G
LOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
A — ORGANIZATION AND BASIS OF PRESENTATION
Throughout this Quarterly Report, the terms “we,” “us,” “our,” “our company,” and “the Company” collectively refer to Global Clean Energy Holdings, Inc. and its wholly-owned subsidiaries. References to “GCEH” refer only to Global Clean Energy Holdings, Inc.
GCEH is a Delaware corporation. GCEH currently operates through various wholly owned U.S. and foreign subsidiaries. The principal subsidiaries include: (i) Sustainable Oils, Inc., (“SusOils”) our Delaware subsidiary that conducts breeding and owns proprietary rights to various Camelina varieties and operates our Camelina business; (ii) GCE Holdings Acquisitions, LLC and its five Delaware limited liability company subsidiaries that were formed to finance and own, directly or indirectly, Bakersfield Renewable Fuels, LLC (“BKRF”) our Delaware limited liability subsidiary that owns the Bakersfield Renewable Fuels Refinery; (iii) GCE Operating Company, LLC, our subsidiary that operates our Bakersfield, California renewable fuels refinery, and employs various personnel throughout the Company; (iv) Agribody Technologies, Inc., (“ATI”) our Delaware subsidiary that owns and oversees aspects of our plant science programs; and (v) Camelina Company Espana, S.L., (“CCE”) our Spanish subsidiary that develops proprietary Camelina varieties and leads our business expansion opportunities in Europe and South America. We also own several foreign inactive subsidiaries.
GCEH is a uniquely positioned, vertically integrated renewable fuels innovator producing ultra-low carbon renewable fuels from patented nonfood camelina varieties. Our farm-to-fuel business model is designed to allow greater efficiencies throughout the value chain, lowering our finished fuels’ carbon intensity and streamlining our operations at every step. Our patented camelina varieties are purposefully bred to increase yield, quicken maturity, and increase tolerance to drought and pests. Today, GCEH owns the world’s largest portfolio of patented camelina genetics, and we contract directly with farmers around the globe to grow our proprietary camelina crop on fallow land. Once online, the 15,000 barrels per day (“BPD”) nameplate Bakersfield Renewable Fuels Refinery will sell up to its full production capacity of the Renewable Diesel (“RD”).
Basis of Presentation and Principles of Consolidation
The accompanying condensed consolidated balance sheet of the Company at December 31, 2022, has been derived from audited consolidated financial statements, but does not include all disclosures required by accounting principles generally accepted in the United States of America (“U.S. GAAP”). The accompanying unaudited condensed consolidated financial statements as of March 31, 2023 have been prepared in accordance with U.S. GAAP for interim financial information and with the instructions to Form 10-Q and Article 8 of Regulation S-X. Accordingly, they do not include all of the information and footnotes required by U.S. GAAP for complete financial statements, and should be read in conjunction with the audited consolidated financial statements and related notes to the financial statements included in the Company’s Annual Report on Form 10-K for the year ended December 31, 2022 as filed with the U.S. Securities and Exchange Commission (“SEC”). The unaudited condensed consolidated financial statements include all material adjustments (consisting of all normal accruals) necessary to make the condensed consolidated financial statements not misleading as required by Regulation S-X Rule 10-01. Operating results for the three months ended March 31, 2023 are not necessarily indicative of the results that may be expected for the year ended December 31, 2023 or any future periods.
The accompanying condensed consolidated financial statements include the accounts of GCEH and its subsidiaries, and have been prepared in accordance with U.S. GAAP. References to the “ASC” hereafter refer to the Accounting Standards Codification established by the Financial Accounting Standards Board (“FASB”) as the source of authoritative U.S. GAAP. All intercompany accounts and transactions have been eliminated in consolidation.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
There can be no assurance that sufficient liquidity can be obtained on terms acceptable to the Company, or at all. As a result, and given the high volatility in the capital markets, as well as our ongoing legal matters with Exxon, the Company has concluded that management’s plans do not alleviate the substantial doubt about our ability to continue as a going concern beyond one year from the date the condensed consolidated financial statements are issued. The accompanying condensed consolidated financial statements do not include any adjustments relating to the recoverability and classification of assets and their carrying amounts, or the amounts and classification of liabilities that might result from the outcome of this uncertainty.
BKRF OCB, LLC, an indirect, wholly-owned subsidiary of GCEH, is a party to a $437.6 million secured term loan agreement (the “Senior Credit Agreement”). The purpose of this facility is to provide cash to BKRF to facilitate the construction of the refinery.
On August 5, 2022, certain subsidiaries of the Company entered into Amendment No. 9 to the senior secured term loan credit agreement to, among other things, increase the Tranche B Commitments thereunder by $60 million to $397.6 million, extend the start date of the Bakersfield Renewable Fuels Refinery to March 31, 2023, and implement certain other commercial arrangements as described therein. Existing defaults and potential events of defaults under the Senior Credit Agreement, if any, were also waived by the lenders in connection with the effectiveness of Amendment No. 9. As payment of an amendment and upsize premium, the Company issued to the lenders warrants to purchase up to 7,468,929 shares of the Company’s common stock, exercisable until December 23, 2028 at an exercise price of $2.25 per share.
On January 30, 2023, we entered into Amendment No. 10 to our Senior Credit Agreement, pursuant to which the lenders agreed to, among other things, a series of Tranche C Commitments in an amount of up
to $40
million, which will be available to be drawn through June 30, 2023.
In addition, the amendment provides for (i) an increase in the underlying interest rate on the loans following the effective date of the amendment from 12.5% to 15%, (ii) the ability to pay interest in kind (in lieu of a cash payment) for the periods ending March 31, 2023 and June 30, 2023, (iii) a change in the maturity date to December 31, 2025, (iv) an agreement to raise at least $10 million in new capital by March 31, 2023, and $100 million by April 1, 2024, and (v) certain governance rights, including certain limited rights for the administrative agent to put forth nominees to our Board of Directors. The requirement to raise at least $10 million in new capital has been extended to June 30, 2023. As of March 31, 2023, we have borrowed $419.6 million under the Senior Credit Agreement
and have $18.0 million available to be borrowed. Subsequent to March 31, 2023, we have borrowed an additional $15 million under the Senior Credit Agreement, resulting in $3 million available to be borrowed as of May 15, 2023.
We also agreed, in relation to Amendment No. 10 of the Senior Credit Agreement, to pay to the lenders an upsize premium of $2.0 million and issue warrants to purchase up to 15,000,000 shares of the Company’s common stock, exercisable until December 23, 2028 at an exercise price of $0.075 per share.
Pursuant to Amendment No. 10, the Company also agreed to grant to the administrative agent a security interest in all assets of SusOils, pursuant to a pledge and security agreement, dated as of January 30, 2023, by and among the Company, SusOils, and Orion Energy Partners TP Agent, LLC, as the collateral agent (the “Security Agreement”). If prior to June 30, 2025, the principal amount of the loans under the Senior Credit Agreement is below $300 million, or on and after June 30, 2025 the principal amount of loans under the Senior Credit Agreement is below $200 million, then the security interest will automatically terminate. The right to foreclose on the collateral is limited to specific fundamental events of default under the Senior Credit Agreement, including payment defaults and defaults arising from bankruptcy related actions.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
On February 23, 2022, we issued 145,000 shares of our newly created Series C Preferred Stock (the “Series C Preferred”) and five-year warrants (the “GCEH Warrants”) to purchase up to an aggregate of 18,547,731 shares of our common stock (5,017,008 issued to settle the Warrant Commitment Liability) at an exercise price of $2.25 per share to ExxonMobil Renewables LLC (“ExxonMobil Renewables”), an affiliate of ExxonMobil, and 11 other institutional investors (all of whom are Senior Lenders under our existing Senior Credit Agreement) for an aggregate purchase price of $145 million and the settlement of the Warrant Commitment Liability. As additional consideration for ExxonMobil’s investment, we also granted ExxonMobil Renewables additional warrants (the “GCEH Tranche II Warrants”) to purchase up to 6.5 million shares of common stock at an exercise price per share of $3.75 until February 22, 2028, and a warrant to acquire 33% (19,701,493 shares) of our SusOils subsidiary for $33 million ($1.675 per share) until February 22, 2027 (“SusOil Warrant”). On August 5, 2022, the GCEH Tranche II Warrants were amended to an exercise price of $2.25 per share and the exercise period for all of the ExxonMobil warrants were extended to December 23, 2028. Each of the GCEH Warrants, GCEH Tranche II Warrants and SusOil Warrant may be exercised for cash or by means of cashless exercise, however the GCEH Tranche II Warrants cannot be exercised until the earlier of (i) the date on which ExxonMobil extends the term of the five-year Offtake Agreement (as described below), which did occur on August 5, 2022, that we entered into with ExxonMobil effective April 10, 2019 (as amended), or (ii) a change of control, sale, or the dissolution of the Company. On August 5, 2022, the SusOil Warrant was amended to an exercise price of $1 million ($0.0507 per share). Under the Certificate of Designations of the Series C Preferred, the holders of the Series C Preferred are entitled to receive dividends at a rate of 15%, compounded quarterly provided that, until March 31, 2024, we may elect not to pay some or all of the accrued dividends in cash, in which case the unpaid dividends shall accrue and be added to the original issuance price of the shares of Series C Preferred. The shares of Series C Preferred have no voting rights, except as required by law or with respect to certain protective provisions in the Certificate of Designations. For such time as ExxonMobil holds any shares of Series C Preferred, ExxonMobil will have the right, exercisable at its option, to appoint two directors to GCEH’s Board of Directors. If the Series C Preferred shares have not been redeemed prior to the fifth anniversary of issuance, or upon an event of default under the Certificate of Designations, ExxonMobil will have the right to appoint a majority of the Board of Directors. The Certificate of Designations provides that we will have the right, at any time, to redeem/repurchase the outstanding shares of Series C Preferred (in increments of no less than $25 million), for an amount equal to the Corporate Redemption Price (as defined in the Certificate of Designations) at any time the Series C Preferred is outstanding. The Certificate of Designations of the Series C Preferred Stock provides for mandatory redemption upon a Change of Control or Event of Default (as defined therein) and are not convertible into shares of our common stock. GCEH may redeem the Series C Preferred Stock at any time within the first two years at 1.85 times, and the next three years at 2.0 times, the amount of the investment (including any accrued unpaid dividends).
In April 2019, the Company entered into a binding Product Offtake Agreement (the
“Offtake Agreement” or “POA”
) with ExxonMobil pursuant to which ExxonMobil has committed to purchase 2.5 million barrels per year of renewable diesel annually (the “Committed Volume”) from the Bakersfield Renewable Fuels Refinery (including the Renewable Identification Numbers (“RINs”) allocated to such quantities of renewable diesel), and the Company has committed to sell these quantities of renewable diesel to ExxonMobil. ExxonMobil’s obligation to purchase renewable diesel will last for a period of five years following the date that the Bakersfield Renewable Fuels Refinery commences operations. ExxonMobil has the option to extend the initial five-year term.
In April 2021, BKRF entered into a Term Purchase Agreement (“TPA”) with ExxonMobil under which ExxonMobil has the right to purchase additional quantities of renewable diesel from our Bakersfield Renewable Fuels Refinery, and the Company is obligated to sell such additional amounts of renewable diesel to ExxonMobil. Under the Offtake Agreement, ExxonMobil committed to purchase the Committed Volume from the Bakersfield Renewable Fuels Refinery. However, the Bakersfield Renewable Fuels Refinery is designed to produce more than the Committed Volume. Under the TPA, following the Start Date, ExxonMobil has the exclusive right to purchase all renewable diesel produced in excess of the Committed Volume that we sell to ExxonMobil under the Offtake Agreement. The Company also agreed to transfer title to ExxonMobil of the RINs allocated to the quantities of renewable diesel purchased under the TPA. In the event that ExxonMobil does not purchase all of the renewable diesel that it can under the TPA and, as a result, our inventory levels exceed certain specified levels, the Company can sell that extra inventory to third parties. The TPA has a five-year term. ExxonMobil has the option to extend the initial five-year term for a second five-year term if it elects to extend the Offtake Agreement.
In connection with the transactions contemplated by Amendment No. 9, the Company also entered into a transaction agreement with ExxonMobil Renewables and ExxonMobil, pursuant to which, among other things, certain subsidiaries of the Company and ExxonMobil entered into amendments to the Company’s Off
t
ake Agreement and Term Purchase Agreement in order to extend the initial terms thereof to 66 months, to increase certain committed volumes under the Off
t
ake Agreement from 105 million gallons per year (“MGPY”) to 135 MGPY, and to implement certain other commercial arrangements between the parties as described therein in exchange for issuing new immediately-vested warrants and modifying existing outstanding warrants (see Note H).
On February 28, 2023, we received notice from ExxonMobil, that effective as of July 1, 2023, ExxonMobil was irrevocably terminating the Offtake Agreement without any further action of ExxonMobil, upon failure of the Bakersfield Renewable Fuels Refinery to commence operations contemplated by the Offtake Agreement by June 30, 2023
On March 5, 2023, we notified ExxonMobil that its purported termination of the Offtake Agreement is ineffective under the terms of the Offtake Agreement, and that we reserve and will enforce all of our rights under the Offtake Agreement, including without limitation those rights that automatically extend the Start Date. Termination of the Offtake Agreement will result in termination of the TPA and would constitute an event of default under our Senior Credit Agreement.
If the Start Date is extended under the Offtake Agreement and the Bakersfield Renewable Fuels Refinery commences operations prior to such extended Start Date, we believe that the parties’ obligations under the Offtake Agreement will not be terminated as of July 1, 2023.
Under both agreements, we retain 100% of the co-products, which include renewable propane, renewable naphtha and renewable butane.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
NOTE C - SIGNIFICANT ACCOUNTING POLICIES
In accordance with the Company’s credit facilities, the Company is required to advance the calculated interest expense on its borrowings at the time of such borrowings to the estimated operational date of the Bakersfield Renewable Fuels Refinery. This interest is deposited into a designated account and the appropriate amount is paid to the lenders at the end of each quarter. Additionally, the construction funds are deposited into their own designated account and deposited from that designated account into a BKRF account only upon approval by the lenders to pay for specific construction, facility, and related costs. These two accounts are restricted and not directly accessible by the Company for general use, although these funds are assets of the Company. The Company estimates how much of this cash is likely to be capitalized into the Bakersfield Renewable Fuels Refinery project in the form of a long-term asset, and classifies this amount as long-term. The Company makes this determination based on its budget, recent and near-term invoicing, and internal projections.
Cash and Cash Equivalents; Concentration of Credit Risk
The Company considers all highly liquid debt instruments maturing in six months or less to be cash and cash equivalents. The Company maintains cash and cash equivalents at high quality financial institutions. However, deposits exceed the federally insured limits. At March 31, 2023, the Company had approximately $2.7 million in uninsured cash.
Foreign Currency Translation
Our Spanish subsidiary uses the Euro as its functional currency. Assets and liabilities are translated using exchange rates at the balance sheet dates, and revenues and expenses are translated at weighted average rates. Adjustments from the translation process are recognized in stockholders’ equity as a component of accumulated other comprehensive loss. During the three months ended March 31, 2023, the Company recognized foreign translation income of $11 thousand and had a foreign translation loss of $2
thousand
for the three months ended March 31, 2022.
Inventories currently consist of Camelina seeds, grain, meal, and oil. Inventories are valued at the lower of cost or net realizable value. Cost is determined based on standard cost. On March 31, 2022, the Company recognized a loss in the amount of $319 thousand due to inventories being adjusted to the lower of cost or net realizable value. There was no lower of cost or net realizable value adjustments made to the inventory values reported as of March 31, 2023 or as of December 31, 2022.
Property, Plant and Equipment
Property, plant and equipment are stated at cost. Depreciation of office equipment and transportation equipment are computed using the straight-line method over estimated useful lives of 3 to 5 years. Refinery assets and buildings are depreciated using the straight-line method over estimated useful lives of 5 to 25 years. However, the refinery will not begin to be depreciated until its retrofitting has been completed and it is ready for operations. Normal maintenance and repair items are charged to operating costs and are expensed as incurred. The cost and accumulated depreciation of property, plant and equipment sold or otherwise retired are removed from the accounts and any gain or loss on disposition is reflected in the statements of operations. Interest on borrowings related to the retrofitting of the Bakersfield Renewable Fuels Refinery is being capitalized, which will continue until the refinery is placed in service. During the three months ended March 31, 2023 and March 31, 2022, interest of $22.0 million and $10.8 million, respectively, was capitalized and is included in property, plant and equipment, net, for a total of $117.5 million of capitalized interest for the project.
In accordance with U.S. GAAP for the impairment or disposal of long-lived assets, the carrying values of intangible assets and other long-lived assets are reviewed on a regular basis for the existence of facts or circumstances that may suggest impairment. The Company recognizes impairment when the aggregate of the expected undiscounted future cash flows is less than the carrying amount of the asset. Impairment losses, if any, are measured as the excess of the carrying amount of the asset over its estimated fair value. During the three months ended March 31, 2023 and 2022, there were no impairment losses recognized on long-lived assets.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
The following table provides a reconciliation of the changes in asset retirement obligations for the three months ended March 31, 2023 and the year ended December 31, 2022.
| | Three months ended March 31, 2023 | | | Year ended December 31, 2022 | |
Asset retirement obligations - beginning of period | | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
Asset retirement obligations - end of period | | | | | | | | |
The amounts shown as of March 31, 2023 and December 31, 2022 include $5.0 million and $2.8 million, respectively, which have been classified as current liabilities and included in accrued liabilities and $16.3 million and $18.3 million which have been classified as long term liabilities as of March 31, 2023 and December 31, 2022, respectively.
The Company utilizes the liability method of accounting for income taxes. Under the liability method, deferred tax assets and liabilities are determined based on differences between financial reporting and tax basis of assets and liabilities and the carryforward of operating losses and tax credits, and are measured using the enacted tax rates and laws that will be in effect when the differences are expected to reverse. A valuation allowance against deferred tax assets is recorded when it is more likely than not that such tax benefits will not be realized. Assets and liabilities are established for uncertain tax positions taken or positions expected to be taken in income tax returns when such positions are judged to not meet the “more-likely-than-not” threshold based on the technical merits of the positions. Estimated interest and penalties related to uncertain tax positions are included as a component of general and administrative expense. The Company has recorded a 100% valuation allowance against the deferred tax assets as of March 31, 2023 and December 31, 2022.
The Company recognizes revenue in accordance with ASC 606, Revenue From Contracts With Customers, using the following five-step model: (1) identify the contract with the customer, (2) identify the performance obligations in the contract, (3) determine the transaction price, (4) allocate the transaction price to the performance obligations in the contract, and (5) recognize revenue. The Company is engaged in contracting with farmers to grow camelina grain that will be processed into oil for use in Bakersfield Biorefinery. The Company recognizes revenues upon the sale of its patented camelina seed to the farmers and also for the crushed camelina meal that it plans to sell to third party livestock and poultry operators. The Company recognized in the three months ended March 31, 2023 and March 31, 2022 $1.3 million and $0.4 million in revenue, respectively. Based upon the Company’s Product Offtake Agreement (see Note B - Liquidity), the Company expects to begin recognizing revenue from the sale of renewable diesel upon the start-up of the Bakersfield Renewable Fuels Refinery and upon such time the Company delivers on its performance obligations.
In exchange for the amendment to the POA and the TPA agreement, the Company provided consideration, in the form of warrants, which was capitalized as a contract asset and will be amortized over the life of the contracts on a per gallon basis as the underlying product, renewable diesel, is produced and sold under the contracts. (see Note H – Stock options and warrants)
Research and development costs are charged to operating expenses when incurred, which were nominal for the three months ended March 31, 2023 and March 31, 2022.
Fair Value Measurements and Fair Value of Financial Instruments
As of March 31, 2023 and December 31, 2022, the carrying amounts of the Company's financial instruments that are not reported at fair value in the accompanying consolidated balance sheets, including cash, cash equivalents, and restricted cash, accounts receivable, and accounts payable and accrued liabilities approximate their fair value due to their short-term nature. As of March 31, 2023 and December 31, 2022, the carrying amount of the Company's
convertible note payable to the executive officer, which is a
financial instrument that
is
not reported at fair value in the accompanying consolidated balance sheets,
approximates its
fair value due to the recent amendments that reflect current market conditions. The Class B Units, issued by BKRF HCB, LLC, are reported at fair value. The Senior Credit Agreement is a long-term fixed rate debt instrument which has a carrying amount that is approximately at fair value based on a comparison of recently completed market transactions.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
The table below summarizes our notes payable and long-term debt at March 31, 2023 and at December 31, 2022:
| | | | | | |
| | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
Less: current portion of long-term debt | | | | | | | | |
Less: unamortized debt discount and issuance costs | | | | | | | | |
| | | | | | | | |
| | | | | | | | |
Convertible note payable to executive officer | | | | | | | | |
| | | | | | | | |
| | | | | | | | |
Senior Credit Agreement and Bridge Loan:
On May 4, 2020, BKRF OCB, LLC, a wholly-owned subsidiary of GCEH, entered into the Senior Credit Agreement with a group of lenders (the “Senior Lenders”) pursuant to which the Senior Lenders agreed to provide a $300.0 million senior secured term loan facility to BKRF OCB to pay the costs of retooling the Bakersfield Renewable Fuels Refinery. Through various amendments, the commitments under the Senior Credit Agreement have subsequently been increased to $437.6 million. As of March 31, 2023, we have borrowed $419.6 million under the Senior Credit Agreement, and have borrowed an additional $15 million through May 15, 2023. Outstanding term loans under the Senior Credit Agreement bear interest at the rate of 12.5% per annum as further amended below, payable quarterly, provided that the borrower may defer up to 2.5% interest to the extent it does not have sufficient cash to pay the interest, which the deferred interest was increased up to 3.5% effective February 23, 2022, and under Amendment No. 9 effective August 5, 2022, the deferred interest can be the full 12.5% interest for the third and fourth quarters of 2022. The Company deferred interest payments of $16.2 million in the three months ending March 31, 2023 for a total outstanding amount of $474.3 million as of March 31, 2023. The principal of the Senior Credit Agreement, originally set to mature November 2026, now matures December 2025 pursuant to Amendment No. 10 as further discussed below, provided that BKRF OCB, LLC must offer to prepay the senior loans with any proceeds of such asset dispositions, borrowings other than permitted borrowings, proceeds from damage or losses at the refinery, and excess net cash flow. BKRF OCB, LLC may also prepay the senior loans in whole or in part with the payment of a prepayment premium. As additional consideration for the senior loans, the Senior Lenders are issued Class B Units in BKRF HCP, LLC, an indirect parent company of BKRF OCB, LLC, as the Company draws on the Senior Credit Agreement. The fair value of the Class B Units are initially recognized at fair value and subsequently re-measured at fair value each reporting period with changes recognized in earnings. The Class B Units are discussed further below.
On March 26, 2021, Amendment No. 3 to the Senior Credit Agreement was made effective to more accurately reflect the updated scope and cost estimates of the Bakersfield Renewable Fuels Refinery and to establish a contingency reserve account to fund the costs of the additional capabilities and equipment and to fund possible cost overruns. Concurrently, Consent No. 2 and Amendment No. 2 to the Senior Credit Agreement were made effective, which, among other things, established a consent premium equal to 1.00% of the aggregate commitments (“Consent Premium”), to be paid in the form of equity or cash to the Lenders, subject to whether the Company raises capital of $35 million prior to July 31, 2021. The Consent Premium was paid in connection with the consummation of the Series C Financing on February 23, 2022, as described below.
On May 19, 2021, Amendment No. 4 to the Senior Credit Agreement was made effective to replace the Engineering, Procurement and Construction Agreement dated April 30, 2020 with ARB, Inc. (the “ARB EPC Agreement”), effective immediately with a Engineering, Procurement and Construction Agreement with CTCI. (the “CTCI EPC Agreement”). The subcontracts for the Bakersfield Renewable Fuels Refinery will remain in effect and are being subsumed in the CTCI EPC Agreement. Accordingly, the subcontractors will continue to provide their services for the Bakersfield Renewable Fuels Refinery through CTCI.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
On July 29, 2021, Amendment No. 5 to the Senior Credit Agreement was made effective to increase the amount of funding available under the Senior Credit Agreement by $4.4 million, to $317.6 million. In addition, under Amendment No. 4 and Amendment No. 5, the parties agreed to change the date by which the borrowers under the two credit agreements (the Company’s BKRF OCB, LLC and BKRF HCB, LLC subsidiaries) had to establish an additional cash contingency reserve of at least $35 million from July 31, 2021 to September 15, 2021. Further, with respect to the Consent Premium established on March 26, 2021, Amendment No. 5 constituted that the Consent Premium will be payable by the Company issuing warrants to purchase shares of the Company’s common stock. The warrants were to be issued on the earlier of September 15, 2021 or the closing of an equity raise in which the Company sells at least $10 million of its common stock.
The Company subsequently received a waiver extending equity raise target date to November 19, 2021 and again in November 2021, based on further discussion with Senior Lenders, was waived until the December 20, 2021 amendment discussed below.
On December 20, 2021, Amendment No. 6 to Senior Credit Agreement was made effective, which, among other things, increased the amount of funding available under the Senior Credit Agreement by $20.0 million to $337.6 million and to provide a new Bridge Loan facility in an aggregate principal amount of $20.0 million. The Bridge Loan bore interest at the rate of 12.5% per annum and had a stated maturity date of January 31, 2022. The Bridge Loan was paid in full on February 23, 2022 in connection with the Series C Financing. In connection with Amendment No. 6 to the Senior Credit Agreement, GCEH committed to the Senior Lenders to issue warrants covering 5,017,008 shares of common stock of GCEH at an exercise price to be determined based on a market pricing mechanism upon the completion of the Series C Financing for a term of five years from that date. These warrants were issued on February 23, 2022 in connection with the consummation of the Series C Financing, and were issued in consideration for (i) the Consent Premium payable from an earlier amendment to the Senior and Mezzanine Credit Facilities, (ii) the Bridge Loan, and (iii) as additional creditor fees for forbearance to the Senior Lenders and Mezzanine Lenders.
Also on December 20, 2021, the Company entered into Forbearance and Conditional Waiver Agreement and Consent No. 5, Forbearance and Conditional Waiver Agreement. Under the respective forbearance agreements, the Senior Lenders agreed to forbear from exercising their rights and remedies under the Senior Credit Agreement, the Mezzanine Credit Agreement, and the related Financing Documents with respect to all Defaults and Events of Default thereunder. Such Defaults and Events of Default were waived upon the consummation of the Series C Financing and the payment of a cash equity contribution to the senior borrower of $115 million.
On January 7, 2022, the Company borrowed an incremental $8.0 million on the Bridge Loan, and the total outstanding at that time was $20.0 million.
On February 2, 2022, Amendment No. 7 to Senior Credit Agreement was made effective, which, among other things, extended the forbearance period and each respective deadline to satisfy the conditions precedent for the conditional waivers to become permanent waivers were extended from January 31, 2022 to February 23, 2022. Additionally, the maturity date of the Bridge Loan was extended from January 31, 2022 to February 23, 2022 and was fully paid on February 23, 2022.
On February 23, 2022, Amendment No. 8 to the Senior Credit Agreement modified a previous provision whereby the Bakersfield Renewable Fuels Refinery needs to achieve Substantial Completion, as defined under the Senior Credit Agreement, no later than August 31, 2022, or an event of default occurs and the Senior Lenders have the right to accelerate the loan for immediate payment of all principal and interest accrued to that date. The amendment also requires a quarterly principal prepayment amount to achieve an agreed-upon end-of-quarter targeted debt balance designed to meet the full payment of the Senior Credit Agreement by November 4, 2026. The Company is only obligated to pay this quarterly principal amount to achieve these targeted debt balances to the extent there is available cash under the specific calculations required in the Senior Credit Agreement. The full amount of the loan matures and is due on November 4, 2026. Additionally, the $35 million reserve requirement from Amendment No. 3 was eliminated by Amendment No. 8 in conjunction with the Series C Preferred Financing.
Effective as of February 23, 2022, the Senior Credit Agreement was further amended to permit the Loan Parties to defer up to 3.50% per annum of the interest until the earlier of September 30, 2022 or the final completion of the retooling of the Bakersfield Renewable Fuels Refinery, with all deferred interest being added to principal. In addition, effective as of February 23, 2022, the parties agreed to various amendments to the representations and warranties, affirmative and negative covenants and events of default in the senior loan facility, including (i) the Company’s loan subsidiaries may enter into working capital facilities in an amount of up to $125 million without the Senior Lenders’ consent, and the Company agreed to use its commercially reasonable efforts to enter into a permitted working capital facility on or before June 30, 2022; (ii) the retooling of the Bakersfield Renewable Fuels Refinery must be substantially complete by August 31, 2022 (subject to extension for up to 90 days as described above); and (iii) the final completion of the retooling of the Bakersfield Renewable Fuels Refinery must be achieved by January 31, 2023.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
On August 5, 2022, certain subsidiaries of the Company entered into Amendment No. 9 to the Senior Credit Agreement to, among other things, increase the Tranche B Commitments thereunder by $60 million to $397.6 million, extend the operation date of the Bakersfield Renewable Fuels Refinery to March 31, 2023, and implement certain other commercial arrangements as described therein. Existing defaults and potential events of defaults under the Senior Credit Agreement, if any, were also waived by the lenders in connection with the effectiveness of Amendment No. 9. The Company’s loan subsidiaries may enter into working capital facilities in an amount of up to $125 million without the Senior Lenders’ consent, and the Company agreed to use its commercially reasonable efforts to enter into a permitted working capital facility on or before October 1, 2022 with a 90-day extension based on the start-up of the refinery; (ii) the retooling of the Bakersfield Renewable Fuels Refinery must be substantially complete by March 31, 2023 (subject to extension for up to 90 days as described above); and (iii) the final completion of the retooling of the Bakersfield Renewable Fuels Refinery must be achieved within
six
m months of the substantially complete date. The Company has deferred 100% of its cash interest payment due on September 30, 2022 and expects it will also defer 100% of its cash interest payment due on December 31, 2022, as such payments are allowed under the paid in kind provisions of the Senior Credit Agreement.
On January 30, 2023, we entered into Amendment No. 10 to our Senior Credit Agreement whereby the Senior Lenders agreed to a series of Tranche C Commitments under the Senior Credit Agreement in an amount of up to $40 million, which will be available to be drawn through June 30, 2023. In addition, the amendment provided for (i) an increase in the underlying interest rate on the loans following the effective date of the amendment from 12.5% to 15%, (ii) the ability to pay interest in kind (in lieu of a cash payment) for the periods ending March 31, 2023 and June 30, 2023, (iii) a change in the maturity date to December 31, 2025, (iv) an agreement to raise at least $10 million in new capital by March 31, 2023, and $100 million by April 1, 2024, and (v) certain governance rights, including certain limited rights for the Administrative Agent to put forth nominees to the Board of Directors of the Company. Additionally, the Company agreed to grant to the Administrative Agent a security interest in all assets of SusOils pursuant to a pledge and security agreement, dated as of January 30, 2023, by and among the Company, SusOils, and Orion Energy Partners TP Agent, LLC, as the collateral agent. If prior to June 30, 2025, the principal amount of the loans under the Credit Agreement is below $300,000,000, or on and after June 30, 2025 the principal amount of loans under the Credit Agreement is below $200,000,000, then the security interest will automatically terminate. The right to foreclose on the collateral is limited to specific fundamental events of default under the Senior Credit Agreement, including payment defaults and defaults arising from bankruptcy related actions. The requirement to raise $10 million by March 31, 2023 has been extended to June 30, 2023.
Rather than issuing additional Class B Units when Tranche C Commitments are funded, Amendment No. 10 obligates the Company to issue to the Tranche C lenders, warrants to purchase up to 15,000,000 shares of the Company’s common stock, exercisable until December 23, 2028 at an exercise price of $0.075 per share (the “Tranche C Lender Warrants”). Through March 31, 2023, $22.0 million of the total $40.0 million Tranche C Commitments had been funded. In connection with this funding, 8,250,000 Tranche C Lender Warrants were issued. Additionally, if the Tranche C loans are prepaid prior to December 31, 2025, the Tranche C loans are subject to a subordinated premium (the “Tranche C Subordinated Premium”) which requires the Company to pay an additional amount upon repayment equal to the interest, with respect to any Tranche C Loan, that would have been payable over the 79-month anniversary of the applicable Tranche C loan funding date. The Tranche C Lender Warrants result in a discount on the Tranche C loans that will be recognized over the contractual term of the Tranche C loans through interest expense. During the three months ended March 31, 2023, the Company recognized a debt discount related to the issuance of 8,250,000 Tranche C Lender Warrants in the amount of $8,607,266 (See Note H)
.
Mezzanine Credit Facility
On May 4, 2020, BKRF HCB, LLC, the indirect parent of BKRF OCB, LLC, entered into a Mezzanine Credit Facility with a group of Mezzanine Lenders who agreed to provide a $
65
million secured term loan facility to be used to pay the costs of repurposing and starting up the Bakersfield Renewable Fuels Refinery. Subsequently, the Mezzanine Credit Facility was increased to $
67.4
million. In connection with the Series C Financing, on February 23, 2022 the Mezzanine Credit Facility was assigned to, and assumed by GCEH and the Mezzanine Lenders have no further rights to the Mezzanine Credit Facility.
The Company amended a derivative forward contract with the counterparty which terminated the derivative forward contract and replaced it with a fixed payment obligation. Under the terms of the fixed payment obligation, the Company agreed to pay the counterparty a total of $23.1 million, which included a payment of $5.5 million in April 2020, and six equal installment payments in 2022 totaling $17.6 million. Under the subsequent revised terms of the fixed payment obligation in April 2020, the Company agreed to pay the counterparty a total of $24.8 million, which included a payment of $4.5 million in June 2020 (which was paid), and six equal monthly installment payments beginning in May 2022 for a total of $20.3 million. For financial reporting purposes, the fixed payment obligation has been recorded at the present value of future payments, using a discount rate of 14.8%. Effective May 11, 2022, the Company agreed with the counterparty to amend the payment structure whereby the Company was to begin making payments beginning one month after the Bakersfield Renewable Fuels Refinery began operations and generated revenues, but no later than January 2023. The total amount of payments was increased to $22.8 million and would start at $1.5 million in the first month and escalate monthly to approximately $6.2 million at the sixth month which would be the final payment. Effective February 27, 2023, we amended our fixed payment obligation whereby we will begin making payments in September 2023 with the first payment of $1.2 million and escalating monthly with the final payment of $6 million scheduled for March 2024. The total amount of the payments is now $26.4 million.
Included in “Other notes” as of March 31, 2023, in the above table, is a note, that is due upon demand related to the Company’s business activities prior to 2019, in the principal amount of $1.3 million and an interest rate of 18% per annum. Also included in “Other notes” above, are several notes payable that are used to finance the Company’s insurance policies. At various times the Company enters into new insurance policies to replace certain policies that are expiring and to insure for additional identified risks. As of March 31, 2023, the Company had one policy financed at a rate of 5.45% with a down payment of 9% with monthly payments through June 2023. In April 2023, the Company financed another insurance policy in the principal amount of $3.4 million at a rate of 8.2% with a down payment of 30% with five monthly payments through September 2023. The Company expects that it will continue to finance certain policy premiums.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
In August 2022, the exercise date was amended to December 28, 2028. If these warrants are exercised, the Company will receive additional proceeds of $41.7 million. Separately the Company issued the GCEH Tranche II Warrant (which allows for the purchase of up to 6.5 million shares of our common stock at an exercise price of $3.75 per share until February 22, 2028) and a warrant to purchase 33% (19,701,493 shares) of our SusOils subsidiary for an exercise price of $1.675 per share until February 27, 2027.
In August 2022, the GCEH Tranche II Warrant was amended to an exercise price of $2.25 per share and the SusOils warrant exercise price was reduced to $0.05076 per share, and the terms for both warrants were extended to December 28, 2028. If these warrants are exercised for cash, the Company will receive an additional $14.6 million and $1 million, respectively. There were new warrants issued in August. The Senior Lenders received warrants to purchase 7,468,929 shares of common stock, exercisable until December 23, 2028 at an exercise price of $2.25. ExxonMobil Renewables received 2,489,643 warrants on the same terms. If these warrants are exercised for cash, the Company will receive an additional $22.4 million.
As a result of issuing new immediately-vested warrants and modifying existing outstanding warrants to ExxonMobil in exchange for increasing the committed volumes of renewable diesel and extending the term of the agreement by an additional six months under the existing Product Offtake Agreement on August 5, 2022, the Company concluded these warrants represent consideration payable to a customer in accordance with ASC 606,
Revenue from Contracts with Customers
. The Company valued this consideration in accordance with ASC 718,
Compensation – Stock Compensation
, using the Black-Scholes option pricing model with the following assumptions:
| | | | |
| | | | |
SusOils Warrant Volatility | | | | |
| | | | |
| | | | |
This amount was determined to be $15.6 million and is reflected initially as a Contract asset - related party on the condensed consolidated balance sheets and will be amortized over the term of the underlying contract as the Company satisfies its performance obligations. There was no amortization for the three months ended March 31, 2023.
In January 2023, under Amendment No. 10 of the Senior Credit Agreement, we agreed to issue warrants to our Senior Lenders to purchase up to 15,000,000 shares of the Company’s common stock, exercisable until December 23, 2028 at an exercise price of $0.075 per share. During the three months ended March 31, 2023, the Company issued 8,250,000 warrants for funds drawn under Amendment No. 10. If these warrants are exercised for cash, the Company will receive an additional $0.6 million. As of May 15, 2023, the Company has issued an additional 5,625,000 warrants under the same terms for additional funds drawn under Amendment No. 10. for a total 13,875,000 warrants issued under amendment No. 10. If these additional warrants are exercised for cash, the Company will receive an additional $0.4 million. T
he Company valued this consideration, using the Black-Scholes option pricing model with the following assumptions:
The effective tax rate for the three months ended March 31, 2023 and 2022 i
s 0.4% and 0.4%, res
pectively.
Provision for income taxes consists of U.S. and state income taxes and income taxes in certain foreign jurisdictions in which the Company conducts business. The Company is in an overall deferred tax asset position in the U.S. and maintains its valuation allowance for certain federal and state tax jurisdictions as existing deferred tax liabilities do not provide sufficient future taxable income to realize the full benefit of its deferred tax assets.
During the three months ended March 31, 2023 and 2022, the Company did not record any material interest or penalties related to uncertain tax positions.
GLOBAL CLEAN ENERGY HOLDINGS, INC. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
The Company files tax returns in the U.S. federal jurisdiction, and in multiple state and foreign jurisdictions. The Company is no longer subject to U.S. federal income tax examinations for years before 2019 and is no longer subject to state, local and foreign income tax examinations by tax authorities for years before 2018. The Company is currently not under audit by any jurisdictions.
NOTE J – COMMITMENTS AND CONTINGENCIES
Engineering, Procurement and Construction Contract
On April 30, 2020, GCE Acquisitions entered into an Engineering, Procurement and Construction Agreement with a national engineering firm pursuant to which this firm agreed to provide services for the engineering, procurement, construction, (“EPC”) start-up and testing of the Bakersfield Renewable Fuels Refinery. The agreement, which was assigned by GCE Acquisitions to BKRF OCB, LLC, the borrower under the Senior Credit Agreement, provides for this engineering firm to be paid on a cost-plus fee basis subject to a guaranteed maximum price of $201.4 million, subject to increase for approved change orders. As of May 17, 2021, the remaining balance of the contract was approximately $151 million. On May 19, 2021 we notified our original EPC firm that we were terminating the EPC Agreement, effective immediately. The cumulative billing on the EPC contract through June 30, 2021 was $63.2 million. The two major subcontracts for the Bakersfield Renewable Fuels Refinery were not terminated and were subsumed in the new replacement EPC agreement (see below). Accordingly, the two major subcontractors have continued to provide their services for the Bakersfield Renewable Fuels Refinery.
On May 18, 2021,
our BKRF subsidiary and CTCI, entered into the CTCI EPC Agreement. CTCI Americas is a leading provider of reliable engineering, procurement and construction services, including for the refinery market. Under the CTCI EPC Agreement, CTCI has agreed to provide services to complete the engineering, procurement, construction, pre-commissioning, commissioning, start-up and testing of our renewable diesel production facility under construction in Bakersfield, California. The guaranteed maximum price under the CTCI EPC Agreement, comprising CTCI’s fees and costs, including direct costs, overhead fees and the contractor’s fee was
$178 million.
The obligations of CTCI have been guaranteed by CTCI Corporation, the Taiwanese parent company of CTCI.
On January 10, 2023, our BKRF subsidiary entered into Amendment No. 2 (the “Amendment”) to the CTCI EPC Agreement. Pursuant to the Amendment, BKRF and CTCI agreed to, among other things: (i) a new guaranteed maximum price of $275 million (subject to upward adjustment pending final settlement of certain change orders pursuant to the procedures set forth in the Amendment) (the “New GMP”); (ii) a change to the payment dates for costs and fees that are payable to CTCI under the CTCI EPC Agreement, which will now be payable after substantial completion of our Bakersfield Renewable Fuels Refinery (the “Project”) in 18 monthly installments; and (iii) provide for liquidated damages commencing on a new substantial completion date of March 31, 2023, which may only be adjusted in accordance with the CTCI EPC Agreement. In connection with the Amendment, the Company agreed to provide a payment guarantee in favor of CTCI for amounts that may be owed by BKRF under the CTCI EPC Agreement, pursuant to an owner parent guarantee, dated as of January 10, 2023, by and between the Company and CTCI.
As part of the Ame
ndment to the CTCI EPC Agreement whereby the Company is deferring its payments to CTCI for all amounts owed as of January 10, 2023 and subsequent billings up to a total of $275 million, subject to certain adjustments, until the first of the month following the achievement of substantial completion of its Bakersfield Renewable Fuels Refinery. Payments will then be scheduled equally over eighteen months, except for accrued interest through the first payment shall be due with the first principal payment and then accrued interest shall be added to each subsequent month accordingly. The interest rate shall be the prime rate as published in the Wall Street Journal on the Amendment Effective Date, adjusted up or down monthly on the first day of each month thereafter should the Wall Street Journal prime rate fluctuate, plus 50 basis points (i.e., 0.5%). The interest rate will be recalculated on the first day of each month thereafter. The Company has paid $146.3 million to CTCI with the remaining amount owed as principal of $128.7 million which brings the full amount recorded to $275 million and is subject to certain adjustments, such as additive change orders.
On April 13, 2023, the Company received notice from CTCI demanding mediation and arbitration in connection with outstanding change order claims, and for other compensation it believes it is owed under the CTCI EPC Agreement. Pursuant to the demand, CTCI is seeking $550 million in total compensation under the CTCI EPC Agreement through the end of the project. While the Company is evaluating CTCI’s claims, it believes that many of CTCI's change order claims are without merit, and the Company intends to vigorously defend its position, including by asserting all rights, defenses and counterclaims that the Company may have under the CTCI EPC Agreement and at law. CTCI has separately advised the Company that it will continue work on the project site during the pendency of the proceedings. On April 28, 2023, the Company entered into a change order whereby the Company has agreed to pay up to a maximum of $15 million to reimburse CTCI for labor costs associated with accelerating the work effort which includes additional personnel, premium and/or overtime differential costs and increasing work shifts. This change order is included in the $275 million amount that is due to CTCI, but will be paid under the payment terms of the EPC contract and is not part of the deferred payment. As of May 15, 2023, the Company does not expect that the acceptance of any change orders identified in the Amendment is probable to aggregate to an amount above the New GMP. Amounts, if any, that would be in excess of the New GMP are not reasonably estimable, and as such an amount or range cannot be established.
I
tem 2: Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following discussion should be read in conjunction with the Company’s condensed consolidated financial statements and the related notes and other financial information appearing elsewhere in this Form 10-Q and with the audited consolidated financial statements and the related notes included in our Annual Report on Form 10-K for the fiscal year ended December 31, 2022 (“Annual Report”). The statements in this discussion regarding industry outlook, our expectations regarding our future performance, liquidity and capital resources, and other non-historical statements are forward-looking statements. These forward-looking statements are subject to risks and uncertainties, including, but not limited to, the risks and uncertainties described in “Cautionary Statements Regarding Forward-Looking Information,” and the risk factors included in our Annual Report, and other reports and filings made with the Securities and Exchange Commission (“SEC”). Our actual results may differ materially from those contained in or implied by any forward-looking statements.
Cautionary Statement Regarding Forward-looking Information
This report contains forward-looking statements. All statements, other than statements of historical are forward looking statements for purposes of this report, including statements about: the timing and cost to complete the conversion of our Bakersfield oil refinery into a renewable fuels refinery and thereafter to operate that refinery for the production of renewable fuels; our plans for large scale cultivation of Camelina as a nonfood-based feedstock and its use at our Bakersfield renewable fuels refinery; our plans to expand Global Clean Energy Holdings’ Camelina operations beyond North America; forecasts and projections of costs, revenues or other financial items; the availability, future price and volatility of feedstocks and other inputs; the plans and objectives of management for future operations; changes in governmental programs, policymaking and requirements or encouraged use of biofuels or renewable fuels; statements concerning proposed new products or services; the anticipated size of future Camelina production; future conditions in the U.S. biofuels and renewable fuels market; our ability to comply with the terms our Offtake Agreement that we entered into with ExxonMobil; our current and future indebtedness and our compliance, or failure to comply, with restrictive and financial covenants in our various debt agreements; our ability to raise additional capital to fund the completion of our Bakersfield oil refinery and for working capital purposes; our ability to continue as a going concern; and any statements of assumptions underlying any of the foregoing. In some cases, forward-looking statements can be identified by the use of terminology such as “may,” “will,” “expects,” “plans,” “anticipates,” “intends,” “believes,” “estimates,” “potential,” or “continue,” or the negative thereof, or other comparable terminology. Although we believe that the expectations reflected in the forward-looking statements contained herein are reasonable, there can be no assurance that such expectations or any of the forward-looking statements will prove to be correct, and actual results could differ materially from those projected or assumed in the forward-looking statements, including not to occur at all. Future financial condition and results of operations, as well as any forward-looking statements, are subject to inherent risks and uncertainties including those discussed in “Risk Factors”, and elsewhere in this Annual Report. All forward-looking statements included in this document are made as of the date hereof and are based on information available to us as of such date. We assume no obligation to update any forward-looking statement, whether as a result of new information, future events or otherwise
Global Clean Energy Holdings, Inc. and its subsidiaries (collectively, herein the “Company,” “we,” “us,” or “our”) is a vertically integrated renewable feedstocks and finished fuels company. Our business model is designed to control all aspects of the value chain, with one end of our business anchored in plant science and the other in renewable fuels production. We contract directly with farmers to grow our ultra-low carbon, nonfood, proprietary Camelina crop on fallow land to process at our renewable fuels refinery in Bakersfield, California (the “Bakersfield Renewable Fuels Refinery”). Once online, the 15,000 barrels per day (“BPD”) facility will sell up to its full production capacity of renewable diesel (“RD”).
Our focus is to be an economically viable solution in reducing global greenhouse gas (“GHG”) emissions via sustainable, more environmentally friendly alternatives to conventional petroleum-based fuels. The three pillars of sustainability — environmental, social, and economic — anchor our business philosophy. Through the implementation of these principals across our vertically integrated asset platform, we seek to drive long-term stakeholder value while creating a positive impact on food security by easing the demand on food crops for fuel production. By creating additive feedstock volume into an undersupplied market, our platform positions us as a globally scalable solution to the “Food vs. Fuel” quandary, while allowing us to continuously lower the carbon intensity of our finished fuels. We believe we can achieve “net zero” GHG footprint on all our finished fuels, including RD, renewable propane, renewable naphtha, and in the future, sustainable aviation fuel. By eliminating intermediaries and leveraging a vertically integrated model, we should maintain significant control of the full value chain which allows us to produce highly sustainable, low cost, high margin and ultra-low carbon finished fuels.
Over the past 15 years we have developed a portfolio of proprietary elite varieties of Camelina sativa (“Camelina”) to be used as a feedstock for our renewable fuels refinery, providing us with feedstock certainty unmatched in the industry. Our Camelina holds several advantages over traditional feedstocks, such as soybean oil, yielding additional Low Carbon Fuel Standard (“LCFS”) credits through a lower carbon intensity (“CI”) score, adding significant value to our end products. As a low water use rotational crop grown on fallow land, Camelina does not impact food production or compete with other crops for scarce water resources. The crop land available for potential Camelina production in the Western half of the U.S. is approximately 35 million acres. In addition, we have identified over 50 million acres of land in South America that is available for Camelina production. The result of our vertically integrated farm-to-fuel strategy is a highly sustainable, low cost, and ultra-low carbon finished fuel.
Utilizing a farm-to-fuels strategy meaningfully differentiates our platform from our competition. Our strategy is to control all aspects of the renewable fuels value chain: (i) our upstream operations, anchored in plant and soil science, develop and produce a patented, low cost, proprietary, nonfood-based crop for use in our downstream operations; (ii) our midstream operations efficiently handle, aggregate, store, and transport feedstock to our downstream operations; and (iii) our downstream operations process and convert feedstock into drop-in renewable fuels at the Bakersfield Renewable Fuels Refinery. By eliminating intermediaries and leveraging a vertically integrated model, we have unparalleled control throughout the value chain to maximize margin generation through operational and logistical efficiencies while simultaneously minimizing feedstock costs and our GHG footprint.
Bakersfield Renewable Fuels Refinery
The Bakersfield Renewable Fuels Refinery is being developed to process up to approximately 15,000 BPD (630,000 gallons) of renewable feedstock into renewable diesel. Upon completion, the Bakersfield Renewable Fuels Refinery is expected to initially produce an estimated 10,000 BPD of renewable diesel (420,000 gallons per day). At design capacity, the refinery is capable of producing approximately 210 million gallons per year of renewable diesel as well as other renewable co-products. We will need to make additional upgrades to the renewable fuels refinery in order to produce product at the maximum design capacity, as we will be hydrogen limited at initial start-up. We are reviewing our options to increase the hydrogen capacity on site. Additionally, it is anticipated that the renewable fuels refinery can be expanded to increase the nameplate volume, and we expect to size any hydrogen expansion capacity to a higher nameplate volume.
Since the purchase of Bakersfield Renewable Fuels Refinery in May of 2020, we have been focused on the retooling and converting the oil refinery into a state-of-the-art renewable fuels refinery. Our long-term goal is to utilize Camelina oil exclusively as the feedstock for the renewable diesel and other fuels produced at the Bakersfield Renewable Fuels Refinery. Various issues experienced to date and other factors beyond our control have delayed the date on which we expect to commence operations to sometime during the second half of 2023. For example, the conversion of the refinery has been delayed due to supply chain issues, engineering, procurement and construction issues with our lead contractor CTCI Americas, Inc. (“CTCI”), including lack of timely scheduling, untimely change order estimations, delay in ordering certain materials and unanticipated turnover of personnel to fully handle the workstreams of the project. We also experienced inefficiencies and delays from contracted engineering firms and supply chain issues related to the general lack of personnel and specialty firms to perform required material fabrication and the necessity of performing work that was not originally anticipated or budgeted. The project has experienced such delays despite steps taken by us to mitigate such delays. See
“Liquidity and Capital Resources
–
Commercial Agreements”
below for an additional discussion regarding the operation date of the Bakersfield Renewable Fuels Refinery and our Product Offtake Agreement with ExxonMobil (the “Offtake Agreement” or “POA”).
In order to finance the costs of the Bakersfield Renewable Fuels Refinery acquisition and the development, construction, and operation of the refinery, BKRF OCB, LLC, an indirect, wholly-owned subsidiary of GCEH, is a party to a $437.6 million secured term loan facility (the “Senior Credit Agreement”). For more details, see “Liquidity and Capital Resources.”
Camelina Grain Production Operations
A key element of our business plan is to control the development and production of the underlying base materials, or feedstock, required to produce renewable diesel. In order to leverage available cultivation assets, we contract with numerous farmers for the planting of our certified Camelina seed, which will be used for Camelina grain production for either the current or future crop years. As of May 15, 2023, we have packaged enough Camelina seed to plant over 400,000 acres in North America, South America and Europe.
In North America, our principal focus has been on expanding production of Camelina in Montana, Kansas and Colorado. We have also expanded grain production in Washington, Oregon, North Dakota, Nebraska, Oklahoma, and Idaho. As of May 15, 2023, commercial contracts for Camelina grain production are exceeding our expectations in North America with over 45,000 acres under contract. In comparison, the extreme drought in the western U.S. limited our 2022 Camelina production to approximately 11,000 acres.
In South America, we have launched Camelina production with a global partner and are initiating grower contracts for our proprietary Camelina varieties in Argentina with a 2023 target of 15,000 acres. We expect our Camelina business to expand rapidly in South America.
Our global headquarters for Camelina breeding is located in Great Falls, Montana and supports additional breeding and agronomy centers in Kansas, Spain, and Argentina. These additional locations have enabled us to expand testing to over 60 sites spread across four continents.
Business and Industry Outlook
.
Our transition to profitability is dependent upon, among other things, the future commercialization of the renewable fuel products that we intend to produce at the Bakersfield Renewable Fuels Refinery. Until such time as the Bakersfield Renewable Fuels Refinery is operational and is producing renewable fuel products, we expect that we will need to raise additional debt or equity financing (See “Liquidity and Capital Resources” below). There can be no assurances, however, that we will be able to obtain sufficient additional funds when needed, or that such funds, if available, will be obtained on terms satisfactory to the Company. (see “Liquidity and Capital Resources” below).
Once the Bakersfield Renewable Fuels Refinery is operational,
we intend to immediately commence with the production of renewable diesel. We believe that renewable diesel has a large addressable market. Because renewable diesel is a 100% replacement for petroleum-based diesel, the total addressable market includes the collective consumption of biodiesel, renewable diesel, and petroleum-based diesel. In aggregate, the United States transportation sector consumed 48 billion gallons of these fuels in 2021, with almost 4 billion gallons consumed in California alone. Canada will also represent an important market as it implements its own LCFS program.
We also intend to further develop our Camelina business. For example, when Camelina grain is processed, it is separated into neat plant oil and biomass, the latter of which is a protein rich animal feed supplement similar to canola or soybean meal. An additional benefit of our animal feed is that it is non-GMO. The market for protein meal in the western United States is roughly 4 million tons per year (“MMTPY”), which is supplied primarily from Midwestern states that grow soybeans for protein and oil extraction. The livestock industry in California’s San Joaquin Valley, which has among the largest concentrations of cattle and dairy producers in the United States, imports all its 1 MMTPY of protein meal from out of state, creating a substantial opportunity for our local meal production. Domestic use of protein meal is estimated to be 40 MMTPY.
Critical Accounting Policies and Related Estimates
There have been no substantial changes to our critical accounting policies and related estimates from those previously disclosed in our 2022 Annual Report on Form 10-K.
Three Months Ended March 31, 2023 vs. Three Months Ended March 31, 2022
Revenues.
Our Bakersfield Renewable Fuels Refinery is still in the construction phase. Our revenues from the refinery will commence with the start of operations. Accordingly, we had no renewable fuel product revenues in the three months ended March 31, 2023. Our revenues consist of the sale our certified camelina seeds to farmers for the production of either camelina seed or camelina grain and the sale of inventory that did not meet certain specifications and which sales and certain advisory fees generated revenues of $1.3 million in the three months ended
March 31, 2023
compared to $0.4 million in the three months ended
March 31, 2022
.
General and Administrative Expenses and Facility Expenses
. General and administrative expenses consist of expenses relating to our corporate overhead functions and operations. The majority of our general and administrative expenses are incurred in the operations of the Bakersfield Renewable Fuels Refinery. During the three month period ended
March 31, 2023
, our administrative expenses increased by $2.2 million from $11.4 million to $13.6 million as compared to the three month period ended March 31, 2022 due to higher personnel, share-based compensation and transaction costs. Facility expenses primarily consist of maintenance costs at the Bakersfield Renewable Fuels Refinery and expenses normally related to the operations of a refinery. During the three month period ended
March 31, 2023
, our facility expenses increased by $4.5 million from $3.2 million to $7.7 million as compared to the three month period ended
March 31, 2022
and was due primarily to an increase in utility costs and outside services.
Other income/expense was $1.5 million of net expense in the three months ended
March 31, 2023
compared to $0.5 million of net expense in the three months ended
March 31, 2022
. The increase in expense was due primarily to an increase in the change in the fair value of the Class B units and a reduction in the change in the fair value of Warrant Commitment Liability. In the 2022 fiscal quarter we recognized a gain of $4.5 million on the change in fair value of the Warrant Commitment Liability related to the issuance of the senior lender warrants, which commitment to issue these warrants occurred in the fourth quarter of 2021 and the commitment to issue these warrants was extinguished in the 2022 fiscal quarter when the warrants were actually issued. During the three months ended March 31, 2023 the change in fair value of the Class B Units was $1.8 million compared to $1.0 million in the three months ended March 31, 2022. This value was driven primarily by market and contractual changes that impact the future cash projection eligible for distribution, including but not limited to a change in interest rate, an acceleration of the maturity date and a delay in operations. The value of the Class B Units is expected to fluctuate based on various market conditions and refinery operational estimates and assumptions. In the three months ended March 31, 2022, a loss on the extinguishment of debt of $4.0 million was recorded and the current period had no comparable charge.
During the three months ended
March 31, 2023
and
March 31, 2022
, interest expense was $1.2 million and $1.3 million, respectively. We believe our interest expense will increase significantly in the future once the construction of our Bakersfield Renewable Fuels Refinery is completed. The construction period interest is capitalized as part of the cost of the refinery and therefore, does not impact our interest expense currently.
We incurred operating losses of $22 million and $15.4 million for the three months ended
March 31, 2023
and
March 31, 2022
, respectively, and a net loss of $24.6 million during the three months ended
March 31, 2023
, compared to a $17.2 million net loss during the three months ended
March 31, 2022
. Our operating loss increased primarily as a result of the increase in activity related to our retooling of the Bakersfield Renewable Fuels Refinery. We expect to incur losses until our Bakersfield Renewable Fuels Refinery becomes operational, which is expected during 2023.
Liquidity and Capital Resources
. As of March 31, 2023 and December 31, 2022, we had approximately $3.4 million and $7.5 million of cash, respectively. Of these amounts, zero and $1.7 million, respectively, is restricted and can only be spent on the Bakersfield Renewable Fuels Refinery. Of the restricted amounts, zero and $0.1 million as of March 31, 2023 and December 31, 2022, respectively, is considered long-term and is expected to be capitalized into the Bakersfield Renewable Fuels Refinery project. On March 31, 2023 and December 31, 2022 we had negative working capital of $93.9 million and $68.7 million, respectively. This working capital does not consider the long-term restricted cash identified above. The retooling of the Bakersfield Renewable Fuels Refinery is ongoing. We believe, based on the schedule provided to us by our lead contractor CTCI, and current work effort, that the refinery will commence operations sometime during the second half of 2023. Various scheduling issues experienced to date with our lead contractor CTCI, and other factors beyond our control have delayed the completion of the project. Even though we believe the Bakersfield Renewable Fuels Refinery will commence operations sometime during the second half of 2023, there can be no assurance that operations will commence within this time period. Revenues from the refinery are expected to commence with the start of operations. In addition, we may incur additional costs as a result of the delays (See Note J - Commitments and Contingencies for more detail on additional costs). See
“Commercial Agreements”
below for an additional discussion regarding the operation date of the Bakersfield Renewable Fuels Refinery and our Offtake Agreement.
Our primary sources of liquidity consist of $3.4 million of unrestricted cash on hand and available borrowing under our Senior Credit Agreement. On January 30, 2023, the Company increased its borrowing capacity under its Senior Credit Agreement by $40 million and as of May 15, 2023 has drawn $37 million with $3 million remaining to be drawn. We have incurred net losses of $24.6 million for the three months ended March 31, 2023 and $54.1 million during the year ended December 31, 2022, and as of March 31, 2023, we had an accumulated deficit of $196.4 million. We estimate that we will require approximately $110 million beginning June 1, 2023 to fund completion of the Bakersfield Renewable Fuels Refinery and operations through May 15, 2024 and possibly an additional $40 million to fund the initial feedstock required for operations. In addition, under the Senior Credit Agreement, the Company is required to raise $110 million to refinance a portion of the senior debt, and may require (if not amended) $60 million for cash interest payments related to the senior debt. We do not have any other credit or equity facilities available with financial institutions, stockholders, or third party investors, and as a result will be required to obtain additional debt or equity financing on a best efforts basis. There is no assurance, however, that we can raise the capital necessary to fund our business plan on terms acceptable to us or at all. Failure to raise the required capital will have a material and adverse effect on our operations, and could cause us to curtail operations.
To the extent that we raise additional funds through the issuance of equity securities, our stockholders will experience dilution, and the terms of the newly issued securities could include certain rights that would adversely affect our stockholders’ rights. Furthermore, if these new securities are convertible or are accompanied by the issuance of warrants to purchase shares of our common stock, our current stockholders will experience substantial dilution.
. As of March 31, 2023, we have borrowed $419.6 million under our Senior Credit Agreement. Proceeds from the Senior Credit Agreement have been, and will continue to be used to fund the pre-operational expenses and the capital costs of the Bakersfield Renewable Fuels Refinery. As of May 15, 2023, we were in compliance with all of our covenants under the Senior Credit Agreement.
On August 5, 2022, we entered into an amendment to our Senior Credit Agreement which provided for, among other things, an upsizing of the Tranche B Commitments by $60 million. In addition, the amendment provided for (i) the ability to pay interest in kind (in lieu of a cash payment) for the periods ending September 30, 2022 and December 31, 2022 and (ii) an extension of the date on which Substantial Completion (as defined in the Senior Credit Agreement) must be achieved from August 31, 2022 to March 31, 2023, which such date can be extended for up to 90 days for each day that the “Start Date” under the ExxonMobil Offtake Agreement is extended.
On January 30, 2023, we entered into a separate amendment to our Senior Credit Agreement, pursuant to which, among other things, the lenders agreed to a series of Tranche C Commitments under the Senior Credit Agreement in an amount of up to $40 million, which will be available to be drawn through June 30, 2023. In addition, the amendment provided for (i) an increase in the underlying interest rate on the loans following the effective date of the amendment from 12.5% to 15%, (ii) the ability to pay interest in kind (in lieu of a cash payment) for the periods ending March 31, 2023 and June 30, 2023, (iii) a change in the maturity date to December 31, 2025, (iv) an agreement to raise at least $10 million in new capital by March 31, 2023, and $100 million by April 1, 2024, and (v) certain governance rights, including certain limited rights for the Administrative Agent to put forth nominees to the Board of Directors of the Company. The requirement to raise at least $10 million in new capital has been extended to June 30, 2023.
The Senior Credit Agreement contains certain customary events of default, including events relating to non-payment of required interest, principal or other amounts due on or with respect to the Senior Credit Agreement, failure to comply with covenants within specified time frames, certain bankruptcy events, breaches of specified representations and warranties, failure of security interests to be effective, and certain judgments. As of May 15, 2023, we were in compliance with all of our covenants under the Senior Credit Agreement.
. On February 23, 2022, we raised $145 million through the sale of shares of our newly created Series C Preferred to ExxonMobil and the senior lenders. The net offering proceeds of the Series C Financing (after payment of $9.3 million of offering expenses and other related fees and costs) were allocated as follows: (i) $20 million to repay an outstanding bridge loan from our Senior Lenders, (ii) $77.4 million to fund the construction of the Bakersfield Renewable Fuels Refinery, (iii) $18 million for a debt service reserve account, and (iv) the balance for use by us as working capital, including the further development of our Camelina feedstock program.
. Our financial commitments during the next twelve months includes a fixed payment obligation that arose from the settlement of a derivative contract that we amended on April 20, 2020, which required us to pay $20.2 million in six equal monthly payments of $3.375 million beginning in May 2022 from the cash generated by the refinery’s operations. Since the Bakersfield Renewable Fuels Refinery is not yet operational, effective May 11, 2022 we amended our fixed payment obligation whereby we would begin payments after the Bakersfield Renewable Fuels Refinery is operational and generating revenues for a full month, but no later than January 2023. Payments were to be made beginning in the first month at $1.5 million and escalate monthly to approximately $6.2 million in the sixth and final month. The original obligation was $20.3 million and was amended to $22.8 million. Effective February 27, 2023, we amended our fixed payment obligation whereby we will begin making payments in September 2023 with the first payment of $1.2 million and escalating monthly with the final payment of $6 million scheduled for March 2024. The total amount of the payments is now $26.4 million.
Our long term commitments include the purchase of certain grades of soybean oil as feedstock for production of renewable diesel at the Bakersfield Renewable Fuels Refinery pursuant to a supply agreement, under which the supplier has agreed to supply a maximum volume of 1.2 billion pounds of feedstock over a period of twenty-four months, with such maximum volume being equally allotted between four 6-month segments or periods. The supply agreement may be extended for an additional segment or period to capture any shortfall of purchases during its primary term. A condition to the sale and purchase of the feedstock is the completion and commissioning of the Bakersfield Renewable Fuels Refinery, and until such condition has been satisfied the Company has no obligation to purchase such feedstock under the supply agreement.
. Our transition to profitability is dependent upon, among other things, the future commercialization of the renewable fuel products that we intend to produce at the Bakersfield Renewable Fuels Refinery. Pursuant to the Offtake Agreement, ExxonMobil has agreed to purchase a minimum of 135 million gallons per year of renewable diesel from the Bakersfield Renewable Fuels Refinery for a period of 66 months following the date that the Bakersfield Renewable Fuels Refinery commences operations, and 67.5 million gallons of renewable diesel for the final six month period of the initial term (for a total of 742.5 million gallons during the 66 month initial term). The price of the renewable diesel to be sold under the Offtake Agreement is based on a combination of a fixed price and a variable price. We have also entered into a Term Purchase Agreement (“TPA”) with ExxonMobil under which ExxonMobil has the right to purchase the additional renewable diesel that is not sold to ExxonMobil under the Offtake Agreement. On February 28, 2023, we received notice from ExxonMobil that effective July 1, 2023, ExxonMobil irrevocably terminates the Offtake Agreement without further action upon the failure of the Company’s renewable diesel facility to commence operations by June 30, 2023 (the “Start Date”). Termination of the Offtake Agreement would also result in a termination of the TPA. On March 5, 2023, the Company notified ExxonMobil that its purported termination of the Offtake Agreement is ineffective under the terms of the Offtake Agreement, and the Company reserves and will enforce all its rights under the Offtake Agreement including without limitation those rights that automatically extend the Start Date. If the Start Date is extended under the Offtake Agreement and the Bakersfield Renewable Fuels Refinery commences operations prior to such extended Start Date, we believe that the parties’ obligations under the Offtake Agreement will not be terminated as of July 1, 2023.
. During the fiscal year ended December 31, 2022 and continuing into the three months ended March 31, 2023, we have experienced increases in prices of products, services and the costs of inputs used in our operations (such as the cost of natural gas, utilities, transportation and labor) throughout our organization. These increases could have a material impact on our operations.