Macondo well incident |
Overview. The semisubmersible drilling rig, Deepwater Horizon, sank on April 22, 2010 after an explosion and fire onboard the rig that began on April 20, 2010. The Deepwater Horizon was owned by an affiliate of Transocean Ltd. and had been drilling the Macondo exploration well in Mississippi Canyon Block 252 in the Gulf of Mexico for the lease operator, BP Exploration & Production, Inc. (BP Exploration), an indirect wholly owned subsidiary of BP p.l.c. We performed a variety of services for BP Exploration, including cementing, mud logging, directional drilling, measurement-while-drilling, and rig data acquisition services. Crude oil flowing from the well site spread across thousands of square miles of the Gulf of Mexico and reached the United States Gulf Coast. Efforts to contain the flow of hydrocarbons from the well were led by the United States government and by BP p.l.c., BP Exploration, and their affiliates (collectively, as applicable, BP). There were eleven fatalities and a number of injuries as a result of the Macondo well incident. |
Litigation. Numerous lawsuits relating to the Macondo well incident were filed against us, BP, Transocean and others in federal and state courts throughout the United States, most of which have been consolidated in a Multi-District Litigation (MDL) proceeding before Judge Carl Barbier in the United States Eastern District of Louisiana. Generally, those lawsuits allege either (1) damages arising from the oil spill pollution and contamination or (2) wrongful death or personal injuries. The pollution complaints include suits brought against us by governmental entities, including all of the coastal states of the Gulf of Mexico, numerous local governmental entities, the Mexican State of Yucatan, and the United Mexican States, and generally allege, among other things, negligence and gross negligence, property damages, taking of protected species, and potential economic losses as a result of environmental pollution, and generally seek awards of compensatory damages, including unspecified economic damages, and punitive damages, as well as injunctive relief. The wrongful death and other personal injury complaints generally allege negligence and gross negligence and seek awards of compensatory damages, including unspecified economic damages, and punitive damages. |
The defendants in the proceedings described above have filed numerous cross claims, third party claims, and other actions against certain other defendants, including us, seeking subrogation, contribution, indemnification, including with respect to liabilities under the Oil Pollution Act of 1990 (OPA), and direct damages, and alleging negligence, gross negligence, fraudulent conduct, willful misconduct, fraudulent concealment, comparative fault, and breach of warranty of workmanlike performance. |
Judge Barbier issued an order, among others, clarifying certain aspects of law applicable to the lawsuits pending in his court. The court ruled that: (1) general maritime law will apply, and therefore all claims brought under state law causes of action were dismissed; (2) general maritime law claims may be brought directly against defendants who are non-“responsible parties” under the OPA with the exception of pure economic loss claims by plaintiffs other than commercial fishermen; (3) all claims for damages, including pure economic loss claims, may be brought under the OPA directly against responsible parties; and (4) punitive damage claims may be brought against both responsible and non-responsible parties under general maritime law. The rulings in the court's order remain subject to each applicable party's right to appeal. Certain parishes in Louisiana appealed the dismissal of their state law claims, and the United States Fifth Circuit Court of Appeals (Fifth Circuit) affirmed the dismissal. The parishes filed a petition for writ of certiorari in the United States Supreme Court (Supreme Court), which the Court denied. |
We have not been named as a responsible party under the OPA, but BP has filed a claim against us for contribution with respect to liabilities incurred by BP under the OPA. In an order dismissing certain other claims, the MDL court noted that we are not liable with respect to those claims under the OPA because we are not a “responsible party” under the OPA. A group of plaintiffs appealed the order, but the Fifth Circuit dismissed the appeal. |
In April 2012, BP announced that it had reached definitive settlement agreements with the Plaintiffs' Steering Committee (PSC) in the MDL to resolve the substantial majority of eligible private economic loss and medical claims stemming from the Macondo well incident (BP MDL Settlements). The PSC acts on behalf of individuals and business plaintiffs in the MDL. The BP MDL Settlements do not include claims against BP made by the United States Department of Justice (DOJ) or other federal agencies or by states and local governments. The BP MDL Settlements provide that the settlement classes are precluded from asserting compensatory damages claims against us. The economic loss settlement (BP Economic Loss Settlement) provides that, to the extent permitted by law, BP assigns to the settlement class certain of its claims, rights, and recoveries against Transocean and us for damages, including BP's alleged direct damages such as damages for clean-up expenses and damage to the well and reservoir. The MDL court has since certified the classes and granted final approval for the BP MDL Settlements. BP's medical claims settlement was final as of February 2014. BP challenged certain provisions of the BP Economic Loss Settlement in the MDL court and applicable appellate courts. In March 2014, the Fifth Circuit upheld the settlement, and BP subsequently filed a petition for writ of certiorari in the Supreme Court. In December 2014, the Supreme Court denied BP’s petition. |
The first phase of the MDL trial, which concluded in April 2013, covered issues arising out of the conduct and degree of culpability of various parties allegedly relevant to the loss of well control, the ensuing fire and explosion on and sinking of the Deepwater Horizon, and the initiation of the release of hydrocarbons from the Macondo well. At the conclusion of the plaintiffs' case, in March 2013, the MDL court dismissed all claims against certain defendants, leaving BP, Transocean, and us as the remaining defendants with respect to the matters addressed during the first phase of the trial. |
In September 2014, we reached an agreement, subject to court approval, to settle a substantial portion of the plaintiffs’ claims asserted against us relating to the Macondo well incident (our MDL Settlement). Pursuant to our MDL Settlement, we agreed to pay an aggregate of $1.1 billion, which includes legal fees and costs, into a settlement fund in three installments over two years, except that one installment of legal fees will not be paid until all of the conditions to the settlement have been satisfied or waived. Under our MDL Settlement, (1) a class of plaintiffs alleging physical damage to property or damages associated with the commercial fishing industry arising from the Macondo well incident agree to release all claims against us for punitive damages and (2) class members of the BP Economic Loss Settlement agree to release the claims against us that BP assigned to them in that settlement. We also agreed to release BP for any damages, consideration, or other relief that we provide under our MDL Settlement. |
Certain conditions must be satisfied before our MDL Settlement becomes effective and the funds are released from the settlement fund. These conditions include, among others, the BP Economic Loss Settlement becoming final and effective and the issuance of a final order of the MDL court, including the resolution of any appeals, that (1) affirms we have no liability for compensatory damages to the class members of the BP Economic Loss Settlement, (2) adopts the MDL court’s January 2012 order enforcing our indemnity rights against BP (see “Indemnification and Insurance” below), and (3) adopts the MDL court’s prior order that, under general maritime law, pure economic loss claims by plaintiffs other than commercial fishermen may not be brought against us. In addition, we have the right to terminate our MDL Settlement if more than an agreed number of plaintiffs elect to opt out of the settlement prior to the expiration of the opt out deadline to be established by the MDL court. |
Our MDL Settlement does not cover claims against us by the state governments of Alabama, Florida, Mississippi, Louisiana, or Texas, claims by our own employees, compensatory damages claims by plaintiffs in the MDL that opted out of or were excluded from the settlement class in the BP MDL Settlements, or claims by other defendants in the MDL or their respective employees. However, as discussed below, these claims have either been dismissed, are subject to dismissal, are subject to indemnification by BP pursuant to rulings of the MDL court, or are not believed to be material. |
Before approving our MDL Settlement, the MDL court must certify the settlement class, the numerous class members must be notified of the proposed settlement, and the court must hold a fairness hearing. We are unable to predict when the MDL court will approve our MDL Settlement. |
Subsequently in September 2014, the MDL court ruled (Phase One Ruling) that, among other things, (1) in relation to the Macondo well incident, BP’s conduct was reckless, Transocean’s conduct was negligent, and our conduct was negligent, |
(2) fault for the Macondo blowout, explosion, and spill is apportioned 67% to BP, 30% to Transocean, and 3% to us, and (3) the indemnity and release clauses in our contract with BP are valid and enforceable against BP. The MDL court did not find that our conduct was grossly negligent, thereby, subject to any appeals, eliminating our exposure in the MDL for punitive damages. |
In October 2014, BP filed a motion in the MDL court to amend the court’s findings, alter or amend the court’s judgment, or for a new trial, and in November 2014, the MDL court denied the motion. BP has filed a notice of appeal of both the MDL court’s denial of its motion and of the Phase One Ruling. |
The second phase of the MDL trial was held in October 2013. In January 2015, the MDL court ruled that, giving effect to the amount of oil collected as a result of BP’s cleanup efforts, a total of 3.19 million barrels of oil were discharged into the Gulf of Mexico for the purposes of determining the maximum penalty under the Clean Water Act (CWA). |
The DOJ's civil action for CWA violations, fines, and penalties against BP Exploration, Anadarko Petroleum Corporation and Anadarko E&P Company LP, which had an approximate 25% interest in the Macondo well, was addressed by the MDL court in another phase of the trial during January 2015; testimony was completed but no ruling has been made yet. |
Also, the MDL court has scheduled a trial of seven OPA test cases which are limited to the plaintiffs and BP. The plaintiffs have dropped their general maritime law claims against us in these test cases, although BP asserts in its affirmative defenses that the damages involved were caused by third parties such as Transocean and us. |
Damages for the cases tried in the MDL proceeding, including punitive damages, if any, are expected to be tried pursuant to a process to be determined by the MDL court. Under ordinary MDL procedures, such cases would, unless waived by the respective parties, be tried in the courts from which they were transferred into the MDL. Discovery is underway for a trial of the State of Alabama’s OPA and general maritime law damages claims, with a potential trial commencing in the fourth quarter of 2015. Pursuant to a court-approved stipulation, we are not actively participating in this trial, but retain the right to participate should we determine that it is in our interest to do so. |
Subject to all applicable appeals and final approvals, the following briefly summarizes the status of the various claims against us based on the various settlements and MDL court rulings described above: |
| |
• | compensatory damages claims asserted against us by the members of the settlement class in the BP MDL Settlements may not be pursued under the terms of that settlement; |
| |
• | compensatory damages claims asserted against us by plaintiffs in the MDL that are not members of the settlement class in the BP MDL Settlements, including plaintiffs who opted out of or were excluded from those settlements, the state governments of Alabama, Florida, Mississippi, Louisiana, and Texas, the Mexican State of Yucatan, and the United Mexican States, are either dismissed, subject to dismissal, or subject to indemnification by BP pursuant to rulings of the MDL court; |
| |
• | punitive damages claims asserted against us by the members of the settlement class in our MDL Settlement are released pursuant to that settlement, and we should not otherwise be held liable for punitive damages claims asserted by any other plaintiffs in the MDL because the Phase One Ruling did not find that our conduct was grossly negligent; |
| |
• | BP’s direct damages claims against us, such as claims for clean-up expenses and damage to the well and reservoir, that are assigned to members of the settlement class in the BP Economic Loss Settlement are released pursuant to our MDL Settlement; |
| |
• | BP’s claims against us for contribution, indemnity, or subrogation with respect to fines and penalties under the CWA or other federal or state statute are unresolved, although we believe that the claims are without merit and are subject to a release given by BP in our contract relating to the Macondo well; and |
| |
• | claims against us asserted by Transocean, and claims against us that are not included in the MDL, are unresolved, but these claims are subject to indemnification by BP pursuant to the rulings of the MDL court and we do not believe that these claims are material. |
As of March 31, 2015, our remaining loss contingency liability related to the Macondo well incident was |
$805 million, consisting of a current portion of $366.6 million and a non-current portion of $438.7 million. The $805 million represents a $733 million loss contingency related to our MDL Settlement and a loss contingency of $72 million unrelated to that settlement. Our loss contingency liability does not include potential recoveries from our insurers or indemnification by BP. See “Indemnification and Insurance” below for information regarding amounts that we could potentially recover from insurance and are currently unable to classify as probable. |
Subject to the satisfaction of the conditions of our MDL Settlement and to the resolution of appeals of the Phase One Ruling, we believe our MDL Settlement and the Phase One Ruling have eliminated any additional material financial exposure to us in relation to the Macondo well incident. However, because our MDL Settlement is subject to court approval and other conditions and the Phase One Ruling is subject to appeals, we are unable to predict the ultimate outcome of the many lawsuits, investigations, and other matters relating to the Macondo well incident, including appeals of the Phase One Ruling, further orders and rulings of the MDL court and other courts, and indemnification and insurance arrangements. We are also unable to predict whether the court will approve our MDL Settlement or whether the conditions of our MDL Settlement will be satisfied. Accordingly, there are additional loss contingencies relating to the Macondo well incident that are reasonably possible but for which we cannot make a reasonable estimate and we may adjust our estimated loss contingency liability and our amounts recoverable from insurance in the future. In addition, applicable accounting rules and guidance may require us to recognize a loss contingency for which we may be fully indemnified, without recognizing a corresponding receivable for the amount of the |
indemnity payment. Depending on the developments discussed above, liabilities arising out of the Macondo well incident could have a material adverse effect on our liquidity, consolidated results of operations, and consolidated financial condition. |
We intend to continue defending any litigation, fines, and/or penalties relating to the Macondo well incident and to vigorously pursue any damages, remedies, or other rights available to us as a result of the Macondo well incident. We have incurred and expect to continue to incur significant legal fees and costs, some of which we intend to seek recovery of through indemnity or insurance arrangements, as a result of the numerous investigations and lawsuits relating to the incident. |
Regulatory Action. In October 2011, the Bureau of Safety and Environmental Enforcement (BSEE) issued a notification of Incidents of Noncompliance (INCs) to us for allegedly violating federal regulations relating to the failure to take measures to prevent the unauthorized release of hydrocarbons, the failure to take precautions to keep the Macondo well under control, the failure to cement the well in a manner that would, among other things, prevent the release of fluids into the Gulf of Mexico, and the failure to protect health, safety, property, and the environment as a result of a failure to perform operations in a safe and workmanlike manner. We have appealed the INCs, but the appeal has been suspended pending certain proceedings in the MDL trial and potential appeals. The BSEE has announced that the INCs will be reviewed for possible imposition of civil penalties once the appeal has ended. We understand that the regulations in effect at the time of the alleged violations provide for fines of up to $35,000 per day per violation. |
DOJ Investigations and Actions. On June 1, 2010, the United States Attorney General announced that the DOJ was launching civil and criminal investigations into the Macondo well incident. The DOJ announced that it was reviewing, among other traditional criminal statutes, possible violations of and liabilities under the CWA, the OPA, and the Endangered Species Act of 1973 (ESA). |
Under the CWA, civil penalties of up to $1,100 per barrel of oil discharged (or $4,300 per barrel in the case of those found to have been grossly negligent) may be assessed against responsible parties, which include an “owner, operator, or person in charge of any vessel, onshore facility, or offshore facility from which oil or a hazardous substance is discharged.” Under the OPA, responsible parties can be liable for removal and response costs for discharges of oil from vessels, onshore facilities, and offshore facilities into or upon the navigable waters of the United States, as well as for damages, including recovery costs to contain and remove discharged oil and damages for injury to natural resources and real or personal property, lost revenues, lost profits, and lost earning capacity. The cap on liability under the OPA during 2010 was the full cost of removal of the discharged oil plus up to $75 million for damages, except that the $75 million cap does not apply in the event the damage was proximately caused by gross negligence or the violation of certain federal safety, construction or operating standards. The OPA defines the set of responsible parties differently depending on whether the source of the discharge is a vessel or an offshore facility. Liability for vessels is imposed on owners and operators; liability for offshore facilities is imposed on the holder of the permit or lessee of the area in which the facility is located. The ESA establishes liability for injury and death to wildlife. The ESA provides for civil penalties for knowing violations that can range up to $25,000 per violation. |
The DOJ has filed a civil action seeking damages and injunctive relief against BP Exploration, subsidiaries of Transocean Ltd., and others for violations of the CWA and the OPA. The DOJ’s complaint seeks a declaration that the defendants are strictly liable under the CWA as a result of the Macondo well incident, and seeks a declaration that the defendants are strictly liable under the OPA, with removal costs and damages to the United States far exceeding $75 million. BP Exploration has been designated, and has accepted the designation, as a responsible party for the pollution under the CWA and the OPA. Others have also been named as responsible parties, and all responsible parties may be held jointly and severally liable for any damages under the OPA. Under the OPA, a responsible party may make a claim for contribution against any other responsible party or against third parties it alleges contributed to or caused the oil spill. In connection with the proceedings discussed above under “Litigation,” in April 2011 BP filed a claim against us for statutory and equitable contribution with respect to liabilities incurred by BP under the OPA or another law, which subsequent court filings have indicated may include the CWA, and requested a judgment that the DOJ assert its claims for OPA financial liability directly against us. We filed a motion to dismiss BP’s claim, and that motion is pending. In July 2013, we also filed a motion for summary judgment requesting a court order that we are not liable to BP or Transocean for equitable indemnification or contribution with regard to any CWA fines and penalties that have been assessed or may be assessed against BP or Transocean. That motion is also pending. |
We were not named as a responsible party under the CWA or the OPA in the DOJ civil action, and we do not believe we are a responsible party under the CWA or the OPA. While we were not included in the DOJ’s civil complaint, there can be no assurance that federal governmental authorities will not bring a civil action against us under the CWA, the OPA, and/or other statutes or regulations. |
In 2013, we settled the federal government's criminal investigation of us in relation to the Macondo well incident by pleading guilty to one misdemeanor violation of federal law concerning the deletion of certain computer files created after the occurrence of the Macondo well incident, paying a criminal fine of $0.2 million and agreeing to three years' probation. |
Indemnification and Insurance. Our contract with BP relating to the Macondo well generally provides for our indemnification by BP for certain claims and expenses relating to the Macondo well incident, including those resulting from pollution or contamination (other than claims by our employees, loss or damage to our property, and any pollution emanating directly from our equipment). Also, under our contract with BP, we have, among other things, generally agreed to indemnify BP and other contractors performing work on the well for claims for personal injury of our employees and subcontractors, as well as for damage to our property. In turn, we believe that BP was obligated to obtain agreement by other contractors performing work on the well to indemnify us for claims for personal injury of their employees or subcontractors, as well as for damages to their property. We have entered into separate indemnity agreements with Transocean and others, under which we have agreed to indemnify those parties for claims for personal injury of our employees and subcontractors and they have agreed to indemnify us for claims for personal injury of their employees and subcontractors. |
In January 2012, the MDL court entered an order regarding certain indemnification matters. The court held that BP is required to indemnify us for third-party compensatory claims, or actual damages, that arise from pollution or contamination that did not originate from our property or equipment located above the surface of the land or water, even if we were found to be grossly negligent. The court also held, however, that BP does not owe us indemnity for punitive damages or for civil penalties under the CWA, if any. As discussed above, the DOJ is not seeking civil penalties from us under the CWA, but BP has filed a claim for contribution against us with respect to its liabilities. |
As discussed above, the Phase One Ruling found that the indemnification provisions in our contract with BP are valid and enforceable against BP. |
In addition to our contractual indemnity arrangements, we had a general liability insurance program of $600 million at the time of the Macondo well incident. Our insurance was designed to cover claims by businesses and individuals made against us in the event of property damage, injury, or death and, among other things, claims relating to environmental damage, as well as legal fees incurred in defending against those claims. We have received payments from our insurers with respect to covered legal fees incurred in connection with the Macondo well incident. Through March 31, 2015, we have incurred legal fees and related expenses of approximately $322 million, of which $283 million has been reimbursed under our insurance program. With respect to our MDL Settlement, we have collected $93 million under our general liability insurance program. |
With regard to the approximately $200 million of remaining insurance coverage relating to the Macondo well incident, most of the insurance carriers for that layer of coverage notified us that they do not intend to reimburse us with respect to our MDL Settlement. During the first quarter of 2015, we settled with one insurance carrier. We have initiated arbitration proceedings to pursue recovery of the remaining balance of approximately $170 million. Due to the uncertainty surrounding such recovery, no related amounts have been recognized in the consolidated financial statements as of March 31, 2015. |
Fair Labor Standards Act (FLSA) Claim |
In 2014, the U.S. Department of Labor Wage and Hour Division (DOL) commenced an audit to determine whether certain workers have been properly classified by us as exempt under the FLSA. In addition, litigation was commenced against us alleging that certain field professionals were not properly classified. During the first quarter of 2015, upon completion of a detailed analysis of the potential exposure involved and settlement of the pending litigation, we recorded corresponding loss contingency liabilities. |
Securities and related litigation |
In June 2002, a class action lawsuit was filed against us in federal court alleging violations of the federal securities laws after the Securities and Exchange Commission (SEC) initiated an investigation in connection with our change in accounting for revenue on long-term construction projects and related disclosures. In the weeks that followed, approximately twenty similar class actions were filed against us. Several of those lawsuits also named as defendants several of our present or former officers and directors. The class action cases were later consolidated, and the amended consolidated class action complaint, styled Richard Moore, et al. v. Halliburton Company, et al., was filed and served upon us in April 2003. As a result of a substitution of lead plaintiffs, the case was styled Archdiocese of Milwaukee Supporting Fund (AMSF) v. Halliburton Company, et al. AMSF has changed its name to Erica P. John Fund, Inc. (the Fund). We settled with the SEC in the second quarter of 2004. |
In June 2003, the lead plaintiffs filed a motion for leave to file a second amended consolidated complaint, which was granted by the court. In addition to restating the original accounting and disclosure claims, the second amended consolidated complaint included claims arising out of our 1998 acquisition of Dresser Industries, Inc., including that we failed to timely disclose the resulting asbestos liability exposure. |
In April 2005, the court appointed new co-lead counsel and named the Fund the new lead plaintiff, directing that it file a third consolidated amended complaint and that we file our motion to dismiss. The court held oral arguments on that motion in August 2005. In March 2006, the court entered an order in which it granted the motion to dismiss with respect to claims arising prior to June 1999 and granted the motion with respect to certain other claims while permitting the Fund to re-plead some of those claims to correct deficiencies in its earlier complaint. In April 2006, the Fund filed its fourth amended consolidated complaint. We filed a motion to dismiss those portions of the complaint that had been re-pled. A hearing was held on that motion in July 2006, and in March 2007 the court ordered dismissal of the claims against all individual defendants other than our Chief Executive Officer (CEO). The court ordered that the case proceed against our CEO and us. |
In September 2007, the Fund filed a motion for class certification, and our response was filed in November 2007. The district court held a hearing in March 2008, and issued an order in November 2008 denying the motion for class certification. The Fund appealed the district court’s order to the Fifth Circuit Court of Appeals. The Fifth Circuit affirmed the district court’s order denying class certification. In May 2010, the Fund filed a writ of certiorari in the United States Supreme Court. In January 2011, the Supreme Court granted the writ of certiorari and accepted the appeal. The Court heard oral arguments in April 2011 and issued its decision in June 2011, reversing the Fifth Circuit ruling that the Fund needed to prove loss causation in order to obtain class certification. The Court’s ruling was limited to the Fifth Circuit’s loss causation requirement, and the case was returned to the Fifth Circuit for further consideration of our other arguments for denying class certification. The Fifth Circuit returned the case to the district court, and in January 2012 the court issued an order certifying the class. We filed a Petition for Leave to Appeal with the Fifth Circuit, which was granted. In April 2013, the Fifth Circuit issued an order affirming the District Court's order certifying the class. |
We filed a writ of certiorari with the United States Supreme Court seeking an appeal of the Fifth Circuit decision. In November 2013, the Supreme Court granted our writ. Oral argument was held before the Supreme Court in March 2014. The Supreme Court issued its decision in June 2014, maintaining the presumption of class member reliance through the “fraud on the market” theory, but holding that we are entitled to rebut that presumption by presenting evidence that there was no impact on our stock price from the alleged misrepresentation. Because the district court and the Fifth Circuit denied us that opportunity, the Supreme Court vacated the Fifth Circuit’s decision and remanded for further proceedings consistent with the Supreme Court decision. In December 2014, the district court held a hearing to consider whether there was an impact on our stock price from the alleged misrepresentations. Fact discovery and other pretrial deadlines have been stayed. The court has not yet issued a ruling on class certification. We cannot predict the outcome or consequences of this case, which we intend to vigorously defend. |
Investigations |
We are conducting internal investigations of certain areas of our operations in Angola and Iraq, focusing on compliance with certain company policies, including our Code of Business Conduct (COBC), and the FCPA and other applicable laws. |
In December 2010, we received an anonymous e-mail alleging that certain current and former personnel violated our COBC and the FCPA, principally through the use of an Angolan vendor. The e-mail also alleges conflicts of interest, self-dealing, and the failure to act on alleged violations of our COBC and the FCPA. We contacted the DOJ to advise them that we were initiating an internal investigation. |
During the second quarter of 2012, in connection with a meeting with the DOJ and the SEC regarding the above investigation, we advised the DOJ and the SEC that we were initiating unrelated, internal investigations into payments made to a third-party agent relating to certain customs matters in Angola and to third-party agents relating to certain customs and visa matters in Iraq. |
Since the initiation of the investigations described above, we have participated in meetings with the DOJ and the SEC to brief them on the status of the investigations and produced documents to them both voluntarily and as a result of SEC subpoenas to us and certain of our current and former officers and employees. |
We expect to continue to have discussions with the DOJ and the SEC regarding issues relevant to the Angola and Iraq matters described above. We have engaged outside counsel and independent forensic accountants to assist us with these investigations. |
Because these investigations are ongoing, we cannot predict their outcome or the consequences thereof. |
Environmental |
We are subject to numerous environmental, legal, and regulatory requirements related to our operations worldwide. In the United States, these laws and regulations include, among others: |
| |
- | the Comprehensive Environmental Response, Compensation, and Liability Act; |
| |
- | the Resource Conservation and Recovery Act; |
| |
- | the Clean Air Act; |
| |
- | the Federal Water Pollution Control Act; |
| |
- | the Toxic Substances Control Act; and |
| |
- | the Oil Pollution Act. |
In addition to the federal laws and regulations, states and other countries where we do business often have numerous environmental, legal, and regulatory requirements by which we must abide. We evaluate and address the environmental impact of our operations by assessing and remediating contaminated properties in order to avoid future liabilities and comply with environmental, legal, and regulatory requirements. Our Health, Safety, and Environment group has several programs in place to maintain environmental leadership and to help prevent the occurrence of environmental contamination. On occasion, in addition to the matters relating to the Macondo well incident described above, we are involved in other environmental litigation and claims, including the remediation of properties we own or have operated, as well as efforts to meet or correct compliance-related matters. We do not expect costs related to those claims and remediation requirements to have a material adverse effect on our liquidity, consolidated results of operations, or consolidated financial position. Excluding our loss contingency for the Macondo well incident, our accrued liabilities for environmental matters were $58 million as of March 31, 2015 and $57 million as of December 31, 2014. Because our estimated liability is typically within a range and our accrued liability may be the amount on the low end of that range, our actual liability could eventually be well in excess of the amount accrued. Our total liability related to environmental matters covers numerous properties. |
Additionally, we have subsidiaries that have been named as potentially responsible parties along with other third parties for eight federal and state Superfund sites for which we have established reserves. As of March 31, 2015, those eight sites accounted for approximately $1 million of our $58 million total environmental reserve. Despite attempts to resolve these Superfund matters, the relevant regulatory agency may at any time bring suit against us for amounts in excess of the amount accrued. With respect to some Superfund sites, we have been named a potentially responsible party by a regulatory agency; however, in each of those cases, we do not believe we have any material liability. We also could be subject to third-party claims with respect to environmental matters for which we have been named as a potentially responsible party. |
Guarantee arrangements |
In the normal course of business, we have agreements with financial institutions under which approximately $2 billion of letters of credit, bank guarantees, or surety bonds were outstanding as of March 31, 2015. Some of the outstanding letters of credit have triggering events that would entitle a bank to require cash collateralization. |