing Lower Roof & Upper Roof Levels | 12/21/2010 | ||||
TP3.10 | Hotel Tower Domestic Water Plans Level 0 and 1 | 2/4/2011 | ||||
TP3.20 | Hotel Tower Domestic Water Plans Level 1.5 & 2 | 12/21/2010 | ||||
TP3.30 | Hotel Tower Domestic Water Plans Level 3 & 4-11 | 12/21/2010 | ||||
TP3.40 | Hotel Tower Domestic Water Plans Level 12 & Roof | 12/21/2010 | ||||
TP4.00 | Plumbing Schedules | 2/4/2011 | ||||
TP4.00 | Plumbing Schedule | 11/12/2010 |
14 of 54
TP4.01 | Plumbing Schedules | 12/21/2010 | ||||
TP5.00 | Enlarged Plumbing Plans | 12/21/2010 | ||||
TP5.01 | Enlarged Plumbing Plans | 12/21/2010 | ||||
TP6.00 | Plumbing Control Diagrams | 12/21/2010 | ||||
TP7.00 | Plumbing Riser Diagrams | 12/21/2010 | ||||
TP7.01 | Plumbing Riser Diagrams | 12/21/2010 | ||||
TP7.02 | Plumbing Riser Diagrams | 12/21/2010 | ||||
TP7.03 | Plumbing Riser Diagrams | 11/12/2010 | ||||
TP8.10 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TP8.10 | Enlarged Guestroom Plumbing Plans | 11/12/2010 | ||||
TP8.11 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TP8.12 | Hotel Tower Enlarged Typical Guestroom Plans | 12/21/2010 | ||||
TP9.00 | Plumbing Isometrics | 12/21/2010 | ||||
TP9.01 | Plumbing Isometrics | 12/21/2010 | ||||
TPFS A3.0 | Room Service Food Service Waste and Vent Plan | 2/4/2011 | ||||
TPFS A3.1 | Room Service Food Service Waste Domestic Water Plan | 2/4/2011 | ||||
TPFS 5.00 | Enlarged Plumbing Food Service Plans | 12/21/2010 | ||||
TPFS 5.01 | Enlarged Plumbing Food Service Plans | 12/21/2010 | ||||
TS0.01 | Cover Sheet | 12/21/2010 | ||||
TS0.11 | General Notes | 12/21/2010 | ||||
TS0.12 | General Notes | 12/21/2010 | ||||
TS2.00 | Hotel Tower Pile Capacity Plan | 12/21/2010 | ||||
TS2.01 | Hotel Tower Foundation Plan | 2/15/2011 | ||||
TS2.01 | Hotel Tower Foundation Plan | 11/12/2010 | ||||
TS2.10 | Hotel Tower Service Level Plan, Hotel Tower Bridge Level 2 Framing Plan | 2/4/2011 | ||||
TS2.10.1 | Hotel Tower Service Level Plan, Hotel Tower Casino Level Framing Plan | 2/4/2011 | ||||
TS2.20 | Hotel Tower Service Level 1.5 Framing Plan, Hotel Tower Bridge Level 2 Fra | 2/4/2011 | ||||
TS2.20.1 | Hotel Tower Service Level 1.5 Framing Plan, Hotel Tower Bridge Level 2 Fra | 2/4/2011 | ||||
TS2.30 | Hotel Tower Framing Plans Level 4-11 Level 3 | 12/21/2010 | ||||
TS2.30 | Hotel Tower Service Level 3 Framing Plan, Hotel Tower Level 4-10 Framing | 2/4/2011 | ||||
TS2.30.1 | Hotel Tower Framing Plans Level 4-11 Level 3 | 12/21/2010 | ||||
TS2.30.1 | Hotel Tower Service Level 3 Framing Plan, Hotel Tower Level 4-10 Framing | 2/4/2011 | ||||
TS2.40 | Hotel Tower Framing Plans Level 12 Intermediate Level | 12/21/2010 | ||||
TS2.40 | Hotel TowerGuest Level 12 Framing Plan, Hotel Tower Guest Intermediate | 2/4/2011 | ||||
TS2.40.1 | Hotel Tower Framing Plans Level 12 Intermediate Level | 12/21/2010 | ||||
TS2.40.1 | Hotel TowerGuest Level 12 Framing Plan, Hotel Tower Guest Intermediate | 2/4/2011 | ||||
TS2.60 | Hotel Tower Framing Plans Roof/Roof Slab | 12/21/2010 | ||||
TS2.60 | Roof Slab and Roof Framing Plans | 2/4/2011 | ||||
TS2.60.1 | Hotel Tower Framing Plans Roof Slab | 2/4/2011 | ||||
TS2.80 | Garage Elevator Framing Plans | 2/4/2011 | ||||
TS2.91 | Drag Chord Reinforcing Plans | 2/4/2011 | ||||
TS3.01 | Wall Elevations | 2/4/2011 | ||||
TS3.02 | Wall Elevations | 2/4/2011 | ||||
TS3.21 | Brace Elevations | 2/4/2011 | ||||
TS4.01 | Column Schedule | 2/4/2011 | ||||
TS4.11 | Column Details | 2/4/2011 | ||||
TS4.41 | Hotel Stud rail Details | 2/4/2011 | ||||
TS5.01 | Foundation Sections & Details | 12/21/2010 |
15 of 54
TS5.02 | Foundation Sections & Details | 12/21/2010 | ||||
TS5.02 | Foundation Sections & Details | 11/12/2010 | ||||
TS5.03 | Foundation Sections & Details | 12/21/2010 | ||||
TS5.03 | Foundation Sections & Details | 11/12/2010 | ||||
TS5.04 | Foundation Sections & Details | 12/21/2010 | ||||
TS5.11 | Concrete Sections and Details | 2/4/2011 | ||||
TS5.11 | Concrete Sections & Details | 11/12/2010 | ||||
TS5.12 | Concrete Sections and Details | 2/4/2011 | ||||
TS5.12 | Concrete Sections & Details | 12/21/2010 | ||||
TS5.13 | Concrete Sections and Details | 2/4/2011 | ||||
TS5.21 | Post-Tension Sections and Details | 2/4/2011 | ||||
TS5.31 | Masonry Sections and Details | 2/4/2011 | ||||
TS5.41 | Stair Sections and Details | 2/4/2011 | ||||
TS5.51 | Steel and Elevator Sections and Details | 2/4/2011 | ||||
TS5.52 | Steel Sections and Details | 2/4/2011 | ||||
TS5.53 | Steel Sections and Details | 2/4/2011 | ||||
TS5.54 | Steel Sections and Details | 2/4/2011 | ||||
TS5.54.1 | Steel Sections and Details | 2/4/2011 | ||||
TS6.01 | Enlarged Plans | 2/4/2011 | ||||
TS6.02 | Enlarged Plans | 2/4/2011 | ||||
TS7.11 | Pile Cap Details | 12/21/2010 | ||||
TS7.12 | Pile Cap Details | 12/21/2010 | ||||
TS7.12.1 | Pile Cap Details | 12/21/2010 | ||||
TS7.13 | Pile Cap Details | 12/21/2010 | ||||
TS7.14 | Pile Cap Details | 2/15/2011 | ||||
TS7.21 | Pile Cap Sections and Details | 12/21/2010 | ||||
W1.0 | Pool Piping Plan | 12/21/2010 | ||||
W1.0A | Pool Structural Depression Plan | 12/21/2010 | ||||
W1.1 | Waterwall Piping Plan | 12/21/2010 | ||||
W2.0 | Equipment Room Layout Plan | 12/21/2010 | ||||
W4.0 | Pool Sections and Details | 12/21/2010 | ||||
W5.0 | Waterwall Sections and Details | 12/21/2010 | ||||
WC | General Notes and Sheet Index | 12/21/2010 | ||||
Volume 3: Bridge | ||||||
BA0.00 | Cover Sheet | 1/28/2011 | ||||
BA0.10 | Drawing Index | 1/28/2011 | ||||
BA0.20 | Information Bridge Package | 1/28/2011 | ||||
BA0.21 | ADA Notes and Figures | 1/28/2011 | ||||
BA0.30 | Overall Architectural Key Plan | 1/28/2011 | ||||
BA2.10 | Porte Cochere/Bridge Floor Plan Elevation 53' | 1/28/2011 | ||||
BA2.20 | Porte Cochere/Bridge Floor Plan Elevation 77' | 1/28/2011 | ||||
BA2.30 | Porte Cochere/Bridge Roof Plan | 1/28/2011 | ||||
BA3.10 | Bridge Elevation | 1/28/2011 | ||||
BA3.20 | Bridge Elevation | 1/28/2011 | ||||
BA3.50 | Bridge Building Section | 1/28/2011 | ||||
BA3.60 | Bridge Building Section | 1/28/2011 | ||||
BA3.70 | Bridge Building Section | 1/28/2011 |
16 of 54
BA3.80 | Bridge Building Section | 1/28/2011 | ||||
BA5.10 | Bridge Wall Sections | 1/28/2011 | ||||
BA6.10 | Porte Cochere/Bridge Plan Details | 1/28/2011 | ||||
BA6.20 | Bridge Enlarged Details | 1/28/2011 | ||||
BA9.10 | Porte Cochere/Bridge RCP Elevation 53′ | 1/28/2011 | ||||
BA9.20 | Porte Cochere/Bridge RCP Elevation 77′ | 1/28/2011 | ||||
BAS2.10 | Porte Cochere/Bridge Slab Plan Elevation 53′ | 1/28/2011 | ||||
BAS2.20 | Porte Cochere/Bridge Slab Plan Elevation 77′ | 1/28/2011 | ||||
BAV0.01 | Symbols and Legends | 1/28/2011 | ||||
BAV2.10 | Porte Cochere/Bridge Plan Elevations 53′ | 1/28/2011 | ||||
BAV2.20 | Porte Cochere/Bridge Plan Elevation 77′ | 1/28/2011 | ||||
BAV4.01 | Lighting Fixture Schedule | 1/28/2011 | ||||
BAV7.01 | Overall AV Topology – Bridge | 1/28/2011 | ||||
BAV9.10 | Bridge AV RCP – Elevation 53′ | 1/28/2011 | ||||
BAV9.20 | Bridge AV RCP – Elevation 77′ | 1/28/2011 | ||||
BE0.10 | Symbol List and General Notes | 1/28/2011 | ||||
BE0.11 | Standard Details Grounding Methods | 1/28/2011 | ||||
BE2.10 | Porte Cochere – Bridge Power Plan Elevation 53′ | 1/28/2011 | ||||
BE2.20 | Porte Cochere – Bridge Power Plan Elevation 77′ | 1/28/2011 | ||||
BE4.00 | Lighting Fixture Schedule | 1/28/2011 | ||||
BE9.10 | Porte Cochere – Bridge Lighting Plan Elevation 53′ | 1/28/2011 | ||||
BELD2.20 | Bridge Lighting Plan – Elevation 77′ | 1/28/2011 | ||||
BELD9.10 | Porte Cochere Lighting RCP – Elevation 53′ | 1/28/2011 | ||||
BFA2.10 | Porte Cochere – Bridge Plan Elevation 53′ Fire Alarm | 1/28/2011 | ||||
BFA2.20 | Porte Cochere – Bridge Plan Elevation 77′ Fire Alarm | 1/28/2011 | ||||
BLD0.01 | Symbols and legends | 1/28/2011 | ||||
BLD0.02 | Notes | 1/28/2011 | ||||
BLD4.01 | Lighting Fixture Schedule | 1/28/2011 | ||||
BLD7.01 | Overall Topology – Bridge | 1/28/2011 | ||||
BLD7.10 | Control Room Locations Level 1.5 | 1/28/2011 | ||||
BLD7.40 | Dimming One Line – Bridge | 1/28/2011 | ||||
BLD7.70 | Control Rack Details | 1/28/2011 | ||||
BLD7.71 | General Control Details | 1/28/2011 | ||||
BLD7.80 | Cable Specifications | 1/28/2011 | ||||
BLD9.10 | Porte Cochere Lighting RCP – Elevation 53′ | 1/28/2011 | ||||
BLV0.10 | Symbol List and General Notes | 1/28/2011 | ||||
BLV9.10 | Bridge Low Voltage Plan Elevation 53′ | 1/28/2011 | ||||
BLV9.20 | Porte Cochere Bridge Low Voltage Plan Elevation 77′ | 1/28/2011 | ||||
BM0.10 | Symbol List and General Notes | 1/28/2011 | ||||
BM0.20 | Mechanical Details | 1/28/2011 | ||||
BM2.10 | Porte Cochere-Bridge Mechanical Plan Elevation 53′ | 1/28/2011 | ||||
BM2.20 | Porte Cochere-Bridge Mechanical Plan Elevation 77′ | 1/28/2011 | ||||
BM3.10 | Porte Cochere-Bridge Piping Plan Elevation 53′ | 1/28/2011 | ||||
BM3.20 | Porte Cochere-Bridge Mechanical Plan Elevation 77′ | 1/28/2011 | ||||
BM4.00 | Mechanical Schedules | 1/28/2011 | ||||
BS0.01 | Cover Sheet | 1/28/2011 | ||||
BS0.11 | General Notes | 1/28/2011 | ||||
BS0.12 | General Notes | 1/28/2011 |
17 of 54
BS2.01 | Bridge Foundation Plan | 1/28/2011 | ||||
BS2.11 | Bridge Vestibule Framing Plan | 1/28/2011 | ||||
BS2.21 | Bridge Level 2 Framing Plan | 1/28/2011 | ||||
BS2.31 | Bridge Roof Framing Plan | 1/28/2011 | ||||
BS3.01 | Bridge Framing Elevations | 1/28/2011 | ||||
BS3.02 | Bridge Framing Elevation | 1/28/2011 | ||||
BS5.21 | Bridge Sections & Details | 1/28/2011 | ||||
BS5.51 | Steel Sections & Details | 1/28/2011 | ||||
BS5.52 | Steel Sections & Details | 1/28/2011 | ||||
BS5.53 | Steel Sections & Details | 1/28/2011 | ||||
BS5.54 | Steel Sections & Details | 1/28/2011 | ||||
BS5.55 | Steel Sections & Details | 1/28/2011 | ||||
BE4.10 | Panel Schedules | 1/28/2011 | ||||
BE4.20 | Dimmer Schedules | 1/28/2011 | ||||
BELD9.20 | Bridge Lighting Plan – Elevations 77' | 1/28/2011 | ||||
BLV4.00 | Low Voltage Schedules | 1/28/2011 | ||||
BFP0.01 | Porte – Cochere – Bridge Plan Elevation 77' General Notes | 1/28/2011 | ||||
BFP2.10 | Porte – Cochere – Bridge Plan Elevation 53' Fire Protection | 1/28/2011 | ||||
BFP2.20 | Porte – Cochere – Bridge Plan Elevation 77' Fire Protection | 1/28/2011 | ||||
BFP5.01 | Porte – Cochere – Bridge Plan Elevation 77' Details | 1/28/2011 | ||||
BID30.000 | Bridge and Promenade Vestibule Plans | 1/28/2011 | ||||
BID30.200 | Bridge and Promenade Vestibule Elevations | 1/28/2011 | ||||
BID30.900 | Bridge and Promenade Vestibule Finish Schedule | 1/28/2011 | ||||
BLD7.60 | Dimming Zone Schedule | 1/28/2011 | ||||
BLD9.20 | Bridge Lighting RCP – Elevation 77' | 1/28/2011 | ||||
BAV0.02 | Notes | 1/28/2011 | ||||
BAV0.05 | Bridge AV Zone Plan | 1/28/2011 | ||||
BAV7.10 | Control Room Locations Level 1.5 | 1/28/2011 | ||||
BAV7.30 | Audio Device Layouts | 1/28/2011 | ||||
BAV7.31 | Audio Device Layouts | 1/28/2011 | ||||
BAV7.35 | Bridge Video Device Layouts | 1/28/2011 | ||||
BAV7.40 | Bridge Audio Oneline | 1/28/2011 | ||||
BAV7.45 | Bridge Audio Oneline | 1/28/2011 | ||||
BAV7.50 | Rack Detail | 1/28/2011 | ||||
BAV7.60 | Bridge Video Schedules | 1/28/2011 | ||||
BAV7.71 | Audio Wiring Details | 1/28/2011 | ||||
BAV7.80 | Cable Specifications | 1/28/2011 | ||||
BE4.00 | Lighting Fixture Schedule | 12/21/2010 | ||||
BLV2.10 | Porte-Cochere – Bridge Low Voltage Plan Elevation 53' | 12/21/2010 | ||||
BLD2.20 | Bridge Lighting Plan Elevation 77' | 1/14/2011 | ||||
Volume 4: Support Facility | ||||||
A1.00 | Overall Architectural Site Plan | 12/19/2010 | ||||
CA0.01 | Central Plant Plans | 1/31/2011 | ||||
CP0.01 | Central Plant Waste and Vent Plan | 1/31/2011 | ||||
CP0.02 | Central Plant Domestic Water Plan | 1/31/2011 | ||||
CS2.00 | Central Plant Pile Capacity Plan | 1/31/2011 | ||||
CS2.01 | Central Plant Foundation Plan | 1/31/2011 |
18 of 54
CS2.11 | Central Plant Roof Framing Plan | 1/31/2011 | ||||
CS3.01 | Brace Elevations | 1/31/2011 | ||||
FA0.00 | Cover Sheet Support facility | 1/31/2011 | ||||
FA0.10 | Drawing Index | 1/31/2011 | ||||
FA0.11 | Support Facility Drawing Index | 1/31/2011 | ||||
FA0.20 | Information Support Facility | 12/21/2010 | ||||
FA0.21 | ADA Notes and Figures | 12/21/2010 | ||||
FA0.30 | Overall Architectural Key Plan | 1/31/2011 | ||||
FA1.00 | Support facility Overall Site Plan | 12/21/2010 | ||||
FA2.10 | Support Facility Floor Plan Level 1 | 12/21/2010 | ||||
FA2.11 | Support Facility Floor Plan Level 1 | 12/21/2010 | ||||
FA3.10 | Support Facility Elevations | 12/21/2010 | ||||
FA3.20 | Support Facility Elevations | 12/21/2010 | ||||
FA3.30 | Support Facility Sections | 12/21/2010 | ||||
FA3.40 | Support Facility Sections | 11/12/2010 | ||||
FA4.20 | Door Schedule | 12/21/2010 | ||||
FA6.00 | Support Facility Details | 1/31/2011 | ||||
FA7.00 | Stair and Ramp Details | 12/21/2010 | ||||
FA7.10 | Stair and Ramp Details | 12/21/2010 | ||||
FA8.10 | Support Facility Enlarged Plans and RCPs | 12/21/2010 | ||||
FA9.10 | Support Facility RCP Level 1 | 12/21/2010 | ||||
FA9.11 | Support Facility RCP Level 2 | 12/21/2010 | ||||
FAS2.10 | Support facility Slab Plan | 12/19/2010 | ||||
FAS2.10 | Support facility Slab Plan | 1/31/2011 | ||||
FAS2.11 | Support Facility Slab Plan | 1/31/2011 | ||||
FE0.10 | Symbol List and General Notes | 12/21/2010 | ||||
FE0.11 | Standard Details Grounding Methods | 12/21/2010 | ||||
FE2.10 | Support Facility Power & Signal Plan | 11/12/2010 | ||||
FE2.10 | Support Facility Power Plan | 12/21/2010 | ||||
FE2.11 | Support Facility Power Plan | 12/21/2010 | ||||
FE2.20 | Support Facility Power & Signal Plan | 11/12/2010 | ||||
FE2.20 | Support Facility Roof Power Plan | 12/21/2010 | ||||
FE2.21 | Support Facility Roof Power Plan | 12/21/2010 | ||||
FE3.00 | Single Line Diagram-Normal | 12/21/2010 | ||||
FE3.01 | Single Line Diagram-Normal | 12/21/2010 | ||||
FE3.02 | Single Line Diagram-Emergency | 12/21/2010 | ||||
FE3.03 | Single Line Diagram-Emergency | 12/21/2010 | ||||
FE4.00 | Notes, Feeder and Transformer Schedules | 12/21/2010 | ||||
FE4.01 | Lighting Fixture, Relay Panel Schedules and Compliance Certificate | 12/21/2010 | ||||
FE4.10 | Panel Schedules-Normal | 12/21/2010 | ||||
FE4.11 | Panel Schedules-Emergency | 12/21/2010 | ||||
FE4.20 | Distribution Equipment Schedules | 12/21/2010 | ||||
FE5.00 | Enlarged Transformer Yard Electrical Plan | 12/21/2010 | ||||
FE5.01 | Enlarged Electrical Plan | 12/21/2010 | ||||
FE5.02 | Enlarged Electrical Plan | 12/21/2010 | ||||
FE5.03 | Enlarged Electrical Plan | 12/21/2010 | ||||
FE9.10 | Support Facility Lighting Plan | 12/21/2010 | ||||
FE9.11 | Support Facility Lighting Plan | 12/21/2010 |
19 of 54
FE9.20 | Support Facility Lighting Plan | 11/12/2010 | ||||
FFA0.01 | Support Facility Fire Protection General Notes | 12/21/2010 | ||||
FFA2.10 | Support Facility Fire Alarm Plan | 12/21/2010 | ||||
FFA2.20 | Support Facility Fire Alarm Plan | 12/21/2010 | ||||
FFP0.00 | Support Facility Fire Protection General Notes | 12/21/2010 | ||||
FFP2.10 | Support Facility Fire Protection Plan | 12/21/2010 | ||||
FFP2.20 | Support Facility Fire Protection Plan | 12/21/2010 | ||||
FFP5.00 | Support Facility Fire Protection Details | 12/21/2010 | ||||
FFP5.01 | Support Facility Fire Protection Details | 12/21/2010 | ||||
FLS2.10 | Support Facility Life Safety Plan | 12/21/2010 | ||||
FLV0.10 | Symbol List and General Notes | 12/21/2010 | ||||
FLV2.10 | Support Facility Low Voltage Plan | 12/21/2010 | ||||
FLV2.11 | Support Facility Low Voltage Plan | 12/21/2010 | ||||
FLV5.01 | Enlarged Low Voltage Plan | 12/21/2010 | ||||
FLV9.10 | Support Facility Low Voltage Plan | 12/21/2010 | ||||
FLV9.11 | Support Facility Low Voltage Plan | 12/21/2010 | ||||
FM0.10 | General Notes, Abbreviations, and Symbol List | 12/21/2010 | ||||
FM0.20 | Mechanical Details | 12/21/2010 | ||||
FM0.21 | Mechanical Details | 12/21/2010 | ||||
FM0.22 | Mechanical Details | 12/21/2010 | ||||
FM2.10 | Support Facility Mechanical Plan | 12/21/2010 | ||||
FM2.11 | Support Facility Mechanical Plan | 12/21/2010 | ||||
FM2.20 | Support Facility Mechanical Plan | 11/12/2010 | ||||
FM2.20 | Support Facility Mechanical Roof Plan | 12/21/2010 | ||||
FM2.21 | Support Facility Mechanical Roof Plan | 12/21/2010 | ||||
FM3.10 | Support Facility Piping Plan | 12/21/2010 | ||||
FM3.11 | Support Facility Piping Plan | 12/21/2010 | ||||
FM3.20 | Support Facility Piping Plan | 11/12/2010 | ||||
FM4.00 | Mechanical Schedules | 12/21/2010 | ||||
FM4.01 | Mechanical Schedules | 12/21/2010 | ||||
FM4.02 | Mechanical Schedules | 12/21/2010 | ||||
FM5.00 | Enlarged mechanical Room Plan | 12/21/2010 | ||||
FM5.01 | Enlarged Mechanical Room Plan | 12/21/2010 | ||||
FM6.00 | Mechanical Control Diagrams | 12/21/2010 | ||||
FM6.01 | Mechanical Control Diagrams | 12/21/2010 | ||||
FM6.02 | Mechanical Control Diagrams | 12/21/2010 | ||||
FM6.03 | Mechanical Control Diagrams | 12/21/2010 | ||||
FP0.10 | General Notes, Abbreviations and Symbol List | 1/31/2011 | ||||
FP0.20 | Plumbing Details | 1/31/2011 | ||||
FP0.21 | Plumbing Details | 1/31/2011 | ||||
FP2.10 | Support Facility Waste and Vent Plan | 1/31/2011 | ||||
FP2.11 | Support Facility Waste & Vent Plan | 12/21/2010 | ||||
FP2.20 | Support Facility Waste & Vent Plan | 11/12/2010 | ||||
FP2.20 | Support Facility Waste and Vent Plan | 12/21/2010 | ||||
FP2.21 | Support Facility Waste and Vent Plan | 12/21/2010 | ||||
FP3.10 | Support Facility Domestic Water Plan | 12/21/2010 | ||||
FP3.11 | Support Facility Domestic Water Plan | 12/21/2010 | ||||
FP3.20 | Support Facility Domestic Water Plan | 11/12/2010 |
20 of 54
FP4.00 | Plumbing Details | 1/31/2011 | ||||
FP4.01 | Plumbing Schedules | 12/21/2010 | ||||
FP5.00 | Enlarged Plumbing Plans | 1/31/2011 | ||||
FP5.01 | Enlarged Plumbing Plans | 1/31/2011 | ||||
FP5.02 | Enlarged Plumbing Plans | 1/31/2011 | ||||
FP6.00 | Plumbing Control Diagrams | 12/21/2010 | ||||
FS0.01 | Cover Sheet | 1/31/2011 | ||||
FS0.11 | General Notes | 1/31/2011 | ||||
FS0.12 | General Notes | 1/31/2011 | ||||
FS2.00 | Support Facility Pile Capacity Plan | 1/31/2011 | ||||
FS2.01 | Support Facility Foundation Plan | 1/31/2011 | ||||
FS2.03 | Support Facility Foundation Plan | 1/31/2011 | ||||
FS2.04 | Support Facility Foundation Plan | 1/31/2011 | ||||
FS2.11 | Support Facility Level 1 Framing Plan | 1/31/2011 | ||||
FS2.12 | Support Facility Level 1 Framing Plan | 1/31/2011 | ||||
FS3.11 | Beam Elevations | 1/31/2011 | ||||
FS3.12 | Beam Elevations | 1/31/2011 | ||||
FS3.13 | Beam Elevations | 1/31/2011 | ||||
FS4.31 | Beam Sections | 1/31/2011 | ||||
FS5.01 | Foundation Sections and Details | 1/31/2011 | ||||
FS5.02 | Foundation Sections and Details | 1/31/2011 | ||||
FS5.11 | Concrete Sections and Details | 1/31/2011 | ||||
FS5.12 | Concrete Sections and Details | 1/31/2011 | ||||
FS5.51 | Steel Sections and Details | 1/31/2011 | ||||
FS5.52 | Stell Sections and Details | 1/31/2011 | ||||
S-FS A1 | Warehouse Food Service Floor Plan | 12/21/2010 | ||||
SPFSA3.0 | Warhouse Food Service Waste and Vent Plan | 1/31/2011 | ||||
SPFSA3.1 | Warehouse Food Service Domestic Water Plan | 1/31/2011 | ||||
Volume 5: Garage | ||||||
GA0.00 | Cover Sheet | 1/18/2011 | ||||
GA0.10 | Drawing Index | 2/7/2011 | ||||
GA0.11 | Drawing Index | 12/21/2010 | ||||
GA0.20 | Information Garage Package | 1/18/2011 | ||||
GA0.21 | ADA Notes and Figures | 1/18/2011 | ||||
GA0.30 | Overall Architectural Key Plan | 1/18/2011 | ||||
GA1.00 | Overall Architectural Site Plan | 11/23/2010 | ||||
GA2.10 | Parking Garage Floor Plan Level 1 | 2/7/2011 | ||||
GA2.20 | Parking Garage Floor Plan Level 2 | 2/7/2011 | ||||
GA2.30 | Parking Garage Floor Plan Level 3 | 2/7/2011 | ||||
GA2.40 | Parking Garage Floor Plan Level 4 & Roof | 12/21/2010 | ||||
GA3.10 | Parking Garage Elevations | 2/7/2011 | ||||
GA3.20 | Parking Garage Elevations | 2/7/2011 | ||||
GA3.30 | Parking Garage Elevations | 2/7/2011 | ||||
GA3.50 | Parking Garage Building Sections | 1/18/2011 | ||||
GA4.10 | Parking Garage Door Schedule and Details | 1/18/2011 | ||||
GA6.10 | Parking garage Wall Sections | 2/7/2011 | ||||
GA6.20 | Parking Garage Wall Sections | 1/18/2011 |
21 of 54
GA7.10 | Parking Garage Section Details | 2/7/2011 | ||||
GA8.10 | Parking Garage Enlarged Floor Plans | 2/7/2011 | ||||
GA8.20 | Parking Garage Enlarged Floor Plans | 12/21/2010 | ||||
GA8.30 | Parking Garage Enlarged Floor Plans | 1/18/2011 | ||||
GA9.10 | Parking Garage Reflected Ceiling Plan – Level 1 | 1/18/2011 | ||||
GA9.20 | Parking Garage Reflected Ceiling Plan – Level 2 | 1/18/2011 | ||||
GA9.30 | Parking Garage Reflected Ceiling Plan – Level 3 | 12/21/2010 | ||||
GA9.40 | Parking Garage Reflected Ceiling Plan – Level 4 | 12/21/2010 | ||||
GAS2.10 | Parking Garage Slab Plan | 12/21/2010 | ||||
GAV0.01 | Symbols and Legends | 12/21/2010 | ||||
GAV4.01 | AV Fixture Schedule | 12/21/2010 | ||||
GAV7.01 | Overall AV Topology – Garage | 12/21/2010 | ||||
GAV9.10 | Parking Garage Audiovisual RCP Levels 1-4 | 12/21/2010 | ||||
GC-1 | Pavement Layout | 1/18/2011 | ||||
GC-2 | Hotel – Garage Building Pad Grading Plan | 1/18/2011 | ||||
GC-3 | Hotel – Garage Building Pad Grading Plan | 1/18/2011 | ||||
GE0.10 | General Notes, Abbreviations, and Symbol List | 1/18/2011 | ||||
GE0.11 | Standard Grounding Methods | 1/18/2011 | ||||
GE2.10 | Parking Garage Power and Signal Plan Level 1 | 1/18/2011 | ||||
GE2.20 | Parking Garage Power and Signal Plan Level 2 | 1/18/2011 | ||||
GE2.30 | Parking Garage Power and Signal Plan Level 3 | 1/18/2011 | ||||
GE3.00 | Single Line Diagram – Normal | 1/18/2011 | ||||
GE3.01 | Single Line Diagram – Emergency | 1/18/2011 | ||||
GE4.00 | Feeder, Transformer, and Lighting Fixture Schedules | 1/18/2011 | ||||
GE4.01 | Lighting Fixture Schedule and Compliance Certificate | 1/18/2011 | ||||
GE4.10 | Panel Schedules – Normal | 1/18/2011 | ||||
GE4.11 | Panel Schedules – Emergency | 1/18/2011 | ||||
GE5.00 | Enlarged Electrical Plans | 1/18/2011 | ||||
GE5.01 | Enlarged Electrical Plans | 1/18/2011 | ||||
GE5.02 | Enlarged Electrical Plans | 1/18/2011 | ||||
GE5.03 | Enlarged Electrical Plans | 12/21/2010 | ||||
GE5.04 | Low Voltage Details | 12/21/2010 | ||||
GE5.05 | Low Voltage Details | 1/18/2011 | ||||
GE9.10 | Parking Garage Lighting Plan Level 1 | 1/18/2011 | ||||
GE9.20 | Parking Garage Lighting Plan Level 2 | 1/18/2011 | ||||
GE9.30 | Parking Garage Lighting Plan Level 3 | 1/18/2011 | ||||
GFA0.01 | Parking Garage Fire Alarm General Notes | 1/18/2011 | ||||
GFA0.10 | Parking Garage Fire Alarm Plan Level 1 | 1/18/2011 | ||||
GFA0.20 | Parking Garage Fire Alarm Plan Level 2 | 1/18/2011 | ||||
GFA0.30 | Parking Garage Fire Alarm Plan Level 3 | 1/18/2011 | ||||
GFP0.00 | Parking Garage Fire Proctection General Notes | 1/18/2011 | ||||
GFP0.10 | Parking Garage Fire Protection Plan Level 1 | 1/18/2011 | ||||
GFP0.20 | Parking Garage Fire Protection Plan Level 2 | 1/18/2011 | ||||
GFP0.30 | Parking Garage Fire Protection Plan Level 3 | 1/18/2011 | ||||
GFP0.40 | Parking Garage Fire Protection Plan Level 4 | 1/18/2011 | ||||
GFP5.00 | Parking Garage Fire Protection Details | 1/18/2011 | ||||
GLD0.01 | Symbols and Legends | 12/21/2010 | ||||
GLD0.02 | Notes | 12/21/2010 |
22 of 54
GLD4.01 | Lighting Fixture Schedule | 12/21/2010 | ||||
GLD9.10 | Parking Garage Lighting RCP Levels 1-4 | 12/21/2010 | ||||
GLS0.10 | Parking Garage Life Safety Plan Level 1 | 1/18/2011 | ||||
GLS0.20 | Parking Garage Life Safety Plan Level 2 | 1/18/2011 | ||||
GLS0.30 | Parking Garage Life Safety Plan Level 3 | 1/18/2011 | ||||
GLS0.40 | Parking Garage Life Safety Plan Level 4 | 1/18/2011 | ||||
GM0.10 | General Notes, Abbreviations, and Symbol List | 1/18/2011 | ||||
GM0.20 | Mechanical Details | 1/18/2011 | ||||
GM2.10 | Parking garage Mechanical Plan Level 1 | 1/18/2011 | ||||
GM2.20 | Parking garage Mechanical Plan Level 2 | 1/18/2011 | ||||
GM2.30 | Parking Garage Mechanical Plan Level 3 | 12/21/2010 | ||||
GM2.40 | Parking Garage Mechanical Plan Level 4 | 12/21/2010 | ||||
GM4.00 | Mechanical Schedules | 1/18/2011 | ||||
GP0.10 | General Notes, Abbreviations, and Symbol List | 1/18/2011 | ||||
GP0.20 | Plumbing Details | 1/18/2011 | ||||
GP2.10 | Parking Garage Plumbing Plan Level 1 | 1/18/2011 | ||||
GP2.20 | Parking Garage Plumbing Plan Level 2 | 1/18/2011 | ||||
GP2.30 | Parking Garage Plumbing Plan Level 3 | 1/18/2011 | ||||
GP2.40 | Parking Garage Plumbing Plan Level 4 | 12/21/2010 | ||||
GP4.00 | Plumbing Schedules | 1/18/2011 | ||||
GS0.01 | Cover Sheet | 1/18/2011 | ||||
GS0.11 | General Notes | 1/18/2011 | ||||
GS0.12 | General Notes | 1/18/2011 | ||||
GS2.00 | Garage Pile Capacity Plan | 1/18/2011 | ||||
GS2.01 | Garage Foundation Plan | 1/26/2011 | ||||
GS2.02 | Garage Service Level 1 Framing Plan | 2/7/2011 | ||||
GS2.03 | Garage Entry Level 2 Framing Plan | 1/18/2011 | ||||
GS2.04 | Garage Casino Level 3 Framing Plan | 1/18/2011 | ||||
GS2.11 | Drag and Chord Reinforcement | 1/18/2011 | ||||
GS3.11 | Beam Elevations | 12/21/2010 | ||||
GS3.11 | Beam Elevations | 1/18/2011 | ||||
GS3.12 | Beam Elevations | 1/18/2011 | ||||
GS3.13 | Beam Elevations | 1/18/2011 | ||||
GS4.01 | Column Schedule | 11/12/2010 | ||||
GS4.11 | Column Detailsv | 11/12/2010 | ||||
GS4.21 | Column Schedule Details | 11/12/2010 | ||||
GS4.31 | Beam Details | 1/18/2011 | ||||
GS5.01 | Foundation Sections and Details | 1/18/2011 | ||||
GS5.02 | Foundation Sections and Details | 1/18/2011 | ||||
GS5.11 | Concrete Sections and Details | 1/18/2011 | ||||
GS5.12 | Concrete Sections and Details | 1/18/2011 | ||||
GS5.13 | Concrete Sections and Details | 1/18/2011 | ||||
GS5.21 | Post-Tensioned Sections and Details | 1/18/2011 | ||||
GS5.31 | Precast Sections and Details | 1/18/2011 | ||||
GS5.32 | Precast Sections and Details | 1/18/2011 | ||||
GS5.41 | Masonry Sections & Details | 11/12/2010 | ||||
GS5.51 | Stair Sections & Details | 12/21/2010 | ||||
GS5.52 | Steel Sections & Details | 12/21/2010 |
23 of 54
GS5.53 | Steel Sections & Details | 12/21/2010 | ||||
GS5.54 | Steel Sections & Details | 12/21/2010 | ||||
GS5.54.1 | Steel Sections & Details | 12/21/2010 | ||||
GS6.01 | Enlarged Plans | 1/18/2011 | ||||
GS6.11 | Pile Cap Details | 1/18/2011 | ||||
GS6.12 | Pile Cap Details | 1/26/2011 | ||||
Volume 6: Lowrise | ||||||
LS5.57 | Steel Sections and Details | 1/11/2011 | ||||
AV7.01 | Overall Topology | 11/12/2010 | ||||
C-EFS A | Main Kitchen Power Plan | 1/11/2011 | ||||
C-EFS B | Main Kitchen Power Plan | 1/11/2011 | ||||
C-EFS C | Buffet Food Power Plan | 1/11/2011 | ||||
C-EFS D | Casino Service Bar Power Plans | 1/11/2011 | ||||
C-EFS E1.0 | Three Meal Power Plan | 1/11/2011 | ||||
C-EFS E1.1 | Three Meal Bar Power Plans | 1/11/2011 | ||||
C-EFS F | Steak House Power Plan | 1/11/2011 | ||||
C-EFS G | Feature Bar Power Plan | 1/11/2011 | ||||
C-FS A1 | Main Kitchen Food Service Floor Plan | 1/11/2011 | ||||
C-FS B1 | Main Kitchen Food Service Floor Plan | 1/11/2011 | ||||
C-FS C1 | Buffet Food Service Floor Plan | 1/13/2011 | ||||
C-FS D1 | Casino Level Service Bars Floor Plan | 1/13/2011 | ||||
C-FS D2 | Casino level Service Bars Schedule and Requirements | 1/11/2011 | ||||
C-FS D2.0 | Casino Level Service Bars Schedule and Requirements | 1/13/2011 | ||||
C-FS D2.1 | Casino Level Service Bars Schedule and Requirements | 1/13/2011 | ||||
C-FS E1.0 | Three Meal Food Service Floor Plan | 1/11/2011 | ||||
C-FS E1.1 | Three Meal Bars Food Service Floor Plan | 1/11/2011 | ||||
C-FS F1 | Steak House Food Service Floor Plan | 1/11/2011 | ||||
C-FS G1 | Feature Bar Food Service Floor Plan | 1/11/2011 | ||||
C-FS G2 | Feature Bar Food Service Schedule and Requirements | 1/11/2011 | ||||
C-FSOR1 | Casino Level Food Service Orientation Plan | 1/11/2011 | ||||
C-PFS A1A | Main Kitchen Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS A1B | Main Kitchen Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS B1A | Main Kitchen Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS B1B | Main Kitchen Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS C1A | Buffet Service Plumbing Plan | 1/11/2011 | ||||
C-PFS C1B | Buffet Service Plumbing Plan | 1/11/2011 | ||||
C-PFS D1A | Casino level Service Bars Plumbing Plan | 1/11/2011 | ||||
C-PFS D1B | Casino level Service Bars Plumbing Plan | 1/11/2011 | ||||
C-PFS E1.0A | Three Meal Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS E1.0B | Three Meal Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS E1.1A | Three Meal Bars Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS E1.1B | Three Meal Bars Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS F1A | Steak House Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS F1B | Steak House Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS G1A | Feature Bar Food Service Plumbing Plan | 1/11/2011 | ||||
C-PFS G1B | Feature Bar Food Service Plumbing Plan | 1/11/2011 | ||||
FLS2.10 | Support Facility Life Safety Plan | 11/12/2010 |
24 of 54
FLS2.20 | Support Facility Life Safety Plan | 11/12/2010 | ||||
ID0.001 | General Notes | 1/11/2011 | ||||
lD01.000 | Overall Plan Level 1 | 1/11/2011 | ||||
ID01.001 | Overall Plan Level 2 | 1/11/2011 | ||||
ID01.02 | Overall Plan Level 2 | 11/12/2010 | ||||
ID01.03 | Overall Plan Level 3 | 11/12/2010 | ||||
ID01.100 | Overall RCP Level 1 | 1/11/2011 | ||||
ID01.101 | Overall RCP Level 2 | 1/11/2011 | ||||
ID20.000 | Public Circulation Floor Finish and Key Elevation Plan Casino Level | 1/11/2011 | ||||
ID20.010 | Public Circulation Plans Second Level | 1/11/2011 | ||||
ID20.020 | Bridge Plans | 1/11/2011 | ||||
ID20.100 | Public Circulation Reflected Ceiling Plan | 1/11/2011 | ||||
ID20.200 | Public Circulation Elevations | 1/11/2011 | ||||
ID20.201 | Public Circulation Elevations | 1/11/2011 | ||||
ID20.202 | Bridge Elevations | 1/11/2011 | ||||
ID21.000 | 2-Meal Resturant Floor Finish and Key Elevations Plan | 1/11/2011 | ||||
ID21.001 | 2-Meal Resturant Furniture Plan | 1/11/2011 | ||||
ID21.100 | 2-Meal Resturant Reflected Ceiling Plan | 1/11/2011 | ||||
ID21.200 | 2-Meal Resturant Elevations | 1/11/2011 | ||||
ID21.201 | 2-Meal Resturant Elevations | 1/11/2011 | ||||
ID21.202 | 2-Meal Resturant Elevations | 1/11/2011 | ||||
ID22.000 | Steakhouse Floor Finish and Key Elevations Plan | 1/11/2011 | ||||
ID22.001 | Steakhouse Furniture Plan | 1/11/2011 | ||||
ID22.100 | Steakhouse Reflected Ceiling Plan | 1/11/2011 | ||||
ID22.200 | Steakhouse Elevations | 1/11/2011 | ||||
ID22.201 | Steakhouse Elevations | 1/11/2011 | ||||
ID22.202 | Steakhouse Elevations | 1/11/2011 | ||||
ID23.000 | Public Restroom Enlarged Plans | 1/11/2011 | ||||
ID23.001 | Public Restroom Enlarged Plans | 1/11/2011 | ||||
ID23.100 | Public Restroom Enlarged RCP | 1/11/2011 | ||||
ID23.101 | Public Restroom Enlarged RCP | 1/11/2011 | ||||
ID23.200 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.201 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.210 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.211 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.220 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.221 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.230 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.231 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.240 | Public Restroom Elevations | 1/11/2011 | ||||
ID23.241 | Public Restroom Elevations | 1/11/2011 | ||||
ID24.000 | Casino Reference Plan | 1/11/2011 | ||||
ID24.001 | Casino Enlarged Plan | 1/11/2011 | ||||
ID24.002 | Casino Enlarged Plan | 1/11/2011 | ||||
ID24.003 | Casino Enlarged Plan | 1/11/2011 | ||||
ID24.004 | Casino Enlarged Plan | 1/11/2011 | ||||
ID24.005 | Casino Cage Enlarged Plan and RCP | 1/11/2011 | ||||
ID24.006 | Casino Poker RM Enlarged Plan | 1/11/2011 |
25 of 54
ID24.007 | Casino High Limit Tables Enlarged Plan | 1/11/2011 | ||||
ID24.008 | Casino High Limit Gaming Enlarged Plan | 1/11/2011 | ||||
ID24.100 | Casino Reference RCP | 1/11/2011 | ||||
ID24.101 | Casino Enlarged RCP | 1/11/2011 | ||||
ID24.102 | Casino Enlarged RCP | 1/11/2011 | ||||
ID24.103 | Casino Enlarged RCP | 1/11/2011 | ||||
ID24.104 | Casino Enlarged RCP | 1/11/2011 | ||||
ID24.105 | Casino Cage Enlarged RCP | 1/11/2011 | ||||
ID24.106 | Casino Poker RM Enlarged RCP | 1/11/2011 | ||||
ID24.107 | Casino High Limit Tables Enlarged RCP | 1/11/2011 | ||||
ID24.108 | Casino High Limit Gaming Enlarged RCP | 1/11/2011 | ||||
ID24.200 | Casino Façade Elevations | 1/11/2011 | ||||
ID24.201 | Casino Façade Elevations | 1/11/2011 | ||||
ID24.202 | Casino Overall Perimeter Elevations | 1/11/2011 | ||||
ID24.203 | Casino Overall Perimeter Elevations | 1/11/2011 | ||||
ID24.204 | Casino Overall Perimeter Elevations | 1/11/2011 | ||||
ID24.210 | Casino Cashier Cage Credit Office Elevations | 1/11/2011 | ||||
ID24.211 | Casino Cashier Cage Credit Office Elevations | 1/11/2011 | ||||
ID24.220 | Casino Poker Elevations | 1/11/2011 | ||||
ID24.230 | Casino High Limit Tables Elevations | 1/11/2011 | ||||
ID24.231 | Casino High Limit Elevations | 1/11/2011 | ||||
ID24.232 | Casino High Limit Elevations | 1/11/2011 | ||||
ID24.233 | Casino High Limit Elevations | 1/11/2011 | ||||
ID24.300 | Casino Interior Details | 1/11/2011 | ||||
ID24.330 | High Limit Interior Details | 1/11/2011 | ||||
ID25.000 | Buffet Floor Finish and Key Elevation Plan | 1/11/2011 | ||||
ID25.001 | Buffet Furniture Plan | 1/11/2011 | ||||
ID25.100 | Buffet Reflected Ceiling Plan | 1/11/2011 | ||||
ID25.200 | Buffet Elevations | 1/11/2011 | ||||
ID25.201 | Buffet Elevations | 1/11/2011 | ||||
ID25.202 | Buffet Elevations | 1/11/2011 | ||||
ID25.203 | Buffet Elevations | 1/11/2011 | ||||
ID26.000 | Casino Feature Bar Enlarged Plan | 1/11/2011 | ||||
ID26.100 | Casino Feature Bar Enlarged RCP | 1/11/2011 | ||||
ID26.200 | Casino Feature Bar Elevations | 1/11/2011 | ||||
ID27.000 | Level 2 Pre-Function Multi-Purpose Plans | 1/11/2011 | ||||
ID27.100 | Level 2 Pre-Function Multi-Purpose RCP | 1/11/2011 | ||||
ID27.200 | Pre-Function Area Elevations | 1/11/2011 | ||||
ID27.201 | Pre-Function Area Elevations | 1/11/2011 | ||||
ID27.202 | Pre-Function Area Elevations | 1/11/2011 | ||||
ID27.203 | Multi-Purpose Room Elevations | 1/11/2011 | ||||
ID27.204 | Multi-Purpose Room Elevations | 1/11/2011 | ||||
ID27.205 | Multi-Purpose Room Elevations | 1/11/2011 | ||||
ID28.000 | Level 2 VIP Lounge Interior Plan | 1/11/2011 | ||||
ID28.001 | Level 2 VIP Lounge Terrace Plan | 1/11/2011 | ||||
ID28.100 | Level 2 VIP Lounge Interior RCP | 1/11/2011 | ||||
ID28.101 | Level 2 VIP Lounge Terrace RCP | 1/11/2011 | ||||
ID28.200 | VIP Lounge Elevations | 1/11/2011 |
26 of 54
ID28.201 | VIP Lounge Elevations | 1/11/2011 | ||||
ID29.000 | Level 2 EDR Plan | 1/11/2011 | ||||
ID29.100 | Level 2 EDR RCP | 1/11/2011 | ||||
ID29-900 | Back of House Finish Schedule | 1/11/2011 | ||||
ID29-901 | Back of House Finish Schedule | 1/11/2011 | ||||
LA0.00 | Cover Sheet | 2/8/2011 | ||||
LA0.10 | Drawing Index | 2/8/2011 | ||||
LA0.11 | Drawing Index | 1/28/2011 | ||||
LA0.11 | Drawing Index | 2/8/2011 | ||||
LA0.12 | Drawing Index | 2/8/2011 | ||||
LA0.13 | Drawing Index | 2/8/2011 | ||||
LA0.14 | Drawing Index | 1/28/2011 | ||||
LA0.15 | Drawing Index | 1/11/2011 | ||||
LA0.16 | Drawing Index | 1/11/2011 | ||||
LA0.20 | Information lowrise Package | 1/11/2011 | ||||
LA0.21 | ADA Notes and Figures | 1/11/2011 | ||||
LA0.30 | Overall Architectural Key Plan | 1/11/2011 | ||||
LA0.40 | Wall Types | 1/11/2011 | ||||
LA0.41 | Wall Types | 1/11/2011 | ||||
LA0.50 | Architectural/Barge Column Grid Control Plan | 1/11/2011 | ||||
LA2.00 | Level 42' Catwalk Plan | 1/11/2011 | ||||
LA2.10 | Level 53' Overall Floor Plan | 1/11/2011 | ||||
LA2.11 | Level 53' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.12 | Level 53' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.13 | Level 53' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.15 | Level 53' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.16 | Level 53' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.17 | Level 53' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.20 | Level 77' Overall Floor Plan | 1/11/2011 | ||||
LA2.21 | Level 77' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.22 | Level 77' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.23 | Level 77' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.24 | Level 77' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.25 | Level 77' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.26 | Level 77' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.27 | Level 77' Enlarged Floor Plan | 1/11/2011 | ||||
LA2.28 | Level 97'-6" Enlarged Floor Plan | 1/11/2011 | ||||
LA2.30 | Level 77' Enlarged Floor Plan | 1/28/2011 | ||||
LA3.00 | Building Elevations | 1/11/2011 | ||||
LA3.10 | Building Elevations | 1/11/2011 | ||||
LA3.11 | Building Elevations | 1/11/2011 | ||||
LA3.20 | Building Sections | 1/11/2011 | ||||
LA3.30 | Building Sections | 1/11/2011 | ||||
LA3.40 | Building Sections | 1/11/2011 | ||||
LA3.50 | Building Elevations | 11/12/2010 | ||||
LA4.10 | Room Finish Schedule | 1/11/2011 | ||||
LA4.11 | Room Finish Schedule | 1/11/2011 | ||||
LA4.20 | Door Schedule | 1/11/2011 |
27 of 54
LA4.21 | Door Schedule | 11/12/2010 | ||||
LA4.22 | Door Types | 1/11/2011 | ||||
LA4.30 | Opening Schedule | 1/11/2011 | ||||
LA4.31 | Opening Schedule | 1/11/2011 | ||||
LA4.32 | Opening Schedule | 1/11/2011 | ||||
LA4.40 | Head, Jamb, Sill Details | 1/11/2011 | ||||
LA4.50 | Special Openings | 1/11/2011 | ||||
LA5.00 | Wall Sections | 11/12/2010 | ||||
LA5.00 | Wall Sections | 1/11/2011 | ||||
LA5.10 | Wall Sections | 1/11/2011 | ||||
LA5.20 | Wall Sections | 1/11/2011 | ||||
LA5.30 | Wall Sections | 1/11/2011 | ||||
LA5.40 | Wall Sections | 1/11/2011 | ||||
LA5.50 | Wall Sections | 1/11/2011 | ||||
LA6.00 | Wall Details | 1/11/2011 | ||||
LA6.10 | Wall Details | 1/11/2011 | ||||
LA6.40 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.41 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.42 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.44 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.45 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.46 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.47 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.48 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA6.49 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LA7.00 | Enlarged Stair Plans | 1/11/2011 | ||||
LA7.01 | Enlarged Stair Plans | 1/11/2011 | ||||
LA7.10 | Low Rise Stair Sections | 1/11/2011 | ||||
LA7.11 | Low Rise Stair Sections | 1/11/2011 | ||||
LA7.12 | Low Rise Stair Sections | 1/11/2011 | ||||
LA7.20 | Low Rise Elevator Sections | 1/11/2011 | ||||
LA7.21 | Low Rise Elevator Sections | 1/11/2011 | ||||
LA8.00 | Level 53′ Enlarged Floor Plans | 1/11/2011 | ||||
LA8.10 | Level 77′ Enlarged Floor Plans | 1/11/2011 | ||||
LA8.20 | Level 53′ Restroom Interior Elevations | 1/11/2011 | ||||
LA8.30 | Level 53′ Restroom Interior Elevations | 1/11/2011 | ||||
LA8.40 | Level 53′ Restroom Interior Elevations | 1/11/2011 | ||||
LA8.50 | Level 53′ Restroom Interior Elevations | 1/11/2011 | ||||
LA8.60 | Level 77′ Restroom Interior Elevations | 1/11/2011 | ||||
LA8.70 | Level 77′ Restroom Interior Elevations | 1/11/2011 | ||||
LA9.10 | Level 53′ Overall RCP | 1/11/2011 | ||||
LA9.11 | Level 53′ Enlarged RCP | 1/11/2011 | ||||
LA9.12 | Level 53′ Enlarged RCP | 1/11/2011 | ||||
LA9.13 | Level 53′ Enlarged RCP | 1/11/2011 | ||||
LA9.14 | Level 53′ Enlarged RCP | 1/11/2011 | ||||
LA9.15 | Level 53′ Enlarged RCP | 1/11/2011 | ||||
LA9.16 | Level 53′ Enlarged RCP | 1/11/2011 | ||||
LA9.17 | Level 53′ Enlarged RCP | 1/11/2011 |
28 of 54
LA9.20 | Level 77′ Overall RCP | 1/11/2011 | ||||
LA9.21 | Level 77′ Enlarged RCP | 1/11/2011 | ||||
LA9.22 | Level 77′ Enlarged RCP | 1/11/2011 | ||||
LA9.23 | Level 77′ Enlarged RCP | 1/11/2011 | ||||
LA9.24 | Level 77′ Enlarged RCP | 1/11/2011 | ||||
LA9.25 | Level 77′ Enlarged RCP | 1/11/2011 | ||||
LA9.26 | Level 77′ Enlarged RCP | 1/11/2011 | ||||
LA9.27 | Level 77′ Enlarged RCP | 1/11/2011 | ||||
LA9.28 | Level 97-6″ Enlarged Floor Plan | 1/11/2011 | ||||
LAS2.00 | Level 42′ Catwalk Slab Plan | 1/28/2011 | ||||
LAS2.10 | Level 53′ Overall Slab Plan | 1/28/2011 | ||||
LAS2.11 | Level 53′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.12 | Level 53′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.13 | Level 53′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.14 | Level 53′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.15 | Level 53′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.16 | Level 53′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.17 | Level 53′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.20 | Level 77′ Overall Slab Plan | 1/28/2011 | ||||
LAS2.20 | Level 77′ Overall Slab Plan | 11/12/2010 | ||||
LAS2.21 | Level 77′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.22 | Level 77′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.23 | Level 77′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.24 | Level 77′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.25 | Level 77′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.26 | Level 77′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.27 | Level 77′ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.27 | Level 77′ Enlarged Slab Plan | 11/12/2010 | ||||
LAS2.28 | Level 97′-6″ Enlarged Slab Plan | 1/28/2011 | ||||
LAS2.30 | Overall Roof Edge Plan | 1/28/2011 | ||||
LAS2.31 | Enlarged Roof Edge Plan | 1/28/2011 | ||||
LAS2.32 | Enlarged Roof Edge Plan | 1/28/2011 | ||||
LAS2.33 | Enlarged Roof Edge Plan | 1/28/2011 | ||||
LAS2.34 | Enlarged Roof Edge Plan | 1/28/2011 | ||||
LAS2.35 | Enlarged Roof Edge Plan | 1/28/2011 | ||||
LAS2.36 | Enlarged Roof Edge Plan | 1/28/2011 | ||||
LAS2.37 | Enlarged Roof Edge Plan | 1/28/2011 | ||||
LAV0.01 | Symbols and Legends | 1/11/2011 | ||||
LAV0.02 | Notes | 1/11/2011 | ||||
LAV0.05 | Level 53′ AV Zone Plan | 1/11/2011 | ||||
LAV0.06 | Level 77′ AV Zone Plan | 1/11/2011 | ||||
LAV2.10 | Level 53′ Overall AV Floor Plan | 1/11/2011 | ||||
LAV2.11 | Level 53′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV2.13 | Level 53′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV2.14 | Level 53′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV2.15 | Level 53′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV2.16 | Level 53′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV2.17 | Level 53′ Enlarged AV Floor Plan | 1/11/2011 |
29 of 54
LAV2.20 | Level 77′ Overall AV Floor Plan | 1/11/2011 | ||||
LAV2.21 | Level 77′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV2.24 | Level 77′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV2.26 | Level 77′ Enlarged AV Floor Plan | 1/11/2011 | ||||
LAV4.01 | AV Fixture Schedule | 1/11/2011 | ||||
LAV7.01 | Overall AV Topology – Lowrise | 1/11/2011 | ||||
LAV7.10 | Level 53′ AV Control Locations Plan | 1/11/2011 | ||||
LAV7.11 | Level 77′ AV Control Locations Plan | 1/11/2011 | ||||
LAV9.10 | Level 53′ Overall AV Plan | 1/11/2011 | ||||
LAV9.11 | Level 53′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.13 | Level 53′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.14 | Level 53′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.15 | Level 53′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.16 | Level 53′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.17 | Level 53′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.20 | Level 77′ Overall AV Plan | 1/11/2011 | ||||
LAV9.21 | Level 77′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.24 | Level 77′ Enlarged AV RCP | 1/11/2011 | ||||
LAV9.26 | Level 77′ Enlarged AV RCP | 1/11/2011 | ||||
LD7.01 | Overall Topology | 11/12/2010 | ||||
LE0.10 | Symbol List | 1/11/2011 | ||||
LE2.00 | Level 42′ Overall Electrical Plan | 1/11/2011 | ||||
LE2.01 | Level 42′ Power Plan | 1/11/2011 | ||||
LE2.02 | Level 42′ Power Plan | 1/11/2011 | ||||
LE2.03 | Level 42′ Power Plan | 1/11/2011 | ||||
LE2.04 | Level 42′ Power Plan | 1/11/2011 | ||||
LE2.05 | Level 42′ Power Plan | 1/11/2011 | ||||
LE2.06 | Level 42′ Power Plan | 1/11/2011 | ||||
LE2.07 | Level 42′ Power Plan | 1/11/2011 | ||||
LE2.10 | Level 53′ Overall Electrical Plan | 1/11/2011 | ||||
LE2.10 | Level 53′ Overall Electrical Plan | 11/12/2010 | ||||
LE2.10A | Level 53′ Overall Floor Duct Plan | 1/11/2011 | ||||
LE2.11 | Level 53′ Power Plan | 1/11/2011 | ||||
LE2.12 | Level 53′ Power Plan | 1/11/2011 | ||||
LE2.13 | Level 53′ Power Plan | 1/11/2011 | ||||
LE2.14 | Level 53′ Power Plan | 1/11/2011 | ||||
LE2.15 | Level 53′ Power Plan | 1/11/2011 | ||||
LE2.16 | Level 53′ Power Plan | 1/11/2011 | ||||
LE2.17 | Level 53′ Power Plan | 1/11/2011 | ||||
LE2.20 | Level 77′ Overall Electrical Plan | 1/11/2011 | ||||
LE2.21 | Level 77′ Power Plan | 1/11/2011 | ||||
LE2.22 | Level 77′ Power Plan | 1/11/2011 | ||||
LE2.23 | Level 77′ Power Plan | 1/11/2011 | ||||
LE2.24 | Level 77′ Power Plan | 1/11/2011 | ||||
LE2.25 | Level 77′ Power Plan | 1/11/2011 | ||||
LE2.26 | Level 77′ Power Plan | 1/11/2011 | ||||
LE2.27 | Level 77′ Power Plan | 1/11/2011 | ||||
LE2.30 | Roof Level Overall Electrical Plan | 1/11/2011 |
30 of 54
LE2.31 | Roof Level Power Plan | 1/11/2011 | ||||
LE2.32 | Roof Level Power Plan | 1/11/2011 | ||||
LE2.33 | Roof Level Power Plan | 1/11/2011 | ||||
LE2.34 | Roof Level Power Plan | 1/11/2011 | ||||
LE2.35 | Roof Level Power Plan | 1/11/2011 | ||||
LE2.36 | Roof Level Power Plan | 1/11/2011 | ||||
LE2.37 | Roof Level Power Plan | 1/11/2011 | ||||
LE3.00 | Single Line Diagram – Normal | 1/11/2011 | ||||
LE3.01 | Single Line Diagram – Normal | 1/11/2011 | ||||
LE3.02 | Single Line Diagram – Emergency | 1/11/2011 | ||||
LE3.03 | Single Line Diagram – Emergency | 1/11/2011 | ||||
LE4.00 | Notes, Feeder and Transformer Schedules | 1/11/2011 | ||||
LE4.01 | Lighting Fixture and Compliance Certificate | 1/11/2011 | ||||
LE4.10 | Panel Schedules – Normal | 1/11/2011 | ||||
LE4.11 | Panel Schedules – Normal | 1/11/2011 | ||||
LE4.12 | Panel Schedules – Emergency | 1/11/2011 | ||||
LE4.13 | Panel Schedules – Emergency | 1/11/2011 | ||||
LE4.14 | Panel Schedules – Emergency | 1/11/2011 | ||||
LE4.20 | Distribution Equipment Schedules – Normal | 1/11/2011 | ||||
LE4.21 | Distribution Equipment Schedules – Emergency | 1/11/2011 | ||||
LE5.00 | Enlarged Electrical Plans | 1/11/2011 | ||||
LE5.01 | Enlarged Electrical Plan | 1/11/2011 | ||||
LE9.01 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.02 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.03 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.04 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.05 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.06 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.07 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.11 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LE9.12 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LE9.12 | Level 53′ Lighting Plan | 11/12/2010 | ||||
LE9.13 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LE9.14 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LE9.15 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LE9.16 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LE9.17 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LE9.21 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LE9.22 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LE9.23 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LE9.24 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LE9.25 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LE9.25 | Level 77′ Lighting Plan | 11/12/2010 | ||||
LE9.26 | Level 42′ Lighting Plan | 1/11/2011 | ||||
LE9.26 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LE9.26 | Level 77′ Lighting Plan | 11/12/2010 | ||||
LE9.27 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LELD2.11 | Level 53′ Low Level Lighting Plan | 1/11/2011 |
31 of 54
LELD2.13 | Level 53′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.14 | Level 53′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.15 | Level 53′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.16 | Level 53′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.17 | Level 53′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.21 | Level 77′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.23 | Level 77′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.24 | Level 77′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.25 | Level 77′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.26 | Level 77′ Low Level Lighting Plan | 1/11/2011 | ||||
LELD2.31 | Roof Lighting Plan | 1/11/2011 | ||||
LELD3.00 | Building Lighting Elevations | 1/11/2011 | ||||
LELD3.10 | Building Lighting Elevations | 1/11/2011 | ||||
LELD9.11 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LELD9.13 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LELD9.14 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LELD9.15 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LELD9.16 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LELD9.17 | Level 53′ Lighting Plan | 1/11/2011 | ||||
LELD9.21 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LELD9.23 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LELD9.24 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LELD9.26 | Level 77′ Lighting Plan | 1/11/2011 | ||||
LFA0.00 | Catwalk Fire Alarm Plan | 11/12/2010 | ||||
LFA0.01 | Lowrise Fire Alarm General Notes | 1/11/2011 | ||||
LFA0.10 | Level 53′ Fire Alarm Plan | 11/12/2010 | ||||
LFA0.20 | Level 77′ Fire Alarm Plan | 11/12/2010 | ||||
LFA2.01 | Level 42′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.02 | Level 42′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.03 | Level 42′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.04 | Level 42′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.05 | Level 42′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.06 | Level 42′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.07 | Level 42′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.11 | Level 53′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.12 | Level 53′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.13 | Level 53′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.14 | Level 53′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.15 | Level 53′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.16 | Level 53′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.17 | Level 53′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.21 | Level 77′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.22 | Level 77′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.23 | Level 77′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.24 | Level 77′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.25 | Level 77′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.26 | Level 77′ Enlarged Floor Plan Fire Alarm | 1/11/2011 | ||||
LFA2.27 | Level 77′ Enlarged Floor Plan Fire Alarm | 1/11/2011 |
32 of 54
LFP0.00 | Fire Protection General Notes | 1/11/2011 | ||||
LFP0.05 | Catwalk Fire Protection Plan | 11/12/2010 | ||||
LFP0.10 | Level 53′ Fire Protection Plan | 11/12/2010 | ||||
LFP0.20 | Level 77′ Fire Protection Plan | 11/12/2010 | ||||
LFP2.01 | Level 42′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.02 | Level 42′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.03 | Level 42′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.04 | Level 42′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.05 | Level 42′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.06 | Level 42′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.07 | Level 42′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.11 | Level 53′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.12 | Level 53′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.13 | Level 53′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.14 | Level 53′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.15 | Level 53′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.16 | Level 53′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.17 | Level 53′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.21 | Level 77′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.22 | Level 77′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.23 | Level 77′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.24 | Level 77′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.25 | Level 77′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.26 | Level 77′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP2.27 | Level 77′ Enlarged Floor Plan Fire Protection | 1/11/2011 | ||||
LFP5.00 | Fire Protection Details | 11/12/2010 | ||||
LFP5.01 | Fire Protection Details | 1/11/2011 | ||||
LLD0.01 | Symbols and Legends | 1/11/2011 | ||||
LLD0.02 | Notes | 1/11/2011 | ||||
LLD0.05 | Level 53′ Dimming Zone Plan | 1/11/2011 | ||||
LLD0.06 | Level 77′ Dimming Zone Plan | 1/11/2011 | ||||
LLD2.10 | Level 53′ Overall Lighting Floor Plan | 1/11/2011 | ||||
LLD2.11 | Level 53′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.13 | Level 53′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.14 | Level 53′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.15 | Level 53′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.16 | Level 53′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.17 | Level 53′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.20 | Level 77′ Overall Lighting Floor Plan | 1/11/2011 | ||||
LLD2.21 | Level 77′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.23 | Level 77′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.24 | Level 77′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.26 | Level 77′ Enlarged Lighting Floor Plan | 1/11/2011 | ||||
LLD2.31 | Enlarged Roof lighting Plan | 1/11/2011 | ||||
LLD3.00 | Building lighting Elevations | 1/11/2011 | ||||
LLD3.10 | Building lighting Elevations | 1/11/2011 | ||||
LLD4.01 | Lighting Fixture Schedule | 1/11/2011 | ||||
LLD4.11 | Dimming Fixture Schedule | 1/11/2011 |
33 of 54
LLD7.01 | Overall Topology | 1/11/2011 | ||||
LLD7.10 | Level 53′ Lighting Control Locations Plan | 1/11/2011 | ||||
LLD7.11 | Level 77′ Lighting Control Locations Plan | 1/11/2011 | ||||
LLD7.40 | Dimming Oneline – Hotel Tower | 1/11/2011 | ||||
LLD7.70 | Control rack Details | 1/11/2011 | ||||
LLD7.71 | General Control Details | 1/11/2011 | ||||
LLD7.80 | Cable Specifications | 1/11/2011 | ||||
LLD9.10 | Level 53′ Overall Lighting RCP | 1/11/2011 | ||||
LLD9.11 | Level 53′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.13 | Level 53′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.14 | Level 53′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.15 | Level 53′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.16 | Level 53′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.17 | Level 53′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.20 | Level 77′ Overall Lighting RCP | 1/11/2011 | ||||
LLD9.21 | Level 77′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.23 | Level 77′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.24 | Level 77′ Enarged Lighting RCP | 1/11/2011 | ||||
LLD9.26 | Level 77′ Enarged Lighting RCP | 1/11/2011 | ||||
LLS0.00 | Catwalk Life Safety Plan | 1/11/2011 | ||||
LLS0.10 | Level 53′ Life Safety Plan | 1/11/2011 | ||||
LLS0.20 | Level 77′ Life Safety Plan | 1/11/2011 | ||||
LLV0.10 | Symbols List and General Notes | 1/11/2011 | ||||
LLV2.10 | Level 53′ Overall Low Voltage Plan | 1/11/2011 | ||||
LLV2.10A | Level 53′ Overall Low Voltage Floor Duct Plan | 1/11/2011 | ||||
LLV2.11 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.12 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.13 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.14 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.15 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.16 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.17 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.20 | Level 77′ Overall Low Voltage Plan | 1/11/2011 | ||||
LLV2.21 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.22 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.23 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.24 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.25 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.26 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV2.27 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV5.00 | Enlarged Low Voltage Plans | 1/11/2011 | ||||
LLV5.01 | Enlarged Low Voltage Plans | 1/11/2011 | ||||
LLV5.02 | Low Voltage Details | 1/11/2011 | ||||
LLV9.11 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.12 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.13 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.14 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.15 | Level 53′ Low Voltage Plan | 1/11/2011 |
34 of 54
LLV9.16 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.17 | Level 53′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.21 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.22 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.23 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.24 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.25 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.26 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LLV9.27 | Level 77′ Low Voltage Plan | 1/11/2011 | ||||
LM0.10 | General Notes, Abbreviations, and Symbol List | 1/11/2011 | ||||
LM0.20 | Mechanical Details | 1/11/2011 | ||||
LM0.21 | Mechanical Details | 1/11/2011 | ||||
LM0.22 | Mechanical Details | 1/11/2011 | ||||
LM2.10 | Level 53′ Overall Mechanical Plan | 1/11/2011 | ||||
LM2.11 | Level 53′ Mechanical Plan | 1/11/2011 | ||||
LM2.12 | Level 53′ Mechanical Plan | 1/11/2011 | ||||
LM2.13 | Level 53′ Mechanical Plan | 1/11/2011 | ||||
LM2.14 | Level 53′ Mechanical Plan | 1/11/2011 | ||||
LM2.15 | Level 53′ Mechanical Plan | 1/11/2011 | ||||
LM2.16 | Level 53′ Mechanical Plan | 1/11/2011 | ||||
LM2.17 | Level 53′ Mechanical Plan | 1/11/2011 | ||||
LM2.20 | Level 77′ Overall Mechanical Plan | 1/11/2011 | ||||
LM2.21 | Level 77′ Mechanical Plan | 11/12/2010 | ||||
LM2.22 | Level 77′ Mechanical Plan | 11/12/2010 | ||||
LM2.23 | Level 77′ Mechanical Plan | 11/12/2010 | ||||
LM2.24 | Level 77′ Mechanical Plan | 1/11/2011 | ||||
LM2.25 | Level 77′ Mechanical Plan | 1/11/2011 | ||||
LM2.26 | Level 77′ Mechanical Plan | 1/11/2011 | ||||
LM2.27 | Level 77′ Mechanical Plan | 1/11/2011 | ||||
LM2.30 | Roof Level Overall Mechanical Plan | 1/11/2011 | ||||
LM2.31 | Roof Level Mechanical Plan | 1/11/2011 | ||||
LM2.32 | Roof Level Mechanical Plan | 1/11/2011 | ||||
LM2.33 | Roof Level Mechanical Plan | 1/11/2011 | ||||
LM2.34 | Roof Level Mechanical Plan | 1/11/2011 | ||||
LM2.35 | Roof Level Mechanical Plan | 1/11/2011 | ||||
LM2.36 | Roof Level Mechanical Plan | 1/11/2011 | ||||
LM2.37 | Roof Level Mechanical Plan | 1/11/2011 | ||||
LM3.01 | Level 42′ Piping Plan | 1/11/2011 | ||||
LM3.03 | Level 42′ Piping Plan | 1/11/2011 | ||||
LM3.05 | Level 42′ Piping Plan | 1/11/2011 | ||||
LM3.06 | Level 42′ Piping Plan | 1/11/2011 | ||||
LM3.11 | Level 53′ Piping Plan | 1/11/2011 | ||||
LM3.12 | Level 53′ Piping Plan | 1/11/2011 | ||||
LM3.13 | Level 53′ Piping Plan | 1/11/2011 | ||||
LM3.14 | Level 53′ Piping Plan | 1/11/2011 | ||||
LM3.15 | Level 53′ Piping Plan | 1/11/2011 | ||||
LM3.16 | Level 53′ Piping Plan | 1/11/2011 | ||||
LM3.17 | Level 53′ Piping Plan | 1/11/2011 |
35 of 54
LM3.21 | Level 77′ Piping Plan | 1/11/2011 | ||||
LM3.22 | Level 77′ Piping Plan | 11/12/2010 | ||||
LM3.23 | Level 77′ Piping Plan | 11/12/2010 | ||||
LM3.24 | Level 77′ Piping Plan | 1/11/2011 | ||||
LM3.25 | Level 77′ Piping Plan | 1/11/2011 | ||||
LM3.26 | Level 77′ Piping Plan | 1/11/2011 | ||||
LM3.27 | Level 77′ Piping Plan | 1/11/2011 | ||||
LM4.00 | Mechanical Schedules | 1/11/2011 | ||||
LM4.01 | Mechanical Schedules | 1/11/2011 | ||||
LM4.02 | Mechanical Schedules | 1/11/2011 | ||||
LM4.03 | Mechanical Schedules | 1/11/2011 | ||||
LM4.04 | Mechanical Schedules | 1/11/2011 | ||||
LM6.00 | Mechanical Control Diagrams | 1/11/2011 | ||||
LM6.01 | Mechanical Control Diagrams | 1/11/2011 | ||||
LM6.02 | Mechanical Control Diagrams | 1/11/2011 | ||||
LP0.10 | General Notes, Abbreviations, and Symbol List | 1/11/2011 | ||||
LP0.20 | Plumbing Details | 1/11/2011 | ||||
LP0.21 | Plumbing Details | 1/11/2011 | ||||
LP2.00 | Level 42′ Overall Plumbing Plan | 1/11/2011 | ||||
LP2.02 | Level 42′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.03 | Level 42′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.04 | Level 42′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.05 | Level 42′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.06 | Level 42′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.07 | Level 42′ Waste & Vent Plan | 11/12/2010 | ||||
LP2.10 | Level 53′ Overall Plumbing Plan | 1/11/2011 | ||||
LP2.11 | Level 53′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.12 | Level 53′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.13 | Level 53′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.14 | Level 53′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.15 | Level 53′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.16 | Level 53′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.17 | Level 53′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.20 | Level 77′ Overall Plumbing Plan | 1/11/2011 | ||||
LP2.21 | Level 77′ Waste & Vent Plan | 11/12/2010 | ||||
LP2.22 | Level 77′ Waste & Vent Plan | 11/12/2010 | ||||
LP2.23 | Level 77′ Waste & Vent Plan | 11/12/2010 | ||||
LP2.24 | Level 77′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.25 | Level 77′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.26 | Level 77′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.27 | Level 77′ Waste and Vent Plan | 1/11/2011 | ||||
LP2.30 | Roof Level Overall Plumbing Plan | 1/11/2011 | ||||
LP2.31 | Roof Level Plumbing Plan | 1/11/2011 | ||||
LP2.32 | Roof Level Plumbing Plan | 1/11/2011 | ||||
LP2.33 | Roof Level Plumbing Plan | 1/11/2011 | ||||
LP2.34 | Roof Level Plumbing Plan | 1/11/2011 | ||||
LP2.35 | Roof Level Plumbing Plan | 1/11/2011 | ||||
LP2.36 | Roof Level Plumbing Plan | 1/11/2011 |
36 of 54
LP2.37 | Roof Level Plumbing Plan | 1/11/2011 | ||||
LP2.37 | Roof Level Plumbing Plan | 11/12/2010 | ||||
LP3.01 | Level 42′ Domestic Water Plan | 1/11/2011 | ||||
LP3.02 | Level 42′ Domestic Water Plan | 1/11/2011 | ||||
LP3.03 | Level 42′ Domestic Water Plan | 1/11/2011 | ||||
LP3.04 | Level 42′ Domestic Water Plan | 1/11/2011 | ||||
LP3.05 | Level 42′ Domestic Water Plan | 11/12/2010 | ||||
LP3.06 | Level 42′ Domestic Water Plan | 1/11/2011 | ||||
LP3.07 | Level 42′ Domestic Water Plan | 11/12/2010 | ||||
LP3.11 | Level 53′ Domestic Water Plan | 1/11/2011 | ||||
LP3.12 | Level 53′ Domestic Water Plan | 1/11/2011 | ||||
LP3.13 | Level 53′ Domestic Water Plan | 1/11/2011 | ||||
LP3.14 | Level 53′ Domestic Water Plan | 1/11/2011 | ||||
LP3.15 | Level 53′ Domestic Water Plan | 1/11/2011 | ||||
LP3.16 | Level 53′ Domestic Water Plan | 1/11/2011 | ||||
LP3.17 | Level 53′ Domestic Water Plan | 1/11/2011 | ||||
LP3.21 | Level 77′ Domestic Water Plan | 11/12/2010 | ||||
LP3.22 | Level 77′ Domestic Water Plan | 11/12/2010 | ||||
LP3.23 | Level 77′ Domestic Water Plan | 11/12/2010 | ||||
LP3.24 | Level 77′ Domestic Water Plan | 1/11/2011 | ||||
LP3.25 | Level 77′ Domestic Water Plan | 1/11/2011 | ||||
LP3.26 | Level 77′ Domestic Water Plan | 1/11/2011 | ||||
LP3.27 | Level 77′ Domestic Water Plan | 1/11/2011 | ||||
LP4.00 | Plumbing Schedules | 1/11/2011 | ||||
LP4.01 | Plumbing Schedules | 1/11/2011 | ||||
LP5.00 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.01 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.02 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.03 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.04 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.05 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.06 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.07 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP5.08 | Enlarged Plumbing Plans | 1/11/2011 | ||||
LP6.00 | Plumbing Control Diagrams | 11/12/2010 | ||||
LS0.01 | Cover Sheet | 1/28/2011 | ||||
LS0.11 | General Notes | 1/11/2011 | ||||
LS0.12 | General Notes | 1/11/2011 | ||||
LS1.11 | Net Wind Load Uplift Plan | 1/28/2011 | ||||
LS1.12 | Gross Wind Load Downward Pressure Plan | 1/28/2011 | ||||
LS2.00 | Pile Key Plan | 1/11/2011 | ||||
LS2.01 | Foundation Plan | 1/11/2011 | ||||
LS2.01.5 | Catwalk Framing Plan | 11/12/2010 | ||||
LS2.01.5 | Catwalk Framing Plan | 1/28/2011 | ||||
LS2.02 | Foundation Plan | 1/11/2011 | ||||
LS2.02.5 | Catwalk Framing Plan | 1/28/2011 | ||||
LS2.03 | Foundation Plan | 1/11/2011 | ||||
LS2.03.5 | Catwalk Framing Plan | 1/28/2011 |
37 of 54
LS2.03.5 | Catwalk Framing Plan | 11/12/2010 | ||||
LS2.04 | Foundation Plan | 1/11/2011 | ||||
LS2.05 | Foundation Plan | 1/11/2011 | ||||
LS2.06 | Foundation Plan | 1/11/2011 | ||||
LS2.07 | Foundation Plan | 1/11/2011 | ||||
LS2.11 | Level 1 Framing Plan | 1/28/2011 | ||||
LS2.12 | Level 1 Framing Plan | 1/28/2011 | ||||
LS2.13 | Level 1 Framing Plan | 1/28/2011 | ||||
LS2.14 | Level 1 Framing Plan | 1/28/2011 | ||||
LS2.15 | Level 1 Framing Plan | 1/28/2011 | ||||
LS2.16 | Level 1 Framing Plan | 1/28/2011 | ||||
LS2.17 | Level 1 Framing Plan | 1/28/2011 | ||||
LS2.20 | Platform and Room Framing Plans | 1/28/2011 | ||||
LS2.20.1 | 1/28/2011 | |||||
LS2.21 | Level 2 Framing Plan | 1/28/2011 | ||||
LS2.22 | Level 2 Framing Plan | 1/28/2011 | ||||
LS2.23 | Level 2 Framing Plan | 1/28/2011 | ||||
LS2.24 | Level 2 Framing Plan | 1/28/2011 | ||||
LS2.25 | Level 2 Framing Plan | 1/28/2011 | ||||
LS2.26 | Level 2 Framing Plan | 1/28/2011 | ||||
LS2.27 | Level 2 Framing Plan | 1/28/2011 | ||||
LS2.31 | Roof Framing Plan | 1/28/2011 | ||||
LS2.33 | Roof Framing Plan | 1/28/2011 | ||||
LS2.34 | Roof Framing Plan | 1/28/2011 | ||||
LS2.35 | Roof Framing Plan | 1/28/2011 | ||||
LS2.36 | Roof Framing Plan | 1/28/2011 | ||||
LS2.37 | Roof Framing Plan | 1/28/2011 | ||||
LS2.41 | High Roof Framing Plan | 1/28/2011 | ||||
LS2.44 | High Roof Framing Plan | 1/28/2011 | ||||
LS2.46 | High Roof Framing Plan | 1/28/2011 | ||||
LS3.01 | Brace Elevations | 1/28/2011 | ||||
LS3.02 | Brace Elevations | 1/28/2011 | ||||
LS3.03 | Brace Elevations | 1/28/2011 | ||||
LS3.04 | Brace Elevations | 1/28/2011 | ||||
LS3.05 | Brace Elevations | 1/28/2011 | ||||
LS3.06 | Brace Elevations | 1/28/2011 | ||||
LS3.07 | Brace Elevations | 1/28/2011 | ||||
LS3.08 | Brace Elevations | 1/28/2011 | ||||
LS3.09 | Brace Elevations | 1/28/2011 | ||||
LS3.51 | Truss Profiles | 1/28/2011 | ||||
LS4.21 | Door Schedule | 1/11/2011 | ||||
LS5.11 | Sections and Details | 1/28/2011 | ||||
LS5.21 | Bridge Sections and Details | 1/28/2011 | ||||
LS5.51 | Steel Sections and Details | 1/28/2011 | ||||
LS5.52 | Steel Sections and Details | 1/28/2011 | ||||
LS5.53 | Steel Sections and Details | 1/28/2011 | ||||
LS5.54 | Steel Sections and Details | 1/28/2011 | ||||
LS5.54.1 | Steel Sections and Details | 1/28/2011 |
38 of 54
LS5.54.1 | Steel Sections & Details | 11/12/2010 | ||||
LS5.55 | Steel Sections and Details | 1/11/2011 | ||||
LS5.56 | Steel Sections and Details | 1/28/2011 | ||||
LS5.57 | Steel Sections and Details | 1/28/2011 | ||||
LS5.58 | Steel Sections and Details | 1/28/2011 | ||||
LS5.59 | Steel Sections and Details | 1/28/2011 | ||||
LS5.60 | Steel Sections and Details | 1/28/2011 | ||||
LS5.61 | Steel Sections and Details | 2/8/2011 | ||||
LS6.43 | Enlarged Floor Plan Details | 1/11/2011 | ||||
LS7.11 | Pile Cap Details | 1/11/2011 | ||||
LS7.12 | Pile Cap Details | 1/11/2011 | ||||
LS7.13 | Pile Cap Details | 1/11/2011 | ||||
LS7.14 | Pile Cap Details | 1/11/2011 | ||||
M-EFS A1 | Liquor and Soda Dispenser Power Plan | 1/11/2011 | ||||
M-EFS B1 | EDR and Multipurpose Kitchen Power Plan | 1/11/2011 | ||||
M-EFS C1 | VIP Lounge Power Plan | 1/11/2011 | ||||
M-FS A1 | Liquor and Soda Disp. Bar Set-Up Floor Plan | 1/11/2011 | ||||
M-FS A2 | Liquor and Soda Disp. Bar Set-Up Schedule and Requirements | 1/11/2011 | ||||
M-FS B1 | EDR and Multi-Purpose Floor Plan | 1/11/2011 | ||||
M-FS B2.0 | EDR and Multi-Purpose Kitchen Schedule and Requirements | 1/11/2011 | ||||
M-FS B2.1 | EDR and Multi-Purpose Kitchen Schedule and Requirements | 1/11/2011 | ||||
M-FS B7.0 | EDR & Multi-Purpose Kitchen Exhaust Hood Plan | 1/13/2011 | ||||
M-FS B7.1 | EDR & Multi-Purpose Kitchen Exhaust Hood Plan | 1/13/2011 | ||||
M-FS B7.2 | EDR & Multi-Purpose Kitchen Exhaust Hood Plan | 1/13/2011 | ||||
M-FS B7.3 | EDR & Multi-Purpose Kitchen Exhaust Hood Plan | 1/13/2011 | ||||
M-FS B7.4 | EDR & Multi-Purpose Kitchen Exhaust Hood Plan | 1/13/2011 | ||||
M-FS B7.5 | EDR & Multi-Purpose Kitchen Exhaust Hood Plan | 1/13/2011 | ||||
M-FS B8.0 | EDR and Multi-Purpose Kitchen Elevations and Details | 1/11/2011 | ||||
M-FS B8.1 | EDR and Multi-Purpose Kitchen Elevations and Details | 1/11/2011 | ||||
M-FS B8.2 | EDR and Multi-Purpose Kitchen Elevations and Details | 1/11/2011 | ||||
M-FS C1 | V.I.P. Lounge Floor Plan | 1/11/2011 | ||||
M-FS C2 | V.I.P. Lounge Schedule and Requirements | 1/11/2011 | ||||
M-FS OR2 | Multi-Purpose Level Food Service Orientation Plan | 1/11/2011 | ||||
M-PFS A1A | Liquor and Soda Disp. Bar Set-Up Plumbing Plan | 1/11/2011 | ||||
M-PFS A1B | Liquor and Soda Disp. Bar Set-Up Plumbing Plan | 1/11/2011 | ||||
M-PFS B1A | EDR and Multipurpose Kitchen Plumbing Plan | 1/11/2011 | ||||
M-PFS B1B | EDR and Multipurpose Kitchen Plumbing Plan | 1/11/2011 | ||||
M-PFS C1A | V.I.P. Lounge Plumbing Plan | 1/11/2011 | ||||
M-PFS C1B | V.I.P. Lounge Plumbing Plan | 1/11/2011 | ||||
M-PFS D1A | Service Bars Plumbing Plan | 1/11/2011 | ||||
M-PFS D1B | Service Bars Plumbing Plan | 1/11/2011 | ||||
TLS0.10 | Hotel Tower Life Safety Plan Level 0 (Service) | 11/12/2010 | ||||
TLS0.20 | Hotel Tower Life Safety Plan Level 1 (Casino) | 11/12/2010 | ||||
TLS0.30 | Hotel Tower Life Safety Plan Level 1.5 | 11/12/2010 | ||||
TLS0.40 | Hotel Tower Life Safety Plan Level 2 | 11/12/2010 | ||||
TLS0.50 | Hotel Tower Life Safety Plan Level 3 | 11/12/2010 | ||||
TLS0.60 | Hotel Tower Life Safety Plan Level 4-11 | 11/12/2010 | ||||
TLS0.70 | Hotel Tower Life Safety Plan Level 11.5 | 11/12/2010 |
39 of 54
TLS0.80 | Hotel Tower Life Safety Plan Level 12 | 11/12/2010 | ||||
TS7.14 | Pile Cap Details | 11/12/2010 | ||||
Naval | ||||||
A0.20 | Drawing Index | 11/12/2010 | ||||
A0.50 | Wall Types | 11/12/2010 | ||||
A4.52 | Bathroom Section & Ceiling Section | 11/12/2010 | ||||
NA-A45 | Cover Sheet | 11/12/2010 | ||||
NA-E11 | Electrical One Line Diagram | 1/11/2011 | ||||
NA-E28 | Raised Grating Lighting Plan | 1/11/2011 | ||||
NA-F30 | Temporary Mooring Plan | 1/11/2011 | ||||
NA-F31 | Infill Structure Procedure | 1/11/2011 | ||||
NA-H11.0 | Ventilation System Diagram for Vessel Support Room | 1/11/2011 | ||||
NA-H11.1 | Ventilation System Diagram for Vessel Support Room | 1/11/2011 | ||||
NA-M11.0 | Vessel Support Room Machinery Arrangement Plan | 1/11/2011 | ||||
NA-M11.1 | Vessel Support Room Machinery Arrangement Plan | 1/11/2011 | ||||
NA-M57.0 | Paddlewheel Drive System Details | 1/11/2011 | ||||
NA-M57.1 | Paddlewheel Drive System Details | 1/11/2011 | ||||
NA-P10.0 | Bilge, Ballast, and Fireman Piping Diagram | 1/11/2011 | ||||
NA-P10.1 | Bilge, Ballast, and Fireman Piping Diagram | 1/11/2011 | ||||
NA-P75.0 | Generator Exhaust Piping Arrangement | 1/11/2011 | ||||
NA-P75.1 | Generator Exhaust Piping Arrangement | 1/11/2011 | ||||
NA-S42 | Celldeck Arrangement & Details | 11/12/2010 | ||||
NA-S42.0 | Celldeck Arrangement & Details | 1/11/2011 | ||||
NA-S42.1 | Celldeck Arrangement & Details | 1/11/2011 | ||||
NA-S51.0 | Miscellaneous Tank Foundations | 1/11/2011 | ||||
NA-S51.1 | Miscellaneous Tank Foundations | 1/11/2011 | ||||
NA-S52.0 | Vessel Support Room Foundations | 1/11/2011 | ||||
NA-S52.1 | Vessel Support Room Foundations | 1/11/2011 | ||||
NA-S65.0 | Elevator Pits and Details | 1/11/2011 | ||||
NA-S65.1 | Elevator Pits and Details | 1/11/2011 | ||||
NA-S84 | Mooring Padeye Installation and Details | 1/11/2011 | ||||
General Information | ||||||
0.1 | Drawing Index-Volume 1-General Info | 11/12/2010 | ||||
0.11 | Drawing Index-Volume 2- Site | 11/12/2010 | ||||
0.12 | Drawing Index-Volume 3- Bridge | 11/12/2010 | ||||
0.13 | Drawing Index-Volume 4- Support Facility | 11/12/2010 | ||||
0.14 | Drawing Index-Volume 5- Garage | 11/12/2010 | ||||
0.15 | Drawing Index-Volume 6- Lowrise | 11/12/2010 | ||||
0.16 | Drawing Index-Volume 6- Lowrise | 11/12/2010 | ||||
0.17 | Drawing Index-Volume 7- Tower | 11/12/2010 | ||||
0.18 | Drawing Index-Volume 7- Tower | 11/12/2010 | ||||
0.2 | Information | 11/12/2010 | ||||
0.3 | Overall Architectural Key Plan | 11/12/2010 | ||||
A0.10 | ADA | 11/12/2010 | ||||
A0.20 | Wall Types | 11/12/2010 | ||||
A0.21 | Wall Types | 11/12/2010 |
40 of 54
E0.10 | Symbol List | 11/12/2010 | ||||
E0.11 | Standard Details Grounding Methods | 11/12/2010 | ||||
FLS2.10 | Support Facility Life Safety Plan | 11/12/2010 | ||||
FLS2.20 | Support Facility Life Safety Plan | 11/12/2010 | ||||
GLS0.10 | Parking Garage Life Safety Plan Level 1 | 11/12/2010 | ||||
GLS0.20 | Parking Garage Life Safety Plan Level 2 | 11/12/2010 | ||||
GLS0.30 | Parking Garage Life Safety Plan Level 3 | 11/12/2010 | ||||
GLS0.40 | Parking Garage Life Safety Plan Level 4 | 11/12/2010 | ||||
ID0.01 | General Notes | 11/12/2010 | ||||
LD0.01 | Legends and Notes | 11/12/2010 | ||||
LD0.02 | Notes | 11/12/2010 | ||||
LLS0.00 | Catwalk Life Safety Plan | 11/12/2010 | ||||
LLS0.10 | Level 53′ Life Safety Plan | 11/12/2010 | ||||
LLS0.20 | Level 77′ Life Safety Plan | 11/12/2010 | ||||
M0.10 | General Notes, Abbreviations, and Symbol List | 11/12/2010 | ||||
M0.20 | Mechanical Details | 11/12/2010 | ||||
M0.21 | Mechanical Details | 11/12/2010 | ||||
M0.22 | Mechanical Details | 11/12/2010 | ||||
M0.23 | Mechanical Details | 11/12/2010 | ||||
P0.10 | General Notes, Abbreviations, and Symbol List | 11/12/2010 | ||||
P0.20 | Plumbing Details | 11/12/2010 | ||||
P0.21 | Plumbing Details | 11/12/2010 | ||||
TLS0.10 | Hotel Tower Life Safety Plan Level 0 (Service) | 11/12/2010 | ||||
TLS0.20 | Hotel Tower Life Safety Plan Level 1 (Casino) | 11/12/2010 | ||||
TLS0.30 | Hotel Tower Life Safety Plan Level 1.5 | 11/12/2010 | ||||
TLS0.40 | Hotel Tower Life Safety Plan Level 2 | 11/12/2010 | ||||
TLS0.50 | Hotel Tower Life Safety Plan Level 3 | 11/12/2010 | ||||
TLS0.60 | Hotel Tower Life Safety Plan Level 4-11 | 11/12/2010 | ||||
TLS0.70 | Hotel Tower Life Safety Plan Level 11.5 | 11/12/2010 | ||||
TLS0.80 | Hotel Tower Life Safety Plan Level 12 | 11/12/2010 | ||||
Specifications | ||||||
01 90 00 | Design Criteria for Cladding | 1/28/2011 | ||||
03 49 00 | Glass-Fiber Reinforced Concrete (GFRC) | 1/28/2011 | ||||
05 40 00 | Cold Formed Steel Stud Framing | 1/28/2011 | ||||
07 11 13 | Damproofing | 1/28/2011 | ||||
07 24 19 | Drainable Exterior Insulation and Finish Systems (EIFS) | 1/28/2011 | ||||
07 42 00 | Metal Wall Panels | 1/28/2011 | ||||
07 43 00 | Aluminum Composite Material (ACM) Panel System | 1/28/2011 | ||||
07 61 00 | Sheet Metal Roofing | 1/28/2011 | ||||
07 92 10 | Exterior Joint Sealants | 1/28/2011 | ||||
08 80 10 | Exterior Glazing | 1/28/2011 | ||||
08 91 00 | Louvers | 1/28/2011 | ||||
10 71 13 | Exterior Sun Control Devices | 1/28/2011 | ||||
00 00 02 | Architectural Certification | 1/18/2011 | ||||
00 00 03 | Civil Certification | 1/18/2011 | ||||
00 00 04 | Structural/Civil Certification | 1/18/2011 | ||||
00 00 05 | Mechanical Certification | 1/18/2011 |
41 of 54
00 00 06 | Electrical Certification | 1/18/2011 | ||||
00 00 07 | Landscape Certification | 1/18/2011 | ||||
00 63 13 | Request for Intepretaion Form | 1/18/2011 | ||||
00 63 25 | Substitution Request (After award of the Contract) | 1/18/2011 | ||||
01 09 00 | Design Criteria for Cladding | 1/18/2011 | ||||
01 11 00 | Summary of Work | 1/18/2011 | ||||
01 26 00 | Contract Modification Procedures | 1/18/2011 | ||||
01 26 13 | Contractors Request for Information/Interpretation | 1/18/2011 | ||||
01 31 10 | Project Management and Coordination | 1/18/2011 | ||||
01 32 33 | Photographis Documentation | 1/18/2011 | ||||
01 32 50 | Electronic Media Release | 1/18/2011 | ||||
01 33 00 | Sumbmittal Procedures | 1/18/2011 | ||||
01 42 00 | References | 1/18/2011 | ||||
01 45 00 | Quality Control | 1/18/2011 | ||||
01 50 00 | Construction Facilities and Temporary Controls | 1/18/2011 | ||||
01 60 00 | Product Requirements | 1/18/2011 | ||||
01 73 00 | Execution Requirements | 1/18/2011 | ||||
01 73 29 | Cutting and Patching | 1/18/2011 | ||||
01 77 00 | Contract Closeout | 1/18/2011 | ||||
03 05 05 | Fly Ash | 1/18/2011 | ||||
03 10 00 | Concrete Formwork | 1/18/2011 | ||||
03 20 00 | Concrete Reinforcement | 1/18/2011 | ||||
03 30 00 | Cast-In-Place Concrete | 1/18/2011 | ||||
03 38 00 | Post Tensioned Concrete | 1/18/2011 | ||||
03 41 00 | Structural prescast Concrete - Plant Cast | 1/18/2011 | ||||
04 01 20.52 | Unit Masonry Cleaning | 1/18/2011 | ||||
04 05 15 | Mortar and Masonry Grout | 1/18/2011 | ||||
04 05 26 | CMU Integral Water Repellent | 1/18/2011 | ||||
04 22 00 | Concrete Masonry Units | 1/18/2011 | ||||
05 10 00 | Structural Steel Framing | 1/18/2011 | ||||
05 21 19 | Open-Web Steel Joists | 1/18/2011 | ||||
05 31 00 | Steel Deck | 1/18/2011 | ||||
05 36 00 | Steel Composite Deck | 1/18/2011 | ||||
05 40 00 | Cold Formed Steel Stud Framing | 1/18/2011 | ||||
05 41 00 | Structural Metal Stud Framing | 1/18/2011 | ||||
05 50 00 | Metal Fabrications | 1/18/2011 | ||||
05 51 00 | Metal Stairs | 1/18/2011 | ||||
05 52 00 | Metal Railings | 1/18/2011 | ||||
06 10 53 | Miscellaneous Carpentry | 1/18/2011 | ||||
07 11 30 | Damproofing | 1/18/2011 | ||||
07 14 13 | Hot Fluid Applied Rubberized Asphalt Waterproofing | 1/18/2011 | ||||
07 19 00 | Water Repellents | 1/18/2011 | ||||
07 21 00 | Building Insulation | 1/18/2011 | ||||
07 22 80 | Roof and Deck Insulation | 1/18/2011 | ||||
07 24 10 | Exterior Insulation and Finish System | 1/18/2011 | ||||
07 54 23 | Thermoplastic Roof System | 1/18/2011 | ||||
07 61 00 | Sheet Metal Roofing | 1/18/2011 | ||||
07 62 00 | Flashing and Sheet Metal | 1/18/2011 |
42 of 54
07 72 00 | Roof Accessories | 1/18/2011 | ||||
07 81 00 | Spray-Applied Fire Resistive Materials | 1/18/2011 | ||||
07 84 00 | Fire Stopping | 1/18/2011 | ||||
07 92 00 | Joint Sealers | 1/18/2011 | ||||
07 92 19 | Acoustical Sealants | 1/18/2011 | ||||
08 11 13 | Steel Doors and Frames | 1/18/2011 | ||||
08 31 13 | Access Doors and Frames | 1/18/2011 | ||||
08 33 00 | Coiling Doors and Grilles | 1/18/2011 | ||||
08 71 00 | Door Hardware | 1/18/2011 | ||||
08 81 00 | Exterior Glazing | 1/18/2011 | ||||
08 83 00 | Mirrors | 1/18/2011 | ||||
08 91 00 | Louvers | 1/18/2011 | ||||
08 92 00 | Louvered Roof Top Equipment Screens | 1/18/2011 | ||||
09 21 16.23 | Gypsum Board Shaft Wall Assemblies | 1/18/2011 | ||||
09 22 16 | Non-Structural Metal Framing | 1/18/2011 | ||||
09 29 00 | Gypsum Board | 1/18/2011 | ||||
09 29 13 | Exterior Gypsum Sheathing | 1/18/2011 | ||||
09 30 00 | Tile | 1/18/2011 | ||||
09 30 33 | Natural Stone Tile | 1/18/2011 | ||||
09 61 13 | Slip Resistant Floor Treatment | 1/18/2011 | ||||
09 65 19 | Resiliant Tile Flooring | 1/18/2011 | ||||
09 67 23 | Resinous Flooring | 1/18/2011 | ||||
09 68 00 | Carpet | 1/18/2011 | ||||
09 68 13 | Carpet Tile | 1/18/2011 | ||||
09 69 00 | Access Flooring | 1/18/2011 | ||||
09 72 00 | Wall Coverings | 1/18/2011 | ||||
09 77 33 | FRP Wall Panels | 1/18/2011 | ||||
09 81 00 | Acoustical Insulation | 1/18/2011 | ||||
09 91 00 | Painting | 1/18/2011 | ||||
09 91 10 | Coating for Steel Piles | 1/18/2011 | ||||
10 21 13 | Metal Toilet Compartments | 1/18/2011 | ||||
10 21 14 | Plastic Laminate Toilet Compartments | 1/18/2011 | ||||
10 51 00 | Lockers | 1/18/2011 | ||||
11 24 23 | Window Washing Systems | 1/18/2011 | ||||
11 40 00 | Food Service | 1/18/2011 | ||||
13 15 00 | Water Feature Construction | 1/18/2011 | ||||
13 34 19 | Metal Building Systems | 1/18/2011 | ||||
14 20 00 | Vertical Transportation – Elevators | 1/18/2011 | ||||
14 31 00 | Escalators | 1/18/2011 | ||||
21 05 13 | Mortor Requirements for Fire Suppression Equipment | 1/18/2011 | ||||
21 12 00 | Fire-Suppression Standpipes | 1/18/2011 | ||||
21 13 13 | Wet-Pipe Sprinkler Systems | 1/18/2011 | ||||
21 13 16 | Dry-Pipe Sprinkler Systems | 1/18/2011 | ||||
21 22 00 | Clean-Agent Fire-Extinguishing Systems | 1/18/2011 | ||||
21 31 16 | Diesel-Drive, Centrifigal Pumps | 1/18/2011 | ||||
21 34 00 | Pressure Maintenance Pumps | 1/18/2011 | ||||
21 39 00 | Controllers for Fire Pump Drivers | 1/18/2011 | ||||
22 05 13 | Common Motor Requirements for Plumbing Equipment | 1/18/2011 |
43 of 54
22 05 16 | Expansion Fittings and Loops for Plumbing Piping | 1/18/2011 | ||||
22 05 17 | Sleeves and Sleeve Seals for Plumbing Piping | 1/18/2011 | ||||
22 05 18 | Excutcheons for Plumbing Piping | 1/18/2011 | ||||
22 05 19 | Meters and Gages for Plumbing Piping | 1/18/2011 | ||||
22 05 23 | General-Duty Valves for Plumbing piping | 1/18/2011 | ||||
22 05 29 | Hangers and Supports for Plumbing Piping and Equipment | 1/18/2011 | ||||
22 05 33 | Heat Tracing for Plumbing Piping | 1/18/2011 | ||||
22 05 53 | Identification for Plumbing Piping and Equipment | 1/18/2011 | ||||
22 07 16 | Plumbing Equipment Insulation | 1/18/2011 | ||||
22 07 19 | Plumbing Piping Insulation | 1/18/2011 | ||||
22 11 16 | Domestic Water Piping | 1/18/2011 | ||||
22 11 19 | Domestic Water Piping Specialties | 1/18/2011 | ||||
22 11 23 | Domestic Water Pumps | 1/18/2011 | ||||
22 11 23.13 | Domestic-Water Packaged Booster Pumps | 1/18/2011 | ||||
22 12 23 | Facility Indoor Potable Water Storage Tanks | 1/18/2011 | ||||
22 13 16 | Sanitary Waste and vent Piping | 1/18/2011 | ||||
22 13 19 | Sanitary Waste Piping Specialties | 1/18/2011 | ||||
22 13 23 | Sanitary Waste Interceptors | 1/18/2011 | ||||
22 13 29 | Sanitay Sewage Pumps | 1/18/2011 | ||||
22 13 53 | Facility Septic Tanks | 1/18/2011 | ||||
22 14 13 | Facility Storm Drainage Piping | 1/18/2011 | ||||
22 14 23 | Storm Drainage Piping Specialties | 1/18/2011 | ||||
22 14 29 | Sump Pumps | 1/18/2011 | ||||
22 31 00 | Domestic Water Softeners | 1/18/2011 | ||||
22 35 00 | Domestic-Water Heat Exchangers | 1/18/2011 | ||||
22 40 00 | Plumbing Fixtures | 1/18/2011 | ||||
23 05 13 | Common Motor Requirements For HVAC Equipment | 1/18/2011 | ||||
23 05 16 | Expansion Fittings and Loops for HVAC Piping | 1/18/2011 | ||||
23 05 19 | Meters and Gages for HVAC Piping | 1/18/2011 | ||||
23 05 23 | General-Duty Valves for HVAC Piping | 1/18/2011 | ||||
23 05 29 | Hangers and Supports for HVAC Piping and Equipment | 1/18/2011 | ||||
23 05 53 | Identification for HVAC Piping and Equipment | 1/18/2011 | ||||
23 05 93 | Testing, Adjusting, and Balancing for HVAC | 1/18/2011 | ||||
23 07 13 | Duct Insulation | 1/18/2011 | ||||
23 07 16 | HVAC Equipment Insulation | 1/18/2011 | ||||
23 07 19 | HVAC Piping Insulation | 1/18/2011 | ||||
23 09 00 | Instrumentation and Control for HVAC | 1/18/2011 | ||||
23 11 23 | Facility Natural-Gas Piping | 1/18/2011 | ||||
23 21 13 | Hydronic Piping | 1/18/2011 | ||||
23 21 13.13 | Underground Hydronic Piping | 1/18/2011 | ||||
23 21 23 | Hydronic Pumps | 1/18/2011 | ||||
23 23 00 | Refrigerant Piping | 1/18/2011 | ||||
23 25 00 | HVAC Water Treatment | 1/18/2011 | ||||
23 31 13 | Metal Ducts | 1/18/2011 | ||||
23 33 00 | Air Duct Accessories | 1/18/2011 | ||||
23 34 23 | HVAC Power Ventilators | 1/18/2011 | ||||
23 36 00 | Air Terminal Units | 1/18/2011 | ||||
23 37 13 | Diffusers, Registers, and Grilles | 1/18/2011 |
44 of 54
23 41 00 | Particulate Air Filtration | 1/18/2011 | ||||
23 52 33 | Water-Tube Boilers | 1/18/2011 | ||||
23 64 16 | Centrifugal Water Chillers | 1/18/2011 | ||||
23 65 00 | Cooling Towers | 1/18/2011 | ||||
23 72 00 | Air-To-Air Energy Recovery Equipment | 1/18/2011 | ||||
23 73 13 | Modular Indoor Central-Station Air Handling Units | 1/18/2011 | ||||
23 74 13 | Custom Air Handling Units | 1/18/2011 | ||||
23 81 23 | Computer-Room Air-Conditioners | 1/18/2011 | ||||
23 81 26 | Split-System Air-Conditioners | 1/18/2011 | ||||
23 82 19 | Fan Coil Units | 1/18/2011 | ||||
23 82 39 | Unit Heaters | 1/18/2011 | ||||
26 05 00 | Common Work Results for Electrical | 1/18/2011 | ||||
26 05 19 | Low-Voltage Electrical Power Conductors and Cables | 1/18/2011 | ||||
26 05 26 | Grounding and Bonding for Electrical Systems | 1/18/2011 | ||||
26 05 29 | Hangers and Supports for Electrical Systems | 1/18/2011 | ||||
26 05 33 | Raceway and Boxes for Electrical Systems | 1/18/2011 | ||||
26 05 36 | Cable Trays for Electrical Systems | 1/18/2011 | ||||
26 05 39 | Under Floor Raceways for Electrical Systems | 1/18/2011 | ||||
26 05 43 | Underground Ducts and Raceways for Electrical Systems | 1/18/2011 | ||||
26 05 53 | Identification for Electrical Systems | 1/18/2011 | ||||
26 05 73 | Overcurrent Protective Device Coordination Study | 1/18/2011 | ||||
26 09 23 | Lighting Control Devices | 1/18/2011 | ||||
26 09 33 | Central Dimming Controls | 1/18/2011 | ||||
26 09 43 | Network Lighting Controls | 1/18/2011 | ||||
26 22 00 | Low-Voltage Transformers | 1/18/2011 | ||||
26 24 13 | Switchboards | 1/18/2011 | ||||
26 24 16 | Panelboards | 1/18/2011 | ||||
26 27 26 | Wiring Devices | 1/18/2011 | ||||
26 28 13 | Fuses | 1/18/2011 | ||||
26 28 16 | Enclosed Switches and Circuit Breakers | 1/18/2011 | ||||
26 29 13 | Enclosed Controllers | 1/18/2011 | ||||
26 29 23 | Variable-Frequency Motor Controllers | 1/18/2011 | ||||
26 32 13 | Engine Generators | 1/18/2011 | ||||
26 33 53 | Static Uninterruptible Power Supply | 1/18/2011 | ||||
26 36 00 | Transfer Switches | 1/18/2011 | ||||
26 41 13 | Lightning Protection for Structures | 1/18/2011 | ||||
26 43 13 | Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits | 1/18/2011 | ||||
26 51 00 | Interior Lighting | 1/18/2011 | ||||
26 56 00 | Exterior Lighting | 1/18/2011 | ||||
27 05 28 | Pathways for Communication Systems | 1/18/2011 | ||||
27 05 36 | Cable Trays for Communication Systems | 1/18/2011 | ||||
27 05 44 | Sleeves and Sleeve Seals for Communication Pathways and Cabling | 1/18/2011 | ||||
27 11 00 | Communications Equipment Room Fittings | 1/18/2011 | ||||
27 13 00 | Communications Backbone Cabling | 1/18/2011 | ||||
27 15 00 | Communications Horizontal Cabling | 1/18/2011 | ||||
27 41 33 | Master Antenna Television System - Hotel | 1/18/2011 | ||||
28 05 13 | Conductors and Cables for Electronic Safety and Security | 1/18/2011 | ||||
28 05 28 | Pathways for Electronic Safety and Security | 1/18/2011 |
45 of 54
28 05 44 | Sleeve and Sleeve Seals for Electronic Safety and Security Pathways and Ca | 1/18/2011 | ||||
28 13 00 | Access Control | 1/18/2011 | ||||
28 16 00 | Intrusion Detection | 1/18/2011 | ||||
28 23 00 | Video Surveillance | 1/18/2011 | ||||
28 31 11 | Digital, Addressable Fire Alarm System | 1/18/2011 | ||||
31 10 00 | Site Clearing | 1/18/2011 | ||||
31 10 05 | Stormwater Pollution Prevention | 1/18/2011 | ||||
31 20 00 | Earthwork – Dry Side | 1/18/2011 | ||||
31 62 23-13 | Concrete Filled Steel Pipe Piles | 1/18/2011 | ||||
31 63 16 | Augered Cast-In-Place Piles | 1/18/2011 | ||||
32 12 16 | Hot-Mix Asphalt Paving | 1/18/2011 | ||||
32 84 00 | Planting Irrigation | 1/18/2011 | ||||
32 92 00 | Lawns & Grasses | 1/18/2011 | ||||
32 93 00 | Turf Grasses Plants | 1/18/2011 | ||||
33 44 16 | Trench Drains | 1/18/2011 | ||||
31 10 00 | Site Clearing | 1/14/2011 | ||||
31 10 05 | Stormwater Pollution Prevention | 1/14/2011 | ||||
31 20 00 | Earthwork – Dry Side | 1/14/2011 | ||||
32 12 16 | Hot-Mix Asphalt Paving | 1/14/2011 | ||||
32 92 00 | Lawns & Grasses | 1/14/2011 | ||||
00 00 02 | Architectural Certification | 12/21/2010 | ||||
00 00 03 | Civil Certification | 12/21/2010 | ||||
00 00 04 | Structural/Civil Certification | 12/21/2010 | ||||
00 00 05 | Mechanical Certification | 12/21/2010 | ||||
00 00 06 | Electrical Certification | 12/21/2010 | ||||
00 00 07 | Landscape Certification | 12/21/2010 | ||||
00 63 13 | Request for Intepretaion Form | 12/21/2010 | ||||
00 63 25 | Substitution Request (After award of the Contract) | 12/21/2010 | ||||
01 11 00 | Summary of Work | 12/21/2010 | ||||
01 26 00 | Contract Modification Procedures | 12/21/2010 | ||||
01 26 13 | Contractors Request for Information/Interpretation | 12/21/2010 | ||||
01 31 10 | Project Management and Coordination | 12/21/2010 | ||||
01 32 33 | Photographis Documentation | 12/21/2010 | ||||
01 32 50 | Electronic Media Release | 12/21/2010 | ||||
01 33 00 | Sumbmittal Procedures | 12/21/2010 | ||||
01 42 00 | References | 12/21/2010 | ||||
01 45 00 | Quality Control | 12/21/2010 | ||||
01 50 00 | Construction Facilities and Temporary Controls | 12/21/2010 | ||||
01 60 00 | Product Requirements | 12/21/2010 | ||||
01 73 00 | Execution Requirements | 12/21/2010 | ||||
01 73 29 | Cutting and Patching | 12/21/2010 | ||||
01 77 00 | Contract Closeout | 12/21/2010 | ||||
03 05 05 | Fly Ash | 12/21/2010 | ||||
03 10 00 | Concrete Formwork | 12/21/2010 | ||||
03 20 00 | Concrete Reinforcement | 12/21/2010 | ||||
03 30 00 | Cast-In-Place Concrete | 12/21/2010 | ||||
03 38 00 | Post Tensioned Concrete | 12/21/2010 | ||||
03 49 00 | Glass-Fiber Reinforced Concrete (GFRC) | 12/21/2010 |
46 of 54
04 01 20.52 | Unit Masonry Cleaning | 12/21/2010 | ||||
04 05 15 | Mortar and Masonry Grout | 12/21/2010 | ||||
04 05 26 | CMU Integral Water Repellent | 12/21/2010 | ||||
04 22 00 | Concrete Masonry Units | 12/21/2010 | ||||
05 10 00 | Structural Steel Framing | 12/21/2010 | ||||
05 21 19 | Open-Web Steel Joists | 12/21/2010 | ||||
05 31 00 | Steel Deck | 12/21/2010 | ||||
05 36 00 | Steel Composite Deck | 12/21/2010 | ||||
05 41 00 | Structural Metal Stud Framing | 12/21/2010 | ||||
05 50 00 | Metal Fabrications | 12/21/2010 | ||||
05 51 00 | Metal Stairs | 12/21/2010 | ||||
05 52 00 | Metal Railings | 12/21/2010 | ||||
05 70 00 | Decorative Metal | 12/21/2010 | ||||
05 73 00 | Decorative Railings | 12/21/2010 | ||||
06 10 53 | Miscellaneous Carpentry | 12/21/2010 | ||||
06 20 00 | Finish Carpentry | 12/21/2010 | ||||
06 40 00 | Architectural Woodwork | 12/21/2010 | ||||
06 61 16 | Solid Surfacing Fabrications | 12/21/2010 | ||||
06 64 13 | Polymer Resin Decorative Panels | 12/21/2010 | ||||
06 82 00 | Glass-Fiber Reinforced Plastic Fabrications | 12/21/2010 | ||||
07 14 13 | Hot Fluid Applied Rubberized Asphalt Waterproofing | 12/21/2010 | ||||
07 18 00 | Traffic Coating | 12/21/2010 | ||||
07 19 00 | Water Repellents | 12/21/2010 | ||||
07 21 00 | Building Insulation | 12/21/2010 | ||||
07 22 80 | Roof and Deck Insulation | 12/21/2010 | ||||
07 24 10 | Exterior Insulation and Finish System | 12/21/2010 | ||||
07 54 23 | Thermoplastic Roof System | 12/21/2010 | ||||
07 61 00 | Sheet Metal Roofing | 12/21/2010 | ||||
07 62 00 | Flashing and Sheet Metal | 12/21/2010 | ||||
07 72 00 | Roof Accessories | 12/21/2010 | ||||
07 81 00 | Spray-Applied Fire Resistive Materials | 12/21/2010 | ||||
07 84 00 | Fire Stopping | 12/21/2010 | ||||
07 92 00 | Joint Sealers | 12/21/2010 | ||||
07 92 13 | Exterior Joint Sealants | 12/21/2010 | ||||
07 92 19 | Acoustical Sealants | 12/21/2010 | ||||
07 95 13 | Expansion Joint Cover Assemblies | 12/21/2010 | ||||
08 11 13 | Steel Doors and Frames | 12/21/2010 | ||||
08 14 00 | Wood Dorrs | 12/21/2010 | ||||
08 31 13 | Access Doors and Frames | 12/21/2010 | ||||
08 33 00 | Coiling Doors and Grilles | 12/21/2010 | ||||
08 42 29.33 | Low-Energy Swing Entrance Automatic Door Operators | 12/21/2010 | ||||
08 71 00 | Door Hardware | 12/21/2010 | ||||
08 80 00 | Exterior Glass and Glazing | 12/21/2010 | ||||
08 80 13 | Interior Glazing | 12/21/2010 | ||||
08 83 00 | Mirrors | 12/21/2010 | ||||
08 91 00 | Louvers | 12/21/2010 | ||||
08 92 00 | Louvered Roof Top Equipment Screens | 12/21/2010 | ||||
09 02 00 | Portland Cement Plaster | 12/21/2010 |
47 of 54
09 21 16.23 | Gypsum Board Shaft Wall Assemblies | 12/21/2010 | ||||
09 22 16 | Non-Structural Metal Framing | 12/21/2010 | ||||
09 24 00 | Portland Cement Plaster | 12/21/2010 | ||||
09 27 13 | Glass Fiber Reinforced Gypsum (GFRG) | 12/21/2010 | ||||
09 29 00 | Gypsum Board | 12/21/2010 | ||||
09 29 13 | Exterior Gypsum Sheathing | 12/21/2010 | ||||
09 30 00 | Tile | 12/21/2010 | ||||
09 30 33 | Natural Stone Tile | 12/21/2010 | ||||
09 51 00 | Acoustical and Specialty Ceilings | 12/21/2010 | ||||
09 56 19 | Sprayed Textured Ceiling | 12/21/2010 | ||||
09 61 13 | Slip Resistant Floor Treatment | 12/21/2010 | ||||
09 64 31 | Wood Flooring | 12/21/2010 | ||||
09 65 19 | Resiliant Tile Flooring | 12/21/2010 | ||||
09 67 23 | Resinous Flooring | 12/21/2010 | ||||
09 68 00 | Carpet | 12/21/2010 | ||||
09 68 13 | Carpet Tile | 12/21/2010 | ||||
09 69 00 | Access Flooring | 12/21/2010 | ||||
09 72 00 | Wall Coverings | 12/21/2010 | ||||
09 75 00 | Interior Stone Facings | 12/21/2010 | ||||
09 77 33 | FRP Wall Panels | 12/21/2010 | ||||
09 81 00 | Acoustical Insulation | 12/21/2010 | ||||
09 91 00 | Painting | 12/21/2010 | ||||
09 91 10 | Coating for Steel Piles | 12/21/2010 | ||||
10 14 00 | Signage | 12/21/2010 | ||||
10 14 53 | Traffic Control Signage | 12/21/2010 | ||||
10 21 13 | Metal Toilet Compartments | 12/21/2010 | ||||
10 21 14 | Plastic Laminate Toilet Compartments | 12/21/2010 | ||||
10 22 26 | Operable Partitions | 12/21/2010 | ||||
10 26 00 | Wall Protection | 12/21/2010 | ||||
10 28 13 | Toilet and Bath Accessories | 12/21/2010 | ||||
10 28 19 | Glass Shower Enclosures | 12/21/2010 | ||||
10 44 00 | Fire Protection Specialties | 12/21/2010 | ||||
10 51 00 | Lockers | 12/21/2010 | ||||
10 73 13 | Fabric Awnings | 12/21/2010 | ||||
11 13 00 | Loading Dock Equipment | 12/21/2010 | ||||
11 24 23 | Window Washing Systems | 12/21/2010 | ||||
12 36 40 | Stone Countertops | 12/21/2010 | ||||
12 48 23 | Entrance Foot Grids | 12/21/2010 | ||||
13 15 00 | Water Feature Construction | 12/21/2010 | ||||
13 34 19 | Metal Building Systems | 12/21/2010 | ||||
14 20 00 | Vertical Transportation - Elevators | 12/21/2010 | ||||
14 31 00 | Escalators | 12/21/2010 | ||||
14 91 33 | Linen Chutes | 12/21/2010 | ||||
21 13 13 | Wet-Pipe Sprinkler Systems | 12/21/2010 | ||||
21 31 16 | Diesel-Drive, Centrifigal Pumps | 12/21/2010 | ||||
21 34 00 | Pressure Maintenance Pumps | 12/21/2010 | ||||
22 05 13 | Common Motor Requirements for Plumbing Equipment | 12/21/2010 | ||||
22 05 16 | Expansion Fittings and Loops for Plumbing Piping | 12/21/2010 |
48 of 54
22 05 17 | Sleeves and Sleeve Seals for Plumbing Piping | 12/21/2010 | ||||
22 05 18 | Excutcheons for Plumbing Piping | 12/21/2010 | ||||
22 05 19 | Meters and Gages for Plumbing Piping | 12/21/2010 | ||||
22 05 23 | General-Duty Valves for Plumbing piping | 12/21/2010 | ||||
22 05 29 | Hangers and Supports for Plumbing Piping and Equipment | 12/21/2010 | ||||
22 05 33 | Heat Tracing for Plumbing Piping | 12/21/2010 | ||||
22 05 53 | Identification for Plumbing Piping and Equipment | 12/21/2010 | ||||
22 07 16 | Plumbing Equipment Insulation | 12/21/2010 | ||||
22 07 19 | Plumbing Piping Insulation | 12/21/2010 | ||||
22 11 16 | Domestic Water Piping | 12/21/2010 | ||||
22 11 19 | Domestic Water Piping Specialties | 12/21/2010 | ||||
22 11 23 | Domestic Water Pumps | 12/21/2010 | ||||
22 11 23.13 | Domestic-Water Packaged Booster Pumps | 12/21/2010 | ||||
22 12 23 | Facility Indoor Potable Water Storage Tanks | 12/21/2010 | ||||
22 13 16 | Sanitary Waste and vent Piping | 12/21/2010 | ||||
22 13 19 | Sanitary Waste Piping Specialties | 12/21/2010 | ||||
22 13 23 | Sanitary Waste Interceptors | 12/21/2010 | ||||
22 13 29 | Sanitay Sewage Pumps | 12/21/2010 | ||||
22 13 53 | Facility Septic Tanks | 12/21/2010 | ||||
22 14 13 | Facility Storm Drainage Piping | 12/21/2010 | ||||
22 14 23 | Storm Drainage Piping Specialties | 12/21/2010 | ||||
22 14 29 | Sump Pumps | 12/21/2010 | ||||
22 31 00 | Domestic Water Softeners | 12/21/2010 | ||||
22 35 00 | Domestic-Water Heat Exchangers | 12/21/2010 | ||||
22 40 00 | Plumbing Fixtures | 12/21/2010 | ||||
23 05 13 | Common Motor Requirements For HVAC Equipment | 12/21/2010 | ||||
23 05 16 | Expansion Fittings and Loops for HVAC Piping | 12/21/2010 | ||||
23 05 19 | Meters and Gages for HVAC Piping | 12/21/2010 | ||||
23 05 23 | General-Duty Valves for HVAC Piping | 12/21/2010 | ||||
23 05 29 | Hangers and Supports for HVAC Piping and Equipment | 12/21/2010 | ||||
23 05 53 | Identification for HVAC Piping and Equipment | 12/21/2010 | ||||
23 05 93 | Testing, Adjusting, and Balancing for HVAC | 12/21/2010 | ||||
23 07 13 | Duct Insulation | 12/21/2010 | ||||
23 07 16 | HVAC Equipment Insulation | 12/21/2010 | ||||
23 07 19 | HVAC Piping Insulation | 12/21/2010 | ||||
23 09 00 | Instrumentation and Control for HVAC | 12/21/2010 | ||||
23 09 93 | Sequence of Operations for HVAC Controls | 12/21/2010 | ||||
23 11 23 | Facility Natural-Gas Piping | 12/21/2010 | ||||
23 21 13 | Hydronic Piping | 12/21/2010 | ||||
23 21 13.13 | Underground Hydronic Piping | 12/21/2010 | ||||
23 21 23 | Hydronic Pumps | 12/21/2010 | ||||
23 23 00 | Refrigerant Piping | 12/21/2010 | ||||
23 25 00 | HVAC Water Treatment | 12/21/2010 | ||||
23 31 13 | Metal Ducts | 12/21/2010 | ||||
23 33 00 | Air Duct Accessories | 12/21/2010 | ||||
23 34 23 | HVAC Power Ventilators | 12/21/2010 | ||||
23 36 00 | Air Terminal Units | 12/21/2010 | ||||
23 37 13 | Diffusers, Registers, and Grilles | 12/21/2010 |
49 of 54
23 41 00 | Particulate Air Filtration | 12/21/2010 | ||||
23 52 33 | Water-Tube Boilers | 12/21/2010 | ||||
23 64 16 | Centrifugal Water Chillers | 12/21/2010 | ||||
23 65 00 | Cooling Towers | 12/21/2010 | ||||
23 72 00 | Air-To-Air Energy Recovery Equipment | 12/21/2010 | ||||
23 73 13 | Modular Indoor Central-Station Air Handling Units | 12/21/2010 | ||||
23 74 13 | Custom Air Handling Units | 12/21/2010 | ||||
23 81 23 | Computer-Room Air-Conditioners | 12/21/2010 | ||||
23 81 26 | Split-System Air-Conditioners | 12/21/2010 | ||||
23 82 19 | Fan Coil Units | 12/21/2010 | ||||
23 82 39 | Unit Heaters | 12/21/2010 | ||||
26 05 00 | Common Work Results for Electrical | 12/21/2010 | ||||
26 05 19 | Low-Voltage Electrical Power Conductors and Cables | 12/21/2010 | ||||
26 05 26 | Grounding and Bonding for Electrical Systems | 12/21/2010 | ||||
26 05 29 | Hangers and Supports for Electrical Systems | 12/21/2010 | ||||
26 05 33 | Raceway and Boxes for Electrical Systems | 12/21/2010 | ||||
26 05 36 | Cable Trays for Electrical Systems | 12/21/2010 | ||||
26 05 39 | Under Floor Raceways for Electrical Systems | 12/21/2010 | ||||
26 05 43 | Underground Ducts and Raceways for Electrical Systems | 12/21/2010 | ||||
26 05 53 | Identification for Electrical Systems | 12/21/2010 | ||||
26 05 73 | Overcurrent Protective Device Coordination Study | 12/21/2010 | ||||
26 09 23 | Lighting Control Devices | 12/21/2010 | ||||
26 09 33 | Central Dimming Controls | 12/21/2010 | ||||
26 09 43 | Network Lighting Controls | 12/21/2010 | ||||
26 22 00 | Low-Voltage Transformers | 12/21/2010 | ||||
26 24 13 | Switchboards | 12/21/2010 | ||||
26 24 16 | Panelboards | 12/21/2010 | ||||
26 27 26 | Wiring Devices | 12/21/2010 | ||||
26 28 13 | Fuses | 12/21/2010 | ||||
26 28 16 | Enclosed Switches and Circuit Breakers | 12/21/2010 | ||||
26 29 13 | Enclosed Controllers | 12/21/2010 | ||||
26 29 23 | Variable-Frequency Motor Controllers | 12/21/2010 | ||||
26 32 13 | Engine Generators | 12/21/2010 | ||||
26 33 53 | Static Uninterruptible Power Supply | 12/21/2010 | ||||
26 36 00 | Transfer Switches | 12/21/2010 | ||||
26 41 13 | Lightning Protection for Structures | 12/21/2010 | ||||
26 43 13 | Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits | 12/21/2010 | ||||
26 51 00 | Interior Lighting | 12/21/2010 | ||||
26 56 00 | Exterior Lighting | 12/21/2010 | ||||
27 05 28 | Pathways for Communication Systems | 12/21/2010 | ||||
27 05 36 | Cable Trays for Communication Systems | 12/21/2010 | ||||
27 05 44 | Sleeves and Sleeve Seals for Communication Pathways and Cabling | 12/21/2010 | ||||
27 11 00 | Communications Equipment Room Fittings | 12/21/2010 | ||||
27 13 00 | Communications Backbone Cabling | 12/21/2010 | ||||
27 15 00 | Communications Horizontal Cabling | 12/21/2010 | ||||
27 41 00 | Audio Video Systems | 12/21/2010 | ||||
27 41 33 | Master Antenna Television System – Hotel | 12/21/2010 | ||||
28 05 13 | Conductors and Cables for Electronic Safety and Security | 12/21/2010 |
50 of 54
28 05 28 | Pathways for Electronic Safety and Security | 12/21/2010 | ||||
28 05 44 | Sleeve and Sleeve Seals for Electronic Safety and Security Pathways and Ca | 12/21/2010 | ||||
28 13 00 | Access Control | 12/21/2010 | ||||
28 16 00 | Intrusion Detection | 12/21/2010 | ||||
28 23 00 | Video Surveillance | 12/21/2010 | ||||
31 10 00 | Site Clearing | 12/21/2010 | ||||
31 10 05 | Storm Water Pollution Prevention | 12/21/2010 | ||||
31 20 01 | Earthwork – Dry Side | 12/21/2010 | ||||
31 31 00 | Soil Treatment | 12/21/2010 | ||||
31 37 00 | Stone Rip-Rap | 12/21/2010 | ||||
31 62 23-13 | Concrete Filled Steel Pipe Piles | 12/21/2010 | ||||
31 63 16 | Augered Cast-In-Place Piles | 12/21/2010 | ||||
32 12 16 | Hot-Mix Asphalt Paving | 12/21/2010 | ||||
32 13 13 | Cement Concrete Pavement | 12/21/2010 | ||||
32 16 00 | Concrete Curbs, Gutters, Sidewalks and Driveways | 12/21/2010 | ||||
32 17 13 | Parking Bumpers | 12/21/2010 | ||||
32 17 23 | Pavement markings | 12/21/2010 | ||||
32 84 00 | Planting Irrigation | 12/21/2010 | ||||
32 92 00 | Lawns and Grasses | 12/21/2010 | ||||
32 93 00 | Turf Grasses Plants | 12/21/2010 | ||||
33 11 16 | Water Distribution | 12/21/2010 | ||||
33 31 00 | Sanitary Utility Sewerage Piping | 12/21/2010 | ||||
33 41 00 | Storm Drainage Piping Specialties | 12/21/2010 | ||||
33 44 16 | Trench Drains | 12/21/2010 | ||||
04 01 20.52 | Unit Masonry Cleaning | 11/12/2010 | ||||
04 05 26 | CMU Integral Water Repellent | 11/12/2010 | ||||
05 51 00 | Metal Stairs | 11/12/2010 | ||||
05 52 00 | Metal Railings | 11/12/2010 | ||||
06 10 53 | Miscellaneous Carpentry | 11/12/2010 | ||||
07 19 00 | Water Repellents | 11/12/2010 | ||||
07 21 00 | Building Insulation | 11/12/2010 | ||||
07 72 00 | Roof Accessories | 11/12/2010 | ||||
07 81 00 | Spray-Applied Fire Resistive Materials | 11/12/2010 | ||||
07 84 00 | Fire Stopping | 11/12/2010 | ||||
07 92 00 | Joint Sealers | 11/12/2010 | ||||
07 92 19 | Acoustical Sealants | 11/12/2010 | ||||
08 11 13 | Steel Doors & Frames | 11/12/2010 | ||||
08 31 13 | Access Doors & Frames | 11/12/2010 | ||||
08 33 00 | Coiling Doors & Grilles | 11/12/2010 | ||||
08 83 00 | Mirrors | 11/12/2010 | ||||
08 91 00 | Louvers | 11/12/2010 | ||||
09 21 16.23 | Gypsum Board Shaft Wall Assemblies | 11/12/2010 | ||||
09 22 16 | Non-Structural Metal Framing | 11/12/2010 | ||||
09 29 00 | Gypsum Board | 11/12/2010 | ||||
09 29 13 | Exterior Gypsum Sheathing | 11/12/2010 | ||||
09 30 00 | Tile | 11/12/2010 | ||||
09 30 33 | Natural Stone Tile | 11/12/2010 | ||||
09 61 13 | Slip Resistant Floor Treatment | 11/12/2010 |
51 of 54
09 65 19 | Resilient Tile Flooring | 11/12/2010 | ||||
09 67 23 | Resinous Flooring | 11/12/2010 | ||||
09 68 00 | Carpet | 11/12/2010 | ||||
09 68 13 | Carpet Tile | 11/12/2010 | ||||
09 69 00 | Access Flooring | 11/12/2010 | ||||
09 72 00 | Wall Coverings | 11/12/2010 | ||||
09 77 33 | FRP Wall Panels | 11/12/2010 | ||||
09 91 00 | Painting | 11/12/2010 | ||||
22 05 13 | Common Motor Requirements for Plumbing Equipment | 11/12/2010 | ||||
22 05 16 | Expansion Fittings & Loops for Plumbing Piping | 11/12/2010 | ||||
22 05 17 | Sleeves & Sleeve Seals for Plumbing Piping | 11/12/2010 | ||||
22 05 18 | Escutcheons for Plumbing Piping | 11/12/2010 | ||||
22 05 19 | Meters & Gages for Plumbing Piping | 11/12/2010 | ||||
22 05 23 | General-Duty Valves for Plumbing Piping | 11/12/2010 | ||||
22 05 29 | Hangers & Supports for Plumbing Piping & Equipment | 11/12/2010 | ||||
22 05 33 | Heat Tracing for Plumbing Piping | 11/12/2010 | ||||
22 05 48 | Vibration & Seismic Controls | 11/12/2010 | ||||
22 05 53 | Identification for Plumbing Piping & Equipment | 11/12/2010 | ||||
22 07 16 | Plumbing Equipment Insulation | 11/12/2010 | ||||
22 07 19 | Plumbing Piping Insulation | 11/12/2010 | ||||
22 11 16 | Domestic Water Piping | 11/12/2010 | ||||
22 11 19 | Domestic Water Piping Specialties | 11/12/2010 | ||||
22 11 23 | Domestic Water Pumps | 11/12/2010 | ||||
22 11 23.13 | Domestic-Water Packaged Booster Pumps | 11/12/2010 | ||||
22 13 16 | Sanitary Waste & Vent Piping | 11/12/2010 | ||||
22 13 19 | Sanitary Waste Piping Specialties | 11/12/2010 | ||||
22 13 23 | Sanitary Waste Interceptors | 11/12/2010 | ||||
22 13 29 | Sump Pumps | 11/12/2010 | ||||
22 31 00 | Domestic Water Softeners | 11/12/2010 | ||||
22 35 00 | Domestic-Water Heat Exchangers | 11/12/2010 | ||||
22 40 00 | Plumbing Fixtures | 11/12/2010 | ||||
23 05 13 | Common Motor Requirements for HVAC Equipment | 11/12/2010 | ||||
23 05 16 | Expansion Fittings & Loops for HVAC Piping | 11/12/2010 | ||||
23 05 23 | General-Duty Valves for HVAC Piping | 11/12/2010 | ||||
23 05 29 | Hangers & Supports for HVAC Piping & Equipment | 11/12/2010 | ||||
23 05 48 | Vibration & Seismic Controls | 11/12/2010 | ||||
23 05 53 | Identification for HVAC Piping & Equipment | 11/12/2010 | ||||
23 05 93 | Testing, Adjusting & Balancing for HVAC | 11/12/2010 | ||||
23 07 13 | Duct Insulation | 11/12/2010 | ||||
23 07 16 | HVAC Equipment Insulation | 11/12/2010 | ||||
23 07 19 | HVAC Piping Insulation | 11/12/2010 | ||||
23 09 00 | Instrumentation & Control for HVAC | 11/12/2010 | ||||
23 09 93 | Sequence of Operations for HVAC Controls | 11/12/2010 | ||||
23 11 23 | Facility Natural-Gas Piping | 11/12/2010 | ||||
23 21 13 | Hydronic Piping | 11/12/2010 | ||||
23 21 13.13 | Underground Hydronic Piping | 11/12/2010 | ||||
23 21 23 | Hydronic Pumps | 11/12/2010 | ||||
23 23 00 | Refrigerant Piping | 11/12/2010 |
52 of 54
23 25 00 | HVAC Water Treatment | 11/12/2010 | ||||
23 31 13 | Metal Ducts | 11/12/2010 | ||||
23 33 00 | Air Duct Accessories | 11/12/2010 | ||||
23 34 23 | HVAC Power Ventilators | 11/12/2010 | ||||
23 36 00 | Air Treatment Units | 11/12/2010 | ||||
23 37 13 | Diffusers, Registers & Grilles | 11/12/2010 | ||||
23 41 00 | Particulate Air Filtration | 11/12/2010 | ||||
23 51 00 | Breechings, Chimneys & Stacks | 11/12/2010 | ||||
23 52 33 | Water-Tube Boilers | 11/12/2010 | ||||
23 64 16 | Centrifugal Water Chillers | 11/12/2010 | ||||
23 65 00 | Cooling Towers | 11/12/2010 | ||||
23 73 13 | Modular Indoor Central-Station Air Handling Units | 11/12/2010 | ||||
23 74 13 | Packaged, Outdoor, Central-Station Air-Handling Units | 11/12/2010 | ||||
23 74 33 | Packaged, Outdoor, Heating & Cooling | 11/12/2010 | ||||
23 81 23 | Computer-Room Air-Conditioners | 11/12/2010 | ||||
23 81 26 | Split-System Air-Conditioners | 11/12/2010 | ||||
23 82 39 | Unit Heaters | 11/12/2010 | ||||
26 05 00 | Common Work Results for Electrical | 11/12/2010 | ||||
26 05 19 | Low-Voltage Electrical Power Conductors & Cables | 11/12/2010 | ||||
26 05 26 | Grounding & Bonding for Electrical Systems | 11/12/2010 | ||||
26 05 29 | Hangers & Supports for Electrical Systems | 11/12/2010 | ||||
26 05 33 | Raceway & Boxes for Electrical Systems | 11/12/2010 | ||||
26 05 36 | Cable Trays for Electrical Systems | 11/12/2010 | ||||
26 05 39 | Under Floor Raceways for Electrical Systems | 11/12/2010 | ||||
26 05 43 | Underground Ducts & Raceways for Electrical Systems | 11/12/2010 | ||||
26 05 53 | Identification for Electrical Systems | 11/12/2010 | ||||
26 05 73 | Overcurrent Protective Device Coordination Study | 11/12/2010 | ||||
26 09 23 | Lighting Control Devices | 11/12/2010 | ||||
26 09 33 | Central Dimming Controls | 11/12/2010 | ||||
26 09 43 | Network Lighting Controls | 11/12/2010 | ||||
26 22 00 | Low-Voltage Transformer | 11/12/2010 | ||||
26 24 13 | Switchboards | 11/12/2010 | ||||
26 24 16 | Panelboards | 11/12/2010 | ||||
26 27 26 | Wiring Devices | 11/12/2010 | ||||
26 28 13 | Fuses | 11/12/2010 | ||||
26 28 16 | Enclosed Switches & Circuit Breakers | 11/12/2010 | ||||
26 29 13 | Enclosed Controllers | 11/12/2010 | ||||
26 29 23 | Variable-Frequency Motor Controllers | 11/12/2010 | ||||
26 32 13 | Engine Generators | 11/12/2010 | ||||
26 33 53 | Static Uninterruptable Power Supply | 11/12/2010 | ||||
26 36 00 | Transfer Switches | 11/12/2010 | ||||
26 41 13 | Lightning Protection for Structures | 11/12/2010 | ||||
26 43 13 | Transient-Voltage Suppression for Low-Voltage | 11/12/2010 | ||||
26 51 00 | Interior Lighting | 11/12/2010 | ||||
26 56 00 | Exterior Lighting | 11/12/2010 | ||||
33 44 16 | Trench Drains | 11/12/2010 |
53 of 54
100% DD Design Deliverable Outstanding Items Required for GMP (updated 02/24//11) | ||||||
Design Item #1 | Site Utilitiy Additional Information | 2/24/2011 | ||||
Design Item #3 | Fireproofing locations and material types | 2/22/2011 | ||||
Design Item #4 | Expansion Joint Plans | 2/21/2011 | ||||
Design Item #7 | Interior Glazing Schedule | 2/25/2011 | ||||
Design Item #8 | Partition Type Schedule | 2/25/2011 | ||||
Design Item #9 | Low Rise Exterior RFP Package | 2/21/2011 | ||||
Design Item #10 | Porte Cochere Finishes | 2/24/2011 | ||||
Design Item #14 | Window Washing Equipment | 2/25/2011 | ||||
Design Item #15 | Wayfinding Signage | 2/25/2011 | ||||
Design Item #17 | Food Service | 2/22/2011 | ||||
Design Item #18 | Area Tabulation | 2/24/2011 | ||||
Design Item #20 | Low and Mid Level Lighting and Dimming Systems | 2/26/2011 | ||||
Technical Studies and Reports | ||||||
USACE Geotechnical Report by Louis Cappazolli & Associates / GeoEngineers | October 15, 2009 | |||||
USACE Geotechnical Update Report (Rev 3) by Geo Engineers | April 28, 2011 |
54 of 54
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
The Work
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
PREMISES AND ASSUMPTIONS (Revised)
1. | The Manhattan General Conditions have been included through the end of May 2012. If the river level does not allow certain elements of the project to be completed by the end of May 2012 then the general conditions would have to be extended due to the increased duration. | ||
2. | The Manhattan project Target schedule with a data date of 04/20/2011 and a run date of 05/02/2011 is based on the water level at the basin being below elevation +11.00 at the Carrolton Gauge no later than 06/14/2011. | ||
3. | The Manhattan project Target schedule with a data date of 04/20/2011 and run date of 05/02/2011 is based on the Army Corp of Engineers (ACOE) final release and permit modification being received no later than 05/06/2011. | ||
4. | The Manhattan GMP has included an estimated amount for the delay due to the ACOE and the Pontchartrain Levee District (PLD) revised programming approval and these estimated amounts will be reconciled once the full impact of the delay is known. | ||
5. | The Manhattan GMP is based on documents issued through ASI #23 dated 2/15/2011. | ||
6. | Manhattan has not included provisions for OCIP or CCIP insurance program. | ||
7. | The costs for all electrical consumption charges have not been included. | ||
8. | The costs for all natural gas consumption charges have not been included. | ||
9. | The costs for all water / sewer consumption charges have not been included. | ||
10. | The cost for all Builders Risk Insurance and deductibles if so required are by Pinnacle Entertainment. | ||
11. | Manhattan has not included the costs for a Payment and Performance Bond. | ||
12. | Indemnification and additional insured requirements for subcontractors must comply with new Louisiana laws that went into effect January 1, 2011. | ||
13. | Manhattan has not included the costs for the off loading, setting or certification of the Casino gaming equipment / tables, slot bases or slot chairs. |
1. | Manhattan has not included the cost for any special concrete admixtures for moisture control. |
1. | Manhattan has included a CMU wall with elastomeric coating at grid line T4 below Elevation +53. |
1. | Manhattan has included the costs for the roof top mounted air handling unit screen wall structural steel support framing and metal screen wall panel above the 2 Meal Restaurant only. All other Casino and Podium roof top equipment screen walls have been deleted per VE Item #12 & #13. | ||
2. | Manhattan has included the costs for a 42″ tall guard rail around the vessel perimeter. The guardrail in front of the Steakhouse and the Feature Bar is assumed to have a drink rail incorporated into the design. | ||
3. | Manhattan has included 10# / SF for the structural steel framing for the Hotel Level 12 roof top mounted pool screen wall. |
Page 1 of 7
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
PREMISES AND ASSUMPTIONS (Revised)
1. | Manhattan has included wood base, chair rail and crown molding in the Casino Green Rooms, Conference Rooms #2182 & #2197, Assistant General Manager’s office, General Manager’s office and Special Events Coordinator office. | ||
2. | Manhattan has included wood base, chair rail and crown molding in the Hotel Director of Finance office. | ||
3. | Manhattan has included a buffet style cabinet with a stone top at the Hotel fitness center. |
1. | Manhattan has included the costs for TPO membrane roofing per Specification Section 07 54 23. The cost for a Modified Bitumen Roof System has not been included. | ||
2. | Manhattan has included the costs for a roof paver pedestal system at the Casino VIP Terrace. | ||
3. | Manhattan has included the costs for spray on thermal insulation below the Podium walk-in cooler areas only. | ||
4. | Manhattan has not included the cost for a sprayed on thermal insulation under the Hotel Level 1 structural slab, Podium Level 53 slab-on-metal deck or the Casino Level 53 slab-on-metal deck. | ||
5. | Manhattan has included the costs for a paver pedestal system with hot fluid applied waterproofing and drainage board at Hotel Level 12 pool deck area. | ||
6. | Manhattan has included the costs for a urethane traffic coating at the Hotel Level 1.5 Mechanical Rooms, Penthouse Mechanical Rooms and the Pool Inter-stitual Level 11.5 floor slab. | ||
7. | The Central Plant exterior wall is based upon utilizing a pre-manufactured metal building manufacturer pre-finished exterior metal wall panel and interior liner panel with a galvalume metal roof panel. |
1. | Manhattan has not included the cost for a fire rated curtainwall system at the east end of the Promenade. | ||
2. | Manhattan has included the costs for operable balcony doors at the Hotel Level 12 Suites only. All other balcony doors are not operable. | ||
3. | Manhattan has included the costs for a full wall mirror at the Hotel fitness center. |
1. | The public area budget is based upon the Interior Design meeting that was held with Marnell and Cagley Tanner on 02/09/2011. The meeting(s) were based on the 02/02/2011 interior finish presentation to Pinnacle Entertainment by the Marnell and Cagley Tanner. | ||
2. | Manhattan has included the costs for glass tile at the back wall of the bar units in the Suite from top of backsplash to the ceiling. | ||
3. | Manhattan has included the back of house finishes per Exhibit S dated 5/11/2011. | ||
4. | MCC has included the cost for carpet pad at the public areas. All back-of-house carpet is based upon direct glue down carpet. | ||
5. | Manhattan has assumed all Owner Furnished Contractor Installed (OFCI) carpet base will be purchased with binding. |
Page 2 of 7
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
PREMISES AND ASSUMPTIONS (Revised)
1. | Manhattan has included toilet accessories comparable to the Lauberge du Lac facility for the public areas and back of house areas. | ||
2. | Manhattan has included hardware comparable to the Lauberge du Lac for the public areas and back of house areas. | ||
3. | Manhattan has not included any costs for way finding graphics and site building signage. |
1. | MCC has included an allowance for kitchen equipment based upon Maddock’s estimate. | ||
2. | MCC has included an allowance for the beverage conduit. | ||
3. | All kitchen equipment small wares, pots, pans, and linens are OFOI FF&E. |
1. | Manhattan has not included the cost for the off loading, storage, handling and installation of the FFE items except for the decorative light fixtures. (See FFE Exhibit T dated 05/11/2011) |
1. | Manhattan has included the costs for the stainless steel pool per the documents titles “PNK (Baton Rouge) Partnership MCC GMP Item 17 Food Service Manning Architects N10.023.00 2/22/11 (14 pages)” issued on February 22, 2011. | ||
2. | Manhattan has not included the costs for the surface parking lot public covered walkway. |
3. | Manhattan has included the specified GEN2 gearless traction hydraulic elevators and hydraulic elevators as indicated in the revised Specification Section 14 20 00 and 14 31 00 along with Appendix No. 3 dated 02/03/2011 issued with ASI-021. All equipment has been verified to be in compliance with the shaft and hoist way sizes indicated within these documents. | ||
4. | Manhattan has assumed within this GMP proposal that appropriately sized elevator machine rooms will be included in future drawing packages located within 50’ of the hoistways on the Low Rise and Casino Vessel as discussed with the design team during the bidding process to house the elevator machine controllers. The current DD package drawings do not indicate any of these control rooms. |
5. | Manhattan has assumed within this GMP proposal that appropriately sized elevator machine rooms will be included in future drawings packages for the two hydraulic elevators as discussed with the design team during the bidding process to house the elevator hydraulic units and controllers. The current DD package drawings do not indicate any of these elevator machine rooms. |
1. | Manhattan has included the costs for fire suppression standpipes only at the parking garage. | ||
2. | Manhattan has included the costs for a diesel fire pump to be located in the central plant facility. |
Page 3 of 7
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
PREMISES AND ASSUMPTIONS (Revised)
1. | Manhattan has included several value engineering options that have been selected by the owner and design team during several coordination meetings. The following value engineering options have been included in the GMP: |
a. | The heating hot water scheme will be revised to remove all boilers and equipment at the central plant and the exterior site work hot water piping to the hotel, garage and low rise/casino buildings. Local domestic hot water equipment shall be added at the hotel, low rise/casino buildings and support facility. | ||
b. | All storm drainage in the parking garage and all horizontal storm drainage in the hotel will be changed to PVC, rather than cast iron as shown in the contract documents. | ||
c. | The Hotel bathroom plumbing system includes the use of PEX systems, manifolds and shut-off valves and Pro-Press pipe and fittings. |
2. | Manhattan has assumed in this GMP proposal that battery venting can be utilized for all floor drain waste piping and grease waste piping below the lowest floor of the Hotel, Central Plant, Support Facility, Low Rise and Casino. |
1. | Manhattan has included several value engineering options that have been selected by the owner and design team during several coordination meetings. The following value engineering options have been included: |
a. | The heating hot water scheme will be revised to remove all boilers and equipment at the central plant and the exterior site work hot water piping to the hotel, garage and low rise/casino buildings. All fan coil and VAV units are to be supplied with electric heating coils. All AHU’s and ERU’s are to be changed to gas heating systems. Local domestic heating hot water equipment shall be added at the hotel and low rise/casino buildings. | ||
b. | The chilled water system will be revised to include three (3 EA) 800 ton chillers. All piping systems shall be design to accommodate 3,200 tons of total cooling capacity. The primary chilled water pumps shall be reduced to 100 HP, rather than the sizes shown on the current drawings. | ||
c. | The exterior site work chilled water pipes will be installed using HDPE with fused joints for all underground applications. All above ground applications across the levee will be steel piping with PVC jacketed insulation. | ||
d. | The water softener system will be eliminated. | ||
e. | The cooling towers will be provided as galvanized steel with stainless steel sumps, rather than all stainless steel as previously indicated. | ||
f. | The outside air exhaust scheme for the hotel tower will be changed to eliminate the multiple exhaust fans on level 11.5 and a single outside air unit with an enthalpy wheel will be installed on the Hotel roof above the mechanical penthouse. The outside air duct risers in the hotel shall be changed to include a single riser with front to back connections. | ||
g. | The kitchen exhaust system will be changed to route all exhaust ductwork in the ceiling and exit the building on level 1.5. This will require water wash hoods for the kitchen equipment and 15 feet of stainless steel ductwork from the hoods. Manhattan has included the costs to install fire rated insulation on the kitchen exhaust ductwork as required by code. |
Page 4 of 7
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
PREMISES AND ASSUMPTIONS (Revised)
2. | Manhattan has additional future value engineering options that have been identified as cost saving measures that will be investigated by the team: |
a. | The Casino Vessel HVAC exhaust/supply requirements for the vessel support and generators on level 77 of the vessel are estimated to be possibly reduced by $50,000. (VE Item #130 approved 3/31/11.) |
1. | Manhattan has included the two generators, one emergency generator and the marine switchboard shown in the vessel support area of the Casino. The switchboards and generators are not required to be constructed to ABS certification standards based on conversations with Lay Pitman and Associates and MSA Engineering. | ||
2. | Manhattan has assumed that all trench excavation spoils removed for electrical underground duct banks can be re-used as back-fill for the duct bank trenches. Manhattan has not included the costs to import fill for the electrical underground duct bank installation. | ||
3. | Manhattan has included several value engineering options that have been selected by the owner and design team during several coordination meetings. The following value engineering options have been included in the GMP: |
a. | The mechanical heating hot water scheme will be revised to remove all boilers and equipment at the central plant and the exterior site work hot water piping to the hotel, garage and low rise/casino buildings. All fan coil and VAV units are to be supplied with electric heating coils. All AHU’s and ERU’s are to be changed to gas heating systems. Local domestic heating hot water equipment shall be added at the hotel and low rise/casino buildings. This GMP proposal has included costs to supply power to all of these pieces of equipment as coordinated with MSA Engineering and Manhattan. | ||
b. | The mechanical chilled water system will be revised to include three (3 EA) 800 ton chillers. All piping systems shall be design to accommodate 3,200 tons of total cooling capacity. The primary chilled water pumps shall be reduced to 100 HP, rather than the sizes shown on the current drawings. This GMP proposal has included costs based on the power requirements of this equipment as coordinated with MSA Engineering and Manhattan. | ||
c. | The automatic transfer switches will be relocated from the hotel and low rise to the support facility. The emergency power feeders shown in the drawings will now be utilized to provide the additional power loads required by the Mechanical Value Engineering Item #1 and Item #2. | ||
d. | Modifications to the switchboard, panel board and transformer equipment presented by Wilhite Electric during the January 21, 2011 value engineering meeting including the removal of the barriers between the sections and taped bus, removal of the ground fault circuit trip function from the secondary branch breakers, changing all bussing in panel boards and switchboards to aluminum where possible, changing the temperature rise for the dry type transformers from 155 °C to 150 °C and deleting the requirement for a factory start-up on switchboards. | ||
e. | The lightning protection system will be changed to an interceptor system as reviewed during the January 21, 2011 value engineering meeting. | ||
f. | The requirement for a factory witness test of the generators will be eliminated. |
Page 5 of 7
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
PREMISES AND ASSUMPTIONS (Revised)
4. | Manhattan has included several future value engineering options that have been identified as cost saving measures that will be investigated by the team: |
a. | The light fixture package for the Casino Vessel is estimated to be possibly reduced by $650,000 by allowing alternate fixture manufacturers and possible quantity reductions. (VE Item #132 approved 3/31/2011) | ||
b. | The light fixture package for the Hotel is estimated to be possibly reduced by $200,000 by allowing alternate fixture manufacturers and possible quantity reductions. (VE Item #133 approved 3/31/2011) | ||
c. | The light fixture package for the Low Rise Podium is estimated to be possibly reduced by $350,000 by allowing alternate fixture manufacturers and possible quantity reductions. (VE Item #131 approved 3/31/2011) | ||
d. | The specialty lighting for the Casino Vessel is estimated to be reduced by $497,105. (VE Item #136 approved 3/31/2011) | ||
e. | The specialty lighting for the Low Rise Podium is estimated to be reduced by $132,315. (VE Item #137 approved 3/31/2011) |
5. | The decorative light poles for the elevated roadway are estimated to be reduced by $195,000. (VE Item #003 approved 3/31/2011) |
1. | Manhattan has included 48 strand fiber runs between the support facility, hotel, garage, casino low rise and casino vessel drawings per the revised site communications plan sheet E3.00 issued by Shane Savoy of MSA Engineering on March 1, 2011. |
2. | Manhattan has included cable tray for low-voltage communications wiring in the MDF/IDF rooms only. No communal cable tray system in the ceilings of the Hotel, Podium and Casino has been included. Manhattan has assumed that all smoke / fire rated cabling in these areas will be secured using j-hooks or suspended from the structure above. |
3. | Manhattan has not included the costs for the distributed CCTV equipment, hospitality TV provider equipment or satellite dish. |
4. | Manhattan has not included the costs for local 2-way radio communication wiring or antenna system. |
1. | Manhattan has not included furnishing any security / surveillance equipment including cameras, security access hardware or software, surveillance system hardware or software. Manhattan has included the installation of cameras provided by Pinnacle as well as terminating and coiling all cabling within the specified IDF/MDF security closets for connection to the security hardware provided by Pinnacle. |
Page 6 of 7
Pinnacle — Baton Rouge Hotel & Casino Project # 3278 05-11-2011 |
PREMISES AND ASSUMPTIONS (Revised)
1. | Manhattan has not included the cost for landscaping and/or irrigation. | ||
2. | Manhattan has included the cost for the delays in the auger cast foundation operations thru June 15, 2011. |
1. | Manhattan has not included the costs for the off-site roadwork at Nicholson Drive. |
1. | Manhattan has not included the cost for offsite utilities (water, gas, sewer, electrical, data). | ||
2. | Manhattan has not included the cost for combination domestic / fire water meter, vault or back-flow preventers. | ||
3. | Manhattan has not included the cost for the site irrigation water meter and vault. | ||
4. | Manhattan has not included the cost for the site sanitary sewer lift station and force main. | ||
5. | Manhattan has not included the cost for fixture impact fees or tap fees. | ||
6. | Manhattan has not included the costs for the relocation of the existing overhead power / phone lines and poles. | ||
7. | Manhattan has not included the costs for the utility company on-site primary electrical wiring or transformers. | ||
8. | Manhattan has not included the costs for the permanent phone company or cable company on-site wiring or equipment. |
Page 7 of 7
SEE AGREEMENT FOR “EXHIBIT M”
and Health Guidelines
II Project Safety Plan | 3 | |||
A. Purpose | 3 | |||
B. Basic Principles | 3 | |||
C. Responsibility | 4 | |||
D. Safety Meetings | 6 | |||
E. Accident Reporting Requirements | 7 | |||
F. Subcontractor Safety Enforcement Policy | 7 | |||
G. Visitors | 8 | |||
H. Conclusion | 8 | |||
II Accident Prevention Plan | 8 | |||
A. Applicable Safety Standards | 8 | |||
B. Scope of Coverage | 8 | |||
C. Employee Orientation | 9 | |||
D. Hazard Communication Program | 9 | |||
F. Sub-contractor safety plan | 10 | |||
G. Job hazard analysis | 10 | |||
H. Temporary Power | 10 | |||
I. Fall Protection | 11 | |||
J. Excavations | 11 | |||
K. Fire Protection | 11 | |||
L. Flammable/Combustible Liquids | 12 | |||
M. First Aid | 12 | |||
N. Medical Emergency | 12 | |||
O. Hand and Power Tools | 12 | |||
P. Scaffolds | 13 | |||
Q. Ladders | 13 | |||
R. Lockout/Tagout | 14 | |||
S. Accident Reporting | 14 | |||
T. Respirator Program | 14 | |||
U. Sanitation | 15 | |||
V. Cranes/Rigging | 15 | |||
W. Floor and Wall Openings | 15 | |||
X. Masonry Walls | 16 | |||
Y. Housekeeping | 16 | |||
Z. Working on the wet-side of levee | 16 | |||
ZZ. Manhattan Construction Company Pandemic Preparation Safety Plan | 19 |
1. | Project Safety Plan |
A. | Purpose |
B. | Basic Principles of the Project Safety Plan |
C. | Responsibility |
MINOR | SIGNIFICANT | SERIOUS | FLAGRANT | |||||
SEVERITY OF INFRACTION EXAMPLES | • Not wearing safety glasses • Not wearing hard hat • Not wearing hearing protection | • Horseplay • Crossing a red barricade | • Not tying off • Using incomplete scaffold • Endangering another employee | • Knowingly endangering another employee • Fighting | ||||
SEVERITY OF INFRACTION DEFINITIONS | A safety violation that does not immediately expose an employee to serious injury or death. | A safety violation in which the employee exposed self or others in a significant risk of injury. | A safety violation in which an employee exposed self or others to risk serious injury or death. | A safety violation in which an employee has committed an inexcusable unsafe act. | ||||
FIRST OFFENSE | VERBAL | WRITTEN | SUSPENSION | TERMINATION | ||||
REPRIMAND | REPRIMAND | |||||||
SECOND OFFENSE | WRITTEN | SUSPENSION | TERMINATION | |||||
REPRIMAND | ||||||||
THIRD OFFENSE | SUSPENSION | TERMINATION | ||||||
FOURTH OFFENSE | TERMINATION |
D. | Safety Meetings |
(1) | Instruction in the safe planning and performance of their work. | ||
(2) | Review of Project accidents, near misses, hazards and unsafe acts. | ||
(3) | Employee suggestions and comments relating to safety. |
E. | Accident Reporting Requirements |
1. | Project Employee Injury: |
• | Names and addresses of victims and witnesses. | ||
• | Description of events leading up to the accident/incident. | ||
• | Factors that may have contributed to the accident/incident. | ||
• | Action taken to prevent this accident/ incident in the future. |
F. | Subcontractor Safety Compliance Program |
G. | Visitors |
H. | Conclusion |
A. | Applicable Safety Standards |
B. | Scope of Coverage |
C. | Employee Orientation |
• | Orientations shall be given to each employee on the project prior to that employee performing work. | ||
• | Orientations shall be documented and copies shall be submitted to Manhattan Construction Company following their completion. | ||
• | Orientations must address specific jobsite conditions and cover all applicable Manhattan Construction Company safety policies, local, state and federal regulations. |
D. | Hazard Communications Programs |
E. | Sub-Contractor Safety Plan |
5.1. | Each trade/craftsman need a job specific safety plan covering the entire process of their contract for the (PNK) job. | ||
5.2. | The specific safety plan must be submitted to Manhattan one week prior to the sub-contractor starting work on the (PNK) job. |
F. | Job Hazard Analysis |
a. | All sub-contractors are required to fill out a JHA everyday they are on site. | ||
b. | They must be filled out completely and signed by everyone assigned to that task for the day. | ||
c. | They must be turned into the Manhattan safety department the following day. |
G. | Working in Confined Spaces |
H. | Temporary Electric Power |
I. | Fall Protection |
• | All employees, subcontractors, vendors, suppliers, and owners on a working/walking surface 6-feet or more above a lower level shall be protected by the 100% fall protection policy. | ||
• | This 100% fall protection policy extends beyond OSHA regulations to include structural steel ironworkers and scaffold builders. | ||
• | Acceptable fall-protection methods include personal fall-arrest systems (2 lanyards required), properly-built scaffolds, guardrail systems, safety nets, warning line systems, controlled access zones, and safety monitor systems. The Project Superintendent shall review Subcontractor fall protection plans in the context of job hazard analysis discussions. | ||
• | All overhead work shall be confined to an area clearly marked by red barricade tape at the closest working surface below the overhead work activity. |
J. | Excavations |
K. | Fire Protection |
L. | Flammable and Combustible Liquids |
M. | First Aid |
N. | Medical Emergency |
O. | Hand and Power Tools |
P. | Scaffolds |
Q. | Ladders |
R. | Lockout/Tagout |
S. | Accident Reporting Requirements |
T. | Respirator Program |
U. | Sanitation |
V. | Cranes and Rigging |
W. | Floor and Wall Openings |
X. | Masonry Walls |
Y. | Housekeeping |
Z. | Working on the wet-side of the levee (Mississippi river side)(MRW) = Mississippi river water |
X.1. | CFR 29 1926 Construction Industry standards. | ||
X.2. | CFR 29 1915 Occup. Safety and Health Standards for Shipyard Employment |
1.1. | I.D. badges are required at all times to anyone on the wet-side of the levee for access. | ||
1.2. | The access will change throughout the year depending on the water levels from the river. | ||
1.3. | There is a north and south ramp going over the levee to gain access to the casino during the low river levels when (MRW) elevation is below 26’ at the job-site. There is a lay down yard for parking company vehicles on the wet-side. When the (MRW) elevation reaches 26’ (PNK) no more driving vehicles on the wet-side. | ||
1.4. | From (MRW) elevation 26’ to 32’ access to the casino will be from a gangway/scaffold on the south side of the river from the south ramp to the casino boat. | ||
1.5. | After (MRW) elevation 32’ access will be by boat to the barge. There will be two boat operators in boats taking personnel on and off the barge at all times during working hours. When (MRW) elevation at (PNK) reaches 32’ only essential personnel will be allowed on the barge for working. | ||
1.6. | NO DRIVING ON THE LEVEE.A maximum of two 18 wheeler delivery trucks at a time may be allowed on the levee for unloading. The 18 wheelers cannot be parked or staged on the levee for long periods of time. | ||
1.7. | When (MRW) elevations reach Elevation +15.0’ in New Orleans as measured at the Carrollton gauge, all construction work must stop on the levee, on the batture, and on the casino vessel.Only operations to maintain safety and the integrity of the barges will be allowed. | ||
1.8. | It is every subcontractor’s responsibility to monitor the river elevation and comply with applicable work restrictions imposed by all governing authorities. |
2.1. | Follow all of Manhattan and OSHA 1926.650 subpart P regulations and policies for excavations. | ||
2.2. | The soil on the (PNK) job-site is type C soil. For any excavations deeper than 5 feet only sloping, trench boxes, or shielding is allowed.NO BENCHING SOIL. | ||
2.3. | Sub-contractors must get a dig permit from LA one call before starting any excavations. | ||
2.4. | Sub-contractors must fill out an excavation report every day. |
3.1. | HARDHATS, SAFETY GLASSES, REFLECTIVE VESTS, LONG PANTS, SHIRT WITH SLEEVES, AND WORK BOOTS REQUIRED AT ALL TIMES ON THE JOB-SITE. | ||
3.2. | When working over water lifejackets will be required at all times. The use of lifejackets will change depending on the water elevation. Coordinate with Manhattan superintendent where lifejackets are required. | ||
3.3. | 100% tie-off/fall protection at all times when above 6’. | ||
3.4. | All P.P.E. required will be provided by the sub-contractors performing the work. | ||
3.5. | Manhattan will provide a rescue boat during operations over and around water. | ||
3.6. | There will be life rings with 100 feet of rope around the perimeter of the barge for rescue purposes. | ||
3.7. | At the back of the barge on the river side there will be a containment buoy put across the river line to contain debris and as the last line of defense to stop personnel for rescue. |
4.1. | Follow Manhattan and OSHA subpart R 1926.750-761 regulations and policies. | ||
4.2. | Must maintain 100% fall protection when 6’ above lower level. | ||
4.3. | When setting steel above water lifejackets and fall protection is required at all times. | ||
4.4. | Coordinate with Manhattan for all deliveries of steel on the wet-side. |
5.1. | Follow Manhattan and OSHA subpart Y 1926.1071-1091 also 1910.420 | ||
5.2. | Each diver shall be continuously tended while in water. Never left unattended for any reason. | ||
5.3. | A stand by diver shall be available while a diver is in the water. | ||
5.4. | All divers must be qualified or certified to make a dive. | ||
5.5. | All divers must be trained in CPR. | ||
5.6. | Daily inspections on all equipment before the start of work. |
6. | Confined Space |
6.1. | All sub-contractors are to follow Manhattans confined space policy when entering a confined space. | ||
6.2. | Only trained and authorized personnel allowed in confined spaces. | ||
6.3. | Notify Manhattan safety for permit required confined spaces. |
7.1. | Each Sub-contractor using a crane shall identify, in writing, their Competent Person who will be responsible for the proper set-up and operation of the crane. A copy of this document shall be kept in the crane at all times. | ||
7.2. | Rigging inspections shall be performed in accordance with CFR Title 29, Part 1926.251. | ||
7.3. | Rigging equipment shall be inspected before each days use by the Competent Person before each lift by the employee rigging the load. | ||
7.4. | Load Moment Indicators will be required on all cranes. | ||
7.5. | Lift calculations will be required for all lifts that are over 85% of the crane’s capacity according to the crane manufacturer’s load charts. | ||
7.6. | Anti-2-bloc devices will be required on all cranes. | ||
7.7. | All certifications and qualifications must be turned into the safety department before start of work. | ||
7.8. | All sub-contractors must coordinate with Manhattan superintendents for tower crane usage. | ||
7.9. | Sub-contractors are to provide their employees with radio communication with the tower crane operators when flying loads in the blind. | ||
7.10. | Only qualified rigger/signalperson allowed lifting loads. | ||
7.11. | Air horns are required when lifting loads to notify surrounding contractors in the area of suspended loads. | ||
7.12. | Loads must be secured properly before lifting, plastic wrap is not allowed. |
8.1. | Each trade/craftsman need a job specific safety plan covering the entire process of their contract for the (PNK) job.Must have a specific safety plan set in place for working over, in, and around water separate from the regular safety plan. | ||
8.2. | The specific safety plan must be submitted to Manhattan one week prior to the sub-contractor starting work on the (PNK) job. |
9. | Job Hazard Analysis |
9.1. | All sub-contractors are required to fill out a JHA everyday they are on site. | ||
9.2. | They must be filled out completely and signed by everyone assigned to that task for the day. | ||
9.3. | They must be turned into the Manhattan safety department the following day. |
10.1. | All sub-contractors are to follow Manhattan emergency action plan. |
ZZ. | Manhattan Construction Company Pandemic Preparation Safety Plan |
A. | ADMINISTRATION OF PROGRAM | ||
B. | CONTACT INFORMATION | ||
C. | CHAIN OF COMMUNICATION |
A. | PROTECT EMPLOYEES AND CUSTOMERS | ||
B. | WORK PRACTICE AND ENGINEERING CONTROLS | ||
C. | LOW RISK PRECAUTIONS |
A. | ADMINISTRATIVE CONTROLS | ||
B. | PERSONAL PROTECTIVE EQUIPMENT (PPE) |
1. | HIGH EXPOSURE OR RISK |
A. | WORK PRACTICES | ||
B. | ADMINISTRATIVE CONTROLS | ||
C. | PPE |
C. | RESPIRATORY PROTECTION |
1. | PPE | ||
2. | RESPIRATOR VERSUS SURGICAL MASK |
A. | SURGICAL MASK | ||
B. | RESPIRATORS |
1. | PARTICULATE FILTERS AND RESPIRATORS | ||
2. | DISPOSABLE RESPIRATORS | ||
3. | DUST MASKS |
D. | REDUCE RISK OF EXPOSURE | ||
E. | GUIDELINES FOR CARE |
1. | INCASE YOU ARE DIAGNOSED WITH N1N1 FLU | ||
2. | YOU TAKE CARE OF SOMEONE WITH N1N1 FLU |
Administrative Controls
• | Administrative controls include controlling employees’ exposure by scheduling their work tasks in ways that minimize their exposure levels. Examples of administrative controls include: |
• | Developing policies that encourage ill employees to stay at home without fear of any reprisals. | ||
• | The discontinuation of unessential travel to locations with high illness transmission rates. | ||
• | Consider practices to minimize face-to-face contact between employees such as e-mail, websites and teleconferences. Where possible, encourage flexible work arrangements such as telecommuting or flexible work hours to reduce the number of your employees who must be at work at one time or in one specific location. | ||
• | Consider home delivery of goods and services to reduce the number of clients or customers who must visit your workplace. | ||
• | Developing emergency communications plans. Maintain a forum for answering employees’ concerns. Develop internet-based communications if feasible. | ||
• | Work with your employees so that they understand the office leave policies for getting paid, transportation issues and day care concerns. |
• | Make sure that employees know where supplies for hand and surface hygiene are located. | ||
• | Work with your employees to designate a person(s), website, bulletin board or other means of communicating important pandemic flu information. | ||
• | Use signs to keep customers informed about symptoms of the flu and ask sick customers to minimize contact with your employees until they are well. | ||
• | Your workplace may consider limiting access to customers and the general public or insuring that they can only enter certain areas of your workplace. |
• | Communicate to employees what options may be available to them for working from home. | ||
• | Communicate the office leave policies, policies for getting paid, transportation issues and day care concerns. | ||
• | Make sure that your employees know where supplies for hand hygiene are located. | ||
• | Monitor public health communications about pandemic flu recommendations and ensure that your employees also have access to that information. | ||
• | Work with your employees to designate a person(s), website, bulletin board or other means of communication important pandemic flu information. |
• | Instruct employees to avoid close contact (within 6 feet) with other employees and the general public. This can be accomplished by simply increasing the distance between the employee and the general public in order to avoid contact with large droplets from people talking, coughing or sneezing. | ||
• | Some organizations can expand internet, phone-based, drive-through window, or home delivery customer service strategies to minimized face-to-face contact. Work with your employees to identify new ways to do business that can also help to keep employees and customers safe and healthy. |
• | Communicate the availability of medical screening or other employee health resources (e.g., on site nurse or employee wellness program to check for flu-like symptoms before employees enter the workplace). | ||
• | Employers also should consider installing physical barriers, such as clear plastic sneeze guars to protect employees where possible (such as cashier stations). |
• | Work with your employees so that they understand the office leave policies for getting paid, transportation issues, and day care concerns. | ||
• | Make sure that employees know where supplies for hand and surface hygiene are located. | ||
• | Work with your employees to designate a person(s), website, bulletin board or other means of communicating important pandemic flu information. | ||
• | Use signs to keep customers informed about symptoms of the flu and ask sick customers to minimize contact with your employees until they are well. | ||
• | Your workplace may consider limiting access to customers and the general public or ensuring that they can only enter certain area of your workplace. |
Educate and train employees about the protective clothing and equipment appropriate to their current duties and the duties which they may be asked to assume when others are absent. Employees may need to be fit tested and trained in the proper use and care of a respirator. Also, it is important to train employees to put on (don) and take off (doff) PPE in the proper order to avoid inadvertent self-contamination(www.osha.gov/SLT/respiratoryprotection/index.html). During a pandemic, recommendations for PPE used in particular occupations may change, depending on geographic proximity to active cases, updated risk assessments for particular employees and information on PPE effectiveness in preventing the spread of influenza.
• | When possible, health care facilities equipped with isolation rooms should use them when performing aerosol generating procedures for patients with known or suspected pandemic influenza. |
• | Laboratory facilities that handle specimens for known or suspected pandemic patients will also require special precautions associated with a Bio-Safety Level 3 Facility. Some recommendations can be found at:www.cdc.gov/flu/h2n2bs13.htm. |
• | Respiratory protection for protection against small droplets from talking, coughing or sneezing and also from small airborne particles of infectious material. | ||
• | N95 or higher rated filter for most situations | ||
• | Supplied air respirator (SAR) or powered air purifying respirator (PARR) for certain high risk medical or dental procedures likely to generate bio-aerosols. | ||
• | Use a surgical respirator when both respiratory protection and resistance to blood and body fluids is necessary. |
• | Selected based upon the hazard to the employee | ||
• | Properly fitted and some must be periodically refitted (e.g. respirators) | ||
• | Conscientiously and properly worn | ||
• | Regularly maintained and replaced as necessary | ||
• | Properly removed and disposed of to avoid contamination of self, others or the environment |
• | Place on sick people to limit the spread of infectious respiratory secretions to others | ||
• | Worn by healthcare providers to prevent accidental contamination of patient’s wounds by the organisms normally present in mucus and saliva | ||
• | Worn by employees to protect themselves from splashes or sprays of blood or body fluids; they may also have the effect of keeping contaminated fingers/hands away from the mouth and nose. |
• | Disposable or filtering face piece respirators where the entire respirator face piece is comprised of filter material. This type of respirator is also commonly referred to as an “N95” respirator. It is discarded when it becomes unsuitable for further use due to excessive breathing resistance (e.g. particulate clogging the filter) unacceptable contamination/soiling or physical damage. | ||
• | Surgical respirators are a type of respiratory protection that offers the combined protective properties of both a filtering face piece respirator and a surgical mask. Surgical N95 respirators are certified by NIOSH as respirators and also cleared by FDA as medical devices which have been designed and tested and shown to be equivalent to surgical masks in certain performance characteristics (resistance to blood penetration, biocompatibility) which are not examined by NIOSH during its certification of N95 respirators. |
• | Reusable or elastomeric respirators, where the face piece can be cleaned, repaired and reused but the filter cartridges are discarded and replaced when they become unsuitable for further use. These respirators can be used with a variety of different cartridges to protect against different hazards. These respirators can also be used with canisters or cartridges that will filter out gases and vapors. | ||
• | Powered air purifying respirators (PAPRs) where a battery powered blower pulls contaminated air through filters, then moves the filtered air to the wearer’s face piece. PAPRs are significantly more expensive than other air purifying respirators but they provide higher levels of protection and may also increase the comfort for some users by reducing the physiologic burden associated with negative pressure respirators and providing a constant flow of air on the face. These respirators can also be used with canisters or cartridges that will filter out gases and vapors. It should also be noted that there are hooded PAPRs that do not require employees to be fit tested in order to use them. |
• | Encourage sick employees to stay at home | ||
• | Encourage your employees to wash their hands frequently with soap and water or with hand sanitizer if there is no soap or water available. Also encourage your employees to avoid touching their noses, mouths and eyes. | ||
• | Encourage your employees to cover their coughs and sneezes with a tissue or to cough and sneeze into their upper sleeves if tissues are not available. All employees should wash their hands or use a hand sanitizer after they cough, sneeze or blow their noses. | ||
• | Employees should avoid close contact with their coworkers and customers (maintain a separation of at least 6 feet). They should avoid shaking hands and always wash their hands after contact with others. Even if employees wear gloves they should wash their hands upon removal of the gloves in case their hands(s) became contaminated during the removal process. | ||
• | Provide customers and the public with tissues and trash receptacles and with a place to wash or disinfect their hands. | ||
• | Keep work surfaces, telephones, computer equipment and other frequently touched surfaces and office equipment clean. Be sure that any cleaner used is safe and will not harm your employees or your office equipment. Use only disinfectants registered by the U.S. Environmental Protection Agency (EPA) and follow all directions and safety precautions indicated on the label. | ||
• | Discourage your employees from using other employee’s phones, desks, offices of other work tools and equipment. | ||
• | Minimize situations where groups of people are crowded together such as in a meeting. Use e-mail, phones and text messages to communicate with each other. When meetings are necessary avoid close contact by keeping a separation of at least 6 feet, where possible and assure that there is proper ventilation in the meeting room. | ||
• | Reducing or eliminating unnecessary social interactions can be very effective in controlling the spread of infectious diseases. Reconsider all situations that permit or require employees, customers and visitors (including family member) to enter the workplace. Workplaces which permit family visitors on site should consider restricting/eliminating that option during an influenza pandemic. Work sites with on-site day care should consider in advance whether these facilities will remain open or will be closed and the impact of such decisions on employees and the business. | ||
• | Promote healthy lifestyles including good nutrition, exercise and smoking cessation. A person’s overall health impacts their body’s immune system and can affect their ability to fight off or recover from an infectious disease. |
Stay home,following your doctor’s orders, and watch for signs that you need immediate medical attention.
EXHIBIT P | ||
DATE (MM/DD/YY) | ||
CERTIFICATE OF LIABILITY INSURANCE | 4/11/2011 |
PRODUCER Rooney Insurance Agency, Inc. 5601 South 122nd East Avenue Tulsa, Oklahoma 74145 PHONE NUMBER 918-582-0565 Fax No. 918-584-3129 INSURED Manhattan Construction Company 2120 Montrose Blvd. Houston, Texas 77006 | THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE INSURER A The Travelers Indemnity CompanyINSURER B Travelers Property Casualty Company of America INSURER C Westchester Fire Insurance Company INSURER D American Guarentee & Liability Insurance Company INSURER E Liberty Insurance Underwriters, Inc. |
INSUR | POLICY EFFECTIVE | POLICY EXPRATION | ||||||||||||
LTR | TYPE OF INSURANCE | POLICY NUMBER | DATE (MM/DD/YY) | DATE (MM/DD/YY) | LIMITS | |||||||||
GENERAL LIABILITY | EACH OCCURRENCE | $ | 1,000,000 | |||||||||||
A | þ COMMERCIAL GENERAL LIABILITY | |||||||||||||
o CLAIMS MADEþ OCCUR. o o | VTC2KCO1098A840 | 10-1-10 | 10-1-11 | FIRE DAMAGE (Any one fire) | $ | 1,000,000 | ||||||||
MED EXP (Any one person) | $ | 5,000 | ||||||||||||
PERSONAL & ACV INJURY | $ | 1,000,000 | ||||||||||||
GENERAL AGGREGATE | $ | 3,000,000 | ||||||||||||
POLICYo PROJECTþ LOCo | PRODUCTS-COMP/OP ACG | $ | 3,000,000 | |||||||||||
AUTOMOBILE LIABILITY | ||||||||||||||
B | þ ANY AUTO þ ALL OWNED AUTOS | VTC2JCAP1098A852 | 10-1-10 | 10-1-11 | COMEBINED SINGLE LIMIT (Ex Accident) | $ | 1,000,000 | |||||||
þ SCHEDULED AUTOS þ HIRED AUTOS þ ON-OWNED AUTOS | BODLY INJURY (Per person) | |||||||||||||
o GARAGE LIABILITY | $ | |||||||||||||
o o | BODLY INJURY (Per Accident) | $ | ||||||||||||
PROPERTY DAMAGE (Per Accident) | $ | |||||||||||||
EXCESS LIABILITY — Occurrence | ||||||||||||||
B | Excess of General, Auto & Employers | VTSMJCUP1098A968 | 10-1-10 | 10-1-11 | EACH OCCURRENCE | $ | 100,000,000 | |||||||
C | Excess of VTSMJCUP 1098A968 | G22008924006 | 10-1-10 | 10-1-11 | AGGREGATE | $ | 100,000,000 | |||||||
D | Excess of G22008924008 | AEC3767527-10 | 10-1-10 | 10-1-11 | ||||||||||
E | Excess of AEC3767527-10 | EXCDA211625-4 | 10-1-10 | 10-1-11 | ||||||||||
WORKERS COMPENSATION AND | VTC2JUB1098A803 | 10-1-10 | þ WC STATUTORY LIMITS H- ER | $ | 1,000,000 | |||||||||
A | EMPLOYERS’ LIABILITY | ELEACH ACCIDENT | $ | 1,000,000 | ||||||||||
EL. DISEASE-POLICY LIMIT | $ | 1,000,000 | ||||||||||||
EL. DISEASE-EACH EMPLOYEE | $ | 1,000,000 | ||||||||||||
OTHER |
Additional Insured and Waiver of Subrogation Endorsements are included in favor of PNK (Baton Rouge) Partnership as required by executed contract.
CERTIFICATE HOLDER | CANCELLATION | |
PNK (Baton Rouge) Partnership 9555 Hillwood Drive Suite 140 Las Vegas, NV 89134 | SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, ROONEY INSURANCE AGENCY WILL MAIL BY CERTIFIED MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. | |
AUTHORIZED REPRESENTATIVE |
5/11/2011
VALUE ENGINEERING LOG
PINNACLE BATON ROUGE SCHEME #6 PROGRAM
HOTEL AND CASINO
STATUS CODE | ||||||||||||||||||||
Cost Included | A – Approved | |||||||||||||||||||
in Current | Estimated | NA – Not Approved | ||||||||||||||||||
Item # | Sub Job # | Scope Description | Budget | Potential Savings | P – Pending | Date | Resp | Notes | ||||||||||||
Div. 2 — Sitework (Div. 31, 32 & 33 — Earthwork, Exterior Improvements & Utilities) | ||||||||||||||||||||
001 | 02 | Reduce LF Fire Loop at Site (Current 4,826 LF Incl.) | $ | 313,690 | P | 3/31/2011 | ABMB | Open Status: Awaiting approval prior to reduction of LF | ||||||||||||
002 | 02 | Reduce 500 LF for 6″ Irrigation Water Line (meter to be Close to River Road) | $ | 27,000 | $ | (25,000 | ) | A | 3/31/2011 | ABMB | ||||||||||
003 | 02 | Reduce Cost/Pole AL for Decorative Light Poles @ Elevated Rd. from $8,500 to $5,500 | $ | 552,500 | $ | (195,000 | ) | A | 3/31/2011 | MCC | 65 Poles Included in Budget AL: MCC Verify original pole cost with specs issued in CD’s | |||||||||
004 | 06 | Delete Westside 400Ib rip-rap, replace w/conventional shoreblock | $ | 304,500 | $ | (177,625 | ) | A | 3/31/2011 | MCC | ||||||||||
004A | 06 | Delete rip rap at T-wall and replace w/conventional shoreblock | $ | 70,000 | $ | (35,035 | ) | A | 4/20/2011 | ABMB/MCC | ||||||||||
005 | 02 | Delete Guest Parking Lot Type “A” Island Curb & Gutter, Landscaping & Irrigation. Extend Asphalt through Island (Confirm City Acceptance Asphalt in lieu C,G & I) | NA | 3/31/2011 | Planning commission does not allow deletion of this item | |||||||||||||||
006 | 02 | Delete Employee Parking Lot Type “B” Island 5” Wide Sitework&ADA Ramps. | NA | 3/31/2011 | Planning commission does not allow deletion of this item | |||||||||||||||
007 | 02 | Delete Employee Parking Lot Type “A” Island @ West Side Curb & Gutter, Landscaping & Irrigation Extend Asphalt through island (Confirm City Acceptance Asphait in lieu C, G & I) | NA | 3/31/2011 | Planning commission does not allow deletion of this item | |||||||||||||||
008 | 02 | Delete Paved Gutter Pan Drain/Grate Flume Concrete (Sheet C16.4) | NA | 3/31/2011 | Walks must remain as cannot delete this item. | |||||||||||||||
009 | 02 | Delete Site Concrete Flume rip-rap & use CIP Baffles | P | 3/31/2011 | Open Status: Out of right of way areas | |||||||||||||||
010 | 02 | Modify routing of sanitary sewer outfall piping | $ | 162,500 | $ | (52,000 | ) | A | 3/31/2011 | ABMB | ||||||||||
Div. 4 — Masonry | ||||||||||||||||||||
011 | 07 | Decrease Interior CMU Partitions at Support Facility from 28’ to 10’ High | $ | 204,960 | P | 3/31/2011 | Manning | Deduct to Chain Link fence in lieu of CMU @ South Wall of Warehouse, 10-foot height CMU @ trash/chemical storage rooms with drywall top-out. | ||||||||||||
Div. 5 — Metals | ||||||||||||||||||||
012 | 03 | Eliminate Steel Supports for Privacy Screens at Roof Top at Casino | $ | 165,060 | $ | (165,060 | ) | A | 3/31/2011 | Manning / Marnell | Straight Deduct: The 2-meal Screen wall needs to be reviewed. | |||||||||
013 | 12 | Eliminate Steel Supports for Privacy Screens at Roof Top at Low Rise | $ | 86,180 | $ | (86,180 | ) | A | 3/31/2011 | Manning / Marnell | Straight Deduct | |||||||||
012 | 03 | Eliminate Privacy Screens at Roof Top of Casino, Paint MEP Equip. | $ | 208,882 | $ | (168,882 | ) | A | 3/31/2011 | Manning / Marnell | Paint estimate based on the quantity of equipment. | |||||||||
013 | 12 | Eliminate Privacy Screens at Roof Top of Low Rise, Paint MEP Equip. | $ | 107,725 | $ | (87,725 | ) | A | 3/31/2011 | Manning / Marnell | Paint estimate based on the quantity of equipment. | |||||||||
014 | 03,12 | Delete Drink Rail and LED Lighting at perimeter walkway guardrail except at the Promenade, Steakhouse and Feature Bar. Use recessed wall packs for Emergency Lighting | P | 3/31/2011 | Manning / Marnell | Currently using $250/LF: Review cost to delete the drink rail. |
1 of 6
STATUS CODE | ||||||||||||||||||||||
Cost Included | A-Approved | |||||||||||||||||||||
in Current | Estimated | NA – Not Approved | ||||||||||||||||||||
Item # | Sub Job # | Scope Description | Budget | Potential Savings | P – Pending | Date | Resp | Notes | ||||||||||||||
Div. 6 - MillWork | ||||||||||||||||||||||
015 | 12 | Delete oil rubbed bronze at Promenade header and use bronze chem metal product | $ | 399,500 | $ | (246,500 | ) | A | 3/31/2011 | Marnell | $18 / SF installed chem metal | |||||||||||
016 | 12 | Simplify Guardrail at Level 2 Promenade Bridge. Reduce allowance from $400/LF to $200/LF | $ | 104,000 | $ | (52,000 | ) | A | 3/31/2011 | Marnell | $200 /LF allowance | |||||||||||
017 | 12 | Delete Bronze Standing Seam Metal Roof at 2 Meal Entry and replace with painted metal | $ | 141,400 | $ | (85,400 | ) | A | 3/31/2011 | Marnell | Painted metal to look bronze | |||||||||||
018 | 12 | Delete Bronze Standing Seam Metal Roof at GNG Entry and replace with painted metal | $ | 101,505 | $ | (61,305 | ) | A | 3/31/2011 | Marnell | Painted metal to look bronze | |||||||||||
019 | 12 | Delete “Hopes” Bronze Storefront at Entry to 2 Meal and replace with standard bronze Aluminum Storefront | $ | 122,720 | $ | (74,720 | ) | A | 3/31/2011 | Marnell | Replace with bronze aluminum storefront for $300 / LF | |||||||||||
020 | 12 | Glazing for “Hopes” Bronze Storefront at Entry to 2 Meal | $ | 199,200 | $ | (139,200 | ) | A | 3/31/2011 | Marnell | 1/4" clear tempered glass & confirm meets applicable codes | |||||||||||
021 | 12 | Operable “Garage Doors” at Entry to 2 Meal | $ | 155,775 | $ | — | P | 3/31/2011 | Marnell | Keep as an allowance: Wheel on door is NOT operable | ||||||||||||
022 | 12 | Delete “Hopes” Bronze Storefront at Entry to Grab N Go and replace with standard bronze Aluminum Storefront | $ | 53,466 | $ | (33,366 | ) | A | 3/31/2011 | Marnell | Replace with bronze aluminum storefront for $300 / LF | |||||||||||
023 | 12 | Replace Red Glazing for “Hopes” Bronze Storefront at Entry to Grab N Go to red united glass | $ | 118,590 | $ | (93,465 | ) | A | 3/31/2011 | Marnell | 1/4’ clear tempered glass (red tinted) | |||||||||||
024 | 12 | Red Bronze Mullion Glass Interior Walls (4’ Knee Walls) at 2 Meal | $ | 28,980 | $ | — | P | 3/31/2011 | MCC | Clear Glass; No change | ||||||||||||
025 | 12 | Red Bronze Mullion Glass Interior Walls (12’ Full Ht Walls) at 2 Meal | $ | 21,735 | $ | — | P | 3/31/2011 | MCC | Clear Glass; No change | ||||||||||||
026 | 12 | Replace Glass Countertops at Main Bars in 2 Meal with Stone (similar to back bar stone) | P | 3/31/2011 | Marnell | |||||||||||||||||
027 | 12 | Change Black Metal Column Wraps (formed) at Main Dining in Steakhouse to drywall wrap with metal cladding | $ | 104,808 | $ | (40,308 | ) | A | 3/31/2011 | Marnell | Change material to $10K per column installed — metal cladding on drywall (framed) | |||||||||||
028 | 12 | Revise Black Metal Tie Back Rods and Trellis at Steakhouse to be wood/light ga metal frame to look like steel (powder coat) | $ | 260,400 | $ | (100,000 | ) | A | 3/31/2011 | Marnell | Revisit design and see if we can lighten the load as does not have to be metal: Price includes backup steel support | |||||||||||
029 | 12 | Change Bronze Standing Seam Metal to paint grade metal at Entry to Steakhouse | $ | 121,483 | $ | (25,000 | ) | A | 3/31/2011 | Marnell | Provide paint grade metal roof | |||||||||||
030 | 12 | Change Black Metal Buttress at Ceiling in Steakhouse to Wood Buttresses | $ | 106,332 | $ | (46,332 | ) | A | 3/31/2011 | Marnell | Change from metal to wood buttresses | |||||||||||
031 | 12 | Delete Beveled/ Colored Glass Glazing System at Wine Storage and Restroom Wall at Steakhouse (Elev 8 & 9 22.001) and replace with Planked Wood with Pol Stl Straps (sim to 4/22.002) | $ | 230,300 | $ | (46,240 | ) | A | 3/31/2011 | Marnell | ||||||||||||
032 | 12 | Glazing system with Black Mullions at Steakhouse Facade / Entry | $ | 74,214 | $ | (23,814 | ) | A | 3/31/2011 | Marnell | Change to wood system to look like metal | |||||||||||
033 | 12 | Glazing system with Black Mullions at Steakhouse Entry | $ | 35,340 | $ | (11,340 | ) | A | 3/31/2011 | Marnell | Change to wood system to look like metal | |||||||||||
034 | 12 | Wall Hung Solid Surface Partitions / Pilasters w Wood doors at Public Restrooms 1166, 1167,1168 — $5,320/stall, reduce to | $ | 47,889 | $ | (16,389 | ) | A | 3/31/2011 | CT | Propose going to full drywall front with door, casing and stone Partitions | |||||||||||
035 | 03 | Wall Hung Solid Surface Partitions / Pilasters w Wood Doors at Public Restrooms in Casino- $5,320/stall, reduce to $3,500/stall | $ | 335,223 | $ | (114,723 | ) | A | 3/31/2011 | CT | Propose going to full drywall front with door, casing and stone partitions | |||||||||||
036 | 03 | Use painted MDF at Casino Entry “Fluted” millwork at entry die wall / soffit at elev +24 | $ | 712,800 | $ | (421,200 | ) | A | 1/31/2011 | Marnell | Popular painted bronze applied to drywall framing to match columns USE WOOD LOOK VINYL WC (UP) Laminate (LOWER) | |||||||||||
037 | 03 | Use painted MDF at Casino Entry “Fluted” False Beams at Columns | $ | 712,800 | $ | (421,200 | ) | A | 3/31/2011 | Marnell | Popular painted bronze applied to drywall framing to match columns | |||||||||||
038 | 03 | Use painted MDF at Casino Entry “Fluted” False Beams at Casino Side | $ | 801,900 | $ | (473,850 | ) | A | 3/31/2011 | Marnell | Popular painted bronze applied to drywall framing to match columns | |||||||||||
039 | 03 | Delete Casino Entry Bronze Column Front and Back and paint bronze | $ | 180,000 | $ | (178,760 | ) | A | 3/31/2011 | Marnell | Popular painted bronze applied to drywall framing to match columns |
2 of 6
STATUS CODE | ||||||||||||||||||||||||
Cost Included | A – Approved | |||||||||||||||||||||||
in Current | Estimated | NA – Not Approved | ||||||||||||||||||||||
Item # | Sub Job # | Scope Description | Budget | Potential Savings | P – Pending | Date | Resp | Notes | ||||||||||||||||
040 | 03 | Utilize Wood in lieu of Metal at Casino Entry 36.5′ Decorative Front (Cat Tail Design, Laser Cut) | $ | 385,000 | $ | (135,000 | ) | A | 3/31/2011 | Wood frame with laser cat tail applied to frame? REDUCE THE 385K TO 250k ALLOWANCE | ||||||||||||||
041 | 03 | Replace Stained Wood Beam, Various Height above Table Games in Casino to MDF box with wallcovering | $ | 698,830 | $ | (610,830 | ) | A | 3/31/2011 | CT | Use MDF “boxes” with OFCI wood wallcovering in lieu of wood beams (no drywall framing). Note the ceiling area has been reduced on the new drawings | |||||||||||||
042 | 03 | Revise Millwork Paneling at High Limit Entry to applied moldling on veneer | $ | 136,356 | priced veneer | VOID | 3/31/2011 | CT | Applied molding on veneer | |||||||||||||||
043 | 03 | Reduce petrified wood at entry into High Limit to only the (2) entrances. Delete petrified wood at cash cage and replace with wood paneling. | $ | 134,700 | $ | (74,940 | ) | A | 3/31/2011 | CT | Delete petrified wood at facade and cash cage, leaving (23) entrances with petrified wood (FRONT FACE ONLY). Replace with OFCI upholstery | |||||||||||||
044 | 03 | Decorative Polished Bronze Rail at Entry to High Limit | $ | 44,356 | NA | 3/31/2011 | Radius driving the cost of railing | |||||||||||||||||
045 | 03 | Wood Paneling with Leather Upholstery at Radius Room in High Limit | $ | 147,229 | priced veneer | P | 3/31/2011 | CT | Applied molding on veneer (Venetian plaster w/ gold leaf?) | |||||||||||||||
046 | 03 | Delete Wood Plank and Beam Ceiling at Slots in High Limit and replace with wallcovering | $ | 153,428 | $ | (139,028 | ) | A | 3/31/2011 | CT | Alt. to deduct wood and use wallcovering at beams (NOTHING AT TABLES) | |||||||||||||
047 | 03 | Reduce cost for Decorative Metal Handrail at Buffet Houses / Servery from $750/IF to $250/IF in Buffet | $ | 187,500 | $ | (125,000 | ) | A | 3/31/2011 | Marnell | $250 / LF installed — only rail at top and bottom, see new CD’s | |||||||||||||
048 | 03 | Reduce cost for Queuing Rails (fixed) from $436/If to $250/If in Buffet | $ | 76,300 | $ | (32,550 | ) | A | 3/31/2011 | Marnell | $250 / LF installed — only rail at top and bottom, see new CD’S | |||||||||||||
049 | 03 | Banquette Die-walls at Houses in Buffet and in general | $ | 21,715 | VOID | 3/31/2011 | Wall between by MCC | |||||||||||||||||
050 | 03 | 10’ Oiled Black Glass Wall at Lighthouse (with operable doors) in Buffet | $ | 119,000 | $ | (34,000 | ) | A | 3/31/2011 | Marnell | Change to wood system to look like metal | |||||||||||||
051 | 03 | 10’ Oiled Black Glass Wall at Dining Areas (Houses) in Buffet | $ | 350,000 | $ | (37,500 | ) | A | 3/31/2011 | Marnell | Change to wood system to look like metal | |||||||||||||
052 | 03 | 10’ Oiled Black Glass Wall at Private Dining in Buffet | $ | 84,000 | $ | (9,000 | ) | A | 3/31/2011 | Marnell | Change to wood system to look like metal | |||||||||||||
053 | 03 | Operable Doors at Dining Areas / Private Dining in Buffet | $ | 34,529 | $ | — | P | 3/31/2011 | Leave as allowance | |||||||||||||||
054 | 03 | 12’ Oiled Black Glass Wall at Open Seating in Buffet | $ | 74,200 | $ | (7,950 | ) | A | 3/31/2011 | Marnell | Change to wood system to look like metal | |||||||||||||
055 | 03 | 7’ Oiled Black Glass Wall at Host Stand in Buffet | $ | 18,620 | $ | (1,995 | ) | A | 3/31/2011 | Marnell | Change to wood system to look like metal | |||||||||||||
056 | 03 | Alternate Material for Ceiling Molding at VIP Lounge | $ | 284,456 | $ | — | P | 3/31/2011 | CT | $284,456. total for ceilings — cost includes faux finish GFRG to look like stain wood (Look at profiles for cost efficiency.) | ||||||||||||||
057 | 03 | Replace Onyx Top at VIP Lounge Restroom Vanity with Granite | $ | 10,514 | $ | (5,614 | ) | A | 3/31/2011 | CT | Vanity with standard granite top ($20 / SF material allowance for stone top) | |||||||||||||
058 | 03 | Delete Antique Ceiling at VIP Entry and replace with wallcovering | P | 3/31/2011 | CT | Need direction from CD’s | ||||||||||||||||||
059 | 05 | Replace Metal Grillwork at Fireplace in Hotel Lobby with Wood Scrollwork | $ | 63,750 | $ | (18,750 | ) | A | 3/31/2011 | CT | Use laminated MDF in lieu of metal scrollwork | |||||||||||||
060 | 05 | Delete 6′ Wainscot at Hotel Level 1 Corridor and replace with wallcovering, base, chair and crown | $ | 81,000 | $ | (68,760 | ) | A | 3/31/2011 | CT | Wood base, chair, crown | |||||||||||||
061 | 05 | Delete 6’ Wainscot at Hotel MPR and replace with wallcovering, base, chair and crown | $ | 59,850 | $ | (48,098 | ) | A | 3/31/2011 | CT | ||||||||||||||
062 | 05 | Verify Hotel Lobby at Level 2 Ceiling | $ | 162,250 | $ | — | P | 3/31/2011 | MCC | Need more detail to define scope (Price new ceiling design.) | ||||||||||||||
063 | 12 | Revise BOH Corridor wainscot from diamond plate to (3) ea 2x6 at Low Rise | $ | 10,300 | P | 3/31/2011 | Marnell / Manning | Need direction from CD’s | ||||||||||||||||
064 | .05 | Revise BOH Corridor wainscot from diamond plate to (3) ea 2x7 at Hotel | $ | 50,500 | P | 3/31/2011 | Marnell / Manning | Need direction from CD’s | ||||||||||||||||
Div. 7 — Thermal and Moisture Protection | ||||||||||||||||||||||||
065 | 05 | Delete Double Stud Exterior Framing at Hotel Column Pops Out by Changing Slab Edge Design above Level 2 | VOID | 3/31/2011 | No cost savings (Level 0-2 slab extensions underway.) | |||||||||||||||||||
066 | 03 | Delete standing seam metal roof at Loading Dock to Levee | $ | 60,140 | $ | (60,140 | ) | A | 3/31/2011 | Marnell / Manning | Straight deduct Explore Pre-fabricated Walkway & eliminate at roadway crosswalks | |||||||||||||
067 | 12 | Replace Composite Metal Panel at Radius Planter Wall with Corrugated Metal Panel | $ | 38,220 | $ | (17,745 | ) | A | 3/31/2011 | Marnell / Manning | ||||||||||||||
068 | 12 | Replace column wraps at Steakhouse Exterior with EIFS | $ | 25,256 | $ | (7,216 | ) | A | 3/31/2011 | Marnell / Manning |
3 of 6
STATUS CODE | ||||||||||||||||||||||||
Cost Included | A – Approved | |||||||||||||||||||||||
in Current | Estimated | NA – Not Approved | ||||||||||||||||||||||
Item # | Sub Job # | Scope Description | Budget | Potential Savings | P – Pending | Date | Resp | Notes | ||||||||||||||||
Div. 8 - Openings | ||||||||||||||||||||||||
069 | 05 | Delete Green Screen System at Service Level of Hotel | $ | 22,400 | $ | — | NA | 3/31/2011 | ||||||||||||||||
070 | 12 | Delete Louvers at Level 11.5 in the hotel and replace with EIFS | $ | 87,573 | $ | (23,573 | ) | A | 3/31/2011 | Marnell / Manning | ||||||||||||||
071 | 04 | Delete Glass at Levels 1, 2 & 3 at Elevator Connector and leave as open air | P | 3/31/2011 | Marnell / Manning | Need direction from CD’s | ||||||||||||||||||
072 | 04 | Delete finishes at Level 1, 2 & 3 Elevator Connector Lobbies and leave as open air | P | 3/31/2011 | Marnell / Manning | Need direction from CD’s | ||||||||||||||||||
073 | 03 | Reduce Glass Height at VIP Wall by 4’ 2” and replace with metal panels. | P | 3/31/2011 | Marnell / Manning | Need direction from CD’s | ||||||||||||||||||
074 | 05 | Reduce Fixed Airfoil Louvers at Hotel Level 12 | $ | 132,847 | VOID | 3/31/2011 | Marnell / Manning | Marnell to redesign | ||||||||||||||||
Div. 9 - Finishes | ||||||||||||||||||||||||
075 | 05 | Deduct waterproofing at guestroom floors (waterproofing called out In specs) | $ | 120,000 | $ | (120,000 | ) | A | 3/31/2011 | Manning | Straight deduct: This is every “wet” area | |||||||||||||
076 | 05 | Deduct epoxy grout at guestroom floors (epoxy called in specs) | $ | 30,000 | $ | (30,000 | ) | A | 3/31/2011 | Manning | Straight deduct: Propose blended epoxy grout | |||||||||||||
077 | 12 | Deduct waterproofing at public area/BOH restroom floors at Low Rise | $ | 10,190 | $ | — | NA | 3/31/2011 | ||||||||||||||||
078 | 12 | Deduct epoxy grout at public area/BOH restroom floors at Low Rise | $ | 8,971 | $ | (8,971 | ) | A | 3/31/2011 | Manning | Straight deduct: Propose blended epoxy grout | |||||||||||||
079 | 03 | Deduct waterproofing at public area/BOH restroom floors at Casino | $ | 20,410 | $ | — | NA | 3/31/2011 | ||||||||||||||||
080 | 03 | Deduct epoxy grout at public area/BOH restroom floors at Casino | $ | 18,257 | $ | (18,257 | ) | A | 3/31/2011 | Manning | Straight deduct: Propose blended epoxy grout | |||||||||||||
081 | Add Schluter “tile ready” pan | $ | 118,800 | A | 3/31/2011 | Manning | ||||||||||||||||||
082 | 12 | Delete Airfoil Sunscreens at Pedestrian Bridge | $ | 267,600 | $ | (167,600 | ) | A | 3/31/2011 | Marnell | ||||||||||||||
083 | 12 | Provide in lieu of stone wainscot at Pedestrian Bridge. | $ | 63,560 | P | 3/31/2011 | MCC | Price Porcelain Tile/Match floor in lieu of wallcovering | ||||||||||||||||
084 | 12 | Provide carpet border in lieu of stone border at Pedestrian Bridge | $ | 21,470 | $ | — | NA | 3/31/2011 | Cost of OFCI Carpet | |||||||||||||||
085 | 12 | Delete stone pilasters at promenade and add chem metal or resin panels at side of columns | $ | (200,000 | ) | A | 3/31/2011 | Marnell | Need column design for takeoff and replacement material #: See highlighted drawings for intent of stone & target $200K | |||||||||||||||
086 | 12 | Reduce concrete tiles with Images at 2 meal (Currently have 450 SF in the budget — CD’s show more SF) | $ | 56,000 | P | 3/31/2011 | Marnell / MCC | Need direction from CD’s (Verify that the new design - budgeted footage.) | ||||||||||||||||
087 | 03 | Replace Casino Entry Antique Bronze Glass Tile at Casino Entry Column Sides with resin, paint of wallcovering | $ | 53,460 | P | 3/31/2011 | Marnell | Resin panels? Chem metal alt. - $20 / SF installed (Review different material types (Custom Tile / Marnell Mat’l = $15 / SF) | ||||||||||||||||
088 | 03 | Delete Casino Entry Structural Framing at Entry (Radiused 12” channel / Cross Member, Clad with Bronze to match columns) and add drywall box beams | $ | 16,320 | P | 3/31/2011 | Marnell | No steel beams: Drywall painted to match columns | ||||||||||||||||
089 | 03 | Delete Casino Entry bronze Cladding at Radiused Entry Steel and add paint | $ | 68,000 | P | 3/31/2011 | Marnell | No steel beams: Drywall painted to match columns | ||||||||||||||||
090 | 03 | Delete Casino Entry Structural Framing at “Octagon” Shapes (C12x30, Clad with Bronze to match columns) and add drywall box beams | $ | 28,000 | P | 3/31/2011 | Marnell | No steel beams: Drywall painted to match columns |
4 of 6
STATUS CODE | ||||||||||||||||||||||||
Cost included | A – Approved | |||||||||||||||||||||||
in Current | Estimated | NA – Not Approved | ||||||||||||||||||||||
Item # | Sub Job # | Scope Description | Budget | Potential Savings | P – Pending | Date | Resp | Notes | ||||||||||||||||
091 | 03 | Delete Casino Entry Bronze Cladding at ‘Octagon” box beam and add paint | $ | 100,000 | P | 3/31/2011 | Marnell | No Steel beams: Drywall painted to match columns | ||||||||||||||||
092 | 03 | Replace 12"x12"x5" Hunter Douglas Open Grid Ceiling in Casino to 26"x26"x5" Open Grid | $ | 556,800 | $ | (204,872 | ) | A | 3/31/2011 | CT | KHSS (26" x 26") | |||||||||||||
093 | 03 | Reduce petrified wood at entry into High Limit to only the (2) entrances. Delete petrified wood at cash cage. | $ | (88,600 | ) | A | 3/31/2011 | CT | Delete petrified wood at façade and cash cage, leaving (2) entrances with petrified wood. (Replace with ???) | |||||||||||||||
094 | 03 | Replace $200 / SF material Hand Painted tile at Buffet Serving Line with $30 / SF material accent tile | $ | 50,000 | $ | (40,000 | ) | A | 3/31/2011 | Marnell | $10K installed: Budgeted amount = 10% of the area | |||||||||||||
095 | 03 | Delete Wood Tile at Fish Camp Ceilings in Buffet (double up with Wood Flooring) | $ | (80,000 | ) | A | 3/31/2011 | Marnell | Double up in GMP | |||||||||||||||
096 | 03 | Reduce wood flooring at Buffet and replace with carpet | P | 3/31/2011 | Marnell | |||||||||||||||||||
097 | 03 | Delete Fireplace at Buffet, (Includes box and block) | $ | 40,000 | $ | (25,000 | ) | A | 3/31/2011 | Marnell | Continue Millwork at Fireplace: Allowance of $15,000. | |||||||||||||
098 | 03 | Delete Fireplace façade at Buffet | $ | 8,280 | $ | (8,280 | ) | A | 3/31/2011 | Marnell | ||||||||||||||
099 | 03 | Replace T&G Wood Ceilings at Buffet Fish Camp with False Ceilings | P | 3/31/2011 | Marnell | Need direction from CD's | ||||||||||||||||||
100 | 03 | Delete Venetian Plaster at Feature Bar Walls and replace with FFE Mural | $ | 11,664 | $ | (11,664 | ) | A | 3/31/2011 | CT | This will be an FF & E item. | |||||||||||||
101 | 03 | Alternate Wood grain Perforated Ceiling tile at MPR | $ | 281,568 | P | 3/31/2011 | CT | DESIGN TEAM TO PROVIDE SOME ALTERNATE MATERIALS (KHSS/ Baker to provide alternate material?) | ||||||||||||||||
102 | 03 | Alternate Wood grain Lay In Ceiling at Buffet Dining | $ | 54,907 | P | 3/31/2011 | CT | Alternate material that looks like wood? | ||||||||||||||||
103 | 03 | Delete Upgraded Framing at Stone Framed Openings (5#/SF) at Prefunction Service Bars | $ | 4,095 | $ | (4,095 | ) | A | 3/31/2011 | CT | ||||||||||||||
104 | 03 | Delete Stone Framed Openings at Portable Bars (2 openings) at Prefunction Service Bars | $ | 46,800 | P | 3/31/2011 | CT | Replace with Wood Frame (ADD BACK WOOD FRAME) | ||||||||||||||||
105 | 05 | Delete Venetian Plaster above wainscot at Hotel Level 1 Corridor and replace with wallcovering | $ | 14,580 | $ | (12,150 | ) | A | 3/31/2011 | CT | ||||||||||||||
106 | 05 | Delete Venetian Plaster above wainscot at Hotel Level 2 Lobby and replace with wallcovering | $ | 18,000 | $ | (15,000 | ) | A | 3/31/2011 | CT | ||||||||||||||
107 | 05 | Delete Venetian PlasteraHotel Multi Purpose Room and replace with wallcovering | $ | 21,546 | $ | (21,546 | ) | A | 3/31/2011 | CT | Wallcovering OFCI and cost in Div. 6 with the millwork change | |||||||||||||
108 | 05 | Replace $70 / SF (material) vanity accent tile in Suites with $20 / SF (material) tile | $ | 225,000 | $ | (145,000 | ) | A | 3/31/2011 | CT | $80k — Installed | |||||||||||||
109 | 05 | Replace $60 / SF (material) glass tile at wet bar in Suites with $30 / SF (material) glass tile | $ | 79,000 | $ | (33,000 | ) | A | 3/31/2011 | CT | $46k — Installed | |||||||||||||
110 | 05 | Reduce material allowance for Hotel Level 1 Lobby tile mural at Registration Desk from $75 / SF to $30 / SF | $ | 25,000 | $ | (18,250 | ) | A | 3/31/2011 | CT | $11,500 — installed (Utilize a $60/sf material.) | |||||||||||||
111 | 03 | Delete ACT in Level 2 Storage Rooms | $ | (5,392 | ) | A | 3/31/2011 | Need direction from CD's | ||||||||||||||||
Div 10 - Specialties | ||||||||||||||||||||||||
112 | 03 | Delete all code required / graphics at Casino | $ | 122,947 | $ | (122,947 | ) | A | 4/19/2011 | MCC | Straight Deduct — TO BE OFOI, PURCHASE WITH ALL OTHER SIGNAGE | |||||||||||||
113 | 04 | Delete all code required / graphics at Garage | $ | 62,241 | $ | (62,241 | ) | A | 4/19/2011 | MCC | Straight Deduct TO BE OFOI, PURCHASE WITH ALL OTHER SIGNAGE | |||||||||||||
114 | 05 | Delete all code required / graphics at Hotel | $ | 98,583 | $ | (98,583 | ) | A | 4/19/2011 | MCC | Straight Deduct — TO BE OFOI, PURCHASE WITH ALL OTHER SIGNAGE | |||||||||||||
115 | 12 | Delete all code required / graphics at Low Rise | $ | 49,667 | $ | (49,667 | ) | A | 4/19/2011 | MCC | Straight Deduct — TO BE OFOI, PURCHASE WITH ALL OTHER SIGNAGE | |||||||||||||
116 | 12 | Delete all code required / graphics at Bridge | $ | 6,351 | $ | (6,351 | ) | A | 4/19/2011 | MCC | Straight Deduct — TO BE OFOI, PURCHASE WITH ALL OTHER SIGNAGE | |||||||||||||
117 | 07 | Delete (4) OH Coiling Doors at Central Plant and replace with knock out panels | $ | 48,000 | P | 3/31/2011 | Manning |
5 of 6
STATUS CODE | |||||||||||||||||||||||||||||
Cost included | A – Approved | ||||||||||||||||||||||||||||
in Current | Estimated | NA – Not Approved | |||||||||||||||||||||||||||
Item # | Sub Job # | Scope Description | Budget | Potential Savings | P – Pending | Date | Resp | Notes | |||||||||||||||||||||
Div. 11 - Equipment | |||||||||||||||||||||||||||||
118 | 03 | Eliminate Service Dock Equipment at Casino | $ | 50,000 | $ | (50,000 | ) | A | 3/31/2011 | MCC | Straight deduct | ||||||||||||||||||
119 | 05 | Delete Fireplace at Hotel Lobby | $ | 45,000 | $ | (22,500 | ) | A | 3/31/2011 | CT | Straight deduct | ||||||||||||||||||
Div. 13 - Special Construction | |||||||||||||||||||||||||||||
120 | 05 | Eliminate Water Feature | $ | 100,000 | $ | (100,000 | ) | A | 3/31/2011 | Marnell / Manning | Propose water feature as an FF&E item. | ||||||||||||||||||
121 | Eliminate Employee Walkway Structure at Support Facility to Levee, leave erosion control and slab on grade | $ | 786,624 | $ | (411,416 | ) | A | 3/31/2011 | Marnell / Manning | Leave sitework and SOG: Explore Prefabricated Walkway - Target $30 / SF for Prefabricated Walkway | |||||||||||||||||||
122 | Eliminate Public Parking Walkway at Garage | $ | 607,999 | $ | (607,999 | ) | A | 3/31/2011 | Marnell / Manning | Eliminate covered walkway complete (incl. foundations, et. al.), except sidewalk | |||||||||||||||||||
Div. 15 - Machanical (Div. 22 & 23 - Plumbing & Mechanical) | |||||||||||||||||||||||||||||
123 | 05 | Alternate plumbing fixtures for the guestrooms | $ | — | $ | (200,000 | ) | A | 3/31/2011 | MSA | Target Reduction: To be finalized after the model room review | ||||||||||||||||||
124 | 03, 05 & 12 | Insulation Specification Changes — Possible use of Polyiso Insulation | P | 3/31/2011 | MSA | ||||||||||||||||||||||||
125 | 04 | Reduce Qty of Interior Floor Drains throughout the garage | $ | 60,000 | P | 3/31/2011 | MSA | Discuss with the Design Team | |||||||||||||||||||||
126 | 03 & 12 | Eliminate Separate 140 & 120 Degree Domestic Water Loops, use local mining valves | $ | 150,000 | $ | (100,000 | ) | A | 3/31/2011 | MSA | |||||||||||||||||||
127 | 03 | Reduce Airflow Qty for Casino units from 42,000 cfm to 30,000 cfm | $ | 400,000 | $ | — | NA | 3/31/2011 | This item will not be pursued per PNK. | ||||||||||||||||||||
128 | 07 | Eliminate Cooling Unit from Fire Pump Room at CEP | $ | 10,000 | $ | — | NA | 3/31/2011 | Hughes will not allow this change. | ||||||||||||||||||||
129 | 03 & 12 | Change (4) sanitary lift station tanks to fiberglass in lieu of Highland (as specified) | $ | 355,000 | $ | (155,000 | ) | A | 3/31/2011 | MSA | |||||||||||||||||||
130 | 03 | HVAC Exhaust/Supply Requirements changes for Vessel Support/Generators | $ | 200,000 | $ | (50,000 | ) | A | 3/31/2011 | MSA | MSA/MECC to review requirements | ||||||||||||||||||
Div. 16 - Electrical (Div. 26 - Electrical) | |||||||||||||||||||||||||||||
131 | 12 | Review / Reduce Interior Light fixture package at 2 Meal, Promenade and Steakhouse (ALTERNATE FIXTURES) | $ | (350,000 | ) | A | 3/31/2011 | IC | Total reduction for Wet Side is $1M. (Item #131 & #132) | ||||||||||||||||||||
132 | 03 | Review / Reduce Interior Light fixture package at Buffet, Public Restrooms. Poker, Feature Bar, High Limit (ALTERNATE FIXTURES) | $ | (650,000 | ) | A | 3/31/2011 | IC | Total reduction for Wet Side is $1M. (Item #131 & #132) | ||||||||||||||||||||
133 | 05 | Review / Reduce Interior Light fixture package at Hotel (ALTERNATE FIXTURES) | $ | (200,000 | ) | A | 3/31/2011 | IC | |||||||||||||||||||||
134 | 05 | Increase Exterior Light fixture spacing at West Elevation of Hotel (with above) | See Items #133 | 3/31/2011 | IC | ||||||||||||||||||||||||
135 | 12 | Increase Exterior Light fixture spacing at North Elevation of Low Rise (with above) | See Item #131/132 | 3/31/2011 | IC | ||||||||||||||||||||||||
136 | 03 | Reduce Specialty Lighting Allowance from $10 / SF to $5 / SF (Casino) | $ | 994,210 | $ | (497,105 | ) | A | 3/31/2011 | IC | MCC Specialty SF Allowance | ||||||||||||||||||
137 | 12 | Reduce Specialty Lighting Allowance from $10 / SF to $5 / SF (Low Rise) | $ | 264,630 | $ | (132,315 | ) | A | 3/31/2011 | IC | MCC Specialty SF Allowance | ||||||||||||||||||
Totals: | $ | 17,858,906 | $ | (10,160,309 | ) | Target $8M | |||||||||||||||||||||||
6 of 6
5/11/2011
ALLOWANCES
PINNACLE ENTERTAINMENT BATON ROUGE SCHEME #6 PROGRAM
HOTEL & CASINO
ITEM #A- | DESCRIPTION | AMOUNT | ||||||
1 | MCC has included an allowance to delete the structural steel framing and privacy screen meal wall panel at the roof top equipment on the low rise per VE Item #12 & #13 approved 3/31/2011. ($86,180. Div 5 & $107,725. Div. 7) | (173,905 | ) | |||||
2 | MCC has included an allowance to delete the structural steel framing and privacy screen metal wall panel at the roof top equipment on the casino per VE Item #12 & #13 approved 3/31/2011 ($165,060. Div. 5 & $208.882. Div. 7) | (333,942 | ) | |||||
3 | MCC has included an allowance to delete the standing seam metal roof at the podium service dock per VE Item #66 approved 3/31/2011 | (60,140 | ) | |||||
4 | MCC has included an allowance to replace composite metal panels at radius planter wall with corrugated metal panels per VE Item #66 approved 3/31/2011 | (17,745 | ) | |||||
5 | MCC has included an allowance to replace column wraps at Steakhouse exterior with EIFS per VE Item #68 approved 3/31/2011 | (7,216 | ) | |||||
6 | MCC has included an allowance to delete louvers at Level 11.5 in the Hotel and replace with EIFS per VE Item #70 approved 3/31/2011 | (23,573 | ) | |||||
7 | MCC has included an allowance to delete Airfoil Sunscreens at the Pedestrian Bridge per VE Item #82 approved 3/31/2011 | (167,600 | ) | |||||
8 | Delete waterproofing at guestroom bathroom floors (waterproofing called out in specs) per VE Item #75 approved 3/31/2011 | (120,000 | ) | |||||
9 | Delete requirement for epoxy grout at guestroom bathroom floors (epoxy called in specs) per VE Item #76 approved 3/31/2011 | (30,000 | ) | |||||
10 | Delete requirement for epoxy grout at public area/BOH restroom floors at Low Rise per VE Item #78 approved 3/31/2011 | (8,971 | ) | |||||
11 | Delete requirement for epoxy grout at public area/BOH restroom floors at Casino per VE Item #80 approved 3/31/2011 | (18,257 | ) | |||||
12 | Add Schluter “Tile Ready” pan system at Hotel guestroom showers per VE Item #81 approved 3/31/2011 | 118,800 | ||||||
13 | MCC has included an allowance to reduce the millwork and theming scope of worK for the public areas of the hotel, low rise and casino by $4,054,127 | (4,054,127 | ) | |||||
14 | MCC has included an allowance to reduce the tile / stone scope of work for the public areas of the hotel, low rise and casino. | (441,880 | ) | |||||
15 | MCC has included an allowance to replace $70/SF (material) vanity accent tile in Suites with $20/SF (material) tile per VE Item #108 approved 3/31/2011 | (145,000) | ||||||
16 | MCC has included an allowance to replace $60/SF (material) glass tile at wet bar in Suites with $30/SF (material) glass tile per VE Item #109 approved 3/31/2011 | (33,000 | ) | |||||
17 | MCC has included an allowance to reduce the Hotel Level 1 Lobby Registration Desk tile mural from $75/SF (material) to $30/SF (material) per VE Item #110 approved 3/31/2011 | (18,250 | ) | |||||
18 | MCC has included an allowance to replace the Casino area 12"xl2"x5" Hunter Douglas open grid ceiling with 26"x26"x5" open grid ceiling per VE Item #92 approved 3/31/2011 | (204,872 | ) | |||||
19 | MCC has included an allowance to delete the Casino Feature Bar venetian plaster walls and replace with an OFOI FFE mural per VE Item #100 approved 3/31/2011 | (11,664 | ) | |||||
20 | MCC has included an allowance to delete the venetian plaster above the wainscot at the Hotel Level 1 Corridor and replace with OFCI wall covering per VE Item #105 approved 3/31/2011 | (12,150 | ) |
1 of 4
5/11/2011
ALLOWANCES
PINNACLE ENTERTAINMENT BATON ROUGE SCHEME #6 PROGRAM
HOTEL&CASINO
ITEM #A- | DESCRIPTION | AMOUNT | ||||||
21 | MCC has included an allowance to delete the venetian plaster above the wainscot at the Hotel Level 2 Lobby and replace with OFCI wall covering per VE item #106 approved 3/31/2011 | (15,000 | ) | |||||
22 | MCC has included an allowance to delete the venetian plaster at the Hotel Multi- Purpose Room and replace with OFCI wall covering per VE Item #107 approved 3/31/2011 | (21,546 | ) | |||||
23 | MCC has included an allowance of $175/SF for the Hotel Sundries Shop interior finishes. | 148,575 | ||||||
24 | MCC has included an allowance to delete all Casino code required way finding graphics per VE Item #112 approved 4/19/2011 | (122,947 | ) | |||||
25 | MCC has included an allowance to delete all Parking Garage and Connector code required way finding graphics at Garage per VE Item #113 approved 4/19/2011 | (62,241 | ) | |||||
26 | MCC has included an allowance to delete all Hotel code required way finding graphics per VE Item #114 approved 4/19/2011 | (98,583 | ) | |||||
27 | MCC has included an allowance to delete all Low Rise Podium code required way finding graphics per VE Item #115 approved 4/19/2011 | (49,667 | ) | |||||
28 | MCC has included an allowance to delete all Pedestrian Bridge code required way finding graphics per VE Item #116 approved 4/19/2011 | (6,351 | ) | |||||
29 | MCC has included an allowance for the Support Facility loading dock equipment. | 50,000 | ||||||
30 | MCC has included an allowance for upgrading the Low Rise Podiurn feature tower. | 100,000 | ||||||
31 | MCC has included an allowance to delete the Low Rise Podium / Casino service dock equipment per VE Item #118 approved 3/31/2011 | (50,000 | ) | |||||
32 | MCC has included an allowance to delete the Hotel Lobby 2 sided fireplace and replace with a 1 sided fireplace per VE Item #119 approved 3/31/2011 | (22,500 | ) | |||||
33 | MCC has included an allowance for the food service equipment ($5,096,465.) and the beverage conduits ($120,000.). | 5,216,465 | ||||||
34 | MCC has included an allowance to delete the surface parking lot / parking garage open air public walkway per VE Item #122 approved 3/31/2011. | (607,999 | ) | |||||
35 | MCC has included an allowance to utilize a prefabricated aluminum awning with a 5” slab-on-grade for the employee walkway per VE Item #121 approved 3/31/2011 | (411,416 | ) | |||||
36 | MCC has included an allowance to eliminate the Hotel roof top pool area water feature per VE Item #120 approved 3/31/2011 | (100,000 | ) | |||||
37 | MCC has included an allowance for the Hotel roof top pool bar millwork, stone tops and MEP equipment. (The kitchen equipment is included in Allowance Item #033.) | 100,000 | ||||||
38 | MCC has included an allowance for the installation of the casino vessel hull paddlewheel | 15,000 | ||||||
39 | MCC has included an allowance of $15,000 ($5,000 for 3 doors) for custom etching at the Hotel Level 53 passenger elevator hallway doors. | 15,000 | ||||||
40 | MCC has included an allowance of $22,500 for temporary work platforms to be installed and removed within the hoist ways for elevator equipment installation access at the tops of the shafts prior to the shaft enclosure as required by the GEN2 elevators that have been specified. (4 EA@Casino / 2 EA @ Podium / 2 EA @ PG) | 22,500 |
2 of 4
5/11/2011
ALLOWANCES
PINNACLE ENTERTAINMENT BATON ROUGE SCHEME #6 PROGRAM
HOTEL & CASINO
ITEM #A- | DESCRIPTION | AMOUNT | ||||||
41 | MCC has included and allowance of $15,000 / EA for the three Casino passenger elevator cab flooring, ceiling, rear wall and side wall interior finishes. | 45,000 | ||||||
42 | MCC has included and allowance of $15,000 / EA for the three Hotel passenger elevator cab flooring, ceiling, rear wall and side wall interior finishes. | 45,000 | ||||||
43 | MCC has included and allowance of $15,000 / EA for the four Parking Garage Connector passenger elevator cab flooring, ceiling, rear wall and side wall interior finishes. | 60,000 | ||||||
44 | MCC has included and allowance of $15,000 / EA for the one Pedestrian Bridge passenger elevator cab flooring, ceiling, rear wall and side wall interior finishes. | 15,000 | ||||||
45 | MCC has included an allowance for the casino vessel basin make-up water system. | 100,000 | ||||||
46 | MCC has included an allowance for the low rise podium grease tanks and sewage lift station tanks including all pumps and controls. This allowances does not include the costs for any additional structural steel or supports required for supporting / hanging these tanks from the Low Rise Podium and / or Vessel structural steel. ($170,000. Casino & $225,000. Podium) | 395,000 | ||||||
47 | MCC has included an allowance to utilize alternate plumbing fixture manufacturers at the Hotel per VE Item #123 approved 3/31/2011. | (200,000 | ) | |||||
48 | MCC has included an allowance to modify the 140 degree hot water loop design by modifying the pipe routing and utilizing local mixing valves to provide 120 degree domestic hot water at the required points of use at the Low Rise podium and Casino per VE Item #126 approved 3/31/2011. ($50,000. Casino & $50,000. Podium) | (100,000 | ) | |||||
49 | MCC has included an allowance for the Casino Vessel Support Generator(s) HVAC Exhaust / Supply requirement changes per VE Item #130 approved 3/31/2011 | (50,000 | ) | |||||
50 | MCC has included an allowance of $375,000. for all landscape lighting and the OFOI site signage lighting. | 375,000 | ||||||
51 | MCC has included an allowance to reduce the Levee elevated road sixty-five (65 EA) each decorative light pole unit cost from $8,500. / EA to $5,500. / EA per VE Item #003 approved 3/31/2011. | (195,000 | ) | |||||
52 | MCC has included an allowance to reduce the Podium interior light fixture package at the 2 Meal, Promenade and Steakhouse (ALTERNATE FIXTURES) per VE Item #131 approved 3/31/2011. | (350,000 | ) | |||||
53 | MCC has included an allowance to reduce the Casino interior light fixture package at the Buffet, Public Restrooms, Poker, Feature Bar and High Limit (ALTERNATE FIXTURES) per VE Item #132 approved 3/31/2911. | (650,000 | ) | |||||
54 | MCC has included an allowance to reduce the interior light fixture package at the Hotel (ALTERNATE FIXTURES) per VE Item #133 approved 3/31/2011. | (200,000 | ) | |||||
55 | MCC has included an allowance to reduce the Casino specialty lighting allowance from $10/SF to $5/SF per VE Item #136 approved 3/31/2011. | (497,105 | ) | |||||
56 | MCC has included an allowance to reduce the Podium specialty lighting allowance from $10/SF to $5/SF per VE Item #137 approved 3/31/2011. | (132,315 | ) | |||||
57 | MCC has included an allowance of $942,486. for the low voltage data and communication wiring, backbone and cover plates. All equipment is OFOI including main phone switch, devices and computers. ($409,823. Vessel / $6,192. PG & Connector/ $345,041. Hotel / $50,738. Central Plant & Support Facility / $99,333. Podium / $31,360. Pedestrian Bridge) | 942,486 |
3 of 4
5/11/2011
ALLOWANCES
PINNACLE ENTERTAINMENT BATON ROUGE SCHEME #6 PROGRAM
HOTEL & CASINO
ITEM #A- | DESCRIPTION | AMOUNT | ||||||
58 | MCC has included an allowance of $767,429. for the low voltage audio visual and background music / paging system wiring, backbone and speakers. All equipment is OFOI including theatrical lighting, light trusses, local venue sound system, multi-purpose room sound system, suite local sound system, overhead projectors / screens and visual display / reader boards.($327,858. Vessel / $6,192. PG & Connector/ $197,166. Hotel / $25,369. Central Plant & Support Facility/ $132,444. Podium / $78,400. Pedestrian Bridge) | 767,429 | ||||||
59 | MCC has included an allowance of $3,075,092. for the low voltage security and surveillance system wiring, backbone and OFCI camera installation / positioning. All surveillance equipment is OFOI except for the cameras. The cameras are OFCI. The Hotel key / suite corridor entry door locking system is OFOI. ($2,458,935. Vessel / $90,186. PG & Connector/ $295,749. Hotel / $50,738. Central Plant & Support Facility / $132,444. Podium / $47,040. Pedestrian Bridge) | 3,075,092 | ||||||
60 | MCC has included an allowance of $100,000. for the proposed Amphitheater electrical and low-voltage services. | 100,000 | ||||||
61 | MCC has included an allowance of $25,000. for the Hotel 2,000 gallon grease trap. | 25,000 | ||||||
62 | MCC has included an allowance to reduce the 6” irrigation water main by 500 LF per VE Item #002 approved 3/31/11. | (25,000 | ) | |||||
63 | MCC has included the cost to utilize shoreblock in lieu of 400# rip rap at the Casino basin T-wall specified by the ACOE per VE Item #004 approved 3/31/2011. | (177,625 | ) | |||||
64 | MCC has included the cost to utilize shoreblock in lieu of the specified rip rap behind the T-wall per VE Item 005 approved 4/20/2011. | (35,035 | ) | |||||
65 | MCC has included an allowance of $100,000 to mill / overlay the existing River Road asphalt from Gardere to the new Central Plant. | 100,000 | ||||||
66 | MCC has included an allowance to reduce the linear footage of the site sanitary sewer lateral piping by 800 LF per VE Item #10 approved 3/31/2011. | (52,000 | ) | |||||
67 | MCC has included an allowance of 16,285 tons of asphalt at a unit price of $125. per ton for the site parking lot and drive lane asphalt. | 2,035,625 |
4 of 4
5/11/2011
PINNACLE BATON ROUGE SCHEME #6 PROGRAM
HOTEL AND CASINO
Flooring (sf) | Base (If) | Walls (sf) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Install | Sealed | Raised | Tile | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Area | UoM | Perimeter | UoM | Carpet (sy) | Concrete | Stonhard | Floor w VCT | VCT | Tile | Vinyl | Tile | FRP | Wainscot | ACT | Washable | |||||||||||||||||||||||||||||||||||||||||||||
1120 BOH Circ | 271 | SF | 66 | LF | 271 | 66 | 271 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1135 Main Kitchen | 121 | SF | 44 | LF | 121 | 44 | 121 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1136 BOH Circulation | 489 | SF | 141 | LF | 489 | 141 | 489 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1144 Employee Entry | 118 | SF | 45 | LF | 118 | 45 | 118 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1145 Janitor | 76 | SF | 36 | LF | 76 | 36 | 144 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1148 Service Bar | 375 | SF | 118 | LF | 375 | 118 | 375 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1149 Data | 101 | SF | 41 | LF | 101 | 41 | 101 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1150 Office | 93 | SF | 39 | LF | 10 | 39 | 93 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1151 Slot | 589 | SF | 101 | LF | 589 | 101 | 589 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1153 Cage | 837 | SF | 162 | LF | 93 | 162 | 837 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1154 Credit | 116 | SF | 43 | LF | 13 | 43 | 116 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1155 Room | 72 | SF | 34 | LF | 72 | 34 | 72 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1174 Janitor | 64 | SF | 34 | LF | 64 | 34 | 136 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1176/79 Service Bar | 552 | SF | 133 | LF | 552 | 133 | 552 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1177 Data | 74 | SF | 35 | LF | 74 | 35 | 74 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1178 Data | 99 | SF | 40 | LF | 99 | 40 | 99 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1183 Service Bar | 287 | SF | 69 | LF | 287 | 69 | 287 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1186 Janitor | 54 | SF | 33 | LF | 54 | 33 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
1188 Data | 96 | SF | 40 | LF | 96 | 40 | 96 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1189 Room | 78 | SF | 35 | LF | 78 | 35 | 78 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1191 Office | 539 | SF | 132 | LF | 60 | 132 | 539 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1192 Storage | 93 | SF | 39 | LF | 93 | 39 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
1199 Electrical | 103 | SF | 43 | LF | 103 | 43 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2108 Storage | 975 | SF | 147 | LF | 975 | 147 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2109 Mech | 407 | SF | 89 | LF | 407 | 89 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2110 Security | 437 | SF | 84 | LF | 49 | 84 | 437 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2111 Head Security | 215 | SF | 62 | LF | 24 | 62 | 215 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2112 BOH Circ | 1,190 | SF | 254 | LF | 1,190 | 254 | 1,190 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2112 BOH Circ | 8,580 | SF | 1,739 | LF | 8,580 | 1,739 | 8,580 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2113 Data/UPS | 668 | SF | 105 | LF | 668 | 105 | 668 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2115 Room | 117 | SF | 45 | LF | 117 | 45 | 117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2116 Room | 636 | SF | 103 | LF | 636 | 103 | 636 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2118 BOH | 822 | SF | 122 | LF | 822 | 122 | 822 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2119 Storage | 156 | SF | 59 | LF | 156 | 59 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2120 Audit | 107 | SF | 42 | LF | 12 | 42 | 107 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2121 State Police | 289 | SF | 72 | LF | 32 | 72 | 289 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2122 Trooper | 106 | SF | 41 | LF | 12 | 41 | 106 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2123 Employee Control | 266 | SF | 70 | LF | 266 | 70 | 266 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2124 BOH | 327 | SF | 76 | LF | 327 | 76 | 327 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2125 Security Dispatch | 212 | SF | 63 | LF | 24 | 63 | 212 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2130 Room | 167 | SF | 59 | LF | 167 | 59 | 167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2131 Room | 82 | SF | 36 | LF | 82 | 36 | 82 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2132 AV | 1,285 | SF | 149 | LF | 1,285 | 149 | 1,285 |
1 of 3
Flooring (sf) | Base (If) | Walls (sf) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Install | Sealed | Raised | Tile | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Area | UoM | Perimeter | UoM | Carpet (sy) | Concrete | Stonhard | Floor w VCT | VCT | Tile | Vinyl | Tile | FRP | Wainscot | ACT | Washable | |||||||||||||||||||||||||||||||||||||||||||||
2133 Surveillance | 1,441 | SF | 159 | LF | 1,441 | 159 | 1,441 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2134 BOH RAMP | 143 | SF | 72 | LF | 143 | 72 | 143 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2135 Training | 1,085 | SF | 151 | LF | 121 | 151 | 1,085 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2136 G Room | 160 | SF | 59 | LF | 18 | 59 | 160 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2138 Bar Storage | 889 | SF | 145 | LF | 889 | 145 | 889 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2139 IT | 884 | SF | 135 | LF | 884 | 135 | 884 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2140 BOH | 689 | SF | 118 | LF | 689 | 118 | 689 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2143 Storage | 850 | SF | 124 | LF | 850 | 124 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2147 Storage | 888 | SF | 132 | LF | 888 | 132 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2149 Room | 173 | SF | 55 | LF | 173 | 55 | 173 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2152 Room | 59 | SF | 34 | LF | 7 | 34 | 59 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2153 AV Storage | 72 | SF | 35 | LF | 72 | 35 | 72 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2154 Banquet Kitchen | 2,357 | SF | 252 | LF | 2,357 | 252 | 2,357 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2155 Room | 717 | SF | 116 | LF | 717 | 116 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2163 Dir F&B | 202 | SF | 57 | LF | 22 | 57 | 202 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2164 Dir Slots | 169 | SF | 53 | LF | 19 | 53 | 169 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2165 F&B Offices | 705 | SF | 112 | LF | 78 | 112 | 705 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2166 Slot/Tables | 801 | SF | 152 | LF | 89 | 152 | 801 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2167 MKTG Storage | 312 | SF | 77 | LF | 35 | 77 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2168 Tables | 176 | SF | 54 | LF | 20 | 54 | 176 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2169 Green Room | 168 | SF | 61 | LF | 19 | 61 | 168 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2170 Green Rom Toilet | 49 | SF | 28 | LF | 49 | 28 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2171 Storage | 284 | SF | 69 | LF | 284 | 69 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2172 Vestibule | 256 | SF | 71 | LF | 28 | 71 | 256 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2175 EDR | 3,305 | SF | 300 | LF | 3,305 | 300 | 3,305 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2176 EDR Kitchen | 1,018 | SF | 184 | LF | 1,018 | 184 | 1,018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2177 Room | 127 | SF | 45 | LF | 127 | 45 | 127 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2178 Mens Toilet | 293 | SF | 90 | LF | 293 | 540 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2179 Womens Toilet | 305 | SF | 93 | LF | 305 | 558 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2180 Team Lounge | 494 | SF | 100 | LF | 494 | 100 | 494 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2182 Conference | 288 | SF | 68 | LF | 32 | 68 | 288 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2183 Dir MKTG | 174 | SF | 54 | LF | 19 | 54 | 174 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2184 MKTG | 2,804 | SF | 332 | LF | 312 | 332 | 2,804 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2185 Dir MKTG | 176 | SF | 55 | LF | 20 | 55 | 176 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2186 VIP Terrace | 1,797 | SF | 199 | LF | 199 | 1,797 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2189 Storage | 81 | SF | 37 | LF | 81 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2190 Room | 230 | SF | 62 | LF | 26 | 62 | 230 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2191 Vessel Support | 1,557 | SF | 226 | LF | 1,557 | 226 | 1,557 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2194 Employee Terrace | 1,518 | SF | 163 | LF | 163 | 1,518 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2196 AGM | 206 | SF | 58 | LF | 23 | 58 | 206 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2197 Conference | 289 | SF | 71 | LF | 32 | 71 | 289 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2198 Special Event | 193 | SF | 57 | LF | 21 | 57 | 193 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2199 GM | 285 | SF | 66 | LF | 32 | 66 | 285 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2200 Office | 320 | SF | 73 | LF | 36 | 73 | 320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2201 Generator | 880 | SF | 119 | LF | 880 | 119 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
2202 Green Room Toilet | 54 | SF | 30 | LF | 54 | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Folding Door Storage | 212 | SF | 104 | LF | 212 | 104 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL CASINO BOH | 52,476 | 9,827 | 1,334 | 6,355 | 4,340 | 2,468 | 20,991 | 2,998 | 9,018 | 626 | 280 | 1,098 | 42,000 | 4,340 | ||||||||||||||||||||||||||||||||||||||||||||||
2 of 3
5/11/2011
BACK OF HOUSE FINISH SCHEDULE
PINNACLE BATON ROUGE SCHEME #6 PROGRAM
HOTEL AND CASINO
Flooring (sf) | Base | Walls (sf ) | Ceilings | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Diamond | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Plate w | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Install | Sealed | 2x6 | Tile | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Area | UoM | Perimeter | UoM | Carpet (sy) | Concrete | Stonhard | VCT | Tile | Vinyl | FRP | top/bot | Wainscot | ACT | Washable | ||||||||||||||||||||||||||||||||||||||||||
1103 Storage | 297 | SF | 77 | LF | 33 | 77 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1104 Office | 318 | SF | 80 | LF | 35 | 80 | 318 | |||||||||||||||||||||||||||||||||||||||||||||||||
1108 3 Meal Kitchen | 2,297 | SF | 212 | LF | 2,297 | 212 | 3000 | 2,297 | ||||||||||||||||||||||||||||||||||||||||||||||||
1109 Exit Corridor | 333 | SF | 87 | LF | 333 | 87 | 333 | |||||||||||||||||||||||||||||||||||||||||||||||||
1110 Vault | 381 | SF | 79 | LF | 381 | 79 | 381 | |||||||||||||||||||||||||||||||||||||||||||||||||
1111 Shift Mgr | 423 | SF | 111 | LF | 423 | 111 | 423 | |||||||||||||||||||||||||||||||||||||||||||||||||
1112 Evs | 79 | SF | 39 | LF | 79 | 39 | 79 | |||||||||||||||||||||||||||||||||||||||||||||||||
1113 Soft Count | 594 | SF | 112 | LF | 594 | 112 | 594 | |||||||||||||||||||||||||||||||||||||||||||||||||
1115 Cage Mgr | 128 | SF | 46 | LF | 14 | 46 | 128 | |||||||||||||||||||||||||||||||||||||||||||||||||
1116 Trap | 50 | SF | 30 | LF | 50 | 30 | 50 | |||||||||||||||||||||||||||||||||||||||||||||||||
1117 Card/Dice | 144 | SF | 48 | LF | 144 | 48 | 144 | |||||||||||||||||||||||||||||||||||||||||||||||||
1118 Cart Storage | 303 | SF | 72 | LF | 303 | 72 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1119 Trap | 99 | SF | 42 | LF | 99 | 42 | 99 | |||||||||||||||||||||||||||||||||||||||||||||||||
1120 BOH Circ | 558 | SF | 112 | LF | 558 | 112 | 448 | 558 | ||||||||||||||||||||||||||||||||||||||||||||||||
1121 Exit Corridor | 601 | SF | 132 | LF | 601 | 132 | 528 | 601 | ||||||||||||||||||||||||||||||||||||||||||||||||
1123/35 Main Kitchen & Bakery | 6,695 | SF | 432 | LF | 6,695 | 432 | 5700 | 6,695 | ||||||||||||||||||||||||||||||||||||||||||||||||
1124 F&B Office | 107 | SF | 44 | LF | 12 | 44 | 107 | |||||||||||||||||||||||||||||||||||||||||||||||||
1125 Mens Toilets | 124 | SF | 52 | LF | 124 | 52 | 208 | |||||||||||||||||||||||||||||||||||||||||||||||||
1126 Womens Toilets | 124 | SF | 51 | LF | 124 | 51 | 204 | |||||||||||||||||||||||||||||||||||||||||||||||||
1127 BOH Circ | 1,943 | SF | 444 | LF | 1,943 | 444 | 1776 | 1943 | ||||||||||||||||||||||||||||||||||||||||||||||||
1128 Electrical | 239 | SF | 62 | LF | 239 | 62 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1129 Liquor | 152 | SF | 50 | LF | 152 | 50 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1130 Soda | 101 | SF | 44 | LF | 101 | 44 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1131 Refrig | 139 | SF | 49 | LF | 139 | 49 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1132 Dry Storage | 234 | SF | 64 | LF | 234 | 64 | 234 | |||||||||||||||||||||||||||||||||||||||||||||||||
1133 Janitor | 57 | SF | 31 | LF | 57 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1134 Electrical | 121 | SF | 48 | LF | 121 | 48 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1136 BOH Circ | 178 | SF | 57 | LF | 178 | 57 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||
1141 F&B Office | 120 | SF | 48 | LF | 13 | 48 | 120 | |||||||||||||||||||||||||||||||||||||||||||||||||
1162/64 Steakhouse Kitchen | 1,886 | SF | 241 | LF | 1,886 | 241 | 2070 | 1,886 | ||||||||||||||||||||||||||||||||||||||||||||||||
1163 Trash | 164 | SF | 56 | LF | 164 | 56 | ||||||||||||||||||||||||||||||||||||||||||||||||||
1165 Vestibule | 243 | SF | 74 | LF | 243 | 74 | 243 | |||||||||||||||||||||||||||||||||||||||||||||||||
1169 Janitor | 22 | SF | 19 | LF | 22 | 19 | 22 | |||||||||||||||||||||||||||||||||||||||||||||||||
1201 EVS | 142 | SF | 51 | LF | 142 | 51 | 142 | |||||||||||||||||||||||||||||||||||||||||||||||||
1215 Electrical | 88 | SF | 41 | LF | 88 | 41 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL LOW RISE BOH | 19,484 | 108 | 2,199 | 11,251 | 4,794 | 270 | 3,237 | 10,770 | 2,752 | 412 | 6,697 | 10,878 | ||||||||||||||||||||||||||||||||||||||||||||
3 of 3
5/11/2011
FF&E Responsibility Matrix
PINNACLE BATON ROUGE SCHEME#6PROGRAM
HOTEL AND CASINO
No. | Description | OFOI | OFCI | CFCI | Notes | |||||
1 Interiors | ||||||||||
Blocking/Backing | • | |||||||||
Carpet | • | |||||||||
Carpet Base | • | |||||||||
Carpet Pad | • | |||||||||
Casework/Millwork Built-in Cabinets | • | |||||||||
Finish Hardware | • | |||||||||
Wall-mounted Keypad/Card Reader for Electronic Locks | • | Owner furnish template, door prep by GC | ||||||||
Trim | • | |||||||||
Special Wall Finishes | • | |||||||||
Special Ceiling Finishes | • | Faux Herringbone Clg (AF-2401) will be CFCl | ||||||||
Tile | • | |||||||||
Tile and Stone Base | • | |||||||||
Wood Flooring | • | |||||||||
Vinyl/Fabric Wallcovering | • | |||||||||
Granite / Marble | • | |||||||||
Fireplace including all connections | • | |||||||||
2 Services | ||||||||||
Decorative Lighting Fixtures | ||||||||||
Plug-in Fixtures | • | |||||||||
Direct Connected (surface/recessed) | • | |||||||||
Chandeliers, Pendants, Sconces | • | |||||||||
BOH Lighting | • | |||||||||
Dimming and Lighting Control for Complete Systems | • | |||||||||
Exit Signage | • | |||||||||
Point of Sales Registers / Computers | • | GC provide dedicated power and data | ||||||||
Signage Power | • | |||||||||
UPS System | • | |||||||||
Loading Dock Equipment | • | |||||||||
3 Telecommunications / Low Voltage | ||||||||||
Cable, Normal and Plenum Rated | • | |||||||||
Computer Room Office Furniture | • | |||||||||
Computer System’s (PC’s Hardware & Systems) | • | |||||||||
Data Center Phone Switch | • | |||||||||
Data Center Server / Comm Racks | • | |||||||||
Data / Telephone Conduit | • | |||||||||
Data / Telephone Systems | • | |||||||||
Data / Telephone Systems Wiring | • | |||||||||
Dedicated Electrical Supply | • | |||||||||
Overhead TV Monitors | • | Blocking/Backing, power and data by contractor | ||||||||
Surveillance Room Equipment | • | |||||||||
Systems, Termination w/ Monitor Console | • |
Page 1 of 3
5/11/2011
FF&E Responsibility Matrix
PINNACLE BATON ROUGE SCHEME #6 PROGRAM
HOTEL AND CASINO
No. | Description | OFOI | OFCI | CFCI | Notes | |||||
4 Audio / Video Systems | ||||||||||
AV Racks | • | |||||||||
Background Music Contract | • | |||||||||
Background Music Distribution Wiring | • | |||||||||
Background Music Receivers | • | |||||||||
Background Music Wall Board + Electrical | • | |||||||||
Cable | • | |||||||||
Terminations | • | |||||||||
CCTV System / Hotel Security | • | |||||||||
Dedicated Electrical Supply | • | |||||||||
Equipment: Speakers/Racks/Amps/Recorders/Patch/Touch Panels/Stations, Etc. — for a complete install | • | |||||||||
MATV Head End Equipment | • | |||||||||
MATV System | • | |||||||||
MATV System Remote Controls | • | |||||||||
Public Address System | • | |||||||||
TV Mounts, Straps & Installation of TV’s (ceiling or wall mount) | • | Blocking/Backing, power and data by contractor | ||||||||
5 Furnishings and Equipment | ||||||||||
Accessories | • | |||||||||
Area Rugs | • | |||||||||
Art | • | |||||||||
Bar Equipment | • | |||||||||
Hanging Fans w/Lights | • | |||||||||
Decorative Light Fixtures | See #2 Above | |||||||||
Decorative Mirrors (Wall Hung) | • | |||||||||
Fabrics | • | |||||||||
Draperies and Tracks | • | Blocking/Backing by contractor | ||||||||
Shimmer Screens (DS-2603) | • | |||||||||
MECHO-SHADES | • | Per MARNELL ID’S | ||||||||
Furnishings | • | |||||||||
Kitchen Equipment | • | |||||||||
POS Terminals & Printers | • | GC provide dedicated power and data | ||||||||
Liquor Dispensors | • | |||||||||
Soda Syrup Rack | • | |||||||||
Blender | • | |||||||||
Coffee Brewer | • | |||||||||
Hot Chocolate Dispenser | • | |||||||||
Juice Dispenser | • | |||||||||
Ice & Soda Dispenser | • | Soda line conduit by contractor | ||||||||
Iced Tea Brewer | • | |||||||||
Mobile Trash Cans | • | |||||||||
Portable Bar | • | |||||||||
Plate Dolly | • | |||||||||
Murals | • | |||||||||
Toilet Partitions/Accessories | • | |||||||||
Folding Partitions | • | |||||||||
Planters | • |
Page 2 of 3
5/11/2011
FF&E Responsibility Matrix
PINNACLE BATON ROUGE SCHEME #6 PROGRAM
HOTEL AND CASINO
No. | Description | OFOI | OFCI | CFCI | Notes | |||||
Plants (Faux) | • | |||||||||
Plug-in Lights | • | |||||||||
Plug-in Picture/Art Lights | • | |||||||||
Restaurant Tables/Chairs | • | |||||||||
Loose Furniture | • | |||||||||
Furniture - Fixed (ie, Banquests/Booths) | • | C&T and Marnell ID’s show a mixture of OFOI & OFCI, clarify PNK/MCC to mark up furniture plan for OFCI scope to be provided. | ||||||||
6 Gaming Equipment | ||||||||||
Slot Bases | • | |||||||||
Slot Seating | • | |||||||||
Slot Signage | • | |||||||||
Table Game Seating | • | |||||||||
Table Games | • | |||||||||
7 Signage | ||||||||||
Blocking For All Signage | • | |||||||||
Code Required Exit Signage | • | |||||||||
Data Cable Termination for All Signage Locations | • | |||||||||
Data Cabling for all Signage Locations | • | |||||||||
Electrical for all Signage Locations | • | |||||||||
Office and Back of House Signage | • | |||||||||
Plasma Display&LCD w/Brackets - Wall / Ceiling Locations | • | Blocking/Backing, power and data by contractor | ||||||||
Signage Lighting | • | |||||||||
Stair Identification | • | |||||||||
Mechanical & Electrical Room Identification & Numbering | • | |||||||||
Wayfinding Signage | • | |||||||||
8 OS&E | ||||||||||
Front of House | ||||||||||
Flat Screen TV’s | • | Blocking/Backing, power and data by contractor | ||||||||
Back of House | ||||||||||
Call Accounting System | • | |||||||||
Carts | • | |||||||||
CRS — Central Reservation System | • | |||||||||
Employee Breakroom TV’s | • | |||||||||
Till Safes | • | |||||||||
Telephone Switch / Public Space / BOH Phones | • | |||||||||
Safe / Vault | • | |||||||||
Computer’s / Printers / etc | • | |||||||||
Support Services — Lockers | • |
Page 3 of 3
PE BATON ROUGE
SURVEY DATE: 4/20/11; REVISED 5/11/11 | JOB NAME: CASINO & HOTEL | |||
MCC JOB # 3278.09 | DESCRIPTION: GENERAL CONDITIONS BUDGET | PREPARED BY: DUANE K DUFFY |
PI | CODE | DESCRIPTION | QUANT | UNIT | U/P | LABOR | MATL | EQUIPMENT | SUB | TOTALS | REMARKS | |||||||||||||||||||||||||||||||
PAY ITEM #010 | ||||||||||||||||||||||||||||||||||||||||||
010 | 110.10 | PROJECT STAFF | 1 | LS | 177,010 | 4,215,300 | 4,392,310 | L= Intem @ 8 Months | ||||||||||||||||||||||||||||||||||
010 | 110.11 | FIELD ENGINEER | 78 | WKS | 5,100 | 397,494 | 346,146 | 0 | 743,640 | L= FE Helper | ||||||||||||||||||||||||||||||||
010 | 110.12 | SCHEDULING | 1 | LS | 57,500 | 0 | 57,500 | M=MCC: E=Surface/P3 Software @ Site | ||||||||||||||||||||||||||||||||||
010 | 110.13 | SAFETY COORD. | 1 | LS | 357,241 | 6,360 | 363,601 | E=Badging Equipment/Supplies/Lanyards | ||||||||||||||||||||||||||||||||||
010 | 110.20 | SECRETARY (17 Months) | 74 | WK | 760.00 | 55,944 | 0 | 55,944 | M=Temporary/Agency if Needed | |||||||||||||||||||||||||||||||||
010 | 110.22 | WATER BOY (20 Months) | 87 | WK | 252.00 | 21,823 | 21,823 | |||||||||||||||||||||||||||||||||||
010 | 110.23 | FLAGMAN | 800 | HRS | 16.00 | 12,800 | 12,800 | |||||||||||||||||||||||||||||||||||
010 | 110.30 | LICENSED SURVEY | 1 | LS | 0 | 20,000 | 20,000 | |||||||||||||||||||||||||||||||||||
010 | 110.41 | FE SUPPLIES | 22 | MO | 8,800 | 0 | 8,800 | |||||||||||||||||||||||||||||||||||
010 | 110.50 | SECURITY | 104 | WK | 3,068.00 | 323,327 | 1,908 | 1,500 | 326,734 | 3,880 | L=Off Duty; M=Mon./Permit/Bars; E=Equip; S=lnstall | |||||||||||||||||||||||||||||||
010 | 110.61 | MEALS/ENTERTAIN. | 24 | MO | 18,000 | 18,000 | ||||||||||||||||||||||||||||||||||||
010 | 110.70 | RELOCATION EXP. | 1 | LS | 168,000 | 168,000 | Rel Expense: Mileage/Airfare/Hotel/Van | |||||||||||||||||||||||||||||||||||
010 | 110.71 | TRAVEL/LIVING EXP. | 1 | LS | 695,708 | 695,708 | Living Allow & Temporary Hotel (Salary & Hourly) | |||||||||||||||||||||||||||||||||||
010 | 110.72 | JOB TRAVEL | 24 | MO | 30,000 | 30,000 | Job Travel for Mlgs/Tests/Inspections | |||||||||||||||||||||||||||||||||||
010 | 120.15 | FENCE – CHAIN LINK: Dry Side Compound | 2,500 | LF | 0.75 | 1,875 | 34,226 | 36,101 | L=Maintenance: Trailer Compound Only | |||||||||||||||||||||||||||||||||
010 | 120.15 | FENCE – CHAIN LINK: Dry Side Site | 5,140 | LF | 0.75 | 3,855 | 22,661 | 26,516 | L=Maintenance: Trailer Compound Only | |||||||||||||||||||||||||||||||||
010 | 120.15 | FENCE – CHAIN LINK: Wet Side | 3,000 | LF | 0.75 | 2,250 | 40,766 | 43,016 | L=Maintenance: Trailer Compound Only | |||||||||||||||||||||||||||||||||
010 | 120.20 | JOB SIGNS | 1 | EA | 592.00 | 592 | 1,090 | 1,682 | ALLOW | Allowance: Site Building Sign | ||||||||||||||||||||||||||||||||
010 | 120.27 | TEMP SIGNS | 50 | EA | 16.00 | 800 | 13,625 | 14,425 | MCC Regulations Board/Stop Signs/Etc. | |||||||||||||||||||||||||||||||||
010 | 120.28 | TEMP ELEV CABS | 3 | EA | 325.00 | 975 | 654 | 1,629 | Temporary Elevator Cab Protection | |||||||||||||||||||||||||||||||||
010 | 120.31 | OFFICE SUPPLIES | 24 | MO | 26,400 | 26,400 | ||||||||||||||||||||||||||||||||||||
010 | 120.32 | DELIVERY SERVICES | 24 | MO | 24,000 | 24,000 | Fed-X/Courier/Mail/Postage Meter | |||||||||||||||||||||||||||||||||||
010 | 120.34 | SMALL TOOLS | 1 | LS | 27,250 | 27,250 | ||||||||||||||||||||||||||||||||||||
010 | 120.36 | FIRST AID/OSHA SUPPL | 24 | MO | 6,813 | 20,220 | 27,032 | E=Vests/Hardhats/Glasses/Life Vests | ||||||||||||||||||||||||||||||||||
010 | 120.37 | FIRE EXTING | 167 | EA | 8.00 | 1,339 | 18,239 | 19,578 | Trailer Compound | |||||||||||||||||||||||||||||||||
010 | 120.38 | PRINTING | 1 | LS | 32,046 | 7,500 | 39,546 | S=Record Drawings Disc | ||||||||||||||||||||||||||||||||||
010 | 120.40 | PROGRESS PHOTOS | 24 | MO | 6,540 | 3,200 | 9,740 | E=Site Cameras/Camcorder | ||||||||||||||||||||||||||||||||||
010 | 120.41 | TEMP TOILETS | 24 | MO | 74,556 | 23,544 | 98,100 | M=Building & E=Trailer Holding Tanks & Treatment Plant | ||||||||||||||||||||||||||||||||||
010 | 120.41 | TEMP TOILETS: Hotel Room | 22 | WKS | 972.00 | 21,044 | 2,360 | 23,404 | M=CIeaning Supplies & Paper | |||||||||||||||||||||||||||||||||
010 | 120.42 | TRASH DUMP FEES | 1,300 | EA | 396,760 | 396,760 | Building & Trailers | |||||||||||||||||||||||||||||||||||
010 | 120.43 | ICE & CUPS (22 Months) | 95 | WK | 2,596 | 11,431 | 14,027 | M=Cans/Tape/Cleaner; E=lce Machine / Block Ice | ||||||||||||||||||||||||||||||||||
010 | 120.44 | SAFETY AWARDS | 1 | LS | 12,500 | 12,500 | Quarterly Awards | |||||||||||||||||||||||||||||||||||
010 | 120.51 | CLEAN UP PERIODICAL (23 Months) Trailers | 100 | WK | 546.00 | 54,376 | 5,428 | 59,804 | Trailers: M=Vac/Trash Bags/Cleaners | |||||||||||||||||||||||||||||||||
010 | 120.51 | CLEAN UP PERIODICAL (16 Months) Buildings | 69 | WK | 1,400.00 | 96,992 | 5,664 | 102,656 | Buildings; M=Vac/Trash Bags/Cleaners | |||||||||||||||||||||||||||||||||
010 | 120.55 | CLEAN SITE. (22 Months) | 95 | WK | 224.00 | 21,338 | 5,192 | 26,530 | Site Trash; M=Trash Cans/Bags | |||||||||||||||||||||||||||||||||
010 | 120.56 | CLEAN SITE STREETS (20 Months) | 87 | WK | 384.00 | 33,254 | 12,000 | 32,700 | 77,954 | Site Parking Lot; M=Fuel Rpr; E=Sweeper | ||||||||||||||||||||||||||||||||
010 | 120.71 | TEMP POLE/HOOKUP | 1 | LS | 7,500 | 7,500 | Trailer Service/Hookup by Utility Company | |||||||||||||||||||||||||||||||||||
010 | 120.72 | TEMP. WIRE/GLOBES | 1 | LS | 0 | 0 | Short Term Trailer HooK-Up: By Electrical | |||||||||||||||||||||||||||||||||||
010 | 120.73 | POWER: TRAILERS BY MCC | 25 | MO | 56,250 | 7,000 | 63,250 | Electric Bill Trailers; E=Generators | ||||||||||||||||||||||||||||||||||
010 | 120.73 | POWER: BUILDINGS BY OWNER | 24 | MO | 0 | 0 | Building are by Owner | |||||||||||||||||||||||||||||||||||
010 | 120.74 | TELEPHONE | 25 | MO | 28,750 | 2,725 | 31,475 | M=Local/Long Distance; E= Equipment; S= Satellite | ||||||||||||||||||||||||||||||||||
010 | 120.75 | GAS BILL: BY OWNER | 0 | MO | 0 | 0 | 0 | |||||||||||||||||||||||||||||||||||
010 | 120.76 | WATER BILL | 25 | MO | 727.44 | 18,186 | 9,538 | 62,500 | 90,224 | Water Bill/Bottle Water/Elec. Coolers; E=Well or Shuttle Trailer / Water TruckIHolding Tanks | ||||||||||||||||||||||||||||||||
010 | 120.78 | WATER/SAN HOOKUP | 1 | LS | 0 | 0 | Trailer Hook-Up: By Plumber | |||||||||||||||||||||||||||||||||||
010 | TELEPHONE: OWNER | 0 | MO | 0 | 0 | 0 | 0 | M=Local/Long Distance/T1: E=Equipment | ||||||||||||||||||||||||||||||||||
010 | 122.02 | PICKUP TRUCKS | MO | 0 | ||||||||||||||||||||||||||||||||||||||
010 | 122.03 | AUTOMOBILES | MO | 0 | ||||||||||||||||||||||||||||||||||||||
010 | 122.05 | JOB TRUCK | 12 | MO | 4,800 | 10,800 | 15,600 | M=Rpr/Gas | ||||||||||||||||||||||||||||||||||
010 | 122.07 | UTILITY TRAILER | LS | 0 | Job Utility Trailer: M= Tags | |||||||||||||||||||||||||||||||||||||
010 | 122.09 | ATV, 4 WHEELER | 12 | EA | 110,400 | 115,431 | 225,831 | M=ATV Fuel/Rpr/Service; E=Mules/Carts |
Page 1 of 2
PE BATON ROUGE
SURVEY DATE: 4/20/11; REVISED 5/11/11 | JOB NAME: CASINO & HOTEL | |||
MCC JOB # 3278.09 | DESCRIPTION: GENERAL CONDITIONS BUDGET | PREPARED BY: DUANE K DUFFY |
PI | CODE | DESCRIPTION | QUANT | UNIT | U/P | LABOR | MATL | EQUIPMENT | SUB | TOTALS | REMARKS | ||||||||||||||||||||||||||||||||
010 | 123.04 | TRAILER & FURN | 25 | MO | 4,360 | 98,100 | 102,460 | M=Furniture/Bookcase; E=Rental | |||||||||||||||||||||||||||||||||||
010 | 123.05 | SETUP OFF TRAILER | 3 | EA | 16,640 | 49,920 | 25,000 | 7,848 | 24,937 | 107,705 | L=Porch/Walks; M=S/R/Shlv/Racks/Walls; E=Frt; S=Setup/Dismantle | ||||||||||||||||||||||||||||||||
010 | 123.06 | JOB OFF EQUIPMENT | 25 | MO | 27,250 | 27,250 | |||||||||||||||||||||||||||||||||||||
010 | OWNER EQUIPMENT/PAPER | 0 | MO | 0 | 0 | 0 | M=Toner/Paper; E=Printer/Scanner | ||||||||||||||||||||||||||||||||||||
010 | 123.07 | COMPUTER | 0 | MO | 0 | 0 | 0 | M=DSL Line (Included w/ Staff Rates) | |||||||||||||||||||||||||||||||||||
010 | 123.08 | FAX MACHINE | 1 | EA | 0 | 2,180 | 2,180 | ||||||||||||||||||||||||||||||||||||
010 | 123.09 | OWNER FACILITY | 0 | MO | 0 | 0 | 0 | M=Furniture/Water Cooler/Bottle Water; E=Rental | |||||||||||||||||||||||||||||||||||
010 | 123.10 | SET-UP OWNER FACILITY | 0 | EA | 0 | 0 | 0 | 0 | L=Porch/Walks; M=Setup/Remove, Shelving, Plan Racks, Porch/Steps/Ramp Materials; E=Freight In/Out; S=Setup/Dismantle | ||||||||||||||||||||||||||||||||||
010 | 123.11 | TOOL & STOR SHEDS | 144 | MO | 3,270 | 17,266 | 20,536 | M=Delivery; E=Conex | |||||||||||||||||||||||||||||||||||
010 | 123.12 | SETUP SHEDS: Roofs | 3 | EA | 3,360.00 | 10,080 | 4,000 | 14,080 | L & M=Site Built Sheds | ||||||||||||||||||||||||||||||||||
010 | 123.13 | TEL/DATA INSTALL. | 1 | LS | 6,813 | 6,813 | Install Phone/Data/Network System | ||||||||||||||||||||||||||||||||||||
010 | 124.01 | SURVEY EQUIPMENT | 23 | MO | 3,270 | 60,168 | 63,438 | M=Purchase 2 Auto Levels | |||||||||||||||||||||||||||||||||||
010 | 125.04 | RADIOS, EQUIPMENT | 10 | EA | 750 | 4,360 | 5,110 | M=Rpr | |||||||||||||||||||||||||||||||||||
010 | 125.05 | MOBILE TELEPHONE | 240 | MO | 26,160 | 26,160 | Ten Mobile Phones | ||||||||||||||||||||||||||||||||||||
010 | 126.06 | EQUIPMENT REPAIR | 104 | WKS | 128.00 | 13,302 | 27,000 | 40,302 | L= Truck/Cart Rpr; M=Spt Truck Repair | ||||||||||||||||||||||||||||||||||
010 | 126.10 | GAS, OIL, AND GREASE | 135 | MO | 97,020 | 101,250 | 198,270 | M=Misc. Job Mileage & Travel To/From; E=Spt Gas | |||||||||||||||||||||||||||||||||||
PAY ITEM #013 | |||||||||||||||||||||||||||||||||||||||||||
013 | 130.10 | CQC STAFF | 52 | WKS | 1,705.00 | 88,592 | 0 | 88,592 | Hourly CQC inspections / Cover Ups | ||||||||||||||||||||||||||||||||||
013 | 130.34 | STRUCTURAL CONSULTANT | 1 | LS | 0 | 0 | |||||||||||||||||||||||||||||||||||||
PAY ITEM #018 | |||||||||||||||||||||||||||||||||||||||||||
018 | 130.10 | WORKER’S COMP (.13) | 1 | LS | 146,210 | 146,210 | |||||||||||||||||||||||||||||||||||||
018 | 180.12 | MEDICAL EXPENSES (.01) | 1 | LS | 10,838 | 10,338 | |||||||||||||||||||||||||||||||||||||
018 | 180.20 | PAYRLL TAXES.INSUR (.115) | 1 | LS | 126,972 | 126,972 | |||||||||||||||||||||||||||||||||||||
018 | 180.21 | GROUP HOSPITAL/401K (.11) | 1 | LS | 111,581 | 111,581 | |||||||||||||||||||||||||||||||||||||
018 | 180.40 | DRUG TESTING | 30 | EA | 1,950 | 1,950 | |||||||||||||||||||||||||||||||||||||
PAY ITEM #999 | |||||||||||||||||||||||||||||||||||||||||||
999 | 9999.90 | LEGAL FEES | 1 | LS | 10,000 | 10,000 | |||||||||||||||||||||||||||||||||||||
QUANTITY SURVEY TOTAL | 1,468,605 | 7,429,054 | 616,240 | 53,937 | 9,567,835 | 9,567,835 | |||||||||||||||||||||||||||||||||||||
DIRECT LABOR | 1,083,841 | ||||||||||||||||||||||||||||||||||||||||||
PR TAXES @ .355% | 384,764 |
Page 2 of 2