shall have an opportunity and the authority to consider and adopt in Washington any commitments or conditions to which the Applicants agree or with which the Applicants are required to comply in other jurisdictions, even if such commitments and conditions are agreed to after the Commission enters its order in this docket. To facilitate the Commission’s consideration and adoption of the commitments and conditions from other jurisdictions, the Parties urge the Commission to issue an order accepting this Stipulation as soon as practical, but to reserve in such order the explicit right to re-open Appendix A to add (without modification of the language thereof except such non-substantive changes as are necessary to make the commitment or condition applicable to Washington) commitments and conditions accepted or ordered in another state jurisdiction. To provide input to the Commission to facilitate a prompt decision regarding the desirability or lack of desirability for these out-of-state commitments and conditions to be adopted in Washington, the Parties agree to and recommend the following process:
be adopted in Washington. Within five calendar days after any such response filing, any Party may file a reply with the Commission. The Parties agree to support in their filings (or by representation of same by MEHC) the issuance by the Commission of an order regarding the adoption of such commitments and conditions as soon as practical thereafter, recognizing that the transaction cannot close until final state orders have issued.
9. Not later than the Final Filing, MEHC and PacifiCorp will disclose to the Parties any written commitments, conditions or covenants made in another state jurisdiction (between the date of the filing of the Stipulation and the receipt of the last state order in the transaction docket) intended to encourage approval of the transaction or avoidance of an objection thereto.
10. The Parties agree that with the commitments set forth in paragraphs 7 through 9 above, including those in Appendix A, the Transaction meets the public interest standard under RCW 80.12.020 and WAC 480-143-170 for approval in Washington. The Parties therefore agree to support this Stipulation as a settlement of all issues in this proceeding and to recommend approval of the Transaction. The Parties encourage the Commission to enter a final Washington approval order by February 28, 2006. The Parties understand that this Stipulation is not binding on the Commission in ruling on the Application.
11. The following provision, applicable only to the Parties, will become effective upon the closing of the Transaction: Through December 31, 2011, MEHC and PacifiCorp will both confer with the Parties and provide drafts in a timely manner prior to introducing legislation in the Washington Legislature that would impact Washington utility regulation.
12. The Parties agree that this Stipulation represents a compromise in the positions of the Parties. As such, conduct, statements and documents disclosed in the negotiation of this Stipulation shall not be admissible as evidence in this or any other proceeding. By executing this Stipulation, no Party shall be deemed to have approved, admitted or consented to the facts, principles, methods or theories employed in arriving at the terms of this Stipulation, nor
STIPULATION – Page 4
shall any Party be deemed to have agreed that any provision of this Stipulation is appropriate for resolving issues in any other proceeding, except those proceedings involving the enforcement or implementation of the terms of this Stipulation.
13. Applicants acknowledge that the Commission’s approval of the Stipulation, the Commitments or the Joint Application shall not bind the Commission in other proceedings with respect to the determination of prudence, just and reasonable character, rate or ratemaking treatment, or public interest of services, accounts, costs, investments, any particular construction project, expenditures or actions referenced in these Commitments.
14. The Parties shall cooperate in submitting this Stipulation promptly to the Commission for acceptance, and shall cooperate in developing supporting testimony as required by WAC 480-07-740(2)(b). The Parties agree to support the Stipulation throughout this proceeding, provide witnesses to sponsor such Stipulation at a Commission hearing (if necessary), and recommend that the Commission issue an order adopting the settlements contained herein. In the event the Commission rejects this Stipulation, the provisions of WAC 480-07-750(2)(a) shall apply; provided, however, that with respect to the status of the proceeding at the time of the Stipulation, the Parties agree that the “time for completion of the hearing” under WAC 480-07-750(2)(a) shall refer only to the preparation and submission of closing briefs. In the event the Commission accepts the Stipu lation upon conditions not proposed herein, each Party reserves the right to seek reconsideration of the decision. The Parties recommend that the Commission allow replies to any request for reconsideration, and that the deadline for such replies be set at seven (7) days. The Parties agree that their right to seek reconsideration is their sole remedy in the event the Commission accepts the Stipulation upon conditions not proposed herein and, that in such circumstance, the provisions of WAC 480-07-750(2)(a) shall not apply.
15. The Parties agree: (1) to provide all other Parties the right to review in advance of publication any and all announcements or news releases that any other Party intends to make about the Stipulation (with the right of review to include a reasonable opportunity to
STIPULATION – Page 5
request changes to the text of such announcements), and (2) to include in any news release or announcement a statement that Staff’s recommendation to approve the Stipulation is not binding on the Commission itself.
16. Subject to Paragraph 17 of this Stipulation, the effective date of this Stipulation shall be the date of the closing of the Transaction.
17. The obligations of the Applicants under this Stipulation are subject to the Commission’s approval of the Application in this docket on terms and conditions acceptable to the Applicants, in their sole discretion, and the closing of the Transaction.
This STIPULATION is entered into by each Party as of the date entered below.
DATED: January 20, 2006.
MidAmerican Energy Holdings Company | | Staff of the Washington Utilities and Transportation Commission |
| | |
By | /s/ Mark C. Moench
| | By | /s/ Robert D. Cedarbaum
|
| Mark C. Moench Senior Vice President, Law | | | Robert D. Cedarbaum Senior Counsel |
PacifiCorp | | Industrial Customers of Northwest Utilities |
| | |
By | /s/ D. Douglas Larson
| | By | /s/ Melinda Davison
|
| D. Douglas Larson Vice President, Regulation | | | Melinda Davison Davison Van Cleve |
Office of the Attorney General Public Counsel Section | | The Energy Project |
| | |
By | /s/ Shannon Smith
| | By | /s/ Brad Purdy
|
| Shannon Smith Assistant Attorney General | | | Brad Purdy Attorney at Law |
STIPULATION – Page 6
APPENDIX A
Consolidated List of Commitments
MEHC Acquisition of PacifiCorp
Washington – WUTC Docket No. UE-051090
Commitments Applicable to All States:
1) | MEHC and PacifiCorp affirm the continuation (through March 31, 2008) of the existing customer service guarantees and performance standards in each jurisdiction. MEHC and PacifiCorp will not propose modifications to the guarantees and standards prior to March 31, 2008. Refer to Commitment 45 for the extension of this commitment through 2011. |
2) | Penalties for noncompliance with performance standards and customer guarantees shall be paid as designated by the Commission and shall be excluded from results of operations. PacifiCorp will abide by the Commission’s decision regarding payments. |
3) | PacifiCorp will maintain its own accounting system, separate from MEHC’s accounting system. All PacifiCorp financial books and records will be kept in Portland, Oregon. PacifiCorp’s financial books and records and state and federal utility regulatory filings and documents will continue to be available to the Commission, upon request, at PacifiCorp’s offices in Portland, Oregon, Salt Lake City, Utah, and elsewhere in accordance with current practice. |
4) | MEHC and PacifiCorp will provide the Commission access to all books of account, as well as all documents, data, and records of their affiliated interests, which pertain to transactions between PacifiCorp and its affiliated interests or which are otherwise relevant to the business of PacifiCorp. This commitment is also applicable to the books and records of Berkshire Hathaway, which shall retain its books and records relevant to the business of PacifiCorp consistent with the manner and time periods of the Federal Energy Regulatory Commission’s record retention requirements that are applicable to PacifiCorp’s books and records. |
5) | MEHC, PacifiCorp and all affiliates will make their employees, officers, directors, and agents available to testify before the Commission to provide information relevant to matters within the jurisdiction of the Commission. |
6) | The Commission or its agents may audit the accounting records of MEHC and its subsidiaries that are the bases for charges to PacifiCorp, to determine the reasonableness of allocation factors used by MEHC to assign costs to PacifiCorp and amounts subject to allocation or direct charges. MEHC agrees to cooperate fully with such Commission audits. |
APPENDIX A - Page 1
7) | MEHC and PacifiCorp will comply with all applicable Commission statutes and regulations regarding affiliated interest transactions, including timely filing of applications and reports. |
8) | PacifiCorp will file on an annual basis an affiliated interest report including an organization chart, narrative description of each affiliate, revenue for each affiliate and transactions with each affiliate. |
9) | PacifiCorp and MEHC will not cross-subsidize between the regulated and non-regulated businesses or between any regulated businesses, and shall comply with the Commission’s applicable orders and rules with respect to such matters. |
10) | Due to PUHCA repeal, neither Berkshire Hathaway nor MEHC will be registered public utility holding companies under PUHCA. Thus, no waiver by Berkshire Hathaway or MEHC of any defenses to which they may be entitled under Ohio Power Co. v. FERC, 954 F.2d 779 (D.C. Cir.), cert. denied sub nom. Arcadia v. Ohio Power Co., 506 U.S. 981 (1992), is necessary to maintain the Commission’s regulation of MEHC and PacifiCorp. However, while PUHCA is in effect, Berkshire Hathaway and MEHC waive such defenses. |
11) a) | Any diversified holdings and investments (e.g., non-utility business or foreign utilities) of MEHC following approval of the transaction will not be held by PacifiCorp or a subsidiary of PacifiCorp. This condition will not prohibit MEHC or its affiliates other than PacifiCorp from holding diversified businesses. |
| b) | Ring-fencing provisions for PPW Holdings LLC will include the provisions in Appendix 1. These provisions have been derived from those in effect for NNGC Acquisition, LLC as of December 1, 2005. |
12) | PacifiCorp or MEHC will notify the Commission subsequent to MEHC’s board approval and as soon as practicable following any public announcement of: (1) any acquisition of a regulated or unregulated business representing 5 percent or more of the capitalization of MEHC; or (2) the change in effective control or acquisition of any material part or all of PacifiCorp by any other firm, whether by merger, combination, transfer of stock or assets. |
13) | The Inter-company Administrative Services Agreement (IASA) will include the corporate and affiliate cost allocation methodologies. The IASA will be filed with the Commission as soon as practicable after the closing of the transaction. Approval of the IASA will be requested if required by law or rule, but approval for ratemaking purposes will not be requested in such filing. Refer to Commitment 14 (f). Amendments to the IASA will also be filed with the Commission. |
APPENDIX A - Page 2
14) | Any proposed cost allocation methodology for the allocation of corporate and affiliate investments, expenses, and overheads, required by law or rule to be submitted to the Commission for approval, will comply with the following principles: |
| a) | For services rendered to PacifiCorp or each cost category subject to allocation to PacifiCorp by MEHC or any of its affiliates, MEHC must be able to demonstrate that such service or cost category is necessary to PacifiCorp for the performance of its regulated operations, is not duplicative of services already being performed within PacifiCorp, and is reasonable and prudent. |
| b) | Cost allocations to PacifiCorp and its subsidiaries will be based on generally accepted accounting standards; that is, in general, direct costs will be charged to specific subsidiaries whenever possible and shared or indirect costs will be allocated based upon the primary cost-driving factors. |
| c) | MEHC and its subsidiaries will have in place positive time reporting systems adequate to support the allocation and assignment of costs of executives and other relevant personnel to PacifiCorp. |
| d) | An audit trail will be maintained such that all costs subject to allocation can be specifically identified, particularly with respect to their origin. In addition, the audit trail must be adequately supported. Failure to adequately support any allocated cost may result in denial of its recovery in rates. |
| e) | Costs which would have been denied recovery in rates had they been incurred by PacifiCorp regulated operations will likewise be denied recovery whether they are allocated directly or indirectly through subsidiaries in the MEHC group. |
| f) | Any corporate cost allocation methodology used for rate setting, and subsequent changes thereto, will be submitted to the Commission for approval if required by law or rule. |
15) | MEHC and PacifiCorp commit that PacifiCorp will maintain separate debt and preferred stock, if any. PacifiCorp will maintain its own corporate credit rating, as well as ratings for long-term debt and preferred stock, from Moody’s and S&P or their successor rating agencies. |
16) | MEHC and PacifiCorp will exclude all costs of the transaction from PacifiCorp’s utility accounts. Within 90 days following completion of the transaction, MEHC will provide a preliminary accounting of these costs. Further, MEHC will provide the Commission with a final accounting of these costs within 30 days of the accounting close. |
APPENDIX A - Page 3
17) | MEHC and PacifiCorp will provide the Commission with unrestricted access to all written information provided by and to credit rating agencies that pertains to PacifiCorp or MEHC. Berkshire Hathaway and MEHC will also provide the Commission with unrestricted access to all written information provided by and to credit rating agencies that pertains to MEHC’s subsidiaries to the extent such information may potentially impact PacifiCorp. |
18) a) | MEHC and PacifiCorp commit that PacifiCorp will not make any dividends to PPW Holdings LLC or MEHC that will reduce PacifiCorp’s common equity capital below the following percentages of its Total Capital without Commission approval: |
48.25% from the date of the close of the transaction through December 31, 2008;
47.25% from January 1, 2009, through December 31, 2009;
46.25% from January 1, 2010 through December 31, 2010;
45.25% from January 1, 2011 through December 31, 2011;
44.00% after December 31, 2011.
| b) | PacifiCorp’s Total Capital is defined as common equity, preferred equity and long-term debt. Long-term debt is defined as debt with a term of more than one year. For purposes of calculating the numerator of the percentage, common equity will be increased by 50% of the remaining balance of preferred stock that was in existence prior to the acquisition of PacifiCorp by MEHC. PacifiCorp and MEHC will work with Commission Staff to determine a percentage of common equity credit to apply to preferred stock issued by PacifiCorp after the acquisition of PacifiCorp by MEHC. In the absence of such an agreement between Commission Staff and the Companies, MEHC and PacifiCorp agree to treat new issuances of preferred stock as 100% debt, unless a Commission order approves a different percentage. |
| c) | MEHC and PacifiCorp commit that PacifiCorp will not make any dividends to PPW Holdings LLC or MEHC that will reduce PacifiCorp’s common equity capital below 35% of its Total Adjusted Capital without Commission approval. For purposes of calculating the numerator of the percentage, common equity will not include any portion of PacifiCorp preferred stock issued and outstanding. PacifiCorp’s Total Adjusted Capital is defined as common equity, preferred equity, long-term debt, short-term debt and capitalized lease obligations. |
APPENDIX A - Page 4
| d) | The Commission, on its own motion or at the request of any party, may reexamine the minimum common equity percentages as financial conditions or accounting standards warrant. |
19) | The capital requirements of PacifiCorp, as determined to be necessary to meet its obligation to serve the public, will be given a high priority by the Board of Directors of MEHC and PacifiCorp. |
20) | MEHC and PacifiCorp commit that neither PacifiCorp nor its subsidiaries will, without the approval of the Commission, make loans or transfer funds (other than dividends and payments pursuant to the IASA) to MEHC, Berkshire Hathaway or their respective subsidiaries, or assume any obligation or liability as guarantor, endorser, surety or otherwise for MEHC, Berkshire Hathaway or their respective subsidiaries; provided that this condition will not prevent PacifiCorp, to the extent allowed by law, from making loans or transferring funds to a subsidiary of PacifiCorp or assuming any obligation or liability on behalf of a subsidiary of PacifiCorp. MEHC and Berkshire Hathaway will not pledge any of the assets of the business of PacifiCorp as backing for any securities which MEHC, Berkshire Hathaway or their respective subsidiaries, but excluding PacifiCorp and its subsidiaries, may issue. |
21) | MEHC and PacifiCorp will not advocate for a higher cost of capital as compared to what PacifiCorp’s cost of capital would have been, using Commission standards, absent MEHC’s ownership. |
22) | [This Commitment number has intentionally been left blank. Commitment 22 is not available if a state selects Washington-specific Commitment Wa 7.] |
23) | PacifiCorp will continue a Blue Sky tariff offering in all states. PacifiCorp will continue to support this offering through innovative marketing, by modifying the tariff to reflect the developing green power market and by monitoring national certification standards. |
24) | PacifiCorp will continue its commitment to gather outside input on environmental matters, such as through the Environmental Forum. |
25) | PacifiCorp will continue to have environmental management systems in place that are self-certified to ISO 14001 standards at all PacifiCorp operated thermal generation plants. |
26) | MEHC will maintain at least the existing level of PacifiCorp’s community-related contributions, both in terms of monetary and in-kind contributions. The distribution of PacifiCorp’s community-related contributions among the states will be done in a manner that is fair and equitable to each state. |
APPENDIX A - Page 5
27) | MEHC will continue to consult with regional advisory boards to ensure local perspectives are heard regarding community issues. |
28) | MEHC will honor PacifiCorp’s existing labor contracts. |
29) | After the closing of the transaction, MEHC and PacifiCorp will make no unilateral changes to employee benefit plans prior to May 23, 2007 that would result in the reduction of employee benefits. |
30) | PacifiCorp will continue to produce Integrated Resource Plans according to the then current schedule and the then current Commission rules and orders. |
31) | When acquiring new generation resources in excess of 100 MW and with a dependable life of 10 or more years, PacifiCorp and MEHC will issue Requests for Proposals (RFPs) or otherwise comply with state laws, regulations and orders that pertain to procurement of new generation resources for PacifiCorp. |
32) | Nothing in these acquisition commitments shall be interpreted as a waiver of PacifiCorp’s or MEHC’s rights to request confidential treatment for information that is the subject of any commitments. |
33) | Unless otherwise specified by Commission regulations or applicable statute, the Commission shall give MEHC and PacifiCorp written notification of any violation by either company of the commitments made in this application. If such failure is corrected within ten (10) business days for failure to file reports, or five (5) business days for other violations, the Commission shall take no action. MEHC or PacifiCorp may request, for cause, an extension of these time periods. If MEHC or PacifiCorp fails to correct such violations within the specified time frames, as modified by any Commission-approved extensions, the Commission may seek to assess penalties for violation of a Commission order, against either MEHC or PacifiCorp, but not both, as allowed under state laws and regulations. |
34) | MEHC and PacifiCorp have identified transmission projects that MEHC and PacifiCorp believe will enhance reliability, facilitate the receipt of renewable resources, or enable further system optimization. Subject to permitting and the availability of materials, equipment and rights-of-way, MEHC and PacifiCorp commit to use their best efforts to achieve the following transmission system infrastructure improvements:8 |
______________8 | It is possible that upon further review a particular investment might not be cost-effective, optimal for customers or able to be completed by the target date. If that should occur, MEHC pledges to propose an alternative to the Commission with a comparable benefit. |
APPENDIX A - Page 6
| a) | Path C Upgrade ( ~$78 million) – Increase Path C capacity by 300 MW (from S.E. Idaho to Northern Utah). The target completion date for this project is 2010. MEHC and PacifiCorp assert that this project: |
| • | enhances reliability because it increases transfer capability between the east and west control areas, |
| • | facilitates the delivery of power from wind projects in Idaho, and |
| • | provides PacifiCorp with greater flexibility and the opportunity to consider additional options regarding planned generation capacity additions. |
| b) | Mona - Oquirrh ( ~$196 million) – Increase the import capability from Mona into the Wasatch Front (from Wasatch Front South to Wasatch Front North). This project would enhance the ability to import power from new resources delivered at or to Mona, and to import from Southern California by “wheeling” over the Adelanto DC tie. The target completion date for this project is 2011. MEHC and PacifiCorp assert that this project: |
| • | enhances reliability by enabling the import of power from Southern California entities during emergency situations, |
| • | facilitates the acceptance of renewable resources, and |
| • | enhances further system optimization since it enables the further purchase or exchange of seasonal resources from parties capable of delivering to Mona. |
| c) | Walla Walla - Yakima or Mid-C ( ~$88 million) – Establish a link between the “Walla Walla bubble” and the “Yakima bubble” and/or reinforce the link between the “Walla Walla bubble” and the Mid-Columbia (at Vantage). MEHC and PacifiCorp assert that either of these projects presents opportunities to enhance PacifiCorp’s ability to accept the output from wind generators and balance the system cost effectively in a regional environment. The target completion date for this project is 2010. |
35) | MEHC and PacifiCorp make the following commitments to improve system reliability: |
| a) | investment in the Asset Risk Program of $75 million over the three years, 2007-2009, |
| b) | investment in local transmission risk projects across all states of $69 million over eight years after the close of the transaction, |
| c) | O & M expense for the Accelerated Distribution Circuit Fusing Program across all states will be increased by $1.5 million per year for five years after the close of the transaction, and |
| d) | extension of the O&M investment across all states for the Saving SAIDI Initiative for three additional years at an estimated cost of $2 million per year. |
APPENDIX A - Page 7
| e) | MEHC and PacifiCorp will support the Bonneville Power Administration in its development of short-term products such as conditional firm. No less than three months following the close of the transaction, PacifiCorp will initiate a process to collaboratively design similar short-term transmission products and will include stakeholders in this process. PacifiCorp will make every reasonable effort to complete a product by the end of 2008. |
| f) | PacifiCorp will continue to offer its Partial Interim Service product, and will make commercially reasonable efforts to offer transmission customers as much firm service as the Company’s transmission studies show is available, including weeks within a month. PacifiCorp will also continue its OATT tariff provision that allows transmission customers to alter pre-scheduled transactions up to 20 minutes before the hour as long as such provision is consistent with established scheduling practices and does not jeopardize system reliability. PacifiCorp will notify parties to this proceeding if it proposes changes to these two elements of its OATT. |
36) | MEHC recognizes that it can and should have a role in addressing the critical importance of transmission infrastructure to the states in which PacifiCorp serves. MEHC also recognizes that some transmission projects, while highly desirable, may not be appropriate investments for PacifiCorp and its regulated customers. Therefore, MEHC commits its resources and leadership to assist PacifiCorp states in the development of transmission projects upon which the states can agree. Examples of such projects would be RMATS and the proposed Frontier transmission line. |
37) | MEHC believes that PacifiCorp’s incremental cost of long-term debt will be reduced as a result of the proposed transaction, due to the association with Berkshire Hathaway. Historically, MEHC’s utility subsidiaries have been able to issue long-term debt at levels below their peers with similar credit ratings. MEHC commits that over the next five years it will demonstrate that PacifiCorp’s incremental long-term debt issuances will be at a yield ten basis points below its similarly rated peers. If it is unsuccessful in demonstrating that PacifiCorp has done so, PacifiCorp will accept up to a ten (10) basis point reduction to the yield it actually incurred on any incremental long-term debt issuances for any revenue requirement calculation effective for the five-year period subsequent to the approval of the proposed acquisition. It is projected that this benefit will yield a value roughly equal to $6.3 million over the post-acquisition five-year period. |
38) | [This Commitment number has intentionally been left blank. Commitment 38 is not available if a state selects Washington-specific Commitments Wa 4 and Wa 6.] |
APPENDIX A - Page 8
39) | In Commitment 31, MEHC and PacifiCorp adopt a commitment to source future PacifiCorp generation resources consistent with the then current rules and regulations of each state. In addition to that commitment, for the next ten years, MEHC and PacifiCorp commit that they will submit as part of any commission approved RFPs for resources with a dependable life greater than 10 years and greater than 100 MW — including renewable energy RFPs — a 100 MW or more utility “own/operate” alternative for the particular resource. It is not the intent or objective that such alternatives be favored over other options. Rather, the option for PacifiCorp to own and operate the resource which is the subject of the RFP will enable comparison and evaluation of that option against other viable alternatives. In addition to providing regulators and interested parties with an additional viable option for assessment, it can be expected that this commitment will enhance PacifiCorp’s ability to increase the proportion of cost-effective renewable energy in its generation portfolio, based upon the actual experience of MEC and the “Renewable Energy” commitment offered below. |
40) a) | MEHC reaffirms PacifiCorp’s commitment to acquire 1400 MW of new cost-effective renewable resources, representing approximately 7% of PacifiCorp’s load. MEHC and PacifiCorp commit to work with developers and bidders to bring at least 100 MW of cost-effective wind resources in service within one year of the close of the transaction. |
| b) | MEHC and PacifiCorp expect that the commitment to build the Walla-Walla and Path C transmission lines will facilitate up to 400 MW of renewable resource projects with an expected in-service date of 2010. MEHC and PacifiCorp commit to actively work with developers to identify other transmission improvements that can facilitate the delivery of cost-effective wind energy in PacifiCorp’s service area. |
| c) | In addition, MEHC and PacifiCorp commit to work constructively with states to implement renewable energy action plans so as to enable PacifiCorp to achieve at least 1400 MW of cost-effective renewable energy resources by 2015. Such renewable energy resources are not limited to wind energy resources. |
41) | MEHC supports and affirms PacifiCorp’s commitment to consider utilization of advanced coal-fuel technology such as super-critical or IGCC technology when adding coal-fueled generation. |
42) a) | MEHC and PacifiCorp commit to participate in the Environmental Protection Agency’s SF6 Emission Reduction Partnership for Electric Power Systems. Sulfur hexafluoride (SF6) is a highly potent greenhouse gas used in the electric industry for insulation and current interruption in electric transmission and distribution equipment. MEHC and PacifiCorp represent that over a 100-year period, SF6 is 23,900 times more effective at trapping infrared radiation than an equivalent amount of CO2, making it the most highly potent, known greenhouse gas. SF6 is also a very stable chemical, with an atmospheric lifetime of 3,200 |
APPENDIX A - Page 9
years. As the gas is emitted, it accumulates in the atmosphere in an essentially un-degraded state for many centuries. Thus, a relatively small amount of SF6can have a significant impact on global climate change. Through its participation in the SF6 partnership, PacifiCorp will commit to an appropriate SF6emissions reduction goal and annually report its estimated SF6 emissions. MEHC and PacifiCorp represent that this not only reduces greenhouse gas emissions, it saves money and improves grid reliability. Since 1999, EPA’s SF6 partner companies have saved $2.5 million from the avoided gas loss alone. Use of improved SF6 equipment and management practices helps protect system reliability and efficiency.
| b) | Within six months after close of the transaction, MEHC and PacifiCorp commit that PacifiCorp will establish a global warming working group composed of representatives of the regulatory, consumer, educational and environmental communities in the six states that PacifiCorp serves, as well as representatives of PacifiCorp and MEHC. PacifiCorp will work with the global warming working group to identify cost-effective measures to reduce PacifiCorp’s greenhouse emissions. PacifiCorp will develop and file with the Commission its strategy, which MEHC supports, for reducing its greenhouse gas emissions. |
43) | Working with the affected generation plant joint owners and with regulators to obtain required approvals, MEHC and PacifiCorp commit to install, to the extent cost effective, the equipment likely to be necessary under future emissions control scenarios at a cost of approximately $812 million. Concurrent with any application for an air permit, MEHC and PacifiCorp will discuss its plans regarding this commitment with interested parties and solicit input. While additional expenditures may ultimately be required as future emission reduction requirements become better defined, MEHC believes these investments in emission control equipment are reasonable and environmentally beneficial. The execution of an emissions reduction plan for the existing PacifiCorp coal-fueled facilities, combined with the use of reduced-emissions coal technology for new coal-fueled generation, is expected to result in a significant decrease in the emissions rate of PacifiCorp’s coal-fueled generation fleet. MEHC represents that the investments to which MEHC is committing are expected to result in a decrease in the SO2 emissions rates of more than 50%, a decrease in the NOx emissions rates of more than 40%, a reduction in the mercury emissions rates of almost 40%, and no increase expected in the CO2 emissions rate. |
44) a) | MEHC and PacifiCorp commit to conducting a company-defined third-party market potential study of additional DSM and energy efficiency opportunities within PacifiCorp’s service areas. The objective of the study will be to identify opportunities not yet identified by the company and, if and where possible, to recommend programs or actions to pursue those opportunities found to be cost-effective. The study will focus on opportunities for deliverable DSM and |
APPENDIX A - Page 10
energy efficiency resources rather than technical potentials that may not be attainable through DSM and energy efficiency efforts. On-site solar and combined heat and power programs may be considered in the study. During the three-month period following the close of the transaction, MEHC and PacifiCorp will consult with DSM advisory groups and other interested parties to define the proper scope of the study. The findings of the study will be reported back to DSM advisory groups, commission staffs, and other interested stakeholders and will be used by the Company in helping to direct ongoing DSM and energy efficiency efforts. The study will be completed within fifteen months after the closing on the transaction, and MEHC shareholders will absorb the first $1 million of the costs of the study.
| b) | PacifiCorp further commits to meeting its portion of the NWPPC’s energy efficiency targets for Oregon, Washington and Idaho, as long as the targets can be achieved in a manner deemed cost-effective by the affected states. |
| c) | In addition, MEHC and PacifiCorp commit that PacifiCorp and MEC will annually collaborate to identify any incremental programs that might be cost-effective for PacifiCorp customers. The Commission will be notified of any additional cost-effective programs that are identified. |
45) | MEHC and PacifiCorp commit to continue customer service guarantees and performance standards as established in each jurisdiction, provided that MEHC and PacifiCorp reserve the right to request modifications of the guarantees and standards after March 31, 2008, and the right to request termination (as well as modification) of one or more guarantees or standards after 2011. The guarantees and standards will not be eliminated or modified without Commission approval. |
46) | MEHC has significant experience in assisting its communities with economic development efforts. MEHC plans to continue PacifiCorp’s existing economic development practices and use MEHC’s experience to maximize the effectiveness of these efforts. |
47) | MEHC understands that having adequate staffing and representation in each state is not optional. MEHC understands its importance to customers, to regulators and to states. MEHC and PacifiCorp commit to maintaining adequate staffing and presence in each state, consistent with the provision of safe and reliable service and cost-effective operations. |
48) | PacifiCorp will provide public notice and an invitation to encourage stakeholders to participate in the Integrated Resource Plan (IRP) process. The IRP process will be used to consider Commitments 34, 39, 40, 41, 44, 52 and 53. PacifiCorp will hold IRP meetings at locations or using communications technologies that encourage broad participation. |
APPENDIX A - Page 11
49) | By June 1, 2007 and each June 1 thereafter through June 1, 2011, PacifiCorp will file a report with the Commission regarding the implementation of the Commitments. The report will, at a minimum, provide a description of the performance of each of the commitments that have quantifiable results. If any of the commitments is not being met, relative to the specific terms of the commitment, the report shall provide proposed corrective measures and target dates for completion of such measures. PacifiCorp will make publicly available at the Commission non-confidential portions of the report. |
50) | PacifiCorp will maintain its current pension funding policy, as described in the 2005 Actuarial Report, for a period of two years following the close of the transaction. |
51) | Subject to, and in consideration for, dismissal of all existing proceedings and no commencement of any future state regulatory proceeding against PacifiCorp involving or arising from the SEC PUHCA Audit Report of Scottish Power dated May 11, 2004, MEHC will contribute to PacifiCorp, at no cost to PacifiCorp, MEHC’s stock ownership in the Intermountain Geothermal Company and the associated steam rights (approximately 70% of the total rights) to the steam resources serving PacifiCorp’s Blundell geothermal plant and terminate MEHC’s and Intermountain Geothermal Company’s rights and obligations under the contracts. MEHC will assist PacifiCorp in determining the cost-effectiveness of acquiring the remaining 30% of the rights. No more than six months after the close of the transaction, MEHC will provide parties a clear and complete disclosure statement that details any potential liabilities and risks, identified by or for MEHC, associated with the ownership rights of MEHC in Intermountain Geothermal. MEHC also commits that PacifiCorp customers will not be harmed from the contribution to PacifiCorp of the Intermountain Geothermal steam resources and stock. |
52) | Upon closing, MEHC and PacifiCorp commit to immediately evaluate increasing the generation capacity of the Blundell geothermal facility by the amount determined to be cost-effective. Such evaluation shall be summarized in a report and filed with the Commission concurrent with the filing of PacifiCorp’s next IRP. This incremental amount is expected to be at least 11 MW and may be as much as 100 MW. All cost effective increases in Blundell capacity, completed before January 1, 2015, should be counted toward satisfaction of PacifiCorp’s 1400 MW renewable energy goal, in an amount equal to the capacity of geothermal energy actually added at the plant. |
53) | MEHC or PacifiCorp commit to commence as soon as practical after close of the transaction a system impact study to examine the feasibility of constructing transmission facilities from the Jim Bridger generating facilities to Miners Substation, in Wyoming. Upon receipt of the results of the system impact |
APPENDIX A - Page 12
| study, MEHC or PacifiCorp will review and discuss with stakeholders the desirability and economic feasibility of performing a subsequent facilities study for the Bridger to Miners 500 kV transmission project. |
Washington-Specific Commitments:
Wa 1) | MEHC and PacifiCorp agree that during the 15-day period to investigate and report back to customers regarding billing and metering problems, it will not take action by initiating collection remedies or disconnecting. |
Wa 2) | MEHC and PacifiCorp commit to $142.5 million (total company amount) of offsetable rate credits as reflected in Appendix 2 and as described in the following Commitments Wa 3 through Wa 7. These rate credits will be reflected in rates on the effective date of new rates as determined by the Commission in a general rate case (including Docket No. UE-050684, PacifiCorp’s current general rate proceeding). The rate credits will terminate on December 31, 2010, to the extent not previously offset, unless otherwise noted. The rate credits in Commitments Wa 3 and Wa 7 are subject to deferred accounting as specified therein. Where total company values are referenced, the amount allocated to Washington will equal the Washington-allocated amount using Commission-adopted allocation factors. |
Wa 3a) | MEHC and PacifiCorp commit to reduce the annual non-fuel costs to PacifiCorp customers of the West Valley lease by $0.417 million per month (total company) or an expected $3.7 million in 2006 (assuming a March 31, 2006 transaction closing), $5 million in 2007 and $2.1 million in 2008 (the lease terminates May 31, 2008), which shall be the amounts of the total company rate credit. If and to the extent that the costs of West Valley are included in Washington rates by Commission order, Washington’s share of the monthly rate credit will be deferred (unless included in rates in Docket No. UE-050684, PacifiCorp’s current general rate proceeding), effective as of the first month after the close of the transaction to purchase PacifiCorp, for the benefit of customers and accrue interest at PacifiCorp’s authorized rate of return. (This commitment is reflected in Row 1 of Appendix 2.) |
| b) | This commitment is offsetable, on a prospective basis, to the extent PacifiCorp demonstrates to the Commission’s satisfaction, in the context of a general rate case, that such West Valley non-fuel cost savings: |
| i) | are reflected in PacifiCorp’s rates; and, |
| ii) | there are no offsetting actions or agreements by MEHC or PacifiCorp for which value is obtained by PPM or an affiliated company, which, directly or indirectly, increases the costs PacifiCorp would otherwise incur. |
APPENDIX A - Page 13
Wa 4a) | MEHC and PacifiCorp will hold customers harmless for increases in costs retained by PacifiCorp that were previously assigned to affiliates relating to management fees. The total company amount assigned to PacifiCorp’s affiliates is $1.5 million per year, which is the amount of the total company rate credit. This commitment expires on December 31, 2010. This Commitment is in lieu of Commitment 38, and a state must choose between this Commitment Wa 4 and Commitment 38. (The commitment is reflected in Row 2 of Appendix 2). |
| b) | This commitment is offsetable to the extent PacifiCorp demonstrates to the Commission’s satisfaction, in the context of a general rate case the following: |
| i) | Corporate allocations from MEHC to PacifiCorp included in PacifiCorp’s rates are less than $7.3 million; |
| ii) | Costs associated with functions previously carried out by parents to PacifiCorp and previously included in rates have not been shifted to PacifiCorp or otherwise included in PacifiCorp’s rates; and |
| iii) | Costs have not been shifted to operational and maintenance accounts (FERC accounts 500-598), customer accounts (FERC accounts 901-905), customer service and informational accounts (FERC accounts 907-910), sales accounts (FERC accounts 911-916), capital accounts, deferred debit accounts, deferred credit accounts, or other regulatory accounts. |
Wa 5a) | MEHC commits to use an existing, or form a new, captive insurance company to provide insurance coverage for PacifiCorp’s operations. The costs of forming such captive will not be reflected in PacifiCorp’s regulated accounts, nor allocated directly or indirectly to PacifiCorp. Such captive shall be comparable in costs and services to that previously provided through ScottishPower’s captive insurance company Dornoch. MEHC further commits that insurance costs incurred by PacifiCorp from the captive insurance company for equivalent coverage for calendar years 2006 through 2010, inclusive, will be no more than $7.4 million (total company). Oregon Commission Staff has valued the potential increase in PacifiCorp’s total company revenue requirement from the loss of ScottishPower’s captive insurance affiliate as $4.3 million annually, which shall be the amount of the total company rate credit. This commitment expires on December 31, 2010. |
| b) | This commitment is offsetable if PacifiCorp demonstrates to the Commission’s satisfaction, in the context of a general rate case, the costs included in PacifiCorp’s rates for such insurance coverage is not more than $7.4 million (total company). (This commitment is reflected in Row 3 in Appendix 2.) |
Wa 6a) | MEHC and PacifiCorp will hold customers harmless for increases in costs resulting from PacifiCorp corporate costs previously billed to PPM and other former affiliates of PacifiCorp. Oregon Commission Staff has valued the |
APPENDIX A - Page 14
potential increase in total company revenue requirement if these costs are not eliminated as $7.9 million annually (total company) through December 31, 2010 and $6.4 million annually (total company) from January 1, 2011 through December 31, 2015, which shall be the amounts of the total company rate credit. This commitment shall expire on the earlier of December 31, 2015 or when PacifiCorp demonstrates to the Commission’s satisfaction, in the context of a general rate case, that corporate costs previously billed to PPM and other former affiliates have not been included in PacifiCorp’s rates. This Commitment is in lieu of Commitment 38, and a state must choose between this Commitment Wa 6 and Commitment 38.
| b) | This commitment is offsetable to the extent PacifiCorp demonstrates to the Commission’s satisfaction, in the context of a general rate case, that corporate costs previously billed to PPM and other former affiliates have not been included in PacifiCorp’s rates. (The commitment is reflected in Row 4 of Appendix 2.) |
Wa 7a) | MEHC and PacifiCorp commit that PacifiCorp’s total company A&G costs will be reduced by $6 million annually based on the A&G categories, assumptions, and values contained in Appendix 3 titled, “UM 1209 A & G Stretch.” The maximum amount of the total company rate credit in any year is $6 million. This commitment expires December 31, 2010. Beginning with the first month after the close of the transaction, Washington’s share of the $0.5 million monthly rate credit will be deferred for the benefit of customers (unless included in rates in Docket No. UE-050684, PacifiCorp’s current general rate proceeding), and accrue interest at PacifiCorp’s authorized rate of return. This Commitment is in lieu of Commitment 22 and Commitment U 23 from the Utah settlement, and a state must choose between this Commitment Wa 7 and Commitments 22 and U 23. |
| b) | The credit will be offsetable, on a prospective basis, for every dollar that PacifiCorp demonstrates, to the Commission’s satisfaction, in a subsequent general rate case, that total company A&G expenses included in PacifiCorp’s rates are less than $6 million above the “Stretch Goal” and have not been shifted to other regulatory accounts. The 2006 Stretch Goal is $222.8 million. Subsequent Stretch Goals shall equal the 2006 Stretch Goal multiplied by the ratio of the Global Insight’s Utility Cost Information Service (UCIS)-Administrative and General – Total Operations and Maintenance Index (INDEX CODE Series JEADGOMMS), for the test period divided by the 2006 index value. If another index is adopted in a future PacifiCorp case, that index will replace the aforementioned index and will be used on a prospective basis only. If this occurs, the Stretch Goal for future years will equal the Stretch Goal from the most recent full calendar year multiplied by the ratio of the new index for the test period divided by the new index value for that same most recent calendar year. |
APPENDIX A - Page 15
Wa 8) | Within three months of closing of the transaction, MEHC commits to obtain a non-consolidation opinion that demonstrates that the ring fencing around PPW Holdings LLC is sufficient to prevent PPW Holdings LLC and PacifiCorp from being pulled into an MEHC bankruptcy. MEHC commits to promptly file such opinion with the Commission. If the ring-fencing provisions of this agreement are insufficient to obtain a non-consolidation opinion, MEHC agrees to promptly undertake the following actions: |
| a) | Notify the Commission of this inability to obtain a non-consolidation opinion. |
| b) | Propose and implement, upon Commission approval, such ring-fencing provisions that are sufficient to prevent PPW Holdings LLC from being pulled into an MEHC bankruptcy. |
| c) | Obtain a non-consolidation opinion. |
Wa 9) | MEHC and PacifiCorp commit that PacifiCorp will not directly own equity shares of either Berkshire Hathaway or MEHC, if MEHC were ever to become publicly traded. |
Wa 10) | MEHC commits to provide 30 days’ notice to the Commission if it intends to create a corporate entity between PPW Holdings LLC and MEHC. MEHC further states that it has no current intention to create such a corporate entity. |
Wa 11) | MEHC commits that immediately following the closing of the transaction, the acquiring company (PPW Holdings LLC) will have no debt in its capital structure. MEHC and PacifiCorp commit that the consolidated capital structure of PPW Holdings LLC will not contain common equity capital below the following percentages of its Total Capital as defined in Commitment 18b: |
48.25% from the date of the close of the transaction through December 31, 2008;
47.25% from January 1, 2009 through December 31, 2009;
46.25% from January 1, 2010 through December 31, 2010;
45.25% from January 1, 2011 through December 31, 2011;
44.00% after December 31, 2011.
| b) | MEHC and PacifiCorp commit that the consolidated capital structure of PPW Holdings LLC will not contain common equity capital below 35% of its Total Adjusted Capital as defined in Commitment 18c. |
| c) | MEHC will provide the Commission 30 days prior notice if PPW Holdings LLC intends to issue debt. MEHC and PacifiCorp acknowledge that if PPW Holdings LLC does issue debt, the |
APPENDIX A - Page 16
Commission has the authority pursuant to a re-opener under RCW 80.04.210 limited to the consideration of additional ring-fencing provisions that may be appropriate.
Wa 12) | MEHC and PacifiCorp agree to use asymmetrical pricing for affiliate charges or costs not covered by the provisions of the InterCompany Administrative Services Agreement (IASA), if a readily identifiable market for the goods, services or assets exists, and if the transaction involves a cost of more than $500,000. |
Wa 13) | MEHC commits to provide shareholder funding to hire a consultant to study and design for possible implementation of an arrearage management project for low-income customers that could be made applicable to Washington and other states that PacifiCorp serves. PacifiCorp will provide a resource for facilitation of a working group to oversee the project. The study shall commence no later than one hundred eighty (180) days after close of the transaction and be completed, through the issuance of a formal report to the Commission, no later than three hundred sixty-five (365) days after close of the transaction. MEHC recognizes that such a program may have to be tailored to best fit the unique low-income environment of each individual state. The project will be developed by PacifiCorp in conjunction with the relevant regulatory and governmental agencies, low-income advocates, and other interested parties in each state that are interested in participating. The goals for the project will include reducing service terminations, reducing referral of delinquent customers to third party collection agencies, reducing collection litigation and reducing arrearages and increasing voluntary customer payments of arrearages. The costs of this study will be at least $66,000 on a Total Company basis paid for by shareholders. If fewer than six states participate, the amount of the shareholder funds will be reduced proportionally. |
Wa 14) | MEHC and PacifiCorp commit to a total contribution level for Washington low-income bill payment assistance in the amount of $80,000 annually, for a five-year period beginning July 1, 2006. The contributions may comprise contributions from corporate, employee, other sources and customer donations. The corporate contribution will be recorded in non-utility accounts. The contribution will be in addition to any funding provided through Schedule 91, Surcharge to Fund Low-Income Bill Assistance Program. Before the end of the five-year period, MEHC and PacifiCorp commit to work with low-income advocates and customer groups to evaluate additional matching contributions. |
Wa 15) | MEHC and PacifiCorp commit that, within sixty (60) days of the close of the transaction, PacifiCorp will initiate a collaborative effort with the Commission Staff, representatives of the Energy Project and other interested parties to track low-income issues by identifying and collecting data pertinent to low-income customers in PacifiCorp’s Washington service territory. |
APPENDIX A - Page 17
Wa 16 | The corporate headquarters of PacifiCorp will remain in Oregon and all books and records relevant to PacifiCorp’s regulated operations and these Commitments will be available in Portland. If corporate or senior managers, and related staff, are relocated from Oregon to Utah, the costs of relocation will not be included in Washington rates. |
Wa 17 | MEHC and PacifiCorp commit that they will interpret RCW 80.12.020 to require Commission approval of any transaction which results in a merger of PacifiCorp with, or acquisition by PacifiCorp of, any other electric, gas or telecommunications company, whether or not such other company provides service in Washington. |
Wa 18 | MEHC and PacifiCorp will file with the Commission, for cost allocation and affiliate transaction purposes, the IASA and any amendments filed pursuant to Commitment 13. Any proposed cost allocation methodology for the allocation of corporate and affiliate investments, expenses, and overheads shall comply with the principles set forth in Commitment 14. |
Wa 19 | The premium paid by MEHC for PacifiCorp (Acquisition Premium) will be excluded from the utility accounts of PacifiCorp and recorded on the books of PPW Holdings LLC. Through the consolidation of PPW Holdings LLC with MEHC for financial reporting, the Acquisition Premium will be reflected on the consolidated balance sheet of MEHC. MEHC and PacifiCorp commit that they will not propose to recover the Acquisition Premium in Washington, or include the Acquisition Premium in PacifiCorp’s results of operations; provided, however, that MEHC may request that this commitment be modified if a party in a proceeding before the Commission proposes an adjustment to PacifiCorp’s revenue requirement that MEHC and PacifiCorp assert violates the regulatory theory of the matching principle. If PacifiCorp seeks recovery of the Acquisition Premium, then other Parties are free to oppose such recovery, including the validity of the matching principle. |
Wa 20 | MEHC commits that no amendments, revisions or modifications will be made to the ring-fencing provisions of Commitment 11 b) without prior Commission approval pursuant to a limited re-opener under RCW 80.04.210 for the sole purpose of addressing the ring-fencing provisions. |
Wa 21 | PacifiCorp will provide to Staff and Public Counsel, on an informational basis, credit rating agency news releases and final reports regarding PacifiCorp when such reports are known to PacifiCorp and are available to the public. |
APPENDIX A - Page 18
Wa 22 | MEHC and PacifiCorp will provide Commission Staff access to operational, internal and risk audit reports and documentation. PacifiCorp and Commission Staff will establish an agreeable procedure to review these confidential documents and the timeline to provide an annual listing of such audits. |
Wa 23 | Berkshire Hathaway acknowledges the Commitments made by MEHC and PacifiCorp and will not impede satisfaction of the Commitments. Berkshire Hathaway acknowledges that it is bound by Commitments 4, 5 and 17 and that it is subject to Commitments that are applicable to the affiliates of PacifiCorp and MEHC; provided, however, that Berkshire Hathaway does not guarantee or agree to be responsible for performance of Commitments made by MEHC and PacifiCorp. |
Wa 24 | MEHC and PacifiCorp commit that PacifiCorp will not make any dividends to PPW Holdings LLC or MEHC if PacifiCorp’s unsecured debt rating is BBB- or lower by S & P or Fitch (or Baa3 or lower by Moody’s), as indicated by two of the three rating agencies. |
Wa 25 | MEHC and PacifiCorp commit to take actions described below to implement the Cascade Kraft Substation Outage and Power Quality Study dated January 10, 2005 (“Study”) in order to increase power quality and improve reliability to the Boise Cascade facility in Wallula, Washington. Boise Cascade LLC (“Boise”) will be responsible only for the costs of these actions to the extent they arise from changes to facilities owned by Boise rather than PacifiCorp. |
| a) | Actions. The following specific actions shall be taken by PacifiCorp: |
| 1) | No item number in Study: Complete the installation of upgraded transformer primary protection for PacifiCorp transformers located in the “Kraft Substation.” Installing “Transruptors” in place of fuses; |
| 2) | Item 2 in Study: Replace the PacifiCorp fixed capacitor banks located in the “Kraft Substation” with units that do not cause voltage transients when switched on and in addition mitigate harmonic currents and voltage distortion; |
| 3) | Item 5A in Study: Prepare an engineering study analyzing the cost of installation of adequate lightning protection to the 69 kV sub-transmission system that is interconnected to the “Kraft Substation;” |
| 4) | Item 5B in Study: Prepare an engineering study analyzing the cost of installation of adequate lightning protection to the 230 kV transmission system that is interconnected to the “Wallula Substation;” |
| 5) | Item 11 in Study: Control the vegetation near the 230 kV structures to prevent range fire damage to the structures; |
APPENDIX A - Page 19
| 6) | Item 12 in Study: Complete and continue the training of system operators to mitigate human errors; and |
| 7) | No item number in Study: Upgrade Dodd Road Substation facilities to reduce the potential for faults on the secondary that pull the voltage down on the primary for extended time periods. |
| b) | Engineering Review and Approval. The engineering and detailed designs for items 1, 2, and 7 shall be completed by PacifiCorp and provided to Boise for its approval no later than twelve (12) months after the close of the transaction. If a dispute arises between the parties in respect of any engineering approval required by the preceding sentence either party may apply to the Commission for an order resolving the dispute on the basis of whether the disputed aspect of PacifiCorp’s design provides a cost effective design that complies with good industrial electrical practices. |
| c) | Completion Dates. Items 1, 2, and 7 shall be completed no later than 12 months after Boise’s approval of PacifiCorp’s engineering and detailed design or the Commission’s resolution of any disputes that arise out of such review and approval process. The engineering studies required by items 3 and 4 shall be completed within 12 months after the close of the transaction and a report specifying the actions that PacifiCorp intends to take with respect to such items and the timing of completion thereof and the means of financing such work shall be supplied at such time to each of Boise and the Commission Staff. |
| d) | Cost Responsibility. All work described in paragraph (a) above shall be completed by PacifiCorp at its sole cost and expense and without additional charge to Boise. The cost of such actions may be included in base rates by PacifiCorp in PacifiCorp’s next filed rate case applicable to its Washington service area; provided that the cost of the studies provided for in items 3 and 4 shall not be added to base rates until a solution to the problem reasonably acceptable to Boise and the Commission Staff has been implemented. |
Wa 26) | MEHC and PacifiCorp acknowledge that the Commitments are being made by MEHC and PacifiCorp and are binding only upon them (and their affiliates where noted). MEHC and PacifiCorp are not requesting in this proceeding a determination of the prudence, just and reasonable character, rate or ratemaking treatment, or public interest of the investments, expenditures or actions referenced in the Commitments, and the Parties in appropriate proceedings may take such positions regarding the prudence, just and reasonable character, rate or ratemaking treatment, or public interest of the investments, expenditures or actions as they deem appropriate. |