Commitments and Contingencies | Commitments and Contingencies Eastern Ohio Incident Summary On February 3, 2023, a train operated by us derailed in East Palestine, Ohio. The derailed equipment included 38 railcars, 11 of which were non-Company-owned tank cars containing hazardous materials. Fires associated with the derailment threatened certain of the tank cars. There was concern about the risk that the contents of five of the tank cars carrying vinyl chloride might polymerize, which would have posed the risk of a catastrophic explosion. As a consequence, on February 6, 2023, the local incident commander (the East Palestine Fire Chief)—in consultation with the incident command that included, among others, federal, state and local officials and Norfolk Southern—opted to conduct a controlled vent and burn of five derailed tank cars, all of which contained vinyl chloride. This procedure involved creating holes in the five tank cars to drain the vinyl chloride into adjacent trenches that had been dug into the ground where such vinyl chloride was then burned, with any material remaining after burning of the vinyl chloride being remediated. The February 3rd derailment, the associated fire, and the resulting vent and burn of the tank cars containing vinyl chloride on February 6th is hereinafter referred to as the “Incident.” In response to the Incident, we have been working to clean the site safely and thoroughly, including those activities described in the Environmental Matters section below with respect to potentially impacted air, soil and water and to monitor for any impact on public health and the environment. We are working with federal, state, and local officials to mitigate impacts from the Incident, including, among other efforts, conducting environmental monitoring and clean-up activities (as more fully described below), operating a family assistance center to provide financial support to affected members of the East Palestine and surrounding communities, and committing additional financial support to the community . Financial Impact Although we cannot predict the final outcome or estimate the reasonably possible range of loss with certainty, we recognized $1.1 billion of expense in 2023 for costs directly attributable to the Incident (including amounts accrued for the probable and reasonably estimable liabilities for those environmental and non-environmental matters described below) which is presented in “ Eastern Ohio incident Certain costs recorded in 2023 may be recoverable under our insurance policies in effect at the date of the Incident or from third parties. To date, we have recognized $101 million in insurance recoveries. Any additional amounts recoverable under our insurance policies or from third parties will be reflected in future periods in which recovery is considered probable. For additional information about our insurance coverage, see “Insurance” below. Environmental Matters – In response to the Incident, we have been working with federal, state, and local officials such as the U.S. Environmental Protection Agency (EPA), the Ohio EPA, the Pennsylvania Department of Environmental Protection (DEP), and the Columbiana County Health District to conduct environmental response and remediation activities, including but not limited to, air monitoring, indoor air quality screenings, municipal water and private water well testing, residential, commercial, and agricultural soil sampling, surface water and groundwater sampling, re-routing a local waterway around the affected site, capturing and shipping stormwater that enters the impacted derailment site to proper disposal facilities, and excavating and disposing of potentially affected soil at hazardous waste landfills or incinerators. The U.S. EPA issued a Unilateral Administrative Order (UAO) on February 21, 2023 containing various requirements, including the submission of numerous work plans to assess and remediate various environmental media and performance of certain removal actions at the affected site. On February 24, 2023, we submitted to the U.S. EPA our Notice of Intent to Comply with the UAO and are currently cooperating with U.S. EPA as well as the Ohio EPA and Pennsylvania DEP, pursuant to the UAO and the directives issued thereunder. On October 18, 2023, the U.S. EPA issued a second unilateral order under Section 311(c) of the Clean Water Act (CWA), requiring preparation of additional environmental work plans. We timely submitted our Notice of Intent to Comply with the CWA order and continue to cooperate with the U.S. EPA, as well as state agencies, in compliance with the CWA order. We are also subject to the following legal proceedings that principally relate to the environmental impact of the Incident: • The DOJ and the U.S. EPA filed a civil complaint (the DOJ Complaint) in the Northern District of Ohio (Eastern Division) seeking injunctive relief, cost recovery and civil penalties for violations of the Clean Water Act and seeking cost recovery under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Ohio Attorney General (AG) also filed a CERCLA lawsuit (the Ohio Complaint) in the Northern District of Ohio (Eastern Division) seeking statutory damages for a variety of tort and environmental claims under CERCLA and various state laws. The DOJ and Ohio AG cases have been consolidated for discovery purposes. We have filed an answer, and on June 30, 2023, we filed a third-party complaint bringing in numerous parties involved in the Incident. In connection with the foregoing items, we recognized $836 million of expense during 2023, of which $517 million was paid during 2023, related to probable obligations that are reasonably estimable, in accordance with FASB ASC 410-30, “ Environmental Obligations. ” Our current estimate includes ongoing and future environmental cleanup activities and remediation efforts, governmental oversight costs (including those incurred by the U.S. EPA and the Ohio EPA), and other related costs, including those in connection with the DOJ Complaint (including potential civil penalties related to violations of the Clean Water Act). Our current estimates of future environmental cleanup and remediation liabilities related to the Incident may change over time due to various factors, including but not limited to, the nature and extent of required future cleanup and removal activities (including those resulting from soil, water, sediment, and air assessment and investigative activities that are currently being, and will continue to be, conducted at the site), and the extent and duration of governmental oversight, amongst other factors. As clean-up efforts progress and more information is available, we will review these estimates and revise as appropriate. Legal Proceedings and Claims (Non-Environmental) – To date, numerous non-environmental legal actions have commenced with respect to the Incident, including those more specifically set forth below. • There is a consolidated putative class action pending in the Northern District of Ohio (Eastern Division) in which plaintiffs allege various claims, including negligence, gross negligence, strict liability, and nuisance, and seeking as relief compensatory and punitive damages, medical monitoring and business losses. The putative class is defined by reference to a class area covering a 30-mile radius. On July 12, 2023, we filed a third-party complaint bringing in multiple parties involved in the Incident. The court in the putative class action has established a fact discovery deadline of February 5, 2024. Another putative class action is pending in the Western District of Pennsylvania, brought by Pennsylvania school districts and students. On August 22, 2023, three school districts voluntarily dismissed their actions, then individual lawsuits. On the same day, six Pennsylvania school districts and students filed a putative class action lawsuit alleging negligence, strict liability, nuisance, and trespass, and seeking damages and health monitoring. On December 8, 2023, the school districts amended their complaint to add additional companies as defendants in the action. The putative class action and individual lawsuits are collectively referred to herein as the Incident Lawsuits. In accordance with FASB ASC 450, “ Contingencies ,” we have recognized a $116 million loss during 2023 with respect to the Incident Lawsuits and related contingencies, of which $34 million has been paid. At this time, we are unable to estimate the possible loss or range of loss in excess of the amounts accrued regarding the Incident Lawsuits. However, for the reasons set forth below, our estimated loss or range of loss with respect to the Incident Lawsuits may change from time to time, and it is reasonably possible that we will incur actual losses in excess of the amounts currently accrued and such additional amounts may be material. While we continue to work with parties with respect to potential resolution pathways, no assurance can be given that we will be successful in doing so and we cannot predict the outcome of these matters. • We have received securities and derivative litigation and multiple shareholder document and litigation demand letters, including a securities class action lawsuit under the Securities Exchange Act of 1934 initially filed in the Southern District of Ohio alleging multiple securities law violations but since transferred to the Northern District of Georgia, a securities class action lawsuit under the Securities Act of 1933 filed in the Southern District of New York alleging misstatements in association with our debt offerings, and a shareholder derivative complaint in Virginia state court asserting claims for breach of fiduciary duties, waste of corporate assets, and unjust enrichment in connection with safety of the Company's operations (collectively, the Shareholder Matters). On February 2, 2024, defendants filed a motion to dismiss the amended complaint in the Securities Act lawsuit. No responsive pleadings have been filed yet with respect to the other Shareholder Matters. With respect to the Incident-related litigation and regulatory matters, we record a liability for loss contingencies through a charge to earnings when we conclude that it is probable that a liability has been incurred and the amount of the liability can be reasonably estimated, and disclose such liability if we conclude it to be material. Any adjustments to the recorded liability will be reflected in earnings in the periods in which such adjustments become known. Because the final outcome of any of these legal proceedings cannot be predicted with certainty, developments related to the progress of such legal proceedings or other unfavorable or unexpected developments or outcomes could result in additional costs or new or additionally accrued amounts that could be material to our results of operations in a particular year or quarter. In addition, if it is reasonably possible that we will incur Incident-related losses in excess of the amounts currently recorded as a loss contingency, we disclose the potential range of loss, if reasonably estimable, or we disclose that we cannot reasonably estimate such an amount at this time. For Incident-related litigation and regulatory matters where a loss may be reasonably possible, but not probable, or probable but not reasonably estimable, no accrual is established but the matter, if potentially material, is disclosed. Our estimates of probable losses and reasonably possible losses are based upon currently available information and involve significant judgement and a variety of assumptions, given that (1) these legal and regulatory proceedings are in early stages; (2) discovery may not be completed; (3) damages sought in these legal and regulatory proceedings can be unsubstantiated or indeterminate; (4) there are often significant facts in dispute; and/or (5) there is a wide range of possible outcomes. Accordingly, our estimated range of loss with respect to these matters may change from time to time, and actual losses may exceed current estimates. At this time, we are unable to estimate the possible loss or range of loss in excess of the amounts accrued with respect to the matters described above. In addition to the costs associated with environmental matters and legal proceedings and claims, we incurred $265 million in other expenses directly related to the Incident in 2023 pertaining to legal fees, community support, and other response-related activities. The amounts recorded by us in 2023 do not include any estimate of loss for the following additional items, for which we believe a loss is either not probable or not reasonably estimable for the reasons noted: (i) the overall cost to us for the healthcare fund being developed in conjunction with relevant stakeholders, including the Ohio AG, for affected residents (given the preliminary nature of such discussions), which amount will impact our loss contingency analysis with respect to the Incident Lawsuits described above, or (ii) any fines or penalties (in excess of the liabilities established for Clean Water Act-related civil penalties) that may be imposed as a result of the Incident Inquiries and Investigations, as more specifically set forth and defined below (the outcome of which are uncertain at this time). Additionally, with the exception of amounts recognized during 2023, potential recoveries under our insurance coverage, which may apply to various Incident-related expenses or liabilities as more specifically set forth further below, have not yet been recorded (given the preliminary nature of discussions with our insurers). No amounts have been recorded related to potential recoveries from other third parties, which may reduce amounts payable by our insurers under our applicable insurance coverage. Inquiries and Investigations As set forth above, we are subject to inquiries and investigations by numerous federal, state, and local government authorities and regulatory agencies regarding the Incident, including but not limited to, the DOJ and the U.S. EPA, the Ohio EPA, the NTSB, the FRA, the Occupational Safety and Health Administration, the Ohio AG, and the Pennsylvania AG. Further details regarding the NTSB and FRA investigations are set forth below. We are cooperating with all inquiries and investigations, including responding to civil and criminal subpoenas and other requests for information (the aforementioned inquiries and investigations, as well as the civil and criminal subpoenas are collectively referred to herein as the Incident Inquiries and Investigations). Aside from the FRA Safety Assessment (defined and described below), the outcome of any current or future Incident Inquiries and Investigations is uncertain at this time, including any related fines, penalties or settlements. Therefore, our expenses for 2023 do not include estimates of the total amount that we may incur for any such fines, penalties or settlements. Subsequent to the Incident, investigators from the NTSB examined railroad equipment and track conditions; reviewed data from the signal system, wayside defect detectors, local surveillance cameras, and the lead locomotive’s event recorder and forward-facing and inward-facing image recorders; and completed certain interviews (the NTSB Investigation). The NTSB issued a preliminary report indicating that one of the cars involved in the derailment appeared to have a wheel bearing in the final stage of overheat failure moments before the derailment. Their preliminary report also indicates that the rail crew was operating the train within our rules; the rail crew operated the train below the track speed limit, the wayside heat detectors were operating as designed; and once the rail crew was alerted by the wayside detector, they immediately began to stop the train. The NTSB conducted a subsequent investigative field hearing in East Palestine, Ohio on June 22 and 23, 2023. The NTSB’s investigation remains ongoing. We expect the NTSB to issue a final report, with a probable cause determination and safety recommendations, in 2024. Concurrent with the NTSB Investigation, the FRA is also investigating the Incident. Similar in scope to the NTSB Investigation, the FRA is examining railroad equipment, track conditions, hazardous materials train placement and routing, and emergency response (the FRA Incident Investigation). The FRA Incident Investigation may result in the assessment of civil penalties. In addition to the FRA Incident Investigation, the FRA completed a 60-day supplemental safety assessment (the FRA Safety Assessment). The FRA Safety Assessment included a review of findings from a previously completed 2022 system audit and an assessment of operational elements including, but not limited to: track, signal, and rolling stock maintenance, inspection and repair practices; protection of employees; communications between transportation departments and mechanical and engineering staff; operation control center procedures and dispatcher training. The overall scope of the FRA Safety Assessment was to examine our safety culture. The FRA issued a public report in early August and included its findings and recommended corrective actions. The FRA Incident Investigation remains ongoing. Other Commitments and Contingencies Lawsuits We and/or certain subsidiaries are defendants in numerous lawsuits and other claims relating principally to railroad operations. When we conclude that it is probable that a liability has been incurred and the amount of the liability can be reasonably estimated, it is accrued through a charge to earnings and, if material, disclosed below. While the ultimate amount of liability incurred in any of these lawsuits and claims is dependent on future developments, in our opinion, the recorded liability is adequate to cover the future payment of such liability and claims. However, the final outcome of any of these lawsuits and claims cannot be predicted with certainty, and unfavorable or unexpected outcomes could result in additional accruals that could be significant to results of operations in a particular year or quarter. Any adjustments to the recorded liability will be reflected in earnings in the periods in which such adjustments become known. For lawsuits and other claims where a loss may be reasonably possible, but not probable, or is probable but not reasonably estimable, no accrual is established but the matter, if potentially material, is disclosed below. We routinely review relevant information with respect to our lawsuits and other claims and update our accruals, disclosures and estimates of reasonably possible loss based on such reviews. In 2007, various antitrust class actions filed against us and other Class I railroads in various Federal district courts regarding fuel surcharges were consolidated in the District of Columbia by the Judicial Panel on Multidistrict Litigation. In 2012, the court certified the case as a class action. The defendant railroads appealed this certification, and the Court of Appeals for the District of Columbia vacated the District Court’s decision and remanded the case for further consideration. On October 10, 2017, the District Court denied class certification. The decision was upheld by the Court of Appeals on August 16, 2019. Since that decision, various individual cases have been filed in multiple jurisdictions and also consolidated in the District of Columbia. We intend to vigorously defend the cases. We do not believe the outcome of these proceedings will have a material effect on our financial position, results of operations, or liquidity. In 2018, a lawsuit was filed against one of our subsidiaries by the minority owner in a jointly-owned terminal railroad company in which our subsidiary has the majority ownership. The lawsuit alleged violations of various state laws and federal antitrust laws. On January 3, 2023, the court granted summary judgment to us on all of the compensatory claims but denied summary judgment for all equitable relief claims. On January 18, 2023, the court dismissed the federal equitable relief claims, leaving the state equitable relief claims as the sole remaining issue under consideration. On April 19, 2023, the court disposed of all remaining state equitable relief claims. The court's dismissals were appealed and the case is currently before the United States Court of Appeals for the Fourth Circuit. We will continue to vigorously defend the lawsuit and, although it is reasonably possible we could incur a loss in the case, we believe that we will prevail. However, given that litigation is inherently unpredictable and subject to uncertainties, there can be no assurances that the final outcome of the litigation (including the related appeal) will not be material. Until such appeal is final, we cannot reasonably estimate the potential loss or range of loss associated with this matter. Casualty Claims Casualty claims include employee personal injury and occupational claims as well as third-party claims, all exclusive of legal costs. To aid in valuing our personal injury liability and determining the amount to accrue with respect to such claims during the year, we utilize studies prepared by an independent consulting actuarial firm. Job-related personal injury and occupational claims are subject to the FELA, which is applicable only to railroads. The variability inherent in FELA’s fault-based tort system could result in actual costs being different from the liability recorded. While the ultimate amount of claims incurred is dependent on future developments, in our opinion, the recorded liability is adequate to cover the future payments of claims and is supported by the most recent actuarial study. In all cases, we record a liability when the expected loss for the claim is both probable and reasonably estimable. Employee personal injury claims – Other than Incident-related matters noted above, the largest component of claims expense is employee personal injury costs. The independent actuarial firm we engage provides quarterly studies to aid in valuing our employee personal injury liability and estimating personal injury expense. The actuarial firm studies our historical patterns of reserving for claims and subsequent settlements, taking into account relevant outside influences. The actuarial firm uses the results of these analyses to estimate the ultimate amount of liability. We adjust the liability quarterly based upon our assessment and the results of the study. The accuracy of our estimate of the liability is subject to inherent limitation given the difficulty of predicting future events such as jury decisions, court interpretations, or legislative changes. As a result, actual claim settlements may vary from the estimated liability recorded. Occupational claims – Occupational claims include injuries and illnesses alleged to be caused by exposures which occur over time as opposed to injuries or illnesses caused by a specific accident or event. Types of occupational claims commonly seen allege exposure to asbestos and other claimed toxic substances resulting in respiratory diseases or cancer. Many such claims are being asserted by former or retired employees, some of whom have not been employed in the rail industry for decades. The independent actuarial firm provides an estimate of the occupational claims liability based upon our history of claim filings, severity, payments, and other pertinent facts. The liability is dependent upon judgments we make as to the specific case reserves as well as judgments of the actuarial firm in the quarterly studies. Our estimate of ultimate loss includes a provision for those claims that have been incurred but not reported. This provision is derived by analyzing industry data and projecting our experience. We adjust the liability quarterly based upon our assessment and the results of the study. However, it is possible that the recorded liability may not be adequate to cover the future payment of claims. Adjustments to the recorded liability are reflected in operating expenses in the periods in which such adjustments become known. Third-party claims – We record a liability for third-party claims including those for highway crossing accidents, trespasser and other injuries, property damage, and lading damage. The actuarial firm assists us with the calculation of potential liability for third-party claims, except lading damage, based upon our experience including the number and timing of incidents, amount of payments, settlement rates, number of open claims, and legal defenses. We adjust the liability quarterly based upon our assessment and the results of the study. Given the inherent uncertainty in regard to the ultimate outcome of third-party claims, it is possible that the actual loss may differ from the estimated liability recorded. Environmental Matters We are subject to various jurisdictions’ environmental laws and regulations. We record a liability where such liability or loss is probable and reasonably estimable. Environmental specialists regularly participate in ongoing evaluations of all known sites and in determining any necessary adjustments to liability estimates. In addition to environmental claims associated with the Incident, our Consolidated Balance Sheets include liabilities for other environmental exposures of $60 million at December 31, 2023, and $66 million at December 31, 2022, of which $15 million is classified as a current liability at the end of both periods. At December 31, 2023, the liability represents our estimates of the probable cleanup, investigation, and remediation costs based on available information at 81 known locations and projects compared with 85 locations and projects at December 31, 2022. At December 31, 2023, twenty-one sites accounted for $48 million of the liability, and no individual site was considered to be material. We anticipate that most of this liability will be paid out over five years; however, some costs will be paid out over a longer period. At eight locations, one or more of our subsidiaries in conjunction with a number of other parties have been identified as potentially responsible parties under CERCLA or comparable state statutes that impose joint and several liability for cleanup costs. We calculate our estimated liability for these sites based on facts and legal defenses applicable to each site and not solely on the basis of the potential for joint liability. As set forth above, with respect to known environmental sites (whether identified by us or by the U.S. EPA or comparable state authorities), estimates of our ultimate potential financial exposure for a given site or in the aggregate for all such sites can change over time because of the widely varying costs of currently available cleanup techniques, unpredictable contaminant recovery and reduction rates associated with available cleanup technologies, the likely development of new cleanup technologies, the difficulty of determining in advance the nature and full extent of contamination and each potential participant’s share of any estimated loss (and that participant’s ability to bear it), and evolving statutory and regulatory standards governing liability. The risk of incurring environmental liability for acts and omissions, past, present, and future, is inherent in the railroad business. Some of the commodities we transport, particularly those classified as hazardous materials, pose special risks that we work diligently to reduce. In addition, several of our subsidiaries own, or have owned, land used as operating property, or which is leased and operated by others, or held for sale. Because environmental problems that are latent or undisclosed may exist on these properties, there can be no assurance that we will not incur environmental liabilities or costs with respect to one or more of them, the amount and materiality of which cannot be estimated reliably at this time. Moreover, lawsuits and claims involving these and potentially other unidentified environmental sites and matters are likely to arise from time to time. The resulting liabilities could have a significant effect on financial position, results of operations, or liquidity in a particular year or quarter. Based on our assessment of the facts and circumstances now known, we believe we have recorded the probable and reasonably estimable costs for dealing with those environmental matters of which we are aware. Further, we believe that it is unlikely that any known matters, either individually or in the aggregate, will have a material adverse effect on our financial position, results of operations, or liquidity. Labor Agreements Approximately 80% of our railroad employees are covered by collective bargaining agreements with various labor unions. Pursuant to the Railway Labor Act, these agreements remain in effect until new agreements are reached, or until the bargaining procedures mandated by the Railway Labor Act are completed. Moratorium provisions in the labor agreements govern when the railroads and unions may propose changes to the agreements. We largely bargain nationally in concert with other major railroads, represented by the National Carriers’ Conference Committee. The latest round of national bargaining concluded in December 2022, when agreements were either ratified or enacted through legislative action for all twelve of our unions. With the conclusion of national bargaining, neither party can compel mandatory bargaining around any new proposals until November 1, 2024. In addition, we understand the imperative to continue improving quality of life for our craft employees and remain actively engaged with our unions in voluntary local discussions (none of which carry the risk of a work stoppage) on this important issue. Insurance We purchase insurance covering legal liabilities for bodily injury and property damage to third parties. Our current liability insurance provides limits for approximately 93% of covered losses above $75 million and below $734 million per occurrence and/or policy year. In addition, we purchase insurance for damage to property owned by us or in our care, custody, or control. Our current property insurance provides limits for approximately 82% of covered losses above $75 million and below $275 million per occurrence and/or policy year. Insurance coverage with respect to the Incident is subject to certain conditions, including but not limited to our insurers’ reservation of rights to further investigate and contest coverage, the express restrictions and sub-limits of coverage, and various policy exclusions, including those for some governmental fines or penalties. Some (re)insurers have disputed certain payments we have made, for example, as part of our effort to respond to, mitigate, and compensate for the impact to the community and affected residents and businesses. We are pursuing coverage with respect to the Incident, and we have recognized $101 million in insurance recoveries in 2023, principally from excess liability (re)insurers. Purchase Commitments At December 31, 2023, we had outstanding purchase commitments totaling $1.4 billion through 2053 for locomotive modernizations, long-term technology support and development contracts, track material, and vehicles. Asset Purchase and Sale Agreement In November 2022, we entered into an asset purchase and sale agreement with the Board of Trustees of the Cincinnati Southern Railway to purchase approximately 337 miles of railway line that extends from Cincinnati, Ohio to Chattanooga, Tennessee which we currently operate under a lease agreement. The agreement is conditioned upon the following, among other items: (i) approval by the voters of the City of Cincinnati (Cincinnati Voter Approval), which was obtained in November 2023, and (ii) the receipt of regulatory approval from the U.S. Surface Transportation Board (STB), which occurred in September 2023. In June 2023, we entered into an amended and restated asset purchase and sale agreement which increased the purchase price by $500,000 and clarified the impact of Cincinnati Voter Approval on the closing timeline. Following the June 2023 amendment, the total purchase price for the line and other associated real and personal property included in the transaction is expected to be approximately $1.7 billion. The transaction is scheduled to close on March 15, 2024. Change-In-Control Arrangements We have compensation agreements with certain officers and key employees that become operative only upon a change in control of Norfolk Southern, as defined in those agreements. The agreements provide gener |