The Trust is also entitled to receive from Mobil Erdgas, a 2% royalty payment on gross receipts from sales of sulfur obtained as a by product of sour gas produced from the western part of Oldenburg. However, the payment of the sulfur royalty is provisional on whether Mobil Erdgas' selling price meets or exceeds the indexed base price. The average selling price for sulfur exceeded the indexed base price since the start of fiscal 2013 except for the first quarter of fiscal 2014 and the first, third and fourth quarters of fiscal 2017. Sulfur is a by-product of gas production and is not considered in the computation of total cost depletion.Oldenburg Area - Sales and Reserves
The Trust's royalty income currently comes exclusively from the Oldenburg area. Gas production accounts for the majority of the income; however, the hydrogen sulfide in much of the gas produced necessitates its removal before the gas can be sold. At the Grossenkneten desulfurization plant, the hydrogen sulfide in sour gas is removed. The plant's present input capacity stands at approximately 400 million cubic feet ("MMcf") per day following EMPG's retirement of Unit 3. The elimination of Unit 3 effectively reduces the input capacity by one third.
Total Sales
During the twelve months ending September 30, 2017, total sales for the Oldenburg area were as follows:
| West | East | Total | |
Gas Well Gas - MMCF | 23,530 | 50,967 | 74,497 |
Oil Well Gas - MMCF | 43 | 25 | 68 |
Oil & Condensate - Barrels | 91,337 | 35,491 | 126,828 |
Sulfur - Short Tons | 103,342 | 354,568 | 457,910 |
Gross Reserves
Estimated gross remaining proved producing reserves attributable to the total Oldenburg area as of October 1, 2017 are as follows:
| West | East | Total | |
Gas Well Gas - MMCF | 213,634 | 321,588 | 535,222 |
Oil Well Gas - MMCF | 431 | 77 | 508 |
Oil & Condensate - Barrels | 941,765 | 110,229 | 1,051,994 |
Sulfur - Short Tons | 927,427 | 2,700,817 | 3,628,244 |
Net Reserves
To present an accurate picture of estimated proved producing reserves net to the Trust, the gross reserve figures outlined above must be modified by the impact of the different royalty rates in effect in the Oldenburg concession. A comparison of the Trust's overriding royalty rates in both the western and eastern areas of Oldenburg is as follows:
| West | East | Mobil Erdgas Gas & Oil | 4% | 0% |
Mobil Erdgas Sulfur | 2% | 0% |
BEB Gas & Oil | 0.6667%(1) | 0.6667%(1) |
BEB Sulfur | 0.6667%(1) | 0.6667%(1) |
|
(1)Prior to the calculation of royalties, 50% of costs as reported for state royalty purposes are deducted. |
The application of these royalty rates to the estimated gross remaining proved producing reserves attributable to the western and eastern Oldenburg areas yields the combined estimated proved producing reserves net to the Trust. The Trust's estimated remaining net proved producing reserves as of October 1, 2017 and net sales for the twelve month period ending September 30, 2017 are as follows:
| Reserves | Sales | Gas Well Gas - MMCF | 9,936 | 1,330 |
Oil Well Gas - MMCF | 20 | 2 |
Oil & Condensate - Barrels | 43,487 | 4,210 |
Sulfur - Short Tons | 40,231 | 4,665 |
|
A summary of net proved producing reserves by product and a five year history of net sales attributable to the royalty interests of the Trust are presented in Attachment A.
Limitations of Available Data
The reserves considered in this report are defined as proved producing reserves. Proved producing reserves are limited to those quantities which can be expected to be recoverable commercially from known reservoirs at current prices and costs, under existing regulatory practices and with existing conventional equipment and operating methods. Proved producing reserves do not include either proved developed non producing reserves or any class of probable reserves.
The estimate of reserves included in this report is based primarily upon production history or analogy with wells in the area producing from the same or similar formations. In addition to individual well production history, geological and well test information, when available, were utilized in the evaluation.
The reserves included in this report are estimates only and should not be construed as being exact quantities. The accuracy of the estimates is dependent upon the quality of available data and upon the independent geological and engineering interpretation of that data. The quantities presented herein are estimated reserves of hydrocarbons and produced products that geologic and engineering data demonstrate can be recovered from known reservoirs under current economic conditions with reasonable certainty. Reserve estimates presented in this report are calculated using acceptable methods and procedures and are believed to be appropriate and reasonable; however, future reservoir performance may justify revision of these estimates.
For the purpose of this report, estimated reserves are scheduled for recovery primarily on the basis of actual producing rates or appropriate well test information. They were prepared giving consideration to engineering and geological data, anticipated producing mechanisms, the number and types of completions, as well as past performance of analogous reservoirs. Individual well production histories, when available, were analyzed and an appropriate daily producing rate was utilized for each individual well in the preparation of a forecast of future producing rates until an anticipated economic limit.
The estimates of reserves and the forecasted rates of production may be subject to regulation by various agencies, changes in market demand or other factors. Consequently, the volumes of reserves recovered and the actual rates of recovery may vary from the estimates included herein.
The Trust, as an overriding royalty interest owner, does not receive proprietary data from the various operators on producing wells. Data, such as logs, core analysis, reservoir tests, pressure tests, gas analyses, geologic maps, and individual well production histories on all of the wells which are used in volumetric and material balance type reserve estimates, are not available to the Trust. The lack of such data increases the inherent uncertainties of our reserve estimate.
The Trust receives quarterly statements from the operators that report production, sales and revenue data. Utilizing the same procedures as in prior years, this information plus published information received from W.E.G. (a German organization comparable to the American Petroleum Institute or the American Gas Association) has been used to prepare this annual report. In addition, the Trust retains a part-time consultant in Germany who is familiar with the German petroleum industry in general and the operating companies in particular. His periodic reports and communications were considered in the preparation of this report.
We believe that reserve estimates prepared using all the available data are appropriate and sufficient for the calculation of the cost depletion percentage. However, due to the limitations of available data, this estimate of reserves cannot have the same degree of accuracy that an estimate of reserves prepared using all pertinent data would have. Our experience in the evaluation of reserves using such limited data compensates somewhat for the limitations of available data.
The data in the reports received by the Trust is in metric tons and cubic meters. The following Metric to English Unit conversion factors were used:
Gas: | 37.25 cubic feet per cubic meter at 14.7 psia and 60 degrees Fahrenheit |
Oil: | 7.23 barrels per metric ton |
Sulfur: | 1.1 short tons per metric ton |
Calculation of Cost Depletion Percentage
The categories of proved producing reserves considered in the calculation of the cost depletion percentage are oil, oil well gas, and gas well gas. Sulfur is a by-product of gas production and is not considered in the computation of total cost depletion percentage.
For each category of reserves, a product base was established for the Trust as of January 1, 1976. Through the use of these product bases, we can account for the relative size of each of these categories of reserves and the corresponding impact on the calculation of the cost depletion percentage. The product base for each category of proved producing reserves is reduced annually by an adjustment that is calculated by multiplying the product base at the beginning of the current year by the depletion factor for that category of reserves.
The depletion factor for each category of reserves is the ratio of the relevant net sales during the current year to the corresponding adjusted net proved producing reserves at the beginning of the current year.
Significant items in the cost depletion percentage calculation that appear on Attachment B as specific item numbers, shown in parentheses and their sources are as follows:
The adjusted estimated net proved producing reserves as of 10/1/16 Line (3) is obtained by adding the estimated remaining net proved producing reserves as of 10/1/16 Line (1) and the adjustments to reserves during the period Line (2). Therefore Line (3) = Line (1) + Line (2).
The depletion factor Line (6) for each category of proved producing reserves is obtained by dividing the relevant net sales Line (4) by the corresponding adjusted estimated net proved producing reserves as of 10/1/16 Line (3). Therefore Line (6) = Line (4) / Line (3).
The product base for each category of proved producing reserves as of 1/1/16 Line (7) and the adjustment taken during 2016 Line (8) were obtained from the previous year's report. The product base as of 1/1/17 Line (9) forms the initial starting point for the calculation of the cost depletion percentage for the 2017 tax year. The product base for 1/1/16 Line (9) then is Line (7) - Line (8).
The adjustment to the product base for each category of proved producing reserves Line (10) is used to reduce the product base as of the beginning of each year. This adjustment is the product of the depletion factor for each category of proved producing reserves Line (6) multiplied by the corresponding product base as of 1/1/17 Line (9). Therefore Line (10) = Line (6) x Line (9).
The cost depletion percentage Line (11) then is the sum of the adjustment to the product base of each category of proved producing reserves [Sum Line (10)] divided by the sum of the product base for each category as of 1/1/17 [Sum Line (9)]. Therefore Line (11) = [Sum Line (10)] / [Sum Line (9)].
The cost depletion percentage represents the total allowable cost depletion for the 2017 calendar year for the Trust's unit owners, expressed as a percentage of their cost base as of January 1, 2017.
Neither Graves & Co. Consulting, LLC nor any of its employees have any interest in the subject properties and neither the employment to make this study and calculation nor our compensation is contingent on our estimate of reserves or the results of our calculation.
We appreciate the opportunity to be of service to you in this matter and will be glad to address any questions or inquiries you may have.
Sincerely yours,
GRAVES & CO. CONSULTING LLC
Texas Registered Engineering Firm F - 19125
/s/ John L. Graves
John L. Graves
President
/s/ Kent B. Lina
Kent B. Lina, P.E.
Senior Reservoir Engineer
Estimated Net Proved Producing Reserves
As of October 1, 2017
Oldenburg |
| | | | | |
Gas Well | Oil Well | Oil/Cond. | Sulfur | | |
Gas | Gas | | | | |
MMcf | MMcf | Barrels | Short Tons | | |
| | | | | |
9,936 | 20 | 43,476 | 40,231 | (1) | |
Five Year Net Sales Summary
12 Months Ending September 30, 2017
Oldenburg | |
| | | | | |
| Gas Well | Oil Well | Oil/Cond. | Sulfur | |
| Gas | Gas | | | |
| MMcf | MMcf | Barrels | Short Tons | |
2017 | 1,330 | 2 | 4,210 | 4,665 | (1) |
2016 | 1,392 | 1 | 4,225 | 4,761 | (2) |
2015 | 1,642 | 2 | 4,667 | 6,090 | (3) |
2014 | 1,821 | 1 | 4,444 | 7,436 | (4) |
2013 | 1,968 | 1 | 4,713 | 8,009 | (5) |
- Royalty payments under the Mobil Erdgas sulfur royalty representing the second quarter of fiscal 2017 were received.
- Royalty payments under the Mobil Erdgas sulfur royalty representing all four quarters of fiscal 2016 were received.
- Royalty payments under the Mobil Erdgas sulfur royalty representing all four quarters of fiscal 2015 were received.
- Royalty payments under the Mobil Erdgas sulfur royalty representing the second, third and fourth quarters of fiscal 2014 were received.
- Royalty payments under the Mobil Erdgas sulfur royalty representing all four quarters of fiscal 2013 were received.
| OLDENBURG |
---|
| Gas Well | Oil Well | |
| Gas | Gas | Oil |
| MMCF | MMCF | Barrels |
|
NEORT NET RESERVES (Million Cubic Feet of Gas and Barrels of Oil) |
| | | |
1. Estimated net proved producing reserves as of 10-1-16 | 12,214 | 14 | 33,371 |
| | | |
2. Adjustment to reserves during period | -948 | 8 | 14,315 |
| | | |
3. Adjusted est. net proved producing reserves as of 10-1-2016 | 11,266 | 22 | 47,686 |
| | | |
4. Net sales from 10-1-16 to 9-30-17 | 1,330 | 2 | 4,210 |
| | | |
5. Estimated remaining net proved producing reserves as of 10-1-2017 | 9,936 | 20 | 43,476 |
| | | |
RESERVE DEPLETION FACTOR | | | |
| | | |
6. Depletion factor | 0.11805 | 0.09091 | 0.08829 |
| | | |
NEORT WEIGHTED PRODUCT BASE ALLOCATION | | | |
| | | |
7. Product base as of 1-1-16 | 2.43449 | 0.00137 | 0.12198 |
| | | |
8. Less adjustments taken during 2016 | 0.24907 | 0.00009 | 0.01371 |
| | | |
9. Product base as of 1-1-17 | 2.18542 | 0.00128 | 0.10827 |
| | | |
10. 2017 Adjustment to product base | 0.25800 | 0.00012 | 0.00956 |
| | | |
11. Cost depletion percentage for 2017 calendar year for Trust unit owners is equal to 11.6635 percent of their 1-1-2017 cost base. |
Footnotes:
Line (1) from reserves review as of 10-1-16
Line (2) from reserves review as of 10-1-17
Line (3) = Line (1) + Line (2)
Line (4) from BEB and Mobil Erdgas statements
Line (5) from reserves review as of 10-1-17
Line (6) = Line (4) / Line (3)
Line (7) from 2016 depletion calculations
Line (8) from 2016 depletion calculations
Line (9) = Line (7) - Line (8)
Line (10) = Line (9) x Line (6)
Line (11) = Sum Line (10) / Sum Line (9)
Securities and Exchange Commission
Definition of Reserves
The following information is taken from the United States Securities and Exchange Commission:
PART 210--FORM AND CONTENT OF AND REQUIREMENTS FOR FINANCIAL STATEMENTS, SECURITIES ACT OF 1933, SECURITIES EXCHANGE ACT OF 1934, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935, INVESTMENT COMPANY ACT OF 1940, INVESTMENT ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975
Section 210.4-10 Financial accounting and reporting for oil and gas producing activities pursuant to the Federal securities laws and the Energy Policy and Conservation Act of 1975.
Reserves
Reserves are estimated remaining quantities of oil and gas and related substances anticipated to be economically producible, as of a given date, by application of development projects to known accumulations. In addition, there must exist, or there must be a reasonable expectation that there will exist, the legal right to produce or a revenue interest in the production, installed means of delivering oil and gas or related substances to market, and all permits and financing required to implement the project.
Reserves should not be assigned to adjacent reservoirs isolated by major, potentially sealing, faults until those reservoirs are penetrated and evaluated as economically producible. Reserves should not be assigned to areas that are clearly separated from a known accumulation by a non-productive reservoir (i.e., absence of reservoir, structurally low reservoir, or negative test results). Such areas may contain prospective resources (i.e., potentially recoverable resources from undiscovered accumulations).
Proved Oil and Gas Reserves
Proved oil and gas reserves are those quantities of oil and gas, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible--from a given date forward, from known reservoirs, and under existing economic conditions, operating methods, and government regulations--prior to the time at which contracts providing the right to operate expire, unless evidence indicates that renewal is reasonably certain, regardless of whether deterministic or probabilistic methods are used for the estimation. The project to extract the hydrocarbons must have commenced or the operator must be reasonably certain that it will commence the project within a reasonable time.
- The area of the reservoir considered as proved includes:
- The area identified by drilling and limited by fluid contacts, if any, and
- Adjacent undrilled portions of the reservoir that can, with reasonable certainty, be judged to be continuous with it and to contain economically producible oil or gas on the basis of available geoscience and engineering data.
- In the absence of data on fluid contacts, proved quantities in a reservoir are limited by the lowest known hydrocarbons (LKH) as seen in a well penetration unless geoscience, engineering, or performance data and reliable technology establishes a lower contact with reasonable certainty.
- Where direct observation from well penetrations has defined a highest known oil (HKO) elevation and the potential exists for an associated gas cap, proved oil reserves may be assigned in the structurally higher portions of the reservoir only if geoscience, engineering, or performance data and reliable technology establish the higher contact with reasonable certainty.
- Reserves which can be produced economically through application of improved recovery techniques (including, but not limited to, fluid injection) are included in the proved classification when:
- Successful testing by a pilot project in an area of the reservoir with properties no more favorable than in the reservoir as a whole, the operation of an installed program in the reservoir or an analogous reservoir, or other evidence using reliable technology establishes the reasonable certainty of the engineering analysis on which the project or program was based; and
- The project has been approved for development by all necessary parties and entities, including governmental entities.
- Existing economic conditions include prices and costs at which economic producibility from a reservoir is to be determined. The price shall be the average price during the 12-month period prior to the ending date of the period covered by the report, determined as an unweighted arithmetic average of the first-day-of-the-month price for each month within such period, unless prices are defined by contractual arrangements, excluding escalations based upon future conditions.
Reasonable certainty. If deterministic methods are used, reasonable certainty means a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed the estimate. A high degree of confidence exists if the quantity is much more likely to be achieved than not, and, as changes due to increased availability of geoscience (geological, geophysical, and geochemical), engineering, and economic data are made to estimated ultimate recovery (EUR) with time, reasonably certain EUR is much more likely to increase or remain constant than to decrease.
Reliable technology. Reliable technology is a grouping of one or more technologies (including computational methods) that has been field tested and has been demonstrated to provide reasonably certain results with consistency and repeatability in the formation being evaluated or in an analogous formation.
Probable Reserves
Probable reserves are those additional reserves that are less certain to be recovered than proved reserves but which, together with proved reserves, are as likely as not to be recovered.
- When deterministic methods are used, it is as likely as not that actual remaining quantities recovered will exceed the sum of estimated proved plus probable reserves. When probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the proved plus probable reserves estimates.
- Probable reserves may be assigned to areas of a reservoir adjacent to proved reserves where data control or interpretations of available data are less certain, even if the interpreted reservoir continuity of structure or productivity does not meet the reasonable certainty criterion. Probable reserves may be assigned to areas that are structurally higher than the proved area if these areas are in communication with the proved reservoir.
- Probable reserves estimates also include potential incremental quantities associated with a greater percentage recovery of the hydrocarbons in place than assumed for proved reserves.
Possible Reserves
Possible reserves are those additional reserves that are less certain to be recovered than probable reserves.
- When deterministic methods are used, the total quantities ultimately recovered from a project have a low probability of exceeding proved plus probable plus possible reserves. When probabilistic methods are used, there should be at least a 10% probability that the total quantities ultimately recovered will equal or exceed the proved plus probable plus possible reserves estimates.
- Possible reserves may be assigned to areas of a reservoir adjacent to probable reserves where data control and interpretations of available data are progressively less certain. Frequently, this will be in areas where geoscience and engineering data are unable to define clearly the area and vertical limits of commercial production from the reservoir by a defined project.
- Possible reserves also include incremental quantities associated with a greater percentage recovery of the hydrocarbons in place than the recovery quantities assumed for probable reserves.
- The proved plus probable and proved plus probable plus possible reserves estimates must be based on reasonable alternative technical and commercial interpretations within the reservoir or subject project that are clearly documented, including comparisons to results in successful similar projects.
- Possible reserves may be assigned where geoscience and engineering data identify directly adjacent portions of a reservoir within the same accumulation that may be separated from proved areas by faults with displacement less than formation thickness or other geological discontinuities and that have not been penetrated by a wellbore, and the registrant believes that such adjacent portions are in communication with the known (proved) reservoir. Possible reserves may be assigned to areas that are structurally higher or lower than the proved area if these areas are in communication with the proved reservoir.
- Pursuant to paragraph (a)(22)(iii) of this section, where direct observation has defined a highest known oil (HKO) elevation and the potential exists for an associated gas cap, proved oil reserves should be assigned in the structurally higher portions of the reservoir above the HKO only if the higher contact can be established with reasonable certainty through reliable technology. Portions of the reservoir that do not meet this reasonable certainty criterion may be assigned as probable and possible oil or gas based on reservoir fluid properties and pressure gradient interpretations.
Developed Oil and Gas Reserves
Developed oil and gas reserves are reserves of any category that can be expected to be recovered:
- Through existing wells with existing equipment and operating methods or in which the cost of the required equipment is relatively minor compared to the cost of a new well; and
- Through installed extraction equipment and infrastructure operational at the time of the reserves estimate if the extraction is by means not involving a well.
Undeveloped Oil and Gas Reserves
Undeveloped oil and gas reserves are reserves of any category that are expected to be recovered from new wells on undrilled acreage, or from existing wells where a relatively major expenditure is required for recompletion.
- Reserves on undrilled acreage shall be limited to those directly offsetting development spacing areas that are reasonably certain of production when drilled, unless evidence using reliable technology exists that establishes reasonable certainty of economic producibility at greater distances.
- Undrilled locations can be classified as having undeveloped reserves only if a development plan has been adopted indicating that they are scheduled to be drilled within five years, unless the specific circumstances, justify a longer time.
- Under no circumstances shall estimates for undeveloped reserves be attributable to any acreage for which an application of fluid injection or other improved recovery technique is contemplated, unless such techniques have been proved effective by actual projects in the same reservoir or an analogous reservoir, as defined in paragraph (a)(2) of this section, or by other evidence using reliable technology establishing reasonable certainty.
Additional Definitions:
Deterministic Estimate
The method of estimating reserves or resources is called deterministic when a single value for each parameter (from the geoscience, engineering, or economic data) in the reserves calculation is used in the reserves estimation procedure.
Probabilistic Estimate
The method of estimation of reserves or resources is called probabilistic when the full range of values that could reasonably occur for each unknown parameter (from the geoscience and engineering data) is used to generate a full range of possible outcomes and their associated probabilities of occurrence.
Reasonable Certainty
If deterministic methods are used, reasonable certainty means a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed the estimate. A high degree of confidence exists if the quantity is much more likely to be achieved than not, and, as changes due to increased availability of geoscience (geological, geophysical, and geochemical), engineering, and economic data are made to estimated ultimate recovery (EUR) with time, reasonably certain EUR is much more likely to increase or remain constant than to decrease.