Commitments and Contingencies Disclosure [Text Block] | Commitments and Contingencies ENVIRONMENTAL LIABILITIES AND REGULATION Environmental Matters The operation of electric generating, transmission and distribution facilities, and gas gathering, transportation and distribution facilities, along with the development (involving site selection, environmental assessments, and permitting) and construction of these assets, are subject to extensive federal, state, and local environmental and land use laws and regulations. Our activities involve compliance with diverse laws and regulations that address emissions and impacts to the environment, including air and water, protection of natural resources, avian and wildlife. We monitor federal, state, and local environmental initiatives to determine potential impacts on our financial results. As new laws or regulations are implemented, our policy is to assess their applicability and implement the necessary modifications to our facilities or their operation to maintain ongoing compliance. Our environmental exposure includes a number of components, including remediation expenses related to the cleanup of current or former properties, and costs to comply with changing environmental regulations related to our operations. At present, the majority of our environmental reserve relates to the remediation of former manufactured gas plant sites owned by us and is estimated to range between $26.4 million to $35.0 million . As of September 30, 2015 , we have a reserve of approximately $28.3 million , which has not been discounted. Environmental costs are recorded when it is probable we are liable for the remediation and we can reasonably estimate the liability. We use a combination of site investigations and monitoring to formulate an estimate of environmental remediation costs for specific sites. Our monitoring procedures and development of actual remediation plans depend not only on site specific information but also on coordination with the different environmental regulatory agencies in our respective jurisdictions; therefore, while remediation exposure exists, it may be many years before costs are incurred. Over time, as costs become determinable, we may seek authorization to recover such costs in rates or seek insurance reimbursement as applicable; therefore, although we cannot guarantee regulatory recovery, we do not expect these costs to have a material effect on our consolidated financial position or results of operations. During the second quarter of 2015, we reached a settlement agreement with an insurance carrier for the former Montana Power Company for what were primarily generation related environmental remediation costs. As a result of this settlement, we recognized a net recovery of approximately $20.8 million , which is reflected as a reduction to operating expenses in our other segment. The environmental remediation costs were never reflected in customer rates and the litigation expenses have not been treated as utility expenses. In a 2002 order approving NorthWestern’s acquisition of the transmission and distribution assets of the Montana Power Company, the MPSC approved a stipulation in which NorthWestern agreed to release its customers from all environmental liabilities associated with the Montana Power Company’s generation assets. While we believe the recovery we recognized as a reduction to operating expenses is not subject to refund to customers, the MPSC could disagree with us and could ultimately require us to refund all or a portion of the net recovery to customers. Manufactured Gas Plants - Approximately $23.4 million of our environmental reserve accrual is related to manufactured gas plants. A formerly operated manufactured gas plant located in Aberdeen, South Dakota, has been identified on the Federal Comprehensive Environmental Response, Compensation, and Liability Information System list as contaminated with coal tar residue. We are currently conducting feasibility studies and implementing remedial actions at the Aberdeen site pursuant to work plans approved by the South Dakota Department of Environment and Natural Resources (DENR). Our current reserve for remediation costs at this site is approximately $10.4 million , and we estimate that approximately $7.5 million of this amount will be incurred during the next five years. We also own sites in North Platte, Kearney and Grand Island, Nebraska on which former manufactured gas facilities were located. We are currently working independently to fully characterize the nature and extent of potential impacts associated with these Nebraska sites. Our reserve estimate includes assumptions for site assessment and remedial action work. At present, we cannot determine with a reasonable degree of certainty the nature and timing of any risk-based remedial action at our Nebraska locations. In addition, we own or have responsibility for sites in Butte, Missoula and Helena, Montana on which former manufactured gas plants were located. The Butte and Helena sites were placed into the Montana Department of Environmental Quality (MDEQ) voluntary remediation program for cleanup due to soil and groundwater impacts. Soil and coal tar were removed at the sites in accordance with MDEQ requirements. Groundwater monitoring is conducted semiannually at both sites. An investigation conducted at the Missoula site did not require remediation activities, but required preparation of a groundwater monitoring plan. Monitoring wells have been installed and groundwater is monitored semiannually. At the request of Missoula Valley Water Quality District, a draft risk assessment was prepared for the Missoula site and presented to the Missoula County Water Quality Board (MCWQB). The MCWQB deferred all decision making to the MDEQ, but suggested additional site delineation. A work plan is being prepared to address further delineation and proposed work is anticipated for the fourth quarter of 2015. At this time, we cannot estimate with a reasonable degree of certainty the nature and timing of risk-based remedial action at these sites or if any additional actions beyond monitored natural attenuation will be required. Global Climate Change - National and international actions have been initiated to address global climate change and the contribution of emissions of greenhouse gases (GHG) including, most significantly, carbon dioxide. These actions include legislative proposals, Executive and Environmental Protection Agency (EPA) actions at the federal level, actions at the state level, and private party litigation relating to GHG emissions. Coal-fired plants have come under particular scrutiny due to their level of GHG emissions. We have joint ownership interests in four electric generating plants, all of which are coal fired and operated by other companies. We are responsible for our proportionate share of the capital and operating costs while being entitled to our proportionate share of the power generated. While numerous bills have been introduced that address climate change from different perspectives, including through direct regulation of GHG emissions, the establishment of cap and trade programs and the establishment of Federal renewable portfolio standards, Congress has not passed any federal climate change legislation and we cannot predict the timing or form of any potential legislation. In the absence of such legislation, EPA is presently regulating new and existing sources of GHG emissions. On August 3, 2015, the EPA released for publication in the Federal Register, the final standards of performance to limit GHG emissions from new, modified and reconstructed fossil fuel generating units and from newly constructed and reconstructed stationary combustion turbines. The standards reflect the degree of emission limitations achievable through the application of the best system of emission reduction that the EPA determined has been demonstrated for each type of unit. In a separate action that also affects power plants, on August 3, 2015, the EPA released its final rule establishing GHG performance standards for existing power plants under Clean Air Act Section 111(d). EPA refers to this rule as the Clean Power Plan or CPP. The CPP specifically establishes CO2 emission performance standards for existing electric utility steam generating units and stationary combustion turbines. States may develop implementation plans for affected units to meet the individual state targets established in the CPP or may adopt a federal plan. The EPA has given states the option to develop compliance plans for annual rate-based reductions (pounds per megawatt hour (MWH)) or mass-based tonnage limits for CO2. The 2030 rate-based requirement for all existing affected generating units in Montana and South Dakota is 1,305 and 1,167 pounds per MWH, respectively. The mass-based approach for existing affected generating units calls for a 37 percent reduction from 2012 levels by 2030 in Montana. The mass-based approach for existing units in South Dakota permits an 11 percent increase by 2030. States are required to submit initial plans for achieving GHG emission standards to EPA by September 2016, but may seek additional time to finalize State plans by September 2018. The initial performance period for compliance would commence in 2022, with full implementation by 2030. The EPA also indicated that states may establish emission trading programs to facilitate compliance with the CPP and provides three options: an emission rate trading program, which would allow the trading of emission reduction credits equal to one MWH of emission free generation; a mass-based program, which would allow trading of allowances with an allowance equal to one short ton of CO2; and a state measures program, that would allow intra-state trading to achieve the state-wide average emission rate. On August 3, 2015, EPA also proposed a federal plan that would be imposed if a state fails to submit a satisfactory plan under the CPP. The federal plan proposal includes a "model trading rule" that describes how the EPA would establish an emission trading program as part of the federal plan to allow affected units to comply with the emission rate requirements. EPA proposed both an emission rate trading plan and a mass-based trading plan and indicated that the final federal rule will elect one of the two options. Comments on the proposed federal plan and model trading rule will be due ninety days after it is published in the Federal Register. On June 23, 2014, the U.S. Supreme Court struck down the EPA's Tailoring Rule, which limited the sources subject to GHG permitting requirements to the largest fossil-fueled power plants, indicating that EPA had exceeded its authority under the Clean Air Act by "rewriting unambiguous statutory terms." However, the decision affirmed EPA's ability to regulate GHG emissions from sources already subject to regulation under the prevention of significant deterioration program, which includes most electric generating units. Requirements to reduce GHG emissions from stationary sources could cause us to incur material costs of compliance, increase our costs of procuring electricity, decrease transmission revenue and impact cost recovery. Although there continues to be proposed legislation and regulations that affect GHG emissions from power plants, technology to efficiently capture, remove and/or sequester such emissions may not be available within a timeframe consistent with the implementation of such requirements. In addition, physical impacts of climate change may present potential risks for severe weather, such as droughts, floods and tornadoes, in the locations where we operate or have interests. We are evaluating the implications of these rules and technology available to achieve the CO2 emission performance standards. We will continue working with federal and state regulatory authorities, other utilities, and stakeholders to seek relief from the final rules that, in our view, disproportionately impact customers in our region, and to seek relief from the final compliance requirements. We cannot predict the ultimate outcome of these matters nor what our obligations might be under the state compliance plans with any degree of certainty until they are finalized; however, complying with the carbon emission standards, and with other future environmental rules, may make it economically impractical to continue operating all or a portion of our jointly owned facilities or for individual owners to participate in their proportionate ownership of the coal-fired generating units. This could lead to significant impacts to customer rates for recovery of plant improvements and / or closure related costs and costs to procure replacement power. In addition, these changes could impact system reliability due to changes in generation sources. Coal Combustion Residuals (CCRs) - In April 2015, the EPA published its final rule regulating CCRs, imposing extensive new requirements, including location restrictions, design and operating standards, groundwater monitoring and corrective action requirements and closure and post-closure care requirements on CCR impoundments and landfills that are located on active power plants and not closed. Under the rule, the EPA will regulate CCRs as non-hazardous under the Resource Conservation and Recovery Act Subtitle B and allow beneficial use of CCRs, with some restrictions. The CCR rule will become effective on October 14, 2015. The rule's requirements for covered CCR impoundments and landfills include commencement or completion of closure activities generally between three and ten years from certain triggering events. Based on our initial assessment of these requirements, during the second quarter of 2015 we recorded an increase to our existing asset retirement obligations (AROs) of approximately $12 million . AROs represent the anticipated costs of removing assets upon retirement and are provided for over the life of those assets as a component of depreciation expense. Our depreciation method, including cost of removal, is established by the respective regulatory commissions. All costs of the rule are expected to be recovered from customers in future rates. Therefore, consistent with this regulated treatment, we reflect this increase to the accrual of removal costs by increasing our regulatory liability. Further, we do not have any assets that are legally restricted related to the settlement of CCR related asset retirement obligations. The actual asset retirement costs related to the CCR Rule requirements may vary substantially from the estimates used to record the increased obligation due to uncertainty about the compliance strategies that will be used and the preliminary nature of available data used to estimate costs, such as the quantity of coal ash present at certain sites and the volume of fill that will be needed to cap and cover certain impoundments. We will coordinate with the plant operators and continue to gather additional data in future periods to make decisions about compliance strategies and the timing of closure activities. As additional information becomes available, we will update the ARO obligation for these changes in estimates, which could be material. Legislation has been introduced in Congress to permanently designate coal ash as non-hazardous and establish a national system to regulate coal ash disposal, but leave enforcement largely to states. We cannot predict at this time the final outcome of any such legislation and what impact, if any, it would have on us. Water Intakes and Discharges - Section 316(b) of the Federal Clean Water Act (CWA) requires that the location, design, construction and capacity of any cooling water intake structure reflect the “best technology available (BTA)” for minimizing environmental impacts. In May, 2014, the EPA issued a final rule applicable to facilities that withdraw at least 2 million gallons per day of cooling water from waters of the US and use at least 25 percent of the water exclusively for cooling purposes. The final rule, which became effective in October 2014, gives options for meeting BTA, and provides a flexible compliance approach. Under the rule, permits required for existing facilities will be developed by the individual states and additional capital and/or increased operating costs may be required to comply with future water permit requirements. Challenges to the final cooling water intake rule filed by industry and environmental groups are under review in the Court of Appeals. On September 30, 2015, the EPA issued final regulations on effluent limitations for power plant wastewater discharges, including mercury, arsenic, lead and selenium. Some of the new requirements for existing power plants would be phased in starting in 2018 with full implementation of the rule by 2023. The EPA rule estimates that 12 percent of the steam electric power plants in the U.S. will have to make new investments to meet the requirements of the new effluent limitation regulations; however, it is too early to determine whether the impacts of these rules will be material. Clean Air Act Rules and Associated Emission Control Equipment Expenditures - The EPA has proposed or issued a number of rules under different provisions of the Clean Air Act that could require the installation of emission control equipment at the generation plants in which we have joint ownership. The Clean Air Visibility Rule was issued by the EPA in June 2005, to address regional haze in national parks and wilderness areas across the United States. The Clean Air Visibility Rule requires the installation and operation of Best Available Retrofit Technology (BART) to achieve emissions reductions from designated sources (including certain electric generating units) that are deemed to cause or contribute to visibility impairment in such 'Class I' areas. In December 2011, the EPA issued a final rule relating to Mercury and Air Toxics Standards (MATS). Among other things, the MATS set stringent emission limits for acid gases, mercury, and other hazardous air pollutants from new and existing electric generating units. The rule was challenged by industry groups and states, and was upheld by the D.C. Circuit Court in April 2014. The decision was appealed to the Supreme Court and in June 2015, the Supreme Court issued an opinion that the EPA did not properly consider the costs to industry when making the requisite “appropriate and necessary” determination as part of its analysis in connection with the issuance of the MATS rule. The Supreme Court remanded the case back to the U.S. Court of Appeals for the District of Columbia Circuit, and on July 31 the litigation was formally sent back to the D.C. Circuit, which will decide whether the standards will be vacated or will remain in place while the EPA addresses the Supreme Court decision. The EPA indicated that it will seek a remand without vacatur of the MATS rule, and in support of that request, the EPA will submit to the court a declaration establishing a plan to "complete the required consideration of costs" to support the "appropriate and necessary finding" by spring 2016. Installation or upgrading of relevant environmental controls at our affected plants is complete or they have received compliance extensions, as applicable. At this time, we cannot predict whether and when compliance with the MATS rule ultimately will be required. In July 2011, the EPA finalized the Cross-State Air Pollution Rule (CSAPR) to reduce emissions from electric generating units that interfere with the ability of downwind states to achieve ambient air quality standards. Under CSAPR, significant reductions in emissions of nitrogen oxide (NOx) and sulfur dioxide (SO2) were to be required in certain states beginning in 2012. In April 2014 the Supreme Court reversed and remanded the 2012 decision of the U.S. Court of Appeals for the D.C. Circuit that had vacated the CSAPR. Litigation of the remaining CSAPR lawsuits continues, with a decision expected by the end of 2015. In October 2013, the Supreme Court denied certiorari in Luminant Generation Co v. EPA , which challenged the EPA’s current approach to regulating air emissions during startup, shutdown and malfunction (SSM) events. As a result, fossil fuel power plants may need to address SSM in their permits to reduce the risk of enforcement or citizen actions. In September 2012, a final Federal Implementation Plan for Montana was published in the Federal Register to address regional haze. As finalized, Colstrip Units 3 and 4 do not have to improve removal efficiency for pollutants that contribute to regional haze. By 2018, Montana, or EPA, must develop a revised Plan that demonstrates reasonable progress toward eliminating man made emissions of visibility impairing pollutants, which could impact Colstrip Unit 4. In November 2012, PPL Montana, the operator of Colstrip, as well as environmental groups (National Parks Conservation Association, Montana Environmental Information Center, and Sierra Club) jointly filed a petition for review of the Federal Implementation Plan in the U.S. Court of Appeals for the Ninth Circuit. Montana Environmental Information Center and Sierra Club challenged the EPA's decision not to require any emissions reductions from Colstrip Units 3 and 4. In June 2015, the U.S. Court of Appeals for the Ninth Circuit rejected the challengers’ contention that the EPA should have required additional pollution-reduction technologies on Unit 4 beyond those in the regulations and the matter is back in EPA Region 8 for action. Jointly Owned Plants - We have joint ownership in generation plants located in South Dakota, North Dakota, Iowa and Montana that are or may become subject to the various regulations discussed above that have been issued or proposed. South Dakota . The South Dakota DENR determined that the Big Stone plant, in which we have a 23.4% ownership, is subject to the BART requirements of the Regional Haze Rule. South Dakota DENR's State Implementation Plan (SIP) was approved by the EPA in May 2012. Under the SIP, the Big Stone plant must install and operate a new BART compliant air quality control system (AQCS) to reduce SO 2 , NOx and particulate emissions as expeditiously as practicable, but no later than five years after the EPA's approval of the SIP. The estimated total project cost for the AQCS at the Big Stone plant is approximately $384 million (our share is 23.4%). As of September 30, 2015 , we have capitalized costs of approximately $95.1 million (including allowance for funds used during construction) related to this project, which is expected to be operational in the first quarter of 2016. Based on the final MATS rule, Big Stone will meet the requirements by installing the AQCS system and using activated carbon injection for mercury control. The South Dakota DENR granted Big Stone an extension to comply with MATS, such that the new compliance deadline is April 16, 2016. New mercury emissions monitoring equipment will be required. North Dakota. The North Dakota Regional Haze SIP requires the Coyote generating facility, in which we have 10% ownership, to reduce its NOx emissions. Coyote must install control equipment to limit its NOx emissions to 0.5 pounds per million Btu as calculated on a 30 -day rolling average basis, including periods of start-up and shutdown, beginning on July 1, 2018. The current estimate of the total cost of the project is approximately $9.0 million (our share is 10.0%). Based on the final MATS rule, Coyote will meet the requirements by using activated carbon injection for mercury control. Initial compliance was demonstrated during the third quarter of 2015. Iowa . The Neal #4 generating facility, in which we have an 8.7% ownership, completed the installation of a scrubber, baghouse, activated carbon injection and a selective non-catalytic reduction system in 2013 to comply with national ambient air quality standards and the MATS. Montana. Colstrip Unit 4, a coal fired generating facility in which we have a 30% interest, is subject to EPA's CCR Rule. A compliance plan has been developed and is in the initial stages of implementation. The current estimate of the total project cost is approximately $90 million (our share is 30.0%) over the remaining life of the facility. In addition, Unit 4 is currently controlling emissions of mercury under regulations issued by the State of Montana, which are stricter than the Federal MATS and therefore in compliance with the Federal MATS. See 'Legal Proceedings - Colstrip Litigation' below for discussion of Sierra Club litigation. Other - We continue to manage equipment containing polychlorinated biphenyl (PCB) oil in accordance with the EPA's Toxic Substance Control Act regulations. We will continue to use certain PCB-contaminated equipment for its remaining useful life and will, thereafter, dispose of the equipment according to pertinent regulations that govern the use and disposal of such equipment. We routinely engage the services of a third-party environmental consulting firm to assist in performing a comprehensive evaluation of our environmental reserve. Based upon information available at this time, we believe that the current environmental reserve properly reflects our remediation exposure for the sites currently and previously owned by us. The portion of our environmental reserve applicable to site remediation may be subject to change as a result of the following uncertainties: • We may not know all sites for which we are alleged or will be found to be responsible for remediation; and • Absent performance of certain testing at sites where we have been identified as responsible for remediation, we cannot estimate with a reasonable degree of certainty the total costs of remediation. LEGAL PROCEEDINGS Colstrip Litigation On March 6, 2013, the Sierra Club and the MEIC (Plaintiffs) filed suit in the United States District Court for the District of Montana (Court) against the six individual owners of Colstrip, including us, as well as the operator or managing agent of the station (Defendants). On September 27, 2013, Plaintiffs filed an Amended Complaint for Injunctive and Declaratory Relief. The original complaint included 39 claims for relief based upon alleged violations of the Clean Air Act and the Montana State Implementation Plan. The Amended Complaint dropped claims associated with projects completed before 2001, the Title V claims and the opacity claims. The Amended Complaint alleged a total of 23 claims covering 64 projects. In the Amended Complaint, Plaintiffs identified physical changes made at Colstrip between 2001 and 2012, that Plaintiffs allege (a) have increased emissions of SO2, NOx and particulate matter and (b) were “major modifications” subject to permitting requirements under the Clean Air Act. They also alleged violations of the requirements related to Part 70 Operating Permits. On May 3, 2013, the Colstrip owners and operator filed a partial motion to dismiss, seeking dismissal of 36 of the 39 claims asserted in the original complaint. The motion was not ruled upon, and the Colstrip owners filed a second motion to dismiss the Amended Complaint on October 11, 2013, incorporating parts of the first motion and supplementing it with new authorities and with regard to new claims contained in the Amended Complaint. On September 12, 2013, Plaintiffs filed a motion for partial summary judgment as to the applicable method for calculating emissions increases from modifications. The parties filed a joint notice (Notice) on April 21, 2014, that advised the Court of Plaintiffs’ intent to file a Second Amended Complaint which dropped claims relating to 52 projects, and added one additional project. On May 6, 2014, the Court held oral argument on Defendants' motion to dismiss and on Plaintiffs’ motion for summary judgment on the applicable legal standard. On May 22, 2014, the Magistrate issued findings and recommendations, which denied Plaintiffs’ motion for summary judgment and denied most of the Colstrip owners’ motion to dismiss, but dismissed seven of Plaintiffs’ “best available control technology” claims and dismissed two of Plaintiffs' claims for injunctive relief. The Plaintiffs filed an objection to the Magistrate's findings and recommendations with the U.S. Federal District Court Judge, and on August 13, 2014, the Court adopted the Magistrate's findings and conclusions. On August 27, 2014, the Plaintiffs filed their Second Amended Complaint, which alleges a total of 13 claims covering eight projects and seeks injunctive and declaratory relief, civil penalties (including $100,000 of civil penalties to be used for beneficial environmental projects), and recovery of their attorney fees. Defendants filed their Answer to the Second Amended Complaint on September 26, 2014. Since filing the Second Amended Complaint, Plaintiffs have indicated that they are no longer pursuing a number of claims and projects thereby reducing their total claims to eight relating to four projects. The parties have filed motions for summary judgment with regard to issues affecting the remaining claims, and the motions for summary judgment are fully briefed. Oral argument on all pending motions for summary judgment is scheduled for December 1, 2015, and a bench trial is scheduled for May 31, 2016. We intend to vigorously defend this lawsuit. At this time, we cannot predict an outcome, nor is it reasonably possible to estimate the amount or range of loss, if any, that would be associated with an adverse decision. Billings Refinery Outage Claim In August 2014, we received a demand letter from a refinery in Billings claiming that it had sustained damages of approximately $48.5 million as a result of a January 2014 electrical outage. We dispute the claim and intend to vigorously defend against it. We reported the refinery's claim to our insurance carrier under our primary insurance policy, which has a $2.0 million retention. This matter is in the initial stages and we cannot predict an outcome or estimate the amount or range of loss, if any, that would be associated with an adverse result. Other Legal Proceedings We are also subject to various other legal proceedings, governmental audits and claims that arise in the ordinary course of business. In the opinion of management, the amount of ultimate liability with respect to these other actions will not materially affect our financial position, results of operations, or cash flows. |