ORGANIZATION AND DESCRIPTION OF BUSINESS | 1. ORGANIZATION AND DESCRIPTION OF BUSINESS China Recycling Energy Corporation (the “Company” or “CREG”) was incorporated on May 8, 1980 as Boulder Brewing Company under the laws of the State of Colorado. On September 6, 2001, the Company changed its state of incorporation to the State of Nevada. In 2004, the Company changed its name from Boulder Brewing Company to China Digital Wireless, Inc. and on March 8, 2007, again changed its name from China Digital Wireless, Inc. to its current name, China Recycling Energy Corporation. The Company, through its subsidiaries, provides energy saving solutions and services, including selling and leasing energy saving systems and equipment to customers, project investment, investment management, economic information consulting, technical services, financial leasing, purchase of financial leasing assets, disposal and repair of financial leasing assets, consulting and ensuring of financial leasing transactions in the Peoples Republic of China (“PRC”). Erdos TCH – Joint Venture On April 14, 2009, the Company formed a joint venture (the “JV”) with Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos’ metal refining plants to generate power and steam to be sold back to Erdos. The name of the JV was Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd. with a term of 20 years. Total investment for the project was estimated at $79 million (RMB 500 million) with an initial investment of $17.55 million (RMB 120 million). Erdos contributed 7% of the total investment of the project, and Xi’an TCH Energy Technology Co., Ltd. (“Xi’an TCH”) contributed 93%. According to the parties’ agreement on profit distribution, Xi’an TCH and Erdos will receive 80% and 20%, respectively, of the profit from the JV until Xi’an TCH receives the complete return of its investment. Xi’an TCH and Erdos will then receive 60% and 40%, respectively, of the profit from the JV. On June 15, 2013, Xi’an TCH and Erdos entered into a share transfer agreement, pursuant to which Erdos transferred and sold its 7% ownership interest in the JV to Xi’an TCH for $1.29 million (RMB 8 million), plus certain accumulated profits as described below. Xi’an TCH paid the $1.29 million in July 2013 and, as a result, became the sole stockholder of the JV. In addition, Xi’an TCH paid Erdos accumulated profits from inception up to June 30, 2013 in accordance with a supplementary agreement entered on August 6, 2013. In August 2013, Xi’an TCH paid 20% of the accumulated profit (calculated under PRC GAAP) of $226,000 to Erdos. The JV currently has two power generation systems in Phase I with a total of 18MW power capacity, and three power generation systems in Phase II with a total of 27MW power capacity. On April 28, 2016, Erdos TCH and Erdos entered a supplemental agreement, effective on May 1, 2016, Erdos TCH cancelled monthly minimum lease payments from Erdos, and charges Erdos based on actual electricity sold at RMB 0.30 / Kwh. The selling price of each Kwh will be determined annually based on market condition. The Company evaluated the modified terms for payments based on actual electricity sold as minimum lease payments as defined in ASC 840-10-25-4, since lease payments that depend on a factor directly related to the future use of the leased property are contingent rentals and, accordingly, are excluded from minimum lease payments in their entirety. The Company wrote off the net investment receivables of these leases at the lease modification date. Pucheng Biomass Power Generation Projects On June 29, 2010, Xi’an TCH entered into a Biomass Power Generation (“BMPG”) Project Lease Agreement with PuchengXinHeng Yuan Biomass Power Generation Co., Ltd. (“Pucheng”), a limited liability company incorporated in China. Under this lease agreement, Xi’an TCH leased a set of 12MW BMPG systems to Pucheng at a minimum of $279,400 (RMB 1,900,000) per month for a term of 15 years. On September 11, 2013, Xi’an TCH entered into a BMPG Asset Transfer Agreement (the “Pucheng Transfer Agreement”) with Pucheng. The Pucheng Transfer Agreement provided for the sale by Pucheng to Xi’an TCH of a set of 12MW BMPG systems with completion of system transformation for a purchase price of RMB 100 million ($16.48 million) in the form of 8,766,547 shares of common stock of the Company at the price of $1.87 per share. These shares were issued to Pucheng on October 29, 2013. Also on September 11, 2013, Xi’an TCH entered into a BMPG Project Lease Agreement with Pucheng (the “Pucheng Lease”). Under the Pucheng Lease, Xi’an TCH leases this same set of 12MW BMPG system to Pucheng, and combined this lease with the lease for the 12MW BMPG station of Pucheng Phase I project, under a single lease to Pucheng for RMB 3.8 million ($0.63 million) per month (the “Pucheng Phase II Project”). The term for the combined lease is from September 2013 to June 2025. The lease agreement for the 12MW station from Pucheng Phase I project terminated upon the effective date of the Pucheng Lease. The ownership of two 12 MW BMPG systems will be transferred to Pucheng at no additional charge when the Pucheng Lease expires. Shenqiu Yuneng Biomass Power Generation Projects On May 25, 2011, Xi’an TCH entered into a Letter of Intent with ShenqiuYuNeng Thermal Power Co., Ltd. (“Shenqiu”) to reconstruct and transform a Thermal Power Generation System owned by Shenqiu into a 75T/H BMPG System for $3.57 million (RMB 22.5 million). The project commenced in June 2011 and was completed in the third quarter of 2011. On September 28, 2011, Xi’an TCH entered into a BMPG Asset Transfer Agreement with Shenqiu (the “Shenqiu Transfer Agreement”). Pursuant to the Shenqiu Transfer Agreement, Shenqiu sold Xi’an TCH a set of 12 MW BMPG systems (after Xi’an TCH converted the system for BMPG purposes). As consideration for the BMPG systems, Xi’an TCH agreed to pay Shenqiu $10,937,500 (RMB 70 million) in cash in three installments within six months upon the transfer of ownership of the systems. By the end of 2012, all of the consideration was paid. On September 28, 2011, Xi’an TCH and Shenqiu also entered into a BMPG Project Lease Agreement (the “2011 Shenqiu Lease”). Under the 2011 Shenqiu Lease, Xi’an TCH agreed to lease a set of 12MW BMPG systems to Shenqiu at a monthly rental rate of $286,000 (RMB 1,800,000) for 11 years. Upon expiration of the 2011 Shenqiu Lease, ownership of this system will be transferred from Xi’an TCH to Shenqiu at no additional cost. In connection with the 2011 Shenqiu Lease, Shenqiu paid one month’s rent as a security deposit to Xi’an TCH, in addition to providing personal guarantees. On October 8, 2012, Xi’an TCH entered into a Letter of Intent for technical reformation of Shenqiu Project Phase II with Shenqiu for technical reformation to enlarge the capacity of the Shenqiu Project Phase I (the “Shenqiu Phase II Project”). The technical reformation involved the construction of another 12MW BMPG system. After the reformation, the generation capacity of the power plant increased to 24MW. The project commenced on October 25, 2012 and was completed during the first quarter of 2013. The total cost of the project was $11.1 million (RMB 68 million). On March 30, 2013, Xi’an TCH and Shenqiu entered into a BMPG Project Lease Agreement (the “2013 Shenqiu Lease”). Under the 2013 Shenqiu Lease, Xi’an TCH agreed to lease the second set of 12MW BMPG systems to Shenqiu for $239,000 (RMB 1.5 million) per month for 9.5 years. When the 2013 Shenqiu Lease expires, ownership of this system will be transferred from Xi’an TCH to Shenqiu at no additional cost. Shanxi Datong Coal Group Power Generation Projects In February 2011, Xi’an TCH entered into an agreement with Shanxi Datong Coal Group Steel Co., Ltd. (“Shanxi Datong”) to recycle gas and steam from groups of blast-furnaces and converters at Shanxi Datong’s metal refining plants to generate power and pursuant to which Xi’an TCH agreed to install two 3MW Blast Furnace Power Recovery Turbine (the “BPRT”) systems and, one 15MW Waste Gas Power Generation (“WGPG”) system with a total of 21MW power capacity for an estimated total investment of $28.6 million (RMB 180 million). In June 2013, the two 3MW BPRT power generation systems were completed. The lease term is 30 years, during which time Shanxi Datong will pay a service fee to Xi’an TCH. The service fee was based on an average of 8,000 electricity-generating hours per year and $0.05 (RMB 0.33) per kilowatt hour (“kWh”) for the first five years from the completion of each power generation station. For each of the leases, at the 6th, 11th and 21st year anniversary of the date of the lease, the rates will change to RMB 0.3 kWh, 0.27 kWh and 0.25 kWh, respectively. In May 2012, Shanxi Datong and Tianjin Construction Materials Group (Holding) Co., Ltd. were restructured and renamed as Datong Coal Mine Tianjian Iron & Steel Co., Ltd. (“Datong”). On June 10, 2013, Xi’an TCH and Shanxi Datong entered into a supplemental agreement relating to the minimum service fee. The minimum service fee per month for the first five years was $0.19 million (RMB 1.2 million), $0.18 million (RMB 1.1 million) for the second five years, $0.16 million (RMB 1.0 million) for the following 10 years and $0.15 million (RMB 0.9 million) for the last 10 years. After 30 years, the units will be transferred to Datong at no additional charge. On May 26, 2015, the 15MW WGPG system was completed. Due to the change of its strategic plan, Datong notified Xi’an TCH that it would not be able to fulfill its obligations under the Cooperative Agreement and requested to repurchase the two 3MW BPRT systems and one 15MW WGPG system (the “Systems”) from Xi’an TCH and terminate the Cooperative Agreement. On May 29, 2015, Xi’an TCH entered into a Repurchase Agreement for the Recycling Economy Project with Datong. Under the Repurchase Agreement, Datong agreed to repurchase the Systems from Xi’an TCH and pay outstanding energy saving service fees of RMB 1.2 million ($193,548) to Xi’an TCH within five business days from the execution of the Repurchase Agreement. The Systems were transferred to Datong for a total price of RMB 250 million ($40.32 million) with RMB 100 million for two BPRT systems and RMB 150 million for one WGPG system. As of June 30, 2015, Xi’an TCH received payment in full and the systems were transferred. The outstanding balance of net investment receivable at the date of transfer was $13.37 million. The Company recorded a $2.98 million gain from two BPRT systems as non-operating income and a $3.02 million gain from the WGPG system as gross profit from the sale. Jitie Power Generation Projects In May 2013, Xi’an TCH signed a contract with Sinosteel Jilin Ferroalloys Co., Ltd. (“Jitie”) to build furnace gas WHPG systems for electricity generation from recycled heat and steam from groups of ferroalloy furnaces and electric furnaces (the “Jitie Project”). According to the contract, Xi’an TCH installed a 7.5 MW and a 3 MW turbine power generation system with a total of 10.5 MW power capacity for an estimated total investment of $9.71 million (RMB 60 million). The lease term is 24 years. During the term of this lease, Jitie will pay a service fee to Xi’an TCH based on the actual generating capacity with a minimum service fee per month of $300,000 (RMB 1.8 million). Xi’an TCH is responsible for the systems operation and will own the power generation systems. In December 2013, the Jitie Project was completed and began operations. On June 18, 2015, Xi’an TCH entered into a WHPG system Repurchase Agreement with Jitie. Under the Repurchase Agreement, Jitie repurchased the Jitie Project from Xi’an TCH and paid outstanding energy saving service fees of RMB 1.8 million ($294,599) to Xi’an TCH within five business days from the execution of the Repurchase Agreement on June 18, 2015. The Jitie Project was transferred to Jitie for a total price of RMB 90 million ($14.73 million). In July 2015, Xi’an TCH received payment in full and the systems were transferred. The outstanding balance of net investment receivable on the date of the transfer was $13.10 million. The Company recorded a $1.62 million gain from this transaction. Yida Coke Oven Gas Power Generation Projects On June 28, 2014, Xi’an TCH entered into an Asset Transfer Agreement (the “Transfer Agreement”) with Qitaihe City Boli Yida Coal Selection Co., Ltd. (“Yida”), a limited liability company incorporated in China. The Transfer Agreement provided for the sale to Xi’an TCH of a 15 MW coke oven gas power generation station, which had been converted from a 15 MW coal gangue power generation station from Yida. As consideration for the Transfer Asset, Xi’an TCH was to pay to Yida RMB 115 million ($18.69 million) in the form of the common stock shares of the Company at the average closing price per share of the Stock for the 10 trading days prior to the closing date of the transaction ($2.27 per share). The exchange rate between the US Dollar and Chinese RMB in connection with the stock issuance is the rate equal to the middle rate published by the People’s Bank of China on the closing date of the assets transfer. Accordingly, the Company issued 8,233,779 shares (the “Shares”) for the Yida 15 MW coke oven gas power generation station, the fair value of 8,233,779 shares was $14.49 million based on the stock price at agreement date ($1.76 per share), and was the cost of the power generation station. On June 28, 2014, Xi’an TCH also entered into a Coke Oven Gas Power Generation Project Lease Agreement (the “Lease Agreement”) with Yida. Under the Lease Agreement, Xi’an TCH leased the Transfer Asset to Yida for RMB 3 million ($0.49 million) per month, and the term of the lease is from June 28, 2014 to June 27, 2029. Yida provided an RMB 3 million ($0.49 million) security deposit (without interest) for the lease. Xi’an TCH will transfer the Transfer Asset back to Yida at no cost at the end of the lease term. On June 22, 2016, Xi’an TCH entered into a Coal Oven Gas Power Generation Project Repurchase Agreement (the “Repurchase Agreement”) with Yida. Under the Repurchase Agreement, Xi’an TCH agreed to transfer to Yida all the project assets for consideration of RMB 112,000,000 ($16.89 million) (the “Transfer Price”) with Yida’s retention of ownership of the Shares. Yida agreed to make the following payments: (i) the outstanding monthly leasing fees for April and May 2016 in total of RMB 6,000,000 ($0.90 million) to Xi’an TCH within 5 business days from the execution of the Repurchase Agreement; (ii) a payment of RMB 50,000,000 ($7.54 million) of the Transfer Price to Xi’an TCH within 5 business days from the execution of the Repurchase Agreement; and (iii) a payment of the remaining RMB 62,000,000 ($9.35 million) of the Transfer Price to Xi’an TCH within 15 business days from the execution of the Repurchase Agreement. Under the Repurchase Agreement, ownership of the project assets will be transferred from Xi’an TCH to Yida within 3 business days after Xi’an TCH receives the full Transfer Price and the outstanding monthly leasing fees. As of June 30, 2016, Xi’an TCH had received the outstanding monthly leasing fees for April and May 2016 in the amount of $0.90 million and the first payment of the Transfer Price in the amount of $7.54 million. On July 11, 2016, the Company received the second payment of the Transfer Price in the amount of $9.35 million. The Company recorded a $0.42 million loss from this transaction. The Fund Management Company On June 25, 2013, Xi’an TCH and HongyuanHuifu Venture Capital Co. Ltd. (“HongyuanHuifu”) jointly established Hongyuan Recycling Energy Investment Management Beijing Co., Ltd. (the “Fund Management Company”) with registered capital of RMB 10 million. Xi’an TCH made an initial capital contribution of RMB 4 million ($650,000) and has a 40% ownership interest in the Fund Management Company. With respect to the Fund Management Company, voting rights and dividend rights are allocated 80% and 20% between HongyuanHuifu and Xi’an TCH, respectively. The Fund Management Company serves as the general partner of Beijing Hongyuan Recycling Energy Investment Center, LLP (the “HYREF Fund”), a limited liability partnership established on July 18, 2013 in Beijing. The Fund Management Company made an initial capital contribution of RMB 5 million ($830,000) to the HYREF Fund. An initial total amount of RMB 460 million ($75 million) has been fully subscribed by all partners for the HYREF Fund. The HYREF Fund has three limited partners: (1) China Orient Asset Management Co., Ltd., which made an initial capital contribution of RMB 280 million ($46.67 million) to the HYREF Fund and is a preferred limited partner; (2) HongyuanHuifu, which made an initial capital contribution of RMB 100 million ($16.67 million) to the HYREF Fund and is an ordinary limited partner; and (3) the Company’s wholly-owned subsidiary, Xi’an TCH, which made an initial capital contribution of RMB 75 million ($12.5 million) to the HYREF Fund and is a secondary limited partner. The term of the HYREF Fund’s partnership is six years from the date of its establishment, expiring on July 18, 2019. The current term is four years from the August 2016 date of contribution for the preferred limited partner, or four years from the date of contribution for the ordinary limited partner. The total size of the HYREF Fund is RMB 460 million ($76.66 million). The HYREF Fund was formed for the purpose of investing in Xi’an Zhonghong New Energy Technology Co., Ltd., a 90% owned subsidiary of Xi’an TCH, for the construction of two coke dry quenching (“CDQ”) WHPG stations with Jiangsu Tianyu Energy and Chemical Group Co., Ltd. (“Tianyu”) and one CDQ WHPG station with Boxing County Chengli Gas Supply Co., Ltd. (“Chengli”). Chengli Waste Heat Power Generation Projects On July 19, 2013, Xi’an TCH formed a new company “Xi’an Zhonghong New Energy Technology Co., Ltd.” (“Zhonghong”) with registered capital of RMB 30 million ($4.85 million). Xi’an TCH paid RMB 27 million ($4.37 million) and owns 90% of Zhonghong. Zhonghong is engaged to provide energy saving solution and services, including constructing, selling and leasing energy saving systems and equipment to customers. On July 24, 2013, Zhonghong entered into a Cooperative Agreement of CDQ and CDQ WHPG Project with Boxing County Chengli Gas Supply Co., Ltd. (“Chengli”). The parties entered into a supplement agreement on July 26, 2013. Pursuant to these agreements, Zhonghong will design, build and maintain a 25 MW CDQ system and a CDQ WHPG system to supply power to Chengli, and Chengli will pay energy saving fees (the “Chengli Project”). Chengli will contract the operation of the system to a third party contractor that is mutually agreed to by Zhonghong. In addition, Chengli will provide the land for the CDQ system and CDQ WHPG system at no cost to Zhonghong. The term of the Agreements is for 20 years. The first 800 million watt hours generated by the Chengli Project will be charged at RMB 0.42 ($0.068) per kilowatt hour (excluding tax); thereafter, the energy saving fee will be RMB 0.20 ($0.036) per kilowatt hour (excluding tax). The operating time shall be based upon an average 8,000 hours annually. If the operating time is less than 8,000 hours per year due to a reason attributable to Chengli, then time charged shall be 8,000 hours a year, and if it is less than 8,000 hours due to a reason attributable to Zhonghong, then it shall be charged at actual operating hours. The construction of the Chengli Project was completed in the second quarter of 2015 and the project is currently under commissioning tests were successfully completed in the first quarter of 2017. The Company expects the Chengli Project to be operational in the second quarter of 2017, provided that the required power generating license is granted. When operations begin, Chengli shall ensure its coking production line works properly and that working hours for the CDQ system are at least 8,000 hours per year, and Zhonghong shall ensure that working hours and the CDQ WHPG system will be at least 7,200 hours per year. On July 22, 2013, Zhonghong entered into an Engineering, Procurement and Construction (“EPC”) General Contractor Agreement for the Boxing County Chengli Gas Supply Co., Ltd. CDQ Power Generation Project (the “Huaxin Project”) with Xi’an Huaxin New Energy Co., Ltd. (“Huaxin”). Zhonghong, as the owner of the Huaxin Project, contracted EPC services for a CDQ system and a 25 MW CDQ WHPG system for Chengli to Huaxin. Huaxin shall provide construction, equipment procurement, transportation, installation and adjustment, test run, construction engineering management and other necessary services to complete the Huaxin Project and ensure the CDQ system and CDQ WHPG system for Chengli meet the inspection and acceptance requirements and work normally. The Huaxin Project is a turn-key project where Huaxin is responsible for monitoring the quality, safety, duration and cost of the project. The total contract price is RMB 200 million ($33.34 million), which includes all the materials, equipment, labor, transportation, electricity, water, waste disposal, machinery and safety costs. We anticipate that Huaxin Project will be operational in the second quarter of 2017. Tianyu Waste Heat Power Generation Project On July 19, 2013, Zhonghong entered into a Cooperative Agreement (the “Tianyu Agreement”) for Energy Management of CDQ and CDQ WHPG Project with Jiangsu Tianyu Energy and Chemical Group Co., Ltd. (“Tianyu”). Pursuant to the Tianyu Agreement, Zhonghong will design, build, operate and maintain two sets of 25 MW CDQ systems and CDQ WHPG systems for two subsidiaries of Tianyu – Xuzhou Tian’an Chemical Co., Ltd. (“Xuzhou Tian’an”) and Xuzhou Huayu Coking Co., Ltd (“Xuzhou Huayu”) – to be located at Xuzhou Tian’an and Xuzhou Huayu’s respective locations (the “Tianyu Project”). Upon completion of the Tianyu Project, Zhonghong will charge Tianyu an energy saving service fee of RMB 0.534 ($0.087) per kilowatt hour (excluding tax). The operating time will be based upon an average 8,000 hours annually for each of Xuzhou Tian’an and Xuzhou Huayu. If the operating time is less than 8,000 hours per year due to a reason attributable to Tianyu, then time charged will be 8,000 hours a year. The term of the Tianyu Agreement is 20 years. The construction of the Xuzhou Tian’an Project is anticipated to be completed by the third quarter of 2017. Xuzhou Tian’an will provide the land for the CDQ and CDQ WHPG systems for free. Xuzhou Tian’an also guarantees that it will purchase all of the power generated by the CDQ WHPG systems. The Xuzhou Huayu Project is currently on hold due to a conflict between Xuzhou Huayu Coking Co., Ltd and local residents on certain pollution-related issues. The local government has acted in its capacity to coordinate the resolution of this issue. The local residents were requested to move out from the hygienic buffer zone of the project location with compensatory payments from the government. Xuzhou Huayu was required to stop production and implement technical innovations of pollution discharge including sewage treatment, dust collection, noise control, and recycling of coal gas. Currently, some local residents have moved out. Xuzhou Huayu has completed the implementation of the technical innovations of sewage treatment, dust collection, and noice control, and expects to complete the recycling of coal gas by the end of June 2017. Once Huayu obtains government’s acceptance and approval of the technical innovations, the project will resume. On July 22, 2013, Zhonghong entered into an EPC General Contractor Agreement for the Tianyu Project with Xi’an Huaxin New Energy Co., Ltd. (“Huaxin”). Zhonghong, as the owner of the Tianyu Project, contracted EPC services for two CDQ systems and two 25 MW CDQ WHPG systems for Tianyu to Huaxin. Huaxin shall provide construction, equipment procurement, transportation, installation and adjustment, test run, construction engineering management and other necessary services to complete the Tianyu Project and ensure the CDQ and CDQ WHPG systems for Tianyu meet the inspection and acceptance requirements and work normally. The Tianyu Project is a turn-key project where Huaxin is responsible for monitoring the quality, safety, duration and cost of the project. The total contract price is RMB 400 million ($66.68 million), which includes all the materials, equipment, labor, transportation, electricity, water, waste disposal, machinery and safety costs. Zhongtai Waste Heat Power Generation Energy Management Cooperative Agreement On December 6, 2013, Xi’an entered into a CDQ and WHPG Energy Management Cooperative Agreement (the “Zhongtai Agreement”) with Xuzhou Zhongtai Energy Technology Co., Ltd. (“Zhongtai”), a limited liability company incorporated in Jiangsu Province, China. Pursuant to the Zhongtai Agreement, Xi’an TCH will design, build and maintain a 150 ton per hour CDQ system and a 25 MW CDQ WHPG system and sell the power to Zhongtai, and Xi’an TCH will also build a furnace to generate steam from the waste heat of the smoke pipeline and sell the steam to Zhongtai. The construction period of the Project is expected to be 18 months from the date when conditions are ready for construction to begin. Zhongtai will start to pay an energy saving service fee from the date when the WHPG station passes the required 72-hour test run. The payment term is 20 years. For the first 10 years, Zhongtai shall pay an energy saving service fee at RMB 0.534 ($0.089) per kilowatt hour (including value added tax) for the power generated from the system. For the second 10 years, Zhongtai shall pay an energy saving service fee at RMB 0.402 ($0.067) per kilowatt hour (including value added tax). During the term of the contract the energy saving service fee shall be adjusted at the same percentage as the change of local grid electricity price. Zhongtai shall also pay an energy saving service fee for the steam supplied by Xi’an TCH at RMB 100 ($16.67) per ton (including value added tax). Zhongtai and its parent company will provide guarantees to ensure Zhongtai will fulfill its obligations under the Agreement. Upon the completion of the term, Xi’an TCH will transfer the systems to Zhongtai at RMB 1 ($0.16). Zhongtai shall provide waste heat to the systems for no less than 8,000 hours per year and waste gas volume no less than 150,000 Nm3 per hour with a temperature no less than 950°C. If these requirements are not met, the term of the Agreement will be extended accordingly. If Zhongtai wants to terminate the Zhongtai Agreement early, it shall provide Xi’an TCH a 60 day notice and pay the termination fee and compensation for the damages to Xi’an TCH according to the following formula: (1) if it is less than five years into the term when Zhongtai requests termination, Zhongtai shall pay: Xi’an TCH’s total investment amount plus Xi’an TCH’s annual investment return times five years minus the years in which the system has already operated); or 2) if it is more than five years into the term when Zhongtai requests the termination, Zhongtai shall pay: Xi’an TCH’s total investment amount minus total amortization cost (the amortization period is 10 years). In March 2016, Xi’an TCH entered into a Transfer Agreement of CDQ and a CDQ WHPG system with Zhongtai and Xi’an Huaxin (the “Transfer Agreement”). Under the Transfer Agreement, Xi’an TCH agreed to transfer to Zhongtai all of the assets associated with the CDQ Waste Heat Power Generation Project (the “Project”), which is under construction pursuant to the Zhongtai Agreement. Xi’an Huaxin will continue to construct and complete the Project and Xi’an TCH agreed to transfer all its rights and obligation under the “EPC” Contract to Zhongtai. As consideration for the transfer of the Project, Zhongtai agreed to pay to Xi’an TCH an aggregate transfer price of RMB 167,360,000 ($25.77 million) including payments of: (i) RMB 152,360,000 ($23.46 million) for the construction of the Project; and (ii) RMB 15,000,000 ($2.31 million) as payment for partial loan interest accrued during the construction period. Those amounts have been, or will be, paid by Zhongtai to Xi’an TCH according to the following schedule: (a) RMB 50,000,000 ($7.70 million) was paid within 20 business days after the Transfer Agreement was signed; (b) RMB 30,000,000 ($4.32 million) will be paid within 20 business days after the Project is completed, but no later than July 30, 2016; and (c) RMB 87,360,000 ($13.45 million) will be paid no later than July 30, 2017. Xuzhou Taifa Special Steel Technology Co., Ltd. (“Xuzhou Taifa”) has guaranteed the payments from Zhongtai to Xi’an TCH. The ownership of the Project was conditionally transferred to Zhongtai following the initial payment of RMB 50,000,000 ($7.70 million) by Zhongtai to Xi’an TCH and the full ownership of the Project will be officially transferred to Zhongtai after it completes all payments pursuant to the Transfer Agreement. As of December 31, 2016, Xi’an TCH had received the first payment of $7.70 million and the second payment of $4.32 million. The Company recorded a $2.82 million loss from this transaction. Rongfeng CDQ Power Generation Energy Management Cooperative Agreement On December 12, 2013, Xi’an TCH entered into a CDQ Power Generation Energy Management Cooperative Agreement with Tangshan Rongfeng Iron & Steel Co., Ltd. (the “Rongfeng Agreement”), a limited liability company incorporated in Hebei Province, China. Pursuant to the Rongfeng Agreement, Xi’an TCH will design, build and maintain a CDQ and a CDQ WHPG system and sell the power to Rongfeng. The construction period of the Project is expected to be 18 months after the Agreement takes effect and from the date when conditions are ready for construction to begin. Rongfeng will start to pay an energy saving service fee from the date when the WHPG station passes the required 72-hour test run. The payment term is 20 years. For the first 10 years, Rongfeng shall pay an energy saving service fee at RMB 0.582 ($0.095) per kilowatt hour (including tax) for the power generated from the system. For the second 10 years, Rongfeng shall pay an energy saving service fee at RMB 0.432 ($0.071) per kWh (including tax). During the term of the contract the energy saving service fee shall be adjusted at the same percentage as the change of local grid electricity price. Rongfeng and its parent company will provide guarantees to ensure Rongfeng will fulfill its obligations under the Rongfeng Agreement. Upon the completion of the term, Xi’an TCH will transfer the systems to Rongfeng at RMB 1. Rongfeng shall provide waste heat to the systems for no less than 8,000 hours per year with a temperature no less than 950°C. If these requirements are not met, the term of the Agreement will be extended accordingly. If Rongfeng wants to terminate the Agreement early, it shall provide Xi’an TCH a 60 day notice and pay the termination fee and compensation for the damages to Xi’an TCH according to the following formula: 1) if it is less than five years (including five years) into the term when Rongfeng requests termination, Rongfeng shall pay: Xi’an TCH’s total investment amount plus Xi’an TCH’s average annual investment return times (five years minus the years of which the system has already operated); 2) if it is more than five years into the term when Rongfeng requests the termination, Rongfeng shall pay: Xi’an TCH’s total investment amount minus total amortization cost (the amortization period is 10 years).On November 16, 2015, Xi’an TCH entered into a Transfer Agreement of CDQ and a CDQ WHPG system with Rongfeng and Xi’an Huaxin New Energy Co., Ltd., a limited liability company incorporated in China (“Xi’an Huaxin”). The Transfer Agreement provided for the sale to Rongfeng of the CDQ Waste Heat Power Generation Project (the “Project”) from Xi’an TCH. Additionally, Xi’an TCH would transfer to Rongfeng the Engineering, Procurement and Construction (“EPC”) Contract for the CDQ Waste Heat Power Generation Project which Xi’an TCH had entered into with Xi’an Huaxin in connection with the Project. As consideration for the transfer of the Project, Rongfeng is to pay to Xi’an TCH an aggregate purchase price of RMB 165,200, 000 ($25.45 million), whereby (a) RMB 65,200,000 ($10.05 million) was to be paid by Rongfeng to Xi’an TCH within 20 business days after signing the Transfer Agreement, (b) RMB 50,000,000 ($7.70 million) is to be paid by Rongfeng to Xi’an TCH within 20 business days after the Project is completed, but no later than March 31, 2016 and |