as Lender
as Borrower
as Guarantor
Page | ||||
ARTICLE I — INTERPRETATION | 1 | |||
1.1 Definitions | 1 | |||
1.2 Interest Calculations and Maximum Interest Rate | 8 | |||
1.3 Accounting Principles | 8 | |||
1.4 Currency References | 9 | |||
1.5 References to Statutes | 9 | |||
1.6 Extended Meanings | 9 | |||
1.7 Schedules | 9 | |||
ARTICLE II — LOAN | 9 | |||
2.1 Agreement to Advance Loan | 9 | |||
2.2 Purpose | 10 | |||
2.3 Non-Revolving Nature | 10 | |||
2.4 Drawdown Procedure | 10 | |||
2.5 Payment of Interest | 10 | |||
2.6 Payment of Principal | 10 | |||
2.7 Conversion of Debenture and Exercise of Option | 11 | |||
ARTICLE III — GENERAL PAYMENT PROVISIONS | 11 | |||
3.1 Interest Calculations | 11 | |||
3.2 Place and Time of Payments | 12 | |||
3.3 No Deduction for Taxes | 12 | |||
3.4 Free Cash Flow | 12 | |||
ARTICLE IV — REPRESENTATIONS AND WARRANTIES | 12 | |||
4.1 Representations and Warranties — Borrower | 12 | |||
4.2 Representations and Warranties — Guarantor | 14 | |||
4.3 Representations and Warranties — Lender | 16 | |||
4.4 Survival of Representations and Warranties | 16 | |||
ARTICLE V — COVENANTS | 16 | |||
5.1 Positive Covenants — Borrower | 16 | |||
5.2 Positive Covenants — Guarantor | 18 | |||
5.3 Negative Covenants — Borrower | 19 | |||
5.4 Negative Covenants — Guarantor | 19 | |||
5.5 Reporting Requirements | 20 | |||
ARTICLE VI — SECURITY | 20 | |||
6.1 Security to be Provided by the Borrower | 20 | |||
6.2 Security to be Provided by Guarantor | 21 | |||
6.3 Form of Security and Registration | 21 | |||
ARTICLE VII — CONDITIONS FOR ADVANCES | 21 | |||
7.1 Conditions for Advance on Financial Closing | 21 | |||
ARTICLE VIII — DEFAULT AND REMEDIES | 22 | |||
8.1 Events of Default | 22 | |||
8.2 Acceleration upon Event of Default and Additional Interest | 23 | |||
8.3 Appropriation of Moneys | 23 |
ii
Page | ||||
8.4 Judgment Currency | 23 | |||
8.5 Remedies Cumulative | 24 | |||
8.6 Insolvency Proceedings | 24 | |||
ARTICLE IX — GENERAL | 24 | |||
9.1 Waivers to be in Writing | 24 | |||
9.2 Governing Law | 24 | |||
9.3 Costs and Expenses | 25 | |||
9.4 General Indemnity | 25 | |||
9.5 Notice | 25 | |||
9.6 Severability | 26 | |||
9.7 Further Assurances | 26 | |||
9.8 Time of the Essence | 26 | |||
9.9 Assignment and Participation | 26 | |||
9.10 Entire Agreement | 27 | |||
9.11 Binding Effect | 27 | |||
ARTICLE X — EXECUTION | 28 | |||
10.1 Execution | 28 |
1.1 | Definitions |
- 3 -
- 4 -
- 5 -
(a) | Liens for taxes, duties and assessments and Liens securing workers’ compensation, unemployment insurance or other social security obligations not at the time overdue; | ||
(b) | Liens for taxes, duties and assessments which may be overdue but the validity of which is being contested in good faith and in respect of which reserves satisfactory to the Lender in its reasonable opinion have been established; | ||
(c) | Liens or rights of distress reserved in or exercisable under any lease for rent or for compliance with the terms of such lease; |
- 6 -
(d) | any obligations or duties affecting any real property owned by the Borrower or the Guarantor due to any public utility or to any municipality or government, or to any statutory or public authority, with respect to any franchise, grant, licence or permit and any defects in title to structures or other facilities arising solely from the fact that such structures or facilities are constructed or installed on any real property owned by the Borrower or the Guarantor under government permits, leases or other grants and which obligations, duties and defects in the aggregate do not materially impair the use of such property, structures or facilities for the purpose for which they are held; | ||
(e) | Liens incurred or deposits made in connection with contracts, bids, tenders or expropriation proceedings, or to secure workers’ compensation, unemployment insurance or other social security obligations, surety or appeal bonds, costs of litigation when required by Law, public and statutory obligations, warehousemen’s, carriers’ and other similar Liens and deposits; | ||
(f) | security given to a public utility or any municipality or government or to any statutory or public authority to secure obligations incurred to such utility, municipality, government or other authority in the ordinary course of business; | ||
(g) | Liens and privileges arising out of judgments or awards in respect of which an appeal or proceeding for review has been commenced, a stay of execution pending such appeal or proceedings for review has been obtained and reserves satisfactory to the Lender in its reasonable opinion have been established; | ||
(h) | any mechanic’s, labourer’s, materialman’s statutory or other similar Lien arising in the ordinary course of business or out of the construction or improvement of any real property owned by the Borrower or the Guarantor or arising out of the furnishing of materials or supplies therefor, the action to enforce which has not proceeded to a final judgment; | ||
(i) | Minor Title Defects; | ||
(j) | Purchase-Money Security Interests incurred or assumed in connection with the purchase, leasing or acquisition of capital equipment in the ordinary course of business, provided that the aggregate amount of indebtedness of the Borrower thereunder is not in excess of $400,000 individually or $2,000,000 in the aggregate; | ||
(k) | any Liens which secure the Senior Indebtedness; | ||
(l) | any Liens which are approved in writing by the Lender from time to time; and | ||
(m) | any extension, renewal or replacement (or successive extensions, renewals or replacements) in whole or in part of any Liens referred to above, inclusively provided that the principal amount of indebtedness secured thereby shall not exceed the principal amount of indebtedness so secured at the time of the incurrence or guarantee thereof and that such extension, renewal or replacement shall be limited to all or a part of the property which secured the Lien so extended, renewed or replaced (plus improvements on such property); |
- 7 -
- 8 -
- 10 -
(a) | the Maturity Date; or | ||
(b) | the Acceleration Date. |
- 11 -
- 12 -
- 13 -
- 14 -
- 15 -
- 16 -
- 17 -
- 18 -
- 19 -
- 20 -
- 21 -
- 22 -
- 23 -
- 24 -
- 25 -
(a) | to the Borrower or the Guarantor at: | ||
BCH Ltd. Suite 500, 816 — 7th Avenue S.W. Calgary, Alberta T2P 1A1 Attention: Craig F. Nieboer, Chief Financial Officer Telecopier no.: (403) 265-4160 E-mail: cnieboer@brazalta.com | |||
with a copy to: | |||
Davisllp Barristers and Solicitors Suite 1000, 250 — 2nd Street SW Calgary, Alberta T2P 0C1 Attention: Trevor Wong-Chor Telecopier no.: (403) 296-4474 E-mail:twong-chor@davis.ca |
- 26 -
(b) | to the Lender, at: | ||
Allis-Chalmers Energy Inc. 5075 Westheimer, Suite 890 Houston, Texas 77056 Attention: Theodore F. Pound III Telecopier no.: (281) 768-3891 E-mail: tpound@alchenergy.com |
- 27 -
- 28 -
ALLIS-CHALMERS ENERGY INC. | ||||
By: | /s/ Theodore F. Pound III | |||
Name: | Theodore F. Pound III | |||
Title: | General Counsel and Secretary | |||
BCH LTD. | ||||
By: | /s/ Craig Nieboer | |||
Name: | Craig Nieboer | |||
Title: | Chief Financial Officer | |||
BCH ENERGY DO BRASIL SERVICOS DE PETROLEO LTDA. | ||||
By: | /s/ Luiz Azevedo | |||
Name: | Luiz Azevedo | |||
Title: | Managing Director | |||
- 2 -
(ii) | City of Mossoró, State of Rio Grande do Norte, Av. Industrial Dehuel Vieira Diniz, S/N, Fazenda Santa Júlia, CEP: 59.600-000; | ||
(iii) | City Japaratuba, State of Sergipe, Rua Domiciano Correia, n° 129, CEP: 49.960-000; and | ||
(iv) | City of São Mateus, State of Espírito Santo, Rodovia BR — 101, Km 67, Bairro Boa Vista, CEP: 29.930-000 |
Drilling Rig which Services Contract | Client | Contract # | ||||||
BCH-01 | Petrobras | Service: | 2300.0031788.07.2 | |||||
Lease: | 2300.0031786.07.2 | |||||||
BCH-02 | Petrobras | Service: | 2500.0031792.07.2 | |||||
Lease: | 2500.0031791.07.2 | |||||||
BCH-04 | Petrobras | Service: | 2700.0031827.07.2 | |||||
Lease: | 2700.0031824.07.2 | |||||||
BCH-05 | Petrobras | Service: | 2500.0031794.07.2 | |||||
Lease: | 2500.0031793.07.2 | |||||||
BCH-03 | Petrobras | Service: | 2600.0037264.07.2 | |||||
Lease: | 2600.0037263.07.2 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
Former: RIG-26
MODEL:SUPERIOR 400 TRAILER MOUNTED RIG
DEPTH RATING | ||||
101.6 (mm), 4 (in.) drill pipe | : | 1500 (m), 4921 (ft) | ||
DRAWWORKS | ||||
Make | : | Superior | ||
Model | : | 400 | ||
Drilling line | : | 25.4 (mm), 1 (in.) (EIPS) | ||
Main brake | : | Band | ||
Auxiliary brake | : | Parmac Hydromatic | ||
Power | : | Caterpillar 3412 (630 hp) | ||
Drive | : | Alison Torque Converter | ||
Crown saver | : | Hitec Cathead | ||
MAST | ||||
Type | : | Box telescope (free standing) (cable raise) | ||
Height | : | 34.14 (m) 112 (ft) | ||
Make | : | Kremco | ||
Gross nominal Capacity | : | 146,780, (daN), 330 000 (lbs) | ||
Static hook load rating | : | 88,960 (daN), 200 000 (lbs) | ||
Racking capacity (doubles) | : | 153 x 101 mm, (4")pipe (doubles) | ||
SUBSTRUCTURE | ||||
Make | : | Kremco | ||
Type | : | One piece box | ||
Casing capacity | : | 88,960 (daN), 200 000 (lbs) | ||
Set back capacity | : | 66,720 (daN), 150 000 (lbs) | ||
TRAVELLING EQUIPMENT | ||||
Block (ton) | : | BJ 150 | ||
Hook (ton) | : | BJ Unimatic 150 | ||
Block and hook model | : | BJ 6150 | ||
Swivel (ton) | : | National 200 | ||
Model | : | P200 |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – sala 11/12 | Rua dos Jasmins n° 01, Bairro Planalto II | |
Rio de Janeiro – RJ | Catu, Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ROTARY TABLE | ||||
Make | : | National | ||
Model | : | C-175 | ||
Opening size | : | 444.5 (mm), 17-1/2 (in.) | ||
Static load rating | : | 226,796 (kg), 250 (ton) | ||
Drive | : | Caterpillar 3406 (420 hp) | ||
MUD PUMP NO. 1 | ||||
Make | : | BPMMP - Baoji, China (to Continental Emsco design) | ||
Model | : | F500 | ||
Type | : | Triplex | ||
Displacement | : | 0.5 - 2.2 (m3/min) (gpm)135-575 @ 165 SPM | ||
Pressures | : | 9.2 - 26.3 (mPa), 1340 to 3820 (psi) | ||
Charge pump | : | Mission Magnum 5 in x 6 in centrifugal | ||
Power | : | Caterpillar 3412 (600 hp) | ||
Transmission | : | 5-speed Allison 5960 | ||
MUD PUMP NO. 2 | ||||
Make | : | BPMMP - Baoji, China (to Continental Emsco design) | ||
Model | : | F500 | ||
Type | : | Triplex | ||
Displacement | : | 0.5 - 2.2 (m3/min), 135 - 575 (gpm) @ 165 spm | ||
Pressures | : | 9.2 - 26.3 (mPa), 1340 to 3820 (psi) spm | ||
Charge pump | : | Demco 5 in x 4 in centrifugal | ||
Power | : | Caterpillar 3412 (600 hp) | ||
Transmission | : | 5-speed Allison 5960 | ||
GENERATORS | ||||
Engines | : | Caterpillar D3406 DIT | ||
Number | : | Three | ||
Generators | : | 210 KW (2x) / 300 KW (1x) - 460/220 V 60 Hz | ||
MUD SYSTEM | ||||
Tank volume | : | 64 (m3), 370 (bbl), (two tanks) | ||
Shakers | : | Sweco LM 3 | ||
Degasser | : | Poorboy |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – sala 11/12 | Rua dos Jasmins n° 01, Bairro Planalto II | |
Rio de Janeiro – RJ | Catu, Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
BOP SYSTEM | ||||
BOP stack | : | 11 in Hydril GK 3M annular | ||
11 in Shaffer 3M double gate | ||||
Accumulator | : | Hydril K8 454 (ltr), 120 (gal) | ||
Choke manifold | : | Oilmaster 3M | ||
Adjustable choke | : | Willis | ||
Test pump | : | Hydratron | ||
INSTRUMENTATION | ||||
Drilling recorder | : | 3-pen Totco | ||
Driller console | : | Hitec Cathead mini console | ||
Inclinometer | : | Totco | ||
Weight Indicator | : | MD Totco | ||
HANDLING EQUIPMENT | ||||
Winch | : | Gearmatic hydraulic 2720 (kg), 3 (ton) | ||
Manriding winch | : | IR46RJ Pneumatic | ||
Kelly spinner | : | Foster hydraulic | ||
Wireline winch | : | Gearmatic | ||
Hydraulic Power Tongs | : | White Bear - 25,000 foot - pounds (3" - 5" in.) | ||
FUEL TANK | ||||
Capacity | : | 21 800 (ltr), 5760 (gal) | ||
WATER TANK | ||||
Capacity | : | 400 (ltr), 105 (gal) | ||
BUILDINGS: | ||||
Change shack | : | 20 ft container (modified) | ||
Doghouse a/c (large) | : | 20 ft container | ||
Trailers | : | 2x 40ft (offices, mess room) | ||
2x 20ft (living quarters) | ||||
Geologist Lab | : | 20 ft container | ||
TUBULARS | ||||
Drill pipe | : | 300 ea - 101.6 (mm), 4" (in.) | ||
Grade E (H90 tool joints) | ||||
Drill collars | : | 20 ea - 171.5 (mm), 6-3/4" (in.) spiral | ||
20 ea - 120.6 (mm), 4-3/4" (in.) | ||||
03 ea - 196.9 (mm), 7.3/4" (in.) | ||||
07 ea - 171.5 (mm), 6.3/4"(in.) | ||||
Heavy Weight Drill pipe | : | 14 ea - 127 (mm) - 5" (in.) |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – sala 11/12 | Rua dos Jasmins n° 01, Bairro Planalto II | |
Rio de Janeiro – RJ | Catu, Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
Former: RIG-15
ITEM | DESCRIPTION | |
DRAWWORKS: | - IRI Cabot 2550 | |
Horsepower Rating: | - 1200 H.P. | |
Maximum Hoisting Capacity: | - 337.5 T with 10 lines of 1-1/4" | |
Auxiliary Brake: | - Parmac V-80 Hydromatic | |
Crown Block Protection: | - Stewart - Stevenson | |
PRIME MOVER (DRAWWORKS): | - 2 Cat 3412 DITA | |
Output Horsepower rating: | - 600 H.P. each | |
Emergency Shut-down: | - Barber Type | |
(Pumps): | - 2 Cat D-399 TA | |
Output Horsepower: | - 1150 H.P. with Barber Type Shutdown | |
AIR COMPRESSORS: | ||
Type: | - 1 - Quincy 350-21 (E) - Electric Powered | |
- 1 - Quincy 350-22 (E) - Electric Powered | ||
Automatic: | - Yes -1 - Primary / 1 - Backup | |
ROTARY TABLE: | - Gardner Denver RT 27-1/2 | |
Maximum Table Opening: | - 700 mm | |
Maximum Static Load: | - (222,500 daN) | |
Torque Gauge: | - Totco | |
RPM Gauge: | - Totco | |
DERRICK: | - IRI Telescoping | |
Static Hook Load w/ Lines of: | - 322 T with 10 lines (318,000 daN) | |
Racking Capacity: | - 145 STD with 5" | |
Clear Working Height: | - 38.7m (127 feet) | |
Wind Capacity (Bare Mast): | - 106 MPH | |
Wind Capacity (Full Set-back): | - 80 MPH | |
SUBSTRUCTURE: | - IRI Telescoping | |
Casing Load: | - 460 Ton (409,400 daN) | |
Minimum Clear Working Height: | - 4.15m (13.8 ft) | |
Set Back Capacity: | - 162 Ton (360,000 lbs) (162,200 daN) | |
TRAVELLING EQUIPMENT: | ||
Crown Block: | - IRI 6 - 42" Sheaves | |
Hook Block: | - Emsco 350 T / 5 Sheaves (311,500 daN) | |
Links: | - BJ 350 T / 96" (311,500 daN, 2743 mm) | |
Swivel: | - Emsco LB 400 (Static Ratio mg 800,000 lb) (356,000 daN) | |
TOP DRIVE: | ||
Manufacturer: | - TESCO | |
Model: | - 250 HMIS | |
Capacity: | - 250 Tons | |
Specs: | - Hydraulic Power Pack (475 HP) |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
DRILLING LINE: | ||
Drilling Line Diameter: | - 31.5 mm (1-1/4") | |
Type: | - IWRC - IPS | |
Strength Capacity: | - 71,000 daN (79.9T) | |
DEAD LINE ANCHOR: | ||
Weight Indicator: | - Martin Decker | |
Hydraulic Sensor: | - Martin Decker | |
Line Scale Weight Indicator | - Cameron C | |
HYDRAULIC WINCH: | ||
Type: | - Pull master PL8 (Hydraulic) | |
Load: | - 7000 Lbs: 3115 daN | |
No: | - Two | |
MUD PUMP: | ||
No/Make/Model/Type — Pumps: | - 2 - Gardner Denver PZ9 Triplex | |
Power Rating: | - Pump- 750 kw (1000 H.P.) Each Engine Rating Caterpillar D-399c/w torque converter (1150 H.P.) | |
Maximum Strokes / Minute: | - 120 | |
Maximum Working Pressure: | - Lesser of 80% of Liner Rating or Published Pressure | |
Liner Size Available: | - 6", 6-1/2" | |
Suction Pulsation Dampener: | - No | |
Discharge Pulsation Dampener: | - Continental Emsco 10 Gallon Lower Case 5000 psi on each Pump | |
Charge Pump (Centrifugal): | - Mission 5 x 6 | |
MUD TANKS: | ||
Active Tank Volume: | - 180 m3(1110 bbl) | |
Premix Tank: | - 48 m3 (400 bbl) | |
Trip Tank: | - 3.5 m3(22 bbl) | |
Agitators: | - 5 - Norgear Model 800SW- 20 H.P. | |
Mud Guns: | - Low Pressure for each Compartment | |
Desilter: | - Swaco 12- 4" Cones | |
Degasser: | - Roll'n Atmospheric 20" (500 mm Dia.) | |
Centrifuge Machine: | - Swaco Model 1828 | |
Shale Shakers: | - 3 - Swaco Linear | |
Centrifugal Pumps: | - Mission Style | |
Type: | - 6" x 8" and 2"x3" | |
Capacity: | - Various as per application | |
Number: | - Seven |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
LIGHT PLANTS: | ||
Generators Available, (Rating-KW) | - 2-CAT-3412 DITA 680 KW | |
Lighting available for: | - Location Lighting and Wellsite Module | |
Both for rig: | - For Rig and Wellsite Accommodation | |
Voltage: | - 480 Volts w/ Transformer to 220v / 110v | |
TUBULARS: | ||
Drill Pipe: | ||
- 288 Joints of 5 inch 19.5 Ib per ft Grade S135 c/w 41/2 inch IF tool joints | ||
- 144 Joints of 5 inch 19.5 Ib. per ft Grade E c/w 41/2 inch IF tool joints | ||
- 360 Joints of 31/2 inch 13.3 Ib per ft. Grade G105 c/w 31/2 inch IF tool joints | ||
- 8-5 inch pup Joints of assorted lengths c/w 41/2 inch IF tool joints | ||
- 15 Joints of 5 inch HEVI- WATE drill pipe c/w 41/2 inch IF connections | ||
Drill Collars: | ||
- 3-9 inch Spiral drill collars with 7 5/8 REG connections | ||
- 9-8 inch Spiral drill collars with 6 5/8 inch REG connections | ||
- 11-7 inch Spiral drill collars with 41/2 inch IF connections | ||
- 12-61/2 inch Spiral drill collars with 41/2 inch IF connections | ||
- 30-61/4 inch Spiral drill collars with 41/2 inch IF connections | ||
- 21-43/4 inch Spiral drill collars with 31/2 inch IF Connections | ||
Drilling Subs: | ||
- 70 subs | ||
Fishing Tools: | ||
- Tool inventory (inventory on request) |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
BLOW OUT PREVENTION EQUIPMENT: | ||
Annular Preventer: | - 1-11 inch 5000 psi Hydril Annular Preventer | |
Ram Preventers: | - 1-11 inch 5000 psi Shaffer double Ram Preventer | |
- 1-11 inch 5000 psi Shaffer single Ram Preventer: | ||
Drilling Spool: | - 1-11 inch 5000 psi drilling spool c/w 2- 4 1/16 5000 psi outlets | |
Choke Manifold: | - 1-5000 psi choke manifold c/w one manual and one auto choke with console | |
Accumulator: | - Valvcon 130 Gallon 6 station | |
AUXILIARY TOOLS & INSTRUMENTS: | ||
1. Automatic Drill Recorder | - Martin Decker 5 Pen | |
2. Single shot Drift Recorder | - Totco 7° | |
3. Wire-line Unit (Hydraulic): | - 0.092 Line Rated for4570m / (15,000 ft) | |
4. High Pressure Wash Gun (Pump): | - CAT w/ 3 H.P. Electric Motor | |
5. Sump Pump: | - FLYGT 4" (Electric) | |
6. Kelly Spinner: | - Foster 77 (Mckinney) | |
Kelly Bushing: | - Varco HDP Hex | |
7. Drill Pipe Spinner: | - Varco SSW 10 | |
8. Rotary Hose: | - Goodall 55' x 3' ID x min 5000PSI Working Pressure | |
9. Portable Rig Matting | - Yes - 6" Thick, 8 ft wide, various lengths | |
10. Kelly: | - 5-1/4" Hex - 40 ft long | |
Kelly Drive Bushing: | - Pin Drive | |
11. Fuel Tanks, One tank at rig | - 40,000 liter / Tank | |
12. Fuel Pumps: | - 2- Electric Powered | |
13. Water Tanks, (Drilling Water Rig Storage): | - 1 Hydormatic Tank | |
- 2-Water Storage Tanks | ||
- 1-Rig Water Tank | ||
Water Pumps: | - 2-3" Jacuzzi (Electric Powered) | |
- 2-120 Barrel water transport tanks skid mounted | ||
14. Hand Tools: | - Complete set for rig, mechanic and electrician | |
15. One (1) Derrick Bunk 16. One wellsite unit for Rig Manager | ||
SPARE EQUIPMENT ITEMS: | ||
Engines: | - 2-398 Caterpillar engines c/w Radiators | |
Transmissions: | - 1-6061 Allison Automatic transmission complete | |
Right Angle Drive: | - 1- complete right angle drive for the drawworks | |
Hook: | - 1-250 ton Web Wilson | |
BOP: | - 1-11 inch 5000 psi Hydril Annular complete | |
- 1-11 inch 5000 psi Shaffer double gate | ||
Swivel: | - 1-LB400 Emsco swivel complete | |
Tongs: | - 1 complete set of AAX tongs with jaws | |
Rotary Table (New) | - 1 Spare 271/2 inch rotary table complete with drive bushing |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
1 | Sonda de Produção e Acessórios. | |||||||
1.1 | Sonda de produção com capacidade igual ou superior a ( 150.000 ) libras, que manobre com seção de ( 2 ) tubos na vertical, dotada de sistema de partida elétrica e descarga, possuindo mastro com altura de ( 30 ) m. | 1 | ||||||
1.2 | Plataforma de trabalho com altura ajustável. | 1 | ||||||
1.3 | Conjunto gancho-catarina com capacidade (150.000lbs). | 1 | ||||||
1.4 | Par delinkscom capacidade ( 220.000lbs ) e comprimento ( 2.20m ). | 1 | ||||||
1.5 | Power-Subtipo ( warning ) comSwivel, acionado por ( Sistema hidráulico ). | 1 | ||||||
1.6 | Cat linecom velocidade de ( 6 ) metros por minuto. | 1 | ||||||
1.7 | Cat headcom controle de torque e curso mínimo de ( 3,77 ) pés. | 1 | ||||||
1.8 | Guincho auxiliar. | |||||||
1.9 | Catarina com cabo de aço de ( 1 ) “. | |||||||
2 | Sistema de Circulação, Amortecimento e Teste | |||||||
2.1 | Bomba de lama modelo (National), com filtro e acionada, com potência de (JWS-400) HP, dotado de sistema de partida, ou Bomba de lama Dowel Schlumberger triplex capacidade 8.5 galões por minunos, motor Detroit 420 HP 8V71 díesel (back-up/bomba reserva). | 1 | ||||||
2.2 | Conjunto de mangueiras de aço, tipo ( 2”lp ) . | 1 | ||||||
2.3 | Conjunto de mangueiras para sucção com ( 4) “ de diâmetro x ( 32 ) pés. | 1 | ||||||
2.4 | Tanque retangular para armazenamento de fluido, com capacidade de ( 114 ) bbl, equipado com câmara de espuma, dotado de divisão com comporta para retenção de detritos e com sucção na extremidade oposta ao retorno. | 2 | ||||||
2.5 | Pistola de lama. | 1 | ||||||
2.6 | Manifoldde ataque e estrangulamento de ( 5000 ) psi WP. | 1 | ||||||
2.7 | Manifoldde sucção de ( 6 ) “. | 1 | ||||||
2.8 | Balança n° ( 1 ) com ( 0 a 27 lbs/pé ) escalas, incluindo lb/pé3. | 1 |
1
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
3 | Equipamentos de Prevenção de Erupções | |||||||
3.1 | BOP hidráulico, modelo ( DR-25 ), 7 1/6” x5.000 psiWP de gaveta dupla com acionador, acumulador e comandos hidráulico e mecânico. Sistema de acionamento utilizando mangueiras de aço ou de borracha, tipo ( 1 1/2 ). Gavetas para tubulações de ( 2.3/8x 3.1/2 “ OD ) e cega. Adaptador para 5000 psi, com tomada lateral de 2 “ abaixo da gaveta inferior e acima da gaveta superior. | 2 | ||||||
3.2 | BOP para trabalhar coluna de hastes de ( 5/8 ) “ a ( 1.1/8 ) “, que utilize um único par de gavetas para todos os diâmetros, tipo ( Doble E ), com pressão de trabalho igual a ( 3000 ) psi, rosca inferior ( 3 ) “ LP Pino e rosca superior igual a ( 3 ) “ LP Caixa. | 1 | ||||||
3.3 | Saída de lama de ( 5 )” OD. | 1 | ||||||
4 | Equipamentos Componentes de Coluna | |||||||
4.1 | Raspador para operar em revestimentos de ( 5.1/2 ) até ( 7 ) lb/pé. | 2 | ||||||
4.2 | Conjunto de equipamentos para pistoneio em tubulações de ( 2.3/8 a 3.1/2 ) “ OD, tipos EUE e NU, comoil savercomreleaseeswabcom esfera móvel,sinker bare percursor. | 3 | ||||||
4.3 | Conjunto de equipamentos cortadores de parafina para tubulações de ( 2.3/8 a 3.1/2 ) “ NU, comsinker-bare percursor. | 3 | ||||||
4.4 | Conjunto de calibradores internos para tubulações de ( 2.3/8 a 3.1/2 ) “ OD tipos EUE e NU, conforme norma API 5A. | 3 | ||||||
4.5 | Conjunto de reduções, como segue: | |||||||
a) das brocas de ( 4.3/4 ) “, para comandos de ( 2.3/8 IF ) “ OD x 3 1/2” IF, com os respectivos protetores de rosca. | 1 | |||||||
b) dos referidos comandos para colunas de tubos de ( 2.3/8 a 3.1/2 ) “ Conexões IF e 3 1/2” EU e NU. | 1 | |||||||
c) das brocas de ( 4.3/4 ) “ para raspador de colunas ( 2.3/8 a 3.1/2 EU ) “. | 1 | |||||||
d) dos raspadores de ( 5.1/2 ) “ para as colunas ( 2.3/8 a 3.1/2 EU ) “. | 1 | |||||||
4.6 | Conjuntos de Adaptadores | |||||||
(A) A.3 7.1/16” x 5000 x 3000 x 2000 PSI | 2 | |||||||
(B) A.3 7.1/16” x 3000 x 2000 x 1000 PSI | 1 | |||||||
4.7 | Válvula para circulação de areia tipo 2LP x 5000 PSI | 1 |
2
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
5 | Equipamentos de Manuseio | |||||||
5.1 | Conjunto de elevadores para tubulações de (2.3/8 a 3.1/2 ) “ OD, tipos EUE e NU. | 2 | ||||||
5.2 | Conjunto (par) de elevadores para hastes de bombeio de ( 5/8 a 1 ) “. | 6 | ||||||
5.3 | Conjunto constituído de mesa e cunha com acionamento pneumático e mecânico, para tubulações de ( 2.3/8 a 3.1/2 ) “ OD, e comandos de ( 3.1/2 ) “ OD. | 3 | ||||||
5.4 | Colar de segurança para comandos de ( 2.3/8) “ OD a ( 7 ) “ OD. | 1 | ||||||
5.5 | Chave hidráulica ( Carter Tooco ), modelo ( BJ ), ou similar, equipada com medidor de torque, e sistema hidráulico para permitir o seu posicionamento, para operar tubulações de ( 2.3/8” a 3.1/2” ) “ OD. | 1 | ||||||
5.6 | Conjunto de chaves para hastes de bombeio de ( 5/8 a 1 ) “. | 6 | ||||||
5.7 | Gancho com mola e trava (catarina de hastes) para manobra de coluna de hastes com capacidade de ( 80.000 ) lbs, tipo ( BJ ) ou similar. | 1 | ||||||
5.8 | Conjunto de chaves manuais tipo grifo, tamanhos ( 24 x 36, 48,60) “. | 4 | ||||||
5.9 | Conjunto de chaves de marreta para parafusos dos flanges de ( 1 a 5 )” para pressões de ( 1.000 a 6.000 ) psi. | 8 | ||||||
5.10 | Conjunto de materiais para conexão com as instalações fixas, constituído denipplescurvas, tês, uniões e válvulas para ( 2 )” LP. | 15 | ||||||
5.11 | Conjunto de ferramentas manuais e outras utilidades, constituído de: bomba de graxa, nível, clips galvanizado para cabos de ( 1/2 )” até ( 1 )”, esticadores, cortadores de cabo, corda de sisal de diversas bitolas, chaves de brocas, lima, alicate, chaves de fenda, chaves ajustáveis, martelo de bola, marretas de bronze de ( 2 ) e ( 5 )kg, serrote, enxada, enxadela, pá redonda, pá quadrada, rodo, carrinho de mão, tesoura tipo aviação corte à esquerda modelo ( reto ), e paquímetro com escala em fração de polegada tamanho ( 0 ) a ( 11.13/16 ), com medidor de profundidade marca (Tubasa) ou similar. | 1 | ||||||
5.12 | Conjunto com ( 8 ) cavaletes para estaleirar hastes de bombeio na horizontal, confeccionado de acordo com padrões estabelecidos pela API. | 1 | ||||||
5.13 | Tubig stripperpara colunas de ( 2.3/8” x 3.1/2” )” OD. | 1 | ||||||
5.14 | Tubing wipperpara limpar tubos de (2.3/8” x 3.1/2” )”. | 1 | ||||||
5.15 | Válvula de segurança 2” LPx5000 PSI | 1 | ||||||
5.16 | Válvula Teste 2” LPx 5000 PSI | 1 | ||||||
5.17 | Pap. Rap. | 1 | ||||||
5.18 | Grupo gerador | 1 |
3
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
6 | Instrumentos Medidores e Registradores | |||||||
6.1 | Indicador de peso tipo MARTIN DECKER ou similar, com capacidade para (280.000)lbs e ponteiro indicador de sensibilidade, escala em libra para guincho principal. | 1 | ||||||
6.2 | Indicador de profundidade (3.500m) para guincho auxiliar. | 1 | ||||||
6.3 | Manômetros com ranges de pressões: ( 0,1000 )psi | 1 | ||||||
6.4 | Manômetros com ranges de pressões: ( 0,1500; 0,5000; 0 até 6.000 )psi | 2 | ||||||
6.5 | Indicador de pressão da bomba de lama. (0 a 6.000)PSI | 1 | ||||||
6.6 | Escala indicadora de volumes em bbl nos tanques, por tanque de lama. | 1 | ||||||
7 | Equipamentos de Segurança | |||||||
7.1 | Extintor de incêndio de espuma química. | NA | ||||||
7.2 | Extintor de incêndio de dióxido de carbono de ( 6 )kg. | 2 | ||||||
7.3 | Extintor de incêndio de pó químico de (12) kg. | 2 | ||||||
7.4 | Mangueira de (2.1/2” )” x ( 1.1/2 )m com uniões ( storz). | 2 | ||||||
7.5 | Esguicho regulável de ( 2.1/2” x 1.1/2)”, tipo ( storzz ) com uniões ( 2.1/2 ) para ( 1.1/2 ) GPM. | 1 | ||||||
7.6 | Chave para mangueira de incêndio de ( 2.1/2, 1.1/2 )”. (conjugada) | 2 | ||||||
7.7 | Proporcionador de espuma mecânica de ( 2.1/2 )”. | 1 | ||||||
7.8 | Jogos de equipamentos de proteção contra vapores de ácido e gás, constituído de: óculos, máscaras semi-facial com filtro, avental plástico, mangois plásticos. | NA | ||||||
7.9 | Gerônimo com cabo de fuga para torrista. | 1 |
4
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
7.10 | Esguicho lançador de espuma. | 1 | ||||||
7.11 | Derivante em ( 3 )” com entrada de ( 2.1/2 )” e duas saídas de ( 1.1/2 )”. | 1 | ||||||
7.12 | Mangueira de ( 2.1/2 – 1.1/2 )”, de ( 12 ) metros. | 2 | ||||||
7.13 | Esguichos de ( 2.1/2 – 1.1/2 )”. | 1 | ||||||
7.14 | Bombonas de LGE (Líquido Gerador de Espuma) de ( 20 ) litros. | 1 | ||||||
7.15 | Conjunto Moto-bomba diesel, para Combate a Incêndio, motor MWM 4 cil – bomba 80 metros cúbicos/hora pressão até 11 kg. | 1 | ||||||
8 | Outros Equipamentos | |||||||
8.1 | Tanque para armazenamento de água doce com capacidade mínima para ( 70 ) bbl com bomba centrífuga para combate a incêndio. | 1 | ||||||
8.2 | Sistema de iluminação com lâmpadas de vapor de sódio. | 1 | ||||||
8.3 | Conjunto gerador de energia, com potência compatível com as cargas da sonda, equipamentos auxiliares e os trailers para operações de ( 24 ) h por dia. | 1 | ||||||
8.4 | Casa de aço para sondador. | 1 | ||||||
8.5 | Trailer para encarregado de sonda. | 1 | ||||||
8.6 | Veículo utilitário para uso de encarregado. | 1 | ||||||
8.7 | Guia Cabo | 1 |
5
![(BCH ENERGY SERVICES INC LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
Rig Name & Number | BCH #3 | |
Depth Rating | 1400 m with 102 mm drill pipe | |
KB to Ground | 3.5 m | |
Bottom of table beam to ground | 2.8 m | |
Approximate Loads | Rig — 9 loads, DP & DC — 1 load |
Drawworks | Make | Rostel 300 | ||
Auxiliary Brake | Eaton 124 WCB | |||
Rig Power & Distribution | Detroit Series 60 | |||
Mast | Make | Rostel Stiff Mast | ||
Height | 20.4 m | |||
Maximum Hook Load | 88,900 daN w/6 lines | |||
Certified | Dec. 2003 | |||
Substructure | Length | Hydraulic High Back | ||
Height | 3 m | |||
Casing Capacity | 66,700 daN setback | |||
Crown Block | Make | Rostel | ||
Maximum Load | 88,900 daN with 3 sheaves | |||
Certified | Yes | |||
Travelling Block / Hook | Make | Ideco UTB 110 | ||
Maximum Load | 97,000 daN | |||
Certified | Jan. 2004 | |||
Swivel | Make | Oilwell PC-100 | ||
Maximum Load | 88,900 daN | |||
Certified | Nov. 2005 |
Drilling Line | Size | 25 mm | ||||||
Rotary Table | Make | Ideco 175 | ||||||
Opening Size | 444 mm | |||||||
Maximum Load | 66,700 daN | |||||||
Pump #1 | Input Power | Series 60 Detroit | ||||||
F500 | ||||||||
Max. Allowable | ||||||||||||
Operating Limits | SPM | Max. Allowable Operating Press | ||||||||||
Linear Size | 140 mm | 165 | 14,000 kPa | |||||||||
152 mm | 165 | 12,000 kPa |
Mud System | # of Tanks | 1 | ||||||
# of Compartments | 4 | |||||||
Total Active Volume | 34 m3 | |||||||
Trip Tank Volume | 3.46 m3 | |||||||
Pill Tank Volume | 5.4 m3 | |||||||
Pre-Mix Tank Volume | 30 m3 | |||||||
Transfer Pumps - Make | 5 x 6 - 50 HP | |||||||
Desilter - Make | Swaco | |||||||
Cone Size | 10 Cones | |||||||
Shaker - Make | Swaco ALS | |||||||
Screen Sizes Available | Up to 170 Mesh | |||||||
Pump #2 | Input Power | Series 60 Detroit | ||||||
F500 | ||||||||
Max. Allowable | ||||||||||||
Operating Limits | SPM | Max. Allowable Operating Press | ||||||||||
Linear Size | 140 mm | 165 | 14,000 kPa | |||||||||
152 mm | 165 | 12,000 kPa |
Well Control System | ||||||||
Accumulator | Type | Valvcon 4 Station | ||||||
Capacity | 80 Gal. | |||||||
Pressure | 21,000 kPa | |||||||
Remote Control Stn. - | 4 | |||||||
# of functions | ||||||||
Master Controls at Accumulator | Yes | |||||||
Choke Manifold | Installed in Heated Enclosure | Yes | ||||||
Max. Working Pressure | 21,000 kPa | |||||||
Gut Line | Size | 76 mm #2 | ||||||
Wing Lines | 52 mm | |||||||
Manual Choke | Make | National | ||||||
Size | 72 mm | |||||||
HCR Valve | Make | National | ||||||
Rating | 21,000 kPa | |||||||
Lower Kelly Cock | Make | API | ||||||
Rating | 21,000 kPa |
Stabbing Valve | Make | API | ||||||
Rating | 21,000 kPa | |||||||
Mud Gas Separator | Size | 762 mm | ||||||
Height | 2.14 m | |||||||
Inlet Line | Size | 76 mm | ||||||
Outlet | 152 mm | |||||||
B.O.Ps | Annular | Make | Townsend | |||||
Size | 228 mm | |||||||
Rating | 21,000 kPa | |||||||
Last Inspection | Mar. 2006 | |||||||
Pipe Ram | Make | Townsend | ||||||
Size | 228 mm | |||||||
Rating | 21,000 kPa | |||||||
Last Inspection | Mar. 2006 | |||||||
Blind Ram | Make | Townsend | ||||||
Size | 228 mm | |||||||
Rating | 21,000 kPa | |||||||
Last Inspection | Mar. 2006 | |||||||
Instrumentation | ||||||||
Weight Indicator | Make | Martin Decker | ||||||
Crown-o-matic | Make | Control Drilling | ||||||
Recorder | Make | Pason Electronic | ||||||
Drilling Recorder | ||||||||
Survey Instrument | Make | Totco | ||||||
Model | Degree 21 | |||||||
Drill Pipe | API Grade | |||||||
Length | 150 joints | |||||||
Size | 102 mm | |||||||
Classification | Premium | |||||||
Drill Collars | O.D | 14 – 121 mm (43/4) | ||||||
Length | 128 m | |||||||
O.D. | 6 – 159 mm (61/4) | |||||||
Tankage | Fuel | 11,000 ltrs | ||||||
Light Plant | Series 60 | |||||||
Type | Detroit |
Output | 350 kw | |||||||
Voltage | 480 | |||||||
Miscellaneous Equipment | Hydraulic Pipe Tub | |||||||
Rig Managers Shack | Size | 8’ x 20’ | ||||||
Type | Fabricated in Brazil | |||||||
Manufactured | 2007 | |||||||
Serial # | R#3 |
![(BCH ENERGY SERVICES INC. LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
General Specification
ITEM | DESCRIPTION | |
MODEL: | IRI 750 TRAILER MOUNTED DRILLING RIG | |
DRAWWORKS: | IRI 750 model 2042/160 750 hp, 1 1/8” grooving, trailer mounted | |
MAST: | 117’ 350,000# IRI double 10 line 365,000# | |
RIG MOTOR: | series 60 Detroit, model #6063HK33, 750 hp | |
TRANSMISSION: | Allison CTL-6061-4 | |
AUXILIARY BRAKE: | Eaton 24” x 3” disc | |
SUBSTRUCTURE: | IRI hydraulic box scoping 350,000# set back, 22’ | |
BLOCK: | Ideco 160 ton shorty | |
SWIVEL: | TSM 150 | |
KELLY: | 51/2” square | |
KELLY BUSHING: | Varco | |
ROTARY TABLE: | Ideco 20-1/2” | |
BAILS: | Joy 350 ton | |
MUD PUMP UNIT #1: | Gardner Denver PZ-8 stroke 8”, P/B Cat. 3508, (705 hp), in house. | |
MUD PUMP UNIT #2: | Gardner Denver PZ-8 stroke 8”, p/b cat. 3508, (705 hp), in house. | |
COMBINATION HOUSE: | Koomey 6 station 5 bottle w/30 hp union triplex pump, (1) generator marathon 350 kw, p/b Detroit series 60, (1) generator magnamax 200kw, p/b cat. 3306 | |
BLOWOUT PREVENTION EQUIPMENT: | 13 5/8” X 5000 Hydril Annular Preventer, 5/8” X 5000 Shaffer Double Ram Preventer. | |
CHOKE MANIFOLD: | 5000 PSI Choke manifold c/w one manual and one auto choke complete with console. (located at end of catwalk). |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH ENERGY SERVICES INC. LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
MUD SYSTEM: | (2) tank 600 bbl. w/(2) shale shakers linear motion dfts, percharge and mixing pumps mission magnums, 8 x 6 w/12” impellers, (5) sew-eurodrive type RF87 c/w 5 hp motor and 1 1/8” shaft, (1) pill tank agitator sew-eurodrive type KF47 c/w 5 hp motor and 1 1/8” shaft, degasser | |
DOGHOUSE WATER TANK: | Drillers controls and brake handle in glass dome inside of doghouse cantilevers down | |
TOOL PUSHER HOUSE: | 40” Office / Living quarters | |
MISC. TOOLS: | Foster Kelly spinner, auto driller, folley type “B” tongs, catwalk, katch kan recovery system for oil based drilling fluids. Pipe racks, 45 foot catwalk w/manifold. | |
TUBULARS: | - 250 Joints of 5” 19.5 S-135 Drill pipe c/w 41/2” IF connections - - 15 Joints of 5” Hevi-Wate drill pipe c/w 41/2” IF connections | |
DRILL COLLARS: | - 20 x 61/2” Spiral drill collars - - 4 x 8” Spiral drill collars |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
• | 400,000 lbs telescopic double | ||
• | 4 x 36” 1 x 42” sheave crown complete | ||
• | Racking board | ||
• | Derrick egress system | ||
• | Fall Arrester Posts | ||
• | Drillers console | ||
• | 2 x PL-8 Tugger winches | ||
• | 1 x PL-5 Boom line | ||
• | Complete electrical package | ||
• | Complete Plumbing Package with Hydraulics and Air | ||
• | Blast and paint with Endura products |
• | 400,000 lbs casing load | ||
• | 350,000 lbs set back | ||
• | 14’4” wide x 17’ total height | ||
• | 48” high x 24” wide pony subs | ||
• | Off trailer sub height 13’ | ||
• | Hydraulic leveling rams | ||
• | Hydraulic power package | ||
• | 27.5” Rotary table | ||
• | BOP handling system for 13 5/8” | ||
• | Complete electrical package | ||
• | Plumbing package with hydraulic, air, steam and water | ||
• | Blast and Paint with Endura products and Pro-coat |
• | Fabricate unitized draw works skid | ||
• | Supply & mount TSM-850 draw works | ||
• | Supply & mount GE 752 DC electric floor motor | ||
• | Supply and install mast raising cylinders | ||
• | Supply and mount DW cooler | ||
• | Supply and mount 1.25” x 5000’ drill line | ||
• | Plumbing package with hydraulic, air, steam and water | ||
• | Complete electrical package | ||
• | Blast and Paint with Endura products and Pro-coat |
• | Fabricate power catwalk with skate and manifold building | ||
• | Fabricate V-door | ||
• | Complete plumbing package |
• | Complete electrical package | ||
• | Blast and Paint with Endura products and Nonslip |
• | Fabricate 55’ x 12’4” combination building | ||
• | Wash room and shower facility | ||
• | 3 cubic meter fresh water tank | ||
• | 3.5 meter disposal water tank | ||
• | Change shack facility | ||
• | Supply and install 120 gal x 5 station accumulator | ||
• | Blast and Paint with Endura products |
• | Fabricate 83m3 3 compartment mud tank | ||
• | 3 each 7.5 HP agitators | ||
• | 6 each 3” mud guns | ||
• | 2 each Derrick Super G Shakers | ||
• | Side Winder style mix hopper | ||
• | 2 each 50 HP 5 x 6 x 11 mix pumps | ||
• | Complete suction / discharge manifold | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 65 m3 2 compartment mix tank | ||
• | 2 each 7.5 HP agitators | ||
• | 4 each 3” mud guns | ||
• | Side winder style mix hopper | ||
• | 1 each 50 hp 5 x 6 x 11 mix pumps | ||
• | Complete suction / discharge manifold | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 40 x 12’4” pump house with cabinets & racks | ||
• | Supply and install off shore F-1000 pump | ||
• | Supply and install GE 752 electric motor and drive system | ||
• | Precharge pump — 50 HP, 5 x 6 x 14 centrifugal pump | ||
• | Supply and install complete drive system | ||
• | Supply and install wash gun | ||
• | Supply and install 7.5HP air compressor | ||
• | Supply and install all guarding |
• | Supply and install all suction / discharge plumbing | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 40’ x 12’4” pump house with cabinets & racks | ||
• | Supply and install off shore F-1000 pump | ||
• | Supply and install GE 752 electric motor and drive system | ||
• | Precharge pump — 50 HP, 5 x 6 x 14 centrifugal pump | ||
• | Supply and install complete drive system | ||
• | Supply and install all guarding | ||
• | Supply and install all suction / discharge plumbing | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 65 m3 water tank / doghouse | ||
• | Slide out system on doghouse | ||
• | Hydraulic doghouse raising system | ||
• | Storage room & tool board on doghouse | ||
• | Tool room with benches & oil storage | ||
• | 2 each Jacuzzi water pumps | ||
• | Wash pump and soap tank | ||
• | 15 HP air compressor | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and paint with Endura products |
• | 40’ x 12.5’ generator skid with roof | ||
• | 2 x Detroit Diesel 12V Series 2000 1000HP generators | ||
• | Electrical panels and plug boards |
• | 40’ x 12.5’ generator skid with roof | ||
• | 1 x Detroit Diesel 12V Series 2000 1000HP generator | ||
• | 1 x Detroit Diesel Series 60 685HP generator | ||
• | Electrical panels and plug boards |
Choke Manifold
• | 2” x 3” x 5000 psi double gut manifold | ||
• | All Plumbing for flare and degasser lines | ||
• | Blast and Paint |
• | Piping for flare & degasser line | ||
• | Auto igniter for flare stack | ||
• | Stackable onto manifold skid | ||
• | Blast and paint with Endura products |
• | Range II pipe tubs | ||
• | Complete hydraulic / plumbing package | ||
• | Blast and paint with Endura products |
• | 7 — 8’ x 48’ x 6” 4 runner mats 2 with jacking pads | ||
• | 3 — 8’ x 36’ | ||
• | 6 — 8’ x 24’ | ||
• | 1 — 8’ x 22’3” with well center | ||
• | 2 — 4’ x 20’ |
• | 40’ tumble racks x 3 sets |
• | Kelly Spinner | ||
• | Pipe Spinner | ||
• | Web Wilson AAX Tongs | ||
• | BJ Style 250 ton DP Elevators | ||
• | 5” Drill Pipe Slips | ||
• | DCS-R Drill Collar Slips | ||
• | Square Roller Kelly Bushing | ||
• | Safety Collar | ||
• | 10’ x 250 ton Bails | ||
• | 250 ton Swivel | ||
• | 250 ton Block and Hook |
• | 2 — 13 5/8” x 5000 psi singles | ||
• | 1 — 13 5/8” x 5000 psi annular | ||
• | All stack valves including HCR | ||
• | Drilling spool with turns |
• | Complete w/ electrical village panel |
12 each 63/4” Drill collars
8 each 8” Drill Collars
3 each 91/2” Drill Collars
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
General Specification
DEPTH RATING: | 2800m with 4” in drill pipe | |
APPROXIMATE LOADS: | 14 loads |
ITEM | DESCRIPTION | |
DERRICK: | ||
Model JJ1351D 105’ telescopic double | ||
Effective height 31m | ||
Max hook load 1350 KN | ||
Hyd lift mechanical telescope | ||
Racking board height above floor 17.4m (57’) | ||
Set back capacity 4 1/2” DP (2800m) (9200’) | ||
+ 61/4 DC (20 jts) | ||
Crown block model TC 135C | ||
Rated 1350 KN (297,500 lbs.) | ||
5 x 760 mm (30”) 11/8” grooved sheaves | ||
Fold up racking board | ||
Easy rider assembly | ||
Escape buggy with deadline anchor weight | ||
Derrick will be Painted White with a Red Crown. | ||
Hydraulic Rams for Make up and Breakout. | ||
One crown mounted fall arrest | ||
One monkeyboard mounted fall arrest on slope line | ||
4” standpipe with Kelly hose and valves and fig 602 fittings | ||
2” casing standpipe with valve, fittings and hose | ||
SUBSTRUCTURE: | ||
Model DZ 160/ 4.5 | ||
Max set back 1350 kN (348,000 lbs) | ||
Floor height 4.5m (14.7’) | ||
Ground to bottom of rotary beam 3.52m ( 11.5 | ||
Pipe bottom bird baths | ||
BOP hydraulic lift system | ||
BOP tie down | ||
Folding handrails on top area | ||
ZP175 171/2 Rotary table rated 1600 KN (352,640 lbs.) | ||
BOPs: | ||
9” 3000 psi 21 mpa | ||
Annular FH23-21 9” 3000 (Annular Shaffer Element.) | ||
2-9” 3000 ram block c/w Pipe Rams and Blind Rams. | ||
FZ23-21 | ||
9” 3000 x 9” 3000 working spool with 3” 3000 outlets | ||
HCR & Manual valves | ||
2-Kill line valves | ||
3 1/8 1-HCR Hydraulic, 1- Manual | ||
9 Valve Manifold c/w 2 Chokes. |
Sede: | Escritório Brasil: | |
Suite 500, 816 – 7th Avenue SW | Av. Rio Branco, 01 – 8° andar – sala 804 | |
Calgary, AB, Canada | Rio de Janeiro – RJ | |
T2P 1A1 | 20090–003 | |
Tel.: +1(403) 539-9488 | Tel.: 21 - 3213-8050 | |
Fax +1(403) 265-4160 | Fax: 21 - 3213-8051 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
DRAWWORKS: | ||
Model JC20 rated 550hp | ||
15 L Cummins 600hp engine | ||
Allison 6061 transmission | ||
JFD 130 right angle drive box | ||
Drum 450mm x 912mm (17.7“x36”) 11/8 “lebus grooved | ||
Circulating drum with closed loop glycol | ||
310mm x 1070mm (12“x42”) break hubs | ||
224 ETN auxiliary brakes with closed loop glycol system shared with circulating drum | ||
Rotary table brake | ||
50 hp electric two stage hydraulic system | ||
PTO hyd system | ||
3 T (6600lb) boom line winch on mud tank side | ||
5 T (11000lb) tugger winch on doghouse side | ||
Survey Winch | ||
PIPE SYSTEM: | ||
Catwalk with manifold shack with two 3” lines and one 8” de-gasser lin | ||
YJG 21 21 mpa (3000 psi) rated choke manifold line | ||
V door installed on catwalk | ||
Folding pipe rack arms installed on shack side | ||
Three of forklift accessible pipetubs | ||
240 Jts. 4” FH X95 drill pipe hardbanded and internal coated | ||
15 Jts. 61/4 41/2 X H drill collars (zipped for slips and hardbanded on pin end) 20 each 41/2” HWDP | ||
MUD TANKS: | ||
60m3 usable 5 compartments including trip tank, shaker tank, settling tank, suction tank and pil tank | ||
Sand trap | ||
4- 7.5 hp agitators in tank | ||
2 - 50 HP 5x6 Victory mud mixers (or 6 x 8) | ||
2 - - Winch poles | ||
De-gasser unit | ||
Mixing hopper | ||
PUMP HOUSE: | ||
12’ 6” wide Building | ||
F1000 mud pump | ||
23 L Cummins with Icona clutch conventional mount with belt drive | ||
Allison 6061 transmission | ||
Electric 5 x 6 precharge or mechanical (please advise if electric or mech preferred and if mechanical whether conventional belt driven or R/A with polychain drive preferred) |
Sede: | Escritório Brasil: | |
Suite 500, 816 – 7th Avenue SW | Av. Rio Branco, 01 – 8° andar – sala 804 | |
Calgary, AB, Canada | Rio de Janeiro – RJ | |
T2P 1A1 | 20090–003 | |
Tel.: +1(403) 539-9488 | Tel.: 21 - 3213-8050 | |
Fax +1(403) 265-4160 | Fax: 21 - 3213-8051 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
LIGHT PLANT: | ||
2x 450 KW generators | ||
Powered by 15 L Cummins | ||
Louvered panels for both generators | ||
1 accumulator with air back up | ||
Plumbing for nitrogen ( nitrogen bottles not included) | ||
Koomey cord and remote (doghouse installed) | ||
Please advised if PLC needed approximately 30000.00 extra | ||
Tool room with work bench, storage shelves and storage cupboard | ||
Electric air compressor | ||
Change shack with 12 lockers and bench | ||
Electric heater in change shack | ||
DOGHOUSE & WATER TANK: | ||
65m3 water storage | ||
Two water supply pumps | ||
18,000L fuel tank | ||
Two fuel pumps | ||
3 oil storage bins | ||
Doghouse with junk room | ||
Knowledge box | ||
Storage cupboards | ||
Winch trolley bar in junk room | ||
TRAVELLING EQUIPMENT: | ||
Swivel SL135 | ||
Hydraulic Kelly spinner | ||
Travelling blocks YG135C 1350 KN | ||
41/4 square Kelly bar/ c/w Drive Bushing or 31/2 bar and bushings | ||
Slips (Drill Pipe and Drill Collar) | ||
Elevators DH 150 | ||
1000m spool 1 1/8 drill line | ||
108” x 250 Ton Bale Links | ||
Choke Hose, 2’ Kill Hose ,Shock Hose |
Sede: | Escritório Brasil: | |
Suite 500, 816 – 7th Avenue SW | Av. Rio Branco, 01 – 8° andar – sala 804 | |
Calgary, AB, Canada | Rio de Janeiro – RJ | |
T2P 1A1 | 20090–003 | |
Tel.: +1(403) 539-9488 | Tel.: 21 - 3213-8050 | |
Fax +1(403) 265-4160 | Fax: 21 - 3213-8051 |
• | Senior Credit Agreement (and related security) |
• | Warrants granted to Standard Bank | ||
• | Options to directors, officers and consultants under ESOP |
as Corporation
as Holder
ARTICLE I — INTERPRETATION | 1 | |||
ARTICLE II — COVENANT TO PAY INDEBTEDNESS | 4 | |||
ARTICLE III — SECURITY FOR INDEBTEDNESS | 4 | |||
ARTICLE IV — FURTHER SECURITIES | 6 | |||
ARTICLE V — CONVERSION OF DEBENTURE | 7 | |||
ARTICLE VI — SUBORDINATION OF DEBENTURE | 10 | |||
ARTICLE VII — GENERAL REPRESENTATIONS AND WARRANTIES | 11 | |||
ARTICLE VIII — GENERAL COVENANTS | 12 | |||
ARTICLE IX — ENFORCEABILITY OF SECURITY | 13 | |||
ARTICLE X — REMEDIES OF HOLDER | 13 | |||
ARTICLE XI — APPOINTMENT OF RECEIVER | 16 | |||
ARTICLE XII — DISCHARGE OF DEBENTURE | 17 | |||
ARTICLE XIII — MISCELLANEOUS PROVISIONS | 17 | |||
ARTICLE XIV — EXECUTION | 20 |
2
3
Schedule “A” | Pledged Rigs | |||
Schedule “B” | Material Contracts | |||
Schedule “C” | Conversion Notice |
4
5
6
7
8
9
10
11
(i) | each of the Material Contracts is valid, subsisting and in good standing; | ||
(ii) | the copies of each of the Material Contracts provided by the Corporation to the Holder are true and complete copies of each of the Material Contracts; |
12
(iii) | there are no subsisting or unremedied breaches of default of a material nature under or in respect of any of the Material Contracts; and | ||
(iv) | other than in favour of the holders of the Senior Indebtedness, the Corporation has not assigned, mortgaged or encumbered in favour of any party any of the Material Contracts, nor any of the rights or benefits of the Corporation under any of the Material Contracts. |
13
14
(i) | carry on and manage the business and operations of the Corporation in respect of the Secured Property and any agreements forming part of the Secured Property (including, without limitation, the Material Contracts or any of them); | ||
(ii) | receive the rents, incomes and profits of the Secured Property and, to the extent applicable, any agreements forming part of the Secured Property (including, without limitation, the Material Contracts or any of them); | ||
(iii) | pay therefrom all expenses with respect to so completing the construction and development of the Secured Property and with respect to the maintenance, repair, protection and preservation of the Secured Property; and | ||
(iv) | preserve, maintain, use and operate the Secured Property; |
15
16
17
18
Suite 500, 816 — 7th Avenue S.W.
Calgary, Alberta T2P 1A1
Attention: Craig F. Nieboer, CFO
Telecopy no.: (403) 213-9254
E-mail: cnieboer@brazalta.com
Suite 1000, 250 — 2nd Street S.W.
Calgary, Alberta T2P 0C1
Attention: Trevor Wong-Chor
Telecopy no.: (403) 296-4474
E-mail: twong-chor@davis.ca
19
20
BCH LTD. | ||||
By: | ||||
Name: | ||||
Title: | ||||
(affix corporate seal) |
Drilling Rig which Services Contract | Client | Contract # | ||||||
BCH-01 | Petrobras | Service: | 2300.0031788.07.2 | |||||
Lease: | 2300.0031786.07.2 | |||||||
BCH-02 | Petrobras | Service: | 2500.0031792.07.2 | |||||
Lease: | 2500.0031791.07.2 | |||||||
BCH-04 | Petrobras | Service: | 2700.0031827.07.2 | |||||
Lease: | 2700.0031824.07.2 | |||||||
BCH-05 | Petrobras | Service: | 2500.0031794.07.2 | |||||
Lease: | 2500.0031793.07.2 | |||||||
BCH-03 | Petrobras | Service: | 2600.0037264.07.2 | |||||
Lease: | 2600.0037263.07.2 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
Former: RIG-26
MODEL:SUPERIOR 400 TRAILER MOUNTED RIG
DEPTH RATING | ||||
101.6 (mm), 4 (in.) drill pipe | : | 1500 (m), 4921 (ft) | ||
DRAWWORKS | ||||
Make | : | Superior | ||
Model | : | 400 | ||
Drilling line | : | 25.4 (mm), 1 (in.) (EIPS) | ||
Main brake | : | Band | ||
Auxiliary brake | : | Parmac Hydromatic | ||
Power | : | Caterpillar 3412 (630 hp) | ||
Drive | : | Alison Torque Converter | ||
Crown saver | : | Hitec Cathead | ||
MAST | ||||
Type | : | Box telescope (free standing) (cable raise) | ||
Height | : | 34.14 (m) 112 (ft) | ||
Make | : | Kremco | ||
Gross nominal Capacity | : | 146,780, (daN), 330 000 (lbs) | ||
Static hook load rating | : | 88,960 (daN), 200 000 (lbs) | ||
Racking capacity (doubles) | : | 153 x 101 mm, (4")pipe (doubles) | ||
SUBSTRUCTURE | ||||
Make | : | Kremco | ||
Type | : | One piece box | ||
Casing capacity | : | 88,960 (daN), 200 000 (lbs) | ||
Set back capacity | : | 66,720 (daN), 150 000 (lbs) | ||
TRAVELLING EQUIPMENT | ||||
Block (ton) | : | BJ 150 | ||
Hook (ton) | : | BJ Unimatic 150 | ||
Block and hook model | : | BJ 6150 | ||
Swivel (ton) | : | National 200 | ||
Model | : | P200 |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – sala 11/12 | Rua dos Jasmins n° 01, Bairro Planalto II | |
Rio de Janeiro – RJ | Catu, Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ROTARY TABLE | ||||
Make | : | National | ||
Model | : | C-175 | ||
Opening size | : | 444.5 (mm), 17-1/2 (in.) | ||
Static load rating | : | 226,796 (kg), 250 (ton) | ||
Drive | : | Caterpillar 3406 (420 hp) | ||
MUD PUMP NO. 1 | ||||
Make | : | BPMMP - Baoji, China (to Continental Emsco design) | ||
Model | : | F500 | ||
Type | : | Triplex | ||
Displacement | : | 0.5 - 2.2 (m3/min) (gpm)135-575 @ 165 SPM | ||
Pressures | : | 9.2 - 26.3 (mPa), 1340 to 3820 (psi) | ||
Charge pump | : | Mission Magnum 5 in x 6 in centrifugal | ||
Power | : | Caterpillar 3412 (600 hp) | ||
Transmission | : | 5-speed Allison 5960 | ||
MUD PUMP NO. 2 | ||||
Make | : | BPMMP - Baoji, China (to Continental Emsco design) | ||
Model | : | F500 | ||
Type | : | Triplex | ||
Displacement | : | 0.5 - 2.2 (m3/min), 135 - 575 (gpm) @ 165 spm | ||
Pressures | : | 9.2 - 26.3 (mPa), 1340 to 3820 (psi) spm | ||
Charge pump | : | Demco 5 in x 4 in centrifugal | ||
Power | : | Caterpillar 3412 (600 hp) | ||
Transmission | : | 5-speed Allison 5960 | ||
GENERATORS | ||||
Engines | : | Caterpillar D3406 DIT | ||
Number | : | Three | ||
Generators | : | 210 KW (2x) / 300 KW (1x) - 460/220 V 60 Hz | ||
MUD SYSTEM | ||||
Tank volume | : | 64 (m3), 370 (bbl), (two tanks) | ||
Shakers | : | Sweco LM 3 | ||
Degasser | : | Poorboy |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – sala 11/12 | Rua dos Jasmins n° 01, Bairro Planalto II | |
Rio de Janeiro – RJ | Catu, Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
BOP SYSTEM | ||||
BOP stack | : | 11 in Hydril GK 3M annular | ||
11 in Shaffer 3M double gate | ||||
Accumulator | : | Hydril K8 454 (ltr), 120 (gal) | ||
Choke manifold | : | Oilmaster 3M | ||
Adjustable choke | : | Willis | ||
Test pump | : | Hydratron | ||
INSTRUMENTATION | ||||
Drilling recorder | : | 3-pen Totco | ||
Driller console | : | Hitec Cathead mini console | ||
Inclinometer | : | Totco | ||
Weight Indicator | : | MD Totco | ||
HANDLING EQUIPMENT | ||||
Winch | : | Gearmatic hydraulic 2720 (kg), 3 (ton) | ||
Manriding winch | : | IR46RJ Pneumatic | ||
Kelly spinner | : | Foster hydraulic | ||
Wireline winch | : | Gearmatic | ||
Hydraulic Power Tongs | : | White Bear - 25,000 foot - pounds (3" - 5" in.) | ||
FUEL TANK | ||||
Capacity | : | 21 800 (ltr), 5760 (gal) | ||
WATER TANK | ||||
Capacity | : | 400 (ltr), 105 (gal) | ||
BUILDINGS: | ||||
Change shack | : | 20 ft container (modified) | ||
Doghouse a/c (large) | : | 20 ft container | ||
Trailers | : | 2x 40ft (offices, mess room) | ||
2x 20ft (living quarters) | ||||
Geologist Lab | : | 20 ft container | ||
TUBULARS | ||||
Drill pipe | : | 300 ea - 101.6 (mm), 4" (in.) | ||
Grade E (H90 tool joints) | ||||
Drill collars | : | 20 ea - 171.5 (mm), 6-3/4" (in.) spiral | ||
20 ea - 120.6 (mm), 4-3/4" (in.) | ||||
03 ea - 196.9 (mm), 7.3/4" (in.) | ||||
07 ea - 171.5 (mm), 6.3/4"(in.) | ||||
Heavy Weight Drill pipe | : | 14 ea - 127 (mm) - 5" (in.) |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – sala 11/12 | Rua dos Jasmins n° 01, Bairro Planalto II | |
Rio de Janeiro – RJ | Catu, Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
Former: RIG-15
ITEM | DESCRIPTION | |
DRAWWORKS: | - IRI Cabot 2550 | |
Horsepower Rating: | - 1200 H.P. | |
Maximum Hoisting Capacity: | - 337.5 T with 10 lines of 1-1/4" | |
Auxiliary Brake: | - Parmac V-80 Hydromatic | |
Crown Block Protection: | - Stewart - Stevenson | |
PRIME MOVER (DRAWWORKS): | - 2 Cat 3412 DITA | |
Output Horsepower rating: | - 600 H.P. each | |
Emergency Shut-down: | - Barber Type | |
(Pumps): | - 2 Cat D-399 TA | |
Output Horsepower: | - 1150 H.P. with Barber Type Shutdown | |
AIR COMPRESSORS: | ||
Type: | - 1 - Quincy 350-21 (E) - Electric Powered | |
- 1 - Quincy 350-22 (E) - Electric Powered | ||
Automatic: | - Yes -1 - Primary / 1 - Backup | |
ROTARY TABLE: | - Gardner Denver RT 27-1/2 | |
Maximum Table Opening: | - 700 mm | |
Maximum Static Load: | - (222,500 daN) | |
Torque Gauge: | - Totco | |
RPM Gauge: | - Totco | |
DERRICK: | - IRI Telescoping | |
Static Hook Load w/ Lines of: | - 322 T with 10 lines (318,000 daN) | |
Racking Capacity: | - 145 STD with 5" | |
Clear Working Height: | - 38.7m (127 feet) | |
Wind Capacity (Bare Mast): | - 106 MPH | |
Wind Capacity (Full Set-back): | - 80 MPH | |
SUBSTRUCTURE: | - IRI Telescoping | |
Casing Load: | - 460 Ton (409,400 daN) | |
Minimum Clear Working Height: | - 4.15m (13.8 ft) | |
Set Back Capacity: | - 162 Ton (360,000 lbs) (162,200 daN) | |
TRAVELLING EQUIPMENT: | ||
Crown Block: | - IRI 6 - 42" Sheaves | |
Hook Block: | - Emsco 350 T / 5 Sheaves (311,500 daN) | |
Links: | - BJ 350 T / 96" (311,500 daN, 2743 mm) | |
Swivel: | - Emsco LB 400 (Static Ratio mg 800,000 lb) (356,000 daN) | |
TOP DRIVE: | ||
Manufacturer: | - TESCO | |
Model: | - 250 HMIS | |
Capacity: | - 250 Tons | |
Specs: | - Hydraulic Power Pack (475 HP) |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
DRILLING LINE: | ||
Drilling Line Diameter: | - 31.5 mm (1-1/4") | |
Type: | - IWRC - IPS | |
Strength Capacity: | - 71,000 daN (79.9T) | |
DEAD LINE ANCHOR: | ||
Weight Indicator: | - Martin Decker | |
Hydraulic Sensor: | - Martin Decker | |
Line Scale Weight Indicator | - Cameron C | |
HYDRAULIC WINCH: | ||
Type: | - Pull master PL8 (Hydraulic) | |
Load: | - 7000 Lbs: 3115 daN | |
No: | - Two | |
MUD PUMP: | ||
No/Make/Model/Type — Pumps: | - 2 - Gardner Denver PZ9 Triplex | |
Power Rating: | - Pump- 750 kw (1000 H.P.) Each Engine Rating Caterpillar D-399c/w torque converter (1150 H.P.) | |
Maximum Strokes / Minute: | - 120 | |
Maximum Working Pressure: | - Lesser of 80% of Liner Rating or Published Pressure | |
Liner Size Available: | - 6", 6-1/2" | |
Suction Pulsation Dampener: | - No | |
Discharge Pulsation Dampener: | - Continental Emsco 10 Gallon Lower Case 5000 psi on each Pump | |
Charge Pump (Centrifugal): | - Mission 5 x 6 | |
MUD TANKS: | ||
Active Tank Volume: | - 180 m3(1110 bbl) | |
Premix Tank: | - 48 m3 (400 bbl) | |
Trip Tank: | - 3.5 m3(22 bbl) | |
Agitators: | - 5 - Norgear Model 800SW- 20 H.P. | |
Mud Guns: | - Low Pressure for each Compartment | |
Desilter: | - Swaco 12- 4" Cones | |
Degasser: | - Roll'n Atmospheric 20" (500 mm Dia.) | |
Centrifuge Machine: | - Swaco Model 1828 | |
Shale Shakers: | - 3 - Swaco Linear | |
Centrifugal Pumps: | - Mission Style | |
Type: | - 6" x 8" and 2"x3" | |
Capacity: | - Various as per application | |
Number: | - Seven |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
LIGHT PLANTS: | ||
Generators Available, (Rating-KW) | - 2-CAT-3412 DITA 680 KW | |
Lighting available for: | - Location Lighting and Wellsite Module | |
Both for rig: | - For Rig and Wellsite Accommodation | |
Voltage: | - 480 Volts w/ Transformer to 220v / 110v | |
TUBULARS: | ||
Drill Pipe: | ||
- 288 Joints of 5 inch 19.5 Ib per ft Grade S135 c/w 41/2 inch IF tool joints | ||
- 144 Joints of 5 inch 19.5 Ib. per ft Grade E c/w 41/2 inch IF tool joints | ||
- 360 Joints of 31/2 inch 13.3 Ib per ft. Grade G105 c/w 31/2 inch IF tool joints | ||
- 8-5 inch pup Joints of assorted lengths c/w 41/2 inch IF tool joints | ||
- 15 Joints of 5 inch HEVI- WATE drill pipe c/w 41/2 inch IF connections | ||
Drill Collars: | ||
- 3-9 inch Spiral drill collars with 7 5/8 REG connections | ||
- 9-8 inch Spiral drill collars with 6 5/8 inch REG connections | ||
- 11-7 inch Spiral drill collars with 41/2 inch IF connections | ||
- 12-61/2 inch Spiral drill collars with 41/2 inch IF connections | ||
- 30-61/4 inch Spiral drill collars with 41/2 inch IF connections | ||
- 21-43/4 inch Spiral drill collars with 31/2 inch IF Connections | ||
Drilling Subs: | ||
- 70 subs | ||
Fishing Tools: | ||
- Tool inventory (inventory on request) |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
BLOW OUT PREVENTION EQUIPMENT: | ||
Annular Preventer: | - 1-11 inch 5000 psi Hydril Annular Preventer | |
Ram Preventers: | - 1-11 inch 5000 psi Shaffer double Ram Preventer | |
- 1-11 inch 5000 psi Shaffer single Ram Preventer: | ||
Drilling Spool: | - 1-11 inch 5000 psi drilling spool c/w 2- 4 1/16 5000 psi outlets | |
Choke Manifold: | - 1-5000 psi choke manifold c/w one manual and one auto choke with console | |
Accumulator: | - Valvcon 130 Gallon 6 station | |
AUXILIARY TOOLS & INSTRUMENTS: | ||
1. Automatic Drill Recorder | - Martin Decker 5 Pen | |
2. Single shot Drift Recorder | - Totco 7° | |
3. Wire-line Unit (Hydraulic): | - 0.092 Line Rated for4570m / (15,000 ft) | |
4. High Pressure Wash Gun (Pump): | - CAT w/ 3 H.P. Electric Motor | |
5. Sump Pump: | - FLYGT 4" (Electric) | |
6. Kelly Spinner: | - Foster 77 (Mckinney) | |
Kelly Bushing: | - Varco HDP Hex | |
7. Drill Pipe Spinner: | - Varco SSW 10 | |
8. Rotary Hose: | - Goodall 55' x 3' ID x min 5000PSI Working Pressure | |
9. Portable Rig Matting | - Yes - 6" Thick, 8 ft wide, various lengths | |
10. Kelly: | - 5-1/4" Hex - 40 ft long | |
Kelly Drive Bushing: | - Pin Drive | |
11. Fuel Tanks, One tank at rig | - 40,000 liter / Tank | |
12. Fuel Pumps: | - 2- Electric Powered | |
13. Water Tanks, (Drilling Water Rig Storage): | - 1 Hydormatic Tank | |
- 2-Water Storage Tanks | ||
- 1-Rig Water Tank | ||
Water Pumps: | - 2-3" Jacuzzi (Electric Powered) | |
- 2-120 Barrel water transport tanks skid mounted | ||
14. Hand Tools: | - Complete set for rig, mechanic and electrician | |
15. One (1) Derrick Bunk 16. One wellsite unit for Rig Manager | ||
SPARE EQUIPMENT ITEMS: | ||
Engines: | - 2-398 Caterpillar engines c/w Radiators | |
Transmissions: | - 1-6061 Allison Automatic transmission complete | |
Right Angle Drive: | - 1- complete right angle drive for the drawworks | |
Hook: | - 1-250 ton Web Wilson | |
BOP: | - 1-11 inch 5000 psi Hydril Annular complete | |
- 1-11 inch 5000 psi Shaffer double gate | ||
Swivel: | - 1-LB400 Emsco swivel complete | |
Tongs: | - 1 complete set of AAX tongs with jaws | |
Rotary Table (New) | - 1 Spare 271/2 inch rotary table complete with drive bushing |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | Tel.: 71 - 3641-9909 | |
Fax: 21 - 2588-8116 | Fax: 71 - 3641-9459 |
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
1 | Sonda de Produção e Acessórios. | |||||||
1.1 | Sonda de produção com capacidade igual ou superior a ( 150.000 ) libras, que manobre com seção de ( 2 ) tubos na vertical, dotada de sistema de partida elétrica e descarga, possuindo mastro com altura de ( 30 ) m. | 1 | ||||||
1.2 | Plataforma de trabalho com altura ajustável. | 1 | ||||||
1.3 | Conjunto gancho-catarina com capacidade (150.000lbs). | 1 | ||||||
1.4 | Par delinkscom capacidade ( 220.000lbs ) e comprimento ( 2.20m ). | 1 | ||||||
1.5 | Power-Subtipo ( warning ) comSwivel, acionado por ( Sistema hidráulico ). | 1 | ||||||
1.6 | Cat linecom velocidade de ( 6 ) metros por minuto. | 1 | ||||||
1.7 | Cat headcom controle de torque e curso mínimo de ( 3,77 ) pés. | 1 | ||||||
1.8 | Guincho auxiliar. | |||||||
1.9 | Catarina com cabo de aço de ( 1 ) “. | |||||||
2 | Sistema de Circulação, Amortecimento e Teste | |||||||
2.1 | Bomba de lama modelo (National), com filtro e acionada, com potência de (JWS-400) HP, dotado de sistema de partida, ou Bomba de lama Dowel Schlumberger triplex capacidade 8.5 galões por minunos, motor Detroit 420 HP 8V71 díesel (back-up/bomba reserva). | 1 | ||||||
2.2 | Conjunto de mangueiras de aço, tipo ( 2”lp ) . | 1 | ||||||
2.3 | Conjunto de mangueiras para sucção com ( 4) “ de diâmetro x ( 32 ) pés. | 1 | ||||||
2.4 | Tanque retangular para armazenamento de fluido, com capacidade de ( 114 ) bbl, equipado com câmara de espuma, dotado de divisão com comporta para retenção de detritos e com sucção na extremidade oposta ao retorno. | 2 | ||||||
2.5 | Pistola de lama. | 1 | ||||||
2.6 | Manifoldde ataque e estrangulamento de ( 5000 ) psi WP. | 1 | ||||||
2.7 | Manifoldde sucção de ( 6 ) “. | 1 | ||||||
2.8 | Balança n° ( 1 ) com ( 0 a 27 lbs/pé ) escalas, incluindo lb/pé3. | 1 |
1
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
3 | Equipamentos de Prevenção de Erupções | |||||||
3.1 | BOP hidráulico, modelo ( DR-25 ), 7 1/6” x5.000 psiWP de gaveta dupla com acionador, acumulador e comandos hidráulico e mecânico. Sistema de acionamento utilizando mangueiras de aço ou de borracha, tipo ( 1 1/2 ). Gavetas para tubulações de ( 2.3/8x 3.1/2 “ OD ) e cega. Adaptador para 5000 psi, com tomada lateral de 2 “ abaixo da gaveta inferior e acima da gaveta superior. | 2 | ||||||
3.2 | BOP para trabalhar coluna de hastes de ( 5/8 ) “ a ( 1.1/8 ) “, que utilize um único par de gavetas para todos os diâmetros, tipo ( Doble E ), com pressão de trabalho igual a ( 3000 ) psi, rosca inferior ( 3 ) “ LP Pino e rosca superior igual a ( 3 ) “ LP Caixa. | 1 | ||||||
3.3 | Saída de lama de ( 5 )” OD. | 1 | ||||||
4 | Equipamentos Componentes de Coluna | |||||||
4.1 | Raspador para operar em revestimentos de ( 5.1/2 ) até ( 7 ) lb/pé. | 2 | ||||||
4.2 | Conjunto de equipamentos para pistoneio em tubulações de ( 2.3/8 a 3.1/2 ) “ OD, tipos EUE e NU, comoil savercomreleaseeswabcom esfera móvel,sinker bare percursor. | 3 | ||||||
4.3 | Conjunto de equipamentos cortadores de parafina para tubulações de ( 2.3/8 a 3.1/2 ) “ NU, comsinker-bare percursor. | 3 | ||||||
4.4 | Conjunto de calibradores internos para tubulações de ( 2.3/8 a 3.1/2 ) “ OD tipos EUE e NU, conforme norma API 5A. | 3 | ||||||
4.5 | Conjunto de reduções, como segue: | |||||||
a) das brocas de ( 4.3/4 ) “, para comandos de ( 2.3/8 IF ) “ OD x 3 1/2” IF, com os respectivos protetores de rosca. | 1 | |||||||
b) dos referidos comandos para colunas de tubos de ( 2.3/8 a 3.1/2 ) “ Conexões IF e 3 1/2” EU e NU. | 1 | |||||||
c) das brocas de ( 4.3/4 ) “ para raspador de colunas ( 2.3/8 a 3.1/2 EU ) “. | 1 | |||||||
d) dos raspadores de ( 5.1/2 ) “ para as colunas ( 2.3/8 a 3.1/2 EU ) “. | 1 | |||||||
4.6 | Conjuntos de Adaptadores | |||||||
(A) A.3 7.1/16” x 5000 x 3000 x 2000 PSI | 2 | |||||||
(B) A.3 7.1/16” x 3000 x 2000 x 1000 PSI | 1 | |||||||
4.7 | Válvula para circulação de areia tipo 2LP x 5000 PSI | 1 |
2
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
5 | Equipamentos de Manuseio | |||||||
5.1 | Conjunto de elevadores para tubulações de (2.3/8 a 3.1/2 ) “ OD, tipos EUE e NU. | 2 | ||||||
5.2 | Conjunto (par) de elevadores para hastes de bombeio de ( 5/8 a 1 ) “. | 6 | ||||||
5.3 | Conjunto constituído de mesa e cunha com acionamento pneumático e mecânico, para tubulações de ( 2.3/8 a 3.1/2 ) “ OD, e comandos de ( 3.1/2 ) “ OD. | 3 | ||||||
5.4 | Colar de segurança para comandos de ( 2.3/8) “ OD a ( 7 ) “ OD. | 1 | ||||||
5.5 | Chave hidráulica ( Carter Tooco ), modelo ( BJ ), ou similar, equipada com medidor de torque, e sistema hidráulico para permitir o seu posicionamento, para operar tubulações de ( 2.3/8” a 3.1/2” ) “ OD. | 1 | ||||||
5.6 | Conjunto de chaves para hastes de bombeio de ( 5/8 a 1 ) “. | 6 | ||||||
5.7 | Gancho com mola e trava (catarina de hastes) para manobra de coluna de hastes com capacidade de ( 80.000 ) lbs, tipo ( BJ ) ou similar. | 1 | ||||||
5.8 | Conjunto de chaves manuais tipo grifo, tamanhos ( 24 x 36, 48,60) “. | 4 | ||||||
5.9 | Conjunto de chaves de marreta para parafusos dos flanges de ( 1 a 5 )” para pressões de ( 1.000 a 6.000 ) psi. | 8 | ||||||
5.10 | Conjunto de materiais para conexão com as instalações fixas, constituído denipplescurvas, tês, uniões e válvulas para ( 2 )” LP. | 15 | ||||||
5.11 | Conjunto de ferramentas manuais e outras utilidades, constituído de: bomba de graxa, nível, clips galvanizado para cabos de ( 1/2 )” até ( 1 )”, esticadores, cortadores de cabo, corda de sisal de diversas bitolas, chaves de brocas, lima, alicate, chaves de fenda, chaves ajustáveis, martelo de bola, marretas de bronze de ( 2 ) e ( 5 )kg, serrote, enxada, enxadela, pá redonda, pá quadrada, rodo, carrinho de mão, tesoura tipo aviação corte à esquerda modelo ( reto ), e paquímetro com escala em fração de polegada tamanho ( 0 ) a ( 11.13/16 ), com medidor de profundidade marca (Tubasa) ou similar. | 1 | ||||||
5.12 | Conjunto com ( 8 ) cavaletes para estaleirar hastes de bombeio na horizontal, confeccionado de acordo com padrões estabelecidos pela API. | 1 | ||||||
5.13 | Tubig stripperpara colunas de ( 2.3/8” x 3.1/2” )” OD. | 1 | ||||||
5.14 | Tubing wipperpara limpar tubos de (2.3/8” x 3.1/2” )”. | 1 | ||||||
5.15 | Válvula de segurança 2” LPx5000 PSI | 1 | ||||||
5.16 | Válvula Teste 2” LPx 5000 PSI | 1 | ||||||
5.17 | Pap. Rap. | 1 | ||||||
5.18 | Grupo gerador | 1 |
3
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
6 | Instrumentos Medidores e Registradores | |||||||
6.1 | Indicador de peso tipo MARTIN DECKER ou similar, com capacidade para (280.000)lbs e ponteiro indicador de sensibilidade, escala em libra para guincho principal. | 1 | ||||||
6.2 | Indicador de profundidade (3.500m) para guincho auxiliar. | 1 | ||||||
6.3 | Manômetros com ranges de pressões: ( 0,1000 )psi | 1 | ||||||
6.4 | Manômetros com ranges de pressões: ( 0,1500; 0,5000; 0 até 6.000 )psi | 2 | ||||||
6.5 | Indicador de pressão da bomba de lama. (0 a 6.000)PSI | 1 | ||||||
6.6 | Escala indicadora de volumes em bbl nos tanques, por tanque de lama. | 1 | ||||||
7 | Equipamentos de Segurança | |||||||
7.1 | Extintor de incêndio de espuma química. | NA | ||||||
7.2 | Extintor de incêndio de dióxido de carbono de ( 6 )kg. | 2 | ||||||
7.3 | Extintor de incêndio de pó químico de (12) kg. | 2 | ||||||
7.4 | Mangueira de (2.1/2” )” x ( 1.1/2 )m com uniões ( storz). | 2 | ||||||
7.5 | Esguicho regulável de ( 2.1/2” x 1.1/2)”, tipo ( storzz ) com uniões ( 2.1/2 ) para ( 1.1/2 ) GPM. | 1 | ||||||
7.6 | Chave para mangueira de incêndio de ( 2.1/2, 1.1/2 )”. (conjugada) | 2 | ||||||
7.7 | Proporcionador de espuma mecânica de ( 2.1/2 )”. | 1 | ||||||
7.8 | Jogos de equipamentos de proteção contra vapores de ácido e gás, constituído de: óculos, máscaras semi-facial com filtro, avental plástico, mangois plásticos. | NA | ||||||
7.9 | Gerônimo com cabo de fuga para torrista. | 1 |
4
![(BCH ENERGY DO BRASIL LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223702.gif)
ITEM | ESPECIFICAÇÃO | QUANT. | ||||||
7.10 | Esguicho lançador de espuma. | 1 | ||||||
7.11 | Derivante em ( 3 )” com entrada de ( 2.1/2 )” e duas saídas de ( 1.1/2 )”. | 1 | ||||||
7.12 | Mangueira de ( 2.1/2 – 1.1/2 )”, de ( 12 ) metros. | 2 | ||||||
7.13 | Esguichos de ( 2.1/2 – 1.1/2 )”. | 1 | ||||||
7.14 | Bombonas de LGE (Líquido Gerador de Espuma) de ( 20 ) litros. | 1 | ||||||
7.15 | Conjunto Moto-bomba diesel, para Combate a Incêndio, motor MWM 4 cil – bomba 80 metros cúbicos/hora pressão até 11 kg. | 1 | ||||||
8 | Outros Equipamentos | |||||||
8.1 | Tanque para armazenamento de água doce com capacidade mínima para ( 70 ) bbl com bomba centrífuga para combate a incêndio. | 1 | ||||||
8.2 | Sistema de iluminação com lâmpadas de vapor de sódio. | 1 | ||||||
8.3 | Conjunto gerador de energia, com potência compatível com as cargas da sonda, equipamentos auxiliares e os trailers para operações de ( 24 ) h por dia. | 1 | ||||||
8.4 | Casa de aço para sondador. | 1 | ||||||
8.5 | Trailer para encarregado de sonda. | 1 | ||||||
8.6 | Veículo utilitário para uso de encarregado. | 1 | ||||||
8.7 | Guia Cabo | 1 |
5
![(BCH ENERGY SERVICES INC LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
Rig Name & Number | BCH #3 | |
Depth Rating | 1400 m with 102 mm drill pipe | |
KB to Ground | 3.5 m | |
Bottom of table beam to ground | 2.8 m | |
Approximate Loads | Rig — 9 loads, DP & DC — 1 load |
Drawworks | Make | Rostel 300 | ||
Auxiliary Brake | Eaton 124 WCB | |||
Rig Power & Distribution | Detroit Series 60 | |||
Mast | Make | Rostel Stiff Mast | ||
Height | 20.4 m | |||
Maximum Hook Load | 88,900 daN w/6 lines | |||
Certified | Dec. 2003 | |||
Substructure | Length | Hydraulic High Back | ||
Height | 3 m | |||
Casing Capacity | 66,700 daN setback | |||
Crown Block | Make | Rostel | ||
Maximum Load | 88,900 daN with 3 sheaves | |||
Certified | Yes | |||
Travelling Block / Hook | Make | Ideco UTB 110 | ||
Maximum Load | 97,000 daN | |||
Certified | Jan. 2004 | |||
Swivel | Make | Oilwell PC-100 | ||
Maximum Load | 88,900 daN | |||
Certified | Nov. 2005 |
Drilling Line | Size | 25 mm | ||||||
Rotary Table | Make | Ideco 175 | ||||||
Opening Size | 444 mm | |||||||
Maximum Load | 66,700 daN | |||||||
Pump #1 | Input Power | Series 60 Detroit | ||||||
F500 | ||||||||
Max. Allowable | ||||||||||||
Operating Limits | SPM | Max. Allowable Operating Press | ||||||||||
Linear Size | 140 mm | 165 | 14,000 kPa | |||||||||
152 mm | 165 | 12,000 kPa |
Mud System | # of Tanks | 1 | ||||||
# of Compartments | 4 | |||||||
Total Active Volume | 34 m3 | |||||||
Trip Tank Volume | 3.46 m3 | |||||||
Pill Tank Volume | 5.4 m3 | |||||||
Pre-Mix Tank Volume | 30 m3 | |||||||
Transfer Pumps - Make | 5 x 6 - 50 HP | |||||||
Desilter - Make | Swaco | |||||||
Cone Size | 10 Cones | |||||||
Shaker - Make | Swaco ALS | |||||||
Screen Sizes Available | Up to 170 Mesh | |||||||
Pump #2 | Input Power | Series 60 Detroit | ||||||
F500 | ||||||||
Max. Allowable | ||||||||||||
Operating Limits | SPM | Max. Allowable Operating Press | ||||||||||
Linear Size | 140 mm | 165 | 14,000 kPa | |||||||||
152 mm | 165 | 12,000 kPa |
Well Control System | ||||||||
Accumulator | Type | Valvcon 4 Station | ||||||
Capacity | 80 Gal. | |||||||
Pressure | 21,000 kPa | |||||||
Remote Control Stn. - | 4 | |||||||
# of functions | ||||||||
Master Controls at Accumulator | Yes | |||||||
Choke Manifold | Installed in Heated Enclosure | Yes | ||||||
Max. Working Pressure | 21,000 kPa | |||||||
Gut Line | Size | 76 mm #2 | ||||||
Wing Lines | 52 mm | |||||||
Manual Choke | Make | National | ||||||
Size | 72 mm | |||||||
HCR Valve | Make | National | ||||||
Rating | 21,000 kPa | |||||||
Lower Kelly Cock | Make | API | ||||||
Rating | 21,000 kPa |
Stabbing Valve | Make | API | ||||||
Rating | 21,000 kPa | |||||||
Mud Gas Separator | Size | 762 mm | ||||||
Height | 2.14 m | |||||||
Inlet Line | Size | 76 mm | ||||||
Outlet | 152 mm | |||||||
B.O.Ps | Annular | Make | Townsend | |||||
Size | 228 mm | |||||||
Rating | 21,000 kPa | |||||||
Last Inspection | Mar. 2006 | |||||||
Pipe Ram | Make | Townsend | ||||||
Size | 228 mm | |||||||
Rating | 21,000 kPa | |||||||
Last Inspection | Mar. 2006 | |||||||
Blind Ram | Make | Townsend | ||||||
Size | 228 mm | |||||||
Rating | 21,000 kPa | |||||||
Last Inspection | Mar. 2006 | |||||||
Instrumentation | ||||||||
Weight Indicator | Make | Martin Decker | ||||||
Crown-o-matic | Make | Control Drilling | ||||||
Recorder | Make | Pason Electronic | ||||||
Drilling Recorder | ||||||||
Survey Instrument | Make | Totco | ||||||
Model | Degree 21 | |||||||
Drill Pipe | API Grade | |||||||
Length | 150 joints | |||||||
Size | 102 mm | |||||||
Classification | Premium | |||||||
Drill Collars | O.D | 14 – 121 mm (43/4) | ||||||
Length | 128 m | |||||||
O.D. | 6 – 159 mm (61/4) | |||||||
Tankage | Fuel | 11,000 ltrs | ||||||
Light Plant | Series 60 | |||||||
Type | Detroit |
Output | 350 kw | |||||||
Voltage | 480 | |||||||
Miscellaneous Equipment | Hydraulic Pipe Tub | |||||||
Rig Managers Shack | Size | 8’ x 20’ | ||||||
Type | Fabricated in Brazil | |||||||
Manufactured | 2007 | |||||||
Serial # | R#3 |
![(BCH ENERGY SERVICES INC. LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
General Specification
ITEM | DESCRIPTION | |
MODEL: | IRI 750 TRAILER MOUNTED DRILLING RIG | |
DRAWWORKS: | IRI 750 model 2042/160 750 hp, 1 1/8” grooving, trailer mounted | |
MAST: | 117’ 350,000# IRI double 10 line 365,000# | |
RIG MOTOR: | series 60 Detroit, model #6063HK33, 750 hp | |
TRANSMISSION: | Allison CTL-6061-4 | |
AUXILIARY BRAKE: | Eaton 24” x 3” disc | |
SUBSTRUCTURE: | IRI hydraulic box scoping 350,000# set back, 22’ | |
BLOCK: | Ideco 160 ton shorty | |
SWIVEL: | TSM 150 | |
KELLY: | 51/2” square | |
KELLY BUSHING: | Varco | |
ROTARY TABLE: | Ideco 20-1/2” | |
BAILS: | Joy 350 ton | |
MUD PUMP UNIT #1: | Gardner Denver PZ-8 stroke 8”, P/B Cat. 3508, (705 hp), in house. | |
MUD PUMP UNIT #2: | Gardner Denver PZ-8 stroke 8”, p/b cat. 3508, (705 hp), in house. | |
COMBINATION HOUSE: | Koomey 6 station 5 bottle w/30 hp union triplex pump, (1) generator marathon 350 kw, p/b Detroit series 60, (1) generator magnamax 200kw, p/b cat. 3306 | |
BLOWOUT PREVENTION EQUIPMENT: | 13 5/8” X 5000 Hydril Annular Preventer, 5/8” X 5000 Shaffer Double Ram Preventer. | |
CHOKE MANIFOLD: | 5000 PSI Choke manifold c/w one manual and one auto choke complete with console. (located at end of catwalk). |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
![(BCH ENERGY SERVICES INC. LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
MUD SYSTEM: | (2) tank 600 bbl. w/(2) shale shakers linear motion dfts, percharge and mixing pumps mission magnums, 8 x 6 w/12” impellers, (5) sew-eurodrive type RF87 c/w 5 hp motor and 1 1/8” shaft, (1) pill tank agitator sew-eurodrive type KF47 c/w 5 hp motor and 1 1/8” shaft, degasser | |
DOGHOUSE WATER TANK: | Drillers controls and brake handle in glass dome inside of doghouse cantilevers down | |
TOOL PUSHER HOUSE: | 40” Office / Living quarters | |
MISC. TOOLS: | Foster Kelly spinner, auto driller, folley type “B” tongs, catwalk, katch kan recovery system for oil based drilling fluids. Pipe racks, 45 foot catwalk w/manifold. | |
TUBULARS: | - 250 Joints of 5” 19.5 S-135 Drill pipe c/w 41/2” IF connections - - 15 Joints of 5” Hevi-Wate drill pipe c/w 41/2” IF connections | |
DRILL COLLARS: | - 20 x 61/2” Spiral drill collars - - 4 x 8” Spiral drill collars |
Escritório Central: | Base de Operações: | |
Av. Rio Branco, 01 – 12° andar – salas 11/12 | Rua dos Jasmins, 01 - Bairro Planalto II | |
Rio de Janeiro – RJ | Catu – Bahia | |
20090-003 | 48110-000 | |
Tel.: 21 - 2588-8011 / 2588-8012 | ||
Fax: 21 - 2588-8116 |
• | 400,000 lbs telescopic double | ||
• | 4 x 36” 1 x 42” sheave crown complete | ||
• | Racking board | ||
• | Derrick egress system | ||
• | Fall Arrester Posts | ||
• | Drillers console | ||
• | 2 x PL-8 Tugger winches | ||
• | 1 x PL-5 Boom line | ||
• | Complete electrical package | ||
• | Complete Plumbing Package with Hydraulics and Air | ||
• | Blast and paint with Endura products |
• | 400,000 lbs casing load | ||
• | 350,000 lbs set back | ||
• | 14’4” wide x 17’ total height | ||
• | 48” high x 24” wide pony subs | ||
• | Off trailer sub height 13’ | ||
• | Hydraulic leveling rams | ||
• | Hydraulic power package | ||
• | 27.5” Rotary table | ||
• | BOP handling system for 13 5/8” | ||
• | Complete electrical package | ||
• | Plumbing package with hydraulic, air, steam and water | ||
• | Blast and Paint with Endura products and Pro-coat |
• | Fabricate unitized draw works skid | ||
• | Supply & mount TSM-850 draw works | ||
• | Supply & mount GE 752 DC electric floor motor | ||
• | Supply and install mast raising cylinders | ||
• | Supply and mount DW cooler | ||
• | Supply and mount 1.25” x 5000’ drill line | ||
• | Plumbing package with hydraulic, air, steam and water | ||
• | Complete electrical package | ||
• | Blast and Paint with Endura products and Pro-coat |
• | Fabricate power catwalk with skate and manifold building | ||
• | Fabricate V-door | ||
• | Complete plumbing package |
• | Complete electrical package | ||
• | Blast and Paint with Endura products and Nonslip |
• | Fabricate 55’ x 12’4” combination building | ||
• | Wash room and shower facility | ||
• | 3 cubic meter fresh water tank | ||
• | 3.5 meter disposal water tank | ||
• | Change shack facility | ||
• | Supply and install 120 gal x 5 station accumulator | ||
• | Blast and Paint with Endura products |
• | Fabricate 83m3 3 compartment mud tank | ||
• | 3 each 7.5 HP agitators | ||
• | 6 each 3” mud guns | ||
• | 2 each Derrick Super G Shakers | ||
• | Side Winder style mix hopper | ||
• | 2 each 50 HP 5 x 6 x 11 mix pumps | ||
• | Complete suction / discharge manifold | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 65 m3 2 compartment mix tank | ||
• | 2 each 7.5 HP agitators | ||
• | 4 each 3” mud guns | ||
• | Side winder style mix hopper | ||
• | 1 each 50 hp 5 x 6 x 11 mix pumps | ||
• | Complete suction / discharge manifold | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 40 x 12’4” pump house with cabinets & racks | ||
• | Supply and install off shore F-1000 pump | ||
• | Supply and install GE 752 electric motor and drive system | ||
• | Precharge pump — 50 HP, 5 x 6 x 14 centrifugal pump | ||
• | Supply and install complete drive system | ||
• | Supply and install wash gun | ||
• | Supply and install 7.5HP air compressor | ||
• | Supply and install all guarding |
• | Supply and install all suction / discharge plumbing | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 40’ x 12’4” pump house with cabinets & racks | ||
• | Supply and install off shore F-1000 pump | ||
• | Supply and install GE 752 electric motor and drive system | ||
• | Precharge pump — 50 HP, 5 x 6 x 14 centrifugal pump | ||
• | Supply and install complete drive system | ||
• | Supply and install all guarding | ||
• | Supply and install all suction / discharge plumbing | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and Paint with Endura products |
• | Fabricate 65 m3 water tank / doghouse | ||
• | Slide out system on doghouse | ||
• | Hydraulic doghouse raising system | ||
• | Storage room & tool board on doghouse | ||
• | Tool room with benches & oil storage | ||
• | 2 each Jacuzzi water pumps | ||
• | Wash pump and soap tank | ||
• | 15 HP air compressor | ||
• | Complete electrical package | ||
• | Complete plumbing package | ||
• | Blast and paint with Endura products |
• | 40’ x 12.5’ generator skid with roof | ||
• | 2 x Detroit Diesel 12V Series 2000 1000HP generators | ||
• | Electrical panels and plug boards |
• | 40’ x 12.5’ generator skid with roof | ||
• | 1 x Detroit Diesel 12V Series 2000 1000HP generator | ||
• | 1 x Detroit Diesel Series 60 685HP generator | ||
• | Electrical panels and plug boards |
Choke Manifold
• | 2” x 3” x 5000 psi double gut manifold | ||
• | All Plumbing for flare and degasser lines | ||
• | Blast and Paint |
• | Piping for flare & degasser line | ||
• | Auto igniter for flare stack | ||
• | Stackable onto manifold skid | ||
• | Blast and paint with Endura products |
• | Range II pipe tubs | ||
• | Complete hydraulic / plumbing package | ||
• | Blast and paint with Endura products |
• | 7 — 8’ x 48’ x 6” 4 runner mats 2 with jacking pads | ||
• | 3 — 8’ x 36’ | ||
• | 6 — 8’ x 24’ | ||
• | 1 — 8’ x 22’3” with well center | ||
• | 2 — 4’ x 20’ |
• | 40’ tumble racks x 3 sets |
• | Kelly Spinner | ||
• | Pipe Spinner | ||
• | Web Wilson AAX Tongs | ||
• | BJ Style 250 ton DP Elevators | ||
• | 5” Drill Pipe Slips | ||
• | DCS-R Drill Collar Slips | ||
• | Square Roller Kelly Bushing | ||
• | Safety Collar | ||
• | 10’ x 250 ton Bails | ||
• | 250 ton Swivel | ||
• | 250 ton Block and Hook |
• | 2 — 13 5/8” x 5000 psi singles | ||
• | 1 — 13 5/8” x 5000 psi annular | ||
• | All stack valves including HCR | ||
• | Drilling spool with turns |
• | Complete w/ electrical village panel |
12 each 63/4” Drill collars
8 each 8” Drill Collars
3 each 91/2” Drill Collars
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
General Specification
DEPTH RATING: | 2800m with 4” in drill pipe | |
APPROXIMATE LOADS: | 14 loads |
ITEM | DESCRIPTION | |
DERRICK: | ||
Model JJ1351D 105’ telescopic double | ||
Effective height 31m | ||
Max hook load 1350 KN | ||
Hyd lift mechanical telescope | ||
Racking board height above floor 17.4m (57’) | ||
Set back capacity 4 1/2” DP (2800m) (9200’) | ||
+ 61/4 DC (20 jts) | ||
Crown block model TC 135C | ||
Rated 1350 KN (297,500 lbs.) | ||
5 x 760 mm (30”) 11/8” grooved sheaves | ||
Fold up racking board | ||
Easy rider assembly | ||
Escape buggy with deadline anchor weight | ||
Derrick will be Painted White with a Red Crown. | ||
Hydraulic Rams for Make up and Breakout. | ||
One crown mounted fall arrest | ||
One monkeyboard mounted fall arrest on slope line | ||
4” standpipe with Kelly hose and valves and fig 602 fittings | ||
2” casing standpipe with valve, fittings and hose | ||
SUBSTRUCTURE: | ||
Model DZ 160/ 4.5 | ||
Max set back 1350 kN (348,000 lbs) | ||
Floor height 4.5m (14.7’) | ||
Ground to bottom of rotary beam 3.52m ( 11.5 | ||
Pipe bottom bird baths | ||
BOP hydraulic lift system | ||
BOP tie down | ||
Folding handrails on top area | ||
ZP175 171/2 Rotary table rated 1600 KN (352,640 lbs.) | ||
BOPs: | ||
9” 3000 psi 21 mpa | ||
Annular FH23-21 9” 3000 (Annular Shaffer Element.) | ||
2-9” 3000 ram block c/w Pipe Rams and Blind Rams. | ||
FZ23-21 | ||
9” 3000 x 9” 3000 working spool with 3” 3000 outlets | ||
HCR & Manual valves | ||
2-Kill line valves | ||
3 1/8 1-HCR Hydraulic, 1- Manual | ||
9 Valve Manifold c/w 2 Chokes. |
Sede: | Escritório Brasil: | |
Suite 500, 816 – 7th Avenue SW | Av. Rio Branco, 01 – 8° andar – sala 804 | |
Calgary, AB, Canada | Rio de Janeiro – RJ | |
T2P 1A1 | 20090–003 | |
Tel.: +1(403) 539-9488 | Tel.: 21 - 3213-8050 | |
Fax +1(403) 265-4160 | Fax: 21 - 3213-8051 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
DRAWWORKS: | ||
Model JC20 rated 550hp | ||
15 L Cummins 600hp engine | ||
Allison 6061 transmission | ||
JFD 130 right angle drive box | ||
Drum 450mm x 912mm (17.7“x36”) 11/8 “lebus grooved | ||
Circulating drum with closed loop glycol | ||
310mm x 1070mm (12“x42”) break hubs | ||
224 ETN auxiliary brakes with closed loop glycol system shared with circulating drum | ||
Rotary table brake | ||
50 hp electric two stage hydraulic system | ||
PTO hyd system | ||
3 T (6600lb) boom line winch on mud tank side | ||
5 T (11000lb) tugger winch on doghouse side | ||
Survey Winch | ||
PIPE SYSTEM: | ||
Catwalk with manifold shack with two 3” lines and one 8” de-gasser lin | ||
YJG 21 21 mpa (3000 psi) rated choke manifold line | ||
V door installed on catwalk | ||
Folding pipe rack arms installed on shack side | ||
Three of forklift accessible pipetubs | ||
240 Jts. 4” FH X95 drill pipe hardbanded and internal coated | ||
15 Jts. 61/4 41/2 X H drill collars (zipped for slips and hardbanded on pin end) 20 each 41/2” HWDP | ||
MUD TANKS: | ||
60m3 usable 5 compartments including trip tank, shaker tank, settling tank, suction tank and pil tank | ||
Sand trap | ||
4- 7.5 hp agitators in tank | ||
2 - 50 HP 5x6 Victory mud mixers (or 6 x 8) | ||
2 - - Winch poles | ||
De-gasser unit | ||
Mixing hopper | ||
PUMP HOUSE: | ||
12’ 6” wide Building | ||
F1000 mud pump | ||
23 L Cummins with Icona clutch conventional mount with belt drive | ||
Allison 6061 transmission | ||
Electric 5 x 6 precharge or mechanical (please advise if electric or mech preferred and if mechanical whether conventional belt driven or R/A with polychain drive preferred) |
Sede: | Escritório Brasil: | |
Suite 500, 816 – 7th Avenue SW | Av. Rio Branco, 01 – 8° andar – sala 804 | |
Calgary, AB, Canada | Rio de Janeiro – RJ | |
T2P 1A1 | 20090–003 | |
Tel.: +1(403) 539-9488 | Tel.: 21 - 3213-8050 | |
Fax +1(403) 265-4160 | Fax: 21 - 3213-8051 |
![(BCH LOGO)](https://capedge.com/proxy/425/0001362310-08-000497/c72237c7223701.gif)
ITEM | DESCRIPTION | |
LIGHT PLANT: | ||
2x 450 KW generators | ||
Powered by 15 L Cummins | ||
Louvered panels for both generators | ||
1 accumulator with air back up | ||
Plumbing for nitrogen ( nitrogen bottles not included) | ||
Koomey cord and remote (doghouse installed) | ||
Please advised if PLC needed approximately 30000.00 extra | ||
Tool room with work bench, storage shelves and storage cupboard | ||
Electric air compressor | ||
Change shack with 12 lockers and bench | ||
Electric heater in change shack | ||
DOGHOUSE & WATER TANK: | ||
65m3 water storage | ||
Two water supply pumps | ||
18,000L fuel tank | ||
Two fuel pumps | ||
3 oil storage bins | ||
Doghouse with junk room | ||
Knowledge box | ||
Storage cupboards | ||
Winch trolley bar in junk room | ||
TRAVELLING EQUIPMENT: | ||
Swivel SL135 | ||
Hydraulic Kelly spinner | ||
Travelling blocks YG135C 1350 KN | ||
41/4 square Kelly bar/ c/w Drive Bushing or 31/2 bar and bushings | ||
Slips (Drill Pipe and Drill Collar) | ||
Elevators DH 150 | ||
1000m spool 1 1/8 drill line | ||
108” x 250 Ton Bale Links | ||
Choke Hose, 2’ Kill Hose ,Shock Hose |
Sede: | Escritório Brasil: | |
Suite 500, 816 – 7th Avenue SW | Av. Rio Branco, 01 – 8° andar – sala 804 | |
Calgary, AB, Canada | Rio de Janeiro – RJ | |
T2P 1A1 | 20090–003 | |
Tel.: +1(403) 539-9488 | Tel.: 21 - 3213-8050 | |
Fax +1(403) 265-4160 | Fax: 21 - 3213-8051 |
ALLIS-CHALMERS ENERGY INC. | ||||
By: | ||||
Name: | ||||
Title: | ||||
Guarantor: | BCH Energy do Brasil Serviços de Petróleo Ltda. | |
Beneficiary: | Allis-Chalmers Energy Inc. | |
Guaranteed Party: | BCH Ltd. | |
Effective Date: | January 31, 2008 | |
Final Term of Subsidiary Guarantee: | January 31, 2013 |
- 2 -
Expiry Date: | This SUBSIDIARY GUARANTEE shall expire on the earlier of January 31, 2013, or the date on which the MAXIMUM AMOUNT under this SUBSIDIARY GUARANTEE is reduced to zero. | |
Maximum Amount: | The MAXIMUM AMOUNT shall be, in respect of any date, an amount equal to the unpaid principal balance of the Loan, plus all accrued and unpaid interest, fees, expenses and other amounts payable in connection therewith pursuant to the Credit Agreement. |
- 3 -
- 4 -
- 5 -
BCH Energy do Brasil Serviços de Petróleo Ltda. | ||||
By: | ||||
Witnesses: | ||||
1. | ||||
ID No. | ||||
Tax Id No. | ||||
2. | ||||
ID No. | ||||
Tax Id No. |
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
320 Park Avenue, 19th Floor
New York, NY 10022
22
Tel: +1 (212) 407-5125
Fax: +1 (212) 407-5178
Email:malena.funegra@standardbank.com
Tel:+1 (212) 407-5031
Fax: +1 (212) 407-5178
5075 Westheimer, Suite 890
Houston, Texas 77056
Attention: Theodore F. Pound III
Fax: 281.768.3891
Email:tpound@alchenergy.com
500, 816 – 7th Ave SW
Calgary, AB
T2P 1A1
Canada
Tel: +1 (403) 237 9925
Fax: +1(403) 265 4160
E-mail:cnieboer@brazalta.com
23
24
25
26
STANDARD BANK PLC, as the Senior Agent on behalf of itself and each other Senior Creditor | ||||
By: | ||||
Name: | ||||
Title: | ||||
ALLIS-CHALMERS ENERGY INC., as Subordinated Creditor | ||||
By: | ||||
Name: | ||||
Title: | ||||
BCH LTD. | ||||
By: | ||||
Name: | ||||
Title: | ||||
BCH ENERGY DO BRASIL SERVIÇOS DE PETRÓLEO LTDA. | ||||
By: | ||||
Name: | ||||
Title: | ||||
BRAZALTA RESOURCES CORP. | ||||
By: | ||||
Name: | ||||
Title: | ||||
(“BrazAlta”)
- - and -
(the “Corporation”)
- - and -
(“Allis-Chalmers”)
Page | ||||
Article I — Interpretation | 4 | |||
1.1 Definitions | 4 | |||
1.2 General Interpretation Provisions | 9 | |||
1.3 Headings | 10 | |||
1.4 Schedules | 10 | |||
Article II — Option to Purchase | 10 | |||
2.1 Option to Purchase | 10 | |||
2.2 Purchase of ESOP Options and ESOP Shares | 11 | |||
2.3 Purchase of Standard Bank Warrant and Standard Bank Shares | 11 | |||
Article III — Due Diligence | 12 | |||
3.1 Due Diligence Right | 12 | |||
3.2 Conduct of Due Diligence | 12 | |||
3.3 Disclosure | 12 | |||
Article IV — Closing | 12 | |||
4.1 Closing Date | 12 | |||
4.2 Closing Documents | 12 | |||
4.3 Closing Conditions | 13 | |||
Article V — Board of Directors | 14 | |||
5.1 Board of Directors | 14 | |||
5.2 Directors’ Meetings | 15 | |||
Article VI — Fundamental Changes | 15 | |||
6.1 No Action | 15 | |||
Article VII — Restrictions On Transfer | 16 | |||
7.1 Restrictions on Transfer by BrazAlta | 16 | |||
7.2 Restrictions on Transfer by the holders of ESOP Options and ESOP Shares | 16 | |||
Article VIII — Third Party Offers | 16 | |||
8.1 Third Party Offer | 16 | |||
8.2 Issuance of Purchase Notice Upon Receipt of Third Party Offer Notice | 17 | |||
8.3 Tag Along | 17 | |||
8.4 Timing | 17 | |||
8.5 No Sale by Allis-Chalmers | 17 | |||
Article IX — Distributions | 18 | |||
9.1 Cash Distributions | 18 | |||
9.2 Statements | 18 | |||
9.3 Form of Distributions | 18 | |||
9.4 Limitations on Distributions | 18 |
ii
Page | ||||
Article X — Additional Equity | 19 | |||
10.1 Additional Equity Issuances | 19 | |||
10.2 Third-Party Equity Financings | 19 | |||
Article XI — Non-Competition and Non-Solicitation | 19 | |||
11.1 Non-Competition and Non-Solicitation | 19 | |||
11.2 Territorial Limits | 20 | |||
11.3 Injunction | 20 | |||
11.4 Co-Operation and Exceptions | 20 | |||
Article XII — Confidentiality | 21 | |||
12.1 Confidentiality | 21 | |||
12.2 Survival | 22 | |||
12.3 Injunctive Relief | 22 | |||
Article XIII — Areas Of Interest Of The Parties | 23 | |||
13.1 Corporation’s Area of Interest | 23 | |||
13.2 Allis-Chalmers Area of Interest | 23 | |||
Article XIV — Representations, Warranties and Covenants | 23 | |||
14.1 Representations and Warranties | 23 | |||
14.2 Indemnity | 24 | |||
Article XV — covenants of brazalta | 24 | |||
15.1 BrazAlta Covenants | 24 | |||
Article XVI — INDEMNITY FROM brazalta | 25 | |||
16.1 BrazAlta Indemnity | 25 | |||
Article XVII — Notices | 25 | |||
17.1 Requirements for Notices | 25 | |||
17.2 Addresses | 26 | |||
17.3 Notice Takes Effect | 26 | |||
17.4 Change of Address | 27 | |||
Article XVIII — Term | 27 | |||
18.1 Termination | 27 | |||
18.2 Sections to Continue in Force | 27 | |||
Article XIX — General | 27 | |||
19.1 Exercise of Rights | 27 | |||
19.2 Non-Waiver | 27 | |||
19.3 Extent of Waiver | 28 | |||
19.4 Rights to be Cumulative | 28 | |||
19.5 No Merger | 28 | |||
19.6 Enurement | 28 |
iii
Page | ||||
19.7 Time is of the Essence | 28 | |||
19.8 Further Assurances | 28 | |||
19.9 Supervening Legislation | 28 | |||
19.10 Entire Agreement | 28 | |||
19.11 No Other Representations or Warranties | 28 | |||
19.12 Counterparts | 29 | |||
19.13 Governing Law | 29 | |||
19.14 Submission to Jurisdiction | 29 | |||
19.15 Service of Process | 29 | |||
19.16 Fees and Commissions | 29 | |||
19.17 Amendments | 29 | |||
19.18 Assignment | 30 | |||
19.19 Continuing Nature of Obligations | 30 | |||
SCHEDULES | ||||
Schedule “A” — Valuation Procedure | ||||
Schedule “B” — By-laws of the Corporation | ||||
ARTICLE I — INTERPRETATION |
- 5 -
- 6 -
- 7 -
- 8 -
- 9 -
In this Agreement: | ||
(a) | the words “herein”, “hereunder” and “hereof” refer to the provisions of this Agreement and a reference to a recital, Article, Section, paragraph or attachment is a reference to a recital, Article, Section, paragraph of or attachment to this Agreement unless otherwise stated and references to this Agreement include any recital, schedule, annex or other attachment; | |
(b) | a reference to a paragraph also refers to the subsection in which it is contained and a reference to subsection refers to the Section in which it is contained; | |
(c) | a reference to this Agreement, any other agreement or an instrument or any provision of any of them includes any amendment, variation, restatement or replacement of this Agreement or that agreement, instrument or provision, as the case may be; | |
(d) | a reference to a statute or other law or a provision of any of them includes regulations and other instruments under any of them as in effect from time to time and consolidations, amendments, re-enactments, extensions or replacements of that statute, law or provision; | |
(e) | the singular includes the plural and vice versa; | |
(f) | a reference to a Person includes a reference to the Person’s executors and administrators (in the case of a natural person) and successors, substitutes (including Persons taking by novation) and permitted assigns; | |
(g) | words of any gender shall include the corresponding words of the other genders; | |
(h) | “including” means “including, but not limited to” and other forms of the verb “to include” are to be interpreted similarly; | |
(i) | where a period of time is specified to run from or after a given day or the day of an act or event, it is to be calculated exclusive of that day; and where a period of time is specified as commencing on a given day or the day of an act or event, it is to be calculated inclusive of that day; | |
(j) | a reference to a day is a reference to a period of time commencing at midnight and ending the following midnight; | |
(k) | if the time for performing an obligation under this Agreement expires on a day that is not a Business Day, the time shall be extended until that time on the next Business Day; | |
(l) | a reference to a month is a reference to a calendar month; | |
(m) | where a word or phrase is specifically defined, other grammatical forms of that word or phrase have corresponding meanings; |
- 10 -
(n) | if a payment prescribed under this Agreement to be made by a Party to this Agreement on or by a given Business Day is made after 12:00 noon (Calgary time) on that Business Day, it is taken to be made on the next Business Day; and | |
(o) | unless otherwise stated, any reference to dollars means United States of America dollars. |
Schedule “B”- By-laws of the Corporation
(a) | BrazAlta hereby grants to Allis-Chalmers an irrevocable option to purchase (the “Option to Purchase”) the Purchased Shares for the Purchased Share Price. The Option to Purchase may be exercised by Allis-Chalmers on and subject to the terms and conditions of this Agreement up to and including the Conversion Deadline (as defined in the Credit Agreement) (the “Option Expiry Date”). | |
(b) | On or about September 30, 2009, the Corporation shall retain, at the cost of the Corporation, RBC Capital Markets, or with the written consent of Allis-Chalmers, an alternate investment bank, (the “Valuator”) to prepare a valuation of the Corporation in accordance with the valuation procedure attached as Schedule “A” (the “Valuation”) and the Statement. | |
(c) | Upon receipt of the Valuation and the Statement, Allis-Chalmers shall have until the Option Expiry Date to determine whether it will exercise the Option to Purchase. | |
(d) | The Option to Purchase may be exercised by Allis-Chalmers giving notice (the “Option Notice”) in writing to BrazAlta of the exercise of the Option to Purchase. |
- 11 -
(e) | Upon Allis-Chalmers exercising the Option to Purchase in accordance with this Agreement, the Parties shall be deemed to have entered into a binding agreement of purchase and sale with respect to the Purchased Shares at and for the Purchased Share Price on and subject to the terms and conditions set forth herein including, without limitation, Section 2.3. | |
(f) | The decision regarding whether to exercise the Option to Purchase shall be solely within the discretion of Allis-Chalmers and no penalty, cost or expense of any kind shall be incurred by Allis-Chalmers to the Corporation or BrazAlta as a result of it deciding not to exercise the Option to Purchase (or being deemed not to have issued, the Option Notice). |
(a) | Upon delivery of the Option Notice, Allis-Chalmers may offer to purchase from the holder or holders thereof the Standard Bank Warrant and the Standard Bank Shares, respectively, for the Standard Bank Warrant Price and the Standard Bank Share Price and upon such additional terms as Allis-Chalmers in its sole discretion, shall determine. Until a definitive purchase agreement is executed and both the Standard Bank Warrant and the Standard Bank Shares are delivered to Allis-Chalmers pursuant to the closing of such transaction or transactions, Allis-Chalmers shall be entitled to withhold from the Purchased Share Price an amount equal to 10% of the aggregate amount assigned by the Valuator to the Standard Bank Warrant Price and the Standard Bank Share Price (such 10% amount being the “Standard Bank Holdback”). | |
(b) | Upon the closing of the purchase transaction referred in Section 2.3(a), Allis-Chalmers shall pay to BrazAlta the amount, equal to the Standard Bank Holdback less the “Standard Bank Excess”, where the Standard Bank Excess is calculated as the aggregate amount paid to the holder or holders of the Standard Bank Warrant and the Standard Bank Shares less the aggregate of the Standard Bank Warrant Price and the Standard Bank Share Price. Allis-Chalmers will have no recourse to BrazAlta in respect of any deficiency in the event the aggregate of the Standard Bank Holdback, the Standard Bank Warrant Price and the Standard Bank Share Price is less than the amount paid to the holder or holders of the Standard Bank Warrant and the Standard Bank Shares. | |
(c) | The Corporation shall use its commercially reasonable best efforts to provide any requested assistance to Allis-Chalmers in the negotiation of the purchase of the Standard Bank Warrant and the Standard Bank Shares by Allis-Chalmers. | |
(d) | In the event that Allis-Chalmers does not offer to purchase the Standard Bank Warrant and the Standard Bank Shares, the Standard Bank Holdback shall be nil. In the event that Allis-Chalmers offers to purchase the Standard Bank Warrant and the Standard Bank Shares, the Standard Bank Holdback shall be dealt with in accordance Section 2.3(b) whether or not such offer is accepted. |
- 12 -
(a) | At the Closing, Allis-Chalmers shall pay by way of cash payment to BrazAlta the Purchased Share Price less the Standard Bank Holdback. | |
(b) | At the Closing, each of BrazAlta and the Corporation shall deliver to Allis-Chalmers such closing documents as are customary including, but not limited to the following: |
(i) | all certificates representing the Purchased Shares, all duly endorsed in favor of Allis-Chalmers or together with stock transfer powers of attorney completed in blank, as directed by and to the satisfaction of Allis-Chalmers; |
- 13 -
(ii) | confirmation from the Corporation evidencing the cancellation or purchase of the ESOP Options and the ESOP Shares by the Corporation; | ||
(iii) | confirmation from the Corporation evidencing the termination of the ESOP; | ||
(iv) | confirmation from Standard Bank Plc (as agent for the Senior Lenders) evidencing that it no longer has any interest in or charge over the Purchased Shares; | ||
(v) | copies of all required consents, waivers and releases by any Person in connection with the transactions contemplated by this Agreement, including, but not limited to, consents from the TSX Venture Exchange and the shareholders of BrazAlta, as may be required; | ||
(vi) | resignations of each of the Directors nominated by BrazAlta and each of the directors of the Subsidiaries of the Corporation, together with a mutual release and discharge executed by each of them in favour of the Corporation and its Subsidiaries; and | ||
(vii) | all original minute books, corporate records, corporate seals and all other books and records of, or documents relating to the Corporation and its Subsidiaries including, without limitation, all accounting and tax records, forms and elections and relevant working papers and files and data in the possession of BrazAlta and which were not previously delivered to Allis-Chalmers. |
(a) | The obligation of Allis-Chalmers to complete the Closing is subject to the satisfaction at or prior to the Closing Date of all of the following conditions precedent, any one or more of which may be waived, in whole or in part, by Allis-Chalmers: |
(i) | the representations and warranties of BrazAlta and the Corporation contained in this Agreement shall be true in all material respects at and as of the Closing Date and BrazAlta and the Corporation shall have performed and satisfied all covenants and agreements required by this Agreement to be performed and satisfied by BrazAlta and the Corporation on or prior to the Closing Date; | ||
(ii) | Allis-Chalmers shall have completed all due diligence investigations as it may deem necessary and the results thereof shall be satisfactory to Allis-Chalmers as it in its sole discretion may determine; | ||
(iii) | Allis-Chalmers shall have received copies of all required consents, waivers and releases by any Person in connection with the transactions contemplated by this Agreement including, but not limited to, consents from the TSX Venture Exchange and the shareholders of BrazAlta, as may be required; |
- 14 -
(iv) | the Corporation shall have caused the holders of each of the ESOP Options and the ESOP Shares to sell the ESOP Options and the ESOP Shares to the Corporation for, respectively, the ESOP Option Price and the ESOP Share Price, as at the Closing Date; and | ||
(v) | Standard Bank Plc (as agent for the Senior Lenders) shall have released its security in and charge over the Purchased Shares. |
(b) | The obligation of BrazAlta to complete the Closing is subject to the satisfaction at or prior to the Closing Date of the following conditions precedent, any one or more of which may be waived, in whole or in part, by BrazAlta: |
(i) | the representations and warranties of Allis-Chalmers contained in this Agreement shall be true in all material respects at and as of the Closing Date and Allis-Chalmers shall have performed and satisfied all covenants and agreements required by this Agreement to be performed and satisfied by Allis-Chalmers on or prior to the Closing Date; | ||
(ii) | Allis-Chalmers shall have converted, or given notice to the Corporation that Allis-Chalmers has decided to convert, the Debenture in accordance with its terms; | ||
(iii) | the security granted by BrazAlta for the benefit of the Corporation in connection with the Senior Indebtedness shall have been released and terminated; and | ||
(iv) | any declared and unpaid dividends outstanding as at the Closing shall be paid by the Corporation to BrazAlta in accordance with Section 9.1. |
(a) | Subject to this Article V, the Corporation shall have six Directors. | |
(b) | The Directors shall consist of (i) three nominees of BrazAlta, and (ii) three nominees of Allis-Chalmers. The chair of the board of Directors shall be a nominee of BrazAlta. The chair of the board of Directors shall be entitled to a second or casting vote. | |
(c) | If a nominee Director of either BrazAlta or Allis-Chalmers resigns or is removed, for any reason, then the vacancy created thereby will be filled by the election or appointment of a Director nominated by BrazAlta or Allis-Chalmers, as applicable. The Directors will not transact any business or exercise any of their powers or functions until such vacancy has been filled, except to elect or appoint the new Director and preserve the business and assets of the Corporation. If a replacement Director is not elected or appointed within 10 days for any reason including the fact that BrazAlta or Allis-Chalmers, as applicable, has failed to nominate a replacement Director, then the Directors shall be entitled to transact business and exercise all of the powers and functions of the Directors provided that the transaction of such business and the exercise of such powers and functions has been approved by not less than a majority of the Directors then in office. |
- 15 -
(a) | Directors’ meetings will be held in accordance with the provisions of the By-laws of the Corporation, attached hereto as Schedule “B” (the “By-Laws”). | |
(b) | Notice of any Directors’ meeting shall be given in accordance with the By-laws. A Director is not considered present at a meeting where that Director attends the meeting for the express purpose of objecting to the transaction of any business on the grounds that the meeting is not lawfully called. Any notice of a Directors’ meeting must specify in reasonable detail the purpose of, or the business to be transacted at, the meeting. No business may be put to the Directors at a meeting unless such business is specified in the notice or all of the Directors are present at such meeting and do not object to the business being put to the meeting. | |
(c) | The quorum for a meeting of the Directors shall be as set forth in the By-laws. Despite the prior sentence, if proper notice of a Directors’ meeting is given, specifying the purpose of or the business to be transacted at the meeting and a quorum of Directors is not present, then a second Directors’ meeting may be held on not less than 48 hours’ written notice to transact the business specified in the original notice. Subject to theBusiness Corporations Act (Alberta), any Directors present at the second meeting constitute a quorum and the business specified in the original notice may be transacted by those Directors in attendance at the second meeting. |
(a) | any amendments to the Corporation’s articles or the By-laws; | |
(b) | any change in the number of Directors; | |
(c) | any sale, lease, transfer or other disposal of all or substantially all of the assets or the business of the Corporation, including by way of a sale of a Subsidiary; | |
(d) | other than in accordance with Article X, any issuance of common shares in the capital of the Corporation or any obligations, charges, debts or other instruments convertible into common shares in the capital of the Corporation or involving rights to vote; | |
(e) | any amalgamation, reorganization, merger, continuation, winding up, dissolution or termination of the Corporation; |
- 16 -
(f) | any material change in the business of the Corporation, any transaction out of the ordinary course of business of the Corporation, any transaction to acquire or establish any additional business or any material change in, or termination or suspension of any material part of, the core business of the Corporation (being the onshore provision of both drilling and service rigs or oil field services in Brazil); | |
(g) | other than the purchase of the ESOP Options and the ESOP Shares in accordance with Section 4.2(b)(ii) and other than the distribution of Free Cash Flow in accordance with Article IX, any declaration or payment of any dividends on any shares in the capital of the Corporation, any redemption or repurchase of any outstanding shares or securities in the capital of the Corporation or any distribution (including bonuses) to any shareholders of the Corporation or Directors which, for certainty, does not include payment of employment income; | |
(h) | adopting, approving, amending, altering, varying or rescinding the terms of the ESOP or any option agreements issued thereunder; | |
(i) | adopting, approving, amending, altering, varying or rescinding the terms of the Standard Bank Warrant; | |
(j) | creating any new Subsidiary or permitting any Subsidiary of the Corporation to do any of the matters contemplated in this Section 6.1; or | |
(k) | causing the appointment of any committee of the Directors or the delegation of any authority of the Directors to any such committee or to any Person. |
- 17 -
- 18 -
- 19 -
(a) | the price per common share offered to such third party purchasers shall not be less than $4.163 unless otherwise agreed by both BrazAlta and Allis-Chalmers; and |
(b) | concurrently with entering into a binding obligation to issue any of such common shares to such third party purchasers, such third party purchasers may also enter into a new governance agreement in a form satisfactory to BrazAlta, Allis-Chalmers, the Corporation and such third party purchasers (acting reasonably) and, for clarity, any common shares purchased by such third party purchasers shall not be subject to the Option to Purchase. |
(a) | BrazAlta covenants and agrees that, for the time period beginning on the Closing Date or on the closing of the transaction contemplated under Section 8.2 or Section 8.4 and ending two years thereafter (the “Non-Compete Period”), BrazAlta will not, directly or indirectly, as owner, partner, joint venturer, stockholder, broker, agent, principal, trustee, licensor, consultant, or in any capacity whatsoever: |
(i) | subject to Section 11.4, carry on, engage in order to compete in, become financially interested in, render any consultation or business advice with respect to, or have any connection with, or permit its name or any part thereof to be used by any business in any area within Brazil that is the same as or substantially similar to or directly competing with or would directly compete with the business conducted by the Corporation as at the Closing Date or such closing (a “Competitive Business”), other than as agreed upon in writing by Allis-Chalmers; |
- 20 -
(ii) | solicit any present or former customer, client or supplier of the business of the Corporation to remove its business from, or reduce its business with, the Corporation or otherwise solicit or gain the business of any such customer or supplier for the benefit of a Competitive Business; | ||
(iii) | take any action that will impair relations between the Corporation and the customers, clients or suppliers of the business of the Corporation or exploit for its own benefit or the benefit of others, its knowledge, influence or relationships with any such customers or suppliers; and | ||
(iv) | solicit any present or former employee or consultant of the Corporation or any of its Subsidiaries, to terminate his/her/its employment or consulting arrangement with the Corporation or its Subsidiaries. |
(a) | During the Non-Compete Period, the Corporation shall use its reasonable commercial efforts to provide drilling and service rigs to BrazAlta in Brazil on market terms and rates then applicable in Brazil. In the event that the Corporation cannot provide rigs with the appropriate specifications, on a timely basis and on reasonable commercial terms with reference to other rig providers in Brazil, then BrazAlta and its Affiliates shall be entitled to own and operate their own drilling or service rigs in Brazil for their use and on any lands in which they have an interest provided that the right for BrazAlta and its Affiliates to own and operate their own drilling and service rigs shall be limited to those contracts for which the Corporation was not able to provide rigs with the appropriate specifications, on a timely basis and on reasonable commercial terms with reference to other rig providers in Brazil. |
(b) | For clarity, nothing in this Article XI shall be construed as a restriction on BrazAlta to conduct exploration and production activities in Brazil. |
- 21 -
(a) | Any and all information and knowledge relating to the terms of this Agreement and the business affairs of a Party that may be acquired under the terms of this Agreement, or by virtue of the relationship between the Parties created by this Agreement (collectively, “Confidential Information”), shall be considered confidential and, except as permitted elsewhere in this Section 12.1, shall not be disclosed to others Persons, or published in any manner whatsoever, without first obtaining the written consent of the other Parties. |
(b) | The confidentiality obligations in Section 12.1(a) shall not apply: |
(i) | to Confidential Information that is (A) already known to the receiving Party prior to the time of disclosure by the disclosing Party, (B) already in the public domain or becomes, after having been disclosed to the receiving Party, generally available to the public through publication or otherwise (unless the publication or other disclosure was made directly or indirectly by the disclosing Party or its Affiliate or by its officer, director, employee, agent or other representative of the disclosing Party or its Affiliate in breach of this Agreement), or (C) independently developed by the receiving Party without any breach of this Agreement; | ||
(ii) | subject to Applicable Laws, to prevent a Party from disclosing Confidential Information in confidence to its Affiliates and to its and their officers, directors, employees, agents or other representatives to the extent reasonably necessary to allow that Party and its Affiliates to perform its obligations under this Agreement, provided that the disclosing Party shall be responsible for compliance with this Article XII by each Person to whom it has made disclosure under this Section 12.1(b)(ii); | ||
(iii) | to prevent a Party from disclosing Confidential Information in confidence to potential third parties purchasers in order to facilitate an Additional Equity Issuance to such potential third party purchasers provided that such disclosure is made on a “need to know basis” provided that such potential third party purchasers are subject to a confidentiality obligation in favour of the other Parties; | ||
(iv) | to prevent a Party from disclosing Confidential Information in confidence to another Party; |
- 22 -
(v) | to prevent a Party from disclosing Confidential Information as required by Applicable Laws or stock exchange requirements; | ||
(vi) | to prevent a Party from disclosing Confidential Information as necessary in connection with any litigation commenced in respect of this Agreement; and | ||
(vii) | to prevent a Party from disclosing in confidence, to the extent necessary, Confidential Information to any financial institution, underwriter or institutional investor which will or may provide financing to, or make an investment in, that Party or its Affiliates provided that the financial institution, underwriter or institutional investor is subject to a confidentiality obligation in favour of the other Parties. |
(c) | If any Party is required to disclose Confidential Information pursuant to Section 12.1(b)(v) or (vi), then that Party shall advise the other Parties in advance of any disclosure (where reasonable and where permitted by Applicable Law) so that the other Parties may take any action one or both of them consider necessary to maintain the confidentiality of that Confidential Information, and the disclosing Party shall take reasonable steps to limit the extent of the disclosure and to make the disclosure confidential under the Applicable Laws or stock exchange rules, as the case may be. | |
(d) | None of the Parties shall make any press releases or other public announcements in respect of this Agreement or any related transaction except for announcements that are: |
(i) | jointly authorized and approved by each of BrazAlta and Allis-Chalmers; | ||
(ii) | required by Applicable Laws or stock exchange requirements (provided that the Party required to make the press release or public announcement shall, to the extent reasonably possible, give the other Parties a reasonable opportunity to review and comment on the press release or public announcement prior to its release); or | ||
(iii) | required by a situation of emergency requiring immediate action by a Party. |
- 23 -
(a) | In recognition of the granting of the Debenture to Allis-Chalmers by the Corporation, for a three year period commencing upon the execution of this Agreement Allis-Chalmers, and its Affiliates, will not discuss, solicit, pursue, negotiate for or commit to any opportunity relating to the performance of any services that are the same as those provided by the Corporation, as at the date of this Agreement, within the jurisdiction of Brazil (“Brazil Opportunity”) unless the Brazil Opportunity has first been offered to the Corporation and the Corporation has rejected, or is deemed to have rejected, the Brazil Opportunity. | |
(b) | The Corporation shall have a 30 day period to determine whether it wishes to participate in the Brazil Opportunity after which date the Corporation shall be deemed to have rejected the Brazil Opportunity and Allis-Chalmers will be entitled to pursue the Brazil Opportunity with no further participation by the Corporation. |
(a) | In recognition of the advance of the Loan to the Corporation by Allis-Chalmers, for a three year period commencing upon the execution of this Agreement the Corporation, BrazAlta and its Affiliates, will not discuss, solicit, pursue, negotiate for or commit to any opportunity relating to the performance of any services that are the same as those provided by Allis-Chalmers or its Affiliates as at the date of this Agreement within the jurisdictions of Argentina or Bolivia (“Argentina and Bolivia Opportunity”) unless the Argentina and Bolivia Opportunity has first been offered to Allis-Chalmers and Allis-Chalmers has rejected, or is deemed to have rejected, the Argentina and Bolivia Opportunity. | |
(b) | Allis-Chalmers shall have a 30 day period to determine whether it wishes to participate in the Argentina or Bolivia Opportunity after which date Allis-Chalmers shall be deemed to have rejected the Brazil Opportunity and the Corporation, BrazAlta or its Affiliates will be entitled to pursue the Argentina or Bolivia Opportunity with no further participation by Allis-Chalmers. |
(a) | the Warrantor is duly incorporated and validly subsisting under the laws of its incorporating jurisdiction; |
- 24 -
(b) | the Warrantor has full corporate power and authority to enter into, perform and observe its obligations and duties under this Agreement; | |
(c) | the Warrantor’s execution, delivery and performance of this Agreement has been duly and validly authorized by all necessary corporate action; | |
(d) | this Agreement is a valid and binding agreement of the Warrantor and is enforceable against it, subject to the exercise of judicial discretions inherent in the courts in Alberta and subject to general principles of equity and laws concerning insolvency, in accordance with its terms; | |
(e) | subject to the consent of the Senior Lenders, the entering into of this Agreement by the Warrantor does not, and the transactions contemplated hereby will not: |
(i) | result in a breach of any law or any provision of the constating documents of the Warrantor or any agreement to which it is a party; or | ||
(ii) | contravene any provision of, or be an event that is (or with the passage of time will result in) a contravention of, or result in the acceleration of or entitle any party to accelerate (whether after the giving of notice or lapse of time or both) any obligation of the Warrantor under any security interest, agreement, instrument, order, arbitration award, judgment, injunction or decree to which the Warrantor is a party or by which it is bound, or conflict with any statute, rule or regulation applicable to the Warrantor; |
(f) | the Warrantor is not in violation of any Applicable Laws, which violations, individually or in the aggregate, would have a material adverse effect upon the Warrantor’s ability to perform of its obligations hereunder; and | |
(g) | the Warrantor is not a party to any legal, administrative, arbitral, investigatorial or other proceeding or controversy pending, or, to the best of the Warrantor’s knowledge, threatened, that would have a material adverse effect upon the Warrantor’s ability to perform its obligations under this Agreement. |
(a) | use its reasonable commercial efforts to obtain from the TSX Venture Exchange Inc., within 15 Business Days following the date of the Financial Closing (as defined in the Credit Agreement), the final approval contemplated by the conditional approval letter of the TSX Venture Exchange Inc.; |
- 25 -
(b) | make all necessary filings and applications under all applicable Canadian Securities Laws (as defined in the Credit Agreement) required to be made on the part of BrazAlta in connection with the transactions contemplated hereby; and | |
(c) | if applicable, use its commercially reasonable efforts to obtain and, if required, cause the Corporation to assist in obtaining any additional approval from the TSX Venture Exchange Inc., necessary for the conversion of the Debenture into common shares in accordance with the Debenture and the exercise of the option to purchase the Purchased Shares in accordance with this Agreement and, if such approval is subject to any conditions which are unacceptable to Allis-Chalmers acting reasonably, BrazAlta agrees to use its commercially reasonable efforts to negotiate with the TSX Venture Exchange Inc., to remove or minimize those conditions required to be satisfied prior to receipt of the final approval from the TSX Venture Exchange Inc., and will, if requested by Allis-Chalmers, allow Allis-Chalmers or its counsel to participate in the negotiation process. |
(a) | in writing; | |
(b) | marked for the attention of the relevant Person named below; and | |
(c) | delivered to the address of the addressee or sent by fax or e-mail to the fax number or e-mail address of the addressee which is specified in Section 17.2. |
- 26 -
(a) | BrazAlta Resources Corp. or BCH Ltd. | |||
Suite 500, 816 - 7th Avenue SW | ||||
Calgary, Alberta T2P 1A1 | ||||
Attention: | Craig F. Nieboer | |||
Fax No: | (403) 213-9254 | |||
E-mail: | cnieboer@brazalta.com | |||
with a copy to: | ||||
Davisllp | ||||
Livingstone Place | ||||
1000, 250 - 2nd Street S.W. | ||||
Calgary, Alberta T2P 0C1 | ||||
Attention: | Trevor Wong-Chor | |||
Fax No: | (403) 296-4474 | |||
E-mail: | twong-chor@davis.ca | |||
(b) | Allis-Chalmers Energy Inc. | |||
5075 Westheimer, Suite 890 | ||||
Houston, Texas 77056 | ||||
Attention: | Theodore F. Pound III | |||
Fax: | (281) 768-3891 | |||
E-mail: | tpound@alchenergy.com | |||
with a copy to: | ||||
Fraser Milner Casgrainllp | ||||
2900, 10180-101 Street | ||||
Edmonton, Alberta T5J 3V5 | ||||
Attention: | Richard A. Miller | |||
Fax No: | (780) 423-7276 | |||
E-mail: | rich.miller@fmc-law.com |
(a) | the time it is actually received by the addressee (the burden of proof of receipt being on the sender and being satisfied by courier or postal delivery records in the case of physical delivery, a fax confirmation in the case of fax delivery or the recipient’s e-mail records in the case of e-mail delivery); and | |
(b) | any later time specified in the notice. |
- 27 -
(a) | the date on which this Agreement is terminated by written agreement of the Parties; | |
(b) | the Closing Date; | |
(c) | the date that the Loan is repaid in full; | |
(d) | that time that any assignee of Allis-Chalmers interest in this Agreement ceases to be an Affiliate of Allis-Chalmers; or | |
(e) | the closing of one of the purchase transactions referred to in Article VIII (other than a purchase transaction where Allis-Chalmers does not sell the Allis-Chalmers Shares to the Third Party). |
- 28 -
- 29 -
(a) | Each Party irrevocably and unconditionally submits to the non-exclusive jurisdiction of the courts of Alberta for determining any dispute concerning this Agreement or the transactions contemplated by this Agreement. | |
(b) | Except to the extent inconsistent with an express provision of this Agreement to submit matters to an alternative forum for dispute resolution or mediation, each Party waives any right it has to object to an action being brought in those courts including claiming that the action has been brought in an inconvenient forum or that those courts do not have jurisdiction. |
- 30 -
- 31 -
BRAZALTA RESOURCES CORP. | ||||||
By: | ||||||
Name: | ||||||
Title: | ||||||
BCH LTD. | ||||||
By: | ||||||
Name: | ||||||
Title: | ||||||
ALLIS-CHALMERS ENERGY INC. | ||||||
By: | ||||||
�� | ||||||
Name: | ||||||
Title: | ||||||
1) | The Valuation of the Corporation shall be determined as of December 31, 2009 based on such appropriate valuation methods as may be chosen and applied by the Valuator. For further clarity, the value of the Corporation as a whole as determined by the Valuator shall be the “Purchase Price”. | ||
2) | The Valuator shall use the Valuation referred to above to prepare a statement (the “Statement”) containing the following information: |
a) | the value of the Corporation as a whole; | ||
b) | the value of each of the Standard Bank Warrant and the Standard Bank Shares (the respective values referred to herein as the “Standard Bank Warrant Price” and the “Standard Bank Share Price”); | ||
c) | the value of the Purchased Shares (the “Purchased Share Price”); | ||
d) | the value of each of the ESOP Options and the ESOP Shares (the respective values referred to herein as the “ESOP Option Price” and the “ESOP Share Price”); | ||
e) | the value of the common shares (if any) held by Allis-Chalmers and the common shares issuable upon the conversion of the Debenture (such common shares are collectively called the“Allis-Chalmers Shares”) and such value is called the“Allis-Chalmers Share Price”; and | ||
f) | the value of the common shares (if any) held by any other Person (such common shares are collectively called the“Third Party Shares”and such value is called the“Third Party Share Price”. |
3) | The Valuator shall deliver the Valuation and the Statement to Allis-Chalmers and BrazAlta concurrently together with the full valuation report. |
the transaction of the business
and affairs of
1. | Calling of and Notice of Meetings- Meetings of the board shall be held at such place and time and on such day as the Chairman of the board, president, chief executive officer or a vice-president, if any, or any two directors may determine. Notice of meetings of the board shall be given to each director not less than 48 hours before the time when the meeting is to be held. Each newly elected board may without notice hold its first meeting for the purposes of organization and the appointment of officers immediately following the meeting of shareholders at which such board was elected. | |
Any notice of a directors’ meeting must specify in reasonable detail the purpose of, or the business to be transacted at, the meeting. No business may be put to the directors at a meeting unless such business is specified in the notice or all of the directors are present at such meeting and do not object to the business being put to the meeting. | ||
2. | Quorum- Subject to the residency requirements contained in the Business Corporations Act, the quorum for the transaction of business at any meeting of the board shall consist of the Chairman of the board plus a minimum of four (4) directors then elected or appointed, or such greater or lesser number of directors as the board may from time to time determine. | |
A director is not considered present at a meeting where that director attends the meeting for the express purpose of objecting to the transaction of any business on the grounds that the meeting is not lawfully called. If proper notice of a directors’ meeting is given, specifying the purpose of or the business to be transacted at the meeting and a quorum of directors is not present, then a second directors’ meeting may be held on 48 hours’ written notice to transact the business specified in the original notice. | ||
Subject to the Business Corporations Act, the directors present at the second directors’ meeting constitute a quorum and the business specified in the original notice may be transacted by those directors in attendance at the second directors’ meeting. | ||
3. | Place of Meeting- Meetings of the board may be held in or outside Canada. | |
4. | Votes to Govern- At all meetings of the board every question shall be decided by a majority of the votes cast on the question; and in case of an equality of votes the Chairman of the board shall be entitled to a second or casting vote. |
- 2 -
5. | Audit Committee- When required by the Business Corporations Act the board shall, and at any other time the board may, appoint annually from among its number an Audit Committee to be composed of not fewer than three (3) directors of whom a majority shall not be officers or employees of the Corporation or its affiliates. The Audit Committee shall have the powers and duties provided in the Business Corporations Act and any other powers delegated by the board. | |
6. | Interest of Directors and Officers Generally in Contracts- No director or officer shall be disqualified by his office from contracting with the Corporation nor shall any contract or arrangement entered into by or on behalf of the Corporation with any director or officer or in which any director or officer is in any way interested be liable to be voided nor shall any director or officer so contracting or being so interested be liable to account to the Corporation for any profit realized by any such contract or arrangement by reason of such director or officer holding that office or of the fiduciary relationship thereby established; provided that the director or officer shall have complied with the provisions of the Business Corporations Act. | |
7. | Appointment of Officers- Subject to the articles, the board may from time to time appoint a president, chief executive officer, chief financial officer, one or more vice-presidents (to which title may be added words indicating seniority or function), a secretary, a treasurer and such other officers as the board may determine, including one or more assistants to any of the officers so appointed. The board may specify the duties of and, in accordance with this by-law and subject to the provisions of the Business Corporations Act, delegate to such officers powers to manage the business and affairs of the Corporation. Subject to the provisions of this by-law, an officer may but need not be a director and one person may hold more than one office. | |
8. | Chairman of the Board- The board may from time to time may also appoint a Chairman of the board who shall be a director. If appointed, the board may assign to him any of the powers and duties that are by any provisions of this by-law assigned to the managing director or to the president; and he shall, subject to the provisions of the Business Corporations Act, have such other powers and duties as the board may specify. During the absence or disability of the Chairman of the board, his duties shall be performed and his powers exercised by the managing director, if any, or by the president. | |
9. | President- If appointed, the president shall be the chief operating officer and, subject to the authority of the board, shall have general supervision of the business of the Corporation; and he shall have such other powers and duties as the board may specify. During the absence or disability of the president, or if no president has been appointed, the managing director shall also have the powers and duties of that office. | |
10. | Vice-President- A vice-president shall have such powers and duties as the board or the chief executive officer may specify. |
- 3 -
11. | Secretary- The secretary shall attend and be the secretary of all meetings of the board, shareholders and committees of the board and shall enter or cause to be entered in records kept for that purpose minutes of all proceedings thereat; he shall give or cause to be given, as and when instructed, all notices to shareholders, directors, officers, auditors and members of committees of the board; he shall be the custodian of the stamp or mechanical device generally used for affixing the corporate seal of the Corporation and of all books, papers, records, documents and instruments belonging to the Corporation, except when some other officer or agent has been appointed for that purpose; and he shall have such other powers and duties as the board or the chief executive officer may specify. | |
12. | Chief Financial Officer- The chief financial officer shall keep proper accounting records in compliance with the Business Corporations Act and shall be responsible for the deposit of money, the safekeeping of securities and the disbursement of the funds of the Corporation; he shall render to the board whenever required an account of all his transactions as chief financial officer and of the financial position of the Corporation; and he shall have such other powers and duties as the board or the chief executive officer may specify. | |
13. | Agents and Attorneys- The board shall have the power from time to time to appoint agents and attorneys for the Corporation in or outside Canada with such powers as the board sees fit. |
14. | Quorum- Subject to the requirements of the Business Corporations Act, a quorum for the transaction of business at any meeting of shareholders, irrespective of the number of persons actually present at the meeting, shall be one person present in person being a shareholder entitled to vote thereat or a duly appointed representative or proxyholder for an absent shareholder so entitled, and holding or representing in the aggregate not less than a majority of the outstanding shares of the Corporation entitled to vote at the meeting. | |
15. | Votes to Govern- At any meeting of shareholders every question shall, unless otherwise required by the Business Corporations Act, be determined by the majority of votes cast on the question. In case of an equality of votes either upon a show of hands or upon a poll, the chairman of the meeting shall not be entitled a second or casting vote. | |
16. | Show of Hands- Subject to the provisions of the Business Corporations Act, any question at a meeting of shareholders shall be decided by a show of hands unless a ballot thereon is required or demanded as hereinafter provided. Upon a show of hands every person who is present and entitled to vote shall have one vote per share. Whenever a vote by show of hands shall have been taken upon a question, unless a ballot thereon is so required or demanded, a declaration by the chairman of the meeting that the vote upon the question has been carried or carried by a particular majority or not carried and an entry to that effect in the minutes of the meeting shall be prima facie evidence of the fact without proof of the number or proportion of the votes recorded in favour of or against any resolution or other proceeding in respect of the said question, and the result of the vote so taken shall be the decision of the shareholders upon the said question. |
- 4 -
17. | Ballots- On any question proposed for consideration at a meeting of shareholders, and whether or not a show of hands has been taken thereon, any shareholder or proxyholder entitled to vote at the meeting may require or demand a ballot. A ballot so required or demanded shall be taken in such manner as the chairman shall direct. A requirement or demand for a ballot may be withdrawn at any time prior to the taking of the ballot. If a ballot is taken each person present shall be entitled, in respect of the shares which he is entitled to vote at the meeting upon the question, to that number of votes provided by the Business Corporations Act or the articles, and the result of the ballot so taken shall be the decision of the shareholders upon the said question. |
18. | Directors- A director may participate in a meeting of the board or of a committee of the board by means of telephone or other communication facilities that permit all persons participating in any such meeting to hear each other. |
19. | Indemnification of Directors and Officers- The Corporation shall indemnify a director or officer of the Corporation, a former director or officer of the Corporation or a person who acts or acted at the Corporation’s request as a director or officer of a body corporate of which the Corporation is or was a shareholder or creditor, and his heirs and legal representatives to the extent permitted by the Business Corporations Act. |
20. | Indemnity of Others- Except as otherwise required by the Business Corporations Act and subject to paragraph 20, the Corporation may from time to time indemnify and save harmless any person who was or is a party or is threatened to be made a party to any threatened, pending or contemplated action, suit or proceeding, whether civil, criminal, administrative or investigative (other than an action by or in the right of the Corporation) by reason of the fact that he is or was an employee or agent of the Corporation, or is or was serving at the request of the Corporation as a director, officer, employee, agent of or participant in another body corporate, partnership, joint venture, trust or other enterprise, against expenses (including legal fees), judgments, fines and any amount actually and reasonably incurred by him in connection with such action, suit or proceeding if he acted honestly and in good faith with a view to the best interests of the Corporation and, with respect to any criminal or administrative action or proceeding that is enforced by a monetary penalty, had reasonable grounds for believing that his conduct was lawful. The termination of any action, suit or proceeding by judgment, order, settlement or conviction shall not, of itself, create a presumption that the person did not act honestly and in good faith with a view to the best interests of the Corporation and, with respect to any criminal or administrative action or proceeding that is enforced by a monetary penalty, had no reasonable grounds for believing that his conduct was lawful. |
21. | Right of Indemnity Not Exclusive- The provisions for indemnification contained in the by-laws of the Corporation shall not be deemed exclusive of any other rights to which any person seeking indemnification may be entitled under any agreement, vote of shareholders or directors or otherwise, both as to action in his official capacity and as to action in another capacity, and shall continue as to a person who has ceased to be a director, officer, employee or agent and shall inure to the benefit of the heirs and legal representatives of such a person. |
- 5 -
22. | No Liability of Directors or Officers for Certain Matters- To the extent permitted by law, no director or officer of the Corporation shall be liable for the acts, receipts, neglects or defaults of any other director or officer or employee or for joining in any receipt or act for conformity or for any loss, damage or expense happening to the Corporation through the insufficiency or deficiency of title to any property acquired by the Corporation or for or on behalf of the Corporation or for the insufficiency or deficiency of any security in or upon which any of the moneys of or belonging to the Corporation shall be placed out or invested or for any loss or damage arising from the bankruptcy, insolvency or tortious act of any person, firm or body corporate with whom or which any moneys, securities or other assets belonging to the Corporation shall be lodged or deposited or for any loss, conversion, misapplication or misappropriation of or any damage resulting from any dealings with any moneys, securities or other assets belonging to the Corporation or for any other loss, damage or misfortune whatever which may happen in the execution of the duties of his respective office or trust or in relation thereto unless the same shall happen by or through his failure to act honestly and in good faith with a view to the best interests of the Corporation and in connection therewith to exercise the care, diligence and skill that a reasonably prudent person would exercise in comparable circumstances. If any director or officer of the Corporation shall be employed by or shall perform services for the Corporation otherwise than as a director or officer or shall be a member of a firm or a shareholder, director or officer of a body corporate which is employed by or performs services for the Corporation, the fact of his being a director or officer of the Corporation shall not disentitle such director or officer or such firm or body corporate, as the case may be, from receiving proper remuneration for such services. |
23. | Dividends- Subject to the provisions of the Business Corporations Act, the board may from time to time declare dividends payable to the shareholders according to their respective rights and interests in the Corporation. Dividends may be paid in money or property or by issuing fully paid shares of the Corporation. |
24. | Dividend Cheques- A dividend payable in cash shall be paid by cheque drawn on the Corporation’s bankers or one of them to the order of each registered holder of shares of the class or series in respect of which it has been declared and mailed by prepaid ordinary mail to such registered holder at his recorded address, unless such holder otherwise directs. In the case of joint holders the cheque shall, unless such joint holders otherwise direct, be made payable to the order of all such joint holders and mailed to them at their recorded address. The mailing of such cheque as aforesaid, unless the same is not paid on due presentation, shall satisfy and discharge the liability for the dividend to the extent of the sum represented thereby plus the amount of any tax which the Corporation is required to and does withhold. |
- 6 -
25. | Non-Receipt of Cheques- In the event of non-receipt of any dividend cheque by the person to whom it is sent as aforesaid, the Corporation shall issue to such person a replacement cheque for a like amount on such terms as to indemnify, reimbursement of expenses and evidence of non-receipt and of title as the board may from time to time prescribe, whether generally or in any particular case. |
26. | Unclaimed Dividends- Any dividend unclaimed after a period of 6 years from the date on which the same has been declared to be payable shall be forfeited and shall revert to the Corporation. |
27. | Banking Arrangements- The banking business of the Corporation, or any part thereof, shall be transacted with such banks, trust companies or other financial institutions as the board may designate, appoint or authorize from time to time by resolution and all such banking business, or any part thereof, shall be transacted on the Corporation’s behalf by such one or more officers and/or other persons as the board may designate, direct or authorize from time to time by resolution and to the extent therein provided. |
28. | Execution of Instruments- Contracts, documents or instruments in writing requiring execution by the Corporation may be signed by any one officer and all contracts, documents or instruments in writing so signed shall be binding upon the Corporation without any further authorization or formality. The board is authorized from time to time by resolution to appoint any officer or officers or any other person or persons on behalf of the Corporation to sign and deliver either contracts, documents or instruments in writing generally or to sign either manually or by facsimile signature and/or counterpart signature and deliver specific contracts, documents or instruments in writing. The term “contracts, documents or instruments in writing” as used in this by-law shall include deeds, mortgages, charges, conveyances, powers of attorney, transfers and assignments of property of all kinds (including specifically, but without limitation, transfers and assignments of shares, warrants, bonds, debentures or other securities), share certificates, warrants, bonds, debentures and other securities or security instruments of the Corporation and all paper writings. |
29. | Voting Rights in Other Bodies Corporate - The signing officers of the Corporation may execute and deliver proxies and arrange for the issuance of voting certificates or other evidence of the right to exercise the voting rights attaching to any securities held by the Corporation. Such instruments shall be in favour of such persons as may be determined by the officers executing or arranging for the same. In addition, the board may from time to time direct the manner in which and the persons by whom any particular voting rights or class of voting rights may or shall be exercised. |
30. | Creation and Consolidation of Divisions- The board may cause the business and operations of the Corporation or any part thereof to be divided or to be segregated into one or more divisions upon such basis, including without limitation, character or type of operation, geographical territory, product manufactured or service rendered, as the board may consider appropriate in each case. The board may also cause the business and operations of any such division to be further divided into sub-units and the business and operations of any such divisions or sub-units to be consolidated upon such basis as the board may consider appropriate in each case. |
- 7 -
31. | Name of Division- Any division or its sub-units may be designated by such name as the board may from time to time determine and may transact business, enter into contracts, sign cheques and other documents of any kind and do all acts and things under such name. Any such contracts, cheque or document shall be binding upon the Corporation as if it had been entered into or signed in the name of the Corporation. |
32. | Officers of Divisions- From time to time the board or a person designated by the board, may appoint one or more officers for any division, prescribe their powers and duties and settle their terms of employment and remuneration. The board or a person designated by the board, may remove at its or his pleasure any officer so appointed, without prejudice to such officers rights under any employment contract. Officers of divisions or their sub-units shall not, as such be officers of the Corporation. |
33. | Invalidity of Any Provisions of This By-law- The invalidity or unenforceability of any provision of this by-law shall not affect the validity or enforceability of the remaining provisions of this by-law. |
34. | Omissions and Errors- The accidental omission to give any notice to any shareholder, director, officer or auditor or the non-receipt of any notice by any shareholder, director, officer or auditor or any error in any notice not affecting the substance thereof shall not invalidate any action taken at any meeting held pursuant to such notice or otherwise founded thereon. |
35. | Interpretation- In this by-law and all other by-laws of the Corporation words importing the singular number only shall include the plural and vice versa; words importing the masculine gender shall include the feminine and neuter genders; words importing persons shall include an individual, partnership, association, body corporate, executor, administrator or legal representative and any number or aggregate of persons; “articles” include the original or restated articles of incorporation, articles of amendment, articles of amalgamation, articles of continuance, articles of reorganization, articles of arrangement and articles of revival; “board” shall mean the board of directors of the Corporation; “Business Corporations Act” shall mean theBusiness Corporations Act(Alberta), R.S.A. 2000, c. B-9, as amended from time to time, or any Act that may hereafter be substituted therefor; “meeting of shareholders” shall mean and include an annual meeting of shareholders and a special meeting of shareholders of the Corporation; and “signing officers” means any person authorized to sign on behalf of the Corporation pursuant to paragraph 29. |
- 8 -
36. | Notwithstanding anything to the contrary set out herein, this by-law shall be subject to the option to purchase and governance agreement dated as of January 31, 2008 made among BrazAlta Resources Corp., the Corporation and Allis-Chalmers Energy Inc. (such agreement, as amended, is called the “Governance Agreement”). In the event of any inconsistency or conflict between this by-law and the Governance Agreement, the terms of the Governance Agreement shall govern. |
Consolidated Balance Sheet
As at
(unaudited, in $000s of US dollars)
September 30, | June 30, | |||||||||||||||||||
BCH Canada | BCH Brazil | CJE | 2007 | 2007 | ||||||||||||||||
Assets | ||||||||||||||||||||
Current | ||||||||||||||||||||
Cash and cash equivalents | 183 | 861 | 1,044 | 334 | ||||||||||||||||
Cash — restricted | 300 | — | 300 | — | ||||||||||||||||
Accounts receivable | 117 | 508 | 625 | 1,286 | ||||||||||||||||
Prepaid expenses | — | 38 | 38 | 59 | ||||||||||||||||
600 | 1,407 | 2,006 | 1,679 | |||||||||||||||||
Due from subsidiary | 2,042 | — | (2,042 | ) | — | — | ||||||||||||||
Investment in subsidiary | 2,035 | — | (2,035 | ) | — | — | ||||||||||||||
Property, plant and equipment | 31,507 | 1,756 | (225 | ) | 33,038 | 13,716 | ||||||||||||||
Future income tax asset | 546 | — | 546 | 361 | ||||||||||||||||
36,130 | 1,756 | 33,584 | 14,077 | |||||||||||||||||
36,730 | 3,163 | 35,590 | 15,756 | |||||||||||||||||
Liabilities and Shareholders’ Equity | ||||||||||||||||||||
Current | ||||||||||||||||||||
Accounts payable and accrued liabilities | 2,013 | 1,747 | 3,760 | 986 | ||||||||||||||||
Interest payable | 190 | — | 190 | — | ||||||||||||||||
2,203 | 1,747 | 3,950 | 986 | |||||||||||||||||
Long term debt | 12,655 | — | 12,655 | — | ||||||||||||||||
Due to parent | — | 2,042 | (2,042 | ) | — | — | ||||||||||||||
Due to BrazAlta | 21,918 | 1,558 | 23,475 | 17,512 | ||||||||||||||||
36,776 | 5,347 | 40,081 | 18,498 | |||||||||||||||||
Shareholders’ equity: | ||||||||||||||||||||
Share capital | 1 | 2,035 | (2,035 | ) | 1 | 1 | ||||||||||||||
Contributed surplus | 112 | — | 112 | — | ||||||||||||||||
Deficit | (160 | ) | (4,219 | ) | (225 | ) | (4,604 | ) | (2,742 | ) | ||||||||||
(47 | ) | (2,184 | ) | (4,491 | ) | (2,741 | ) | |||||||||||||
36,730 | 3,163 | — | 35,591 | 15,756 | ||||||||||||||||
Consolidated Statements of Loss and Comprehensive Loss and Deficit
For the three months ended September 30, 2007
(unaudited, in $000s of US dollars)
BCH Canada | BCH Brazil | CJE | F2008-Q1 | |||||||||||||
Revenues: | ||||||||||||||||
Drilling services | — | 1,910 | 1,910 | |||||||||||||
Intercompany transactions, net | 791 | (723 | ) | (69 | ) | — | ||||||||||
Interest revenue | 2 | 2 | 4 | |||||||||||||
794 | 1,189 | 1,914 | ||||||||||||||
Expenses: | ||||||||||||||||
Operating | 471 | 2,035 | 2,507 | |||||||||||||
Depletion, depreciation and accretion | 123 | 24 | 148 | |||||||||||||
General and administrative | 307 | 813 | (10 | ) | 1,110 | |||||||||||
Foreign exchange (gain) loss | (718 | ) | 142 | (576 | ) | |||||||||||
Interest expense | 218 | 58 | 276 | |||||||||||||
Interest expense — related party | 282 | 31 | 312 | |||||||||||||
683 | 3,104 | 3,776 | ||||||||||||||
Net income (loss) and comprehensive income (loss) before income tax | 111 | (1,914 | ) | (1,862 | ) | |||||||||||
Current and withholding income tax | 157 | — | 157 | |||||||||||||
Future income tax recovery | (157 | ) | — | (157 | ) | |||||||||||
Income taxes | — | — | — | |||||||||||||
Net income (loss) and comprehensive income (loss) | 111 | (1,914 | ) | (1,862 | ) | |||||||||||
Deficit, beginning of period | (271 | ) | (2,305 | ) | (166 | ) | (2,742 | ) | ||||||||
Deficit, end of period | (160 | ) | (4,219 | ) | (225 | ) | (4,604 | ) | ||||||||
Consolidated Statements of Cash Flows
For the three months ended September 30, 2007
(unaudited, in $000s of US dollars)
BCH Canada | BCH Brazil | CJE | F2008-Q1 | |||||||||||||
Cash provided by (used in): | ||||||||||||||||
Operating Activities: | ||||||||||||||||
Net income (loss) | 111 | (1,914 | ) | (1,862 | ) | |||||||||||
Items not involving cash: | ||||||||||||||||
Amortization of effective interest | 27 | — | 27 | |||||||||||||
Depletion, depreciation and accretion | 123 | 24 | 148 | |||||||||||||
Future income tax recovery | (157 | ) | — | (157 | ) | |||||||||||
Unrealized foreign exchange loss | (620 | ) | 250 | (10 | ) | (380 | ) | |||||||||
Change in non-cash operating working capital | 105 | 1,330 | 1,435 | |||||||||||||
(411 | ) | (309 | ) | (789 | ) | |||||||||||
Financing Activities: | ||||||||||||||||
Issue of common shares | — | 656 | (656 | ) | — | |||||||||||
Long term debt | 13,690 | — | 13,690 | |||||||||||||
Financing costs | (815 | ) | — | (815 | ) | |||||||||||
Loans from BrazAlta | 4,729 | 265 | 4,993 | |||||||||||||
17,603 | 921 | 17,868 | ||||||||||||||
Investing Activities: | ||||||||||||||||
Capital asset purchases | (17,324 | ) | (637 | ) | 69 | (17,892 | ) | |||||||||
Cash — restricted | (300 | ) | — | (300 | ) | |||||||||||
Investment in BCH Energy do Brasil | (656 | ) | — | 656 | — | |||||||||||
Due to/from parent/subsidiary | (634 | ) | 634 | — | ||||||||||||
Change in non-cash investing working capital | 1,815 | — | 1,815 | |||||||||||||
(17,099 | ) | (3 | ) | (16,377 | ) | |||||||||||
Add: Foreign exchange gain on cash and cash equivalents held in foreign currency | 17 | (9 | ) | 9 | ||||||||||||
Net decrease in cash and cash equivalents | 111 | 600 | 710 | |||||||||||||
Cash and cash equivalents, beginning of period | 72 | 261 | 334 | |||||||||||||
Cash and cash equivalents, end of period | 183 | 861 | 1,044 | |||||||||||||